AES 10-Q 2025-09-30
Filed 2025-11-04. 8 sections, 561K characters. Original on sec.gov · Markdown · JSON
Cover and table of contents
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-Q
(Mark One)
| ☒ | QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the Quarterly Period Ended September 30, 2025
or
| ☐ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
Commission file number 1-12291

THE AES CORPORATION
(Exact name of registrant as specified in its charter)
| Delaware | 54-1163725 | |||||||
| (State or other jurisdiction of incorporation or organization) | (I.R.S. Employer Identification No.) |
| 4300 Wilson Boulevard | |||||||||||
| Arlington, | Virginia | 22203 | |||||||||
| (Address of principal executive offices) | (Zip Code) |
| Registrant's telephone number, including area code: | (703) | 522-1315 |
| Securities registered pursuant to Section 12(b) of the Act: | ||||||||
| Title of Each Class | Trading Symbol(s) | Name of Each Exchange on Which Registered | ||||||
| Common Stock, par value $0.01 per share | AES | New York Stock Exchange |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.
| Large accelerated filer | ☒ | Accelerated filer | ☐ | Smaller reporting company | ☐ | Emerging growth company | ☐ | Non-accelerated filer | ☐ |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒
The number of shares outstanding of Registrant’s Common Stock, par value $0.01 per share, on October 31, 2025 was 712,120,944.
The AES Corporation
Form 10-Q for the Quarterly Period ended September 30, 2025
Table of Contents
1 | The AES Corporation | September 30, 2025 Form 10-Q
Glossary of Terms
The following terms and acronyms appear in the text of this report and have the definitions indicated below:
| 2024 Base Rate Order | The order issued in April 2024 by the IURC authorizing AES Indiana to, among other things, increase its basic rates and charges by $71 million annually | ||||
| Adjusted EBITDA | Adjusted earnings before interest income and expense, taxes, depreciation and amortization, a non-GAAP measure of operating performance | ||||
| Adjusted EBITDA with Tax Attributes | Adjusted earnings before interest income and expense, taxes, depreciation and amortization, adding back the pre-tax effect of Production Tax Credits, Investment Tax Credits and depreciation tax deductions allocated to tax equity investors, a non-GAAP measure | ||||
| Adjusted EPS | Adjusted Earnings Per Share, a non-GAAP measure | ||||
| Adjusted PTC | Adjusted Pre-tax Contribution, a non-GAAP measure of operating performance | ||||
| AES | The Parent Company and its subsidiaries and affiliates | ||||
| AES Andes | AES Andes S.A., formerly AES Gener | ||||
| AES Brasil | AES Brasil Operações S.A., formerly branded as AES Tietê | ||||
| AES Clean Energy Development | AES Clean Energy Development, LLC | ||||
| AES Indiana | Indianapolis Power & Light Company, formerly branded as IPL. AES Indiana is wholly-owned by IPALCO | ||||
| AES Ohio | The Dayton Power & Light Company, formerly branded as DP&L. For the periods covered by this report, AES Ohio was wholly-owned by DPL. Beginning in April 2025, CDPQ owns an aggregate indirect equity interest in AES Ohio of approximately 30%. | ||||
| AES Renewable Holdings | AES Renewable Holdings, LLC, formerly branded as AES Distributed Energy | ||||
| AFUDC | Allowance for Funds Used During Construction | ||||
| AGIC | AES Global Insurance Company, AES’ captive insurance company | ||||
| AOCL | Accumulated Other Comprehensive Loss | ||||
| ARO | Asset Retirement Obligations | ||||
| ASC | Accounting Standards Codification | ||||
| ASU | Accounting Standards Update | ||||
| BESS | Battery Energy Storage System | ||||
| CAA | United States Clean Air Act | ||||
| CCR | Coal Combustion Residuals, which include bottom ash, fly ash, and air pollution control wastes generated at coal-fired generation plant sites | ||||
| CDPQ | Caisse de dépôt et placement du Québec | ||||
| CECL | Current Expected Credit Loss | ||||
| CO2 | Carbon Dioxide | ||||
| CSAPR | Cross-State Air Pollution Rule | ||||
| CWA | U.S. Clean Water Act | ||||
| DG Comp | Directorate-General for Competition | ||||
| DPL | DPL LLC and its consolidated subsidiaries. On April 3, 2025, DPL Inc. converted its form of business organization from an Ohio corporation to an Ohio limited liability company. Upon the conversion, DPL Inc. changed its name to DPL LLC. References to DPL are to DPL Inc. before April 3, 2025, and DPL LLC on and after April 3, 2025. | ||||
| EBITDA | Earnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, a non-GAAP measure of operating performance | ||||
| ENSO | El Niño-Southern Oscillation | ||||
| EPA | United States Environmental Protection Agency | ||||
| EPC | Engineering, Procurement and Construction | ||||
| ESP | Electric Security Plan | ||||
| EU | European Union | ||||
| FASB | Financial Accounting Standards Board | ||||
| Fluence | Fluence Energy, Inc and its subsidiaries, including Fluence Energy, LLC, which was previously our joint venture with Siemens (NASDAQ: FLNC) | ||||
| FONINVEMEM | Fund for the Investment Needed to Increase the Supply of Electricity in the Wholesale Market in Argentina | ||||
| GAAP | Generally Accepted Accounting Principles in the United States | ||||
| GHG | Greenhouse Gas | ||||
| GILTI | Global Intangible Low Taxed Income | ||||
| GW | Gigawatts | ||||
| GWh | Gigawatt Hours | ||||
| HLBV | Hypothetical Liquidation at Book Value | ||||
| IPALCO | IPALCO Enterprises, Inc. CDPQ owns direct and indirect interests in IPALCO of approximately 30%. | ||||
| ITC | Investment Tax Credit | ||||
| IURC | Indiana Utility Regulatory Commission | ||||
| LNG | Liquid Natural Gas | ||||
| MISO | Midcontinent Independent System Operator | ||||
| MMBtu | Million British Thermal Units | ||||
| MW | Megawatts | ||||
| MWh | Megawatt Hours | ||||
| NAAQS | National Ambient Air Quality Standards | ||||
| NCI | Noncontrolling Interest | ||||
| NEK | Natsionalna Elektricheska Kompania (state-owned electricity public supplier in Bulgaria) | ||||
2 | The AES Corporation | September 30, 2025 Form 10-Q
| NM | Not Meaningful | ||||
| NOV | Notice of Violation | ||||
| NOX | Nitrogen Oxide | ||||
| NPDES | National Pollutant Discharge Elimination System | ||||
| OVEC | Ohio Valley Electric Corporation, an electric generating company in which AES Ohio has a 4.9% interest | ||||
| Parent Company | The AES Corporation | ||||
| PJM | PJM Interconnection, LLC | ||||
| PPA | Power Purchase Agreement | ||||
| PREPA | Puerto Rico Electric Power Authority | ||||
| PUCO | The Public Utilities Commission of Ohio | ||||
| RSU | Restricted Stock Unit | ||||
| RTO | Regional Transmission Organization | ||||
| SBU | Strategic Business Unit | ||||
| SEC | United States Securities and Exchange Commission | ||||
| SEET | Significantly Excessive Earnings Test | ||||
| SO2 | Sulfur Dioxide | ||||
| SOFR | Secured Overnight Financing Rate | ||||
| SPP | Southwest Power Pool | ||||
| TDSIC | Transmission, Distribution, and Storage System Improvement Charge | ||||
| TEP | Termoeléctrica Peñoles, S. de R.L. de C.V. | ||||
| U.S. | United States | ||||
| USD | United States Dollar | ||||
| VIE | Variable Interest Entity | ||||
3 | The AES Corporation | September 30, 2025 Form 10-Q
PART I: FINANCIAL INFORMATION
Item 1. FINANCIAL STATEMENTS
Condensed Consolidated Balance Sheets
(Unaudited)
| September 30, 2025 | December 31, 2024 | ||||||||||
| (in millions, except share and per share amounts) | |||||||||||
| ASSETS | |||||||||||
| CURRENT ASSETS | |||||||||||
| Cash and cash equivalents | $ | 1,758 | $ | 1,524 | |||||||
| Restricted cash | 689 | 437 | |||||||||
| Accounts receivable, net of allowance of $43 and $52, respectively | 1,790 | 1,646 | |||||||||
| Inventory | 607 | 593 | |||||||||
| Prepaid expenses | 162 | 157 | |||||||||
| Other current assets, net of allowance of $2 and $0, respectively | 1,781 | 1,612 | |||||||||
| Current held-for-sale assets | 33 | 862 | |||||||||
| Total current assets | 6,820 | 6,831 | |||||||||
| NONCURRENT ASSETS | |||||||||||
| Property, plant and equipment, net of accumulated depreciation of $9,579 and $8,701, respectively | 36,511 | 33,166 | |||||||||
| Investments in and advances to affiliates | 1,030 | 1,124 | |||||||||
| Debt service reserves and other deposits | 102 | 78 | |||||||||
| Goodwill | 345 | 345 | |||||||||
| Other intangible assets, net of accumulated amortization of $480 and $426, respectively | 2,016 | 1,947 | |||||||||
| Deferred income taxes | 404 | 365 | |||||||||
| Loan receivable, net of allowance of $19 and $0, respectively | 781 | — | |||||||||
| Other noncurrent assets, net of allowance of $23 and $20, respectively | 2,774 | 2,917 | |||||||||
| Noncurrent held-for-sale assets | — | 633 | |||||||||
| Total noncurrent assets | 43,963 | 40,575 | |||||||||
| TOTAL ASSETS | $ | 50,783 | $ | 47,406 | |||||||
| LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY | |||||||||||
| CURRENT LIABILITIES | |||||||||||
| Accounts payable | $ | 2,000 | $ | 1,654 | |||||||
| Accrued interest | 343 | 256 | |||||||||
| Accrued non-income taxes | 297 | 249 | |||||||||
| Supplier financing arrangements | 1,046 | 917 | |||||||||
| Accrued and other liabilities | 1,362 | 1,246 | |||||||||
| Recourse debt | 1,442 | 899 | |||||||||
| Non-recourse debt | 2,944 | 2,688 | |||||||||
| Current held-for-sale liabilities | — | 662 | |||||||||
| Total current liabilities | 9,434 | 8,571 | |||||||||
| NONCURRENT LIABILITIES | |||||||||||
| Recourse debt | 4,804 | 4,805 | |||||||||
| Non-recourse debt | 21,659 | 20,626 | |||||||||
| Deferred income taxes | 1,885 | 1,490 | |||||||||
| Other noncurrent liabilities | 2,471 | 2,881 | |||||||||
| Noncurrent held-for-sale liabilities | — | 391 | |||||||||
| Total noncurrent liabilities | 30,819 | 30,193 | |||||||||
| Commitments and Contingencies (see Note 9) | |||||||||||
| Redeemable stock of subsidiaries | 2,122 | 938 | |||||||||
| EQUITY | |||||||||||
| THE AES CORPORATION STOCKHOLDERS’ EQUITY | |||||||||||
| Common stock ($0.01 par value, 1,200,000,000 shares authorized; 859,836,539 issued and 712,120,944 outstanding at September 30, 2025 and 859,709,987 issued and 711,074,269 outstanding at December 31, 2024) | 9 | 9 | |||||||||
| Additional paid-in capital | 5,912 | 5,913 | |||||||||
| Retained earnings | 555 | 293 | |||||||||
| Accumulated other comprehensive loss | (817) | (766) | |||||||||
| Treasury stock, at cost (147,715,595 and 148,635,718 shares at September 30, 2025 and December 31, 2024, respectively) | (1,794) | (1,805) | |||||||||
| Total AES Corporation stockholders’ equity | 3,865 | 3,644 | |||||||||
| NONCONTROLLING INTERESTS | 4,543 | 4,060 | |||||||||
| Total equity | 8,408 | 7,704 | |||||||||
| TOTAL LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY | $ | 50,783 | $ | 47,406 |
See Notes to Condensed Consolidated Financial Statements.
4 | The AES Corporation
Condensed Consolidated Statements of Operations
(Unaudited)
| Three Months Ended September 30, | Nine Months Ended September 30, | ||||||||||||||||||||||||||||||||||
| 2025 | 2024 | 2025 | 2024 | ||||||||||||||||||||||||||||||||
| (in millions, except share and per share amounts) | |||||||||||||||||||||||||||||||||||
| Revenue: | |||||||||||||||||||||||||||||||||||
| Non-Regulated | $ | 2,269 | $ | 2,352 | $ | 6,132 | $ | 6,654 | |||||||||||||||||||||||||||
| Regulated | 1,082 | 937 | 3,000 | 2,662 | |||||||||||||||||||||||||||||||
| Total revenue | 3,351 | 3,289 | 9,132 | 9,316 | |||||||||||||||||||||||||||||||
| Cost of Sales: | |||||||||||||||||||||||||||||||||||
| Non-Regulated | (1,730) | (1,794) | (4,998) | (5,198) | |||||||||||||||||||||||||||||||
| Regulated | (886) | (773) | (2,505) | (2,224) | |||||||||||||||||||||||||||||||
| Total cost of sales | (2,616) | (2,567) | (7,503) | (7,422) | |||||||||||||||||||||||||||||||
| Operating margin | 735 | 722 | 1,629 | 1,894 | |||||||||||||||||||||||||||||||
| General and administrative expenses | (46) | (57) | (172) | (198) | |||||||||||||||||||||||||||||||
| Interest expense | (348) | (379) | (1,042) | (1,125) | |||||||||||||||||||||||||||||||
| Interest income | 76 | 119 | 215 | 312 | |||||||||||||||||||||||||||||||
| Loss on extinguishment of debt | (2) | (1) | (15) |
Showing the first 8K of 297K characters. Open the full section
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The condensed consolidated financial statements included in Item 1.—Financial Statements of this Form 10-Q and the discussions contained herein should be read in conjunction with our 2024 Form 10-K.
Forward-Looking Information
The following discussion may contain forward-looking statements regarding us, our business, prospects and our results of operations, that are subject to certain risks and uncertainties posed by many factors and events that could cause our actual business, prospects and results of operations to differ materially from those that may be anticipated by such forward-looking statements. These statements include, but are not limited to, statements regarding management’s intents, beliefs, and current expectations and typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “forecast,” “target,” “will,” “would,” “intend,” “believe,” “project,” “estimate,” “plan,” and similar words. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute current expectations based on reasonable assumptions. Factors that could cause or contribute to such differences include, but are not limited to, those described in Item 1A.—Risk Factors of this Form 10-Q, Item 1A.—Risk Factors and Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations of our 2024 Form 10-K and subsequent filings with the SEC.
Readers are cautioned not to place undue reliance on these forward-looking statements which speak only as of the date of this report. We undertake no obligation to revise any forward-looking statements in order to reflect events or circumstances that may subsequently arise. If we do update one or more forward-looking statements, no inference should be drawn that we will make additional updates with respect to those or other forward-looking statements. Readers are urged to carefully review and consider the various disclosures made by us in this report and in our other reports filed with the SEC that advise of the risks and factors that may affect our business.
Overview of Our Business
We are a diversified power generation and utility company organized into the following four SBUs, mainly organized by technology: Renewables (solar, wind, energy storage, and hydro), Utilities (AES Indiana, AES Ohio, and AES El Salvador), Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil), and New Energy Technologies (investments in Fluence, Uplight, Maximo, and other initiatives). Prior to the first quarter of 2025, our businesses in Chile (which have a mix of generation sources, including renewables, that were pooled to service our existing PPAs) were reported in the Energy Infrastructure SBU. After the sale or disconnection of a significant portion of AES Andes’ coal plants and the expiration of its coal-indexed contracts with regulated customers at the end of 2024, the results of our businesses in Chile, excluding the two remaining coal plants, are now reported as part of the Renewables SBU. The results of the two remaining coal plants in Chile, Angamos and Cochrane, remain within the Energy Infrastructure SBU. For additional information regarding our business, see Item 1.—Business of our 2024 Form 10-K.
We have two lines of business: generation and utilities. Our Renewables, Utilities, and Energy Infrastructure SBUs participate in our first business line, generation, in which we own and/or operate power plants to generate and sell power to customers, such as utilities, industrial users, and other intermediaries. Our Utilities SBU participates in our second business line, utilities, in which we own and/or operate utilities to generate or purchase, distribute, transmit, and sell electricity to end-user customers in the residential, commercial, industrial, and governmental sectors within a defined service area. In certain circumstances, our utilities also generate and sell electricity on the wholesale market. Our New Energy Technologies SBU includes investments in new and innovative technologies to support leading-edge greener energy solutions.
48 | The AES Corporation | September 30, 2025 Form 10-Q
Executive Summary
Compared with last year, third quarter net income increased $302 million, from $215 million to $517 million. This increase is primarily due to higher income tax benefit mainly driven by tax credit transfers, higher margins from new projects in the Renewables SBU, and an increase in rider revenues due to revised rates at AES Indiana and AES Ohio in the Utilities SBU. This was partially offset by lower generation at the Energy Infrastructure SBU and the sale of AES Brasil.
Adjusted EBITDA, a non-GAAP measure, increased $132 million, from $698 million to $830 million, driven by higher contributions from new projects in the Renewables SBU and an increase in rider revenues due to revised rates at AES Indiana and AES Ohio in the Utilities SBU. This was partially offset by the sale of AES Brasil and the impact of the selldown of AES Ohio.
Adjusted EBITDA with Tax Attributes, a non-GAAP measure, increased $82 million, from $1,174 million to $1,256 million, due to the drivers above, partially offset by lower realized tax attributes driven by timing of tax attribute recognition.
Compared with last year, third quarter diluted earnings per share from continuing operations increased $0.22, from $0.72 to $0.94. This increase is mainly driven by higher income tax benefit, higher contributions from new projects in the Renewables SBU, and higher retail margin at the Utilities SBU. This was partially offset by lower realized tax attributes at the Renewables SBU due to timing of tax attribute recognition, lower other income, and lower interest income.
Adjusted EPS, a non-GAAP measure, increased $0.04 from $0.71 to $0.75, mainly driven by a lower adjusted tax rate, including the impact of tax credit transfers, higher retail margin at the Utilities SBU, and lower general and administrative costs at Corporate. This was partially offset by lower realized tax attributes at the Renewables SBU due to timing of tax attribute recognition.
Compared with last year, net income for the nine months ended September 30, 2025 decreased $352 million from $646 million to $294 million. This decrease is primarily driven by lower earnings from the Energy Infrastructure SBU due to higher prior year revenues from the monetization of the Warrior Run coal plant PPA, higher day-one losses on the commencement of sales type leases at AES Clean Energy Development, and the sale of AES Brasil. This was partially offset by the derecognition of a valuation allowance on the loan receivable upon reclassifying Mong Duong from held-for-sale to held and used, higher margins from new projects in the Renewables SBU, higher income tax benefit mainly driven by tax credit transfers, lower interest expense, and higher retail margin at AES Indiana in the Utilities SBU under the 2024 Base Rate Order, including the impact of certain riders now included in base rates.
Adjusted EBITDA, a non-GAAP measure, increased $106 million, from $1,996 million to $2,102 million, for the nine months ended September 30, 2025, mainly driven by higher contributions from new projects in the Renewables SBU and higher retail margin at AES Indiana in the Utilities SBU under the 2024 Base Rate Order, including the impact of certain riders now included in base rates. This was partially offset by higher prior year revenues from the monetization of the Warrior Run coal plant PPA and the sale of AES Brasil.
Adjusted EBITDA with Tax Attributes, a non-GAAP measure, increased $199 million, from $2,891 million to $3,090 million, for the nine months ended September 30, 2025, due to the drivers above as well as higher realized tax attributes driven by higher income from tax credit transfers.
Compared with last year, diluted earnings per share from continuing operations for the nine mo
Showing the first 8K of 198K characters. Open the full section
Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Overview Regarding Market Risks
Our businesses are exposed to, and proactively manage, market risk. Market risk is the potential loss that may result from market changes associated with AES power generation or with existing or forecasted financial or commodity transactions. Our primary market risk exposure is to the price of commodities, particularly electricity, natural gas, coal, and environmental credits. AES is also exposed to fluctuations in interest rates and foreign currency exchange rates associated primarily with outstanding and expected future issuances and borrowing, and from investments in foreign subsidiaries and affiliates. We enter into various transactions, including derivatives, in order to hedge our exposure to these market risks.
The disclosures presented in this Item 3 are based upon a number of assumptions; actual effects may differ. The safe harbor provided in Section 27A of the Securities Act of 1933 and Section 21E of the Exchange Act shall apply to the disclosures contained in this Item 3. For further information regarding market risk, see Item 1A.—Risk Factors, Fluctuations in currency exchange rates may impact our financial results and position; Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for
87 | The AES Corporation | September 30, 2025 Form 10-Q
future growth; We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology of the 2024 Form 10-K.
Commodity Price Risk
Although we prefer to hedge our exposure to the impact of market fluctuations in the price of commodities, some of our generation businesses operate under short-term sales, have contracted electricity obligations greater than supply, or operate under contract sales that leave an unhedged exposure on some of our capacity or through imperfect fuel pass-throughs. These businesses subject our operational results to the volatility of prices for electricity, fuels, and environmental credits in competitive markets. In addition, our businesses are exposed to lower electricity prices due to increased competition, including from renewable sources such as wind and solar, because of lower costs of entry and lower variable costs. We employ risk management strategies to hedge our financial performance against these effects. The implementation of these strategies can involve the use of physical and financial commodity contracts, futures, swaps, and options. We have some natural offsets across our businesses such that low commodity prices may benefit certain businesses and be a cost to others. Exposures are not perfectly linear or symmetric. The sensitivities are affected by a number of local or indirect market factors. Examples of these factors include hydrology, local energy market supply/demand balances, regional fuel supply issues, regional competition, bidding strategies, and regulatory interventions such as price caps. Volume variation also affects our commodity exposure. The volume sold under contracts or retail concessions can vary based on weather and economic conditions, resulting in a higher or lower volume of sales in spot markets. Thermal unit availability and hydrology can affect the generation output available for sale and can affect the marginal unit setting power prices.
As of September 30, 2025, we project pre-tax earnings exposure on a 10% increase in commodity prices to be less than a $5 million gain for power, less than a $5 million loss for gas, and less than a $5 million loss for coal. The sensitivities are calculated using industry-standard valuation techniques to revalue all transactions (physical and financial commodity transactions) in the portfolio for a change in the underlying prices the transactions are exposed to and exclude correlation effects, including those due to renewable resource availability. The models reference market prices of commodities across future periods and associated volatility of these market prices. Prices and volatilities are predominantly based on observable market prices.
Exposures at individual businesses will change as new contracts or financial hedges are executed, and our sensitivity to changes in commodity prices generally increases in later years with reduced hedge levels at some of our businesses.
In the Energy Infrastructure SBU, the generation businesses are largely contracted but may have residual risk to the extent contracts are not perfectly indexed to the business drivers. In California, our Southland once-through cooling generation units (“Legacy Assets”) in Long Beach and Huntington Beach have been extended to operate through 2026 under capacity contracts with the State as part of the Strategic Reserve program. Our facility in Redondo Beach has been retired effective January 1, 2024. Our ability to operate the Long Beach facility at full capacity through 2025 was approved under Tentative Time Schedule Order coverage in November 2023. Approval to operate Long Beach through 2026 will be subject to review with State Agencies. Our Southland combined cycle gas turbine (Southland Energy) units benefit from higher power and lower gas and carbon prices, depending on the contracted or hedge position. The AES Andes business in Chile owns assets in the central and northern regions of the country and has a portfolio of contract sales in both. A significant portion of our PPAs through 2025 include mechanisms of indexation that adjust the price of energy based on fluctuations in the price of coal, with an index defined by the National Energy Commission based on the physical coal imports for the energy system. This mechanism mitigates exposures to changes in the price of fuel. The increasing share of renewable energy in Chile's power market may reduce reliance on thermal units and impact power price volatility, which could impact our cost to serve certain unregulated PPAs. In the Dominican Republic, we own natural gas plants contracted under a portfolio of contract sales, and both contract and spot prices may move with commodity prices. Our thermal assets in Panama have PPAs with distribution companies which match the term of the LNG supply agreement of such thermal assets. New entrants into the Panama thermal generation market could impact the dispatch of existing generation, requiring purchases in the spot market to satisfy the PPA obligations. Contract levels do not always match our generation availability or needs, and our assets may be sellers of spot prices in excess of contract levels or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments. Our assets operating in Vietnam and Bulgaria have minimal exposure to commodity price risk as they have no or minor merchant exposure and fuel is subject to a pass-through mechanism.
In the Renewables SBU, our businesses have commodity exposure on unhedged volumes and resource volatility and benefit from higher power prices, where generation exceeds contracted levels. In Colombia, we operate under a shorter-term sales strategy with spot market exposure for uncontracted volumes. Because we own
88 | The AES Corporation | September 30, 2025 Form 10-Q
hydroelectric assets there, contracts are not indexed to fuel. Our Renewables businesses in Panama are highly contracted under financial and load-following PPA-type structures, exposing the business to hydrology-based variance. To the extent hydrological inflows are greater than or less than the contract volumes, the business will be sensitive to changes in spot power prices which may be driven by oil and natural gas prices in some time periods.
Foreign Exchange Rate Risk
We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.
In the normal course of business, we are exposed to foreign currency risk and other foreign operations risks that arise from investments in foreign subsidiaries and affiliates. A key component of these risks stems from the fact that some of our foreign subsidiaries and affiliates utilize currencies other than our consolidated reporting currency, the USD. Additionally, certain of our foreign subsidiaries and affiliates have entered into monetary obligations in USD or currencies other than their own functional currencies. Certain of our foreign subsidiaries calculate and pay taxes in currencies other than their own functional currency. We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso. Our exposure to certain of these currencies may be material. These subsidiaries and affiliates attempt to limit potential foreign exchange exposure by entering into revenue contracts that adjust to changes in foreign exchange rates. We also use foreign currency forwards, swaps, and options where possible to manage our risk related to certain foreign currency fluctuations.
AES enters into foreign currency hedges to protect economic value of the business and minimize the impact of foreign exchange rate fluctuations to AES' portfolio. While protecting cash flows, the hedging strategy is also designed to reduce forward-looking earnings foreign exchange volatility. Due to variation of timing and amount between cash distributions and earnings exposure, the hedge impact may not fully cover the earnings exposure on a realized basis, which could result in greater volatility in earnings.
AES has unhedged forward-looking earnings which are exposed to foreign exchange deterioration risk from the Argentine peso that could be material. As of September 30, 2025, assuming a 10% USD appreciation, cash distributions attributable to foreign subsidiaries in the Colombian peso, Euro, and Argentine peso may be exposed to exchange rate movements, with a total potential loss of less than $1 million.
These numbers have been produced by applying a one-time 10% USD appreciation to forecasted exposed cash distributions for 2025 coming from the respective subsidiaries exposed to the currencies listed above, net of the impact of outstanding hedges and holding all other variables constant. The numbers presented above are net of any transactional gains or losses. These sensitivities may change in the future as new hedges are executed or existing hedges are unwound. Additionally, updates to the forecasted cash distributions exposed to foreign exchange risk may result in further modification. The sensitivities presented do not capture the impacts of any administrative market restrictions or currency inconvertibility.
Interest Rate Risks
We are exposed to risk resulting from changes in interest rates primarily because of our current and expected future issuance of debt and borrowing.
Decisions on the fixed-floating debt mix are made to be consistent with the risk factors faced by individual businesses or plants. Depending on whether a plant’s capacity payments or revenue stream is fixed or varies with inflation, we partially hedge against interest rate fluctuations by arranging fixed-rate or variable-rate financing. In certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing. Most of our interest rate risk is related to non-recourse financings at our businesses.
As of September 30, 2025, the portfolio’s 2025 pre-tax earnings exposure to a one-time 100-basis-point increase in interest rates for our Argentine peso, Chilean peso, Colombian peso, Euro, and USD denominated debt would be less than $3 million on interest expense for the debt denominated in these currencies. These amounts do not take into account the historical correlation between these interest rates.
89 | The AES Corporation | September 30, 2025 Form 10-Q
Item 4. CONTROLS AND PROCEDURES
Evaluation of Disclosure Controls and Procedures
The Company maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that the Company files or submits under the Exchange Act, is recorded, processed, summarized, and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to allow timely decisions regarding required disclosures.
The Company, under the supervision and with the participation of its management, including the Company’s CEO and CFO, evaluated the effectiveness of its “disclosure controls and procedures,” as such term is defined in Rule 13a-15(e) under the Exchange Act, as of the end of the period covered by this Quarterly Report on Form 10-Q. Based on that evaluation, our CEO and CFO concluded that, as of September 30, 2025, our disclosure controls and procedures were not effective due to the material weakness in our internal control over financial reporting described below.
As previously reported in our Annual Report on Form 10-K for the year ended December 31, 2024, management identified that we did not design effective controls over the review of the disposition of AES Brasil, a complex non-routine transaction; specifically due to the use of incomplete data in the estimation of the fair value of the net assets of AES Brasil, which was used in calculation of the impairment expense after AES Brasil was classified as held-for-sale in Q2 2024.
Notwithstanding the identified material weakness, our CEO and CFO have concluded that our unaudited condensed consolidated financial statements contained in this Quarterly Report on Form 10-Q fairly present, in all material respects, our financial position, results of operations, and cash flows for the periods presented and such financial statements are presented in conformity with GAAP.
Remediation Efforts and Status
As of the date of the filing of this Quarterly Report on Form 10-Q, our management has taken significant measures towards remediation of this material weakness. While we have implemented the remediation measures described below, our conclusion on remediation will take place during our annual SOX testing which will conclude with the filing of our annual financial statements.
The remediation actions implemented to date include: (i) policy updates detailing steps to perform in an impairment analysis of complex ownership structures, (ii) detailed instructions on considerations to be included in the fair value estimations, (iii) updates to held-for-sale and discontinued operations policies, and (iv) training to impacted personnel.
Following a thorough review, Management determined that the revised controls have been designed effectively. However, the material weakness will not be considered fully remediated until the applicable controls operate for a sufficient period of time and management has concluded, through the testing mentioned above, that the controls are operating effectively. Management will continue to monitor the operating effectiveness of these and other processes, procedures, and controls, and make any further changes management deems appropriate.
Changes in Internal Controls over Financial Reporting
Other than the remediation efforts described above, there were no changes that occurred during the fiscal quarter covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
90 | The AES Corporation | September 30, 2025 Form 10-Q
PART II: OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
The Company is involved in certain claims, suits and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's condensed consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of September 30, 2025. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a government authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.
In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian court. GRIDCO's challenge of the costs award has been dismissed by the court, but its challenge of the liability award remains pending. A hearing on the liability award has not taken place to date. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.
Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $11 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.
In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program (“LCP”). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26, 2020, CCC staff sent AES an NOV directing AES to discontinue any operation of the water pumps in the alleged
91 | The AES Corporation | September 30, 2025 Form 10-Q
wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and, if necessary, a CDP application for their continued operation. With respect to the vault pumps, AES provided the CCC with the requested analysis and the CCC has not required further action. With respect to the pumps in the alleged wetlands, AES locked out those pumps to prevent further operation and submitted the CDP to the permitting authority, the City of Redondo Beach (the “City”), with respect to AES’ plans to disable or remove the pumps. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required. AES submitted all required information and waited for the City to continue processing the application. In December 2023, the City indicated it would continue processing the CDP application; AES has since followed up with the City and awaits the next phase of the permitting process. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.
On March 23, 2021, the U.S. District Court for the Southern District of Indiana approved and entered a judicial consent decree among AES Indiana, the United States on behalf of the Environmental Protection Agency (EPA), and the Indiana Department of Environmental Management (“IDEM”). The decree resolved allegations by EPA and IDEM that AES Indiana had violated the federal Clean Air Act (“CAA”) at its Petersburg Station, which AES denies. Under the decree, AES Indiana agreed to certain emission limits and annual caps on NOx, SO2 and PM emissions at the four Units at the station; paid a civil penalty of $1.525 million; retired Units 1 and 2, spent $325,000 on an environmentally beneficial project to preserve local, ecologically-significant lands (notice of completion of which was provided May 8, 2025 and confirmed satisfactory by IDEM on September 8, 2025); and will spend a total of $5 million on a further environmental mitigation project to build and operate a new, non-emitting source of generation at the site.
In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths, and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The AES companies have moved to dismiss the lawsuit. That motion is under consideration by the relevant court of first instance. The AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.
In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. Subsequently, the claimants withdrew the lawsuit with respect to AES Puerto Rico. The lawsuit remains pending against the other AES defendants (“AES Defendants”) and the unaffiliated defendants. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court, namely, the Civil Court of La Vega (“CFI”). In May 2024, the CFI dismissed the entire case due to the expiry of the statute of limitations. Later in 2024, the claimants appealed the dismissal to the relevant intermediate appellate court. The appellate court heard the parties’ respective oral arguments in September 2025. A decision on the appeal is pending. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.
In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include exceeding generation limits, failing to reduce emissions during episodes of poor air quality, exceeding limits on discharges to the sea, and exceeding noise limits. AES Andes has submitted a proposed “Compliance Program” to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021. On December 30, 2021, the Compliance Program was approved by the SMA. AES Andes has completed the Compliance Program and is planning to file its final report in Q3-2025. The SMA will review the final report. If the SMA approves the final report,
92 | The AES Corporation | September 30, 2025 Form 10-Q
the Compliance Program will be considered fully completed, and thus any alleged charges associated with the same will be considered permanently waived. Separately, an ex officio action was brought by the SMA due to alleged exceedances of generation limits, which would require the Company to reduce SO2, NOX and PM emissions in order to achieve the emissions offset established in the Compliance Program. On January 6, 2022, AES Andes filed a request with the SMA seeking modification of the means for compliance with the ex officio action. On January 17, 2023, the SMA approved street paving measures, or alternatively a program providing heaters for community members, as the means to satisfy the air emissions offsets in the approved Compliance Plan. The cost of the proposed Compliance Program is approximately $10.8 million and is in the execution stage. Fines are possible if the SMA determines there is an unsatisfactory execution of the Compliance Program. On April 21, 2023, the SMA notified AES Andes of a resolution alleging an additional “serious” non-compliance of the Ventanas Complex failing to reduce emissions during episodes of poor air quality. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. On May 10, 2024, the Company was notified of a fine for $180,515. On June 3, 2024, the Company appealed this fine to the Environmental Court. The appellate hearing occurred on April 3, 2025; the Environmental Court’s decision on the appeal is pending. The Company believes that it has meritorious defenses and will continue to assert them vigorously in this dispute; however, there can be no assurances that it will be successful.
On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Agency”) initiated an environmental audit at the Termoeléctrica Peñoles thermal generation facility (“TEP”). On January 20, 2023, TEP was notified of the resolution issued by the Agency, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately $1.5 million), as well as a series of corrective measures. On March 3, 2023, TEP filed a lawsuit in an administrative court—The Specialized Chamber of the Federal Administrative Justice Tribunal (“Chamber”)—challenging the legality of the Agency’s resolution and fine. On May 30, 2025, the Chamber issued a final administrative ruling denying TEP’s lawsuit. On July 1, 2025, TEP appealed to the Federal District Court. TEP’s appeal challenges the constitutionality of the Agency’s regulations (demanda de amparo) and requests a stay of enforcement of the Chamber’s final administrative ruling. The appeal has been duly admitted and the Federal District Court’s decision on the injunction request is pending. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.
In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In February 2024, at the request of the Company, the Dominican Supreme Court of Justice transferred the case to a different civil court, namely, the Civil Court of La Vega (“CFI”). The claimants’ attempt to recuse the presiding judge has been rejected by the relevant Dominican appellate court. The parties have completed briefing on the Company’s motion to dismiss the lawsuit. That motion is under consideration by the CFI. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.
On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all of which are categorized by the SMA as “serious.” The alleged charges include: untimely completion of certain intake works; insufficient capture species; non-compliance with certain forest management plan goals; and intervention of a restricted paleontological area. On February 16, 2023, the Alto Maipo project submitted an initial compliance program to the SMA. On December 9, 2024 the SMA rejected an updated version of the Compliance Program. On December 16, 2024, Alto Maipo submitted a petition for reconsideration of the rejection, which SMA denied on October 13, 2025. On October 15, 2025 Alto Maipo submitted to SMA its defense response to the four alleged charges. Alto Maipo is exploring other avenues of appeal to the alleged charges. If Alto Maipo’s defense response arguments are not acceptable to the SMA, the imposition of fines is possible.
In May 2024, the Chilean competition agency (the Fiscalía Nacional Económica or “FNE”) opened an investigation regarding AES Andes’s declarations with respect to coal prices and coal blends used to generate electricity in Chile. The investigation was prompted by two confidential complaints that were not disclosed to AES Andes. In general terms, the investigation sought to determine whether the facts alleged in the complaints could establish an abuse of a dominant position by AES Andes. AES Andes responded to all of the FNE’s requests for information. In August 2025, the FNE closed the investigation without any findings of violations by AES Andes. The FNE’s decision to close the investigation is final and not subject to judicial review.
93 | The AES Corporation | September 30, 2025 Form 10-Q
In April 2025, an alleged shareholder of Fluence Energy, Inc. (“Fluence”) filed a putative securities class action in the U.S. District Court for the Eastern District of Virginia (“Court”) against Fluence and certain of Fluence’s officers and directors. The complaint in the case also named the Company and AES Grid Stability, LLC as defendants (together, the “AES Defendants”). In May 2025, the Court consolidated the lawsuit with another putative securities class action against Fluence and certain of its officers and directors. The Court also appointed a lead plaintiff (the “Plaintiff”) and lead plaintiffs’ counsel for the consolidated lawsuit. In June 2025, the Plaintiff filed a consolidated amended complaint against Fluence, certain of its officers and directors (the “Individual Fluence Defendants” and, together with Fluence, the “Fluence Defendants”), and the AES Defendants. The Plaintiff seeks to pursue claims on behalf of a putative class of all purchasers of Fluence Class A common stock between October 28, 2021 and February 10, 2025. The Plaintiff alleges that the Fluence Defendants made allegedly false or misleading statements in violation of Section 10(b) of the Securities Exchange Act of 1934 (the “Exchange Act”), as well as Rule 10b-5 promulgated thereunder. In addition, the Plaintiff asserts claims against the Individual Fluence Defendants and the AES Defendants as alleged “control persons” under Section 20(a) of the Exchange Act. In July 2025, the Fluence Defendants and the AES Defendants filed separate motions to dismiss the consolidated lawsuit. The motions are now fully briefed and pending before the Court. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this lawsuit; however, there can be no assurances that they will be successful in their efforts.
In May 2025, a special session of the Federal Regional Court of the 1st Region of Brazil ("TRF1”) issued a decision dismissing the claims of Sul, which was sold to a third party in 2016 (“Buyer”), to annul ANEEL’s Order 288. Order 288 was issued in May 2002 and retroactively changed the effects of the Wholesale Energy Market (“MAE”) for the year 2001. The aggregate impact of Order 288 for AES Sul was to reverse a gain on certain purchases and sales into an approximately R$75 million ($14 million) loss, estimated as of May 2002. The TRF1’s May 2025 decision reversed its April 2013 decision in Sul’s favor that annulled Order 288. In August 2025, Sul filed a motion for clarification of the decision with the TRF1, which is considering the motion. After the motion is decided, Sul will have the ability to file appeals with the Superior Court of Justice and the Supreme Federal Court. In the event of an unsuccessful outcome for Sul, the Buyer may attempt to seek recovery of losses relating to the R$75 million ($14 million) loss above, an additional amount of approximately R$27 million ($5 million) that was collected by Sul in 2008 and may need to be reimbursed, plus interest on these amounts, from the AES seller and The AES Corporation under the sale agreement. In that event, AES would defend itself vigorously; however, there can be no assurances that it would be successful in its efforts.
On May 30, 2025, an arbitral tribunal (the “Tribunal”) of the International Centre for the Settlement of Investment Disputes (“ICSID”) issued an arbitration award in the Company’s favor (“Award”) in connection with a treaty arbitration initiated by the Company against the Argentine Republic (“Argentina”) under the US-Argentina bilateral investment treaty (“BIT”). In the Award, the Tribunal found that certain measures taken by Argentina in relation to its power sector, beginning in late 2001, breached the BIT. The Tribunal ordered Argentina to pay to the Company approximately $733 million in damages, including an award of costs, as well as accrued interest. In August 2025, the Company filed a lawsuit in the U.S. District Court for the District of Columbia (“DDC”) to recognize and enforce the ICSID Award against Argentina. In September 2025, Argentina filed an application with ICSID to annul the Tribunal’s Award. In its application, Argentina also requested that all attempts to enforce the Award be suspended pending the completion of the annulment proceedings. Argentina’s annulment application, as well as its request to suspend enforcement, will ultimately be decided by a new three-person panel appointed by ICSID (“Annulment Panel”). Pending the appointment of the Annulment Panel and its decision on Argentina’s suspension request, the Company’s enforcement efforts in the DDC will be provisionally suspended. The Company can provide no assurance as to how an Annulment Panel will rule on Argentina’s request to stay execution of the Award or the merits of the annulment application. Relatedly, measures to enforce the Award through judicial means entail a process that is inherently unpredictable; as a result, the Company cannot provide any assurance as to the timing or success of such enforcement measures. The Company may attempt to settle this dispute with Argentina. However, the Company can provide no assurances regarding the likelihood, substance, or timing of any such settlement.
Item 1A. RISK FACTORS
There have been no material changes to the risk factors disclosed in Item 1A.—Risk Factors of our 2024 Form 10-K. Additional risks and uncertainties also may adversely affect our business and operations, including those discussed in Item 2.—Management's Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q.
94 | The AES Corporation | September 30, 2025 Form 10-Q
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
Issuer Purchases of Equity Securities
The following table provides information relating to our purchases of AES Common Stock during the third quarter of fiscal year 2025:
| Period | Total Number of Shares Purchased | Average Price Paid Per Share | Total Number of Shares Purchased as Part of Publicly Announced Plans or Programs | Maximum Number (or Approximate Dollar Value) of Shares That May Yet Be Purchased Under the Plans or Programs (1) | |||||||||||||||||||
| July 1 — July 31 | — | $ | — | — | $ | 264,000,000 | |||||||||||||||||
| August 1 — August 31 | — | — | — | 264,000,000 | |||||||||||||||||||
| September 1 — September 30 | — | — | — | 264,000,000 | |||||||||||||||||||
| Total | — | — | — | $ | 264,000,000 |
(1) On July 7, 2010, The AES Corporation announced that its Board of Directors approved a common stock repurchase program under which the Company may purchase up to $500 million of shares of its outstanding common stock, depending on cash availability, market conditions, and other factors. The original authorization was set to expire on December 31, 2010, however, in December 2010, the Board authorized an extension of the stock repurchase program. The current program does not have a predetermined expiration date. Repurchases under this program may be made using a variety of methods, which may include open market repurchases, purchases by contract (including, without limitation, accelerated stock repurchase programs or 10b5-1 plans), and/or privately negotiated transactions. No repurchases were made under this program during the third quarter of 2025. As of September 30, 2025, $264 million remained available for purchase under this authorization.
ITEM 3. DEFAULTS UPON SENIOR SECURITIES
None.
ITEM 4. MINE SAFETY DISCLOSURES
Not applicable.
Item 5. OTHER INFORMATION
Trading Arrangements
None of the Company’s directors or “officers,” as defined in Rule 16a-1(f) of the Exchange Act, adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K, during the Company’s fiscal quarter ended September 30, 2025.
Item 6. EXHIBITS
| 10.1 | Loan Agreement dated as of October 31, 2025 among The AES Corporation as Borrower, the banks named therein as Banks, and Wells Fargo Bank, National Association as Administrative Agent (filed herewith). | |||||||
| 31.1 | Rule 13a-14(a)/15d-14(a) Certification of Andrés Gluski (filed herewith). | |||||||
| 31.2 | Rule 13a-14(a)/15d-14(a) Certification of Stephen Coughlin (filed herewith). | |||||||
| 32.1 | Section 1350 Certification of Andrés Gluski (filed herewith). | |||||||
| 32.2 | Section 1350 Certification of Stephen Coughlin (filed herewith). | |||||||
| 101 | The AES Corporation Quarterly Report on Form 10-Q for the quarter ended September 30, 2025, formatted in Inline XBRL (Inline Extensible Business Reporting Language): (i) the Cover Page, (ii) Condensed Consolidated Balance Sheets, (iii) Condensed Consolidated Statements of Operations, (iv) Condensed Consolidated Statements of Comprehensive Income (Loss), (v) Condensed Consolidated Statements of Changes in Equity, (vi) Condensed Consolidated Statements of Cash Flows, and (vii) Notes to Condensed Consolidated Financial Statements. The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document. | |||||||
| 104 | Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101). |
95 | The AES Corporation | September 30, 2025 Form 10-Q
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
| THE AES CORPORATION (Registrant) | |||||||||||||||||
| Date: | November 4, 2025 | By: | /s/ STEPHEN COUGHLIN | ||||||||||||||
| Name: | Stephen Coughlin | ||||||||||||||||
| Title: | Executive Vice President and Chief Financial Officer (Principal Financial Officer) | ||||||||||||||||
| By: | /s/ SHERRY L. KOHAN | ||||||||||||||||
| Name: | Sherry L. Kohan | ||||||||||||||||
| Title: | Senior Vice President and Chief Accounting Officer (Principal Accounting Officer) |