American Electric Power 10-K 2021-12-31

Filed 2022-02-24. 23 sections, 2040K characters. Original on sec.gov · Markdown · JSON

What changed since the 2020-12-31 10-KNew, removed and reworded risk factor headings, then every item sentence by sentence.

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON**, D.C. 20549**

FORM 10-K

(Mark One)

☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2021

or

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from __________ to_________

CommissionRegistrants;I.R.S. Employer
File NumberAddress and Telephone NumberStates of IncorporationIdentification Nos.
1-3525AMERICAN ELECTRIC POWER CO INC.New York13-4922640
333-221643AEP TEXAS INC.Delaware51-0007707
333-217143AEP TRANSMISSION COMPANY, LLCDelaware46-1125168
1-3457APPALACHIAN POWER COMPANYVirginia54-0124790
1-3570INDIANA MICHIGAN POWER COMPANYIndiana35-0410455
1-6543OHIO POWER COMPANYOhio31-4271000
0-343PUBLIC SERVICE COMPANY OF OKLAHOMAOklahoma73-0410895
1-3146SOUTHWESTERN ELECTRIC POWER COMPANYDelaware72-0323455
1 Riverside Plaza,Columbus,Ohio43215-2373
Telephone(614)716-1000

Securities registered pursuant to Section 12(b) of the Act:

RegistrantTitle of each classTrading SymbolName of Each Exchange on Which Registered
American Electric Power Company Inc.Common Stock, $6.50 par valueAEPThe NASDAQ Stock Market LLC
American Electric Power Company Inc.6.125% Corporate UnitsAEPPLThe NASDAQ Stock Market LLC
American Electric Power Company Inc.6.125% Corporate UnitsAEPPZThe NASDAQ Stock Market LLC

Securities registered pursuant to Section 12(g) of the Act: None

Indicate by check mark if the registrant American Electric Power Company, Inc., AEP Texas Inc., AEP Transmission Company, LLC, Appalachian Power Company, Ohio Power Company and Southwestern Electric Power Company, are well-known seasoned issuers, as defined in Rule 405 of the Securities Act.YesxNo¨
Indicate by check mark if the registrants Indiana Michigan Power Company and Public Service Company of Oklahoma, are well-known seasoned issuers, as defined in Rule 405 of the Securities Act.Yes¨Nox
Indicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act.Yes¨Nox
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days.YesxNo¨
Indicate by check mark whether the registrants have submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).YesxNo¨
Indicate by check mark whether American Electric Power Company, Inc. is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large Accelerated filerxAccelerated filer☐Non-accelerated filer☐
Smaller reporting company☐Emerging growth company☐
Indicate by check mark whether AEP Texas Inc., AEP Transmission Company, LLC, Appalachian Power Company, Indiana Michigan Power Company, Ohio Power Company, Public Service Company of Oklahoma and Southwestern Electric Power Company are large accelerated filers, accelerated filers, non-accelerated filers, smaller reporting companies, or emerging growth companies. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large Accelerated filer☐Accelerated filer☐Non-accelerated filerx
Smaller reporting company☐Emerging growth company☐
If an emerging growth company, indicate by check mark if the registrants have elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.
☒
Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Exchange Act).Yes☐Nox

AEP Texas Inc., AEP Transmission Company, LLC, Appalachian Power Company, Indiana Michigan Power Company, Ohio Power Company, Public Service Company of Oklahoma and Southwestern Electric Power Company meet the conditions set forth in General Instruction I(1)(a) and (b) of Form 10-K and are therefore filing this Form 10-K with the reduced disclosure format specified in General Instruction I(2) to such Form 10-K.

Aggregate Market Value of Voting and Non-Voting Common Equity Held by Nonaffiliates of the Registrants as of June 30, 2021 the Last Trading Date of the Registrants' Most Recently Completed Second Fiscal QuarterNumber of Shares of Common Stock Outstanding of the Registrants as of December 31, 2021
American Electric Power Company, Inc.$42,651,294,349504,212,015
($6.50 par value)
AEP Texas Inc.None100
($0.01 par value)
AEP Transmission Company, LLC (a)NoneNA
Appalachian Power CompanyNone13,499,500
(no par value)
Indiana Michigan Power CompanyNone1,400,000
(no par value)
Ohio Power CompanyNone27,952,473
(no par value)
Public Service Company of OklahomaNone9,013,000
($15 par value)
Southwestern Electric Power CompanyNone3,680
($18 par value)

(a)100% interest is held by AEP Transmission Holdco.

NA Not applicable.

Note on Market Value of Common Equity Held by Nonaffiliates

American Electric Power Company, Inc. owns all of the common stock of AEP Texas Inc., Appalachian Power Company, Indiana Michigan Power Company, Ohio Power Company, Public Service Company of Oklahoma and Southwestern Electric Power Company and, indirectly, all of the LLC membership interest in AEP Transmission Company, LLC (see Item 12 herein).

Documents Incorporated By Reference

DescriptionPart of Form 10-K into which Document is Incorporated
Portions of Annual Reports of the following companies for the fiscal year ended December 31, 2021:Part II
American Electric Power Company, Inc.
AEP Texas Inc.
AEP Transmission Company, LLC
Appalachian Power Company
Indiana Michigan Power Company
Ohio Power Company
Public Service Company of Oklahoma
Southwestern Electric Power Company
Portions of Proxy Statement of American Electric Power Company, Inc. for 2022 Annual Meeting of Shareholders.Part III

This combined Form 10-K is separately filed by American Electric Power Company, Inc., AEP Texas Inc., AEP Transmission Company, LLC, Appalachian Power Company, Indiana Michigan Power Company, Ohio Power Company, Public Service Company of Oklahoma and Southwestern Electric Power Company. Information contained herein relating to any individual registrant is filed by such registrant on its own behalf. Except for American Electric Power Company, Inc., each registrant makes no representation as to information relating to the other registrants.

You can access financial and other information at AEP’s website, including AEP’s Principles of Business Conduct, certain committee charters and Principles of Corporate Governance. The address is www.AEP.com. Investors can obtain copies of our SEC filings from this site free of charge, as well as from the SEC website at www.sec.gov.

TABLE OF CONTENTS

Item NumberPage Number
Glossary of Termsi
Forward-Looking Informationvii
PART I
1Business
General1
Business Segments18
Vertically Integrated Utilities18
Transmission and Distribution Utilities25
AEP Transmission Holdco27
Generation & Marketing31
Executive Officers of AEP34
1ARisk Factors35
1BUnresolved Staff Comments48
2Properties48
Generation Facilities48
Transmission and Distribution Facilities53
Title to Property54
System Transmission Lines and Facility Siting54
Construction Program54
Potential Uninsured Losses54
3Legal Proceedings54
4Mine Safety Disclosure55
PART II
5Market for Registrants’ Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities56
6Reserved57
7Management’s Discussion and Analysis of Financial Condition and Results of Operations57
7AQuantitative and Qualitative Disclosures about Market Risk57
8Financial Statements and Supplementary Data57
9Changes i****n and Disagreements with Accountants on Accounting and Financial Disclosure424
9AControls and Procedures424
9BOther Information424
9CDisclosure Regarding Foreign Jurisdictions that Prevent Inspections424
PART III
10Directors, Executive Officers and Corporate Governance425
11Executive Compensation425
12Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters426
13Certain Relationships and Related Transactions and Director Independence426
14Principal Accounting Fees and Services427
PART IV
15Exhibits and Financial Statement Schedules
Financial Statements428
16Form 10-K Summary429
Signatures430
Index of Financial Statement SchedulesS-1
Report of Independent Registered Public Accounting FirmS-2
Exhibit IndexE-1

GLOSSARY OF TERMS

When the following terms and abbreviations appear in the text of this report, they have the meanings indicated below.

TermMeaning
AEGCoAEP Generating Company, an AEP electric utility subsidiary.
AEPAmerican Electric Power Company, Inc., an investor-owned electric public utility holding company which includes American Electric Power Company, Inc. (Parent) and majority-owned consolidated subsidiaries and consolidated affiliates.
AEP CreditAEP Credit, Inc., a consolidated VIE of AEP which securitizes accounts receivable and accrued utility revenues for affiliated electric utility companies.
AEP East CompaniesAPCo, I&M, KGPCo, KPCo, OPCo and WPCo.
AEP EnergyAEP Energy, Inc., a wholly-owned retail electric supplier for customers in Ohio, Illinois and other deregulated electricity markets throughout the United States.
AEP Energy Supply, LLCA nonregulated holding company for AEP’s competitive generation, wholesale and retail businesses, and a wholly-owned subsidiary of AEP.
AEP OnSite PartnersA division of AEP Energy Supply, LLC that builds, owns, operates and maintains customer solutions utilizing existing and emerging distributed technologies.
AEP RenewablesA division of AEP Energy Supply, LLC that develops and/or acquires large scale renewable projects that are backed with long-term contracts with creditworthy counter parties.
AEP SystemAmerican Electric Power System, an electric system, owned and operated by AEP subsidiaries.
AEP TexasAEP Texas Inc., an AEP electric utility subsidiary.
AEP Transmission HoldcoAEP Transmission Holding Company, LLC, a wholly-owned subsidiary of AEP.
AEP UtilitiesAEP Utilities, Inc., a former subsidiary of AEP and holding company for TCC, TNC and CSW Energy, Inc. Effective December 31, 2016, TCC and TNC were merged into AEP Utilities, Inc. Subsequently following this merger, the assets and liabilities of CSW Energy, Inc. were transferred to a competitive affiliate company and AEP Utilities, Inc. was renamed AEP Texas Inc.
AEP Wind Holdings LLCAcquired in April 2019 as Sempra Renewables LLC, develops, owns and operates, or holds interests in, wind generation facilities in the United States.
AEPEPAEP Energy Partners, Inc., a subsidiary of AEP dedicated to wholesale marketing and trading, hedging activities, asset management and commercial and industrial sales in deregulated markets.
AEPROAEP River Operations, LLC, a commercial barge operation sold in November 2015.
AEPSCAmerican Electric Power Service Corporation, an AEP service subsidiary providing management and professional services to AEP and its subsidiaries.
AEPTCoAEP Transmission Company, LLC, a wholly-owned subsidiary of AEP Transmission Holdco, is an intermediate holding company that owns the State Transcos.
AEPTCo ParentAEP Transmission Company, LLC, the holding company of the State Transcos within the AEPTCo consolidation.
AEPTHCoAEP Transmission Holding Company, LLC, a subsidiary of AEP, an intermediate holding company that owns transmission operations joint ventures and AEPTCo.
AFUDCAllowance for Equity Funds Used During Construction.
AGRAEP Generation Resources Inc., a competitive AEP subsidiary in the Generation & Marketing segment.
ALJAdministrative Law Judge.
AMIAdvanced Metering Infrastructure.
AOCIAccumulated Other Comprehensive Income.

i

TermMeaning
APCoAppalachian Power Company, an AEP electric utility subsidiary.
Appalachian Consumer Rate Relief FundingAppalachian Consumer Rate Relief Funding LLC, a wholly-owned subsidiary of APCo and a consolidated VIE formed for the purpose of issuing and servicing securitization bonds related to the under-recovered ENEC deferral balance.
APTCoAEP Appalachian Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
APSCArkansas Public Service Commission.
ARAMAverage Rate Assumption Method, an IRS approved method used to calculate the reversal of Excess ADIT for rate-making purposes.
AROAsset Retirement Obligations.
ASUAccounting Standards Update.
ATMAt-the-Market
CAAClean Air Act.
CARES ActCoronavirus Aid, Relief, and Economic Security Act signed into law in March 2020.
CCRCoal Combustion Residual.
CLECOCentral Louisiana Electric Company, a nonaffiliated utility company.
CO2Carbon dioxide and other greenhouse gases.
Conesville PlantA retired, single unit coal-fired generation plant totaling 651 MW located in Conesville, Ohio. The plant was jointly-owned by AGR and a nonaffiliate.
Cook PlantDonald C. Cook Nuclear Plant, a two-unit, 2,296 MW nuclear plant owned by I&M.
COVID-19Coronavirus 2019, a highly infectious respiratory disease. In March 2020, the World Health Organization declared COVID-19 a worldwide pandemic.
CRES providerCompetitive Retail Electric Service providers under Ohio law that target retail customers by offering alternative generation service.
CSAPRCross-State Air Pollution Rule.
CSPCoColumbus Southern Power Company, a former AEP electric utility subsidiary that was merged into OPCo effective December 31, 2011.
CWAClean Water Act.
CWIPConstruction Work in Progress.
DCC FuelDCC Fuel IX , DCC Fuel X, DCC Fuel XI, DCC Fuel XII, DCC Fuel XIII, DCC Fuel XIV, DCC Fuel XV, and DCC Fuel XVI consolidated VIEs formed for the purpose of acquiring, owning and leasing nuclear fuel to I&M.
Desert SkyDesert Sky Wind Farm LLC, a 170 MW wind electricity generation facility located on Indian Mesa in Pecos County, Texas in which AEP owns a 100% interest.
DHLCDolet Hills Lignite Company, LLC, a wholly-owned lignite mining subsidiary of SWEPCo.
DIRDistribution Investment Rider.
DOEU. S. Department of Energy.
EISEnergy Insurance Services, Inc., a nonaffiliated captive insurance company and consolidated VIE of AEP.
ELGEffluent Limitation Guidelines.
ENECExpanded Net Energy Cost.
Energy SupplyAEP Energy Supply LLC, a nonregulated holding company for AEP’s competitive generation, wholesale and retail businesses, and a wholly-owned subsidiary of AEP.
Equity UnitsAEP’s Equity Units issued in August 2020 and March 2019.
ERCOTElectric Reliability Council of Texas regional transmission organization.
ESPElectric Security Plans, a PUCO requirement for electric utilities to adjust their rates by filing with the PUCO.

ii

TermMeaning
ETTElectric Transmission Texas, LLC, an equity interest joint venture between AEP Transmission Holdco and Berkshire Hathaway Energy Company formed to own and operate electric transmission facilities in ERCOT.
Excess ADITExcess accumulated deferred income taxes.
FACFuel Adjustment Clause.
FASBFinancial Accounting Standards Board.
Federal EPAUnited States Environmental Protection Agency.
FERCFederal Energy Regulatory Commission.
FGDFlue Gas Desulfurization or scrubbers.
FIPFederal Implementation Plan.
FTRFinancial Transmission Right, a financial instrument that entitles the holder to receive compensation for certain congestion-related transmission charges that arise when the power grid is congested resulting in differences in locational prices.
GAAPAccounting Principles Generally Accepted in the United States of America.
Global SettlementIn February 2017, the PUCO approved a settlement agreement filed by OPCo in December 2016 which resolved all remaining open issues on remand from the Supreme Court of Ohio in OPCo’s 2009 - 2011 and June 2012 - May 2015 ESP filings. It also resolved all open issues in OPCo’s 2009, 2014 and 2015 SEET filings and 2009, 2012 and 2013 FAC Audits.
I&MIndiana Michigan Power Company, an AEP electric utility subsidiary.
IMTCoAEP Indiana Michigan Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
IRSInternal Revenue Service.
ITCInvestment Tax Credit.
IURCIndiana Utility Regulatory Commission.
KGPCoKingsport Power Company, an AEP electric utility subsidiary.
KPCoKentucky Power Company, an AEP electric utility subsidiary.
KPSCKentucky Public Service Commission.
KTCoAEP Kentucky Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
kVKilovolt.
KWhKilowatt-hour.
LibertyLiberty Utilities Co., a subsidiary of Algonquin Power & Utilities Corporation.
LPSCLouisiana Public Service Commission.
MATSMercury and Air Toxic Standards.
MaverickMaverick, part of the North Central Wind Energy Facilities, consists of 287 MWs of wind generation in Oklahoma.
MISOMidcontinent Independent System Operator.
MMBtuMillion British Thermal Units.
MPSCMichigan Public Service Commission.
MTMMark-to-Market.
MWMegawatt.
MWhMegawatt-hour.
NAAQSNational Ambient Air Quality Standards.
NERCNorth American Electric Reliability Corporation.
Nonutility Money PoolCentralized funding mechanism AEP uses to meet the short-term cash requirements of certain nonutility subsidiaries.

iii

TermMeaning
NCWFNorth Central Wind Energy Facilities, a joint PSO and SWEPCo project, which includes three Oklahoma wind facilities totaling approximately 1,484 MWs of wind generation.
NOLNet operating losses.
NOxNitrogen oxide.
NPDESNational Pollutant Discharge Elimination System.
NRCNuclear Regulatory Commission.
NSRNew Source Review.
OATTOpen Access Transmission Tariff.
OCCCorporation Commission of the State of Oklahoma.
OHTCoAEP Ohio Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
Oklaunion Power StationA retired, single unit coal-fired generation plant totaling 650 MW located in Vernon, Texas. The plant was jointly-owned by AEP Texas, PSO and certain nonaffiliated entities.
OKTCoAEP Oklahoma Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
OPCoOhio Power Company, an AEP electric utility subsidiary.
OPEBOther Postretirement Benefits.
Operating AgreementAgreement, dated January 1, 1997, as amended, by and among PSO and SWEPCo governing generating capacity allocation, energy pricing, and revenues and costs of third-party sales. AEPSC acts as the agent.
OTCOver-the-counter.
OVECOhio Valley Electric Corporation, which is 43.47% owned by AEP.
ParentAmerican Electric Power Company, Inc., the equity owner of AEP subsidiaries within the AEP consolidation.
PATH-WVPATH West Virginia Transmission Company, LLC, a joint venture-owned 50% by FirstEnergy and 50% by AEP.
PCAPower Coordination Agreement among APCo, I&M, KPCo and WPCo.
PFDProposal for Decision.
PJMPennsylvania – New Jersey – Maryland regional transmission organization.
PMParticulate Matter.
PPAPurchase Power and Sale Agreement.
PSOPublic Service Company of Oklahoma, an AEP electric utility subsidiary.
PTCProduction Tax Credits.
PUCOPublic Utilities Commission of Ohio.
PUCTPublic Utility Commission of Texas.
RacineA generation plant consisting of two hydroelectric generating units totaling 48 MWs located in Racine, Ohio and formerly owned by AGR. Racine was sold to a nonaffiliate in December 2021.
Registrant SubsidiariesAEP subsidiaries which are SEC registrants: AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo.
RegistrantsSEC registrants: AEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo.
REPTexas Retail Electric Provider.
Restoration FundingAEP Texas Restoration Funding LLC, a wholly-owned subsidiary of AEP Texas and a consolidated VIE formed for the purpose of issuing and servicing securitization bonds related to storm restoration in Texas primarily caused by Hurricane Harvey.
Risk Management ContractsTrading and non-trading derivatives, including those derivatives designated as cash flow and fair value hedges.

iv

TermMeaning
Rockport PlantA generation plant, consisting of two 1,310 MW coal-fired generating units near Rockport, Indiana. AEGCo and I&M jointly-own Unit 1. In 1989, AEGCo and I&M entered into a sale-and-leaseback transaction with Wilmington Trust Company, an unrelated, unconsolidated trustee for Rockport Plant, Unit 2.
ROEReturn on Equity.
RPMReliability Pricing Model.
RTORegional Transmission Organization, responsible for moving electricity over large interstate areas.
SabineSabine Mining Company, a lignite mining company that is a consolidated VIE for AEP and SWEPCo.
Santa Rita EastSanta Rita East Wind Holdings, LLC, a consolidated VIE whose sole purpose is to own and operate a 302 MW wind generation facility in west Texas in which AEP owns an 85% interest.
SECU.S. Securities and Exchange Commission.
SEETSignificantly Excessive Earnings Test.
Sempra Renewables LLCSempra Renewables LLC, acquired in April 2019 (subsequently renamed as AEP Wind Holdings LLC), consists of 724 MWs of wind generation and battery assets in the United States.
SIASystem Integration Agreement, effective June 15, 2000, as amended, provides contractual basis for coordinated planning, operation and maintenance of the power supply sources of the combined AEP.
SIPState Implementation Plan.
SNFSpent Nuclear Fuel.
SO2Sulfur dioxide.
SPPSouthwest Power Pool regional transmission organization.
SSOStandard service offer.
State TranscosAEPTCo’s seven wholly-owned, FERC regulated, transmission only electric utilities, which are geographically aligned with AEP's existing utility operating companies.
SundanceSundance, acquired in April 2021 as part of the North Central Wind Energy Facilities, consists of 199 MWs of wind generation in Oklahoma.
SWEPCoSouthwestern Electric Power Company, an AEP electric utility subsidiary.
SWTCoAEP Southwestern Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.
TATransmission Agreement, effective November 2010, among APCo, I&M, KGPCo, KPCo, OPCo and WPCo with AEPSC as agent.
Tax ReformOn December 22, 2017, President Trump signed into law legislation referred to as the “Tax Cuts and Jobs Act” (the TCJA). The TCJA includes significant changes to the Internal Revenue Code of 1986, including a reduction in the corporate federal income tax rate from 35% to 21% effective January 1, 2018.
TCATransmission Coordination Agreement dated January 1, 1997, by and among, PSO, SWEPCo and AEPSC, in connection with the operation of the transmission assets of the two public utility subsidiaries.
TCCFormerly AEP Texas Central Company; now a division of AEP Texas.
Texas Restructuring LegislationLegislation enacted in 1999 to restructure the electric utility industry in Texas.
TNCFormerly AEP Texas North Company; now a division of AEP Texas.
Transition FundingAEP Texas Central Transition Funding II LLC and AEP Texas Central Transition Funding III LLC, wholly-owned subsidiaries of TCC and consolidated VIE formed for the purpose of issuing and servicing securitization bonds related to Texas Restructuring Legislation. In July 2020, the final AEP Texas Central Transition Funding II LLC securitization bond matured.

v

TermMeaning
Transource EnergyTransource Energy, LLC, a consolidated VIE formed for the purpose of investing in utilities which develop, acquire, construct, own and operate transmission facilities in accordance with FERC-approved rates.
TraverseTraverse, part of the North Central Wind Energy Facilities, consists of 998 MWs of wind generation in Oklahoma.
TrentTrent Wind Farm LLC, a 156 MW wind electricity generation facility located between Abilene and Sweetwater in west Texas in which AEP owns a 100% interest.
Turk PlantJohn W. Turk, Jr. Plant, a 650 MW coal-fired plant in Arkansas that is 73% owned by SWEPCo.
UMWAUnited Mine Workers of America.
UPAUnit Power Agreement.
Utility Money PoolCentralized funding mechanism AEP uses to meet the short-term cash requirements of certain utility subsidiaries.
VIEVariable Interest Entity.
Virginia SCCVirginia State Corporation Commission.
WPCoWheeling Power Company, an AEP electric utility subsidiary.
WVPSCPublic Service Commission of West Virginia.
WVTCoAEP West Virginia Transmission Company, Inc., a wholly-owned AEPTCo transmission subsidiary.

vi

FORWARD-LOOKING INFORMATION

This report made by the Registrants contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Many forward-looking statements appear in “Item 7 – Management’s Discussion and Analysis of Financial Condition and Results of Operations,” but there are others throughout this document which may be identified by words such as “expect,” “anticipate,” “intend,” “plan,” “believe,” “will,” “should,” “could,” “would,” “project,” “continue” and similar expressions, and include statements reflecting future results or guidance and statements of outlook. These matters are subject to risks and uncertainties that could cause actual results to differ materially from those projected. Forward-looking statements in this document are presented as of the date of this document. Except to the extent required by applicable law, management undertakes no obligation to update or revise any forward-looking statement. Among the factors that could cause actual results to differ materially from those in the forward-looking statements are:

•Changes in economic conditions, electric market demand and demographic patterns in AEP service territories.
•The impact of pandemics, including COVID-19, and any associated disruption of AEP’s business operations due to impacts on economic or market conditions, costs of compliance with potential vaccination or testing mandates to AEP, electricity usage, supply chain issues, employees including employee reactions to potential vaccination mandates, customers, service providers, vendors and suppliers.
•Inflationary or deflationary interest rate trends.
•Volatility in the financial markets, particularly developments affecting the availability or cost of capital to finance new capital projects and refinance existing debt.
•The availability and cost of funds to finance working capital and capital needs, particularly (i) if expected sources of capital, such as proceeds from the sale of assets or subsidiaries, do not materialize, and (ii) during periods when the time lag between incurring costs and recovery is long and the costs are material.
•Decreased demand for electricity.
•Weather conditions, including storms and drought conditions, and the ability to recover significant storm restoration costs.
•The cost of fuel and its transportation, the creditworthiness and performance of fuel suppliers and transporters and the cost of storing and disposing of used fuel, including coal ash and SNF.
•The availability of fuel and necessary generation capacity and the performance of generation plants.
•The ability to recover fuel and other energy costs through regulated or competitive electric rates.
•The ability to transition from fossil generation and the ability to build or acquire renewable generation, transmission lines and facilities (including the ability to obtain any necessary regulatory approvals and permits) when needed at acceptable prices and terms, including favorable tax treatment, and to recover those costs.
•New legislation, litigation and government regulation, including changes to tax laws and regulations, oversight of nuclear generation, energy commodity trading and new or heightened requirements for reduced emissions of sulfur, nitrogen, mercury, carbon, soot or PM and other substances that could impact the continued operation, cost recovery and/or profitability of generation plants and related assets.
•The risks associated with fuels used before, during and after the generation of electricity, including coal ash and nuclear fuel.
•Timing and resolution of pending and future rate cases, negotiations and other regulatory decisions, including rate or other recovery of new investments in generation, distribution and transmission service and environmental compliance.
•Resolution of litigation.
•The ability to constrain operation and maintenance costs.
•Prices and demand for power generated and sold at wholesale.
•Changes in technology, particularly with respect to energy storage and new, developing, alternative or distributed sources of generation.
•The ability to recover through rates any remaining unrecovered investment in generation units that may be retired before the end of their previously projected useful lives.
•Volatility and changes in markets for coal and other energy-related commodities, particularly changes in the price of natural gas.

vii

•Changes in utility regulation and the allocation of costs within RTOs including ERCOT, PJM and SPP.
•Changes in the creditworthiness of the counterparties with contractual arrangements, including participants in the energy trading market.
•Actions of rating agencies, including changes in the ratings of debt.
•The impact of volatility in the capital markets on the value of the investments held by the pension, OPEB, captive insurance entity and nuclear decommissioning trust and the impact of such volatility on future funding requirements.
•Accounting standards periodically issued by accounting standard-setting bodies.
•Other risks and unforeseen events, including wars, the effects of terrorism (including increased security costs), embargoes, naturally occurring and human-caused fires, cyber security threats and other catastrophic events.
•The ability to attract and retain the requisite work force and key personnel.

The forward-looking statements of the Registrants speak only as of the date of this report or as of the date they are made. The Registrants expressly disclaim any obligation to update any forward-looking information, except as required by law. For a more detailed discussion of these factors, see “Risk Factors” in Part I of this report.

The Registrants may use AEP’s website as a distribution channel for material company information. Financial and other important information regarding the Registrants is routinely posted on and accessible through AEP’s website at www.aep.com/investors/. In addition, you may automatically receive email alerts and other information about the Registrants when you enroll your email address by visiting the “Email Alerts” section at www.aep.com/investors/.

Company Website and Availability of SEC Filings

Our principal corporate website address is www.aep.com. Information on our website is not incorporated by reference herein and is not part of this Form 10-K. We make available free of charge through our website our Annual Report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act as soon as reasonably practicable after such documents are electronically filed with, or furnished to, the SEC. The SEC maintains a website at www.sec.gov that contains reports, proxy and information statements and other information regarding AEP.

viii

PART I

Item 1. BUSINESS

GENERAL

Overview and Description of Major Subsidiaries

AEP was incorporated under the laws of the State of New York in 1906 and reorganized in 1925. It is a public utility holding company that owns, directly or indirectly, all of the outstanding common stock of its public utility subsidiaries and varying percentages of other subsidiaries.

The service areas of AEP’s public utility subsidiaries cover portions of the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. Transmission networks are interconnected with extensive distribution facilities in the territories served. The public utility subsidiaries of AEP have traditionally provided electric service, consisting of generation, transmission and distribution, on an integrated basis to their retail customers. Restructuring laws in Michigan, Ohio and the ERCOT area of Texas have caused AEP public utility subsidiaries in those states to unbundle previously integrated regulated rates for their retail customers.

The member companies of the AEP System have contractual, financial and other business relationships with the other member companies, such as participation in the AEP System savings and retirement plans and tax returns, sales of electricity and transportation and handling of fuel. The companies of the AEP System also obtain certain accounting, administrative, information systems, engineering, financial, legal, maintenance and other services at cost from a common provider, AEPSC.

As of December 31, 2021, the subsidiaries of AEP had a total of 16,688 employees. Because it is a holding company rather than an operating company, AEP has no employees. The material subsidiaries of AEP are as follows:

AEP Texas

Organized in Delaware in 1925, AEP Texas is engaged in the transmission and distribution of electric power to approximately 1,082,000 retail customers through REPs in west, central and southern Texas. As of December 31, 2021, AEP Texas had 1,575 employees. Among the principal industries served by AEP Texas are petroleum and coal products manufacturing, chemical manufacturing, oil and gas extraction, pipeline transportation and support activities for mining. The territory served by AEP Texas also includes several military installations. AEP Texas is a member of ERCOT. AEP Texas is part of AEP’s Transmission and Distribution Utilities segment.

AEPTCo

Organized in Delaware in 2006, AEPTCo is a holding company for the State Transcos. The State Transcos develop and own new transmission assets that are physically connected to the AEP System. Individual State Transcos (a) have obtained the approvals necessary to operate in Indiana, Kentucky, Michigan, Ohio, Oklahoma and West Virginia, subject to any applicable siting requirements, (b) are authorized to submit projects for commission approval in Virginia and (c) have been granted consent to enter into a joint license agreement that will support investment in Tennessee. Neither AEPTCo nor its subsidiaries have any employees. Instead, AEPSC and certain AEP utility subsidiaries provide services to these entities. AEPTCo is part of the AEP Transmission Holdco segment.

APCo

Organized in Virginia in 1926, APCo is engaged in the generation, transmission and distribution of electric power to approximately 966,000 retail customers in the southwestern portion of Virginia and southern West Virginia, and in supplying and marketing electric power at wholesale to other electric utility companies, municipalities and other market participants. APCo owns 6,681 MWs of generating capacity. APCo uses its generation to serve its retail and other customers. As of December 31, 2021, APCo had 1,617 employees. Among the principal industries served by APCo are coal-mining, primary metals, pipeline transportation, chemical manufacturing and paper manufacturing. APCo is a member of PJM. APCo is part of AEP’s Vertically Integrated Utilities segment.

I&M

Organized in Indiana in 1907, I&M is engaged in the generation, transmission and distribution of electric power to approximately 607,000 retail customers in northern and eastern Indiana and southwestern Michigan, and in supplying and marketing electric power at wholesale to other electric utility companies, rural electric cooperatives, municipalities and other market participants. I&M owns or leases 3,662 MWs of generating capacity, which it uses to serve its retail and other customers. As of December 31, 2021, I&M had 1,978 employees. Among the principal industries served are primary metals, transportation equipment, chemical manufacturing, plastics and rubber products and fabricated metal product manufacturing. I&M is a member of PJM. I&M is part of AEP’s Vertically Integrated Utilities segment.

KPCo

Organized in Kentucky in 1919, KPCo is engaged in the generation, transmission and distribution of electric power to approximately 165,000 retail customers in eastern Kentucky, and in supplying and marketing electric power at wholesale to other electric utility companies, municipalities and other market participants. KPCo owns 1,075 MWs of generating capacity. KPCo uses its generation to serve its retail and other customers. As of December 31, 2021, KPCo had 433 employees. Among the principal industries served are petroleum and coal products manufacturing, chemical manufacturing, coal-mining, oil and gas extraction and pipeline transportation. KPCo is a member of PJM. KPCo is part of AEP’s Vertically Integrated Utilities segment. In October 2021, AEP entered into a Stock Purchase Agreement to sell KPCo to Liberty Utilities Co. Subject to satisfying closing conditions and obtaining regulatory approvals, the sale is expected to close in the second quarter of 2022. See “Disposition of KPCo and KTCo” section of Note 7 for additional information.

KGPCo

Organized in Virginia in 1917, KGPCo provides electric service to approximately 49,000 retail customers in Kingsport and eight neighboring communities in northeastern Tennessee. KGPCo does not own any generating facilities and is a member of PJM. It purchases electric power from APCo for distribution to its customers. As of December 31, 2021, KGPCo had 54 employees. KGPCo is part of AEP’s Vertically Integrated Utilities segment.

OPCo

Organized in Ohio in 1907 and re-incorporated in 1924, OPCo is engaged in the transmission and distribution of electric power to approximately 1,515,000 retail customers in Ohio. OPCo purchases energy and capacity at auction to serve generation service customers who have not switched to a competitive generation supplier. As of December 31, 2021, OPCo had 1,694 employees. Among the principal industries served by OPCo are primary metals, petroleum and coal products manufacturing, plastics and rubber products, chemical manufacturing, pipeline transportation and data centers. OPCo is a member of PJM. OPCo is part of AEP’s Transmission and Distribution Utilities segment.

PSO

Organized in Oklahoma in 1913, PSO is engaged in the generation, transmission and distribution of electric power to approximately 570,000 retail customers in eastern and southwestern Oklahoma, and in supplying and marketing electric power at wholesale to other electric utility companies, municipalities, rural electric cooperatives and other market participants. PSO owns 3,931 MWs of generating capacity, which it uses to serve its retail and other customers. As of December 31, 2021, PSO had 1,018 employees. Among the principal industries served by PSO are paper manufacturing, oil and gas extraction, petroleum and coal products manufacturing, plastics and rubber products and pipeline transportation. PSO is a member of SPP. PSO is part of AEP’s Vertically Integrated Utilities segment.

SWEPCo

Organized in Delaware in 1912, SWEPCo is engaged in the generation, transmission and distribution of electric power to approximately 548,000 retail customers in northeastern and

Showing the first 8K of 140K characters. Open the full section

Item 1A. RISK FACTORS

GENERAL RISKS OF REGULATED OPERATIONS

AEP may not be able to recover the costs of substantial planned investment in capital improvements and additions. (Applies to all Registrants)

AEP’s business plan calls for extensive investment in capital improvements and additions, including the construction of additional transmission and renewable generation facilities, modernizing existing infrastructure, installation of environmental upgrades and retrofits as well as other initiatives. AEP’s public utility subsidiaries currently provide service at rates approved by one or more regulatory commissions. If these regulatory commissions do not approve adjustments to the rates charged, affected AEP subsidiaries would not be able to recover the costs associated with their investments. This would cause financial results to be diminished.

Regulated electric revenues and earnings are dependent on federal and state regulation that may limit AEP’s ability to recover costs and other amounts. (Applies to all Registrants)

The rates customers pay to AEP regulated utility businesses are subject to approval by the FERC and the respective state utility commissions of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. In certain instances, AEP’s applicable regulated utility businesses may agree to negotiated settlements related to various rate matters that are subject to regulatory approval. AEP cannot predict the ultimate outcomes of any settlements or the actions by the FERC or the respective state commissions in establishing rates.

If regulated utility earnings exceed the returns established by the relevant commissions, retail electric rates may be subject to review and possible reduction by the commissions, which may decrease future earnings. Additionally, if regulatory bodies do not allow recovery of costs incurred in providing service on a timely basis, it could reduce future net income and cash flows and negatively impact financial condition. Similarly, if recovery or other rate relief authorized in the past is overturned or reversed on appeal, future earnings could be negatively impacted. Any regulatory action or litigation outcome that triggers a reversal of a regulatory asset or deferred cost generally results in an impairment to the balance sheet and a charge to the income statement of the company involved. See Note 4 – Rate Matters included in the 2021 Annual Report for additional information.

AEP’s transmission investment strategy and execution are dependent on federal and state regulatory policy. (Applies to all Registrants)

A significant portion of AEP’s earnings is derived from transmission investments and activities. FERC policy currently favors the expansion and updating of the transmission infrastructure within its jurisdiction. If the FERC were to adopt a different policy, if states were to limit or restrict such policies, or if transmission needs do not continue or develop as projected, AEP’s strategy of investing in transmission could be impacted. Management believes AEP’s experience with transmission facilities construction and operation gives AEP an advantage over other competitors in securing authorization to install, construct and operate new transmission lines and facilities. However, there can be no assurance that PJM, SPP, ERCOT or other RTOs will authorize new transmission projects or will award such projects to AEP.

Certain elements of AEP’s transmission formula rates have been challenged, which could result in lowered rates and/or refunds of amounts previously collected and thus have an adverse effect on AEP’s business, financial condition, results of operations and cash flows. (Applies to all Registrants other than AEP Texas)

AEP provides transmission service under rates regulated by the FERC. The FERC has approved the cost-based formula rate templates used by AEP to calculate its respective annual revenue requirements, but it has not expressly approved the amount of actual capital and operating expenditures to be used in the formula rates. All aspects of AEP’s rates accepted or approved by the FERC, including the formula rate templates, the rates of return on the

actual equity portion of its respective capital structures and the approved targeted capital structures, are subject to challenge by interested parties at the FERC, or by the FERC on its own initiative. In addition, interested parties may challenge the annual implementation and calculation by AEP of its projected rates and formula rate true-up pursuant to its approved formula rate templates under AEP’s formula rate implementation protocols. If a challenger can establish that any of these aspects are unjust, unreasonable, unduly discriminatory or preferential, then the FERC can make appropriate prospective adjustments to them and/or disallow any of AEP’s inclusion of those aspects in the rate setting formula.

Inquiries related to rates of return, as well as challenges to the formula rates of other utilities, are ongoing in other proceedings at the FERC. The results of these proceedings could potentially negatively impact AEP in any future challenges to AEP’s formula rates. If the FERC orders revenue reductions, including refunds, in any future cases related to its formula rates, it could reduce future net income and cash flows and impact financial condition.

End-use consumers and entities supplying electricity to end-use consumers may also attempt to influence government and/or regulators to change the rate setting methodologies that apply to AEP, particularly if rates for delivered electricity increase substantially.

AEP faces risks related to project siting, financing, construction, permitting, governmental approvals and the negotiation of project development agreements that may impede their development and operating activities. (Applies to all Registrants)

AEP owns, develops, constructs, manages and operates electric generation, transmission and distribution facilities. A key component of AEP's growth is its ability to construct and operate these facilities. As part of these operations AEP must periodically apply for licenses and permits from various local, state, federal and other regulatory authorities and abide by their respective conditions. Should AEP be unsuccessful in obtaining necessary licenses or permits on acceptable terms or resolving third-party challenges to such licenses or permits, should there be a delay in obtaining or renewing necessary licenses or permits or should regulatory authorities initiate any associated investigations or enforcement actions or impose related penalties or disallowances, it could reduce future net income and cash flows and impact financial condition. Any failure to negotiate successful project development agreements for new facilities with third-parties could have similar results.

Changes in technology and regulatory policies may lower the value of electric utility facilities and franchises. (Applies to all Registrants)

AEP primarily generates electricity at large central facilities and delivers that electricity to customers over its transmission and distribution facilities to customers usually situated within an exclusive franchise. This method results in economies of scale and generally lower costs than newer technologies such as fuel cells and microturbines, and distributed generation using either new or existing technology. Other technologies, such as light emitting diodes (LEDs), increase the efficiency of electricity and, as a result, lower the demand for it. Changes in regulatory policies and advances in batteries or energy storage, wind turbines and photovoltaic solar cells are reducing costs of new technology to levels that are making them competitive with some central station electricity production and delivery. These developments can challenge AEP’s competitive ability to maintain relatively low cost, efficient and reliable operations, to establish fair regulatory mechanisms and to provide cost-effective programs and services to customers. Further, in the event that alternative generation resources are mandated, subsidized or encouraged through legislation or regulation or otherwise are economically competitive and added to the available generation supply, such resources could displace a higher marginal cost generating units, which could reduce the price at which market participants sell their electricity.

AEP may not recover costs incurred to begin construction on projects that are canceled. (Applies to all Registrants)

AEP’s business plan for the construction of new projects involves a number of risks, including construction delays, non-performance by equipment and other third-party suppliers and increases in equipment and labor costs. To limit the risks of these construction projects, AEP’s subsidiaries enter into equipment purchase orders and construction contracts and incur engineering and design service costs in advance of receiving necessary regulatory approvals and/or siting or environmental permits. If any of these projects are canceled for any reason, including failure to receive necessary regulatory approvals and/or siting or environmental permits, significant cancellation penalties under the equipment purchase orders and construction contracts could occur. In addition, if any construction work or investments have been recorded as an asset, an impairment may need to be recorded in the event the project is canceled.

AEP is exposed to nuclear generation risk. (Applies to AEP and I&M)

I&M owns the Cook Plant, which consists of two nuclear generating units for a rated capacity of 2,296 MWs, or about 7% of the generating capacity in the AEP System. AEP and I&M are, therefore, subject to the risks of nuclear generation, which include the following:

  • The potential harmful effects on the environment and human health due to an adverse incident/event resulting from the operation of nuclear facilities and the storage, handling and disposal of radioactive materials such as SNF.

  • Limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with nuclear operations.

  • Uncertainties with respect to contingencies and assessment amounts triggered by a loss event (federal law requires owners of nuclear units to purchase the maximum available amount of nuclear liability insurance and potentially contribute to the coverage for losses of others).

  • Uncertainties with respect to the technological and financial aspects of decommissioning nuclear plants at the end of their licensed lives.

There can be no assurance that I&M’s preparations or risk mitigation measures will be adequate if these risks are triggered.

The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. In the event of non-compliance, the NRC has the authority to impose fines or shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated by the NRC could necessitate substantial capital expenditures at nuclear plants. In addition, although management has no reason to anticipate a serious nuclear incident at the Cook Plant, if an incident did occur, it could harm results of operations or financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit. Moreover, a major incident at any nuclear facility in the U.S. could require AEP or I&M to make material contributory payments.

Costs associated with the operation (including fuel), maintenance and retirement of nuclear plants continue to be more significant and less predictable than costs associated with other sources of generation, in large part due to changing regulatory requirements and safety standards, availability of nuclear waste disposal facilities and experience gained in the operation of nuclear facilities. Costs also may include replacement power, any unamortized investment at the end of the useful life of the Cook Plant (whether scheduled or premature), the carrying costs of that investment and retirement costs. The ability to obtain adequate and timely recovery of costs associated with the Cook Plant is not assured.

AEP subsidiaries are exposed to risks through participation in the market and transmission structures in various regional power markets that are beyond their control. (Applies to all Registrants)

Results are likely to be affected by differences in the market and transmission structures in various regional power markets. The rules governing the various RTOs, including SPP and PJM, may also change from time to time which could affect costs or revenues. Existing, new or changed rules of these RTOs could result in significant additional fees and increased costs to participate in those structures, including the cost of transmission facilities built by others due to changes in transmission rate design. In addition, these RTOs may assess costs resulting from improved transmission reliability, reduced transmission congestion and firm transmission rights. As members of these RTOs, AEP’s subsidiaries are subject to certain additional risks, including the allocation among existing members, of losses caused by unreimbursed defaults of other participants in these markets and resolution of complaint cases that may seek refunds of revenues previously earned by members of these markets.

AEP could be subject to higher costs and/or penalties related to mandatory reliability standards. (Applies to all Registrants)

Owners and operators of the bulk power transmission system are subject to mandatory reliability standards promulgated by the NERC and enforced by the FERC. The standards are based on the functions that need to be performed to ensure the bulk power system operates reliably and are guided by reliability and market interface principles. Compliance with new reliability standards may subject AEP to higher operating costs and/or increased capital expenditures. While management expects to recover costs and expenditures from customers through regulated rates, there can be no assurance that the applicable commissions will approve full recovery in a timely manner. If AEP were found not to be in compliance with the mandatory reliability standards, AEP could be subject to sanctions, including substantial monetary penalties, which likely would not be recoverable from customers through regulated rates.

A substantial portion of the receivables of AEP Texas is concentrated in a small number of REPs, and any delay or default in payment could adversely affect its cash flows, financial condition and results of operations. (Applies to AEP and AEP Texas)

AEP Texas collects receivables from the distribution of electricity from REPs that supply the electricity it distributes to its customers. As of December 31, 2021, AEP Texas did business with approximately 123 REPs. Adverse economic conditions, structural problems in the market served by ERCOT or financial difficulties of one or more REPs could impair the ability of these REPs to pay for these services or could cause them to delay such payments. AEP Texas depends on these REPs to remit payments on a timely basis. Applicable regulatory provisions require that customers be shifted to another REP or a provider of last resort if a REP cannot make timely payments. Applicable PUCT regulations significantly limit the extent to which AEP Texas can apply normal commercial terms or otherwise seek credit protection from firms desiring to provide retail electric service in its service territory, and AEP Texas thus remains at risk for payments related to services provided prior to the shift to another REP or the provider of last resort. In 2021, AEP Texas’ three largest REPs accounted for 43% of its operating revenue. Any delay or default in payment by REPs could adversely affect cash flows, financial condition and results of operations. If a REP were unable to meet its obligations, it could consider, among various options, restructuring under the bankruptcy laws, in which event such REP might seek to avoid honoring its obligations, and claims might be made by creditors involving payments AEP Texas had received from such REP.

Ohio House Bill 6 (HB 6), which provides for beneficial cost recovery for OPCo and for plants owned by OVEC, has come under public scrutiny. (Applies to AEP and OPCo)

In 2019, Ohio adopted and implemented HB 6 which benefits OPCo by authorizing rate recovery for certain costs including renewable energy contracts, OVEC’s coal-fired generating units and energy efficiency measures. AEP and OPCo engaged in lobbying efforts and provided testimony during the legislative process in connection with HB 6. In July 2020, an investigation led by the U.S. Attorney’s Office resulted in a federal grand jury indictment of an Ohio legislator and associates in connection with an alleged racketeering conspiracy involving the adoption of HB

  1. The outcome of the U.S. Attorney’s Office investigation and its impact on HB 6 is not known. If certain provisions of HB 6 were to be eliminated, it is unclear whether new legislation addressing similar issues would be adopted. To the extent that OPCo is unable to recover the costs currently authorized by HB 6, it could reduce future net income and cash flows and impact financial condition. In addition, the impact of continued public scrutiny of HB 6 is not known, and may have an adverse impact on AEP and OPCo, including their relationship with regulatory and legislative authorities, customers and other stakeholders. AEP is a defendant in current litigation relating to HB6 and AEP or OPCo may be involved in future litigation.

RISKS RELATED TO MARKET, ECONOMIC OR FINANCIAL VOLATILITY AND OTHER RISKS

AEP’s financial condition and results of operations could continue to be adversely affected by the ongoing Coronavirus pandemic. (Applies to all Registrants)

The global 2019 novel coronavirus pandemic is an evolving situation that has caused and could continue to lead to extended disruption of economic activity in AEP’s markets. COVID-19 could negatively affect AEP’s ability to operate its generating and transmission and distribution assets, its ability to access capital markets and results of operations. AEP currently cannot estimate the potential impact to its financial position, results of operations and cash flows caused by COVID-19, which will depend on future developments and which are highly uncertain at this time. See Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations - Executive Overview for additional information on COVID-19.

AEP’s financial performance may be adversely affected if AEP is unable to successfully operate facilities or perform certain corporate functions. (Applies to all Registrants)

Performance is highly dependent on the successful operation of generation, transmission and/or distribution facilities. Operating these facilities involves many risks, including:

  • Operator error and breakdown or failure of equipment or processes.

  • Operating limitations that may be imposed by environmental or other regulatory requirements.

  • Labor disputes.

  • Compliance with mandatory reliability standards, including mandatory cyber security standards.

  • Information technology failure that impairs AEP’s information technology infrastructure or disrupts normal business operations.

  • Information technology failure that affects AEP’s ability to access customer information or causes loss of confidential or proprietary data that materially and adversely affects AEP’s reputation or exposes AEP to legal claims.

  • Supply chain disruptions and inflation.

  • Fuel or water supply interruptions caused by transportation constraints, adverse weather such as drought, non-performance by suppliers and other factors.

  • Catastrophic events such as fires, earthquakes, explosions, hurricanes, tornados, ice storms, terrorism (including cyber-terrorism), floods or other similar occurrences.

  • Fuel costs and related requirements triggered by financial stress in the coal industry.

Physical attacks or hostile cyber intrusions could severely impair operations, lead to the disclosure of confidential information and damage AEP’s reputation. (Applies to all Registrants)

AEP and its regulated utility businesses face physical security and cybersecurity risks as the owner-operators of generation, transmission and/or distribution facilities and as participants in commodities trading. AEP and its regulated utility businesses own assets deemed as critical infrastructure, the operation of which is dependent on information technology systems. Further, the computer systems that run these facilities are not completely isolated from external networks. Parties that wish to disrupt the U.S. bulk power system or AEP operations could view these computer systems, software or networks as targets for cyber-attack. In addition, the electric utility business requires the collection of sensitive customer data, as well as confidential employee and shareholder information, which is

subject to electronic theft or loss.

A security breach of AEP or its regulated utility businesses’ physical assets or information systems, interconnected entities in RTOs, or regulators could impact the operation of the generation fleet and/or reliability of the transmission and distribution system. AEP and its regulated utility businesses could be subject to financial harm associated with ransomware theft or inappropriate release of certain types of information, including sensitive customer, vendor, employee, trading or other confidential data. A successful cyber-attack on the systems that control generation, transmission, distribution or other assets could severely disrupt business operations, preventing service to customers or collection of revenues. The breach of certain business systems could affect the ability to correctly record, process and report financial information. A major cyber incident could result in significant expenses to investigate and repair security breaches or system damage and could lead to litigation, fines, other remedial action, heightened regulatory scrutiny and damage to AEP’s reputation. In addition, the misappropriation, corruption or loss of personally identifiable information and other confidential data could lead to significant breach notification expenses and mitigation expenses such as credit monitoring. AEP and its third-party vendors have been subject, and will likely continue to be subject, to attempts to gain unauthorized access to their technology systems and confidential data or to attempts to disrupt utility and related business operations. While there have been immaterial incidents of phishing, unauthorized access to technology systems, financial fraud, and disruption of remote access across the AEP System, there has been no material impact on business or operations from these attacks. However, the AEP cannot guarantee that security efforts will detect or prevent breaches, operational incidents, or other breakdowns of technology systems and network infrastructure and cannot provide any assurance that such incidents will not have a material adverse effect in the future.

The rate of taxes imposed on AEP could change. (Applies to all Registrants)

AEP is subject to income taxation at the federal level and by certain states and municipalities. In determining AEP’s income tax liability for these jurisdictions, management monitors changes to the applicable tax laws and related regulations. While management believes it is in compliance with current prevailing laws, one or more taxing jurisdictions could seek to impose incremental or new taxes on the company. In addition, the Biden administration has proposed and congressional leaders have considered significant changes in tax law and regulations that could result in additional federal income taxes being imposed on AEP. Any adverse developments in these laws or regulations, including legislative changes, judicial holdings or administrative interpretations, could have a material and adverse effect on financial condition and results of operations.

If AEP is unable to access capital markets or insurance markets on reasonable terms, it could reduce future net income and cash flows and negatively impact financial condition. (Applies to all Registrants)

AEP relies on access to capital markets as a significant source of liquidity for capital requirements not satisfied by operating cash flows or proceeds from the strategic sale of assets and investments, including subsidiaries such as the planned sale of KPCo and KTCo, and insurance markets to assist in managing its risk and liability profile. Volatility, increased interest rates and reduced liquidity in the financial markets could affect AEP’s ability to raise capital on reasonable terms to fund capital needs, including construction costs and refinancing maturing indebtedness. Certain sources of insurance and debt and equity capital have expressed increasing unwillingness to procure insurance for or to invest in companies, such as AEP, that rely on fossil fuels. Any planned sale of assets and investments, including subsidiaries, may not occur for any number of reasons beyond our control, including regulatory approval on terms that are acceptable. If sources of capital for AEP are reduced and/or expected sale proceeds do not become available, capital costs could increase materially. Restricted access to capital or insurance markets and/or increased borrowing costs or insurance premiums could reduce future net income and cash flows and negatively impact financial condition.

Shareholder activism could cause AEP to incur significant expense, hinder execution of AEP’s business strategy and impact AEP’s stock price. (Applies to all Registrants)

Shareholder activism, which can take many forms and arise in a variety of situations, could result in substantial costs and divert management’s and AEP’s board’s attention and resources from AEP’s business. Additionally, such

shareholder activism could give rise to perceived uncertainties as to AEP’s future, adversely affect AEP’s relationships with its employees, customers or service providers and make it more difficult to attract and retain qualified personnel. Also, AEP may be required to incur significant fees and other expenses related to activist shareholder matters, including for third-party advisors. AEP’s stock price could be subject to significant fluctuation or otherwise be adversely affected by the events, risks and uncertainties of any shareholder activism.

The announced phasing out of LIBOR may adversely affect the costs and availability of financing. (Applies to all Registrants)

A portion of the Registrants’ indebtedness bears interest at fluctuating interest rates, primarily based on the London interbank offered rate (“LIBOR”) for deposits of U.S. dollars. On November 30, 2020, the Federal Reserve and the Financial Conduct Authority in the United Kingdom announced that LIBOR would be phased out completely by June 20, 2023 and replaced by the Secured Overnight Financing Rate ("SOFR") and certain LIBOR maturities have already been phased out. However, because SOFR is a broad U.S. Treasury repo financing rate that represents overnight secured funding transactions, it differs fundamentally from U.S. dollar LIBOR and the SOFR market is not yet fully developed. In addition, the overall financial markets may be disrupted as a result of the phase-out or replacement of LIBOR. Uncertainty as to the nature of such phase-out and alternative reference rates or disruption in the financial market could cause interest rates to increase. If sources of capital for the Registrants are reduced, capital costs could increase materially. Restricted access to capital markets and/or increased borrowing costs could reduce future net income and cash flows and negatively impact financial condition and/or liquidity.

Downgrades in AEP’s credit ratings could negatively affect its ability to access capital. (Applies to all Registrants)

The credit ratings agencies periodically review AEP’s capital structure and the quality and stability of earnings and cash flows. Any negative ratings actions could constrain the capital available to AEP and could limit access to funding for operations. AEP’s business is capital intensive, and AEP is dependent upon the ability to access capital at rates and on terms management determines to be attractive. If AEP’s ability to access capital becomes significantly constrained, AEP’s interest costs will likely increase and could reduce future net income and cash flows and negatively impact financial condition.

AEP and AEPTCo have no income or cash flow apart from dividends paid or other payments due from their subsidiaries. (Applies to AEP and AEPTCo)

AEP and AEPTCo are holding companies and have no operations of their own. Their ability to meet their financial obligations associated with their indebtedness and to pay dividends is primarily dependent on the earnings and cash flows of their operating subsidiaries, primarily their regulated utilities, and the ability of their subsidiaries to pay dividends to, or repay loans from them. Their subsidiaries are separate and distinct legal entities that have no obligation (apart from loans from AEP or AEPTCo) to provide them with funds for their payment obligations, whether by dividends, distributions or other payments. Payments to AEP or AEPTCo by their subsidiaries are also contingent upon their earnings and business considerations. AEP and AEPTCo indebtedness and dividends are structurally subordinated to all subsidiary indebtedness.

AEP’s operating results may fluctuate on a seasonal or quarterly basis and with general economic and weather conditions. (Applies to all Registrants)

Electric power consumption is generally seasonal. In many parts of the country, demand for power peaks during the hot summer months, with market prices also peaking at that time. In other areas, power demand peaks during the winter. As a result, overall operating results in the future may fluctuate substantially on a seasonal basis. In addition, AEP has historically sold less power, and consequently earned less income, when weather conditions are milder. Unusually mild weather in the future could reduce future net income and cash flows and negatively impact financial condition. In addition, unusually extreme weather conditions could impact AEP’s results of operations in a manner that would not likely be sustainable.

Further, deteriorating economic conditions triggered by any cause, including international tariffs, generally result in reduced consumption by customers, particularly industrial customers who may curtail operations or cease production entirely, while an expanding economic environment generally results in increased revenues. As a result, prevailing economic conditions may reduce future net income and cash flows and negatively impact financial condition.

Volatility in the securities markets, interest rates, and other factors could substantially increase defined benefit pension and other postretirement plan costs and the costs of nuclear decommissioning. (Applies to all Registrants and to AEP and I&M with respect to the costs of nuclear decommissioning)

The costs of providing pension and other postretirement benefit plans are dependent on a number of factors, such as the rates of return on plan assets, discount rates, the level of interest rates used to measure the required minimum funding levels of the plan, changes in actuarial assumptions, future government regulation, changes in life expectancy and the frequency and amount of AEP’s required or voluntary contributions made to the plans. Changes in actuarial assumptions and differences between the assumptions and actual values, as well as a significant decline in the value of investments that fund the pension and other postretirement plans, if not offset or mitigated by a decline in plan liabilities, could increase pension and other postretirement expense, and AEP could be required from time to time to fund the pension plan with significant amounts of cash. Such cash funding obligations could have a material impact on liquidity by reducing cash flows and could negatively affect results of operations.

Additionally, I&M holds a significant amount of assets in its nuclear decommissioning trusts to satisfy obligations to decommission its nuclear plant. The rate of return on assets held in those trusts can significantly impact both the costs of decommissioning and the funding requirements for the trusts.

Supply chain disruptions and inflation could negatively impact our operations and corporate strategy. (Applies to all Registrants)

AEP’s operations and business plans depend on the global supply chain to procure the equipment, materials and other resources necessary to build and provide services in a safe and reliable manner. The delivery of components, materials, equipment and other resources that are critical to our business operations and corporate strategy has been restricted by the current domestic and global supply chain upheaval. This has resulted in the shortage of critical items. These disruptions and shortages could adversely impact both our business operations and corporate strategy. The constraints in the supply chain could restrict the availability and delay the construction, maintenance or repair of items that are needed to support normal operations or are required to execute on our corporate strategy for continued capital investment in utility equipment. These disruptions and constraints could reduce future net income and cash flows and possibly harm AEP’s financial condition.

Supply chain disruptions have contributed to higher prices of components, materials, equipment and other needed commodities and these inflationary increases may continue in the future. While inflation in the United States has been relatively low in recent years, during 2021, the economy in the United States encountered a material level of inflation. The impact of COVID-19 continues to increase uncertainty in the outlook of near-term economic activity, including whether inflation will continue and at what rate. AEP typically recovers increases in capital expenses from customers through rates in regulated jurisdictions. Failure to recover increased capital costs could reduce future net income and cash flows and possibly harm AEP’s financial condition. Increases in inflation raises our costs for labor, materials and services, and failure to secure these on reasonable terms may adversely impact our financial condition.

AEP’s results of operations and cash flows may be negatively affected by a lack of growth or slower growth in the number of customers, or decline in customer demand. (Applies to all Registrants)

Growth in customer accounts and growth of customer usage each directly influence demand for electricity and the need for additional power generation and delivery facilities. Customer growth and customer usage are affected by a number of factors outside the control of AEP, such as mandated energy efficiency measures, demand-side

management goals, distributed generation resources and economic and demographic conditions, such as population changes, job and income growth, housing starts, new business formation and the overall level of economic activity, including changes due to public health considerations.

Certain regulatory and legislative bodies have introduced or are considering requirements and/or incentives to further reduce energy consumption. Additionally, technological advances or other improvements in or applications of technology could lead to declines in per capita energy consumption. Some or all of these factors, could impact the demand for electricity.

Failure to attract and retain an appropriately qualified workforce could harm results of operations. (Applies to all Registrants)

Certain events, such as an aging workforce without appropriate replacements, employee reaction to comply with potential COVID-19 vaccination or testing mandates, mismatch of skillset or complement to future needs, or unavailability of contract resources may lead to operating challenges and increased costs. The challenges include potential higher rates of existing employee departures, lack of resources, loss of knowledge and a lengthy time period associated with skill development. In this case, costs, including costs for contractors to replace employees, productivity costs, safety costs and costs of compliance with potential COVID-19 vaccination or testing mandates, may rise. Failure to hire and adequately train replacement employees, including the transfer of significant internal historical knowledge and expertise to the new employees, or the future availability and cost of contract labor may adversely affect the ability to manage and operate the business. If AEP is unable to successfully attract and retain an appropriately qualified workforce, future net income and cash flows may be reduced.

Changes in the price of commodities, the cost of procuring fuel, emission allowances for criteria pollutants and the costs of transport may increase AEP’s cost of producing power, impacting financial performance. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

AEP is exposed to changes in the price and availability of fuel (including the cost to procure coal and gas) and the price and availability to transport fuel. AEP has existing contracts of varying durations for the supply of fuel, but as these contracts end or if they are not honored, AEP may not be able to purchase fuel on terms as favorable as the current contracts. The inability to procure fuel at costs that are economical could cause AEP to retire generating capacity prior to the end of its useful life, and while AEP typically recovers expenditures for undepreciated plant balances, there can be no assurance in the future that AEP will recover such costs. Similarly, AEP is exposed to changes in the price and availability of emission allowances. AEP uses emission allowances based on the amount of fuel used and reductions achieved through emission controls and other measures. Based on current environmental programs remaining in effect, AEP has sufficient emission allowances to cover the majority of the projected needs for the next two years and beyond. Additional costs may be incurred either to acquire additional allowances or to achieve further reductions in emissions. If AEP needs to obtain allowances, those purchases may not be on as favorable terms as those under the current environmental programs. AEP’s risks relative to the price and availability to transport coal include the volatility of the price of diesel which is the primary fuel used in transporting coal by barge.

Prices for coal, natural gas and emission allowances have shown material swings in the past. Changes in the cost of fuel, emission allowances or natural gas and changes in the relationship between such costs and the market prices of power could reduce future net income and cash flows and negatively impact financial condition.

In addition, actual power prices and fuel costs will differ from those assumed in financial projections used to value trading and marketing transactions, and those differences may be material. As a result, as those transactions are marked-to-market, they may impact future results of operations and cash flows and impact financial condition.

AEP is subject to physical and financial risks associated with climate change. (Applies to all Registrants)

Climate change creates physical and financial risk. Physical risks from climate change may include an increase in sea level and changes in weather conditions, such as changes in precipitation and extreme weather events, such as fires. Customers’ energy needs vary with weather conditions, primarily temperature and humidity. For residential customers, heating and cooling represent their largest energy use. To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease depending on the duration and magnitude of the changes.

Increased energy use due to weather changes may require AEP to invest in additional generating assets, transmission and other infrastructure to serve increased load. Decreased energy use due to weather changes may affect financial condition through decreased revenues. Extreme weather conditions in general require more system backup, adding to costs, and can contribute to increased system stress, including service interruptions. Weather conditions outside of the AEP service territory could also have an impact on revenues. AEP buys and sells electricity depending upon system needs and market opportunities. Extreme weather conditions creating high energy demand on AEP’s own and/or other systems may raise electricity prices as AEP buys short-term energy to serve AEP’s own system, which would increase the cost of energy AEP provides to customers.

Severe weather and weather-related events impact AEP’s service territories, primarily when thunderstorms, tornadoes, hurricanes, fires, floods and snow or ice storms occur. To the extent the frequency and intensity of extreme weather events and storms increase, AEP’s cost of providing service will increase, including the costs and the availability of procuring insurance related to such impacts, and these costs may not be recoverable. Changes in precipitation resulting in droughts, water shortages or floods could adversely affect operations, principally the fossil fuel generating units. A negative impact to water supplies due to long-term drought conditions or severe flooding could adversely impact AEP’s ability to provide electricity to customers, as well as increase the price they pay for energy. AEP may not recover all costs related to mitigating these physical and financial risks.

To the extent climate change impacts a region’s economic health, it may also impact revenues. AEP’s financial performance is tied to the health of the regional economies AEP serves. The price of energy, as a factor in a region’s cost of living as well as an important input into the cost of goods and services, has an impact on the economic health of the communities within the AEP System.

Management cannot predict the outcome of the legal proceedings relating to AEP’s business activities. (Applies to all Registrants)

AEP is involved in legal proceedings, claims and litigation arising out of its business operations, the most significant of which are summarized in Note 6 - Commitments, Guarantees and Contingencies included in the 2021 Annual Report. Adverse outcomes in these proceedings could require significant expenditures that could reduce future net income and cash flows and negatively impact financial condition.

Disruptions at power generation facilities owned by third-parties could interrupt the sales of transmission and distribution services. (Applies to AEP and AEP Texas)

AEP Texas transmits and distributes electric power that the REPs obtain from power generation facilities owned by third-parties. If power generation is disrupted or if power generation capacity is inadequate, sales of transmission and distribution services may be diminished or interrupted, and results of operations, financial condition and cash flows could be adversely affected.

Management is unable to predict the course, results or impact, if any, of current or future litigation or investigations relating to the extreme winter weather in Texas in February 2021. (Applies to AEP and AEP Texas)

As a result of the February 2021 severe winter weather in Texas which caused a shortage of electric generation, ERCOT instructed AEP Texas and other Texas electric utilities to initiate power outages to avoid a sustained large-scale outage and prevent long-term damage to the electric system. At its peak, approximately 468,000 (44%) AEP Texas customers were without power.

AEP Texas and other AEP entities are named in approximately 100 lawsuits generally alleging the failure to exercise reasonable care in maintaining and updating their generation, transmission and distribution facilities in order to prevent cold weather failures and other related negligence. The complaints seek monetary damages among other forms of relief. In February 2021, AEP Texas received a Civil Investigative Demand from the Office of the Attorney General of Texas requesting, among other data, information about its communications to and from ERCOT, PUCT, retail electric providers, utilities, or power generation companies, concerning power outages related to the February 2021 winter storm. The company responded to the Civil Investigative Demand in March 2021. Management is unable to predict the course or outcome of these or any future litigation or investigations or their impact, if any, on future results of operations, financial condition and cash flows.

Hazards associated with high-voltage electricity transmission may result in suspension of AEP’s operations or the imposition of civil or criminal penalties. (Applies to all Registrants)

AEP operations are subject to the usual hazards associated with high-voltage electricity transmission, including explosions, fires, inclement weather, natural disasters, mechanical failure, unscheduled downtime, equipment interruptions, remediation, chemical spills, discharges or releases of toxic or hazardous substances or gases and other environmental risks. The hazards can cause personal injury and loss of life, severe damage to or destruction of property and equipment and environmental damage, and may result in suspension of operations and the imposition of civil or criminal penalties. AEP maintains property and casualty insurance, but AEP is not fully insured against all potential hazards incident to AEP’s business, such as damage to poles, towers and lines or losses caused by outages.

AEPTCo depends on its affiliates in the AEP System for a substantial portion of its revenues. (Applies to AEPTCo)

AEPTCo’s principal transmission service customers are its affiliates in the AEP System. Management expects that these affiliates will continue to be AEPTCo’s principal transmission service customers for the foreseeable future. For the year ended December 31, 2021, its affiliates were responsible for approximately 79% of the consolidated transmission revenues of AEPTCo.

Most of the real property rights on which the assets of AEPTCo are situated result from affiliate license agreements and are dependent on the terms of the underlying easements and other rights of its affiliates. (Applies to AEPTCo)

AEPTCo does not hold title to the majority of real property on which its electric transmission assets are located. Instead, under the provisions of certain affiliate contracts, it is permitted to occupy and maintain its facilities upon real property held by the respective AEP System utility affiliate that overlay its operations. The ability of AEPTCo to continue to occupy such real property is dependent upon the terms of such affiliate contracts and upon the underlying real property rights of these utility affiliates, which may be encumbered by easements, mineral rights and other similar encumbrances that may affect the use of such real property. AEP can give no assurance that (a) the relevant AEP System utility affiliates will continue to be affiliates of AEPTCo, (b) suitable replacement arrangements can be obtained in the event that the relevant AEP System utility affiliates are not its affiliates and (c) the underlying easements and other rights are sufficient to permit AEPTCo to operate its assets in a manner free from interruption.

Compliance with legislative and regulatory requirements may lead to increased costs and result in penalties. (Applies to all Registrants)

Business activities of electric utilities and related companies are heavily regulated, primarily through national and state laws and regulations of general applicability, including laws and regulations related to working conditions, health and safety, equal employment opportunity, employee benefit and other labor and employment matters, laws and regulations related to competition and antitrust matters. Many agencies employ mandatory civil penalty structures for regulatory violations. Registrants are subject to the jurisdiction of many federal and state agencies, including the FERC, NERC, Commodities Futures Trading Commission, Federal EPA, NRC, Occupational Safety and Health Administration, the SEC and the United States Department of Justice which may impose significant civil and criminal penalties to enforce compliance requirements relative to AEP’s business, which could have a material adverse effect on financial operating results including earnings, cash flow and liquidity.

The impact of new laws, regulations and policies and the related interpretations, as well as changes in enforcement practices or regulatory scrutiny generally cannot be predicted, and changes in applicable laws, regulations and policies and the related interpretations and enforcement practices may require extensive system and operational changes, be difficult to implement, increase AEP’s operating costs, require significant capital expenditures, or adversely impact the cost or attractiveness of the products or services AEP offers, or result in adverse publicity and harm AEP’s reputation.

RISKS RELATED TO OWNING AND OPERATING GENERATION ASSETS AND SELLING POWER

Costs of compliance with existing and evolving environmental laws are significant. (Applies to all Registrants except AEPTCo)

Operations are subject to extensive federal, state and local environmental statutes, rules and regulations relating to air quality, water quality, waste management, natural resources and health and safety. A majority of the electricity generated by the AEP System is produced by the combustion of fossil fuels. Emissions of nitrogen and sulfur oxides, mercury and particulates and the discharge and disposal of solid waste (including coal-combustion residuals or CCR) resulting from fossil fueled generation plants are subject to increased regulations, controls and mitigation expenses. Compliance with these legal requirements (including any new and more stringent application of existing CCR regulations) requires AEP to commit significant capital toward environmental monitoring, installation of pollution control equipment, emission fees, disposal, remediation and permits at AEP facilities and could cause AEP to retire generating capacity prior to the end of its estimated useful life. Costs of compliance with environmental statutes and regulations could reduce future net income and negatively impact financial condition, especially if emission limits, CCR waste discharge and/or discharge disposal obligations are tightened, more extensive operating and/or permitting requirements are imposed or additional substances or facilities become regulated. Although AEP typically recovers expenditures for pollution control technologies, replacement generation, undepreciated plant balances and associated operating costs from customers, there can be no assurance in the future that AEP will recover the remaining costs associated with such plants. Failure to recover these costs could reduce future net income and cash flows and possibly harm financial condition.

Regulation of CO****2 emissions could materially increase costs to AEP and its customers or cause some electric generating units to be uneconomical to operate or maintain. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

To date, federal court decisions have blocked Federal EPA’s attempts to regulate CO2 emissions from existing utility units. While there are no federal CO2 regulations in effect at present, the current administration has announced addressing climate change as a policy priority. Costs of compliance with the environmental regulation of CO2 emissions, if any, could reduce future net income and negatively impact financial condition and/or could cause AEP to retire generating capacity prior to the end of its estimated useful life. Although AEP typically recovers environmental expenditures, there can be no assurance in the future that AEP can recover such costs which could reduce future net income and cash flows and possibly harm financial condition.

Courts adjudicating nuisance and other similar claims in the future may order AEP to pay damages or to limit or reduce emissions. (Applies to all Registrants except AEP Texas and AEPTCo)

In the past, there have been several cases seeking damages based on allegations of federal and state common law nuisance in which AEP, among others, were defendants. In general, the actions allege that emissions from the defendants’ power plants constitute a public nuisance. The plaintiffs in these actions generally seek recovery of damages and other relief. If future actions are resolved against AEP, substantial modifications or retirement of AEP’s existing coal-fired power plants could be required, and AEP might be required to purchase power from third-parties to fulfill AEP’s commitments to supply power to AEP customers. This could have a material impact on revenues. In addition, AEP could be required to invest significantly in additional emission control equipment, accelerate the timing of capital expenditures, pay damages or penalties and/or halt operations. Unless recovered, those costs could reduce future net income and cash flows and harm financial condition. Moreover, results of operations and financial position could be reduced due to the timing of recovery of these investments and the expense of ongoing litigation.

Commodity trading and marketing activities are subject to inherent risks which can be reduced and controlled but not eliminated. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

AEP routinely has open trading positions in the market, within guidelines set by AEP, resulting from the management of AEP’s trading portfolio. To the extent open trading positions exist, fluctuating commodity prices can improve or diminish financial results and financial position.

AEP’s power trading activities also expose AEP to risks of commodity price movements. To the extent that AEP’s power trading does not hedge the price risk associated with the generation it owns, or controls, AEP would be exposed to the risk of rising and falling spot market prices.

In connection with these trading activities, AEP routinely enters into financial contracts, including futures and options, OTC options, financially-settled swaps and other derivative contracts. These activities expose AEP to risks from price movements. If the values of the financial contracts change in a manner AEP does not anticipate, it could harm financial position or reduce the financial contribution of trading operations.

Parties with whom AEP has contracts may fail to perform their obligations, which could harm AEP’s results of operations. (Applies to all Registrants)

AEP sells power from its generation facilities into the spot market and other competitive power markets on a contractual basis. AEP also enters into contracts to purchase and sell electricity, natural gas, emission allowances, renewable energy credits and coal as part of its power marketing and energy trading operations. AEP is exposed to the risk that counterparties that owe AEP money or the delivery of a commodity, including power, could breach their obligations. Should the counterparties to these arrangements fail to perform, AEP may be forced to enter into alternative hedging arrangements or honor underlying commitments at then-current market prices that may exceed AEP’s contractual prices, which would cause financial results to be diminished and AEP might incur losses. Although estimates take into account the expected probability of default by a counterparty, actual exposure to a default by a counterparty may be greater than the estimates predict.

AEP relies on electric transmission facilities that AEP does not own or control. If these facilities do not provide AEP with adequate transmission capacity, AEP may not be able to deliver wholesale electric power to the purchasers of AEP’s power. (Applies to all Registrants)

AEP depends on transmission facilities owned and operated by other nonaffiliated power companies to deliver the power AEP sells at wholesale. This dependence exposes AEP to a variety of risks. If transmission is disrupted, or transmission capacity is inadequate, AEP may not be able to sell and deliver AEP wholesale power. If a region’s power transmission infrastructure is inadequate, AEP’s recovery of wholesale costs and profits may be limited. If

restrictive transmission price regulation is imposed, the transmission companies may not have sufficient incentive to invest in expansion of transmission infrastructure.

The FERC has issued electric transmission initiatives that require electric transmission services to be offered unbundled from commodity sales. Although these initiatives are designed to encourage wholesale market transactions, access to transmission systems may not be available if transmission capacity is insufficient because of physical constraints or because it is contractually unavailable. Management also cannot predict whether transmission facilities will be expanded in specific markets to accommodate competitive access to those markets.

OVEC may require additional liquidity and other capital support. (Applies to AEP, APCo, I&M and OPCo)

AEP and several nonaffiliated utility companies own OVEC. The Inter-Company Power Agreement (ICPA) defines the rights and obligations and sets the power participation ratio of the parties to it. Under the ICPA, parties are entitled to receive and are obligated to pay for all OVEC capacity (approximately 2,400 MWs) in proportion to their respective power participation ratios. The aggregate power participation ratio of APCo, I&M and OPCo is 43.47%. If a party fails to make payments owed by it under the ICPA, OVEC may not have sufficient funds to honor its payment obligations, including its ongoing operating expenses as well as its indebtedness. As of December 31, 2021, OVEC has outstanding indebtedness of approximately $1.1 billion, of which APCo, I&M, and OPCo are collectively responsible for $492 million through the ICPA. Although they are not an obligor or guarantor, APCo, I&M, and OPCo are responsible for their respective ratio of OVEC’s outstanding debt through the ICPA and if OVEC’s indebtedness is accelerated for any reason, there is risk that APCo, I&M and/or OPCo may be required to pay some or all of such accelerated indebtedness in amounts equal to their aggregate power participation ratio of 43.47%.

Item 1B. UNRESOLVED STAFF COMMENTS

None.

Item 2. PROPERTIES

GENERATION FACILITIES

As of December 31, 2021, the AEP System owned (or leased where indicated) generation plants, with locations and net maximum power capabilities (winter rating), are shown in the following tables:

Vertically Integrated Utilities Segment

AEGCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Rockport, Units 1 and 2 – 50% of each (a)2INSteam - Coal1,3101984

(a)Rockport Plant, Unit 2 is leased. In April 2021, AEGCo and I&M executed an agreement to purchase 100% of the interests in Rockport Plant, Unit 2 effective at the end of the lease term in December 2022.

APCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Buck3VAHydro111912
Byllesby4VAHydro191912
Claytor4VAHydro761939
Leesville2VAHydro501964
London3WVHydro141935
Marmet3WVHydro141935
Niagara2VAHydro11906
Winfield3WVHydro151938
Ceredo6WVNatural Gas5162001
Dresden3OHNatural Gas6652012
Smith Mountain5VAPumped Storage5851965
Amos3WVSteam - Coal2,9301971
Mountaineer1WVSteam - Coal1,3201980
Clinch River2VASteam - Natural Gas4651958
Total MWs6,681
I&M
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Berrien Springs12MIHydro71908
Buchanan10MIHydro31919
Constantine4MIHydro11921
Elkhart3INHydro31913
Mottville4MIHydro21923
Twin Branch Hydro8INHydro41904
Deer Creek Solar FarmNAINSolar32016
Olive Solar FarmNAINSolar52016
St. JosephNAINSolar202021
Twin Branch Solar FarmNAINSolar32016
WatervlietNAMISolar52016
Rockport (Units 1 and 2, 50% of each) (a)2INSteam - Coal1,3101984
Cook2MISteam - Nuclear2,2961975
Total MWs3,662

(a)Rockport Plant, Unit 2 is leased. In April 2021, AEGCo and I&M executed an agreement to purchase 100% of the interests in Rockport Plant, Unit 2 effective at the end of the lease term in December 2022.

NA Not applicable.

The following table provides operating information related to the Cook Plant:

Cook Plant
Unit 1Unit 2
Year Placed in Operation19751978
Year of Expiration of NRC License20342037
Nominal Net Electrical Rating in MWs1,0841,212
Annual Capacity Utilization
202196.0%84.2%
202087.2%94.2%
201977.3%84.3%
KPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mitchell (a)(b)2WVSteam - Coal7801971
Big Sandy1KYSteam - Natural Gas2951963
Total MWs1,075

(a)KPCo owns a 50% interest in the Mitchell Plant units. WPCo owns the remaining 50%. Figures presented reflect only the portion owned by KPCo.

(b)In November 2021, KPCo made filings with KPSC, WVPSC and FERC to approve a new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement between KPCo and WPCo pursuant to which WPCo will replace KPCo as the operator of Mitchell Plant. See “Dispositions of KPCo and KTCo” section of Note 7 included in the 2021 Annual Report for additional information.

PSO
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Comanche3OKNatural Gas2481973
Northeastern, Unit 11OKNatural Gas4701961
Riverside, Units 3 and 42OKNatural Gas1602008
Southwestern, Units 4 and 52OKNatural Gas1682008
Weleetka2OKNatural Gas1001975
Northeastern, Unit 31OKSteam - Coal4651979
Northeastern, Unit 21OKSteam - Natural Gas4341961
Riverside, Units 1 and 22OKSteam - Natural Gas8961974
Southwestern, Units 1, 2 and 33OKSteam - Natural Gas4461952
Tulsa2OKSteam - Natural Gas3221956
Maverick (a)NAOKWind1312021
Sundance (a)NAOKWind912021
Total MWs3,931

(a)SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance and Maverick.

NA Not applicable.

SWEPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mattison4ARNatural Gas3142007
Stall3LANatural Gas5342010
Flint Creek (a)1ARSteam - Coal2581978
Turk (a)1ARSteam - Coal4772012
Welsh (b)2TXSteam - Coal1,0531977
Pirkey (a)(c)1TXSteam - Lignite5801985
Arsenal Hill1LASteam - Natural Gas1101960
Knox Lee1TXSteam - Natural Gas3441950
Lieberman3LASteam - Natural Gas2171947
Wilkes3TXSteam - Natural Gas8891964
Maverick (d)NAOKWind1562021
Sundance (d)NAOKWind1082021
Total MWs5,040

(a)Jointly-owned with nonaffiliated entities. Figures presented reflect only the portion owned by SWEPCo. The Arkansas jurisdictional portion of SWEPCo’s interest in Turk Plant is not in rate base.

(b)In November 2020, management announced it will cease using coal at the Welsh Plant in 2028.

(c)In November 2020, management announced plans to retire the plant in 2023.

(d)SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance and Maverick.

NA Not applicable.

WPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mitchell (a)(b)2WVSteam - Coal7801971

(a)WPCo owns 50% in the Mitchell Plant units. KPCo owns the remaining 50%. Figures presented reflect only the portion owned by WPCo.

(b)In November 2021, KPCo made filings with KPSC, WVPSC and FERC to approve a new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement between KPCo and WPCo pursuant to which WPCo will replace KPCo as the operator of Mitchell Plant. See “Dispositions of KPCo and KTCo” section of Note 7 included in the 2021 Annual Report for additional information.

Generation & Marketing Segment

AGR
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Cardinal1OHSteam - Coal5951967
Renewable Power
Size of Energy ResourceAEP Energy Supply, LLC DivisionRenewable Energy ResourceLocationIn-Service or Under Construction
1,435 MWAEP RenewablesWindEight states (a)In-service
20 MWAEP RenewablesSolarCaliforniaIn-service
20 MWAEP RenewablesSolarUtahIn-service
125 MWAEP RenewablesSolarNevadaIn-service
161 MWAEP OnSite PartnersSolarSeventeen states (b)In-service
27 MWAEP OnSite PartnersSolarTwo states (c)Under Construction

(a) Colorado, Hawaii, Indiana, Kansas, Michigan, Minnesota, Pennsylvania and Texas.

(b) California, Colorado, Florida, Hawaii, Illinois, Iowa, Minnesota, Nebraska, New Hampshire, New Jersey, New Mexico, New York, Ohio, Rhode Island, Texas, Vermont and Wisconsin.

(c) Ohio and New Mexico.

TRANSMISSION AND DISTRIBUTION FACILITIES

The following tables set forth the total overhead circuit miles of transmission and distribution lines of the AEP System and its operating companies.

Vertically Integrated Utilities Segment

Total Overhead Circuit Miles of Transmission and Distribution Lines
APCo51,714
I&M20,943
KGPCo1,408
KPCo11,166
PSO18,145
SWEPCo26,162
WPCo1,730
Total Circuit Miles131,268

Transmission and Distribution Utilities Segment

Total Overhead Circuit Miles of Transmission and Distribution Lines
OPCo44,703
AEP Texas46,353
Total Circuit Miles91,056

AEP Transmission Holdco Segment

The following table sets forth the total overhead circuit miles of transmission lines of certain wholly-owned and joint venture-owned entities:

Total Overhead Circuit Miles of Transmission Lines
ETT1,883
IMTCo990
OHTCo1,026
OKTCo1,015
WVTCo261
Pioneer43
Prairie Wind Transmission216
Transource Missouri167
Transource West Virginia27
Total Circuit Miles5,628

TITLE TO PROPERTY

The AEP System’s generating facilities are generally located on lands owned in fee simple. The greater portion of the transmission and distribution lines of the AEP System has been constructed over lands of private owners pursuant to easements or along public highways and streets pursuant to appropriate statutory authority. The rights of AEP’s public utility subsidiaries in the realty on which their facilities are located are considered adequate for use in the conduct of their business. Minor defects and irregularities customarily found in title to properties of like size and character may exist, but such defects and irregularities do not materially impair the use of the properties. AEP’s public utility subsidiaries generally have the right of eminent domain which permits them, if necessary, to acquire, perfect or secure titles to or easements on privately held lands used or to be used in their utility operations.

SYSTEM TRANSMISSION LINES AND FACILITY SITING

Laws in the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Tennessee, Texas, Virginia and West Virginia require prior approval of sites of generating facilities and/or routes of high-voltage transmission lines. AEP has experienced delays and additional costs in constructing facilities as a result of proceedings conducted pursuant to such statutes and in proceedings in which AEP’s operating companies have sought to acquire rights-of-way through condemnation. These proceedings may result in additional delays and costs in future years.

CONSTRUCTION PROGRAM

With input from its state utility commissions, the AEP System continuously assesses the adequacy of its transmission, distribution, generation and other facilities to plan and provide for the reliable supply of electric power and energy to its customers. In this assessment process, assumptions are continually being reviewed as new information becomes available and assessments and plans are modified, as appropriate. AEP forecasts approximately $7.6 billion of construction expenditures for 2022. Estimated construction expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, supply chain issues, weather, legal reviews and the ability to access capital. See the “Budgeted Capital Expenditures” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations included in the 2021 Annual Report for additional information.

POTENTIAL UNINSURED LOSSES

Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including liabilities relating to damage to AEP’s generation plants and costs of replacement power. Unless allowed to be recovered through rates, future losses or liabilities which are not completely insured could reduce net income and impact the financial conditions of AEP and other AEP System companies. For risks related to owning a nuclear generating unit, see the “Nuclear Contingencies” section of Note 6 - Commitments, Guarantees and Contingencies included in the 2021 Annual Report for additional information.

Item 3. LEGAL PROCEEDINGS

For a discussion of material legal proceedings, see Note 6 - Commitments, Guarantees and Contingencies included in the 2021 Annual Report for additional information.

Item 4. MINE SAFETY DISCLOSURE

The Federal Mine Safety and Health Act of 1977 (Mine Act) imposes stringent health and safety standards on various mining operations. The Mine Act and its related regulations affect numerous aspects of mining operations, including training of mine personnel, mining procedures, equipment used in mine emergency procedures, mine plans and other matters. SWEPCo, through its ownership of DHLC, a wholly-owned lignite mining subsidiary of SWEPCo, is subject to the provisions of the Mine Act.

The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) requires companies that operate mines to include in their periodic reports filed with the SEC, certain mine safety information covered by the Mine Act. Exhibit 95 “Mine Safety Disclosure Exhibit” contains the notices of violation and proposed assessments received by DHLC under the Mine Act for the quarter ended December 31, 2021.

PART II

Item 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

AEP

In addition to the AEP Common Stock Information section below, the remaining information required by this item is incorporated herein by reference to the material under the “Dividend Policy and Restrictions” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations included in the 2021 Annual Report.

During the quarter ended December 31, 2021, neither AEP nor its publicly-traded subsidiaries purchased equity securities that are registered by AEP or its publicly-traded subsidiaries pursuant to Section 12 of the Exchange Act.

AEP Texas, APCo, I&M, OPCo, PSO and SWEPCo

The common stock of these companies is held solely by AEP. For more information see the “Dividend Restrictions” section of Note 14 - Financing Activities included in the 2021 Annual Report.

AEPTCo

AEP owns the entire interest in AEPTCo through its wholly-owned subsidiary AEP Transmission Holdco.

AEP COMMON STOCK INFORMATION

AEP common stock is principally traded using the trading symbol “AEP” on the NASDAQ Stock Market. As of December 31, 2021, AEP had 53,124 registered shareholders. The performance graph below compares the cumulative total return among AEP, the S&P 500 Index and the S&P Electric Utilities (SP833) Index over a five year period. The performance graph assumes an initial investment of $100 on December 31, 2016 and that all dividends were reinvested.

aep-20211231_g3.jpg

Source: S&P Dow Jones Indices LLC. Data as of December 31, 2021. Past performance is no guarantee of future results. Chart provided for illustrative purposes.

Item 6. RESERVED

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

AEP

The information required by this item is incorporated herein by reference to the material under Management’s Discussion and Analysis of Financial Condition and Results of Operations in the 2021 Annual Report. Year-to-year comparisons between 2020 and 2019 have been omitted from this Form 10-K but may be found in "Management's Discussion and Analysis of Financial Condition" in Part II, Item 7 of our Form 10-K for the fiscal year ended December 31, 2020, which specific discussion is incorporated herein by reference.

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(a). Management’s narrative analysis of the results of operations and other information required by Instruction I(2)(a) is incorporated herein by reference to the material under Management’s Discussion and Analysis of Financial Condition and Results of Operations in the 2021 Annual Report.

Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

AEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

The information required by this item is incorporated herein by reference to the material under the “Quantitative and Qualitative Disclosures About Market Risk” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations in the 2021 Annual Report.

Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

2021 Annual Reports

American Electric Power Company, Inc. and Subsidiary Companies

AEP Texas Inc. and Subsidiaries

AEP Transmission Company, LLC and Subsidiaries

Appalachian Power Company and Subsidiaries

Indiana Michigan Power Company and Subsidiaries

Ohio Power Company and Subsidiaries

Public Service Company of Oklahoma

Southwestern Electric Power Company Consolidated

Audited Financial Statements and

Management’s Discussion and Analysis of Financial Condition and Results of Operations

aep-20211231_g4.jpg

AMERICAN ELECTRIC POWER COMPANY, INC. AND SUBSIDIARY COMPANIES

INDEX OF ANNUAL REPORTS

Page Number
American Electric Power Company, Inc. and Subsidiary Companies:
Management’s Discussion and Analysis of Financial Condition and Results of Operations60
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)126
Management’s Report on Internal Control Over Financial Reporting129
Consolidated Financial Statements130
AEP Texas Inc. and Subsidiaries:
Management’s Narrative Discussion and Analysis of Results of Operations137
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)140
Management’s Report on Internal Control Over Financial Reporting142
Consolidated Financial Statements143
AEP Transmission Company, LLC and Subsidiaries:
Management’s Narrative Discussion and Analysis of Results of Operations150
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)152
Management’s Report on Internal Control Over Financial Reporting154
Consolidated Financial Statements155
Appalachian Power Company and Subsidiaries:
Management’s Narrative Discussion and Analysis of Results of Operations161
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)164
Management’s Report on Internal Control Over Financial Reporting166
Consolidated Financial Statements167
Indiana Michigan Power Company and Subsidiaries:
Management’s Narrative Discussion and Analysis of Results of Operations174
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)177
Management’s Report on Internal Control Over Financial Reporting179
Consolidated Financial Statements180
Ohio Power Company and Subsidiaries:
Management’s Narrative Discussion and Analysis of Results of Operations187
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)190
Management’s Report on Internal Control Over Financial Reporting193
Consolidated Financial Statements194
Public Service Company of Oklahoma:
Management’s Narrative Discussion and Analysis of Results of Operations201
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)204
Management’s Report on Internal Control Over Financial Reporting206
Financial Statements207
Southwestern Electric Power Company Consolidated:
Management’s Narrative Discussion and Analysis of Results of Operations214
Report of Independent Registered Public Accounting Firm (PCAOB ID 238)217
Management’s Report on Internal Control Over Financial Reporting219
Consolidated Financial Statements220
[Index of Notes to Financial Statements of Regis

Showing the first 8K of 1581K characters. Open the full section

Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

AEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Information required by this item is set forth under the caption Proposal to Ratify the Appointment of the Independent Registered Public Accounting Firm in the 2022 Proxy Statement, which is incorporated by reference into this item.

Item 9A. CONTROLS AND PROCEDURES

Disclosure Controls and Procedures

During 2021, management, including the principal executive officer and principal financial officer of each of the Registrants evaluated each respective Registrant’s disclosure controls and procedures. Disclosure controls and procedures are defined as controls and other procedures of the Registrant that are designed to ensure that information required to be disclosed by the Registrants in the reports that they file or submit under the Exchange Act are recorded, processed, summarized and reported within the time periods specified in the Commission’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Registrants in the reports that they file or submit under the Exchange Act is accumulated and communicated to each Registrant’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

As of December 31, 2021, the principal executive officer and financial officer of each of the Registrants concluded that the disclosure controls and procedures in place were effective at the reasonable assurance level. The Registrants continually strive to improve their disclosure controls and procedures to enhance the quality of their financial reporting and to maintain dynamic systems that change as events warrant.

Changes in Internal Control over Financial Reporting

There have been no changes in the Registrants’ internal control over financial reporting (as such term is defined in Rule 13a-15(f) and 15d-15(f) under the Exchange Act) during the fourth quarter 2021 that materially affected, or are reasonably likely to materially affect, the Registrants’ internal control over financial reporting.

Internal Control over Financial Reporting

See Management’s Report on Internal Control over Financial Reporting for each Registrant under Item 8. As discussed in that report, management assessed and reported on the effectiveness of each Registrant’s internal control over financial reporting as of December 31, 2021. As a result of that assessment, management concluded that each Registrant’s internal control over financial reporting was effective as of December 31, 2021.

Item 9B. OTHER INFORMATION

None.

Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

None.

PART III

Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

AEP

Directors, Director Nomination Process and Audit Committee

Certain of the information called for in this Item 10, including the information relating to directors, is incorporated herein by reference to AEP’s definitive proxy information statement (which will be filed with the SEC pursuant to Regulation 14A under the Exchange Act) relating to the 2022 Annual Meeting of Shareholders (the 2022 Annual Meeting) including under the captions “Election of Directors,” “AEP’s Board of Directors and Committees,” “Directors” and “Nominees for Directors.”

Executive Officers

Reference also is made under the caption “Information About our Executive Officers” in Part I, Item 1 of this report.

Code of Ethics

AEP’s Principles of Business Conduct is the code of ethics that applies to AEP’s Chief Executive Officer, Chief Financial Officer and principal accounting officer. The Principles of Business Conduct is available on AEP’s website at www.aep.com. The Principles of Business Conduct will be made available, without charge, in print to any shareholder who requests such document from Investor Relations, American Electric Power Company, Inc., 1 Riverside Plaza, Columbus, Ohio 43215.

If any substantive amendments to the Principles of Business Conduct are made or any waivers are granted, including any implicit waiver, from a provision of the Principles of Business Conduct, to its Chief Executive Officer, Chief Financial Officer or principal accounting officer, AEP will disclose the nature of such amendment or waiver on AEP’s website, www.aep.com, or in a report on Form 8-K.

Delinquent Section 16(a) Reports

None.

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(c).

Item 11. EXECUTIVE COMPENSATION

AEP

The information called for by this Item 11 is incorporated herein by reference to AEP’s definitive proxy statement (which will be filed with the SEC pursuant to Regulation 14A under the Exchange Act) relating to the 2022 Annual Meeting including under the captions “Compensation Discussion and Analysis,” “Executive Compensation”, “Director Compensation” and “2021 Director Compensation Table”. The information set forth under the subcaption “Human Resources Committee Report” and “Audit Committee Report” should not be deemed filed nor should it be incorporated by reference into any other filing under the Securities Act of 1933, as amended, or the Exchange Act except to the extent AEP specifically incorporates such report by reference therein.

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(c).

Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

AEP

The information relating to Security Ownership of Certain Beneficial Owners is incorporated herein by reference to AEP’s definitive proxy statement (which will be filed with the SEC pursuant to Regulation 14A under the Exchange Act) relating to 2022 Annual Meeting under the caption “Share Ownership of Certain Beneficial Owners” and “Share Ownership of Directors and Executive Officers.”

EQUITY COMPENSATION PLAN INFORMATION

The following table summarizes the ability of AEP to issue common stock pursuant to equity compensation plans as of December 31, 2021:

Plan CategoryNumber of Securities to be Issued upon Exercise of Outstanding Options Warrants and Rights (a)Weighted-Average Exercise Price of Outstanding Options, Warrants and Rights (b)Number of Securities Remaining Available for Future Issuance under Equity Compensation Plans
Equity Compensation Plans Approved by Security Holders2,453,084—5,976,468
Equity Compensation Plans Not Approved by Security Holders———
Total2,453,084—5,976,468

(a)The balance includes unvested performance units and restricted stock units as well as vested performance units deferred as AEP career shares, all of which will be settled and paid in shares of AEP common stock. For performance units, the total includes the target number of shares that could be granted if performance meets target objectives. The number of securities that would be granted, with respect to performance units, if performance meets the maximum payout level, is two times the amount included in this total.

(b)No consideration is required from participants for the exercise or vesting of any outstanding AEP equity compensation awards.

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(c).

Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS AND DIRECTOR INDEPENDENCE

AEP

The information called for by this Item 13 is incorporated herein by reference to AEP’s definitive proxy statement (which will be filed with the SEC pursuant to Regulation 14A under the Exchange Act) relating to the 2022 Annual Meeting under the captions “Transactions with Related Persons” and “Director Independence.”

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(c).

Item 14. PRINCIPAL ACCOUNTING FEES AND SERVICES

AEP

The information called for by this Item 14 is incorporated herein by reference to AEP’s definitive proxy statement (which will be filed with the SEC pursuant to Regulation 14A under the Exchange Act) relating to the 2022 Annual Meeting under the captions “Audit and Non-Audit Fees,” “Audit Committee Report” and “Policy on Audit Committee Pre-Approval of Audit and Permissible Non-Audit Services of the Independent Auditor.”

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Each of the above is a wholly-owned subsidiary of AEP and does not have a separate audit committee. A description of the AEP Audit Committee pre-approval policies, which apply to these companies, is contained in the definitive proxy statement of AEP for the 2022 Annual Meeting of shareholders. The following table presents directly billed fees for professional services rendered by PricewaterhouseCoopers LLP for the audit of these companies’ annual financial statements for the years ended December 31, 2021 and 2020, and fees directly billed for other services rendered by PricewaterhouseCoopers LLP during those periods. PricewaterhouseCoopers LLP also provides additional professional and other services to the AEP System, the cost of which may ultimately be allocated to these companies though not billed directly to them. For a description of these fees and services, see the description of principal accounting fees and services for AEP above.

AEP TexasAEPTCoAPCo
202120202021202020212020
Audit Fees$1,279,272$1,204,518$1,443,675$1,249,959$1,702,193$1,747,977
Audit-Related Fees42,00080,000——47,14344,857
Tax Fees15,1226,34915,3476,43319,6039,090
Total$1,336,394$1,290,867$1,459,022$1,256,392$1,768,939$1,801,924
I&MOPCoPSO
202120202021202020212020
Audit Fees$1,637,968$1,383,356$1,169,647$1,096,241$729,463$577,138
Audit-Related Fees11,14310,60711,14310,6075,1434,857
Tax Fees17,8488,16912,9235,7016,9913,281
Total$1,666,959$1,402,132$1,193,713$1,112,549$741,597$585,276
SWEPCo
20212020
Audit Fees$1,118,206$951,594
Audit-Related Fees27,14325,857
Tax Fees11,8485,523
Total$1,157,197$982,974

PART IV

Item 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

The following documents are filed as a part of this report:

**1.**FINANCIAL STATEMENTS:

The following financial statements have been incorporated herein by reference pursuant to Item 8.

AEP and Subsidiary Companies:

Report of Independent Registered Public Accounting Firm; Management’s Report on Internal Control over Financial Reporting; Consolidated Statements of Income for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Comprehensive Income (Loss) for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Changes in Equity for the years ended December 31, 2021, 2020 and 2019; Consolidated Balance Sheets as of December 31, 2021 and 2020; Consolidated Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019; Notes to Financial Statements of Registrants.

AEP Texas, APCo, I&M and OPCo:

Report of Independent Registered Public Accounting Firm; Management’s Report on Internal Control over Financial Reporting; Consolidated Statements of Income for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Comprehensive Income (Loss) for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Changes in Common Shareholder’s Equity for the years ended December 31, 2021, 2020 and 2019; Consolidated Balance Sheets as of December 31, 2021 and 2020; Consolidated Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019; Notes to Financial Statements of Registrants.

AEPTCo:

Report of Independent Registered Public Accounting Firm; Management’s Report on Internal Control over Financial Reporting; Consolidated Statements of Income for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Changes in Member’s Equity for the years ended December 31, 2021, 2020 and 2019; Consolidated Balance Sheets as of December 31, 2021 and 2020; Consolidated Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019; Notes to Financial Statements of Registrants.

PSO:

Report of Independent Registered Public Accounting Firm; Management’s Report on Internal Control over Financial Reporting; Statements of Income for the years ended December 31, 2021, 2020 and 2019; Statements of Comprehensive Income (Loss) for the years ended December 31, 2021, 2020 and 2019; Statements of Changes in Common Shareholder’s Equity for the years ended December 31, 2021, 2020 and 2019; Balance Sheets as of December 31, 2021 and 2020; Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019; Notes to Financial Statements of Registrants.

SWEPCo:

Report of Independent Registered Public Accounting Firm; Management’s Report on Internal Control over Financial Reporting; Consolidated Statements of Income for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Comprehensive Income (Loss) for the years ended December 31, 2021, 2020 and 2019; Consolidated Statements of Changes in Equity for the years ended December 31, 2021, 2020 and 2019; Consolidated Balance Sheets as of December 31, 2021 and 2020; Consolidated Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019; Notes to Financial Statements of Registrants.

2. FINANCIAL STATEMENT SCHEDULES:Page Number
Financial Statement Schedules are listed in the Index of Financial Statement Schedules. (Certain schedules have been omitted because the required information is contained in the notes to financial statements or because such schedules are not required or are not applicable). Reports of Independent Registered Public Accounting Firm.S-1
3. EXHIBITS:
Exhibits for AEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo are listed in the Exhibit Index beginning on page E-1 and are incorporated herein by reference.E-1

Item 16. FORM 10-K SUMMARY

None.

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

American Electric Power Company, Inc.
By:/s/ Julia A. Sloat
(Julia A. Sloat, Executive Vice President
and Chief Financial Officer)

Date: February 24, 2022

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated.

SignatureTitleDate
(i)Principal Executive Officer:
/s/ Nicholas K. AkinsChairman of the Board, Chief Executive Officer and DirectorFebruary 24, 2022
(Nicholas K. Akins)
(ii)Principal Financial Officer:
/s/ Julia A. SloatExecutive Vice President and Chief Financial OfficerFebruary 24, 2022
(Julia A. Sloat)
(iii)Principal Accounting Officer:
/s/ Joseph M. BuonaiutoSenior Vice President, Controller and Chief Accounting OfficerFebruary 24, 2022
(Joseph M. Buonaiuto)
(iv)A Majority of the Directors:
*Nicholas K. Akins
*David J. Anderson
*J. Barnie Beasley, Jr.
*Art A. Garcia
*Linda A. Goodspeed
*Thomas E. Hoaglin
*Sandra Beach Lin
*Margaret M. McCarthy
*Stephen S. Rasmussen
*Oliver G. Richard, III
*Daryl Roberts
*Sara Martinez Tucker
*By:/s/ Julia A. SloatFebruary 24, 2022
(Julia A. Sloat, Attorney-in-Fact

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

AEP Texas Inc.
By:/s/ Julia A. Sloat
(Julia A. Sloat, Vice President and Chief Financial Officer)

Date: February 24, 2022

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated. The signature of each of the undersigned shall be deemed to relate only to matters having reference to the above-named company and any subsidiaries thereof.

SignatureTitleDate
(i)Principal Executive Officer:
/s/ Nicholas K. AkinsChairman of the Board, Chief Executive Officer and DirectorFebruary 24, 2022
(Nicholas K. Akins)
(ii)Principal Financial Officer:
/s/ Julia A. SloatVice President, Chief Financial Officer and DirectorFebruary 24, 2022
(Julia A. Sloat)
(iii)Principal Accounting Officer:
/s/ Joseph M. BuonaiutoController and Chief Accounting OfficerFebruary 24, 2022
(Joseph M. Buonaiuto)
(iv)A Majority of the Directors:
*Nicholas K. Akins
*Lisa M. Barton
*Paul Chodak, III
*David M. Feinberg
*Charles R. Patton
*Therace M. Risch
Julia A. Sloat
*Judith E. Talavera
*Toby L. Thomas
*By:/s/ Julia A. SloatFebruary 24, 2022
(Julia A. Sloat, Attorney-in-Fact)

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

AEP Transmission Company, LLC

Showing the first 8K of 167K characters. Open the full section