Dominion Energy 10-K 2019-12-31

Filed 2020-02-28. 22 sections, 1222K characters. Original on sec.gov · Markdown · JSON

What changed since the 2018-12-31 10-KNew, removed and reworded risk factor headings, then every item sentence by sentence.

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM

10-K

(Mark One)

☒ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2019

OR

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File NumberExact name of registrants as specified in their chartersI.R.S. Employer Identification Number
001-08489DOMINION ENERGY, INC.54-1229715
000-55337VIRGINIA ELECTRIC AND POWER COMPANY54-0418825
001-37591DOMINION ENERGY GAS HOLDINGS, LLC46-3639580
VIRGINIA (State or other jurisdiction of incorporation or organization)
120 TREDEGAR STREET RICHMOND, VIRGINIA (Address of principal executive offices)23219 (Zip Code)
(804) 819-2000 (Registrants’ telephone number)

Securities registered pursuant to Section 12(b) of the Act:

RegistrantTrading SymbolTitle of Each ClassName of Each Exchange on Which Registered
DOMINION ENERGY, INC.DCommon Stock, no par valueNew York Stock Exchange
DRUA2016 Series A 5.25% Enhanced Junior Subordinated NotesNew York Stock Exchange
DOMINION ENERGY GAS HOLDINGS, LLCDCUE2019 Series A Corporate Units 2014 Series C 4.6% Senior NotesNew York Stock Exchange New York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act:

VIRGINIA ELECTRIC AND POWER COMPANY

Common Stock, no par value

DOMINION ENERGY GAS HOLDINGS, LLC

Limited Liability Company Membership Interests

Indicate by check mark whether the registrant is a well-known seasoned issuer as defined in Rule 405 of the Securities Act.

Dominion Energy, Inc. Yes

☒

No

☐

Virginia Electric and Power Company Yes

☒

No

☐

Dominion Energy Gas Holdings, LLC Yes

☒

No

☐

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Dominion Energy, Inc. Yes

☐

No

☒

Virginia Electric and Power Company Yes

☐

No

☒

Dominion Energy Gas Holdings, LLC Yes

☐

No

☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Dominion Energy, Inc. Yes

☒

No

☐

Virginia Electric and Power Company Yes

☒

No

☐

Dominion Energy Gas Holdings, LLC Yes

☒

No

☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation

S-T

(§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Dominion Energy, Inc. Yes

☒

No

☐

Virginia Electric and Power Company Yes

☒

No

☐

Dominion Energy Gas Holdings, LLC Yes

☒

No

☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a

non-accelerated

filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,”

“non-accelerated

filer,” “smaller reporting company,” and “emerging growth company” in Rule

12b-2

of the Exchange Act.

Dominion Energy, Inc.

Large accelerated filer ☒Accelerated filer ☐Non-accelerated filer ☐Smaller reporting company ☐
Emerging growth company ☐

Virginia Electric and Power Company

Large accelerated filer ☐Accelerated filer ☐Non-accelerated filer ☒Smaller reporting company ☐
Emerging growth company ☐

Dominion Energy Gas Holdings, LLC

Large accelerated filer ☐Accelerated filer ☐Non-accelerated filer ☒Smaller reporting company ☐
Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined by Rule

12b-2

of the Act).

Dominion Energy, Inc. Yes

☐

No

☒

Virginia Electric and Power Company Yes

☐

No

☒

Dominion Energy Gas Holdings, LLC Yes

☐

No

☒

The aggregate market value of Dominion Energy, Inc. common stock held by

non-affiliates

of Dominion Energy was approximately $62.0 billion based on the closing price of Dominion Energy’s common stock as reported on the New York Stock Exchange as of the last day of Dominion Energy’s most recently completed second fiscal quarter. Dominion Energy is the sole holder of Virginia Electric and Power Company common stock. At February 14, 2020, Dominion Energy had 838,000,325 shares of common stock outstanding and Virginia Power had 274,723 shares of common stock outstanding. Dominion Energy Questar Corporation, a wholly-owned subsidiary of Dominion Energy, Inc., holds all of the membership interests of Dominion Energy Gas Holdings, LLC.

DOCUMENT INCORPORATED BY REFERENCE

Portions of Dominion Energy’s 2020 Proxy Statement are incorporated by reference in Part III.

This combined Form

10-K

represents separate filings by Dominion Energy, Inc., Virginia Electric and Power Company and Dominion Energy Gas Holdings, LLC. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Virginia Electric and Power Company and Dominion Energy Gas Holdings, LLC make no representations as to the information relating to Dominion Energy, Inc.’s other operations.

VIRGINIA ELECTRIC AND POWER COMPANY AND DOMINION ENERGY GAS HOLDINGS, LLC MEET THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION I(1)(a) AND (b) OF FORM

10-K

AND ARE FILING THIS FORM

10-K

UNDER THE REDUCED DISCLOSURE FORMAT.

Dominion Energy, Inc., Virginia Electric and

Power Company and Dominion Energy Gas Holdings, LLC

Item NumberPage Number
Glossary of Terms3
Part I
1.Business8
1A.Risk Factors28
1B.Unresolved Staff Comments36
2.Properties37
3.Legal Proceedings42
4.Mine Safety Disclosures42
Information about our Executive Officers43
Part II
5.Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities44
6.Selected Financial Data45
7.Management’s Discussion and Analysis of Financial Condition and Results of Operations46
7A.Quantitative and Qualitative Disclosures About Market Risk66
8.Financial Statements and Supplementary Data69
9.Changes in and Disagreements with Accountants on Accounting and Financial Disclosure196
9A.Controls and Procedures196
9B.Other Information199
Part III
10.Directors, Executive Officers and Corporate Governance200
11.Executive Compensation200
12.Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters200
13.Certain Relationships and Related Transactions, and Director Independence200
14.Principal Accountant Fees and Services201
Part IV
15.Exhibits and Financial Statement Schedules202
16.Form 10-K Summary209
2

Glossary of Terms

The following abbreviations or acronyms used in this Form

10-K

are defined below:

Abbreviation or AcronymDefinition
2016 Equity UnitsDominion Energy’s 2016 Series A Equity Units issued in August 2016, initially in the form of 2016 Series A Corporate Units, consisting of a stock purchase contract and a 1/40 interest in RSNs issued by Dominion Energy
2019 Equity UnitsDominion Energy’s 2019 Series A Equity Units issued in June 2019, initially in the form of 2019 Series A Corporate Units, consisting of a stock purchase contract and a 1/10 interest in a share of the Series A Preferred Stock
2017 Tax Reform ActAn Act to Provide for Reconciliation Pursuant to Titles II and V of the Concurrent Resolution on the Budget for Fiscal Year 2018 (previously known as The Tax Cuts and Jobs Act) enacted on December 22, 2017
2020 Proxy StatementDominion Energy 2020 Proxy Statement, File No. 001-08489
ABOAccumulated benefit obligation
ACE RuleAffordable Clean Energy Rule
AFUDCAllowance for funds used during construction
Align RNGAlign RNG, LLC, a joint venture between Dominion Energy and Smithfield Foods, Inc.
AMIAdvanced Metering Infrastructure
AOCIAccumulated other comprehensive income (loss)
AROAsset retirement obligation
Atlantic Coast PipelineAtlantic Coast Pipeline, LLC, a limited liability company owned by Dominion Energy, Duke and Southern
Atlantic Coast Pipeline ProjectAn approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina which will be owned by Dominion Energy, Duke and Southern to be constructed and operated by DETI
BACTBest available control technology
bcfBillion cubic feet
bcfeBillion cubic feet equivalent
Bear GardenA 590 MW combined-cycle, natural gas-fired power station in Buckingham County, Virginia
Blue RacerBlue Racer Midstream, LLC, a joint venture between Caiman Energy II, LLC and FR BR Holdings, LLC effective December 2018
BPBP Wind Energy North America Inc.
BrookfieldBrookfield Super-Core Infrastructure Partners, an infrastructure fund managed by Brookfield Asset Management Inc.
Brunswick CountyA 1,376 MW combined-cycle, natural gas-fired power station in Brunswick County, Virginia
CAAClean Air Act
CAISOCalifornia ISO
CAOChief Accounting Officer
CCRCoal combustion residual
CEACommodity Exchange Act
CEOChief Executive Officer
CEPCapital Expenditure Program, as established by House Bill 95, Ohio legislation enacted in 2011, deployed by East Ohio to recover certain costs associated with capital investment
CERCLAComprehensive Environmental Response, Compensation and Liability Act of 1980, also known as Superfund
CFOChief Financial Officer
CGN CommitteeCompensation, Governance and Nominating Committee of Dominion Energy’s Board of Directors
CNGConsolidated Natural Gas Company
CO 2Carbon dioxide
Colonial Trail WestA 142 MW utility-scale solar power station located in Surry County, Virginia
CompaniesDominion Energy, Virginia Power and Dominion Energy Gas, collectively
Contracted GenerationContracted Generation operating segment
COOChief Operating Officer
Cooling degree daysUnits measuring the extent to which the average daily temperature is greater than 65 degrees Fahrenheit, or 75 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 75 degrees, as applicable, and the average temperature for that day
Cove PointDominion Energy Cove Point LNG, LP
Cove Point LNG FacilityAn LNG import/export and storage facility, including the Liquefaction Facility, located on the Chesapeake Bay in Lusby, Maryland
Cove Point PipelineA 136 mile natural gas pipeline that connects the Cove Point LNG Facility to interstate natural gas pipelines
CPCNCertificate of Public Convenience and Necessity
CWAClean Water Act
DCPThe legal entity, Dominion Cove Point, LLC (formerly known as Dominion Cove Point, Inc.), one or more of its consolidated subsidiaries, or the entirety of Dominion Cove Point, LLC and its consolidated subsidiaries
3
Abbreviation or AcronymDefinition
DECGDominion Energy Carolina Gas Transmission, LLC
DECGSDominion Energy Carolina Gas Services, Inc.
DEQPSDominion Energy Questar Pipeline Services, Inc.
DESDominion Energy Services, Inc.
DESCThe legal entity, Dominion Energy South Carolina, Inc. (formerly known as South Carolina Electric & Gas Company), one or more of its consolidated entities or operating segment, or the entirety of Dominion Energy South Carolina, Inc. and its consolidated entities
DETIDominion Energy Transmission, Inc.
DGIDominion Generation, Inc.
DGPDominion Gathering and Processing, Inc.
DMLPHCIIDominion MLP Holding Company II, LLC (formerly known as Dominion MLP Holding Company II, Inc.)
Dodd-Frank ActThe Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010
DOEU.S. Department of Energy
Dominion EnergyThe legal entity, Dominion Energy, Inc., one or more of its consolidated subsidiaries (other than Virginia Power and Dominion Energy Gas) or operating segments, or the entirety of Dominion Energy, Inc. and its consolidated subsidiaries
Dominion Energy Direct ®A dividend reinvestment and open enrollment direct stock purchase plan
Dominion Energy GasThe legal entity, Dominion Energy Gas Holdings, LLC, one or more of its consolidated subsidiaries or operating segment, or the entirety of Dominion Energy Gas Holdings, LLC and its consolidated subsidiaries
Dominion Energy Gas RestructuringThe acquisition of DCP and DMLPHCII from, and the disposition of East Ohio and DGP to, Dominion Energy by Dominion Energy Gas on November 6, 2019
Dominion Energy MidstreamThe legal entity, Dominion Energy Midstream Partners, LP, one or more of its consolidated subsidiaries, or the entirety of Dominion Energy Midstream Partners, LP and its consolidated subsidiaries
Dominion Energy QuestarThe legal entity, Dominion Energy Questar Corporation, one or more of its consolidated subsidiaries (other than Dominion Energy Gas, effective November 2019), or the entirety of Dominion Energy Questar Corporation and its consolidated subsidiaries
Dominion Energy Questar CombinationDominion Energy’s acquisition of Dominion Energy Questar completed on September 16, 2016 pursuant to the terms of the agreement and plan of merger entered on January 31, 2016
Dominion Energy Questar PipelineDominion Energy Questar Pipeline, LLC, one or more of its consolidated subsidiaries, or the entirety of Dominion Energy Questar Pipeline, LLC and its consolidated subsidiaries
Dominion Energy South CarolinaDominion Energy South Carolina operating segment
Dominion Energy VirginiaDominion Energy Virginia operating segment
DSMDemand-side management
DthDekatherm
DukeThe legal entity, Duke Energy Corporation, one or more of its consolidated subsidiaries, or the entirety of Duke Energy Corporation and its consolidated subsidiaries
Eagle SolarEagle Solar, LLC, a wholly-owned subsidiary of DGI
East OhioThe East Ohio Gas Company, doing business as Dominion Energy Ohio
Eastern Market Access ProjectProject to provide 150,000 Dths/day of transportation service to help meet demand for natural gas for Washington Gas Light Company, a local gas utility serving customers in D.C., Virginia and Maryland
Energy ChoiceProgram authorized by the Ohio Commission which provides energy customers with the ability to shop for energy options from a group of suppliers certified by the Ohio Commission
EPAU.S. Environmental Protection Agency
EPACTEnergy Policy Act of 2005
EPSEarnings per share
ERISAEmployee Retirement Income Security Act of 1974
ESA Excess Tax BenefitsEndangered Species Act Benefits of tax deductions in excess of the compensation cost recognized for stock-based compensation
Export CustomersST Cove Point, LLC, a joint venture of Sumitomo Corporation and Tokyo Gas Co., LTD., and GAIL Global (USA) LNG, LLC
FairlessFairless power station
FASBFinancial Accounting Standards Board
FERCFederal Energy Regulatory Commission
FILOTFee in lieu of taxes
FitchFitch Ratings Ltd.
Four BrothersFour Brothers Solar, LLC, a limited liability company owned by Dominion Energy and Four Brothers Holdings, LLC, a subsidiary of GIP effective August 2018
Fowler RidgeFowler I Holdings LLC, a wind-turbine facility joint venture with BP in Benton County, Indiana
FTRsFinancial transmission rights
GAAPU.S. generally accepted accounting principles
GalGallon
Gas DistributionGas Distribution operating segment
Gas Transmission & StorageGas Transmission & Storage operating segment
4
Abbreviation or AcronymDefinition
GENCOSouth Carolina Generating Company, Inc.
GHGGreenhouse gas
GIPThe legal entity, Global Infrastructure Partners, one or more of its consolidated subsidiaries (including, effective August 2018, Four Brothers Holdings, LLC, Granite Mountain Renewables, LLC and Iron Springs Renewables, LLC) or operating segments, or the entirety of Global Infrastructure Partners and its consolidated subsidiaries
Granite MountainGranite Mountain Holdings, LLC, a limited liability company owned by Dominion Energy and Granite Mountain Renewables, LLC, a subsidiary of GIP effective August 2018
Green MountainGreen Mountain Power Corporation
GreenHatGreenHat Energy, LLC
Greensville CountyA 1,588 MW combined-cycle, natural gas-fired power station in Greensville County, Virginia
GTSAVirginia Grid Transformation and Security Act of 2018
Heating degree daysUnits measuring the extent to which the average daily temperature is less than 65 degrees Fahrenheit, or 60 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 60 degrees, as applicable, and the average temperature for that day
HopeHope Gas, Inc., doing business as Dominion Energy West Virginia
Idaho CommissionIdaho Public Utilities Commission
IRCAIntercompany revolving credit agreement
Iron SpringsIron Springs Holdings, LLC, a limited liability company owned by Dominion Energy and Iron Springs Renewables, LLC, a subsidiary of GIP effective August 2018
IroquoisIroquois Gas Transmission System, L.P.
IRSInternal Revenue Service
ISOIndependent system operator
ISO-NEISO New England
July 2016 hybridsDominion Energy’s 2016 Series A Enhanced Junior Subordinated Notes due 2076
June 2006 hybridsDominion Energy’s 2006 Series A Enhanced Junior Subordinated Notes due 2066
KewauneeKewaunee nuclear power station
kVKilovolt
LIBORLondon Interbank Offered Rate
LIFOLast-in-first-out inventory method
Liquefaction FacilityA natural gas export/liquefaction facility at the Cove Point LNG Facility
LNGLiquefied natural gas
LTIPLong-term incentive program
ManchesterManchester power station
Massachusetts MunicipalMassachusetts Municipal Wholesale Electric Company
MATSUtility Mercury and Air Toxics Standard Rule
mcfThousand cubic feet
mcfeThousand cubic feet equivalent
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations
MGDMillion gallons a day
MillstoneMillstone nuclear power station
Millstone 2019 power purchase agreementsPower purchase agreements with Eversource Energy and The United Illuminating Company for Millstone to provide nine million MWh per year of electricity for ten years
Moody’sMoody’s Investors Service
MtpaMillion metric tons per annum
MWMegawatt
MWhMegawatt hour
Natural Gas Rate Stabilization ActLegislation effective February 2005 designed to improve and maintain natural gas service infrastructure to meet the needs of customers in South Carolina
NAVNet asset value
NedPowerNedPower Mount Storm LLC, a wind-turbine facility joint venture between Dominion Energy and Shell WindEnergy, Inc. in Grant County, West Virginia
NEILNuclear Electric Insurance Limited
NERCNorth American Electric Reliability Corporation
NGCollectively, North East Transmission Co., Inc. and National Grid IGTS Corp.
NGLNatural gas liquid
NJNRNJNR Pipeline Company
NND ProjectV.C. Summer Units 2 and 3 nuclear development project under which DESC and Santee Cooper undertook to construct two Westinghouse AP1000 Advanced Passive Safety Nuclear Units in Jenkinsville, South Carolina
North AnnaNorth Anna nuclear power station
North Carolina CommissionNorth Carolina Utilities Commission
NO XNitrogen oxide
NRCU.S. Nuclear Regulatory Commission
5
Abbreviation or AcronymDefinition
NRGThe legal entity, NRG Energy, Inc., one or more of its consolidated subsidiaries (including, effective November 2016 through August 2018, Four Brothers Holdings, LLC, Granite Mountain Renewables, LLC and Iron Springs Renewables, LLC) or operating segments, or the entirety of NRG Energy, Inc. and its consolidated subsidiaries
NSPSNew Source Performance Standards
NYSENew York Stock Exchange
October 2014 hybridsDominion Energy’s 2014 Series A Enhanced Junior Subordinated Notes due 2054
ODECOld Dominion Electric Cooperative
Ohio CommissionPublic Utilities Commission of Ohio
Order 1000Order issued by FERC adopting requirements for electric transmission planning, cost allocation and development
PHMSAPipeline and Hazardous Materials Safety Administration
PIRPipeline Infrastructure Replacement program deployed by East Ohio
PJMPJM Interconnection, L.L.C.
ppbParts-per-billion
PredecessorDominion Energy as the predecessor for accounting purposes for the period of Dominion Energy’s ownership of DCP and DMLPHCII until the completion of the Dominion Energy Gas Restructuring
PREPPipeline Replacement and Expansion Program, a program of replacing, upgrading and expanding natural gas utility infrastructure deployed by Hope
PSDPrevention of significant deterioration
PSNCPublic Service Company of North Carolina, Incorporated, doing business as Dominion Energy North Carolina
PURAConnecticut’s Public Utility Regulatory Authority
Questar GasQuestar Gas Company, doing business as Dominion Energy Utah, Dominion Energy Wyoming and Dominion Energy Idaho
RCCReplacement Capital Covenant
Regulation ActLegislation effective July 1, 2007, that amended the Virginia Electric Utility Restructuring Act and fuel factor statute, which legislation is also known as the Virginia Electric Utility Regulation Act, as amended in 2015 and 2018
RGGIRegional Greenhouse Gas Initiative
RICORacketeer Influenced and Corrupt Organizations Act
Rider BA rate adjustment clause associated with the recovery of costs related to the conversion of three of Virginia Power’s coal-fired power stations to biomass
Rider BWA rate adjustment clause associated with the recovery of costs related to Brunswick County
Rider EA rate adjustment clause associated with the recovery of costs related to certain capital projects at Virginia Power’s electric generating stations to comply with federal and state environmental laws and regulations
Rider GVA rate adjustment clause associated with the recovery of costs related to Greensville County
Rider RA rate adjustment clause associated with the recovery of costs related to Bear Garden
Rider SA rate adjustment clause associated with the recovery of costs related to the Virginia City Hybrid Energy Center
Rider T1A rate adjustment clause to recover the difference between revenues produced from transmission rates included in base rates, and the new total revenue requirement developed annually for the rate years effective September 1
Rider UA rate adjustment clause associated with the recovery of costs of new underground distribution facilities
Rider US-2A rate adjustment clause associated with the recovery of costs related to Woodland Solar, Scott Solar and Whitehouse Solar
Rider US-3A rate adjustment clause associated with the recovery of costs related to Colonial Trail West and Spring Grove 1
Rider US-4A rate adjustment clause associated with the recovery of costs related to Sadler Solar
Rider WA rate adjustment clause associated with the recovery of costs related to Warren County
Riders C1A, C2A and C3ARate adjustment clauses associated with the recovery of costs related to certain DSM programs approved in DSM cases
ROEReturn on equity
ROICReturn on invested capital
RSNRemarketable subordinated note
RTEPRegional transmission expansion plan
RTORegional transmission organization
Sadler SolarAn approximately 100 MW proposed utility-scale solar power station located in Greensville County, Virginia
SAFSTORA method of nuclear decommissioning, as defined by the NRC, in which a nuclear facility is placed and maintained in a condition that allows the facility to be safely stored and subsequently decontaminated to levels that permit release for unrestricted use
SAIDISystem Average Interruption Duration Index, metric used to measure electric service reliability
Santee CooperSouth Carolina Public Service Authority
SBL HoldcoSBL Holdco, LLC, a wholly-owned subsidiary of DGI
SCANAThe legal entity, SCANA Corporation, one or more of its consolidated subsidiaries, or the entirety of SCANA Corporation and its consolidated subsidiaries
6
Abbreviation or AcronymDefinition
SCANA CombinationDominion Energy’s acquisition of SCANA completed on January 1, 2019 pursuant to the terms of the agreement and plan of merger entered on January 2, 2018 between Dominion Energy and SCANA
SCANA Merger Approval OrderFinal order issued by the South Carolina Commission on December 21, 2018 setting forth its approval of the SCANA Combination
SCDHECSouth Carolina Department of Health and Environmental Control
SCDORSouth Carolina Department of Revenue
Scott SolarA 17 MW utility-scale solar power station in Powhatan County, Virginia
SECU.S. Securities and Exchange Commission
SEMISCANA Energy Marketing, Inc.
September 2006 hybridsDominion Energy’s 2006 Series B Enhanced Junior Subordinated Notes due 2066
SERCSoutheast Electric Reliability Council
Series A Preferred StockDominion Energy’s 1.75% Series A Cumulative Perpetual Convertible Preferred Stock, without par value, with a liquidation preference of $1,000 per share
Series B Preferred StockDominion Energy’s 4.65% Series B Fixed-Rate Reset Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share
SO 2Sulfur dioxide
South Carolina CommissionPublic Service Commission of South Carolina
SouthernThe legal entity, The Southern Company, one or more of its consolidated subsidiaries, or the entirety of The Southern Company and its consolidated subsidiaries
Spring Grove 1An approximately 98 MW proposed utility-scale solar power station located in Surry County, Virginia
Standard & Poor’sStandard & Poor’s Ratings Services, a division of the McGraw-Hill Companies, Inc.
SummerV.C. Summer nuclear power station
SunEdisonThe legal entity, SunEdison, Inc., one or more of its consolidated subsidiaries, or the entirety of SunEdison, Inc. and its consolidated subsidiaries
SurrySurry nuclear power station
Terra Nova Renewable PartnersA partnership comprised primarily of institutional investors advised by J.P. Morgan Asset Management—Global Real Assets
Three CedarsGranite Mountain and Iron Springs, collectively
TransCanadaThe legal entity, TransCanada Corporation, one or more of its consolidated subsidiaries or operating segments, or the entirety of TransCanada Corporation and its consolidated subsidiaries
TSRTotal shareholder return
Utah CommissionUtah Public Service Commission
VDEQVirginia Department of Environmental Quality
VEBAVoluntary Employees’ Beneficiary Association
VIEVariable interest entity
Virginia City Hybrid Energy CenterA 610 MW baseload carbon-capture compatible, clean coal powered electric generation facility in Wise County, Virginia
Virginia CommissionVirginia State Corporation Commission
Virginia PowerThe legal entity, Virginia Electric and Power Company, one or more of its consolidated subsidiaries or operating segment, or the entirety of Virginia Electric and Power Company and its consolidated subsidiaries
VOCVolatile organic compounds
Warren CountyA 1,350 MW combined-cycle, natural gas-fired power station in Warren County, Virginia
WECTECWECTEC Global Project Services, Inc. (formerly known as Stone & Webster, Inc.), a wholly-owned subsidiary of Westinghouse
West Virginia CommissionPublic Service Commission of West Virginia
WestinghouseWestinghouse Electric Company LLC
WexproThe legal entity, Wexpro Company, one or more of its consolidated subsidiaries, or the entirety of Wexpro Company and its consolidated subsidiaries
Wexpro AgreementAn agreement which sets forth the rights of Questar Gas to receive certain benefits from Wexpro’s operations, including cost-of-service gas
Wexpro II AgreementAn agreement with the states of Utah and Wyoming modeled after the Wexpro Agreement that allows for the addition of properties under the cost-of-service methodology for the benefit of Questar Gas customers
Whitehouse SolarA 20 MW utility-scale solar power station in Louisa County, Virginia
White River HubWhite River Hub, LLC
Woodland SolarA 19 MW utility-scale solar power station in Isle of Wight County, Virginia
WranglerWrangler Retail Gas Holdings, LLC, a partnership between Dominion Energy and Interstate Gas Supply Inc.
Wyoming CommissionWyoming Public Service Commission
7

Part I

Item 1. Business

General

Dominion Energy

, headquartered in Richmond, Virginia and incorporated in Virginia in 1983, is one of the nation’s largest producers and transporters of energy. Dominion Energy’s strategy is to be a leading sustainable provider of electricity, natural gas and related services to customers primarily in the eastern and Rocky Mountain regions of the U.S. As of December 31, 2019, Dominion Energy’s portfolio of assets includes approximately 30,700 MW of electric generating capacity, 10,400 miles of electric transmission lines, 85,000 miles of electric distribution lines, 14,600 miles of natural gas transmission, gathering and storage pipelines and 103,400 miles of gas distribution pipeline, exclusive of service lines. As of December 31, 2019, Dominion Energy serves more than 7 million utility and retail energy customers and operates one of the nation’s largest underground natural gas storage systems, with approximately 1 trillion cubic feet of storage capacity.

In January 2019, Dominion Energy completed the SCANA Combination in a

stock-for-stock

merger valued at $13.4 billion. SCANA, which operates as a wholly-owned subsidiary of Dominion Energy, is primarily engaged in the generation, transmission and distribution of electricity in the central, southern and southwestern portions of South Carolina and in the distribution of natural gas in North Carolina and South Carolina. DESC, a wholly-owned subsidiary of SCANA, is consolidated by Dominion Energy and remains an SEC registrant. However, its Form

10-K

is filed separately and is not combined herein.

Dominion Energy continues to focus on expanding and improving its regulated and long-term contracted electric and natural gas businesses while transitioning to a cleaner energy future. The $26 billion growth capital plan for 2019 through 2023 includes a focus on upgrading the electric system in Virginia through investments in additional renewable generation facilities, strategic undergrounding and energy conservation programs. Renewable generation facilities are expected to include investments in utility-scale solar and offshore wind projects. In addition, Dominion Energy is currently seeking, or intends to seek, license extensions for its regulated nuclear power stations in Virginia. Other drivers for the growth capital expenditure plan include agriculture-waste-to-energy initiatives, the replacement of gas distribution pipeline, the construction of infrastructure to handle the increase in natural gas production from the Marcellus and Utica Shale formations, including investing in Atlantic Coast Pipeline which is focused on constructing an approximately

600-mile

natural gas pipeline running from West Virginia through Virginia to North Carolina, to increase natural gas supplies in the region. Dominion Energy also plans to continue upgrading its gas and electric transmission and distribution networks while also meeting environmental requirements and standards set by various regulatory bodies.

Over the past decade, Dominion Energy has transitioned to a more regulated, less volatile earnings mix as evidenced by its capital investments in regulated infrastructure, including the SCANA Combination and Dominion Energy Questar Combination, and in infrastructure with output sold under long-term purchase agreements, as well as the divestiture of interests in certain merchant generating facilities and natural gas gathering and processing investments. Dominion Energy expects approximately 95% of

earnings from its primary operating segments to come from regulated and long-term contracted businesses. Dominion Energy’s nonregulated operations include merchant generation and natural gas retail energy marketing operations. Dominion Energy’s operations are conducted through various subsidiaries, including Virginia Power and Dominion Energy Gas.

Virginia Power

, headquartered in Richmond, Virginia and incorporated in Virginia in 1909 as a Virginia public service corporation, is a wholly-owned subsidiary of Dominion Energy and a regulated public utility that generates, transmits and distributes electricity for sale in Virginia and North Carolina. In Virginia, Virginia Power conducts business under the name “Dominion Energy Virginia” and primarily serves retail customers. In North Carolina, it conducts business under the name “Dominion Energy North Carolina” and serves retail customers located in the northeastern region of the state, excluding certain municipalities. In addition, Virginia Power sells and transmits electricity at wholesale prices to rural electric cooperatives, municipalities and into wholesale electricity markets. All of Virginia Power’s stock is owned by Dominion Energy.

Dominion Energy Gas,

a limited liability company formed in September 2013,

is a wholly-owned subsidiary of Dominion Energy and a holding company. Following the Dominion Energy Gas Restructuring, Dominion Energy Gas serves as the intermediate parent company for Dominion Energy’s FERC-regulated interstate natural gas transmission pipeline and underground storage systems in the eastern and Rocky Mountain regions of the U.S., as well as for the Cove Point LNG Facility. Dominion Energy Gas’ principal operating subsidiaries include DETI, DECG, Dominion Energy Questar Pipeline and a controlling 75% interest in Cove Point. In addition, Dominion Energy Gas holds a 50% noncontrolling partnership interest in Iroquois, a FERC-regulated interstate natural gas pipeline. All of Dominion Energy Gas’ membership interests are owned by Dominion Energy.

Amounts and information disclosed for Dominion Energy are inclusive of Virginia Power and/or Dominion Energy Gas, where applicable.

Employees

At December 31, 2019, Dominion Energy had approximately 19,100 full-time employees, of which approximately 5,400 are subject to collective bargaining agreements, including approximately 6,000 full-time employees at Virginia Power, of which approximately 2,500 are subject to collective bargaining agreements and approximately 1,400 full-time employees at Dominion Energy Gas, of which approximately 700 are subject to collective bargaining agreements.

Where You Can Find More Information About The Companies

The Companies file their annual, quarterly and current reports, proxy statements and other information with the SEC. Their SEC filings are available to the public over the Internet at the SEC’s website at http://www.sec.gov.

The Companies make their SEC filings available, free of charge, including the annual report on Form

10-K,

quarterly

8

reports on Form

10-Q,

current reports on Form

8-K

and any amendments to those reports, through Dominion Energy’s website, http://www.dominionenergy.com, as soon as reasonably practicable after filing or furnishing the material to the SEC. Information contained on Dominion Energy’s website, including but not limited to reports mentioned in

Environmental Strategy

, is not incorporated by reference in this report.

Acquisitions and Dispositions

The following are significant acquisitions and divestitures by the Companies during the last five years.

Pending Acquisition of Interest in Atlantic Coast Pipeline and Pivotal LNG, Inc.

In February 2020, Dominion Energy entered into agreements with Southern to acquire its 5% membership interest in Atlantic Coast Pipeline and its 100% ownership interest in Pivotal LNG, Inc., for approximately $175 million in aggregate, plus certain purchase price adjustments. See Note 9 to the Consolidated Financial Statements for additional information.

Acquisition of SCANA

In January 2019, Dominion Energy and SCANA completed a

stock-for-stock

merger valued at $13.4 billion, inclusive of SCANA’s outstanding debt, which totaled $6.9 billion at closing. SCANA operates as a wholly-owned subsidiary of Dominion Energy. See Note 3 to the Consolidated Financial Statement

Showing the first 8K of 135K characters. Open the full section

Item 1A. Risk Factors

The Companies’ businesses are influenced by many factors that are difficult to predict, involve uncertainties that may materially affect actual results and are often beyond their control. A number of these factors have been identified below. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement or projection contained in this report, see

Forward-Looking Statements

in Item 7. MD&A.

Regulatory, Legislative and Legal Risks

The rates of the Companies’ electric transmission, distribution and generation operations and gas transmission, storage and distribution operations are subject to regulatory review.

Revenue provided by the Companies’ electric transmission, distribution and generation operations and by gas transmission and distribution operations is based primarily on rates approved by state and federal regulatory agencies. The profitability of the Companies’ businesses is dependent on their ability, through the rates that they are permitted to charge, to recover costs and earn a reasonable rate of return on their capital investment.

At the federal level, Dominion Energy and Virginia Power’s wholesale rates for electric transmission service and various rates and charges assessed by Dominion Energy and Dominion Energy Gas’ natural gas transmission and storage businesses are regulated by FERC. Rates for electric transmission services are updated annually according to a FERC-approved formula rate mechanism, and may be subject to additional prospective adjustments and retroactive corrections. Rates for gas transmission and storage services are adjusted in rate cases periodically and must reflect recovery of costs plus a reasonable return on investment, in accordance with cost of service ratemaking. A failure by the Companies to support these rates could result in rate decreases from current rate levels, which could adversely affect the Companies’ results of operations, cash flows and financial condition.

At the state level, Virginia Power’s retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia Commission in a proceeding that involves the determination of Virginia Power’s actual earned ROE during a historic test period, and the determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances described in the Regulation Act, Virginia Power may be required to refund a portion of its earnings to customers through a refund process and to reduce its rates.

In states other than Virginia, Dominion Energy and Virginia Power’s retail electric base rates for generation and distribution services to customers are regulated on a

cost-of-service/

rate-of-return

basis subject to the statutes, rules and procedures of such states. Dominion Energy’s rates for gas distribution to retail customers are similarly regulated at the state level. If retail electric or gas earnings exceed the returns established by state utility commissions, retail electric rates or gas rates may be subject to review and possible reduction, which may decrease the Companies’ future earnings. Additionally, if any state utility commission

28

does not allow recovery through base rates, on a timely basis, of costs incurred in providing service, the Company’s future earnings could be negatively impacted.

Under certain circumstances, state utility regulators may impose a moratorium on increases to retail base rates for a specified period of time, which could delay recovery of costs incurred in providing service. Additionally, governmental officials, stakeholders and advocacy groups may challenge any of these regulatory reviews. Such challenges may lengthen the time, complexity and costs associated with such regulatory reviews.

Through the SCANA Combination, Dominion Energy acquired SCANA and DESC which are subject to numerous legal proceedings and ongoing governmental investigations and examinations.

SCANA and DESC are defendants in numerous federal and state legal proceedings and governmental investigations relating to the decision to abandon construction at the NND Project. Among other things, the lawsuits and investigations allege misrepresentation, failure to properly manage the NND Project, unfair trade practices and violation of anti-trust laws. Additionally, pursuant to the SCANA Merger Agreement and applicable indemnification agreements, SCANA is indemnifying former directors and officers of SCANA and DESC who are defendants in federal and state legal proceedings relating to the decision to abandon construction at the NND Project and the subsequent SCANA Combination. Among other things, the lawsuits allege breaches of various fiduciary duties.

The outcome of these legal proceedings, investigations and examinations, including settlements, is uncertain and may adversely affect Dominion Energy’s financial condition or results of operation.

Dominion Energy and Virginia Power’s generation business may be negatively affected by possible FERC actions that could change market design in the wholesale markets or affect pricing rules or revenue calculations in the RTO markets.

Dominion Energy and Virginia Power’s generation stations operating in RTO markets sell capacity, energy and ancillary services into wholesale electricity markets regulated by FERC. The wholesale markets allow these generation stations to take advantage of market price opportunities, but also expose them to market risk. Properly functioning competitive wholesale markets depend upon FERC’s continuation of clearly identified market rules. From time to time FERC may investigate and authorize RTOs to make changes in market design. FERC also periodically reviews Dominion Energy’s authority to sell at market-based rates. Material changes by FERC to the design of the wholesale markets or its interpretation of market rules, Dominion Energy or Virginia Power’s authority to sell power at market-based rates, or changes to pricing rules or rules involving revenue calculations, could adversely impact the future results of Dominion Energy or Virginia Power’s generation business. For example, in December 2019, FERC issued an order on PJM’s Minimum Offer Price Rule proposals finding the PJM tariff unjust and unreasonable and directed PJM to expand the Minimum Offer Price Rule to all existing and new generation resources benefitting from a state subsidy to address the effects of state subsidies on new and existing resources on the PJM capacity market. The expanded Minimum Offer Price Rule will set a floor price on new and existing state subsidized resources that do not seek a FERC exemption, increasing their risk of failing to clear the capacity auction and

not obtaining a capacity payment and obligation. In addition, there have been changes to the interpretation and application of FERC’s market manipulation rules. A failure to comply with these rules could lead to civil and criminal penalties.

The Companies are subject to complex governmental regulation, including tax regulation, that could adversely affect

their results of operations and subject the Companies to monetary penalties.

The Companies’ operations are subject to extensive federal, state and local regulation and require numerous permits, approvals and certificates from various governmental agencies. Such laws and regulations govern the terms and conditions of the services we offer, our relationships with affiliates, protection of our critical electric infrastructure assets and pipeline safety, among other matters. These operations are also subject to legislation governing taxation at the federal, state and local level. They must also comply with environmental legislation and associated regulations. Management believes that the necessary approvals have been obtained for existing operations and that the businesses are conducted in accordance with applicable laws. The Companies’ businesses are subject to regulatory regimes which could result in substantial monetary penalties if any of the Companies is found not to be in compliance, including mandatory reliability standards and interaction in the wholesale markets. New laws or regulations, the revision or reinterpretation of existing laws or regulations, changes in enforcement practices of regulators, or penalties imposed for

non-compliance

with existing laws or regulations may result in substantial additional expense. Recent legislative and regulatory changes that are impacting the Companies include the 2017 Tax Reform Act and tariffs imposed on imported solar panels by the U.S. government in 2018.

The 2017 Tax Reform Act could have a material impact on the Companies’ operations, cash flows, and financial results.

Excess accumulated deferred income taxes due to the reduction in the corporate income tax rates to 21% under the provisions of the 2017 Tax Reform Act have been recognized as regulatory liabilities and are expected to be shared with customers, generally through reductions in future rates or in the form of credits to customer bills. The 2017 Tax Reform Act includes provisions that stipulate how these excess deferred taxes may be passed back to customers for certain accelerated tax depreciation benefits. Potential reductions in future rates attributable to other,

non-plant

related excess deferred taxes may be determined by our regulators. The amount and timing of these reductions could be material to the Companies’ results of operations, cash flows and/or financial condition.

Additionally, the 2017 Tax Reform Act contains provisions that limit the interest deduction on business interest to (1) business interest income, plus (2) 30 percent of the taxpayer’s adjusted taxable income. Business interest and business interest income are defined as that allocable to a trade or business and not investment interest and income. Dominion Energy is a consolidated group with both regulated and nonregulated lines of businesses. In November 2018, the U.S. Department of Treasury issued proposed regulations defining interest as any amounts associated with the time value of money or use of funds. These proposed regulations provide guidance for purposes of the exception to the interest limitation for regulated public utilities, the application of the interest limitation to consolidated groups, such as Dominion Energy, and the interest limitation with respect

29

to partnerships and partners in those partnerships. It is unclear when that guidance may be finalized, or whether that guidance could result in a disallowance of a portion of our interest deductions in the future.

Environmental Risks

The Companies’ operations and construction activities are subject to a number of environmental laws and regulations which impose significant compliance costs on the Companies.

The Companies’ operations and construction activities are subject to extensive federal, state and local environmental statutes, rules and regulations relating to air quality, water quality, waste management, natural resources, and health and safety. Compliance with these legal requirements requires the Companies to commit significant capital toward permitting, emission fees, environmental monitoring, installation and operation of environmental control equipment and purchase of allowances and/or offsets. Additionally, the Companies could be responsible for expenses relating to remediation and containment obligations, including at sites where they have been identified by a regulatory agency as a potentially responsible party. Expenditures relating to environmental compliance have been significant in the past, and the Companies expect that they will remain significant in the future. Certain facilities have become uneconomical to operate and have been shut down, converted to new fuel types or sold. These types of events could occur again in the future.

We expect that existing environmental laws and regulations may be revised and/or new laws may be adopted including regulation of GHG emissions which could have an impact on the Companies’ business (risks relating to regulation of GHG emissions from existing fossil fuel-fired electric generating units are discussed in more detail below). In addition, further regulation of air quality and GHG emissions under the CAA have been imposed on the natural gas sector, including rules to limit methane leakage. The Companies are also subject to federal water and waste regulations, including regulations concerning cooling water intake structures, coal combustion

by-product

handling and disposal practices, wastewater discharges from steam electric generating stations, management and disposal of hydraulic fracturing fluids and the potential further regulation of polychlorinated biphenyls.

Compliance costs cannot be estimated with certainty due to the inability to predict the requirements and timing of implementation of any new environmental rules or regulations. Other factors which affect the ability to predict future environmental expenditures with certainty include the difficulty in estimating

clean-up

costs and quantifying liabilities under environmental laws that impose joint and several liabilities on all responsible parties. However, such expenditures, if material, could make the Companies’ facilities uneconomical to operate, result in the impairment of assets, or otherwise adversely affect the Companies’ results of operations, financial performance or liquidity.

Any additional federal and/or state requirements imposed on energy companies mandating limitations on GHG emissions or requiring efficiency improvements may result in compliance costs that alone or in combination could make some of the Companies’ electric generation units or natural gas facilities uneconomical to maintain or operate.

The ACE Rule, which became effective in September 2019, is targeted at reducing CO

emissions from existing coal-fired power plants. The ACE

Rule requires states to develop plans by July 2022 to implement CO

performance standards. State plans must be approved by the EPA by January 2024. States are also contemplating regulations regarding GHG emissions. For example, the Virginia General Assembly is considering legislation which would authorize Virginia to directly join the RGGI program as a full participant. Compliance with the ACE Rule or other federal or state carbon regulations, such as the RGGI program, is expected to require increasing the energy efficiency of equipment at facilities, committing significant capital toward carbon reduction programs, purchase of allowances and/or emission offset credits, fuel switching, and/or retirement of high-emitting generation facilities and potential replacement with lower-emitting generation facilities. Given these developments and uncertainties, Dominion Energy and Virginia Power cannot estimate the aggregate effect of such requirements on their results of operations, financial condition or their customers. However, such expenditures, if material, could make Dominion Energy and Virginia Power’s generation facilities uneconomical to operate, result in the impairment of assets, or otherwise adversely affect Dominion Energy or Virginia Power’s results of operations, financial performance or liquidity.

There are also potential impacts on Dominion Energy and Dominion Energy Gas’ natural gas businesses as federal or state GHG regulations may require GHG emission reductions from the natural gas sector which, in addition to resulting in increased costs, could affect demand for natural gas. Additionally, GHG requirements could result in increased demand for energy conservation and renewable products, which could impact the natural gas businesses.

Dominion Energy and Virginia Power are subject to risks associated with the disposal and storage of coal ash.

Dominion Energy and Virginia Power historically produced and continue to produce coal ash, or CCRs, as a

by-product

of their coal-fired generation operations. The ash is stored and managed in impoundments (ash ponds) and landfills located at 11 different facilities, eight of which are at Virginia Power.

The EPA has issued regulations concerning the management and storage of CCRs, which Virginia has adopted. These CCR regulations require Dominion Energy and Virginia Power to make additional capital expenditures and increase operating and maintenance expenses. In addition, Dominion Energy and Virginia Power will incur expenses and other costs associated with closing, corrective action and ongoing monitoring of certain ash ponds. Dominion Energy and Virginia Power also may face litigation concerning their coal ash facilities.

Further, while Dominion Energy and Virginia Power operate their ash ponds and landfills in compliance with applicable state safety regulations, a release of coal ash with a significant environmental impact, such as the Dan River ash basin release by a neighboring utility, could result in remediation costs, civil and/or criminal penalties, claims, litigation, increased regulation and compliance costs, and reputational damage, and could impact the financial condition of Dominion Energy and/or Virginia Power.

Construction Risks

The Companies’ infrastructure build and expansion plans often require regulatory approval, including environmental permits, before commencing construction and completing projects. The

30

Companies may not complete facility construction, pipeline, conversion or other infrastructure projects that they commence, or they may complete projects on materially different terms, costs or timing than initially estimated or anticipated, and they may not be able to achieve the intended benefits of any such

project, if completed.

Several facility construction, pipeline, electric transmission line, expansion, conversion and other infrastructure projects have been announced and additional projects may be considered in the future. The Companies compete for projects with companies of varying size and financial capabilities, including some that may have competitive advantages. Commencing construction on announced and future projects may require approvals from applicable state and federal agencies, and such approvals could include mitigation costs which may be material to the Companies. Projects may not be able to be completed on time or in accordance with our estimated costs as a result of weather conditions, delays in obtaining or failure to obtain regulatory approvals, delays in obtaining key materials, labor difficulties, difficulties with partners or potential partners, a decline in the credit strength of counterparties or vendors, or other factors beyond the Companies’ control. For example, Atlantic Coast Pipeline has experienced certain delays in obtaining and maintaining permits necessary for construction along with construction delays due to judicial actions which has impacted the cost and schedule for the Atlantic Coast Pipeline Project. Even if facility construction, pipeline, expansion, electric transmission line, conversion and other infrastructure projects are completed, the total costs of the projects may be higher than anticipated and the performance of the business of the Companies following completion of the projects may not meet expectations.

Start-up

and operational issues can arise in connection with the commencement of commercial operations at our facilities. Such issues may include failure to meet specific operating parameters, which may require adjustments to meet or amend these operating parameters. Additionally, the Companies may not be able to timely and effectively integrate the projects into their operations and such integration may result in unforeseen operating difficulties or unanticipated costs. Further, regulators may disallow recovery of some of the costs of a project if they are deemed not to be prudently incurred. Any of these or other factors could adversely affect the Companies’ ability to realize the anticipated benefits from the facility construction, pipeline, electric transmission line, expansion, conversion and other infrastructure projects.

The development, construction and commissioning of several large-scale infrastructure projects simultaneously involves significant execution risk.

The Companies are currently simultaneously developing, constructing or commissioning several major projects, including the Atlantic Coast Pipeline Project, the Supply Header project and the Coastal Virginia Offshore Wind project. Several of the Companies’ key projects are increasingly large-scale, complex and being constructed in constrained geographic areas or in difficult terrain, for example, the Atlantic Coast Pipeline Project. The advancement of the Companies’ ventures is also affected by the interventions, litigation or other activities of stakeholder and advocacy groups, some of which oppose natural

gas-related

and energy infrastructure projects. For example, certain landowners and stakeholder groups oppose the Atlantic Coast Pipeline Project, which could impede construction activities or the

acquisition of

rights-of-way

and other land rights on a timely basis or on acceptable terms. Given that these projects provide the foundation for the Companies’ strategic growth plan, if the Companies are unable to obtain or maintain the required approvals, develop the necessary technical expertise, allocate and coordinate sufficient resources, adhere to budgets and timelines, effectively handle public outreach efforts, or otherwise fail to successfully execute the projects, there could be an adverse impact to the Companies’ financial position, results of operations and cash flows. Failure to comply with regulatory approval conditions or an adverse ruling in any future litigation could adversely affect the Companies’ ability to execute their business plan.

The Companies are dependent on their contractors for the successful and timely completion of large-scale infrastructure projects. The construction of such projects is expected to take several years, is typically confined within a limited geographic area or difficult terrain and could be subject to delays, cost overruns, labor disputes and other factors that could cause the total cost of the project to exceed the anticipated amount and adversely affect the Companies’ financial performance and/or impair the Companies’ ability to execute the business plan for the project as scheduled.

Further, an inability to obtain financing or otherwise provide liquidity for the projects on acceptable terms could negatively affect the Companies’ financial condition, cash flows, the projects’ anticipated financial results and/or impair the Companies’ ability to execute the business plan for the projects as scheduled.

Operational Risks

The Companies’ financial performance and condition can be affected by changes in the weather, including the effects of global climate change.

Fluctuations in weather can affect demand for the Companies’ services. For example, milder than normal weather can reduce demand for electricity and gas transmission and distribution services. In addition, severe weather, including hurricanes, winter storms, earthquakes, floods and other natural disasters can stress systems, disrupt operation of the Companies’ facilities and cause service outages, production delays and property damage that require incurring additional expenses. Changes in weather conditions can result in reduced water levels or changes in water temperatures that could adversely affect operations at some of the Companies’ power stations. Furthermore, the Companies’ operations could be adversely affected and their physical plant placed at greater risk of damage should changes in global climate produce, among other possible conditions, unusual variations in temperature and weather patterns, resulting in more intense, frequent and extreme weather events, abnormal levels of precipitation and, for operations located on or near coastlines, a change in sea level or sea temperatures. Due to the location of Dominion Energy and Virginia Power’s electric utility service territories and a number of its other facilities in the eastern portions of the states of South Carolina, North Carolina and Virginia which are frequently in the path of hurricanes, we experience the consequences of these weather events to a greater degree than many of our industry peers.

The Companies’ operations are subject to operational hazards, equipment failures, supply chain disruptions and personnel issues which could negatively affect the Companies.

Operation of the Companies’ facilities involves risk, including the risk of potential breakdown or failure of equipment or processes due to

31

aging infrastructure, fuel supply, pipeline integrity or transportation disruptions, accidents, labor disputes or work stoppages by employees, acts of terrorism or sabotage, construction delays or cost overruns, shortages of or delays in obtaining equipment, material and labor, operational restrictions resulting from environmental limitations and governmental interventions, changes to the environment and performance below expected levels. The Companies’ businesses are dependent upon sophisticated information technology systems and network infrastructure, the failure of which could prevent them from accomplishing critical business functions. Because the Companies’ transmission facilities, pipelines and other facilities are interconnected with those of third parties, the operation of their facilities and pipelines could be adversely affected by unexpected or uncontrollable events occurring on the systems of such third parties.

Operation of the Companies’ facilities below expected capacity levels could result in lost revenues and increased expenses, including higher maintenance costs. Unplanned outages of the Companies’ facilities and extensions of scheduled outages due to mechanical failures or other problems occur from time to time and are an inherent risk of the Companies’ business. Unplanned outages typically increase the Companies’ operation and maintenance expenses and may reduce their revenues as a result of selling less output or may require the Companies to incur significant costs as a result of operating higher cost units or obtaining replacement output from third parties in the open market to satisfy forward energy and capacity or other contractual obligations. Moreover, if the Companies are unable to perform their contractual obligations, penalties or liability for damages could result.

In addition, there are many risks associated with the Companies’ operations and the transportation, storage and processing of natural gas and NGLs, including nuclear accidents, fires, explosions, uncontrolled release of natural gas and other environmental hazards, pole strikes, electric contact cases, the collision of third party equipment with pipelines and avian and other wildlife impacts. Such incidents could result in loss of human life or injuries among employees, customers or the public in general, environmental pollution, damage or destruction of facilities or business interruptions and associated public or employee safety impacts, loss of revenues, increased liabilities, heightened regulatory scrutiny and reputational risk. Further, the location of pipelines and storage facilities, or generation, transmission, substations and distribution facilities near populated areas, including residential areas, commercial business centers and industrial sites, could increase the level of damages resulting from these risks.

Dominion Energy and Dominion Energy Gas conduct certain operations through partnership arrangements involving third-party investors that may limit our operational flexibility.

Certain operations are conducted through partnership arrangements, such as Atlantic Coast Pipeline and Iroquois, to which Dominion Energy and Dominion Energy Gas have significant influence but do not control the operations of such entities. Accordingly, Dominion Energy and Dominion Energy Gas may have limited ability to influence, as they do not control, certain day to day activities affecting the operations and do not have unilateral control over decisions that may have a material financial impact on the partnership participants. Dominion Energy and Dominion Energy Gas also conduct

certain operations through entities, such as Cove Point and the owners of certain contracted generation solar facilities, to which Dominion Energy and Dominion Energy Gas maintain a controlling interest, but third-party investors hold certain protective rights. These rights may impact the ability of Dominion Energy and Dominion Energy Gas to make certain decisions, such as the retention or distribution of available cash, significant acquisitions or dispositions of assets or the ability to sell or transfer their ownership interests. In each case such partnership arrangements operate in accordance with their respective governance documents, and Dominion Energy and Dominion Energy Gas are dependent upon third parties satisfying their respective obligations, including, as applicable, funding of their required share of capital expenditures. Such third-party investors have their own interests and objectives which may differ from those of Dominion Energy and Dominion Energy Gas and, accordingly, disputes may arise amongst the owners of such partnership arrangements that may result in delays, litigation or operational impasses.

The Companies’ financial results can be adversely affected by various factors driving supply and demand for electricity and gas and related services.

Technological advances required by federal laws mandate new levels of energy efficiency in

end-use

devices, including lighting, furnaces and electric heat pumps and could lead to declines in per capita energy consumption. Additionally, certain regulatory and legislative bodies have introduced or are considering requirements and/or incentives to reduce energy consumption by a fixed date. Further, Virginia Power’s business model is premised upon the cost efficiency of the production, transmission and distribution of large-scale centralized utility generation. However, advances in distributed generation technologies, such as solar cells, gas microturbines, battery storage and fuel cells, may make these alternative generation methods competitive with large-scale utility generation, and change how customers acquire or use our services. Virginia Power has an exclusive franchise to serve retail electric customers in Virginia. However, Virginia’s Retail Access Statutes allow certain electric generation customers exceptions to this franchise. As market conditions change, Virginia Power’s customers may further pursue exceptions and Virginia Power’s exclusive franchise may erode.

Reduced energy demand or significantly slowed growth in demand due to customer adoption of energy efficient technology, conservation, distributed generation, regional economic conditions, or the impact of additional compliance obligations, unless substantially offset through regulatory cost allocations, could adversely impact the value of the Companies’ business activities.

The Companies may be materially adversely affected by negative publicity.

From time to time, political and public sentiment in connection with significant transactions and infrastructure projects, such as the Atlantic Coast Pipeline, the SCANA Merger and the abandonment of the NND Project, may result in a significant amount of adverse press coverage and other adverse public statements affecting the Companies. Additionally, any failure by the Companies to realize voluntary targets set with respect to the reduction of GHG emissions or other long-term goals could lead to adverse press coverage and other adverse public statements affecting the Companies. Adverse press coverage and other adverse statements, whether or not driven by political or public sentiment, may also result in investigations by regulators, legislators and law enforcement officials or in legal claims.

32

Addressing any adverse publicity, governmental scrutiny or enforcement or other legal proceedings is time consuming and expensive and, regardless of the factual basis for the assertions being made, can have a negative impact on the reputation of the Companies, on the morale and performance of their employees and on their relationships with their respective regulators, customers and commercial counterparties. It may also have a negative impact on the Companies’ ability to take timely advantage of various business and market opportunities. The direct and indirect effects of negative publicity, and the demands of responding to and addressing it, may have a material adverse effect on the Companies’ business, financial condition and results of operations.

Dominion Energy’s merchant generation business operates in a challenging market, which could adversely affect its results of operations and future growth.

The success of Dominion Energy’s contracted generation business depends upon favorable market conditions including the ability to sell power at prices sufficient to cover its operating costs. Dominion Energy operates in active wholesale markets that expose it to price volatility for electricity and nuclear fuel as well as the credit risk of counterparties. Dominion Energy attempts to manage its price risk by entering into long-term power purchase agreements with customers as well as hedging transactions, including short-term and long-term fixed price sales and purchase contracts.

In these wholesale markets, the spot market price of electricity for each hour is generally determined by the cost of supplying the next unit of electricity to the market during that hour. In many cases, the next unit of electricity supplied would be provided by generating stations that consume fossil fuels, primarily natural gas. Consequently, the open market wholesale price for electricity generally reflects the cost of natural gas plus the cost to convert the fuel to electricity. Therefore, changes in the price of natural gas generally affect the open market wholesale price of electricity. To the extent Dominion Energy does not enter into long-term power purchase agreements or otherwise effectively hedge its output, these changes in market prices could adversely affect its financial results.

Dominion Energy purchases nuclear fuel primarily under long-term contracts. Dominion Energy is exposed to nuclear fuel cost volatility for the portion of its nuclear fuel obtained through short-term contracts or on the spot market, including as a result of market supply shortages. Nuclear fuel prices can be volatile and the price that can be obtained for power produced may not change at the same rate as nuclear fuel costs, thus adversely impacting Dominion Energy’s financial results. In addition, in the event that any of the contracted generation facilities experience a forced outage, Dominion Energy may not receive the level of revenue it anticipated.

Dominion Energy and Dominion Energy Gas may not be able to maintain, renew or replace their existing portfolio of customer contracts successfully, or on favorable terms.

Upon contract expiration, customers may not elect to

re-contract

with Dominion Energy and Dominion Energy Gas as a result of a variety of factors, including the amount of competition in the industry, changes in the price of electricity or natural gas, their level of satisfaction with Dominion Energy and Dominion Energy Gas’ services, the extent to which Dominion Energy and Dominion Energy Gas are able to successfully execute their business plans and the effect of the regulatory framework on customer demand. The failure to replace any such customer contracts on

similar terms or with counterparties with similar credit profiles could result in a loss of revenue for Dominion Energy and Dominion Energy Gas and related decreases in their earnings and cash flows.

Certain of Dominion Energy and Dominion Energy Gas’ gas pipeline services are subject to long-term, fixed-price “negotiated rate” contracts that are not subject to adjustment, even if the cost to perform such services exceeds the revenues received from such contracts.

Under FERC policy, a regulated service provider and a customer may mutually agree to sign a contract for service at a “negotiated rate” which may be above or below the FERC regulated, cost-based recourse rate for that service. These “negotiated rate” contracts are not generally subject to adjustment for increased costs which could be produced by inflation or other factors relating to the specific facilities being used to perform the services. Any shortfall of revenue as a result of these “negotiated rate” contracts could decrease Dominion Energy and Dominion Energy Gas’ earnings and cash flows.

Hostile cyber intrusions could severely impair the Companies’ operations, lead to the disclosure of confidential information, damage the reputation of the Companies and otherwise have an adverse effect on the Companies’ business.

The Companies own assets deemed as critical infrastructure, the operation of which is dependent on information technology systems. Further, the computer systems that run the Companies’ facilities are not completely isolated from external networks. There appears to be an increasing level of activity, sophistication and maturity of threat actors, in particular nation state actors, that wish to disrupt the U.S. bulk power system and the U.S. gas transmission or distribution system. Such parties could view the Companies’ computer systems, software or networks as attractive targets for cyber attack. For example, malware has been designed to target software that runs the nation’s critical infrastructure such as power transmission grids and gas pipelines. In addition, the Companies’ businesses require that they and their vendors collect and maintain sensitive customer data, as well as confidential employee and shareholder information, which is subject to electronic theft or loss.

A successful cyber attack on the systems that control the Companies’ electric generation, electric or gas transmission or distribution assets could severely disrupt business operations, preventing the Companies from serving customers or collecting revenues. The breach of certain business systems could affect the Companies’ ability to correctly record, process and report financial information. A major cyber incident could result in significant expenses to investigate and repair security breaches or system damage and could lead to litigation, fines, other remedial action, heightened regulatory scrutiny and damage to the Companies’ reputation. In addition, the misappropriation, corruption or loss of personally identifiable information and other confidential data at the Companies or one of their vendors could lead to significant breach notification expenses and mitigation expenses such as credit monitoring. If a significant breach were to occur, the reputation of the Companies also could be adversely affected. While the Companies maintain property and casualty insurance, along with other contractual provisions, that may cover certain damage caused by potential cyber incidents, all damage and claims arising from such incidents may not be covered or may exceed the amount of any insurance available. For these reasons, a significant cyber incident could materially and adversely affect the Companies’ business, financial condition and results of operations.

33

War, acts and threats of terrorism, intentional acts and other significant events could adversely affect the Companies’ operations.

The Companies cannot predict the impact that any future terrorist attacks or retaliatory military or other action may have on the energy industry in general or on the Companies’ businesses in particular. Any such future attacks or retaliatory action may adversely affect the Companies’ operations in a variety of ways, including by disrupting the power, fuel and other markets in which the Companies operate or requiring the implementation of additional, more costly security guidelines and measures. The Companies’ infrastructure facilities, including nuclear facilities and projects under construction, could be direct targets or indirect casualties of an act of terror or other physical attack. Any physical compromise of the Companies’ facilities could adversely affect the Companies’ ability to generate, purchase, transmit or distribute electricity, store, transmit or distribute natural gas, store or export LNG or otherwise operate their respective facilities in the most efficient manner or at all. In addition, the amount and scope of insurance coverage maintained against losses resulting from any such attack may not be sufficient to cover such losses or otherwise adequately compensate for any business disruptions that could result.

Instability in financial markets as a result of terrorism, war, intentional acts, pandemic, credit crises, recession or other factors could result in a significant decline in the U.S. economy and/or increase the cost or limit the availability of insurance or adversely impact the Companies’ ability to access capital on acceptable terms.

Failure to attract and retain key executive officers and an appropriately qualified workforce could have an adverse effect on the Companies’ operations.

The Companies’ business strategy is dependent on their ability to recruit, retain and motivate employees. The Companies’ key executive officers are the CEO, CFO,

Co-COOs

and presidents and those responsible for financial, operational, legal, regulatory and accounting functions. Competition for skilled management employees in these areas of the Companies’ business operations is high. Certain events, such as an aging workforce, mismatch of skill set, or unavailability of contract resources may lead to operating challenges and increased costs. The challenges include lack of resources, loss of knowledge base and the length of time required for skill development. In this case, costs, including costs for contractors to replace employees, productivity costs and safety costs, may rise. Failure to hire and adequately train replacement employees, including the transfer of significant internal historical knowledge and expertise to new employees, or future availability and cost of contract labor may adversely affect the ability to manage and operate the Companies’ business. In addition, certain specialized knowledge is required of the Companies’ technical employees for construction and operation of transmission, generation and distribution assets. The Companies’ inability to attract and retain these employees could adversely affect their business and future operating results.

Dominion Energy may be unable to successfully integrate SCANA’s businesses. Dominion Energy is devoting significant resources to integrating SCANA’s businesses.

While Dominion Energy has assumed that a certain level of transaction and integration expenses will be incurred, there are a number of factors beyond its control that could affect the total amount or the timing of its integration expenses. Potential complexities associated with integrating SCANA, including its utility businesses, while at the same time continuing to provide consistent, high quality services

and with integrating a company with different markets and customers could arise. Due to the complexities involved in integrating SCANA and its different markets and customers, it is possible that the process could result in the disruption of Dominion Energy’s ongoing business or inconsistencies in its services, standards, controls, procedures and policies, any of which could adversely affect the ability of Dominion Energy to maintain or establish relationships with current and prospective customers, vendors and employees or could otherwise adversely affect the business and financial results of Dominion Energy.

Nuclear Generation Risks

Dominion Energy and Virginia Power have substantial ownership interests in and operate nuclear generating units; as a result, each may incur substantial costs and liabilities.

Dominion Energy and Virginia Power’s nuclear facilities are subject to operational, environmental, health and financial risks such as the

on-site

storage of spent nuclear fuel, the ability to dispose of such spent nuclear fuel, the ability to maintain adequate reserves for decommissioning, limitations on the amounts and types of insurance available, potential operational liabilities and extended outages, the costs of replacement power, the costs of maintenance and the costs of securing the facilities against possible terrorist attacks. Dominion Energy and Virginia Power maintain decommissioning trusts and external insurance coverage to minimize the financial exposure to these risks; however, it is possible that future decommissioning costs could exceed amounts in the decommissioning trusts and/or damages could exceed the amount of insurance coverage. If Dominion Energy and Virginia Power’s decommissioning trust funds are insufficient, and they are not allowed to recover the additional costs incurred through insurance or regulatory mechanisms, their results of operations could be negatively impacted.

Dominion Energy and Virginia Power’s nuclear facilities are also subject to complex government regulation which could negatively impact their results of operations. The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generating facilities. In the event of noncompliance, the NRC has the authority to impose fines, set license conditions, shut down a nuclear unit, or take some combination of these actions, depending on its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated by the NRC could require Dominion Energy and Virginia Power to make substantial expenditures at their nuclear plants. In addition, although the Companies have no reason to anticipate a serious nuclear incident at their plants, if an incident did occur, it could materially and adversely affect their results of operations and/or financial condition. A major incident at a nuclear facility anywhere in the world, such as the nuclear events in Japan in 2011, could cause the NRC to adopt increased safety regulations or otherwise limit or restrict the operation or licensing of domestic nuclear units.

Financial, Economic and Market Risks

Exposure to counterparty performance may adversely affect the Companies’ financial results of operations.

The Companies are exposed to credit risks of their counterparties and the risk that one or more counterparties may fail or delay the performance of their contractual obligations, including but not limited to payment

34

for services. Some of Dominion Energy’s and Dominion Energy Gas’ operations are conducted through partnership arrangements, as noted above. Counterparties could fail or delay the performance of their contractual obligations for a number of reasons, including the effect of regulations on their operations. Defaults or failure to perform by customers, suppliers, contractors, joint venture partners, financial institutions or other third parties may adversely affect the Companies’ financial results.

Dominion Energy and Dominion Energy Gas are exposed to counterparty credit risk relating to Cove Point’s terminal services agreements for the Liquefaction Facility. While the counterparties’ obligations are supported by parental guarantees and letters of credit, there is no assurance that such credit support would be sufficient to satisfy the obligations in the event of a counterparty default. In addition, if a controversy arises under either agreement resulting in a judgment in Cove Point’s favor, Cove Point may need to seek to enforce a final U.S. court judgment in a foreign tribunal, which could involve a lengthy process.

Changing rating agency requirements could negatively affect the Companies’ growth and business strategy.

In order to maintain appropriate credit ratings to obtain needed credit at a reasonable cost in light of existing or future rating agency requirements, the Companies may find it necessary to take steps or change their business plans in ways that may adversely affect their growth and earnings. A reduction in the Companies’ credit ratings could result in an increase in borrowing costs, loss of access to certain markets, or both, thus adversely affecting operating results and could require the Companies to post additional collateral in connection with some of its price risk management activities.

An inability to access financial markets and, in the case of Dominion Energy and Dominion Energy Gas, obtain cash from subsidiaries could adversely affect the execution of the Companies’ business plans.

The Companies rely on access to short-term money markets and longer-term capital markets as significant sources of funding and liquidity for business plans with increasing capital expenditure needs, normal working capital and collateral requirements related to hedges of future sales and purchases of energy-related commodities. Deterioration in the Companies’ creditworthiness, as evaluated by credit rating agencies or otherwise, or declines in market reputation either for the Companies or their industry in general, or general financial market disruptions outside of the Companies’ control could increase their cost of borrowing or restrict their ability to access one or more financial markets. Market disruptions could stem from general market disruption due to general credit market or political events, the planned phase out of LIBOR by the end of 2021 or reform or replacement of other benchmark rates, the failure of financial institutions on which the Companies rely or the bankruptcy of an unrelated company. Increased costs and restrictions on the Companies’ ability to access financial markets may be severe enough to affect their ability to execute their business plans as scheduled.

Dominion Energy and Dominion Energy Gas are holding companies that conduct all of their operations through their respective subsidiaries. Accordingly, each entity’s ability to execute its business plan is further subject to the earnings and cash flows of its subsidiaries and the ability of its subsidiaries to pay dividends or advance or repay funds to it, which may, from time to time, be subject to certain contractual restrictions or restrictions imposed by regulators.

Market performance, interest rates and other changes may decrease the value of Dominion Energy and Virginia Power’s decommissioning trust funds and Dominion Energy and Dominion Energy Gas’ benefit plan assets or increase Dominion Energy and Dominion Energy Gas’ liabilities, which could then require significant additional funding.

The performance of the capital markets affects the value of the assets that are held in trusts to satisfy future obligations to decommission Dominion Energy and Virginia Power’s nuclear plants and under Dominion Energy and Dominion Energy Gas’ pension and other postretirement benefit plans. The Companies have significant obligations in these areas and hold significant assets in these trusts. These assets are subject to market fluctuation and will yield uncertain returns, which may fall below expected return rates.

With respect to decommissioning trust funds, a decline in the market value of these assets may increase the funding requirements of the obligations to decommission Dominion Energy and Virginia Power’s nuclear plants or require additional NRC-approved funding assurance.

A decline in the market value of the assets held in trusts to satisfy future obligations under Dominion Energy and Dominion Energy Gas’ pension and other postretirement benefit plans may increase the funding requirements under such plans. Additionally, changes in interest rates will affect the liabilities under Dominion Energy and Dominion Energy Gas’ pension and other postretirement benefit plans; as interest rates decrease, the liabilities increase, potentially requiring additional funding. Further, changes in demographics, including increased numbers of retirements or changes in mortality assumptions, may also increase the funding requirements of the obligations related to the pension and other postretirement benefit plans.

If the decommissioning trust funds and benefit plan assets are negatively impacted by market fluctuations or other factors, the Companies’ results of operations, financial condition and/or cash flows could be negatively affected.

The use of derivative instruments could result in financial losses and liquidity constraints.

The Companies use derivative instruments, including futures, swaps, forwards, options and FTRs, to manage commodity, currency and financial market risks. In addition, Dominion Energy and Dominion Energy Gas purchase and sell commodity-based contracts for hedging purposes.

The Dodd-Frank Act was enacted into law in July 2010 in an effort to improve regulation of financial markets. The CEA, as amended by Title VII of the Dodd-Frank Act, requires certain

over-the-counter

derivatives, or swaps, to be cleared through a derivatives clearing organization and, if the swap is subject to a clearing requirement, to be executed on a designated contract market or swap execution facility.

Non-financial

entities that use swaps to hedge or mitigate commercial risk, often referred to as end users, may elect the

end-user

exception to the CEA’s clearing requirements. The Companies have elected to exempt their swaps from the CEA’s clearing requirements. If, as a result of changes to the rulemaking process, the Companies’ derivative activities are not exempted from the clearing, exchange trading or margin requirements, the Companies could be subject to higher costs due to decreased market liquidity or increased margin payments. In addition, the Companies’ swap dealer counterparties may attempt to pass-through additional trading costs in connection with changes to or the elimination of rulemaking that implements Title VII of the Dodd-Frank Act.

35

Future impairments of goodwill or other intangible assets or long-lived assets may have a material adverse effect on the Companies’ results.

Goodwill is evaluated for impairment annually or more frequently if an event or circumstance occurs that would more likely than not reduce the fair value of a reporting unit below its carrying amount. Other intangible assets and long-lived assets are evaluated for impairment on an annual basis or more frequently whenever events or circumstances indicate that an asset’s carrying value may not be recoverable. If Dominion Energy or Dominion Energy Gas’ goodwill, including the goodwill recorded by Dominion Energy in connection with the

SCANA Combination and the Dominion Energy Questar Combination, or the Companies’ other intangible assets or long-lived assets are in the future determined to be impaired, the applicable Company may be required during the period in which the impairment is determined to record a noncash charge to earnings that may have a material adverse effect on the Company’s results.

Item 1B. Unresolved Staff Comments

None.

36

Item 2. Properties

As of December 31, 2019, Dominion Energy owned its principal executive office in Richmond, Virginia and five other corporate offices. Dominion Energy also leases corporate offices in Richmond, Virginia and other cities in which its subsidiaries operate. Virginia Power and Dominion Energy Gas share Dominion Energy’s principal office in Richmond, Virginia, which is owned by Dominion Energy. In addition, Virginia Power leases certain buildings and equipment.

Dominion Energy’s assets consist primarily of its investments in its subsidiaries, the principal properties of which are described below.

Certain of Virginia Power’s properties are subject to the lien of the Indenture of Mortgage securing its First and Refunding Mortgage Bonds. There were no bonds outstanding as of December 31, 2019; however, by leaving the indenture open, Virginia Power expects to retain the flexibility to issue mortgage bonds in the future. Certain of Dominion Energy’s merchant generation facilities are also subject to liens. Additionally, DESC’s bond indenture, which secures its First Mortgage Bonds, constitutes a direct mortgage lien on substantially all of its electric utility property.

Dominion Energy Virginia

Virginia Power has approximately 6,700 miles of electric transmission lines of 69 kV or more located in North Carolina, Virginia and West Virginia. Portions of Virginia Power’s electric transmission lines cross national parks and forests under permits entitling the federal government to use, at specified charges, any surplus capacity that may exist in these lines. While Virginia Power owns and maintains its electric transmission facilities, they are a part of PJM, which coordinates the planning, operation, emergency assistance and exchange of capacity and energy for such facilities.

In addition, Virginia Power’s electric distribution network includes approximately 58,400 miles of distribution lines, exclusive of service level lines, in Virginia and North Carolina. The grants for most of its electric lines contain

rights-of-way

that have been obtained from the apparent owners of real estate, but underlying titles have not been examined. Where

rights-of-way

have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, Virginia Power owns 471 substations.

The following tables list Virginia Power’s generating units and capability as of December 31, 2019.

37

Virginia Power Utility Generation

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Gas
Greensville County (CC)Greensville County, VA1,629
Brunswick County (CC)Brunswick County, VA1,376
Warren County (CC)Warren County, VA1,370
Ladysmith (CT)Ladysmith, VA783
Bear Garden (CC)Buckingham County, VA622
Remington (CT)Remington, VA622
Possum Point (CC) (1)Dumfries, VA573
Chesterfield (CC)Chester, VA392
Elizabeth River (CT)Chesapeake, VA330
Gordonsville Energy (CC)Gordonsville, VA218
Gravel Neck (CT)Surry, VA170
Darbytown (CT)Richmond, VA168
Rosemary (CC)Roanoke Rapids, NC160
Total Gas8,41340%
Coal
Mt. StormMt. Storm, WV1,621
ChesterfieldChester, VA1,014
Virginia City Hybrid Energy CenterWise County, VA610
CloverClover, VA439(2)
Total Coal3,68418
Nuclear
SurrySurry, VA1,676
North AnnaMineral, VA1,672(3)
Total Nuclear3,34816
Oil
YorktownYorktown, VA790
Possum PointDumfries, VA770
Gravel Neck (CT)Surry, VA198
Darbytown (CT)Richmond, VA168
Possum Point (CT)Dumfries, VA72
Low Moor (CT)Covington, VA48
Northern Neck (CT)Lively, VA47
Chesapeake (CT)Chesapeake, VA39
Total Oil2,13210
Hydro
Bath CountyWarm Springs, VA1,808(4)
GastonRoanoke Rapids, NC220
Roanoke RapidsRoanoke Rapids, NC95
Other1
Total Hydro2,12410
Solar
Colonial Trail WestSurry County, VA142
Whitehouse SolarLouisa County, VA20
Woodland SolarIsle of Wight County, VA19
Scott SolarPowhatan, VA17
Total Solar1981
Biomass
AltavistaAltavista, VA51
PolyesterHopewell, VA51
SouthamptonSouthampton, VA51
Total Biomass1531
Various
Mt. Storm (CT)Mt. Storm, WV11—
20,063
Power Purchase Agreements7824
Total Utility Generation20,845100%

Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

(1)Will be retired after meeting capacity obligation to PJM in 2021. See Note 2 to the Consolidated Financial Statements for additional information.
(2)Excludes 50% undivided interest owned by ODEC.
(3)Excludes 11.6% undivided interest owned by ODEC.
(4)Excludes 40% undivided interest owned by Allegheny Generating Company, a subsidiary of FirstEnergy Corp.
38

Virginia Power Non-jurisdictional Generation

PlantLocationNet Summer Capability (MW)
Solar (1)
GutenbergGarysburg, NC80
PecanPleasant Hill, NC75
GloucesterGloucester County, VA20
MontrossWestmoreland County, VA20
Morgans CornerPasquotank County, NC20
RemingtonFauquier County, VA20
OceanaVirginia Beach, VA18
HollyfieldManquin, VA17
PullerTopping, VA15
Total Solar285
(1)All solar facilities are alternating current.

Gas Transmission & Storage

Dominion Energy Gas has approximately 7,900 miles, excluding interests held by others, of gas transmission, gathering and storage pipelines located in the states of Colorado, Georgia, Maryland, New York, Ohio, Pennsylvania, South Carolina, Utah, Virginia, West Virginia and Wyoming.

Cove Point’s LNG Facility has an operational peak regasification daily

send-out

capacity of approximately 1.8 million Dths and an aggregate LNG storage capacity of approximately 14.6 bcfe. In addition, Cove Point has a small liquefier that has the potential to create approximately 15,000 Dths/day. The Liquefaction Facility consists of one LNG train with a nameplate outlet capacity of 5.25 Mtpa. Cove Point has authorization from the DOE to export up to 0.77 Bcfe/day (approximately 5.75 Mtpa) should the Liquefaction Facility perform better than expected.

The total designed capacity of the underground storage fields operated by Dominion Energy Gas is approximately 900 bcf. Certain storage fields are jointly-owned and operated by Dominion Energy Gas. The capacity of those fields owned by Dominion Energy Gas’ partners totals approximately 240 bcf.

In total, Dominion Energy Gas has 111 compressor stations with approximately 1,200,000 installed compressor horsepower.

In addition to the pipeline network owned by Dominion Energy Gas, Dominion Energy has approximately 2,500 miles of gas transmission, gathering and storage pipelines located in the states of West Virginia, Ohio, Arizona and Pennsylvania.

Gas Distribution

Gas Distribution’s network is located in the states of Idaho, North Carolina, Ohio, Utah, West Virginia and Wyoming. This network includes approximately 3,700 miles of transmission pipeline and approximately 85,000 miles of distribution mains and related service facilities. The

right-of-way

grants for many natural gas pipelines have been obtained from the actual owners of real

estate, as underlying titles have been examined. Where

rights-of-way

have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many natural gas pipelines are on publicly-owned property, where company rights and actions are determined on a

case-by-case

basis, with results that range from reimbursed relocation to revocation of permission to operate.

PSNC owns one LNG facility that stores the liquefied equivalent of 1.0 bcf of natural gas, can regasify approximately 10% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day.

Dominion Energy South Carolina

DESC has approximately 3,700 miles and 26,600 miles of electric transmission and distribution lines, respectively, exclusive of service level lines, in South Carolina. The grants for most of DESC’s electric lines contain

rights-of-way

that have been obtained from the apparent owners of real estate, but underlying property titles have not been examined. Where

rights-of-way

have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, DESC owns 439 substations.

DESC’s natural gas system includes approximately 500 miles of transmission pipeline and approximately 18,400 miles of distribution mains and related service facilities.

DESC owns two LNG facilities, one located near Charleston, South Carolina, and the other in Salley, South Carolina. The Charleston facility can store the liquefied equivalent of 1.0 bcf of natural gas, can regasify approximately 6% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day. The Salley facility can store the liquefied equivalent of 0.9 bcf of natural gas and can regasify approximately 10% of its storage capacity per day. The Salley facility has no liquefying capabilities.

39

The following table lists DESC’s generating units and capability as of December 31, 2019.

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Gas
Jasper (CC) (1)Hardeeville, SC852
Columbia Energy Center (CC) (1)Gaston, SC519
Urquhart (CC) (1)Beech Island, SC458
McMeekinIrmo, SC250
Hagood (CT) (1)Charleston, SC126
Urquhart Unit 3Beech Island, SC95
Urquhart (CT)Beech Island, SC87
Parr (CT) (1)Jenkinsville, SC60
Williams (CT) (1)Goose Creek, SC40
Coit (CT) (1)Columbia, SC26
Total Gas (2)2,51340%
Coal
WatereeEastover, SC684
WilliamsGoose Creek, SC605
Cope (3)Cope, SC415
Total Coal1,70427
Hydro
FairfieldJenkinsville, SC576
SaludaIrmo, SC190
OtherVarious18
Total Hydro78413
Nuclear
SummerJenkinsville, SC650(4)
Total Nuclear65010
Power Purchase Agreements596(5)10
Total Utility Generation6,247100%

Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

(1)Capable of burning fuel oil as a secondary source.
(2)Excludes the Hardeeville gas combustion turbine which currently does not have any net summer capability.
(3)Capable of burning natural gas as a secondary source.
(4)Excludes 33.3% undivided interest owned by Santee Cooper.
(5)Includes 143MW from agreements with certain solar facilities within Contracted Generation.
40

Contracted Generation

The following table lists Contracted Generation’s generating units and capability as of December 31, 2019.

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Nuclear
MillstoneWaterford, CT2,001(1)
Total Nuclear2,00159%
Solar (2)
Escalante I, II and IIIBeaver County, UT120(3)
Amazon Solar Farm Virginia—SouthamptonNewsoms, VA100(4)
Amazon Solar Farm Virginia—AccomackOak Hall, VA80(4)
Innovative Solar 37Morven, NC79(4)
WilkinsonPantego, NC74
SeabrookBeaufort County, SC72
Moffett Solar 1Ridgeland, SC71(4)
Granite Mountain East and WestIron County, UT65(3)
Summit Farms SolarMoyock, NC60(4)
EnterpriseIron County, UT40(3)
Iron SpringsIron County, UT40(3)
Pavant SolarHolden, UT34(5)
Camelot SolarMojave, CA30(5)
Midway IICalipatria, CA30(4)
Indy I, II and IIIIndianapolis, IN20(5)
Amazon Solar Farm Virginia—BuckinghamCumberland, VA20(4)
Amazon Solar Farm Virginia—CorrectionalBarhamsville, VA20(4)
Hecate CherrydaleCape Charles, VA20(4)
Amazon Solar Farm Virginia—SapponyStoney Creek, VA20(4)
Amazon Solar Farm Virginia—Scott IIPowhatan, VA20(4)
Cottonwood SolarKings and Kern Counties, CA16(5)
Adams East SolarTranquility, CA13(5)
Alamo SolarSan Bernardino, CA13(5)
CID SolarCorcoran, CA13(5)
Imperial Valley SolarImperial, CA13(5)
Kansas SolarLenmore, CA13(5)
Kent South SolarLenmore, CA13(5)
Maricopa West SolarKern County, CA13(5)
Old River One SolarBakersfield, CA13(5)
Richland SolarJeffersonville, GA13(5)
West Antelope SolarLancaster, CA13(5)
Catalina 2 SolarKern County, CA12(5)
Mulberry SolarSelmer, TN11(5)
Selmer SolarSelmer, TN11(5)
Columbia 2 SolarMojave, CA10(5)
Hecate Energy Clarke CountyWhite Post, VA10(4)
Ridgeland Solar Farm IRidgeland, SC10(4)
OtherVarious43(4)(5)
Total Solar1,26837
Wind
Fowler Ridge (6)Benton County, IN150(7)4
Total Merchant Generation3,419100%
(1)Excludes 6.53% undivided interest in Unit 3 owned by Massachusetts Municipal and Green Mountain.
(2)All solar facilities are alternating current.
(3)Excludes 50% noncontrolling interest owned by GIP. Dominion Energy’s interest is subject to a lien securing Dominion Solar Projects III, Inc.’s debt.
(4)Dominion Energy’s interest is subject to a lien securing Eagle Solar’s debt.
(5)Excludes 33% noncontrolling interest owned by Terra Nova Renewable Partners. Dominion Energy’s interest is subject to a lien securing SBL Holdco’s debt.
(6)Subject to a lien securing the facility’s debt.
(7)Excludes 50% membership interest owned by BP.
41

Item 3. Legal Proceedings

From time to time, the Companies are alleged to be in violation or in default under orders, statutes, rules or regulations relating to the environment, compliance plans imposed upon or agreed to by the Companies, or permits issued by various local, state and/or federal agencies for the construction or operation of facilities. Administrative proceedings may also be pending on these matters. In addition, in the ordinary course of business, the Companies and their subsidiaries are involved in various legal proceedings.

See Notes 13 and 23 to the Consolidated Financial Statements and

Future Issues and Other Matters

in Item 7. MD&A, which information is incorporated herein by reference, for discussion of various legal, environmental and other regulatory proceedings to which the Companies are a party.

Item 4. Mine Safety Disclosures

Not applicable.

42

Information about our Executive Officers

Information concerning the executive officers of Dominion Energy, each of whom is elected annually, is as follows:

Name and AgeBusiness Experience Past Five Years (1)
Thomas F. Farrell, II (65)Chairman of the Board of Directors, President and CEO from April 2007 to date.
Robert M. Blue (52)Executive Vice President and Co-COO from December 2019 to date; Executive Vice President and President & CEO—Power Delivery Group from May 2017 to November 2019; Senior Vice President and President & CEO—Dominion Virginia Power from January 2017 to May 2017; Senior Vice President—Law, Regulation & Policy from February 2016 to December 2016; Senior Vice President—Regulation, Law, Energy Solutions and Policy from May 2015 to January 2016; President of Virginia Power from January 2014 to May 2015.
James R. Chapman (50)Executive Vice President, CFO and Treasurer from January 2019 to date; Senior Vice President, CFO and Treasurer from November 2018 to December 2018; Senior Vice President—Mergers & Acquisitions and Treasurer from February 2016 to October 2018; Vice President—Corporate Finance and Mergers & Acquisitions and Assistant Treasurer from May 2015 to January 2016; Vice President—Corporate Finance and Mergers & Acquisitions from January 2015 to May 2015.
Diane Leopold (53)Executive Vice President and Co-COO from December 2019 to date; Executive Vice President and President & CEO—Gas Infrastructure Group from May 2017 to November 2019; Senior Vice President and President & CEO—Dominion Energy from January 2017 to May 2017; President of DETI, East Ohio and DCP from January 2014 to date.
P. Rodney Blevins (55)President— Dominion Energy South Carolina from December 2019 to date; President & Chief Executive Officer—Southeast Energy Group from January 2019 to November 2019; Senior Vice President and Chief Information Officer from January 2014 to December 2018.
Donald R. Raikes (57)President—Gas Distribution of Dominion Energy from December 2019 to date and of Hope, East Ohio, PSNC, and Questar Gas from October 2019 to date; Senior Vice President—Gas Transmission Operations of DCP, Dominion Energy Midstream and Dominion Energy Questar Pipeline from February 2019 to September 2019; Senior Vice President—Dominion Midstream Operations of DCP, Dominion Energy Midstream and Dominion Energy Questar Pipeline from August 2017 to January 2019; Senior Vice President—Pipeline Customer Service & Business Development of DCP and DETI from May 2017 to August 2017; Senior Vice President—Customer Service and Business Development of DCP and DETI from November 2014 to May 2017.
Paul E. Ruppert (55)President—Gas Transmission & Storage from December 2019 to date; President—Gas Transmission of DETI, Dominion Energy Questar Pipeline and DCP from August 2017 to November 2019; President—Dominion Midstream Operations of Dominion Energy Questar Pipeline and DCP from May 2017 to July 2017; Senior Vice President and President—Dominion Midstream Operations of Dominion Energy Midstream from January 2017 to July 2017; Senior Vice President—Dominion Midstream Operations of Dominion Energy Midstream from January 2016 to December 2016; Senior Vice President—Business Development & Generation Construction of Virginia Power from April 2012 to December 2015.
Daniel G. Stoddard (57)Senior Vice President, Chief Nuclear Officer and President—Contracted Generation from December 2019 to date; Senior Vice President and Chief Nuclear Officer of Virginia Power from October 2016 to date; Senior Vice President—Nuclear Operations of Virginia Power from May 2011 to September 2016.
Carlos M. Brown (45)Senior Vice President, General Counsel and Chief Compliance Officer from December 2019 to date; Senior Vice President and General Counsel from January 2019 to November 2019; Vice President and General Counsel from January 2017 to December 2018; Deputy General Counsel—Litigation, Labor, and Employment of DES from July 2016 to December 2016; Director—Power Generation Station II of DES from July 2015 to June 2016; Director—Alternative Energy Solutions Business Development & Commercialization of DES from January 2013 to June 2015.
William L. Murray (52)Senior Vice President—Corporate Affairs & Communications from February 2019 to date; Vice President—State & Electric Public Policy of DES from May 2017 to January 2019; Senior Policy Director—Public Policy of DES from April 2016 to May 2017; Managing Director—Corporate Public Policy of DES from June 2007 to March 2016.
Michele L. Cardiff (52)Vice President, Controller and CAO from April 2014 to date.
(1)All positions held at Dominion Energy, unless otherwise noted. Any service listed for Virginia Power, DETI, East Ohio, Hope, PSNC, Questar Gas, Dominion Energy Midstream, Dominion Energy Questar Pipeline, DCP and DES reflects service at a subsidiary of Dominion Energy.
43

Part II

Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

Dominion Energy

Dominion Energy’s common stock is listed on the NYSE under the ticker symbol D. At February 14, 2020, there were approximately 134,000 record holders of Dominion Energy’s common stock. The number of record holders is comprised of individual shareholder accounts maintained on Dominion Energy’s transfer agent records and includes accounts with shares held in (1) certificate form, (2) book-entry in the Direct Registration System and (3) book-entry under Dominion Energy Direct

®

. Discussions of expected dividend payments required by this Item are contained in

Liquidity and Capital Resources

in Item 7. MD&A.

The following table presents certain information with respect to Dominion Energy’s common stock repurchases during the fourth quarter of 2019:

Dominion Energy Purchases Of Equity Securities
PeriodTotal Number of Shares (or Units) Purchased (1)Average Price Paid per Share (or Unit) (2)Total Number of Shares (or Units) Purchased as Part of Publicly Announced Plans or ProgramsMaximum Number (or Approximate Dollar Value) of Shares (or Units) that May Yet Be Purchased under the Plans or Programs (3)
10/1/19-10/31/1931,435$81.22—19,629,059 shares/$1.18 billion
11/1/19-11/30/1940183.08—19,629,059 shares/$1.18 billion
12/1/19-12/31/192,42983.11—19,629,059 shares/$1.18 billion
Total34,265$81.38—19,629,059 shares/$1.18 billion
(1)Represents shares that were tendered by employees to satisfy tax withholding obligations on vested restricted stock.
(2)Represents the weighted-average price paid per share.
(3)The remaining repurchase authorization is pursuant to repurchase authority granted by the Dominion Energy Board of Directors in February 2005, as modified in June 2007. The aggregate authorization granted by the Dominion Energy Board of Directors was 86 million shares (as adjusted to reflect a two-for-one stock split distributed in November 2007) not to exceed $4 billion.

Virginia Power

There is no established public trading market for Virginia Power’s common stock, all of which is owned by Dominion Energy. Virginia Power intends to pay quarterly cash dividends in 2020 but is neither required to nor restricted, except as described in Note 21 to the Consolidated Financial Statements, from making such payments.

Dominion Energy Gas

All of Dominion Energy Gas’ membership interests are owned by Dominion Energy. Dominion Energy Gas intends to pay quarterly cash dividends in 2020 but is neither required to nor restricted, except as described in Note 21 to the Consolidated Financial Statements, from making such payments.

44

Item 6. Selected Financial Data

The following table should be read in conjunction with the Consolidated Financial Statements included in Item 8. Financial Statements and Supplementary Data.

Dominion Energy’s Consolidated Financial Statements include the results of operations acquired in the SCANA Combination effective January 2019.

Dominion Energy

Year Ended December 31,2019 (1)2018 (2)2017 (3)2016 (4)2015
(millions, except per share amounts)
Operating revenue$16,572$13,366$12,586$11,737$11,683
Net income attributable to Dominion Energy1,3582,4472,9992,1231,899
Net income attributable to Dominion Energy per common share-basic1.663.744.723.443.21
Net income attributable to Dominion Energy per common share-diluted1.623.744.723.443.20
Dividends declared per common share3.673.343.0352.802.59
Total assets103,82377,91476,58571,61058,648
Long-term debt (5)33,82431,14430,94830,23123,468
(1)Includes merger and integration-related costs associated with the SCANA Combination of $1.8 billion after-tax (inclusive of $756 million after-tax charge for refunds of amounts previously collected for the NND Project, $480 million after-tax charge for litigation acquired in the SCANA Combination and $319 million after-tax charge related to a voluntary retirement program), $585 million after-tax charges associated primarily with the planned early retirement of certain electric generation facilities, automated meter reading infrastructure and the termination of a contract with a non-utility generator, partially offset by a $429 million after-tax net gain related to nuclear decommissioning trust funds.
(2)Includes $568 million after-tax gains on sales of certain merchant generation facilities and equity method investments partially offset by $164 million after-tax charge related to the impairment of certain gathering and processing assets and a $160 million after-tax charge associated with Virginia legislation enacted in March 2018 that required one-time rate credits of certain amounts to utility customers.
(3)Includes $851 million of tax benefits resulting from the remeasurement of deferred income taxes to the new corporate income tax rate, partially offset by $96 million of after-tax charges associated with equity method investments in wind-powered generation facilities.
(4)Includes a $122 million after-tax charge related to future ash pond and landfill closure costs at certain utility generation facilities.
(5)Includes finance leases.
45

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

MD&A discusses Dominion Energy’s results of operations and general financial condition and Virginia Power and Dominion Energy Gas’ results of operations. MD&A should be read in conjunction with Item 1. Business and the Consolidated Financial Statements in Item 8. Financial Statements and Supplementary Data. Virginia Power and Dominion Energy Gas meet the conditions to file under the reduced disclosure format, and therefore have omitted certain sections of MD&A.

Contents of MD&A

MD&A consists of the following information:

•Forward-Looking Statements
•Accounting Matters—Dominion Energy
•Dominion Energy
•Results of Operations
•Segment Results of Operations
•Virginia Power
•Results of Operations
•Dominion Energy Gas
•Results of Operations
•Liquidity and Capital Resources—Dominion Energy
•Future Issues and Other Matters—Dominion Energy

Forward-looking Statements

This report contains statements concerning the Companies’ expectations, plans, objectives, future financial performance and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. In most cases, the reader can identify these forward-looking statements by such words as “anticipate,” “estimate,” “forecast,” “expect,” “believe,” “should,” “could,” “plan,” “may,” “continue,” “target” or other similar words.

The Companies make forward-looking statements with full knowledge that risks and uncertainties exist that may cause actual results to differ materially from predicted results. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Additionally, other factors may cause actual results to differ materially from those indicated in any forward-looking statement. These factors include but are not limited to:

•Unusual weather conditions and their effect on energy sales to customers and energy commodity prices;
•Extreme weather events and other natural disasters, including, but not limited to, hurricanes, high winds, severe storms, earthquakes, flooding, climate changes and changes in water temperatures and availability that can cause outages and property damage to facilities;
•Federal, state and local legislative and regulatory developments, including changes in federal and state tax laws and regulations;
•Risks of operating businesses in regulated industries that are subject to changing regulatory structures;
•Changes to regulated electric rates collected by Dominion Energy and Virginia Power and regulated gas distribution, transportation and storage rates, including LNG storage, collected by Dominion Energy and Dominion Energy Gas;
•Changes in rules for RTOs and ISOs in which Dominion Energy and Virginia Power join and/or participate, including changes in rate designs, changes in FERC’s interpretation of market rules and new and evolving capacity models;
•Risks associated with Virginia Power’s membership and participation in PJM, including risks related to obligations created by the default of other participants;
•Risks associated with entities in which Dominion Energy and Dominion Energy Gas share ownership with third parties, including risks that result from lack of sole decision making authority, disputes that may arise between Dominion Energy and Dominion Energy Gas and third party participants and difficulties in exiting these arrangements;
•Changes in future levels of domestic and international natural gas production, supply or consumption;
•Fluctuations in future volumes of LNG imports or exports from the U.S. and other countries worldwide or demand for, purchases of, and prices related to natural gas or LNG;
•Timing and receipt of regulatory approvals necessary for planned construction or growth projects and compliance with conditions associated with such regulatory approvals;
•The inability to complete planned construction, conversion or growth projects at all, or with the outcomes or within the terms and time frames initially anticipated, including as a result of increased public involvement, intervention or litigation in such projects;
•Changes to federal, state and local environmental laws and regulations, including those related to climate change, the tightening of emission or discharge limits for GHGs and other substances, more extensive permitting requirements and the regulation of additional substances;
•Cost of environmental compliance, including those costs related to climate change;
•Changes in implementation and enforcement practices of regulators relating to environmental standards and litigation exposure for remedial activities;
•Difficulty in anticipating mitigation requirements associated with environmental and other regulatory approvals or related appeals;
•Unplanned outages at facilities in which the Companies have an ownership interest;
•The impact of operational hazards, including adverse developments with respect to pipeline and plant safety or integrity, equipment loss, malfunction or failure, operator error, and other catastrophic events;
•Risks associated with the operation of nuclear facilities, including costs associated with the disposal of spent nuclear fuel, decommissioning, plant maintenance and changes in existing regulations governing such facilities;
•Changes in operating, maintenance and construction costs;
•Domestic terrorism and other threats to the Companies’ physical and intangible assets, as well as threats to cybersecurity;
•Additional competition in industries in which the Companies operate, including in electric markets in which Dominion Energy’s merchant generation facilities operate and potential competition from the development and deployment of alternative energy sources, such as self-generation and distributed generation technologies, and availability of market alternatives to large commercial and industrial customers;
46
•Competition in the development, construction and ownership of certain electric transmission facilities in Dominion Energy and Virginia Power’s service territory in connection with Order 1000;
•Changes in technology, particularly with respect to new, developing or alternative sources of generation and smart grid technologies;
•Changes in demand for the Companies’ services, including industrial, commercial and residential growth or decline in the Companies’ service areas, changes in supplies of natural gas delivered to Dominion Energy and Dominion Energy Gas’ pipeline systems, failure to maintain or replace customer contracts on favorable terms, changes in customer growth or usage patterns, including as a result of energy conservation programs, the availability of energy efficient devices and the use of distributed generation methods;
•Receipt of approvals for, and timing of, closing dates for acquisitions and divestitures;
•Impacts of acquisitions, divestitures, transfers of assets to joint ventures and retirements of assets based on asset portfolio reviews;

| • | Adverse outcomes

Showing the first 8K of 141K characters. Open the full section

Item 7A. Quantitative and Qualitative Disclosures About Market Risk

The matters discussed in this Item may contain “forward-looking statements” as described in the introductory paragraphs of Item 7. MD&A. The reader’s attention is directed to those paragraphs and Item 1A. Risk Factors for discussion of various risks and uncertainties that may impact the Companies.

66

Market Risk Sensitive Instruments And Risk Management

The Companies’ financial instruments, commodity contracts and related financial derivative instruments are exposed to potential losses due to adverse changes in commodity prices, interest rates and equity security prices as described below. Commodity price risk is present in Dominion Energy and Virginia Power’s electric operations and Dominion Energy and Dominion Energy Gas’ natural gas procurement and marketing operations due to the exposure to market shifts in prices received and paid for electricity, natural gas and other commodities. The Companies use commodity derivative contracts to manage price risk exposures for these operations. Interest rate risk is generally related to their outstanding debt and future issuances of debt. In addition, the Companies are exposed to investment price risk through various portfolios of equity and debt securities.

The following sensitivity analysis estimates the potential loss of future earnings or fair value from market risk sensitive instruments over a selected time period due to a 10% change in commodity prices or interest rates.

Commodity Price Risk

To manage price risk, Dominion Energy and Virginia Power hold commodity-based derivative instruments held for

non-trading

purposes associated with purchases and sales of electricity, natural gas and other energy-related products. Dominion Energy Gas’ operations are contracted primarily under long-term fixed reservation agreements. Accordingly, management believes that Dominion Energy Gas is not subject to material commodity price risk.

The derivatives used to manage commodity price risk are executed within established policies and procedures and may include instruments such as futures, forwards, swaps, options and FTRs that are sensitive to changes in the related commodity prices. For sensitivity analysis purposes, the hypothetical change in market prices of commodity-based derivative instruments is determined based on models that consider the market prices of commodities in future periods, the volatility of the market prices in each period, as well as the time value factors of the derivative instruments. Prices and volatility are principally determined based on observable market prices.

A hypothetical 10% decrease in commodity prices would have resulted in a decrease in fair value of $50 million and $6 million of Dominion Energy’s commodity-based derivative instruments as of December 31, 2019 and December 31, 2018, respectively.

A hypothetical 10% decrease in commodity prices of Virginia Power’s commodity-based derivative instruments would have resulted in a decrease in fair value of $54 million and $51 million as of December 31, 2019 and December 31, 2018, respectively.

The impact of a change in energy commodity prices on the Companies’ commodity-based derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net losses from commodity-based financial derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction, such as revenue from physical sales of the commodity.

Interest Rate Risk

The Companies manage their interest rate risk exposure predominantly by maintaining a balance of fixed and variable rate debt. For variable rate debt outstanding for Dominion Energy, a hypothetical 10% increase in market interest rates would not have resulted in a material change in earnings at December 31, 2019 and would have resulted in a $24 million decrease in earnings at December 31, 2018. For variable rate debt outstanding for Virginia Power, a hypothetical 10% increase in market interest rates would not have resulted in a material change in earnings at December 31, 2019 or December 31, 2018. For variable rate debt outstanding for Dominion Energy Gas, a hypothetical 10% increase in market interest rates would not have resulted in a material change in earnings at December 31, 2019 and would have resulted in a $16 million decrease in earnings at December 31, 2018.

The Companies also use interest rate derivatives, including forward-starting swaps, interest rate swaps and interest rate lock agreements to manage interest rate risk. As of December 31, 2019, Dominion Energy, Virginia Power and Dominion Energy Gas had $6.4 billion, $1.9 billion and $1.3 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $135 million, $88 million and $17 million, respectively, in the fair value of Dominion Energy, Virginia Power and Dominion Energy Gas’ interest rate derivatives at December 31, 2019. As of December 31, 2018, Dominion Energy, Virginia Power and Dominion Energy Gas had $6.6 billion, $1.9 billion and $1.4 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $142 million, $94 million and $17 million, respectively, in the fair value of Dominion Energy, Virginia Power and Dominion Energy Gas’ interest rate derivatives at December 31, 2018.

Dominion Energy Gas holds foreign currency swaps with the purpose of hedging the foreign currency exchange risk associated with Euro denominated debt. As of December 31, 2019 and December 31, 2018, Dominion Energy and Dominion Energy Gas had

€

250 million in aggregate notional amounts of these foreign currency swaps outstanding. A hypothetical 10% decrease in market interest rates would not have resulted in a material decrease in fair value of Dominion Energy Gas’ foreign currency swaps at December 31, 2019 and would have resulted in a decrease of $8 million in the fair value of Dominion Energy Gas’ foreign currency swaps at December 31, 2018.

The impact of a change in interest rates on the Companies’ interest rate-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from interest rate derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.

Investment Price Risk

Dominion Energy and Virginia Power are subject to investment price risk due to securities held as investments in nuclear decommissioning and rabbi trust funds that are managed by third-party

67

Management’s Discussion and Analysis of Financial Condition and Results of Operations, Continued

investment managers. These trust funds primarily hold marketable securities that are reported in the Consolidated Balance Sheets at fair value.

Dominion Energy recognized net investment gains (including investment income) on nuclear decommissioning and rabbi trust investments of $1 billion for the year ended December 31, 2019. Dominion Energy recognized net investment losses (including investment income) on nuclear decommissioning trust investments of $135 million for the year ended December 31, 2018. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Dominion Energy recorded, in AOCI and regulatory liabilities, a net increase in unrealized gains on debt investments of $74 million for the year ended December 31, 2019 and recorded a net decrease in unrealized gains on debt investments of $36 million for the year ended December 31, 2018.

Virginia Power recognized net investment gains (including investment income) on nuclear decommissioning trust investments of $481 million for the year ended December 31, 2019. Virginia Power recognized net investment losses (including investment income) on nuclear decommissioning trust investments of $44 million for the year ended December 31, 2018. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Virginia Power recorded, in AOCI and regulatory liabilities, a net increase in unrealized gains on debt investments of $30 million for the year ended December 31, 2019 and recorded a net decrease in unrealized gains on debt investments of $21 million for the year ended December 31, 2018.

Dominion Energy sponsors pension and other postretirement employee benefit plans that hold investments in trusts to fund employee benefit payments. Virginia Power and Dominion Energy Gas employees participate in these plans. Dominion Energy’s pension and other postretirement plan assets experienced aggregate actual returns (losses) of $2.1 billion and $(605) million in 2019 and 2018, respectively, versus expected returns of $848 million and $806 million, respectively. Dominion Energy Gas’ pension and other postretirement plan assets for employees represented by collective bargaining units experienced aggregate actual returns (losses) of $167 million and $(129) million in 2019 and 2018, respectively, versus expected returns of $70 million and $178 million, respectively. Differences between actual and

expected returns on plan assets are accumulated and amortized during future periods. As such, any investment-related declines in these trusts will result in future increases in the net periodic cost recognized for such employee benefit plans and will be included in the determination of the amount of cash to be contributed to the employee benefit plans. A hypothetical 0.25% decrease in the assumed long-term rates of return on Dominion Energy’s plan assets would result in an increase in net periodic cost of $23 million and $19 million as of December 31, 2019 and 2018, respectively, for pension benefits and $5 million and $4 million as of December 31, 2019 and 2018, respectively, for other postretirement benefits. A hypothetical 0.25% decrease in the assumed long-term rates of return on Dominion Energy Gas’ plan assets, for employees represented by collective bargaining units, would result in an increase in net periodic cost of $2 million and $4 million as of December 31, 2019 and 2018, respectively, for pension benefits and $1 million as of December 31, 2018 for other postretirement benefits. This hypothetical decrease would result in an immaterial change in net periodic cost to Dominion Energy Gas for other postretirement benefits as of December 31, 2019.

Risk Management Policies

The Companies have established operating procedures with corporate management to ensure that proper internal controls are maintained. In addition, Dominion Energy has established an independent function at the corporate level to monitor compliance with the credit and commodity risk management policies of all subsidiaries, including Virginia Power and Dominion Energy Gas. Dominion Energy maintains credit policies that include the evaluation of a prospective counterparty’s financial condition, collateral requirements where deemed necessary and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty. In addition, Dominion Energy also monitors the financial condition of existing counterparties on an ongoing basis. Based on these credit policies and the Companies’ December 31, 2019 provision for credit losses, management believes that it is unlikely that a material adverse effect on the Companies’ financial position, results of operations or cash flows would occur as a result of counterparty nonperformance.

68

Item 8. Financial Statements and Supplementary Data

Page Number
Dominion Energy, Inc.
Report of Independent Registered Public Accounting Firm71
Consolidated Statements of Income for the years ended December 31, 2019, 2018 and 201774
Consolidated Statements of Comprehensive Income for the years ended December 31, 2019, 2018 and 201775
Consolidated Balance Sheets at December 31, 2019 and 201876
Consolidated Statements of Equity at December 31, 2019, 2018 and 2017 and for the years then ended78
Consolidated Statements of Cash Flows for the years ended December 31, 2019, 2018 and 201779
Virginia Electric and Power Company
Report of Independent Registered Public Accounting Firm81
Consolidated Statements of Income for the years ended December 31, 2019, 2018 and 201782
Consolidated Statements of Comprehensive Income for the years ended December 31, 2019, 2018 and 201783
Consolidated Balance Sheets at December 31, 2019 and 201884
Consolidated Statements of Common Shareholder’s Equity at December 31, 2019, 2018 and 2017 and for the years then ended86
Consolidated Statements of Cash Flows for the years ended December 31, 2019, 2018 and 201787
Dominion Energy Gas Holdings, LLC
Report of Independent Registered Public Accounting Firm89
Consolidated Statements of Income for the years ended December 31, 2019, 2018 and 201790
Consolidated Statements of Comprehensive Income for the years ended December 31, 2019, 2018 and 201791
Consolidated Balance Sheets at December 31, 2019 and 201892
Consolidated Statements of Equity at December 31, 2019, 2018 and 2017 and for the years then ended94
Consolidated Statements of Cash Flows for the years ended December 31, 2019, 2018 and 201795
Combined Notes to Consolidated Financial Statements97
69

[THIS PAGE INTENTIONALLY LEFT BLANK]

70

Report of Independent Registered

Public Accounting Firm

To the Shareholders and the Board of Directors of

Dominion Energy, Inc.

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated balance sheets of Dominion Energy, Inc. and subsidiaries (“Dominion Energy”) at December 31, 2019 and 2018, the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2019, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of Dominion Energy at December 31, 2019 and 2018, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2019, in conformity with accounting principles generally accepted in the United States of America.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), Dominion Energy’s internal control over financial reporting at December 31, 2019, based on criteria established in

Internal Control—Integrated Framework (2013)

issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 28, 2020, expressed an unqualified opinion on Dominion Energy’s internal control over financial reporting.

Basis for Opinion

These consolidated financial statements are the responsibility of Dominion Energy’s management. Our responsibility is to express an opinion on Dominion Energy’s consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matters

The critical audit matters communicated below are matters arising from the current-period audit of the financial statements that were communicated or required to be communicated to the audit

committee and that (1) relate to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.

Investments—Equity Method Investment Impairment Evaluation—Refer to Note 9 to the Consolidated Financial Statements

Critical Audit Matter Description

The investment balance of Dominion Energy’s equity method investment in Atlantic Coast Pipeline, LLC (“Atlantic Coast Pipeline”) was $1.1 billion at December 31, 2019. The Atlantic Coast Pipeline project is the subject of challenges in federal courts, including, among others, challenges of the Atlantic Coast Pipeline project’s biological opinion and incidental take statement, permits providing right of way crossings of certain federal lands, the U.S. Army Corps of Engineers 404 permit, the air permit for a compressor station at Buckingham, Virginia, and the Federal Energy Regulatory Commission (“FERC”) order approving the Certificate of Public Convenience and Necessity. The delays in obtaining and maintaining permits necessary for construction along with construction delays due to judicial actions have impacted the cost and schedule for the Atlantic Coast Pipeline project; project construction is expected to be completed by the end of 2021, with full

in-service

in early 2022 with project costs estimated to be approximately $8 billion, excluding financing costs. Atlantic Coast Pipeline has reached agreements in principle with major customers to amend the contracted rate to share in certain delay cost increases, pending certain regulatory approvals.

Dominion Energy evaluated the carrying amount of its equity method investment in Atlantic Coast Pipeline for an other-than-temporary impairment and determined that it was not impaired. The estimation of the fair

Showing the first 8K of 729K characters. Open the full section

Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosure

None.

Item 9A. Controls and Procedures

Dominion Energy

Senior management of Dominion Energy, including Dominion Energy’s CEO and CFO, evaluated the effectiveness of Dominion Energy’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Dominion Energy’s CEO and CFO have concluded that Dominion Energy’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Dominion Energy’s internal control over financial reporting.

Management’s Annual Report on Internal Control Over Financial Reporting

Management of Dominion Energy understands and accepts responsibility for Dominion Energy’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Dominion Energy continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as Dominion Energy does throughout all aspects of its business.

Dominion Energy maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Audit Committee of the Board of Directors of Dominion Energy, composed entirely of independent directors, meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss auditing, internal control, and financial reporting matters of Dominion Energy and to ensure that each is properly discharging its responsibilities. Both the independent registered public accounting firm and the internal auditors periodically meet alone with the Audit Committee and have free access to the Audit Committee at any time.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act of 2002 require Dominion Energy’s 2019 Annual Report to contain a management’s report and a report of the independent registered public accounting firm regarding the effectiveness of internal control. As a basis for the report, Dominion Energy tested and evaluated the design and operating effectiveness of internal controls. Based on its assessment as of December 31, 2019, Dominion Energy makes the following assertions:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Dominion Energy.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Dominion Energy‘s internal control over financial reporting as of December 31, 2019. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Dominion Energy maintained effective internal control over financial reporting as of December 31, 2019.

Dominion Energy’s independent registered public accounting firm is engaged to express an opinion on Dominion Energy‘s internal control over financial reporting, as stated in their report which is included herein.

In January 2019, Dominion Energy acquired SCANA. Dominion Energy excluded all of the acquired SCANA businesses from the scope of management’s assessment of the effectiveness of Dominion Energy’s internal control over financial reporting as of December 31, 2019. SCANA constituted 19% of Dominion Energy’s total revenues for 2019 and 17% of Dominion Energy’s total assets as of December 31, 2019.

February 28, 2020

196

Report of Independent Registered Public Accounting Firm

To the Shareholders and the Board of Directors of Dominion Energy, Inc.

Opinion on Internal Control over Financial Reporting

We have audited the internal control over financial reporting of Dominion Energy, Inc. and subsidiaries (“Dominion Energy”) at December 31, 2019, based on criteria established in

Internal Control—Integrated Framework (2013)

issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, Dominion Energy maintained, in all material respects, effective internal control over financial reporting at December 31, 2019, based on criteria established in

Internal Control—Integrated Framework (2013)

issued by COSO.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements at and for the year ended December 31, 2019, of Dominion Energy and our report dated February 28, 2020, expressed an unqualified opinion on those consolidated financial statements.

As described in Management’s Annual Report on Internal Control over Financial Reporting, management excluded from its assessment the internal control over financial reporting the legacy SCANA Corporation businesses (the “SCANA businesses”), which were acquired on January 1, 2019, and which constitute 19% of total revenues and 17% of total assets of the consolidated financial statement amounts at and for the year ended December 31, 2019. Accordingly, our audit did not include the internal control over financial reporting of SCANA businesses.

Basis for Opinion

Dominion Energy’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on Dominion Energy’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

Definition and Limitations of Internal Control over Financial Reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/ Deloitte & Touche LLP

Richmond, Virginia

February 28, 2020

197

Virginia Power

Senior management of Virginia Power, including Virginia Power’s CEO and CFO, evaluated the effectiveness of Virginia Power’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Virginia Power’s CEO and CFO have concluded that Virginia Power’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Virginia Power’s internal control over financial reporting.

Management’s Annual Report on Internal Control over Financial Reporting

Management of Virginia Power understands and accepts responsibility for Virginia Power’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Virginia Power continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as it does throughout all aspects of its business.

Virginia Power maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Board of Directors also serves as Virginia Power’s Audit Committee and meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss Virginia Power’s auditing, internal accounting control and financial reporting matters and to ensure that each is properly discharging its responsibilities.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act require Virginia Power’s 2019 Annual Report to contain a management’s report regarding the effectiveness of internal control. As a basis for the report, Virginia Power tested and evaluated the design and operating effectiveness of internal controls. Based on the assessment as of December 31, 2019, Virginia Power makes the following assertions:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Virginia Power.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Virginia Power’s internal control over financial reporting as of December 31, 2019. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Virginia Power maintained effective internal control over financial reporting as of December 31, 2019.

This annual report does not include an attestation report of Virginia Power’s registered public accounting firm regarding internal control over financial reporting. Management’s report is not subject to attestation by Virginia Power’s independent registered public accounting firm pursuant to a permanent exemption under the Dodd-Frank Act.

February 28, 2020

Dominion Energy Gas

Senior management of Dominion Energy Gas, including Dominion Energy Gas’ CEO and CFO, evaluated the effectiveness of Dominion Energy Gas’ disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Dominion Energy Gas’ CEO and CFO have concluded that Dominion Energy Gas’ disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Dominion Energy Gas’ internal control over financial reporting.

Management’s Annual Report on Internal Control over Financial Reporting

Management of Dominion Energy Gas understands and accepts responsibility for Dominion Energy Gas’ financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Dominion Energy Gas continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as it does throughout all aspects of its business.

Dominion Energy Gas maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Board of Directors also serves as Dominion Energy Gas’ Audit Committee and meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss Dominion Energy Gas’ auditing, internal accounting control and financial reporting matters and to ensure that each is properly discharging its responsibilities.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act require Dominion Energy Gas’ 2019 Annual Report to contain a management’s report regarding the effectiveness of internal control. As a basis for the report, Dominion Energy Gas tested and evaluated the design and operating effectiveness of internal controls. Based on the assessment as of December 31, 2019, Dominion Energy Gas makes the following assertions:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Dominion Energy Gas.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal

198

controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Dominion Energy Gas’ internal control over financial reporting as of December 31, 2019. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Dominion Energy Gas maintained effective internal control over financial reporting as of December 31, 2019.

This annual report does not include an attestation report of Dominion Energy Gas’ registered public accounting firm regarding internal control over financial reporting. Management’s report is not subject to attestation by Dominion Energy Gas’ independent registered public accounting firm pursuant to a permanent exemption under the Dodd-Frank Act.

February 28, 2020

Item 9B. Other Information

Explanatory Note: The following information is furnished in this Form 10-K in lieu of being furnished pursuant to Item 2.02 in a Form

8-K.

The date of the events reported below was February 28, 2020.

On February 11, 2020, Dominion Energy issued its 4th Quarter 2019 Earnings Release Kit reporting unaudited earnings determined in accordance with GAAP for the year ended December 31, 2019. On February 28, 2020, Dominion Energy issued a revised 4th Quarter 2019 Earnings Release Kit to reflect a reduction in reported earnings for the year ended December 31, 2019. The reduction relates to additional reserves taken for SCANA legal proceedings. The revised Earnings Release Kit reflecting the reduction in earnings is furnished with this Form 10-K as Exhibit 99.

199

Part III

Item 10. Directors, Executive Officers and Corporate Governance

Dominion Energy

The following information for Dominion Energy is incorporated by reference from the Dominion Energy 2020 Proxy Statement, which will be filed on or around March 26, 2020:

•Information regarding the directors required by this item is found under the heading Election of Directors .
•Information regarding compliance with Section 16 of the Securities Exchange Act of 1934, as amended, required by this item is found under the heading Delinquent Section 16(a) Reports .
•Information regarding the Dominion Energy Audit Committee Financial expert(s) required by this item is found under the heading The Committees of the Board—Audit Committee .
•Information regarding the Dominion Energy Audit Committee required by this item is found under the headings The Committees of the Board—Audit Committee and Audit Committee Report .
•Information regarding Dominion Energy’s Code of Ethics and Business Conduct required by this item is found under the heading Other Information — Code of Ethics and Business Conduct .

The information concerning the executive officers of Dominion Energy required by this item is included in Part I of this Form

10-K

under the caption

Information about our

Executive Officers

. Each executive officer of Dominion Energy is elected annually.

Item 11. Executive Compensation

Dominion Energy

The following information about Dominion Energy is contained in the 2020 Proxy Statement and is incorporated by reference: the information regarding executive compensation contained under the headings

Compensation Discussion and Analysis

and

Executive Compensation Tables

; the information regarding Compensation Committee interlocks contained under the heading

Compensation Committee Interlocks

and

Insider Participation

; the information regarding the Compensation Committee review and discussions of Compensation Discussion and Analysis contained under the heading

Compensation, Governance and Nominating Committee Report

; and the information regarding director compensation contained under the heading

Compensation of Non-Employee Directors.

Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

Dominion Energy

The information concerning stock ownership by directors, executive officers and five percent beneficial owners contained under the heading

Securities Ownership

in the 2020 Proxy Statement is incorporated by reference.

The information regarding equity securities of Dominion Energy that are authorized for issuance under its equity compensation plans contained under the heading

Executive Compensation Tables-Equity

Compensation Plans

in the 2020 Proxy Statement is incorporated by reference.

Item 13. Certain Relationships and Related Transactions, and Director Independence

Dominion Energy

The information regarding related party transactions required by this item found under the heading

Other Information—Certain Relationships and Related Party Transactions,

and information regarding director independence found under the heading

Corporate Governance –Director Independence,

in the 2020 Proxy Statement is incorporated by reference.

200

Item 14. Principal Accountant Fees and Services

Dominion Energy

The information concerning principal accountant fees and services contained under the heading

Auditor Fees and Pre-Approval Policy

in the 2020 Proxy Statement is incorporated by reference.

Virginia Power and Dominion Energy Gas

The following table presents fees paid to Deloitte & Touche LLP for services related to Virginia Power and Dominion Energy Gas for the fiscal years ended December 31, 2019 and 2018.

Type of Fees20192018
(millions)
Virginia Power
Audit fees$2.13$1.68
Audit-related fees——
Tax fees——
All other fees——
Total Fees$2.13$1.68
Dominion Energy Gas
Audit fees$2.31$0.97
Audit-related fees0.260.26
Tax fees——
All other fees——
Total Fees$2.57$1.23

Audit fees represent fees of Deloitte & Touche LLP for the audit of Virginia Power and Dominion Energy Gas’ annual consolidated financial statements, the review of financial statements included in Virginia Power and Dominion Energy Gas’ quarterly Form

10-Q

reports, and the services that an independent auditor would customarily provide in connection with subsidiary audits, statutory requirements, regulatory filings, and similar engagements for the fiscal year, such as comfort letters, attest services, consents, and assistance with review of documents filed with the SEC.

Audit-related fees consist of assurance and related services that are reasonably related to the performance of the audit or review of Virginia Power and Dominion Energy Gas’ consolidated financial statements or internal control over financial reporting. This category may include fees related to the performance of audits and attest services not required by statute or regulations, due diligence related to mergers, acquisitions, and investments, and accounting consultations about the application of GAAP to proposed transactions.

Virginia Power and Dominion Energy Gas’ Boards of Directors have adopted the Dominion Energy Audit Committee

pre-approval

policy for their independent auditor’s services and fees and have delegated the execution of this policy to the Dominion Energy Audit Committee. In accordance with this delegation, each year the Dominion Energy Audit Committee

pre-approves

a schedule that details the services to be provided for the following year and an estimated charge for such services. At its December 2019 meeting, the Dominion Energy Audit Committee approved schedules of services and fees for 2020 inclusive of Virginia Power and Dominion Energy Gas. In accordance with the

pre-approval

policy, any changes to the

pre-approved

schedule may be

pre-approved

by the Dominion Energy Audit Committee or a delegated member of the Dominion Energy Audit Committee.

201

Part IV

Item 15. Exhibits and Financial Statement Schedules

(a) Certain documents are filed as part of this Form

10-K

and are incorporated by reference and found on the pages noted.

  1. Financial Statements

See Index on page 69.

  1. All schedules are omitted because they are not applicable, or the required information is either not material or is shown in the financial statements or the related notes.

  2. Exhibits (incorporated by reference unless otherwise noted)

Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
2.1Agreement and Plan of Merger by and among Dominion Energy, Inc., Sedona Corp. and SCANA Corporation, dated as of January 2, 2018 (Exhibit 2.1, Form 8-K filed January 5, 2018, File No. 1-8489).X
3.1.aDominion Energy, Inc. Articles of Incorporation, as restated, effective December 13, 2019 (Exhibit 3.1, Form 8-K filed December 13, 2019, File No.1-8489).X
3.1.bVirginia Electric and Power Company Amended and Restated Articles of Incorporation, as in effect on October 30, 2014 (Exhibit 3.1.b, Form 10-Q filed November 3, 2014, File No. 1-2255).X
3.1.cArticles of Organization of Dominion Energy Gas Holdings, LLC (Exhibit 3.1, Form S-4 filed April 4, 2014, File No. 333-195066).X
3.1.dArticles of Amendment to the Articles of Organization of Dominion Energy Gas Holdings, LLC (Exhibit 3.1, Form 8-K filed May 16, 2017, File No. 1-37591).X
3.2.aDominion Energy, Inc. Bylaws, as amended and restated, effective September 26, 2019 (Exhibit 3.2, Form 8-K filed October 2, 2019, File No. 1-8489).X
3.2.bVirginia Electric and Power Company Amended and Restated Bylaws, effective June 1, 2009 (Exhibit 3.1, Form 8-K filed June 3, 2009, File No. 1-2255).X
3.2.cOperating Agreement of Dominion Energy Gas Holdings, LLC as amended and restated, Effective November 5, 2019 (Exhibit 3.1, Form 8-K filed November 12, 2019, File No. 001-37591).X
4Dominion Energy, Inc., Virginia Electric and Power Company and Dominion Energy Gas Holdings, LLC agree to furnish to the Securities and Exchange Commission upon request any other instrument with respect to long-term debt as to which the total amount of securities authorized does not exceed 10% of any of their total consolidated assets.XXX
4.1.aSee Exhibit 3.1.a above.X
4.1.bSee Exhibit 3.1.b above.X
4.2Indenture of Mortgage of Virginia Electric and Power Company, dated November 1, 1935, as supplemented and modified by Fifty-Eighth Supplemental Indenture (Exhibit 4(ii), Form 10-K for the fiscal year ended December 31, 1985, File No. 1-2255); Ninety-Second Supplemental Indenture, dated as of July 1, 2012 (Exhibit 4.1, Form 10-Q for the quarter ended June 30, 2012 filed August 1, 2012, File No. 1-2255).XX
202
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
4.3Form of Senior Indenture, dated June 1, 1998, between Virginia Electric and Power Company and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)), as Trustee (Exhibit 4(iii), Form S-3 Registration Statement filed February 27, 1998, File No. 333-47119); Form of Thirteenth Supplemental Indenture, dated as of January 1, 2006 (Exhibit 4.3, Form 8-K filed January 12, 2006, File No. 1-2255); Form of Fourteenth Supplemental Indenture, dated May 1, 2007 (Exhibit 4.2, Form 8-K filed May 16, 2007, File No. 1-2255); Form of Seventeenth Supplemental Indenture, dated November 1, 2007 (Exhibit 4.3, Form 8-K filed November 30, 2007, File No. 1-2255); Form of Nineteenth Supplemental and Amending Indenture, dated November 1, 2008 (Exhibit 4.2, Form 8-K filed November 5, 2008, File No. 1-2255); Form of Twentieth Supplemental Indenture, dated June 1, 2009 (Exhibit 4.3, Form 8-K filed June 24, 2009, File No. 1-2255); Form of Twenty-First Supplemental Indenture, dated August 1, 2010 (Exhibit 4.3, Form 8-K filed September 1, 2010, File No. 1-2255); Twenty-Second Supplemental Indenture, dated as of January 1, 2012 (Exhibit 4.3, Form 8-K filed January 12, 2012, File No. 1-2255); Twenty-Fourth Supplemental Indenture, dated as of January 1, 2013 (Exhibit 4.4, Form 8-K filed January 8, 2013, File No. 1-2255); Twenty-Fifth Supplemental Indenture, dated as of March 1, 2013 (Exhibit 4.3, Form 8-K filed March 14, 2013, File No. 1-2255); Twenty-Sixth Supplemental Indenture, dated as of August 1, 2013 (Exhibit 4.3, Form 8-K filed August 15, 2013, File No. 1-2255); Twenty-Seventh Supplemental Indenture, dated February 1, 2014 (Exhibit 4.3, Form 8-K filed February 7, 2014, File No. 1-2255); Twenty-Eighth Supplemental Indenture, dated February 1, 2014 (Exhibit 4.4, Form 8-K filed February 7, 2014, File No. 1-2255); Twenty-Ninth Supplemental Indenture, dated May 1, 2015 (Exhibit 4.3, Form 8-K filed May 13, 2015, File No. 1-02255); Thirtieth Supplemental Indenture, dated May 1, 2015 (Exhibit 4.4, Form 8-K filed May 13, 2015, File No. 1-02255); Thirty-First Supplemental Indenture, dated January 1, 2016 (Exhibit 4.3, Form 8-K filed January 14, 2016, File No. 000-55337); Thirty-Second Supplemental Indenture, dated November 1, 2016 (Exhibit 4.3, Form 8-K filed November 16, 2016, File No. 000-55337); Thirty-Third Supplemental Indenture, dated November 1, 2016 (Exhibit 4.4, Form 8-K filed November 16, 2016, File No. 000-55337); Thirty-Fourth Supplemental Indenture, dated March 1, 2017 (Exhibit 4.3, Form 8-K filed March 16, 2017; File No. 000-55337).XX
4.4Senior Indenture, dated as of September 1, 2017, between Virginia Electric and Power Company and U.S. Bank National Association, as Trustee (Exhibit 4.1, Form 8-K filed September 13, 2017, File No.000-55337); First Supplemental Indenture, dated as of September 1, 2017 (Exhibit 4.2, Form 8-K filed September 13, 2017, File No.000-55337); Second Supplemental Indenture, dated as of March 1, 2018 (Exhibit 4.2, Form 8-K filed March 22, 2018, File No. 000-55337); Third Supplemental Indenture, dated as of November 1, 2018 (Exhibit 4.2, Form 8-K filed November 28, 2018, File No. 000-55337); Fourth Supplemental Indenture, dated as of July 1, 2019 (Exhibit 4.2, Form 8-K filed July 10, 2019, File No. 00-55337); Fifth Supplemental Indenture, dated as of December 1, 2019 (Exhibit 4.2, Form 8-K filed December 5, 2019, File No. 000-55337).XX
4.5Indenture, Junior Subordinated Debentures, dated December 1, 1997, between Dominion Resources, Inc. and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)) as supplemented by a Form of Second Supplemental Indenture, dated January 1, 2001 (Exhibit 4.6, Form 8-K filed January 12, 2001, File No. 1-8489).X
4.6Indenture, dated April 1, 1995, between Consolidated Natural Gas Company and The Bank of New York Mellon (as successor trustee to United States Trust Company of New York) (Exhibit (4), Certificate of Notification No. 1 filed April 19, 1995, File No. 70-8107); Securities Resolution No. 2 effective as of October 16, 1996 (Exhibit 2, Form 8-A filed October 18, 1996, File No. 1-3196 and relating to the 6 7/8% Debentures Due October 15, 2026); Securities Resolution No. 4 effective as of December 9, 1997 (Exhibit 2, Form 8-A filed December 12, 1997, File No. 1-3196 and relating to the 6.80% Debentures Due December 15, 2027).X
203
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
4.7Form of Senior Indenture, dated June 1, 2000, between Dominion Resources, Inc. and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)), as Trustee (Exhibit 4(iii), Form S-3 Registration Statement filed December 21, 1999, File No. 333-93187); Form of Sixteenth Supplemental Indenture, dated December 1, 2002 (Exhibit 4.3, Form 8-K filed December 13, 2002, File No. 1-8489); Form of Twenty-First Supplemental Indenture, dated March 1, 2003 (Exhibits 4.3, Form 8-K filed March 4, 2003, File No. 1-8489); Form of Twenty-Second Supplemental Indenture, dated July 1, 2003 (Exhibit 4.2, Form 8-K filed July 22, 2003, File No. 1-8489); Form of Twenty-Ninth Supplemental Indenture, dated June 1, 2005 (Exhibit 4.3, Form 8-K filed June 17, 2005, File No. 1-8489); Form of Thirty-Sixth Supplemental Indentures, dated June 1, 2008 (Exhibit 4.3, Form 8-K filed June 16, 2008, File No. 1-8489); Form of Thirty-Ninth Supplemental Indenture, dated August 1, 2009 (Exhibit 4.3, Form 8-K filed August 12, 2009, File No. 1-8489); Forty-Third Supplemental Indenture, dated August 1, 2011 (Exhibit 4.3, Form 8-K, filed August 5, 2011, File No. 1-8489); Forty-Sixth Supplemental Indenture, dated September 1, 2012 (Exhibit 4.4, Form 8-K, filed September 13, 2012, File No. 1-8489); Forty-Seventh Supplemental Indenture, dated September 1, 2012 (Exhibit 4.5, Form 8-K, filed September 13, 2012, File No. 1-8489); Fifty-First Supplemental Indenture, dated November 1, 2014 (Exhibit 4.5, Form 8-K, filed November 25, 2014, File No. 1-8489).X
4.8Indenture, dated as of June 1, 2015, between Dominion Resources, Inc. and Deutsche Bank Trust Company Americas, as Trustee (Exhibit 4.1, Form 8-K filed June 15, 2015, File No. 1-8489); Second Supplemental Indenture, dated as of September 1, 2015 (Exhibit 4.2, Form 8-K filed September 24, 2015, File No. 1-8489); Fourth Supplemental Indenture, dated as of August 1, 2016 (Exhibit 4.2, Form 8-K filed August 9, 2016, File No. 1-8489); Fifth Supplemental Indenture, dated as of August 1, 2016 (Exhibit 4.3, Form 8-K filed August 9, 2016, File No. 1-8489); Sixth Supplemental Indenture, dated as of August 1, 2016 (Exhibit 4.4, Form 8-K filed August 9, 2016, File No. 1-8489); Ninth Supplemental Indenture, dated as of January 1, 2017 (Exhibit 4.2, Form 8-K filed January 12, 2017, File No. 1-8489); Tenth Supplemental Indenture, dated as of January 1, 2017 (Exhibit 4.3, Form 8-K filed January 12, 2017, File No. 1-8489); Eleventh Supplemental Indenture, dated as of March 1, 2017 (Exhibit 4.3, Form 10-Q filed May 4, 2017, File No. 1-8489); Twelfth Supplemental Indenture, dated as of June 1, 2017 (Exhibit 4.2, Form 10-Q filed August 3, 2017, File No. 1-8489); Thirteenth Supplemental Indenture, dated December 1, 2017 (Exhibit 4.8, Form 10-K for the fiscal year ended December 31, 2017 filed February 27, 2018, File No. 1-8489); Fourteenth Supplemental Indenture, dated May 1, 2018 (Exhibit 4.2, Form 10-Q filed August 2, 2018, File No. 1-8489); Fifteenth Supplemental Indenture, dated June 1, 2018 (Exhibit 4.2, Form 8-K, filed June 5, 2018, File No. 1-8489); Sixteenth Supplemental Indenture, dated March 1, 2019 (Exhibit 4.2, Form 8-K filed March 13, 2019, File No. 1-8489); Seventeenth Supplemental Indenture, dated as of August 1, 2019 (Exhibit 4.2, Form 10-Q filed November 1, 2019, File No. 1-8489).X
4.9Junior Subordinated Indenture II, dated June 1, 2006, between Dominion Resources, Inc. and The Bank of New York Mellon (successor to JPMorgan Chase Bank, N.A.), as Trustee (Exhibit 4.1, Form 10-Q for the quarter ended June 30, 2006 filed August 3, 2006, File No. 1-8489); First Supplemental Indenture dated as of June 1, 2006 (Exhibit 4.2, Form 10-Q for the quarter ended June 30, 2006 filed August 3, 2006, File No. 1-8489); Second Supplemental Indenture, dated as of September 1, 2006 (Exhibit 4.2, Form 10-Q for the quarter ended September 30, 2006 filed November 1, 2006, File No. 1-8489); Third Supplemental and Amending Indenture, dated as of June 1, 2009 (Exhibit 4.2, Form 8-K filed June 15, 2009, File No. 1-8489); Sixth Supplemental Indenture, dated as of June 1, 2014 (Exhibit 4.3, Form 8-K filed July 1, 2014, File No. 1-8489); Seventh Supplemental Indenture, dated as of September 1, 2014 (Exhibit 4.3, Form 8-K filed October 3, 2013, File No. 1-8489); Eighth Supplemental Indenture, dated March 7, 2016 (Exhibit 4.4, Form 8-K filed March 7, 2016, File No. 1-8489); Ninth Supplemental Indenture, dated May 26, 2016 (Exhibit 4.4, Form 8-K filed May 26, 2016, File No. 1-8489); Tenth Supplemental Indenture, dated July 1, 2016 (Exhibit 4.3, Form 8-K filed July 19, 2016, File No. 1-8489); Eleventh Supplemental Indenture, dated August 1, 2016 (Exhibit 4.3, Form 8-K filed August 15, 2016, File No. 1-8489); Twelfth Supplemental Indenture, dated August 1, 2016 (Exhibit 4.4, Form 8-K filed August 15, 2016, File No. 1-8489); Thirteenth Supplemental Indenture, dated May 18, 2017 (Exhibit 4.4, Form 8-K filed May 18, 2017, File No. 1-8489); Fourteenth Supplemental Indenture, dated June 27, 2019 (Exhibit 4.5, Form 8-K filed June 27, 2019, File No. 1-8489); Fifteenth Supplemental Indenture, dated June 27, 2019 (Exhibit 4.6, Form 8-K filed June 27, 2019, File No. 1-8489).X
204
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
4.10Replacement Capital Covenant entered into by Dominion Resources, Inc. dated June 23, 2006 (Exhibit 4.3, Form 10-Q for the quarter ended June 30, 2006 filed August 3, 2006, File No. 1-8489), as amended by Amendment No. 1 to Replacement Capital Covenant dated September 26, 2011 (Exhibit 4.2, Form 10-Q for the quarter ended September 30, 2011 filed October 28, 2011, File No. 1-8489).X
4.11Replacement Capital Covenant entered into by Dominion Resources, Inc. dated September 29, 2006 (Exhibit 4.3, Form 10-Q for the quarter ended September 30, 2006 filed November 1, 2006, File No. 1-8489), as amended by Amendment No. 1 to Replacement Capital Covenant dated September 26, 2011 (Exhibit 4.3, Form 10-Q for the quarter ended September 30, 2011 filed October 28, 2011, File No. 1-8489).X
4.122016 Series A Purchase Contract and Pledge Agreement, dated August 15, 2016, between the Company and Deutsche Bank Trust Company Americas, as Purchase Contract Agent, Collateral Agent, Custodial Agent and Securities Intermediary (Exhibit 4.7, Form 8-K filed August 15, 2016, File No. 1-8489).X
4.13Indenture, dated as of October 1, 2013, between Dominion Gas Holdings, LLC and Deutsche Bank Trust Company Americas, as Trustee (Exhibit 4.1, Form S-4 filed April 4, 2014, File No. 333-195066); Second Supplemental Indenture, dated as of October 1, 2013 (Exhibit 4.3, Form S-4 filed April 4, 2014, File No. 333-195066); Third Supplemental Indenture, dated as of October 1, 2013 (Exhibit 4.4, Form S-4 filed April 4, 2014, File No. 333-195066); Fourth Supplemental Indenture, dated as of December 1, 2014 (Exhibit 4.2, Form 8-K filed December 8, 2014, File No. 333-195066); Fifth Supplemental Indenture, dated as of December 1, 2014 (Exhibit 4.3, Form 8-K filed December 8, 2014, File No. 333-195066); Sixth Supplemental Indenture, dated as of December 1, 2014 (Exhibit 4.4, Form 8-K filed December 8, 2014, File No. 333-195066); Seventh Supplemental Indenture, dated as of November 1, 2015 (Exhibit 4.2, Form 8-K filed November 17, 2015, File No. 001-37591); Eighth Supplemental Indenture, dated as of May 1, 2016 (Exhibit 4.1.a, Form 10-Q filed August 3, 2016, File No. 1-37591); Ninth Supplemental Indenture, dated as of June 1, 2016 (Exhibit 4.1.b, Form 10-Q filed August 3, 2016, File No. 1-37591); Tenth Supplemental Indenture, dated as of June 1, 2016 (Exhibit 4.1.c, Form 10-Q filed August 3, 2016, File No. 1-37591); Eleventh Supplemental Indenture, dated June 1, 2018 (Exhibit 4.2, Form 8-K filed June 19, 2018, File No. 1-37591); Twelfth Supplemental Indenture, dated November 1, 2019 (Exhibit 4.2, Form 8-K filed November 21, 2019, File No. 1-37591); Thirteenth Supplemental Indenture, dated November 1, 2019 (Exhibit 4.3, Form 8-K filed November 21, 2019, File No. 1-37591); Fourteenth Supplemental Indenture, dated November 1, 2019 (Exhibit 4.4, Form 8-K filed November 21, 2019, File No. 1-37591).XX
4.142019 Series A Purchase Contract and Pledge Agreement, dated June 14, 2019, among the Dominion Energy, Inc., Deutsche Bank Trust Company Americas, in its capacity as the purchase contract agent, and HSBC Bank USA, National Association, in its capacity as the collateral agent, custodial agent and securities intermediary (Exhibit 3.1, Form 8-K filed June 14, 2019, File No.1-8489).X
4.15Registration Rights Agreement, dated December 16, 2019, by and between Dominion Energy, Inc. and Gallagher Fiduciary Advisors, LLC on behalf of the Dominion Energy, Inc. Defined Benefit Master Trust (Exhibit 4.1, Form 8-K filed December 20, 2019, File No. 1-8489).X
4.16Description of Dominion Energy, Inc.’s Common Stock (filed herewith).X
4.17Description of Dominion Energy, Inc.’s 2016 Series A 5.25% Enhanced Junior Subordinated Notes due 2076 (filed herewith).X
4.18Description of Dominion Energy, Inc.’s 2019 Series A Corporate Units (filed herewith).X
4.19Description of Virginia Electric and Power Company’s Common Stock (filed herewith).X
4.20Description of Dominion Energy Gas Holdings, LLC’s Limited Liability Company Membership Interests (filed herewith).X
4.21Description of Dominion Energy Gas Holdings, LLC’s 2014 Series C 4.6% Senior Notes due 2044 (filed herewith).X
205
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
10.1$6,000,000,000 Fourth Amended and Restated Revolving Credit Agreement, dated March 22, 2019, among Dominion Energy, Inc., Virginia Electric and Power Company, Dominion Energy Gas Holdings, LLC, Questar Gas Company, South Carolina Electric & Gas Company, JPMorgan Chase Bank, N.A., as Administrative Agent, Mizuho Bank, Ltd., Bank of America, N.A., The Bank of Nova Scotia and Wells Fargo Bank, N.A., as Syndication Agents, and other lenders named therein (Exhibit 10.1, Form 8-K filed March 26, 2019, File No. 1-8489).XXX
10.2Inter-Company Credit Agreement, dated October 17, 2013, between Dominion Resources, Inc. and Dominion Gas Holdings, LLC (Exhibit 10.2, Form S-4 filed April 4, 2014, File No. 333-195066).XX
10.3DRS Services Agreement, dated January 1, 2003, between Dominion Resources, Inc. and Dominion Resources Services, Inc. (Exhibit 10.1, Form 10-K for the fiscal year ended December 31, 2011 filed February 28, 2012, File No. 1-8489).X
10.4DRS Services Agreement, dated January 1, 2012, between Dominion Resources Services, Inc. and Virginia Electric and Power Company (Exhibit 10.2, Form 10-K for the fiscal year ended December 31, 2011 filed February 28, 2012, File No. 1-8489 and File No. 1-2255).X
10.5DRS Services Agreement, dated September 12, 2013, between Dominion Gas Holdings, LLC and Dominion Resources Services, Inc. (Exhibit 10.3, Form S-4 filed April 4, 2014, File No. 333-195066).X
10.6DRS Services Agreement, dated January 1, 2003, between Dominion Transmission Inc. and Dominion Resources Services, Inc. (Exhibit 10.4, Form S-4 filed April 4, 2014, File No. 333-195066).X
10.7DRS Services Agreement, dated January 1, 2003, between Dominion Iroquois, Inc. and Dominion Resources Services, Inc. (Exhibit 10.6, Form S-4 filed April 4, 2014, File No. 333-195066).X
10.8Agreement between PJM Interconnection, L.L.C. and Virginia Electric and Power Company (Exhibit 10.1, Form 8-K filed April 26, 2005, File No. 1-2255 and File No. 1-8489).XX
10.9Form of Settlement Agreement in the form of a proposed Consent Decree among the United States of America, on behalf of the United States Environmental Protection Agency, the State of New York, the State of New Jersey, the State of Connecticut, the Commonwealth of Virginia and the State of West Virginia and Virginia Electric and Power Company (Exhibit 10, Form 10-Q for the quarter ended March 31, 2003 filed May 9, 2003, File No. 1-8489 and File No. 1-2255).XX
10.10*Dominion Resources, Inc. Executive Supplemental Retirement Plan, as amended and restated effective December 17, 2004 (Exhibit 10.5, Form 8-K filed December 23, 2004, File No. 1-8489), as amended September 26, 2014 (Exhibit 10.1, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014).XXX
10.11*Form of Employment Continuity Agreement for certain officers of Dominion Resources, Inc. and Virginia Electric and Power Company, amended and restated July 15, 2003 (Exhibit 10.1, Form 10-Q for the quarter ended June 30, 2003 filed August 11, 2003, File No. 1-8489 and File No. 1-2255), as amended March 31, 2006 (Exhibit 10.1, Form 8-K filed April 4, 2006, File No. 1-8489).XXX
10.12*Form of Employment Continuity Agreement for certain officers of Dominion Resources, Inc. and Virginia Electric and Power Company dated January 24, 2013 (effective for certain officers elected subsequent to February 1, 2013) (Exhibit 10.9, Form 10-K for the fiscal year ended December 31, 2013 filed February 28, 2014, File No. 1-8489 and File No. 1-2255).XXX
10.13*Dominion Resources, Inc. Retirement Benefit Restoration Plan, as amended and restated effective December 17, 2004 (Exhibit 10.6, Form 8-K filed December 23, 2004, File No. 1-8489), as amended September 26, 2014 (Exhibit 10.2, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014).XXX
206
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
10.14*Dominion Resources, Inc. Executives’ Deferred Compensation Plan, amended and restated effective December 31, 2004 (Exhibit 10.7, Form 8-K filed December 23, 2004, File No. 1-8489).XXX
10.15*Dominion Resources, Inc. New Executive Supplemental Retirement Plan, as amended and restated effective July 1, 2013 (Exhibit 10.2, Form 10-Q for the quarter ended June 30, 2013 filed August 6, 2013 File No. 1-8489), as amended September 26, 2014 (Exhibit 10.3, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014), as amended effective October 1, 2019 (Exhibit 10.1, Form 8-K filed October 2, 2019, File No. 1-8489).XXX
10.16*Dominion Resources, Inc. New Retirement Benefit Restoration Plan, as amended and restated effective January 1, 2009 (Exhibit 10.17, Form 10-K for the fiscal year ended December 31, 2008 filed February 26, 2009, File No. 1-8489 and Exhibit 10.20, Form 10-K for the fiscal year ended December 31, 2008 filed February 26, 2009, File No. 1-2255), as amended September 26, 2014 (Exhibit 10.4, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014).XXX
10.17*Dominion Resources, Inc. Stock Accumulation Plan for Outside Directors, amended as of February 27, 2004 (Exhibit 10.15, Form 10-K for the fiscal year ended December 31, 2003 filed March 1, 2004, File No. 1-8489) as amended effective December 31, 2004 (Exhibit 10.1, Form 8-K filed December 23, 2004, File No. 1-8489).X
10.18*Dominion Resources, Inc. Directors Stock Compensation Plan, as amended February 27, 2004 (Exhibit 10.16, Form 10-K for the fiscal year ended December 31, 2003 filed March 1, 2004, File No. 1-8489) as amended effective December 31, 2004 (Exhibit 10.2, Form 8-K filed December 23, 2004, File No. 1-8489).X
10.19*Dominion Resources, Inc. Non-Employee Directors’ Compensation Plan, effective January 1, 2005, as amended and restated effective December 17, 2009 (Exhibit 10.18, Form 10-K filed for the fiscal year ended December 31, 2009 filed February 26, 2010, File No. 1-8489).X
10.20*Dominion Resources, Inc. Executive Stock Purchase Tool Kit, effective September 1, 2001, amended and restated May 7, 2014 (Exhibit 10.4, Form 10-Q for the fiscal quarter ended June 30, 2014 filed July 30, 2014, File No. 1-8489 and File No. 1-2250).XXX
10.21*Letter agreement between Dominion Resources, Inc. and Thomas F. Farrell, II, dated February 27, 2003 (Exhibit 10.24, Form 10-K for the fiscal year ended December 31, 2002 filed March 20, 2003, File No. 1-8489), as amended December 16, 2005 (Exhibit 10.1, Form 8-K filed December 16, 2005, File No. 1-8489).XXX
10.22*Supplemental Retirement Agreement dated October 22, 2003 between Dominion Resources, Inc. and Paul D. Koonce (Exhibit 10.18, Form 10-K for the fiscal year ended December 31, 2003 filed March 1, 2004, File No. 1-2255).XXX
10.23*Form of Advancement of Expenses for certain directors and officers of Dominion Resources, Inc., approved by the Dominion Resources, Inc. Board of Directors on October 24, 2008 (Exhibit 10.2, Form 10-Q for the quarter ended September 30, 2008 filed October 30, 2008, File No. 1-8489 and Exhibit 10.3, Form 10-Q for the quarter ended September 30, 2008 filed October 30, 2008, File No. 1-2255).XXX
10.24*Dominion Resources, Inc. 2014 Incentive Compensation Plan, effective May 7, 2014 (Exhibit 10.1, Form 8-K filed May 7, 2014, File No. 1-8489).XXX
10.25*Form of Restricted Stock Award Agreement under the 2016 Long-Term Incentive Program approved January 21, 2016 (Exhibit 10.48, Form 10-K for the fiscal year ended December 31, 2015 filed February 26, 2016, File No. 1-8489).XXX
10.26*Form of Restricted Stock Award Agreement under the 2017 Long-Term Incentive Program approved January 24, 2017 (Exhibit 10.46, Form 10-K for the fiscal year ended December 31, 2016 filed February 28, 2017, File No. 1-8489).XXX
207
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
10.27*2017 Performance Grant Plan under the 2014 Incentive Compensation Plan approved January 24, 2017 (Exhibit 10.3, Form 10-Q for the quarter ended March 31, 2017 filed May 4, 2017, File No. 1-8489).XXX
10.28*2018 Performance Grant Plan under the 2018 Long-Term Incentive Program approved January 25, 2018 (Exhibit 10.43, Form 10-K for the fiscal year ended December 31, 2017, filed February 27, 2018, File No. 1-8489).XXX
10.29*Form of Restricted Stock Award Agreement under the 2018 Long-Term Incentive Program approved January 25, 2018 (Exhibit 10.44, Form 10-K for the fiscal year ended December 31, 2017, filed February 27, 2018, File No. 1-8489).XXX
10.30*2019 Performance Grant Plan under the 2019 Long-Term Incentive Program approved January 24, 2019 (Exhibit 10.42, Form 10-K for the fiscal year ended December 31, 2018, filed February 28, 2019, File No. 1-8489).XXX
10.31*2019 Goal-Based Stock Award Agreement under the 2019 Long-Term Incentive Program approved January 24, 2019 (Exhibit 10.43, Form 10-K for the fiscal year ended December 31, 2018, filed February 28, 2019, File No. 1-8489)..XXX
10.32*Form of Restricted Stock Award Agreement under the 2019 Long-Term Incentive Program approved January 24, 2019 (Exhibit 10.42, Form 10-K for the fiscal year ended December 31, 2018, filed February 28, 2019, File No. 1-8489).XXX
10.33*2020 Performance Grant Plan under the 2020 Long-Term Incentive Program approved January 23, 2020 (filed herewith).XXX
10.34*2020 Goal-Based Stock Award Agreement under the 2020 Long-Term Incentive Program approved January 23, 2020 (filed herewith).XXX
10.35*Form of Restricted Stock Award Agreement under the 2020 Long-Term Incentive Program approved January 23, 2020 (filed herewith).XXX
21Subsidiaries of Dominion Energy, Inc. (filed herewith).X
23Consent of Deloitte & Touche LLP, Independent Registered Public Accounting Firm for Dominion Energy, Inc., Virginia Electric and Power Company and Dominion Energy Gas Holdings, LLC (filed herewith).XXX
31.aCertification by Chief Executive Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.bCertification by Chief Financial Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.cCertification by Chief Executive Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.dCertification by Chief Financial Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.eCertification by Chief Executive Officer of Dominion Energy Gas Holdings, LLC pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.fCertification by Chief Financial Officer of Dominion Energy Gas Holdings, LLC pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
32.aCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Dominion Energy, Inc. as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
32.bCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Virginia Electric and Power Company as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
208
Exhibit NumberDescriptionDominion EnergyVirginia PowerDominion Energy Gas
32.cCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Dominion Energy Gas Holdings, LLC as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
99Dominion Energy, Inc. Earnings Release Kit (furnished herewith).X
101The following financial statements from Dominion Energy, Inc.’s Annual Report on Form 10-K for the year ended December 31, 2019, filed on February 28, 2020, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Equity, (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements. The following financial statements from Virginia Electric and Power Company’s Annual Report on Form 10-K for the year ended December 31, 2019, filed on February 28, 2020, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Common Shareholder’s Equity (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements. The following financial statements from Dominion Energy Gas Holdings, LLC’s Annual Report on Form 10-K for the year ended December 31, 2019, filed on February 28, 2020, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Equity, (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements.XXX
104Cover Page Interactive Data File formatted in iXBRL (Inline eXtensible Business Reporting Language) and contained in Exhibit 101.XXX
*Indicates management contract or compensatory plan or arrangement.

Item 16. Form

10-K

Summary

None.

209

Signatures

Dominion Energy

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

DOMINION ENERGY, INC.
By:/s/ Thomas F. Farrell, II
(Thomas F. Farrell, II, Chairman, President and Chief Executive Officer)

Date: February 28, 2020

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 28th day of February, 2020.

SignatureTitle
/s/ Thomas F. Farrell, II Thomas F. Farrell, IIChairman of the Board of Directors, President and Chief Executive Officer
/s/ James A. Bennett James A. BennettDirector
/s/ Helen E. Dragas Helen E. DragasDirector
/s/ James O. Ellis, Jr. James O. Ellis, Jr.Director
/s/ D. Maybank Hagood D. Maybank HagoodDirector
/s/ John W. Harris John W. HarrisDirector
/s/ Ronald W. Jibson Ronald W. JibsonDirector
/s/ Mark J. Kington Mark J. KingtonDirector
/s/ Joseph M. Rigby Joseph M. RigbyDirector
/s/ Pamela J. Royal Pamela J. RoyalDirector
/s/ Robert H. Spilman, Jr. Robert H. Spilman, Jr.Director
/s/ Susan N. Story Susan N. StoryDirector
/s/ Michael E. Szymanczyk Michael E. SzymanczykDirector
/s/ James R. Chapman James R. ChapmanExecutive Vice President, Chief Financial Officer and Treasurer
/s/ Michele L. Cardiff Michele L. CardiffVice President, Controller and Chief Accounting Officer
210

Virginia Power

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

VIRGINIA ELECTRIC AND POWER COMPANY
By:/s/ Thomas F. Farrell, II
(Thomas F. Farrell, II, Chairman of the Board of Directors and Chief Executive Officer)

Date: February 28, 2020

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 28th day of February, 2020.

SignatureTitle
/s/ Thomas F. Farrell, II Thomas F. Farrell, IIChairman of the Board of Directors and Chief Executive Officer
/s/ Robert M. Blue Robert M. BlueDirector
/s/ Carlos M. Brown Carlos M. BrownDirector
/s/ James R. Chapman James R. ChapmanExecutive Vice President, Chief Financial Officer and Treasurer
/s/ Michele L. Cardiff Michele L. CardiffVice President, Controller and Chief Accounting Officer
211

Dominion Energy Gas

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

DOMINION ENERGY GAS HOLDINGS, LLC
By:/s/ Thomas F. Farrell, II
(Thomas F. Farrell, II, Chairman of the Board of Directors and Chief Executive Officer)

Date: February 28, 2020

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 28th day of February, 2020.

SignatureTitle
/s/ Thomas F. Farrell, II Thomas F. Farrell, IIChairman of the Board of Directors and Chief Executive Officer
/s/ Carlos M. Brown Carlos M. BrownDirector
/s/ James R. Chapman James R. ChapmanDirector, Executive Vice President, Chief Financial Officer and Treasurer
/s/ Michele L. Cardiff Michele L. CardiffVice President, Controller and Chief Accounting Officer
212