Dominion Energy 10-K 2022-12-31
Filed 2023-02-21. 23 sections, 987K characters. Original on sec.gov · Markdown · JSON
Cover and table of contents
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2022
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from to
| Commission File Number | Exact name of registrants as specified in their charters | I.R.S. Employer Identification Number |
| 001-08489 | DOMINION ENERGY, INC. | 54-1229715 |
| 000-55337 | Virginia ELECTRIC AND POWER COMPANY | 54-0418825 |
| Virginia (State or other jurisdiction of incorporation or organization) | ||
| 120 TREDEGAR STREET RICHMOND**,** Virginia (Address of principal executive offices) | 23219 (Zip Code) | |
| (804) 819-2284 (Registrants’ telephone number) |
Securities registered pursuant to Section 12(b) of the Act:
| Registrant | Trading Symbol | Title of Each Class | Name of Each Exchange on Which Registered |
| DOMINION ENERGY, INC. | D | Common Stock, no par value | New York Stock Exchange |
Securities registered pursuant to Section 12(g) of the Act:
VIRGINIA ELECTRIC AND POWER COMPANY
Common Stock, no par value
Indicate by check mark whether the registrant is a well-known seasoned issuer as defined in Rule 405 of the Securities Act.
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “non-accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Dominion Energy, Inc.
| Large accelerated filer | ☒ | Accelerated filer | ☐ | Emerging growth company | ☐ |
| Non-accelerated filer | ☐ | Smaller reporting company | ☐ | ||
Virginia Electric and Power Company
| Large accelerated filer | ☐ | Accelerated filer | ☐ | Emerging growth company | ☐ | |
| Non-accelerated filer | ☒ | Smaller reporting company | ☐ | |||
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.
Dominion Energy, Inc. ☒ Virginia Electric and Power Company ☐
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.
Dominion Energy, Inc. ☐ Virginia Electric and Power Company ☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b).
Dominion Energy, Inc. ☐ Virginia Electric and Power Company ☐
Indicate by check mark whether the registrant is a shell company (as defined by Rule 12b-2 of the Act).
Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒
The aggregate market value of Dominion Energy, Inc. common stock held by non-affiliates of Dominion Energy was approximately $66.3 billion based on the closing price of Dominion Energy’s common stock as reported on the New York Stock Exchange as of the last day of Dominion Energy’s most recently completed second fiscal quarter. Dominion Energy is the sole holder of Virginia Electric and Power Company common stock. At February 15, 2023, Dominion Energy had 835,193,617 shares of common stock outstanding and Virginia Power had 274,723 shares of common stock outstanding.
DOCUMENT INCORPORATED BY REFERENCE
Portions of Dominion Energy’s 2023 Proxy Statement are incorporated by reference in Part III.
This combined Form 10-K represents separate filings by Dominion Energy, Inc. and Virginia Electric and Power Company. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Virginia Electric and Power Company makes no representations as to the information relating to Dominion Energy, Inc.’s other operations.
VIRGINIA ELECTRIC AND POWER COMPANY MEETS THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION I(1)(a) AND (b) OF FORM 10-K AND IS FILING THIS FORM 10-K UNDER THE REDUCED DISCLOSURE FORMAT.
Dominion Energy, Inc. and Virginia Electric and Power Company
Glossary of Terms
The following abbreviations or acronyms used in this Form 10-K are defined below:
| Abbreviation or Acronym | Definition | |
| 2017 Tax Reform Act | An Act to Provide for Reconciliation Pursuant to Titles II and V of the Concurrent Resolution on the Budget for Fiscal Year 2018 (previously known as The Tax Cuts and Jobs Act) enacted on December 22, 2017 | |
| 2019 Equity Units | Dominion Energy’s 2019 Series A Equity Units issued in June 2019, initially in the form of 2019 Series A Corporate Units, which consisted of a stock purchase contract and a 1/10 interest in a share of the Series A Preferred Stock | |
| 2021 BLS Industry Average OSHA Recordable Rate | An average of the OSHA Recordable Rate for 2021 published by the Bureau of Labor Statistics for electric power generation, transmission and distribution (NAICS code 2211) and natural gas distribution (NAICS code 2212) | |
| 2021 Triennial Review | Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the four successive 12-month test periods beginning January 1, 2017 and ending December 31, 2020 | |
| 2023 Proxy Statement | Dominion Energy 2023 Proxy Statement, File No. 001-08489 | |
| ABO | Accumulated benefit obligation | |
| ACE Rule | Affordable Clean Energy Rule | |
| AFUDC | Allowance for funds used during construction | |
| Align RNG | Align RNG, LLC, a joint venture between Dominion Energy and Smithfield Foods, Inc. | |
| Altavista | Altavista biomass power station | |
| AMI | Advanced Metering Infrastructure | |
| AOCI | Accumulated other comprehensive income (loss) | |
| ARO | Asset retirement obligation | |
| Atlantic Coast Pipeline | Atlantic Coast Pipeline, LLC, a limited liability company owned by Dominion Energy and Duke Energy | |
| Atlantic Coast Pipeline Project | A previously proposed approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina which would have been owned by Dominion Energy and Duke Energy | |
| bcf | Billion cubic feet | |
| bcfe | Billion cubic feet equivalent | |
| Bear Garden | A 622 MW combined-cycle, natural gas-fired power station in Buckingham County, Virginia | |
| BHE | The legal entity, Berkshire Hathaway Energy Company, one or more of its consolidated subsidiaries (including Dominion Energy Gas, Dominion Energy Midstream and Cove Point effective November 1, 2020), or the entirety of Berkshire Hathaway Energy Company and its consolidated subsidiaries | |
| Birdseye | Birdseye Renewable Energy, LLC | |
| BP | BP Wind Energy North America Inc. | |
| Brookfield | Brookfield Super-Core Infrastructure Partners, an infrastructure fund managed by Brookfield Asset Management Inc. | |
| Brunswick County | A 1,376 MW combined-cycle, natural gas-fired power station in Brunswick County, Virginia | |
| CAA | Clean Air Act | |
| CAISO | California ISO | |
| CAO | Chief Accounting Officer | |
| CCR | Coal combustion residual | |
| CCRO | Customer credit reinvestment offset | |
| CEA | Commodity Exchange Act | |
| CEO | Chief Executive Officer | |
| CEP | Capital Expenditure Program, as established by House Bill 95, Ohio legislation enacted in 2011, deployed by East Ohio to recover certain costs associated with capital investment | |
| CERCLA | Comprehensive Environmental Response, Compensation and Liability Act of 1980, also known as Superfund |
| Abbreviation or Acronym | Definition | |
| CFO | Chief Financial Officer | |
| CH4 | Methane | |
| Clearway | The legal entity, Clearway Energy, Inc. (a subsidiary of Global Infrastructure Partners), one or more of its consolidated subsidiaries, or the entirety of Clearway Energy, Inc. and its consolidated subsidiaries | |
| CNG | Consolidated Natural Gas Company | |
| CO2 | Carbon dioxide | |
| Colonial Trail West | A 142 MW utility-scale solar power station located in Surry County, Virginia | |
| Companies | Dominion Energy and Virginia Power, collectively | |
| Contracted Assets | Contracted Assets operating segment | |
| COO | Chief Operating Officer | |
| Cooling degree days | Units measuring the extent to which the average daily temperature is greater than 65 degrees Fahrenheit, or 75 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 75 degrees, as applicable, and the average temperature for that day | |
| Cove Point | Cove Point LNG, LP (formerly known as Dominion Energy Cove Point LNG, LP) | |
| Cove Point LNG Facility | An LNG import/export and storage facility, including the Liquefaction Facility, located on the Chesapeake Bay in Lusby, Maryland | |
| CPCN | Certificate of Public Convenience and Necessity | |
| CVOW Commercial Project | A proposed 2.6 GW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters adjacent to the CVOW Pilot Project and associated interconnection facilities in and around Virginia Beach, Virginia | |
| CVOW Pilot Project | A 12 MW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters | |
| CWA | Clean Water Act | |
| DCP | The legal entity, CPMLP Holding Company, LLC (formerly known as Dominion Cove Point, LLC), one or more of its consolidated subsidiaries (including Dominion Energy Midstream), or the entirety of CPMLP Holding Company, LLC and its consolidated subsidiaries | |
| DECGS | Carolina Gas Services, Inc. (formerly known as Dominion Energy Carolina Gas Services, Inc.) | |
| DECP Holdings | The legal entity DECP Holdings, Inc., which holds Dominion Energy’s noncontrolling interest in Cove Point | |
| DEQPS | MountainWest Pipeline Services, Inc. (formerly known as Dominion Energy Questar Pipeline Services, Inc.) | |
| DES | Dominion Energy Services, Inc. | |
| DESC | The legal entity, Dominion Energy South Carolina, Inc., one or more of its consolidated entities or operating segment, or the entirety of Dominion Energy South Carolina, Inc. and its consolidated entities | |
| DETI | Eastern Gas Transmission and Storage, Inc. (formerly known as Dominion Energy Transmission, Inc.) | |
| DGI | Dominion Generation, Inc. | |
| DGP | Eastern Gathering and Processing, Inc. (formerly known as Dominion Gathering and Processing, Inc.) | |
| DMLPHCII | Eastern MLP Holding Company II, LLC (formerly known as Dominion MLP Holding Company II, LLC) | |
| Dodd-Frank Act | The Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 | |
| DOE | U.S. Department of Energy | |
| Dominion Energy | The legal entity, Dominion Energy, Inc., one or more of its consolidated subsidiaries (other than Virginia Power) or operating segments, or the entirety of Dominion Energy, Inc. and its consolidated subsidiaries | |
| Dominion Energy Direct® | A dividend reinvestment and open enrollment direct stock purchase plan | |
| Dominion Energy Gas | The legal entity, Eastern Energy Gas Holdings, LLC (formerly known as Dominion Energy Gas Holdings, LLC), one or more of its consolidated subsidiaries (consisting of DETI, DCP, DMLPHCII and Dominion Iroquois), or the entirety of Eastern Energy Gas Holdings, LLC and its consolidated subsidiaries | |
| Dominion Energy Midstream | The legal entity, Northeast Midstream Partners, LP (formerly known as Dominion Energy Midstream Partners, LP), one or more of its consolidated subsidiaries, or the entirety of Northeast Midstream Partners, LP and its consolidated subsidiaries |
| Abbreviation or Acronym | Definition | |
| Dominion Energy Questar Pipeline | The legal entity, MountainWest Pipeline, LLC (formerly known as Dominion Energy Questar Pipeline, LLC), one or more of its consolidated subsidiaries (including its 50% noncontrolling interest in White River Hub), or the entirety of Dominion Energy Questar Pipeline, LLC and its consolidated subsidiaries | |
| Dominion Energy South Carolina | Dominion Energy South Carolina operating segment | |
| Dominion Energy Virginia | Dominion Energy Virginia operating segment | |
| Dominion Iroquois | The legal entity Iroquois Inc. (formerly known as Dominion Iroquois Inc.), one or more of its consolidated subsidiaries, or the entirety of Iroquois, Inc. and its consolidated subsidiaries, which held a 50% noncontrolling interest in Iroquois | |
| Dominion Privatization | Dominion Utility Privatization, LLC, a joint venture between Dominion Energy and Patriot | |
| DSM | Demand-side management | |
| DSM Riders | Rate adjustment clauses, designated Riders C1A, C2A, C3A and C4A, associated with the recovery of costs related to certain Virginia DSM programs in approved DSM cases | |
| Dth | Dekatherm | |
| Duke Energy | The legal entity, Duke Energy Corporation, one or more of its consolidated subsidiaries, or the entirety of Duke Energy Corporation and its consolidated subsidiaries | |
| Eagle Solar | Eagle Solar, LLC, a wholly-owned subsidiary of DGI | |
| East Ohio | The East Ohio Gas Company, doing business as Dominion Energy Ohio | |
| Energy Choice | Program authorized by the Ohio Commission which provides energy customers with the ability to shop for energy options from a group of suppliers certified by the Ohio Commission | |
| EnergySolutions | EnergySolutions, LLC | |
| EPA | U.S. Environmental Protection Agency | |
| EPACT | Energy Policy Act of 2005 | |
| EPS | Earnings per common share | |
| ERISA | Employee Retirement Income Security Act of 1974 | |
| ESA Excess Tax Benefits | Endangered Species Act Benefits of tax deductions in excess of the compensation cost recognized for stock-based compensation | |
| FASB | Financial Accounting Standards Board | |
| FERC | Federal Energy Regulatory Commission | |
| FILOT | Fee in lieu of taxes | |
| Fitch | Fitch Ratings Ltd. | |
| Four Brothers | Four Brothers Solar, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Four Brothers Holdings, LLC, a subsidiary of Clearway | |
| Fowler Ridge | Fowler I Holdings LLC, a wind-turbine facility in Benton County, Indiana | |
| FTRs | Financial transmission rights | |
| GAAP | U.S. generally accepted accounting principles | |
| Gas Distribution | Gas Distribution operating segment | |
| GENCO | South Carolina Generating Company, Inc. | |
| GHG | Greenhouse gas | |
| Granite Mountain | Granite Mountain Holdings, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Granite Mountain Renewables, LLC, a subsidiary of Clearway | |
| Green Mountain | Green Mountain Power Corporation | |
| Greensville County | A 1,629 MW combined-cycle, natural gas-fired power station in Greensville County, Virginia | |
| Abbreviation or Acronym | Definition | |
| GT&S Transaction | The sale by Dominion Energy to BHE of Dominion Energy Gas, DGP, DECGS, Eastern Energy Field Services, Inc. (formerly known as Dominion Energy Field Services, Inc.) and Modular LNG Holdings, Inc. (formerly known as Dominion Modular LNG Holdings, Inc.) (which holds a 50% noncontrolling interest in JAX LNG) pursuant to a purchase and sale agreement entered into on July 3, 2020, which was completed on November 1, 2020 | |
| GTSA | Virginia Grid Transformation and Security Act of 2018 | |
| GW | Gigawatt | |
| Heating degree days | Units measuring the extent to which the average daily temperature is less than 65 degrees Fahrenheit, or 60 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 60 degrees, as applicable, and the average temperature for that day | |
| Hope | Hope Gas, Inc., doing business as Dominion Energy West Virginia through August 2022 | |
| Hopewell | Polyester biomass power station | |
| Idaho Commission | Idaho Public Utilities Commission | |
| IRA | An Act to Provide for Reconciliation Pursuant to Title II of Senate Concurrent Resolution 14 of the 117th Congress (also known as the Inflation Reduction Act of 2022) enacted on August 16, 2022 | |
| Iron Springs | Iron Springs Holdings, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Iron Springs Renewables, LLC, a subsidiary of Clearway | |
| Iroquois | Iroquois Gas Transmission System, L.P. | |
| IRS | Internal Revenue Service | |
| ISO | Independent system operator | |
| ISO-NE | ISO New England | |
| JAX LNG | JAX LNG, LLC, an LNG supplier in Florida serving the marine and LNG markets | |
| Jones Act | The Coastwise Merchandise Statute (commonly known as the Jones Act) 46 U.S.C. §55102 regulating U.S. maritime commerce | |
| July 2016 hybrids | Dominion Energy’s 2016 Series A Enhanced Junior Subordinated Notes due 2076 | |
| Kewaunee | Kewaunee nuclear power station | |
| kV | Kilovolt | |
| LIBOR | London Interbank Offered Rate | |
| LIFO | Last-in-first-out inventory method | |
| Liquefaction Facility | A natural gas export/liquefaction facility at the Cove Point LNG Facility | |
| LNG | Liquefied natural gas | |
| LTIP | Long-term incentive program | |
| Massachusetts Municipal | Massachusetts Municipal Wholesale Electric Company | |
| mcfe | Thousand cubic feet equivalent | |
| MD&A | Management’s Discussion and Analysis of Financial Condition and Results of Operations | |
| MGD | Million gallons per day | |
| Millstone | Millstone nuclear power station | |
| Millstone 2019 power purchase agreements | Power purchase agreements with Eversource Energy and The United Illuminating Company for Millstone to provide nine million MWh per year of electricity for ten years | |
| Moody’s | Moody’s Investors Service | |
| Mtpa | Million metric tons per annum | |
| MW | Megawatt | |
| MWh | Megawatt hour | |
| N2O | Nitrous oxide | |
| Natural Gas Rate Stabilization Act | Legislation effective February 2005 designed to improve and maintain natural gas service infrastructure to meet the needs of customers in South Carolina | |
| NAV | Net asset value | |
| NEIL | Nuclear Electric Insurance Limited | |
| NERC | North American Electric Reliability Corporation | |
| NGL | Natural gas liquid | |
| NND Project | V.C. Summer Units 2 and 3 nuclear development project under which DESC and Santee Cooper undertook to construct two Westinghouse AP1000 Advanced Passive Safety nuclear units in Jenkinsville, South Carolina | |
| North Anna | North Anna nuclear power station |
| Abbreviation or Acronym | Definition | |
| North Carolina Commission | North Carolina Utilities Commission | |
| NOX | Nitrogen oxide | |
| NRC | U.S. Nuclear Regulatory Commission | |
| NWP 12 | A nationwide permit from the U.S. Army Corps of Engineers authorizing activities required for the construction, maintenance, repair and removal of utility lines, including electric transmission, gas pipelines, water and communications conduit and associate facilities in waters of the U.S. | |
| NYSE | New York Stock Exchange | |
| October 2014 hybrids | Dominion Energy’s 2014 Series A Enhanced Junior Subordinated Notes due 2054 | |
| ODEC | Old Dominion Electric Cooperative | |
| offshore wind turbine installation season | The period May 1st through October 31st for waters off the coast of the Mid-Atlantic and Northeast | |
| Ohio Commission | Public Utilities Commission of Ohio | |
| Order 1000 | Order issued by FERC adopting requirements for electric transmission planning, cost allocation and development | |
| OSHA Recordable Rate | Number of recordable cases, as defined by the Occupational Health and Safety Administration, a division of the U.S. Department of Labor, for every 100 employees over the course of a year | |
| Patriot | Patriot Utility Privatizations, LLC, a joint venture between Foundation Infrastructure Partners, LLC and John Hancock Life Insurance Company (U.S.A.) and affiliates | |
| PHMSA | Pipeline and Hazardous Materials Safety Administration | |
| PIPP | Percentage of Income Payment Plan deployed by East Ohio | |
| PIR | Pipeline Infrastructure Replacement program deployed by East Ohio | |
| PJM | PJM Interconnection, LLC | |
| PSD | Prevention of significant deterioration | |
| PSNC | Public Service Company of North Carolina, Incorporated, doing business as Dominion Energy North Carolina | |
| Q-Pipe Group | Collectively, Dominion Energy Questar Pipeline, DEQPS and MountainWest Energy Holding Company, LLC (formerly known as QPC Holding Company, LLC and its subsidiary MountainWest Southern Trails Pipeline Company (formerly known as Questar Southern Trails Pipeline Company)) | |
| Q-Pipe Transaction | A previously proposed sale by Dominion Energy to BHE of the Q-Pipe Group pursuant to a purchase and sale agreement entered into on October 5, 2020 and terminated on July 9, 2021 | |
| Questar Gas | Questar Gas Company, doing business as Dominion Energy Utah, Dominion Energy Wyoming and Dominion Energy Idaho | |
| Regulation Act | Legislation effective July 1, 2007, that amended the Virginia Electric Utility Restructuring Act and fuel factor statute, which legislation is also known as the Virginia Electric Utility Regulation Act, as amended in 2015 and 2018 | |
| RGGI | Regional Greenhouse Gas Initiative | |
| RICO | Racketeer Influenced and Corrupt Organizations Act | |
| Rider B | A rate adjustment clause associated with the recovery of costs related to the conversion of three of Virginia Power’s coal-fired power stations to biomass | |
| Rider BW | A rate adjustment clause associated with the recovery of costs related to Brunswick County | |
| Rider CCR | A rate adjustment clause associated with the recovery of costs related to the removal of CCR at certain power stations | |
| Rider CE | A rate adjustment clause associated with the recovery of costs related to certain renewable generation, energy storage and related transmission facilities in Virginia as well as certain small-scale distributed generation projects and related transmission facilities | |
| Rider D | A rate mechanism which allows PSNC to recover from customers all prudently incurred gas costs and the related portion of uncollectible expenses as well as losses on negotiated gas and transportation sales | |
| Rider E | A rate adjustment clause associated with the recovery of costs related to certain capital projects at Virginia Power’s electric generating stations to comply with federal and state environmental laws and regulations | |
| Rider GT | A rate adjustment clause associated with the recovery of costs associated with electric distribution grid transformation projects that the Virginia Commission has approved as authorized by the GTSA |
| Abbreviation or Acronym | Definition | ||
| Rider GV | A rate adjustment clause associated with the recovery of costs related to Greensville County | ||
| Rider OSW | A rate adjustment clause associated with costs incurred to construct, own and operate the CVOW Commercial Project | ||
| Rider PPA | A rate adjustment clause associated with the recovery of costs associated with power purchase agreements for the energy, capacity, ancillary services and renewable energy credits owned by third parties | ||
| Rider R | A rate adjustment clause associated with the recovery of costs related to Bear Garden | ||
| Rider RGGI | A rate adjustment clause associated with the recovery of costs related to the purchase of allowances through the RGGI market-based trading program for CO2 | ||
| Rider RPS | A rate adjustment clause associated with the recovery of costs related to the mandatory renewable portfolio standard program established by the VCEA | ||
| Rider S | A rate adjustment clause associated with the recovery of costs related to the Virginia City Hybrid Energy Center | ||
| Rider SNA | A rate adjustment clause associated with costs relating to the preparation of the applications for subsequent license renewal to the NRC to extend the operating licenses of Surry and North Anna and related projects | ||
| Rider T1 | A rate adjustment clause to recover the difference between revenues produced from transmission rates included in base rates, and the new total revenue requirement developed annually for the rate years effective September 1 | ||
| Rider U | A rate adjustment clause associated with the recovery of costs of new underground distribution facilities | ||
| Rider US-2 | A rate adjustment clause associated with the recovery of costs related to Woodland Solar, Scott Solar and Whitehouse Solar | ||
| Rider US-3 | A rate adjustment clause associated with the recovery of costs related to Colonial Trail West and Spring Grove 1 | ||
| Rider US-4 | A rate adjustment clause associated with the recovery of costs related to Sadler Solar | ||
| Rider W | A rate adjustment clause associated with the recovery of costs related to Warren County | ||
| ROE | Return on equity | ||
| ROIC | Return on invested capital | ||
| RTEP | Regional transmission expansion plan | ||
| RTO | Regional transmission organization | ||
| Sadler Solar | A 100 MW utility-scale solar power station located in Greensville County, Virginia | ||
| SAIDI | System Average Interruption Duration Index, metric used to measure electric service reliability | ||
| Santee Cooper | South Carolina Public Service Authority | ||
| SBL Holdco | SBL Holdco, LLC, a wholly-owned subsidiary of DGI through December 2021 | ||
| SCANA | The legal entity, SCANA Corporation, one or more of its consolidated subsidiaries, or the entirety of SCANA Corporation and its consolidated subsidiaries | ||
| SCANA Combination | Dominion Energy’s acquisition of SCANA completed on January 1, 2019 pursuant to the terms of the agreement and plan of merger entered on January 2, 2018 between Dominion Energy and SCANA | ||
| SCANA Merger Approval Order | Final order issued by the South Carolina Commission on December 21, 2018 setting forth its approval of the SCANA Combination | ||
| SCDOR | South Carolina Department of Revenue | ||
| Scope 1 emissions | Emissions that are produced directly by an entity’s own operations | ||
| Scope 2 emissions | Emissions from electricity a company consumes but does not generate from its own facilities | ||
| Scope 3 emissions | Emissions generated downstream of company operations by customers and upstream by suppliers | ||
| Scott Solar | A 17 MW utility-scale solar power station in Powhatan County, Virginia | ||
| SEC | U.S. Securities and Exchange Commission | ||
| SEEM | Southeast Energy Exchange Market | ||
| SERC | Southeast Electric Reliability Council | ||
| Series A Preferred Stock | Dominion Energy’s Series A Cumulative Perpetual Convertible Preferred Stock, without par value, with a liquidation preference of $1,000 per share (previously designated the 1.75% Series A Cumulative Perpetual Convertible Preferred Stock) | ||
| Series B Preferred Stock | Dominion Energy’s 4.65% Series B Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share |
| Abbreviation or Acronym | Definition | |
| Series C Preferred Stock | Dominion Energy’s 4.35% Series C Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share | |
| SF6 | Sulfur hexafluoride | |
| SO2 | Sulfur dioxide | |
| SOFR | Secured Overnight Financing Rate | |
| South Carolina Commission | Public Service Commission of South Carolina | |
| Southampton | Southampton biomass power station | |
| Southern | The legal entity, The Southern Company, one or more of its consolidated subsidiaries, or the entirety of The Southern Company and its consolidated subsidiaries | |
| Southwest Gas | The legal entity, Southwest Gas Holdings, Inc., one or more of its consolidated subsidiaries, or the entirety of Southwest Gas Holdings, Inc. and its consolidated subsidiaries | |
| Spring Grove 1 | A 98 MW utility-scale solar power station located in Surry County, Virginia | |
| Standard & Poor’s | Standard & Poor’s Ratings Services, a division of S&P Global Inc. | |
| Summer | V.C. Summer nuclear power station | |
| Supply Header Project | A project previously intended for DETI to provide approximately 1,500,000 Dths of firm transportation service to various customers in connection with the Atlantic Coast Pipeline Project | |
| Surry | Surry nuclear power station | |
| Terra Nova Renewable Partners | The legal entity, Terra Nova Renewable Partners, LLC, a partnership comprised primarily of institutional investors advised by J.P. Morgan Asset Management-Global Real Assets, or one or more of its consolidated subsidiaries | |
| Three Cedars | Granite Mountain and Iron Springs, collectively | |
| TSR | Total shareholder return | |
| UEX | Uncollectible Expense Rider deployed by East Ohio | |
| Ullico | The legal entity, Ullico Inc., one or more of its consolidated subsidiaries, or the entirety of Ullico Inc. and its consolidated subsidiaries | |
| Utah Commission | Utah Public Service Commission | |
| VCEA | Virginia Clean Economy Act of March 2020 | |
| VEBA | Voluntary Employees’ Beneficiary Association | |
| VIE | Variable interest entity | |
| Virginia City Hybrid Energy Center | A 610 MW baseload carbon-capture compatible, clean coal powered electric generation facility in Wise County, Virginia | |
| Virginia Commission | Virginia State Corporation Commission | |
| Virginia Facilities | Proposed electric interconnection and transmission facilities in and around Virginia Beach, Virginia, comprising transmission facilities required to interconnect the CVOW Commercial Project reliably with the existing transmission system; including 3 miles of 230 kV offshore export circuits, 4 miles of underground 230 kV onshore export circuits, a new Harpers switching station, 14 miles of three new overhead 230 kV transmission circuits between a new Harpers switching station and the Fentress substation, rebuild eight miles of two existing 230 kV overhead lines and an expansion of the Fentress substation | |
| Virginia Power | The legal entity, Virginia Electric and Power Company, one or more of its consolidated subsidiaries or operating segment, or the entirety of Virginia Electric and Power Company and its consolidated subsidiaries | |
| VOC | Volatile organic compounds | |
| Warren County | A 1,349 MW combined-cycle, natural gas-fired power station in Warren County, Virginia | |
| WECTEC | WECTEC Global Project Services, Inc., a wholly-owned subsidiary of Westinghouse | |
| West Virginia Commission | Public Service Commission of West Virginia | |
| Westinghouse | Westinghouse Electric Company LLC | |
| Wexpro | The legal entity, Wexpro Company, one or more of its consolidated subsidiaries, or the entirety of Wexpro Company and its consolidated subsidiaries | |
| Wexpro Agreement | An agreement which sets forth the rights of Questar Gas to receive certain benefits from Wexpro’s operations, including cost-of-service gas | |
| Wexpro II Agreement | An agreement with the states of Utah and Wyoming modeled after the Wexpro Agreement that allows for the addition of properties under the cost-of-service methodology for the benefit of Questar Gas customers | |
| Wexpro Agreements | Collectively, the Wexpro Agreement, Wexpro II Agreement and two stipulation agreements approved by the Utah Commission allowing for the inclusion of certain property at Canyon Creek and the Trail Unit under the Wexpro II Agreement | |
| Whitehouse Solar | A 20 MW utility-scale solar power station in Louisa County, Virginia | |
| White River Hub | MountainWest White River Hub, LLC (formerly known as White River Hub, LLC) |
| Abbreviation or Acronym | Definition | |
| Wisconsin Commission | Public Service Commission of Wisconsin | |
| Woodland Solar | A 19 MW utility-scale solar power station in Isle of Wight County, Virginia | |
| WP&L | Wisconsin Power and Light Company, a subsidiary of Alliant Energy Corporation | |
| WPSC | Wisconsin Public Service Corporation, a subsidiary of WEC Energy Group | |
| Wrangler | Wrangler Retail Gas Holdings, LLC, a partnership between Dominion Energy (through March 2022) and Interstate Gas Supply, Inc. | |
| Wyoming Commission | Wyoming Public Service Commission |
Part I
Item 1. Business
GENERAL
Dominion Energy, headquartered in Richmond, Virginia and incorporated in Virginia in 1983, is one of the nation’s largest producers and distributors of energy. Dominion Energy is committed to safely delivering sustainable, reliable and affordable energy and achieving net zero carbon and methane emissions by 2050. Dominion Energy’s strategy is to be a leading sustainable provider of electricity, natural gas and related services to customers primarily in the eastern and Rocky Mountain regions of the U.S. As of December 31, 2022, Dominion Energy’s portfolio of assets includes approximately 31.0 GW of electric generating capacity, 10,600 miles of electric transmission lines, 78,500 miles of electric distribution lines and 93,500 miles of gas distribution mains and related service facilities, which are supported by 4,000 miles of gas transmission, gathering and storage pipeline. As of December 31, 2022, Dominion Energy operates in 15 states and serves approximately 7 million customers.
Dominion Energy has commenced a comprehensive business review as discussed in Future Issues and Other Matters in Item 7. MD&A. Pending the results of the business review, Dominion Energy continues to focus on expanding and improving its regulated and long-term contracted electric and natural gas utility businesses while transitioning to a cleaner energy future. Its previously announced growth capital expenditure plan for 2022 through 2026 includes a focus on upgrading the electric system in Virginia through investments in additional renewable generation facilities, strategic undergrounding and energy conservation programs. Renewable generation facilities are expected to include significant investments in utility-scale solar and offshore wind projects. In addition, Dominion Energy has either received or applied for license extensions for its regulated nuclear power stations in Virginia. Other drivers for the growth capital plan include renewable natural gas initiatives, the replacement and modernization of gas distribution pipeline and continued upgrades to its gas and electric transmission and distribution networks while also meeting environmental requirements and standards set by various regulatory bodies.
Dominion Energy currently expects approximately 90% of earnings from its primary operating segments to come from state-regulated electric and natural gas utility businesses. Dominion Energy’s nonregulated operations consist primarily of long-term contracted electric generation operations and its investment in Cove Point. Dominion Energy’s operations are conducted through various subsidiaries, including DESC and Virginia Power. DESC is an SEC registrant; however, its Form 10-K is filed separately and is not combined herein.
Virginia Power, headquartered in Richmond, Virginia and incorporated in Virginia in 1909 as a Virginia public service corporation, is a wholly-owned subsidiary of Dominion Energy and a regulated public utility that generates, transmits and distributes electricity for sale in Virginia and North Carolina. In Virginia, Virginia Power conducts business under the name “Dominion Energy Virginia” and primarily serves retail customers. In North Carolina, it conducts business under the name “Dominion Energy North Carolina” and serves retail customers located in the northeastern region of the state, excluding certain municipalities. In addition, Virginia Power sells and transmits electricity at wholesale prices to rural electric cooperatives, municipalities and into wholesale electricity markets. All of Virginia Power’s stock is owned by Dominion Energy.
Amounts and information disclosed for Dominion Energy are inclusive of Virginia Power, where applicable.
WHERE YOU CAN FIND MORE INFORMATION ABOUT THE COMPANIES
The Companies file their annual, quarterly and current reports, proxy statements and other information with the SEC. Their SEC filings are available to the public over the Internet at the SEC’s website at http://www.sec.gov.
The Companies make their SEC filings, including the annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to those reports, available, free of charge, through Dominion Energy’s website, http://www.dominionenergy.com, as soon as reasonably practicable after filing or furnishing the material to the SEC. We also make available on the “Investors” page of our website additional information which may be important to investors, such as investor presentations, earnings release kits and other materials and presentations. Information contained on Dominion Energy’s website, including but not limited to reports mentioned in Environmental Strategy, is not incorporated by reference in this report.
ACQUISITIONS AND DISPOSITIONS
The following acquisitions and divestitures within the last three years are considered significant to the Companies.
Gas Transmission and Storage Operations
Sales to BHE and Southwest Gas
In November 2020, Dominion Energy completed the GT&S Transaction with BHE for approximately $2.7 billion in cash proceeds and the assumption by BHE of approximately $5.3 billion of related long-term debt.
In December 2021, Dominion Energy completed the sale of the Q-Pipe Group to Southwest Gas for approximately $1.5 billion in cash proceeds and the assumption by Southwest Gas of $430 million of related long-term debt.
See Note 3 to the Consolidated Financial Statements for additional information.
Acquisition of Interest in Atlantic Coast Pipeline and Pivotal LNG, Inc.
In March 2020, Dominion Energy completed the acquisition from Southern of its 5% membership interest in Atlantic Coast Pipeline and its 100% ownership interest in Pivotal LNG, Inc., for $184 million in aggregate, plus certain purchase price adjustments. See Note 9 to the Consolidated Financial Statements for additional information, including the cancellation of the Atlantic Coast Pipeline Project. Pivotal LNG, Inc. was included within the GT&S Transaction and sold to BHE in November 2020.
Hope
In August 2022, Dominion Energy completed the sale of 100% of the equity interests in Hope to Ullico for $690 million in cash consideration, subject to customary closing adjustments. See Note 3 to the Consolidated Financial Statements for additional information.
Electric Generation Facilities
Acquisition of Virginia Power Solar Projects
In 2020 through 2022, Virginia Power entered into and completed the acquisitions of several primarily early-stage solar development projects in Virginia, including both non-jurisdictional facilities and those expected to be recovered under Rider CE.
In 2022, Virginia Power entered into and completed the acquisitions of various solar development projects in Virginia. These projects are expected to cost a total of approximately $1.1 billion once constructed, including initial acquisition costs, and generate approximately 537 MW combined.
In 2021, Virginia Power entered into and completed the acquisitions of various solar development projects in Virginia. These projects are expected to cost a total of approximately $1.4 billion once constructed, including initial acquisition costs, and generate approximately 697 MW combined.
In 2020, Virginia Power entered into and completed the acquisition of various solar development projects in Virginia. These projects are expected to cost a total of approximately $595 million once constructed, including initial acquisition costs, and generate approximately 282 MW combined.
See Notes 10 and 13 to the Consolidated Financial Statements for additional information.
Acquisition of Nonregulated Solar Projects
In 2022, Dominion Energy entered into an agreement and completed the acquisition of a nonregulated solar project in Ohio. The project is expected to cost a total of $390 million once constructed, including the initial acquisition cost, and generate approximately 200 MW.
In 2020, Dominion Energ
Showing the first 8K of 132K characters. Open the full section
Item 1A. Risk Factors
The Companies’ businesses are influenced by many factors that are difficult to predict, involve uncertainties that may materially affect actual results and are often beyond their control. A number of these factors have been identified below. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement or projection contained in this report, see Forward-Looking Statements in Item 7. MD&A. As discussed in Future Issues in Item 7. MD&A, Dominion Energy has commenced a comprehensive business review. The outcomes of the business review and the implementation of the resulting recommendations may be subject to various risks and uncertainties (some of which may include the risks and uncertainties discussed below or other risks and uncertainties that cannot yet be determined) that could have a material impact on the Companies’ future results of operations, cash flows and/or financial condition.
Regulatory, Legislative and Legal Risks
The rates of the Companies’ principal electric transmission, distribution and generation operations and gas distribution operations are subject to regulatory review. Revenue provided by the Companies’ electric transmission, distribution and generation operations and by gas distribution operations is based primarily on rates approved by state and federal regulatory agencies. The profitability of the Companies’ businesses is dependent on their ability, through the rates that they are permitted to charge, to recover costs and earn a reasonable rate of return on their capital investment.
At the federal level, the Companies’ wholesale rates for electric transmission service are regulated by FERC. Rates for electric transmission services are updated annually according to a FERC-approved formula rate mechanism, and may be subject to additional prospective adjustments and retroactive corrections. A failure by the Companies to support these rates could result in rate decreases from current rate levels, which could adversely affect the Companies’ results of operations, cash flows and financial condition.
At the state level, Virginia Power’s retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia Commission in a proceeding that involves the determination of Virginia Power’s actual earned ROE during a historic test period, and the determination of Virginia Power’s authorized ROE prospectively. The GTSA reinstated triennial reviews commencing with the 2021 Triennial Review. Under certain circumstances described in the Regulation Act, Virginia Power may be required to refund a portion of its earnings to customers through a refund process and to reduce its rates. Additionally, Virginia Power’s ability to utilize CCROs for certain qualifying projects as provided for in the GTSA may be limited if the Virginia Commission does not approve such projects. Virginia Power makes assessments throughout the review period and will record a regulatory liability for refunds and/or CCRO benefits to customers in any period it is determined probable, which could be material to the Companies’ results of operations in the period recognized and to cash flows on completion of any triennial review. Several proposed legislative bills have been introduced in the Virginia General Assembly which, if ultimately enacted into law, could have a material impact on Virginia Power’s retail base rates and other cost-recovery mechanisms. Items under consideration include frequency of base rate reviews, eliminating CCROs, shifting the recovery of certain costs currently recovered through riders into base rates and adjusting the parameters for determining an acceptable ROE and revenue sharing.
In states other than Virginia, the Companies’ retail electric base rates for generation and distribution services to customers are regulated on a cost-of-service/rate-of-return basis subject to the statutes, rules and procedures of such states. Dominion Energy’s rates for gas distribution to retail customers are similarly regulated at the state level. If retail electric or gas earnings exceed the returns established by state utility commissions, retail electric rates or gas rates may be subject to review and possible reduction, which may decrease the Companies’ future earnings. Additionally, if any state utility commission does not allow recovery through base rates, on a timely basis, of costs incurred in providing service, the Company’s future earnings could be negatively impacted.
Under certain circumstances, state utility regulators may impose a moratorium on increases to retail base rates for a specified period of time, which could delay recovery of costs incurred in providing service. Additionally, governmental officials, stakeholders and advocacy groups may challenge any of the regulatory reviews or proceedings referred to above. Such challenges may lengthen the time, complexity and costs associated with such regulatory reviews or proceedings.
The Companies’ generation business may be negatively affected by possible FERC actions that could change market design in the wholesale markets or affect pricing rules or revenue calculations in the RTO markets. The Companies’ generation stations operating in RTO markets sell capacity, energy and ancillary services into wholesale electricity markets regulated by FERC. The wholesale markets allow these generation stations to take advantage of market price opportunities, but also expose them to market risk. Properly functioning competitive wholesale markets depend upon FERC’s continuation of clearly identified market rules. From time to time FERC may investigate and authorize RTOs to make changes in market design. FERC also periodically reviews the Companies’ authority to sell at market-based rates. Material changes by FERC to the design of the wholesale markets or its interpretation of market rules, the Companies’ authority to sell power at market-based rates, or changes to pricing rules or rules involving revenue calculations, could adversely impact the future results of the Companies’ generation business. For example, in September 2021, FERC issued a final order that allows distributed energy resource aggregators to compete in regional wholesale
electric markets. This rule followed a previous order which mandated that distributed energy resources be allowed to participate in wholesale markets. RTOs, including PJM, are responsible for issuing implementation rules to FERC for approval. In addition, changes to the interpretation and application of FERC’s market manipulation rules may occur from time to time. A failure to comply with these market manipulation rules could lead to civil and criminal penalties.
The Companies are subject to complex governmental regulation, including tax regulation, that could adversely affect their results of operations and subject the Companies to monetary penalties. The Companies’ operations are subject to extensive federal, state and local laws and regulations and require numerous permits, approvals and certificates from various governmental agencies. Such laws and regulations govern the terms and conditions of the services we offer, our relationships with affiliates, protection of our critical electric infrastructure assets and pipeline safety, among other matters. The Companies are also subject to legislation and associated regulation governing taxation at the federal, state and local level. They must also comply with environmental legislation and associated regulations. Management believes that the necessary approvals have been obtained for existing operations and that the businesses are conducted in accordance with applicable laws. The Companies’ businesses are subject to regulatory regimes which could result in substantial monetary penalties if either of the Companies is found not to be in compliance, including mandatory reliability standards
Showing the first 8K of 65K characters. Open the full section
Item 1B. Unresolved Staff Comments
None.
Item 2. Properties
As of December 31, 2022, Dominion Energy owned its principal executive office in Richmond, Virginia and five other corporate offices. Dominion Energy also leases corporate offices in Richmond, Virginia and other cities in which its subsidiaries operate. Virginia Power shares Dominion Energy’s principal executive office in Richmond, Virginia. In addition, Virginia Power leases certain buildings and equipment.
Dominion Energy’s assets consist primarily of its investments in its subsidiaries, the principal properties of which are described below by operating segment.
Certain of Virginia Power’s properties are subject to the lien of the Indenture of Mortgage securing its First and Refunding Mortgage Bonds. There were no bonds outstanding as of December 31, 2022; however, by leaving the indenture open, Virginia Power retains the flexibility to issue mortgage bonds in the future. Certain of Dominion Energy’s nonregulated generation facilities are also subject to liens. Additionally, DESC’s bond indenture, which secures its First Mortgage Bonds, constitutes a direct mortgage lien on substantially all of its electric utility property.
DOMINION ENERGY VIRGINIA
Virginia Power has approximately 6,700 miles of electric transmission lines of 69 kV or more located in North Carolina, Virginia and West Virginia. Portions of Virginia Power’s electric transmission lines cross national parks and forests under permits entitling the federal government to use, at specified charges, any surplus capacity that may exist in these lines. While Virginia Power owns and maintains its electric transmission facilities, they are a part of PJM, which coordinates the planning, operation, emergency assistance and exchange of capacity and energy for such facilities.
In addition, Virginia Power’s electric distribution network includes approximately 59,700 miles of distribution lines, exclusive of service level lines, in Virginia and North Carolina. The grants for most of its electric lines contain rights-of-way that have been obtained from the apparent owners of real estate, but underlying titles have not been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, Virginia Power owns 482 substations and 16 MW of battery storage. Dominion Energy also owns various solar facilities, primarily at schools in Virginia, with an aggregate generation capacity of 21 MW.
The following tables list Virginia Power’s generating units and capability as of December 31, 2022.
VIRGINIA POWER UTILITY GENERATION
| Plant | Location | Net Summer Capability (MW) | Percentage Net Summer Capability | ||||||||
| Gas | |||||||||||
| Greensville County (CC) | Greensville County, VA | 1,629 | |||||||||
| Brunswick County (CC) | Brunswick County, VA | 1,376 | |||||||||
| Warren County (CC) | Warren County, VA | 1,349 | |||||||||
| Ladysmith (CT) | Ladysmith, VA | 783 | |||||||||
| Bear Garden (CC) | Buckingham County, VA | 622 | |||||||||
| Remington (CT) | Remington, VA | 622 | |||||||||
| Possum Point (CC) | Dumfries, VA | 573 | |||||||||
| Chesterfield (CC) | Chester, VA | 392 | |||||||||
| Elizabeth River (CT) | Chesapeake, VA | 330 | |||||||||
| Gordonsville Energy (CC) | Gordonsville, VA | 218 | |||||||||
| Gravel Neck (CT) | Surry, VA | 170 | |||||||||
| Darbytown (CT) | Richmond, VA | 168 | |||||||||
| Total Gas | 8,232 | 41 | % | ||||||||
| Coal | |||||||||||
| Mt. Storm | Mt. Storm, WV | 1,617 | |||||||||
| Chesterfield(1) | Chester, VA | 1,014 | |||||||||
| Virginia City Hybrid Energy Center | Wise County, VA | 610 | |||||||||
| Clover | Clover, VA | 439 | (2) | ||||||||
| Total Coal | 3,680 | 18 | |||||||||
| Nuclear | |||||||||||
| Surry | Surry, VA | 1,676 | |||||||||
| North Anna | Mineral, VA | 1,672 | (3) | ||||||||
| Total Nuclear | 3,348 | 16 | |||||||||
| Hydro | |||||||||||
| Bath County | Warm Springs, VA | 1,808 | (4) | ||||||||
| Gaston | Roanoke Rapids, NC | 220 | |||||||||
| Roanoke Rapids | Roanoke Rapids, NC | 95 | |||||||||
| Other | 1 | ||||||||||
| Total Hydro | 2,124 | 10 | |||||||||
| Oil | |||||||||||
| Yorktown(1) | Yorktown, VA | 790 | |||||||||
| Gravel Neck (CT) | Surry, VA | 198 | |||||||||
| Darbytown (CT) | Richmond, VA | 168 | |||||||||
| Rosemary (CC) | Roanoke Rapids, NC | 160 | |||||||||
| Possum Point (CT) | Dumfries, VA | 72 | |||||||||
| Low Moor (CT) | Covington, VA | 48 | |||||||||
| Northern Neck (CT) | Lively, VA | 47 | |||||||||
| Chesapeake (CT) | Chesapeake, VA | 39 | |||||||||
| Total Oil | 1,522 | 7 | |||||||||
| Solar**(5)** | |||||||||||
| Colonial Trail West | Surry County, VA | 142 | |||||||||
| Sadler Solar | Emporia, VA | 100 | |||||||||
| Spring Grove | Surry County, VA | 98 | |||||||||
| Grassfield | Chesapeake, VA | 20 | |||||||||
| Whitehouse Solar | Louisa County, VA | 20 | |||||||||
| Woodland Solar | Isle of Wight County, VA | 19 | |||||||||
| Scott Solar | Powhatan, VA | 17 | |||||||||
| Total Solar | 416 | 2 | |||||||||
| Biomass | |||||||||||
| Altavista(6) | Altavista, VA | 51 | |||||||||
| Polyester(6) | Hopewell, VA | 51 | |||||||||
| Southampton(6) | Southampton, VA | 51 | |||||||||
| Total Biomass | 153 | 1 | |||||||||
| Wind | |||||||||||
| CVOW Pilot Project | Virginia Beach, VA | 12 | — | ||||||||
| Various | |||||||||||
| Mt. Storm (CT) | Mt. Storm, WV | 11 | — | ||||||||
| 19,498 | |||||||||||
| Power Purchase Agreements | 1,106 | 5 | |||||||||
| Total Utility Generation | 20,604 | 100 | % |
Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.
(1)
Will be retired after it meets its capacity obligation in 2023. See Note 2 to the Consolidated Financial Statements for additional information.
(2)
Excludes 50% undivided interest owned by ODEC.
(3)
Excludes 11.6% undivided interest owned by ODEC.
(4)
Excludes 40% undivided interest owned by Allegheny Generating Company, a subsidiary of FirstEnergy Corp.
(5)
All solar facilities are alternating current.
(6)
In accordance with the VCEA, these units will be retired no later than 2028.
VIRGINIA POWER NON-JURISDICTIONAL GENERATION
| Plant | Location | Net Summer Capability (MW) | ||||
| Solar(1) | ||||||
| Fort Powhatan | Disputanta, VA | 150 | ||||
| Maplewood | Chatham, VA | 120 | ||||
| Desper | Louisa, VA | 88 | ||||
| Gutenberg | Garysburg, NC | 80 | ||||
| Butcher Creek | Chase City, VA | 80 | ||||
| Pecan | Pleasant Hill, NC | 75 | ||||
| Chestnut | Halifax County, NC | 75 | ||||
| Bedford | Chesapeake, VA | 70 | ||||
| Pumpkinseed | Emporia, VA | 60 | ||||
| Gloucester | Gloucester County, VA | 20 | ||||
| Montross | Westmoreland County, VA | 20 | ||||
| Morgans Corner | Pasquotank County, NC | 20 | ||||
| Remington | Fauquier County, VA | 20 | ||||
| Rochambeau | James City County, VA | 20 | ||||
| Oceana | Virginia Beach, VA | 18 | ||||
| Hollyfield | Manquin, VA | 17 | ||||
| Puller | Topping, VA | 15 | ||||
| Total Non-Jurisdictional Generation | 948 |
(1)
All solar facilities are alternating current.
GAS DISTRIBUTION
Gas Distribution’s network is located in Ohio, North Carolina, Utah, southwestern Wyoming and southeastern Idaho. This network includes approximately 74,400 miles of distribution mains and related service facilities which are supported by approximately 3,600 miles of transmission, gathering and storage pipeline. The right-of-way grants for many natural gas pipelines have been obtained from the actual owners of real estate, as underlying titles have been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many natural gas pipelines are on publicly-owned property, where company rights and actions are determined on a case-by-case basis, with results that range from reimbursed relocation to revocation of permission to operate.
East Ohio’s integrated underground storage facilities have more than 60 bcf of working gas capacity to serve base and peak demand. PSNC owns one LNG facility that stores the liquefied equivalent of 1.0 bcf of natural gas, can regasify approximately 10% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day. Questar Gas also owns one LNG facility that stores the liquified equivalent of 1.2 bcf of natural gas, can regasify approximately 12% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day.
DOMINION ENERGY SOUTH CAROLINA
DESC has approximately 3,900 miles and 18,800 miles of electric transmission and distribution lines, respectively, exclusive of service level lines, in South Carolina. The grants for most of DESC’s electric lines contain rights-of-way that have been obtained from the apparent owners of real estate, but underlying property titles have not been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, DESC owns 459 substations.
DESC’s natural gas system includes approximately 19,100 miles of distribution mains and related service facilities, which are supported by approximately 400 miles of transmission pipeline.
DESC owns two LNG facilities, one located near Charleston, South Carolina, and the other in Salley, South Carolina. The Charleston facility can store the liquefied equivalent of approximately 1.0 bcf of natural gas, can regasify approximately 6% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day. The Salley facility can store the liquefied equivalent of approximately 0.9 bcf of natural gas and can regasify approximately 10% of its storage capacity per day. The Salley facility has no liquefying capabilities.
The following table lists DESC’s generating units and capability as of December 31, 2022.
| Plant | Location | Net Summer Capability (MW) | Percentage Net Summer Capability | ||||||||
| Gas | |||||||||||
| Jasper (CC) (1) | Hardeeville, SC | 903 | |||||||||
| Columbia Energy Center (CC) (1) | Gaston, SC | 519 | |||||||||
| Urquhart (CC) (1) | Beech Island, SC | 458 | |||||||||
| McMeekin | Irmo, SC | 250 | |||||||||
| Hagood (CT) (1) | Charleston, SC | 126 | |||||||||
| Urquhart Unit 3 | Beech Island, SC | 95 | |||||||||
| Urquhart (CT) (1) | Beech Island, SC | 87 | |||||||||
| Parr (CT) (1)(2) | Jenkinsville, SC | 47 | |||||||||
| Coit (CT) (1)(2) | Columbia, SC | 26 | |||||||||
| Total Gas | 2,511 | 38 | % | ||||||||
| Coal | |||||||||||
| Wateree | Eastover, SC | 684 | |||||||||
| Williams | Goose Creek, SC | 605 | |||||||||
| Cope (3) | Cope, SC | 415 | |||||||||
| Total Coal | 1,704 | 26 | |||||||||
| Hydro | |||||||||||
| Fairfield | Jenkinsville, SC | 576 | |||||||||
| Saluda | Irmo, SC | 198 | |||||||||
| Other | Various | 18 | |||||||||
| Total Hydro | 792 | 12 | |||||||||
| Nuclear | |||||||||||
| Summer | Jenkinsville, SC | 651 | (4) | 10 | |||||||
| 5,658 | |||||||||||
| Power Purchase Agreements | 973 | (5) | 14 | ||||||||
| Total Utility Generation | 6,631 | 100 | % |
Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.
(1)
Capable of burning fuel oil as a secondary source.
(2)
Expected to be retired by the end of 2025.
(3)
Capable of burning natural gas as a secondary source.
(4)
Excludes 33.3% undivided interest owned by Santee Cooper.
(5)
Includes 189 MW from agreements with certain solar facilities within Contracted Assets.
CONTRACTED ASSETS
Contracted Assets includes Dominion Energy’s 50% noncontrolling interest in Cove Point. The Cove Point LNG Facility has an operational peak regasification daily send-out capacity of approximately 1.8 million Dths and an aggregate LNG storage capacity of approximately 14.6 bcfe. In addition, Cove Point has a small liquefier that has the potential to create approximately 15,000 Dths/day. The Liquefaction Facility consists of one LNG train with a nameplate outlet capacity of 5.25 Mtpa. Cove Point has authorization from the DOE to export up to 0.77 bcfe/day (approximately 5.75 Mtpa) should the Liquefaction Facility perform better than expected. In addition, Cove Point operates a 136-mile natural gas pipeline that connects the Cove Point LNG Facility to interstate natural gas pipelines.
The following table lists Contracted Assets’ generating units and capability as of December 31, 2022.
| Plant | Location | Net Summer Capability (MW) | Percentage Net Summer Capability | ||||||||
| Nuclear | |||||||||||
| Millstone | Waterford, CT | 2,001 | (1) | ||||||||
| Total Nuclear | 2,001 | 67 | % | ||||||||
| Solar(2) | |||||||||||
| Hardin I | Hardin County, OH | 150 | |||||||||
| Amazon Solar Farm Virginia – Southampton | Newsoms, VA | 100 | (3) | ||||||||
| Amazon Solar Farm Virginia – Accomack | Oak Hall, VA | 80 | (3) | ||||||||
| Greensville | Greensville County, VA | 80 | |||||||||
| Innovative Solar 37 | Morven, NC | 79 | (3) | ||||||||
| Wilkinson | Pantego, NC | 74 | |||||||||
| Seabrook | Beaufort County, SC | 73 | |||||||||
| Moffett Solar 1 | Ridgeland, SC | 71 | (3) | ||||||||
| Summit Farms Solar | Moyock, NC | 60 | (3) | ||||||||
| Midway II | Calipatria, CA | 30 | (3) | ||||||||
| Amazon Solar Farm Virginia – Buckingham | Cumberland, VA | 20 | (3) | ||||||||
| Amazon Solar Farm Virginia – Correctional | Barhamsville, VA | 20 | (3) | ||||||||
| Hecate Cherrydale | Cape Charles, VA | 20 | (3) | ||||||||
| Amazon Solar Farm Virginia – Sussex Drive | Stoney Creek, VA | 20 | (3) | ||||||||
| Amazon Solar Farm Virginia – Scott II | Powhatan, VA | 20 | (3) | ||||||||
| Myrtle | Suffolk, VA | 15 | |||||||||
| Trask | Beaufort County, SC | 12 | |||||||||
| Hecate Energy Clarke County | White Post, VA | 10 | (3) | ||||||||
| Ridgeland Solar Farm I | Ridgeland, SC | 10 | (3) | ||||||||
| Yemassee | Hampton County, SC | 10 | |||||||||
| Blackville | Blackville, SC | 7 | |||||||||
| Denmark | Denmark, SC | 6 | |||||||||
| Other | Various | 35 | (3) | ||||||||
| Total Solar | 1,002 | 33 | |||||||||
| Total Nonregulated Generation | 3,003 | 100 | % |
(1)
Excludes 6.53% undivided interest in Unit 3 owned by Massachusetts Municipal and Green Mountain.
(2)
All solar facilities are alternating current.
(3)
Dominion Energy’s interest is subject to a lien securing Eagle Solar’s debt.
Item 3. Legal Proceedings
From time to time, the Companies are parties to various legal, environmental or other regulatory proceedings, including in the ordinary course of business. SEC regulations require disclosure of certain environmental matters when a governmental authority is a party to the proceedings and such proceedings involve potential monetary sanctions that the Companies reasonably believe will exceed a specified threshold. Pursuant to the SEC regulations, the Companies use a threshold of $1 million for such proceedings. See Notes 13 and 23 to the Consolidated Financial Statements, which information is incorporated herein by reference, for discussion of certain legal, environmental and other regulatory proceedings to which the Companies are a party.
Item 4. Mine Safety Disclosures
Not applicable.
Information about our Executive Officers
Information concerning the executive officers of Dominion Energy, each of whom is elected annually, is as follows:
| Name and Age | Business Experience Past Five Years(1) | |
| Robert M. Blue (55) | Chair of the Board of Directors from April 2021 to present; President and CEO from October 2020 to present; Director from November 2020 to present; Executive Vice President and Co-COO from December 2019 to September 2020; Executive Vice President and President & CEO—Power Delivery Group from May 2017 to November 2019. | |
| Edward H. Baine (49) | President—Dominion Energy Virginia from October 2020 to present; Senior Vice President—Power Delivery of Virginia Power from December 2019 to September 2020; Senior Vice President—Distribution of Virginia Power from February 2016 to November 2019. | |
| P. Rodney Blevins (58) | President—Gas Distribution from January 2022 to present; President—Dominion Energy South Carolina from December 2019 to December 2021; President & Chief Executive Officer—Southeast Energy Group from January 2019 to November 2019; Senior Vice President and Chief Information Officer from January 2014 to December 2018. | |
| Carlos M. Brown (48) | Senior Vice President, Chief Legal Officer and General Counsel from September 2022 to present; Senior Vice President, General Counsel and Chief Compliance Officer from December 2019 to August 2022; Senior Vice President and General Counsel from January 2019 to November 2019; Vice President and General Counsel from January 2017 to December 2018. | |
| Michele L. Cardiff (55) | Senior Vice President, Controller and Chief Accounting Officer from October 2020 to present; Vice President, Controller and CAO from April 2014 to September 2020. | |
| W. Keller Kissam (56) | President—Dominion Energy South Carolina from January 2022 to present; President—Electric Operations of DESC from January 2019 to December 2021; President—Generation, Transmission and Distribution and COO of DESC from January 2018 to December 2018. | |
| Diane Leopold (56) | Executive Vice President and COO from October 2020 to present; Executive Vice President and Co-COO from December 2019 to September 2020; Executive Vice President and President & CEO—Gas Infrastructure Group from May 2017 to November 2019. | |
| Steven D. Ridge (42) | Senior Vice President and CFO from November 2022 to present; President of Questar Gas from October 2022 to November 2022; Vice President and General Manager—Western Distribution from October 2021 to September 2022; Vice President—Investor Relations of DES from April 2019 to September 2021; Director—Investor Relations of DES from October 2017 to March 2019. | |
| Daniel G. Stoddard (60) | Senior Vice President, Chief Nuclear Officer and President—Contracted Assets from September 2020 to present; Senior Vice President, Chief Nuclear Officer and President—Contracted Generation from December 2019 to August 2020; Senior Vice President and Chief Nuclear Officer of Virginia Power from October 2016 to present. | |
(1)
All positions held at Dominion Energy, unless otherwise noted. Any service listed for Virginia Power, DESC, Questar Gas and DES reflects service at a current or previous subsidiary of Dominion Energy.
Part II
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
DOMINION ENERGY
Dominion Energy’s common stock is listed on the NYSE under the ticker symbol D. At February 15, 2023, there were 122,016 record holders of Dominion Energy’s common stock. The number of record holders is comprised of individual shareholder accounts maintained on Dominion Energy’s transfer agent records and includes accounts with shares held in (1) certificate form, (2) book-entry in the Direct Registration System and (3) book-entry under Dominion Energy Direct®. Discussions of expected dividend payments required by this Item are contained in Liquidity and Capital Resources in Item 7. MD&A.
Purchases of Equity Securities
| Period | Total Number of Shares (or Units) Purchased (1) | Average Price Paid per Share (or Unit)****(2) | Total Number of Shares (or Units) Purchased as Part of Publicly Announced Plans or Programs | Maximum Number (or Approximate Dollar Value) of Shares (or Units) that May Yet Be Purchased under the Plans or Programs**(3)** | ||||||||||
| 10/1/22-10/31/22 | 74,869 | $ | 69.11 | — | $ 0.92 billion | |||||||||
| 11/1/22-11/30/22 | 1,014 | 69.72 | — | 0.92 billion | ||||||||||
| 12/1/22-12/31/22 | 556 | 60.37 | — | 0.92 billion | ||||||||||
| Total | 76,439 | $ | 69.05 | — | $ 0.92 billion |
(1)
Represents shares of common stock that were tendered by employees to satisfy tax withholding obligations on vested restricted stock.
(2)
Represents the weighted-average price paid per share.
(3)
In November 2020, the Dominion Energy Board of Directors authorized the repurchase of up to $1.0 billion of shares of common stock. This repurchase program has no expiration date or price or volume targets and may be modified suspended or terminated at any time. Shares may be purchased through open market or privately negotiated transactions or otherwise at the discretion of management subject to prevailing market conditions, applicable securities laws and other factors.
VIRGINIA POWER
There is no established public trading market for Virginia Power’s common stock, all of which is owned by Dominion Energy. Virginia Power may pay cash dividends in 2023 but is neither required to nor restricted, except as described in Note 21 to the Consolidated Financial Statements, from making such payments.
Item 6. [Reserved]
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
MD&A discusses Dominion Energy’s results of operations, general financial condition and liquidity and Virginia Power’s results of operations as of and for the year ended December 31, 2022 as compared to the year ended December 31, 2021, as applicable. For a discussion of these items for the year ended December 31, 2021 as compared to the year ended December 31, 2020, please see Part II, Item 7. MD&A in the Companies’ Annual Report on Form 10-K for the year ended December 31, 2021, filed with the SEC on February 24, 2022. MD&A should be read in conjunction with Item 1. Business and the Consolidated Financial Statements in Item 8. Financial Statements and Supplementary Data. Virginia Power meets the conditions to file under the reduced disclosure format, and therefore has omitted certain sections of MD&A.
CONTENTS OF MD&A
MD&A consists of the following information:
Forward-Looking Statements—Dominion Energy and Virginia Power
Accounting Matters—Dominion Energy
Results of Operations—Dominion Energy and Virginia Power
Segment Results of Operations—Dominion Energy
Outlook—Dominion Energy
Liquidity and Capital Resources—Dominion Energy
Future Issues and Other Matters—Dominion Energy
FORWARD-LOOKING STATEMENTS
This report contains statements concerning the Companies’ expectations, plans, objectives, future financial performance and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. In most cases, the reader can identify these forward-looking statements by such words as “anticipate,” “estimate,” “forecast,” “expect,” “believe,” “should,” “could,” “plan,” “may,” “continue,” “target” or other similar words.
The Companies make forward-looking statements with full knowledge that risks and uncertainties exist that may cause actual results to differ materially from predicted results. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Additionally, other factors may cause actual results to differ materially from those indicated in any forward-looking statement. These factors include but are not limited to:
Unusual weather conditions and their effect on energy sales to customers and energy commodity prices;
Extreme weather events and other natural disasters, including, but not limited to, hurricanes, high winds, severe storms, earthquakes, flooding, climate changes and changes in water temperatures and availability that can cause outages and property damage to facilities;
The impact of extraordinary external events, such as the current pandemic health event resulting from COVID-19, and their collateral consequences, including extended disruption of economic activity in our markets and global supply chains;
Federal, state and local legislative and regulatory developments, including changes in or interpretations of federal and state tax laws and regulations;
The direct and indirect impacts of implementing recommendations resulting from the business review announced in November 2022;
Risks of operating businesses in regulated industries that are subject to changing regulatory structures;
Changes to regulated electric rates collected by the Companies and regulated gas distribution, transportation and storage rates collected by Dominion Energy;
Changes in rules for RTOs and ISOs in which the Companies join and/or participate, including changes in rate designs, changes in FERC’s interpretation of market rules and new and evolving capacity models;
Risks associated with Virginia Power’s membership and participation in PJM, including risks related to obligations created by the default of other participants;
Risks associated with entities in which Dominion Energy shares ownership with third parties, including risks that result from lack of sole decision making authority, disputes that may arise between Dominion Energy and third party participants and difficulties in exiting these arrangements;
Changes in future levels of domestic and international natural gas production, supply or consumption;
Impacts to Dominion Energy’s noncontrolling interest in Cove Point from fluctuations in future volumes of LNG imports or exports from the U.S. and other countries worldwide or demand for, purchases of, and prices related to natural gas or LNG;
Timing and receipt of regulatory approvals necessary for planned construction or growth projects and compliance with conditions associated with such regulatory approvals;
The inability to complete planned construction, conversion or growth projects at all, or with the outcomes or within the terms and time frames initially anticipated, including as a result of increased public involvement, intervention or litigation in such projects;
Risks and uncertainties that may impact the Companies’ ability to develop and construct the CVOW Commercial Project within the currently proposed timeline, or at all, and consistent with current cost estimates along with the ability to recover such costs from customers;
Changes to federal, state and local environmental laws and regulations, including those related to climate change, the tightening of emission or discharge limits for GHGs and other substances, more extensive permitting requirements and the regulation of additional substances;
Cost of environmental strategy and compliance, including those costs related to climate change;
Changes in implementation and enforcement practices of regulators relating to environmental standards and litigation exposure for remedial activities;
Difficulty in anticipating mitigation requirements associated with environmental and other regulatory approvals or related appeals;
Unplanned outages at facilities in which the Companies have an ownership interest;
The impact of operational hazards, including adverse developments with respect to pipeline and plant safety or integrity, equipment loss, malfunction or failure, operator error and other catastrophic events;
Risks associated with the operation of nuclear facilities, including costs associated with the disposal of spent nuclear fuel, decommissioning, plant maintenance and changes in existing regulations governing such facilities;
Changes in operating, maintenance and construction costs;
Domestic terrorism and other threats to the Companies’ physical and intangible assets, as well as threats to cybersecurity;
Additional competition in industries in which the Companies operate, including in electric markets in which Dominion Energy’s nonregulated generation facilities operate and potential competition from the development and deployment of alternative energy sources, such as self-generation and distributed generation technologies, and availability of market alternatives to large commercial and industrial customers;
Competition in the development, construction and ownership of certain electric transmission facilities in the Companies’ service territory in connection with Order 1000;
Changes in technology, particularly with respect to new, developing or alternative sources of generation and smart grid technologies;
Changes in demand for the Companies’ services, including industrial, commercial and residential growth or decline in the Companies’ service areas, changes in supplies of natural gas delivered to Dominion Energy’s pipeline system, failure to maintain or replace customer contracts on favorable terms, changes in customer growth or usage patterns, including as a result of energy conservation programs, the availability of energy efficient devices and the use of distributed generation methods;
Receipt of approvals for, and timing of, closing dates for acquisitions and divestitures;
Impacts of acquisitions, divestitures, transfers of assets to j
Showing the first 8K of 114K characters. Open the full section
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
The matters discussed in this Item may contain “forward-looking statements” as described in the introductory paragraphs of Item 7. MD&A. The reader’s attention is directed to those paragraphs and Item 1A. Risk Factors for discussion of various risks and uncertainties that may impact the Companies.
MARKET RISK SENSITIVE INSTRUMENTS AND RISK MANAGEMENT
The Companies’ financial instruments, commodity contracts and related financial derivative instruments are exposed to potential losses due to adverse changes in commodity prices, interest rates and equity security prices as described below. Commodity price risk is present in the Companies’ electric operations and Dominion Energy’s natural gas procurement and marketing operations due to the exposure to market shifts in prices received and paid for electricity, natural gas and other commodities. The Companies use commodity derivative contracts to manage price risk exposures for these operations. Interest rate risk is generally related to their outstanding debt and future issuances of debt. In addition, the Companies are exposed to investment price risk through various portfolios of equity and debt securities. The Companies’ exposure to foreign currency exchange rate risk is related to certain fixed price contracts associated with the CVOW Commercial Project which it manages through foreign currency exchange rate derivatives. The contracts include services denominated in currencies other than the U.S. dollar for approximately €2.6 billion and 5.1 billion kr. In addition, certain of the fixed price contracts, approximately €0.7 billion, contain commodity indexing provisions linked to steel.
The following sensitivity analysis estimates the potential loss of future earnings or fair value from market risk sensitive instruments over a selected time period due to a 10% change in commodity prices or interest rates.
Commodity Price Risk
To manage price risk, the Companies hold commodity-based derivative instruments held for non-trading purposes associated with purchases and sales of electricity, natural gas and other energy-related products.
The derivatives used to manage commodity price risk are executed within established policies and procedures and may include instruments such as futures, forwards, swaps, options and FTRs that are sensitive to changes in the related commodity prices. For sensitivity analysis purposes, the hypothetical change in market prices of commodity-based derivative instruments is determined based on models that consider the market prices of commodities in future periods, the volatility of the market prices in each period, as well as the time value factors of the derivative instruments. Prices and volatility are principally determined based on observable market prices.
A hypothetical 10% increase in commodity prices would have resulted in a decrease of $52 million and $16 million in the fair value of Dominion Energy’s commodity-based derivative instruments as of December 31, 2022 and 2021, respectively.
A hypothetical 10% increase in commodity prices would have resulted in a decrease of $25 million and $6 million in the fair value of Virginia Power’s commodity-based derivative instruments as of December 31, 2022 and 2021, respectively.
The impact of a change in energy commodity prices on the Companies’ commodity-based derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net losses from commodity-based financial derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction, such as revenue from physical sales of the commodity.
Interest Rate Risk
The Companies manage their interest rate risk exposure predominantly by maintaining a balance of fixed and variable rate debt. They also enter into interest rate sensitive derivatives, including interest rate swaps and interest rate lock agreements. For variable rate debt outstanding for Dominion Energy, a hypothetical 10% increase in market interest rates would result in a $37 million and $6 million decrease in earnings at December 31, 2022 and 2021, respectively. For variable rate debt outstanding for Virginia Power, a hypothetical 10% increase in market interest rates would result in a $14 million and less than $1 million decrease in earnings at December 31, 2022 and 2021, respectively.
The Companies also use interest rate derivatives, including forward-starting swaps, interest rate swaps and interest rate lock agreements to manage interest rate risk. As of December 31, 2022, Dominion Energy and Virginia Power had $12.7 billion and $3.6 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $274 million and $156 million, respectively, in the fair value of Dominion Energy and Virginia Power’s interest rate derivatives at December 31, 2022. As of December 31, 2021, Dominion Energy and
Virginia Power had $11.4 billion and $2.8 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $191 million and $111 million, respectively, in the fair value of Dominion Energy and Virginia Power’s interest rate derivatives at December 31, 2021.
The impact of a change in interest rates on the Companies’ interest rate-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from interest rate derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.
Foreign Currency Exchange Rate Risk
The Companies utilize foreign currency exchange rate swaps to economically hedge the foreign currency exchange risk associated with fixed price contracts related to the CVOW Commercial Project denominated in foreign currencies. As of December 31, 2022, Dominion Energy had €2.9 billion in aggregate notional amounts of these foreign currency forward purchase agreements outstanding. A hypothetical 10% increase in exchange rates would have resulted in a decrease of $284 million in the fair value of Dominion Energy’s foreign currency swaps at December 31, 2022.
The impact of a change in exchange rates on the Companies’ foreign currency-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from foreign exchange derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.
Investment Price Risk
The Companies are subject to investment price risk due to securities held as investments in nuclear decommissioning and rabbi trust funds that are managed by third-party investment managers. These trust funds primarily hold marketable securities that are reported in the Consolidated Balance Sheets at fair value.
Dominion Energy recognized net investment losses (including investment income) on nuclear decommissioning and rabbi trust investments of $888 million and net investment gains (including investment income) on nuclear decommissioning and rabbi trust investments of $1.1 billion for the years ended December 31, 2022 and 2021, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Dominion Energy recorded, in AOCI and regulatory liabilities, a net decrease in unrealized gains on debt investments of $196 million and $64 million for the years ended December 31, 2022 and 2021, respectively.
Virginia Power recognized net investment losses (including investment income) on nuclear decommissioning and rabbi trust investments of $426 million and net investment gains (including investment income) on nuclear decommissioning and rabbi trust investments of $568 million for the years ended December 31, 2022 and 2021, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Virginia Power recorded, in AOCI and regulatory liabilities, a net decrease in unrealized gains on debt investments of $106 million and $31 million for the years ended December 31, 2022 and 2021, respectively.
Dominion Energy sponsors pension and other postretirement employee benefit plans that hold investments in trusts to fund employee benefit payments. Virginia Power employees participate in these plans. Dominion Energy’s pension and other postretirement plan assets experienced aggregate actual returns (losses) of $(3.0) billion and $1.5 billion in 2022 and 2021, respectively, versus expected returns of $1.1 billion and $1.0 billion, respectively. Differences between actual and expected returns on plan assets are accumulated and amortized during future periods. As such, any investment-related declines in these trusts will result in future increases in the net periodic cost recognized for such employee benefit plans and will be included in the determination of the amount of cash to be contributed to the employee benefit plans. A hypothetical 0.25% decrease in the assumed long-term rates of return on Dominion Energy’s plan assets would result in an increase in the following year's net periodic cost of $26 million and $27 million as of December 31, 2022 and 2021, respectively, for pension benefits and $5 million and $6 million as of December 31, 2022 and 2021, respectively, for other postretirement benefits.
Risk Management Policies
The Companies have established operating procedures with corporate management to ensure that proper internal controls are maintained. In addition, Dominion Energy has established an independent function at the corporate level to monitor compliance with the credit and commodity risk management policies of all subsidiaries, including Virginia Power. Dominion Energy maintains credit policies that include the evaluation of a prospective counterparty’s financial condition, collateral requirements where deemed necessary and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty. In addition, Dominion Energy also monitors the financial condition of existing counterparties on an ongoing basis. Based on these credit policies and the Companies’ December 31, 2022 provision for credit losses, management believes that it is unlikely that a material adverse effect on the Companies’ financial position, results of operations or cash flows would occur as a result of counterparty nonperformance.
Item 8. Financial Statements and Supplementary Data
REPORT OF INDEPENDENT REGIST****ERED PUBLIC ACCOUNTING FIRM
To the Shareholders and the Board of Directors of Dominion Energy, Inc.
Opinion on the Consolidated Financial Statements
We have audited the accompanying consolidated balance sheets of Dominion Energy, Inc. and subsidiaries ("Dominion Energy") at December 31, 2022 and 2021, the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2022, and the related notes (collectively referred to as the "consolidated financial statements"). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of Dominion Energy at December 31, 2022 and 2021, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2022, in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), Dominion Energy's internal control over financial reporting at December 31, 2022, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 21, 2023, expressed an unqualified opinion on Dominion Energy's internal control over financial reporting.
Basis for Opinion
These consolidated financial statements are the responsibility of Dominion Energy's management. Our responsibility is to express an opinion on Dominion Energy's consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current-period audit of the financial statements that was communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
Regulatory Assets and Liabilities - Impact of Rate Regulation on the Consolidated Financial Statements — Refer to Notes 2, 12 and 13 to the Consolidated Financial Statements
Critical Audit Matter Description
Dominion Energy, through its regulated electric and gas subsidiaries, is subject to rate regulation by certain state public utility commissions and the Federal Energy Regulatory Commission (“FERC”) (collectively, the “relevant commissions”) which have jurisdiction with respect to the rates of electric utility and natural gas distribution companies. Management has determined its rate-regulated subsidiaries meet the requirements under accounting principles generally accepted in the United States of America to apply the specialized rules to account for the effects of cost-based rate regulation. Accounting for the economics of rate regulation impacts multiple financial statement line items and disclosures, such as property, plant and equipment, net; regulatory assets; regulatory liabilities; operating revenues; electric fuel and other energy-related purchases; purchased gas; other operations and maintenance expense; depreciation, depletion and amortization expense; and impairment of assets and other charges, collectively, the “financial statement impacts of rate regulation.”
Revenue provided by Dominion Energy’s electric transmission, distribution and generation operations and its gas distribution operations is based primarily on rates approved by the relevant commissions. Further, Virginia Electric and Power Company’s (“Virginia Power”) retail base rates, terms and conditions for generation and distribution services to customers in Virginia are
reviewed by the Virginia State Corporation Commission (the “Virginia Commission”) in a proceeding that involves the determination of Virginia Power’s actual earned return on equity (“ROE”) during a historic test period, and determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances, Virginia Power may be required to credit a portion of its earnings to customers.
When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs that otherwise would be expensed by nonregulated companies are deferred as regulatory assets. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds or other benefits through future rates or when revenue is collected from customers for expenditures that have yet to be incurred.
Showing the first 8K of 541K characters. Open the full section
Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosure
None.
Item 9A. Controls and Procedures
Dominion Energy
Senior management of Dominion Energy, including Dominion Energy’s CEO and CFO, evaluated the effectiveness of Dominion Energy’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Dominion Energy’s CEO and CFO have concluded that Dominion Energy’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Dominion Energy’s internal control over financial reporting.
Management’s Annual Report on Internal Control over Financial Reporting
Management of Dominion Energy understands and accepts responsibility for Dominion Energy's financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Dominion Energy continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as Dominion Energy does throughout all aspects of its business.
Dominion Energy maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.
The Audit Committee of the Board of Directors of Dominion Energy, composed entirely of independent directors, meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss auditing, internal control, and financial reporting matters of Dominion Energy and to ensure that each is properly discharging its responsibilities. Both the independent registered public accounting firm and the internal auditors periodically meet alone with the Audit Committee and have free access to the Audit Committee at any time.
SEC rules implementing Section 404 of the Sarbanes-Oxley Act of 2002 require Dominion Energy’s 2022 Annual Report to contain a management's report and a report of the independent registered public accounting firm regarding the effectiveness of internal control. As a basis for the report, Dominion Energy tested and evaluated the design and operating effectiveness of internal controls. Based on its assessment as of December 31, 2022, Dominion Energy makes the following assertions:
Management is responsible for establishing and maintaining effective internal control over financial reporting of Dominion Energy.
There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.
Management evaluated Dominion Energy’s internal control over financial reporting as of December 31, 2022. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Dominion Energy maintained effective internal control over financial reporting as of December 31, 2022.
Dominion Energy’s independent registered public accounting firm is engaged to express an opinion on Dominion Energy’s internal control over financial reporting, as stated in their report which is included herein.
February 21, 2023
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Shareholders and the Board of Directors of Dominion Energy, Inc.
Opinion on Internal Control over Financial Reporting
We have audited the internal control over financial reporting of Dominion Energy, Inc. and subsidiaries (“Dominion Energy”) at December 31, 2022, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, Dominion Energy maintained, in all material respects, effective internal control over financial reporting at December 31, 2022, based on criteria established in Internal Control — Integrated Framework (2013) issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements at and for the year ended December 31, 2022, of Dominion Energy and our report dated February 21, 2023, expressed an unqualified opinion on those consolidated financial statements.
Basis for Opinion
Dominion Energy’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management's Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on Dominion Energy’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
/s/ Deloitte & Touche LLP
Richmond, Virginia
February 21, 2023
Virginia Power
Senior management of Virginia Power, including Virginia Power’s CEO and CFO, evaluated the effectiveness of Virginia Power’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Virginia Power’s CEO and CFO have concluded that Virginia Power’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Virginia Power’s internal control over financial reporting.
Management’s Annual Report on Internal Control over Financial Reporting
Management of Virginia Power understands and accepts responsibility for Virginia Power's financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Virginia Power continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as it does throughout all aspects of its business.
Virginia Power maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.
The Board of Directors also serves as Virginia Power's Audit Committee and meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss Virginia Power's auditing, internal accounting control and financial reporting matters and to ensure that each is properly discharging its responsibilities.
SEC rules implementing Section 404 of the Sarbanes-Oxley Act require Virginia Power's 2022 Annual Report to contain a management's report regarding the effectiveness of internal control. As a basis for the report, Virginia Power tested and evaluated the design and operating effectiveness of internal controls. Based on the assessment as of December 31, 2022, Virginia Power makes the following assertions:
Management is responsible for establishing and maintaining effective internal control over financial reporting of Virginia Power.
There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.
Management evaluated Virginia Power's internal control over financial reporting as of December 31, 2022. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Virginia Power maintained effective internal control over financial reporting as of December 31, 2022.
This annual report does not include an attestation report of Virginia Power's registered public accounting firm regarding internal control over financial reporting. Management's report is not subject to attestation by Virginia Power's independent registered public accounting firm pursuant to a permanent exemption under the Dodd-Frank Act.
February 21, 2023
Item 9B. Other Information
Explanatory Note: The following information is filed in this Form 10-K in lieu of being filed pursuant to Item 5.03 in a Form 8-K. The date of the events reported below was February 20, 2023.
On February 20, 2023, the Board of Directors, as part of a periodic review of Dominion Energy’s governance documents, approved changes to Dominion Energy’s Bylaws, effective as of February 20, 2023. The amendments, among other things:
clarify the Board of Directors’ ability to adjourn, postpone or reschedule shareholder meetings whether or not a quorum is present without establishing a new record date unless the meeting is adjourned for more than 120 days;
provide that the annual meeting of shareholders may be held at any time determined by the Board of Directors, as opposed to only in May;
clarify that if there is no quorum present at a meeting, the Chair may adjourn the meeting without notice other than an announcement at the meeting until a quorum is present;
expand the scope of disclosures required by a shareholder seeking to bring business (other than a director nomination) before a meeting of shareholders, known as a proposing shareholder, to include:
a representation that such shareholder is a shareholder of record, is entitled to vote at the annual meeting of the shareholders, will continue to be a shareholder of record at the annual meeting of the shareholders, and intends to appear in person or by proxy at the annual meeting of the shareholders to bring the business before the meeting specified in the notice;
any agreement, arrangement or understanding (including any derivative or short positions, profit interests, options, warrants, convertible securities, stock appreciation or similar rights, hedging transactions and borrowed or loaned shares) that has been entered into by, or on behalf of, the proposing shareholder or any associated person, whether or not such instrument or right shall be subject to settlement in an underlying class of Dominion Energy’s stock, the effect or intent of which is to mitigate loss to, manage risk or benefit of share price changes for, or increase or decrease the voting power of, the proposing shareholder or any associated person, with respect to Dominion Energy’s shares, or relates to the acquisition or disposition of any Dominion Energy shares;
any agreement pursuant to which the proposing shareholder or any associated person, has a right to vote or direct the voting of any of the Dominion Energy’s securities;
any rights to dividends on Dominion Energy’s shares owned beneficially by the proposing shareholder and any associated person that are separated or separable from the underlying Dominion Energy’s shares;
any proportionate interest in Dominion Energy’s shares or any derivative instruments held, directly or indirectly, by a general or limited partnership or limited liability company or similar entity in which the proposing shareholder or any associated person is a general partner or, directly or indirectly, beneficially owns an interest in a general partner, is the manager or managing member or, directly or indirectly, beneficially owns an interest in the manager or managing member of a limited liability company or similar entity;
any performance-related fees (other than an asset-based fee) that the proposing shareholder or any associated person is entitled to based on the increase or decrease in the value of Dominion Energy’s shares or derivative instruments;
the information that would be required to be set forth in a Schedule 13D filed pursuant to Rule 13d-1(a) or an amendment pursuant to Rule 13d-2(a) if such statement were required to be filed under the Securities Exchange Act of 1934, as amended, and the rules and regulations promulgated thereunder by such shareholder and any associated person on whose behalf the notice is given; and
any other information as reasonably requested by Dominion Energy;
clarify that, in addition to complying with the advance notice provisions in the Bylaw regarding any business proposed by a shareholder, each proposing shareholder and any associated person must also comply with all applicable requirements of the Articles of Incorporation, these Bylaws and state and federal law, including the Securities Exchange Act of 1934, as amended;
provide that an election will be considered to be contested if, as of the date that is 21days prior to the date that Dominion Energy files its definitive proxy statement, there are more nominees for election than positions on the Board of Directors to be filled by election at that meeting;
clarify the duties of the president;
adopt a forum selection bylaw to provide that (i) shareholder suits and other derivative actions asserted against Dominion Energy or its directors and officers be brought only before the United States District Court for the Eastern District of Virginia or, in the event that the court lacks jurisdiction or is unavailable to hear such action, the Circuit Court of the City of Richmond, Virginia, and (ii) the U.S. federal district courts will be the exclusive forum for the resolution of claims under the Securities Act of 1933, as amended;
provide that any shareholder directly or indirectly soliciting proxies from other shareholders must use a proxy card color other than white; and
make various other updates, including clarify, ministerial and conforming changes.
The foregoing description of the amendments to Dominion Energy’s Bylaws is qualified in its entirety by reference to the full text of Dominion Energy’s Bylaws, a copy of which is attached hereto as Exhibit 3.2.a and is incorporated herein by reference.
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections
Not applicable.
Part III
Item 10. Directors, Executive Officers and Corporate Governance
DOMINION ENERGY
The information required by this item is incorporated by reference to the sections entitled Item 1—Election of Directors, Corporate Governance—The Committees of the Board and Corporate Governance—Other Governance Policies and Practices—Code of Ethics and Business Conduct in the Dominion Energy 2023 Proxy Statement.
The information concerning the executive officers of Dominion Energy required by this item is included in Part I of this Form 10-K under the caption Information about our Executive Officers. Each executive officer of Dominion Energy is elected annually.
Item 11. Executive Compensation
DOMINION ENERGY
The information required by this item is incorporated by reference to the section entitled Executive Compensation, Compensation of Non-Employee Directors in the 2023 Proxy Statement*.*
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
DOMINION ENERGY
The information required by this item is incorporated by reference to the sections entitled Security Ownership of Certain Beneficial Owners and Management and Executive Compensation—Equity Compensation Plans in the 2023 Proxy Statement.
Item 13. Certain Relationships and Related Transactions, and Director Independence
DOMINION ENERGY
The information required by this item is incorporated by reference to the sections entitled Corporate Governance—Other Governance Policies and Practices —Certain Relationships and Related Party Transactions and Corporate Governance —Director Independence in the 2023 Proxy Statement.
Item 14. Principal Accountant Fees and Services
DOMINION ENERGY
The information required by this item is incorporated by reference to the section entitled Audit-Related Matters—Auditor Fees and Pre-Approval Policy in the 2023 Proxy Statement.
VIRGINIA POWER
The following table presents fees paid to Deloitte & Touche LLP for services related to Virginia Power for the fiscal years ended December 31, 2022 and 2021.
| Type of Fees | 2022 | 2021 | ||||||
| (millions) | ||||||||
| Virginia Power | ||||||||
| Audit fees | $ | 2.44 | $ | 2.37 | ||||
| Audit-related fees | 0.08 | — | ||||||
| Tax fees | — | 0.04 | ||||||
| All other fees | — | — | ||||||
| Total Fees | $ | 2.52 | $ | 2.41 |
Audit fees represent fees of Deloitte & Touche LLP for the audit of Virginia Power’s annual consolidated financial statements, the review of financial statements included in Virginia Power’s quarterly Form 10-Q reports, and the services that an independent auditor
would customarily provide in connection with subsidiary audits, statutory requirements, regulatory filings and similar engagements for the fiscal year, such as comfort letters, attest services, consents and assistance with review of documents filed with the SEC.
Audit-related fees consist of assurance and related services that are reasonably related to the performance of the audit or review of Virginia Power’s consolidated financial statements or internal control over financial reporting. This category may include fees related to the performance of audits and attest services not required by statute or regulations, due diligence related to mergers, acquisitions and investments, and accounting consultations about the application of GAAP to proposed transactions.
Virginia Power’s Board of Directors has adopted the Dominion Energy Audit Committee pre-approval policy for their independent auditor’s services and fees and have delegated the execution of this policy to the Dominion Energy Audit Committee. In accordance with this delegation, each year the Dominion Energy Audit Committee pre-approves a schedule that details the services to be provided for the following year and an estimated charge for such services. At its December 2022 meeting, the Dominion Energy Audit Committee approved schedules of services and fees for 2023 inclusive of Virginia Power. In accordance with the pre-approval policy, any changes to the pre-approved schedule may be pre-approved by the Dominion Energy Audit Committee or a delegated member of the Dominion Energy Audit Committee.
Part IV
Item 15. Exhibits and Financial Statement Schedules
(a) Certain documents are filed as part of this Form 10-K and are incorporated by reference and found on the pages noted.
- Financial Statements
See Index on page 86.
-
All schedules are omitted because they are not applicable, or the required information is either not material or is shown in the financial statements or the related notes.
-
Exhibits (incorporated by reference unless otherwise noted)
** Indicates management contract or compensatory plan or arrangement.*
Item 16. Form 10-K Summary
None.
Signatures
D****OMINION ENERGY
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| DOMINION ENERGY, INC. | |
| By: | /s/ Robert M. Blue |
| (Robert M. Blue, President and Chief Executive Officer) |
Date: February 21, 2023
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 21st day of February, 2023.
| Signature | Title | |
| /s/ Robert M. Blue Robert M. Blue | Chair of the Board of Directors, President and Chief Executive Officer | |
| /s/ James A. Bennett James A. Bennett | Director | |
| /s/ Helen E. Dragas Helen E. Dragas | Director | |
| /s/ James O. Ellis, Jr. James O. Ellis, Jr. | Director | |
| /s/ D. Maybank Hagood | Director | |
| D. Maybank Hagood | ||
| /s/ Ronald W. Jibson Ronald W. Jibson | Director | |
| /s/ Mark J. Kington Mark J. Kington | Director | |
| /s/ Kristin G. Lovejoy | Director | |
| Kristin G. Lovejoy | ||
| /s/ Joseph M. Rigby Joseph M. Rigby | Director | |
| /s/ Pamela J. Royal Pamela J. Royal | Director | |
| /s/ Robert H. Spilman, Jr. Robert H. Spilman, Jr. | Director | |
| /s/ Susan N. Story Susan N. Story | Director | |
| /s/ Michael E. Szymanczyk Michael E. Szymanczyk | Director | |
| /s/ Steven D. Ridge Steven D. Ridge | Senior Vice President and Chief Financial Officer | |
| /s/ Michele L. Cardiff Michele L. Cardiff | Senior Vice President, Controller and Chief Accounting Officer | |
Virginia Power
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| VIRGINIA ELECTRIC AND POWER COMPANY | ||
| By: | /s/ Robert M. Blue | |
| (Robert M. Blue, Chief Executive Officer) |
Date: February 21, 2023
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 21st day of February, 2023.
| Signature | Title |
| /s/ Edward H. Baine Edward H. Baine | Director |
| /s/ Robert M. Blue Robert M. Blue | Director and Chief Executive Officer |
| /s/ Diane Leopold Diane Leopold | Director |
| /s/ Steven D. Ridge Steven D. Ridge | Senior Vice President and Chief Financial Officer |
| /s/ Michele L. Cardiff Michele L. Cardiff | Senior Vice President, Controller and Chief Accounting Officer |