AES (AES) 10-K risk factor changes: FY2024 vs FY2023
The 2024-12-31 10-K against the 2023-12-31 one, compared heading by heading and sentence by sentence.
Item 1A63 rewritten36 added22 removed410 unchanged
All filing items2,261 rewritten1,298 added961 removed3,300 unchanged
Sentence counts leave out repeated page headers and footers. 133 of those lines differ and are listed apart under each item.
Summary
counted, not written
- Item 1A headings could not be compared: only 0 carried over between the two years, which usually means one filing was read wrongly, so none is reported as new or removed.
- Sentence by sentence, 1,298 added, 961 removed, 2,261 rewritten and 3,300 unchanged across 18 items that differ.
- Not counted above: 133 repeated page header or footer lines also differ. They are listed apart under each item.
Sentences by item
23 items, with every count and a link to each item that changed
Underlined words on a shaded ground are new in FY2024; struck-through words were in FY2023. Sentences that are wholly new or wholly gone are labelled rather than marked.
Item 1A. RISK FACTORS
63 rewritten, 36 added, 22 removed, 410 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The categories of risk we have identified in Item 1A.—*[Risk [removed: Factors](#i8ea710b913994516904e0694e23e5230_58)*] [added: Factors](#i3951040d90a14d81a315859e5f4b3298_58)*] include risks associated with our operations, governmental regulation and laws, our indebtedness and financial condition.
These risk factors should be read in conjunction with Item 7*.—[Management's Discussion and Analysis of Financial Condition and Results of [removed: Operations](#i8ea710b913994516904e0694e23e5230_100)*] [added: Operations](#i3951040d90a14d81a315859e5f4b3298_103)*] in this Form 10-K and the Consolidated Financial Statements and related notes included elsewhere in this Form 10-K.
See Item 3.— *[Legal [removed: Proceedings](#i8ea710b913994516904e0694e23e5230_67)*] [added: Proceedings](#i3951040d90a14d81a315859e5f4b3298_70)*] below.
[removed: This trend of volatility] [added: Volatility] in wholesale prices could [removed: continue and could] have a material adverse impact on the financial performance of our existing generation assets to the extent they currently sell or buy power into the spot market to serve our contracts or will seek to sell power into the spot market once our contracts expire.
[removed: Adverse] [added: Volatility in] economic [removed: developments] [added: growth] in China could [removed: have a negative impact on] [added: result in lower economic growth and lower] demand for electricity in [removed: many of] our [added: key] markets.
In many cases, we also limit our exposure to fluctuations in fuel prices by entering into [removed: long-term contracts for fuel with a limited number of suppliers.][added: long-]
Some of these business lines are dependent upon favorable regulatory incentives to support continued investment, and there is significant uncertainty about the extent to which such favorable regulatory [removed: incentives] [added: incentives, in particular, those associated with the U.S. Inflation Reduction Act of 2022,] will be available in the future.
In particular, in the U.S., AES’ renewable energy generation growth strategy depends in part on federal, state and local government policies and incentives that support the development, financing, ownership and operation of renewable energy generation projects, including investment tax credits, production tax credits, accelerated depreciation, renewable portfolio standards, feed-in-tariffs and similar programs, [removed: renewable energy credit mechanisms,] [added: REC mechanisms] and [added: compliance programs, and] tax exemptions.
In [removed: addition,new] [added: addition, new] tariffs, duties or other assessments could be imposed on the imports of solar cells, modules, batteries or other equipment utilized in our renewable energy projects.
Any such developments could impede the realization of our U.S. renewables strategy by resulting in, among other items, lack of a satisfactory market for the development and/or financing of our U.S. renewable energy [removed: projects, abandoning the development of certain U.S. renewable energy projects, a loss of our investments in the projects, and/or reduced project returns.]
Additionally, in the U.S., there is a significant backlog of interconnection requests for renewables [added: and battery storage] projects and the average time for receiving interconnection approvals is over four years, with significant variations across [removed: projects.][added: projects and regions.]
For example, our subsidiaries may instruct contractors to begin the construction process or seek to procure equipment without having [added: financing, a PPA or critical permits in place (or enter into a PPA, procurement agreement or other agreement without agreed financing).]
[removed: The COVID-19 pandemic, or the future outbreak of any other highly] [added: Highly] infectious or contagious [removed: diseases,] [added: diseases outbreaks] could impact our business and operations.
[removed: COVID-19] [added: Regional] or [removed: another pandemic] [added: global outbreaks of infectious or contagious diseases, such as occurred during the COVID-19 pandemic,] could have material and adverse effects on our results of operations, financial condition and cash flows due to, among other factors:
- [removed: further] decline in customer demand as a result of general decline in business activity;
- [removed: further] destabilization of the markets and decline in business activity negatively impacting customers’ ability to pay for our services when due or at all, including downstream impacts, whereby the utilities’ customers are unable to pay monthly bills or receiving a moratorium from payment obligations, resulting in inability on the part of utilities to make payments for power supplied by our generation companies;
- [removed: further] decline in spot electricity prices;
- a deterioration in our ability to ensure business continuity, including increased cybersecurity attacks related to [removed: the] [added: a] work-from-home environment;
- [removed: further] delays to our construction projects, including at our renewables projects, and the timing of the completion of renewables projects;
- delay or inability in obtaining regulatory actions and outcomes that could be material to our business, including for recovery of [removed: COVID-19] related losses and the review and approval of our rates at our U.S. regulated utilities.
[added: Counterparties to these agreements may breach or may be unable to] perform their obligations, due to bankruptcy, insolvency, financial distress or other factors.
Any loss or corruption of confidential or proprietary data through a breach [added: of our systems or certain of our third party vendor systems] may:
- expose us to [added: negative publicity,] legal [removed: claims and/or] [added: claims,] regulatory investigations and [removed: proceedings;][added: proceedings and associated penalties or liabilities;]
To date, [removed: cyber-attacks] [added: cyber breaches] have not had a material impact on our operations or financial results.
[removed: We continue to assess potential threats and vulnerabilities and make investments to address them, including global monitoring of networks and systems, identifying and] implementing new technology, improving user awareness through employee security training, and updating our security policies as well as those for third-party providers.
Further, we do not control certain of [added: our] joint ventures or our equity method investments and cannot guarantee that their efforts will be effective.
To the extent that hydrological conditions result in droughts or other conditions negatively affect our hydroelectric generation business, such as has happened in Panama in [removed: 2019 and] [added: 2019,] Brazil in [removed: 2021,] [added: 2021 and Colombia in 2024,] our results of operations can be materially adversely affected.
In addition, severe weather and natural disasters, such as hurricanes, floods, tornadoes, icing events, earthquakes, dam [removed: failures] [added: failures, wildfires] and tsunamis can be destructive and could prevent us from operating our business in the normal course by causing power outages and property damage, reducing revenue, affecting the availability of fuel and water, causing injuries and loss of life, and requiring us to incur additional costs, for example, to restore service and repair damaged facilities, to obtain replacement power and to access available financing sources.
At our businesses where cost recovery is available, recovery of costs to restore service and repair damaged facilities is or may be subject to regulatory approval, and any determination by the [removed: regulator not to permit timely and full recovery of the costs incurred.]
In addition, if a joint venture partner becomes insolvent or bankrupt or [removed: is] otherwise [removed: unable] [added: fails] to meet its obligations to or share of liabilities for the joint venture, we may be responsible for meeting certain obligations of the joint ventures to the extent provided for in our governing documents or applicable [removed: law.][added: law, or may assume additional obligations in order to preserve such projects.]
As of December 31, [removed: 2023,] [added: 2024,] Fluence continues to report that a material weakness in its internal control over revenue recognition [removed: and related inventory] has not yet been remediated.
The management teams of our equity method investments may not have the level of experience, technical expertise, human resources, management and other attributes necessary to operate these projects or businesses optimally, and they may not share our business priorities, which could have a material adverse effect on [added: the] value of such investments as well as our growth, business, financial condition, results of operations and prospects.
[removed: As part] of this strategy, we routinely utilize fixed price or indexed forward physical purchase and sales contracts, futures, financial swaps, and option contracts traded in the over-the-counter markets or on exchanges.
[added: However, we may not cover the entire exposure of our] assets or positions to market price or interest rate volatility, and the coverage will vary over time.
We have [removed: 28] [added: 27] defined benefit plans, five at U.S. subsidiaries and the remaining plans at foreign subsidiaries, which cover substantially all of the employees at these subsidiaries.
See Item 7.—*[Management's Discussion and Analysis—Critical Accounting Policies and Estimates—Pension and Other Postretirement [removed: Plans](#i8ea710b913994516904e0694e23e5230_262)*] [added: Plans](#i3951040d90a14d81a315859e5f4b3298_259)*] and Note [removed: 15—*[Benefit Plans](#i8ea710b913994516904e0694e23e5230_337)*] [added: 16—*[Benefit Plans](#i3951040d90a14d81a315859e5f4b3298_337)*] included in Item 8.—*[Financial Statements and Supplementary [removed: Data](#i8ea710b913994516904e0694e23e5230_271)*.][added: Data](#i3951040d90a14d81a315859e5f4b3298_268)*.]
[removed: Any impairment of long-lived] [added: lived] assets could have a material adverse effect on our business, financial condition, results of operations, and prospects.
- other changes that impact the short- or long-term price-setting mechanism in [removed: the] our markets.
See Item [removed: 1.*—[Business—](#i8ea710b913994516904e0694e23e5230_31)[Utilities SBU](#i8ea710b913994516904e0694e23e5230_31)*.][added: 1.*—[Business—Utilities SBU](#i3951040d90a14d81a315859e5f4b3298_31)*.]
modifications to [removed: a] coal-fired generating units without proper permit approvals and without installing best available control technology.
projects, abandoning the development of certain U.S. renewable energy projects, a loss of our investments in the projects, and/or reduced project returns.
Our existing interconnection requests may also be subject to regulatory changes that could negatively impact the timing or cost associated with obtaining interconnection approval.
Some RTOs, such as PJM, have recently implemented or are considering accelerated or supplemental interconnection processes for high-capacity factor resources, which could result in delays or cost increases to existing or future interconnection requests of intermittent renewable energy projects, such as solar and wind.
Additional measures could be considered by RTOs, transmission owners, or governmental authorities to foster or accelerate deployment or utilization of certain high-capacity factor technologies in a manner that negative impacts the development or solar or wind projects.
These upgrades may also be delayed by the accelerated or supplemental interconnection of high-capacity factor resources, as discussed above.
Further, the Chinese market has driven global materials demand and pricing for commodities, many of which are produced in our key electricity markets in South America.
term contracts for fuel with a limited number of suppliers.
Additionally, we store and use customer, employee, and other personal information and other confidential and sensitive information.
We continue to assess potential threats and vulnerabilities and make investments to address them, including global monitoring of networks and systems, identifying and
regulator not to permit timely and full recovery of the costs incurred.
As part
Any impairment of long-
Any of the foregoing could have a material adverse effect on our business, financial condition, results of operations, reputation and prospects.
On May 9, 2024, the EPA published the final NSPS requiring carbon capture and sequestration for new and reconstructed baseload stationary combustion turbines, among other requirements.
The EPA did not finalize revisions to the NSPS for newly constructed or reconstructed coal-fired electric utility steam generating units as proposed in 2018.
On May 9, 2024, the EPA published the final rule regulating GHGs from existing EGUs pursuant to Section 111(d) of the Clean Air Act and effective on July 8, 2024.
Existing EGUs are those that were constructed prior to January 8, 2014.
Depending on various EGU-specific factors, the bases of emissions guidelines for natural gas-fired units include the use of uniform fuels and routine methods of operation and maintenance and the bases of emissions guidelines for coal-fired units include 40% natural gas co-firing or carbon capture and sequestration with 90% capture of CO2 depending on the date that coal operations cease.
Specific standards for performance for EGUs will be established through a State Plan (or a Federal Plan if the state of Indiana were to not submit an approvable plan).
The May 2024 rule is subject to legal challenges.
On October 16, 2024, the U.S. Supreme Court denied emergency stay applications.
The impact to the Company during 2024 was not material.
Our subsidiaries face various restrictions in their ability to distribute cash.
involving material subsidiaries and relating to accelerations of outstanding material debt of material subsidiaries or any subsidiaries that in the aggregate constitute a material subsidiary; or
Failure to maintain an effective system of internal control over financial reporting could result in material misstatements in our financial statements or may negatively impact investor confidence in our reported financial information.
Our internal controls, accounting policies, and practices are designed to enable us to evaluate transactions in a timely and accurate manner in compliance with GAAP, laws and regulations, taxation requirements, and federal securities laws and regulations in order to, among other things, disclose and report financial and other information in connection with our reporting requirements under federal securities, tax, and other laws and regulations.
We have also implemented corporate governance, internal controls, and accounting policies and procedures in connection with the Sarbanes-Oxley Act of 2002.
Our internal controls and policies have been and continue to be closely monitored by management and our Board of Directors.
While we believe these controls, policies, practices, and
systems are adequate to accurately and fairly reflect the transactions and dispositions of the assets of the Company, the identification of significant deficiencies or material weaknesses in our internal controls that we cannot remediate in a timely manner could lead to undetected errors that could result in material misstatements in our financial statements.
As more fully disclosed in Item 9A.—*Controls and Procedures*, we have identified a material weakness in our internal control over financial reporting that existed at December 31, 2024.
The Company did not design effective controls over management's review of the disposition of AES Brasil, a complex non-routine transaction; specifically, the evaluation of the completeness and accuracy of data and information used in the impairment and disposition calculations of the AES Brasil disposal group.
This control deficiency was not remediated as of December 31, 2024.
Since there is a reasonable possibility that the control deficiency could result in a material misstatement in our financial statements that would not be detected, we determined that this control deficiency constituted a material weakness.
While we are taking steps to implement a remediation plan, the material weakness will not be considered remediated until the applicable controls operate and management has concluded, through testing, that the controls are operating effectively.
Furthermore, we can give no assurance that the measures we take will remediate the material weakness or that additional material weaknesses will not arise in the future, either of which could result in material misstatements in our financial statements and cause us to fail to meet our reporting and financial obligations, and in turn, could negatively impact investor confidence in our reported financial information.
The Chinese market has been driving global materials demand and pricing for commodities over the past decade.
Many of these commodities are produced in our key electricity markets.
After experiencing rapid growth for more than a decade, China’s economy has experienced decreasing foreign and domestic demand, weak investment, factory overcapacity and oversupply in the property market, and has experienced a significant slowdown in recent years.
U.S. tariffs have also had a negative impact on China's economic growth.
Further, China's Zero COVID strategy contributed to a significant decrease in GDP growth in 2022 and its GDP growth in 2023 was below growth rates in the years preceding the pandemic.
Continued slowing in China’s economic growth, demand for commodities and/or material changes in policy could result in lower economic growth and lower demand for electricity in our key markets, which could have a material adverse effect on our results of operations, financial condition and prospects.
financing, a PPA or critical permits in place (or enter into a PPA, procurement agreement or other agreement without agreed financing).
The COVID-19 pandemic has severely impacted global economic activity in recent years, including electricity and energy consumption.
The impact of the COVID-19 pandemic also depends on factors, including the effectiveness and timing of updated vaccines to address new variants, the development of more virulent COVID-19 variants as well as third-party actions taken to contain its spread and mitigate its public health effects.
A resurgence or material worsening of the COVID-19 pandemic could present material uncertainty that could adversely affect our generation facilities, transmission and distribution systems, development projects, energy storage sales by Fluence, and results of operations, financial condition and cash flows.
The COVID-19 pandemic may also heighten many of the other risks described in this section.
Further, our suppliers may source certain materials from areas impacted by the COVID-19 pandemic, which may cause delays and/or disruptions to our development projects or operations.
Counterparties to these agreements may breach or may be unable to
However, we may not cover the entire exposure of our
On May 23, 2023, the EPA published a proposed rule that would establish CO2 emissions limits for certain new fossil-fuel fired stationary combustion turbines that commence construction or are modified after May 23, 2023.
On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule, establish emissions guidelines in the form of CO2 emissions limitations for certain existing EGUs and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines.
Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s.
For further discussion of the regulation of GHG
violation of applicable privacy laws, subject us to claims from third parties, require compliance with notification and monitoring regulations, and harm our reputation.
For example, in the third quarter of 2022, the Inflation Reduction Act (the “IRA”) was signed into law in the United States.
In that event, we may not be able to borrow money,
However, as a result of future mix of
An excerpt. Shown here: 40 of 63 rewritten, all 36 added and all 22 removed. The counts are complete. For every sentence, read Item 1A. RISK FACTORS in the FY2024 filing and the FY2023 filing.
Page headers and footers: 18 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 55] [added: 56] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 56] [added: 57] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 57] [added: 58] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 58] [added: 59] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 59] [added: 60] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 60] [added: 61] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 61] [added: 62] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 62] [added: 63] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 63] [added: 64] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 64] [added: 65] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 65] [added: 66] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 66] [added: 67] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 67] [added: 68] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 68] [added: 69] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 69] [added: 70] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 70] [added: 71] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 71] [added: 72] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 73 \| 2024 Annual Report | | | | | |
Item 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
359 rewritten, 160 added, 184 removed, 360 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
For discussion of the Company's year ended December 31, [removed: 2022] [added: 2023] compared to the year ended December 31, [removed: 2021,] [added: 2022,] refer to Item 7.*—Management's Discussion and Analysis of Financial Condition and Results of Operations* in [removed: Exhibit 99.1 of the] [added: our 2023] Form [removed: 8-K] [added: 10-K] filed with the SEC on [removed: May 8, 2023.][added: February 26, 2024.]
In [removed: 2023,] [added: 2024,] AES delivered on its strategic and financial objectives.
We completed construction or the acquisition of [removed: 3.5] [added: 3.0] GW of renewables and energy storage, [added: construction of a 670 MW combined cycle gas plant,] and signed long-term PPAs for an additional [removed: 5.6] [added: 4.4] GW of new renewable energy.
See *Overview of our Strategy* included in Item [removed: 1.—*[Business](#i8ea710b913994516904e0694e23e5230_19)*] [added: 1.—*[Business](#i3951040d90a14d81a315859e5f4b3298_19)*] of this Form 10-K for further information.
Adjusted EBITDA with Tax Attributes, a non-GAAP measure, increased [removed: $225] [added: $513] million, from [removed: $3,198] [added: $3,439] million to [removed: $3,423] [added: $3,952] million, primarily due to higher realized tax attributes driven by more renewables projects placed in service, [removed: as well as impact from] [added: partially offset by] the drivers above.
Compared with last year, diluted earnings per share from continuing operations increased [removed: $1.16,] [added: $2.03,] from [removed: a loss of $0.82 in 2022 to earnings of] $0.34 [removed: in 2023.][added: to $2.37.]
This increase is mainly driven by lower [removed: goodwill] [added: long-lived asset] impairments in the current year, higher contributions from renewables projects placed in service in the current year, [removed: the current] [added: prior] year [removed: gain on sale of shares in Fluence, and higher contributions at the Utilities SBU due to the deferral of purchased power costs; partially offset by lower contributions from LNG transactions versus 2022, and higher] unrealized foreign currency losses at the Energy Infrastructure [removed: SBU.][added: SBU, the gain on sale of AES Brasil, and lower income tax expense.]
Adjusted EPS, a non-GAAP measure, increased [removed: $0.09] [added: $0.38] from [removed: $1.67] [added: $1.76] to [removed: $1.76,] [added: $2.14,] mainly driven by higher contributions from renewables projects placed in service in the current year, [added: a lower adjusted tax rate, and] higher contributions [removed: at] [added: from] the Utilities [removed: SBU, and lower losses of affiliates at the New Energy Technologies] SBU; partially offset by lower contributions from the Energy Infrastructure [removed: SBU and higher Parent Company interest.][added: SBU.]
| Years Ended December 31, | | | [removed: 2023] [added: 2024] | | | | | | [removed: 2022] [added: 2023] | | | | | | | | | | | | $ Change | | | | | | % Change | | |
| Renewables SBU | | | $ | [removed: 2,339] [added: 2,510] | | | | | $ | [removed: 1,893] [added: 2,339] | | | | | | | | | | | $ | [removed: 446] [added: 171] | | | | | [removed: 24] [added: 7] | | % |
| Utilities SBU | | | [removed: 3,495] [added: 3,608] | | | | | | [removed: 3,617] [added: 3,495] | | | | | | | | | | | | [removed: (122)] [added: 113] | | | | | | [removed: \-3] [added: 3] | | % |
| Energy Infrastructure SBU | | | [removed: 6,836] [added: 6,238] | | | | | | [removed: 7,204] [added: 6,836] | | | | | | | | | | | | [removed: (368)] [added: (598)] | | | | | | [removed: \-5] [added: \-9] | | % |
| New Energy Technologies SBU | | | [removed: 76] [added: 1] | | | | | | [removed: 3] [added: 76] | | | | | | | | | | | | [removed: 73] [added: (75)] | | | | | | [removed: NM] [added: \-99] | | [added: %] |
| Corporate and Other | | | [removed: 138] [added: 162] | | | | | | [removed: 116] [added: 138] | | | | | | | | | | | | [removed: 22] [added: 24] | | | | | | [removed: 19] [added: 17] | | % |
| Eliminations | | | [removed: (216)] [added: (241)] | | | | | | (216) | | | | | | | | | | | | [removed: —] [added: (25)] | | | | | | [removed: —] [added: 12] | | % |
| Total Revenue | | | [removed: 12,668] [added: 12,278] | | | | | | [removed: 12,617] [added: 12,668] | | | | | | | | | | | | [removed: 51] [added: (390)] | | | | | | [removed: —] [added: \-3] | | % |
| Renewables SBU | | | [removed: 492] [added: 359] | | | | | | [removed: 528] [added: 492] | | | | | | | | | | | | [removed: (36)] [added: (133)] | | | | | | [removed: \-7] [added: \-27] | | % |
| Utilities SBU | | | [removed: 433] [added: 543] | | | | | | [removed: 379] [added: 433] | | | | | | | | | | | | [removed: 54] [added: 110] | | | | | | [removed: 14] [added: 25] | | % |
| Energy Infrastructure SBU | | | [removed: 1,418] [added: 1,273] | | | | | | [removed: 1,535] [added: 1,418] | | | | | | | | | | | | [removed: (117)] [added: (145)] | | | | | | [removed: \-8] [added: \-10] | | % |
| New Energy Technologies SBU | | | [removed: (9)] [added: (7)] | | | | | | [removed: (7)] [added: (9)] | | | | | | | | | | | | [removed: (2)] [added: 2] | | | | | | [removed: 29] [added: \-22] | | % |
| Corporate and Other | | | [removed: 239] [added: 267] | | | | | | [removed: 182] [added: 239] | | | | | | | | | | | | [removed: 57] [added: 28] | | | | | | [removed: 31] [added: 12] | | % |
| Eliminations | | | [removed: (69)] [added: (121)] | | | | | | (69) | | | | | | | | | | | | [removed: —] [added: (52)] | | | | | | [removed: —] [added: 75] | | % |
| Total Operating Margin | | | [removed: 2,504] [added: 2,314] | | | | | | [removed: 2,548] [added: 2,504] | | | | | | | | | | | | [removed: (44)] [added: (190)] | | | | | | [removed: \-2] [added: \-8] | | % |
| General and administrative expenses | | | [removed: (255)] [added: (288)] | | | | | | [removed: (207)] [added: (255)] | | | | | | | | | | | | [removed: (48)] [added: (33)] | | | | | | [removed: 23] [added: 13] | | % |
| Interest expense | | | [removed: (1,319) | | | | | | (1,117) | | | | | |] [added: 1,485] | | | | | | [removed: (202)] [added: 1,319] | | | | | | [removed: 18] | | [removed: %] |
| Interest income | | | [removed: 551 | | | | | | 389 | | | | | |] [added: (381)] | | | | | | [removed: 162] [added: (551)] | | | | | | [removed: 42] | | [removed: %] |
| Loss on extinguishment of debt | | | [removed: (63)] [added: (17)] | | | | | | [removed: (15)] [added: (63)] | | | | | | | | | | | | [removed: (48)] [added: 46] | | | | | | [removed: NM] [added: \-73] | | [added: %] |
| Other expense | | | [removed: (99)] [added: (175)] | | | | | | [removed: (68)] [added: (99)] | | | | | | | | | | | | [removed: (31)] [added: (76)] | | | | | | [removed: 46] [added: 77] | | % |
| Other income | | | [removed: 89] [added: 156] | | | | | | [removed: 102] [added: 89] | | | | | | | | | | | | [removed: (13)] [added: 67] | | | | | | [removed: \-13] [added: 75] | | % |
| Gain (loss) on disposal and sale of business interests | | | [removed: 134] [added: 351] | | | | | | [removed: (9)] [added: 134] | | | | | | | | | | | | [removed: 143] [added: 217] | | | | | | NM | | |
| Goodwill impairment expense | | | [removed: (12)] [added: —] | | | | | | [removed: (777)] [added: (12)] | | | | | | | | | | | | [removed: 765] [added: 12] | | | | | | [removed: \-98] [added: \-100] | | % |
| Asset impairment expense | | | [removed: (1,067)] [added: (374)] | | | | | | [removed: (763)] [added: (1,067)] | | | | | | | | | | | | [removed: (304)] [added: 693] | | | | | | [removed: 40] [added: \-65] | | % |
| Foreign currency transaction [removed: losses] [added: gains (losses)] | | | [removed: (359)] [added: 31] | | | | | | [removed: (77)] [added: (359)] | | | | | | | | | | | | [removed: (282)] [added: 390] | | | | | | NM | | |
| Income tax [removed: benefit (expense) | | | (261) | | | | | | (265) | | |] [added: expense] | | | [added: 59] | | | | | | [removed: 4] [added: 261] | | | | | | [removed: \-2] | | [removed: %] |
| Net equity in losses of affiliates | | | [removed: (32)] [added: (26)] | | | | | | [removed: (71)] [added: (32)] | | | | | | | | | | | | [removed: 39] [added: 6] | | | | | | [removed: \-55] [added: \-19] | | % |
| [removed: LOSS] [added: INCOME (LOSS)] FROM CONTINUING OPERATIONS | | | [removed: (189)] [added: 809] | | | | | | [removed: (505)] [added: (189)] | | | | | | | | | | | | [removed: 316] [added: 998] | | | | | | [removed: \-63] [added: NM] | | [removed: %] |
| Gain [added: (loss)] from disposal of discontinued businesses, net of income tax benefit (expense) of $7, [removed: $0,] [added: $7,] and [removed: $-1,] [added: $0,] respectively | | | [removed: 7] [added: (7)] | | | | | | [removed: —] [added: 7] | | | | | | | | | | | | [removed: 7] [added: (14)] | | | | | | NM | | |
| [removed: NET LOSS | | | (182) | | | | | | (505) | | |] [added: Net income (loss)] | | | [added: $] | [added: 802] | | | | | [removed: 323] [added: $] | [added: (182)] | | | | | [removed: \-64] | | [removed: %] |
| Less: Net loss (income) attributable to noncontrolling interests and redeemable stock of subsidiaries | | | [removed: 431] [added: 877] | | | | | | [removed: (41)] [added: 431] | | | | | | | | | | | | [removed: 472] [added: 446] | | | | | | NM | | |
| NET INCOME (LOSS) ATTRIBUTABLE TO THE AES CORPORATION | | | $ | [removed: 249] [added: 1,679] | | | | | $ | [removed: (546)] [added: 249] | | | | | | | | | | | $ | [removed: 795] [added: 1,430] | | | | | NM | | |
Compared with last year, net income increased $984 million, from a net loss of $182 million in 2023 to net income of $802 million in 2024.
This increase is the result of lower impairments, unrealized foreign currency gains in the current year versus losses in the prior year, gain on sale of AES Brasil, favorable contributions at the Utilities and New Energy Technologies SBUs, and higher contributions from renewables projects placed in service in the current year; partially offset by higher interest expense and lower interest income, and the prior year gain on sell-down of Fluence.
Adjusted EBITDA, a non-GAAP measure, decreased $189 million, from $2,828 million to $2,639 million, mainly driven by record-breaking drought conditions and outages in Colombia at the Renewables SBU, lower margins at the Energy Infrastructure SBU due to prior year margin at the hedged merchant Southland facilities that are contracted primarily for capacity in the current year and higher outages; partially offset by higher contributions at the Utilities SBU and higher revenues from new projects at the Renewables SBU.
This was partially offset by higher interest expense and lower interest income, and lower margins due to outages.
- $598 million at Energy Infrastructure primarily driven by a $398 million decrease in regulated contract sales and prices, $319 million due to higher revenues from our hedged merchant Southland facilities in the prior year that are contracted primarily for capacity in the current year, $73 million due to lower generation driven by lower dispatch in Argentina, and $69 million impact from the selldown of Amman East and IPP4 in Jordan; partially offset by $195 million higher realized gains on power swaps; and
- $171 million at Renewables mainly driven by $205 million due to new projects in service, $61 million of unrealized derivative gains, $58 million of higher contracted energy sales, and $35 million due to the appreciation of the Colombian peso; partially offset by $125 million impact from the sale of our controlling interest in AES Brasil, and $69 million due to higher outages and record-breaking drought conditions in Colombia; and
- $145 million at Energy Infrastructure mainly driven by $110 million due to higher energy margin from our hedged merchant Southland facilities in the prior year that are contracted primarily for capacity in the current year, $54 million impact from the selldown of Amman East and IPP4 in Jordan, $51 million due to higher outages, $39 million due to end of commercial operations at Warrior Run in May 2024, and $31 million due to lower LNG transactions; partially offset by $82 million from a PPA termination loss recognized in the prior year and $45 million of unrealized derivative gains;
- $133 million at Renewables driven by $148 million impact primarily from record-breaking drought conditions in Colombia, alongside drier hydrological conditions in Brazil, $45 million impact of outages at Colombia due to a flooding incident at the Chivor plant which occurred in June 2024, $44 million impact from the sale of our controlling interest in AES Brasil, and $29 million higher fixed costs primarily due to an accelerated growth plan; partially offset by unrealized derivative gains of $61 million and higher contracted energy sales of $58 million; and
These unfavorable impacts were partially offset by an increase of $110 million at Utilities primarily driven by $83 million due to higher transmission and rider revenues, $76 million due to higher retail rates as a result of the 2024 Base Rate Order, and $72 million due to higher demand primarily from the impact of weather; partially offset by $57 million higher depreciation from additional assets placed in service, the prior year $29 million deferral of power purchase costs associated with the approval of ESP 4, and $25 million higher expected credit losses due to the one-time implementation of customer billing system upgrades.
Interest expense increased $166 million, or 13%, to $1,485 million in 2024, compared to $1,319 million in 2023.
Interest income decreased $170 million, or 31%, to $381 million in 2024, compared to $551 million in 2023 primarily due to a decrease in Argentina of $138 million primarily due to lower short-term investments at lower rates and a decrease in Brazil of $51 million due to lower short-term investments and the sale of AES Brasil in October 2024; partially offset by an increase in Chile of $30 million mainly driven by interest recognized on the Stabilization Fund receivables.
Loss on extinguishment of debt decreased $46 million to $17 million in 2024, compared to $63 million in 2023.
Other income increased $67 million, or 75%, to $156 million in 2024, compared to $89 million in 2023 primarily due to the bargain purchase gain recognized on the Madison and Birdseye acquisition for $20 million, a $17 million increase in gains on remeasurement of contingent consideration primarily on projects acquired at AES Clean Energy, a $14 million gain corresponding to the step acquisition of Felix, and an indexation adjustment of Stabilization Fund receivables at AES Andes of $12 million.
Other expense increased $76 million, or 77%, to $175 million in 2024, compared to $99 million in 2023 primarily driven by $52 million higher losses on commencement of sales-type leases at AES Renewable Holdings, a $43 million increase in losses on remeasurement of contingent consideration primarily on projects acquired at AES Clean Energy, and a $20 million loss related to legal expenses and other direct costs associated with the troubled debt restructuring at Puerto Rico.
This was partially offset by a $36 million decrease in loss on sale and disposal of assets, mainly driven by prior year impairments of inventory due to the planned early plant closures at Ventanas 2, Norgener, and Warrior Run.
Gain on disposal and sale of business increased $217 million to $351 million in 2024, compared to $134 million in 2023.
This increase was driven by the gain on sale of AES Brasil of $312 million and a $52 million gain corresponding to the dilution of AES' ownership in Uplight as a result of the AutoGrid acquisition; partially offset by a $136 million gain on sale of shares of Fluence, our equity method investment, in 2023, and the $10 million loss on the selldown of Amman East and IPP4 in Jordan, which is now accounted for as an equity method investment.
Asset impairment expense decreased $693 million, or 65%, to $374 million in 2024, compared to $1.1 billion in 2023.
In addition, the decrease was driven by lower impairment expense of $105 million associated with the held-for-sale classification of Mong Duong and lower impairment expense of $56 million at AES Clean Energy Development related to the write-off of project development intangibles for projects that were determined to be no longer viable.
This was partially offset by current year impairments of $125 million and $80 million at Ventanas and AES Brasil, respectively, after meeting held-for-sale criteria.
The Company recognized net foreign currency transaction gains of $31 million in 2024, primarily driven by realized gains on swaps and options denominated in the Brazilian real.
The 2024 effective tax rate was impacted by the current year benefits associated with ITCs and the restructuring of a foreign holding company.
These drivers were partially offset by the impacts of allocations of losses to tax equity investors on renewables projects.
This was partially offset by a $13 million decrease in earnings from Mesa La Paz, primarily due to the prior year termination of derivative positions due to a contract amendment; lower earnings from sPower of $7 million, mainly due to lower earnings from renewables projects that came online; and lower earnings from Energía Natural Dominicana Enadom of $7 million due to lower capitalized interest and higher depreciation.
- Higher losses at Brazil of $60 million, primarily due to held-for-sale impairment.
- Selldowns of business interests resulting in larger shares of income attributable to minority shareholders at the Energy Infrastructure SBU of $46 million.
- Gain on sale of AES Brasil in the current year of $312 million;
- Lower income tax expense attributable to AES, primarily driven by $273 million of tax benefit resulting from the transfer of ITCs directly to third parties; and
- Higher margin from the Utilities SBU impacting net income attributable to AES by $77 million, mainly driven by higher transmission and rider revenues and higher retail rates.
- Higher interest expense and lower interest income in the current year of $245 million;
- Lower margin from the Energy Infrastructure SBU impacting net income attributable to AES by $147 million, mainly driven by selldowns, higher energy margin from our hedged merchant Southland facilities in the prior year that are contracted primarily for capacity in the current year, and higher outages;
- Lower margin at the Renewables SBU impacting net income attributable to AES by $145 million, mainly driven by record-breaking drought conditions and partial outage due to a flooding incident in Colombia; and
For the year ended December 31, 2024, the Company updated the definitions of EBITDA and Adjusted EBITDA to include accretion of AROs in the *depreciation and amortization* add-back.
We believe excluding accretion of AROs from these metrics better reflects the underlying business performance of the Company and is aligned with the metrics of our industry peers.
For comparability and consistency, all prior period EBITDA and Adjusted EBITDA measures have been recast to conform to the current presentation.
The impact of this update resulted in an increase to Adjusted EBITDA of $22 million and $16 million in each of the years ended December 31, 2024 and 2023, respectively.
During the first quarter of 2024, the Company updated the definitions of Adjusted EBITDA, Adjusted PTC, and Adjusted EPS add-back (a) *unrealized gains or losses related to derivative transactions and equity securities* to include financial assets and liabilities measured using the fair value option, and updated add-back (e) *gains, losses, and costs due to the early retirement of debt* to include troubled debt restructuring.
We believe excluding these gains or losses better reflects the underlying business performance of the Company.
The Company also removed the adjustment for net gains at Angamos, one of our businesses in the Energy Infrastructure SBU, associated with the early contract terminations with Minera Escondida and Minera Spence.
As this adjustment was specific to certain contract terminations that occurred in 2020, we believe removing this adjustment from our non-GAAP definitions provides simplification and clarity for our investors.
Compared with last year, net loss decreased $323 million, from $505 million to $182 million primarily as a result of favorable contributions at the Utilities, New Energy Technologies, and Renewables SBUs, partially offset by lower contributions from LNG transactions versus 2022 at the Energy Infrastructure SBU.
Adjusted EBITDA, a non-GAAP measure, decreased $119 million, from $2,931 million to $2,812 million, mainly driven by favorable LNG transactions in the prior year, lower contract prices, and higher fixed costs at the Energy Infrastructure SBU; partially offset by favorable weather conditions and new businesses at the Renewables SBU, higher contributions at the Utilities SBU due to the deferral of purchased power costs, higher revenues under a PPA termination agreement at the Energy Infrastructure SBU, and lower losses from affiliates at the New Energy Technologies SBU due to improved margins on a new product line.
| Other non-operating expense | | | — | | | | | | (175) | | | | | | | | | | | | 175 | | | | | | \-100 | | % |
- $446 million at Renewables driven by higher spot sales at higher prices, and new projects placed in service; partially offset by unrealized derivative losses; and
- $368 million at Energy Infrastructure driven by prior year favorable LNG transactions, lower contract energy sales due to lower prices, lower CO2 purchases passed through due to lower production, lower generation, and the impact of the devaluation of the Argentine peso; partially offset by unrealized gains resulting mainly from derivatives as part of our commercial hedging strategy, and higher revenues due to a PPA termination agreement; and
- $117 million at Energy Infrastructure primarily driven by prior year favorable LNG transactions, lower contract energy sales due to lower prices, lower dispatch driven by lower demand, higher fixed costs, and a prior year one-time revenue recognition driven by a reduction in a project's expected completion costs; partially offset
by unrealized gains resulting mainly from derivatives as part of our commercial hedging strategy, and higher revenues due to a PPA termination agreement; and
- $36 million at Renewables mainly driven by higher fixed costs due to an accelerated growth plan and unrealized derivative losses; partially offset by new projects placed in service, better hydrology, and higher wind availability, resulting in higher renewable energy generation.
- $54 million at Utilities primarily driven by the deferral of purchased power costs in the current year, which were recognized in the prior year, associated with the ESP 4 approval, an increase in transmission and TDSIC rider revenues, higher demand due to extreme heat in El Salvador, and a regulatory settlement in the prior year; partially offset by the impact of milder weather in Indiana and Ohio, and higher fixed costs.
Interest income increased $162 million, or 42%, to $551 million in 2023, compared to $389 million in 2022 primarily due to higher average interest rates and short-term investments at the Energy Infrastructure and Renewables SBUs and the Parent Company; partially offset by the prior year sales-type lease receivable adjustment at the Alamitos Energy Center.
Loss on extinguishment of debt increased $48 million to $63 million in 2023, compared to $15 million in 2022.
Other income decreased $13 million, or 13%, to $89 million in 2023, compared to $102 million in 2022 primarily due to the prior year gain on remeasurement of our existing investment in 5B, which is accounted for using the measurement alternative, and the prior year insurance proceeds primarily associated with property damage at TermoAndes; partially offset by the current year gain on remeasurement of contingent consideration at AES Clean Energy.
Other expense increased $31 million, or 46%, to $99 million in 2023, compared to $68 million in 2022 primarily driven by impairments of inventory due to planned early plant closures at Ventanas 2, Norgener, and Warrior Run, as well as higher losses on commencement of sales-type leases at AES Renewable Holdings; partially offset by the prior year costs related to the disposition of AES Gilbert, including the recognition of an allowance on the sales-type lease receivable.
Gain on disposal and sale of business interests was $134 million in 2023, primarily due to the gain on sale of shares of Fluence, our equity method investment, compared to a loss of $9 million in 2022.
Goodwill impairment expense was $777 million in 2022 due to a $644 million impairment at AES Andes and a $133 million impairment at AES El Salvador.
This was due to the Company seeing increases in inputs utilized to derive the discount rate applied in our goodwill impairment analysis, such as higher interest rates and country risk premiums in certain markets.
These changes to the inputs of our discount rate negatively impacted our annual goodwill impairment test as of October 1, 2022.
Asset impairment expense increased $304 million, or 40%, to $1.1 billion in 2023, compared to $763 million in 2022.
This increase was partially offset by the $468 million impairment of Maritza's coal-fired plant in 2022 due to Bulgaria's commitment to cease electricity generation using coal as a fuel-source beyond 2038 and lower impairments at TEG and TEP in Mexico.
The Company recognized net foreign currency transaction losses of $77 million in 2022, primarily driven by the depreciation of the Argentine peso, partially offset by realized foreign currency derivative gains in South America due to the depreciating Colombian peso.
Other non-operating expense
There was no other non-operating expense in 2023.
Other non-operating expense was $175 million in 2022 due to the other-than-temporary impairment of the sPower equity method investment.
The impairment analysis was triggered by the signing of a purchase and sale agreement which, at the time, implied an expected loss upon sale of the Company's indirect interest in a portfolio of sPower's operating assets ("OpCo B").
The transaction closed on February 28, 2023.
sPower primarily holds operating assets where the tax credits associated with underlying projects have already been allocated to tax equity investors.
The application of HLBV accounting increases the carrying value of these investments, as earnings are initially disproportionately allocated to the sponsor entity.
Since sPower does not have any ongoing development or other value creation activities following the transfer of these activities to AES Clean Energy Development, the impairment adjusts the carrying value to the fair market value of the operating assets.
The 2022 effective tax rate was impacted by the nondeductible goodwill impairments at AES Andes and AES El Salvador, as well as the asset impairment of the Maritza coal-fired plant.
These impacts were partially offset by favorable LNG transactions at the Energy Infrastructure SBU and inflationary and foreign currency impacts at certain Argentine businesses recognized in 2022.
costs.
This decrease in losses was partially offset by lower earnings from sPower, mainly due to lower earnings from renewables projects that came online.
- Prior year one-time revenue recognition driven by a reduction in a project's expected completion costs at the Energy Infrastructure SBU; and
- Lower earnings from the Utilities SBU due to unfavorable weather conditions.
- Higher earnings from the Renewables SBU due to favorable weather conditions; and
- Higher allocation of earnings at Southland Energy to noncontrolling interests.
- Prior year other-than-temporary impairment of our investment in sPower;
- Increase in interest income due to higher average interest rates and short term investments at the Energy Infrastructure and Renewables SBUs;
- Higher earnings from the Utilities SBU due to the deferral of previously recognized purchased power costs and a prior year charge resulting from a regulatory settlement; and
- Lower losses from affiliates at the New Energy Technologies SBU.
An excerpt. Shown here: 40 of 359 rewritten, 40 of 160 added and 40 of 184 removed. The counts are complete. For every sentence, read Item 7. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS in the FY2024 filing and the FY2023 filing.
Page headers and footers: 32 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 80] [added: 82] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 81] [added: 83] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 82] [added: 84] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 83] [added: 85] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 84] [added: 86] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 85] [added: 87] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 86] [added: 88] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 87] [added: 89] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 88] [added: 90] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 89] [added: 91] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 90] [added: 92] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 91] [added: 93] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 92] [added: 94] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 93] [added: 95] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 94] [added: 96] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 95] [added: 97] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 96] [added: 98] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 97] [added: 99] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 98] [added: 100] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 99] [added: 101] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 100] [added: 102] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 101] [added: 103] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 102] [added: 104] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 103] [added: 105] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 104] [added: 106] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 105] [added: 107] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 106] [added: 108] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 107] [added: 109] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 108] [added: 110] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 109] [added: 111] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 110] [added: 112] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 113 \| 2024 Annual Report | | | | | |
Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
14 rewritten, 2 added, 5 removed, 61 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Our businesses are exposed to, and proactively [removed: manage] [added: manage,] market risk.
For further information regarding market risk, see Item 1A.—*[Risk [removed: Factors](#i8ea710b913994516904e0694e23e5230_58)*,] [added: Factors](#i3951040d90a14d81a315859e5f4b3298_58)*,] *Fluctuations in currency exchange rates may impact our financial results and position*; *Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for future growth;* *We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology* of this [removed: 2023] [added: 2024] Form 10-K.
Examples of these factors include hydrology, local energy market supply/demand balances, regional fuel supply issues, regional [removed: competition, bidding strategies, and regulatory interventions such as price caps.]
As of December 31, [removed: 2023,] [added: 2024,] we project pre-tax earnings exposure on a 10% increase in commodity prices to be less than a [removed: $30] [added: $5] million gain for power, less than [removed: $15] [added: a $5] million [removed: loss] [added: gain] for gas, and less than [removed: $10] [added: a $5] million loss for coal.
A significant portion of our PPAs through [removed: 2024] [added: 2025] include mechanisms of indexation that adjust the price of energy based on fluctuations in the price of coal, with an index defined by the National Energy Commission based on the physical coal imports for the energy system.
Contract levels do not always match our generation availability or needs, and our assets may be sellers of spot prices in excess of contract levels [added: or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments.]
[removed: Certain of our foreign subsidiaries calculate and pay] taxes in currencies other than their own functional currency.
We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, [removed: Brazilian real,] Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso.
AES has unhedged forward-looking earnings [added: which are exposed to] foreign exchange deterioration risk from the Argentine peso that could be material.
Additionally, as of December 31, [removed: 2023,] [added: 2024,] assuming a 10% USD appreciation, cash distributions attributable to foreign subsidiaries in the [removed: Brazilian real,] Colombian peso, [removed: and] Euro, [added: and Argentine peso] individually, may be exposed to exchange rate movement of less than a $5 million [removed: gain.][added: loss.]
These numbers have been produced by applying a one-time 10% USD appreciation to forecasted exposed cash distributions for [removed: 2024] [added: 2025] coming from the respective subsidiaries exposed to the currencies listed above, net of the impact of outstanding hedges and holding all other variables constant.
[added: In] certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing.
As of December 31, [removed: 2023,] [added: 2024,] the portfolio’s pre-tax earnings exposure to a one-time 100-basis-point increase in interest rates for our Argentine peso, [removed: Brazilian real,] Chilean peso, Colombian peso, Euro, and USD denominated debt would be less than [removed: $35] [added: $15] million on interest expense for the debt denominated in these currencies.
These amounts represent [removed: 2024] [added: 2025] full year exposure and do not take into account the historical correlation between these interest rates.
competition, bidding strategies, and regulatory interventions such as price caps.
Certain of our foreign subsidiaries calculate and pay
or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments.
In Brazil, the majority of the hydroelectric and other renewable generating facility volumes are covered by contract sales.
Under normal hydrological volatility, spot price risk is mitigated through a regulated sharing mechanism across all hydroelectric generators in the country.
Under drier conditions, the sharing mechanism may not be sufficient to cover the business' contract position, and therefore it may have to purchase power at spot prices driven by the cost of thermal generation.
In
Page headers and footers: 4 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 111] [added: 114] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 112] [added: 115] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 113] [added: 116] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 114 \| 2023 Annual Report | | | | | |
Item 1. BUSINESS
344 rewritten, 196 added, 272 removed, 837 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Additional items that may have an impact on our businesses are discussed in Item 1A.—*[Risk [removed: Factors](#i8ea710b913994516904e0694e23e5230_58)*] [added: Factors](#i3951040d90a14d81a315859e5f4b3298_58)*] and Item 3.—*[Legal [removed: Proceedings](#i8ea710b913994516904e0694e23e5230_67)*.][added: Proceedings](#i3951040d90a14d81a315859e5f4b3298_70)*.]
[removed: ][added: ]
In [removed: 2023,] [added: 2024,] we signed long-term contracts for [removed: 5.6] [added: 4.4] GW of renewables, bringing our backlog of projects — those with signed contracts, but which are not yet in operation — to [removed: 12.3] [added: 11.9] GW.
As a result, we have been consistently rated by Bloomberg New Energy Finance as one of the top two largest sellers globally of renewable power to corporate [removed: customers, with a focus on large technology/data center providers.][added: customers.]
[removed: 2023] [added: 2024] Strategic Highlights
- Our backlog, which includes projects with signed contracts, but which are not yet operational, is now [removed: 12.3] [added: 11.9] GW, consisting of:
[removed: ◦5.1] [added: ◦4.9] GW under construction; and
[removed: ◦7.2] [added: ◦7.0] GW with signed PPAs, but that are not yet under construction.
We currently own and/or operate a generation portfolio of [removed: 34,596] [added: 32,109] MW, including generation from our integrated utility, AES Indiana.
*Contract Sales* — Most of our generation businesses sell electricity [added: and associated generation attributes] under medium- or long-term contracts [added: ("PPAs")] in either regulated or competitive markets ("contract sales") or under short-term agreements in competitive markets ("short-term sales").
For further information regarding commodity price risk please see Item 7A.—*[Quantitative and Qualitative Disclosures about Market [removed: Risk](#i8ea710b913994516904e0694e23e5230_268)*] [added: Risk](#i3951040d90a14d81a315859e5f4b3298_265)*] in this Form 10-K.
[removed: 53%] [added: 50%] of the capacity of our generation plants [removed: are] [added: is fueled by] renewables, including [removed: hydro,] solar, [added: hydro,] wind, energy [removed: storage, biomass] [added: storage] and landfill gas, which do not have significant fuel costs.
[removed: 27%] [added: 32%] of the capacity of our generation plants [removed: are] [added: is] fueled by natural gas.
[removed: 18%] [added: 16%] of the capacity of our generation fleet is coal-fired.
At our non-U.S. generation plants, and at our plant in Puerto Rico, we source coal from a mix of [added: sources from the international market and in the local jurisdictions.]
AES' six utility businesses distribute power to [removed: 2.6] [added: 2.7] million customers and AES' two utilities in the U.S. also include generation capacity totaling [removed: 3,500] [added: 3,561] MW.
AES Indiana owns and operates all of the facilities necessary to generate, [removed: transmit] [added: transmit,] and distribute electricity.
Key performance drivers for utilities include the regulated rate of return and tariff, seasonality, weather variations, economic [removed: activity] [added: activity,] and reliability of service.
For our generation businesses, our priority for development is in key growth markets, [added: such as the U.S. and Chile,] where we can leverage our global scale and synergies with our existing businesses by adding renewable energy.
We are organized into four technology-oriented SBUs: Renewables (solar, wind, energy storage, and hydro generation facilities); Utilities (AES Indiana, AES Ohio, and AES El Salvador regulated utilities and their generation facilities); Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil generation facilities, and our businesses in Chile); and New Energy Technologies [removed: (green hydrogen initiatives and investments] [added: (investments] in Fluence, Uplight, [added: Maximo,] and [removed: 5B)] [added: other initiatives)] — which are led by our SBU Presidents.
The Adjusted EBITDA by SBU for the year ended December 31, [removed: 2023] [added: 2024] is shown below.
Our New Energy Technologies SBU generated losses for the year ended December 31, [removed: 2023.][added: 2024.]
See Item 7.—*[Management's Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance [removed: Analysis](#i8ea710b913994516904e0694e23e5230_160)*] [added: Analysis](#i3951040d90a14d81a315859e5f4b3298_163)*] of this Form 10-K for reconciliation and definitions of Adjusted EBITDA.
[removed: ][added: ]
See Item 7.—*[Management's Discussion and Analysis of Financial Condition and Results of [removed: Operations](#i8ea710b913994516904e0694e23e5230_100)*] [added: Operations](#i3951040d90a14d81a315859e5f4b3298_103)*] and Note [removed: 18—*[Segment] [added: 19—*[Segment] and Geographic [removed: Information](#i8ea710b913994516904e0694e23e5230_346)*] [added: Information](#i3951040d90a14d81a315859e5f4b3298_346)*] included in Item 8.—*[Financial Statements and Supplementary [removed: Data](#i8ea710b913994516904e0694e23e5230_271)*] [added: Data](#i3951040d90a14d81a315859e5f4b3298_268)*] of this Form 10-K for further discussion of the Company's segment structure.
[removed: ][added: ]
| (1) Non-GAAP measure. See Item 7.—*[Management’s Discussion and Analysis of Financial Condition and Results of [removed: Operations](#i8ea710b913994516904e0694e23e5230_100)—SBU] [added: Operations](#i3951040d90a14d81a315859e5f4b3298_103)—SBU] Performance Analysis—Non-GAAP Measures* for reconciliation and definition. | | | | | |
The Renewables SBU has generation facilities in [removed: ten] [added: nine] countries — the United States, [removed: Brazil,] Argentina, Colombia, Mexico, Panama, Bulgaria, the Dominican Republic, Jordan, and the Netherlands.
*Generation* — Total operating installed capacity of the Renewables SBU is [removed: 16,211] [added: 13,229] MW.
| Alicura [removed: (9)] [added: (1)] | | | | | | Argentina | | | | | | Hydro | | | | | | 1,050 | | | | | | 100 | | % | | | | 2000 | | | | | | | | | | | | | | |
| Chivor | | | | | | Colombia | | | | | | Hydro | | | | | | 1,000 | | | | | | 99 | | % | | | | 2000 | | | | | | [removed: 2024-2039] [added: 2025-2039] | | | | | | Various | | |
| AES Renewable Holdings (3) | | | | | | US-Various | | | | | | Solar | | | | | | [removed: 414] [added: 470] | | | | | | 100 | | % | | | | [removed: 2015-2023] [added: 2015-2024] | | | | | | [removed: 2029-2042] [added: 2029-2044] | | | | | | Utility, Municipality, Education, Non-Profit | | |
| | | | | | | Energy Storage | | | | | | [removed: 90] [added: 77] | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Spotsylvania Solar Energy Center (OpCo B) [removed: (2)] | | | | | | US-VA | | | | | | Solar | | | | | | 485 | | | | | | 26 | | % | | | | 2020-2021 | | | | | | 2035 | | | | | | Apple, Akami, Etsy, Microsoft | | |
| McFarland A [removed: (4)] | | | | | | US-AZ | | | | | | Solar | | | | | | 200 | | | | | | 75 | | % | | | | 2023 | | | | | | 2038 | | | | | | BP | | |
| Chevelon Butte (OpCo D) [removed: (3)] | | | | | | US-AZ | | | | | | Wind | | | | | | [removed: 238] [added: 454] | | | | | | 75 | | % | | | | [removed: 2023] [added: 2023-2024] | | | | | | [removed: 2043] [added: 2043-2044] | | | | | | APS | | |
| Baldy Mesa [removed: (4)] | | | | | | US-CA | | | | | | Solar | | | | | | 150 | | | | | | 75 | | % | | | | 2023 | | | | | | 2043 | | | | | | Amazon | | |
| Great Cove 1&2 [removed: (4)] | | | | | | US-PA | | | | | | Solar | | | | | | 220 | | | | | | 75 | | % | | | | 2023 | | | | | | 2043 | | | | | | University of Pennsylvania | | |
| Prevailing Winds (OpCo B) (2) | | | | | | US-SD | | | | | | Wind | | | | | | 200 | | | | | | 26 | | % | | | | 2020 | | | | | | 2050 | | | | | | [removed: Prevailing Winds] [added: Basin Electric Power Cooperative] | | |
| Oak Ridge [removed: (4)] | | | | | | US-LA | | | | | | Solar | | | | | | 200 | | | | | | 75 | | % | | | | 2023 | | | | | | 2043 | | | | | | Amazon | | |
AES is the next-generation energy company with over four decades of experience helping the world transition to clean, renewable energy.
We are very well-positioned as a leading provider of renewable energy to data center companies, particularly in the U.S., and to large mining companies outside the U.S. These customers want to work with AES due to our track record of providing customized solutions that best serve their specific needs and delivering our projects on time and on budget.
Projections for electricity demand growth from data centers in the U.S. continue to increase exponentially, and today, this demand is expected to grow to up to 90 GW by 2030, representing an increase of approximately 60 GW.
At the same time, we have embarked on the most ambitious investment growth in the history of our U.S. utilities, which will improve the reliability and quality of service for our customers, while maintaining some of the lowest rates in both states where our utilities operate.
AES Indiana and AES Ohio are now two of the fastest growth U.S. utilities, with projected double-digit rate base growth through 2027, based on necessary investments for our customers.
We are also seeing additional investment opportunities from data center growth in our utility service areas, above and beyond existing rate base projections.
Our utilities have many natural advantages that are attractive to large technology companies, such as proximity to fiber networks and the presence of ample land and water.
We have worked to proactively identify sites that are well-positioned to support new data centers, capitalizing on our
deep relationships with technology companies.
*•*We were awarded or signed 6.8 GW of new contracts, including renewables PPAs, data center load growth at our US utilities, and retail supply for data centers:
◦4.4 GW of renewables under long-term PPAs;
◦2.1 GW of data center growth at AES Ohio; and
◦310 MW of retail supply to support data centers throughout Ohio.
- We were ranked the #1 provider of clean energy globally to corporations by BloombergNEF, representing the third consecutive year as a top seller.
- We completed the construction or acquisition of 3.0 GW of renewables, primarily in the United States and Chile, and completed the construction of a 670 MW combined cycle gas plant in Panama.
- AES Indiana received approval from the Indiana Utility Regulatory Commission (IURC) to implement new base rates and an ROE of 9.9%, supporting an investment program that will improve reliability for customers and support local economic development.
- Including transactions in 2023 and 2024, we announced or closed nearly three-quarters of our $3.5 billion asset sale proceeds target through 2027.
◦In September 2024, announced a strategic partnership to support AES Ohio's robust growth plans by agreeing to sell a 30% indirect interest to CDPQ for approximately $546 million.
◦In October 2024, closed the sale of our 47.3% interest in AES Brasil for approximately $630 million, including sale and hedge proceeds.
- Retired 481 MW of coal generation in Chile and the United States, for a total of 13.4 GW of coal exits announced or closed since 2017.
These contract sales and short-term sales may also include RECs, as discussed below.
Our renewable energy generation businesses may also sell RECs under short-term contracts, either through bilateral sales or over commodity exchanges.
For some development projects, rather than advancing them through construction and maintaining long-term ownership of an operating facility, AES may monetize project value by entering into Develop-Transfer Agreements ("DTAs") in which we transfer assets to a third party prior to construction in exchange for appropriate compensation.
These DTAs may be entered into for new generation facilities or other potential uses of our development assets, including for data centers.
Our Renewables SBU is well-positioned to take advantage of the growth in data centers driven by the increase in power demand for generative artificial intelligence.
In 2024, our assets in operation grew to 13.2 GW, and we added an incremental 3.7 GW to our backlog of contracted projects.
| Silver Peak | | | | | | US-CA | | | | | | Solar | | | | | | 50 | | | | | | 75 | | % | | | | 2024 | | | | | | 2044 | | | | | | Amazon | | |
| Mountain View Repowering (OpCo D) (3) | | | | | | US-CA | | | | | | Wind | | | | | | 67 | | | | | | 75 | | % | | | | 2022 | | | | | | 2042 | | | | | | Central Coast Community Energy, Silicon Valley Clean Energy Authority | | |
| Madison | | | | | | US-VA | | | | | | Solar | | | | | | 63 | | | | | | 75 | | % | | | | 2024 | | | | | | 2039 | | | | | | Northrop Grumman | | |
| Westwing 2B | | | | | | US-AZ | | | | | | Energy Storage | | | | | | 59 | | | | | | 75 | | % | | | | 2024 | | | | | | 2044 | | | | | | APS | | |
| | | | | | | | | | | | | | | | | | | 13,229 | | | | | | | | | | | | | | | | | | | | | | | | | | |
Argentina's Secretariat of Energy has enacted several resolutions since the contractual expiration date and established that AES must continue to operate Alicura and comply with its obligations under the contract until, at the latest, August 2025.
| Esti Solar II | | | | | | Panama | | | | | | Solar | | | | | | 6 | | | | | | 49 | | % | | | | 1H 2025 | | |
| Keydet | | | | | | US-VA | | | | | | Solar | | | | | | 128 | | | | | | 75 | | % | | | | 1H 2025 | | |
| McFarland C | | | | | | US-CA | | | | | | Energy Storage | | | | | | 185 | | | | | | 75 | | % | | | | 1H 2025 | | |
| West Camp | | | | | | US-AZ | | | | | | Wind | | | | | | 500 | | | | | | 75 | | % | | | | 2H 2025 | | |
| Halifax | | | | | | US-NC | | | | | | Solar | | | | | | 80 | | | | | | 75 | | % | | | | 1H 2026 | | |
| Jobos | | | | | | US-PR | | | | | | Solar | | | | | | 80 | | | | | | 70 | | % | | | | 1H 2026 | | |
| Salinas | | | | | | US-PR | | | | | | Solar | | | | | | 120 | | | | | | 70 | | % | | | | 1H 2026 | | |
| Baldy Mesa Energy Storage | | | | | | US-CA | | | | | | Energy Storage | | | | | | 50 | | | | | | 75 | | % | | | | 1H 2027 | | |
AES remains an industry leader in developing and operating the innovative solutions that enable the transition to zero and low-carbon sources of energy.
We continue to see an enormous opportunity from the once-in-a-lifetime transformation of the electricity sector driven by decarbonization, electrification, and digitalization.
One example of our successful execution is our collaboration with large technology companies.
Specifically, demand from data centers in the U.S. is expected to nearly double in the next three years.
Our well-established relationships with these customers, combined with our proven track record of delivering our projects, positions us well to take advantage of this opportunity.
We are a leader in developing green hydrogen.
We are partnering with Air Products to develop, build, own, and operate the largest green hydrogen production facility in the United States.
We are also participating in two green hydrogen hubs in the United States, which were awarded up to $2.4 billion of grant funding from the U.S. Department of Energy.
With our utilities, we are working with a broad range of stakeholders to transition to lower carbon forms of energy.
At AES Indiana, for example, we are working to retire its remaining coal generation by the end of 2025, while adding new renewables and natural gas to the grid.
We are also developing and incubating new technologies that add value today and will drive our business in
the future.
We understand that the energy industry is changing rapidly, and aim to proactively seek solutions that will give us a continued competitive advantage.
At the core of our innovation strategy is AES Next, our business and technology incubator.
AES Next works to identify new and innovative technologies and business opportunities that provide or support leading-edge greener energy solutions.
*•*We signed 5.6 GW of renewables and energy storage under long-term PPAs.
- We completed the construction of 3.5 GW.
- AES Indiana reached a unanimous settlement agreement for its first rate case since 2018, and expects to receive approval from the IURC by the middle of 2024.
- AES Ohio received approval from the PUCO for its Electric Security Plan (ESP4), providing the regulatory foundation necessary to enable future investments.
- We exited or announced the sale or closure of 2.1 GW of coal generation in Vietnam, the U.S., and Chile.
- We signed agreements for three-year extensions of 1.4 GW of gas generation at the Southland legacy units in Southern California.
These extensions will help meet the State of California's grid reliability needs while supporting its decarbonization goals.
- Awarded up to $2.4 billion of grant funding by the U.S. Department of Energy for two green hydrogen hubs with AES participation.
- We secured $1.1 billion in asset sale proceeds, to accelerate our portfolio transformation, outpacing our target of $400 to $600 million.
sources from the international market and in the local jurisdictions.
Our Renewables SBU is the highest growth segment for AES, adding 4.9 GW to our contracted backlog during 2023, including 1.2 GW with large technology companies.
Specifically, demand from data centers in the U.S. is expected to nearly double in the next three years as generative artificial intelligence use-cases expand.
Our well-established relationships with these customers, combined with our proven track record of delivering our projects, positions us well to take advantage of this opportunity.
| AES Brasil Operacoes (AES Tietê) (1) | | | | | | Brazil | | | | | | Hydro | | | | | | 2,658 | | | | | | 47 | | % | | | | 1999 | | | | | | 2032 | | | | | | Various | | |
| Ventos do Araripe, Caetes & Cassino (Cubico II) | | | | | | Brazil | | | | | | Wind | | | | | | 456 | | | | | | 47 | | % | | | | 2022 | | | | | | 2034-2035 | | | | | | Various, CCEE | | |
| Alto Sertão II | | | | | | Brazil | | | | | | Wind | | | | | | 386 | | | | | | 36 | | % | | | | 2017 | | | | | | 2033-2035 | | | | | | Various, CCEE | | |
| Cajuina 1 | | | | | | Brazil | | | | | | Wind | | | | | | 314 | | | | | | 36%-47% | | | | | | 2023 | | | | | | 2035-2043 | | | | | | Various | | |
| Cajuina 2 | | | | | | Brazil | | | | | | Wind | | | | | | 296 | | | | | | 36%-47% | | | | | | 2023 | | | | | | 2044 | | | | | | Various | | |
| Ventus | | | | | | Brazil | | | | | | Wind | | | | | | 187 | | | | | | 36 | | % | | | | 2020 | | | | | | 2034 | | | | | | CCEE | | |
| Tucano Phase 2 | | | | | | Brazil | | | | | | Wind | | | | | | 161 | | | | | | 47 | | % | | | | 2023 | | | | | | 2036 | | | | | | Anglo American | | |
| Mandacaru and Salinas | | | | | | Brazil | | | | | | Wind | | | | | | 159 | | | | | | 47 | | % | | | | 2021 | | | | | | 2033-2034 | | | | | | CCEE | | |
| Tucano Phase 1 | | | | | | Brazil | | | | | | Wind | | | | | | 155 | | | | | | 24 | | % | | | | 2022-2023 | | | | | | 2042 | | | | | | Unipar | | |
| Guaimbê | | | | | | Brazil | | | | | | Solar | | | | | | 150 | | | | | | 36 | | % | | | | 2018 | | | | | | 2037 | | | | | | CCEE | | |
| AGV Solar | | | | | | Brazil | | | | | | Solar | | | | | | 76 | | | | | | 36 | | % | | | | 2019 | | | | | | 2040 | | | | | | Various, CCEE | | |
| Boa Hora | | | | | | Brazil | | | | | | Solar | | | | | | 69 | | | | | | 47 | | % | | | | 2019 | | | | | | 2038 | | | | | | CCEE | | |
An excerpt. Shown here: 40 of 344 rewritten, 40 of 196 added and 40 of 272 removed. The counts are complete. For every sentence, read Item 1. BUSINESS in the FY2024 filing and the FY2023 filing.
Page headers and footers: 50 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 5] [added: 7] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 6] [added: 8] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 7] [added: 9] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 8] [added: 10] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 9] [added: 11] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 10] [added: 12] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 11] [added: 13] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 12] [added: 14] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 13] [added: 15] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 14] [added: 16] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 15] [added: 17] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 16] [added: 18] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 17] [added: 19] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 18] [added: 20] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 19] [added: 21] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 20] [added: 22] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 21] [added: 23] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 22] [added: 24] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 23] [added: 25] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 24] [added: 26] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 25] [added: 27] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 26] [added: 28] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 27] [added: 29] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 28] [added: 30] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 29] [added: 31] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 30] [added: 32] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 31] [added: 33] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 32] [added: 34] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 33] [added: 35] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 34] [added: 36] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 35] [added: 37] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 36] [added: 38] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 37] [added: 39] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 38] [added: 40] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 39] [added: 41] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 40] [added: 42] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 41] [added: 43] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 42] [added: 44] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 43] [added: 45] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 44] [added: 46] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 54 \| 2023 Annual Report | | | | | |
Shown here: 40 of 49 changed, all 0 added and all 1 removed.
Item 3. LEGAL PROCEEDINGS
19 rewritten, 26 added, 34 removed, 76 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of December 31, [removed: 2023.][added: 2024.]
The removal and remediation costs are estimated to be approximately R$15 million to R$60 million [removed: ($3] [added: ($2] million to [removed: $12] [added: $10] million), and there could be additional costs which cannot be estimated at this time.
In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the [added: sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter.]
[removed: On May 26, 2020, CCC staff sent AES a NOV directing AES to discontinue any operation of the water pumps in the alleged] wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands.
With respect to the vault pumps, AES provided the [removed: CCC] [added: CCC,] with the requested analysis, and the CCC has not required further action.
The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any [added: information supporting the demand for damages or explaining how the quantum was derived.]
In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil [removed: court ("Civil Court").][added: court, namely, the Civil Court of La Vega (“CFI”).]
[removed: However] [added: However,] an ex officio action was brought by the SMA due to alleged exceedances of generation limits, which would require the Company to reduce SO2, NOX and PM emissions in order to achieve the emissions offset established in the Compliance Program.
The cost of [added: the] proposed Compliance Program is approximately $10.8 million [removed: USD.][added: and is in the execution stage.]
CFE [removed: made allegations] [added: alleged] that AES Mérida [removed: III] was in breach of [removed: its obligations under] a power and capacity purchase agreement (“Contract”) between the two parties, [removed: which] [added: even though the] allegations [removed: related] [added: relate] to CFE’s own failure to provide fuel within the specifications of the Contract.
CFE sought to recover approximately $200 million in payments made to AES Mérida under the [removed: Contract as well as] [added: Contract, plus] approximately $480 million in alleged damages for having to acquire power from alternative sources in the Yucatan Peninsula.
In November 2022, the arbitration Tribunal issued its decision in the case, rejecting CFE’s claims for damages and [removed: granting] [added: awarding] AES Mérida a net amount of damages on AES Mérida’s counterclaims ("Award").
On January 20, [removed: 2023] [added: 2023,] TEP was notified of the resolution issued by the Authority, which alleges breaches of air emission regulations, including the failure to submit reports.
The resolution imposes a fine of $27,615,140 pesos (approximately [removed: USD $1.6] [added: $1.3] million).
However, the local tax authority rejected receiving the bond that is required to guarantee the injunction, and as a result, on September 18, [removed: 2023] [added: 2023,] TEP filed a complaint seeking to compel the tax authority to accept the bond and recognize the validity of the injunction.
The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief [added: relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004.]
[removed: If] [added: Fines are possible if] the SMA determines there is an unsatisfactory execution of the [removed: compliance program, fines are possible.][added: Compliance Program.]
On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all [added: of] which are categorized by the SMA as “serious.” The alleged charges include untimely completion of intake works and insufficient capture by the provisional works, irrigation water outlet and canal contemplated by an agreement with local communities; non-compliance with the details of the forest management plans and intervention in unauthorized areas; construction of a road in a restricted paleontological area; and unlawful moving of fauna.
On February 16, 2023, the Alto Maipo project submitted [removed: a] [added: an initial] compliance program to [added: the SMA,] which [added: has undergone observations by] the SMA [removed: provided observations.][added: and interested third parties, and been resubmitted by the project.]
On May 26, 2020, CCC staff sent AES an NOV directing AES to discontinue any operation of the water pumps in the alleged
In May 2024, the CFI dismissed the entire case due to the expiry of the statute of limitations.
Later in 2024, the claimants appealed the dismissal to the relevant intermediate appellate court.
The claimants are attempting to formally serve the appeal on all defendants.
On May 10, 2024, the Company was notified of a fine for $180,515.
On June 3, 2024, the Company appealed this fine to the Environmental Court.
The Company believes that it has meritorious defenses and will continue to assert them vigorously in this dispute; however, there can be no assurances that it will be successful.
At AES Mérida's request, in November 2024, the court of first instance confirmed the award and ordered its enforcement against CFE.
This decision is subject to further review within the Mexican judiciary.
Separately, in March 2024, the relevant court of first instance denied CFE’s request to nullify the Award.
The March 2024 decision was upheld by the relevant federal District Court and later by the Collegiate Circuit Court.
The Specialized Chamber has not issued a response to the complaint, despite the fact that the Company has taken several legal actions to try to expedite the proceedings.
In February 2024, at the request of the Company, the Dominican Supreme Court of Justice transferred the case to a different civil court, namely, the Civil Court of La Vega.
The claimants' attempt to recuse the presiding judge has been rejected by the relevant Dominican appellate court.
On December 9, 2024, the SMA rejected the latest version of the Compliance Program.
On December 16, Alto Maipo submitted a petition for reconsideration.
If appeals are unsuccessful, the imposition of fines are possible.
In May 2024, the Chilean competition agency (the Fiscalía Nacional Económica or “FNE”) opened an investigation regarding AES Andes’s declarations with respect to coal prices and coal blends used to generate electricity in Chile.
The investigation was prompted by a confidential complaint filed in December 2023, which has not been disclosed to AES Andes.
In general terms, the investigation seeks to determine whether the facts alleged in the complaint could be considered as an abuse of a dominant position by AES Andes.
The investigation is at a very early stage; AES Andes is currently responding to the FNE’s information requests.
The FNE will independently conduct the investigation and will ultimately decide whether to dismiss the matter or initiate a judicial proceeding on the allegations in the confidential complaint.
These types of investigations in Chile commonly last for years.
AES Andes does not believe that it has violated any competition laws.
Further, if the FNE ever initiates a judicial proceeding on this matter, AES Andes will defend itself vigorously.
Given the early nature of this investigation, we are unable to estimate any potential impact of the investigation or its eventual outcome on our business, financial condition or results of operations.
sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter.
information supporting the demand for damages or explaining how the quantum was derived.
The parties are awaiting the Civil Court's ruling on the AES Defendants' motions to dismiss the lawsuit.
AES Andes plans to vigorously defend itself through the administrative process, but there are no guarantees that it will be successful.
Fines are possible if AES Andes is unsuccessful in its defense of the April 2023 resolution and/or if the SMA determines there is an unsatisfactory execution of the Compliance Program approved in connection with the October 2019 sanctioning process.
The Specialized Chamber has not issued a response to the complaint, and therefore on January 12, 2024, TEP filed a request for the Specialized Chamber to rule on the admission of the complaint.
On February 2, 2024, TEP filed an amparo lawsuit on the basis that no resolution has been issued regarding TEP's May 2023 filing with the Chamber to inform if the Authority had submitted its response to the nullity lawsuit, and if not, to declare that the Authority's right precluded.
relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004.
On July 25, 2022, AES Puerto Rico, LP (“AES-PR”) received from the EPA an NOV alleging certain violations of the CAA at AES-PR’s coal-fired power facility in Guayama, Puerto Rico.
The NOV alleges AES-PR exceeded an emission limit and did not continuously operate certain monitoring equipment, conduct certain analyses and testing, maintain complete records, and submit certain reports as required by the EPA’s Mercury and Air Toxics Standards.
The NOV further alleges AES-PR did not comply fully with the facility’s Title V operating permit.
AES-PR is engaging in discussions with the EPA about the NOV.
AES-PR will defend its interests, but we cannot predict the outcome of this matter at this time.
However, settlements and litigated outcomes of CAA claims alleged against other coal-fired power plants have required companies to pay civil penalties and undertake remedial measures.
In April 2022, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the construction of the Mesamávida wind project, initiating a sanctioning process.
The alleged charges include untimely implementation of road improvement measures and road use schedules and the failure to identify all noise receptors closest to the first construction phases of the project.
On June 23, 2022, the SMA addressed the charges to Energía Eólica Mesamávida SpA.
On June 28, 2022, Energía Eólica Mesamávida SpA submitted a proposed compliance program, with an estimated cost of $4.3 million, which was subsequently approved by the SMA.
On November 9, 2022, opponents to the project submitted before the Third Environmental Court a judicial action challenging the approval of this compliance program.
On March 7, 2023, the Third Environmental Court rejected the third-party judicial action against the Compliance Program.
The deadline to appeal the decision has passed and no appeals were submitted.
The Company has fulfilled the required actions of the Compliance Program; however, opponents to project have submitted claims before the SMA challenging the fulfillment of the Compliance Program.
In June 2020, the Energy Regulatory Commission of Mexico passed resolution RES/894/2020 ("Resolution 894"), which attempts to increase the wheeling tariffs that are paid by TEG and TEP to CFE.
The increase for the relevant period (July 2020 through March 2024) would have been over $90 million according to current estimates.
In October 2022, TEG and TEP initiated a challenge of the constitutionality of the resolution.
In February 2024, the relevant First Collegiate Court of Mexico ruled in favor of TEG and TEP and determined that they do not need to pay increased wheeling tariffs under Resolution 894.
If TEG and TEP are ever required to pay increased wheeling tariffs in the future, they will seek to enforce their respective contractual rights to pass-through the tariff increases to their respective offtakers.
On June 6, 2023, Alto Maipo responded to the SMA's observations by submitting a revised compliance program, which is currently under consideration by the SMA.
In late June and early July 2023, third-party opponents submitted observations to the compliance program, claiming that the proposal to address the intake works charges is inadequate.
Alto Maipo completed its submission of responses to these third-party observations in August 2023, and subsequently, new, additional observations were submitted by opponents to the project.
In December 2023, Alto Maipo submitted responses to the opponents' latest observations.
Review by the SMA is still pending.
The costs of any such compliance program are uncertain.
If a compliance program is not approved by or executed to the satisfaction of the SMA, fines, revocation of the facility’s RCA environmental permit approved by the SMA, or closure are possible outcomes for such alleged serious violations under applicable regulations.
Page headers and footers: 3 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 74] [added: 76] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 75] [added: 77] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 76] [added: 78] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
Cover and table of contents
70 rewritten, 39 added, 9 removed, 200 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
For the Fiscal Year Ended December 31, [removed: 2023][added: 2024]
[removed: ][added: ]
Indicate by check mark whether any of those error corrections are [removed: restatement] [added: restatements] that required a recovery analysis of incentive-based compensation received by any of the registrant's executive officers during the relevant recovery period pursuant to §240.10D-1(b).
Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the [removed: Exchange] Act).
The aggregate market value of the voting and non-voting common equity held by non-affiliates on June [removed: 30, 2023,] [added: 28, 2024,] the last business day of the Registrant's most recently completed second fiscal quarter (based on the closing sale price of [removed: $20.73] [added: $17.57] of the Registrant's Common Stock, as reported by the New York Stock Exchange on such date) was approximately [removed: $13.88] [added: $12.49] billion.
The number of shares outstanding of Registrant's Common Stock, par value $0.01 per share, on [removed: February 22, 2024] [added: March 6, 2025] was [removed: 710,287,083.][added: 711,900,547.]
Portions of Registrant's Proxy Statement for its [removed: 2024] [added: 2025] annual meeting of stockholders are incorporated by reference in Parts II and III
The AES Corporation Fiscal Year [removed: 2023] [added: 2024] Form 10-K
| [Glossary of [removed: Terms](#i8ea710b913994516904e0694e23e5230_7)] [added: Terms](#i3951040d90a14d81a315859e5f4b3298_7)] | | | [removed: [1](#i8ea710b913994516904e0694e23e5230_10)] [added: [1](#i3951040d90a14d81a315859e5f4b3298_10)] | | |
| [ITEM 1. [removed: BUSINESS](#i8ea710b913994516904e0694e23e5230_19)] [added: BUSINESS](#i3951040d90a14d81a315859e5f4b3298_19)] | | | [removed: [4](#i8ea710b913994516904e0694e23e5230_19)] [added: [6](#i3951040d90a14d81a315859e5f4b3298_19)] | | |
| [ITEM 1A. RISK [removed: FACTORS](#i8ea710b913994516904e0694e23e5230_58)] [added: FACTORS](#i3951040d90a14d81a315859e5f4b3298_58)] | | | [removed: [54](#i8ea710b913994516904e0694e23e5230_58)] [added: [55](#i3951040d90a14d81a315859e5f4b3298_58)] | | |
| [ITEM 1B. UNRESOLVED STAFF [removed: COMMENTS](#i8ea710b913994516904e0694e23e5230_61)] [added: COMMENTS](#i3951040d90a14d81a315859e5f4b3298_61)] | | | [removed: [71](#i8ea710b913994516904e0694e23e5230_61)] [added: [73](#i3951040d90a14d81a315859e5f4b3298_61)] | | |
| [ITEM 2. [removed: PROPERTIES](#i8ea710b913994516904e0694e23e5230_64)] [added: PROPERTIES](#i3951040d90a14d81a315859e5f4b3298_67)] | | | [removed: [73](#i8ea710b913994516904e0694e23e5230_64)] [added: [74](#i3951040d90a14d81a315859e5f4b3298_67)] | | |
| [ITEM 3. LEGAL [removed: PROCEEDINGS](#i8ea710b913994516904e0694e23e5230_67)] [added: PROCEEDINGS](#i3951040d90a14d81a315859e5f4b3298_70)] | | | [removed: [73](#i8ea710b913994516904e0694e23e5230_67)] [added: [75](#i3951040d90a14d81a315859e5f4b3298_70)] | | |
| [ITEM 4. MINE SAFETY [removed: DISCLOSURES](#i8ea710b913994516904e0694e23e5230_70)] [added: DISCLOSURES](#i3951040d90a14d81a315859e5f4b3298_73)] | | | [removed: [76](#i8ea710b913994516904e0694e23e5230_70)] [added: [78](#i3951040d90a14d81a315859e5f4b3298_73)] | | |
| [ITEM [removed: 5. MARKET] [added: 5.](#i3951040d90a14d81a315859e5f4b3298_79) [MARKET] FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY [removed: SECURITIES](#i8ea710b913994516904e0694e23e5230_76)] [added: SECURITIES](#i3951040d90a14d81a315859e5f4b3298_79)] | | | [removed: [77](#i8ea710b913994516904e0694e23e5230_76)] [added: [79](#i3951040d90a14d81a315859e5f4b3298_79)] | | |
| [ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF [removed: OPERATIONS](#i8ea710b913994516904e0694e23e5230_100)] [added: OPERATIONS](#i3951040d90a14d81a315859e5f4b3298_103)] | | | [removed: [79](#i8ea710b913994516904e0694e23e5230_100)] [added: [81](#i3951040d90a14d81a315859e5f4b3298_103)] | | |
| [Review of Consolidated Results of [removed: Operations](#i8ea710b913994516904e0694e23e5230_106)] [added: Operations](#i3951040d90a14d81a315859e5f4b3298_109)] | | | [removed: [80](#i8ea710b913994516904e0694e23e5230_106)] [added: [82](#i3951040d90a14d81a315859e5f4b3298_109)] | | |
| [SBU Performance [removed: Analysis](#i8ea710b913994516904e0694e23e5230_160)] [added: Analysis](#i3951040d90a14d81a315859e5f4b3298_163)] | | | [removed: [86](#i8ea710b913994516904e0694e23e5230_160)] [added: [87](#i3951040d90a14d81a315859e5f4b3298_163)] | | |
| [Key Trends and [removed: Uncertainties](#i8ea710b913994516904e0694e23e5230_175)] [added: Uncertainties](#i3951040d90a14d81a315859e5f4b3298_178)] | | | [removed: [92](#i8ea710b913994516904e0694e23e5230_175)] [added: [94](#i3951040d90a14d81a315859e5f4b3298_178)] | | |
| [Capital Resources and [removed: Liquidity](#i8ea710b913994516904e0694e23e5230_232)] [added: Liquidity](#i3951040d90a14d81a315859e5f4b3298_229)] | | | [removed: [97](#i8ea710b913994516904e0694e23e5230_232)] [added: [99](#i3951040d90a14d81a315859e5f4b3298_229)] | | |
| [Critical Accounting Policies and [removed: Estimates](#i8ea710b913994516904e0694e23e5230_262)] [added: Estimates](#i3951040d90a14d81a315859e5f4b3298_259)] | | | [removed: [106](#i8ea710b913994516904e0694e23e5230_262)] [added: [109](#i3951040d90a14d81a315859e5f4b3298_259)] | | |
| [ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET [removed: RISK](#i8ea710b913994516904e0694e23e5230_268)] [added: RISK](#i3951040d90a14d81a315859e5f4b3298_265)] | | | [removed: [110](#i8ea710b913994516904e0694e23e5230_268)] [added: [113](#i3951040d90a14d81a315859e5f4b3298_265)] | | |
| [ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY [removed: DATA](#i8ea710b913994516904e0694e23e5230_271)] [added: DATA](#i3951040d90a14d81a315859e5f4b3298_268)] | | | [removed: [114](#i8ea710b913994516904e0694e23e5230_271)] [added: [116](#i3951040d90a14d81a315859e5f4b3298_268)] | | |
| [Consolidated Statements of Comprehensive Income [removed: (Loss)](#i8ea710b913994516904e0694e23e5230_283)] [added: (Loss)](#i3951040d90a14d81a315859e5f4b3298_280)] | | | [removed: [121](#i8ea710b913994516904e0694e23e5230_283)] [added: [122](#i3951040d90a14d81a315859e5f4b3298_280)] | | |
| [Consolidated Statements of Changes in [removed: Equity](#i8ea710b913994516904e0694e23e5230_286)] [added: Equity](#i3951040d90a14d81a315859e5f4b3298_283)] | | | [removed: [122](#i8ea710b913994516904e0694e23e5230_286)] [added: [123](#i3951040d90a14d81a315859e5f4b3298_283)] | | |
| [Consolidated Statements of Cash [removed: Flows](#i8ea710b913994516904e0694e23e5230_289)] [added: Flows](#i3951040d90a14d81a315859e5f4b3298_286)] | | | [removed: [123](#i8ea710b913994516904e0694e23e5230_289)] [added: [124](#i3951040d90a14d81a315859e5f4b3298_286)] | | |
| [Note 1 - General and Summary of Significant Accounting [removed: Policies](#i8ea710b913994516904e0694e23e5230_295)] [added: Policies](#i3951040d90a14d81a315859e5f4b3298_295)] | | | [removed: [125](#i8ea710b913994516904e0694e23e5230_295)] [added: [126](#i3951040d90a14d81a315859e5f4b3298_295)] | | |
| [Note 2 - [removed: Inventory](#i8ea710b913994516904e0694e23e5230_298)] [added: Inventory](#i3951040d90a14d81a315859e5f4b3298_298)] | | | [removed: [137](#i8ea710b913994516904e0694e23e5230_298)] [added: [138](#i3951040d90a14d81a315859e5f4b3298_298)] | | |
| [Note 3 - Property, Plant and [removed: Equipment](#i8ea710b913994516904e0694e23e5230_301)] [added: Equipment](#i3951040d90a14d81a315859e5f4b3298_301)] | | | [removed: [137](#i8ea710b913994516904e0694e23e5230_301)] [added: [138](#i3951040d90a14d81a315859e5f4b3298_301)] | | |
| [Note 4 - Asset Retirement [removed: Obligation](#i8ea710b913994516904e0694e23e5230_304)s] [added: Obligation](#i3951040d90a14d81a315859e5f4b3298_304)s] | | | [removed: [138](#i8ea710b913994516904e0694e23e5230_304)] [added: [138](#i3951040d90a14d81a315859e5f4b3298_304)] | | |
| [Note 5 - Fair [removed: Value](#i8ea710b913994516904e0694e23e5230_307)] [added: Value](#i3951040d90a14d81a315859e5f4b3298_307)] | | | [removed: [139](#i8ea710b913994516904e0694e23e5230_307)] [added: [139](#i3951040d90a14d81a315859e5f4b3298_307)] | | |
| [Note 6 - Derivative Instruments and Hedging [removed: Activities](#i8ea710b913994516904e0694e23e5230_310)] [added: Activities](#i3951040d90a14d81a315859e5f4b3298_310)] | | | [removed: [145](#i8ea710b913994516904e0694e23e5230_310)] [added: [146](#i3951040d90a14d81a315859e5f4b3298_310)] | | |
| [Note 7 - Financing [removed: Receivables](#i8ea710b913994516904e0694e23e5230_313)] [added: Receivables](#i3951040d90a14d81a315859e5f4b3298_313)] | | | [removed: [146](#i8ea710b913994516904e0694e23e5230_313)] [added: [147](#i3951040d90a14d81a315859e5f4b3298_313)] | | |
| [removed: [Note 8 -] [added: [Note](#i3951040d90a14d81a315859e5f4b3298_316) [9](#i3951040d90a14d81a315859e5f4b3298_316) [-] Investments in and Advances to [removed: Affiliates](#i8ea710b913994516904e0694e23e5230_316)] [added: Affiliates](#i3951040d90a14d81a315859e5f4b3298_316)] | | | [removed: [147](#i8ea710b913994516904e0694e23e5230_316)] [added: [149](#i3951040d90a14d81a315859e5f4b3298_316)] | | |
| [removed: [Note 9 -] [added: [Note](#i3951040d90a14d81a315859e5f4b3298_319) [10](#i3951040d90a14d81a315859e5f4b3298_319) [-] Goodwill and Other Intangible [removed: Assets](#i8ea710b913994516904e0694e23e5230_319)] [added: Assets](#i3951040d90a14d81a315859e5f4b3298_319)] | | | [removed: [149](#i8ea710b913994516904e0694e23e5230_319)] [added: [151](#i3951040d90a14d81a315859e5f4b3298_319)] | | |
| [Note [removed: 10 -] [added: 1](#i3951040d90a14d81a315859e5f4b3298_322)[1](#i3951040d90a14d81a315859e5f4b3298_322) [-] Regulatory Assets and [removed: Liabilities](#i8ea710b913994516904e0694e23e5230_322)] [added: Liabilities](#i3951040d90a14d81a315859e5f4b3298_322)] | | | [removed: [151](#i8ea710b913994516904e0694e23e5230_322)] [added: [153](#i3951040d90a14d81a315859e5f4b3298_322)] | | |
| [Note [removed: 12 - Commitments](#i8ea710b913994516904e0694e23e5230_328)] [added: 1](#i3951040d90a14d81a315859e5f4b3298_328)[3](#i3951040d90a14d81a315859e5f4b3298_328) [- Commitments](#i3951040d90a14d81a315859e5f4b3298_328)] | | | [removed: [156](#i8ea710b913994516904e0694e23e5230_328)] [added: [160](#i3951040d90a14d81a315859e5f4b3298_328)] | | |
| [Note [removed: 13 - Contingencies](#i8ea710b913994516904e0694e23e5230_331)] [added: 1](#i3951040d90a14d81a315859e5f4b3298_331)[4](#i3951040d90a14d81a315859e5f4b3298_331) [- Contingencies](#i3951040d90a14d81a315859e5f4b3298_331)] | | | [removed: [156](#i8ea710b913994516904e0694e23e5230_331)] [added: [160](#i3951040d90a14d81a315859e5f4b3298_331)] | | |
| [Note [removed: 14 - Leases](#i8ea710b913994516904e0694e23e5230_334)] [added: 1](#i3951040d90a14d81a315859e5f4b3298_334)[5](#i3951040d90a14d81a315859e5f4b3298_334) [- Leases](#i3951040d90a14d81a315859e5f4b3298_334)] | | | [removed: [157](#i8ea710b913994516904e0694e23e5230_334)] [added: [161](#i3951040d90a14d81a315859e5f4b3298_334)] | | |
| [E](#i3951040d90a14d81a315859e5f4b3298_3971)[xplanatory Note](#i3951040d90a14d81a315859e5f4b3298_3971) | | | [4](#i3951040d90a14d81a315859e5f4b3298_3971) | | |
| [PART I](#i3951040d90a14d81a315859e5f4b3298_13) | | | [5](#i3951040d90a14d81a315859e5f4b3298_13) | | |
| [ITEM 1C. CYBERSECURITY](#i3951040d90a14d81a315859e5f4b3298_64) | | | [73](#i3951040d90a14d81a315859e5f4b3298_64) | | |
| [PART II](#i3951040d90a14d81a315859e5f4b3298_76) | | | [79](#i3951040d90a14d81a315859e5f4b3298_76) | | |
| [ITEM 6.](#i3951040d90a14d81a315859e5f4b3298_100) \[RESERVED\] | | | [80](#i3951040d90a14d81a315859e5f4b3298_100) | | |
| [Executive Summary](#i3951040d90a14d81a315859e5f4b3298_106) | | | [81](#i3951040d90a14d81a315859e5f4b3298_106) | | |
| [Consolidated Balance Sheets](#i3951040d90a14d81a315859e5f4b3298_274) | | | [120](#i3951040d90a14d81a315859e5f4b3298_274) | | |
| [Consolidated Statements of Operations](#i3951040d90a14d81a315859e5f4b3298_277) | | | [121](#i3951040d90a14d81a315859e5f4b3298_277) | | |
| [Note 8 - Allowance for Credit Losses](#i3951040d90a14d81a315859e5f4b3298_549755817703) | | | [148](#i3951040d90a14d81a315859e5f4b3298_549755817703) | | |
| [Note 1](#i3951040d90a14d81a315859e5f4b3298_325)[2](#i3951040d90a14d81a315859e5f4b3298_325) [-](#i3951040d90a14d81a315859e5f4b3298_325) Obligations | | | [154](#i3951040d90a14d81a315859e5f4b3298_325) | | |
| [Note 3](#i3951040d90a14d81a315859e5f4b3298_1649267445618)[0](#i3951040d90a14d81a315859e5f4b3298_1649267445618) [-](#i3951040d90a14d81a315859e5f4b3298_1649267445618) [Restatement](#i3951040d90a14d81a315859e5f4b3298_1649267445618) [(Unaudited)](#i3951040d90a14d81a315859e5f4b3298_1649267445618) | | | [195](#i3951040d90a14d81a315859e5f4b3298_1649267445618) | | |
| [SIGNATURES](#i3951040d90a14d81a315859e5f4b3298_424) | | | [211](#i3951040d90a14d81a315859e5f4b3298_424) | | |
| 2024 Base Rate Order | | | The order issued in April 2024 by the IURC authorizing AES Indiana to, among other things, increase its basic rates and charges by $71 million annually | | |
| CWIP | | | Construction Work In Progress | | |
| REC | | | Renewable energy credit | | |
| SEET | | | Significantly Excessive Earnings Test | | |
EXPLANATORY NOTE
Restatement Background
In this Annual Report on Form 10-K for the year ended December 31, 2024 (the "2024 Form 10-K"), The AES Corporation is restating its previously issued (i) Condensed Consolidated Balance Sheets, (ii) Condensed Consolidated Statements of Operations, (iii) Condensed Consolidated Statements of Comprehensive Income, and (iv) Condensed Consolidated Statements of Changes in Equity as of and for the three and six months ended June 30, 2024, and as of and for the three and nine months ended September 30, 2024.
During the normal course of the preparation of its audited consolidated financial statements for the year ended December 31, 2024, and not related to the Form 12(b)-25 that was filed, the Company determined that we used incomplete data in the estimation of fair value of the net assets of AES Brasil, which was used in the calculation of impairment expense after AES Brasil was classified as held-for-sale in Q2 2024.
The result of which caused an overstatement of impairment expense that was calculated in Q2 2024 and Q3 2024.
The Company evaluated the adjustments to impairment expense recorded in Q2 and Q3 2024, and after assessing the materiality of such adjustments, is restating its financial statements for each of the quarterly periods ended June 30, 2024 and September 30, 2024 in this 2024 Form 10-K for the year ended December 31, 2024.
The correct held-for-sale value was used in the calculation of the gain on the AES Brasil disposal group recorded in Q4 2024.
Due to the discovery of this error, the Company's management identified a material weakness in the Company's internal control over financial reporting that existed at December 31, 2024.
The company did not design effective controls over management's review of the disposition of AES Brasil, a complex non-routine transaction; specifically, due to the use of incomplete data used in the impairment calculation of the AES Brasil disposal group.
We have not filed, and do not intend to file, any amendments to our previously filed Quarterly Reports on Form 10-Q for the restated periods.
Accordingly, investors should rely only on the financial information and other disclosures regarding the restated periods in this Form 10-K or in our future filings with the SEC as applicable, and not any previously issued or filed reports, earnings releases, or investor presentations.
See Note 30—*Restatement (unaudited)* in the notes to the audited consolidated financial statements included in Item 8.—*Financial Statements* of this Form 10-K.
Restatement Overview
In connection with the restatement of the prior quarterly financial statements, the Company, in the 2024 Form 10-K:
(i) restated its unaudited Condensed Consolidated Balance Sheets as of June 30, 2024 and September 30, 2024; Condensed Consolidated Statements of Operations for the three and six months ended June 30, 2024 and for the three and nine months ended September 30, 2024; Condensed Consolidated Statements of Comprehensive Income for the three and six months ended June 30, 2024 and for the three and nine months ended September 30, 2024; and Condensed Consolidated Statements of Changes in Equity for the six months ended June 30, 2024 and for the nine months ended September 30, 2024, in Note 30—*Restatement (unaudited)* to the unaudited consolidated financial statements, in Item 8.—*Financial Statements* of this Form 10-K;
(ii) added a risk factor relating to its material weakness in its internal control over financial reporting in Item 1A of this Form 10-K; and
(iii) updated its disclosures regarding its controls and procedures in Item 9A.—*Controls and Procedures* of this Form 10-K.
The financial information that has been previously filed or otherwise reported for the prior quarterly financial statements is superseded by the information in this Annual Report on Form 10-K.
See Note 30—*Restatement (unaudited)* in the notes to the audited consolidated financial statements in Item 8.—*Financial Statements* of this Form 10-K for additional information on the restatement and the related financial statement impact.
Internal Control Considerations
In connection with the restatement described above, management has determined that the overstatement of impairment expense and related impact on the gain on disposition of the AES Brasil disposal group resulted in a material weakness in internal control over financial reporting as of December 31, 2024.
For a discussion of management's considerations of the Company's disclosure controls and procedures, internal control over financial reporting, and material weakness identified, refer to Item 9A.—*Controls and Procedures* of this Form 10-K.
- our ability to remediate the material weakness described in Item 9A;
| [PART I](#i8ea710b913994516904e0694e23e5230_13) | | | [3](#i8ea710b913994516904e0694e23e5230_13) | | |
| [I](#i8ea710b913994516904e0694e23e5230_1099511631612)[TEM 1C. CYBERSECURITY](#i8ea710b913994516904e0694e23e5230_1099511631612) | | | [71](#i8ea710b913994516904e0694e23e5230_1099511631612) | | |
| [PART II](#i8ea710b913994516904e0694e23e5230_73) | | | [77](#i8ea710b913994516904e0694e23e5230_73) | | |
| [ITEM 6.](#i8ea710b913994516904e0694e23e5230_1099511631594) \[RESERVED\] | | | [78](#i8ea710b913994516904e0694e23e5230_1099511631594) | | |
| [Executive Summary](#i8ea710b913994516904e0694e23e5230_103) | | | [79](#i8ea710b913994516904e0694e23e5230_103) | | |
| [Consolidated Balance Sheets](#i8ea710b913994516904e0694e23e5230_277) | | | [119](#i8ea710b913994516904e0694e23e5230_277) | | |
| [Consolidated Statements of Operations](#i8ea710b913994516904e0694e23e5230_280) | | | [120](#i8ea710b913994516904e0694e23e5230_280) | | |
| [Note 11 - Debt](#i8ea710b913994516904e0694e23e5230_325) | | | [152](#i8ea710b913994516904e0694e23e5230_325) | | |
| [SIGNATURES](#i8ea710b913994516904e0694e23e5230_424) | | | [198](#i8ea710b913994516904e0694e23e5230_424) | | |
An excerpt. Shown here: 40 of 70 rewritten, all 39 added and all 9 removed. The counts are complete. For every sentence, read Cover and table of contents in the FY2024 filing and the FY2023 filing.
Page headers and footers: 6 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| 1 \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 2 \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 3 \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 4 \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 5 \| 2024 Annual Report | | | | | |
| 6 \| 2024 Annual Report | | | | | |
Item 1C. CYBERSECURITY
4 rewritten, 0 added, 1 removed, 34 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The CISO is responsible for assessing and managing our cyber risk management [added: program.]
Our CISO has served in that position since [removed: 2020.][added: 2024.]
The [removed: Executive] [added: Global] Leadership Team, as well as the [removed: Chief Accounting Officer, Chief Risk Officer,] Vice President Global Financial Planning and Analytics, Treasurer, and Vice President Internal Audit, among others, participate in such meetings.
For more information about the cybersecurity risks we face, see Item 1A.*—[Risk [removed: Factors](#i8ea710b913994516904e0694e23e5230_58)[—](#i8ea710b913994516904e0694e23e5230_58)[Cyber-attacks] [added: Factors—Cyber-attacks] and data security breaches could harm our [removed: business](#i8ea710b913994516904e0694e23e5230_58)*] [added: business](#i3951040d90a14d81a315859e5f4b3298_58)*] included in this Form 10-K.
program.
Page headers and footers: 2 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 72] [added: 74] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 73 \| 2023 Annual Report | | | | | |
Item 2. PROPERTIES
1 rewritten, 0 added, 0 removed, 3 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
With a few exceptions, our facilities, which are described in Item [removed: 1*—[Business](#i8ea710b913994516904e0694e23e5230_19)*] [added: 1*—[Business](#i3951040d90a14d81a315859e5f4b3298_19)*] of this Form 10-K, are subject to mortgages or other liens or encumbrances as part of the project's related finance facility.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| 75 \| 2024 Annual Report | | | | | |
Item 4. MINE SAFETY DISCLOSURES
0 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 77] [added: 79] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
Item 5. MARKET FOR REGISTRANT'S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
14 rewritten, 1 added, 0 removed, 19 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
*Stock Repurchase Program* — The Board authorization permits the Parent Company to repurchase stock through a variety of methods, including open market [removed: repurchases] [added: repurchases, purchases by contract (including, without limitation, accelerated stock repurchase programs or 10b5-1 plans),] and/or privately negotiated transactions.
The cumulative repurchases from the commencement of the Stock Repurchase Program in July 2010 through December 31, [removed: 2023] [added: 2024] totaled 154.3 million shares for a total cost of $1.9 billion, at an average price per share of $12.12 (including a nominal amount of commissions).
As of December 31, [removed: 2023,] [added: 2024,] $264 million remained available for repurchase under the Stock Repurchase Program.
No repurchases were made by The AES Corporation of its common stock in [added: 2024,] 2023, [removed: 2022,] and [removed: 2021.][added: 2022.]
The [removed: Parent Company has increased this dividend annually and the] quarterly per-share cash dividends for the last three years are displayed below.
| Commencing the fourth quarter of | | | | | | [removed: 2023] [added: 2024] | | | | | | [removed: 2022] [added: 2023] | | | | | | [removed: 2021] [added: 2022] | | |
| Cash dividend | | | | | | [removed: $0.1725] [added: $0.17595] | | | | | | [removed: $0.1659] [added: $0.1725] | | | | | | [removed: $0.1580] [added: $0.1659] | | |
The fourth quarter [removed: 2023] [added: 2024] cash dividend [removed: is to be] [added: was] paid [removed: in the first quarter of 2024.][added: on February 14, 2025.]
Under the terms of our revolving credit [removed: facility,] [added: facilities,] which we entered into with [removed: a] commercial bank [removed: syndicate,] [added: syndicates,] we have limitations on our ability to pay cash dividends and/or repurchase stock.
See the information contained under Item 12.—*[Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters—Securities Authorized for Issuance under Equity Compensation [removed: Plans](#i8ea710b913994516904e0694e23e5230_409)*] [added: Plans](#i3951040d90a14d81a315859e5f4b3298_409)*] of this Form 10-K.
As of [removed: February 22, 2024,] [added: March 6, 2025,] there were approximately [removed: 3,395] [added: 3,301] record holders of our common stock.
[removed: ][added: ]
The S&P 500 Utilities Index is a published sector index comprising the [removed: 30] [added: 31] electric and gas utilities included in the S&P 500.
The five year total return chart assumes $100 invested on December 31, [removed: 2018] [added: 2019] in AES Common Stock, the S&P 500 Index and the S&P 500 Utilities Index.
The Parent Company has increased this dividend annually.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 78] [added: 80] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
Item 6. [RESERVED]
0 rewritten, 0 added, 0 removed, 0 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 79] [added: 81] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
1,218 rewritten, 789 added, 397 removed, 1,135 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
We have audited the accompanying consolidated balance sheets of The AES Corporation (the Company) as of December 31, [removed: 2023,] [added: 2024,] and [removed: 2022,] [added: 2023,] the related consolidated statements of operations, comprehensive income (loss), changes in equity and cash flows for each of the three years in the period ended December 31, [removed: 2023,] [added: 2024,] and the related notes and [removed: the] financial statement schedule listed in the Index at Item 15(a) (collectively referred to as the “consolidated financial statements”).
In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, [removed: 2023] [added: 2024] and [removed: 2022,] [added: 2023,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2023,] [added: 2024,] in conformity with U.S. generally accepted accounting principles.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, [removed: 2023,] [added: 2024,] based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework), and our report dated [removed: February 26, 2024] [added: March 10, 2025] expressed an [removed: unqualified] [added: adverse] opinion thereon.
| *How We Addressed the Matter in Our Audit* | | | | | | We obtained an understanding, evaluated the design and tested the operating effectiveness of the Company’s controls over the accounting for [removed: these acquisitions.] [added: the acquisition.] For example, we tested controls over the [removed: recognition] [added: Company’s accounting considerations] and [removed: measurement of] the [removed: consideration transferred and] valuation of [added: the significant] assets [removed: acquired,] [added: acquired and liabilities assumed,] including management’s review of the valuation models, the significant assumptions used to develop the estimates, and the completeness and accuracy of the data used in the valuations. To test the estimated fair value of the [removed: project development intangible] [added: significant] assets [added: acquired] and [removed: construction in progress,] [added: liabilities assumed,] we performed audit procedures that included, among others, evaluating the Company's selection of the valuation methodology, evaluating the [removed: methods and] significant assumptions used, and evaluating the completeness and accuracy of the underlying data supporting the significant [removed: assumptions and estimates.] [added: assumptions.] For example, we compared the significant assumptions used by management to third-party industry and market data and to the Company’s [removed: budgets and forecasts.] [added: historical operating results.] We [removed: also] involved our internal valuation specialists to assist in our evaluation of the reasonableness of the Company’s valuation [removed: methodology, forecasted revenue assumptions,] [added: methodology] and the discount rates used in the valuations. [added: We also tested the Company’s measurement period adjustment, including assumptions used in determining the Madison solar project’s qualification for the ITC, and the Company’s assessment over the bargain purchase recognized in the transaction.] | | | | | | | | |
| *Description of the Matter* | | | | | | A significant number of [removed: renewable] [added: renewables] projects at AES Clean Energy have been financed with tax equity structures, where the tax equity investors receive a portion of the economic attributes of the facilities, including tax attributes, that vary over the life of the projects. When the allocation of earnings and losses, cash distributions, and tax benefits are not based on fixed ownership percentages, the Company uses the hypothetical liquidation at book value (HLBV) method to calculate the earnings attributable to noncontrolling interest for consolidated partnerships, when it is a reasonable approximation of the profit-sharing arrangement. As discussed in Note [removed: 17] [added: 18] to the consolidated financial statements, AES Clean Energy Development and AES Renewable Holdings sold noncontrolling interest to tax equity investors resulting in an increase of [removed: $1,163] [added: $866] million to noncontrolling interest in [removed: 2023.] [added: 2024. Auditing the allocation of earnings to noncontrolling interest holders for significant new tax equity partnerships was complex due to the evaluation of whether a newly established HLBV model used to allocate earnings appropriately reflects the unique substantive profit-sharing terms and features within each arrangement. A greater extent of audit effort and specialized skill and knowledge was required to evaluate compliance with the contractual provisions in each partnership agreement as well as the appropriateness of the investors’ capital account balances used in the HLBV models.] | | | | | | | | |
| *How We Addressed the Matter in Our Audit* | | | | | | We obtained an understanding, evaluated the design and tested the operating effectiveness of the controls over the Company’s process for developing the HLBV model for new tax equity arrangements. For example, we tested management’s review of substantive profit-sharing terms [removed: and features] to evaluate whether they are properly reflected in the HLBV model for new arrangements. To test the allocation of earnings to noncontrolling interest holders for new significant tax equity partnerships, we read the related partnership agreements to understand the substantive profit-sharing provisions. We evaluated the HLBV models for consistency with the contractual provisions in the related partnership agreements and tested the capital contributions made by the tax equity [removed: investors.] [added: investors and tax credits transferred by the partnership.] We involved tax subject matter professionals to assist in evaluating the calculation of the investors’ capital accounts used in the HLBV models, including the proceeds attributable to the tax equity investor due to the recognition of investment tax credits and other adjustments as required by the U.S. Internal Revenue Code. Additionally, we tested the allocation of earnings by recalculating the hypothetical liquidation in the HLBV models based on the liquidation provisions of the related partnership agreements. | | | | | | | | |
[added: | Mesamávida | | | | | |] February [removed: 26,] 2024 [added: | | | | | | 40 | | | | | | 51 | | | | | | (11) | | |]
December 31, [removed: 2023] [added: 2024] and [removed: 2022][added: 2023]
| | | | [added: 2024 | | | | | |] 2023 | | | | | | 2022 | | |
| Cash and cash equivalents | | | $ | [removed: 1,426] [added: 1,524] | | | | | $ | [removed: 1,374] [added: 1,426] | |
| Restricted cash | | | [removed: 370] [added: 437] | | | | | | [removed: 536] [added: 370] | | |
| Short-term investments | | | [removed: 395] [added: 79] | | | | | | [removed: 730] [added: 395] | | |
| Accounts receivable, net of allowance of [removed: $15] [added: $52] and [removed: $5,] [added: $15,] respectively | | | [removed: 1,420] [added: 1,646] | | | | | | [removed: 1,799] [added: 1,420] | | |
| Inventory | | | [removed: 712] [added: 593] | | | | | | [removed: 1,055] [added: 712] | | |
| Prepaid expenses | | | [removed: 177] [added: 157] | | | | | | [removed: 98] [added: 177] | | |
| Other current assets, net of allowance of [removed: $14] [added: $0] and [removed: $2,] [added: $14,] respectively | | | [removed: 1,387] [added: 1,533] | | | | | | [removed: 1,533] [added: 1,387] | | |
| Current held-for-sale assets | | | [removed: 762] [added: 862] | | | | | | [removed: 518] [added: 762] | | |
| Total current assets | | | [removed: 6,649] [added: 6,831] | | | | | | [removed: 7,643] [added: 6,649] | | |
| [removed: Property, Plant] [added: Property, plant] and [removed: Equipment:] [added: equipment, net] | | | | | | | | | [added: $] | [added: 33,166] | | [added: | | | $ | 29,958 | |]
| Land | | | [removed: 522] | | | | | | [removed: 470] [added: 610] | | | [added: | | | 522 | | |]
| [removed: Electric] [added: Total electric] generation, distribution assets and other | | | [removed: 30,190] | | | | | | [removed: 26,599] [added: 32,823] | | | [added: | | | 30,190 | | |]
| Accumulated depreciation | | | [removed: (8,602)] | | | | | | [removed: (8,651)] [added: (8,701)] | | | [added: | | | (8,602) | | |]
| Construction in progress | | | [removed: 7,848] | | | | | | [removed: 4,621] [added: 8,434] | | | [added: | | | 7,848 | | |]
| Property, [removed: plant] [added: plant,] and equipment, net | | | [removed: 29,958] [added: 851] | | | | | | [removed: 23,039] [added: 671] | | |
| Other [removed: Assets:] | | | | | | [added: 1] | | | | | | [added: (1) | | |]
| Investments in and advances to affiliates | | | [added: 1,124 | | | | | |] 941 | | | | | | 952 | | |
| Debt service reserves and other deposits | | | [added: 78 | | | | | |] 194 | | | | | | 177 | | |
| Goodwill | | | [added: 345 | | | | | |] 348 | | | | | | 362 | | |
| Other intangible assets, net of accumulated amortization of [removed: $498] [added: $426] and [removed: $434,] [added: $498,] respectively | | | [removed: 2,243] [added: 1,947] | | | | | | [removed: 1,841] [added: 2,243] | | |
| Deferred income taxes | | | [added: 365 | | | | | |] 396 | | | | | | 319 | | |
| Other noncurrent assets, net of allowance of [removed: $9] [added: $20] and [removed: $77,] [added: $9,] respectively | | | [removed: 3,259] [added: 2,917] | | | | | | [removed: 4,030] [added: 3,259] | | |
| Noncurrent held-for-sale assets | | | [removed: 811] [added: 633] | | | | | | [removed: —] [added: 811] | | |
| [removed: TOTAL ASSETS] [added: Total Assets] | | | $ | [added: 47,406 | | | | | $ |] 44,799 | | | | | $ | 38,363 | |
| [removed: LIABILITIES] [added: LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES,] AND EQUITY | | | | | | | | | | | |
| Accounts payable | | | $ | [removed: 2,199] [added: 1,654] | | | | | $ | [removed: 1,730] [added: 2,199] | |
| Accrued interest | | | [removed: 315] [added: 256] | | | | | | [removed: 249] [added: 315] | | |
| Accrued non-income taxes | | | [removed: 278] [added: 249] | | | | | | [removed: 249] [added: 278] | | |
| Supplier financing arrangements | | | [removed: 974] [added: 917] | | | | | | [removed: 662] [added: 974] | | |
| Accrued and other liabilities | | | [removed: 1,334] [added: 1,246] | | | | | | [removed: 1,489] [added: 1,334] | | |
| Recourse debt | | | [removed: 200] [added: 899] | | | | | | [removed: —] [added: 200] | | |
| | | | | | | Accounting for the Madison and Birdseye Acquisition | | | | | | | | |
| *Description of the Matter* | | | | | | During 2024, the Company completed the acquisition of the Madison solar project and the Birdseye pipeline of early-stage renewable energy development projects. The transaction was accounted for as a business combination with a purchase price of $20 million paid in cash, as disclosed in Note 26 to the consolidated financial statements. The acquisition resulted in a bargain purchase gain of $20 million, primarily due to the determination that the Madison solar project would qualify for an increased investment tax credit (ITC) based on studies performed subsequent to the acquisition date, which resulted in a measurement period adjustment related to the increase of the fair value of assets acquired. Auditing the Company's accounting for the acquisition was complex due to the unobservable inputs used by management to determine the fair values of the significant assets acquired and liabilities assumed at the acquisition date, primarily consisting of the construction work in progress (CWIP) of $78 million and the off-market virtual power purchase agreement (VPPA) liability of $53 million. These fair value estimates were sensitive to the significant assumptions used, including the market PPA price, forecasted operating expenses, and the discount rates utilized, which affected the bargain purchase gain recognized. | | | | | | | | |
| Property, plant and equipment, net of accumulated depreciation of $8,701 and $8,602, respectively | | | 33,166 | | | | | | 29,958 | | |
| Total noncurrent assets | | | 40,575 | | | | | | 38,150 | | |
| Non-recourse debt | | | 2,688 | | | | | | 3,932 | | |
| Non-recourse debt | | | 20,626 | | | | | | 18,482 | | |
| Fair value option liabilities activity: | | | | | | | | | | | | | | | | | |
| Change in fair value option liabilities due to instrument-specific credit risk, net of $0 income tax for all periods | | | 3 | | | | | | — | | | | | | — | | |
| Total change in fair value option liabilities | | | 3 | | | | | | — | | | | | | — | | |
| Foreign currency translation adjustments and reclassification to earnings, net of income tax | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (88) | | | | | | 502 | | |
| Change in fair value of derivatives and reclassification to earnings, net of income tax | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 333 | | | | | | 86 | | |
| Total other comprehensive income (loss) | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 250 | | | | | | 596 | | |
| Reclassification of redeemable stock of subsidiaries to noncontrolling interests (2) | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 736 | | |
| Disposition of business interests | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 14 | | | | | | — | | | | | | — | | | | | | (1,399) | | |
| Distributions to noncontrolling interests | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (368) | | |
| Acquisitions of noncontrolling interests | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (802) | | | | | | — | | | | | | 498 | | | | | | 304 | | |
| Contributions from noncontrolling interests | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 411 | | |
| Conversion of Corporate Units to shares of common stock | | | (1.0) | | | | | | (838) | | | | | | 40.5 | | | | | | 1 | | | | | | — | | | | | | — | | | | | | 838 | | | | | | — | | | | | | — | | | | | | — | | |
| Dividends declared on AES common stock ($0.6935/share) | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (493) | | | | | | — | | | | | | — | | | | | | — | | |
| Purchase of treasury stock | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | 0.1 | | | | | | (3) | | | | | | 3 | | | | | | — | | | | | | — | | | | | | — | | |
| Issuance and exercise of stock-based compensation benefit plans, net of income tax | | | — | | | | | | — | | | | | | 0.1 | | | | | | — | | | | | | (0.9) | | | | | | 11 | | | | | | 17 | | | | | | — | | | | | | — | | | | | | — | | |
| Balance at December 31, 2024 | | | — | | | | | | $ | — | | | | | 859.7 | | | | | | $ | 9 | | | | | 148.6 | | | | | | $ | (1,805) | | | | | $ | 5,913 | | | | | $ | 293 | | | | | $ | (766) | | | | | $ | 4,060 | |
(2) Related to the reclassification of AES Clean Energy Development common stock and certain tax equity partnerships at AES Clean Energy from *Redeemable stock of subsidiaries* to *Noncontrolling interests*.
| Depreciation, amortization, and accretion of AROs | | | 1,264 | | | | | | 1,147 | | | | | | 1,072 | | |
| Deferred income tax expense (benefit), net of tax credit transfer proceeds allocated to AES | | | 111 | | | | | | (54) | | | | | | 4 | | |
| Tax credit transfer proceeds allocated to noncontrolling interests | | | 220 | | | | | | — | | | | | | — | | |
| Other | | | 221 | | | | | | 130 | | | | | | 99 | | |
| Conversion of Corporate Units to shares of common stock (see Note 18) | | | 838 | | | | | | — | | | | | | — | | |
| Liabilities derecognized upon completion of remaining performance obligation for sale of Warrior Run receivables (see Note 21) | | | 273 | | | | | | — | | | | | | — | | |
Certain consolidated VIEs have arrangements which may require the Company to contribute additional equity totaling $1.7 billion.
Such contributions are generally contingent upon the underlying asset achieving specific project milestones.
In some other arrangements, consolidated subsidiaries are subject to profit-sharing arrangements where cash distributions to noncontrolling interest holders are based on a stated internal rate of return, among other criteria.
In many of these arrangements, earnings are allocated to noncontrolling interest holders based on the stated internal rate of return to the noncontrolling interest holders for any given period.
noncurrent when they are not expected to be settled or disposed of within the next twelve months.
component basis.
An intangible asset is recognized when construction activities have yet to commence and the development work completed consists of contractual arrangements which are intangible in nature, such as permitting, contracting, and surveying.
Amortization is computed using the straight-line method beginning when a project is placed in service and continuing over the estimated useful lives of the assets.
The Company accounts for purchased emission allowances as intangible assets and records an expense when they are utilized or sold.
If the carrying amount of an
All plan assets are recorded at fair value and categorized by level within the fair value hierarchy as described in Note 1—*General and Summary of Significant Accounting Policies—Fair Value*.
| | | | | | | Long-lived Asset Impairments of Coal and Pet Coke-fired Generation Assets | | | | | | | | |
| *Description of the Matter* | | | | | | At December 31, 2023, the Company's net property, plant and equipment was $29,958 million. As discussed in Note 1 to the consolidated financial statements, when circumstances indicate that the carrying amount of long-lived assets in a held-for-use asset group may not be recoverable, the Company evaluates the assets for potential impairment. Events or changes in circumstances that may necessitate a recoverability evaluation include, but are not limited to, adverse changes in the regulatory environment, unfavorable changes in power prices or fuel costs, increased competition due to additional capacity in the grid, technological advancements, declining trends in demand, or an expectation it is more likely than not that the asset will be disposed of before the end of its previously estimated useful life. If the carrying amount of the assets exceeds the undiscounted cash flows, an impairment is recognized for the amount by which the carrying amount of the asset group exceeds its fair value. As discussed in Note 22 to the consolidated financial statements, the Company recognized a total asset impairment expense of $471 million related to the Norgener, TEG, TEP, and Warrior Run asset groups, consisting of coal and pet coke generation plants included in the Energy Infrastructure SBU reportable segment in 2023. Auditing the Company's identification of impairment indicators was complex and highly judgmental because of the many geographic, regulatory, and economic environments in which the Company operates. Also, due to the wide variety of events or changes in circumstances that may indicate that an asset group is not recoverable, auditing the Company’s identification of impairment indicators involved a high degree of subjectivity, particularly given the Company’s decarbonization initiatives and shift towards clean energy platforms. In addition, auditing the Company’s impairment analyses for Norgener, TEG, TEP, and Warrior Run asset groups was complex due to the judgmental nature of the significant assumptions used to determine the fair value of the asset groups (e.g., the Company’s projections of revenue growth, discount rates, and consideration of the industry outlook and market conditions). | | | | | | | | |
| *How We Addressed the Matter in Our Audit* | | | | | | We obtained an understanding, evaluated the design and tested the operating effectiveness of the Company’s controls over the identification of impairment indicators and the fair value analysis of the Norgener, TEG, TEP, and Warrior Run asset groups. For example, we tested management’s monitoring controls over the evaluation of events or changes in circumstances that would require an asset to be tested for recoverability. We also tested management’s review controls of the valuation models used in the impairment analyses, the significant assumptions used to develop the estimates, and the completeness and accuracy of the data used in the valuations. To test the Company's identification of impairment indicators, our audit procedures included, among others, making inquiries of management, including personnel in operations, to understand changes in the businesses and management’s strategic plans, and evaluate whether management has considered any identified changes in their analysis. We evaluated the results of earnings and the projected cash flows for significant coal generation assets and assessed whether there has been a deterioration in earnings or projected losses that would represent an impairment indicator. We also evaluated conditions and trends in the industry for the underlying economies, including any sale or disposition activities, and evaluated any adverse changes in the regulatory environment or the geographic areas to test the completeness and accuracy of the company's evaluation of potential impairment indicators. We also evaluated the Company’s useful life estimates, in particular for the coal and pet coke-fired generation assets with impairment indicators, considering the existing Power Purchase Agreements (PPAs) and the market for the use of these assets subsequent to the expiration of existing PPAs, based on the regulatory and market conditions. | | | | | | | | |
| | | | | | | To test the impairment analyses for the Norgener, TEG, TEP, and Warrior Run asset groups, our audit procedures included, among others, assessing the appropriateness of valuation methodologies, testing the significant assumptions discussed above, and testing the completeness and accuracy of the underlying data used by the Company in its analyses. We compared the significant assumptions used by management to current industry and economic trends as well as historical results. We performed sensitivity analyses of significant assumptions to evaluate the changes in the fair value of the asset groups that would result from changes in the assumptions. We also involved valuation specialists to assist in our evaluation of the overall valuation methodology and the discount rates used in the fair value estimates, as necessary. | | | | | | | | |
| | | | | | | Accounting for the Bellefield and Rexford Renewable Acquisitions | | | | | | | | |
| *Description of the Matter* | | | | | | During 2023, the Company completed its acquisitions of the Bellefield solar and battery energy storage system (BESS) projects and the Rexford solar and BESS project for consideration of $358 million and $253 million, respectively, as disclosed in Note 25 to the consolidated financial statements. These transactions were accounted for as acquisitions of variable interest entities that did not meet the definition of a business. Auditing the Company's accounting for its significant renewables acquisitions was complex due to the significant judgment made by management to determine the fair values of significant assets acquired, including project development intangible assets and construction in progress assets. The significant assumptions used included the discount rates and revenue pricing curves used in the Company’s forecasted cash flows to determine the fair value of the acquired assets. In particular, the fair value estimate was sensitive to these significant assumptions, which are affected by expectations about future market conditions. | | | | | | | | |
| | | | | | | Auditing the allocation of earnings to noncontrolling interest holders for tax equity partnerships was complex due to the evaluation of whether a newly established HLBV model used to allocate earnings appropriately reflects the unique substantive profit-sharing terms and features within each arrangement. A greater extent of audit effort and specialized skill and knowledge was required to evaluate compliance with the contractual provisions in each partnership agreement as well as the appropriateness of the investors’ capital account balances used in the HLBV models. | | | | | | | | |
| Total other assets | | | 8,192 | | | | | | 7,681 | | |
| Non-recourse debt, including $1,080 and $416, respectively, related to variable interest entities | | | 3,932 | | | | | | 1,758 | | |
| Non-recourse debt, including $1,715 and $2,295, respectively, related to variable interest entities | | | 18,482 | | | | | | 17,846 | | |
| Balance at December 31, 2020 | | | — | | | | | | $ | — | | | | | 818.4 | | | | | | $ | 8 | | | | | 153.0 | | | | | | $ | (1,858) | | | | | $ | 7,561 | | | | | $ | (680) | | | | | $ | (2,397) | | | | | $ | 2,086 | |
| Issuance of preferred stock (3) | | | 1.0 | | | | | | 838 | | | | | | — | | | | | | — | | | | | | — | | | | | | — | | | | | | (29) | | | | | | — | | | | | | — | | | | | | — | | |
(2) Adjustment to record the redeemable stock of Colon at redemption value.
(3) Includes a $13 million reclass from *Additional paid-in capital* to *Preferred stock* to reflect the retrospective adoption of ASU 2020-06.
| Depreciation and amortization | | | 1,128 | | | | | | 1,053 | | | | | | 1,056 | | |
| Other | | | 149 | | | | | | 123 | | | | | | 202 | | |
| Increase (decrease) in deferred income | | | (2) | | | | | | 33 | | | | | | (314) | | |
| Issuance of preferred shares in subsidiaries | | | 421 | | | | | | 60 | | | | | | 153 | | |
| Issuance of preferred stock | | | — | | | | | | — | | | | | | 1,014 | | |
| Notes payable issued for the acquisition of business interests (see Notes 17 and 25) | | | — | | | | | | — | | | | | | 258 | | |
| Noncash consideration transferred for AES Clean Energy acquisitions (see Note 25) | | | — | | | | | | — | | | | | | 118 | | |
expense when the loss in value is deemed other-than-temporary and included in *Other non-operating expense* in the Consolidated Statements of Operations.
Company's operations and financial results.
Of the amounts outstanding under supplier financing arrangements, $814 million and $296 million were guaranteed by the Company as of December 31, 2023 and 2022, respectively.
All plan assets are recorded at fair value.
As payments are collected
requisite service period, net of estimated forfeitures.
(1)Excludes operating lease receivable allowances and contractual dispute allowances of $1 million as of December 31, 2022.
Those reserves are not in scope under ASC 326.
(2)Increase in CECL reserve balance for regulatory receivables in Argentina.
| 2021-08, Business Combinations (Topic 805): Accounting for Contract Assets and Contract Liabilities from Contracts with Customers | | | This update is to improve the accounting for acquired revenue contracts with customers in a business combination by addressing diversity in practice and inconsistency related to the following: (1) recognition of an acquired contract liability, and (2) payment terms and their effect on subsequent revenue recognized by the acquirer. Early adoption of the amendments is permitted, including adoption in an interim period. An entity that early adopts in an interim period should apply the amendments (1) retrospectively to all business combinations for which the acquisition date occurs on or after the beginning of the fiscal year that includes the interim period of early application and (2) prospectively to all business combinations that occur on or after the date of initial application. | | | January 1, 2023 | | | The Company adopted this standard on a prospective basis, which is being applied to any business combinations that occur in 2023 or after. The adoption of this ASU did not have a material impact on the Company's consolidated financial statements. | | |
| 2022-02 Financial Instruments - Credit Losses (Topic 326): Troubled Debt Restructurings and Vintage Disclosures | | | ASU 2022-02 amends ASC 326-20-50-6 to require public business entities to disclose gross write-offs recorded in the current period, on a year-to-date basis, by year of origination in the vintage disclosures. This disclosure should cover each of the previous five annual periods starting with the date of the financial statements and, for the annual periods before that, an aggregate total. However, upon adoption of the ASU, an entity would not provide the previous five annual periods of gross write-offs. The FASB decided that disclosure of gross write-offs would instead be applied on a prospective transition basis so that preparers can “build” the five-annual-period disclosure over time. | | | January 1, 2023 | | | The Company adopted this standard on a prospective basis and it did not have a material impact on the Company’s consolidated financial statements. | | |
| 2023-03, Presentation of Financial Statements (Topic 205), Income Statement - Reporting Comprehensive Income (Topic 220), Distinguishing Liabilities from Equity (Topic 480), Equity (Topic 505), and Compensation - Stock Compensation (Topic 718) | | | This Accounting Standards Update amends various SEC paragraphs pursuant to SEC Staff Accounting Bulletin No. 120, SEC Staff Announcement at the March 24, 2022 EITF Meeting, and Staff Accounting Bulletin Topic 6.B, Accounting Series Release 280—General Revision of Regulation S-X: Income or Loss Applicable to Common Stock. The amendments in this Update are effective for all entities upon issuance of this Update. | | | June 30, 2023 | | | The adoption of this ASU did not have a material impact on the Company’s consolidated financial statements. | | |
| Accumulated depreciation | | | | | | | | | (8,602) | | | | | | (8,651) | | |
| Net electric generation, distribution assets and other | | | | | | $ | 21,588 | | | | | $ | 17,948 | |
| | | | | | | 2023 | | | | | | 2022 | | |
| Liabilities assumed in acquisition | | | | | | — | | | | | | 15 | | |
The increase at Southland Energy is mostly due to additional liabilities incurred related to a demolition obligation at Alamitos.
The increase at AES Indiana is primarily due to an upward revision of estimated cash flows at the Petersburg, Eagle Valley, and Harding Street plants.
The increase at AES Brasil is primarily due to the initial recognition of asset retirement obligations as a result of the Cubico II acquisition.
An excerpt. Shown here: 40 of 1,218 rewritten, 40 of 789 added and 40 of 397 removed. The counts are complete. For every sentence, read Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA in the FY2024 filing and the FY2023 filing.
Page headers and footers: 5 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
| [removed: 115] [added: 117] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 116] [added: 118] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 117] [added: 119] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| [removed: 118] [added: 202] \| [removed: 2023] [added: 2024] Annual Report | | | | | |
| 191 \| 2023 Annual Report | | | | | |
Item 9A. CONTROLS AND PROCEDURES
4 rewritten, 15 added, 9 removed, 29 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Based upon this evaluation, the CEO and CFO concluded that as of December 31, [removed: 2023,] [added: 2024,] our disclosure controls and procedures were [removed: effective.][added: not effective due to a material weakness in our internal control over financial reporting described below.]
[removed: There] [added: Other than the material weakness discussed above, there] were no changes that occurred during the quarter ended December 31, [removed: 2023] [added: 2024] that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
We have audited The AES Corporation’s internal control over financial reporting as of December 31, [removed: 2023,] [added: 2024,] based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) (the COSO criteria).
In our opinion, [added: because of the effect of the material weakness described below on the achievement of the objectives of the control criteria,] The AES Corporation (the Company) [removed: maintained, in all material respects,] [added: has not maintained] effective internal control over financial reporting as of December 31, [removed: 2023,] [added: 2024,] based on the COSO criteria.
Management, including the CEO and CFO, assessed the effectiveness of our internal control over financial reporting as of December 31, 2024 and has concluded that we did not design effective controls over the review of the disposition of AES Brasil, a complex non-routine transaction; specifically due to the use of incomplete data in the estimation of the fair value of the net assets of AES Brasil, which was used in calculation of the impairment expense after AES Brasil was classified as Held for Sale in Q2 2024.
The result of which caused an overstatement of impairment expense that was calculated in Q2 2024 and Q3 2024.
Management continues to implement measures designed to ensure that the control deficiency contributing to the material weakness is remediated.
The remediation actions include: (i) policy updates detailing steps to perform in an impairment analysis of complex ownership structures, (ii) detailed instructions on considerations to be included in the fair value estimations, (iii) updates to Held for Sale and Discontinued Operations policies, and (iv) training to impacted personnel.
As of the date of the filing of this Annual Report on Form 10-K, our management believes we have made progress toward remediating the underlying causes of the material weakness.
We believe these actions will remediate the forgoing material weakness.
The material weakness will not be considered remediated, however, until the applicable controls operate and management has concluded, through testing, that the controls are operating effectively.
Management expects to begin remediation efforts immediately and be completed by June 30, 2025.
Notwithstanding the identified material weakness, as of the date of the filing of this Annual Report on Form 10-K, our management, including our CEO and CFO, believes that the audited consolidated financial statements contained in this Annual Report on Form 10-K fairly present, in all material respects, our financial position, results of operations, and cash flows for the periods presented and such financial statements are presented in conformity with GAAP.
A material weakness is a deficiency, or combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the company’s annual or interim financial statements will not be prevented or detected on a timely basis.
The following material weakness has been identified and included in management’s assessment.
Management has identified a material weakness in controls related to the Company’s disposition process related to AES Brasil.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the 2024 consolidated financial statements of the Company.
This material weakness was considered in determining the nature, timing and extent of audit tests applied in our audit of the 2024 consolidated financial statements, and this report does not affect our report dated March 10, 2025 which expressed an unqualified opinion thereon.
March 10, 2025
Management, including our CEO and CFO, does not expect that our internal controls will prevent or detect all errors and all fraud.
A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met.
Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs.
In addition, any evaluation of the effectiveness of controls is subject to risks that those internal controls may become inadequate in future periods because of changes in business conditions, or that the degree of compliance with the policies or procedures deteriorates.
Management assessed the effectiveness of our internal control over financial reporting as of December 31, 2023.
Based on this assessment, management believes that the Company maintained effective internal control over financial reporting as of December 31, 2023.
The effectiveness of the Company's internal control over financial reporting as of December 31, 2023, has been audited by Ernst & Young LLP, an independent registered public accounting firm, as stated in their report, which appears herein.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated balance sheets of the Company as of December 31, 2023 and 2022, the related consolidated statements of operations, comprehensive income (loss), changes in equity and cash flows for each of the three years in the period ended December 31, 2023, and the related notes and the financial statement schedule listed in the Index at Item 15(c) and our report dated February 26, 2024 expressed an unqualified opinion thereon.
February 26, 2024
Page headers and footers: 4 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[removed: 192] [added: 203] | [removed: 2023] [added: 2024] Annual Report
[removed: 193] [added: 204] | [removed: 2023] [added: 2024] Annual Report
205 | 2024 Annual Report
206 | 2024 Annual Report
Item 9B. OTHER INFORMATION
0 rewritten, 2 added, 1 removed, 0 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Trading Arrangements
None of the Company’s directors or “officers,” as defined in Rule 16a-1(f) of the Exchange Act, adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K, during the Company’s fiscal quarter ended December 31, 2024.
None.
Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
0 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[removed: 194] [added: 207] | [removed: 2023] [added: 2024] Annual Report
Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
5 rewritten, 2 added, 0 removed, 1 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The following information is incorporated by reference from the Registrant's Proxy Statement for the Registrant's [removed: 2024] [added: 2025] Annual Meeting of Stockholders which the Registrant expects will be filed on or around March [removed: 14, 2024] [added: 19, 2025] (the [removed: "2024] [added: "2025] Proxy Statement"):
- information regarding the directors required by this item found under the heading *Board [added: and Committee Governance*—*Board] of [removed: Directors - Biographies*;][added: Directors*—*Biographies*;]
- information regarding AES' Code of [removed: Ethics] [added: Conduct] found under the heading *Corporate Governance at [removed: AES - Additional] [added: AES*— *Additional] Governance Information*; [removed: and]
- information regarding AES' Financial Audit Committee found under the heading *Board and Committee [removed: Governance - Board Committees - Financial] [added: Governance*—*Board Committees*—*Financial] Audit Committee (the “Audit [removed: Committee”).*][added: Committee”);* and]
The other information required by this Item, to the extent not included above, will be contained in our [removed: 2024] [added: 2025] Proxy Statement and is herein incorporated by reference.
- information regarding AES' insider trading policies and procedures found under the heading *Compensation Discussion and Analysis ("CD&A")—Other Relevant Compensation Elements, Policies, and Information—Insider Trading Policy*.
A copy of our insider trading policy is filed as Exhibit 19 to this Report.
Item 11. EXECUTIVE COMPENSATION
1 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The information required by Item 402 of Regulation S-K will be contained in the [removed: 2024] [added: 2025] Proxy Statement under "Director Compensation" and "Executive Compensation" (excluding the information under the caption “Compensation Committee Report”) and is incorporated herein by reference.
Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
6 rewritten, 2 added, 3 removed, 14 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
See the information contained under the heading *Security Ownership of Certain Beneficial Owners, Directors, and Executive Officers* of the [removed: 2024] [added: 2025] Proxy Statement, which information is incorporated herein by reference.
The following table provides information about shares of AES common stock that may be issued under AES' equity compensation plans, as of December 31, [removed: 2023:][added: 2024:]
Securities Authorized for Issuance under Equity Compensation Plans (As of December 31, [removed: 2023)][added: 2024)]
The weighted average exercise price of Options outstanding under this plan included in Column (b) is [removed: $13.60] [added: $12.50] (excluding performance stock units, restricted stock units and director stock units), with [removed: 11,153,030] [added: 9,254,667] shares available for future issuance.
Any remaining shares under this plan, which are not reserved for [added: issuance under outstanding awards, are not available for future issuance and thus the amount of 105,341 shares is not included in Column (c) above.]
(2)Includes [removed: 3,435,116] [added: 4,165,134] (of which [removed: 330,522] [added: 558,954] are vested and [removed: 3,104,594] [added: 3,606,180] are unvested) shares underlying PSU and RSU awards (assuming [removed: 2021, 2022 and] [added: 2022,] 2023 PSUs [added: at] maximum [added: performance and the 2024 PSUs at target] performance), [removed: 1,477,308] [added: 1,504,284] shares underlying Director stock unit awards, and [removed: 720,613] [added: 119,051] shares issuable upon the exercise of Stock Option grants, for an aggregate number of [removed: 5,633,037] [added: 5,788,469] shares.
| Equity compensation plans approved by security holders (1) | | | 5,788,469 | | | (2) | | | $ | 12.50 | | | | | 9,254,667 | | |
| Total | | | 5,788,469 | | | | | | $ | 12.50 | | | | | 9,254,667 | | |
| Equity compensation plans approved by security holders (1) | | | 5,633,037 | | | (2) | | | $ | 13.60 | | | | | 11,153,030 | | |
| Total | | | 5,633,037 | | | | | | $ | 13.70 | | | | | 11,153,030 | | |
issuance under outstanding awards, are not available for future issuance and thus the amount of 105,341 shares is not included in Column (c) above.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[removed: 195] [added: 208] | [removed: 2023] [added: 2024] Annual Report
Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
1 rewritten, 0 added, 0 removed, 0 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The information regarding related party transactions required by this item will be included in the [removed: 2024] [added: 2025] Proxy Statement found under the headings *Related Person Policies and Procedures* and *Board and Committee Governance* and are incorporated herein by reference.
Item 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
1 rewritten, 0 added, 0 removed, 1 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
The information required by this Item 14 will be included in the [removed: 2024] [added: 2025] Proxy Statement under the headings *Information Regarding The Independent Registered Public Accounting Firm, Audit Fees, Audit Related [removed: Fees,] [added: Fees,*] and [removed: Pre-Approval] [added: *Pre-Approval] Policies and Procedures* and is incorporated herein by reference.
Page headers and footers: 1 line differs, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[removed: 196] [added: 209] | [removed: 2023] [added: 2024] Annual Report
Item 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
137 rewritten, 28 added, 24 removed, 112 unchanged
Read the full itemFY2024 item · filed March 11, 2025FY2023 item · filed February 26, 2024
| [Consolidated Balance Sheets as of December 31, [removed: 202](#i8ea710b913994516904e0694e23e5230_277)[3](#i8ea710b913994516904e0694e23e5230_277)] [added: 202](#i3951040d90a14d81a315859e5f4b3298_274)[4](#i3951040d90a14d81a315859e5f4b3298_274)] [and [removed: 202](#i8ea710b913994516904e0694e23e5230_277)[2](#i8ea710b913994516904e0694e23e5230_277)] [added: 20](#i3951040d90a14d81a315859e5f4b3298_274)[23](#i3951040d90a14d81a315859e5f4b3298_274)] | | | | | | [removed: [119](#i8ea710b913994516904e0694e23e5230_277)] [added: [120](#i3951040d90a14d81a315859e5f4b3298_274)] | | |
| [Consolidated Statements of Operations for the years ended December 31, [removed: 202](#i8ea710b913994516904e0694e23e5230_280)[3](#i8ea710b913994516904e0694e23e5230_280)[, 202](#i8ea710b913994516904e0694e23e5230_280)[2](#i8ea710b913994516904e0694e23e5230_280)] [added: 202](#i3951040d90a14d81a315859e5f4b3298_277)[4](#i3951040d90a14d81a315859e5f4b3298_277)[, 202](#i3951040d90a14d81a315859e5f4b3298_277)[3](#i3951040d90a14d81a315859e5f4b3298_277)] [and [removed: 202](#i8ea710b913994516904e0694e23e5230_280)[1](#i8ea710b913994516904e0694e23e5230_280)] [added: 20](#i3951040d90a14d81a315859e5f4b3298_277)[22](#i3951040d90a14d81a315859e5f4b3298_277)] | | | | | | [removed: [120](#i8ea710b913994516904e0694e23e5230_280)] [added: [121](#i3951040d90a14d81a315859e5f4b3298_277)] | | |
| [Consolidated Statements of Comprehensive Income (Loss) for the years ended December 31, [removed: 202](#i8ea710b913994516904e0694e23e5230_283)[3](#i8ea710b913994516904e0694e23e5230_283)[, 202](#i8ea710b913994516904e0694e23e5230_283)[2](#i8ea710b913994516904e0694e23e5230_283)] [added: 202](#i3951040d90a14d81a315859e5f4b3298_280)[4](#i3951040d90a14d81a315859e5f4b3298_280)[, 202](#i3951040d90a14d81a315859e5f4b3298_280)[3](#i3951040d90a14d81a315859e5f4b3298_280)] [and [removed: 202](#i8ea710b913994516904e0694e23e5230_283)[1](#i8ea710b913994516904e0694e23e5230_283)] [added: 20](#i3951040d90a14d81a315859e5f4b3298_280)[22](#i3951040d90a14d81a315859e5f4b3298_280)] | | | | | | [removed: [121](#i8ea710b913994516904e0694e23e5230_283)] [added: [122](#i3951040d90a14d81a315859e5f4b3298_280)] | | |
| [Consolidated Statements of Changes in Equity for the years ended December 31, [removed: 202](#i8ea710b913994516904e0694e23e5230_286)[3](#i8ea710b913994516904e0694e23e5230_286)[, 202](#i8ea710b913994516904e0694e23e5230_286)[2](#i8ea710b913994516904e0694e23e5230_286)] [added: 202](#i3951040d90a14d81a315859e5f4b3298_283)[4](#i3951040d90a14d81a315859e5f4b3298_283)[, 202](#i3951040d90a14d81a315859e5f4b3298_283)[3](#i3951040d90a14d81a315859e5f4b3298_283)] [and [removed: 202](#i8ea710b913994516904e0694e23e5230_286)[1](#i8ea710b913994516904e0694e23e5230_286)] [added: 20](#i3951040d90a14d81a315859e5f4b3298_283)[22](#i3951040d90a14d81a315859e5f4b3298_283)] | | | | | | [removed: [122](#i8ea710b913994516904e0694e23e5230_286)] [added: [123](#i3951040d90a14d81a315859e5f4b3298_283)] | | |
| [Consolidated Statements of Cash Flows for the years ended December 31, [removed: 202](#i8ea710b913994516904e0694e23e5230_289)[3](#i8ea710b913994516904e0694e23e5230_289)[, 202](#i8ea710b913994516904e0694e23e5230_289)[2](#i8ea710b913994516904e0694e23e5230_289)] [added: 202](#i3951040d90a14d81a315859e5f4b3298_286)[4](#i3951040d90a14d81a315859e5f4b3298_286)[, 202](#i3951040d90a14d81a315859e5f4b3298_286)[3](#i3951040d90a14d81a315859e5f4b3298_286)] [and [removed: 202](#i8ea710b913994516904e0694e23e5230_289)[1](#i8ea710b913994516904e0694e23e5230_289)] [added: 20](#i3951040d90a14d81a315859e5f4b3298_286)[22](#i3951040d90a14d81a315859e5f4b3298_286)] | | | | | | [removed: [123](#i8ea710b913994516904e0694e23e5230_289)] [added: [124](#i3951040d90a14d81a315859e5f4b3298_286)] | | |
| [Notes to Consolidated Financial [removed: Statements](#i8ea710b913994516904e0694e23e5230_292)] [added: Statements](#i3951040d90a14d81a315859e5f4b3298_292)] | | | | | | [removed: [125](#i8ea710b913994516904e0694e23e5230_292)] [added: [126](#i3951040d90a14d81a315859e5f4b3298_292)] | | |
| [removed: [Schedules](#i8ea710b913994516904e0694e23e5230_427)] [added: [Schedules](#i3951040d90a14d81a315859e5f4b3298_427)] | | | | | | S-2-S-7 | | |
| 3.2 | | | | | | [Amended and Restated By-Laws of The AES Corporation, incorporated herein by reference to Exhibit 3.2 of the Company's Form 10-Q for the quarter [removed: ended June 30, 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476123000071/aes0630202310-qexhibit32.htm)] [added: ended](https://www.sec.gov/Archives/edgar/data/874761/000087476124000070/aes0930202410-qexhibit32.htm) [September 30](https://www.sec.gov/Archives/edgar/data/874761/000087476124000070/aes0930202410-qexhibit32.htm)[, 202](https://www.sec.gov/Archives/edgar/data/874761/000087476124000070/aes0930202410-qexhibit32.htm)[4](https://www.sec.gov/Archives/edgar/data/874761/000087476124000070/aes0930202410-qexhibit32.htm)[.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000070/aes0930202410-qexhibit32.htm)] | | |
| 4 | | | | | | There are numerous instruments defining the rights of holders of long-term indebtedness of the Registrant and its consolidated subsidiaries, none of which exceeds ten percent of the total assets of the Registrant and its subsidiaries on a consolidated basis. The Registrant hereby agrees to furnish a copy of any of such agreements to the Commission upon request. Since these documents are not required filings under Item 601 of Regulation S-K, the Company has elected to file certain of these documents as Exhibits [removed: 4.(a)—4.(i).] [added: 4.(a)—4.(l).] | | |
| [removed: 4.(i)] [added: 4.(l)] | | | | | | [Description of the Registrant's Securities is incorporated herein by reference to Exhibit 4.(k) of the Company's Form 10-K for the year ended December 31, 2020.is incorporated herein by reference to Exhibit 4.(k) of the Company's Form 10-K for the year ended December 31, 2020.](https://www.sec.gov/Archives/edgar/data/874761/000087476121000015/aes1231202010-kexhibit4k.htm) | | |
| 10.5 | | | | | | [The AES Corporation 2003 Long Term Compensation Plan, as Amended and [removed: Restated, dated] [added: Restated on] October [removed: 11, 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit105.htm)] [added: 10, 2023, is incorporated herein by reference to Exhibit 10.5 of the Company's Form 10-K for the year ended December 31, 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit105.htm)] | | |
| 10.7 | | | | | | [Form of AES Performance Stock Unit Award Agreement under The AES Corporation 2003 Long Term Compensation Plan [added: is incorporated herein by reference to Exhibit 10.7 of the Company's Form 10-K] for the year ended December 31, [removed: 2023 (filed herewith)](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit107.htm)] [added: 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit107.htm)] | | |
| 10.8 | | | | | | [Form of AES Restricted Stock Unit Award Agreement under The AES Corporation 2003 Long Term Compensation Plan [added: is incorporated herein by reference to Exhibit 10.8 of the Company's Form 10-K] for the year ended December 31, [removed: 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit108.htm)] [added: 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit108.htm)] | | |
| 10.9 | | | | | | [Form of AES Performance Cash Unit Award Agreement under The AES Corporation 2003 Long Term Compensation Plan [added: is incorporated herein by reference to Exhibit 10.9 of the Company's Form 10-K] for the year ended December 31, [removed: 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit109.htm)] [added: 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit109.htm)] | | |
| 10.11 | | | | | | [Form of AES Performance Cash Unit Award Agreement under The AES Corporation 2003 Long Term Compensation Plan [added: is incorporated herein by reference to Exhibit 10.11 of the Company's Form 10-K] for the year ended December 31, [removed: 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1011.htm)] [added: 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1011.htm)] | | |
| 10.12 | | | | | | [The AES Corporation Restoration Supplemental Retirement Plan, as [removed: amended] [added: Amended] and [removed: restated, effective] [added: Restated on] October 10, [removed: 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1012.htm)] [added: 2023, is incorporated herein by reference to Exhibit 10.12 of the Company's Form 10-K for the year ended December 31, 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1012.htm)] | | |
| 10.14 | | | | | | [The AES Corporation Amended and Restated Executive Severance Plan and Summary Plan Description [removed: dated October 10, 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1014.htm)] [added: is incorporated herein by reference to Exhibit 10.14 of the Company's Form 10-K for the year ended December 31, 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit1014.htm)] | | |
| 10.15 | | | | | | [The AES Corporation Performance Incentive Plan, as Amended and Restated on October 10, [added: 2023, is incorporated herein by reference to Exhibit 10.15 of the Company's Form 10-K for the year ended December 31,] 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1015.htm) | | |
| 10.18 | | | | | | [removed: [Seventh] [added: [Eight] Amended and Restated Credit [removed: and Reimbursement] Agreement dated as of [removed: December 20, 2019] [added: September 24, 2021] among The AES Corporation, a Delaware corporation, the [removed: Banks] [added: lenders] listed on the signature pages thereof, Citibank, N.A., as Administrative Agent and [removed: Collateral Agent, and] Citibank, N.A., Mizuho Bank Ltd. and [removed: Crédit Agricole Corporate and Investment Bank,] [added: Sumitomo Mitsui Banking Corporation,] as Joint Lead [removed: Arrangers and Joint Book Runners is] [added: Arrangers,] incorporated herein by reference to Exhibit [removed: 10.1.A] [added: 10.1] of the [removed: Company's] [added: Company’s] Form 8-K filed on [removed: December 23, 2019.](http://www.sec.gov/Archives/edgar/data/874761/000095010319017587/dp118017_ex1001a.htm)] [added: September 28, 2021 (SEC File No. 001-12291).](https://www.sec.gov/Archives/edgar/data/0000874761/000095010321014800/dp159621_ex1001.htm)] | | |
| [removed: 10.19] [added: 10.20] | | | | | | [removed: [Eight Amended and Restated] [added: [Amendment No. 1 to the] Credit Agreement dated as of [removed: September 24, 2021] [added: August 23, 2022] among The AES Corporation, a Delaware corporation, the lenders listed on the signature pages thereof, [added: and] Citibank, N.A., as Administrative Agent [removed: and Citibank, N.A., Mizuho Bank Ltd. and Sumitomo Mitsui Banking Corporation, as Joint Lead Arrangers,] [added: is] incorporated herein by reference to Exhibit [removed: 10.1] [added: 10.31] of the [removed: Company’s] [added: Company's] Form [removed: 8-K filed on] [added: 10-Q for the period ended] September [removed: 28, 2021 (SEC File No. 001-12291).](https://www.sec.gov/Archives/edgar/data/0000874761/000095010321014800/dp159621_ex1001.htm)] [added: 30, 2022](https://www.sec.gov/Archives/edgar/data/874761/000087476122000073/aes0930202210-qexhibit1031.htm).] | | |
| [removed: 10.20] [added: 10.19] | | | | | | [Form of Director and Officer Indemnification Agreement is incorporated herein by reference to Exhibit 10.30 of the Company's Form 10-Q for the period ended September 30, 2022](https://www.sec.gov/Archives/edgar/data/874761/000087476122000073/aes0930202210-qexhibit1030.htm). | | |
| [removed: 10.22] [added: 10.21] | | | | | | [removed: [Term Loan] [added: [Loan] Agreement dated as of [removed: September 30, 2022] [added: December 6, 2024] among The AES Corporation as Borrower, the banks named [removed: herein] [added: therein] as Banks, and Sumitomo Mitsui Banking Corporation as Administrative [removed: Agent is incorporated herein by reference to Exhibit 10.32 of the Company's Form 10-Q for the period ended September 30, 2022](https://www.sec.gov/Archives/edgar/data/874761/000087476122000073/aes0930202210-qexhibit1032.htm).] [added: Agent.](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit1021.htm)] | | |
| [removed: 10.23] [added: 10.22] | | | | | | [Form of AES Non-Executive Restricted Stock Unit Award Agreement under the AES Corporation 2003 Long Term Compensation Plan [added: is incorporated herein by reference to Exhibit 10.23 of the Company's Form 10-K] for the year ended December 31, [removed: 2023 (filed herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1023.htm)] [added: 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit1023.htm)] | | |
| 21.1 | | | | | | [Subsidiaries of The AES Corporation (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit211.htm)] [added: herewith)](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit211.htm).] | | |
| 23.1 | | | | | | [Consent of Independent Registered Public Accounting Firm, Ernst & Young LLP (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit231.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit231.htm)] | | |
| 24 | | | | | | [Powers of Attorney (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit24.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit24.htm)] | | |
| 31.1 | | | | | | [Rule 13a-14(a)/15d-14(a) Certification of Andrés Gluski (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit311.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit311.htm)] | | |
| 31.2 | | | | | | [Rule 13a-14(a)/15d-14(a) Certification of Stephen Coughlin (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit312.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit312.htm)] | | |
| 32.1 | | | | | | [Section 1350 Certification of Andrés Gluski (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit321.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit321.htm)] | | |
| 32.2 | | | | | | [Section 1350 Certification of Stephen Coughlin (filed [removed: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit322.htm)] [added: herewith).](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit322.htm)] | | |
| 97 | | | | | | [Amended and Restated Compensation Recoupment Policy, effective October 6, [added: 2023, is incorporated herein by reference to Exhibit 97 of the Company's Form 10-K for the year ended December 31,] 2023.](https://www.sec.gov/Archives/edgar/data/874761/000087476124000011/aes1231202310-kexhibit97.htm) | | |
| 101 | | | | | | The AES Corporation Annual Report on Form 10-K for the year ended December 31, [removed: 2022,] [added: 2024,] formatted in Inline XBRL (Inline Extensible Business Reporting Language): (i) the Cover Page, (ii) Consolidated Balance Sheets, (iii) Consolidated Statements of Operations, (iv) Consolidated Statements of Comprehensive Income (Loss), (v) Consolidated Statements of Changes in Equity, (vi) Consolidated Statements of Cash Flows, and (vii) Notes to Consolidated Financial Statements. The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document. | | |
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, [removed: as amended,] the [removed: Company] [added: Registrant] has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Date: | | | [removed: February 26, 2024] [added: March 10, 2025] | | | By: | | | | | | /s/ ANDRÉS GLUSKI | | |
Pursuant to the requirements of the Securities Exchange Act of 1934, [removed: as amended,] this report has been signed below by the following persons on behalf of the Company and in the capacities and on the dates indicated.
S-1 | [removed: 2023] [added: 2024] Annual Report
| [Schedule I—Condensed Financial Information of [removed: Registrant](#i8ea710b913994516904e0694e23e5230_430)] [added: Registrant](#i3951040d90a14d81a315859e5f4b3298_430)] | | | [removed: S-[2](#i8ea710b913994516904e0694e23e5230_430)] [added: S-[2](#i3951040d90a14d81a315859e5f4b3298_430)] | | |
S-2 | [removed: 2023] [added: 2024] Annual Report
DECEMBER 31, [removed: 2023] [added: 2024] AND [removed: 2022][added: 2023]
| | | | [added: 2024] | | | [added: | | |] 2023 | | | | | | 2022 | | |
| 4.(i) | | | | | | [Base Indenture, dated May 21, 2024, between The AES Corporation and Deutsche Bank Trust Company Americas, as Trustee is incorporated herein by reference to Exhibit 4.1 of the Company's Form 8-K filed on May 21, 2024](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524143386/d841766d8k.htm)[.](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524143386/d841766d8k.htm) | | |
| 4.(j) | | | | | | [F](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524143386/d841766d8k.htm)[irst Supplemental Indenture, dated May 21, 2024, between The AES Corporation and Deutsche Bank Trust Company Americas, as Trustee is incorporated herein by reference to Exhibit 4.2 of the Company's Form 8-K filed on May 21, 2024](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524143386/d841766d8k.htm)[.](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524143386/d841766d8k.htm) | | |
| 4.(k) | | | | | | [Second Supplemental Indenture, dated December 6, 2024, between The AES Corporation and Deutsche Bank Trust Company Americas, as Trustee is incorporated herein by reference to Exhibit 4.1 of the Company's Form 8-K filed on December 6, 2024](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524272460/d563045d8k.htm)[.](https://www.sec.gov/ix?doc=/Archives/edgar/data/874761/000119312524272460/d563045d8k.htm) | | |
| 19 | | | | | | [The AES Corporation Insider Trading Policy](https://www.sec.gov/Archives/edgar/data/874761/000087476125000013/aes1231202410-kexhibit19.htm) | | |
| Andrés Gluski | | | | | | | | | March 10, 2025 | | | | | |
| Gerard M. Anderson | | | | | | | | | March 10, 2025 | | | | | |
| Inderpal S. Bhandari | | | | | | | | | March 10, 2025 | | | | | |
| Janet G. Davidson | | | | | | | | | March 10, 2025 | | | | | |
| Holly K. Koeppel | | | | | | | | | March 10, 2025 | | | | | |
| Julia M. Laulis | | | | | | | | | March 10, 2025 | | | | | |
| Alain Monié | | | | | | | | | March 10, 2025 | | | | | |
| John B. Morse | | | | | | | | | March 10, 2025 | | | | | |
| Moisés Naím | | | | | | | | | March 10, 2025 | | | | | |
| Teresa M. Sebastian | | | | | | | | | March 10, 2025 | | | | | |
| Maura Shaughnessy | | | | | | | | | March 10, 2025 | | | | | |
| Stephen Coughlin | | | | | | | | | March 10, 2025 | | | | | |
| Sherry L. Kohan | | | | | | | | | March 10, 2025 | | | | | |
| *By: | | | /s/ PAUL L. FREEDMAN | | | | | | March 10, 2025 | | |
| | | | | | | 2024 | | | | | | 2023 | | |
| Total pension adjustments | | | 2 | | | | | | (3) | | | | | | 10 | | |
| Fair value option liabilities activity: | | | | | | | | | | | | | | | | | |
| Change in fair value option liabilities due to instrument-specific credit risk, net of $0 income tax for all periods | | | 3 | | | | | | — | | | | | | — | | |
| Total change in fair value option liabilities | | | 3 | | | | | | — | | | | | | — | | |
| Repayments of notes payable and other coupon bearing securities | | | | | | (200) | | | | | | — | | | | | | — | | |
| Junior Unsecured Note | | | | | | 7.60% | | | | | | 2055 | | | | | | 950 | | | | | | — | | |
| Junior Unsecured Note | | | | | | 6.95% | | | | | | 2055 | | | | | | 500 | | | | | | — | | |
| 2029 | | | — | | |
| Thereafter | | | 3,150 | | |
| 10.21 | | | | | | [Amendment No. 1 to the Credit Agreement dated as of August 23, 2022 among The AES Corporation, a Delaware corporation, the lenders listed on the signature pages thereof, and Citibank, N.A., as Administrative Agent is incorporated herein by reference to Exhibit 10.31 of the Company's Form 10-Q for the period ended September 30, 2022](https://www.sec.gov/Archives/edgar/data/874761/000087476122000073/aes0930202210-qexhibit1031.htm). | | |
| Andrés Gluski | | | | | | | | | February 26, 2024 | | | | | |
| * | | | | | | Director | | | | | | | | |
| Gerard M. Anderson | | | | | | | | | February 26, 2024 | | | | | |
| Inderpal S. Bhandari | | | | | | | | | February 26, 2024 | | | | | |
| Janet G. Davidson | | | | | | | | | February 26, 2024 | | | | | |
| Tarun Khanna | | | | | | | | | February 26, 2024 | | | | | |
| Holly K. Koeppel | | | | | | | | | February 26, 2024 | | | | | |
| Julia M. Laulis | | | | | | | | | February 26, 2024 | | | | | |
| Alain Monié | | | | | | | | | February 26, 2024 | | | | | |
| John B. Morse | | | | | | | | | February 26, 2024 | | | | | |
| Moisés Naím | | | | | | | | | February 26, 2024 | | | | | |
| Teresa M. Sebastian | | | | | | | | | February 26, 2024 | | | | | |
| Maura Shaughnessy | | | | | | | | | February 26, 2024 | | | | | |
| Stephen Coughlin | | | | | | | | | February 26, 2024 | | | | | |
| Sherry L. Kohan | | | | | | | | | February 26, 2024 | | | | | |
| *By: | | | /s/ PAUL L. FREEDMAN | | | | | | February 26, 2024 | | |
| | | | 2023 | | | | | | 2022 | | | | | | 2021 | | |
| Total change in unfunded pension obligation | | | (3) | | | | | | 10 | | | | | | 24 | | |
| Issuance of preferred stock | | | | | | — | | | | | | — | | | | | | 1,014 | | |
| Sales to noncontrolling interests | | | | | | — | | | | | | — | | | | | | (1) | | |
| Drawings on revolving credit facility | | | | | | SOFR + 1.75% | | | | | | 2027 | | | | | | — | | | | | | 325 | | |
| 2024 | | | $ | 200 | |
| Thereafter | | | 1,700 | | |
An excerpt. Shown here: 40 of 137 rewritten, all 28 added and all 24 removed. The counts are complete. For every sentence, read Item 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES in the FY2024 filing and the FY2023 filing.
Page headers and footers: 2 lines differ, not counted above
Lines that repeat across the filing's pages, such as a footer with the company, form, year and page number. A change here is a change in the page, not in what was disclosed.
[removed: 197] [added: 210] | [removed: 2023] [added: 2024] Annual Report
[removed: 198] [added: 211] | [removed: 2023] [added: 2024] Annual Report