UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549


FORM 10-Q

(Mark One)

☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the Quarterly Period Ended June 30, 2026

or

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

Commission file number 1-12291

AESlogo03.jpg

THE AES CORPORATION

(Exact name of registrant as specified in its charter)

Delaware54-1163725
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
4300 Wilson Boulevard
Arlington,Virginia22203
(Address of principal executive offices)(Zip Code)
Registrant's telephone number, including area code:(703)522-1315
Securities registered pursuant to Section 12(b) of the Act:
Title of Each ClassTrading Symbol(s)Name of Each Exchange on Which Registered
Common Stock, par value $0.01 per shareAESNew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer☒Accelerated filer☐Smaller reporting company☐Emerging growth company☐Non-accelerated filer☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒


The number of shares outstanding of Registrant’s Common Stock, par value $0.01 per share, on July 31, 2026 was 713,438,630.

The AES Corporation

Form 10-Q for the Quarterly Period ended June 30, 2026

Table of Contents

Glossary of Terms1
PART I: FINANCIAL INFORMATION3
ITEM 1.FINANCIAL STATEMENTS (UNAUDITED)3
Condensed Consolidated Balance Sheets3
Condensed Consolidated Statements of Operations4
Condensed Consolidated Statements of Comprehensive Income (Loss)5
Condensed Consolidated Statements of Changes in Equity6
Condensed Consolidated Statements of Cash Flows8
Notes to Condensed Consolidated Financial Statements10
Note 1 - Financial Statement Presentation10
Note 2 - Inventory15
Note 3 - Fair Value15
Note 4 - Derivative Instruments and Hedging Activities19
Note 5 - Financing Receivables20
Note 6 - Allowance for Credit Losses21
Note 7 - Investments in and Advances to Affiliates21
Note 8 - Obligations22
Note 9 - Commitments and Contingencies25
Note 10 - Leases27
Note 11 - Redeemable Stock of Subsidiaries28
Note 12 - Equity30
Note 13 - Segments32
Note 14 - Revenue38
Note 15 - Other Income and Expense39
Note 16 - Asset Impairment Expense40
Note 17 - Income Taxes41
Note 18 - Held-for-Sale and Dispositions41
Note 19 - Acquisitions42
Note 20 - Earnings Per Share42
Note 21 - Restructuring44
ITEM 2.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS45
Executive Summary47
Review of Consolidated Results of Operations50
SBU Performance Analysis57
Key Trends and Uncertainties63
Capital Resources and Liquidity75
Critical Accounting Policies and Estimates82
ITEM 3.QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK82
ITEM 4.CONTROLS AND PROCEDURES85
PART II: OTHER INFORMATION86
ITEM 1.LEGAL PROCEEDINGS86
ITEM 1A.RISK FACTORS91
ITEM 2.UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS92
ITEM 3.DEFAULTS UPON SENIOR SECURITIES92
ITEM 4.MINE SAFETY DISCLOSURES92
ITEM 5.OTHER INFORMATION92
ITEM 6.EXHIBITS94
SIGNATURES95

1 | The AES Corporation | June 30, 2026 Form 10-Q

Glossary of Terms

The following terms and acronyms appear in the text of this report and have the definitions indicated below:

2024 DRC SettlementThe order issued in November 2025 by the PUCO authorizing AES Ohio to, among other things, increase its basic rates and charges by $168 million annually
Adjusted EBITDAAdjusted earnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, a non-GAAP measure of operating performance
Adjusted EBITDA with Tax AttributesAdjusted earnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, adding back the pre-tax effect of Production Tax Credits, Investment Tax Credits and depreciation tax deductions allocated to tax equity investors, as well as the tax benefit recorded from tax credits retained or transferred to third parties, a non-GAAP measure
Adjusted EPSAdjusted Earnings Per Share, a non-GAAP measure
Adjusted PTCAdjusted Pre-tax Contribution, a non-GAAP measure of operating performance
AESThe Parent Company and its subsidiaries and affiliates
AES AndesAES Andes S.A., formerly AES Gener
AES IndianaIndianapolis Power & Light Company, formerly branded as IPL. AES Indiana is wholly-owned by IPALCO
AES OhioThe Dayton Power & Light Company, formerly branded as DP&L. Beginning in April 2025, CDPQ owns an aggregate indirect equity interest in AES Ohio of approximately 30%.
AES Renewable HoldingsAES Renewable Holdings, LLC, formerly branded as AES Distributed Energy
AFUDCAllowance for Funds Used During Construction
AGICAES Global Insurance Company, AES’ captive insurance company
ANEELBrazilian National Electric Energy Agency
AOCLAccumulated Other Comprehensive Loss
AROAsset Retirement Obligations
ASCAccounting Standards Codification
ASUAccounting Standards Update
BESSBattery Energy Storage System
BOTBuild, Operate and Transfer
CAAU.S. Clean Air Act
CAISOCalifornia Independent System Operator
CAMMESAWholesale Electric Market Administrator in Argentina
CCRCoal Combustion Residuals, which include bottom ash, fly ash, and air pollution control wastes generated at coal-fired generation plant sites
CDPQLa Caisse de dépôt et placement du Québec
CECLCurrent Expected Credit Loss
CEOChief Executive Officer
CFOChief Financial Officer
CO2Carbon Dioxide
CSAPRCross-State Air Pollution Rule
CWAU.S. Clean Water Act
DPLDPL LLC and its consolidated subsidiaries. On April 3, 2025, DPL Inc. converted its form of business organization from an Ohio corporation to an Ohio limited liability company. Upon the conversion, DPL Inc. changed its name to DPL LLC. References to DPL are to DPL Inc. before April 3, 2025, and DPL LLC on and after April 3, 2025.
EBITDAEarnings before interest income and expense, taxes, depreciation, amortization, and accretion of AROs, a non-GAAP measure of operating performance
ENSOEl Niño-Southern Oscillation
EPAU.S. Environmental Protection Agency
EPCEngineering, Procurement and Construction
ESPElectric Security Plan
EUEuropean Union
FASBFinancial Accounting Standards Board
FERCU.S. Federal Energy Regulatory Commission
FluenceFluence Energy, Inc and its subsidiaries, including Fluence Energy, LLC, which was previously our joint venture with Siemens AG (NASDAQ: FLNC)
GAAPGenerally Accepted Accounting Principles in the United States
GHGGreenhouse Gas
GILTIGlobal Intangible Low-Taxed Income
GWGigawatts
GWhGigawatt Hours
HLBVHypothetical Liquidation at Book Value
IDEMIndiana Department of Environmental Management
IPALCOIPALCO Enterprises, Inc. CDPQ owns direct and indirect interests in IPALCO of approximately 30%.
ITCInvestment Tax Credit
IURCIndiana Utility Regulatory Commission
LNGLiquefied Natural Gas
MISOMidcontinent Independent System Operator, Inc.
MMBtuMillion British Thermal Units
MWMegawatts
MWhMegawatt Hours

2 | The AES Corporation | June 30, 2026 Form 10-Q

NAAQSU.S. National Ambient Air Quality Standards
NCINoncontrolling Interest
NCTINet Controlled Foreign Corporation Tested Income
NMNot Meaningful
NOVNotice of Violation
NOXNitrogen Dioxide
NPDESNational Pollutant Discharge Elimination System
NSPSNew Source Performance Standards
O&MOperations and Maintenance
OCCOhio Consumers' Counsel (statewide legal representative for Ohio's residential consumers and advocates on their behalf in PUCO and Ohio Supreme Court proceedings)
OTCOnce-Through Cooling
OTC PolicyStatewide Water Quality Control Policy on the Use of Coastal and Estuarine Waters for Power Plant Cooling
OVECOhio Valley Electric Corporation, an electric generating company in which AES Ohio has a 4.9% interest
Parent CompanyThe AES Corporation
Pet CokePetroleum Coke
PJMPJM Interconnection, LLC
PPAPower Purchase Agreement
PREPAPuerto Rico Electric Power Authority
PUCOThe Public Utilities Commission of Ohio
RSCThe Rate Stabilization Charge is a non-bypassable rider intended to compensate AES Ohio for providing stabilized rates to customers.
RSURestricted Stock Unit
RTORegional Transmission Organization
SBUStrategic Business Unit
SECU.S. Securities and Exchange Commission
SEETSignificantly Excessive Earnings Test
SO2Sulfur Dioxide
SPVSpecial Purpose Vehicle
U.S.United States
USDUnited States Dollar
VIEVariable Interest Entity

3 | The AES Corporation | June 30, 2026 Form 10-Q

PART I: FINANCIAL INFORMATION

Item 1. FINANCIAL STATEMENTS

Condensed Consolidated Balance Sheets

(Unaudited)

June 30, 2026December 31, 2025
(in millions, except share and per share amounts)
ASSETS
CURRENT ASSETS
Cash and cash equivalents$1,800$1,382
Restricted cash530691
Short-term investments53174
Accounts receivable, net of allowance of $37 and $39, respectively1,9341,683
Inventory618612
Prepaid expenses101192
Other current assets, net of allowance of $2 and $2, respectively1,3511,723
Current held-for-sale assets1645
Total current assets6,4036,502
NONCURRENT ASSETS
Property, plant, and equipment, net of accumulated depreciation of $9,508 and $9,796, respectively40,65737,818
Investments in and advances to affiliates8851,004
Debt service reserves and other deposits5389
Goodwill342342
Other intangible assets, net of accumulated amortization of $508 and $479, respectively2,0332,040
Deferred income taxes356397
Loan receivable, net of allowance of $17 and $19, respectively710755
Other noncurrent assets, net of allowance of $26 and $24, respectively2,7992,821
Total noncurrent assets47,83545,266
TOTAL ASSETS$54,238$51,768
LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY
CURRENT LIABILITIES
Accounts payable$2,170$1,980
Accrued interest286268
Accrued non-income taxes305294
Supplier financing arrangements826616
Accrued and other liabilities1,5232,223
Recourse debt300879
Non-recourse debt3,1622,232
Current held-for-sale liabilities6—
Total current liabilities8,5788,492
NONCURRENT LIABILITIES
Recourse debt5,8005,105
Non-recourse debt22,85521,681
Deferred income taxes1,6041,581
Other noncurrent liabilities2,5772,980
Total noncurrent liabilities32,83631,347
Commitments and Contingencies (see Note 9)
Redeemable stock of subsidiaries3,0522,824
EQUITY
THE AES CORPORATION STOCKHOLDERS’ EQUITY
Common stock ($0.01 par value, 1,200,000,000 shares authorized; 859,837,679 issued and 713,157,713 outstanding at June 30, 2026 and 859,836,539 issued and 712,201,777 outstanding at December 31, 2025)99
Additional paid-in capital5,8885,904
Retained earnings1,429641
Accumulated other comprehensive loss(603)(698)
Treasury stock, at cost (146,679,966 and 147,634,762 shares at June 30, 2026 and December 31, 2025, respectively)(1,781)(1,793)
Total AES Corporation stockholders’ equity4,9424,063
NONCONTROLLING INTERESTS4,8305,042
Total equity9,7729,105
TOTAL LIABILITIES, REDEEMABLE STOCK OF SUBSIDIARIES, AND EQUITY$54,238$51,768

See Notes to Condensed Consolidated Financial Statements.

4 | The AES Corporation

Condensed Consolidated Statements of Operations

(Unaudited)

Three Months Ended June 30,Six Months Ended June 30,
2026202520262025
(in millions, except share and per share amounts)
Revenue:
Non-Regulated$2,427$1,922$4,493$3,863
Regulated9959332,1091,918
Total revenue3,4222,8556,6025,781
Cost of Sales:
Non-Regulated(1,896)(1,607)(3,555)(3,268)
Regulated(834)(795)(1,715)(1,619)
Total cost of sales(2,730)(2,402)(5,270)(4,887)
Operating margin6924531,332894
General and administrative expenses(62)(49)(117)(126)
Interest expense(368)(352)(721)(694)
Interest income6570130139
Loss on extinguishment of debt(6)(5)(14)(13)
Other expense(27)(295)(85)(347)
Other income28314038
Gain on disposal and sale of business interests2097020969
Asset impairment reversals (expense)(30)154(42)105
Foreign currency transaction losses(52)(28)(41)(38)
Other non-operating expense—(10)—(1

Showing the first 8K of 276K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The condensed consolidated financial statements included in Item 1.—Financial Statements of this Form 10-Q and the discussions contained herein should be read in conjunction with our 2025 Form 10-K.

Forward-Looking Information

The following discussion may contain forward-looking statements regarding us, our business, prospects, and our results of operations, that are subject to certain risks and uncertainties posed by many factors and events that could cause our actual business, prospects and results of operations to differ materially from those that may be anticipated by such forward-looking statements. These statements include, but are not limited to, statements regarding management’s intents, beliefs, and current expectations and typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “forecast,” “target,” “will,” “would,” “intend,” “believe,” “project,” “estimate,” “plan,” and similar words. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute current expectations based on reasonable assumptions. Factors that could cause or contribute to such differences include, but are not limited to, the following:

  • the completion of the proposed transaction between AES and Horizon Parent, L.P. (the “Transaction”) on the anticipated terms and timing;

  • the risk that the conditions to the completion of the Transaction are not satisfied in a timely manner or at all;

  • potential litigation relating to the Transaction, including resulting expense or delay, and the effects of any outcomes related thereto;

  • the risk that disruptions from the Transaction will harm AES’ business, including current plans and operations;

  • the ability of AES to retain and hire key personnel through the consummation of the Transaction;

  • potential adverse reactions or changes to business relationships resulting from the announcement or completion of the Transaction;

  • continued availability of capital and financing, and rating agency actions;

  • certain restrictions during the pendency of the Transaction that may impact AES’ ability to pursue certain business opportunities or strategic transactions;

  • significant transaction costs associated with the Transaction;

  • the possibility that the Transaction may be more expensive to complete than anticipated, including as a result of unexpected factors or events;

  • the occurrence of any event, change, or other circumstance that could give rise to the termination of the Transaction, including in circumstances requiring AES to pay a termination fee or other expenses;

  • competitive responses to the Transaction;

  • the economic climate, particularly the state of the economy in the areas in which we operate, which impacts demand for electricity in many of our key markets, including the fact that the global economy faces considerable uncertainty for the foreseeable future, which further increases many of the risks discussed in our 2025 Form 10-K;

  • changes in the price of electricity at which our generation businesses sell into the wholesale market and our utility businesses purchase to distribute to their customers, and the success of our risk management practices, such as our ability to hedge our exposure to such market price risk;

  • changes in the prices and availability of coal, gas, and other fuels (including our ability to have fuel transported to our facilities) and the success of our risk management practices, such as our ability to hedge our exposure to such market price risk, and our ability to meet credit support requirements for fuel and power supply contracts;

  • changes in and access to the financial markets, particularly changes affecting the availability and cost of capital in order to refinance existing debt and finance capital expenditures, acquisitions, investments, and other corporate purposes;

  • changes in inflation, demand for power, interest rates, and foreign currency exchange rates, including our ability to hedge our interest rate and foreign currency risk;

  • our ability to fulfill our obligations, manage liquidity and comply with covenants under our recourse and non-recourse debt, including our ability to manage our significant liquidity needs and to comply with covenants under our revolving credit facilities and other existing financing obligations;

46 | The AES Corporation | June 30, 2026 Form 10-Q

  • our ability to receive funds from our subsidiaries by way of dividends, fees, interest, loans or otherwise;

  • changes in our or any of our subsidiaries' corporate credit ratings or the ratings of our or any of our subsidiaries' debt securities or preferred stock, and changes in the rating agencies' ratings criteria;

  • our ability to purchase and sell assets at attractive prices and on other attractive terms;

  • our ability to compete in markets where we do business;

  • our ability to operate power generation, transmission and distribution facilities, including managing availability, outages, and equipment failures;

  • our ability to manage our operational and maintenance costs and the performance and reliability of our generating plants, including our ability to reduce unscheduled down times;

  • our ability to enter into long-term contracts, which limit volatility in our results of operations and cash flow, such as PPAs, fuel supply, and other agreements and to manage counterparty credit risks in these agreements;

  • variations in weather, especially mild winters and cooler summers in the areas in which we operate, the occurrence of difficult hydrological conditions for our hydropower plants, as well as hurricanes and other storms and disasters, wildfires and low levels of wind or sunlight for our wind and solar facilities;

  • pandemics, or the future outbreak of any other highly infectious or contagious disease;

  • the performance of our contracts by our contract counterparties, including suppliers or customers;

  • severe weather and natural disasters;

  • our ability to manage global supply chain disruptions;

  • our ability to raise sufficient capital to fund development projects or to successfully execute our development projects;

  • the success of our initiatives in renewable energy projects and energy storage projects;

  • the availability of government incentives or policies that support the development of renewable energy generation projects;

  • our ability to execute on our strategies or achieve expectations related to environmental, social, and governance matters;

  • our ability to keep up with advances in technology;

  • changes in number of customers or in customer usage;

  • the operations of our joint ventures and equity method investments that we do not control;

  • our ability to achieve reasonable rate treatment in our utility businesses;

  • changes in laws, rules and regulations affecting our international businesses, particularly in developing countries;

  • changes in laws, rules and regulations affecting our utilities businesses, including, but not limited to, regulations which may affect competition, the ability to recover net utility assets and other potential stranded costs by our utilities;

  • changes in law resulting from new local, state, federal or international energy legislation and changes in political or regulatory oversight or incentives affecting our wind business and solar projects, our other renewables projects, and our initiatives in GHG reductions and energy storage, including government policies or tax incentives;

  • changes in environmental laws, including requirements for reduced emissions, GHG legislation, regulation, and/or treaties and CCR regulation and remediation;

  • changes in tax laws, including U.S. tax reform, and challenges to our tax positions;

  • the effects of litigation and government and regulatory investigations;

  • the performance of our acquisitions;

  • our ability to maintain adequate insurance;

  • decreases in the value of pension plan assets, increases in pensio

Showing the first 8K of 180K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Overview Regarding Market Risks

Our businesses are exposed to, and therefore proactively manage, market risk. Market risk is a potential loss that may result from market changes associated with AES power generation or with existing or forecasted financial or commodity transactions. Our primary market risk exposure is to the price of commodities, particularly electricity, natural gas, coal, and environmental credits. AES is also exposed to fluctuations in interest rates associated primarily with outstanding and expected issuances and borrowings, and foreign currency exchange rates associated primarily with investments in foreign subsidiaries and affiliates. To hedge our exposure to market risks, we enter into various transactions, including derivatives.

The disclosures presented in this Item 3 are based upon a number of assumptions; actual effects may differ. The safe harbor provided in Section 27A of the Securities Act of 1933 and Section 21E of the Exchange Act shall

83 | The AES Corporation | June 30, 2026 Form 10-Q

apply to the disclosures contained in this Item 3. For further information regarding market risk, see Item 1A.—Risk Factors, Fluctuations in currency exchange rates may impact our financial results and position; Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for future growth; We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology of the 2025 Form 10-K.

Commodity Price Risk

AES generally seeks to hedge its exposure to commodity price risk; however, certain generation businesses may retain limited unhedged positions due to short‑term sales structures or contractual mismatches between supply and obligations. As a result, a portion of operating results may be exposed to changes in market prices for electricity, fuels, and environmental credits. Increased competition, including from renewable generation and the growing penetration of energy storage systems, may exert downward pressure on electricity prices in certain markets. AES employs risk management strategies designed to limit the impact of commodity price movements on consolidated financial performance. These strategies may include the use of physical and financial commodity contracts, futures, swaps, and options. The portfolio also benefits from natural offsets across businesses, as changes in commodity prices may positively affect certain operations while negatively affecting others. Actual results may differ from modeled sensitivities due to local market conditions, including hydrology, regional supply and demand dynamics, fuel supply constraints, competition and bidding conditions, and regulatory interventions such as price caps.

Volume variation also affects our commodity exposure. The volume sold under contracts or retail concessions can vary based on weather and economic conditions, resulting in a higher or lower volume of sales in spot markets. Thermal unit availability and hydrology can affect the generation output available for sale and can affect the marginal unit setting power prices.

As of June 30, 2026, a hypothetical 10% increase in commodity prices would not be expected to have a material impact on consolidated pre-tax earnings, with estimated impacts of less than a $5 million gain for power, less than a $5 million gain for gas, and less than a $5 million gain for coal. The sensitivities are calculated using industry-standard valuation techniques to revalue all transactions (physical and financial commodity transactions) in the portfolio for a change in the underlying prices the transactions are exposed to and exclude correlation effects, including those due to renewable resource availability. The models reference market prices of commodities across future periods and associated volatility of these market prices. Prices and volatilities are predominantly based on observable market prices.

Commodity price exposure at individual businesses may change over time as contracts mature and hedging positions are adjusted, and although longer-dated forward commodity prices are generally less volatile, our sensitivity to changes in commodity prices may increase in later years due to lower levels of forward hedging at some of our businesses.

In the Energy Infrastructure SBU, the generation businesses are largely contracted, but may have residual risk to the extent contracts are not perfectly indexed to the business drivers. This type of market risk exists primarily in California, Chile, the Dominican Republic, and Panama.

In California, our Southland OTC generation units (“Legacy Assets”) in Long Beach and Huntington Beach have been extended to operate through 2026 under capacity contracts with the State as part of the Strategic Reserve program. Approval to operate Long Beach through 2026 will be subject to review with State Agencies. Our Southland combined cycle gas turbine (“Southland Energy”) units benefit from higher power and lower gas prices, depending on the contracted or hedge position.

The AES Andes business in Chile owns assets in the central and northern regions of the country and has a portfolio of contract sales in both. A significant portion of our PPAs through 2026 include mechanisms of indexation that adjust the price of energy based on the U.S. Consumer Price Index or coal. These mechanisms mitigate exposure to changes in the price of fuel. The increasing share of renewable energy in Chile's power market may reduce reliance on thermal units and impact power price volatility, which could impact our cost to serve certain unregulated PPAs.

In the Dominican Republic, we own natural gas plants contracted under a portfolio of contract sales, and both contract and spot prices may move with commodity prices through 2027.

Our thermal assets in Panama have PPAs with distribution companies which match the term of the LNG supply agreement of such thermal assets. New entrants into the Panama thermal generation market could impact the dispatch of existing generation, requiring purchases in the spot market to satisfy the PPA obligations. Contract

84 | The AES Corporation | June 30, 2026 Form 10-Q

levels do not always match our generation availability or needs, and our assets may be sellers of spot prices in excess of contract levels or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments. Our assets operating in Vietnam and Bulgaria have minimal exposure to commodity price risk as they have no or minor merchant exposure and fuel is subject to a pass-through mechanism.

In the Renewables SBU, our businesses have commodity exposure on unhedged volumes and resource volatility and benefit from higher power prices, where generation exceeds contracted levels. In Colombia, we operate under a shorter-term sales strategy with spot market exposure for uncontracted volumes. Because we own hydroelectric assets there, contracts are not indexed to fuel. Our Renewables businesses in Panama are highly contracted under financial and load-following PPA-type structures, exposing the business to hydrology-based variance. To the extent hydrological inflows are greater than or less than the contract volumes, the business will be sensitive to changes in spot power prices which may be driven by oil and natural gas prices in some time periods.

Foreign Exchange Rate Risk

AES operates in multiple countries and as such is subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

In the normal course of business, we are exposed to foreign currency risk and other foreign operational risks that arise from investments in foreign subsidiaries and affiliates. A key component of these risks stems from the fact that some of our foreign subsidiaries and affiliates utilize currencies other than our consolidated reporting currency, the USD. Additionally, certain of our foreign subsidiaries and affiliates have entered into monetary obligations in USD or currencies other than their own functional currencies. Certain of our foreign subsidiaries calculate and pay taxes in currencies other than their own functional currency. We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso. Our exposure to certain of these currencies may be material. These subsidiaries and affiliates attempt to limit potential foreign exchange exposure by entering into revenue contracts that adjust to changes in foreign exchange rates. We also use foreign currency forwards, swaps, and options where possible to manage our risk related to certain foreign currency fluctuations.

AES enters into foreign currency hedges to protect economic value of the business and minimize the impact of foreign exchange rate fluctuations in our portfolio. While protecting cash flows, the hedging strategy is also designed to reduce forward-looking earnings foreign exchange volatility. Due to variation of timing and amount between cash distributions and earnings exposure, the hedge impact may not fully cover the earnings exposure on a realized basis, which could result in greater volatility in earnings.

AES has unhedged forward-looking earnings exposure to the Argentine peso, which could increase earnings volatility, particularly in times of adverse exchange-rate movement. Additionally, as of June 30, 2026, a hypothetical one-time 10% appreciation of the U.S. dollar applied to forecasted 2026 cash distributions, net of outstanding hedges and with all other variables held constant, indicates that cash distributions attributable to foreign subsidiaries in the Colombian peso, Euro, and Argentine peso may each be exposed to exchange-rate movements, resulting in less than a $10 million gain.

These sensitivities may change in the future as new hedges are executed or existing hedges are unwound. Additionally, updates to the forecasted cash distributions exposed to foreign exchange risk may result in further modification. The sensitivities presented do not capture the impacts of any administrative market restrictions or currency inconvertibility.

Interest Rate Risks

AES is exposed to risk resulting from changes in interest rates primarily because of our current and expected future issuance of debt and borrowing.

Decisions on the fixed-floating debt mix are made to be consistent with the risk factors faced by individual businesses or plants. Depending on whether a plant’s capacity payments or revenue stream is fixed or varies with inflation, we partially hedge against interest rate fluctuations by arranging fixed-rate or variable-rate financing. In certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing. Most of our interest rate risk is related to non-recourse financings at our businesses.

As of June 30, 2026, a hypothetical 100-basis-point increase in interest rates would be expected to increase annual pre-tax interest expense by less than $10 million, based on the portion of the Company’s debt that is subject

85 | The AES Corporation | June 30, 2026 Form 10-Q

to variable interest rates. These amounts represent the exposure for the remainder of 2026 and do not take into account the historical correlation among interest rates.

Item 4. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that the Company files or submits under Exchange Act, is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow timely decisions regarding required disclosures.

The Company, under the supervision and with the participation of its management, including the Company’s CEO and CFO, evaluated the effectiveness of its “disclosure controls and procedures,” as such term is defined in Rule 13a-15(e) under the Exchange Act, as of the end of the period covered by this Quarterly Report on Form 10-Q. Based on that evaluation, our CEO and CFO have concluded that, as of June 30, 2026, our disclosure controls and procedures were effective.

Changes in Internal Controls over Financial Reporting

There were no changes that occurred during the fiscal quarter covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

86 | The AES Corporation | June 30, 2026 Form 10-Q

PART II: OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

The Company is involved in certain claims, suits, and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's condensed consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of June 30, 2026. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a government authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.

In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian Commercial Court in Bhubaneswar (“Court”). GRIDCO's challenge of the costs award was previously dismissed by the Court. In July 2026, the Court dismissed the challenge of the liability award for GRIDCO’s default. It is unclear whether GRIDCO will seek to contest the dismissal. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $12 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program (“LCP”). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26,

87 | The AES Corporation | June 30, 2026 Form 10-Q

2020, CCC staff sent AES an NOV directing AES to discontinue any operation of the water pumps in the alleged wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and, if necessary, a CDP application for their continued operation. With respect to the vault pumps, AES provided the CCC with the requested analysis and the CCC has not required further action. With respect to the pumps in the alleged wetlands, AES locked out those pumps to prevent further operation and submitted the CDP to the permitting authority, the City of Redondo Beach (the “City”), with respect to AES’ plans to disable or remove the pumps. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required. AES submitted all required information and waited for the City to continue processing the application. In December 2023, the City indicated it would continue processing the CDP application; AES has since followed up with the City and awaits the next phase of the permitting process. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.

On March 23, 2021, the U.S. District Court for the Southern District of Indiana approved and entered a judicial consent decree among AES Indiana, the United States on behalf of the Environmental Protection Agency ("EPA"), and IDEM. The decree resolved allegations by the EPA and IDEM that AES Indiana had violated the federal Clean Air Act (“CAA”) at its Petersburg Station, which AES denies. Under the decree, AES Indiana agreed to certain emission limits and annual caps on NOX, SO2 and particulate matter emissions at the four Units at the station; paid a civil penalty of $1.525 million; retired Units 1 and 2, spent $325,000 on an environmentally beneficial project to preserve local, ecologically-significant lands (notice of completion of which was provided May 8, 2025 and confirmed satisfactory by IDEM on September 8, 2025); and is spending a total of $5 million on a further environmental mitigation project to build and operate a new, non-emitting source of generation at the site.

In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths, and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The AES companies moved to dismiss the lawsuit. In May 2026, the relevant court of first instance in Santo Domingo, Dominican Republic, dismissed the entire case due to the expiry of the statute of limitations. It is unclear whether the claimants will seek to appeal the dismissal. The AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. Subsequently, the claimants withdrew the lawsuit with respect to AES Puerto Rico. The lawsuit remains pending against the other AES defendants (“AES Defendants”) and the unaffiliated defendants. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court, namely, the Civil Court of La Vega (“CFI”). In May 2024, the CFI dismissed the entire case due to the expiry of the statute of limitations. Later in 2024, the claimants appealed the dismissal to the relevant intermediate appellate court. The appellate court heard the parties’ respective oral arguments in September 2025. In May 2026, the appellate court issued a decision affirming the CFI’s ruling that the case is time-barred. In July 2026, the claimants filed an appeal with the Dominican Supreme Court of Justice. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include (i) exceeding generation limits, (ii) failing to reduce emissions during episodes of poor air quality, (iii) exceeding limits on discharges to the sea, and (iv) exceeding noise limits.

88 | The AES Corporation | June 30, 2026 Form 10-Q

With respect to the sanctioning procedure, AES Andes has submitted a proposed “Compliance Program” (“Programa de Cumplimiento”) to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021 and approved by the SMA on December 30, 2021. AES Andes has completed the execution of the Compliance Program and filed a request for final compliance report in late 2025. The SMA will review the final report and, if approved, the Compliance Program will be considered fully completed, resulting in the permanent extinction of administrative liability associated with the charges included in this proceeding. To date, this sanctioning procedure remains on stand-by pending the decision of the final report, and no fines have been imposed in connection with it. Separately, and in an independent sanctioning procedure not related to the foregoing Compliance Program, the SMA initiated an ex officio action concerning an alleged failure of the Ventanas Complex to adequately reduce emissions during episodes of poor air quality. In connection with this separate proceeding, on April 21, 2023, the SMA notified AES Andes of a resolution alleging an additional “serious” non-compliance. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. On May 10, 2024, the Company was notified of a fine for $180,515. On June 3, 2024, the Company appealed this fine to the Environmental Court. The appellate hearing occurred on April 3, 2025 and the Environmental Court subsequently upheld the sanction imposed by the SMA, confirming the fine. The Company has paid the fine and will appeal this decision before the Supreme Court. The Company believes that it has meritorious defenses and will continue to assert them vigorously in this dispute; however, there can be no assurances that it will be successful.

On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Agency”) initiated an environmental audit at the Termoeléctrica del Peñoles thermal generation facility (“TEP”). On January 20, 2023, TEP was notified of the resolution issued by the Agency, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately $1.6 million), as well as a series of corrective measures. On March 3, 2023, TEP filed a lawsuit in an administrative court—The Specialized Chamber of the Federal Administrative Justice Tribunal (“Chamber”)—challenging the legality of the Agency’s resolution and fine. On May 30, 2025, the Chamber issued a final administrative ruling denying TEP’s lawsuit. On July 1, 2025, TEP appealed to the Federal District Court. TEP’s appeal challenges the constitutionality of the Agency’s regulations (demanda de amparo) and requests a stay of enforcement of the Chamber’s final administrative ruling. The appeal has been duly admitted, initial discovery completed, and the Federal District Court’s decision on the injunction request is pending. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts. TEP subsequently challenged the ruling through an amparo proceeding, however, TEP did not prevail in the amparo. As a result, TEP was required to file an additional request for legal remedy to prevent the collection of the fine and to preserve its ability to negotiate a potential reduction or commutation of the sanction. There is no guarantee TEP will be successful in any negotiation or commutation request. Additionally, applicable surcharges and inflation adjustments may increase the total amount of the fine to approximately $50 million pesos (approximately $3 million). The company continues to assess the available legal and negotiation alternatives, but there can be no assurances that it will be successful in these efforts.

In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In February 2024, at the request of the Company, the Dominican Supreme Court of Justice transferred the case to a different civil court, namely, the Civil Court of La Vega (“CFI”). The claimants’ attempt to recuse the presiding judge was rejected by the relevant Dominican appellate court. The parties completed briefing on the Company’s motion to dismiss the lawsuit. In May 2026, the CFI dismissed the entire case due to the expiry of the statute of limitations. The claimants may seek to appeal. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.

On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged serious charges relating to the Alto Maipo environmental permit. The alleged charges include: untimely completion of certain intake works; insufficient capture of species; non-compliance with certain forest management plan goals; and intervention of a restricted paleontological area. On February 16, 2023, the Alto Maipo project submitted a proposed compliance program to the SMA. On October 13, 2025, the SMA ultimately rejected an updated version of the compliance program and restarted the sanctions process for the alleged charges. Alto Maipo filed a legal action before the environmental tribunal seeking annulment of the decision that rejected the proposed compliance program. This legal action is pending. Separately, on October 15, 2025, Alto Maipo submitted to SMA its defense response to the four alleged

89 | The AES Corporation | June 30, 2026 Form 10-Q

charges. A decision from SMA is still pending. If Alto Maipo’s defense response arguments are not acceptable to the SMA, the imposition of fines is possible. Separately, Alto Maipo filed a legal action seeking annulment of the decision that rejected its proposed compliance program.

In April 2025, an alleged shareholder of Fluence Energy, Inc. (“Fluence”) filed a putative securities class action in the U.S. District Court for the Eastern District of Virginia (“Court”) against Fluence and certain of Fluence’s officers and directors. The complaint in the case also named the Company and AES Grid Stability, LLC as defendants (together, the “AES Defendants”). In May 2025, the Court consolidated the lawsuit with another putative securities class action against Fluence and certain of its officers and directors. The Court also appointed a lead plaintiff (the “Plaintiff”) and lead plaintiffs’ counsel for the consolidated lawsuit. In June 2025, the Plaintiff filed a consolidated amended complaint against Fluence, certain of its officers and directors (the “Individual Fluence Defendants” and, together with Fluence, the “Fluence Defendants”), and the AES Defendants. The Plaintiff seeks to pursue claims on behalf of a putative class of all purchasers of Fluence Class A common stock between October 28, 2021 and February 10, 2025. The Plaintiff alleges that the Fluence Defendants made allegedly false or misleading statements in violation of Section 10(b) of the Exchange Act, as well as Rule 10b-5 promulgated thereunder. In addition, the Plaintiff asserts claims against the Individual Fluence Defendants and the AES Defendants as alleged “control persons” under Section 20(a) of the Exchange Act. In July 2025, the Fluence Defendants and the AES Defendants filed separate motions to dismiss the consolidated lawsuit. In March 2026, the Court issued an order dismissing without prejudice the Plaintiff’s consolidated amended complaint for failure to state a claim. In its order, the Court noted that it will issue a more detailed memorandum opinion in the future, after which Plaintiffs may file an amended complaint. The memorandum opinion has not been issued to date. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this lawsuit; however, there can be no assurances that they will be successful in their efforts.

In May 2025, a special session of the Federal Regional Court of the 1st Region of Brazil ("TRF1”) issued a decision dismissing the claims of Sul, which was sold to a third party in 2016 (“Buyer”), to annul ANEEL’s Order 288. Order 288 was issued in May 2002 and retroactively changed the effects of the Wholesale Energy Market (“MAE”) for the year 2001. The aggregate impact of Order 288 for AES Sul was to reverse a gain on certain purchases and sales into an approximately R$75 million ($14 million) loss, estimated as of May 2002. The TRF1’s May 2025 decision reversed its April 2013 decision in Sul’s favor that annulled Order 288. In August 2025, Sul filed a motion for clarification of the decision with the TRF1, which is considering the motion. After the motion is decided, Sul will have the ability to file appeals with the Superior Court of Justice and the Supreme Federal Court. In the event of an unsuccessful outcome for Sul, the Buyer may attempt to seek recovery of losses relating to the R$75 million ($14 million) loss above, an additional amount of approximately R$27 million ($5 million) that was collected by Sul in 2008 and may need to be reimbursed, plus interest on these amounts, from the AES seller and The AES Corporation under the sale agreement. In that event, AES would defend itself vigorously; however, there can be no assurances that it would be successful in its efforts.

On May 30, 2025, an arbitral tribunal (the “Tribunal”) of the International Centre for the Settlement of Investment Disputes (“ICSID”) issued an arbitration award in the Company’s favor (“Award”) in connection with a treaty arbitration initiated by the Company against the Argentine Republic (“Argentina”) under the US-Argentina bilateral investment treaty (“BIT”). In the Award, the Tribunal found that certain measures taken by Argentina in relation to its power sector, beginning in late 2001, breached the BIT. The Tribunal ordered Argentina to pay to the Company approximately $733 million in damages, including an award of costs, as well as accrued interest. In August 2025, the Company filed a lawsuit in the U.S. District Court for the District of Columbia (“DDC”) to recognize and enforce the ICSID Award against Argentina. In September 2025, Argentina filed an application with ICSID to annul the Tribunal’s Award. In its application, Argentina also requested a stay of enforcement of the Award pending the completion of the annulment proceedings ("Stay Request"). Argentina’s annulment application will be decided by a new three-person panel (“Annulment Panel”), which was appointed by ICSID in January 2026. In March 2026, the Annulment Panel issued a procedural order scheduling the hearing on the annulment petition for March 4-5, 2027. In April 2026, the Annulment Panel issued an order (“Order”) conditionally granting Argentina’s Stay Request subject to Argentina’s provision of a bank guarantee that covers the full amount of damages and interest and that can be collected by the Company if Argentina’s annulment application is ultimately rejected. The Order also required that the terms of the bank guarantee were to be negotiated by the Parties, and if such negotiations were unsuccessful, would be established by the Annulment Panel. Further, the Order provided that if Argentina failed to post the bank guarantee, the conditional stay would be lifted automatically. Argentina failed to procure the bank guarantee and, consequently, the Annulment Panel has confirmed that the conditional stay has been lifted. The Company will now continue its enforcement efforts in the DDC. The Company can provide no assurance as to how the Annulment Panel will rule on the annulment application. Relatedly, measures to enforce the Award through judicial means entail a process that is inherently unpredictable; as a result, the Company cannot provide any assurance as to the timing

90 | The AES Corporation | June 30, 2026 Form 10-Q

or success of such enforcement measures. The Company may attempt to settle this dispute with Argentina. However, the Company can provide no assurances regarding the likelihood, substance, or timing of any such settlement.

On December 30, 2025, the Company received a complaint filed in Virginia state court by Sinolam LNG Terminal, SA and Sinolam Smarter Energy LNG Power Co. (collectively, “Plaintiffs”) against the Company, AES Latin America, S. de R.L., AES Panama, S.R.L. (“AES Panama”), AES Colon Holding, S. de R.L., Costa Norte LNG Terminal, S. de R.L., Gas Natural Atlantico S. de R.L., InterEnergy Holdings UK Limited (“IEHL”) (a third party), and Group Energy Gas Panama, S.R.L. (“GEGP”) (a partnership between IEHL and AES Panama) (collectively, “Defendants”). In their complaint, the Plaintiffs allege that the Defendants interfered with the Plaintiffs’ efforts to develop an LNG-fired power plant and an LNG terminal in Panama. The Plaintiffs appear to seek recovery of alleged lost profits totaling about $4 billion, alleged out-of-pocket damages, interest, statutory damages, and other relief from the Defendants. The Defendants removed the case to the U.S. District Court for the Eastern District of Virginia (“EDVA”) and thereafter moved to dismiss the case. Post-removal, the Plaintiffs dismissed AES Panama from the case. Also, in response to the Defendants’ motion to dismiss, the Plaintiffs filed an amended complaint naming only the Company, IEHL, and GEGP as defendants. In April 2026, the EDVA granted the Plaintiffs’ motion to remand the case to state court. The Company has again moved to dismiss the case. IEHL and GEGP have also filed motions to dismiss. The Parties are undertaking limited discovery on the Defendants’ respective motions to dismiss. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this lawsuit; however, there can be no assurances that it will be successful in its efforts.

In July 2026, an alleged shareholder of Fluence Energy, Inc. (“Fluence”) filed a derivative complaint in the Delaware Court of Chancery allegedly on behalf of Fluence and against the Company and AES Grid Stability, LLC (the “AES Defendants”); Siemens Industry, Inc., and Siemens AG (the “Siemens Defendants”); Qatar Investment Authority and Qatar Holding, LLC (the “QIA Defendants”); and certain Fluence officers and directors (the “Fluence Defendants”). The Plaintiff alleges that Fluence failed to disclose information about, among other things, alleged deficiencies in its products and financial reporting and controls; that the AES Defendants, Siemens Defendants, and QIA Defendants possessed material nonpublic information on those subjects, among others, at the time of Fluence’s December 2023 secondary public offering (the “SPO”); and that Fluence’s directors breached their fiduciary duties by approving the SPO, while the AES Defendants, Siemens Defendants, and QIA Defendants breached alleged fiduciary duties by selling Fluence stock in the SPO. The Plaintiff also asserts claims for unjust enrichment and aiding and abetting insider selling against the AES Defendants, Siemens Defendants, and QIA Defendants in connection with the SPO. The Plaintiff seeks damages and other relief from all defendants. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this lawsuit; however, there can be no assurances that they will be successful in their efforts.

To date, the Company is aware of two (2) complaints that have been filed as individual actions in connection with the Merger by purported stockholders of the Company against the Company and the individual members of the Company’s Board of Directors. The complaints are captioned as follows: Miller v. The AES Corporation, et al, Index No. [Unassigned] (N.Y. Sup. Ct. N.Y. Cnty. Jun. 3, 2026) and Wright v. The AES Corporation, et al, Index No. [Unassigned] (N.Y. Sup. Ct. N.Y. Cnty. Jun. 5, 2026) (the “Complaints”). The Complaints seek to enjoin the defendants from proceeding with the Merger unless the defendants disclose certain purportedly material information alleged to have been omitted from the Preliminary Proxy Statement filed on May 4, 2026 (the “Preliminary Proxy Statement”) and/or the Definitive Proxy Statement filed on May 15, 2026 (the “Definitive Proxy Statement”), respectively, and/or damages if the Merger is consummated. In addition to the Complaints, to date, the Company has received sixteen (16) demand letters from law firms claiming to represent purported Company stockholders, which also generally allege disclosure deficiencies in the Preliminary Proxy Statement and/or the Definitive Proxy Statement (collectively, the “Demand Letters” and, together with the Complaints, the “Matters”). The Company and the other defendants named in the Matters deny all allegations in the Matters and believe that the Matters are without merit and that no supplemental disclosure to the Preliminary Proxy Statement and/or the Definitive Proxy Statement was or is required under any applicable law, rule or regulation. However, solely to minimize the burden and expense of potential litigation, avoid nuisance and potential delay or disruption to the Merger and provide additional information to the Company’s stockholders, the Company determined to voluntarily supplement the Definitive Proxy Statement in a Form 8-K filed on June 12, 2026. The Company believes that the disclosures in the Preliminary Proxy Statement and the Definitive Proxy Statement comply fully with applicable law and nothing will be deemed an admission of legal necessity or materiality under applicable law with respect to the legal proceedings described herein. In addition, the Company has received two (2) stockholder books and records demands and one stockholder demand for an appraisal of the stockholder’s alleged shares.

91 | The AES Corporation | June 30, 2026 Form 10-Q

Item 1A. RISK FACTORS

You should consider carefully the following updates to risk factors, along with the risk factors disclosed in Item 1A.—Risk Factors of our 2025 Form 10-K and other information contained in or incorporated by reference in this Form 10-Q. Additional risks and uncertainties also may adversely affect our business and operations, including those discussed in Item 2.—Management's Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-Q. The Risk Factors section in our 2025 Form 10-K otherwise remains current in all material respects. We routinely encounter and address risks, some of which may cause our future results to be materially different than we presently anticipate. If any of the following events actually occur, our business, financial results, and financial condition could be materially adversely affected.

Risks Related to the Proposed Merger

There is no assurance when or if the Merger will be completed. If our proposed Merger does not close, or is delayed, we may experience financial and operational disruptions. In addition, our stock price may decline if the Merger is perceived as uncertain to close.

On March 1, 2026, AES entered into the Merger Agreement, by and among the Company, Parent, and Merger Sub. The closing of the Merger is subject to various closing conditions, many of which are not within our full control, including: (1) approval of the shareholders of AES; (2) receipt of all required regulatory approvals without the imposition of a Burdensome Condition, as defined in the Merger Agreement; (3) absence of any law or order prohibiting the consummation of the Merger; (4) subject to materiality qualifiers, the accuracy of each party’s representations and warranties; (5) each party’s compliance in all material respects with its obligations and covenants under the Merger Agreement; and (6) the absence of a material adverse effect with respect to the Company.

The Merger is currently expected to close in late 2026 or early 2027, subject to satisfaction or waiver (to the extent permitted by law) of all closing conditions. The approval of the shareholders was received on June 26, 2026. However, we may be unable to obtain and satisfy, or experience delays in obtaining and satisfying, required regulatory approvals and other closing conditions. In addition, both we and the Parent may terminate the Merger Agreement for reasons specified therein.

The announcement and pendency of the Merger could adversely affect our business and stock price, including if the Merger does not close or is delayed, for reasons including the following:

  • Uncertainty about the effect of the Merger may impair our ability to attract, retain, and motivate key personnel, and could cause customers, suppliers, partners, lenders, and others to seek to change existing business relationships with us;

  • The Merger Agreement also requires the Company to obtain Parent’s consent prior to taking certain specified actions, including acquisitions and disposals above certain thresholds, the incurrence of additional debt, subject to certain exceptions, and from taking other specified actions while the Merger is pending. These restrictions may prevent the Company from pursuing otherwise attractive business opportunities or making other changes to its business prior to the completion of the Merger;

  • We have incurred, and will continue to incur, significant costs, expenses, and fees for professional services and other transaction costs in connection with the Merger. Many of the fees and costs will be payable by us even if the Merger is not completed. In addition, we may be required to pay a termination fee of approximately $321 million to Parent if the Merger Agreement is terminated by us for certain specified reasons; and

  • The Merger may not occur on the expected timeline if there are delays in receiving required regulatory approvals or other reasons. We cannot provide any assurance that all of the required approvals will be obtained or that the approvals will not be conditioned on terms, conditions or restrictions that would be detrimental to the combined company after the completion of the proposed Merger. Any delay or inability to close the Merger may cause the market price of our common stock to decline. The Merger Agreement also contains certain termination rights for both AES and Parent, including if the Merger is not consummated by June 1, 2027 (subject to extension for an additional two successive three-month periods if all of the conditions to closing, other than the conditions related to obtaining regulatory approvals, have been satisfied).

92 | The AES Corporation | June 30, 2026 Form 10-Q

The Company and its directors have been named in securities class action and derivative lawsuits arising out of the proposed Merger, which could result in substantial costs and may delay or prevent the proposed Merger or otherwise negatively affect our business and operations.

Securities class action lawsuits and derivative lawsuits are often brought against companies that have entered into a merger agreement. To date, two (2) complaints have been filed as individual actions in connection with the Merger by purported stockholders of the Company against the Company and the individual members of the Company’s Board of Directors. In addition, the Company has received sixteen (16) demand letters from law firms claiming to represent purported Company stockholders, which also generally allege disclosure deficiencies in the Preliminary Proxy Statement filed on May 4, 2026 (the “Preliminary Proxy Statement”) and/or the Definitive Proxy Statement filed on May 15, 2026 (the “Definitive Proxy Statement”), respectively, two (2) stockholder books and records demands, and one stockholder demand for an appraisal of the stockholder’s alleged shares. Although these lawsuits and demands are without merit, defending against these claims can result in substantial costs to the parties to the Merger Agreement and diverts management time and resources. Additionally, if a plaintiff is successful in obtaining an injunction prohibiting the completion of a merger, that injunction may delay or prevent such merger from being completed. If the Merger is not consummated for any reason, litigation could be filed in connection with the failure to consummate the Merger.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Issuer Purchases of Equity Securities

The following table provides information relating to our purchases of AES Common Stock during the second quarter of fiscal year 2026:

PeriodTotal Number of Shares PurchasedAverage Price Paid Per ShareTotal Number of Shares Purchased as Part of Publicly Announced Plans or ProgramsMaximum Number (or Approximate Dollar Value) of Shares That May Yet Be Purchased Under the Plans or Programs (1)
April 1 — April 30—$——$264,000,000
May 1 — May 31———264,000,000
June 1 — June 30———264,000,000
Total—$——$264,000,000

(1) On July 7, 2010, The AES Corporation announced that its Board of Directors approved a common stock repurchase program under which the Company may purchase up to $500 million of shares of its outstanding common stock, depending on cash availability, market conditions, and other factors. The original authorization was set to expire on December 31, 2010, however, in December 2010, the Board authorized an extension of the stock repurchase program. The current program does not have a predetermined expiration date. Repurchases under this program may be made using a variety of methods, which may include open market repurchases, purchases by contract (including, without limitation, accelerated stock repurchase programs or 10b5-1 plans), and/or privately negotiated transactions. No repurchases were made under this program during the second quarter of 2026. As of June 30, 2026, $264 million remained available for purchase under this authorization.

ITEM 3. DEFAULTS UPON SENIOR SECURITIES

None.

ITEM 4. MINE SAFETY DISCLOSURES

Not applicable.

Item 5. OTHER INFORMATION

On July 21, 2026, the Financial Audit Committee (the “Audit Committee”) of the Board of Directors of The AES Corporation (the “Company”) dismissed Ernst & Young LLP (“EY”) as the Company’s independent registered public accounting firm, due to the fact that EY will no longer be considered independent with respect to the Company under the rules of the Securities and Exchange Commission (the “SEC”) after the closing of the announced Agreement and Plan of Merger (the “Merger Agreement”), by and among the Company, Horizon Parent, L.P., a Delaware limited partnership (“Parent”), and Horizon Merger Sub, Inc., a Delaware corporation and wholly owned subsidiary of Parent (“Merger Sub”). Pursuant to the Merger Agreement, on the terms and subject to the conditions set forth therein, Merger Sub will merge with and into the Company (the “Merger”), with the Company continuing as the surviving corporation in the Merger. Parent is jointly controlled by investment vehicles affiliated with one or more funds, accounts or other entities managed or advised by Global Infrastructure Management, LLC and the EQT Infrastructure VI fund. The dismissal is effective upon the filing of this Quarterly Report on Form 10-Q for the quarter ended June 30, 2026.

93 | The AES Corporation | June 30, 2026 Form 10-Q

The audit reports of EY on the Company’s consolidated financial statements as of and for the fiscal years ended December 31, 2024 and 2025 did not contain an adverse opinion or a disclaimer of opinion, nor were such reports qualified or modified as to uncertainty, audit scope or accounting principles. EY’s report on the Company’s internal control over financial reporting as of December 31, 2024 contained an adverse opinion. Specifically, EY’s report stated that the Company had not maintained effective internal control over financial reporting as of December 31, 2024 due to the effect of a material weakness identified by management in controls related to the disposition process of AES Brasil, as reported by the Company in “Part II, Item 9A. Controls and Procedures” of its Annual Report on Form 10-K for the fiscal year ended December 31, 2024, filed with the SEC on March 11, 2025. This material weakness was discussed by the Audit Committee and EY. During the fiscal years ended December 31, 2024 and 2025, and the subsequent interim period through the date of the Current Report on Form 8- K filed with the SEC on July 27, 2026 (the “Current Report”), there were no (i) disagreements (within the meaning of Item 304(a)(1)(iv) of Regulation S-K and the related instructions under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) between the Company and EY on any matter of accounting principles or practices, financial statement disclosure or auditing scope or procedure, which, if not resolved to the satisfaction of EY, would have caused EY to make reference to the subject matter of the disagreement in connection with its report on the consolidated financial statements of the Company for the applicable year, or (ii) reportable events (within the meaning of Item 304(a)(1)(v) of Regulation S-K and the related instructions under the Exchange Act), other than the material weakness described above. The Company provided EY with a copy of the disclosures in the Current Report and requested that EY provide the Company with a letter addressed to the SEC stating whether EY agrees with the statements made by the Company therein. A copy of EY’s letter, dated July 27, 2026, is filed as Exhibit 16.1 to the Current Report.

Following consideration of multiple accounting firms, on July 21, 2026, the Audit Committee engaged KPMG LLP (“KPMG”) as the independent registered public accounting firm for the Company for the fiscal year ending December 31, 2026, effective as of EY’s dismissal upon the filing of this Quarterly Report on Form 10-Q for the quarter ended June 30, 2026.

As part of the request for proposal process by which KPMG was selected, KPMG and the Company identified that, during the year ending December 31, 2026 (the “Audit Period”), various member firms within the KPMG International network (“KPMG Member Firms”) provided tax advisory support, payroll processing, employment legal advice, and financial model review services to certain subsidiaries of the Company. Each of these services contain one or more components of work performed during the Audit Period that render them to be impermissible services (“Impermissible Services”) pursuant to SEC Regulation S-X Rule 2-01 and therefore impact KPMG’s independence with respect to the Company. Prior to the appointment of KPMG as the independent registered public accounting firm for the Company, all Impermissible Services have either been completed or terminated.

The Impermissible Services were strictly advisory or clerical in nature, and management of the Company retained sole decision-making authority and responsibility for all underlying data and assumptions. Additionally, these services were limited to foreign affiliates, the subject matters to which the services relate are not expected to be in-scope for the consolidated group audit of the Company, and the fees associated with the Impermissible Services are immaterial to each of the Company and KPMG.

KPMG considered whether the matters noted above impacted its objectivity and ability to exercise impartial judgment with regard to its engagement as the Company’s independent registered public accounting firm and has concluded that KPMG’s objectivity and ability to exercise impartial judgment has not been impaired. After taking into consideration the facts and circumstances of the above matters and KPMG’s determination, the Company’s Audit Committee also concluded that KPMG’s objectivity and ability to exercise impartial judgment has not been impaired.

During the fiscal years ended December 31, 2024 and 2025, and the subsequent interim period through the date of the Current Report, neither the Company, nor anyone on the Company’s behalf, consulted with KPMG regarding either (1) the application of accounting principles to a specified transaction, either completed or proposed, or the type of audit opinion that might be rendered on the Company’s consolidated financial statements, and no written report or oral advice was provided by KPMG to the Company that KPMG concluded was an important factor considered by the Company in reaching a decision as to the accounting, auditing or financial reporting issue; or (2) any matter that was the subject of either a disagreement (within the meaning of Item 304(a)(1)(iv) of Regulation S-K and the related instructions under the Exchange Act) or a reportable event (within the meaning of Item 304(a)(1)(v) of Regulation S-K and the related instructions under the Exchange Act).

Trading Arrangements

94 | The AES Corporation | June 30, 2026 Form 10-Q

None of the Company’s directors or “officers,” as defined in Rule 16a-1(f) of the Exchange Act, adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or a “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K, during the Company’s fiscal quarter ended June 30, 2026.

Item 6. EXHIBITS

4.1Thirty-Second Supplemental Indenture, dated June 16, 2026, between The AES Corporation and Deutsche Bank Trust Company Americas, as Trustee, is incorporated herein by reference to Exhibit 4.1 of the Company's Form 8-K filed on June 16, 2026.
31.1Rule 13a-14(a)/15d-14(a) Certification of Andrés Gluski (filed herewith).
31.2Rule 13a-14(a)/15d-14(a) Certification of Stephen Coughlin (filed herewith).
32.1Section 1350 Certification of Andrés Gluski (filed herewith).
32.2Section 1350 Certification of Stephen Coughlin (filed herewith).
101The AES Corporation Quarterly Report on Form 10-Q for the quarter ended June 30, 2026, formatted in Inline XBRL (Inline Extensible Business Reporting Language): (i) the Cover Page, (ii) Condensed Consolidated Balance Sheets, (iii) Condensed Consolidated Statements of Operations, (iv) Condensed Consolidated Statements of Comprehensive Income (Loss), (v) Condensed Consolidated Statements of Changes in Equity, (vi) Condensed Consolidated Statements of Cash Flows, and (vii) Notes to Condensed Consolidated Financial Statements. The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
104Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101).

95 | The AES Corporation | June 30, 2026 Form 10-Q

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

THE AES CORPORATION (Registrant)
Date:August 4, 2026By:/s/ STEPHEN COUGHLIN
Name:Stephen Coughlin
Title:Executive Vice President and Chief Financial Officer (Principal Financial Officer)
By:/s/ AUBREY JARRED
Name:Aubrey Jarred
Title:Vice President and Controller (Principal Accounting Officer)