GENERATION FACILITIES

The tables below summarize the net maximum capacity of AEP's owned generation plants as of December 31, 2024. AEP subsidiaries serve customer electricity needs from these facilities and from purchased power in the PJM and SPP markets based on demand and other economic conditions. AEP's regulated subsidiaries have approved recovery mechanisms in retail jurisdictions that recover the cost of prudently incurred fuel, purchased power and other expenses.

Vertically Integrated Utilities Segment

AEGCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Rockport (a)2INSteam - Coal1,3101984

(a)AEGCo owns a 50% interest in the Rockport Plant units. I&M owns the remaining 50%. Figures presented reflect only the portion owned by AEGCo.

APCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Ceredo6WVNatural Gas5162001
Dresden3OHNatural Gas6652012
Smith Mountain5VAPumped Storage5851965
Amos3WVSteam - Coal2,9501971
Mountaineer1WVSteam - Coal1,3201980
Clinch River2VASteam - Natural Gas4651958
Hydro (Various Plants)VariousVAHydro1581906-1964
Hydro (Various Plants)VariousWVHydro531935-1938
AmherstNAVASolar52023
Total MWs6,717
I&M
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Rockport (a)2INSteam - Coal1,3101984
Cook2MISteam - Nuclear2,2961975
Hydro (Various Plants)VariousINHydro71904-1913
Hydro (Various Plants)VariousMIHydro131908-1923
Solar (Various Plants)NAINSolar312016-2021
Solar (Various Plants)NAMISolar52016
Total MWs3,662

(a)I&M owns a 50% interest in the Rockport Plant units. AEGCo owns the remaining 50%. Figures presented reflect only the portion owned by I&M.

NA Not applicable.

KPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mitchell (a)2WVSteam - Coal7801971
Big Sandy1KYSteam - Natural Gas2951963
Total MWs1,075

(a)KPCo owns a 50% interest in the Mitchell Plant units. WPCo owns the remaining 50%. Figures presented reflect only the portion owned by KPCo.

PSO
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Comanche3OKNatural Gas2381973
Northeastern, Unit 11OKNatural Gas4701961
Riverside, Units 3 and 42OKNatural Gas1602008
Southwestern, Units 4 and 52OKNatural Gas1662008
Weleetka2OKNatural Gas751975
Northeastern, Unit 31OKSteam - Coal4721979
Northeastern, Unit 21OKSteam - Natural Gas4351961
Riverside, Units 1 and 22OKSteam - Natural Gas8791974
Southwestern, Units 1, 2 and 33OKSteam - Natural Gas4461952
Tulsa2OKSteam - Natural Gas3181956
North Central Wind Energy Facilities (a)NAOKWind6752021-2022
Rock FallsNAOKWind1552017
Total MWs4,489

(a)PSO owns a 45.5% interest and SWEPCo owns the remaining 54.5% interest in Sundance, Maverick and Traverse. Figures presented reflect only the portion owned by PSO.

NA Not applicable.

SWEPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mattison4ARNatural Gas3142007
Stall3LANatural Gas5342010
Flint Creek (a)1ARSteam - Coal2591978
Turk (a)1ARSteam - Coal4772012
Welsh (b)2TXSteam - Coal1,0561977
Arsenal Hill1LASteam - Natural Gas1111960
Knox Lee1TXSteam - Natural Gas3441950
Lieberman3LASteam - Natural Gas2191947
Wilkes3TXSteam - Natural Gas8891964
North Central Wind Energy Facilities (c)NAOKWind8092021-2022
Diversion Wind FarmNATXWind2012024
Total MWs5,213

(a)Jointly-owned with nonaffiliated entities. Figures presented reflect only the portion owned by SWEPCo. The Arkansas jurisdictional portion of SWEPCo’s interest in Turk Plant is not in rate base.

(b)In November 2020, management announced it will cease using coal at the Welsh Plant in 2028. In December 2024, SWEPCo filed an application for a Certificate of Convenience and Necessity (CCN) with the APSC, LPSC and PUCT to convert Welsh Plant, Units 1 and 3 to natural gas in 2028 and 2027, respectively.

(c)SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance, Maverick and Traverse. Figures presented reflect only the portion owned by SWEPCo.

NA Not applicable.

WPCo
Plant NameUnitsStateFuel TypeNet Maximum Capacity (MWs)Year Plant or First Unit Commissioned
Mitchell (a)2WVSteam - Coal7801971

(a)WPCo owns 50% in the Mitchell Plant units. KPCo owns the remaining 50%. Figures presented reflect only the portion owned by WPCo.

TRANSMISSION AND DISTRIBUTION FACILITIES

The AEP System has significant investments in transmission and distribution lines across its Vertically Integrated Utilities, Transmission and Distribution Utilities and AEP Transmission Holdco Segments.

TITLE TO PROPERTY

The AEP System’s generating facilities are generally located on lands owned in fee simple. The greater portion of the transmission and distribution lines of the AEP System has been constructed over lands of private owners pursuant to easements or along public highways and streets pursuant to appropriate statutory authority. The rights of AEP’s public utility subsidiaries in the realty on which their facilities are located are considered adequate for use in the conduct of their business. Minor defects and irregularities customarily found in title to properties of like size and character may exist, but such defects and irregularities do not materially impair the use of the properties. AEP’s public utility subsidiaries generally have the right of eminent domain which permits them, if necessary, to acquire, perfect or secure titles to or easements on privately held lands used or to be used in their utility operations.

SYSTEM TRANSMISSION LINES AND FACILITY SITING

Laws in the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Tennessee, Texas, Virginia and West Virginia require prior approval of sites of generating facilities and/or routes of high-voltage transmission lines. AEP has experienced delays and additional costs in constructing facilities as a result of proceedings conducted pursuant to such statutes and in proceedings in which AEP’s operating companies have sought to acquire rights-of-way through condemnation. These proceedings may result in additional delays and costs in future years.

CONSTRUCTION PROGRAM

With input from its state utility commissions, AEP subsidiaries continuously assess the adequacy of their transmission, distribution, generation and other facilities to plan and provide for the reliable supply of electric power and energy to its customers. In this assessment process, assumptions are continually being reviewed as new information becomes available and assessments and plans are modified, as appropriate. AEP forecasts approximately $11.5 billion of construction expenditures for 2025. Estimated construction expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, supply chain issues, weather, legal reviews, inflation and the ability to access capital. See the “Budgeted Capital Expenditures” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

POTENTIAL UNINSURED LOSSES

Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including liabilities relating to damage to AEP’s generation plants and costs of replacement power. Unless allowed to be recovered through rates, future losses or liabilities which are not completely insured could reduce net income and impact the financial conditions of AEP and subsidiaries. For risks related to owning a nuclear generating unit, see the “Nuclear Contingencies” section of Note 6 - Commitments, Guarantees and Contingencies for additional information.