AES 10-Q 2025-03-31

Filed 2025-05-01. 8 sections, 445K characters. Original on sec.gov · Markdown · JSON

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549


FORM 10-Q

(Mark One)

☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the Quarterly Period Ended March 31, 2025

or

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Commission file number 1-12291

AESlogo03.jpg

THE AES CORPORATION

(Exact name of registrant as specified in its charter)

Delaware54-1163725
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
4300 Wilson Boulevard
Arlington,Virginia22203
(Address of principal executive offices)(Zip Code)
Registrant's telephone number, including area code:(703)522-1315
Securities registered pursuant to Section 12(b) of the Act:
Title of Each ClassTrading Symbol(s)Name of Each Exchange on Which Registered
Common Stock, par value $0.01 per shareAESNew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer☒Accelerated filer☐Smaller reporting company☐Emerging growth company☐Non-accelerated filer☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒


The number of shares outstanding of Registrant’s Common Stock, par value $0.01 per share, on April 29, 2025 was 711,922,815.

The AES Corporation

Form 10-Q for the Quarterly Period ended March 31, 2025

Table of Contents

Glossary of Terms1
PART I: FINANCIAL INFORMATION3
ITEM 1.FINANCIAL STATEMENTS (UNAUDITED)3
Condensed Consolidated Balance Sheets3
Condensed Consolidated Statements of Operations4
Condensed Consolidated Statements of Comprehensive Income (Loss)5
Condensed Consolidated Statements of Changes in Equity6
Condensed Consolidated Statements of Cash Flows7
Notes to Condensed Consolidated Financial Statements8
Note 1 - Financial Statement Presentation8
Note 2 - Inventory9
Note 3 - Fair Value9
Note 4 - Derivative Instruments and Hedging Activities12
Note 5 - Financing Receivables14
Note 6 - Allowance for Credit Losses15
Note 7 - Investments in and Advances to Affiliates15
Note 8 - Obligations16
Note 9 - Commitments and Contingencies19
Note 10 - Leases20
Note 11 - Redeemable Stock of Subsidiaries21
Note 12 - Equity22
Note 13 - Segments25
Note 14 - Revenue28
Note 15 - Other Income and Expense29
Note 16 - Asset Impairment Expense30
Note 17 - Income Taxes30
Note 18 - Held-for-Sale and Dispositions30
Note 19 - Acquisitions31
Note 20 - Earnings Per Share31
Note 21 - Restructuring32
Note 22 - Subsequent Events33
ITEM 2.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS34
Executive Summary34
Review of Consolidated Results of Operations37
SBU Performance Analysis41
Key Trends and Uncertainties47
Capital Resources and Liquidity57
Critical Accounting Policies and Estimates64
ITEM 3.QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK64
ITEM 4.CONTROLS AND PROCEDURES67
PART II: OTHER INFORMATION68
ITEM 1.LEGAL PROCEEDINGS68
ITEM 1A.RISK FACTORS71
ITEM 2.UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS71
ITEM 3.DEFAULTS UPON SENIOR SECURITIES71
ITEM 4.MINE SAFETY DISCLOSURES71
ITEM 5.OTHER INFORMATION71
ITEM 6.EXHIBITS72
SIGNATURES73

1 | The AES Corporation | March 31, 2025 Form 10-Q

Glossary of Terms

The following terms and acronyms appear in the text of this report and have the definitions indicated below:

2024 Base Rate OrderThe order issued in April 2024 by the IURC authorizing AES Indiana to, among other things, increase its basic rates and charges by $71 million annually
Adjusted EBITDAAdjusted earnings before interest income and expense, taxes, depreciation and amortization, a non-GAAP measure of operating performance
Adjusted EBITDA with Tax AttributesAdjusted earnings before interest income and expense, taxes, depreciation and amortization, adding back the pre-tax effect of Production Tax Credits, Investment Tax Credits and depreciation tax deductions allocated to tax equity investors, a non-GAAP measure
Adjusted EPSAdjusted Earnings Per Share, a non-GAAP measure
Adjusted PTCAdjusted Pre-tax Contribution, a non-GAAP measure of operating performance
AESThe Parent Company and its subsidiaries and affiliates
AES AndesAES Andes S.A., formerly AES Gener
AES BrasilAES Brasil Operações S.A., formerly branded as AES Tietê
AES Clean Energy DevelopmentAES Clean Energy Development, LLC
AES IndianaIndianapolis Power & Light Company, formerly branded as IPL. AES Indiana is wholly-owned by IPALCO
AES OhioThe Dayton Power & Light Company, formerly branded as DP&L. For the periods covered by this report, AES Ohio was wholly-owned by DPL. Beginning in April 2025, CDPQ owns an aggregate indirect equity interest in AES Ohio of approximately 30%.
AES Renewable HoldingsAES Renewable Holdings, LLC, formerly branded as AES Distributed Energy
AFUDCAllowance for Funds Used During Construction
AGICAES Global Insurance Company, AES’ captive insurance company
AOCLAccumulated Other Comprehensive Loss
ASCAccounting Standards Codification
ASUAccounting Standards Update
CAAUnited States Clean Air Act
CCRCoal Combustion Residuals, which includes bottom ash, fly ash, and air pollution control wastes generated at coal-fired generation plant sites
CECLCurrent Expected Credit Loss
CDPQCaisse de dépôt et placement du Québec
CO2Carbon Dioxide
CSAPRCross-State Air Pollution Rule
CWAU.S. Clean Water Act
DG CompDirectorate-General for Competition
DIRDistribution Investment Rider - established in ESP 4 to recover certain distribution capital investments placed in service beginning June 30, 2020, and subject to increasing annual revenue limits and other terms. The annual revenue limit for 2025 is $49.4 million.
DPLDPL LLC and its consolidated subsidiaries. On April 3, 2025, DPL Inc. converted its form of business organization from an Ohio corporation to an Ohio limited liability company. Upon the conversion, DPL Inc. changed its name to DPL LLC. References to DPL are to DPL Inc. before April 3, 2025, and DPL LLC on and after April 3, 2025.
EBITDAEarnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, a non-GAAP measure of operating performance
ECCRAEnvironmental Compliance Cost Recovery Adjustment
ENSOEl Niño-Southern Oscillation
EPAUnited States Environmental Protection Agency
EPCEngineering, Procurement and Construction
ESPElectric Security Plan
EUEuropean Union
FASBFinancial Accounting Standards Board
FluenceFluence Energy, Inc and its subsidiaries, including Fluence Energy, LLC, which was previously our joint venture with Siemens (NASDAQ: FLNC)
GAAPGenerally Accepted Accounting Principles in the United States
GHGGreenhouse Gas
GILTIGlobal Intangible Low Taxed Income
GWGigawatts
GWhGigawatt Hours
HLBVHypothetical Liquidation at Book Value
IPALCOIPALCO Enterprises, Inc. CDPQ owns direct and indrect interests in IPALCO of approximately 30%.
ITCInvestment Tax Credit
IURCIndiana Utility Regulatory Commission
LNGLiquid Natural Gas
MMBtuMillion British Thermal Units
MWMegawatts
MWhMegawatt Hours
NAAQSNational Ambient Air Quality Standards
NCINoncontrolling Interest
NEKNatsionalna Elektricheska Kompania (state-owned electricity public supplier in Bulgaria)

2 | The AES Corporation | March 31, 2025 Form 10-Q

NMNot Meaningful
NOVNotice of Violation
NOXNitrogen Oxide
NPDESNational Pollutant Discharge Elimination System
OVECOhio Valley Electric Corporation, an electric generating company in which AES Ohio has a 4.9% interest
Parent CompanyThe AES Corporation
Pet CokePetroleum Coke
PPAPower Purchase Agreement
PREPAPuerto Rico Electric Power Authority
PUCOThe Public Utilities Commission of Ohio
RSURestricted Stock Unit
SBUStrategic Business Unit
SECUnited States Securities and Exchange Commission
SO2Sulfur Dioxide
TDSICTransmission, Distribution, and Storage System Improvement Charge
TEGTermoeléctrica del Golfo, S. de R.L. de C.V.
TEPTermoeléctrica Peñoles, S. de R.L. de C.V.
U.S.United States
USDUnited States Dollar
VIEVariable Interest Entity

3 | The AES Corporation | March 31, 2025 Form 10-Q

PART I: FINANCIAL INFORMATION

Item 1. FINANCIAL STATEMENTS

Condensed Consolidated Balance Sheets

(Unaudited)

March 31, 2025December 31, 2024
(in millions, except share and per share amounts)
ASSETS
CURRENT ASSETS
Cash and cash equivalents$1,753$1,524
Restricted cash735437
Short-term investments6479
Accounts receivable, net of allowance of $65 and $52, respectively1,7191,646
Inventory624593
Prepaid expenses168157
Other current assets, net of $0 allowance for both periods1,3411,533
Current held-for-sale assets1,474862
Total current assets7,8786,831
NONCURRENT ASSETS
Property, plant and equipment, net of accumulated depreciation of $8,978 and $8,701, respectively33,99533,166
Investments in and advances to affiliates1,1291,124
Debt service reserves and other deposits7878
Goodwill345345
Other intangible assets, net of accumulated amortization of $449 and $426, respectively1,9431,947
Deferred income taxes371365
Other noncurrent assets, net of allowance of $21 and $20, respectively2,8762,917
Noncurrent held-for-sale assets—633
Total noncurrent assets40,73740,575
TOTAL ASSETS$48,615$47,406
LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY
CURRENT LIABILITIES
Accounts payable$1,655$1,654
Accrued interest310256
Accrued non-income taxes288249
Supplier financing arrangements605917
Accrued and other liabilities1,3151,246
Recourse debt1,177899
Non-recourse debt2,9902,688
Current held-for-sale liabilities1,004662
Total current liabilities9,3448,571
NONCURRENT LIABILITIES
Recourse debt4,8014,805
Non-recourse debt21,60820,626
Deferred income taxes1,4751,490
Other noncurrent liabilities2,7632,881
Noncurrent held-for-sale liabilities—391
Total noncurrent liabilities30,64730,193
Commitments and Contingencies (see Note 9)
Redeemable stock of subsidiaries899938
EQUITY
THE AES CORPORATION STOCKHOLDERS’ EQUITY
Common stock ($0.01 par value, 1,200,000,000 shares authorized; 859,711,007 issued and 711,908,057 outstanding at March 31, 2025 and 859,709,987 issued and 711,074,269 outstanding at December 31, 2024)99
Additional paid-in capital5,8885,913
Retained earnings214293
Accumulated other comprehensive loss(848)(766)
Treasury stock, at cost (147,802,950 and 148,635,718 shares at March 31, 2025 and December 31, 2024, respectively)(1,795)(1,805)
Total AES Corporation stockholders’ equity3,4683,644
NONCONTROLLING INTERESTS4,2574,060
Total equity7,7257,704
TOTAL LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY$48,615$47,406

See Notes to Condensed Consolidated Financial Statements.

4 | The AES Corporation

Condensed Consolidated Statements of Operations

(Unaudited)

Three Months Ended March 31,
20252024
(in millions, except share and per share amounts)
Revenue:
Non-Regulated$1,941$2,232
Regulated985853
Total revenue2,9263,085
Cost of Sales:
Non-Regulated(1,661)(1,733)
Regulated(824)(733)
Total cost of sales(2,485)(2,466)
Operating margin441619
General and administrative expenses(77)(75)
Interest expense(342)(357)
Interest income69105
Loss on extinguishment of debt(8)(1)
Other expense(52)(38)
Other income735
Gain (loss) on disposal and sale of business interests(1)43
Asset impairment expense(49)(46)
Foreign currency transaction losses(10)(8)
INCOME (LOSS) FROM CONTINUING OPERATIONS BEFORE TAXES AND EQUITY IN EARNINGS OF AFFILIATES(22)277
Income tax benefit (expense)(17)

Showing the first 8K of 226K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The condensed consolidated financial statements included in Item 1.—Financial Statements of this Form 10-Q and the discussions contained herein should be read in conjunction with our 2024 Form 10-K.

Forward-Looking Information

The following discussion may contain forward-looking statements regarding us, our business, prospects and our results of operations, that are subject to certain risks and uncertainties posed by many factors and events that could cause our actual business, prospects and results of operations to differ materially from those that may be anticipated by such forward-looking statements. These statements include, but are not limited to, statements regarding management’s intents, beliefs, and current expectations and typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “forecast,” “target,” “will,” “would,” “intend,” “believe,” “project,” “estimate,” “plan,” and similar words. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute current expectations based on reasonable assumptions. Factors that could cause or contribute to such differences include, but are not limited to, those described in Item 1A.—Risk Factors of this Form 10-Q, Item 1A.—Risk Factors and Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations of our 2024 Form 10-K and subsequent filings with the SEC.

Readers are cautioned not to place undue reliance on these forward-looking statements which speak only as of the date of this report. We undertake no obligation to revise any forward-looking statements in order to reflect events or circumstances that may subsequently arise. If we do update one or more forward-looking statements, no inference should be drawn that we will make additional updates with respect to those or other forward-looking statements. Readers are urged to carefully review and consider the various disclosures made by us in this report and in our other reports filed with the SEC that advise of the risks and factors that may affect our business.

Overview of Our Business

We are a diversified power generation and utility company organized into the following four SBUs, mainly organized by technology: Renewables (solar, wind, energy storage, and hydro), Utilities (AES Indiana, AES Ohio, and AES El Salvador), Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil), and New Energy Technologies (investments in Fluence, Uplight, Maximo, and other initiatives). Prior to the first quarter of 2025, our businesses in Chile (which have a mix of generation sources, including renewables, that were pooled to service our existing PPAs) were reported in the Energy Infrastructure SBU. After the sale or disconnection of a significant portion of AES Andes’ coal plants and the expiration of its coal-indexed contracts with regulated customers at the end of 2024, the results of our businesses in Chile, excluding the two remaining coal plants, are now reported as part of the Renewables SBU. The results of the two remaining coal plants in Chile, Angamos and Cochrane, remain within the Energy Infrastructure SBU. For additional information regarding our business, see Item 1.—Business of our 2024 Form 10-K.

We have two lines of business: generation and utilities. Our Renewables, Utilities, and Energy Infrastructure SBUs participate in our first business line, generation, in which we own and/or operate power plants to generate and sell power to customers, such as utilities, industrial users, and other intermediaries. Our Utilities SBU participates in our second business line, utilities, in which we own and/or operate utilities to generate or purchase, distribute, transmit, and sell electricity to end-user customers in the residential, commercial, industrial, and governmental sectors within a defined service area. In certain circumstances, our utilities also generate and sell electricity on the wholesale market. Our New Energy Technologies SBU includes investments in new and innovative technologies to support leading-edge greener energy solutions.

Executive Summary

Compared with last year, first quarter net income decreased $351 million, from net income of $278 million to a net loss of $73 million. This decrease is the result of higher prior year revenues from the monetization of the Warrior Run coal plant PPA, one-time costs due to organizational restructuring, and a gain in the prior year on dilution of our interest in Uplight; partially offset by higher contributions from the Utilities and Renewables SBUs.

Adjusted EBITDA, a non-GAAP measure, decreased $49 million, from $640 million to $591 million, driven by lower contributions from the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA. This was partially offset by higher margins at the Utilities SBU, higher revenues from renewables projects placed in service, and better hydrology.

Adjusted EBITDA with Tax Attributes, a non-GAAP measure, decreased $91 million, from $868 million to $777

35 | The AES Corporation | March 31, 2025 Form 10-Q

million primarily due to the drivers above, as well as lower realized tax attributes driven by timing of tax attribute recognition.

Compared with last year, first quarter diluted earnings per share from continuing operations decreased $0.53, from $0.60 to $0.07. This decrease is mainly driven by lower earnings at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA, lower realized tax attributes, a gain in the prior year on dilution of our interest in Uplight, and one-time costs due to organizational restructuring. This was partially offset by higher contributions at the Utilities SBU due to higher margins and realized tax attributes related to the Pike County energy storage project.

Adjusted EPS, a non-GAAP measure, decreased $0.23 from $0.50 to $0.27, mainly driven by lower realized tax attributes due to timing of tax attribute recognition, and lower contributions at the Energy Infrastructure SBU primarily due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA, partially offset by higher contributions at the Utilities SBU.

36 | The AES Corporation | March 31, 2025 Form 10-Q

q12025aesaesinfographic4001.jpg

(1) Non-GAAP measure. See Item 2.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis—Non-GAAP Measures for reconciliation and definition.
(2) GWh sold in 2024.

37 | The AES Corporation | March 31, 2025 Form 10-Q

Overview of Strategic Performance

AES is leading the industry's transition to clean energy by investing in renewables, utilities, and technology businesses.

  • Our PPA backlog, which consists of projects with signed contracts, but which are not yet operational, is 11.7 GW, including 5.3 GW under construction. Since our fourth quarter 2024 earnings call in February 2025, we:

◦Completed the construction of 643 MW of energy storage and solar, and expect to add a total of 3.2 GW to our operating portfolio by year-end 2025; and

◦Signed or were awarded new long-term PPAs for 443 MW of solar and energy storage.

  • Received final regulatory approval for the 170 MW Crossvine solar-plus-storage project at AES Indiana, which is expected to come online in 2027.

  • With the sale of a minority stake in our global insurance company, AGIC, for $450 million, achieved full year 2025 asset sale proceeds target of $400 to $500 million.

  • To fund the substantial growth at AES Ohio, closed on the sale of an approximate 30% indirect equity interest to a wholly-owned subs

Showing the first 8K of 154K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Overview Regarding Market Risks

Our businesses are exposed to, and proactively manage, market risk. Market risk is the potential loss that may result from market changes associated with AES power generation or with existing or forecasted financial or commodity transactions. Our primary market risk exposure is to the price of commodities, particularly electricity, natural gas, coal, and environmental credits. AES is also exposed to fluctuations in interest rates and foreign currency exchange rates associated primarily with outstanding and expected future issuances and borrowing, and from investments in foreign subsidiaries and affiliates. We enter into various transactions, including derivatives, in order to hedge our exposure to these market risks.

The disclosures presented in this Item 3 are based upon a number of assumptions; actual effects may differ. The safe harbor provided in Section 27A of the Securities Act of 1933 and Section 21E of the Exchange Act shall apply to the disclosures contained in this Item 3. For further information regarding market risk, see Item 1A.—Risk Factors, Fluctuations in currency exchange rates may impact our financial results and position; Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for

65 | The AES Corporation | March 31, 2025 Form 10-Q

future growth; We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology of the 2024 Form 10-K.

Commodity Price Risk

Although we prefer to hedge our exposure to the impact of market fluctuations in the price of commodities, some of our generation businesses operate under short-term sales, have contracted electricity obligations greater than supply, or operate under contract sales that leave an unhedged exposure on some of our capacity or through imperfect fuel pass-throughs. These businesses subject our operational results to the volatility of prices for electricity, fuels, and environmental credits in competitive markets. In addition, our businesses are exposed to lower electricity prices due to increased competition, including from renewable sources such as wind and solar, because of lower costs of entry and lower variable costs. We employ risk management strategies to hedge our financial performance against these effects. The implementation of these strategies can involve the use of physical and financial commodity contracts, futures, swaps, and options. We have some natural offsets across our businesses such that low commodity prices may benefit certain businesses and be a cost to others. Exposures are not perfectly linear or symmetric. The sensitivities are affected by a number of local or indirect market factors. Examples of these factors include hydrology, local energy market supply/demand balances, regional fuel supply issues, regional competition, bidding strategies, and regulatory interventions such as price caps. Volume variation also affects our commodity exposure. The volume sold under contracts or retail concessions can vary based on weather and economic conditions, resulting in a higher or lower volume of sales in spot markets. Thermal unit availability and hydrology can affect the generation output available for sale and can affect the marginal unit setting power prices.

As of March 31, 2025, we project pre-tax earnings exposure on a 10% increase in commodity prices to be less than a $5 million gain for power, less than a $5 million gain for gas, and less than a $5 million loss for coal. The sensitivities are calculated using industry-standard valuation techniques to revalue all transactions (physical and financial commodity transactions) in the portfolio for a change in the underlying prices the transactions are exposed to and excludes correlation effects, including those due to renewable resource availability. The models reference market prices of commodities across future periods and associated volatility of these market prices. Prices and volatilities are predominantly based on observable market prices.

Exposures at individual businesses will change as new contracts or financial hedges are executed, and our sensitivity to changes in commodity prices generally increases in later years with reduced hedge levels at some of our businesses.

In the Energy Infrastructure SBU, the generation businesses are largely contracted, but may have residual risk to the extent contracts are not perfectly indexed to the business drivers. In California, our Southland once-through cooling generation units (“Legacy Assets”) in Long Beach and Huntington Beach have been extended to operate through 2026 under capacity contracts with the State as part of the Strategic Reserve program. Our facility in Redondo Beach has been retired effective January 1, 2024. Our ability to operate the Long Beach facility at full capacity through 2025 was approved under Tentative Time Schedule Order coverage in November 2023. Approval to operate Long Beach through 2026 will be subject to review with State Agencies. Our Southland combined cycle gas turbine (Southland Energy) units benefit from higher power and lower gas prices, depending on the contracted or hedge position. The AES Andes business in Chile owns assets in the central and northern regions of the country and has a portfolio of contract sales in both. A significant portion of our PPAs through 2025 include mechanisms of indexation that adjust the price of energy based on fluctuations in the price of coal, with an index defined by the National Energy Commission based on the physical coal imports for the energy system. This mechanism mitigates exposures to changes in the price of fuel. The increasing share of renewable energy in Chile's power market may reduce reliance on thermal units and impact power price volatility, which could impact our cost to serve certain unregulated PPAs. In the Dominican Republic, we own natural gas plants contracted under a portfolio of contract sales, and both contract and spot prices may move with commodity prices through 2024. Our thermal asset in Panama has PPAs with distribution companies which matches the term of the LNG supply agreement of such thermal assets. New entrants into the Panama thermal generation market could impact the dispatch of existing generation, requiring purchases in the spot market to satisfy the PPA obligations. Contract levels do not always match our generation availability or needs, and our assets may be sellers of spot prices in excess of contract levels or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments. Our assets operating in Vietnam and Bulgaria have minimal exposure to commodity price risk as they have no or minor merchant exposure and fuel is subject to a pass-through mechanism.

In the Renewables SBU, our businesses have commodity exposure on unhedged volumes and resource volatility and benefit from higher power prices, where generation exceeds contracted levels. In Colombia, we operate under a shorter-term sales strategy with spot market exposure for uncontracted volumes. Because we own

66 | The AES Corporation | March 31, 2025 Form 10-Q

hydroelectric assets there, contracts are not indexed to fuel. Our Renewables businesses in Panama are highly contracted under financial and load-following PPA-type structures, exposing the business to hydrology-based variance. To the extent hydrological inflows are greater than or less than the contract volumes, the business will be sensitive to changes in spot power prices which may be driven by oil and natural gas prices in some time periods.

Foreign Exchange Rate Risk

We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

In the normal course of business, we are exposed to foreign currency risk and other foreign operations risks that arise from investments in foreign subsidiaries and affiliates. A key component of these risks stems from the fact that some of our foreign subsidiaries and affiliates utilize currencies other than our consolidated reporting currency, the USD. Additionally, certain of our foreign subsidiaries and affiliates have entered into monetary obligations in USD or currencies other than their own functional currencies. Certain of our foreign subsidiaries calculate and pay taxes in currencies other than their own functional currency. We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso. Our exposure to certain of these currencies may be material. These subsidiaries and affiliates attempt to limit potential foreign exchange exposure by entering into revenue contracts that adjust to changes in foreign exchange rates. We also use foreign currency forwards, swaps, and options where possible to manage our risk related to certain foreign currency fluctuations.

AES enters into foreign currency hedges to protect economic value of the business and minimize the impact of foreign exchange rate fluctuations to AES' portfolio. While protecting cash flows, the hedging strategy is also designed to reduce forward-looking earnings foreign exchange volatility. Due to variation of timing and amount between cash distributions and earnings exposure, the hedge impact may not fully cover the earnings exposure on a realized basis, which could result in greater volatility in earnings.

AES has unhedged forward-looking earnings which are exposed to foreign exchange deterioration risk from the Argentine peso that could be material. As of March 31, 2025, assuming a 10% USD appreciation, cash distributions attributable to foreign subsidiaries in the Colombian peso, Euro, and Argentine peso may be exposed to exchange rate movements, with a total potential loss of less than $10 million.

These numbers have been produced by applying a one-time 10% USD appreciation to forecasted exposed cash distributions for 2025 coming from the respective subsidiaries exposed to the currencies listed above, net of the impact of outstanding hedges and holding all other variables constant. The numbers presented above are net of any transactional gains or losses. These sensitivities may change in the future as new hedges are executed or existing hedges are unwound. Additionally, updates to the forecasted cash distributions exposed to foreign exchange risk may result in further modification. The sensitivities presented do not capture the impacts of any administrative market restrictions or currency inconvertibility.

Interest Rate Risks

We are exposed to risk resulting from changes in interest rates primarily because of our current and expected future issuance of debt and borrowing.

Decisions on the fixed-floating debt mix are made to be consistent with the risk factors faced by individual businesses or plants. Depending on whether a plant’s capacity payments or revenue stream is fixed or varies with inflation, we partially hedge against interest rate fluctuations by arranging fixed-rate or variable-rate financing. In certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing. Most of our interest rate risk is related to non-recourse financings at our businesses.

As of March 31, 2025, the portfolio’s 2025 pre-tax earnings exposure to a one-time 100-basis-point increase in interest rates for our Argentine peso, Chilean peso, Colombian peso, Euro, and USD denominated debt would be less than $15 million on interest expense for the debt denominated in these currencies. These amounts do not take into account the historical correlation between these interest rates.

67 | The AES Corporation | March 31, 2025 Form 10-Q

Item 4. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that the Company files or submits under the Exchange Act, is recorded, processed, summarized, and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to allow timely decisions regarding required disclosures.

The Company, under the supervision and with the participation of its management, including the Company’s CEO and CFO, evaluated the effectiveness of its “disclosure controls and procedures,” as such term is defined in Rule 13a-15(e) under the Exchange Act, as of the end of the period covered by this Quarterly Report on Form 10-Q. Based on that evaluation, our CEO and CFO concluded that, as of March 31, 2025, our disclosure controls and procedures were not effective due to the material weakness in our internal control over financial reporting described below.

As previously reported in our Annual Report on Form 10-K for the year ended December 31, 2024, management identified that we did not design effective controls over the review of the disposition of AES Brasil, a complex non-routine transaction; specifically due to the use of incomplete data in the estimation of the fair value of the net assets of AES Brasil, which was used in calculation of the impairment expense after AES Brasil was classified as held-for-sale in Q2 2024.

Notwithstanding the identified material weakness, our CEO and CFO have concluded that our unaudited condensed consolidated financial statements contained in this Quarterly Report on Form 10-Q fairly present, in all material respects, our financial position, results of operations, and cash flows for the periods presented and such financial statements are presented in conformity with GAAP.

Remediation Efforts and Status

During the first quarter of 2025, management began implementing measures designed to remediate the material weakness. The remediation actions that management began implementing include: (i) policy updates detailing steps to perform in an impairment analysis of complex ownership structures, (ii) detailed instructions on considerations to be included in the fair value estimations, (iii) updates to held-for-sale and discontinued operations policies, and (iv) training to impacted personnel.

As of the date of the filing of this Quarterly Report on Form 10-Q, our management believes we have made progress toward remediating the underlying causes of the material weakness. We believe these actions will remediate the forgoing material weakness. The material weakness will not be considered remediated, however, until the applicable controls operate and management has concluded, through testing, that the controls are operating effectively. Management expects these remediation efforts to be completed by June 30, 2025.

Changes in Internal Controls over Financial Reporting

Other than the remediation efforts described above, there were no changes that occurred during the fiscal quarter covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

68 | The AES Corporation | March 31, 2025 Form 10-Q

PART II: OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

The Company is involved in certain claims, suits and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's condensed consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of March 31, 2025. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a governmental authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.

In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian court. GRIDCO's challenge of the costs award has been dismissed by the court, but its challenge of the liability award remains pending. A hearing on the liability award has not taken place to date. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $10 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program (“LCP”). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26, 2020, CCC staff sent AES an NOV directing AES to discontinue any operation of the water pumps in the alleged

69 | The AES Corporation | March 31, 2025 Form 10-Q

wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and, if necessary, a CDP application for their continued operation. With respect to the vault pumps, AES provided the CCC, with the requested analysis, and the CCC has not required further action. With respect to the pumps in the alleged wetlands, AES locked out those pumps to prevent further operation and submitted the CDP to the permitting authority, the City of Redondo Beach (the “City”), with respect to AES’ plans to disable or remove the pumps. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required. AES submitted all required information and waited for the City to continue processing the application. In December 2023, the City indicated it would continue processing the CDP application. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.

In October 2015, AES Indiana received an NOV alleging violations of the Clean Air Act (“CAA”), the Indiana State Implementation Plan (“SIP”), and the Title V operating permit related to alleged particulate and opacity violations at Petersburg Station Unit 3. In addition, in February 2016, AES Indiana received an NOV from the EPA alleging violations of New Source Review and other CAA regulations, the Indiana SIP, and the Title V operating permit at Petersburg Station. On August 31, 2020, AES Indiana reached a settlement with the EPA, the DOJ and the Indiana Department of Environmental Management (“IDEM”), resolving these purported violations of the CAA at Petersburg Station. The settlement agreement, in the form of a proposed judicial consent decree, was approved and entered by the U.S. District Court for the Southern District of Indiana on March 23, 2021, and includes, among other items, the following requirements: annual caps on NOx and SO2 emissions and more stringent emissions limits than AES Indiana's current Title V air permit; payment of civil penalties totaling $1.5 million; a $5 million environmental mitigation project consisting of the construction and operation of a new, non-emitting source of generation at the site; expenditure of $0.3 million on a state-only environmentally beneficial project to preserve local, ecologically-significant lands; and retirement of Units 1 and 2 prior to July 1, 2023.

In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. Preliminary hearings have taken place. The relevant AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. Subsequently, the claimants withdrew the lawsuit with respect to AES Puerto Rico. The lawsuit remains pending against the other AES defendants (“AES Defendants”) and the unaffiliated defendants. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court, namely, the Civil Court of La Vega (“CFI”). In May 2024, the CFI dismissed the entire case due to the expiry of the statute of limitations. Later in 2024, the claimants appealed the dismissal to the relevant intermediate appellate court. The claimants are attempting to formally serve the appeal on all defendants. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include exceeding generation limits, failing to reduce emissions during episodes of poor air quality, exceeding limits on discharges to the sea, and exceeding noise limits. AES Andes has submitted a proposed “Compliance Program” to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021. On December 30, 2021, the Compliance Program was approved by the SMA. However, an ex officio action was brought by the SMA due to

70 | The AES Corporation | March 31, 2025 Form 10-Q

alleged exceedances of generation limits, which would require the Company to reduce SO2, NOX and PM emissions in order to achieve the emissions offset established in the Compliance Program. On January 6, 2022, AES Andes filed a reposition with the SMA seeking modification of the means for compliance with the ex officio action. On January 17, 2023, the SMA approved street paving measures, or alternatively a program providing heaters for community members, as the means to satisfy the air emissions offsets in the approved Compliance Plan. The cost of the proposed Compliance Program is approximately $10.8 million and is in the execution stage. Fines are possible if the SMA determines there is an unsatisfactory execution of the Compliance Program. On April 21, 2023, the SMA notified AES Andes of a resolution alleging an additional “serious” non-compliance of the Ventanas Complex failing to reduce emissions during episodes of poor air quality. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. On May 10, 2024, the Company was notified of a fine for $180,515. On June 3, 2024, the Company appealed this fine to the Environmental Court. The Company believes that it has meritorious defenses and will continue to assert them vigorously in this dispute; however, there can be no assurances that it will be successful.

In March 2020, Mexico’s Comisión Federal de Electricidad (“CFE”) served an arbitration demand upon AES Mérida III. CFE alleged that AES Mérida was in breach of a power and capacity purchase agreement (“Contract”) between the two parties, even though the allegations relate to CFE’s own failure to provide fuel within the specifications of the Contract. CFE sought to recover approximately $200 million in payments made to AES Mérida under the Contract, plus approximately $480 million in alleged damages for having to acquire power from alternative sources in the Yucatan Peninsula. AES Mérida filed an answer denying liability to CFE and asserted a counterclaim for damages due to CFE’s breach of its obligations. The evidentiary hearing took place in November 2021. Closing arguments were heard in May 2022. In November 2022, the arbitration Tribunal issued its decision in the case, rejecting CFE’s claims for damages and awarding AES Mérida a net amount of damages on AES Mérida’s counterclaims ("Award"). There were proceedings in the Mexican courts concerning AES Mérida's attempt to enforce the Award and CFE's attempt to challenge the Award. In April 2025, AES Mérida and CFE finalized a settlement agreement resolving this dispute.

On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Authority”) initiated an environmental audit at the TEP thermal generating facility. On January 20, 2023, TEP was notified of the resolution issued by the Authority, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately $1.3 million). On March 3, 2023, the facility filed a nullity judgment to challenge such resolution, which has been admitted by the local judge with an injunction granted against execution of the proposed fine during the course of the underlying proceedings. However, the local tax authority rejected receiving the bond that is required to guarantee the injunction, and as a result, on September 18, 2023, TEP filed a complaint seeking to compel the tax authority to accept the bond and recognize the validity of the injunction. The Specialized Chamber has not issued a response to the complaint, despite the fact that the Company has taken several legal actions to try to expedite the proceedings. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In February 2024, at the request of the Company, the Dominican Supreme Court of Justice transferred the case to a different civil court, namely, the Civil Court of La Vega. The claimants’ attempt to recuse the presiding judge has been rejected by the relevant Dominican appellate court. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.

On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all of which are categorized by the SMA as “serious.” The alleged charges include untimely completion of intake works and insufficient capture by the provisional works, irrigation water outlet and canal contemplated by an agreement with local communities; non-compliance with the details of the forest management plans and intervention in unauthorized areas; construction of a road in a restricted paleontological area; and unlawful moving of fauna. On February 16, 2023, the Alto Maipo project submitted an initial compliance program to the SMA, which has undergone observations by the SMA and interested third parties, and been resubmitted by the project. On December 9, 2024 the SMA rejected the latest version of the Compliance Program. On December 16, 2024, Alto Maipo submitted a petition for reconsideration. If appeals are unsuccessful, the imposition of fines are possible.

71 | The AES Corporation | March 31, 2025 Form 10-Q

In May 2024, the Chilean competition agency (the Fiscalía Nacional Económica or “FNE”) opened an investigation regarding AES Andes’s declarations with respect to coal prices and coal blends used to generate electricity in Chile. The investigation was prompted by a confidential complaint filed in December 2023, which has not been disclosed to AES Andes. In general terms, the investigation seeks to determine whether the facts alleged in the complaint could be considered as an abuse of a dominant position by AES Andes. The investigation is at a very early stage; AES Andes has responded to all of the FNE’s information requests received to date. The FNE will independently conduct the investigation and will ultimately decide whether to dismiss the matter or initiate a judicial proceeding on the allegations in the confidential complaint. These types of investigations in Chile commonly last for years. AES Andes does not believe that it has violated any competition laws. Further, if the FNE ever initiates a judicial proceeding on this matter, AES Andes will defend itself vigorously. Given the early nature of this investigation, we are unable to estimate any potential impact of the investigation or its eventual outcome on our business, financial condition or results of operations.

In April 2025, an alleged shareholder of Fluence Energy, Inc. (“Fluence”) filed a putative securities class action in the U.S. District Court for the Eastern District of Virginia against Fluence and certain of Fluence’s officers and directors (the “Individual Fluence Defendants” and, together with Fluence, the “Fluence Defendants”). The complaint in the case also named the Company and AES Grid Stability, LLC as defendants (together, the “AES Defendants”). The plaintiff seeks to pursue claims on behalf of a putative class of all purchasers of Fluence Class A common stock between October 28, 2021 and February 10, 2025. The plaintiff alleges that the Fluence Defendants made allegedly false or misleading statements in violation of Section 10(b) of the Securities Exchange Act of 1934 (the “Exchange Act”), as well as Rule 10b-5 promulgated thereunder. In addition, the plaintiff asserts claims against the Individual Fluence Defendants and the AES Defendants as alleged “control persons” under Section 20(a) of the Exchange Act. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this lawsuit; however, there can be no assurances that they will be successful in their efforts.

Item 1A. RISK FACTORS

There have been no material changes to the risk factors disclosed in Item 1A.—Risk Factors of our 2024 Form 10-K. Additional risks and uncertainties also may adversely affect our business and operations, including those discussed in Item 2.—Management's Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Issuer Purchases of Equity Securities

The following table provides information relating to our purchases of AES Common Stock during the first quarter of fiscal year 2025:

PeriodTotal Number of Shares PurchasedAverage Price Paid Per ShareTotal Number of Shares Purchased as Part of Publicly Announced Plans or ProgramsMaximum Number (or Approximate Dollar Value) of Shares That May Yet Be Purchased Under the Plans or Programs (1)
January 1 — January 31—$——$264,000,000
February 1 — February 28———264,000,000
March 1 — March 31———264,000,000
Total———$264,000,000

(1) On July 7, 2010, The AES Corporation announced that its Board of Directors approved a common stock repurchase program under which the Company may purchase up to $500 million of shares of its outstanding common stock, depending on cash availability, market conditions, and other factors. The original authorization was set to expire on December 31, 2010, however, in December 2010, the Board authorized an extension of the stock repurchase program. The current program does not have a predetermined expiration date. Repurchases under this program may be made using a variety of methods, which may include open market repurchases, purchases by contract (including, without limitation, accelerated stock repurchase programs or 10b5-1 plans), and/or privately negotiated transactions. No repurchases were made under this program during the first quarter of 2025. As of March 31, 2025, $264 million remained available for purchase under this authorization.

ITEM 3. DEFAULTS UPON SENIOR SECURITIES

None.

ITEM 4. MINE SAFETY DISCLOSURES

Not applicable.

Item 5. OTHER INFORMATION

Trading Arrangements

72 | The AES Corporation | March 31, 2025 Form 10-Q

None of the Company’s directors or “officers,” as defined in Rule 16a-1(f) of the Exchange Act, adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K, during the Company’s fiscal quarter ended March 31, 2025.

Item 6. EXHIBITS

4.1Twenty-Ninth Supplemental Indenture, dated March 20, 2025, between The AES Corporation and Deutsche Bank Trust Company Americas, as Trustee, incorporated herein by reference to Exhibit 4.1 of the Company’s Form 8-K filed on March 20, 2025.
31.1Rule 13a-14(a)/15d-14(a) Certification of Andrés Gluski (filed herewith).
31.2Rule 13a-14(a)/15d-14(a) Certification of Stephen Coughlin (filed herewith).
32.1Section 1350 Certification of Andrés Gluski (filed herewith).
32.2Section 1350 Certification of Stephen Coughlin (filed herewith).
101The AES Corporation Quarterly Report on Form 10-Q for the quarter ended March 31, 2025, formatted in Inline XBRL (Inline Extensible Business Reporting Language): (i) the Cover Page, (ii) Condensed Consolidated Balance Sheets, (iii) Condensed Consolidated Statements of Operations, (iv) Condensed Consolidated Statements of Comprehensive Income (Loss), (v) Condensed Consolidated Statements of Changes in Equity, (vi) Condensed Consolidated Statements of Cash Flows, and (vii) Notes to Condensed Consolidated Financial Statements. The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
104Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101).

73 | The AES Corporation | March 31, 2025 Form 10-Q

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

THE AES CORPORATION (Registrant)
Date:May 1, 2025By:/s/ STEPHEN COUGHLIN
Name:Stephen Coughlin
Title:Executive Vice President and Chief Financial Officer (Principal Financial Officer)
By:/s/ SHERRY L. KOHAN
Name:Sherry L. Kohan
Title:Senior Vice President and Chief Accounting Officer (Principal Accounting Officer)