Item 2. PROPERTIES
9K characters. Original on sec.gov · Markdown
Item 2. PROPERTIES
For information on our principal properties, see the energy center and in-service utility-related properties tables below. See also Liquidity and Capital Resources and Regulatory Matters in Management’s Discussion and Analysis of Financial Condition and Results of Operations under Part II, Item 7, of this report for a discussion of planned additions. See also Note 5 – Long-term Debt and Equity Financings and Note 14 – Commitments and Contingencies under Part II, Item 8, of this report.
The following table shows the anticipated capability of our energy centers at the time of the expected 2024 peak summer electrical demand for all energy centers owned as of December 31, 2023:
| Primary Fuel Source | Energy Center | Location | Net Kilowatt Capability**(a)** | ||||||||
| Ameren Missouri: | |||||||||||
| Coal | Labadie(b) | Franklin County, Missouri | 2,372,000 | ||||||||
| Rush Island(c) | Jefferson County, Missouri | 1,178,000 | |||||||||
| Sioux(d) | St. Charles County, Missouri | 972,000 | |||||||||
| Total coal | 4,522,000 | ||||||||||
| Nuclear | Callaway(e) | Callaway County, Missouri | 1,194,000 | ||||||||
| Hydroelectric | Osage(e) | Lakeside, Missouri | 235,000 | ||||||||
| Keokuk | Keokuk, Iowa | 148,000 | |||||||||
| Total hydroelectric | 383,000 | ||||||||||
| Pumped-storage | Taum Sauk(e) | Reynolds County, Missouri | 440,000 | ||||||||
| Wind | High Prairie Renewable | Adair and Schuyler Counties, Missouri | 400,000 | ||||||||
| Atchison Renewable | Atchison County, Missouri | 298,800 | |||||||||
| Total wind | 698,800 | ||||||||||
| Natural gas (CTs) | Audrain | Audrain County, Missouri | 608,000 | ||||||||
| Venice(f) | Venice, Illinois | 487,000 | |||||||||
| Goose Creek(f) | Piatt County, Illinois | 438,000 | |||||||||
| Pinckneyville(f) | Pinckneyville, Illinois | 316,000 | |||||||||
| Raccoon Creek(f) | Clay County, Illinois | 304,000 | |||||||||
| Kinmundy(f) | Kinmundy, Illinois | 210,000 | |||||||||
| Peno Creek | Bowling Green, Missouri | 172,000 | |||||||||
| Total natural gas | 2,535,000 | ||||||||||
| Oil (CTs) | Fairgrounds(g) | Jefferson City, Missouri | 55,000 | ||||||||
| Mexico(g) | Mexico, Missouri | 54,000 | |||||||||
| Moberly(g) | Moberly, Missouri | 54,000 | |||||||||
| Moreau(g) | Jefferson City, Missouri | 54,000 | |||||||||
| Total oil | 217,000 | ||||||||||
| Methane gas (CT) | Maryland Heights | Maryland Heights, Missouri | 9,000 | ||||||||
| Solar | Montgomery County | Montgomery County, Missouri | 5,700 | ||||||||
| O’Fallon | O’Fallon, Missouri | 4,500 | |||||||||
| BJC | St. Louis, Missouri | 1,600 | |||||||||
| Cape Girardeau | Cape Girardeau, Missouri | 1,200 | |||||||||
| Lambert | St. Louis County, Missouri | 900 | |||||||||
| Other Solar(h) | Various | 1,400 | |||||||||
| Total solar | 15,300 | ||||||||||
| Total Ameren Missouri | 10,014,100 | ||||||||||
| Ameren Illinois: | |||||||||||
| Solar | East St. Louis | East St. Louis, Illinois | 2,500 | ||||||||
| Total Ameren | 10,016,600 |
(a)Net kilowatt capability, except for wind and solar generating facilities, is the generating capacity available for dispatch from the energy center into the electric transmission grid. Capability for wind and solar generating facilities represents nameplate capacity. This capacity is only attainable when wind/solar conditions are sufficiently available. The on-demand capability for wind and solar units is zero.
(b)The Labadie Energy Center is scheduled to retire 1,186,000 kilowatts by 2036 and 1,186,000 kilowatts by 2042.
(c)The Rush Island Energy Center is scheduled to retire by October 15, 2024 per the remedy order of the United States District Court for the Eastern District of Missouri. For additional information, see NSR and Clean Air Act Litigation in Note 14 – Commitments and Contingencies under Part II, Item 8, of this report.
(d)As noted in the 2023 IRP, Ameren Missouri plans to extend the retirement date of the Sioux Energy Center from 2030 to 2032, which is subject to the approval of a change in depreciable lives of the energy center’s assets by the MoPSC.
(e)The operating licenses for the Callaway, Osage, and Taum Sauk energy centers expire in 2044, 2047, and 2044, respectively.
(f)The Venice Energy Center is scheduled to retire by the end of 2029 and the Goose Creek, Pinckneyville, Raccoon Creek, and Kinmundy energy centers are scheduled to retire by the end of 2039 as noted in the 2023 IRP. See Illinois Emissions Standards in Note 14 – Commitments and Contingencies under Part II, Item 8, of this report.
(g)The Fairgrounds, Mexico, Moberly, and Moreau energy centers are scheduled to be retired by the end of 2029 as noted in the 2023 IRP.
(h)Includes five solar energy centers that each have a nameplate capacity of 500 kilowatts or less.
The following table presents in-service electric and natural gas utility-related properties for Ameren Missouri and Ameren Illinois as of December 31, 2023:
| Ameren Missouri | Ameren Illinois | ||||||||||
| Circuit miles of electric transmission lines(a) | 3,140 | 4,761 | |||||||||
| Circuit miles of electric distribution lines | 33,927 | 45,984 | |||||||||
| Percentage of circuit miles of electric distribution lines underground | 24 | % | 16 | % | |||||||
| Miles of natural gas transmission and distribution mains | 3,532 | 18,713 | |||||||||
| Underground natural gas storage fields | — | 12 | |||||||||
| Total working capacity of underground natural gas storage fields in billion cubic feet | — | 24 |
(a)ATXI owns 561 circuit miles of electric transmission lines not reflected in this table.
Our other properties include office buildings, warehouses, garages, and repair shops.
With only a few exceptions, we have fee title to all principal energy centers and other units of property material to the operation of our businesses, and to the real property on which such facilities are located (subject to mortgage liens securing our outstanding first mortgage bonds and to certain permitted liens and judgment liens). The exceptions as of December 31, 2023 are as follows:
-
Certain property is situated on lands occupied under leases, easements, franchises, licenses, or permits. That property includes a portion of Ameren Missouri’s Osage Energy Center reservoir; certain facilities at Ameren Missouri’s Sioux Energy Center; most of Ameren Missouri’s High Prairie Renewable and Atchison Renewable energy centers; Ameren Missouri’s BJC, Cape Girardeau, Lambert, and Maryland Heights energy centers; certain substations; and most transmission and distribution lines and natural gas mains. The United States or the state of Missouri may own or may have paramount rights with respect to certain lands lying in the bed of the Osage River or located between the inner and outer harbor lines of the Mississippi River on which certain of Ameren Missouri’s energy centers and other properties are located.
-
The United States, the state of Illinois, the state of Iowa, or the city of Keokuk, Iowa, may own or may have paramount rights with respect to certain lands lying in the bed of the Mississippi River on which a portion of Ameren Missouri’s Keokuk Energy Center is located.
Substantially all of the properties and plant of Ameren Missouri and Ameren Illinois are subject to the liens of the indentures securing their respective mortgage bonds.
Previous: Item 1C. CYBERSECURITY · Next: Item 3. LEGAL PROCEEDINGS