☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the Quarterly Period Ended September 30, 2023

or

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Commission file number 1-12291

AESlogo03.jpg

THE AES CORPORATION

(Exact name of registrant as specified in its charter)

Delaware54-1163725
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
4300 Wilson Boulevard
Arlington,Virginia22203
(Address of principal executive offices)(Zip Code)
Registrant's telephone number, including area code:(703)522-1315
Securities registered pursuant to Section 12(b) of the Act:
Title of Each ClassTrading Symbol(s)Name of Each Exchange on Which Registered
Common Stock, par value $0.01 per shareAESNew York Stock Exchange
Corporate UnitsAESCNew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer☒Accelerated filer☐Smaller reporting company☐Emerging growth company☐Non-accelerated filer☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒


The number of shares outstanding of Registrant’s Common Stock, par value $0.01 per share, on October 31, 2023 was 669,629,035.

The AES Corporation

Form 10-Q for the Quarterly Period ended September 30, 2023

Table of Contents

Glossary of Terms1
PART I: FINANCIAL INFORMATION3
ITEM 1.FINANCIAL STATEMENTS (UNAUDITED)3
Condensed Consolidated Balance Sheets3
Condensed Consolidated Statements of Operations4
Condensed Consolidated Statements of Comprehensive Income (Loss)5
Condensed Consolidated Statements of Changes in Equity6
Condensed Consolidated Statements of Cash Flows8
Notes to Condensed Consolidated Financial Statements9
Note 1 - Financial Statement Presentation9
Note 2 - Inventory12
Note 3 - Fair Value12
Note 4 - Derivative Instruments and Hedging Activities17
Note 5 - Financing Receivables18
Note 6 - Investments in and Advances to Affiliates19
Note 7 - Debt20
Note 8 - Commitments and Contingencies22
Note 9 - Leases23
Note 10 - Redeemable Stock of Subsidiaries24
Note 11 - Equity25
Note 12 - Segments28
Note 13 - Revenue30
Note 14 - Other Income and Expense31
Note 15 - Asset Impairment Expense32
Note 16 - Income Taxes32
Note 17 - Held-for-Sale33
Note 18 - Acquisitions33
Note 19 - Earnings Per Share34
Note 20 - Risks and Uncertainties35
Note 21 - Subsequent Events36
ITEM 2.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS37
Executive Summary37
Review of Consolidated Results of Operations40
SBU Performance Analysis46
Key Trends and Uncertainties53
Capital Resources and Liquidity61
Critical Accounting Policies and Estimates68
ITEM 3.QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK68
ITEM 4.CONTROLS AND PROCEDURES71
PART II: OTHER INFORMATION72
ITEM 1.LEGAL PROCEEDINGS72
ITEM 1A.RISK FACTORS75
ITEM 2.UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS75
ITEM 3.DEFAULTS UPON SENIOR SECURITIES75
ITEM 4.MINE SAFETY DISCLOSURES75
ITEM 5.OTHER INFORMATION75
ITEM 6.EXHIBITS76
SIGNATURES77

1 | The AES Corporation | September 30, 2023 Form 10-Q

Glossary of Terms

The following terms and acronyms appear in the text of this report and have the definitions indicated below:

Adjusted EBITDAAdjusted earnings before interest income and expense, taxes, depreciation and amortization, a non-GAAP measure of operating performance
Adjusted EBITDA with Tax AttributesAdjusted earnings before interest income and expense, taxes, depreciation and amortization, adding back the pre-tax effect of Production Tax Credits, Investment Tax Credits and depreciation tax expense allocated to tax equity investors, a non-GAAP measure
Adjusted EPSAdjusted Earnings Per Share, a non-GAAP measure
Adjusted PTCAdjusted Pre-tax Contribution, a non-GAAP measure of operating performance
AESThe Parent Company and its subsidiaries and affiliates
AES AndesAES Andes S.A., formerly AES Gener
AES BrasilAES Brasil Operações S.A., formerly branded as AES Tietê
AES Clean Energy DevelopmentAES Clean Energy Development, LLC
AES IndianaIndianapolis Power & Light Company, formerly branded as IPL. AES Indiana is wholly-owned by IPALCO
AES OhioThe Dayton Power & Light Company, formerly branded as DP&L. AES Ohio is wholly-owned by DPL
AES Renewable HoldingsAES Renewable Holdings, LLC, formerly branded as AES Distributed Energy
AFUDCAllowance for Funds Used During Construction
AGICAES Global Insurance Company, AES’ captive insurance company
AOCLAccumulated Other Comprehensive Loss
ASCAccounting Standards Codification
ASUAccounting Standards Update
BESSBattery Energy Storage System
CAAUnited States Clean Air Act
CCRCoal Combustion Residuals, which includes bottom ash, fly ash, and air pollution control wastes generated at coal-fired generation plant sites
CECLCurrent Expected Credit Loss
CO2Carbon Dioxide
CSAPRCross-State Air Pollution Rule
CWAU.S. Clean Water Act
DG CompDirectorate-General for Competition
DPLDPL Inc.
EBITDAEarnings before interest income and expense, taxes, depreciation and amortization, a non-GAAP measure of operating performance
EPAUnited States Environmental Protection Agency
EPCEngineering, Procurement and Construction
ESPElectric Security Plan
EUEuropean Union
FASBFinancial Accounting Standards Board
FluenceFluence Energy, Inc and its subsidiaries, including Fluence Energy, LLC, which was previously our joint venture with Siemens (NASDAQ: FLNC)
GAAPGenerally Accepted Accounting Principles in the United States
GHGGreenhouse Gas
GILTIGlobal Intangible Low Taxed Income
GWGigawatts
GWhGigawatt Hours
HLBVHypothetical Liquidation at Book Value
IPALCOIPALCO Enterprises, Inc.
ITCInvestment Tax Credit
IURCIndiana Utility Regulatory Commission
LNGLiquid Natural Gas
MMBtuMillion British Thermal Units
MWMegawatts
MWhMegawatt Hours
NAAQSNational Ambient Air Quality Standards
NCINoncontrolling Interest
NEKNatsionalna Elektricheska Kompania (state-owned electricity public supplier in Bulgaria)
NMNot Meaningful
NOVNotice of Violation
NOXNitrogen Oxide
NPDESNational Pollutant Discharge Elimination System
Parent CompanyThe AES Corporation
Pet CokePetroleum Coke
PPAPower Purchase Agreement
PREPAPuerto Rico Electric Power Authority
PUCOThe Public Utilities Commission of Ohio
RSURestricted Stock Unit
SBUStrategic Business Unit
SECUnited States Securities and Exchange Commission

2 | The AES Corporation | September 30, 2023 Form 10-Q

SO2Sulfur Dioxide
TDSICTransmission, Distribution, and Storage System Improvement Charge
TEGTermoeléctrica del Golfo, S. de R.L. de C.V.
TEPTermoeléctrica Peñoles, S. de R.L. de C.V.
U.S.United States
USDUnited States Dollar
VIEVariable Interest Entity

3 | The AES Corporation | September 30, 2023 Form 10-Q

PART I: FINANCIAL INFORMATION

Item 1. FINANCIAL STATEMENTS

Condensed Consolidated Balance Sheets (Unaudited)

September 30, 2023December 31, 2022
(in millions, except share and per share amounts)
ASSETS
CURRENT ASSETS
Cash and cash equivalents$1,765$1,374
Restricted cash365536
Short-term investments538730
Accounts receivable, net of allowance for doubtful accounts of $9 and $5, respectively1,7251,799
Inventory7981,055
Prepaid expenses16198
Other current assets1,4721,533
Current held-for-sale assets493518
Total current assets7,3177,643
NONCURRENT ASSETS
Property, Plant and Equipment:
Land492470
Electric generation, distribution assets and other27,99826,599
Accumulated depreciation(8,602)(8,651)
Construction in progress7,6474,621
Property, plant and equipment, net27,53523,039
Other Assets:
Investments in and advances to affiliates894952
Debt service reserves and other deposits205177
Goodwill362362
Other intangible assets, net of accumulated amortization of $486 and $434, respectively2,2901,841
Deferred income taxes428319
Loan receivable, net of allowance of $24 and $26, respectively9901,051
Other noncurrent assets, net of allowance of $16 and $51, respectively3,1402,979
Total other assets8,3097,681
TOTAL ASSETS$43,161$38,363
LIABILITIES AND EQUITY
CURRENT LIABILITIES
Accounts payable$1,641$1,730
Accrued interest379249
Accrued non-income taxes269249
Accrued and other liabilities2,4422,151
Recourse debt700—
Non-recourse debt, including $1,015 and $416, respectively, related to variable interest entities3,0601,758
Current held-for-sale liabilities328354
Total current liabilities8,8196,491
NONCURRENT LIABILITIES
Recourse debt4,8643,894
Non-recourse debt, including $1,781 and $2,295, respectively, related to variable interest entities18,76717,846
Deferred income taxes1,2571,139
Other noncurrent liabilities2,7753,168
Total noncurrent liabilities27,66326,047
Commitments and Contingencies (see Note 8)
Redeemable stock of subsidiaries1,4231,321
EQUITY
THE AES CORPORATION STOCKHOLDERS’ EQUITY
Preferred stock (without par value, 50,000,000 shares authorized; 1,043,050 issued and outstanding at September 30, 2023 and December 31, 2022)838838
Common stock ($0.01 par value, 1,200,000,000 shares authorized; 819,051,591 issued and 669,629,035 outstanding at September 30, 2023 and 818,790,001 issued and 668,743,464 outstanding at December 31, 2022)88
Additional paid-in capital6,4496,688
Accumulated deficit(1,292)(1,635)
Accumulated other comprehensive loss(1,410)(1,640)
Treasury stock, at cost (149,422,556 and 150,046,537 shares at September 30, 2023 and December 31, 2022, respectively)(1,814)(1,822)
Total AES Corporation stockholders’ equity2,7792,437
NONCONTROLLING INTERESTS2,4772,067
Total equity5,2564,504
TOTAL LIABILITIES AND EQUITY$43,161$38,363

See Notes to Condensed Consolidated Financial Statements.

4 | The AES Corporation

Condensed Consolidated Statements of Operations

(Unaudited)

Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
(in millions, except share and per share amounts)
Revenue:
Non-Regulated$2,571$2,651$7,051$6,944
Regulated8639762,6492,613
Total revenue3,4343,6279,7009,557
Cost of Sales:
Non-Regulated(1,813)(1,839)(5,392)(5,237)
Regulated(703)(896)(2,298)(2,335)
Total cost of sales(2,516)(2,735)(7,690)(7,572)
Operating margin9188922,0101,985
General and administrative expenses(64)(51)(191)(149)
Interest expense(326)(276)(966)(813)
Interest income144100398270
Loss on extinguishment of debt—(1)(1)(8)
Other expense(12)(10)(38)(51)
Other income1243680
Gain (loss) on disposal and sale of business interests—1(4)—
Asset impairment expense(158)

Showing the first 8K of 231K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The condensed consolidated financial statements included in Item 1.—Financial Statements of this Form 10-Q and the discussions contained herein should be read in conjunction with our 2022 Form 10-K.

Forward-Looking Information

The following discussion may contain forward-looking statements regarding us, our business, prospects and our results of operations, that are subject to certain risks and uncertainties posed by many factors and events that could cause our actual business, prospects and results of operations to differ materially from those that may be anticipated by such forward-looking statements. These statements include, but are not limited to, statements regarding management’s intents, beliefs, and current expectations and typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “forecast,” “target,” “will,” “would,” “intend,” “believe,” “project,” “estimate,” “plan,” and similar words. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute current expectations based on reasonable assumptions. Factors that could cause or contribute to such differences include, but are not limited to, those described in Item 1A.—Risk Factors of this Form 10-Q, Item 1A.—Risk Factors and Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations of our 2022 Form 10-K and subsequent filings with the SEC.

Readers are cautioned not to place undue reliance on these forward-looking statements which speak only as of the date of this report. We undertake no obligation to revise any forward-looking statements in order to reflect events or circumstances that may subsequently arise. If we do update one or more forward-looking statements, no inference should be drawn that we will make additional updates with respect to those or other forward-looking statements. Readers are urged to carefully review and consider the various disclosures made by us in this report and in our other reports filed with the SEC that advise of the risks and factors that may affect our business.

Overview of Our Business

We are a diversified power generation and utility company organized into the following four SBUs, mainly organized by technology: Renewables (solar, wind, energy storage, and hydro), Utilities (AES Indiana, AES Ohio, and AES El Salvador), Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil), and New Energy Technologies (green hydrogen, Fluence, Uplight, and 5B). Our businesses in Chile, which have a mix of generation sources, including renewables, are also included within the Energy Infrastructure SBU, as the generation from all sources is pooled to service our existing PPAs. In our 2022 Form 10-K, the management reporting structure and the Company’s reportable segments were mainly organized by geographic regions. In March 2023, we announced internal management changes as a part of our ongoing strategy to align our business to meet our customers’ needs and deliver on our major strategic objectives. The results of our operations are now reported along our four newly formed technology-based SBUs. For additional information regarding our business, see Item 1.—Business of our 2022 Form 10-K.

We have two lines of business: generation and utilities. Our Renewables, Utilities and Energy Infrastructure SBUs participate in our first business line, generation, in which we own and/or operate power plants to generate and sell power to customers, such as utilities, industrial users, and other intermediaries. Our Utilities SBU participates in our second business line, utilities, in which we own and/or operate utilities to generate or purchase, distribute, transmit, and sell electricity to end-user customers in the residential, commercial, industrial, and governmental sectors within a defined service area. In certain circumstances, our utilities also generate and sell electricity on the wholesale market. Our New Energy Technologies SBU includes investments in new and innovative technologies to support leading-edge greener energy solutions.

Executive Summary

Compared with last year, third quarter net income decreased $155 million, from $446 million to $291 million. This decrease is the result of lower contributions from LNG transactions versus 2022 at the Energy Infrastructure SBU, partially offset by favorable contributions at the Utilities, Renewables, and New Energy Technologies SBUs.

Adjusted EBITDA, a non-GAAP measure, increased $59 million, from $931 million to $990 million, mainly driven by higher contributions at the Utilities SBU, favorable weather conditions and new businesses at the Renewables SBU, higher revenues under a PPA termination agreement at the Energy Infrastructure SBU, and lower losses from affiliates at the New Energy Technologies SBU due to improved margins on a new product line; partially offset by favorable LNG transactions in the prior year at the Energy Infrastructure SBU.

Adjusted EBITDA with Tax Attributes, a non-GAAP measure, increased $17 million, from $991 million to $1,008

38 | The AES Corporation | September 30, 2023 Form 10-Q

million primarily due to the drivers above, partially offset by lower realized tax attributes driven by fewer projects placed in service.

Compared with last year, third quarter diluted earnings per share from continuing operations decreased $0.27, from $0.59 to $0.32. This decrease is mainly driven by higher long-lived asset impairments in the current year and lower earnings at the Energy Infrastructure SBU mainly due to unrealized foreign currency losses and prior year favorable LNG transactions; partially offset by higher contributions at the Utilities SBU due to the deferral of power purchase costs, and favorable weather conditions and new businesses at the Renewables SBU.

Adjusted EPS, a non-GAAP measure, decreased $0.03 from $0.63 to $0.60, mainly driven by lower contributions from the Energy Infrastructure SBU, higher Parent Company interest, and a higher adjusted tax rate, partially offset by higher contributions at the Utilities SBU.

Compared with last year, net income for the nine months ended September 30, 2023 decreased $20 million, from $481 million to $461 million. This decrease is the result of lower contributions from LNG transactions versus 2022 at the Energy Infrastructure SBU, partially offset by favorable contributions at the Renewables, Utilities, and New Energy Technologies SBUs.

Adjusted EBITDA, a non-GAAP measure, decreased $51 million, from $2,238 million to $2,187 million, mainly driven by favorable LNG transactions in the prior year and higher cost of sales at the Energy Infrastructure SBU; partially offset by favorable weather conditions and new businesses at the Renewables SBU, higher contributions at the Utilities SBU, higher revenues under a PPA termination agreement at the Energy Infrastructure SBU, and lower losses from affiliates at the New Energy Technologies SBU due to improved margins on a new product line.

Adjusted EBITDA with Tax Attributes, a non-GAAP measure, decreased $91 million, from $2,347 million to $2,256 million, primarily due to the drivers above and lower realized tax attributes driven by fewer projects placed in service.

Compared with last year, diluted earnings per share from continuing operations for the nine months ended September 30, 2023 decreased $0.02, from $0.50 to $0.48. This decrease is mainly driven by favorable LNG transactions in the prior year, higher unrealized foreign currency losses and higher cost of sales at the Energy Infrastructure SBU; partially offset by lower long-lived asset impairments in the current year, higher contributions at the Utilities SBU due to the deferral of power purchase costs, and lower losses of affiliates at the New Energy Technologies SBU.

Adjusted EPS, a non-GAAP measure, decreased $0.15 from $1.18 to $1.03, mainly driven by lower contributions from the Energy Infra

Showing the first 8K of 154K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Overview Regarding Market Risks

Our businesses are exposed to and proactively manage market risk. Our primary market risk exposure is to the price of commodities, particularly electricity, oil, natural gas, coal, and environmental credits. In addition, our businesses are exposed to lower electricity price trends due to increased competition, including from renewable sources such as wind and solar, as a result of lower costs of entry and lower variable costs. We operate in multiple countries and as such, are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate. We are also exposed to interest rate fluctuations due to our issuance of debt and related financial instruments.

69 | The AES Corporation | September 30, 2023 Form 10-Q

The disclosures presented in this Item 3 are based upon a number of assumptions; actual effects may differ. The safe harbor provided in Section 27A of the Securities Act of 1933 and Section 21E of the Exchange Act shall apply to the disclosures contained in this Item 3. For further information regarding market risk, see Item 1A.—Risk Factors, Fluctuations in currency exchange rates may impact our financial results and position; Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for future growth; We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology of the 2022 Form 10-K.

Commodity Price Risk

Although we prefer to hedge our exposure to the impact of market fluctuations in the price of electricity, fuels, and environmental credits, some of our generation businesses operate under short-term sales, have contracted electricity obligations greater than supply, or operate under contract sales that leave an unhedged exposure on some of our capacity or through imperfect fuel pass-throughs. These businesses subject our operational results to the volatility of prices for electricity, fuels, and environmental credits in competitive markets. We employ risk management strategies to hedge our financial performance against the effects of fluctuations in energy commodity prices. The implementation of these strategies can involve the use of physical and financial commodity contracts, futures, swaps, and options.

The portion of our sales and purchases that are not subject to such agreements, or contracted businesses where indexation is not perfectly matched to business drivers, will be exposed to commodity price risk. When hedging the output of our generation assets, we utilize contract sales that lock in the spread per MWh between variable costs and the price at which the electricity can be sold.

AES businesses will see changes in variable margin performance as global commodity prices shift. As of September 30, 2023, we project pre-tax earnings exposure on a 10% (uncorrelated) increase in commodity prices to be less than a $5 million loss for power, gas and coal and a less than $5 million gain for oil for the remainder of the year. Our estimates exclude correlation effects, including those due to renewable resource availability. For example, a decline in oil or natural gas prices can be accompanied by a decline in power price if commodity prices are correlated. Exposures at individual businesses will change as new contracts or financial hedges are executed, and our sensitivity to changes in commodity prices generally increases in later years with reduced hedge levels at some of our businesses.

Commodity prices affect our businesses differently depending on contract terms, the local market characteristics and risk management strategies. Spot power prices, contract indexation provisions, and generation costs can be directly or indirectly affected by movements in the price of natural gas, oil, and coal. We have some natural offsets across our businesses such that low commodity prices may benefit certain businesses and be a cost to others. Exposures are not perfectly linear or symmetric. The sensitivities are affected by a number of local or indirect market factors. Examples of these factors include hydrology, local energy market supply/demand balances, regional fuel supply issues, regional competition, bidding strategies, and regulatory interventions such as price caps. Operational flexibility changes the shape of our sensitivities. For instance, certain power plants may limit downside exposure by reducing dispatch in low market environments. Volume variation also affects our commodity exposure. The volume sold under contracts or retail concessions can vary based on weather and economic conditions, resulting in a higher or lower volume of sales in spot markets. Thermal unit availability and hydrology can affect the generation output available for sale and can affect the marginal unit setting power prices.

In the Energy Infrastructure SBU, the generation businesses are largely contracted, but may have residual risk to the extent contracts are not perfectly indexed to the business drivers. In California, our Southland once-through cooling generation units (“Legacy Assets”) in Long Beach and Huntington Beach have been extended to operate through 2026 under capacity contracts with the State as part of the Strategic Reserve program. The Office of Administrative Law (OAL) is expected to confirm approval by the end of November. Our facility in Redondo Beach has been approved to retire at the end of 2023. Our ability to operate the Long Beach facility at full capacity through 2026 remains subject to approved Time Schedule Order coverage, which is expected in late November 2023. Our Southland combined cycle gas turbine (Southland Energy) units benefit from higher power and lower gas prices, depending on the contracted or hedge position.

The AES Andes business in Chile owns assets in the central and northern regions of the country and has a portfolio of contract sales in both. A significant portion of our PPAs through 2024 include mechanisms of indexation that adjust the price of energy based on fluctuations in the price of coal, with an index defined by the National Energy Commission based on the physical coal imports for the energy system. This mechanism mitigates exposures to changes in the price of fuel. In the Dominican Republic, we own natural gas plants contracted under a portfolio of contract sales, and both contract and spot prices may move with commodity prices through 2024.

70 | The AES Corporation | September 30, 2023 Form 10-Q

Additionally, the contract levels do not always match our generation availability and our assets may be sellers of spot prices in excess of contract levels or a net buyer in the spot market to satisfy contract obligations. Our assets operating in Vietnam and Bulgaria have minimal exposure to commodity price risk as they have no or minor merchant exposure and fuel is subject to a pass-through mechanism.

In the Renewables SBU, our businesses have commodity exposure on unhedged volumes and resource volatility and benefit from higher power prices, where generation exceeds contracted levels. In Colombia, we operate under a shorter-term sales strategy with spot market exposure for uncontracted volumes. Because we own hydroelectric assets there, contracts are not indexed to fuel. In Brazil, the majority of the hydroelectric and other renewable generating facility volumes are covered by contract sales. Under normal hydrological volatility, spot price risk is mitigated through a regulated sharing mechanism across all hydroelectric generators in the country. Under drier conditions, the sharing mechanism may not be sufficient to cover the business' contract position, and therefore it may have to purchase power at spot prices driven by the cost of thermal generation. Our Renewables businesses in Panama are highly contracted under financial and load-following PPA type structures, exposing the business to hydrology-based variance. To the extent hydrological inflows are greater than or less than the contract volumes, the business will be sensitive to changes in spot power prices which may be driven by oil and natural gas prices in some time periods.

Foreign Exchange Rate Risk

In the normal course of business, we are exposed to foreign currency risk and other foreign operations risks that arise from investments in foreign subsidiaries and affiliates. A key component of these risks stems from the fact that some of our foreign subsidiaries and affiliates utilize currencies other than our consolidated reporting currency, the USD. Additionally, certain of our foreign subsidiaries and affiliates have entered into monetary obligations in USD or currencies other than their own functional currencies. Certain of our foreign subsidiaries calculate and pay taxes in currencies other than their own functional currency. We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, Brazilian real, Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso. Our exposure to certain of these currencies may be material and economic mechanisms to hedge certain of these risks may not always be available. These subsidiaries and affiliates have attempted to limit potential foreign exchange exposure by entering into revenue contracts that adjust to changes in foreign exchange rates. We also use foreign currency forwards, swaps, and options, where possible, to manage our risk related to certain foreign currency fluctuations.

AES enters into foreign currency hedges to protect economic value of the business and minimize the impact of foreign exchange rate fluctuations to AES’ portfolio. While protecting cash flows, the hedging strategy is also designed to reduce forward-looking earnings foreign exchange volatility. Due to variation of timing and amount between cash distributions and earnings exposure, the hedge impact may not fully cover the earnings exposure on a realized basis, which could result in greater volatility in earnings.

AES has unhedged forward-looking earnings foreign exchange deterioration risk from the Argentina peso that could be material. Additionally, as of September 30, 2023, assuming a 10% USD appreciation, cash distributions attributable to foreign subsidiaries in the Euro may be exposed to exchange rate movement of less than a $5 million loss. Sensitivities are produced by applying a one-time 10% USD appreciation to forecasted exposed cash distributions for 2023 coming from the respective subsidiaries exposed to the currencies listed above, net of the impact of outstanding hedges and holding all other variables constant. The numbers presented above are net of any transactional gains or losses. These sensitivities may change in the future as new hedges are executed or existing hedges are unwound. Additionally, updates to the forecasted cash distributions exposed to foreign exchange risk may result in further modification. The sensitivities presented do not capture the impacts of any administrative market restrictions or currency in convertibility.

Interest Rate Risks

We are exposed to risk resulting from changes in interest rates as a result of our issuance of variable and fixed-rate debt, as well as interest rate swap, cap, floor, and option agreements.

Decisions on the fixed-floating debt mix are made to be consistent with the risk factors faced by individual businesses or plants. Depending on whether a plant’s capacity payments or revenue stream is fixed or varies with inflation, we partially hedge against interest rate fluctuations by arranging fixed-rate or variable-rate financing. In certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing. Most of our interest rate risk is related to non-recourse financings at our businesses.

71 | The AES Corporation | September 30, 2023 Form 10-Q

As of September 30, 2023, the portfolio’s pre-tax earnings exposure to a one-time 100-basis-point increase in interest rates for our Argentine peso, Brazilian real, Chilean peso, Colombian peso, Euro, and USD denominated debt would be approximately $15 million on interest expense for the debt denominated in these currencies. These amounts represent year to go exposure and do not take into account the historical correlation between these interest rates.

Item 4. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company, under the supervision and with the participation of its management, including the Company’s Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), evaluated the effectiveness of its “disclosure controls and procedures,” as such term is defined in Rule 13a-15(e) under the Exchange Act, as of the end of the period covered by this Quarterly Report on Form 10-Q. Based on that evaluation, our CEO and CFO have concluded that our disclosure controls and procedures were effective as of September 30, 2023, to ensure that information required to be disclosed by the Company in reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in SEC rules and forms, and include controls and procedures designed to ensure that information required to be disclosed by us in such reports is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow timely decisions regarding required disclosures.

Changes in Internal Controls over Financial Reporting

There were no changes that occurred during the fiscal quarter covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

72 | The AES Corporation | September 30, 2023 Form 10-Q

PART II: OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

The Company is involved in certain claims, suits and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's condensed consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of September 30, 2023. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a governmental authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.

In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian court. GRIDCO's challenge of the costs award has been dismissed by the court, but its challenge of the liability award remains pending. A hearing on the liability award has not taken place to date. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $12 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program (“LCP”). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26, 2020, CCC staff sent AES a NOV directing AES to submit a Coastal Development Permit (“CDP”) application for the

73 | The AES Corporation | September 30, 2023 Form 10-Q

removal of the water pumps within the alleged wetlands. AES has submitted the CDP to the permitting authority, the City of Redondo Beach (“the City”), with respect to AES’ plans to disable or remove the pumps. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and a CDP application for their continued operation. AES has responded to the CCC, providing the requested analysis and seeking further discussion with the agency regarding the CDP. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required, at which time AES must present additional information and analysis on the pumps within the alleged wetlands and the onsite electrical vaults. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.

In October 2015, AES Indiana received an NOV alleging violations of the Clean Air Act (“CAA”), the Indiana State Implementation Plan (“SIP”), and the Title V operating permit related to alleged particulate and opacity violations at Petersburg Station Unit 3. In addition, in February 2016, AES Indiana received an NOV from the EPA alleging violations of New Source Review and other CAA regulations, the Indiana SIP, and the Title V operating permit at Petersburg Station. On August 31, 2020, AES Indiana reached a settlement with the EPA, the DOJ and the Indiana Department of Environmental Management (“IDEM”), resolving these purported violations of the CAA at Petersburg Station. The settlement agreement, in the form of a proposed judicial consent decree, was approved and entered by the U.S. District Court for the Southern District of Indiana on March 23, 2021, and includes, among other items, the following requirements: annual caps on NOx and SO2 emissions and more stringent emissions limits than AES Indiana's current Title V air permit; payment of civil penalties totaling $1.5 million; a $5 million environmental mitigation project consisting of the construction and operation of a new, non-emitting source of generation at the site; expenditure of $0.3 million on a state-only environmentally beneficial project to preserve local, ecologically-significant lands; and retirement of Units 1 and 2 prior to July 1, 2023.

In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The relevant AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court (“Civil Court”). Preliminary hearings have taken place. The parties are awaiting the Civil Court’s ruling on the AES respondents’ motions to dismiss the lawsuit. The relevant AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include exceeding generation limits, failing to reduce emissions during episodes of poor air quality, exceeding limits on discharges to the sea, and exceeding noise limits. AES Andes has submitted a proposed “Compliance Program” to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021. On December 30, 2021, the Compliance Program was approved by the SMA. However an ex officio action was brought by the SMA due to alleged exceedances of generation limits, which would require the Company to reduce SO2, NOx and PM emissions in order to achieve the emissions offset established in the Compliance Program. On January 6, 2022, AES Andes filed a reposition with the SMA seeking modification of the means for compliance with the ex officio action. On January 17, 2023, the SMA approved street paving measures, or alternatively a program providing heaters for community members, as the means to satisfy the air emissions offsets in the approved Compliance Plan. The cost of proposed Compliance Program is approximately $10.8 million USD. On April 21, 2023, the SMA

74 | The AES Corporation | September 30, 2023 Form 10-Q

notified AES Andes of a resolution alleging an additional “serious” non-compliance of the Ventanas Complex failing to reduce emissions during episodes of poor air quality. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. AES Andes plans to vigorously defend itself through the administrative process, but there are no guarantees that it will be successful. Fines are possible if AES Andes is unsuccessful in its defense of the April 2023 resolution and/or if the SMA determines there is an unsatisfactory execution of the Compliance Program approved in connection with the October 2019 sanctioning process.

In March 2020, Mexico’s Comisión Federal de Electricidad (“CFE”) served an arbitration demand upon AES Mérida III. CFE made allegations that AES Mérida III was in breach of its obligations under a power and capacity purchase agreement (“Contract”) between the two parties, which allegations related to CFE’s own failure to provide fuel within the specifications of the Contract. CFE sought to recover approximately $200 million in payments made to AES Mérida under the Contract as well as approximately $480 million in alleged damages for having to acquire power from alternative sources in the Yucatan Peninsula. AES Mérida filed an answer denying liability to CFE and asserted a counterclaim for damages due to CFE’s breach of its obligations. The parties submitted their respective initial briefs and supporting evidence in December 2020. After additional briefing, the evidentiary hearing took place in November 2021. Closing arguments were heard in May 2022. In November 2022, the arbitration Tribunal issued its decision in the case, rejecting CFE’s claims for damages and granting AES Mérida a net amount of damages on AES Mérida’s counterclaims (“Award”). There are ongoing proceedings in the Mexican courts concerning AES Mérida’s attempt to enforce the Award and CFE’s attempt to challenge the Award. AES Mérida believes that it has meritorious defenses and claims and will assert them vigorously in this dispute; however, there can be no assurances that it will be successful in its efforts.

On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Authority”) initiated an environmental audit at the TEP thermal generating facility. On January 20, 2023 TEP was notified of the resolution issued by the Authority, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately USD $1.6 million). On March 3, 2023, the facility filed a nullity judgment to challenge such resolution, which has been admitted by the local judge with an injunction granted against execution of the proposed fine during the course of the underlying proceedings. However, the local tax authority rejected receiving the bond that is required to guarantee the injunction, and as a result, TEP filed a complaint on September 18, 2023 seeking to compel the tax authority to accept the bond and recognize the validity of the injunction. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.

On July 25, 2022, AES Puerto Rico, LP (“AES-PR”) received from the EPA an NOV alleging certain violations of the CAA at AES-PR’s coal-fired power facility in Guayama, Puerto Rico. The NOV alleges AES-PR exceeded an emission limit and did not continuously operate certain monitoring equipment, conduct certain analyses and testing, maintain complete records, and submit certain reports as required by the EPA’s Mercury and Air Toxics Standards. The NOV further alleges AES-PR did not comply fully with the facility’s Title V operating permit. AES-PR is engaging in discussions with the EPA about the NOV. AES-PR will defend its interests, but we cannot predict the outcome of this matter at this time. However, settlements and litigated outcomes of CAA claims alleged against other coal-fired power plants have required companies to pay civil penalties and undertake remedial measures.

In April 2022, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the construction of the Mesamávida wind project, initiating a sanctioning process. The alleged charges include untimely implementation of road improvement measures and road use schedules and the failure to identify all noise receptors closest to the first construction phases of the project. On June 23, 2022, the SMA addressed the charges to Energía Eólica Mesamávida SpA. On June 28, 2022, Energía Eólica Mesamávida SpA submitted a proposed compliance program, with an estimated cost of $4.3 million, which was subsequently approved by the SMA. On November 9, 2022, opponents to the project submitted before the Third Environmental Court a judicial action challenging the approval of this compliance program. On March 7, 2023, the Third

75 | The AES Corporation | September 30, 2023 Form 10-Q

Environmental Court rejected the third-party judicial action against the Compliance Program. The deadline to appeal the decision has passed and no appeals were submitted. If the SMA determines there is an unsatisfactory execution of the compliance program, fines are possible.

In June 2020, the Energy Regulatory Commission of Mexico passed resolution RES/894/2020 that may increase the wheeling tariffs that are paid by TEG and TEP to CFE. The increase is currently estimated to be over $130 million for the relevant period (July 2020 through March 2024). In October 2022, TEG and TEP initiated a challenge of the constitutionality of the resolution. If that challenge is unsuccessful, TEG and TEP will seek to enforce their respective contractual rights to pass-through the tariff increases to their respective offtakers.

On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all which are categorized by the SMA as “serious.” The alleged charges include untimely completion of intake works and insufficient capture by the provisional works, irrigation water outlet and canal contemplated by an agreement with local communities; non-compliance with the details of the forest management plans and intervention in unauthorized areas; construction of a road in a restricted paleontological area; and unlawful moving of fauna. On February 16, 2023, the Alto Maipo project submitted a compliance program, to which the SMA provided observations. On June 6, 2023, Alto Maipo responded to the SMA’s observations by submitting a revised compliance program, which is currently under consideration by the SMA. In late June and early July 2023, third-party opponents submitted observations to the compliance program, claiming that the proposal to address the intake works charges is inadequate. Alto Maipo completed its submission of responses to these third-party observations in August 2023, and subsequently, new, additional observations were submitted by opponents to the project. The costs of any such compliance program are uncertain. If a compliance program is not approved by or executed to the satisfaction of the SMA, fines, revocation of the facility’s RCA environmental permit approved by the SMA, or closure are possible outcomes for such alleged serious violations under applicable regulations.

Item 1A. RISK FACTORS

There have been no material changes to the risk factors disclosed in Item 1A.—Risk Factors of our 2022 Form 10-K. Additional risks and uncertainties also may adversely affect our business and operations, including those discussed in Item 2.—Management's Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

The Board has authorized the Company to repurchase stock through a variety of methods, including open market repurchases, purchases by contract (including, without limitation, accelerated stock repurchase programs or 10b5-1 plans), and/or privately negotiated transactions. There can be no assurances as to the amount, timing, or prices of repurchases, which may vary based on market conditions and other factors. The Program does not have an expiration date and can be modified or terminated by the Board of Directors at any time. As of September 30, 2023, $264 million remained available for repurchase under the Program. No repurchases were made by The AES Corporation of its common stock during the third quarter of 2023.

ITEM 3. DEFAULTS UPON SENIOR SECURITIES

None.

ITEM 4. MINE SAFETY DISCLOSURES

Not applicable.

Item 5. OTHER INFORMATION

Trading Arrangements

None of the Company’s directors or “officers,” as defined in Rule 16a-1(f) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K, during the Company’s fiscal quarter ended September 30, 2023.

76 | The AES Corporation | September 30, 2023 Form 10-Q

Item 6. EXHIBITS

31.1Rule 13a-14(a)/15d-14(a) Certification of Andrés Gluski (filed herewith).
31.2Rule 13a-14(a)/15d-14(a) Certification of Stephen Coughlin (filed herewith).
32.1Section 1350 Certification of Andrés Gluski (filed herewith).
32.2Section 1350 Certification of Stephen Coughlin (filed herewith).
101The AES Corporation Quarterly Report on Form 10-Q for the quarter ended September 30, 2023, formatted in Inline XBRL (Inline Extensible Business Reporting Language): (i) the Cover Page, (ii) Condensed Consolidated Balance Sheets, (iii) Condensed Consolidated Statements of Operations, (iv) Condensed Consolidated Statements of Comprehensive Income (Loss), (v) Condensed Consolidated Statements of Changes in Equity, (vi) Condensed Consolidated Statements of Cash Flows, and (vii) Notes to Condensed Consolidated Financial Statements. The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
104Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)

77 | The AES Corporation | September 30, 2023 Form 10-Q

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

THE AES CORPORATION (Registrant)
Date:November 2, 2023By:/s/ STEPHEN COUGHLIN
Name:Stephen Coughlin
Title:Executive Vice President and Chief Financial Officer (Principal Financial Officer)
By:/s/ SHERRY L. KOHAN
Name:Sherry L. Kohan
Title:Senior Vice President and Chief Accounting Officer (Principal Accounting Officer)