Dominion Energy, Inc.
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)87
Consolidated Statements of Income for the years ended December 31, 2024, 2023 and 202290
Consolidated Statements of Comprehensive Income for the years ended December 31, 2024, 2023 and 202291
Consolidated Balance Sheets at December 31, 2024 and 202392
Consolidated Statements of Equity at December 31, 2024, 2023 and 2022 and for the years then ended94
Consolidated Statements of Cash Flows for the years ended December 31, 2024, 2023 and 202295
Virginia Electric and Power Company
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)96
Consolidated Statements of Income for the years ended December 31, 2024, 2023 and 202299
Consolidated Statements of Comprehensive Income for the years ended December 31, 2024, 2023 and 2022100
Consolidated Balance Sheets at December 31, 2024 and 2023101
Consolidated Statements of Equity at December 31, 2024, 2023 and 2022 and for the years then ended103
Consolidated Statements of Cash Flows for the years ended December 31, 2024, 2023 and 2022104
Combined Notes to Consolidated Financial Statements105

REPORT OF INDEPENDENT REGIST****ERED PUBLIC ACCOUNTING FIRM

To the Shareholders and the Board of Directors of Dominion Energy, Inc.

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated balance sheets of Dominion Energy, Inc. and subsidiaries ("Dominion Energy") at December 31, 2024 and 2023, the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2024, and the related notes (collectively referred to as the "consolidated financial statements"). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of Dominion Energy at December 31, 2024 and 2023, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2024, in conformity with accounting principles generally accepted in the United States of America.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), Dominion Energy’s internal control over financial reporting at December 31, 2024, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 27, 2025, expressed an unqualified opinion on Dominion Energy’s internal control over financial reporting.

Change in Accounting Principle

As discussed in Note 2 to the consolidated financial statements, Dominion Energy has elected to change its method of accounting for the recognition of actuarial gains and losses on its defined benefit pension and other postretirement benefit plans into earnings from an amortization approach to immediate recognition, which has been retrospectively applied in the consolidated financial statements at December 31, 2024 and 2023 and for the three years ended December 31, 2024.

Basis for Opinion

These consolidated financial statements are the responsibility of Dominion Energy’s management. Our responsibility is to express an opinion on Dominion Energy’s consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matters

The critical audit matters communicated below are matters arising from the current-period audit of the financial statements that were communicated or required to be communicated to the audit committee and that (1) relate to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.

Regulatory Assets and Liabilities - Impact of Rate Regulation on the Consolidated Financial Statements — Refer to Notes 2, 12 and 13 to the Consolidated Financial Statements

Critical Audit Matter Description

Dominion Energy, through its regulated electric and gas subsidiaries, is subject to rate regulation by certain state public utility commissions and the Federal Energy Regulatory Commission (“FERC”) (collectively, the “relevant commissions”) which have jurisdiction with respect to the rates of electric utility companies. Management has determined its rate-regulated subsidiaries meet the requirements under accounting principles generally accepted in the United States of America to apply the specialized rules to account for the effects of cost-based rate regulation. Accounting for the economics of rate regulation impacts multiple financial statement line items and disclosures, such as property, plant and equipment, net; regulatory assets; regulatory liabilities; operating revenues; electric fuel and other energy-related purchases; purchased gas; other operations and maintenance expense; depreciation and amortization expense; and impairment of assets and other charges, collectively, the “financial statement impacts of rate regulation.”

Revenue provided by Dominion Energy’s electric transmission, distribution and generation operations and its gas distribution operations is primarily based on rates approved by the relevant commissions. Further, Virginia Electric and Power Company’s (“Virginia Power”) retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia State Corporation Commission (the “Virginia Commission”) in a proceeding that involves the determination of Virginia Power’s actual earned return on equity (“ROE”) during a historic test period, and determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances, Virginia Power may be required to credit a portion of its earnings to customers.

When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs that otherwise would be expensed by nonregulated companies are deferred as regulatory assets. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds or other benefits through future rates or when revenue is collected from customers for expenditures that have yet to be incurred. In addition, a loss is recognized if it becomes probable that capital expenditures will be disallowed for ratemaking purposes and if a reasonable estimate of the amount of the disallowance can be made. Dominion Energy evaluates whether recovery of its regulatory assets through future rates is probable as well as whether a regulatory liability due to customers is probable and makes various assumptions in its analyses. These analyses are generally based on orders issued by regulatory commissions, legislation and judicial actions; past experience; discussions with applicable regulatory authorities and legal counsel; estimated construction costs; forecasted earnings; and considerations around the likelihood of impacts from events such as unusual weather conditions, extreme weather events and other natural disasters, and unplanned outages of facilities.

We identified the impact of rate regulation as a critical audit matter due to the significant judgments made by management to support its assertions about the financial statement impacts of rate regulation. Management judgments include assessing the likelihood of (1) recovery of its regulatory assets through future rates and (2) whether a regulatory liability is due to customers. Given management’s accounting judgments are based on assumptions about the outcome of future decisions by the relevant commissions, auditing these judgments required specialized knowledge of the accounting for rate regulation and the rate setting process due to its inherent complexities.

How the Critical Audit Matter Was Addressed in the Audit

Our audit procedures related to the assessment of whether recovery of regulatory assets through future rates or a regulatory liability due to customers is probable included the following, among others:

We tested the effectiveness of management’s controls over the evaluation of the likelihood of (1) recovery of regulatory assets through future rates, and (2) whether a regulatory liability is due to customers. We also tested the effectiveness of management’s controls over the initial recognition of amounts as regulatory assets or liabilities; and the monitoring and evaluation of regulatory and legislative developments that may impact the assessment of whether recovery of regulatory assets through future rates or a regulatory liability due to customers is probable.

We evaluated Dominion Energy’s disclosures related to the financial statement impacts of rate regulation.

We read and evaluated orders issued by the relevant commissions, as well as relevant regulatory statutes, interpretations, procedural memorandums, existing laws and other publicly available information to assess whether this external information was properly considered by management in concluding upon the financial statement impacts of rate regulation.

We considered the likelihood of (1) recovery of regulatory assets through future rates and (2) whether a regulatory liability is due to customers based on precedents established by the relevant commissions’ previous orders and Dominion Energy’s past experience with the relevant commissions.

For regulatory matters in process, we inspected associated documents and testimony filed with the relevant commissions for any evidence that might contradict management’s assertions.

We read and analyzed the minutes of the Boards of Directors of Dominion Energy and Dominion Energy’s rate-regulated subsidiaries for discussions of changes in legal, regulatory, or business factors which could impact management’s conclusions with respect to the financial statement impacts of rate regulation.

Coastal Virginia Offshore Wind (“CVOW”) Commercial Project – Estimated Total Project Cost – Refer to Note 10 to the Consolidated Financial Statements

Critical Audit Matter Description

As discussed in Note 10, Virginia Power’s CVOW Commercial Project is expected to be placed in service by the end of 2026 with an estimated total project cost of approximately $10.7 billion, excluding financing costs. The expected total project cost reflects increases driven primarily by projections for onshore electrical interconnection costs and network upgrade costs assigned by PJM.

Relative to Virginia Power’s previous cost estimate, the updated estimated total project cost reflects an approximately $0.6 billion increase for such onshore costs and network upgrade costs assigned to the project by PJM and an approximately $0.3 billion increase for increased contingency for remaining construction activities and other factors.

Virginia Power is subject to a cost sharing mechanism in which Virginia Power will be eligible to recover 50% of such incremental costs which fall between $10.3 billion and $11.3 billion with no recovery of such incremental costs which fall between $11.3 billion and $13.7 billion. There is no cost sharing mechanism for any total construction costs in excess of $13.7 billion, the recovery of which would be determined in a future Virginia Commission proceeding. In October 2024, Virginia Power closed on the sale of a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak Partners, LLC (Stonepeak) pursuant to which Stonepeak will contribute 50% of the remaining capital necessary to fund construction of the CVOW Commercial Project provided the total project cost, excluding financing costs, is less than $11.3 billion.

As a result of the revised total project cost estimate and cost sharing mechanism, in the fourth quarter of 2024 Virginia Power recorded a charge for costs not expected to be recovered from customers of $206 million within impairment of assets and other charges, which includes $103 million attributable to noncontrolling interests, and an associated income tax benefit of $26 million, in Dominion Energy’s Consolidated Statements of Income.

We identified the auditing of management’s anticipated allocated network upgrade costs and project contingency cost components of the revised total project cost estimate as a critical audit matter because of the judgments management made to determine those components of the expected total project cost. This required a high degree of auditor judgment and subjectivity, and a significant extent of effort, including the need to involve our construction specialists.

How the Critical Audit Matter Was Addressed in the Audit

Our audit procedures related to the reasonableness of the anticipated allocated network upgrade costs and total project contingency components included the following, among others:

We tested the effectiveness of internal controls over management’s calculation of estimated total project costs, including those over the determination of anticipated allocated network upgrade costs and the estimate of total project contingency.

We evaluated management’s ability to accurately forecast contingency by performing a retrospective review of the project’s historical contingency utilization, reviewing internal communications relevant to the project, reading public information included in press releases and regulatory filings.

With the assistance of our construction specialists, we evaluated the reasonableness of the (1) contingency methodology (2) percentage complete of certain significant project components and (3) overall contingency percentage.

We obtained an understanding of management’s cost model for the network upgrade costs. We audited key inputs to the model and associated allocated cost estimate as it relates to the network upgrade costs, including generator participation and other expected transmission projects. We selected a sample of project costs associated with the network upgrade cost and compared our selections to realized costs of comparable historical projects.

/s/ Deloitte & Touche LLP

Richmond, Virginia

February 27, 2025

We have served as Dominion Energy’s auditor since 1988.

Dominion Energy, Inc.

Consolidated Statements of Income

Year Ended December 31,202420232022
(millions, except per share amounts)
Operating Revenue$14,459$14,393$13,938
Operating Expenses
Electric fuel and other energy-related purchases3,6143,9353,711
Purchased electric capacity745559
Purchased gas260285426
Other operations and maintenance3,5893,1603,365
Depreciation and amortization2,3452,5802,442
Other taxes731684675
Impairment of assets and other charges6003071,401
Losses (gains) on sales of assets**(**1)(27)412
Total operating expenses11,21210,97912,491
Income from operations3,2473,4141,447
Other income (expense)822984(117)
Interest and related charges1,8871,6741,002
Income from continuing operations including noncontrolling interests before income tax expense2,1822,724328
Income tax expense30856859
Net Income From Continuing Operations Including Noncontrolling Interests1,8742,156269
Net Income (Loss) From Discontinued Operations Including Noncontrolling Interests**(1)**197(125)922
Net Income Including Noncontrolling Interests2,0712,0311,191
Noncontrolling Interests**(**53)——
Net Income Attributable to Dominion Energy$2,124$2,031$1,191
Amounts attributable to Dominion Energy
Net income from continuing operations$1,927$2,156$269
Net income (loss) from discontinued operations197(125)922
Net income attributable to Dominion Energy$2,124$2,031$1,191
EPS - Basic
Net income from continuing operations$2.20$2.48$0.22
Net income (loss) from discontinued operations0.24(0.15)1.11
Net income attributable to Dominion Energy$2.44$2.33$1.33
EPS - Diluted
Net income from continuing operations$2.20$2.48$0.22
Net income (loss) from discontinued operations0.24(0.15)1.11
Net income attributable to Dominion Energy$2.44$2.33$1.33

(1)

*Includes income tax expense of $*31 *million, $*1.3 *billion and $*207 million for the years ended December 31, 2024, 2023 and 2022, respectively.

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

Dominion Energy, Inc.

Consolidated Statements of Comprehensive Income

Year Ended December 31,202420232022
(millions)
Net income including noncontrolling interests$2,071$2,031$1,191
Other comprehensive income (loss), net of taxes:
Net deferred gains (losses) on derivatives-hedging activities, net of $(4), $1 and $(22) tax13—67
Changes in unrealized net gains (losses) on investment securities, net of $10, $(19) and $29 tax**(**22)55(100)
Changes in net unrecognized pension and other postretirement benefit costs (credits), net of $1, $— and $1 tax**(**2)——
Amounts reclassified to net income (loss):
Net derivative (gains) losses-hedging activities, net of $(11), $(10) and $(15) tax323342
Net realized (gains) losses on investment securities, net of $(3), $3 and $(6) tax8(11)19
Net pension and other postretirement benefit costs (credits), net of $4, $5 and $5 tax**(**12)(13)(13)
Net earnings from equity method investees, net of $—, $(1) and $— tax—3—
Changes in other comprehensive income from equity method investees, net of $—, $— and $— tax——1
Total other comprehensive income (loss)176716
Comprehensive income including noncontrolling interests2,0882,0981,207
Comprehensive income (loss) attributable to noncontrolling interests**(**53)——
Comprehensive income attributable to Dominion Energy$2,141$2,098$1,207

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

Dominion Energy, Inc.

Consolidated Balance Sheets

At December 31,20242023
(millions)
ASSETS
Current Assets
Cash and cash equivalents(1)$310$184
Customer receivables (less allowance for doubtful accounts of $30 and $38)(1)2,1692,251
Other receivables (less allowance for doubtful accounts of $2 and $1)358258
Inventories:
Materials and supplies1,3601,251
Fossil fuel382417
Gas stored2230
Derivative assets436699
Margin deposit assets10438
Prepayments(1)315246
Regulatory assets(1)9921,309
Other(1)165175
Assets held for sale—18,577
Total current assets6,61325,435
Investments
Nuclear decommissioning trust funds8,0516,946
Investment in equity method affiliates138268
Other361324
Total investments8,5507,538
Property, Plant and Equipment
Property, plant and equipment(1)94,84483,417
Accumulated depreciation and amortization**(**25,982)(24,637)
Total property, plant and equipment, net68,86258,780
Deferred Charges and Other Assets
Goodwill4,1434,143
Pension and other postretirement benefit assets2,2401,779
Intangible assets, net1,136945
Derivative assets963597
Regulatory assets(1)8,2888,356
Other(1)1,6201,507
Total deferred charges and other assets18,39017,327
Total assets$102,415$109,080

(1)

See Note 16 for amounts attributable to VIEs.

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

At December 31,20242023
(millions)
LIABILITIES AND EQUITY
Current Liabilities
Securities due within one year(1)$1,725$6,589
Supplemental credit facility borrowings—450
Short-term debt2,5003,956
Accounts payable1,149921
Accrued interest, payroll and taxes(1)1,0451,075
Derivative liabilities207346
Regulatory liabilities579522
Other(2)2,0841,732
Liabilities held for sale—8,885
Total current liabilities9,28924,476
Long-Term Debt
Long-term debt33,03432,368
Securitization bonds(1)1,054—
Junior subordinated notes3,223688
Supplemental credit facility borrowings——
Other214192
Total long-term debt37,52533,248
Deferred Credits and Other Liabilities
Deferred income taxes6,4126,621
Deferred investment tax credits1,0701,098
Regulatory liabilities9,1968,674
Asset retirement obligations(1)7,0745,641
Derivative liabilities305321
Other1,3521,434
Total deferred credits and other liabilities25,40923,789
Total liabilities72,22381,513
Commitments and Contingencies (see Note 23)
Equity
Preferred stock (See Note 19)9911,783
Common stock – no par(3)24,38323,728
Retained earnings2,0352,229
Accumulated other comprehensive loss**(**156)(173)
Shareholders’ equity27,25327,567
Noncontrolling interests2,939—
Total equity30,19227,567
Total liabilities and equity$102,415$109,080

(1)

See Note 16 for amounts attributable to VIEs.

(2)

See Note 9 for amounts attributable to related parties.

(3)

1.8 billion shares authorized; 852 million shares and 838 million shares outstanding at December 31, 2024 and 2023*, respectively.*

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

Dominion Energy, Inc.

Consolidated Statements of Equity

Preferred StockCommon Stock
SharesAmountSharesAmountRetained EarningsAOCIShareholders’ EquityNoncontrolling InterestsTotal Equity
(millions except per share amounts)
December 31, 20212$1,783810$21,610$4,824$(1,458)$26,759$—$26,759
Cumulative-effect of a change in accounting principle(1,202)1,202——
Net income including noncontrolling interests1,1911,1911,191
Issuance of stock251,9691,9691,969
Stock awards (net of change in unearned compensation)262626
Preferred stock dividends (See Note 19)(93)(93)(93)
Common dividends ($2.67 per common share) and distributions(2,209)(2,209)(2,209)
Other comprehensive income, net of tax161616
December 31, 20222$1,783835$23,605$2,511$(240)$27,659$—$27,659
Net income including noncontrolling interests2,0312,0312,031
Issuance of stock2949494
Stock awards (net of change in unearned compensation)1303030
Preferred stock dividends (See Note 19)(81)(81)(81)
Common dividends ($2.67 per common share)(2,233)(2,233)(2,233)
Other comprehensive income, net of tax676767
Other(1)1——
December 31, 20232$1,783838$23,728$2,229$(173)$27,567$—$27,567
Net income including noncontrolling interests2,1242,124**(**53)2,071
Issuance of stock14732732732
Sale of noncontrolling interest in OSWP**(**107)**(**107)2,6152,508
Contributions from Stonepeak to OSWP377377
Stock awards (net of change in unearned compensation)—303030
Repurchase and redemption of preferred stock**(**1)**(**791)**(**791)**(**791)
Preferred stock dividends (See Note 19)**(**78)**(**78)**(**78)
Common dividends ($2.67 per common share)**(**2,239)**(**2,239)**(**2,239)
Other comprehensive income, net of tax171717
Other**(**1)**(**1)**(**2)**(**2)
December 31, 20241$991852$24,383$2,035$**(**156)$27,253$2,939$30,192

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

Dominion Energy, Inc.

Consolidated Statements of Cash Flows

Year Ended December 31,202420232022
(millions)
Operating Activities
Net income including noncontrolling interests$2,071$2,031$1,191
Adjustments to reconcile net income including noncontrolling interests to net cash provided by operating activities:
Depreciation, depletion and amortization (including nuclear fuel)2,6393,1283,113
Deferred income taxes**(**302)1,47458
Deferred investment tax credits (benefits)**(**32)(37)141
Impairment of assets and other charges6396951,435
Losses (gains) on the East Ohio, Questar Gas and PSNC Transactions130——
Losses (gains) on sales of assets and equity method investments (including Cove Point)—(657)467
Net (gains) losses on nuclear decommissioning trusts funds and other investments**(**669)(474)505
Other adjustments18378(62)
Changes in:
Accounts receivable208147(985)
Inventories**(**87)(198)(216)
Deferred fuel and purchased gas costs, net727975(2,021)
Prepayments and deposits, net**(**108)516145
Accounts payable76(506)556
Accrued interest, payroll and taxes**(**85)17541
Net realized and unrealized changes related to derivative activities236(35)(47)
Pension and other postretirement benefits**(**208)(476)(274)
Other operating assets and liabilities**(**235)(564)(347)
Net cash provided by operating activities5,0186,5723,700
Investing Activities
Plant construction and other property additions (including nuclear fuel)**(**12,198)(10,211)(7,591)
Acquisition of solar development projects**(**229)(24)(167)
Proceeds from sale of noncontrolling interest in Cove Point—3,293—
Proceeds from sale of Hope——727
Proceeds from East Ohio, Questar Gas and PSNC Transactions9,243——
Proceeds from sales of securities3,0722,9663,282
Purchases of securities**(**3,213)(3,152)(3,067)
Proceeds from sales of assets3547252
Contributions to equity method affiliates**(**20)(104)(43)
Distributions from equity method affiliates12613
Short-term deposit——(2,000)
Return of short-term deposit——2,000
Other1(23)(142)
Net cash used in investing activities**(**3,183)(7,207)(6,746)
Financing Activities
Issuance (repayment) of short-term debt, net**(**1,456)5331,109
364-day term loan facility borrowings3,0005,725—
Repayment of 364-day term loan facility borrowings**(**7,750)(975)—
Issuance and remarketing of long-term debt5,9933,3104,965
Repayment and repurchase of long-term debt**(**2,740)(5,673)(1,388)
Issuance of securitization bonds1,282——
Repayment of securitization bonds**(**65)——
Supplemental credit facility borrowings—900900
Supplemental credit facility repayments**(**450)(900)(450)
Proceeds from sale of noncontrolling interest in OSWP2,558——
Contributions from Stonepeak to OSWP377——
Series B Preferred Stock repurchase and redemption**(**801)——
Series A Preferred Stock redemption——(1,610)
Issuance of common stock732941,866
Common dividend payments**(**2,239)(2,233)(2,209)
Other**(**212)(186)(204)
Net cash provided by (used in) financing activities**(**1,771)5952,979
Increase (decrease) in cash, restricted cash and equivalents64(40)(67)
Cash, restricted cash and equivalents at beginning of period301341408
Cash, restricted cash and equivalents at end of period$365$301$341

See Note 2 for disclosure of supplemental cash flow information.

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

REPORT OF INDEPENDENT REGIST****ERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholder of Virginia Electric and Power Company

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated balance sheets of Virginia Electric and Power Company (a wholly-owned subsidiary of Dominion Energy, Inc.) and subsidiaries ("Virginia Power") at December 31, 2024 and 2023, the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2024, and the related notes (collectively referred to as the "consolidated financial statements"). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of Virginia Power at December 31, 2024 and 2023, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2024, in conformity with accounting principles generally accepted in the United States of America.

Basis for Opinion

These consolidated financial statements are the responsibility of Virginia Power’s management. Our responsibility is to express an opinion on Virginia Power’s consolidated financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to Virginia Power in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Virginia Power is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits, we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of Virginia Power’s internal control over financial reporting. Accordingly, we express no such opinion.

Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matters

The critical audit matters communicated below are matters arising from the current-period audit of the financial statements that were communicated or required to be communicated to the audit committee and that (1) relate to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.

Regulatory Assets and Liabilities - Impact of Rate Regulation on the Consolidated Financial Statements — Refer to Notes 2, 12 and 13 to the Consolidated Financial Statements

Critical Audit Matter Description

Virginia Power is subject to utility rate regulation by certain state public utility commissions and the Federal Energy Regulatory Commission (“FERC”) (collectively, the “relevant commissions”), which have jurisdiction with respect to the rates of electric utility companies in the territories Virginia Power serves. Management has determined Virginia Power meets the requirements under accounting principles generally accepted in the United States of America to apply the specialized rules to account for the effects of cost-based rate regulation. Accounting for the economics of rate regulation impacts multiple financial statement line items and disclosures such as property, plant, and equipment, net; regulatory assets; regulatory liabilities; operating revenues; electric fuel and other energy-related purchases; other operations and maintenance expense; depreciation and amortization expense; and impairment of assets and other charges (benefits), collectively, the “financial statement impacts of rate regulation”.

Revenue provided by Virginia Power’s electric transmission, distribution and generation operations is primarily based on rates approved by the relevant commissions. Further, Virginia Power’s retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia State Corporation Commission (the “Virginia Commission”) in a proceeding that involves the determination of Virginia Power’s actual earned return on equity (“ROE”) during a historic test period

and determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances, Virginia Power may be required to credit a portion of its earnings to customers.

When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs that otherwise would be expensed by nonregulated companies are deferred as regulatory assets. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds or other benefits through future rates or when revenue is collected from customers for expenditures that have yet to be incurred. In addition, a loss is recognized if it becomes probable that capital expenditures will be disallowed for ratemaking purposes and if a reasonable estimate of the amount of the disallowance can be made. Virginia Power evaluates whether recovery of its regulatory assets through future rates is probable as well as whether a regulatory liability due to customers is probable and makes various assumptions in its analyses. These analyses are generally based on orders issued by regulatory commissions, legislation and judicial actions; past experience; discussions with applicable regulatory authorities and legal counsel; estimated construction costs; forecasted earnings; and considerations around the likelihood of impacts from events such as unusual weather conditions, extreme weather events, and other natural disasters, and unplanned outages of facilities.

We identified the impact of rate regulation as a critical audit matter due to the significant judgments made by management to support its assertions about the financial statement impacts of rate regulation. Management judgments include assessing the likelihood of (1) recovery of its regulatory assets through future rates and (2) whether a regulatory liability is due to customers. Given management’s accounting judgments are based on assumptions about the outcome of future decisions by the relevant commissions, auditing these judgments required specialized knowledge of the accounting for rate regulation and the rate setting process due to its inherent complexities.

How the Critical Audit Matter Was Addressed in the Audit

Our audit procedures related to the assessment of whether recovery of regulatory assets through future rates or a regulatory liability due to customers is probable included the following, among others:

We tested the effectiveness of management’s controls over the evaluation of the likelihood of (1) recovery of regulatory assets through future rates, and (2) whether a regulatory liability is due to customers. We also tested the effectiveness of management’s controls over the initial recognition of amounts as regulatory assets or liabilities; and the monitoring and evaluation of regulatory and legislative developments that may impact the assessment of whether recovery of regulatory assets through future rates or a regulatory liability due to customers is probable.

We evaluated Virginia Power’s disclosures related to the financial statement impacts of rate regulation.

We read and evaluated orders issued by the relevant commissions, as well as relevant regulatory statutes, interpretations, procedural memorandums, existing laws and other publicly available information to assess whether this external information was properly considered by management in concluding upon the financial statement impacts of rate regulation.

We considered the likelihood of (1) recovery of regulatory assets through future rates and (2) whether a regulatory liability is due to customers based on precedents established by the relevant commissions’ previous orders and Virginia Power’s past experience with relevant commissions.

For regulatory matters in process, we inspected associated documents and testimony filed with the relevant commissions for any evidence that might contradict management’s assertions.

We read and analyzed the minutes of the Board of Directors of Dominion Energy, Inc. and the Board of Directors of Virginia Power, for discussions of changes in legal, regulatory, or business factors which could impact management’s conclusions with respect to the financial statement impacts of rate regulation.

Coastal Virginia Offshore Wind (“CVOW”) Commercial Project – Estimated Total Project Cost – Refer to Note 10 to the Consolidated Financial Statements

Critical Audit Matter Description

As discussed in Note 10, Virginia Power’s CVOW Commercial Project is expected to be placed in service by the end of 2026 with an estimated total project cost of approximately $10.7 billion, excluding financing costs. The expected total project cost reflects increases driven primarily by projections for onshore electrical interconnection costs and network upgrade costs assigned by PJM. Relative to Virginia Power’s previous cost estimate, the updated estimated total project cost reflects an approximately $0.6 billion increase for such onshore costs and network upgrade costs assigned to the project by PJM and an approximately $0.3 billion increase for increased contingency for remaining construction activities and other factors.

Virginia Power is subject to a cost sharing mechanism in which Virginia Power will be eligible to recover 50% of such incremental costs which fall between $10.3 billion and $11.3 billion with no recovery of such incremental costs which fall between $11.3 billion

and $13.7 billion. There is no cost sharing mechanism for any total construction costs in excess of $13.7 billion, the recovery of which would be determined in a future Virginia Commission proceeding. In October 2024, Virginia Power closed on the sale of a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak Partners, LLC (Stonepeak) pursuant to which Stonepeak will contribute 50% of the remaining capital necessary to fund construction of the CVOW Commercial Project provided the total project cost, excluding financing costs, is less than $11.3 billion.

As a result of the revised total project cost estimate and cost sharing mechanism, in the fourth quarter of 2024 Virginia Power recorded a charge for costs not expected to be recovered from customers of $206 million within impairment of assets and other charges, which includes $103 million attributable to noncontrolling interests, and an associated income tax benefit of $26 million, in Virginia Power’s Consolidated Statements of Income.

We identified the auditing of management’s anticipated allocated network upgrade costs and project contingency cost components of the revised total project cost estimate as a critical audit matter because of the judgments management made to determine those components of the expected total project cost. This required a high degree of auditor judgment and subjectivity, and a significant extent of effort, including the need to involve our construction specialists.

How the Critical Audit Matter Was Addressed in the Audit

Our audit procedures related to the reasonableness of the anticipated allocated network upgrade costs and total project contingency components included the following, among others:

We tested the effectiveness of internal controls over management’s calculation of estimated total project costs, including those over the determination of anticipated allocated network upgrade costs and the estimate of total project contingency.

We evaluated management’s ability to accurately forecast contingency by performing a retrospective review of the project’s historical contingency utilization, reviewing internal communications relevant to the project, reading public information included in press releases and regulatory filings.

With the assistance of our construction specialists, we evaluated the reasonableness of the (1) contingency methodology (2) percentage complete of certain significant project components and (3) overall contingency percentage.

We obtained an understanding of management’s cost model for the network upgrade costs. We audited key inputs to the model and associated allocated cost estimate as it relates to the network upgrade costs, including generator participation and other expected transmission projects. We selected a sample of project costs associated with the network upgrade cost and compared our selections to realized costs of comparable historical projects.

/s/ Deloitte & Touche LLP

Richmond, Virginia

February 27, 2025

We have served as Virginia Power’s auditor since 1988.

Virginia Electric and Power Company

Consolidated Statements of Income

Year Ended December 31,202420232022
(millions)
Operating Revenue**(1)**$10,235$9,573$9,654
Operating Expenses
Electric fuel and other energy-related purchases(1)2,7432,9182,913
Purchased electric capacity684646
Other operations and maintenance:
Affiliated suppliers433395342
Other1,8041,4561,709
Depreciation and amortization1,6441,8711,736
Other taxes333298303
Impairment of assets and other charges292115557
Total operating expenses7,3177,0997,606
Income from operations2,9182,4742,048
Other income (expense)195131—
Interest and related charges(1)848764642
Income before income tax expense2,2651,8411,406
Income tax expense408389294
Net Income Including Noncontrolling Interests$1,857$1,452$1,112
Noncontrolling Interests**(**53)——
Net Income Attributable to Virginia Power$1,910$1,452$1,112

(1)

See Note 25 for amounts attributable to affiliates.

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

Virginia Electric and Power Company

Consolidated Statements of Comprehensive Income

Year Ended December 31,202420232022
(millions)
Net income including noncontrolling interests$1,857$1,452$1,112
Other comprehensive income (loss), net of taxes:
Net deferred gains (losses) on derivatives-hedging activities, net of $(4), $— and $(20) tax13(1)60
Changes in unrealized net gains (losses) on investment securities, net of $2, $(3) and $4 tax**(**5)7(11)
Amounts reclassified to net income (loss):
Net derivative (gains) losses-hedging activities, net of $—, $(1) and $(1) tax——1
Net realized (gains) losses on investment securities, net of $(1), $— and $— tax31—
Total other comprehensive income (loss)11750
Comprehensive income including noncontrolling interests$1,868$1,459$1,162
Comprehensive income (loss) attributable to noncontrolling interests**(**53)——
Comprehensive income attributable to Virginia Power$1,921$1,459$1,162

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

Virginia Electric and Power Company

Consolidated Balance Sheets

At December 31,20242023
(millions)
ASSETS
Current Assets
Cash and cash equivalents(1)$160$90
Customer receivables (less allowance for doubtful accounts of $23 and $30)(1)1,6121,728
Other receivables (less allowance for doubtful accounts of $2 and $1)168121
Affiliated receivables2750
Inventories (average cost method)
Materials and supplies849761
Fossil fuel299324
Derivative assets(2)248234
Margin deposit assets135
Prepayments(1)6446
Regulatory assets(1)697868
Other(1)12960
Total current assets4,2544,317
Investments
Nuclear decommissioning trust funds4,2863,716
Other44
Total investments4,2903,720
Property, Plant and Equipment
Property, plant and equipment(1)70,55060,963
Accumulated depreciation and amortization**(**18,033)(17,096)
Total property, plant and equipment, net52,51743,867
Deferred Charges and Other Assets
Pension and other postretirement benefit assets(2)663584
Intangible assets, net818653
Regulatory assets(1)4,5374,317
Other(1)(2)1,3081,160
Total deferred charges and other assets7,3266,714
Total assets$68,387$58,618

(1)

See Note 16 for amounts attributable to VIEs.

(2)

See Note 25 for amounts attributable to affiliates.

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

At December 31,20242023
(millions)
LIABILITIES AND EQUITY
Current Liabilities
Securities due within one year(1)$548$381
Short-term debt950455
Accounts payable660597
Payables to affiliates133111
Accrued dividend(2)407—
Affiliated current borrowings500500
Accrued interest, payroll and taxes(1)366293
Asset retirement obligations321377
Regulatory liabilities385321
Derivative liabilities (2)139244
Other1,228908
Total current liabilities5,6374,187
Long-Term Debt
Long-term debt18,87417,043
Securitization bonds(1)1,054—
Other11072
Total long-term debt20,03817,115
Deferred Credits and Other Liabilities
Deferred income taxes4,0453,624
Deferred investment tax credits640656
Asset retirement obligations(1)5,0764,276
Regulatory liabilities6,5745,978
Other(2)1,2241,125
Total deferred credits and other liabilities17,55915,659
Total liabilities43,23436,961
Commitments and Contingencies (see Note 23)
Equity
Common stock – no par(3)8,9878,987
Other paid-in capital1,0061,113
Retained earnings12,19411,541
Accumulated other comprehensive income2716
Shareholder’s equity22,21421,657
Noncontrolling interests2,939—
Total equity25,15321,657
Total liabilities and equity$68,387$58,618

(1)

See Note 16 for amounts attributable to VIEs.

(2)

See Note 25 for amounts attributable to affiliates.

(3)

500,000 shares authorized; 324,245 shares outstanding at both December 31, 2024 and 2023.

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

Virginia Electric and Power Company

Consolidated Statements of Equity

Common Stock
SharesAmountOther Paid-In CapitalRetained EarningsAOCIShareholder's EquityNoncontrolling InterestsTotal Equity
(millions, except for shares)(thousands)
December 31, 2021275$5,738$1,113$8,977$(41)$15,787$—$15,787
Net income1,1121,1121,112
Other comprehensive income, net of tax505050
December 31, 20222755,7381,11310,089916,949—16,949
Net income1,4521,4521,452
Issuance of stock to Dominion Energy493,2503,2503,250
Other comprehensive income, net of tax777
Other(1)(1)(1)
December 31, 20233248,9871,11311,5411621,657—21,657
Net income including noncontrolling interests1,9101,910**(**53)1,857
Sale of noncontrolling interest in OSWP**(**107)**(**107)2,6152,508
Contributions from Stonepeak to OSWP377377
Dividends**(**1,257)**(**1,257)**(**1,257)
Other comprehensive income, net of tax111111
December 31, 2024324$8,987$1,006$12,194$27$22,214$2,939$25,153

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

Virginia Electric and Power Company

Consolidated Statements of Cash Flows

Year Ended December 31,202420232022
(millions)
Operating Activities
Net income including noncontrolling interests$1,857$1,452$1,112
Adjustments to reconcile net income including noncontrolling interests to net cash provided by operating activities:
Depreciation and amortization (including nuclear fuel)1,8022,0341,892
Deferred income taxes384504141
Deferred investment tax credits (benefits)**(**20)(5)153
Impairment of assets and other charges292130493
Net (gains) losses on nuclear decommissioning trust funds and other investments**(**97)(68)66
Other adjustments**(**44)237(42)
Changes in:
Accounts receivable511(629)
Affiliated receivables and payables46(188)165
Inventories**(**65)(165)(71)
Prepayments and deposits, net34289(150)
Deferred fuel expenses, net304538(1,393)
Accounts payable**(**21)(43)145
Accrued interest, payroll and taxes7323(4)
Net realized and unrealized changes related to derivative activities153451109
Other operating assets and liabilities**(**163)(375)(159)
Net cash provided by operating activities4,5864,8151,828
Investing Activities
Plant construction and other property additions**(**9,760)(6,978)(4,909)
Purchases of nuclear fuel**(**168)(194)(201)
Acquisition of solar development projects**(**40)(24)(77)
Proceeds from sales of securities1,9251,8761,538
Purchases of securities**(**2,011)(1,987)(1,580)
Other81934
Net cash used in investing activities**(**10,046)(7,288)(5,195)
Financing Activities
Issuance (repayment) of short-term debt, net495(486)196
Issuance (repayment) of affiliated current borrowings, net—(1,524)1,325
Issuance and remarketing of long-term debt2,4432,6602,338
Repayment and repurchase of long-term debt**(**593)(1,308)(438)
Issuance of common stock—3,250—
Issuance of securitization bonds1,282——
Repayment of securitization bonds**(**65)——
Proceeds from sale of noncontrolling interest in OSWP2,558——
Contributions from Stonepeak to OSWP377——
Common dividend payments to parent**(**850)——
Other**(**71)(53)(56)
Net cash provided by financing activities5,5762,5393,365
Increase (decrease) in cash, restricted cash and equivalents11666(2)
Cash, restricted cash and equivalents at beginning of year902426
Cash, restricted cash and equivalents at end of year$206$90$24

See Note 2 for disclosure of supplemental cash flow information.

The accompanying notes are an integral part of Virginia Power’s Consolidated Financial Statements.

Combined Notes to Consolidated Financial Statements

NOTE 1. NATURE OF OPERATIONS

Dominion Energy, headquartered in Richmond, Virginia, is one of the nation’s leading developers and operators of regulated offshore wind and solar power and the largest producer of carbon-free electricity in New England, and serves primarily electric utility customers in Virginia, North Carolina and South Carolina through its subsidiaries, Virginia Power and DESC. Dominion Energy also has nonregulated operations that consist primarily of long-term contracted electric generation operations.

In connection with the comprehensive business review concluded in March 2024, Dominion Energy sold all of its regulated gas distribution operations, except for DESC’s, to Enbridge through the East Ohio Transaction (completed in March 2024), the Questar Gas Transaction (completed in May 2024) and the PSNC Transaction (completed in September 2024). In addition in September 2023, Dominion Energy completed the sale of its remaining 50% noncontrolling partnership interest in Cove Point to BHE. As discussed in Notes 3 and 9, these operations as well as certain solar generation facility development operations are reflected as discontinued operations in Dominion Energy's Consolidated Financial Statements.

Dominion Energy manages its daily operations through three primary operating segments: Dominion Energy Virginia, Dominion Energy South Carolina and Contracted Energy. Dominion Energy also reports a Corporate and Other segment, which includes its corporate, service company and other functions (including unallocated debt) as well as its noncontrolling interest in Dominion Privatization, its noncontrolling interest in Wrangler (through March 2022) and Hope (through August 2022). In addition, Corporate and Other includes specific items attributable to Dominion Energy’s operating segments that are not included in profit measures evaluated by executive management in assessing the operating segments’ performance or in allocating resources including the net impact of the operations reflected as discontinued operations, which in addition to the operations discussed above includes Dominion Energy’s noncontrolling interest in Atlantic Coast Pipeline. See Notes 3 and 9 for additional information.

Virginia Power is a regulated public utility that generates, transmits and distributes electricity for sale in Virginia and North Carolina. Virginia Power is a member of PJM, an RTO, and its electric transmission facilities are integrated into the PJM wholesale electricity markets. All of Virginia Power’s stock is owned by Dominion Energy.

Virginia Power manages its daily operations through one primary operating segment: Dominion Energy Virginia. It also reports a Corporate and Other segment that primarily includes specific items attributable to its operating segment that are not included in profit measures evaluated by executive management in assessing the segment’s performance or in allocating resources.

See Note 26 for further discussion of the Companies’ operating segments.

NOTE 2. SIGNIFICANT ACCOUNTING POLICIES

General

The Companies make certain estimates and assumptions in preparing their Consolidated Financial Statements in accordance with GAAP. These estimates and assumptions affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues, expenses and cash flows for the periods presented. Actual results may differ from those estimates.

The Companies’ Consolidated Financial Statements include, after eliminating intercompany transactions and balances, their accounts, those of their respective majority-owned subsidiaries and non-wholly-owned entities in which they have a controlling financial interest. For certain partnership structures, income is allocated based on the liquidation value of the underlying contractual arrangements. Stonepeak’s 50% ownership interest in OSWP is reflected as noncontrolling interest in the Companies’ Consolidated Financial Statements.

The Companies report certain contracts, instruments and investments at fair value. See below and Note 6 for further information on fair value measurements.

The Companies consider acquisitions or dispositions in which substantially all of the fair value of the gross assets acquired or disposed of is concentrated into a single identifiable asset or group of similar identifiable assets to be an acquisition or a disposition of an asset, rather than a business. See Notes 3 and 10 for further information on such transactions.

Dominion Energy maintains pension and other postretirement benefit plans and Virginia Power participates in certain of these plans. See Note 22 for further information on these plans.

Certain amounts in the Companies’ 2023 and 2022 Consolidated Financial Statements have been reclassified to conform to the 2024 presentation for comparative purposes; however, such reclassifications did not affect the Companies’ net income, total assets, liabilities, equity or cash flows. Effective in the fourth quarter of 2024, Dominion Energy changed its method of accounting for the recognition of actuarial gains and losses on its defined benefit pension and other postretirement benefit plans into earnings from an

amortization approach to immediate recognition. All prior period information was conformed to this presentation as described below under the heading Change in Accounting Policy.

Amounts disclosed for Dominion Energy are inclusive of Virginia Power, where applicable.

Change in Accounting Policy

During the fourth quarter of 2024, Dominion Energy changed its method of accounting for the recognition of actuarial gains and losses on its defined benefit pension and other postretirement benefit plans into earnings from an amortization approach to immediate recognition. Previously, Dominion Energy recognized the net actuarial gains and losses as a component of AOCI and amortized such amounts into earnings to the extent such gains and losses were outside a corridor of the greater of 10% of the market-related value of plan assets or 10% of the plans' projected benefit obligation. As a result of the change in policy, Dominion Energy immediately recognizes the change in the fair value of plan assets and liabilities and net actuarial gains and losses annually in the fourth quarter of each fiscal year as well as whenever a triggering event occurs that is determined to require remeasurement. This change in accounting policy does not impact the recognition of the other components of net periodic benefit cost associated with Dominion Energy’s defined benefit pension and other postretirement benefit plans. Actuarial losses attributable to Dominion Energy’s rate regulated operations are deferred to regulatory assets when it is probable that regulators will permit them to be recovered from customers in future rates. Likewise, actuarial gains attributable to Dominion Energy’s rate regulated operations are deferred to regulatory liabilities when it is probable that regulators will require customer refunds or other benefits through future rates. Although the amortization of actuarial gains and losses is considered acceptable, Dominion Energy believes the immediate recognition of actuarial gains and losses is preferable as it eliminates the delay in recognizing gains and losses to earnings. Dominion Energy applied this change in accounting policy retrospectively to all prior periods presented.

The following table details the increase (decrease) to each affected line item in Dominion Energy’s Consolidated Statements of Income for the periods presented:

Dominion Energy
Year ended December 31,202420232022
(millions, except per share amounts)
Employee Benefit Plan Market-Related Impacts**(1)**
Other income (expense)$**(**359)$(8)$(226)
Income tax expense**(**93)(7)(57)
Net income from continuing operations(2)**(**266)(1)(169)
Net income (loss) from discontinued operations——28
Earnings per share(2)**(**0.32)—(0.17)

(1)

*Excludes the impacts associated with the impairment of goodwill associated with the Questar Transaction previously recorded in 2023 and gain on sale of Hope in 2022. Such amounts are an $*18 *million and $*38 *million increase in net income from discontinued operations with a corresponding $*0.02 *and $*0.04 *increase in earnings per share, for the years ended December 31, 2024 and 2023, respectively, and a $*14 *decrease in loss on sales of assets, a $*3 *million increase in income tax expense and an $*11 *million increase in net income from continuing operations, resulting in a $*0.01 *increase in earnings per share for the year ended December 31, 2022. Such amounts include the impact on deferred income taxes of $*10 *million in 2023 related to an increase in the deferred taxes on the outside basis of Questar Gas, Wexpro and related affiliates’ stock, which reversed in 2024 upon closing of the Questar Gas Transaction. The impact to Dominion Energy's net income (loss) from discontinued operations includes an increase (decrease) of $*4 million ($**— *per share), $*16 *million ($*0.02 per share), $(2) million ($**— per share) and $**— million ($**— per share) for the first, second, third and fourth quarters of 2024, respectively.

(2)

*The impact to Dominion Energy's net income from continuing operations includes an increase (decrease) of $(237) million ($(0.28) per share), $(8) million ($(0.01) per share), $*6 *million ($*0.01 per share) and $(27) million ($(0.03) per share) for the first, second, third and fourth quarters of 2024, respectively.

The employee benefit plan market-related impacts on Dominion Energy’s Consolidated Statements of Comprehensive Income for the years ended 2024, 2023 and 2022 was an increase (decrease) to changes in net unrecognized pension and other postretirement benefit costs (credits) of $278 million (net of tax of $(98) million), $(27) million (net of tax of $9 million) and $218 million (net of tax of $(75) million), respectively, and an increase (decrease) to amounts reclassified to net income (loss) related to net pension and other postretirement benefits costs (credits) of $(68) million (net of tax of $24 million), $28 million (net of tax of $(15) million) and $(88) million (net of tax of $32 million), respectively.

The employee benefit plan market-related impacts on Dominion Energy’s Consolidated Balance Sheets at December 31, 2024 and 2023 was a reclassification between AOCI and retained earnings. In addition, Dominion Energy’s Consolidated Balance Sheet at December 31, 2023 had an increase of $48 million in assets held for sale related to a decreased impairment of goodwill associated

with the Questar Gas Transaction. Dominion Energy recorded a cumulative decrease of $1.2 billion to retained earnings as of January 1, 2022.

Operating Revenue

Operating revenue is recorded on the basis of services rendered, commodities delivered or contracts settled and includes amounts yet to be billed to customers. The Companies collect sales, consumption and consumer utility taxes; however, these amounts are excluded from revenue. Dominion Energy’s customer receivables at December 31, 2024 and 2023 included $797 million and $1.0 billion, respectively, of accrued unbilled revenue based on estimated amounts of electricity and natural gas delivered but not yet billed to its utility customers. The balances presented within assets held for sale were $284 million at December 31, 2023. Virginia Power’s customer receivables at December 31, 2024 and 2023 included $611 million and $550 million, respectively, of accrued unbilled revenue based on estimated amounts of electricity delivered but not yet billed to its customers. See Note 25 for amounts attributable to related parties.

The primary types of sales and service activities reported as operating revenue for Dominion Energy are as follows:

Revenue from Contracts with Customers

Regulated electric sales consist primarily of state-regulated retail electric sales, and federally-regulated wholesale electric sales and electric transmission services;

Nonregulated electric sales consist primarily of sales of electricity at market-based rates and contracted fixed rates and associated hedging activity as well as sales to Virginia Power customers from non-jurisdictional solar generation facilities;

Regulated gas sales consist primarily of state-regulated natural gas sales and related distribution services;

Regulated gas transportation and storage sales consist of state-regulated sales of gathering services (through August 2022) and sales of transportation services to off-system customers;

Other regulated revenue consists primarily of miscellaneous service revenue from electric and gas distribution operations and sales of excess electric capacity and other commodities; and

Other nonregulated revenue consists primarily of sales of other miscellaneous products. Other nonregulated revenue also includes service concession arrangements (through December 2022) and revenue associated with services provided to entities presented in discontinued operations under transition services agreements.

Other Revenue

Other revenue consists primarily of alternative revenue programs, gains and losses from derivative instruments not subject to hedge accounting and lease revenues.

The primary types of sales and service activities reported as operating revenue for Virginia Power are as follows:

Revenue from Contracts with Customers

Regulated electric sales consist primarily of state-regulated retail electric sales and federally-regulated wholesale electric sales and electric transmission services;

Nonregulated electric sales consists of sales to customers from non-jurisdictional solar generation facilities;

Other regulated revenue consists primarily of sales of excess capacity and other commodities and miscellaneous service revenue from electric distribution operations; and

Other nonregulated revenue consists primarily of revenue from renting space on certain electric transmission poles and distribution towers and service concession arrangements (through October 2022).

Other Revenue

Other revenue consists primarily of alternative revenue programs, gains and losses from derivative instruments not subject to hedge accounting and lease revenues.

The Companies record refunds to customers as required by state commissions as a reduction to regulated electric sales or regulated gas sales, as applicable. The Companies’ revenue accounted for under the alternative revenue program guidance primarily consists of the equity return for under-recovery of certain riders. Alternative revenue programs compensate the Companies for certain projects and

initiatives. Revenues arising from these programs are presented separately from revenue arising from contracts with customers in the categories above.

Revenues from electric and gas sales are recognized over time, as the customers of the Companies consume gas and electricity as it is delivered. Fixed fees are recognized ratably over the life of the contract as the stand-ready performance obligation is satisfied, while variable usage fees are recognized when Dominion Energy has a right to consideration from a customer in an amount that corresponds directly with the value to the customer of the performance obligation completed to date. Sales of products and services typically transfer control and are recognized as revenue upon delivery of the product or service. The customer is able to direct the use of, and obtain substantially all of the benefits from, the product at the time the product is delivered. The contract with the customer states the final terms of the sale, including the description, quantity and price of each product or service purchased. Payment for most sales and services varies by contract type but is typically due within a month of billing.

Revenue included in Discontinued Operations

Operating revenue for the gas distribution operations sold to Enbridge as part of the East Ohio, PSNC and Questar Gas Transactions primarily consists of state-regulated natural gas sales to residential, commercial and industrial customers and related distribution services, state regulated gas distribution charges to retail distribution service customers opting for alternate suppliers and sales of commodities related to nonregulated extraction activities.

Transportation and storage contracts associated with the operations sold to Enbridge as part of the East Ohio, PSNC and Questar Gas Transactions are primarily stand-ready service contracts that include fixed reservation and variable usage fees. Substantially all of the revenue associated with these local gas distribution companies is derived from performance obligations satisfied over time and month-to-month billings according to their respective tariffs.

Credit Risk

Credit risk is the risk of financial loss if counterparties fail to perform their contractual obligations. In order to minimize overall credit risk, credit policies are maintained, including the evaluation of counterparty financial condition, collateral requirements and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty. In addition, counterparties may make available collateral, including letters of credit or cash held as margin deposits, as a result of exceeding agreed-upon credit limits, or may be required to prepay the transaction.

The Companies maintain a provision for credit losses based on factors surrounding the credit risk of their customers, historical trends and other information. Expected credit losses are estimated and recorded based on historical experience, current conditions and reasonable and supportable forecasts that affect the collectability of financial assets held at amortized cost as well as expected credit losses on commitments with respect to financial guarantees.

Electric Fuel, Purchased Energy and Purchased Gas-Deferred Costs

Where permitted by regulatory authorities, the differences between the Companies’ actual electric fuel and purchased energy expenses and Dominion Energy’s purchased gas expenses and the related levels of recovery for these expenses in current rates are deferred and matched against recoveries in future periods. The deferral of costs in excess of current period fuel rate recovery is recognized as a regulatory asset, while rate recovery in excess of current period fuel expenses is recognized as a regulatory liability.

Of the cost of fuel used in electric generation and energy purchases to serve Virginia utility customers, at December 31, 2024, approximately 87% is subject to Virginia Power’s deferred fuel accounting, while substantially all of the remaining amount is subject to recovery through similar mechanisms. Additionally in 2024, Virginia Power securitized $1.3 billion of under-recovered deferred fuel expenses through the issuance of bonds by VPFS. Of the cost of fuel used in electric generation and energy purchases to serve South Carolina utility customers, at December 31, 2024, substantially all is subject to DESC’s deferred fuel accounting.

Virtually all of DESC’s natural gas purchases are either subject to deferral accounting or are recovered from the customer in the same accounting period as the sale. Through the respective closing dates of the East Ohio, Questar Gas and PSNC Transactions, these companies’ natural gas purchases were also either subject to deferral accounting or were recovered from the customer in the same accounting period as the sale.

Dominion Energy earned certain cost saving sharing incentives under the Wexpro Agreements to the extent that the cost of gas supplied to Questar Gas was a certain amount lower than third-party market rates. In 2023 and 2022, Dominion Energy recorded $4 million and $27 million, respectively, for such incentives, reflected in discontinued operations in Dominion Energy’s Consolidated Statements of Income, with no such incentives recorded in 2024.

Income Taxes

A consolidated federal income tax return is filed for Dominion Energy and its subsidiaries, including Virginia Power. In addition, where applicable, combined income tax returns for Dominion Energy and its subsidiaries are filed in various states; otherwise, separate state income tax returns are filed.

Virginia Power participates in intercompany tax sharing agreements with Dominion Energy and its subsidiaries. Current income taxes are based on taxable income or loss and credits determined on a separate company basis.

Under the agreements, if a subsidiary incurs a tax loss or earns a credit, recognition of current income tax benefits is limited to refunds of prior year taxes obtained by the carryback of the net operating loss or credit or to the extent the tax loss or credit is absorbed by the taxable income of other Dominion Energy consolidated group members. Otherwise, the net operating loss or credit is carried forward and is recognized as a deferred tax asset until realized.

Accounting for income taxes involves an asset and liability approach. Deferred income tax assets and liabilities are provided, representing future effects on income taxes for temporary differences between the bases of assets and liabilities for financial reporting and tax purposes. Accordingly, deferred taxes are recognized for the future consequences of different treatments used for the reporting of transactions in financial accounting and income tax returns. The Companies establish a valuation allowance when it is more-likely-than-not that all, or a portion, of a deferred tax asset will not be realized. Where the treatment of temporary differences is different for rate regulated operations, a regulatory asset is recognized if it is probable that future revenues will be provided for the payment of deferred tax liabilities.

The Companies recognize positions taken, or expected to be taken, in income tax returns that are more-likely-than-not to be realized, assuming that the position will be examined by tax authorities with full knowledge of all relevant information.

If it is not more-likely-than-not that a tax position, or some portion thereof, will be sustained, the related tax benefits are not recognized in the financial statements. Unrecognized tax benefits may result in an increase in income taxes payable, a reduction of income tax refunds receivable or changes in deferred taxes. Also, when uncertainty about the deductibility of an amount is limited to the timing of such deductibility, the increase in income taxes payable (or reduction in tax refunds receivable) is accompanied by a decrease in deferred tax liabilities. Except when such amounts are presented net with amounts receivable from or amounts prepaid to tax authorities, noncurrent income taxes payable related to unrecognized tax benefits are classified in other deferred credits and other liabilities on the Consolidated Balance Sheets and current payables are included in accrued interest, payroll, and taxes on the Consolidated Balance Sheets.

The Companies recognize interest on underpayments and overpayments of income taxes in interest expense and other income, respectively. Penalties are also recognized in other income.

At December 31, 2024, Virginia Power had an income tax-related affiliated receivable of $26 million, comprised of $21 million of federal income taxes and $5 million of state income taxes receivable from Dominion Energy. Virginia Power’s net affiliated balances are expected to be received from Dominion Energy in 2025.

At December 31, 2023, Virginia Power had an income tax-related affiliated receivable of $40 million, comprised of $45 million of federal income taxes receivable from, and $5 million of state income taxes payable to, Dominion Energy. Virginia Power’s net affiliated balances were received from Dominion Energy in 2024.

Investment tax credits for both regulated and nonregulated operations are deferred and amortized to income tax expense over the service lives of the properties giving rise to the credits beginning in the year qualifying property is placed in service. The Companies recognize the tax benefit related to initial book and tax basis differences as a reduction of income tax expense in the year in which the qualifying property is placed into service, except where cost-of-service rate regulation applies. Production tax credits are recognized as energy is generated and sold. The IRA allows the election of either the investment tax credit or production tax credit for certain technologies including solar and wind. Such election is made on a project-by-project basis and the choice of credit may vary based on a combination of factors including, but not limited to, capital expenditures and net capacity factors.

Cash, Restricted Cash and Equivalents

Cash, restricted cash and equivalents include cash on hand, cash in banks and temporary investments purchased with an original maturity of three months or less.

Current banking arrangements generally do not require checks to be funded until they are presented for payment. The following table illustrates the checks outstanding but not yet presented for payment and recorded in accounts payable for the Companies:

At December 31,20242023
(millions)
Dominion Energy(1)$52$54
Virginia Power2344

(1)

*In addition, at December 31, 2023, Dominion Energy had $*19 million of checks outstanding but not yet presented for payment included in liabilities held for sale.

Restricted Cash and Equivalents

The Companies hold restricted cash and equivalent balances that primarily consist of amounts held for litigation settlements, customer deposits, federal assistance funds and future debt payments on DECP Holdings’ term loan agreement (through September 2023), on Eagle Solar’s senior note agreement (through February 2024) and on the securitization bonds.

The following table provides a reconciliation of the total cash, restricted cash and equivalents reported within the Companies’ Consolidated Balance Sheets to the corresponding amounts reported within the Companies’ Consolidated Statements of Cash Flows for the years ended December 31, 2024, 2023 and 2022:

Cash, Restricted Cash and Equivalents at End/Beginning of Year
December 31, 2024December 31, 2023December 31, 2022December 31, 2021
(millions)
Dominion Energy
Cash and cash equivalents(1)$310$217$153$283
Restricted cash and equivalents(2)(3)5584188125
Cash, restricted cash and equivalents shown in the Consolidated Statements of Cash Flows$365$301$341$408
Virginia Power
Cash and cash equivalents$160$90$22$26
Restricted cash and equivalents(3)(4)46—2—
Cash, restricted cash and equivalents shown in the Consolidated Statements of Cash Flows$206$90$24$26

(1)

*At December 31, 2023, 2022 and 2021, Dominion Energy had $*33 *million, $*34 *million and $*49 million, respectively, of cash and cash equivalents included in assets held for sale.

(2)

*At December 31, 2023, 2022 and 2021, Dominion Energy had $*4 *million, $*2 *million and $*3 million, respectively, of restricted cash and equivalents included in assets held for sale with the remaining balances presented within other current assets in Dominion Energy’s Consolidated Balance Sheets.

(3)

*Includes $*41 million at VPFS attributable to VIEs at December 31, 2024.

(4)

Restricted cash and equivalents balances are presented within other current assets in Virginia Power’s Consolidated Balance Sheets.

Supplemental Cash Flow Information

The following table provides supplemental disclosure of cash flow information related to Dominion Energy:

Year Ended December 31,202420232022
(millions)
Cash paid during the year for:
Interest and related charges, excluding capitalized amounts$1,900$1,991$1,408
Income taxes840286139
Significant noncash investing and financing activities:(1)(2)
Accrued capital expenditures1,2681,085979
Leases(3)233255144

(1)

See Note 9 for noncash investing activities related to the acquisition of a noncontrolling interest in Dominion Privatization.

(2)

See Notes 3, 10, 19, 20 and 23 for noncash financing activities related to debt assumed with closing of the East Ohio, Questar Gas and PSNC Transactions, the sale of noncontrolling interest in the CVOW Commercial Project, remarketing of the Series A Preferred Stock and the issuance of common stock and transfer of property associated with the settlement of litigation.

(3)

*Includes $*93 *million of finance leases and $*140 *million of operating leases entered in 2024, $*44 *million of finance leases and $*211 *million of operating leases entered in 2023 and $*34 *million of finance leases and $*110 million of operating leases entered in 2022.

The following table provides supplemental disclosure of cash flow information related to Virginia Power:

Year Ended December 31,202420232022
(millions)
Cash paid (received) during the year for:
Interest and related charges, excluding capitalized amounts$786$709$599
Income taxes25(47)(54)
Significant noncash investing activities(1):
Accrued capital expenditures992807665
Leases(2)201203116

(1)

See Note 10 for noncash financing activities related to the sale of noncontrolling interest in the CVOW Commercial Project.

(2)

*Includes $*77 *million of finance leases and $*124 *million of operating leases entered in 2024, $*30 *million of finance leases and $*173 *million of operating leases entered in 2023 and $*26 *million of finance leases and $*90 million of operating leases entered in 2022.

Distributions from Equity Method Investees

Dominion Energy holds investments that are accounted for under the equity method of accounting and classifies distributions from equity method investees as either cash flows from operating activities or cash flows from investing activities in the Consolidated Statements of Cash Flows according to the nature of the distribution. Distributions received are classified on the basis of the nature of the activity of the investee that generated the distribution as either a return on investment (classified as cash flows from operating activities) or a return of an investment (classified as cash flows from investing activities) when such information is available to Dominion Energy.

Fair Value Measurements

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability (exit price) in an orderly transaction between market participants at the measurement date. However, the use of a mid-market pricing convention (the mid-point between bid and ask prices) is permitted. Fair values are based on assumptions that market participants would use when pricing an asset or liability, including assumptions about risk and the risks inherent in valuation techniques and the inputs to valuations. This includes not only the credit standing of counterparties involved and the impact of credit enhancements but also the impact of the Companies’ own nonperformance risk on their liabilities. Fair value measurements assume that the transaction occurs in the principal market for the asset or liability (the market with the most volume and activity for the asset or liability from the perspective of the reporting entity), or in the absence of a principal market, the most advantageous market for the asset or liability (the market in which the reporting entity would be able to maximize the amount received or minimize the amount paid). Dominion Energy applies fair value measurements to certain assets and liabilities including commodity, interest rate and/or foreign currency exchange rate derivative instruments and other investments including those held in nuclear decommissioning, rabbi and pension and other postretirement benefit plan trusts, in accordance with the requirements discussed above. Virginia Power applies fair value measurements to certain assets and liabilities including commodity, interest rate and/or foreign currency exchange rate derivative instruments and other investments including those held in the nuclear decommissioning trust, in accordance with the requirements discussed above. The Companies apply credit adjustments to their derivative fair values in accordance with the requirements described above.

Inputs and Assumptions

Fair value is based on actively-quoted market prices, if available. In the absence of actively-quoted market prices, price information is sought from external sources, including industry publications, and to a lesser extent, broker quotes. When evaluating pricing information provided by Designated Contract Market settlement pricing, other pricing services or brokers, the Companies consider the ability to transact at the quoted price, i.e. if the quotes are based on an active market or an inactive market and to the extent which pricing models are used, if pricing is not readily available. If pricing information from external sources is not available, or if the Companies believe that observable pricing is not indicative of fair value, judgment is required to develop the estimates of fair value. In those cases the unobservable inputs are developed and substantiated using historical information, available market data, third-party data and statistical analysis. Periodically, inputs to valuation models are reviewed and revised as needed, based on historical information, updated market data, market liquidity and relationships and changes in third-party sources.

For options and contracts with option-like characteristics where observable pricing information is not available from external sources, the Companies generally use a model that considers time value, the volatility of the underlying commodities and other relevant assumptions when estimating fair value. For contracts with unique characteristics, the Companies may estimate fair value using a discounted cash flow approach deemed appropriate in the circumstances and applied consistently from period to period. For individual contracts, the use of different valuation models or assumptions could have a significant effect on the contract’s estimated fair value.

The inputs and assumptions used in measuring fair value include the following:

Derivative Contracts
Inputs and assumptionsCommodityInterest RateForeign Currency Exchange RateInvestments
Forward commodity pricesX
Transaction pricesX
Price volatilityX
Price correlationX
VolumesX
Commodity locationX
Interest rate curvesX
Foreign currency forward exchange ratesX
Quoted securities prices and indicesX
Securities trading information including volume and restrictionsX
MaturityX
Interest ratesXXX
Credit quality of counterparties and the CompaniesXXXX
Credit enhancementsXX
Notional valueXX
Time valueXXX

Levels

The Companies also utilize the following fair value hierarchy, which prioritizes the inputs to valuation techniques used to measure fair value into three broad levels:

Level 1—Quoted prices (unadjusted) in active markets for identical assets and liabilities that they have the ability to access at the measurement date. Instruments categorized in Level 1 primarily consist of financial instruments such as certain exchange-traded derivatives and exchange-listed equities, U.S. and international equity securities, mutual funds and certain treasury securities and cash and cash equivalents held in nuclear decommissioning trust funds for the Companies and benefit plan trust funds and rabbi trust funds for Dominion Energy.

Level 2—Inputs other than quoted prices included within Level 1 that are either directly or indirectly observable for the asset or liability, including quoted prices for similar assets or liabilities in active markets, quoted prices for identical or similar assets or liabilities in inactive markets, inputs other than quoted prices that are observable for the asset or liability and inputs that are derived from observable market data by correlation or other means. Instruments categorized in Level 2 primarily include commodity forwards and swaps, interest rate swaps, foreign currency exchange rate instruments and certain cash and cash equivalents, corporate debt instruments, government securities and other fixed income investments held in nuclear decommissioning trust funds for the Companies and benefit plan trust funds and rabbi trust funds for Dominion Energy.

Level 3—Unobservable inputs for the asset or liability, including situations where there is little, if any, market activity for the asset or liability. Instruments categorized in Level 3 for the Companies consist of long-dated commodity derivatives, FTRs, certain natural gas options and other modeled commodity derivatives.

The fair value hierarchy gives the highest priority to quoted prices in active markets (Level 1) and the lowest priority to unobservable data (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. In these cases, the lowest level input that is significant to a fair value measurement in its entirety determines the applicable level in the fair value hierarchy. Assessing the significance of a particular input to the fair value measurement in its entirety requires judgment, considering factors specific to the asset or liability. Alternative investments, consisting of investments in partnerships, joint ventures and other alternative investments held in nuclear decommissioning and benefit plan trust funds, are generally valued using NAV based on the proportionate share of the fair value as determined by reference to the most recent audited fair value financial statements or fair value statements provided by the investment manager adjusted for any significant events occurring between the investment manager’s and the Companies’ measurement date. Alternative investments recorded at NAV are not classified in the fair value hierarchy.

Transfers out of Level 3 represent assets and liabilities that were previously classified as Level 3 for which the inputs became observable for classification in either Level 1 or Level 2. Because the activity and liquidity of commodity markets vary substantially

between regions and time periods, the availability of observable inputs for substantially the full term and value of the Companies’ over-the-counter derivative contracts is subject to change.

Derivative Instruments

The Companies are exposed to the impact of market fluctuations in the price of electricity, natural gas and other energy-related products they market and purchase, as well as interest rate and foreign currency exchange rate risks in their business operations. The Companies use derivative instruments such as physical and financial forwards, futures, swaps, options, foreign currency transactions and FTRs to manage the commodity, interest rate and/or foreign currency exchange rate risks of their business operations.

Derivative assets and liabilities are presented gross on the Companies’ Consolidated Balance Sheets. Derivative contracts representing unrealized gain positions and purchased options are reported as derivative assets. Derivative contracts representing unrealized losses and options sold are reported as derivative liabilities. All derivatives, except those for which an exception applies, are required to be reported at fair value. One of the exceptions to fair value accounting, normal purchases and normal sales, may be elected when the contract satisfies certain criteria, including a requirement that physical delivery of the underlying commodity is probable. Expenses and revenues resulting from deliveries under normal purchase contracts and normal sales contracts, respectively, are included in earnings at the time of contract performance. See Fair Value Measurements above for additional information about fair value measurements and associated valuation methods for derivatives.

The Companies’ derivative contracts include both over-the-counter transactions and those that are executed on an exchange or other trading platform (exchange contracts) and centrally cleared. Over-the-counter contracts are bilateral contracts that are transacted directly with a third party. Exchange contracts utilize a financial intermediary, exchange or clearinghouse to enter, execute or clear the transactions. Certain over-the-counter and exchange contracts contain contractual rights of offset through master netting arrangements, derivative clearing agreements and contract default provisions. In addition, the contracts are subject to conditional rights of offset through counterparty nonperformance, insolvency or other conditions.

In general, most over-the-counter transactions and all exchange contracts are subject to collateral requirements. Types of collateral for over-the-counter and exchange contracts include cash, letters of credit, and in some cases, other forms of security, none of which are subject to restrictions.

The Companies do not offset amounts recognized for the right to reclaim cash collateral or the obligation to return cash collateral against amounts recognized for derivative instruments executed with the same counterparty under the same master netting arrangement. Dominion Energy had margin assets of $104 million and $38 million associated with cash collateral at December 31, 2024 and 2023, respectively. Dominion Energy had margin liabilities of $3 million and $15 million associated with cash collateral at December 31, 2024 and 2023, respectively. Virginia Power had margin assets of $1 million and $35 million associated with cash collateral at December 31, 2024 and 2023, respectively. Virginia Power had no margin liabilities associated with cash collateral at December 31, 2024 or 2023. See Note 7 for further information about derivatives.

To manage price and interest rate risk, the Companies hold derivative instruments that are not designated as hedges for accounting purposes. However, to the extent the Companies do not hold offsetting positions for such derivatives, they believe these instruments represent economic hedges that mitigate their exposure to fluctuations in commodity prices or interest rates. All income statement activity, including amounts realized upon settlement, is presented in operating revenue, operating expenses, interest and related charges or discontinued operations based on the nature of the underlying risk.

Changes in the fair value of derivative instruments result in the recognition of regulatory assets or regulatory liabilities for jurisdictions subject to cost-based rate regulation. Realized gains or losses on the derivative instruments are generally recognized when the related transactions impact earnings.

Derivative Instruments Designated as Hedging Instruments

In accordance with accounting guidance pertaining to derivatives and hedge accounting, the Companies designate a portion of their derivative instruments as cash flow hedges for accounting purposes. For derivative instruments that are accounted for as cash flow hedges, the cash flows from the derivatives and from the related hedged items are classified in operating cash flows.

Cash Flow Hedges

The Companies’ derivatives designated into cash flow hedges primarily consist of interest rate swaps to hedge the Companies’ exposure to variations in interest rates on long-term debt. For transactions in which the Companies are hedging the variability of cash flows, changes in the fair value of the derivatives are reported in AOCI, to the extent they are effective at offsetting changes in the hedged item, or as appropriate to regulatory assets or regulatory liabilities. Any derivative gains or losses reported in AOCI are reclassified to earnings when the forecasted item is included in earnings, or earlier, if it becomes probable that the forecasted

transaction will not occur. For cash flow hedge transactions, hedge accounting is discontinued if the occurrence of the forecasted transaction is no longer probable.

Property, Plant and Equipment

Property, plant and equipment is recorded at lower of original cost or fair value, if impaired. Capitalized costs include labor, materials and other direct and indirect costs such as asset retirement costs, capitalized interest and, for certain operations subject to cost-of-service rate regulation, AFUDC and overhead costs. The cost of repairs and maintenance, including minor additions and replacements, is generally charged to expense as it is incurred.

Amounts capitalized to property, plant and equipment for capitalized interest costs and AFUDC for the Companies are as follows:

Dominion EnergyVirginia Power
Year ended December 31,202420232022202420232022
(millions)
Capitalized interest costs and AFUDC debt$152$109$43$46$47$27
AFUDC equity(1)1095041963939

(1)

The Companies include AFUDC equity in other adjustments within operating activities in their Consolidated Statements of Cash Flows.

Under Virginia law, certain Virginia jurisdictional projects qualify for current recovery of AFUDC through rate adjustment clauses. AFUDC on these projects is calculated and recorded as a regulatory asset and is not capitalized to property, plant and equipment. In 2024, 2023 and 2022, Virginia Power recorded $3 million, less than $1 million and $34 million of AFUDC related to these projects, respectively.

For property subject to cost-of-service rate regulation, the undepreciated cost of such property, less salvage value, is generally charged to accumulated depreciation at retirement. Cost of removal collections from utility customers are recorded as regulatory liabilities. For property subject to cost-of-service rate regulation that will be abandoned significantly before the end of its useful life, the net carrying value is reclassified from plant-in-service when it becomes probable it will be abandoned and recorded as a regulatory asset for amounts expected to be collected through future rates.

In 2024, 2023 and 2022, Virginia Power had the following charges, recorded in impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment), related to early retirements and abandonments:

In 2024, Virginia Power recorded charges of $40 million ($30 million after-tax) associated with dismantling of certain electric generation facilities. In addition, Virginia Power recorded a $25 million ($18 million after-tax) charge in 2024 related to the write-off of early-stage development costs associated with a hydroelectric pumped storage facility that it is no longer considering constructing.

In 2023, Virginia Power recorded a charge of $25 million ($19 million after-tax) as a result of the abandonment of long-lived assets associated with certain rooftop solar and other projects before the end of their useful lives.

In 2022, Virginia Power recorded charges of $167 million ($124 million after-tax) associated with dismantling of certain electric generation facilities.

For property that is not subject to cost-of-service rate regulation, including nonutility property, cost of removal not associated with AROs is charged to expense as incurred. The Companies also record gains and losses upon retirement based upon the difference between the proceeds received, if any, and the property’s net book value at the retirement date.

Depreciation of property, plant and equipment is computed on the straight-line method based on projected service lives. The Companies’ average composite depreciation rates on utility property, plant and equipment are as follows:

Year Ended December 31,202420232022
(percent)
Dominion Energy**(1)**
Generation2.592.652.71
Transmission2.322.322.32
Distribution2.732.722.80
General and other3.974.204.31
Virginia Power
Generation2.662.752.84
Transmission2.292.292.29
Distribution2.772.782.76
General and other4.294.604.78

(1)

Excludes rates for depreciation reported as discontinued operations.

In January 2022, Dominion Energy revised the estimated useful life of its non-jurisdictional and certain nonregulated solar generation facilities to 35 years. This revision resulted in an annual decrease of depreciation expense of $16 million ($12 million after-tax), including $6 million ($4 million after-tax) at Virginia Power, and increased Dominion Energy’s EPS by approximately $0.02.

In the first quarter of 2022, Virginia Power revised the depreciation rates for its assets to reflect the results of a new depreciation study. The change resulted in a decrease in depreciation expense in Virginia Power’s Consolidated Statements of Income of $60 million ($45 million after-tax) and increased Dominion Energy’s EPS by $0.05.

In December 2023, Dominion Energy revised the estimated useful lives for Millstone Units 2 and 3 to reflect lower depreciation rates as a result of its expectation that a 20-year license extension is approved for these facilities. This revision resulted in a 2024 annual decrease of depreciation expense of $35 million ($26 million after-tax) and increased Dominion Energy’s 2024 EPS by $0.03. For the year ended December 31, 2023, this revision resulted in an inconsequential impact.

In January 2024, Virginia Power revised the depreciation rates for Bath County as a result of its expectation that a license extension of at least 40 years will be approved for this facility. This revision resulted in an annual decrease of depreciation expense of $17 million ($13 million after-tax) and increased Dominion Energy's EPS by $0.02.

Virginia Power’s non-jurisdictional solar generation property, plant and equipment is depreciated using the straight-line method over an estimated useful life of 35 years.

Capitalized costs of development wells and leaseholds were amortized on a field-by-field basis using the unit-of-production method and the estimated proved developed or total proved gas and oil reserves, at a rate of $1.83, $1.73 and $1.67 per mcfe in 2024, 2023 and 2022, respectively. Depletion associated with Wexpro's operations is reflected within discontinued operations through May 2024. See Note 3 for additional information.

Dominion Energy’s nonutility property, plant and equipment is depreciated using the straight-line method over the following estimated useful lives:

AssetEstimated Useful Lives(1)
Nonregulated generation-nuclear54**-**64 years
Nonregulated generation-other30**-**35 years
General and other5**-**50 years

(1)

The estimated useful life for a generation station is made on a unit basis if the facility has multiple generating units and represents the period the unit was placed in service or acquired until the end of its license or estimated service period.

Nuclear fuel used in electric generation is amortized over its estimated service life on a units-of-production basis. The Companies report the amortization of nuclear fuel in electric fuel and other energy-related purchases expense in their Consolidated Statements of Income and in depreciation and amortization in their Consolidated Statements of Cash Flows.

Long-Lived and Intangible Assets

The Companies perform an evaluation for impairment whenever events or changes in circumstances indicate that the carrying amount of long-lived assets or intangible assets with finite lives may not be recoverable. A long-lived or intangible asset is written down to fair value if the sum of its expected future undiscounted cash flows is less than its carrying amount. Intangible assets with finite lives are amortized over their estimated useful lives. See Note 6 for further discussion on the impairment of long-lived assets.

Accounting for Regulated Operations

The accounting for the Companies’ regulated electric and gas operations differs from the accounting for nonregulated operations in that the Companies are required to reflect the effect of rate regulation in their Consolidated Financial Statements. For regulated businesses subject to federal or state cost-of-service rate regulation, regulatory practices that assign costs to accounting periods may differ from accounting methods generally applied by nonregulated companies. When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs that otherwise would be expensed by nonregulated companies are deferred as regulatory assets. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds or other benefits through future rates or when revenue is collected from customers for expenditures that have yet to be incurred. In addition, a loss is recognized if it becomes probable that capital expenditures will be disallowed for ratemaking purposes and if a reasonable estimate of the amount of the disallowance can be made.

In the fourth quarter of 2024, the Companies recorded a net $103 million ($77 million after-tax) charge for Virginia Power’s share of costs not expected to be recovered from customers on the CVOW Commercial Project as a result of a revised total project cost estimate of approximately $10.7 billion, excluding financing costs, that reflects a revised estimate of network upgrade costs assigned

by PJM to the CVOW Commercial Project and cost sharing mechanism included in the Virginia Commission’s December 2022 order. The expected total project cost reflects increases driven primarily by projections for onshore electrical interconnection costs and network upgrade costs assigned to the project by PJM, specifically incorporating consideration of PJM’s December 2024 publication of potential transmission network upgrades required for certain generation projects and related cost allocations, including those attributable to the CVOW Commercial Project. Relative to Virginia Power’s November 2024 Rider OSW filing, the updated estimated total project cost reflects an approximately $0.6 billion increase for such onshore and network upgrade costs and an approximately $0.3 billion increase for increased contingency for remaining construction activities, completion of the removal of unexploded ordnance, undersea cable protection system design enhancements, commodity prices for transportation fuel, updates for sea fastener fabrication and installation and other construction and equipment supplier costs.

The estimated total project cost reflects the Companies’ best estimate of the remaining construction costs, including contingency of approximately 5% on such remaining amounts. Such estimate could potentially change for items, certain of which are beyond the Companies’ control, including but not limited to actual network upgrade costs allocated by PJM, fuel for transportation and installation, the impact of applicable tariffs, if any, costs to maintain necessary permits, approvals and authorizations, ability of key suppliers and contractors to timely satisfy their obligations under existing contracts, marine wildlife and/or any severe weather events. Any additional increase in such costs in excess of the contingency included in the estimated total project cost would be subject to the cost sharing mechanisms described above and could have a material impact on the Companies’ future financial condition, results of operations and/or cash flows. See Note 10 for additional information.

The Companies evaluate whether or not recovery of their regulatory assets through future rates is probable as well as whether a regulatory liability due to customers is probable and make various assumptions in their analyses. These analyses are generally based on:

Orders issued by regulatory commissions, legislation and judicial actions;

Past experience;

Discussions with applicable regulatory authorities and legal counsel;

Estimated construction costs;

Forecasted earnings; and

Considerations around the likelihood of impacts from events such as unusual weather conditions, extreme weather events and other natural disasters and unplanned outages of facilities.

Generally, regulatory assets and liabilities are amortized into income over the period authorized by the regulator. If recovery of a regulatory asset is determined to be less than probable, it will be written off in the period such assessment is made. A regulatory liability, if considered probable, will be recorded in the period such assessment is made or reversed into earnings if no longer probable. In connection with the future 2025 Biennial Review, the Companies concluded that it was not probable that Virginia Power would have earnings in excess of an expected authorized ROE of 9.70% for the period January 1, 2023 through December 31, 2024. As a result, no regulatory liability for Virginia Power ratepayer credits to customers has been recorded at December 31, 2024. See Note 13 for additional information.

Leases

The Companies lease certain assets including vehicles, real estate, office equipment and other operational assets under both operating and finance leases. For the Companies’ operating leases, rent expense is recognized on a straight-line basis over the term of the lease agreement, subject to regulatory framework. Rent expense associated with operating leases, short-term leases and variable leases is primarily recorded in other operations and maintenance expense in the Companies’ Consolidated Statements of Income. Rent expense associated with finance leases results in the separate presentation of interest expense on the lease liability and amortization expense of the related right-of-use asset in the Companies’ Consolidated Statements of Income or, subject to regulatory framework, is deferred within regulatory assets in the Consolidated Balance Sheets and amortized into the Consolidated Statements of Income.

Certain of the Companies’ leases include one or more options to renew, with renewal terms that can extend the lease from one to 70 years. The exercise of renewal options is solely at the Companies’ discretion and is included in the lease term if the option is reasonably certain to be exercised. A right-of-use asset and corresponding lease liability for leases with original lease terms of one year or less are not included in the Consolidated Balance Sheets, unless such leases contain renewal options that the Companies are reasonably certain will be exercised. Additionally, certain of the Companies’ leases contain escalation clauses whereby payments are adjusted for consumer price or other indices or contain fixed dollar or percentage increases. The Companies also have leases with variable payments based upon usage of, or revenues associated with, the leased assets.

The determination of the discount rate utilized has a significant impact on the calculation of the present value of the lease liability included in the Companies’ Consolidated Balance Sheets. For the Companies’ fleet of leased vehicles, the discount rate is equal to the prevailing borrowing rate earned by the lessor. For the Companies’ remaining leased assets, the discount rate implicit in the lease is generally unable to be determined from a lessee perspective. As such, the Companies use internally-developed incremental borrowing rates as a discount rate in the calculation of the present value of the lease liability. The incremental borrowing rates are determined based on an analysis of the Companies’ publicly available unsecured borrowing rates, adjusted for a collateral discount, over various lengths of time that most closely correspond to the Companies’ lease maturities.

In addition, Dominion Energy acts as lessor under certain power purchase agreements in which the counterparty or counterparties purchase substantially all of the output of certain solar facilities. These leases are considered operating in nature. For such leasing arrangements, rental revenue and an associated accounts receivable are recorded when the monthly output of the solar facility is determined. Depreciation on these solar facilities is computed on a straight-line basis primarily over an estimated useful life of 35 years.

Asset Retirement Obligations

The Companies recognize AROs at fair value as incurred or when sufficient information becomes available to determine a reasonable estimate of the fair value of future retirement activities to be performed, for which a legal obligation exists. These amounts are generally capitalized as costs of the related tangible long-lived assets. Since relevant market information is not available, fair value is estimated using discounted cash flow analyses. Quarterly, the Companies assess their AROs to determine if circumstances indicate that estimates of the amounts or timing of future cash flows associated with retirement activities have changed. AROs are adjusted when significant changes in the amounts or timing of future cash flows are identified. Dominion Energy reports accretion of AROs and depreciation on asset retirement costs associated with its natural gas pipelines of its distribution business as an adjustment to the related regulatory assets or liabilities when revenue is recoverable from customers for AROs. The Companies report accretion of AROs and depreciation on asset retirement costs associated with decommissioning its nuclear power stations as an adjustment to the regulatory asset or liability for certain jurisdictions. Additionally, the Companies report accretion of AROs and depreciation on asset retirement costs associated with certain rider and prospective rider projects and other electric generation and distribution facilities as an adjustment to the regulatory asset for certain jurisdictions. Accretion of all other AROs and depreciation of all other asset retirement costs are reported in other operations and maintenance expense and depreciation expense, respectively, in the Consolidated Statements of Income.

Debt Issuance Cost****s

The Companies defer and amortize debt issuance costs and debt premiums or discounts over the expected lives of the respective debt issues, considering maturity dates and, if applicable, redemption rights held by others. Deferred debt issuance costs are recorded as a reduction in long-term debt in the Consolidated Balance Sheets. Amortization of the issuance costs is reported as interest expense. Unamortized costs associated with redemptions of debt securities prior to stated maturity dates are generally recognized and recorded in interest expense immediately. As permitted by regulatory authorities, gains or losses resulting from the refinancing or redemption of debt allocable to utility operations subject to cost-based rate regulation are deferred and amortized.

Investments

Debt Securities

Dominion Energy accounts for and classifies investments in debt securities as trading or available-for-sale securities. Virginia Power classifies investments in debt securities as available-for-sale securities.

Debt securities classified as trading securities include securities held by Dominion Energy in rabbi trusts associated with certain deferred compensation plans. These securities are reported in other investments in the Consolidated Balance Sheets at fair value with net realized and unrealized gains and losses included in other income in the Consolidated Statements of Income.

Debt securities classified as available-for-sale securities include all other debt securities, primarily comprised of securities held in the nuclear decommissioning trusts. These investments are reported at fair value in nuclear decommissioning trust funds in the Consolidated Balance Sheets. Net realized and unrealized gains and losses (including any credit-related impairments) on investments held in nuclear decommissioning trusts are deferred to a regulatory asset or liability, as applicable, for certain jurisdictions subject to cost-based regulation. For all other available-for-sale debt securities, including those held in Dominion Energy’s nonregulated generation nuclear decommissioning trusts, net realized gains and losses (including any credit-related impairments) are included in other income and unrealized gains and losses are reported as a component of AOCI, after-tax.

In determining realized gains and losses for debt securities, the cost basis of the security is based on the specific identification method.

Credit Impairment

The Companies periodically review their available-for-sale debt securities to determine whether a decline in fair value should be considered credit related. If a decline in the fair value of any available-for-sale debt security is determined to be credit related, the credit-related impairment is recorded to an allowance included in nuclear decommissioning trust funds in the Companies’ Consolidated Balance Sheets at the end of the reporting period, with such allowance for credit losses subject to reversal in subsequent evaluations.

Using information obtained from their nuclear decommissioning trust fixed-income investment managers, the Companies record in earnings, or defer as applicable for certain jurisdictions subject to cost-based regulation, any unrealized loss for a debt security when the manager intends to sell the debt security or it is more-likely-than-not that the manager will have to sell the debt security before recovery of its fair value up to its cost basis. If that is not the case, but the debt security is deemed to have experienced a credit loss, the Companies record the credit loss in earnings or defer as applicable for certain jurisdictions subject to cost-based regulation, with the remaining non-credit portion of the unrealized loss recorded in AOCI. Credit losses are evaluated primarily by considering the credit ratings of the issuer, prior instances of non-performance by the issuer and other factors.

Equity Securities with Readily Determinable Fair Values

Equity securities with readily determinable fair values include securities held by Dominion Energy in rabbi trusts associated with certain deferred compensation plans and securities held by the Companies in the nuclear decommissioning trusts. The Companies record all equity securities with a readily determinable fair value, or for which they are permitted to estimate fair value using NAV (or its equivalent), at fair value in nuclear decommissioning trust funds and other investments in the Consolidated Balance Sheets. Net realized and unrealized gains and losses on equity securities held in the nuclear decommissioning trusts are deferred to a regulatory asset or liability, as applicable, for certain jurisdictions subject to cost-based regulation. For all other equity securities, including those held in Dominion Energy’s nonregulated generation nuclear decommissioning trusts and rabbi trusts, net realized and unrealized gains and losses are included in other income in the Consolidated Statements of Income.

Equity Securities without Readily Determinable Fair Values

The Companies account for illiquid and privately held securities without readily determinable fair values under either the equity method or cost method. Equity securities without readily determinable fair values include:

Equity method investments when the Companies have the ability to exercise significant influence, but not control, over the investee. Dominion Energy’s investments are included in investments in equity method affiliates in its Consolidated Balance Sheets, except for the liability to Atlantic Coast Pipeline or where such investments are classified as held for sale. Dominion Energy records equity method adjustments in other income in its Consolidated Statements of Income, including its proportionate share of investee income or loss, gains or losses resulting from investee capital transactions, amortization of certain differences between the carrying value and the equity in the net assets of the investee at the date of investment and other adjustments required by the equity method.

Cost method investments when the Companies do not have the ability to exercise significant influence over the investee. The Companies’ investments are included in other investments and nuclear decommissioning trust funds. Cost method investments are reported at cost less impairment, if any, plus or minus changes resulting from observable price changes in orderly transactions for identical or similar investments of the same issuer.

Other-Than-Temporary Impairment

The Companies periodically review their equity method investments to determine whether a decline in fair value should be considered other-than-temporary. If a decline in the fair value of any security is determined to be other-than-temporary, the investment is written down to its fair value at the end of the reporting period.

Inventories

Materials and supplies and fossil fuel inventories are valued primarily using the weighted-average cost method. Stored gas inventory is valued using the weighted-average cost method, except for East Ohio’s gas distribution operations, which were valued using the LIFO method and reflected in assets held for sale in Dominion Energy’s Consolidated Balance Sheet as of December 31, 2023. Under the LIFO method, current stored gas inventory was valued at $18 million at December 31, 2023. Based on the average price of gas purchased during 2023, the cost of replacing the current portion of stored gas inventory exceeded the amount stated on a LIFO basis by $42 million.

In 2024, Dominion Energy wrote off certain inventory balances in connection with the electric base rate case in South Carolina as discussed in Note 13. In 2022, Dominion Energy wrote off certain inventory balances associated with certain nonrenewable electric generation facilities resulting in a $40 million charge ($30 million after-tax) recorded in impairment of assets and other charges (reflected in the Corporate and Other segment) in its Consolidated Statements of Income, including $19 million ($14 million after-tax) at Virginia Power, for inventory not utilized at such facilities prior to their retirement in the first half of 2023.

Goodwill

Dominion Energy evaluates goodwill for impairment annually as of April 1 and whenever an event occurs or circumstances change in the interim that would more-likely-than-not reduce the fair value of a reporting unit below its carrying amount. In the fourth quarter of 2023 and first quarter of 2024, Dominion Energy's current period calculations of the expected gain or loss on the Questar Gas and East Ohio Transactions resulted in an impairment of the related goodwill. There were no other impairments recorded in 2024. See Note 3 for additional information.

New Accounting Standards

Segment Disclosures

In November 2023, the FASB issued revised accounting guidance for reportable segments. The revised guidance requires disclosure of significant segment expenses and other segment items on an annual and interim basis and to provide in interim periods all disclosures about a reportable segment’s profit or loss and assets that are currently required annually. Additionally, it requires disclosure of the title and position of the CODM. The revised guidance does not change how an entity identifies its operating segments, aggregates them or applies the quantitative thresholds to determine its reportable segments. The new standard is effective for fiscal years beginning after December 15, 2023, and interim periods within fiscal years beginning after December 15, 2024, with early adoption permitted and requires retrospective application to all prior periods presented. This revised guidance only impacted the Companies’ disclosures with no impacts to their results of operations, cash flows or financial condition.

Income Tax Disclosures

In December 2023, the FASB issued revised accounting guidance for income taxes. The revised guidance requires disclosure of disaggregated information about an entity’s effective tax rate reconciliation as well as additional information on income taxes paid. The new standard is effective for fiscal years beginning after December 15, 2024, with early adoption permitted and allows either prospective or retrospective application. The Companies expect this revised guidance to only impact their disclosures with no impacts to their results of operations, cash flows or financial condition.

Climate-Related Disclosures

In March 2024, the SEC issued guidance for climate-related disclosures. The guidance requires disclosure of the financial statement impacts of severe weather events and other natural conditions, including amounts capitalized or expensed as well as any associated recoveries. In addition, the guidance requires disclosure of amounts related to renewable energy credits or carbon offsets if utilized as a material component of plans to achieve climate-related targets or goals. This guidance is currently subject to a stay issued by the SEC. Should this guidance become effective, the Companies expect it to only impact their disclosures with no impacts to their results of operations, cash flows or financial condition.

Expense Disaggregation Disclosures

In November 2024, the FASB issued revised accounting guidance for income statement expense disaggregation disclosures. The revised guidance requires disclosure of disaggregated information about specific expense categories in commonly presented income statement expense captions. The new standard is effective for fiscal years beginning after December 15, 2026, and interim periods within fiscal years beginning after December 15, 2027, with early adoption permitted and allows either prospective or retrospective application. The Companies expect this revised guidance to only impact their disclosures with no impacts to their results of operations, cash flows or financial condition.

NOTE 3. ACQUISITIONS AND DISPOSITIONS

Business Review Dispositions

Sale of East Ohio

In September 2023, Dominion Energy entered into an agreement with Enbridge for the East Ohio Transaction, which included the sale of East Ohio and was valued at approximately $6.6 billion, consisting of a purchase price of approximately $4.3 billion in cash and approximately $2.3 billion of assumed indebtedness. The sale closed in March 2024 after all customary closing and regulatory conditions were satisfied, including clearance or approval under or by the Hart-Scott-Rodino Act, CFIUS and FCC. Dominion Energy utilized the after-tax proceeds, as required, to repay outstanding borrowings under 364-day term loan facilities. See Note 17 for additional information. The purchase price was subject to customary post-closing adjustments, including adjustments for cash, indebtedness, net working capital, capital expenditures and net regulatory assets and liabilities. The transaction was structured as a stock sale for tax purposes. In October 2023, as required under the sale agreement, Dominion Energy filed a notice with the Ohio Commission. The internal reorganization in connection with the East Ohio Transaction was subject to approval by the Utah and

Wyoming Commissions. Dominion Energy filed for such approvals in September 2023 which were received in November 2023. The internal reorganization was completed in February 2024.

Dominion Energy retained the pension and other postretirement benefit plan assets and obligations, including related income tax and other deferred balances, associated with retiree participants in both East Ohio’s union pension and other postretirement benefit plans and retiree participants of the sale entities in the Dominion Energy Pension Plan and the Dominion Energy Retiree Health and Welfare Plan. Dominion Energy recognized a pre-tax loss of $97 million ($109 million after-tax loss) upon the closing of the transaction, including the write-off of $1.5 billion of goodwill which was not deductible for tax purposes and including the effects of final closing adjustments. In 2023, Dominion Energy recorded a charge of $29 million to reflect the recognition of deferred taxes on the outside basis of East Ohio’s stock upon meeting the classification as held for sale. These deferred taxes reversed in the first quarter of 2024 upon closing of the sale and became a component of current income tax expense on the loss on sale disclosed above. See Note 5 for additional information.

At the closing of the East Ohio Transaction, Dominion Energy and Enbridge entered into a transition services agreement pursuant to which Dominion Energy will continue to provide certain services to support the ongoing operations of East Ohio for up to approximately two years. Enbridge has also agreed to provide certain services to Dominion Energy.

Sale of PSNC

In September 2023, Dominion Energy entered into an agreement with Enbridge for the PSNC Transaction, which included the sale of PSNC. The sale closed in September 2024 after all customary closing and regulatory conditions were satisfied, including clearance or approval under or by the Hart-Scott-Rodino Act, CFIUS, FCC and North Carolina Commission. At closing, the transaction was valued at $3.3 billion, consisting of a purchase price of $2.0 billion in cash and $1.3 billion of assumed indebtedness. The purchase price is subject to customary post-closing adjustments, including adjustments for cash, indebtedness, net working capital, capital expenditures and net regulatory assets and liabilities. The transaction was structured as a stock sale for tax purposes. The internal reorganization in connection with the PSNC Transaction was subject to approval by the North Carolina Commission. Dominion Energy filed for such approval in September 2023 which was received in November 2023. The internal reorganization was completed in December 2023.

Dominion Energy retained the entirety of the assets and obligations, including related income tax and other deferred balances, of the pension and other postretirement employee benefit plans associated with the operations included in the transaction and relating to services provided through closing. Dominion Energy recognized a pre-tax loss of $35 million ($31 million after-tax loss) upon the closing of the transaction, including the write-off of $0.7 billion of goodwill which is not deductible for tax purposes and including the effects of final closing adjustments. In 2023, Dominion Energy recorded a charge of $334 million to reflect the deferred taxes on the outside basis of PSNC’s stock upon meeting the classification as held for sale. Dominion Energy recorded an additional charge of $16 million to adjust these deferred taxes to recorded balances as of June 30, 2024. These deferred taxes reversed in the third quarter of 2024 upon closing of the sale and became a component of current income tax expense on the pre-tax loss on sale disclosed above. See Note 5 for additional information.

At the closing of the PSNC Transaction, Dominion Energy and Enbridge entered into a transition services agreement pursuant to which Dominion Energy will continue to provide certain services to support the ongoing operations of PSNC for up to approximately two years. Enbridge has also agreed to provide certain services to Dominion Energy.

Sale of Questar Gas and Wexpro

In September 2023, Dominion Energy entered into an agreement with Enbridge for the Questar Gas Transaction, which included the sale of Questar Gas, Wexpro and related affiliates and was valued at approximately $4.3 billion, consisting of a purchase price of approximately $3.0 billion in cash and approximately $1.3 billion of assumed indebtedness. The sale closed in May 2024 after all customary closing and regulatory conditions were satisfied, including clearance or approval under or by the Hart-Scott-Rodino Act, CFIUS, FCC and Utah and Wyoming Commissions. Dominion Energy utilized the after-tax proceeds, as required, to repay outstanding borrowings under a 364-day term loan facility. See Note 17 for additional information. The purchase price was subject to customary post-closing adjustments, including adjustments for cash, indebtedness, net working capital, capital expenditures and net regulatory assets and liabilities. The transaction was structured as a stock sale for tax purposes. In October 2023, as required under the sale agreement, Dominion Energy filed the notice with the Idaho Commission. The internal reorganization in connection with the Questar Gas Transaction was subject to approval by the Utah and Wyoming Commissions. Dominion Energy filed for such approvals in September 2023 which were received in November 2023. The internal reorganization was completed in February 2024.

Dominion Energy retained the pension and other postretirement benefit plan assets and obligations, including related income tax and other deferred balances, associated with retiree participants of the sale entities in the Dominion Energy Pension Plan and the Dominion Energy Retiree Health and Welfare Plan. Dominion Energy recognized a pre-tax gain of $2 million ($42 million after-tax gain) upon the closing of the transaction, including the write-off of $0.7 billion of goodwill which was not deductible for tax purposes and including the effects of final closing adjustments. In 2023, Dominion Energy recorded a charge of $236 million ($231 million after-tax), including amounts associated with an impairment of goodwill. Based on the recorded balances at March 31, 2024, Dominion Energy recorded an additional charge of $78 million ($78 million after-tax), including amounts associated with an

impairment of goodwill, in the first quarter of 2024. Following the internal reorganization noted above and upon closing of the East Ohio Transaction, Dominion Energy recorded a tax benefit of $5 million. In 2023, Dominion Energy recorded a charge of $472 million to reflect the deferred taxes on the outside basis of Questar Gas, Wexpro and related affiliates’ stock upon meeting the classification as held for sale. These deferred taxes reversed in the first quarter of 2024 and became a component of current income tax expense. In addition, Dominion Energy recorded an incremental deferred tax benefit of $10 million to reflect the deferred taxes on the outside basis of Questar Gas, Wexpro and related affiliates’ stock in the first quarter of 2024. These deferred taxes reversed in the second quarter of 2024 upon closing of the sale and became a component of current income tax expense on the pre-tax loss on sale disclosed above. See Note 5 for additional information.

At the closing of the Questar Gas Transaction, Dominion Energy and Enbridge entered into a transition services agreement pursuant to which Dominion Energy will continue to provide certain services to support the ongoing operations of Questar Gas and Wexpro for up to approximately two years. Enbridge has also agreed to provide certain services to Dominion Energy.

Other Sales

In February 2024, Dominion Energy entered into an agreement with AES to sell Birdseye and the Madison solar project for approximately $17 million in cash, subject to customary closing adjustments, which closed in April 2024. Dominion Energy had previously recognized a charge of $68 million ($51 million after-tax) in the fourth quarter of 2023 to adjust the assets down to their realizable fair value. As a result, the gain on the sale recognized by Dominion Energy in the second quarter of 2024, including the effects of final closing adjustments, was inconsequential.

In August 2023, Dominion Energy entered into an agreement and completed the sale of Tredegar Solar Fund I, LLC to Spruce Power for cash consideration of $21 million.

Financial Statement Information for Business Review Dispositions

The following table represents selected information regarding the results of operations, which were reported within discontinued operations in Dominion Energy’s Consolidated Statements of Income:

Year Ended December 31, 2024East Ohio Transaction**(1)**PSNC Transaction**(1)**Questar Gas Transaction**(1)**Other
(millions)
Operating revenue$229$488$894$—
Operating expense(2)247313724**(**8)
Other income (expense)**(**17)112—
Interest and related charges154425—
Income (loss) before income taxes**(**50)1421478
Income tax expense114454—
Net income (loss) attributable to Dominion Energy(3)$**(**61)$98$93$8

(1)

Represents amounts attributable to Dominion Energy prior to the closing of the East Ohio Transaction which closed on March 6, 2024, the PSNC Transaction which closed on September 30, 2024 and the Questar Gas Transaction which closed on May 31, 2024.

(2)

*East Ohio Transaction includes a charge of $*45 *million ($*33 million after-tax) associated with an increase to certain pension retirement benefits attributable to a plan amendment and a contribution to the defined contribution employee savings plan. See Note 22 for further information on these transactions.

(3)

Excludes $(69) million of income tax expense (benefit) attributable to consolidated state tax adjustments for the year ended December 31, 2024.

Year Ended December 31, 2023East Ohio TransactionPSNC TransactionQuestar Gas TransactionOther
(millions)
Operating revenue$1,037$743$1,679$15
Operating expense(1)7015171,554111
Other income (expense)30118—
Interest and related charges7152681
Income (loss) before income taxes29518565(97)
Income tax expense(2)69431531(38)
Net income (loss) attributable to Dominion Energy(3)$226$(246)$(466)$(59)

(1)

*East Ohio Transaction includes a charge of $*50 *million ($*45 *million after-tax) primarily for an impairment of associated goodwill, Questar Gas Transaction includes a charge of $*236 *million ($*231 *million after-tax) primarily for an impairment of associated goodwill and Other includes a charge of $*68 *million ($*51 *million after-tax) associated with the impairment of nonregulated solar generation facility development operations and a charge of $*15 *million ($*11 million after-tax) associated with the impairment of certain nonregulated solar assets.

(2)

Includes amounts to reflect the recognition of deferred taxes on the outside basis of the applicable entities’ stock upon meeting the classification as held for sale.

(3)

Excludes $(3) million of income tax expense (benefit) attributable to consolidated state tax adjustments for the year ended December 31, 2023.

Year Ended December 31, 2022East Ohio TransactionPSNC TransactionQuestar Gas TransactionOther
(millions)
Operating revenue$1,043$841$1,341$11
Operating expense(1)7026481,043118
Other income (expense)28937—
Interest and related charges364345—
Income (loss) before income taxes333159290(107)
Income tax expense453460(28)
Net income (loss) attributable to Dominion Energy(2)$288$125$230$(79)

(1)

*Other includes a charge of $*103 *million ($*76 million after-tax) associated with the impairment of a nonregulated solar generation asset.

(2)

Excludes $(4) million of income tax expense (benefit) attributable to consolidated state tax adjustments for the year ended December 31, 2022.

The carrying value of major classes of assets and liabilities relating to the disposal groups, which are reported as held for sale in Dominion Energy’s Consolidated Balance Sheet were as follows:

At December 31, 2023East Ohio TransactionPSNC TransactionQuestar Gas TransactionOther
(millions)
Current assets(1)$497$336$764$1
Property, plant and equipment, net5,4432,8064,36926
Other deferred charges and other assets, including goodwill(2) and intangible assets2,659834814—
Current liabilities(3)(4)5602243897
Long-term debt(5)2,2869481,205—
Other deferred credits and liabilities(6)1,4377111,1162

(1)

*Includes cash and cash equivalents of $*4 *million, $*2 *million and $*26 *million within the East Ohio, PSNC and Questar Gas Transactions, respectively. Also includes regulatory assets of $*75 *million, $*89 *million and $*297 million within the East Ohio, PSNC and Questar Gas Transactions, respectively.

(2)

*Includes goodwill of $*1.5 *billion, $*673 *million and $*768 *million within the East Ohio, PSNC and Questar Gas Transactions, respectively. Also includes regulatory assets of $*781 *million, $*86 million and $(39) million within the East Ohio, PSNC and Questar Gas Transactions, respectively.

(3)

*Includes regulatory liabilities of $*54 *million, $*44 *million and $*55 million within the East Ohio, PSNC and Questar Gas Transactions, respectively.

(4)

Questar Gas Transaction includes $40 million of 2.98% unsecured senior notes at December 31, 2023, which were scheduled to mature in December 2024.

(5)

Includes East Ohio Unsecured Senior Notes due 2025 to 2052 at rates from 1.30*% to* 6.38*% and with a weighted-average coupon rate for debt outstanding at December 31, 2023 of* 3.13*%; PSNC Unsecured Senior Notes due 2026 to 2053 at rates from* 3.10*% to* 7.45*% and with a weighted-average coupon rate for debt outstanding at December 31, 2023 of* 4.67*%; and Questar Gas Unsecured Senior Notes due 2024 to 2052 at rates from* 2.21*% to* 7.20*% and with a weighted-average coupon rate for debt outstanding at December 31, 2023 of* 3.99*%; in the East Ohio, PSNC and Questar Gas Transactions, respectively.*

(6)

*Includes regulatory liabilities of $*711 *million, $*435 *million and $*502 million within the East Ohio, PSNC and Questar Gas Transactions, respectively.

Capital expenditures and significant noncash items relating to the disposal groups included the following:

Year Ended December 31, 2024East Ohio Transaction**(1)**PSNC Transaction**(1)**Questar Gas Transaction**(1)**Other
(millions)
Capital expenditures$65$287$160$—
Significant noncash item
Depreciation, depletion and amortization————

(1)

Represents amounts attributable to Domi**nion Energy prior to the closing of the East Ohio Transaction which closed on March 6, 2024, the PSNC Transaction which closed on September 30, 2024 and the Questar Gas Transaction which closed on May 31, 2024.

Year Ended December 31, 2023East Ohio TransactionPSNC TransactionQuestar Gas TransactionOther
(millions)
Capital expenditures$507$233$449$—
Significant noncash items
Depreciation, depletion and amortization148901752
Accrued capital expenditures424332—
Year Ended December 31, 2022East Ohio TransactionPSNC TransactionQuestar Gas TransactionOther
(millions)
Capital expenditures$456$153$438$—
Significant noncash items
Depreciation, depletion and amortization134871634
Accrued capital expenditures531631—

Sale of Hope

In February 2022, Dominion Energy entered into an agreement to sell 100% of the equity interests in Hope to Ullico for $690 million of cash consideration, subject to customary closing adjustments, which closed in August 2022 after all customary closing and regulatory conditions were satisfied, including clearance under the Hart-Scott-Rodino Act and approval from the West Virginia Commission. The sale was treated as a stock sale for tax purposes.

In connection with closing, Dominion Energy recognized a pre-tax gain of $28 million, inclusive of customary closing adjustments, (net of $110 million write-off of goodwill which was not deductible for tax purposes) in losses (gains) on sales of assets in its Consolidated Statements of Income. The transaction resulted in an after-tax loss of $73 million. Upon meeting the classification as held for sale in the first quarter of 2022 and through the second quarter of 2022, Dominion Energy had recorded charges of $90 million in deferred income tax expense in its Consolidated Statements of Income to reflect the recognition of deferred taxes on the outside basis of Hope’s stock. This deferred income tax expense reversed upon closing of the sale and became a component of current income tax expense on the sale disclosed above. See Note 5 for additional information. In addition, a curtailment was recorded related to other postretirement benefit plans as discussed in Note 22.

All activity related to Hope is reflected in the Corporate and Other segment.

Sale of Kewaunee

In May 2021, Dominion Energy entered into an agreement to sell 100% of the equity interests in Dominion Energy Kewaunee, Inc. to EnergySolutions, including the transfer of all decommissioning obligations associated with Kewaunee, which ceased operations in 2013. The sale closed in June 2022 following approval from the Wisconsin Commission in May 2022 and NRC approval of a requested license transfer in March 2022. The sale was treated as an asset sale for tax purposes and Dominion Energy retained the assets and obligations of the pension and other postretirement employee benefit plans. EnergySolutions is subject to the Wisconsin regulatory conditions agreed to by Dominion Energy upon its acquisition of Kewaunee, including the return of any excess decommissioning funds to WPSC and WP&L customers following completion of all decommissioning activities.

In the second quarter of 2022, Dominion Energy recorded a loss of $649 million ($513 million after-tax), recorded in losses (gains) on sales of assets in its Consolidated Statements of Income, primarily related to the difference between the nuclear decommissioning trust and AROs. Prior to its receipt, there had been uncertainty as to the timing of or ability to obtain approval from the Wisconsin Commission. Prior to closing, Dominion Energy withdrew $80 million from the nuclear decommissioning trust to recover certain spent nuclear fuel and other permitted costs.

All activity related to Kewaunee prior to closing is included in Contracted Energy, with remaining activity reflected in the Corporate and Other segment.

NOTE 4. OPERATING REVENUE

The Companies’ operating revenue consists of the following:

Dominion EnergyVirginia Power
Year Ended December 31,202420232022202420232022
(millions)
Regulated electric sales:
Residential$5,436$5,141$5,261$4,133$3,863$4,039
Commercial(1)4,6794,5564,4803,7863,6323,647
Industrial845887901429440472
Government and other retail1,0811,0361,2351,0159651,172
Wholesale136176234105116132
Nonregulated electric sales9337581,249866568
Regulated gas sales:
Residential309293331
Commercial136145188
Other6779168
Regulated gas transportation and storage211838
Other regulated revenues372253296359238277
Other nonregulated revenues(2)(3)(4)167145171465361
Total operating revenue from contracts with customers14,18213,48714,5529,9599,3729,868
Other revenues(2)(5)277906(614)276201(214)
Total operating revenue$14,459$14,393$13,938$10,235$9,573$9,654

(1)

Includes large scale users including certain data center customers.

(2)

See Note 25 for amounts attributable to affiliates.

(3)

*Includes sales of renewable energy credits of $*31 *million, $*44 *million and $42 million for the years ended December 31, 2024, 2023 and 2022, respectively, at Dominion Energy and $*12 *million, $*29 million and $18 million for the years ended December 31, 2024, 2023 and 2022, respectively, at Virginia Power.

(4)

*Includes revenue from transition services agreements of $*61 *million, $*18 million and $28 million for the years ended December 31, 2024, 2023 and 2022, respectively, at Dominion Energy.

(5)

*Includes alternative revenue of $*129 *million, $*162 million and $72 million at both Dominion Energy and Virginia Power for years ended December 31, 2024, 2023 and 2022, respectively.

Neither Dominion Energy nor Virginia Power have any amounts for revenue to be recognized in the future on multi-year contracts in place at December 31, 2024.

Contract liabilities represent an entity’s obligation to transfer goods or services to a customer for which the entity has received consideration, or the amount that is due, from the customer. At December 31, 2024 and 2023, Dominion Energy’s contract liability balances were $52 million and $47 million, respectively. At December 31, 2024 and 2023, Virginia Power’s contract liability balances were $46 million and $40 million, respectively. The Companies’ contract liabilities are recorded in other current liabilities and other deferred credits and other liabilities in the Consolidated Balance Sheets.

The Companies recognize revenue as they fulfill their obligations to provide service to their customers. During the years ended December 31, 2024 and 2023, Dominion Energy recognized revenue of $45 million and $48 million from the beginning contract liability balance. During the years ended December 31, 2024 and 2023, Virginia Power recognized revenue of $40 million and $39 million, respectively, from the beginning contract liability balance.

NOTE 5. INCOME TAXES

Judgment and the use of estimates are required in developing the provision for income taxes and reporting of tax-related assets and liabilities. The interpretation of tax laws and associated regulations involves uncertainty, since tax authorities may interpret the laws differently. The Companies are routinely audited by federal and state tax authorities. Ultimate resolution of income tax matters may result in favorable or unfavorable impacts to net income and cash flows, and adjustments to tax-related assets and liabilities could be material.

In August 2022, the IRA was enacted which, among other things, extends the investment and production tax credits for clean energy technologies until at least 2032, provides for transferability of certain tax credits and imposes a 15% alternative minimum tax on corporations with GAAP net income greater than $1 billion, as adjusted for certain items, for tax years beginning after December 31, 2022. The IRA did not impact the measurement of the Companies’ deferred income taxes or change the Companies' assessment of the

realizability of deferred tax assets. The Companies continue to monitor and evaluate the impacts of the IRA, including changes in the Companies' interpretations, if any, as guidance is issued and finalized.

As indicated in Note 2, certain of the Companies’ operations, including accounting for income taxes, are subject to regulatory accounting treatment. For regulated operations, many of the changes in deferred taxes from the 2017 Tax Reform Act represent amounts probable of collection from or return to customers and are presented as components of regulatory assets or liabilities. See Note 13 for additional information and current year developments.

Continuing Operations

Details of income tax expense for continuing operations including noncontrolling interests were as follows:

Dominion EnergyVirginia Power
Year Ended December 31,202420232022202420232022
(millions)
Current:
Federal$**(**235)$(385)$(76)$**(**23)$(116)$17
State32(99)27676(17)
Total current expense (benefit)**(**203)(484)(49)44**(**110)—
Deferred:
Federal
Taxes before operating loss carryforwards and investment tax credits44675855325406215
Tax utilization expense of operating loss carryforwards404535———
State602775960107108
Total deferred expense5461,080149385513323
Investment tax credits**(**35)(28)(41)**(**21)(14)(29)
Total income tax expense$308$568$59$408$389$294

In 2024, Dominion Energy’s current income taxes reflect a benefit from continuing operations as the income tax expense associated with the East Ohio, PSNC and Questar Gas Transactions, is reflected in discontinued operations. Dominion Energy’s income tax expense from continuing operations reflects the utilization of tax credit carryforwards to offset a portion of the federal tax on the gains from the East Ohio, PSNC and Questar Gas Transactions, presented in discontinued operations.

In 2023, Dominion Energy’s current income taxes reflect a benefit from continuing operations as the income tax expense associated with the East Ohio, PSNC and Questar Gas Transactions and Cove Point operations, including the Cove Point gain, is reflected in discontinued operations. Dominion Energy’s income tax expense from continuing operations reflects the utilization of investment tax credit carryforwards to offset a portion of the federal tax on the Cove Point gain, presented in discontinued operations.

In 2022, Dominion Energy’s current income taxes reflect a benefit from continuing operations as the income tax expense associated with the East Ohio, PSNC and Questar Gas Transactions and Cove Point operations is reflected in discontinued operations.

Discontinued Operations

Income tax expense reflected in discontinued operations is $31 million, $1.3 billion, and $207 million for the years ended December 31, 2024, 2023 and 2022, respectively. As discussed in Note 3, Dominion Energy entered into agreements for the East Ohio, PSNC and Questar Gas Transactions in September 2023, each of which was treated as a stock sale for income tax purposes. During 2023 in connection with the pending sales, Dominion Energy recorded a charge of $835 million to establish deferred tax liabilities to reflect the excess of the financial reporting basis over tax basis in the stock of the entities to be sold. These deferred taxes reversed upon closing of the respective sales, all of which occurred in 2024. In addition, Dominion Energy recorded tax expense of $278 million associated with completing the sale in September 2023 of its remaining 50% noncontrolling partnership interest in Cove Point to BHE as discussed in Note 9. During 2024, Dominion Energy recorded a tax benefit of $39 million, including the reversal of $851 million of the deferred tax liabilities associated with the East Ohio, PSNC and Questar Gas Transactions previously established during 2023 and 2024. Income taxes reflect tax expense on pre-tax income attributable to East Ohio, PSNC, Questar Gas, Wexpro and equity method earnings from Cove Point of $60 million, $116 million and $242 million, partially offset by an income tax benefit of $11 million, $59 million and $38 million related to excess deferred income tax amortization for the years ended December 31, 2024, 2023 and 2022, respectively.

Continuing Operations

For continuing operations including noncontrolling interests, the statutory U.S. federal income tax rate reconciles to the Companies’ effective income tax rate as follows:

Dominion EnergyVirginia Power
Twelve Months Ended December 31,202420232022202420232022
U.S. statutory rate21.0%21.0%21.0%21.0%21.0%21.0%
Increases (reductions) resulting from:
Recognition of taxes - sale of subsidiary stock——28.0
Recognition of taxes - privatization intercompany gain——2.4
State taxes, net of federal benefit3.63.915.94.54.74.6
Investment tax credits**(**1.6)(1.0)(12.6)**(**0.9)(0.8)(2.0)
Production tax credits**(**4.8)(0.6)(4.5)**(**4.5)(0.8)(1.0)
Reversal of excess deferred income taxes**(**3.1)(2.6)(25.2)**(**2.0)(2.6)(3.8)
State legislative change—(0.1)(0.1)———
Changes in state deferred taxes associated with assets held for sale—1.10.9
AFUDC—equity**(**0.8)—(1.9)**(**0.7)—(0.4)
Settlements of uncertain tax positions**(**0.7)(0.4)————
Employee stock ownership plan deduction**(**0.3)(0.3)(2.5)
Other, net0.8(0.1)(0.9)0.6(0.4)0.1
Effective tax rate14.1%20.9%18.1%18.0%21.1%20.9%

The IRA created a nuclear production tax credit for electricity produced and sold beginning in 2024. Dominion Energy’s and Virginia Power’s 2024 effective tax rate includes an $89 million income tax benefit for the estimated net realizable value of the nuclear production tax credit. The ultimate nuclear production tax credit realized by the Companies could vary significantly based on pending final U.S. Treasury guidance.

Dominion Energy’s 2023 effective tax rate includes a net income tax expense of $29 million associated with the remeasurement of consolidated state deferred taxes as a result of the East Ohio, PSNC and Questar Gas Transactions and sale of Dominion Energy’s 50% noncontrolling partnership interest in Cove Point as discussed in Notes 3 and 9, respectively.

In August 2022, Dominion Energy sold 100% of the equity interests in Hope in a stock sale for income tax purposes. Dominion Energy’s 2022 effective tax rate reflects the current income tax expense on the sale of Hope’s stock. Virginia Power transferred its existing privatization operations in Virginia to Dominion Energy, and Dominion Energy contributed these assets to Dominion Privatization. As the original owner of these privatization assets, Virginia Power is required to recognize the income tax expense on Dominion Energy’s transaction with Dominion Privatization. As such, Virginia Power’s 2022 effective tax rate reflects an income tax expense of $34 million on this transaction.

The Companies’ deferred income taxes consist of the following:

Dominion EnergyVirginia Power
At December 31,2024202320242023
(millions)
Deferred income taxes:
Total deferred income tax assets$1,854$2,150$1,082$1,281
Total deferred income tax liabilities8,2668,7715,1274,905
Total net deferred income tax liabilities$6,412$6,621$4,045$3,624
Total deferred income taxes:
Depreciation method and plant basis differences$4,878$4,588$3,765$3,588
Excess deferred income taxes**(**790)(811)**(**587)(600)
Unrecovered nuclear plant cost420450
DESC rate refund**(**49)(67)
Toshiba Settlement**(**133)(147)
Nuclear decommissioning1,2321,109357332
Deferred state income taxes1,046976676620
Federal benefit of deferred state income taxes**(**230)(220)**(**142)(130)
Deferred fuel, purchased energy and gas costs189299178267
Pension benefits345324**(**116)(110)
Other postretirement benefits174116141125
Loss and credit carryforwards**(**680)(1,022)—(309)
Deferred unamortized investment tax credits**(**250)(257)**(**159)(164)
Valuation allowances113130—8
Partnership basis differences**(**30)70**(**98)—
Total deferred taxes on stock held for sale—814
Other17726930(3)
Total net deferred income tax liabilities$6,412$6,621$4,045$3,624

At December 31, 2024, Dominion Energy had the following deductible loss and credit carryforwards:

Deductible AmountDeferred Tax Asset**(1)**Valuation AllowanceExpiration Period
(millions)
Federal losses$391$82$—2037
Federal production and other credits—22—2036**-**2038
State losses2,245115**(**50)2025**-**2043
State minimum tax credits—378—No expiration
State investment and other credits—113**(**63)2025**-**2033
Total$2,636$710$**(**113)

(1)

*Includes $*38 million of unrecognized tax benefits.

At December 31, 2024, Virginia Power had no deductible loss or credit carryforwards.

A reconciliation of changes in Dominion Energy’s unrecognized tax benefits follows. Virginia Power does not have any unrecognized tax benefits in the periods presented:

Dominion Energy
202420232022
(millions)
Balance at January 1,$110$117$128
Prior period positions - increases1358
Prior period positions - decreases**(**18)(12)(8)
Current period positions - increases——2
Settlements with tax authorities**(**13)—(3)
Expiration of statutes of limitations**(**14)—(10)
Balance at December 31,$78$110$117

Certain unrecognized tax benefits, or portions thereof, if recognized, would affect the effective tax rate. Changes in these unrecognized tax benefits may result from remeasurement of amounts expected to be realized, settlements with tax authorities and expiration of statutes of limitations. For Dominion Energy and its subsidiaries, these unrecognized tax benefits were $30 million, $52 million and $64 million at December 31, 2024, 2023 and 2022, respectively. In discontinued operations, these unrecognized tax benefits were $32 million, $38 million and $33 million at December 31, 2024, 2023 and 2022, respectively. For Dominion Energy, the change in these unrecognized tax benefits decreased income tax expense by $22 million, $8 million and $7 million in 2024, 2023 and 2022, respectively.

Dominion Energy participates in the IRS Compliance Assurance Process, which provides the opportunity to resolve complex tax matters with the IRS before filing its federal income tax returns, thus achieving certainty for such tax return filing positions agreed to by the IRS. The IRS has completed its audit of tax years through 2019. The statute of limitations has not yet expired for years after 2019. Although Dominion Energy has not received a final letter indicating no changes to its taxable income for tax years 2023, 2022, 2021 and 2020, no material adjustments are expected. The IRS examination of tax year 2024 is ongoing.

It is reasonably possible that settlement negotiations and expiration of statutes of limitations could result in a decrease in unrecognized tax benefits in 2025 by up to $38 million for Dominion Energy. If such changes were to occur, other than revisions of the accrual for interest on tax underpayments and overpayments, earnings could increase by up to $30 million for Dominion Energy. Otherwise, with regard to 2024 and prior years, the Companies cannot estimate the range of reasonably possible changes to unrecognized tax benefits that may occur in 2025.

For each of the major states in which Dominion Energy operates or previously operated, the earliest tax year remaining open for examination is as follows:

StateEarliest Open Tax Year
Pennsylvania(1)2012
Connecticut2021
Virginia(2)2021
Utah(1)2021
South Carolina2021

(1)

Considered a major state for entities presented in discontinued operations.

(2)

Considered a major state for Virginia Power’s operations.

The Companies are also obligated to report adjustments resulting from IRS settlements to state tax authorities. In addition, if Dominion Energy utilizes operating losses or tax credits generated in years for which the statute of limitations has expired, such amounts are generally subject to examination.

NOTE 6. FAIR VALUE MEASUREMENTS

The Companies’ fair value measurements are made in accordance with the policies discussed in Note 2. See Note 7 for additional information about the Companies’ derivative and hedge accounting activities.

The Companies enter into certain physical and financial forwards, futures and options, which are considered Level 3 as they have one or more inputs that are not observable and are significant to the valuation. The discounted cash flow method is used to value Level 3 physical and financial forwards and futures contracts. An option model is used to value Level 3 physical options. The discounted cash flow model for forwards and futures calculates mark-to-market valuations based on forward market prices, original transaction prices,

volumes, risk-free rate of return and credit spreads. The inputs into the option models are the forward market prices, implied price volatilities, risk-free rate of return, the option expiration dates, the option strike prices, the original sales prices and volumes. For Level 3 fair value measurements, certain forward market prices and implied price volatilities are considered unobservable.

The following table presents the Companies’ quantitative information about Level 3 fair value measurements at December 31, 2024. The range and weighted-average are presented in dollars for market price inputs and percentages for price volatility.

Dominion EnergyVirginia Power
Valuation TechniquesUnobservable InputFair Value (millions)RangeWeighted-average**(1)**Fair Value (millions)RangeWeighted-average**(1)**
Assets
Physical and financial forwards:
FTRsDiscounted cash flowMarket price (per MWh)(3)$38(3)-114$38(3) - 114
ElectricityDiscounted cash flowMarket price (per MWh)(3)24831-11955
Natural gas(2)Discounted cash flowMarket price (per Dth)(3)25(2)-6(1)25(2)-6(1)
Physical options:
Natural gas(2)Option modelMarket price (per Dth)(3)882-7472-64
Price volatility(4)11%-73%48%11%-65%49%
Total assets$399$70
Liabilities
Physical and financial forwards:
FTRsDiscounted cash flowMarket price (per MWh)(3)2(6)-622(6)-62
ElectricityDiscounted cash flowMarket price (per MWh)(3)1337-12266
Total liabilities$15$2

(1)

Averages weighted by volume.

(2)

Includes basis.

(3)

Represents market prices beyond defined terms for Levels 1 and 2.

(4)

Represents volatilities unrepresented in published markets.

Sensitivity of the fair value measurements to changes in the significant unobservable inputs is as follows:

Significant Unobservable InputsPositionChange to InputImpact on Fair Value Measurement
Market priceBuyIncrease (decrease)Gain (loss)
Market priceSellIncrease (decrease)Loss (gain)
Price volatilityBuyIncrease (decrease)Gain (loss)
Price volatilitySellIncrease (decrease)Loss (gain)

Nonrecurring Fair Value Measurements

See Note 9 for information regarding nonrecurring fair value measurements associated with Dominion Energy’s noncontrolling ownership interest in Dominion Privatization. See Note 10 for information regarding impairment charges recorded by Dominion Energy associated with corporate office buildings, nonregulated renewable natural gas facilities and nonregulated solar facilities. See Note 22 for information regarding Dominion Energy’s pension and other postretirement benefit plan remeasurements.

In 2023, Dominion Energy recorded a charge of $15 million ($11 million after-tax) presented within discontinued operations in its Consolidated Statements of Income to adjust certain nonregulated solar assets down to their estimated fair value, using a market approach, of $22 million. The valuation is considered a Level 2 fair value measurement given that it is based on bids received. As discussed in Note 3, these assets were sold in August 2023.

Recurring Fair Value Measurements

Fair value measurements are separately disclosed by level within the fair value hierarchy with a separate reconciliation of fair value measurements categorized as Level 3. Fair value disclosures for assets held in the Companies’ pension and other postretirement benefit plans are presented in Note 22.

The following table presents the Companies’ assets and liabilities that are measured at fair value on a recurring basis for each hierarchy level, including both current and noncurrent portions:

Dominion EnergyVirginia Power
Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
(millions)
December 31, 2024
Assets
Derivatives:
Commodity$—$95$399$494$—$45$70$115
Interest rate—875—875—230—230
Foreign currency exchange rate—30—30—30—30
Investments(1):
Equity securities:
U.S.5,4032—5,4052,7692—2,771
International165——16599——99
Fixed income:
Corporate debt instruments—518—518—294—294
Government securities1381,605—1,74385939—1,024
Cash equivalents and other29——29————
Total assets$5,735$3,125$399$9,259$2,953$1,540$70$4,563
Liabilities
Derivatives:
Commodity$—$108$15$123$—$31$2$33
Interest rate—197—197————
Foreign currency exchange rate—192—192—192—192
Total liabilities$—$497$15$512$—$223$2$225
December 31, 2023
Assets
Derivatives:
Commodity$—$325$225$550$—$96$21$117
Interest rate—800—800—181—181
Investments(1):
Equity securities:
U.S.4,527——4,5272,362——2,362
Fixed income:
Corporate debt instruments—500—500—274—274
Government securities2191,238—1,457129687—816
Cash equivalents and other31——3120——20
Total assets$4,777$2,863$225$7,865$2,511$1,238$21$3,770
Liabilities
Derivatives:
Commodity$—$160$139$299$—$95$137$232
Interest rate—359—359—45—45
Foreign currency exchange rate—39—39—39—39
Total liabilities$—$558$139$697$—$179$137$316

(1)

*Includes investments held in the nuclear decommissioning trusts and rabbi trusts. Excludes $*212 *million and $*457 *million of assets at Dominion Energy, inclusive of $*76 million and $217 million at Virginia Power, at December 31, 2024 and 2023, respectively, measured at fair value using NAV (or its equivalent) as a practical expedient which are not required to be categorized in the fair value hierarchy.

The following table presents the net change in the Companies’ assets and liabilities measured at fair value on a recurring basis and included in the Level 3 fair value category:

Dominion EnergyVirginia Power
202420232022202420232022
(millions)
Beginning balance$86$422$222$**(**116)$221$102
Total realized and unrealized gains (losses):
Included in earnings:
Operating revenue**(**6)12
Electric fuel and other energy-related purchases**(**172)(273)444**(**176)(278)382
Purchased gas1—————
Discontinued operations**(**4)(1)—
Included in regulatory assets/liabilities297(414)183202(349)102
Settlements77241(455)137255(393)
Purchases11210428213528
Transfers out of Level 3**(**7)6(2)
Ending balance$384$86$422$68$(116)$221

Dominion Energy had a $(5) million loss and a $7 million gain included in earnings in the Level 3 fair value category related to assets/liabilities still held at the reporting date for the years ended December 31, 2024 and 2023, respectively, and had no such activity still held at the reporting date for the year ended December 31, 2022. Virginia Power had no unrealized gains and losses included in earnings in the Level 3 fair value category relating to assets/liabilities still held at the reporting date for the years ended December 31, 2024, 2023 and 2022.

Fair Value of Financial Instruments

Substantially all of the Companies’ financial instruments are recorded at fair value, with the exception of the instruments described below, which are reported at historical cost. Estimated fair values have been determined using available market information and valuation methodologies considered appropriate by management. The carrying amount of cash, restricted cash and equivalents, customer and other receivables, affiliated receivables, short-term debt, affiliated current borrowings, payables to affiliates and accounts payable are representative of fair value because of the short-term nature of these instruments. For the Companies’ financial instruments that are not recorded at fair value, the carrying amounts and estimated fair values are as follows:

Dominion EnergyVirginia Power
Carrying AmountEstimated Fair Value**(1)**Carrying AmountEstimated Fair Value**(1)**
(millions)
December 31, 2024
Long-term debt(2)$34,533$32,167$19,224$17,578
Securitization bonds(3)1,2171,2181,2171,218
Junior subordinated notes(2)3,2233,372
December 31, 2023
Long-term debt(2)$42,526$40,539$17,392$16,418
Supplemental credit facility borrowings450450
Junior subordinated notes(2)1,3881,374

(1)

Fair value is estimated using market prices, where available, and interest rates currently available for issuance of debt with similar terms and remaining maturities. All fair value measurements are classified as Level 2. The carrying amount of debt issuances with short-term maturities and variable rates refinanced at current market rates is a reasonable estimate of their fair value.

(2)

Carrying amount includes current portions included in securities due within one year and amounts which represent the unamortized debt issuance costs and discount or premium. There were no fair value hedges associated with fixed-rate debt at December 31, 2024 and December 31, 2023. Additionally, Dominion Energy carrying amounts include portions classified as liabilities held for sale at December 31, 2023.

(3)

Carrying amount includes current portions included in securities due within one year.

NOTE 7. DERIVATIVES AND HEDGE ACCOUNTING ACTIVITIES

See Note 2 for the Companies’ accounting policies, objectives and strategies for using derivative instruments. See Notes 2 and 6 for further information about fair value measurements and associated valuation methods for derivatives.

Cash collateral is used in the table below to offset derivative assets and liabilities. In February 2022, Dominion Energy entered into contracts representing offsetting positions to certain existing exchange contracts with collateral requirements as well as new over-the-counter transactions that are not subject to collateral requirements. These contracts resulted in positions which limit the risk of increased cash collateral requirements. Certain accounts receivable and accounts payable recognized on the Companies’ Consolidated Balance Sheets, letters of credit and other forms of securities, as well as certain other long-term debt, all of which are not included in the tables below, are subject to offset under master netting or similar arrangements and would reduce the net exposure. See Note 18 for further information regarding other long-term debt, in the form of restructured derivatives, subject to offset under master netting or similar agreements. See Note 24 for further information regarding credit-related contingent features for the Companies derivative instruments.

Balance Sheet Presentation

The tables below present the Companies’ derivative asset and liability balances by type of financial instrument, if the gross amounts recognized in its Consolidated Balance Sheets were netted with derivative instruments and cash collateral received or paid:

Dominion Energy Gross Amounts Not Offset in the Consolidated Balance SheetVirginia Power Gross Amounts Not Offset in the Consolidated Balance Sheet
Gross Assets Presented in the Consolidated Balance Sheet(1)Financial InstrumentsCash Collateral ReceivedNet AmountsGross Assets Presented in the Consolidated Balance Sheet(1)Financial InstrumentsCash Collateral ReceivedNet Amounts
(millions)
December 31, 2024
Commodity contracts:
Over-the-counter$197$20$—$177$95$14$—$81
Exchange5554—121—1
Interest rate contracts:
Over-the-counter875197—678230——230
Foreign currency exchange rate contracts:
Over-the-counter3030——3030——
Total derivatives, subject to a master netting or similar arrangement$1,157$301$—$856$357$45$—$312
December 31, 2023
Commodity contracts:
Over-the-counter$289$26$—$263$112$13$—$99
Exchange11833157043—1
Interest rate contracts:
Over-the-counter800191—60918111—170
Total derivatives, subject to a master netting or similar arrangement$1,207$250$15$942$297$27$—$270

(1)

*Excludes derivative assets of $*242 *million and $*143 *million at Dominion Energy, and $*18 million and $1 million at Virginia Power, at December 31, 2024 and 2023, respectively, which are not subject to master netting or similar arrangements.

Dominion Energy Gross Amounts Not Offset in the Consolidated Balance SheetVirginia Power Gross Amounts Not Offset in the Consolidated Balance Sheet
Gross Liabilities Presented in the Consolidated Balance Sheet(1)Financial InstrumentsCash Collateral PaidNet AmountsGross Liabilities Presented in the Consolidated Balance Sheet(1)Financial InstrumentsCash Collateral PaidNet Amounts
(millions)
December 31, 2024
Commodity contracts:
Over-the-counter$42$20$—$22$15$14$—$1
Exchange745420—11——
Interest rate contracts:
Over-the-counter197197——————
Foreign currency exchange rate contracts:
Over-the-counter19230—16219230—162
Total derivatives, subject to a master netting or similar arrangement$505$301$20$184$208$45$—$163
December 31, 2023
Commodity contracts:
Over-the-counter$266$26$30$210$153$13$30$110
Exchange3333——33——
Interest rate contracts:
Over-the-counter359186—173456—39
Foreign currency exchange rate contracts:
Over-the-counter395—34395—34
Total derivatives, subject to a master netting or similar arrangement$697$250$30$417$240$27$30$183

(1)

Excludes derivative liabilities of $7 million at Dominion Energy at December 31, 2024, which are not subject to master netting or similar arrangements. Dominion Energy did no**t have any derivative liabilities at December 31, *2023 which were not subject to master netting or similar arrangements. Excludes derivative liabilities of $*17 million and $76 million at Virginia Power at December 31, 2024 and 2023, respectively, which are not subject to master netting or similar arrangements.

Volumes

The following table presents the volume of the Companies’ derivative activity as of December 31, 2024. These volumes are based on open derivative positions and represent the combined absolute value of their long and short positions, except in the case of offsetting transactions, for which they represent the absolute value of the net volume of their long and short positions.

Dominion EnergyVirginia Power
CurrentNoncurrentCurrentNoncurrent
Natural Gas (bcf):
Fixed price(1)31213121
Basis(2)178333146303
Electricity (MWh in millions):
Fixed price18309—
FTRs45—45—
Interest rate(3) (in millions)$2,078$8,735$1,077$2,673
Foreign currency exchange rate(3) (in millions)
Danish Krone1,741 kr.826 kr.1,741 kr.826 kr.
Euro**€**293**€**832**€**293**€**832

(1)

Includes options at Dominion Energy.

(2)

Includes options.

(3)

Maturity is determined based on final settlement period.

AOCI

The following table presents selected information related to gains (losses) on cash flow hedges included in AOCI in the Companies’ Consolidated Balance Sheets at December 31, 2024:

Dominion EnergyVirginia Power
AOCI After-TaxAmounts Expected to be Reclassified to Earnings During the Next 12 Months After-TaxMaximum TermAOCI After-TaxAmounts Expected to be Reclassified to Earnings During the Next 12 Months After-TaxMaximum Term
(millions)(months)(months)
Interest rate$**(**171)$**(**29)384$28$1384
Total$**(**171)$**(**29)$28$1

The amounts that will be reclassified from AOCI to earnings will generally be offset by the recognition of the hedged transactions (e.g., interest rate payments) in earnings, thereby achieving the realization of prices contemplated by the underlying risk management strategies and will vary from the expected amounts presented above as a result of changes in interest rates.

Fair Value and Gains and Losses on Derivative Instruments

The following tables present the fair values of the Companies’ derivatives and where they are presented in their Consolidated Balance Sheets:

Dominion EnergyVirginia Power
AssetsLiabilitiesAssetsLiabilities
(millions)
At December 31, 2024
Current derivatives not under cash flow hedge accounting
Commodity$171$78$84$32
Interest rate10122
Foreign currency exchange rate2710727107
Current derivatives under cash flow hedge accounting
Interest rate137—137—
Total current derivatives$436$207$248$139
Noncurrent derivatives not under cash flow hedge accounting
Commodity$323$45$31$1
Interest rate544175
Foreign currency exchange rate385385
Noncurrent derivatives under cash flow hedge accounting
Interest rate93—93—
Total noncurrent derivatives(1)96330512786
Total derivatives$1,399$512$375$225
At December 31, 2023
Current derivatives not under cash flow hedge accounting
Commodity$312$244$91$188
Interest rate29876——
Foreign currency exchange rate—11—11
Current derivatives under cash flow hedge accounting
Interest rate1434514345
Total current derivatives(2)$753$376$234$244
Noncurrent derivatives not under cash flow hedge accounting
Commodity$238$55$26$44
Interest rate321238——
Foreign currency exchange rate—28—28
Noncurrent derivatives under cash flow hedge accounting
Interest rate38—38—
Total noncurrent derivatives(1)5973216472
Total derivatives$1,350$697$298$316

(1)

Noncurrent derivative assets are presented in other deferred charges and other assets and noncurrent derivative liabilities are presented in other deferred credits and other liabilities in Virginia Power’s Consolidated Balance Sheets.

(2)

*Includes $*54 *million recorded in assets held for sale and $*30 million recorded in liabilities held for sale in Dominion Energy's Consolidated Balance Sheets.

The following tables present the gains and losses on the Companies’ derivatives, as well as where the associated activity is presented in their Consolidated Balance Sheets and Statements of Income:

Dominion EnergyVirginia Power
Derivatives in cash flow hedging relationshipsAmount of Gain (Loss) Recognized in AOCI on Derivatives(1)Amount of Gain (Loss) Reclassified from AOCI to IncomeIncrease (Decrease) in Derivatives Subject to Regulatory Treatment(2)Amount of Gain (Loss) Recognized in AOCI on Derivatives(1)Amount of Gain (Loss) Reclassified from AOCI to IncomeIncrease (Decrease) in Derivatives Subject to Regulatory Treatment(2)
(millions)
Year Ended December 31, 2024
Derivative type and location of gains (losses):
Interest rate(3)$17$**(**43)$189$17$—$188
Total$17$**(**43)$189$17$—$188
Year Ended December 31, 2023
Derivative type and location of gains (losses):
Interest rate(3)$(1)(43)$5$(1)$(1)$4
Total$(1)$(43)$5$(1)$(1)$4
Year Ended December 31, 2022
Derivative type and location of gains (losses):
Interest rate(3)$89(57)$855$80$(2)$854
Total$89$(57)$855$80$(2)$854

(1)

Amounts deferred into AOCI have no associated effect in the Companies’ Consolidated Statements of Income.

(2)

Represents net derivative activity deferred into and amortized out of regulatory assets/liabilities. Amounts deferred into regulatory assets/liabilities have no associated effect in the Companies’ Consolidated Statements of Income.

(3)

Amounts recorded in the Companies’ Consolidated Statements of Income are classified in interest and related charges*.*

Amount of Gain (Loss) Recognized in Income on Derivatives**(1)(2)**
Derivatives not designated as hedging instrumentsDominion EnergyVirginia Power
Year Ended December 31,202420232022202420232022
(millions)
Derivative type and location of gains (losses):
Commodity:
Operating revenue$116$707$(729)$140$27$(303)
Purchased gas——13
Electric fuel and other energy-related purchases**(**240)(380)514**(**244)(384)453
Discontinued operations**(**28)868
Other operations & maintenance—2——2—
Interest rate:
Interest and related charges**(**3)84406
Discontinued operations—17244
Total$**(**155)$516$456$**(**104)$(355)$150

(1)

Includes derivative activity amortized out of regulatory assets/liabilities. Amounts deferred into regulatory assets/liabilities have no associated effect in the Companies’ Consolidated Statements of Income.

(2)

Excludes amounts related to foreign currency exchange rate derivatives that are deferred to plant under construction within property, plant and equipment and regulatory assets/liabilities that will begin to amortize once the CVOW Commercial Project is placed in service.

NOTE 8. EARNINGS PER SHARE

The following table presents the calculation of Dominion Energy’s basic and diluted EPS:

202420232022
(millions, except EPS)
Net income attributable to Dominion Energy from continuing operations$1,927$2,156$269
Preferred stock dividends (See Note 19)**(**68)(81)(93)
Preferred stock deemed dividends (See Note 19)**(**10)——
Net income attributable to Dominion Energy from continuing operations - Basic1,8492,075176
Dilutive effect of 2019 Equity Units(1)———
Net income attributable to Dominion Energy from continuing operations - Diluted1,8492,075176
Net income (loss) attributable to Dominion Energy from discontinued operations - Basic & Diluted$197$(125)$922
Average shares of common stock outstanding – Basic839.2836.4823.9
Net effect of dilutive securities(2)0.20.10.9
Average shares of common stock outstanding – Diluted839.4836.5824.8
EPS from continuing operations - Basic$2.20$2.48$0.22
EPS from discontinued operations - Basic0.24(0.15)1.11
EPS attributable to Dominion Energy - Basic$2.44$2.33$1.33
EPS from continuing operations - Diluted$2.20$2.48$0.22
EPS from discontinued operations - Diluted0.24(0.15)1.11
EPS attributable to Dominion Energy - Diluted$2.44$2.33$1.33

(1)

As discussed in Note 19, effective in June 2022 through its redemption in September 2022, the Series A Preferred Stock was considered to be mandatorily redeemable and was classified in current liabilities.

(2)

Dilutive securities for 2024 consists of certain of the forward sales agreements entered into in 2024 with certain of these securities settling in 2024 (applying the treasury stock method). Dilutive securities for 2023 and 2022 consist primarily of stock potentially to be issued to satisfy the obligation under a settlement agreement with the SCDOR (applying the if converted method). Additionally, in 2022, dilutive securities include forward sales agreements entered into in November 2021 and settled in December 2022 (applying the treasury stock method). See Notes 20 and 23 for additional information.

Certain of the forward sales agreements entered into in 2024 were potentially dilutive securities but were excluded from the calculation of diluted EPS from continuing operations for the year ended December 31, 2024 as the dilutive stock price threshold was not met. The 2019 Equity Units, prior to settlement in June 2022, were potentially dilutive instruments. See Note 19 for additional information.

NOTE 9. INVESTMENTS

Equity and Debt Securities

Short-Term Deposit

In May 2022, Dominion Energy entered into an agreement with a financial institution and committed to make a short-term deposit of at least $1.6 billion but not more than $2.0 billion to be posted as collateral to secure its $1.6 billion redemption obligation of the Series A Preferred Stock as described in Note 19. In May 2022, Dominion Energy funded the short-term deposit in the amount of $2.0 billion, which earned interest income at an annual rate of 1.75% through its maturity in September 2022.

Rabbi Trust Securities

Equity and fixed income securities and cash equivalents in Dominion Energy’s rabbi trusts and classified as trading totaled $160 million and $119 million at December 31, 2024 and 2023, respectively.

Decommissioning Trust Securities

The Companies hold equity and fixed income securities and cash equivalents, and Dominion Energy also holds insurance contracts, in nuclear decommissioning trust funds to fund future decommissioning costs for its nuclear plants. The Companies’ decommissioning trust funds are summarized below:

Dominion EnergyVirginia Power
Amortized CostTotal Unrealized GainsTotal Unrealized LossesAllowance for Credit LossesFair ValueAmortized CostTotal Unrealized GainsTotal Unrealized LossesAllowance for Credit LossesFair Value
(millions)
December 31, 2024
Equity securities:(1)
U.S.$1,220$4,157$**(**4)$5,373$695$2,155$**(**3)$2,847
International52111—1633465—99
Fixed income securities:(2)
Corporate debt instruments5166**(**15)$—5073033**(**12)$—294
Government securities1,7367**(**39)—1,7041,0384**(**18)—1,024
Insurance contracts(3)239——239
Cash equivalents and other(4)65———6522———22
Total$3,828$4,281$**(**58)(5)$—$8,051$2,092$2,227$**(**33)(5)$—$4,286
December 31, 2023
Equity securities:(1)
U.S.$1,276$3,270$(10)$4,536$759$1,706$(10)$2,455
Fixed income securities:(2)
Corporate debt instruments50810(27)$—4912923(21)$—274
Government securities1,42628(24)—1,43081117(12)—816
Common/ collective trust funds161———161124———124
Insurance contracts(3)244——244
Cash equivalents and other(4)84———8447———47
Total$3,699$3,308$(61)(5)$—$6,946$2,033$1,726$(43)(5)$—$3,716

(1)

Unrealized gains and losses on equity securities are included in other income (expense) and the nuclear decommissioning trust regulatory liability as discussed in Note 2.

(2)

Unrealized gains and losses on fixed income securities are included in AOCI and the nuclear decommissioning trust regulatory liability as discussed in Note 2. Changes in allowance for credit losses are included in other income (expense)**.

(3)

Includes company owned life insurance contracts measured at cash surrender value.

(4)

*Dominion Energy includes pending sales of securities of $*35 *million and $49 million at December 31, 2024 and 2023, respectively. Virginia Power includes pending sales of securities of $*22 *million and $*27 million at December 31, 2024 and 2023, respectively.

(5)

*Dominion Energy’s fair value of securities in an unrealized loss position was $*1.4 *billion and $764 million at December 31, 2024 and 2023, respectively. Virginia Power’s fair value of securities in an unrealized loss position was $*796 million and $384 million at December 31, 2024 and 2023, respectively.

The portion of unrealized gains and losses that relates to equity securities held within Dominion Energy and Virginia Power’s nuclear decommissioning trusts is summarized below:

Dominion EnergyVirginia Power
Year Ended December 31,202420232022202420232022
(millions)
Net gains (losses) recognized during the period$1,020$811$(848)$532$420$(436)
Less: Net (gains) losses recognized during the period on securities sold during the period**(**16)(7)8**(**11)7(7)
Unrealized gains (losses) recognized during the period on securities still held at period end(1)$1,004$804$(840)$521$427$(443)

(1)

Included in other income (expense) and the nuclear decommissioning trust regulatory liability as discussed in Note 2.

The fair value of Dominion Energy and Virginia Power’s fixed income securities with readily determinable fair values held in nuclear decommissioning trust funds at December 31, 2024 by contractual maturity is as follows:

Dominion EnergyVirginia Power
(millions)
Due in one year or less$7$7
Due after one year through five years565294
Due after five years through ten years441251
Due after ten years1,198766
Total$2,211$1,318

Presented below is selected information regarding Dominion Energy and Virginia Power’s equity and fixed income securities with readily determinable fair values held in nuclear decommissioning trust funds.

Dominion EnergyVirginia Power
Year Ended December 31,202420232022202420232022
(millions)
Proceeds from sales$3,072$2,966$3,282$1,925$1,876$1,538
Realized gains(1)10692143675048
Realized losses(1)1281692968899107

(1)

Includes realized gains and losses recorded to the nuclear decommissioning trust regulatory liability as discussed in Note 2*.*

EQUITY METHOD INVESTMENTS

Investments that Dominion Energy accounts for under the equity method of accounting are as follows:

Investment
CompanyOwnership%BalanceDescription
As of December 31,20242023
(millions)
Align RNG50%$91$80Renewable natural gas
Dominion Privatization50%27172Military electric and gas
Other(1)various2059(2)
Total$138$311

(1)

*Dominion Energy’s Consolidated Balance Sheets include a liability associated with its investment in Atlantic Coast Pipeline of $*7 *million and $*4 million at December 31, 2024 and 2023, respectively, presented in other current liabilities. See discussion below for additional information.

(2)

*Dominion Energy’s Consolidated Balance Sheets includes balances presented in assets held for sale of $*43 million for December 31, 2023.

Dominion Energy recorded equity earnings (losses) on its investments of $3 million, $(26) million and $21 million for the years ended December 31, 2024, 2023 and 2022, respectively, in other income (expense) in its Consolidated Statements of Income. In addition, Dominion Energy recorded equity earnings (losses) of $(12) million, $235 million and $271 million for the years ended December 31, 2024, 2023 and 2022, respectively, in discontinued operations including amounts related to its investments in Cove Point (through September 2023) and Atlantic Coast Pipeline discussed below. Dominion Energy received distributions from these investments of $140 million, $245 million and $355 million for the years ended December 31, 2024, 2023 and 2022, respectively. As of December 31, 2024 and 2023, the net difference between the carrying amount of Dominion Energy’s investments and its share of underlying equity in net assets was $5 million and $18 million, respectively. At December 31, 2024, this difference is attributable to capitalized interest. At December 31, 2023, these differences are primarily comprised of $9 million of equity method goodwill that is not being amortized and $3 million attributable to capitalized interest.

Cove Point

Prior to the completion of the sale to BHE in September 2023, Dominion held a 50% noncontrolling limited partnership interest in Cove Point which was accounted for as an equity method investment as Dominion Energy had the ability to exercise significant influence over, but not control, Cove Point.

Dominion Energy recorded distributions from Cove Point of $227 million and $344 million for the years ended December 31, 2023 and 2022, respectively. Dominion Energy made no contributions to Cove Point for the years ended December 31, 2023 or 2022.

In June 2023, Dominion Energy entered into an agreement with Cove Point for transportation and storage services at market rates for a 20-year period commencing August 2023.

In July 2023, Dominion Energy entered into an agreement to sell its 50% noncontrolling limited partnership interest in Cove Point to BHE for cash consideration of $3.3 billion which closed in September 2023 after all customary closing and regulatory conditions were satisfied, including clearance under the Hart-Scott-Rodino Act and approval from the DOE. The sale is treated as an asset sale for tax purposes. In addition, Dominion Energy received proceeds of $199 million from the settlement of related interest rate derivatives. In connection with closing, Dominion Energy utilized proceeds, as required, to repay DECP Holding’s term loan secured by its noncontrolling interest in Cove Point, which had an outstanding balance of $2.2 billion, and $750 million of outstanding borrowings under Dominion Energy’s two $600 million 364-day term loan facilities entered in July 2023. See Note 17 for additional information on these facilities. Dominion Energy recorded a gain on the sale of its noncontrolling interest in Cove Point of $626 million ($348 million after-tax) within discontinued operations in its Consolidated Statements of Income for the year ended December 31, 2023.

In September 2023, as a result of Dominion Energy entering agreements for the East Ohio, PSNC and Questar Gas Transactions, Dominion Energy’s 50% noncontrolling limited partnership interest in Cove Point also met the requirements to be presented as discontinued operations and held for sale (through the date of disposal) as both disposition activities were executed in connection with Dominion Energy’s comprehensive business review announced in November 2022. In addition, interest expense associated with DECP Holding’s term loan secured by its noncontrolling interest in Cove Point and related interest rate derivatives have been classified as discontinued operations.

Amounts presented in discontinued operations within Dominion Energy's Consolidated Statements of Income for the year ended December 31, 2023 include $218 million for earnings on equity method investees, $120 million of interest expense and $31 million of income tax expense, in addition to the gain on sale and associated tax expense disclosed above. Such amounts for the years ended December 31, 2022 were $277 million for earnings on equity method investees, $(160) million for interest expense (benefit) and $92 million of income tax expense.

All activity relating to Dominion Energy’s noncontrolling interest in Cove Point is recorded within the Corporate and Other segment.

Atlantic Coast Pipeline

In September 2014, Dominion Energy, along with Duke Energy and Southern, announced the formation of the Atlantic Coast Pipeline for the purpose of constructing an approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina. Following Dominion Energy’s acquisition from Southern of its 5% interest in Atlantic Coast Pipeline in 2020, Dominion Energy owns a 53% noncontrolling membership interest in Atlantic Coast Pipeline with Duke Energy owning the remaining interest.

Atlantic Coast Pipeline continues to be accounted for as an equity method investment as the power to direct the activities most significant to Atlantic Coast Pipeline is shared with Duke Energy. As a result, Dominion Energy has the ability to exercise significant influence, but not control, over the investee.

In July 2020, as a result of ongoing permitting delays, growing legal uncertainties and the need to incur significant capital expenditures to maintain project timing before such uncertainties could be resolved, Dominion Energy and Duke Energy announced the cancellation of the Atlantic Coast Pipeline Project.

Dominion Energy recorded earnings (losses) on equity method investees of $(13) million ($(10) million after-tax), $15 million ($11 million after-tax), and $(7) million ($(5) million after-tax) for the years ended December 31, 2024, 2023 and 2022, respectively. In connection with Dominion Energy’s decision to sell substantially all of its gas transmission and storage operations, Dominion Energy has reflected the results of its equity method investment in Atlantic Coast Pipeline as discontinued operations in its Consolidated Statements of Income. As a result of its share of equity losses exceeding its investment, Dominion Energy’s Consolidated Balance Sheets at December 31, 2024 and 2023 include a liability of $7 million and $4 million, respectively, presented in other current liabilities and reflecting Dominion Energy’s obligations to Atlantic Coast Pipeline related to AROs.

Dominion Energy recorded contributions of $12 million, $95 million and $3 million during the years ended December 31, 2024, 2023 and 2022, respectively, to Atlantic Coast Pipeline.

Dominion Energy expects it could incur additional losses from Atlantic Coast Pipeline as it completes wind-down activities. While Dominion Energy is unable to precisely estimate the amounts to be incurred by Atlantic Coast Pipeline, the portion of such amounts attributable to Dominion Energy is not expected to be material to Dominion Energy’s results of operations, financial position or statement of cash flows.

All activity relating to Atlantic Coast Pipeline is recorded within the Corporate and Other segment.

Align RNG

In the fourth quarter of 2023, Dominion Energy reflected its share of an impairment of certain property, plant and equipment at Align RNG totaling $35 million ($26 million after-tax) in other income (expense) in its Consolidated Statements of Income. All activity related to Align RNG is reflected within Contracted Energy.

Dominion Privatization

In February 2022, Dominion Energy entered into an agreement to form Dominion Privatization, a partnership with Patriot. Dominion Privatization, through its wholly-owned subsidiaries, maintains and operates electric and gas distribution infrastructure under service concession arrangements with certain U.S. military installations. Under the agreement, Dominion Energy contributed its existing privatization operations, excluding contracts held by DESC, and Patriot contributed cash.

The initial contribution, consisting of privatization operations in South Carolina, Texas and Pennsylvania, closed in March 2022 for which Dominion Energy received total consideration of $120 million, subject to customary closing adjustments, comprised of $60 million in cash proceeds and a 50% noncontrolling ownership interest in Dominion Privatization with an initial fair value of $60 million, estimated using the market approach. This is considered a Level 2 fair value measurement given that it is based on the agreed-upon sales price. In the first quarter of 2022, Dominion Energy recorded a gain of $23 million ($16 million after-tax), presented in losses (gains) on sales of assets in its Consolidated Statements of Income. Dominion Energy’s 50% noncontrolling ownership interest in Dominion Privatization is accounted for as an equity method investment as Dominion Energy has the ability to exercise significant influence, but not control, over the investee.

The second contribution, consisting of privatization operations in Virginia, closed in December 2022 for which Dominion Energy received total consideration of $215 million, subject to customary closing adjustments, comprised of $108 million in cash proceeds and retention of its 50% noncontrolling ownership interest valued at $107 million using the market approach. This is considered a

Level 2 fair value measurement given that it is based on the agreed-upon sales price. In the fourth quarter of 2022, Dominion Energy recorded a gain of $133 million ($99 million after-tax), presented in losses (gains) on sales of assets in its Consolidated Statements of Income.

In February 2024, Dominion Energy received a distribution of $126 million from Dominion Privatization, which was accounted for as a return of an investment.

All activity related to Dominion Privatization is reflected within the Corporate and Other segment.

Wrangler

In March 2022, Dominion Energy sold its 15% noncontrolling partnership interest in Wrangler to Interstate Gas Supply, Inc. for cash consideration of $85 million. Dominion Energy recognized a gain of $11 million ($8 million after-tax), included in other income (expense) in its Consolidated Statements of Income reflected within the Corporate and Other segment for the year ended December 31, 2022.

NOTE 10. PROPERTY, PLANT AND EQUIPMENT

Major classes of property, plant and equipment and their respective balances for the Companies are as follows:

Dominion EnergyVirginia Power
At December 31,2024202320242023
(millions)
Utility:
Generation$26,854$24,903$20,219$18,580
Transmission17,85616,54015,51414,268
Distribution23,57221,83617,26115,934
Nuclear fuel2,3932,4241,8231,815
General and other1,8651,7581,1341,036
Plant under construction(1)13,8168,23012,8267,548
Total utility86,35675,69168,77759,181
Non-jurisdictional - including plant under construction1,7631,7721,7631,772
Nonutility:
Nonregulated generation-nuclear1,9621,855——
Nonregulated generation-solar1,207945——
Nuclear fuel1,1731,009——
Other-including plant under construction2,3832,1451010
Total nonutility6,7255,9541010
Total property, plant and equipment$94,844$83,417$70,550$60,963

(1)

*Includes $*5.8 *billion and $*2.9 *billion of costs associated with the CVOW Commercial Project at December 31, 2024 and 2023, respectively. The amount at December 31, 2024 is net of $*206 million of costs not expected to be recovered from customers.

Jointly-Owned Power Stations

The Companies’ proportionate share of jointly-owned power stations at December 31, 2024 is as follows:

Bath County Pumped Storage Station**(1)**North Anna Units 1 and 2**(1)**Clover Power Station**(1)**Millstone Unit 3**(2)**Summer Unit 1 (2)
(millions, except percentages)
Ownership interest60%88.4%50%93.5%66.7%
Plant in service1,0692,9066161,5281,598
Accumulated depreciation**(**774)**(**1,403)**(**312)**(**628)**(**755)
Nuclear fuel—767—619570
Accumulated amortization of nuclear fuel—**(**620)—**(**475)**(**345)
Plant under construction1240899358

(1)

Units jointly owned by Virginia Power.

(2)

Units jointly owned by Dominion Energy.

The co-owners are obligated to pay their share of all future construction expenditures and operating costs of the jointly-owned facilities in the same proportion as their respective ownership interest. The Companies report their share of operating costs in the appropriate operating expense (electric fuel and other energy-related purchases, other operations and maintenance, depreciation and amortization, other taxes and other applicable accounts) in the Consolidated Statements of Income.

CVOW Commercial Project – Estimated Total Project Cost

In September 2019, Virginia Power filed applications with PJM for the CVOW Commercial Project and for certain approvals and rider recovery from the Virginia Commission in November 2021. The Virginia Commission provided such approvals in August 2022, as revised for certain provisions related to rider recovery in December 2022. The 2.6 GW project is expected to be placed in service by the end of 2026 with an estimated total project cost of approximately $10.7 billion, excluding financing costs, that reflects a revised estimate of network upgrade costs assigned by PJM to the CVOW Commercial Project.

The expected total project cost reflects increases driven primarily by projections for onshore electrical interconnection costs and network upgrade costs assigned to the project by PJM, specifically incorporating consideration of PJM’s December 2024 publication of potential transmission network upgrades required for certain generation projects and related cost allocations, including those attributable to the CVOW Commercial Project. Relative to Virginia Power’s November 2024 Rider OSW filing, the updated estimated total project cost reflects an approximately $0.6 billion increase for such onshore and network upgrade costs and an approximately $0.3 billion increase for increased contingency for remaining construction activities, completion of the removal of unexploded ordnance, undersea cable protection system design enhancements, commodity prices for transportation fuel, updates for sea fastener fabrication and installation and other construction and equipment supplier costs. Virginia Power has entered into fixed price contracts for the major offshore construction and equipment components. The contracts include services denominated in currencies other than the U.S. dollar, for which Virginia Power has entered forward contracts to economically hedge.

In accordance with the Virginia Commission’s December 2022 order, the Companies are subject to a cost sharing mechanism in which Virginia Power will be eligible to recover 50% of such incremental costs which fall between $10.3 billion and $11.3 billion with no recovery of such incremental costs which fall between $11.3 billion and $13.7 billion. There is no cost sharing mechanism for any total construction costs in excess of $13.7 billion, the recovery of which would be determined in a future Virginia Commission proceeding. In October 2024, Virginia Power completed the sale of a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak as discussed below.

As a result of the revised total project cost estimate and cost sharing mechanism, in the fourth quarter of 2024 Virginia Power recorded a charge for costs not expected to be recovered from customers of $206 million within impairment of assets and other charges, which includes $103 million attributable to noncontrolling interests, and an associated income tax benefit of $26 million, all reflected in the Corporate and Other segment, in the Companies’ Consolidated Statements of Income.

The estimated total project cost above reflects the Companies’ best estimate of the remaining construction costs, including contingency of approximately 5% on such remaining amounts. Such estimate could potentially change for items, certain of which are beyond the Companies’ control, including but not limited to actual network upgrade costs allocated by PJM, fuel for transportation and installation, the impact of applicable tariffs, if any, costs to maintain necessary permits, approvals and authorizations, ability of key suppliers and contractors to timely satisfy their obligations under existing contracts, marine wildlife and/or any severe weather events. Any additional increase in such costs in excess of the contingency included in the estimated total project cost would be subject to the cost sharing mechanisms described above and could have a material impact on the Companies’ future financial condition, results of operations and/or cash flows.

Sale of Noncontrolling Interest in CVOW Commercial Project

In February 2024, Virginia Power entered into an agreement to sell a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak through the formation of OSWP. In October 2024, Virginia Power and Stonepeak closed on the agreement following the receipt of consent by BOEM and satisfaction of other customary closing and regulatory conditions. Consistent with the terms of the agreement, Virginia Power contributed the CVOW Commercial Project and Stonepeak contributed cash to OSWP. The contribution of the CVOW Commercial Project required approvals from the Virginia and North Carolina Commissions, which were received in September 2024. At closing, Virginia Power received $2.6 billion, subject to customary post-closing adjustments, representing 50% of the CVOW Commercial Project construction costs incurred through closing, less an initial withholding of $145 million. If the total project costs of the CVOW Commercial Project are $9.8 billion, excluding financing costs, or less Virginia Power shall receive $100 million of the initial withholding. Such amount is subject to downward adjustment with Virginia Power receiving no withheld amounts if the total costs, excluding financing costs, of the CVOW Commercial Project exceed $11.3 billion.

Virginia Power and Stonepeak will each contribute 50% of the remaining capital necessary to fund construction of the CVOW Commercial Project provided the total project cost, excluding financing costs, is less than $11.3 billion. For capital funding necessary, if any, for total project costs, excluding financing costs, of $11.3 billion through $13.7 billion, Stonepeak will have the option to make additional capital contributions. If Stonepeak elects to make additional capital contributions for project costs, excluding financing costs, in excess of $11.3 billion, if any, Virginia Power shall contribute between 67% and 83% of such capital with Stonepeak contributing the remainder. To the extent that Stonepeak elects not to make such contributions, Virginia Power shall receive an increase in its ownership percentage of OSWP for any contributed capital based on a tiered unit price for membership interests in OSWP as set forth in the agreement. Virginia Power and Stonepeak have the right to provide capital contributions for any total project costs, excluding financing costs, in excess of $13.7 billion.

OSWP is considered to be a VIE primarily because its equity capitalization is insufficient to support its operations. Virginia Power is considered to be the primary beneficiary and consolidates OSWP with Stonepeak’s interests reflected as noncontrolling interests beginning in the fourth quarter of 2024 as Virginia Power has the power to direct the most significant activities of OSWP, including construction and operation of the CVOW Commercial Project. In the event that OSWP ceases to be a VIE, Virginia Power expects to continue to consolidate OSWP as its ownership interest is expected to be considered a controlling financial interest over the entity through its rights to control operations.

Virginia Power Easement Agreement

In November 2023, Virginia Power entered into an agreement to pay $65 million for an easement related to the CVOW Commercial Project for which it will not seek recovery and therefore recorded a charge of $65 million ($49 million after-tax) within impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment).

Nonregulated Solar Projects

The following table presents acquisitions by Virginia Power of non-jurisdictional solar projects (reflected in Dominion Energy Virginia). Virginia Power has claimed federal investment tax credits on the projects, except as otherwise noted.

Project NameDate Agreement EnteredDate Agreement ClosedProject LocationProject Cost (millions)****(1)Date of Commercial OperationsMW Capacity
Ft. PowhatanJune 2019June 2019Virginia$267January 2022150
MaplewoodOctober 2019October 2019Virginia210December 2022120
PumpkinseedMay 2020May 2020Virginia138September 202260

(1)

Includes acquisition costs.

In addition, the following table presents acquisitions by Dominion Energy of solar projects (reflected in Contracted Energy unless otherwise noted). Dominion Energy has claimed or expects to claim federal tax credits on the projects.

Project NameDate Agreement EnteredDate Agreement ClosedProject LocationProject Cost (millions)****(1)Date of Commercial OperationsMW Capacity
Madison(2)July 2020July 2020Virginia165N/A62
Hardin IIAugust 2020Terminated(3)
Atlanta FarmsMarch 2022May 2022Ohio390January 2025(4)200
FoxhoundMarch 2023February 2024Virginia195April 2024(4)83

(1)

Includes acquisition costs.

(2)

Madison was reflected in the Corporate and Other segment before its sale 2024. See Note 3 for discussion.

(3)

In January 2023, Dominion Energy terminated its agreement, without penalty, to acquire Hardin II.

(4)

Dominion Energy expects to claim production tax credits on the energy generated and sold by these projects.

In addition to the facilities discussed above, Dominion Energy has also entered into various agreements to install solar facilities (reflected in the Corporate and Other segment), primarily at schools in Virginia. As of December 31, 2024, Dominion Energy has in service solar facilities with an aggregate generation capacity of 7 MW at a cost of $16 million and anticipates placing additional facilities in service by the end of 2025 with an estimated total projected cost of approximately $5 million and an aggregate generation capacity of 3 MW. Dominion Energy has claimed or expects to claim federal investment tax credits on the projects.

Impairment

In the fourth quarter of 2022, Dominion Energy modified its intentions for the ongoing growth and development of its nonregulated solar generation assets as part of the preliminary stages of its comprehensive business review announced in November 2022. In connection with that determination, Dominion Energy expects that it is more likely than not that the nonregulated solar generation projects within Contracted Energy will be sold before the end of their useful lives and therefore evaluated the associated long-lived

assets for recoverability. Given their strategic alignment with Virginia Power’s operations, the non-jurisdictional solar generation projects reflected in Dominion Energy Virginia were not further evaluated for recoverability. Using a probability-weighted approach, Dominion Energy determined Contracted Energy’s nonregulated solar generation assets were impaired and recorded a charge of $908 million ($685 million after-tax) primarily in impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment) for the year ended December 31, 2022 to adjust the property, plant and equipment, intangible assets and right-of-use lease assets down to an estimated fair value of $665 million in aggregate. The fair value was estimated using an income approach. The valuation is considered a Level 3 fair value measurement due to the use of significant judgmental and unobservable inputs, including projected timing and amount of future cash flows and discount rates reflecting risks inherent in the future cash flows and market prices.

Acquisition of Offshore Wind Project

In July 2024, Virginia Power entered into an agreement to acquire an approximately 40,000-acre area lease 27 miles off the coast of North Carolina in federal waters and associated project assets in the early stages of development for approximately $160 million. The transaction closed in October 2024 following the receipt of approval from BOEM and other customary regulatory approvals. The CVOW South project, if constructed, is expected to have a generating capacity of 800 MW with ultimate development of the project dependent upon the receipt of approvals from the Virginia Commission and other permitting entities. The project would support Virginia Power’s ability to meet the renewable energy portfolio standards established in the VCEA.

Sales of Corporate Office Buildings

In 2023, Dominion Energy entered into an agreement for the sale of a corporate office building for total cash consideration of $40 million. The corporate office building is reflected in the Corporate and Other segment and was presented as held for sale in Dominion Energy’s Consolidated Balance Sheets at December 31, 2023. In the second quarter of 2024, Dominion Energy recorded a charge of $17 million ($12 million after-tax) in impairment of assets and other charges in its Consolidated Statements of Income to adjust the corporate office building down to its estimated fair value, using a market approach, of $23 million. The valuation is considered a Level 3 fair value measurement as it is based on unobservable inputs due to limited comparable market activity. In the third quarter of 2024, Dominion Energy entered into a new agreement to sell the corporate office building, which closed in December 2024 for $19 million, and recorded an inconsequential loss upon closing.

In 2023, Dominion Energy recorded a charge of $93 million ($69 million after-tax) in impairment of assets and other charges in its Consolidated Statements of Income to adjust a corporate office building down to its estimated fair value, using a market approach, of $35 million. The valuation is considered a Level 3 fair value measurement as it is based on unobservable inputs due to limited comparable market activity. The corporate office building is reflected in the Corporate and Other segment and is presented as held for sale in Dominion Energy’s Consolidated Balance Sheets at December 31, 2023. Dominion Energy completed the sale in July 2024.

Nonregulated Renewable Natural Gas Facilities

Dominion Energy recorded impairment charges of $33 million ($25 million after-tax) and $27 million ($21 million after-tax) in the second and third quarters of 2024, respectively, in impairment of assets and other charges in the Consolidated Statements of Income reflected in the Corporate and Other segment, to write down the long-lived assets of certain nonregulated renewable natural gas facilities under development to their estimated fair values which were each less than $1 million. The fair values were estimated using an income approach. The valuations are considered Level 3 fair value measurements due to the use of significant judgmental and unobservable inputs, including projected timing and amount of future cash flows and discount rates reflecting risks inherent in future cash flows and market prices.

Sale of Utility Property

In 2023, Dominion Energy completed the sales of certain utility property in South Carolina, as approved by the South Carolina Commission in February 2023, for total cash consideration of $12 million. In connection with the sales, Dominion Energy recognized a gain of $11 million ($8 million after-tax), recorded in losses (gains) on sales of assets, in its Consolidated Statements of Income (reflected in the Corporate and Other segment) for the year ended December 31, 2023.

In 2022, Dominion Energy completed the sales of certain utility property in South Carolina, as approved by the South Carolina Commission, for total cash consideration of $20 million. In connection with the sales, Dominion Energy recognized a gain of $20 million ($15 million after-tax), recorded in losses (gains) on sales of assets, in its Consolidated Statements of Income (reflected in Dominion Energy South Carolina) for the year ended December 31, 2022.

NOTE 11. GOODWILL AND INTANGIBLE ASSETS

Goodwill

The changes in Dominion Energy’s carrying amount and segment allocation of goodwill are presented below:

Dominion Energy VirginiaDominion Energy South CarolinaContracted EnergyCorporate and OtherTotal
(millions)
Dominion Energy
Balance at December 31, 2022(1)$2,106$1,521$516$—$4,143
No events affecting goodwill—————
Balance at December 31, 2023(1)$2,106$1,521$516$—$4,143
No events affecting goodwill—————
Balance at December 31, 2024(1)$2,106$1,521$516$—$4,143

(1)

Goodwill amounts do not contain any accumulated impairment losses.

Other Intangible Assets

The Companies’ other intangible assets are subject to amortization over their estimated useful lives. Dominion Energy’s amortization expense for software, licenses and other intangible assets was $87 million, $160 million and $103 million for the years ended December 31, 2024, 2023 and 2022, respectively. In 2024, Dominion Energy acquired $675 million of intangible assets, primarily representing renewable energy credits and software, with an estimated weighted-average amortization period of approximately 7 years. Amortization expense for Virginia Power’s software, licenses and other intangible assets was $51 million, $123 million and $67 million for the years ended December 31, 2024, 2023 and 2022, respectively. In 2024, Virginia Power acquired $605 million of intangible assets, primarily representing renewable energy credits and software, with an estimated weighted-average amortization period of 6 years.

The components of intangible assets are as follows:

20242023
At December 31,Gross Carrying AmountAccumulated AmortizationGross Carrying AmountAccumulated Amortization
(millions)
Dominion Energy
Software, licenses and other$1,645$708$1,477$627
Renewable energy credits and RGGI allowances(1)199—708613
Virginia Power
Software, licenses and other$911$291$802$243
Renewable energy credits and RGGI allowances(1)198—707613

(1)

*Includes $*370 *million and $*209 *million of renewable energy credits consumed and retired in 2024 and 2023, respectively. In addition, balances at December 31, 2023 includes $*613 *million of RGGI allowances consumed, including $*198 million purchased and consumed in 2023, all of which were retired in 2024. All amounts for renewable energy credits and RGGI allowances were deferred to regulatory assets upon consumption.

Annual amortization expense for intangible assets, excluding renewable energy credits and RGGI allowances which are deferred to regulatory assets, is estimated to be as follows:

20252026202720282029
(millions)
Dominion Energy$84$75$64$51$39
Virginia Power$54$49$43$33$26

NOTE 12. REGULATORY ASSETS AND LIABILITIES

Regulatory assets and liabilities include the following:

Dominion EnergyVirginia Power
At December 31,2024202320242023
(millions)
Dominion Energy
Regulatory assets:
Deferred cost of fuel used in electric generation(1)$38$245$3$95
Securitized cost of fuel used in electric generation(2)124—124—
Deferred rider costs for Virginia electric utility(3)293270293270
Ash pond and landfill closure costs(4)108200108200
Deferred nuclear refueling outage costs(5)97638063
NND Project costs(6)138138
Derivatives(7)81626160
Other1862318380
Regulatory assets-current9921,309697868
Unrecognized pension and other postretirement benefit costs(8)4861,036——
Deferred rider costs for Virginia electric utility(3)651496651496
Interest rate hedges(9)167168——
AROs and related funding(10)387379
NND Project costs(6)1,8111,949
CCR remediation, ash pond and landfill closure costs(4)2,8982,4102,5602,407
Deferred cost of fuel used in electric generation(1)—1,221—1,221
Securitized cost of fuel used in electric generation(2)1,040—1,040—
Derivatives(7)18210714866
Other666590138127
Regulatory assets-noncurrent8,2888,3564,5374,317
Total regulatory assets$9,280$9,665$5,234$5,185
Regulatory liabilities:
Deferred cost of fuel used in electric generation(1)92—92—
Provision for future cost of removal and AROs(11)119118119118
Reserve for rate credits to electric utility customers(12)7383——
Income taxes refundable through future rates(13)881076470
Monetization of guarantee settlement(14)6767
Derivatives(7)51730—
Other8914080133
Regulatory liabilities-current579522385321
Income taxes refundable through future rates(13)2,9883,0762,1682,237
Provision for future cost of removal and AROs(11)1,8091,8181,2101,185
Nuclear decommissioning trust(15)2,5502,0982,5502,098
Monetization of guarantee settlement(14)568635
Interest rate hedges(9)406233406233
Reserve for rate credits to electric utility customers(12)161237——
Overrecovered other postretirement benefit costs(16)183155
Derivatives(7)24813625—
Other283286215225
Regulatory liabilities-noncurrent9,1968,6746,5745,978
Total regulatory liabilities$9,775$9,196$6,959$6,299

(1)

*Reflects deferred fuel expenses for the Virginia and North Carolina jurisdictions of Virginia Power’s electric generation operations. Additionally, Dominion Energy includes deferred fuel expenses for the South Carolina jurisdiction of its electric generation operations. In February 2024, Virginia Power completed a securitization of $*1.3 billion of under-recovered fuel costs for its Virginia service territory. See Notes 13 and 18 for additional information.

(2)

Reflects under-recovered fuel costs for Virginia Power’s Virginia service territory securitized through the issuance of bonds by VPFS in February 2024. See Notes 13, 16 and 18 for additional information.

(3)

*Reflects deferrals under Virginia Power’s electric transmission FERC formula rate and the deferral of costs associated with certain current and prospective rider projects. In 2023, Virginia Power recorded a charge of $*36 *million ($*27 million after-tax), included in impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment), for the write-off of certain previously deferred amounts related to Riders R, S and W in connection with the cessation of such riders effective July 2023. See Note 13 for additional information.

(4)

Primarily reflects legislation in Virginia which requires any CCR asset located at certain Virginia Power stations to be closed by removing the CCR to an approved landfill or through beneficial reuse. These deferred costs are expected to be collected over a period between 15 and 18 years commencing December 2021 through Rider CCR. Virginia Power is entitled to collect carrying costs on uncollected expenditures once expenditures have been made. In addition, the balance at December 31, 2024 reflects amounts related to the EPA’s May 2024 final rule concerning CCR as discussed in Note 14.

(5)

Primarily reflects deferred operation and maintenance costs at Virginia Power incurred in connection with the refueling of any nuclear-powered generating plant as required by Virginia legislation. Virginia Power deferred costs will be amortized over the refueling cycle, not to exceed 18 months.

(6)

Reflects expenditures by DESC associated with the NND Project, which pursuant to the SCANA Merger Approval Order, will be recovered from DESC electric service customers over a 20*-year period ending in 2039.*

(7)

Represents changes in the fair value of derivatives, excluding separately presented interest rate hedges, that following settlement are expected to be recovered from or refunded to customers.

(8)

*Represents unrecognized pension and other postretirement employee benefit costs expected to be recovered or refunded through future rates generally over the expected remaining service period of plan participants by certain of Dominion Energy’s rate-regulated subsidiaries. Includes regulatory assets of $*215 *million and regulatory liabilities of $*12 million in aggregate at December 31, 2023 related to retained pension and other postretirement benefit plan assets and obligations for the East Ohio, Questar Gas and PSNC Transactions which were reclassified to into other income (expense) in the Consolidated Statement of Income upon closing of each transaction.

(9)

Reflects interest rate hedges recoverable from or refundable to customers. Certain of these instruments are settled and any related payments are being amortized into interest expense over the life of the related debt, which has a weighted-average useful life of approximately 25 years and 24 years for Dominion Energy and Virginia Power, respectively, as of December 31, 2024.

(10)

Represents uncollected costs, including deferred depreciation and accretion expense, related to legal obligations associated with the future retirement of generation, transmission and distribution properties. The AROs primarily relate to DESC’s electric generating facilities, including Summer, and are expected to be recovered over the related property lives and periods of decommissioning which may range up to approximately 105 years.

(11)

Rates charged to customers by Dominion Energy and Virginia Power’s regulated businesses include a provision for the cost of future activities to remove assets that are expected to be incurred at the time of retirement.

(12)

Reflects amounts previously collected from retail electric customers of DESC for the NND Project to be credited over an estimated 11*-year period effective February 2019, in connection with the SCANA Merger Approval Order.*

(13)

Amounts recorded to pass the effect of reduced income taxes from the 2017 Tax Reform Act to customers in future periods, which will primarily reverse at the weighted-average tax rate that was used to build the reserves over the remaining book life of the property, net of amounts to be recovered through future rates to pay income taxes that become payable when rate revenue is provided to recover AFUDC equity.

(14)

Reflects amounts to be refunded to DESC electric service customers over a 20*-year period ending in 2039 associated with the monetization of a bankruptcy settlement agreement.*

(15)

Primarily reflects a regulatory liability representing amounts collected from Virginia jurisdictional customers and placed in external trusts (including income, losses and changes in fair value thereon, as applicable) for the future decommissioning of Virginia Power’s utility nuclear generation stations, in excess of the related AROs.

(16)

Reflects a regulatory liability for the collection of postretirement benefit costs allowed in rates in excess of expense incurred.

At December 31, 2024, Dominion Energy and Virginia Power regulatory assets include $6.1 billion and $4.5 billion, respectively, on which they do not expect to earn a return during the applicable recovery period. With the exception of certain items discussed above, the majority of these expenditures are expected to be recovered within the next two years.

NOTE 13. REGULATORY MATTERS

Regulatory Matters Involving Potential Loss Contingencies

As a result of issues generated in the ordinary course of business, the Companies are involved in various regulatory matters. Certain regulatory matters may ultimately result in a loss; however, as such matters are in an initial procedural phase, involve uncertainty as to the outcome of pending reviews or orders and/or involve significant factual issues that need to be resolved, it is not possible for the Companies to estimate a range of possible loss. For regulatory matters that the Companies cannot estimate, a statement to this effect is made in the description of the matter. Other matters may have progressed sufficiently through the regulatory process such that the Companies are able to estimate a range of possible loss. For regulatory matters that the Companies are able to reasonably estimate a range of possible losses, an estimated range of possible loss is provided, in excess of the accrued liability (if any) for such matters. Any estimated range is based on currently available information, involves elements of judgment and significant uncertainties and may not represent the Companies’ maximum possible loss exposure. The circumstances of such regulatory matters will change from time to time and actual results may vary significantly from the current estimate. For current matters not specifically reported below,

management does not anticipate that the outcome from such matters would have a material effect on the Companies’ financial position, liquidity or results of operations.

Other Regulatory Matters

Virginia Regulation – Key Legislation Affecting Operations

Regulation Act and Grid Transformation and Security Act of 2018

The Regulation Act enacted in 2007 instituted a cost-of-service rate model that authorizes stand-alone rate adjustment clauses for recovery of costs for new generation projects, FERC-approved transmission costs, underground distribution lines, environmental compliance, conservation and energy efficiency programs, renewable energy programs and nuclear license renewals, and also contains statutory provisions directing Virginia Power to file annual fuel cost recovery cases with the Virginia Commission.

If the Virginia Commission’s future rate decisions, including actions relating to Virginia Power’s rate adjustment clause filings, differ materially from Virginia Power’s expectations, it may adversely affect its results of operations, financial condition and cash flows.

The GTSA reinstated base rate reviews commencing with the 2021 Triennial Review. In the triennial review proceedings, earnings that were more than 70 basis points above the utility’s authorized ROE that might have been refunded to customers and served as the basis for a reduction in future rates, could be reduced by Virginia Commission-approved investment amounts in qualifying solar or wind generation facilities or electric distribution grid transformation projects that Virginia Power elected to include in a CCRO. The legislation declared that electric distribution grid transformation projects are in the public interest and provided that the costs of such projects may be recovered through a rate adjustment clause if not the subject of a CCRO. Any costs that were the subject of a CCRO were deemed recovered in base rates during the triennial period under review and could not be included in base rates in future triennial review proceedings. In any triennial review in which the Virginia Commission determined that the utility’s earnings were more than 70 basis points above its authorized ROE, base rates were subject to reduction prospectively and customer refunds would be due unless the total CCRO elected by the utility equaled or exceeded the amount of earnings in excess of the 70 basis points. For the purposes of measuring any customer refunds or CCRO amounts utilized under the GTSA, associated income taxes were factored into the determination of such amounts. In the 2021 Triennial Review, any such rate reduction was limited to $50 million. This section of the GTSA concerning base rate reviews was amended by 2023 legislation as discussed below.

Virginia 2020 Legislation

In April 2020, the Governor of Virginia signed into law the VCEA, which along with related legislation forms a comprehensive framework affecting Virginia Power’s operations. The VCEA replaces Virginia’s voluntary renewable energy portfolio standard for Virginia Power with a mandatory program setting annual renewable energy portfolio standard requirements based on the percentage of total electric energy sold by Virginia Power, excluding existing nuclear generation and certain new carbon-free resources, reaching 100% by the end of 2045. The VCEA includes related requirements concerning deployment of wind, solar and energy storage resources, as well as provides for certain measures to increase net-metering, including an allocation for low-income customers, incentivizes energy efficiency programs and provides for cost recovery related to participation in a carbon trading program. While the legislation affects several portions of Virginia Power’s operations, key provisions of the GTSA remained in effect, including the triennial review structure and timing, the use of the CCRO and the $50 million cap on revenue reductions in the first triennial review proceeding. Key provisions of the VCEA and related legislation passed include the following:

Fossil Fuel Electric Generation: The legislation mandates Chesterfield Power Station Units 5 & 6 and Yorktown Power Station Unit 3 to be retired by the end of 2024, Altavista, Southampton and Hopewell to be retired by the end of 2028 and Virginia Power’s remaining fossil fuel units to be retired by the end of 2045, unless the retirement of such generating units will compromise grid reliability or security. In addition, the Virginia Commission shall determine the amortization period for recovery of any appropriate costs due to the early retirement of any electric generation facilities. Virginia Power revised the depreciable lives of Altavista, Southampton and Hopewell for the mandated retirement to the end of 2028, which did not have a material impact to Virginia Power’s results of operations or cash flows given the existing regulatory framework. This section of the VCEA concerning mandatory retirements of certain facilities by the end of 2028 was amended by 2023 legislation as discussed below. As a result, in November 2023 Virginia Power revised the depreciable lives of Altavista, Southampton and Hopewell and implemented useful life assumptions that were effective before the previous revision.

Renewable Generation: The legislation provides a detailed renewable energy portfolio standard to achieve 100% zero-carbon generation by the end of 2045, excluding existing nuclear generation and certain new carbon-free resources. Components include requirements to petition the Virginia Commission for approval to construct or acquire new generating capacity to reach 16.1 GW of installed solar and onshore wind by the end of 2035, which includes specific requirements for utility-scale solar of 3.0 GW by the end of 2024, up to 15.0 GW by the end of 2035 and 1.1 GW of small-scale solar by the end of 2035. The legislation deems 2.7 GW of energy storage, including up to 800 MW for any one project which may include a pumped storage facility, by the end of 2035 to be in the public interest. The legislation also deems the construction or purchase of an offshore wind facility constructed off the Virginia coast with a capacity of up to 5.2 GW before 2035 to be in the public

interest and provides certain presumptions facilitating cost recovery. The costs of such a facility constructed by the utility with a capacity between 2.5 and 3.0 GW will be presumed reasonably and prudently incurred if the Virginia Commission finds that the project meets competitive procurement requirements, the projected cost of the facility does not exceed a specified industry benchmark and the utility commences construction by the end of 2023 or has a plan for the facility to be in service by the end of 2027. Projects to meet these requirements are subject to approval by the Virginia Commission.

Energy Efficiency: The legislation includes an energy efficiency target of 5% energy savings, as measured from a 2019 baseline, through verifiable energy efficiency programs by the end of 2025 with future targets to be set by the Virginia Commission. Virginia Power has the opportunity to offset the lost revenues with margins on program spend if certain targets are achieved and can also seek recovery of the lost revenues associated with energy efficiency programs if such reductions are found to have caused Virginia Power to earn more than 50 basis points below a fair rate of return on its rates for generation and distribution services.

Carbon trading program: The legislation authorizes Virginia to participate in a market-based carbon trading program consistent with RGGI through 2050. In January 2022, the Governor of Virginia issued an executive order which put directives in place to start administrative steps to withdraw Virginia from RGGI. In December 2023, the withdrawal took effect, which remains subject to ongoing legal challenges. All costs of the carbon trading program are recoverable through an environmental rider.

Low-income customers: The legislation includes the establishment of a percentage of income payment program to be administered by the Virginia Department of Housing and Community Development and the Virginia Department of Social Services. To fund the program, Virginia Power will remit amounts collected from customers under a universal service fee established and set by the Virginia Commission. As such, this program will not affect Virginia Power’s results of operations, financial position or cash flows. In December 2020, the Virginia Commission issued a final order confirming a revenue requirement of $93 million related to this program. Implementation details and the effective date of the program would be established in future legislation prior to collection of fees from customers. In October 2023, the Virginia Commission approved the collection by Virginia Power of a universal service fee of $71 million from customers during the rate year beginning November 2023, including the impact on certain non-jurisdictional customers which follow Virginia Power’s jurisdictional customer rate methodology.

Virginia 2023 Legislation

In April 2023, legislation was enacted that amended several key provisions of the Regulation Act, as previously amended by the GTSA, and revised portions of the existing regulatory framework affecting Virginia Power’s operations.

The legislation resets the frequency of base rate reviews from a triennial period, as established under the GTSA, to a biennial period commencing with the 2023 Biennial Review. Such biennial reviews shall include the establishment of an authorized ROE to be utilized for base rates and riders, prospective base rates for the upcoming two-year period based on projected cost of service and a determination by the Virginia Commission as to Virginia Power’s base rate earned return for the most recently completed two-year period against the previously authorized ROE, including any potential credits to customers’ bills.

The legislation provides that the Virginia Commission will establish an authorized ROE of 9.70% for Virginia Power in the 2023 Biennial Review, reflecting the average authorized ROE of vertically integrated electric utilities by the applicable regulatory commissions in the peer group jurisdictions of Florida, Georgia, Texas, Tennessee, West Virginia, Kentucky and North Carolina. Subsequent to the 2023 Biennial Review, all provisions related to this peer group benchmarking expire and the Virginia Commission is authorized to utilize any methodology it deems to be consistent with the public interest to make future ROE determinations. In all future biennial reviews, if the Virginia Commission determines that Virginia Power’s existing base rates will, on a going-forward basis, produce revenues that are either in excess of or below its authorized rate of return, the Virginia Commission is authorized to reduce or increase such base rates, as applicable and necessary, to ensure that Virginia Power’s base rates are just and reasonable while still allowing Virginia Power to recover its costs and earn a fair rate of return. In addition, beginning with the biennial review to be filed in 2025, the Virginia Commission may, at its discretion, increase or decrease Virginia Power’s authorized ROE by up to 50 basis points based on factors that may include reliability, generating plant performance, customer service and operating efficiency, with the provisions applying to such adjustments to be determined in a future proceeding.

The legislation directs that if the Virginia Commission determines as part of the 2023 Biennial Review that Virginia Power has earned more than 70 basis points above its authorized ROE of 9.35% established in the 2021 Triennial Review that 85% of the amount of such earnings above this level be credited to customers’ bills. In future biennial reviews, beginning with the biennial review to be filed in 2025, 85% of any earnings determined by the Virginia Commission to be up to 150 basis points above Virginia Power’s authorized ROE shall be credited to customers’ bills as well as 100% of any earnings that are more than 150 basis points above Virginia Power’s authorized ROE. For the purposes of measuring any bill credits due to customers, associated income taxes are factored into the determination of such amounts. In addition, the legislation eliminates Virginia Power’s ability to utilize Virginia

Commission-approved investment amounts in qualifying solar or wind generation facilities or electric distribution grid transformation projects as a CCRO to reduce or offset any earnings otherwise eligible for customer credits as previously permitted under the GTSA.

In addition to the biennial review mechanisms discussed above, the legislation also includes provisions related to other aspects of Virginia Power’s ratemaking framework.

Riders into base rates: Virginia Power is required to combine certain riders with an aggregate annual revenue requirement of at least $350 million with its base rates effective July 2023. After such riders are combined, they will be considered as part of base rates for the purposes of the biennial review proceedings. The inclusion of such riders cannot serve as the basis for an increase in base rates as part of the 2023 Biennial Review.

Rider consolidation: Upon determination by the Virginia Commission, certain riders, while remaining separate from base rates, may be consolidated for cost recovery and review purposes.

Capitalization ratio: The legislation establishes that Virginia Power is required to undertake reasonable efforts to maintain a common equity capitalization to total capitalization ratio through December 2024 of 52.10%.

Fuel cost securitization: Virginia Power is authorized, on or before July 2024, to petition the Virginia Commission for approval of a financing order for certain deferred fuel costs. Virginia Power is required to permit certain retail customers to opt out of any such deferred fuel cost securitization.

Electric generation plant retirements: The Virginia Commission shall provide to the Virginia General Assembly, on an annual basis, a report that includes information concerning the reliability impacts of generation unit additions and retirement determinations, along with the potential impact on the purchase of power from generation assets outside of the Virginia jurisdiction, the result of which could impact the depreciable lives of Virginia Power’s electric generation facilities in future periods.

In addition, in May 2023 legislation was enacted that amended certain portions of the VCEA to qualify generation produced by Virginia Power’s biomass electric generating stations as renewable energy and eliminate the mandated retirement of such facilities by the end of 2028.

Virginia Power is incurring and expects to incur significant costs, including capital expenditures, to comply with the legislative requirements discussed above. The legislation allows for cost recovery under the existing or modified regulatory framework through rate adjustment clauses, rates for generation and distribution services or Virginia Power’s fuel factor, as approved by the Virginia Commission. Costs allocated to the North Carolina jurisdiction will be recovered, subject to approval by the North Carolina Commission, in accordance with the existing regulatory framework.

Virginia Regulation – Key Developments

2023 Biennial Review

In July 2023, Virginia Power filed its base rate case and accompanying schedules in support of the 2023 Biennial Review in accordance with legislation enacted in Virginia in April 2023 as discussed above. Virginia Power’s earnings test analysis, as filed, demonstrated it earned a combined ROE of 9.04% on its generation and distribution services for the test period, within 70 basis points of its authorized ROE of 9.35% established in the 2021 Triennial Review. Virginia Power did not request an increase in base rates for generation and distribution services and proposed that base rates remain at their existing level utilizing an ROE of 9.70% for the prospective test periods and a common equity capitalization to total capitalization ratio of 52.10%. Virginia Power noted that while its prospective test periods would result in a revenue deficiency, it did not request an increase to base rates given that the combination of certain riders with an aggregate annual revenue requirement of at least $350 million into base rates effective July 2023 cannot serve as the basis for an increase in base rates as part of the 2023 Biennial Review.

In November 2023, Virginia Power, the Virginia Commission staff and other parties filed a comprehensive settlement agreement with the Virginia Commission for approval. The comprehensive settlement agreement indicates that Virginia Power demonstrated it earned a combined ROE of 9.05% on its generation and distribution services for the test period, requires previously unrecovered severe weather event costs of $45 million to be recovered through base rates during the 2023-2024 biennial period, with carrying costs, and provides for $15 million in one-time credits to customers by September 2024.

In February 2024, the Virginia Commission approved the comprehensive settlement agreement and issued its order in this matter. In doing so, the Virginia Commission determined that Virginia Power’s earnings for the test period, considered as a whole, were within 70 basis points above or below its authorized ROE of 9.35%. The Virginia Commission also authorized an ROE of 9.70%, as directed by legislation enacted in Virginia in April 2023, for Virginia Power that will be applied to Virginia Power’s riders prospectively and that will also be utilized to measure base rate earnings for the 2025 Biennial Review. In connection with the order, Virginia Power recorded a net benefit of $17 million ($12 million after-tax) in the first quarter of 2024 within impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment) for a regulatory asset for previously unrecovered severe weather event costs, which were amortized by the end of 2024.

Virginia Fuel Expenses

In May 2023, Virginia Power filed its annual fuel factor filing with the Virginia Commission to recover an estimated $2.3 billion in Virginia jurisdictional projected fuel expense for the rate year beginning July 1, 2023 and a projected $1.3 billion under-recovered balance as of June 30, 2023. Virginia Power proposed two alternatives to recover these under-collected fuel costs, including an option based on an anticipated securitization of up to $1.3 billion under-recovered balance as of June 30, 2023 as permitted under legislation enacted in Virginia in April 2023, with such securitization approved by the Virginia Commission in November 2023 and completed by Virginia Power in February 2024. In March 2024, the Virginia Commission approved Virginia Power’s annual fuel factor based on the securitization option, which results in a net decrease in Virginia Power’s fuel revenues for the rate year of approximately $541 million. In addition, the Virginia Commission approved Virginia Power’s proposal to alter the order in which revenue from certain customers who elect to pay market-based rates would be allocated between base rates and fuel, which results in a reduction to fuel revenue of $13 million.

In May 2024, Virginia Power filed its annual fuel factor with the Virginia Commission to recover an estimated $2.2 billion in Virginia jurisdictional projected fuel expenses for the rate year beginning July 1, 2024 and to return an estimated $266 million net over-recovered balance through June 30, 2024. Virginia Power’s proposed fuel rate represents a fuel revenue decrease of $636 million when applied to projected kilowatt-hour sales for the rate year beginning July 1, 2024. In May 2024, the Virginia Commission ordered that Virginia Power’s proposed total fuel factor rate be placed into effect on an interim basis for usage on and after July 1, 2024. In January 2025, the Virginia Commission approved the filing.

Renewable Generation Projects

In October 2023, Virginia Power filed a petition with the Virginia Commission for CPCNs to construct or acquire and operate four utility-scale projects totaling approximately 329 MW of solar generation as part of its efforts to meet the renewable generation development targets under the VCEA. The projects, as of October 2023, are expected to cost approximately $850 million in the aggregate, excluding financing costs, and be placed into service between 2024 and 2026. In March 2024, the Virginia Commission approved the petition.

In October 2024, Virginia Power filed a petition with the Virginia Commission for CPCNs to construct or acquire and operate two utility-scale projects totaling approximately 208 MW of solar generation as part of its efforts to meet the renewable generation development targets under the VCEA. The projects, as of October 2024, are expected to cost approximately $605 million in the aggregate, excluding financing costs, and be placed into service between 2026 and 2028. This matter is pending.

Virginia LNG Storage Facility

In June 2024, Virginia Power filed a petition with the Virginia Commission to amend the CPCNs for Brunswick County and Greensville County to construct and operate an LNG production, storage and regasification facility and related transmission facilities adjacent to Greensville County. When complete, the facility will store the liquefied equivalent of approximately 2.0 bcf and would be able to regasify approximately 25% of its storage capacity per day and liquefy from the pipeline less than 1% of its equivalent storage capacity per day. The facility will serve as a backup fuel source for Brunswick County and Greensville County to support operations and improve system reliability. The facility is expected to cost approximately $550 million, excluding financing costs, and be placed into service by the end of 2027. In February 2025, the Virginia Commission approved the petition.

Riders

Significant riders associated with various Virginia Power projects are as follows:

Rider NameApplication DateApproval DateRate Year BeginningTotal Revenue Requirement (millions)****(1)Increase (Decrease) Over Previous Year (millions)
Rider BW(2)October 2021May 2022September 2023$120$(25)
Rider CCRMarch 2024November 2024December 2024103(91)
Rider CE(3)October 2023March 2024May 202413344
Rider CE(4)October 2024PendingMay 202518249
Rider DIST(5)August 2024PendingJune 2025269N/A
Rider EJanuary 2024September 2024November 202472(37)
Rider EJanuary 2025PendingNovember 202537(35)
Rider GEN(2)June 2024PendingApril 2025438N/A
Rider GENJune 2024PendingApril 2026311(127)
Rider GT(5)August 2023May 2024June 2024145131
Rider GV(2)June 2023February 2024April 20241325
Rider GV(2)June 2023February 2024April 20251353
Rider OSWNovember 2023July 2024September 2024486215
Rider OSW(6)November 2024PendingSeptember 2025640154
Rider RPSDecember 2023(12)August 2024September 2024358262
Rider RPSDecember 2024PendingSeptember 2025609251
Rider SNAOctober 2023June 2024September 20246919
Rider SNA(7)October 2024PendingSeptember 2025207138
Rider T1(8)May 2024July 2024September 20241,170291
Rider U(5)(9)October 2023July 2024August 202415076
DSM Riders(10)December 2023July 2024September 202486(21)
DSM Riders(11)December 2024PendingSeptember 20259711

(1)

In addition, Virginia *Power has various riders associated with other projects with an aggregate total annual revenue requirement of approximately $*18 *million as of December 31, 2024. There are various pending applications associated with such riders, which if approved, would result in a net increase of approximately $*24 million.

(2)

*Rider GEN includes $*348 million in total revenue requirement related to the consolidation of Riders BW, GV and four other riders associated with generation facilities, ceasing the separate collection of rates under these riders effective April 1, 2025 and the extension of existing rates for Rider BW through March 2025. In addition, Virginia Power also requests approval to recover costs associated with the Virginia LNG Storage Facility described above.

(3)

The Virginia Commission approved four solar generation projects and 13 power purchase agreements in addition to previously approved Rider CE projects. In addition, the approved total revenue requirement includes amounts which had previously been collected under a separate rider.

(4)

Associated with two solar generation projects, two small-scale solar projects and 24 power purchase agreements in addition to previously approved Rider CE projects and power purchase agreements.

(5)

*Rider DIST consists of $*103 *million in total revenue requirement for certain previously approved electric distribution grid transformation projects and $*166 million for previously approved phases and proposed phase eight of certain new underground distribution facilities. If approved, would result in the consolidation of Riders GT and U and cease the separate collection of rates under these riders effective June 1, 2025.

(6)

Includes a proposal for Virginia Power to establish a decommissioning trust fund associated with the CVOW Commercial Project. If approved, the applicable amount included within the total revenue requirement would be allocated for such purposes.

(7)

*Virginia Power also requested approval of cost recovery of approximately $*1.7 billion through Rider SNA for the second phase of nuclear life extension program which includes investments for calendar years 2025 through 2027.

(8)

*Consists of $*532 *million for the transmission component of Virginia Power’s base rates and $*638 million for Rider T1.

(9)

*Consists of $*72 *million for previously approved phases and $*78 million for phase seven costs for Rider U. In addition, the Virginia Commission approved Virginia Power’s request to extend existing rates for Rider U through July 2024.

(10)

Associated with an additional three new energy efficiency programs and one new demand response program with a $102 million cost cap, with the ability to exceed the cost cap by no more than 15%.

(11)

Associated with three redesigned energy efficiency programs, one new and two redesigned demand response program and one demand response pilot with a $222 million cost cap, with the ability to exceed the cost cap by no more than 15%.

(12)

Virginia Power amended its application in February 2024.

In June 2024, the Virginia Commission approved Virginia Power’s request, filed in May 2024, to cease Rider RGGI effective July 2024.

Electric Transmission Projects

Significant Virginia Power electric transmission projects approved or applied for are as follows:

Description and Location of ProjectApplication DateApproval DateType of LineMiles of LinesCost Estimate (millions)****(1)
Construct new Germanna substation, transmission line and related projects in Culpeper County, VirginiaNovember 2023August 2024230 kV2$55
Construct Daves Store transmission line extension in Prince William County, VirginiaFebruary 2024October 2024230 kV370
Construct new Aspen and Golden substations, transmission lines and related projects in Loudoun County, VirginiaMarch 2024February 2025500- 230 kV10705
Partial rebuild Fredericksburg-Aquia Harbour transmission lines and related projects in Stafford County and the City of Fredericksburg, VirginiaMarch 2024February 2025230- 115 kV24135
Construct new Apollo-Twin Creek transmission lines, new substations and related projects in Loudoun County, VirginiaMarch 2024February 2025230 kV2285
Rebuild Dooms-Harrisonburg transmission lines and related projects in the Counties of Augusta and Rockingham and the Town of Grottoes, VirginiaApril 2024February 2025230 kV2260
Rebuild and construct new Fentress-Yadkin transmission lines and related projects in the City of Chesapeake, VirginiaJune 2024Pending500 kV14205
Partial rebuild, reconductor and construct new Network Takeoff transmission lines and related projects in the Counties of Fairfax and Loudoun, VirginiaJuly 2024Pending230 kV6170
Rebuild Aquia Harbor-Possum Point transmission lines and related projects in the Counties of Stafford and Prince William and the City of Fredericksburg, VirginiaAugust 2024Pending500- 230 kV32210
Partial rebuild, reconductor and construct new New Post transmission lines and related projects in the Counties of Caroline and Spotsylvania, VirginiaAugust 2024Pending230 kV38120
Construct new Centreport transmission line, substation and related projects in Stafford County, VirginiaSeptember 2024Pending230 kV355
Partial rebuild and construct new Meadowville transmission lines, substations and related projects in Chesterfield County, VirginiaOctober 2024Pending230 kV11190
Construct new Carmel Church and Ruther Glen transmission lines, substations and related projects in Caroline County, VirginiaDecember 2024Pending230 kV785
Construct new Nebula transmission lines, substation and related projects in Mecklenburg County, VirginiaJanuary 2025Pending230 kV15130
Construct new Culpeper Technology transmission lines, substations and related projects in the Counties of Culpeper, Orange and Fauquier and the Town of Culpeper, VirginiaFebruary 2025Pending230 kV13255

(1)

*Represents the cost estimate included in the application except as updated in the approval if applicable. In addition, Virginia Power had various other transmission projects approved during 2024 and early 2025 or applied for and currently pending approval with aggregate cost estimates of approximately $*145 *million and $*65 million, respectively.

In November 2013, the Virginia Commission issued an order granting Virginia Power a CPCN to construct approximately 7 miles of new overhead 500 kV transmission line from the existing Surry switching station in Surry County to a new Skiffes Creek switching

station in James City County, and approximately 20 miles of new 230 kV transmission line in James City County, York County and the City of Newport News from the proposed new Skiffes Creek switching station to Virginia Power’s existing Whealton substation in the City of Hampton. In February 2019, the transmission line project was placed into service. In March 2019, the U.S. Court of Appeals for the D.C. Circuit issued an order vacating the permit from the U.S. Army Corps of Engineers issued in July 2017 and ordered the U.S. Army Corps of Engineers to do a full environmental impact study of the project. In April 2019, Virginia Power and the U.S. Army Corps of Engineers filed petitions for rehearing with the U.S. Court of Appeals for the D.C. Circuit, asking that the permit from the U.S. Army Corps of Engineers remain in effect while an environmental impact study is performed. In May 2019, the U.S. Court of Appeals for the D.C. Circuit denied the request for rehearing and ordered the U.S. District Court for the D.C. Circuit to consider and issue a ruling on whether the permit should be vacated during the U.S. Army Corps of Engineers’ preparation of an environmental impact statement. In November 2019, the U.S. District Court for the D.C. Circuit issued an order allowing the permit to remain in effect while an environmental impact statement is prepared. In November 2020, the U.S. Army Corps of Engineers issued a draft environmental impact statement noting there is no better alternative. This matter is pending.

Virginia Regulation – Key Developments Affecting 2022

Virginia Fuel Expenses

In May 2022, Virginia Power filed its annual fuel factor filing with the Virginia Commission to recover an estimated $2.3 billion in Virginia jurisdictional projected fuel expense for the rate year beginning July 1, 2022 and a projected $1.0 billion under-recovered balance as of June 30, 2022. Virginia Power’s proposed fuel rate represents a fuel revenue increase of $1.8 billion when applied to projected kilowatt-hour sales for that period. Virginia Power also proposed alternatives to recover this under-collected balance over a two- or three-year period. Under these alternatives, Virginia Power’s fuel revenues for the rate year would increase by $1.3 billion or $1.2 billion, respectively. In addition, Virginia Power proposed a change in the timing of fuel cost recovery for certain customers who elect market-based rates that would consider those customers’ portion of the projected under-recovered balance to have been recovered as of June 30, 2022. In July 2022, Virginia Power, the Virginia Commission staff and another party filed a comprehensive settlement agreement with the Virginia Commission for approval. The comprehensive settlement agreement provides for the collection of the requested under-recovered projected fuel expense over a three-year period beginning July 1, 2022 and that Virginia Power will exclude from recovery through base rates one half of the related financing costs over the three-year period. In addition, the proposed settlement agreement affirmed Virginia Power’s proposal regarding fuel cost recovery for market-based rate customers. As a result, Virginia Power recorded a $191 million ($142 million after-tax) charge in the second quarter of 2022 within impairment of assets and other charges in its Consolidated Statement of Income (reflected in the Corporate and Other segment). In September 2022, the Virginia Commission approved the comprehensive settlement agreement.

Rider RGGI

In May 2022, Virginia Power filed a petition with the Virginia Commission requesting suspension of Rider RGGI approved in August 2021. Virginia Power also requested that RGGI compliance costs incurred and unrecovered through July 2022 be recovered through existing base rates in effect during the period incurred. The Virginia Commission approved the request in June 2022. In the second quarter of 2022, Virginia Power recorded a charge of $180 million ($134 million after-tax) in impairment of assets and other charges (reflected in the Corporate and Other segment) for the amount deemed recovered through base rates through June 30, 2022, including the impact of certain non-jurisdictional customers which follow Virginia Power’s jurisdictional rate methodology. Virginia Power recorded $33 million ($25 million after-tax) in depreciation and amortization in the third quarter of 2022.

North Carolina Regulation

Virginia Power Base Rate Case

In March 2024, Virginia Power filed its base rate case and schedules with the North Carolina Commission. Virginia Power proposed a non-fuel, base rate increase of $57 million effective November 1, 2024 on an interim basis subject to refund, with any permanent rates ordered by the North Carolina Commission effective February 1, 2025. The base rate increase was proposed to recover the significant investments in generation, transmission and distribution infrastructure for the benefit of North Carolina customers. Virginia Power presented an earned return of 5.01% based upon a fully-adjusted test period, compared to its authorized 9.75% return, and proposed a 10.60% ROE.

In October 2024, Virginia Power, the North Carolina public staff and other parties of record filed a settlement agreement with the North Carolina Commission for approval. The settlement agreement provides for a non-fuel, base rate increase of $37 million effective November 1, 2024 on an interim basis subject to refund, with any permanent rates ordered by the North Carolina Commission effective February 1, 2025, and an authorized ROE of 9.95%. In addition, the settlement agreement provides that Virginia Power may file with the North Carolina Commission an application for an annual rider to seek recovery of incurred North Carolina jurisdictional CCR expenses, with the first such rider, if approved by the North Carolina Commission, covering costs for the period July 1, 2024 through December 31, 2024. In January 2025, the North Carolina Commission approved the settlement agreement.

In February 2025, the North Carolina Commission approved Virginia Power’s request to recover $6 million in CCR expenses through a CCR rider on an interim basis, with rates effective March 2025.

Virginia Power Fuel Filing

In August 2024, Virginia Power submitted its annual filing to the North Carolina Commission to adjust the fuel component of its electric rates. As subsequently updated in October 2024, Virginia Power proposed a total $107 million decrease to the fuel component of its electric rates for the rate year beginning February 1, 2025. In addition, Virginia Power proposed the implementation of a three-month decrement rider effective November 1, 2024 to reduce the over-recovery of the fuel component of its electric rates during the current rate year. In January 2025, the North Carolina Commission approved the filing.

PSNC Customer Usage Tracker

PSNC utilizes a customer usage tracker, a decoupling mechanism, which allows it to adjust its base rates semi-annually for residential and commercial customers based on average per customer consumption. In March 2024, PSNC submitted a filing with the North Carolina Commission for a $31 million decrease relating to the customer usage tracker. The North Carolina Commission approved the filing in March 2024 with rates effective April 2024.

South Carolina Regulation

Electric Base Rate Case

In March 2024, DESC filed its retail electric base rate case and schedules with the South Carolina Commission. DESC proposed a non-fuel, base rate increase of $295 million, partially offset by a net decrease in storm damage and DSM components of $4 million. If approved, the overall proposed rate increase of $291 million, or 12.59%, would be effective on and after the first billing cycle of September 2024. The base rate increase was proposed to recover the significant investment in assets and operating resources required to serve an expanding customer base, maintain the safety, reliability and efficiency of DESC’s system and meet increasingly stringent reliability, security and environmental requirements for the benefit of South Carolina customers. DESC presented an earned ROE of 4.32% based upon a fully-adjusted test period. The proposed rates would provide for an earned ROE of 10.60% compared to the currently authorized ROE of 9.50%.

In July 2024, DESC, the South Carolina Office of Regulatory Staff and other parties of record filed a comprehensive settlement agreement with the South Carolina Commission for approval. The comprehensive settlement agreement provides for a non-fuel, base rate increase of $219 million prior to the effect of South Carolina Commission-ordered DSM reductions commencing with service rendered on September 1, 2024 and an authorized ROE of 9.94%. In addition, the comprehensive settlement agreement includes that DESC would provide a one-time bill credit in 2024 of approximately $7 million primarily to residential customers. In August 2024, the South Carolina Commission voted to approve the settlement agreement.

In connection with this matter, in the third quarter of 2024 Dominion Energy recorded a charge of $58 million ($44 million after tax) (reflected within the Corporate and Other segment), including $50 million to write down certain materials and supplies inventory presented within impairment of assets and other charges.

Cost of Fuel

DESC’s retail electric rates include a cost of fuel component approved by the South Carolina Commission which may be adjusted periodically to reflect changes in the price of fuel purchased by DESC. In February 2024, DESC filed with the South Carolina Commission a proposal to decrease the total fuel cost component of retail electric rates. DESC’s proposed adjustment is designed to recover DESC’s current base fuel costs, including its existing under-collected balance, over the 12-month period beginning with the first billing cycle of May 2024. In addition, DESC proposed an increase to its variable environmental and avoided capacity cost component. The net effect is a proposed annual decrease of $315 million. In March 2024, DESC, the South Carolina Office of Regulatory Staff and another party of record filed a settlement agreement with the South Carolina Commission for approval to make certain adjustments to the February 2024 filing that would result in a net annual decrease of $316 million. In April 2024, the South Carolina Commission voted to approve the settlement agreement, with rates effective May 2024.

In February 2025, DESC filed with the South Carolina Commission a proposal to increase the total fuel cost component of retail electric rates. DESC’s proposed adjustment is designed to recover DESC’s current base fuel costs, including its existing under-collected balance, over the 12-month period beginning with the first billing cycle of May 2025. In addition, DESC proposed an increase to its variable environmental and avoided capacity cost component. The net effect is a proposed annual increase of $154 million. This matter is pending.

Electric DSM Programs

DESC has approval for a DSM rider through which it recovers expenditures related to its electric DSM programs. In January 2024, DESC filed an application with the South Carolina Commission seeking approval to recover $47 million of costs and net lost revenues associated with these programs, along with an incentive to invest in such programs. DESC requested that rates be effective with the

first billing cycle of May 2024. In April 2024, the South Carolina Commission approved the request, effective with the first billing cycle of May 2024.

In January 2025, DESC filed an application with the South Carolina Commission seeking approval to recover $46 million of costs and net lost revenues associated with these programs, along with an incentive to invest in such programs. DESC requested that rates be effective with the first billing cycle of May 2025. This matter is pending.

Electric - Transmission Projects

In March 2024, DESC filed an application with the South Carolina Commission requesting approval of a CPCN to construct and operate the Church Creek - Charleston Transmission Line, comprised of a 7-mile 230 kV transmission line and associated facilities in Charleston County, South Carolina with an estimated total project cost of $40 million. In July 2024, the South Carolina Commission approved the application.

In December 2024, DESC filed an application with the South Carolina Commission requesting approval of a CPCN to construct and operate the Ritter - Yemassee Transmission Line #2, comprised of a 17-mile 230 kV transmission line and associated facilities in Colleton and Hampton Counties, South Carolina with an estimated total project cost of $55 million. This matter is pending.

NOTE 14. ASSET RETIREMENT OBLIGATIONS

AROs represent obligations that result from laws, statutes, contracts and regulations related to the eventual retirement of certain of the Companies’ long-lived assets. The Companies’ AROs are primarily associated with the decommissioning of their nuclear generation facilities, ash pond and landfill closures and CCR remediation.

The Companies have also identified, but not recognized, AROs related to the retirement of certain electric transmission and distribution assets located on property with easements, rights of way, franchises and lease agreements, Virginia Power’s hydroelectric generation facilities and the abatement of certain asbestos not expected to be disturbed in the Companies’ generation facilities. The Companies currently do not have sufficient information to estimate a reasonable range of expected retirement dates for any of these assets since the economic lives of these assets can be extended indefinitely through regular repair and maintenance and they currently have no plans to retire or dispose of any of these assets. As a result, a settlement date is not determinable for these assets and AROs for these assets will not be reflected in the Consolidated Financial Statements until sufficient information becomes available to determine a reasonable estimate of the fair value of the activities to be performed. The Companies continue to monitor operational and strategic developments to identify if sufficient information exists to reasonably estimate a retirement date for these assets.

The changes to AROs during 2023 and 2024 were as follows:

(millions)Dominion EnergyVirginia Power
AROs at December 31, 2022$5,427$4,093
Obligations incurred during the period169
Obligations settled during the period(193)(169)
Revisions in estimated cash flows(1)603564
Accretion222156
AROs at December 31, 2023(2)$6,075$4,653
Obligations incurred during the period(3)1,126469
Obligations settled during the period**(**347)**(**259)
Revisions in estimated cash flows(4)300342
Accretion272192
AROs at December 31, 2024(2)$7,426$5,397

(1)

*Primarily reflects revisions to future ash pond and landfill closure costs at certain utility generation facilities at Virginia Power as discussed below. In addition, Dominion Energy recorded a $*48 *million increase to its AROs to reflect a revision in the estimated cash flows following the approval of closure plans for a DESC generation facility previously taken out of service. Dominion Energy also recorded a decrease of $*125 million to its AROs due to a revision in the timing of expected cash flows associated with the expected approval of a 20-year *useful life extension of Millstone Units 2 and 3. Concurrently, Dominion Energy reevaluated its estimated cash flows associated with Millstone Unit 1, which resulted in an increase to its AROs of $*83 *million. As a result, Dominion Energy recorded a charge of $*83 *million ($*60 million after-tax) within impairment of assets and other charges in its Consolidated Statements of Income (reflected in the Corporate and Other segment).

(2)

*Includes $*434 *million and $*352 million reported in other current liabilities for Dominion Energy at December 31, 2023 and 2024, respectively.

(3)

Primarily reflects AROs related to CCR remediation as discussed below.

(4)

*Primarily reflects revisions for increased costs related to the completion of nuclear decommissioning cost studies for Millstone, Surry and North Anna inclusive of a charge of $*122 *million ($*89 million after-tax) within impairment of assets and other charges in Dominion Energy’s Consolidated Statements of Income (reflected in the Corporate and Other segment). In addition, there were downward revisions for CCR remediation costs at Dominion Energy and future ash pond and landfill closure costs of certain electric generation facilities at Virginia Power.

Dominion Energy’s AROs at December 31, 2024 and 2023, include $2.6 billion and $1.9 billion, respectively, with $1.4 billion and $1.0 billion recorded by Virginia Power, related to the future decommissioning of their nuclear facilities. The Companies have established trusts dedicated to funding the future decommissioning activities. At December 31, 2024 and 2023, the aggregate fair value of Dominion Energy’s trusts, consisting primarily of equity and debt securities, totaled $8.1 billion and $6.9 billion, respectively. At December 31, 2024 and 2023, the aggregate fair value of Virginia Power’s trusts, consisting primarily of debt and equity securities, totaled $4.3 billion and $3.7 billion, respectively.

AROs at December 31, 2024 also include $828 million, with $404 million recorded at Virginia Power, related to Dominion Energy’s CCR remediation activities. In May 2024, the EPA released a final rule to regulate inactive surface impoundments located at retired generating stations that contained CCR and liquids after October 2015, and certain other inactive or previously closed surface impoundments, landfills or other areas that contain accumulations of CCR. Dominion Energy believes that it may have inactive or closed units or areas that could be subject to the final rule at up to 19 different stations, including 12 at Virginia Power. In connection with this rule, in 2024, Dominion Energy and Virginia Power recorded an increase to their AROs of $1.1 billion and $420 million, respectively, with a corresponding increase of $536 million and $234 million, respectively, to regulatory assets for amounts recoverable through retail electric rates, including riders, for electric generation stations that have been retired, $505 million and $152 million, respectively, to property, plant and equipment for amounts recoverable for electric generation stations that are currently in service and $34 million to other deferred charges and other assets for amounts associated with nonjurisdictional customers at Virginia Power. Subsequently in 2024, Dominion Energy recorded an adjustment to decrease the ARO and related property, plant and equipment by $215 million to reflect updated information concerning one facility. The actual AROs related to CCRs may vary substantially from the estimates used to record the obligation.

In addition, AROs at December 31, 2024 and 2023 include $3.2 billion and $3.4 billion, respectively, related to Virginia Power’s future ash pond and landfill closure costs. In 2024, Virginia Power revised its estimated cash flow projections associated with ash pond and landfill closure costs at certain of its utility generation facilities attributable to changes in the scheduling of certain projects and as a result recorded a decrease to its AROs of $64 million with a corresponding decrease of $56 million to regulatory assets for amounts recoverable through riders and $8 million to other deferred charges and other assets for amounts associated with nonjurisdictional customers. In 2023, Virginia Power revised its estimated cash flow projections associated with ash pond and landfill closure costs at certain of its utility generation facilities in connection with obtaining replacement contracts for certain services following the bankruptcy of a previous vendor along with general updates of the contractual rates. As a result, Virginia Power recorded an increase to its AROs of $552 million with a corresponding increase of $471 million to regulatory assets for amounts recoverable through riders and $81 million to other deferred charges and other assets for amounts associated with nonjurisdictional customers. Regulatory mechanisms, primarily associated with legislation enacted in Virginia in 2019, provide for recovery of costs to be incurred. See Note 12 for additional information.

NOTE 15. LEASES

At December 31, 2024 and 2023, the Companies had the following lease assets and liabilities recorded in the Consolidated Balance Sheets:

Dominion EnergyVirginia Power
At December 31,2024202320242023
(millions)
Lease assets:
Operating lease assets(1)$588$578$410$393
Finance lease assets(2)267258146104
Total lease assets$855$836$556$497
Lease liabilities:
Operating lease liabilities(3)$36$36$22$20
Finance lease liabilities(4)62603531
Total lease liabilities - current98965751
Operating lease liabilities (5)644627399377
Finance lease liabilities(6)21420311072
Total lease liabilities - noncurrent858830509449
Total lease liabilities$956$926$566$500

(1)

*Dominion Energy includes $*588 million and $561 million at December 31, 2024 and 2023, respectively, in other deferred charges and other assets, with the remaining balance at December 31, 2023 in assets held for sale, in its Consolidated Balance Sheets. Virginia Power’s balances are included in other deferred charges and other assets in its Consolidated Balance Sheets.

(2)

*Dominion Energy includes $*267 million and $244 million at December 31, 2024 and 2023, respectively, in property, plant and equipment *in its Consolidated Balance Sheets, net of $*199 *million and $142 million at December 31, 2024 and 2023, respectively, of accumulated amortization, with the remaining balance at December 31, 2023 in assets held for sale. Virginia Power’s balances are included in property, plant and equipment in its Consolidated Balance Sheets, net of $*88 million and $51 million at December 31, 2024 and 2023, respectively, of accumulated amortization.

(3)

Dominion Energy includes $36 million and $32 million at December 31, 2024 and 2023, respectively, in other current liabilities, with the remaining balance at December 31, 2023 in liabilities held for sale, in its Consolidated Balance Sheets. Virginia Power’s balances are in other current liabilities in its Consolidated Balance Sheets.

(4)

Dominion Energy includes $62 million and $57 million at December 31, 2024 and 2023, respectively, in securities due within one year, with the remaining balance at December 31, 2023 in liabilities held for sale, in its Consolidated Balance Sheets. Virginia Power’s balances are included in securities due within one year in its Consolidated Balance Sheets.

(5)

*Dominion Energy includes $*644 million and $610 million at December 31, 2024 and 2023, respectively, in other deferred credits and other liabilities, with the remaining balance at December 31, 2023 in liabilities held for sale, in its Consolidated Balance Sheets. Virginia Power’s balances are included in other deferred credits and other liabilities in its Consolidated Balance Sheets.

(6)

Dominion Energy includes $214 million and $192 million at December 31, 2024 and 2023, respectively, in other long-term debt, with the remaining balance in liabilities held for sale, in its Consolidated Balance Sheets. Virginia Power’s balances are included in other long-term debt in its Consolidated Balance Sheets.

In addition to the amounts disclosed above, Dominion Energy’s Consolidated Balance Sheets at both December 31, 2024 and 2023 includes property, plant and equipment of $382 million related to facilities subject to power purchase agreements under which Dominion Energy is the lessor. There was $38 million and $28 million of accumulated depreciation related to these facilities recorded in Dominion Energy’s Consolidated Balance Sheets at December 31, 2024 and 2023, respectively.

For the years ended December 31, 2024, 2023 and 2022, total lease cost associated with the Companies’ leasing arrangements consisted of the following:

Dominion EnergyVirginia Power
Year ended December 31,202420232022202420232022
(millions)
Finance lease cost:
Amortization(1)$54$50$41$24$24$15
Interest(2)14133543
Operating lease cost(3)817053604332
Short-term lease cost(4)223231162321
Variable lease cost664221
Total lease cost$177$171$132$107$96$72

(1)

Dominion Energy includes $**— *million, $*3 million and $3 million for the years ended December 31, 2024, 2023 and 2022, respectively, reflected in discontinued operations in its Consolidated Statements of Income.

(2)

Dominion Energy includes $**— *million, $*1 million and $1 million for the years ended December 31, 2024, 2023 and 2022, respectively, reflected in discontinued operations in its Consolidated Statements of Income.

(3)

Dominion Energy includes $**— *million, $*5 million and $6 million for the years ended December 31, 2024, 2023 and 2022, respectively, reflected in discontinued operations in its Consolidated Statements of Income.

(4)

Dominion Energy includes $**— *million, $*2 million and $2 million for the years ended December 31, 2024, 2023 and 2022, respectively, reflected in discontinued operations in its Consolidated Statements of Income.

For the years ended December 31, 2024, 2023 and 2022, cash paid for amounts included in the measurement of the lease liabilities consisted of the following amounts, included in the Companies’ Consolidated Statements of Cash Flows:

Dominion EnergyVirginia Power
Year ended December 31,202420232022202420232022
(millions)
Operating cash flows for finance leases$14$13$3$5$4$3
Operating cash flows for operating leases10610582746450
Financing cash flows for finance leases504732231912

In addition to the amounts disclosed above, Dominion Energy’s Consolidated Statements of Income for the years ended December 31, 2024, 2023 and 2022, include $18 million, $21 million and $16 million, respectively, of rental revenue, included in operating revenue and $10 million, $10 million and $34 million, respectively, of depreciation expense, included in depreciation and amortization, related to facilities subject to power purchase agreements under which Dominion Energy is the lessor.

In April 2024, Dominion Energy agreed to pay $47 million in connection with a settlement of an agreement related to the offshore wind installation vessel under development and recorded a charge of $47 million ($35 million after-tax) in the first quarter of 2024 (reflected in the Corporate and Other segment) within impairment of assets and other charges in its Consolidated Statements of Income.

At December 31, 2024 and 2023, the weighted-average remaining lease term and weighted discount rate for the Companies’ finance and operating leases were as follows:

Dominion EnergyVirginia Power
December 31,2024202320242023
Weighted-average remaining lease term - finance leases5 years5 years5 years5 years
Weighted-average remaining lease term - operating leases31 years31 years32 years33 years
Weighted-average discount rate - finance leases5.61%7.14%6.71%7.28%
Weighted-average discount rate - operating leases4.42%4.11%5.13%4.18%

The Companies’ lease liabilities have the following maturities:

Maturity of Lease LiabilitiesDominion EnergyVirginia Power
(millions)OperatingFinanceOperatingFinance
2025$41$78$25$43
202639692336
202736642232
202835562126
202934402018
After 20291,1311774017
Total undiscounted lease payments1,316324851172
Present value adjustment(636)(48)(430)(27)
Present value of lease liabilities$680$276$421$145

Offshore Wind Vessel Leasing Arrangement

In December 2020, Dominion Energy signed an agreement (most recently amended in August 2024) with a lessor to complete construction of and lease a Jones Act compliant offshore wind installation vessel. This vessel is designed to handle current turbine technologies as well as next generation turbines. The lessor is providing equity and has obtained financing commitments from debt investors, totaling $715 million, to fund the estimated project costs. The completed project is expected to be delivered to the CVOW Commercial Project in the third quarter of 2025. Dominion Energy has been appointed to act as the construction agent for the lessor, during which time Dominion Energy will request cash draws from the lessor and debt investors to fund all project costs, which totaled $598 million as of December 31, 2024. If the project is terminated under certain events of default, Dominion Energy could be required to pay up to 100% of the then funded amount.

The initial lease term will commence once construction is substantially complete and the vessel is delivered and will mature after five years. At the end of the initial lease term, Dominion Energy can (i) extend the term of the lease for an additional term, subject to the approval of the participants, at current market terms, (ii) purchase the property for an amount equal to the outstanding project costs, or (iii) subject to certain terms and conditions, sell the property on behalf of the lessor to a third party using commercially reasonable efforts to obtain the highest cash purchase price for the property. If the project is sold and the proceeds from the sale are insufficient to repay the investors for the outstanding project costs, Dominion Energy may be required to make a payment to the lessor for the difference between the outstanding project costs and sale proceeds. Dominion Energy is not considered the owner during construction for financial accounting purposes and, therefore, will not reflect the construction activity in its consolidated financial statements. Dominion Energy expects to recognize a right-of-use asset and a corresponding finance lease liability at the commencement of the

lease term. Dominion Energy will be considered the owner of the leased property for tax purposes, and as a result, will be entitled to tax deductions for depreciation and interest expense.

NOTE 16. VARIABLE INTEREST ENTITIES

The primary beneficiary of a VIE is required to consolidate the VIE and to disclose certain information about its significant variable interests in the VIE. The primary beneficiary of a VIE is the entity that has both 1) the power to direct the activities that most significantly impact the entity’s economic performance and 2) the obligation to absorb losses or receive benefits from the entity that could potentially be significant to the VIE.

Dominion Energy

At December 31, 2024, Dominion Energy owns a 53% membership interest in Atlantic Coast Pipeline. Dominion Energy concluded that Atlantic Coast Pipeline is a VIE because it has insufficient equity to finance its activities without additional subordinated financial support. Dominion Energy has concluded that it is not the primary beneficiary of Atlantic Coast Pipeline as it does not have the power to direct the activities of Atlantic Coast Pipeline that most significantly impact its economic performance, as the power to direct is shared with Duke Energy. Dominion Energy is obligated to provide capital contributions based on its ownership percentage. Dominion Energy’s maximum exposure to loss is limited to any future investment. See Note 9 for additional details regarding the nature of this entity.

Dominion Energy and Virginia Power

The Companies’ nuclear decommissioning trust funds and Dominion Energy’s rabbi trusts hold investments in limited partnerships or similar type entities, as discussed in Note 9. Dominion Energy and Virginia Power concluded that these partnership investments are VIEs due to the limited partners lacking the characteristics of a controlling financial interest. Dominion Energy and Virginia Power have concluded neither is the primary beneficiary as they do not have the power to direct the activities that most significantly impact these VIEs’ economic performance. Dominion Energy and Virginia Power are obligated to provide capital contributions to the partnerships as required by each partnership agreement based on their ownership percentages. Dominion Energy and Virginia Power’s maximum exposure to loss is limited to their current and future investments.

Virginia Power

Virginia Power purchased shared services from DES, an affiliated VIE, of $494 million, $463 million and $396 million for the years ended December 31, 2024, 2023 and 2022, respectively. Virginia Power’s Consolidated Balance Sheets included amounts due to DES of $38 million and $32 million at December 31, 2024 and 2023, respectively, recorded in payables to affiliates in the Consolidated Balance Sheets. Virginia Power determined that it is not the primary beneficiary of DES as it does not have power to direct the activities that most significantly impact its economic performance as well as the obligation to absorb losses and benefits which could be significant to it. DES provides accounting, legal, finance and certain administrative and technical services to all Dominion Energy subsidiaries, including Virginia Power. Virginia Power has no obligation to absorb more than its allocated share of DES costs.

As described in Note 18, Virginia Power formed VPFS in October 2023, a wholly-owned special purpose subsidiary which is considered to be a VIE, for the sole purpose of securitizing certain of Virginia Power’s under-recovered deferred fuel balance through the issuance of senior secured deferred fuel cost bonds. The Companies’ Consolidated Balance Sheets at December 31, 2024 included balances for VPFS in prepayments (less than $1 million), regulatory assets-current ($124 million), other current assets ($41 million), regulatory assets-noncurrent ($1.0 billion), securities due within one year ($163 million), accrued interest, payroll and taxes ($10 million) and securitization bonds ($1.1 billion).

As described in Note 10, in October 2024 Virginia Power completed the sale of a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak through the sale of an interest in OSWP, which is considered to be a VIE. The Companies’ Consolidated Balance Sheets at December 31, 2024 included balances for OSWP in cash and cash equivalents ($70 million), customer receivables (less than $1 million), prepayments ($10 million), regulatory assets-current ($6 million), property, plant and equipment ($5.8 billion), regulatory assets-noncurrent ($52 million), other deferred charges and other assets (less than $1 million), accrued interest, payroll and taxes (less than $1 million) and asset retirement obligations ($38 million).

NOTE 17. SHORT-TERM DEBT AND CREDIT AGREEMENTS

The Companies use short-term debt to fund working capital requirements and as a bridge to long-term debt financings. The levels of borrowing may vary significantly during the course of the year, depending upon the timing and amount of cash requirements not satisfied by cash from operations. In addition, Dominion Energy utilizes cash and letters of credit to fund collateral requirements. Collateral requirements are impacted by commodity prices, hedging levels, Dominion Energy’s credit ratings and the credit quality of its counterparties.

Dominion Energy

Dominion Energy’s short-term financing is supported by its $6.0 billion joint revolving credit facility that provides for a discount in the pricing of certain annual fees and amounts borrowed by Dominion Energy under the facility if Dominion Energy achieves certain annual renewable electric generation and diversity and inclusion objectives. Commercial paper and letters of credit outstanding, as well as capacity available under the credit facility were as follows:

Facility LimitOutstanding Commercial Paper(1)Outstanding Letters of CreditFacility Capacity Available
(millions)
At December 31, 2024
Joint revolving credit facility(2)(3)$6,000$2,061$10$3,929
At December 31, 2023
Joint revolving credit facility(2)$6,000$3,547$16$2,437

(1)

The weighted-average interest rate of the outstanding commercial paper supported by Dominion Energy’s credit facility was 4.74*% and* 5.69*% at December 31,* 2024 and 2023*, respectively.*

(2)

*This credit facility matures in June 2026, with the potential to be extended by the borrowers to June 2028, and can be used by the borrowers under the credit facility to support bank borrowings and the issuance of commercial paper, as well as to support up to a combined $*2.0 billion of letters of credit.

(3)

In May 2024, the joint revolving credit facility was amended to remove Questar Gas as a co-borrower.

DESC’s short-term financings are supported through its access as a co-borrower to the joint revolving credit facility discussed above with the Companies. At December 31, 2024, the sub-limit for DESC was $500 million.

In March 2023, FERC granted DESC authority through March 2025 to issue short-term indebtedness (pursuant to Section 204 of the Federal Power Act) in amounts not to exceed $2.2 billion outstanding with maturity dates of one year or less. In addition, in March 2023, FERC granted GENCO authority through March 2025 to issue short-term indebtedness not to exceed $200 million outstanding with maturity dates of one year or less. In January 2025, DESC and GENCO applied to FERC for a two-year short-term borrowing authorization in amounts not to exceed $1.8 billion and $300 million, respectively. The applications are pending.

In addition to the credit facility mentioned above, Dominion Energy had the following credit facilities and agreements:

A credit facility which allowed it to issue up to approximately $30 million in letters of credit, which matured in June 2024. At December 31, 2023, Dominion Energy had $25 million in letters of credit outstanding under this facility.

An agreement entered into with a financial institution in March 2023, which it expects to allow it to issue up to $100 million in letters of credit. At December 31, 2024 and 2023, $48 million and $54 million in letters of credit were issued and outstanding under this agreement, respectively.

An agreement entered into with a financial institution in June 2024, subsequently amended in January 2025, which it expects to allow it to issue up to a combined $275 million in letters of credit at either Dominion Energy or Virginia Power. At December 31, 2024, Dominion Energy had $88 million in letters of credit issued and outstanding under this agreement, including $77 million for Virginia Power.

An agreement entered into with a financial institution in January 2025, which it expects to allow it to issue up to a combined $150 million in letters of credit, with $50 million available to Dominion Energy and $100 million available to Virginia Power. Through February 2025, Virginia Power had issued $50 million in letters of credit.

Dominion Energy has an effective shelf registration statement with the SEC for the sale of up to $3.0 billion of variable denomination floating rate demand notes, called Dominion Energy Reliability InvestmentSM. The registration limits the principal amount that may be outstanding at any one time to $1.0 billion. The notes are offered on a continuous basis and bear interest at a floating rate per annum determined by the Dominion Energy Reliability Investment Committee, or its designee, on a weekly basis. The notes have no stated

maturity date, are non-transferable and may be redeemed in whole or in part by Dominion Energy or at the investor’s option at any time. At December 31, 2024 and 2023, Dominion Energy’s Consolidated Balance Sheets include $439 million and $409 million, respectively, presented within short-term debt with weighted-average interest rates of 4.50% and 5.50%, respectively. The proceeds are used for general corporate purposes and to repay debt.

In January 2023, Dominion Energy entered into a $2.5 billion 364-day term loan facility which bore interest at a variable rate and was scheduled to mature in January 2024 with the proceeds to be used to repay existing long-term debt and short-term debt upon maturity and for other general corporate purposes. Concurrently, Dominion Energy borrowed an initial $1.0 billion with the proceeds used to repay long-term debt. In February and March 2023, Dominion Energy borrowed $500 million and $1.0 billion, respectively, with the proceeds used for general corporate purposes and to repay long-term debt. At December 31, 2023, Dominion Energy’s Consolidated Balance Sheet included $2.5 billion with respect to such facility presented within securities due within one year. In January 2024, the facility was amended to mature July 2024. The amended agreement contained certain mandatory early repayment provisions, including that any after-tax proceeds in connection with the East Ohio, Questar Gas and PSNC Transactions be applied to any outstanding borrowings under the facility. In March 2024, Dominion Energy repaid the full $2.5 billion outstanding using after-tax proceeds received in connection with the East Ohio Transaction. The maximum allowed total debt to total capital ratio under the facility was consistent with such allowed ratio under Dominion Energy’s joint revolving credit facility.

In July 2023, Dominion Energy entered into two $600 million 364-day term loan facilities which bore interest at a variable rate and were scheduled to mature in July 2024 with the proceeds to be used to repay existing long-term debt and short-term debt upon maturity and for other general corporate purposes. Subsequently in July 2023, Dominion Energy borrowed an initial $750 million in the aggregate under these facilities with the proceeds used to repay short-term debt and for general corporate purposes. Dominion Energy was permitted to make up to three additional borrowings under each agreement through November 2023, at which point any unused capacity would cease to be available to Dominion Energy. The agreements contained certain mandatory early repayment provisions, including that any after-tax proceeds in connection with a sale of Dominion Energy’s noncontrolling interest in Cove Point, following the repayment of DECP Holding’s term loan secured by its noncontrolling interest in Cove Point, be applied to any outstanding borrowings under the facilities. In September 2023, Dominion Energy repaid the $750 million borrowing with after-tax proceeds from the sale of Dominion Energy’s noncontrolling interest in Cove Point, as discussed in Note 9. Subsequently in September 2023, Dominion Energy borrowed $225 million in the aggregate under these facilities with the proceeds used to repay short-term debt and for general corporate purposes. In October 2023, Dominion Energy repaid the $225 million borrowing and terminated the facilities along with any remaining unused commitments.

In October 2023, Dominion Energy entered into a $2.25 billion 364-day term loan facility which bore interest at a variable rate with the proceeds to be used for general corporate purposes, which was scheduled to mature in October 2024. Concurrently, Dominion Energy borrowed an initial $1.0 billion with the proceeds used for general corporate purposes, including to repay short-term and long-term debt. In November and December 2023, Dominion Energy borrowed $500 million and $750 million, respectively, with the proceeds used for general corporate purposes. Dominion Energy also had the ability through August 2024 to request an increase in the amount of this facility by up to an additional $500 million. The agreement contained certain mandatory early repayment provisions, including that any after-tax proceeds in connection with the East Ohio, PSNC and Questar Gas Transactions, following the repayment of the 364-day term loan facility entered into in January 2023, be applied to any outstanding borrowings under this facility. At December 31, 2023, Dominion Energy’s Consolidated Balance Sheet included $2.25 billion with respect to such facility presented within securities due within one year. In March 2024, Dominion Energy repaid $1.8 billion using after-tax proceeds received in connection with the East Ohio Transaction. Subsequently in March 2024, Dominion Energy requested and received a $500 million increase to the amount of the facility and concurrently borrowed $500 million with the proceeds used for general corporate purposes. In May 2024, Dominion Energy repaid the full $976 million outstanding under the facility, using after-tax proceeds received in connection with the Questar Gas Transaction. The maximum allowed total debt to total capital ratio under this facility was consistent with such allowed ratio under Dominion Energy’s joint revolving credit facility.

Virginia Power

Virginia Power’s short-term financing is supported through its access as co-borrower to Dominion Energy’s $6.0 billion joint revolving credit facility. The credit facility can be used for working capital, as support for the combined commercial paper programs of the borrowers under the credit facility and for other general corporate purposes.

Virginia Power’s share of commercial paper and letters of credit outstanding under the joint revolving credit facility with Dominion Energy, Questar Gas (through May 2024) and DESC were as follows:

Facility LimitOutstanding Commercial Paper(1)Outstanding Letters of Credit
(millions)
At December 31, 2024
Joint revolving credit facility(2)(3)$6,000$950$10
At December 31, 2023
Joint revolving credit facility(2)$6,000$455$10

(1)

The weighted-average interest rates of the outstanding commercial paper supported by the credit facility was 4.73*% and* 5.65*% at December 31,* 2024 and 2023*, respectively.*

(2)

*The full amount of the facility is available to Virginia Power, less any amounts outstanding to co-borrowers Dominion Energy and DESC. The sub-limit for Virginia Power is set pursuant to the terms of the facility but can be changed at the option of the borrowers multiple times per year. At December 31, 2024, the sub-limit for Virginia Power was $*1.75 *billion. If Virginia Power has liquidity needs in excess of its sub-limit, the sub-limit may be changed or such needs may be satisfied through short-term intercompany borrowings from Dominion Energy. This credit facility matures in June 2026, with the potential to be extended by the borrowers to June 2028. The credit facility can be used to support bank borrowings and the issuance of commercial paper, as well as to support up to $*2.0 billion (or the sub-limit, whichever is less) of letters of credit.

(3)

In May 2024, the joint revolving credit facility was amended to remove Questar Gas as a co-borrower*.*

In addition to the credit facility mentioned above, Virginia Power had the following credit facilities and agreements:

A credit facility entered into in January 2023 which allowed it to issue up to $125 million in letters of credit and was scheduled to mature in January 2026. At December 31, 2023, less than $1 million in letters of credit were issued and outstanding under this facility with no amounts drawn under the letters of credit. As of March 2024, the credit facility had been terminated.

An agreement entered into with a financial institution in March 2023, which it expects to allow it to issue up to $300 million in letters of credit. At December 31, 2024 and 2023, $112 million and $124 million, respectively, in letters of credit were issued and outstanding under this agreement.

An agreement entered into with a financial institution in June 2024, subsequently amended in January 2025, which it expects to allow it to issue up to a combined $275 million in letters of credit at either Dominion Energy or Virginia Power. At December 31, 2024, Virginia Power had $77 million, out of Dominion Energy’s total $88 million, in letters of credit issued and outstanding under this agreement.

An agreement entered into with a financial institution in January 2025, which it expects to allow it to issue up to a combined $150 million in letters of credit, with $50 million available to Dominion Energy and $100 million available to Virginia Power. Through February 2025, Virginia Power had issued $50 million in letters of credit.

NOTE 18. LONG-TERM DEBT

2024 Weighted- average Coupon**(1)**Dominion EnergyVirginia Power
At December 31,2024202320242023
(millions, except percentages)
Term Loans, variable rate, due 2024$—$4,750
Sustainability Revolving Credit Agreement, variable rate, due 2025(2)—450
Unsecured Senior Notes:
1.45% to 7.00%, due 2024 to 2052(3)4.16%11,17611,476
Junior Subordinated Notes:
3.071% due 2024—700
Payable to Affiliated Trust, 8.4%, due 20318.40%1010
5.75% to 7.0% due 2054 to 2055(4)6.82%3,250685
Virginia Electric and Power Company:
Unsecured Senior Notes, 2.30% to 8.875%, due 2024 to 20544.38%18,78516,935$18,785$16,935
Tax-Exempt Financings, 0.75% to 3.80%, due 2032 to 2041(5)2.68%625625625625
Senior Secured Deferred Fuel Cost Bonds, 4.877% and 5.088%, due 2029 and 20334.94%1,217—1,217—
DESC:
First Mortgage Bonds, 2.30% to 6.625%, due 2028 to 20655.23%4,1344,134
Tax-Exempt Financings(6):
Variable rate due 20383.70%3535
3.625% and 4.00%, due 2028 and 20333.90%5454
GENCO, variable rate due 20383.70%3333
Other3.58%11
Secured Senior Notes, 4.82%, due 2042(7)—291
Tax-Exempt Financing, 3.80% due 2033(8)—27
Total Principal$39,320$40,206$20,627$17,560
Securities due within one year and supplemental credit facility borrowings(7)(9)**(**1,662)(6,839)**(**513)(350)
Unamortized discount, premium and debt issuance costs, net**(**347)(311)**(**186)(167)
Finance leases21419211072
Total long-term debt$37,525$33,248$20,038$17,115

(1)

Represents weighted-average coupon rates for debt outstanding as of December 31, 2024*.*

(2)

*This $*900 *million supplemental credit facility, entered in 2021, and amended in June 2024, offers a reduced interest rate margin with respect to borrowed amounts allocated to certain environmental sustainability or social investment initiatives. Proceeds of the supplemental credit facility also may be used for general corp**orate purposes, but such proceeds are not eligible for a reduced interest rate margin. In May 2022, Dominion Energy borrowed $*900 *million. The proceeds from these borrowings were used to support environmental sustainability and social investment initiatives ($*450 *million) and for general corporate purposes ($*450 *million). In June 2022, Dominion Energy repaid $*450 *million borrowed for general corporate purposes. In March 2023, Dominion Energy borrowed $*450 *million with the proceeds used for general corporate purposes. In April 2023, Dominion Energy repaid $*450 *million borrowed for general corporate purposes. In September 2023, Dominion Energy borrowed $*450 *million under this facility with the proceeds used for general corporate purposes. In October 2023, Dominion Energy repaid $*450 million borrowed for general corporate purposes. In May 2024, Dominion Energy repaid $450 million borrowed to support environmental sustainability and social investment initiatives. In June 2024, the facility was amended to extend the maturity date to June 2025.

(3)

Includes debt assumed by Dominion Energy from the merger of its former CNG subsidiary.

(4)

In October 2024, Dominion Energy redeemed all $685 million in outstanding principal amount of its October 2014 hybrids at par plus accrued interest including interest accrued at a floating rate effective October 2024. The notes would have otherwise matured in 2054.

(5)

These financings relate to certain pollution control equipment at Virginia Power’s generating facilities. In May 2024, Virginia Power remarketed three series of tax-exempt bonds, with an aggregate outstanding principal of $243 million to new investors. All three bonds will bear interest at a coupon of 3.80% until May 2027*, after which they will bear interest at a market rate to be determined at that time.*

(6)

*Industrial revenue bonds totaling $*68 million are secured by letters of credit that expire, subject to renewal, in the fourth quarter of 2025.

(7)

*Represents debt associated with Eagle Solar. In February 2024, Eagle Solar redeemed the remaining principal outstanding of $*279 *million. The debt which otherwise would have matured in 2042 was nonrecourse to Dominion Energy and was secured by Eagle Solar's interest in certain solar facilities. As such, these borrowings are presented within securities due within one year in Dominion Energy’s Consolidated Balance Sheets at December 31, 2023. Dominion Energy recognized a charge of $*10 million during the year ended December 31, 2024 within interest expense in its Consolidated Statements of Income in connection with the early redemption of these notes.

(8)

In October 2024, Dominion Energy redeemed all $27 million in outstanding principal amount of its 3.80% Peninsula Ports Authority of Virginia Coal Terminal Revenue Refunding Bonds at par plus accrued interest. The bonds would have otherwise matured in 2033*.*

(9)

Dominion Energy and Virginia Power’s weighted-average rate for securities due within one year was 3.70*% and* 3.73*%, respectively, as of December 31, 2024.*

Based on stated maturity dates rather than early redemption dates that could be elected by instrument holders, the scheduled principal payments of long-term debt at December 31, 2024 were as follows:

20252026202720282029ThereafterTotal
(millions, except percentages)
Dominion Energy
First Mortgage Bonds$—$—$—$53$—$4,081$4,134
Unsecured Senior Notes1,5002,1201,7831,19550022,86429,962
Senior Secured Deferred Fuel Cost Bonds1631711801901983151,217
Tax-Exempt Financings———39—708747
Junior Subordinated Notes—————3,2603,260
Total$1,663$2,291$1,963$1,477$698$31,228$39,320
Weighted-average Coupon3.70%2.80%3.86%4.11%3.44%4.87%
Virginia Power
Unsecured Senior Notes$350$1,150$1,350$700$500$14,735$18,785
Senior Secured Deferred Fuel Cost Bonds1631711801901983151,217
Tax-Exempt Financings—————625625
Total$513$1,321$1,530$890$698$15,675$20,627
Weighted-average Coupon3.73%3.34%3.77%4.03%3.44%4.58%

The Companies’ credit facilities and debt agreements, both short-term and long-term, contain customary covenants and default provisions. As of December 31, 2024, there were no events of default under these covenants.

First Mortgage Bonds

In January 2025, DESC issued $450 million of 5.30% first mortgage bonds that mature in 2035. The proceeds were used for general corporate purposes and/or to repay short-term debt.

Senior Secured Deferred Fuel Cost Bonds

In February 2024, VPFS issued $439 million of 5.088% senior secured deferred fuel cost bonds with a scheduled final payment date of May 2027 and a final maturity date of May 2029 and $843 million of 4.877% senior secured deferred fuel cost bonds with a scheduled final payment date of May 2031 and a final maturity date of May 2033. The full principal of each tranche of bonds is payable semi-annually according to a sinking fund schedule. Interest on each tranche of bonds accrues from the date of issuance and is payable semi-annually. Payment on the bonds commenced in November 2024. The scheduled final payment date for the applicable tranche is the date by which all interest and principal for such tranche is expected to be paid in full. The final maturity date of the applicable tranche is the legal maturity date for such tranche. The bonds are not subject to optional redemption prior to their stated maturity. VPFS as the issuer of the bonds is a bankruptcy remote, wholly-owned special purpose subsidiary of Virginia Power formed in October 2023 for the sole purpose of securitizing certain of Virginia Power’s under-recovered deferred fuel balance through the issuance of deferred fuel cost bonds. VPFS is considered to be a VIE primarily because its equity capitalization is insufficient to support its operations. Virginia Power is considered the primary beneficiary and consolidates VPFS as it has the power to direct the most significant activities of VPFS, including performing servicing activities such as billing and collecting the deferred fuel cost charges. Pursuant to the financing order issued by the Virginia Commission in November 2023, Virginia Power sold to VPFS its right to receive revenues from the non-bypassable deferred fuel cost charges from Virginia Power’s retail customers in Virginia, except for certain exempt customers, as deferred fuel cost property. The securitization bondholders have recourse solely with respect to the deferred fuel cost property owned by VPFS and no recourse to any other assets of Dominion Energy or Virginia Power. Any deferred fuel cost charges collected by Virginia Power to pay for bond servicing and other qualified costs are deferred fuel cost property solely owned by VPFS. Any deferred fuel cost charges collected by Virginia Power are remitted to a trustee and are not available to other creditors of Virginia Power or Dominion Energy.

Junior Subordinated Notes

In October 2014, Dominion Energy issued $685 million of October 2014 hybrids that bore interest at 5.75% per year until October 1, 2024. In October 2024, Dominion Energy redeemed all $685 million in outstanding principal amount at par plus accrued interest including interest accrued at a floating rate effective October 2024. The notes would have otherwise matured in 2054. Dominion

Energy recorded a charge of $7 million ($5 million after-tax) within interest expense in its Consolidated Statements of Income in connection with this early redemption.

In May 2024, Dominion Energy issued $2.0 billion of junior subordinated notes, consisting of $1.0 billion of 2024 Series A JSNs and $1.0 billion of 2024 Series B JSNs that mature in 2055 and 2054, respectively. The 2024 Series A JSNs will bear interest at 6.875% until February 1, 2030. The interest rate will reset every five years beginning on February 1, 2030, to equal the then-current five-year U.S. Treasury rate plus a spread of 2.386%, provided that the interest rate will not reset below 6.875%. The 2024 Series B JSNs will bear interest at 7.0% until June 1, 2034. The interest rate will reset every five years beginning on June 1, 2034, to equal the then-current five-year U.S. Treasury rate plus a spread of 2.511%, provided that the interest rate will not reset below 7.0%. Dominion Energy may defer interest payments on the 2024 Series A JSNs or 2024 Series B JSNs on one or more occasions for up to 10 consecutive years. If interest payments on the 2024 Series A JSNs and the 2024 Series B JSNs are deferred, Dominion Energy may not, subject to certain limited exceptions, declare or pay any dividends or other distributions on, or redeem, repurchase or otherwise acquire any of its capital stock during the deferral period. Also, during the deferral period, Dominion Energy may not make any payments on or redeem or repurchase any debt securities or make any payments under any guarantee of debt that, in each case, is equal or junior in right of payment to the 2024 Series A JSNs and the 2024 Series B JSNs. Dominion Energy used the proceeds from this issuance for general corporate purposes including the repayment of short-term debt, the repayment of amounts outstanding under the Sustainability Revolving Credit Agreement as discussed above and the repurchase of Series B Preferred Stock as discussed in Note 19.

In November 2024, Dominion Energy issued $1.25 billion of 2024 Series C JSNs that mature in 2055. The 2024 Series C JSNs will bear interest at 6.625% until May 15, 2035. The interest rate will reset every five years beginning on May 15, 2035, to equal the then-current-five-year U.S. Treasury rate plus a spread of 2.207%. Dominion Energy may defer interest payments on the 2024 Series C JSNs on one or more occasions for up to 10 consecutive years. If interest payments on the 2024 Series C JSNs are deferred, Dominion Energy may not, subject to certain limited exceptions, declare or pay any dividends or other distributions on, or redeem, repurchase or otherwise acquire any of its capital stock during the deferral period. Also, during the deferral period, Dominion Energy may not make any payments on or redeem or repurchase any debt securities or make any payments under any guarantee of debt that, in each case, is equal or junior in right of payment to the 2024 Series C JSNs. Dominion Energy used the proceeds from the issuance for general corporate purposes and to repay short-term debt.

Derivative Restructuring

In June 2020, Dominion Energy amended a portfolio of interest rate swaps with a notional value of $2.0 billion, extending the mandatory termination dates from 2020 and 2021 to December 2024. As a result of this noncash financing activity with an embedded interest rate swap, Dominion Energy recorded $326 million in other long-term debt representing the net present value of the initial fair value measurement of the new contract with an imputed interest rate of 1.19%, in its Consolidated Balance Sheets with an embedded interest rate derivative that had a fair value of zero at inception. In August 2021, Dominion Energy settled certain of the outstanding interest rate swaps which would have otherwise matured in December 2024, resulting in a $39 million reduction in other long-term debt. In August 2022, Dominion Energy settled certain of the outstanding interest rate swaps which would have otherwise matured in December 2024, resulting in a $154 million reduction in other long-term debt. In December 2024, Dominion Energy settled the remaining outstanding interest rate swaps resulting in a $144 million reduction in securities due within one year.

In August 2020, Virginia Power amended a portfolio of interest rate swaps with a notional value of $900 million, extending the mandatory termination dates from 2020 to December 2023. As a result of this noncash financing activity with an embedded interest rate swap, Virginia Power recorded $443 million in other long-term debt representing the net present value of the initial fair value measurement of the new contract with an imputed interest rate of 0.34%, in its Consolidated Balance Sheets with an embedded interest rate derivative that had a fair value of zero at inception. The interest rate swaps were in a hedge relationship prior to the transaction. Virginia Power de-designated the hedge relationships prior to the transaction and then designated the new interest rate swap in a hedge relationship after the transaction. In March 2023, Virginia Power settled the remaining outstanding interest rate swaps which would have otherwise matured in December 2023, resulting in a $448 million reduction in securities due within one year.

NOTE 19. PREFERRED STOCK

Dominion Energy is authorized to issue up to 20 million shares of preferred stock, which may be designated into separate classes. At December 31, 2024, Dominion Energy had issued and outstanding 1.0 million shares of the Series C Preferred Stock. At December 31, 2023, Dominion Energy had issued and outstanding 1.8 million shares preferred stock, 0.8 million and 1.0 million of which were designated as the Series B Preferred Stock and the Series C Preferred Stock, respectively.

DESC is authorized to issue up to 20 million shares of preferred stock. At both December 31, 2024 and 2023, DESC had issued and outstanding 1,000 shares of preferred stock, all of which were held by SCANA and are eliminated in consolidation.

Virginia Power is authorized to issue up to 10 million shares of preferred stock, $100 liquidation preference; however, none were issued and outstanding at December 31, 2024 or 2023.

2019 Corporate Units

In June 2019, Dominion Energy issued $1.6 billion of 2019 Equity Units, initially in the form of 2019 Series A Corporate Units. The Corporate Units were listed on the NYSE under the symbol DCUE. The net proceeds were used for general corporate purposes and to repay short-term debt, including commercial paper.

Each 2019 Series A Corporate Unit consisted of a stock purchase contract and a 1/10, or 10%, undivided beneficial ownership interest in one share of Series A Preferred Stock. Beginning in June 2022, the Series A Preferred Stock was convertible at the option of the holder. Settlement of any conversion was initially payable in cash, common stock or a combination thereof, at Dominion Energy’s election. In November 2021, Dominion Energy’s Articles of Incorporation were amended to require that any conversion of its Series A Preferred Stock be settled, at Dominion Energy’s election, either entirely in cash or in cash up to the first $1,000 per share and in shares of Dominion Energy common stock, cash or any combination thereof for any amounts in excess of $1,000 per share. As a result of establishing a minimum amount to be settled in cash if the holders elect to convert the Series A Preferred Stock, $1.6 billion was reclassified from equity to mezzanine equity in 2021. The Series A Preferred Stock was redeemable in cash by Dominion Energy beginning September 2022 at the liquidation preference.

The stock purchase contracts obligated the holders to purchase shares of Dominion Energy common stock in June 2022. The purchase price paid under the stock purchase contracts was $100 per Corporate Unit and the number of shares purchased was determined under a formula based upon the average closing price of Dominion Energy common stock near the settlement date. See Note 20 for additional information. The Series A Preferred Stock had been pledged upon issuance as collateral to secure the purchase of common stock under the related stock purchase contracts. Dominion Energy paid cumulative dividends on the Series A Preferred Stock and quarterly contract adjustment payments on the stock purchase contracts, at the rates described below.

Pursuant to the terms of the 2019 Equity Units, Dominion Energy conducted a final remarketing of substantially all shares of Series A Preferred Stock in May 2022 which resulted in the dividend rate for all shares of Series A Preferred Stock being reset to 1.75% for the June 2022 through August 2022 dividend period and 6.75% effective September 2022. The conversion rate on the Series A Preferred Stock did not increase as a result of the remarketing. In May 2022, Dominion Energy received a commitment from a financial institution to purchase up to 1.6 million shares of the Series A Preferred Stock in the final remarketing. Accordingly, following the settlement of the successful remarketing and approval from its Board of Directors in June 2022, Dominion Energy became obligated to redeem all outstanding shares of Series A Preferred Stock in September 2022. As such, effective June 2022, the Series A Preferred Stock was considered to be mandatorily redeemable and was classified as a current liability. In addition, Dominion Energy made a short-term deposit at the financial institution as described further in Note 9. Proceeds from the final remarketing were used on behalf of holders of 2019 Series A Corporate Units at the time of the remarketing to pay the purchase price to Dominion Energy for the issuance of its common stock under the stock purchase contracts included in such corporate units in June 2022. In September 2022, Dominion Energy redeemed all outstanding shares of Series A Preferred Stock for $1.6 billion.

Selected information about Dominion Energy’s 2019 Equity Units is presented below:

Issuance DateUnits IssuedTotal Net Proceeds**(1)**Total Preferred Stock**(2)**Cumulative Dividend RateStock Purchase Contract Annual RateStock Purchase Contract Liability**(3)**Stock Purchase Contract Settlement Date
(millions except interest rates)
6/14/201916$1,582$1,6101.75%5.5%$2506/1/2022

(1)

*Issuance costs of $*28 *million were recorded as a reduction to preferred stock ($*14 *million) and common stock ($*14 million). In connection with the reclassification of the Series A Preferred Stock to mezzanine equity in 2021, the issuance costs originally recognized as a reduction to preferred stock were reclassified to common stock.

(2)

*Dominion Energy recorded dividends of $*12 *million ($*7.292 *per share) for the year ended December 31, 2022. In addition, Dominion Energy recorded interest expense of $*7 million on the Series A Preferred Stock for the year ended December 31, 2022, following the reclassification of these shares to a mandatorily redeemable liability effective June 2022 as discussed above.

(3)

*Payment of $*44 million was made in 2022.

Series B Preferred Stock

In December 2019, Dominion Energy issued 800,000 shares of Series B Preferred Stock for $791 million, net of $9 million of issuance costs. The preferred stock had a liquidation preference of $1,000 per share and paid a 4.65% dividend per share on the liquidation preference. Dividends were paid cumulatively on a semi-annual basis, commencing June 15, 2020. The dividend rate for the Series B Preferred Stock was scheduled to reset every five years beginning on December 15, 2024 to equal the then-current five-year U.S. Treasury rate plus a spread of 2.993%.

Dominion Energy was permitted to, at its option, redeem the Series B Preferred Stock in whole or in part on December 15, 2024 or on any subsequent fifth anniversary of such date at a price equal to $1,000 per share plus any accumulated and unpaid dividends. Dominion Energy was also permitted to, at its option, redeem the Series B Preferred Stock in whole but not in part at a price equal to $1,020 per share plus any accumulated and unpaid dividends at any time within a certain period of time following any change in the criteria ratings agencies use to assign equity credit to securities such as the Series B Preferred Stock that had certain adverse effects on the equity credit actually received by the Series B Preferred Stock.

In June 2024, Dominion Energy completed a tender offer repurchasing 0.4 million shares of Series B Preferred Stock and in December 2024 redeemed the remaining 0.4 million shares outstanding. Dominion Energy recorded dividends of $24 million ($42.86 per share) for the year ended December 31, 2024, excluding deemed dividends of $10 million representing deferred issuance costs, legal and bank fees and excise tax associated with the repurchase and redemption, and $37 million ($46.50 per share) for each of the years ended December 31, 2023 and 2022.

Series C Preferred Stock

In December 2021, Dominion Energy issued 750,000 shares of Series C Preferred Stock for $742 million, net of $8 million of issuance costs. Also in December 2021, Dominion Energy issued 250,000 shares of Series C Preferred Stock valued at $250 million to the qualified benefit pension plans. The preferred stock has a liquidation preference of $1,000 per share and currently pays a 4.35% dividend per share on the liquidation preference. Dividends are paid cumulatively on a semi-annual basis, commencing April 15, 2022. Dominion Energy recorded dividends of $44 million ($43.50 per share) for each of the years ended December 31, 2024, 2023 and 2022. The dividend rate for the Series C Preferred Stock will be reset every five years beginning on April 15, 2027 to equal the then-current five-year U.S. Treasury rate plus a spread of 3.195%. Unless all accumulated and unpaid dividends on the Series C Preferred Stock have been declared and paid, Dominion Energy may not make any distributions on any of its capital stock ranking equal or junior to the Series C Preferred Stock as to dividends or upon liquidation, including through dividends, redemptions, repurchases or otherwise.

Dominion Energy may, at its option, redeem the Series C Preferred Stock in whole or in part anytime from and including January 15, 2027 through and including April 15, 2027 or during any subsequent fifth anniversary of such period at a price equal to $1,000 per share plus any accumulated and unpaid dividends. Dominion Energy may also, at its option, redeem the Series C Preferred Stock in whole but not in part at a price equal to $1,020 per share plus any accumulated and unpaid dividends at any time within a certain period of time following any change in the criteria ratings agencies use to assign equity credit to securities such as the Series C Preferred Stock that has certain adverse effects on the equity credit actually received by the Series C Preferred Stock.

Holders of the Series C Preferred Stock have no voting rights except in the limited circumstances provided for in the terms of the Series C Preferred Stock or as otherwise required by applicable law. The Series C Preferred Stock is not subject to any sinking fund or other obligation of ours to redeem, repurchase or retire the Series C Preferred Stock. The preferred stock contains no conversion rights.

NOTE 20. EQUITY

Common Stock

Dominion Energy

During 2024, 2023 and 2022, Dominion Energy recorded, net of fees and commissions, $732 million, $94 million and $2.0 billion from the issuance of approximately 14 million, 2 million and 25 million shares of common stock, respectively, as described below.

Dominion Energy Direct*®* and Employee Savings Plans

Dominion Energy maintains Dominion Energy Direct® and a number of employee savings plans through which contributions may be invested in Dominion Energy’s common stock. These shares may either be newly issued or purchased on the open market with proceeds contributed to these plans. In January 2021, Dominion Energy began issuing new shares of common stock for these direct stock purchase plans. In August 2023, Dominion Energy began purchasing its common stock on the open market for these direct stock purchase plans, and in March 2024, began issuing new shares of common stock. During 2024, 2023 and 2022, Dominion Energy issued 2.7 million, 1.7 million and 2.4 million, respectively, of such shares and received proceeds of $138 million, $94 million and $179 million, respectively.

At-the-Market Program

In 2020, Dominion Energy entered into sales agency agreements to effect sales under a new at-the-market program. Under the sales agency agreements, Dominion Energy could, from time to time, offer and sell shares of its common stock through the sales agents or enter into one or more forward sale agreements with respect to shares of its common stock. Sales by Dominion Energy through the sales agents or by forward sellers pursuant to a forward sale agreement cannot exceed $1.0 billion in the aggregate. In November 2021, Dominion Energy entered forward sale agreements for approximately 1.1 million shares of its common stock to be settled by November 2022 at an initial forward price of $74.66 per share. Except in certain circumstances, Dominion Energy could have elected physical, cash or net settlement of the forward sale agreements. In November 2022, Dominion Energy provided notice to elect physical settlement of the forward sale agreements and in December 2022 received total proceeds of $78 million. This program expired in June 2023.

In May 2024, Dominion Energy entered into sales agency agreements to effect sales under a new at-the-market program. Under the sales agency agreements, Dominion Energy may, from time to time, offer and sell shares of its common stock through the sales agents or enter into one or more forward sale agreements with respect to shares of its common stock. Sales by Dominion Energy through the sales agents or by forward sellers pursuant to a forward sale agreement cannot exceed $1.8 billion in the aggregate. Through August 2024, Dominion Energy entered forward sale agreements for approximately 11.4 million shares of its common stock to be settled by the fourth quarter of 2024 at a weighted-average initial forward price of $53.23 per share. Except in certain circumstances, Dominion Energy could have elected physical, cash or net settlement of the forward sale agreements. In December 2024, Dominion Energy provided notice to elect physical settlement of the forward sale agreements and in December 2024 settled the agreements at a weighted-average final forward price of $52.20 and received total proceeds of $594 million.

Additionally, from September through December 2024, Dominion Energy entered forward sale agreements for approximately 9.7 million shares of its common stock expected to be settled in the fourth quarter of 2025 at a weighted-average initial forward price of $57.78 per share. Except in certain circumstances, Dominion Energy can elect physical, cash or net settlement of the forward sale agreements.

Other Issuances

In May 2022, Dominion Energy issued 0.9 million shares of its common stock, valued at $72 million, to partially satisfy DESC’s remaining obligation under a settlement agreement with the SCDOR discussed in Note 23.

In June 2022, Dominion Energy issued 0.4 million shares of its common stock, valued at $30 million, to partially satisfy its obligation under a settlement agreement for the State Court Merger Case discussed in Note 23.

In June 2022, Dominion Energy issued 19.4 million shares of its common stock to settle the stock purchase contract component of the 2019 Equity Units, as discussed in Note 19, and received proceeds of $1.6 billion.

Repurchase of Common Stock

Dominion Energy did not repurchase any shares in 2024, 2023 or 2022, except for shares tendered by employees to satisfy tax withholding obligations on vested restricted stock, which do not count against its stock repurchase authorization.

In November 2020, the Board of Directors authorized the repurchase of up to $1.0 billion of Dominion Energy’s common stock, with $0.9 billion available as of December 31, 2024. This repurchase program does not include a specific timetable or price or volume targets and may be modified, suspended or terminated at any time. Shares may be purchased through open market or privately negotiated transactions or otherwise at the discretion of management subject to prevailing market conditions, applicable securities laws and other factors.

Virginia Power

In the fourth quarter of 2023, Virginia Power issued 49,522 shares of its common stock to Dominion Energy for $3.25 billion with the proceeds utilized to repay substantially all of the outstanding borrowings under Virginia Power’s intercompany credit facility with Dominion Energy. Virginia Power issued the shares pursuant to a Virginia Commission order authorizing the issuance of up to $3.25 billion of common stock to Dominion Energy through the end of 2023 as part of its reasonable efforts to maintain a common equity capitalization to total capitalization ratio of 52.10% through December 2024 in accordance with legislation enacted in Virginia in April 2023 as discussed in Note 13. Virginia Power did not issue any shares of its common stock to Dominion Energy in 2024 or 2022.

Accumulated Other Comprehensive Income (Loss)

Dominion Energy

The following table presents Dominion Energy’s changes in AOCI (net of tax) and reclassifications out of AOCI by component:

Total Derivative- Hedging Activities(1)(2)Investment Securities(3)Pension and other postretirement benefit costs(4)(5)Equity Method Investees(6)Total
(millions)
Year Ended December 31, 2024
Beginning balance$**(**216)$—$43$**(**173)
Other comprehensive income before reclassifications: gains (losses)13**(**22)**(**2)**(**11)
Amounts reclassified from AOCI (gains) losses:
Interest and related charges4343
Other income (expense)—11**(**16)**(**5)
Total4311**(**16)38
Income tax expense (benefit)**(**11)**(**3)4**(**10)
Total, net of tax328**(**12)28
Net current period other comprehensive income (loss)45**(**14)**(**14)17
Ending balance$**(**171)$**(**14)$29$**(**156)
Year Ended December 31, 2023
Beginning balance$(249)$(44)$56$(3)$(240)
Other comprehensive income before reclassifications: gains (losses)—55——55
Amounts reclassified from AOCI (gains) losses:
Interest and related charges43———43
Other income (expense)—(14)(18)—(32)
Discontinued operations———44
Total43(14)(18)415
Income tax expense (benefit)(10)35(1)(3)
Total, net of tax33(11)(13)312
Net current period other comprehensive income (loss)3344(13)367
Ending balance$(216)$—$43$—$(173)

(1)

Comprised entirely of interest rate derivative hedging activities.

(2)

*Net of $*58 *million, $*73 million and $83 million tax at December 31, 2024, 2023 and 2022, respectively.

(3)

*Net of $*5 million, $(2) million and $13 million tax at December 31, 2024, 2023 and 2022, respectively.

(4)

Comprised entirely of prior service cost. See Note 22 for additional information.

(5)

Net of $(9) million, $(14) million and $(19) million tax at December 31, 2024, 2023 and 2022*, respectively.*

(6)

Net of $— million and $1 million tax at December 31, 2023 and 2022, respectively.

Virginia Power

The following table presents Virginia Power’s changes in AOCI (net of tax) and reclassification out of AOCI by component:

Total Derivative- Hedging Activities(1)(2)Investment Securities(3)Total
(millions)
Year Ended December 31, 2024
Beginning balance$15$1$16
Other comprehensive income before reclassifications: gains (losses)13**(**5)8
Amounts reclassified from AOCI (gains) losses:
Other income (expense)—44
Total—44
Income tax expense (benefit)—**(**1)**(**1)
Total, net of tax—33
Net current period other comprehensive income (loss)13**(**2)11
Ending balance$28$**(**1)$27
Year Ended December 31, 2023
Beginning balance$16$(7)$9
Other comprehensive income before reclassifications: gains (losses)(1)76
Amounts reclassified from AOCI (gains) losses:
Interest and related charges1—1
Other income (expense)—11
Total112
Income tax expense (benefit)(1)—(1)
Total, net of tax—11
Net current period other comprehensive income (loss)(1)87
Ending balance$15$1$16

(1)

Comprised entirely of interest rate derivative hedging activities.

(2)

Net of $(10) million, $(5) million and $(5) million tax at December 31, 2024, 2023 and 2022*, respectively.*

(3)

Net of $— million, $— million and $2 million tax at December 31, 2024, 2023 and 2022, respectively.

Stock-Based Awards

The 2024 Incentive Compensation Plan permits stock-based awards that include restricted stock, performance grants, goal-based stock, stock options and stock appreciation rights. The Non-Employee Directors Compensation Plan permits grants of restricted stock and stock options. Under provisions of these plans, employees and non-employee directors may be granted options to purchase common stock at a price not less than its fair market value at the date of grant with a maximum term of eight years. Option terms are set at the discretion of the Compensation and Talent Development Committee of the Board of Directors or the Board of Directors itself, as provided under each plan. No options are outstanding under either plan. At December 31, 2024, approximately 27 million shares were available for future grants under these plans.

In 2022 and 2023, goal-based stock awards were granted in lieu of cash-based performance grants to certain officers who have not achieved a certain targeted level of share ownership prior to 2024. Beginning in 2024, officers were granted performance share awards settling in shares or cash or, for officers who have not achieved a certain targeted level of share ownership at the time of grant, settling in shares. At both December 31, 2024 and 2023, unrecognized compensation cost related to these awards was inconsequential.

Dominion Energy measures and recognizes compensation expense relating to share-based payment transactions over the vesting period based on the fair value of the equity or liability instruments issued. Dominion Energy’s results for the years ended December 31, 2024, 2023 and 2022 include $53 million, $44 million and $36 million, respectively, of compensation costs and $12 million, $10 million and $7 million, respectively, of income tax benefits related to Dominion Energy’s stock-based compensation arrangements. Stock-based compensation cost is reported in other operations and maintenance expense in Dominion Energy’s Consolidated Statements of Income. Excess Tax Benefits are classified as a financing cash flow.

Restricted Stock

Restricted stock grants are made to officers under Dominion Energy’s LTIP and may also be granted to certain key non-officer employees. The fair value of Dominion Energy’s restricted stock awards is equal to the closing price of Dominion Energy’s stock on the date of grant. New shares are issued for restricted stock awards on the date of grant and generally vest over a three-year service period. The following table provides a summary of restricted stock activity for the years ended December 31, 2024, 2023 and 2022:

Shares (millions)Weighted-average Grant Date Fair Value
Nonvested at December 31, 20211.3$76.65
Granted0.675.08
Vested(0.4)77.87
Cancelled and forfeited(0.1)73.15
Nonvested at December 31, 20221.4$75.56
Granted1.048.99
Vested(0.4)79.89
Cancelled and forfeited(0.1)53.36
Nonvested at December 31, 20231.9$61.34
Granted0.755.58
Vested**(**0.5)71.05
Cancelled and forfeited**(**0.2)43.13
Nonvested at December 31, 20241.9$57.10

As of December 31, 2024, unrecognized compensation cost related to nonvested restricted stock awards totaled $70 million and is expected to be recognized over a weighted-average period of 2.1 years. The fair value of restricted stock awards that vested was $25 million, $20 million and $31 million in 2024, 2023 and 2022, respectively. Employees may elect to have shares of restricted stock withheld upon vesting to satisfy tax withholding obligations. The number of shares withheld will vary for each employee depending on the vesting date fair market value of Dominion Energy stock and the applicable federal, state and local tax withholding rates.

Cash-Based Performance Grants

Prior to 2024, cash-based performance grants were issued to Dominion Energy’s officers under Dominion Energy’s LTIP. The actual payout of cash-based performance grants will vary between zero and 200% of the targeted amount based on the level of performance metrics achieved.

In February 2021, a cash-based performance grant was made to officers. Payout of the performance grant occurred in January 2024 based on the achievement of two performance metrics during 2021, 2022 and 2023: TSR relative to that of companies that are members of Dominion Energy’s compensation peer group and ROIC. There is an additional opportunity to earn a portion of the award based on Dominion Energy’s relative price-earnings ratio performance. The total of the payout under the grant was $4 million, all of which was accrued at December 31, 2023.

In February 2022, a cash-based performance grant was made to officers. Payout of the performance grant occurred in January 2025 based on the achievement of three performance metrics during 2022, 2023 and 2024: TSR relative to that of companies that are members of Dominion Energy’s compensation peer group, Cumulative Operating EPS and Non-Carbon Emitting Generation Capacity Performance. There was an additional opportunity to earn a portion of the award based on Dominion Energy’s relative price-earnings ratio performance. The total of the payout under the grant was $5 million, all of which was accrued at December 31, 2024.

In February 2023, a cash-based performance grant was made to officers. Payout of the performance grant is expected to occur by March 15, 2026 based on the achievement of three performance metrics during 2023, 2024 and 2025: TSR relative to that of companies that are members of Dominion Energy’s compensation peer group over a 3-year and a 2-year period and Non-Carbon Emitting Generation Capacity Performance. For officers other than the CEO, there is an additional opportunity to earn a portion of the award based on Dominion Energy’s relative price-earnings ratio performance. At December 31, 2024, the targeted amount of the three-year grant was $15 million and a liability of $11 million had been accrued for this award.

Performance Share Awards

Performance share awards are granted under Dominion Energy’s LTIP. The performance share awards are settled in cash at the end of the three-year performance period if certain ownership requirements are satisfied. If the ownership requirements have not been met at the time of grant, then the performance share awards are settled in common stock.

In February 2024, a performance share grant was made to officers. Payout of the performance grant is expected to occur by March 15, 2027, based on the achievement of three performance metrics during 2024, 2025 and 2026: TSR relative to that of companies that are members of Dominion Energy’s compensation peer group, Cumulative Operating EPS and Non-Carbon Emitting Generation Capacity Performance. At December 31, 2024, the targeted amount of the three-year grant was $26 million and a liability of $8 million had been accrued for this award.

NOTE 21. DIVIDEND RESTRICTIONS

The Virginia Commission may prohibit any public service company, including Virginia Power, from declaring or paying a dividend to an affiliate if found to be inconsistent with the public interest. At December 31, 2024, the Virginia Commission had not restricted the payment of dividends by Virginia Power.

The North Carolina Commission, in its order approving the SCANA Combination, limited cumulative dividends payable to Dominion Energy by Virginia Power to (i) the amount of retained earnings the day prior to closing of the SCANA Combination plus (ii) any future earnings recorded by Virginia Power after such closing. In addition, notice to the North Carolina Commission is required if payment of dividends causes the equity component of Virginia Power’s capital structure to fall below 45%.

There is no specific restriction from the South Carolina Commission on the payment of dividends paid by DESC. Pursuant to the SCANA Merger Approval Order, the amount of any DESC dividends paid must be reasonable and consistent with the long-term payout ratio of the electric utility industry and gas distribution industry.

DESC’s bond indenture under which it issues first mortgage bonds contains provisions that could limit the payment of cash dividends on its common stock. DESC's bond indenture permits the payment of dividends on DESC's common stock only either (1) out of its Surplus (as defined in the bond indenture) or (2) in case there is no Surplus, out of its net profits for the fiscal year in which the dividend is declared and/or the preceding fiscal year.

At December 31, 2024, DESC’s retained earnings exceed the balance established by the Federal Power Act as a reserve on earnings attributable to hydroelectric generation plants. As a result, DESC is permitted to pay dividends without additional regulatory approval provided that such amounts would not bring the retained earnings balance below the established threshold.

See Notes 18 and 19 for a description of potential restrictions on common stock dividend payments by Dominion Energy in connection with the deferral of interest payments on the junior subordinated notes or a failure to pay dividends on the Series C Preferred Stock.

NOTE 22. EMPLOYEE BENEFIT PLANS

Defined Benefit Plans

Dominion Energy provides certain retirement benefits to eligible active employees, retirees and qualifying dependents. Under the terms of its benefit plans, Dominion Energy reserves the right to change, modify or terminate the plans. From time to time in the past, benefits have changed, and some of these changes have reduced benefits.

Dominion Energy maintains qualified noncontributory defined benefit pension plans covering virtually all employees who commenced employment prior to July 2021. Retirement benefits are based primarily on years of service, age and the employee’s compensation. Dominion Energy’s funding policy is to contribute annually an amount that is in accordance with the provisions of ERISA. The pension programs also provide benefits to certain retired executives under company-sponsored nonqualified employee benefit plans. The nonqualified plans are funded through contributions to grantor trusts. Dominion Energy also provides retiree healthcare and life insurance benefits with annual employee premiums based on several factors such as age, retirement date and years of service.

Pension and other postretirement benefit costs are affected by employee demographics (including age, compensation levels and years of service), the level of contributions made to the plans and earnings on plan assets. These costs may also be affected by changes in key assumptions, including expected long-term rates of return on plan assets, discount rates, healthcare cost trend rates, mortality rates and the rate of compensation increases.

Dominion Energy uses December 31 as the measurement date for all of its employee benefit plans. Dominion Energy immediately recognizes the change in the fair value of plan assets and liabilities and net actuarial gains and losses annually in the fourth quarter of each fiscal year as well as whenever a triggering event occurs that is determined to require remeasurement. Actuarial losses

attributable to Dominion Energy’s rate regulated operations are deferred to regulatory assets when it is probable that regulators will permit them to be recovered from customers in future rates. Likewise, actuarial gains attributable to Dominion Energy’s rate regulated operations are deferred to regulatory liabilities when it is probable that regulators will require customer refunds or other benefits through future rates.

Dominion Energy’s pension and other postretirement benefit plans hold investments in trusts to fund employee benefit payments. Dominion Energy’s pension and other postretirement plan assets experienced aggregate actual returns of $738 million and $1.2 billion in 2024 and 2023, respectively, versus expected returns of $982 million and $1.0 billion, respectively. Any investment-related declines in these trusts are immediately recognized in earnings and will be included in the determination of the amount of cash to be contributed to the employee benefit plans.

Pension and Other Postretirement Benefit Plan Remeasurements

As a result of the East Ohio and Questar Gas Transactions in 2024, Dominion Energy remeasured its pension and other postretirement benefit plans. The remeasurements resulted in $217 million ($162 million after-tax) of higher market related impacts on pension and other postretirement plans related to the East Ohio and Questar Gas Transactions, reflected in other income (expense) in Dominion Energy’s Consolidated Statement of Income. The discount rates used for the remeasurements related to the East Ohio and Questar Gas Transactions were 5.62% and 5.75% for the pension plans and 5.61%-5.62% and 5.74% for the other postretirement benefit plans, respectively. All other assumptions used for the remeasurements were consistent with the measurement as of December 31, 2023.

Funded Status

The following table summarizes the changes in pension plan and other postretirement benefit plan obligations and plan assets and includes a statement of the plans’ funded status for Dominion Energy:

Pension BenefitsOther Postretirement Benefits
Year Ended December 31,2024202320242023
(millions, except percentages)
Changes in benefit obligation:
Benefit obligation at beginning of year$8,431$8,066$1,109$1,127
Service cost83961114
Interest cost4314425761
Benefits paid**(**504)(493)**(**88)(94)
Actuarial (gain) loss during the year**(**404)322**(**43)1
Plan amendments302——
Settlements and curtailments(1)**(**415)(4)**(**28)—
Benefit obligation at end of year$7,652$8,431$1,018$1,109
Changes in fair value of plan assets:
Fair value of plan assets at beginning of year$9,087$8,694$2,062$1,845
Actual return gain (loss) on plan assets503882235277
Employer contributions768——
Benefits paid**(**504)(493)**(**54)(60)
Settlements(2)**(**684)(4)**(**40)—
Fair value of plan assets at end of year$8,478$9,087$2,203$2,062
Funded status at end of year$826$656$1,185$953
Amounts recognized in the Consolidated Balance Sheets at December 31:
Noncurrent pension and other postretirement benefit assets$883$647$1,356$1,132
Assets held for sale—308—13
Other current liabilities**(**7)(27)**(**13)(13)
Noncurrent pension and other postretirement benefit liabilities(3)**(**50)(237)**(**158)(179)
Liabilities held for sale—(35)——
Net amount recognized$826$656$1,185$953
Significant assumptions used to determine benefit obligations as of December 31:
Discount rate5.84**%-5.87%**5.37%-5.47%5.83**%-5.86%**5.40%-5.42%
Weighted-average rate of increase for compensation4.40**%**4.28%n/an/a
Crediting interest rate for cash balance and similar plans4.59**%-4.62%**4.12%-4.22%n/an/a

(1)

2024 amounts include settlements and curtailment related to the East Ohio and Questar Gas Transactions. Additionally, 2024 and 2023 amounts include settlements of nonqualified pension obligations.

(2)

2024 amounts include settlements related to the East Ohio and Questar Gas Transactions. Additionally, 2024 and 2023 include amounts related to settlements of nonqualified pension obligations.

(3)

Presented within other deferred credits and other liabilitie**s in Dominion Energy's Consolidated Balance Sheets.

Actuarial gains recognized during 2024 in Dominion Energy’s pension benefit obligations were $404 million primarily driven by an increase in the discount rate. Actuarial losses recognized during 2023 in Dominion Energy’s pension benefit obligations were $322 million primarily driven by a decrease in the discount rate. Actuarial gains recognized during 2024 in Dominion Energy’s other

postretirement benefit obligations were $43 million primarily driven by an increase in the discount rate. Actuarial losses recognized during 2023 in Dominion Energy’s other postretirement benefit obligations were $1 million primarily driven by a $29 million loss due to a decrease in the discount rate that was largely offset by a $28 million gain from favorable claims and other experience.

The ABO for all of Dominion Energy’s defined benefit pension plans was $7.4 billion and $8.1 billion at December 31, 2024 and 2023, respectively.

Under its funding policies, Dominion Energy evaluates plan funding requirements annually, usually in the fourth quarter after receiving updated plan information from its actuary. Based on the funded status of each plan and other factors, Dominion Energy determines the amount of contributions for the current year, if any, at that time. Dominion Energy expects to make $22 million of minimum required contributions to its qualified defined benefit pension plans in 2025. Dominion Energy also considers voluntary contributions from time to time, either in the form of cash or equity securities.

Certain of Dominion Energy’s subsidiaries fund other postretirement benefit costs through VEBAs. Dominion Energy’s remaining subsidiaries do not prefund other postretirement benefit costs but instead pay claims as presented. Dominion Energy did not make any contributions to VEBAs associated with its other postretirement plans in 2024 and 2023. Dominion Energy is not required to make any contributions to its VEBAs associated with its other postretirement plans in 2025. Dominion Energy considers voluntary contributions from time to time, either in the form of cash or equity securities.

The following table provides information on the benefit obligations and fair value of plan assets for plans with a benefit obligation in excess of plan assets for Dominion Energy:

Pension BenefitsOther Postretirement Benefits
As of December 31,2024202320242023
(millions)
Benefit obligation$724$7,996$171$195
Fair value of plan assets6667,697—4

The following table provides information on the ABO and fair value of plan assets for Dominion Energy’s pension plans with an ABO in excess of plan assets:

As of December 31,20242023
(millions)
Accumulated benefit obligation$715$792
Fair value of plan assets666654

The following benefit payments, which reflect expected future service, as appropriate, are expected to be paid for Dominion Energy’s plans:

Estimated Future Benefit Payments
Pension BenefitsOther Postretirement Benefits
(millions)
2025$537$89
202653988
202754687
202855585
202956184
2030-20342,871403

Plan Assets

Dominion Energy’s overall objective for investing its pension and other postretirement plan assets is to achieve appropriate long-term rates of return commensurate with prudent levels of risk. To minimize risk, funds are broadly diversified among asset classes, investment strategies and investment advisors. In December 2024, Dominion Energy revised its long-term strategic target asset allocation for its pension funds to 30% public equity (inclusive of both U.S. equity and non-U.S. equity), 27% fixed income and 43% other alternative investments. Public equity includes investments in U.S. and non-U.S. large-cap, mid-cap and small-cap companies. Fixed income includes government securities and cash. The public equity and fixed income investments are in individual securities as well as mutual funds and exchange traded funds. Other alternative investments include private equity, typically through limited partnerships, and credit and absolute return strategies which include investments in public debt, private debt and hedge funds.

Through December 2024, the long-term strategic target asset allocations for substantially all of Dominion Energy’s pension funds were 26% U.S. equity, 19% non-U.S. equity, 32% fixed income, 3% real assets and 20% other alternative investments. U.S. equity includes investments in large-cap, mid-cap and small-cap companies located in the U.S. Non-U.S. equity includes investments in large-cap, mid-cap and small-cap companies located outside of the U.S. including both developed and emerging markets. Fixed income includes corporate debt instruments of companies from diversified industries and U.S. Treasuries. The U.S. equity, non-U.S. equity and fixed income investments are in individual securities as well as mutual funds and exchange-traded funds. Real assets include investments in real estate investment trusts and private partnerships. Other alternative investments include partnership investments in private equity-debt and hedge funds that follow several different strategies.

Strategic investment policies are established for Dominion Energy’s prefunded benefit plans based upon periodic asset/liability studies. Factors considered in setting the investment policy include employee demographics, liability growth rates, future discount rates, the funded status of the plans and the expected long-term rate of return on plan assets. Deviations from the plans’ strategic allocation are a function of Dominion Energy’s assessments regarding short-term risk and reward opportunities in the capital markets and/or short-term market movements which result in the plans’ actual asset allocations varying from the strategic target asset allocations. Through periodic rebalancing, actual allocations are brought back in line with the target. Future asset/liability studies will focus on strategies to further reduce pension and other postretirement plan risk, while still achieving attractive levels of returns. Financial derivatives may be used to obtain or manage market exposures and to hedge assets and liabilities.

For fair value measurement policies and procedures related to pension and other postretirement benefit plan assets, see Note 2.

The fair values of Dominion Energy’s pension plan assets by asset category are as follows:

At December 31,20242023
(millions)Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
Cash and cash equivalents$395$—$—$395$21$9$—$30
Common and preferred stocks:
U.S.1,004——1,0041,145——1,145
International7231—7249442—946
Insurance contracts—13973212—162—162
Corporate debt instruments704861156774750—824
Government securities161,303—1,319431,720—1,763
Total recorded at fair value$2,208$1,929$84$4,221$2,227$2,643$—$4,870
Assets recorded at NAV(1):
Commingled funds/collective trust funds1,7712,012
Alternative investments:
Real estate funds3767
Private equity funds1,3041,395
Debt funds188236
Hedge funds319239
Total recorded at NAV$3,619$3,949
Total investments(2)$7,840$8,819

(1)

These investments that are measured at fair value using the NAV per share (or its equivalent) as a practical expedient are not required to be categorized in the fair value hierarchy.

(2)

Excludes net assets related to pending sales of securities and advanced subscription of *$*633 million, net accrued income of *$*21 million, and includes net assets related to pending purchases of securities of *$*16 million at December 31, 2024. Excludes net assets related to pending sales of securities of *$*298 million, net accrued income of *$*24 million, and includes net assets related to pending purchases of securities of $54 million at December 31, 2023.

The fair values of Dominion Energy’s other postretirement plan assets by asset category are as follows:

At December 31,20242023
(millions)Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
Cash and cash equivalents$7$—$—$7$3$1$—$4
Common and preferred stocks:
U.S.946——946757——757
International74——74194——194
Insurance contracts—8513—10—10
Corporate debt instruments183301214436—40
Government securities16582—2473100—103
Total recorded at fair value$1,375$120$6$1,501$961$147$—$1,108
Assets recorded at NAV(1):
Commingled funds/collective trust funds495725
Alternative investments:
Real estate funds911
Private equity funds147173
Debt funds1214
Hedge funds2014
Total recorded at NAV$683$937
Total investments(2)$2,184$2,045

(1)

These investments that are measured at fair value using the NAV per share (or its equivalent) as a practical expedient are not required to be categorized in the fair value hierarchy.

(2)

Excludes net assets related to pending sales of securities and advanced subscription of *$*19 million, net accrued income of *$*2 million, and includes net assets related to pending purchases of securities of *$*2 million at December 31, 2024. Excludes net assets related to pending sales of securities and advanced subscription of *$*17 million, net accrued income of *$*2 million, and includes net assets related to pending purchases of securities of $2 million at December 31, 2023.

The following table presents the net change in the Dominion Energy’s pension and other postretirement plan assets included in the Level 3 fair value category:

Pension BenefitsOther Postretirement Benefits
(millions)202420232022202420232022
Beginning balance$—$—$—$—$—$—
Total realized and unrealized gains:——————
Purchases11——1——
Transfers into Level 373——5——
Ending balance$84$—$—$6$—$—

The plan assets investments are determined based on the fair values of the investments and the underlying investments, which have been determined as follows:

Cash and Cash Equivalents—Represents interest-bearing cash, foreign cash and money market funds. Interest-bearing cash and money market funds are valued at cost plus accrued interest. The foreign cash balances are valued at the amount held and translated on the reporting date based on prevailing exchange rates. Foreign cash and money market funds are classified as Level 1. The interest-bearing cash is held in variation margin and with various brokers, which are less liquid and therefore are classified as Level 2.

Common and Preferred Stocks—Investments are valued at the closing price reported on the active market on which the individual securities are traded. Investments in certain preferred stocks are classified as Level 2 and are valued using pricing models maximizing the use of observable inputs for similar securities. This includes basing value on yields currently available on comparable securities of issuers with similar credit ratings.

Insurance Contracts—Investments in Group Annuity Contracts are stated at fair value based on the fair value of the underlying securities as provided by the managers and include investments in U.S. government securities, corporate debt instruments and state and municipal debt securities.

Corporate Debt Instruments—Investments are valued using pricing models maximizing the use of observable inputs for similar securities. This includes basing value on yields currently available for comparable securities of issuers with similar credit ratings. When quoted prices are not available for identical or similar instruments, the instrument is valued under a discounted cash flows approach that maximizes observable inputs, such as current yields of similar instruments, but includes adjustments for certain risks that may not be observable, such as credit and liquidity risks or a broker quote, if available.

Government Securities—Investments are valued using pricing models maximizing the use of observable inputs for similar securities.

Commingled Funds/Collective Trust Funds—Commingled funds/collective trust funds invest in debt and equity securities and other instruments with characteristics similar to those of the funds’ benchmarks. The primary objectives of the funds are to seek investment returns that approximate the overall performance of their benchmark indexes. These benchmarks are major equity indices, fixed income indices and money market indices that focus on growth, income and liquidity strategies, as applicable. Investments in commingled funds/collective trust funds are stated at the NAV as determined by the issuer of the commingled funds/collective trust funds and are based on the fair value of the underlying investments held by the fund less its liabilities. The NAV is used as a practical expedient to estimate fair value. The commingled funds/collective trust funds do not have any unfunded commitments, and do not have any applicable liquidation periods or defined terms/periods to be held. The majority of these funds have redemption restrictions allowing investors to redeem capital on a periodic basis.

Alternative Investments—Investments in private real estate funds, private equity funds, private debt funds and hedge funds are stated at fair value based on the NAV of the plan’s proportionate share of the partnership, joint venture or other alternative investment’s fair value as determined by reference to audited financial statements or NAV statements provided by the investment manager. The NAV, which is used as a practical expedient to estimate fair value, is adjusted for contributions and distributions occurring between the investment manager and Dominion Energy’s measurement date. These valuations also involve assumptions and methods that are reviewed, evaluated, and adjusted, if necessary, by Dominion Energy.

Net Periodic Benefit (Credit) Cost

The service cost component of net periodic benefit (credit) cost is reflected in other operations and maintenance expense in Dominion Energy’s Consolidated Statements of Income, except for $5 million, $18 million and $25 million for the years ended December 31, 2024, 2023 and 2022, respectively, presented in discontinued operations. The non-service cost components of net periodic benefit (credit) cost are reflected in other income (expense) in Dominion Energy’s Consolidated Statements of Income, except for $12 million, $(46) million and $(81) million for the years ended December 31, 2024, 2023 and 2022, respectively, presented in

discontinued operations. The components of the provision for net periodic benefit (credit) cost and amounts recognized in other comprehensive income and regulatory assets and liabilities for Dominion Energy plans are as follows:

Pension BenefitsOther Postretirement Benefits
Year Ended December 31,202420232022202420232022
(millions, except percentages)
Service cost$83$96$142$11$14$22
Interest cost431442333576145
Expected return on plan assets**(**811)(864)(886)**(**171)(151)(191)
Amortization of prior service (credit) cost1——**(**36)(36)(38)
Net actuarial (gain) loss**(**96)304726**(**107)(125)246
Settlements, curtailments and special termination benefits(1)**(**56)—(3)**(**4)—(8)
Plan amendment22—————
Net periodic benefit (credit) cost$**(**426)$(22)$312$**(**250)$(237)$76
Changes in plan assets and benefit obligations recognized in other comprehensive income and regulatory assets and liabilities:
Prior service (credit) cost6214—8
Less amounts included in net periodic benefit cost:
Amortization of prior service credit (cost)**(**1)——363638
Total recognized in other comprehensive income and regulatory assets and liabilities$5$2$1$40$36$46
Significant assumptions used to determine periodic cost:
Discount rate5.37**%-5.75%**5.65%-5.75%3.06%-3.19%5.40**%-5.74%**5.69%-5.70%3.04%-5.03%
Expected long-term rate of return on plan assets7.00**%-8.35%**7.00%-8.35%7.00%-8.35%8.35**%**8.35%8.35%
Weighted-average rate of increase for compensation4.28**%**4.38%4.51%n/an/an/a
Crediting interest rate for cash balance and similar plans4.12**%-4.50%**4.40%-4.50%1.81%-1.94%n/an/an/a
Healthcare cost trend rate(2)7.00**%**7.00%6.25%
Rate to which the cost trend rate is assumed to decline (the ultimate trend rate)(2)5.00**%**5.00%5.00%
Year that the rate reaches the ultimate trend rate(2)203120302026-2027

(1)

2024 amounts relate primarily to the East Ohio Transaction. 2022 amounts relate primarily to Dominion Energy’s sale of Hope.

(2)

Assumptions used to determine net periodic cost for the following year.

The components of AOCI and regulatory assets and liabilities for Dominion Energy’s plans that have not been recognized as components of net periodic benefit (credit) cost are as follows:

Pension BenefitsOther Postretirement Benefits
At December 31,2024202320242023
(millions)
Regulatory assets and liabilities(1):
Net actuarial loss (gain)$496$1,237$**(**65)$(56)
Prior service cost (credit)82**(**41)(61)
AOCI:
Prior service cost (credit)23**(**40)(60)
Total$506$1,242$**(**146)$(177)

(1)

*At December 31, 2023, includes $*173 million presented in assets and liabilities held for sale.

The expected long-term rates of return on plan assets, discount rates, healthcare cost trend rates and mortality are critical assumptions in determining net periodic benefit (credit) cost. Dominion Energy develops non-investment related assumptions, which are then compared to the forecasts of an independent investment advisor to ensure reasonableness. An internal committee selects the final assumptions used for Dominion Energy’s pension and other postretirement plans including discount rates, expected long-term rates of return, healthcare cost trend rates and mortality rates.

Dominion Energy determines the expected long-term rates of return on plan assets for its pension plans and other postretirement benefit plans by using a combination of:

Expected inflation and risk-free interest rate assumptions;

Historical return analysis to determine long term historic returns as well as historic risk premiums for various asset classes;

Expected future risk premiums, asset classes’ volatilities and correlations;

Forward-looking return expectations derived from the yield on long-term bonds and the expected long-term returns of major capital market assumptions; and

Investment allocation of plan assets.

Dominion Energy determines discount rates from analyses of AA/Aa rated bonds with cash flows matching the expected payments to be made under its plans.

Mortality rates are developed from actual and projected plan experience for postretirement benefit plans. Dominion Energy’s actuary conducts an experience study periodically as part of the process to select its best estimate of mortality. Dominion Energy considers both standard mortality tables and improvement factors as well as the plans’ actual experience when selecting a best estimate.

Assumed healthcare cost trend rates have a significant effect on the amounts reported for Dominion Energy’s retiree healthcare plans. Dominion Energy establishes the healthcare cost trend rate assumption based on analyses of various factors including the specific provisions of its medical plans, actual cost trends experienced and projected and demographics of plan participants.

Other Employee Matters

In the first quarter of 2024, Dominion Energy recorded a charge of $23 million ($17 million after-tax) within discontinued operations in the Consolidated Statements of Income attributable to a contribution to its defined contribution employee savings plan associated with the closing of the East Ohio Transaction. In addition, in the first quarter of 2024, Dominion Energy recorded a charge of $13 million ($10 million after-tax) in other operations and maintenance expense in the Consolidated Statements of Income related to a severance accrual for certain employees in connection with the business review.

Virginia Power Participation in Defined Benefit Plans

Virginia Power employees are covered by the Dominion Energy Pension Plan described above. As a participating employer, Virginia Power is subject to Dominion Energy’s funding policy, which is to contribute annually an amount that is in accordance with ERISA. Virginia Power made no contribution payments to the Dominion Energy Pension Plan during 2024 and 2023. During 2022, Virginia Power made payments to Dominion Energy of $172 million, related to its participation in the Dominion Energy Pension Plan. Virginia Power’s net periodic pension cost related to this plan was $49 million, $34 million and $72 million in 2024, 2023 and 2022, respectively. Net periodic benefit (credit) cost is reflected in other operations and maintenance expense in Virginia Power’s Consolidated Statements of Income. The funded status of various Dominion Energy subsidiary groups and employee compensation are the basis for determining the share of total pension costs for participating Dominion Energy subsidiaries. See Note 25 for Virginia Power amounts due to/from Dominion Energy related to this plan.

Retiree healthcare and life insurance benefits, for Virginia Power employees are covered by the Dominion Energy Retiree Health and Welfare Plan described above. Virginia Power’s net periodic benefit (credit) cost related to this plan was $(72) million, $(60) million and $(81) million in 2024, 2023 and 2022, respectively. Net periodic benefit (credit) cost is reflected in other operations and maintenance expense in Virginia Power’s Consolidated Statements of Income. Employee headcount is the basis for determining the share of total other postretirement benefit costs for participating Dominion Energy subsidiaries. See Note 25 for Virginia Power amounts due to/from Dominion Energy related to this plan.

Dominion Energy holds investments in trusts to fund employee benefit payments for the pension and other postretirement benefit plans in which Virginia Power’s employees participate. Any investment-related declines in these trusts will result in future increases in the net periodic cost recognized for such employee benefit plans and will be included in the determination of the amount of cash that Virginia Power will provide to Dominion Energy for its share of employee benefit plan contributions.

Virginia Power funds other postretirement benefit costs through VEBAs. During 2024, 2023 and 2022, Virginia Power made no contributions to the VEBAs and does not expect to contribute to the VEBAs in 2025.

Defined Contribution Plans

Dominion Energy also sponsors defined contribution employee savings plans that cover substantially all employees. During 2024, 2023 and 2022, Dominion Energy recognized $82 million, $85 million and $75 million, respectively, as employer matching contributions to these plans, excluding discontinued operations. Virginia Power also participates in these employee savings plans. During 2024, 2023 and 2022, Virginia Power recognized $29 million, $26 million and $22 million, respectively, as employer matching contributions to these plans.

NOTE 23. COMMITMENTS AND CONTINGENCIES

As a result of issues generated in the ordinary course of business, the Companies are involved in legal proceedings before various courts and are periodically subject to governmental examinations (including by regulatory authorities), inquiries and investigations. Certain legal proceedings and governmental examinations involve demands for unspecified amounts of damages, are in an initial procedural phase, involve uncertainty as to the outcome of pending appeals or motions, or involve significant factual issues that need to be resolved, such that it is not possible for the Companies to estimate a range of possible loss. For such matters that the Companies cannot estimate, a statement to this effect is made in the description of the matter. Other matters may have progressed sufficiently through the litigation or investigative processes such that the Companies are able to estimate a range of possible loss. For legal proceedings and governmental examinations that the Companies are able to reasonably estimate a range of possible losses, an estimated range of possible loss is provided, in excess of the accrued liability (if any) for such matters. The Companies maintain various insurance programs, including general liability insurance coverage which provides coverage for personal injury or wrongful death cases. Any accrued liability is recorded on a gross basis with a receivable also recorded for any probable insurance recoveries. Estimated ranges of loss are inclusive of legal fees and net of any anticipated insurance recoveries. Any estimated range is based on currently available information and involves elements of judgment and significant uncertainties. Any estimated range of possible loss may not represent the Companies’ maximum possible loss exposure. The circumstances of such legal proceedings and governmental examinations will change from time to time and actual results may vary significantly from the current estimate. For current proceedings not specifically reported below, management does not anticipate that the liabilities, if any, arising from such proceedings would have a material effect on the Companies’ financial position, liquidity or results of operations.

Environmental Matters

The Companies are subject to costs resulting from a number of federal, state and local laws and regulations designed to protect human health and the environment. These laws and regulations affect future planning and existing operations. They can result in increased capital, operating and other costs as a result of compliance, remediation, containment and monitoring obligations.

Air

The CAA, as amended, is a comprehensive program utilizing a broad range of regulatory tools to protect and preserve the nation’s air quality. At a minimum, states are required to establish regulatory programs to meet applicable requirements of the CAA. However, states may choose to develop regulatory programs that are more restrictive. Many of the Companies’ facilities are subject to the CAA’s permitting and other requirements.

Ozone Standards

The EPA published final non-attainment designations for the October 2015 ozone standards in June 2018 with states required to develop plans to address the new standard. Certain states in which the Companies operate have developed plans, and had such plans approved or partially approved by the EPA, which are not expected to have a material impact on the Companies’ results of operations or cash flows. In March 2023, the EPA issued a final rule specifying an interstate federal implementation plan to comply with certain aspects of planning for the 2015 ozone standards which was applicable in August 2023 for certain states, including Virginia. The interstate federal implementation plan imposes tighter NOX emissions limits during the ozone season and includes provisions for the use of allowances to cover such emissions. Unless and until implementation plans for the 2015 ozone standards are fully developed and approved and in effect for all states in which the Companies operate, the Companies are unable to predict whether or to what extent the new rules will ultimately require additional controls. The expenditures required to implement additional controls could have a material impact on the Companies’ results of operations, financial condition and/or cash flows.

ACE Rule

In July 2019, the EPA published the final rule informally referred to as the ACE Rule, as a replacement for the Clean Power Plan. The ACE Rule regulated GHG emissions from existing coal-fired power plants pursuant to Section 111(d) of the CAA and required states to develop plans by July 2022 establishing unit-specific performance standards for existing coal-fired power plants. In January 2021, the U.S. Court of Appeals for the D.C. Circuit vacated the ACE Rule and remanded it to the EPA. This decision would take effect upon issuance of the court’s mandate. In March 2021, the court issued a partial mandate vacating and remanding all parts of the ACE Rule except for the portion of the ACE Rule that repealed the Clean Power Plan. In October 2021, the U.S. Supreme Court agreed to hear a challenge of the U.S. Court of Appeals for the D.C. Circuit’s decision on the ACE Rule. In June 2022, the U.S. Supreme Court reversed the D.C. Circuit’s decision on the ACE Rule and remanded the case back to the D.C. Circuit. In May 2024, the EPA repealed the ACE Rule as part of a package of final rules addressing CO2 emissions from new and existing fossil fuel-fired electric generating units.

Carbon Regulations

In August 2016, the EPA issued a draft rule proposing to reaffirm that a source’s obligation to obtain a PSD or Title V permit for GHGs is triggered only if such permitting requirements are first triggered by non-GHG, or conventional, pollutants that are regulated by the New Source Review program, and exceed a significant emissions rate of 75,000 tons per year of CO2 equivalent emissions. Until the EPA ultimately takes final action on this rulemaking, the Companies cannot predict the impact to their results of operations, financial condition and/or cash flows.

In December 2018, the EPA proposed revised Standards of Performance for Greenhouse Gas Emissions from New, Modified, and Reconstructed Stationary Sources. The proposed rule would amend the previous determination that the best system of emission reduction for newly constructed coal-fired steam generating units is no longer partial carbon capture and storage. Instead, the proposed revised best system of emission reduction for this source category is the most efficient demonstrated steam cycle (e.g., supercritical steam conditions for large units and subcritical steam conditions for small units) in combination with best operating practices. In May 2024, the EPA withdrew the proposed revision to the performance standards for coal-fired steam generating units as part of a package of final rules addressing CO2 emissions from new and existing fossil fuel-fired electric generating units.

Water

The CWA, as amended, is a comprehensive program requiring a broad range of regulatory tools including a permit program to authorize and regulate discharges to surface waters with strong enforcement mechanisms. The Companies must comply with applicable aspects of the CWA programs at their operating facilities.

Regulation 316(b)

In October 2014, the final regulations under Section 316(b) of the CWA that govern existing facilities and new units at existing facilities that employ a cooling water intake structure and that have flow levels exceeding a minimum threshold became effective. The rule establishes a national standard for impingement based on seven compliance options, but forgoes the creation of a single technology standard for entrainment. Instead, the EPA has delegated entrainment technology decisions to state regulators. State regulators are to make case-by-case entrainment technology determinations after an examination of five mandatory facility-specific factors, including a social cost-benefit test, and six optional facility-specific factors. The rule governs all electric generating stations with water withdrawals above two MGD, with a heightened entrainment analysis for those facilities over 125 MGD. Dominion Energy and Virginia Power currently have 14 and eight facilities, respectively, that are subject to the final regulations. Dominion Energy is also working with the EPA and state regulatory agencies to assess the applicability of Section 316(b) to eight hydroelectric facilities, including three Virginia Power facilities. The Companies anticipate that they may have to install impingement control technologies at certain of these stations that have once-through cooling systems. The Companies are currently evaluating the need or potential for entrainment controls under the final rule as these decisions will be made on a case-by-case basis after a thorough review of detailed biological, technological, and cost benefit studies. DESC is conducting studies and implementing plans as required by the rule to determine appropriate intake structure modifications at certain facilities to ensure compliance with this rule. While the impacts of this rule could be material to the Companies’ results of operations, financial condition and/or cash flows, the existing regulatory frameworks in South Carolina and Virginia provide rate recovery mechanisms that could substantially mitigate any such impacts for the regulated electric utilities.

Effluent Limitations Guidelines

In September 2015, the EPA released a final rule to revise the Effluent Limitations Guidelines for the Steam Electric Power Generating Category. The final rule established updated standards for wastewater discharges that apply primarily at coal and oil steam generating stations. Affected facilities are required to convert from wet to dry or closed cycle coal ash management, improve existing wastewater treatment systems and/or install new wastewater treatment technologies in order to meet the new discharge limits. In April 2017, the EPA granted two separate petitions for reconsideration of the Effluent Limitations Guidelines final rule and stayed future compliance dates in the rule. Also in April 2017, the U.S. Court of Appeals for the Fifth Circuit granted the EPA’s request for a stay of the pending consolidated litigation challenging the rule while the EPA addresses the petitions for reconsideration. In September 2017, the EPA signed a rule to postpone the earliest compliance dates for certain waste streams regulations in the Effluent Limitations Guidelines final rule from November 2018 to November 2020; however, the latest date for compliance for these regulations was December 2023. In October 2020, the EPA released the final rule that extended the latest dates for compliance with individual facilities’ compliance dates that would vary based on circumstances and the determination by state regulators and may range from 2021 to 2028. In May 2024, the EPA released a final rule revising the 2015 and 2020 Effluent Limitations Guidelines, establishing more stringent standards for wastewater discharges for the Steam Electric Power Generating Category, which apply primarily to wastewater discharges at coal and oil steam generating stations. Individual facilities’ compliance dates will vary based on circumstances and the determination by state regulators and may range to 2029, except in certain circumstances when a facility will be retired by 2034. Dominion Energy expects to complete wastewater treatment technology retrofits and modifications at its Williams generating station, with a similar project at its Wateree generation station under evaluation, to meet the requirements with the existing

regulatory framework in South Carolina providing rate recovery mechanisms for costs of the projects. As discussed in Note 14, the Companies recorded an increase to their AROs in the second quarter of 2024 in connection with the expected compliance costs associated with the EPA’s May 2024 final rule concerning CCR. The Companies expect that such AROs would satisfy any AROs that would have otherwise been necessary for compliance with the EPA’s May 2024 Effluent Limitations Guidelines. Dominion Energy is currently unable to estimate what costs, if any, may be required in addition to the project for the Williams generating station, a potential project at the Wateree generating station and the recorded AROs to meet the requirements to operate certain facilities past 2034. However, Dominion Energy expects that while such costs for facility improvements, if required, could be material to the Companies’ financial condition and/or cash flows, the existing regulatory frameworks in Virginia and South Carolina provide rate recovery mechanisms that could substantially mitigate any such impacts.

Waste Management and Remediation

The operations of the Companies are subject to a variety of state and federal laws and regulations governing the management and disposal of solid and hazardous waste, and release of hazardous substances associated with current and/or historical operations. The CERCLA, as amended, and similar state laws, may impose joint, several and strict liability for cleanup on potentially responsible parties who owned, operated or arranged for disposal at facilities affected by a release of hazardous substances. In addition, many states have created programs to incentivize voluntary remediation of sites where historical releases of hazardous substances are identified and property owners or responsible parties decide to initiate cleanups.

From time to time, the Companies may be identified as a potentially responsible party in connection with the alleged release of hazardous substances or wastes at a site. Under applicable federal and state laws, the Companies could be responsible for costs associated with the investigation or remediation of impacted sites, or subject to contribution claims by other responsible parties for their costs incurred at such sites. The Companies also may identify, evaluate and remediate other potentially impacted sites under voluntary state programs. Remediation costs may be subject to reimbursement under the Companies’ insurance policies, rate recovery mechanisms, or both. Except as described below, the Companies do not believe these matters will have a material effect on results of operations, financial condition and/or cash flows.

Dominion Energy has determined that it is associated with former manufactured gas plant sites, including certain sites associated with Virginia Power. At four sites associated with Dominion Energy, remediation work has been substantially completed under federal or state oversight. Where required, the sites are following state-approved groundwater monitoring programs. Dominion Energy has proposed remediation plans for one site at Virginia Power and expects to commence remediation activities in 2025 depending on receipt of final permits and approvals. At December 31, 2024 and December 31, 2023, Dominion Energy had $56 million and $32 million, respectively, of reserves recorded including a charge of $25 million ($19 million after-tax) that Virginia Power recorded in 2024, reflected in other operations and maintenance expense in the Consolidated Statements of Income. At December 31, 2024 and 2023, Virginia Power had $50 million and $25 million of reserves recorded, respectively. Dominion Energy is associated with three additional sites, including two associated with Virginia Power, which are not under investigation by any state or federal environmental agency nor the subject of any current or proposed plans to perform remediation activities. Due to the uncertainty surrounding such sites, the Companies are unable to make an estimate of the potential financial statement impacts.

Other Legal Matters

The Companies are defendants in a number of lawsuits and claims involving unrelated incidents of property damage and personal injury. In 2024, Dominion Energy resolved a claim associated with operations included in the East Ohio Transaction and at December 31, 2024, Dominion Energy’s Consolidated Balance Sheet includes a $30 million offsetting reserve and insurance receivable. The related charge in Dominion Energy’s Consolidated Statement of Income for the year ended December 31, 2024 is inconsequential. Due to the uncertainty surrounding other matters, the Companies are unable to make an estimate of the potential financial statement impacts; however, they could have a material impact on results of operations, financial condition and/or cash flows.

SCANA Legal Proceedings

The following describes certain legal proceedings involving Dominion Energy, SCANA or DESC relating primarily to events occurring before closing of the SCANA Combination. No reference to, or disclosure of, any proceeding, item or matter described below shall be construed as an admission or indication that such proceeding, item or matter is material. For certain of these matters, and unless otherwise noted therein, Dominion Energy is unable to estimate a reasonable range of possible loss and the related financial statement impacts, but for any such matter there could be a material impact to its results of operations, financial condition and/or cash flows. For the matters for which Dominion Energy is able to reasonably estimate a probable loss, Dominion Energy's Consolidated Balance Sheets at December 31, 2024 and 2023 included an inconsequential amount of reserves primarily related to personal injury or

wrongful death cases. During the years ended December 31, 2024, 2023 and 2022, charges included in Dominion Energy’s Consolidated Statements of Income were inconsequential.

Matters Fully Resolved Prior to 2024 Impacting the Consolidated Financial Statements

Governmental Proceedings and Investigations

In June 2018, DESC received a notice of proposed assessment of approximately $410 million, excluding interest, from the SCDOR following its audit of DESC’s sales and use tax returns for the periods September 1, 2008 through December 31, 2017. The proposed assessment, which includes 100% of the NND Project, is based on the SCDOR’s position that DESC’s sales and use tax exemption for the NND Project does not apply because the facility will not become operational. In December 2020, the parties reached an agreement in principle in the amount of $165 million to resolve this matter. In June 2021, the parties executed a settlement agreement which allows DESC to fund the settlement amount through a combination of cash, shares of Dominion Energy common stock or real estate with an initial payment of at least $43 million in shares of Dominion Energy common stock. In August 2021, Dominion Energy issued 0.6 million shares of its common stock to satisfy DESC’s obligation for the initial payment under the settlement agreement. In May 2022, Dominion Energy issued an additional 0.9 million shares of its common stock to partially satisfy DESC’s remaining obligation under the settlement agreement. In June 2022, DESC requested approval from the South Carolina Commission to transfer certain real estate with a total settlement value of $51 million to satisfy its remaining obligation under the settlement agreement. In July 2022, the South Carolina Commission voted to approve the request and issued its final order in August 2022. In September 2022, DESC transferred certain non-utility property with a fair value of $28 million to the SCDOR under the settlement agreement, resulting in a gain of $18 million ($14 million after-tax) recorded in losses (gains) on sales of assets (reflected in Dominion Energy South Carolina) in Dominion Energy’s Consolidated Statements of Income for the year ended December 31, 2022. In December 2022, DESC transferred additional utility property with a fair value of $3 million to the SCDOR, resulting in an inconsequential gain. In October 2022, DESC filed for approval to transfer the remaining real estate with FERC which was received in November 2022. In March 2023, DESC transferred utility property with a fair value of $10 million to the SCDOR resulting in a gain of $9 million ($7 million after-tax), recorded in losses (gains) on sales of assets (reflected in the Corporate and Other segment) in Dominion Energy’s Consolidated Statements of Income for the year ended December 31, 2023. In June 2023, DESC transferred the remaining utility property with a fair value of $11 million to the SCDOR resulting in a gain of $11 million ($8 million after-tax), recorded in losses (gains) on sales of assets (reflected in the Corporate and Other segment) in Dominion Energy’s Consolidated Statements of Income for the year ended December 31, 2023. In July 2023, DESC made a less than $1 million cash payment to the SCDOR to fully satisfy its remaining obligation, including applicable interest, under the settlement agreement.

SCANA Shareholder Litigation

In September 2017, a shareholder derivative action was filed against certain former executive officers and directors of SCANA in the State Court of Common Pleas in Richland County, South Carolina (the State Court Derivative Case). In September 2018, this action was consolidated with another action in the Business Court Pilot Program in Richland County. The plaintiffs allege, among other things, that the defendants breached their fiduciary duties to shareholders by their gross mismanagement of the NND Project, and that the defendants were unjustly enriched by bonuses they were paid in connection with the project. In January 2019, the defendants filed a motion to dismiss the consolidated action. In February 2019, one action was voluntarily dismissed. In March 2020, the court denied the defendants’ motion to dismiss. In April 2020, the defendants filed a notice of appeal with the South Carolina Court of Appeals and a petition with the Supreme Court of South Carolina seeking appellate review of the denial of the motion to dismiss. In June 2020, the plaintiffs filed a motion to dismiss the appeal with the South Carolina Court of Appeals, which was granted in July 2020. In August 2020, the Supreme Court of South Carolina denied the defendants’ petition seeking appellate review. Also in August 2020, the defendants filed a petition for rehearing with the South Carolina Court of Appeals relating to the July 2020 ruling by the court, which was denied in October 2020. In November 2020, SCANA filed a petition of certiorari with the Supreme Court of South Carolina seeking appellate review of the denial of SCANA’s motion to dismiss. This petition was denied in June 2021. Also in June 2021, the parties reached an agreement in principle in the amount of $33 million to resolve this matter, subject to court approval. This settlement was reached in contemplation of and to be utilized to satisfy a portion of the Federal Court Merger Case and the State Court Merger Case discussed below. In November 2021, the parties executed a settlement agreement and filed with the State Court of Common Pleas in Richland County, South Carolina for approval. In June 2022, the State Court of Common Pleas in Richland County, South Carolina issued final approval of the settlement agreement with the funds utilized to satisfy a portion of the State Court Merger Case as discussed below.

In January 2018, a purported class action was filed against SCANA, Dominion Energy and certain former executive officers and directors of SCANA in the State Court of Common Pleas in Lexington County, South Carolina (the City of Warren Lawsuit). The plaintiff alleges, among other things, that defendants violated their fiduciary duties to shareholders by executing a merger agreement that would unfairly deprive plaintiffs of the true value of their SCANA stock, and that Dominion Energy aided and abetted these actions. Among other remedies, the plaintiff seeks to enjoin and/or rescind the merger.

In February 2018, a purported class action was filed against Dominion Energy and certain former directors of SCANA and DESC in the State Court of Common Pleas in Richland County, South Carolina (the Metzler Lawsuit). The allegations made and the relief sought by the plaintiffs are substantially similar to that described for the City of Warren Lawsuit.

In September 2019, the U.S. District Court for the District of South Carolina granted the plaintiffs’ motion to consolidate the City of Warren Lawsuit and the Metzler Lawsuit (the Federal Court Merger Case). In October 2019, the plaintiffs filed an amended complaint against certain former directors and executive officers of SCANA and DESC, which stated substantially similar allegations to those in the City of Warren Lawsuit and the Metzler Lawsuit as well as an inseparable fraud claim. In November 2019, the defendants filed a motion to dismiss. In April 2020, the U.S. District Court for the District of South Carolina denied the motion to dismiss. In May 2020, SCANA filed a motion to intervene, which was denied in August 2020. In September 2020, SCANA filed a notice of appeal with the U.S. Court of Appeals for the Fourth Circuit. In June 2021, the parties reached an agreement in principle in the amount of $63 million to resolve this matter as well as the State Court Merger Case described below, subject to court approval. This settlement was reached in contemplation of and to be partially satisfied by the State Court Derivative Case settlement described above. In November 2021, the parties executed a settlement agreement, as described above relating to this matter as well as the State Court Derivative Case and the State Court Merger Case, and filed with the State Court of Common Pleas in Richland County, South Carolina for approval. In June 2022, this case was dismissed in connection with the final approval by the State Court of Common Pleas in Richland County, South Carolina of the settlement agreement.

In May 2019, a case was filed against certain former executive officers and directors of SCANA in the State Court of Common Pleas in Richland County, South Carolina (the State Court Merger Case). The plaintiff alleges, among other things, that the defendants breached their fiduciary duties to shareholders by their gross mismanagement of the NND Project, were unjustly enriched by the bonuses they were paid in connection with the project and breached their fiduciary duties to secure and obtain the best price for the sale of SCANA. Also in May 2019, the case was removed to the U.S. District Court of South Carolina by the non-South Carolina defendants. In June 2019, the plaintiffs filed a motion to remand the case to state court. In January 2020, the case was remanded to state court. In February 2020, the defendants filed a motion to dismiss. In June 2021, the parties reached an agreement in principle as described above relating to this matter as well as the Federal Court Merger Case and the State Court Derivative Case. In November 2021, the parties executed a settlement agreement, as described above relating to this matter as well as the State Court Derivative Case and the Federal Court Merger Case, and filed with the State Court of Common Pleas in Richland County, South Carolina for approval. In June 2022, the State Court of Common Pleas in Richland County, South Carolina issued final approval of the settlement agreement. Also in June 2022, Dominion Energy utilized the $33 million of insurance proceeds from the State Court Derivative Case settlement, the issuance of 0.4 million shares of its common stock and the payment of $2 million in cash to satisfy its obligations under the settlement agreement.

Nuclear Operations

Nuclear Decommissioning – Minimum Financial Assurance

The NRC requires nuclear power plant owners to annually update minimum financial assurance amounts for the future decommissioning of their nuclear facilities. Decommissioning involves the decontamination and removal of radioactive contaminants from a nuclear power station once operations have ceased, in accordance with standards established by the NRC. The 2024 calculation for the NRC minimum financial assurance amount, aggregated for Dominion Energy and Virginia Power’s nuclear units, excluding joint owners’ assurance amounts and Millstone Unit 1, as this unit is in a decommissioning state, was $3.4 billion and $2.0 billion, respectively, and has been satisfied by a combination of the funds being collected and deposited in the nuclear decommissioning trusts and the real annual rate of return growth of the funds allowed by the NRC. The 2024 NRC minimum financial assurance amounts above were calculated using preliminary December 31, 2024 U.S. Bureau of Labor Statistics indices. Dominion Energy believes that decommissioning funds and their expected earnings will be sufficient to cover expected decommissioning costs for the Millstone units. In addition, Dominion Energy believes that the decommissioning funds and their expected earnings will be sufficient to cover expected decommissioning costs for the Summer unit, particularly when combined with future ratepayer collections and contributions. The Companies believe the decommissioning funds and their expected earnings for the Surry and North Anna units will be sufficient to cover decommissioning costs, particularly when combined with future ratepayer collections and contributions to these decommissioning trusts, if such future collections and contributions are required. This reflects a positive long-term outlook for trust fund investment returns as the decommissioning of the units will not be complete for decades. The Companies will continue to monitor these trusts to ensure they meet the NRC minimum financial assurance requirement, which may include, if needed, the use of parent company guarantees, surety bonding or other financial instruments recognized by the NRC. See Note 9 for additional information on nuclear decommissioning trust investments.

Nuclear Insurance

The Price-Anderson Amendments Act of 1988 provides the public up to $16.3 billion of liability protection on a per site, per nuclear incident basis, via obligations required of owners of nuclear power plants, and allows for an inflationary provision adjustment every

five years. During the first quarter of 2024, the total liability protection per nuclear incident available to all participants in the Secondary Financial Protection Program increased from $16.2 billion to $16.3 billion. These increases do not impact Dominion Energy’s responsibility per active unit under the Price-Anderson Amendments Act of 1988. The Companies have purchased $500 million of coverage from commercial insurance pools for Millstone, Summer, Surry and North Anna with the remainder provided through the mandatory industry retrospective rating plan. In the event of a nuclear incident at any licensed nuclear reactor in the U.S., the Companies could be assessed up to $166 million for each of their licensed reactors not to exceed $25 million per year per reactor. There is no limit to the number of incidents for which this retrospective premium can be assessed. The current levels of nuclear property insurance coverage for Millstone, Summer, Surry and North Anna are all $1.06 billion.

The Companies’ nuclear property insurance coverage for Millstone, Summer, Surry and North Anna meets or exceeds the NRC minimum requirement for nuclear power plant licensees of $1.06 billion per reactor site. This includes coverage for premature decommissioning and functional total loss. The NRC requires that the proceeds from this insurance be used first, to return the reactor to and maintain it in a safe and stable condition and second, to decontaminate the reactor and station site in accordance with a plan approved by the NRC. Nuclear property insurance is provided by NEIL, a mutual insurance company, and is subject to retrospective premium assessments in any policy year in which losses exceed the funds available to the insurance company. Dominion Energy and Virginia Power’s maximum retrospective premium assessment for the current policy period is $56 million and $30 million, respectively. Based on the severity of the incident, the Board of Directors of the nuclear insurer has the discretion to lower or eliminate the maximum retrospective premium assessment. The Companies have the financial responsibility for any losses that exceed the limits or for which insurance proceeds are not available because they must first be used for stabilization and decontamination. Additionally, DESC maintains an excess property insurance policy with the European Mutual Association for Nuclear Insurance. The policy provides coverage to Summer for property damage and outage costs up to $1 million resulting from an event of a non-nuclear origin. The European Mutual Association for Nuclear Insurance policy permits retrospective assessments under certain conditions to cover insurer’s losses. Based on the current annual premium, DESC’s share of the retrospective premium assessment would not exceed an inconsequential amount.

Millstone, Virginia Power and Summer also purchase accidental outage insurance from NEIL to mitigate certain expenses, including replacement power costs, associated with the prolonged outage of a nuclear unit due to direct physical damage. Under this program, the Companies are subject to a retrospective premium assessment for any policy year in which losses exceed funds available to NEIL. Dominion Energy and Virginia Power’s maximum retrospective premium assessment for the current policy period is $36 million and $10 million, respectively.

ODEC, a part owner of North Anna, Santee Cooper, a part owner of Summer and Massachusetts Municipal and Green Mountain, part owners of Millstone’s Unit 3, are responsible to the Companies for their share of the nuclear decommissioning obligation and insurance premiums on applicable units, including any retrospective premium assessments and any losses not covered by insurance.

Spent Nuclear Fuel

The Companies entered into contracts with the DOE for the disposal of spent nuclear fuel under provisions of the Nuclear Waste Policy Act of 1982. The DOE failed to begin accepting the spent fuel on January 31, 1998, the date provided by the Nuclear Waste Policy Act and by the Companies’ contracts with the DOE. The Companies have previously received damages award payments and settlement payments related to these contracts.

By mutual agreement of the parties, the settlement agreements are extendable to provide for resolution of damages incurred after 2013. The settlement agreements for the Surry, North Anna and Millstone nuclear power stations have been extended and provided for periodic payments for damages incurred through December 31, 2025 and future additional extensions are contemplated by the settlement agreements. A similar agreement for Summer extends until the DOE has accepted the same amount of spent fuel from the facility as if it has fully performed its contractual obligations.

In 2024, Virginia Power received payments of $16 million for resolution of claims incurred at North Anna and Surry for the period of January 1, 2022 through December 31, 2022. In addition, Dominion Energy received payments of $11 million for resolution of claims incurred at Millstone for the period of July 1, 2022 through June 30, 2023 and $2 million for resolution of its share of claims incurred at Summer for the period of January 1, 2023 through December 31, 2023.

In 2023, Virginia Power received payments of $22 million for resolution of claims incurred at North Anna and Surry for the period of January 1, 2021 through December 31, 2021. In addition, Dominion Energy received payments of $8 million for resolution of claims incurred at Millstone for the period of July 1, 2021 through June 30, 2022 and $6 million for resolution of its share of claims incurred at Summer for the period of January 1, 2022 through December 31, 2022.

In 2022, Virginia Power received payments of $17 million for resolution of claims incurred at North Anna and Surry for the period of January 1, 2020 through December 31, 2020. In addition, Dominion Energy received payments of $7 million for resolution of claims

incurred at Millstone for the period of July 1, 2020 through June 30, 2021 and $1 million for resolution of its share of claims incurred at Summer for the period of January 1, 2021 through December 31, 2021.

The Companies continue to recognize receivables for certain spent nuclear fuel-related costs that they believe are probable of recovery from the DOE. Dominion Energy’s receivables for spent nuclear fuel-related costs totaled $83 million and $62 million at December 31, 2024 and 2023, respectively. Virginia Power’s receivables for spent nuclear fuel-related costs totaled $62 million and $43 million at December 31, 2024 and 2023, respectively.

The Companies will continue to manage their spent fuel until it is accepted by the DOE.

Offshore Wind Decommissioning – Minimum Financial Assurance

BOEM requires entities holding a commercial lease for offshore wind facilities to provide financial assurance, as annually determined by BOEM, for future decommission of such facilities including those under development. Decommissioning costs include removing or decommissioning all facilities, projects, cables, pipelines and obstructions, as well as clearing the seafloor of all obstructions created by activities on the leased acreage. The most recent financial assurance calculation received from BOEM for the CVOW Commercial Project, based on its expected completion, was $1.6 billion. As discussed in Note 13, Virginia Power’s November 2024 application for Rider OSW filed with the Virginia Commission included a proposal for Virginia Power to establish a decommissioning trust fund associated with the CVOW Commercial Project. If approved, the applicable amount included within the total revenue requirement of Rider OSW would be allocated for such purposes. To the extent that the minimum financial assurance requirements are not able to be met from such decommission trust funds, if approved, Virginia Power may be required to utilize parent company guarantees, surety bonding or other financial instruments recognized by BOEM.

Long-Term Purchase Agreements

At December 31, 2024, Dominion Energy had the following long-term commitments that are noncancelable or are cancelable only under certain conditions, and that a third party has used to secure financing for the facility that will provide the contracted goods or services:

20252026202720282029ThereafterTotal
(millions)
Purchased electric capacity(1)$70$71$72$71$71$383$738

(1)

*Commitments represent estimated amounts payable for energy under power purchase contracts with qualifying facilities which expire at various dates through 2040. Energy payments are generally based on fixed dollar amounts per month and totaled $*60 million and $58 million for the years ended December 31, 2024 and 2023, respectively.

Guarantees, Surety Bonds and Letters of Credit

Dominion Energy also enters into guarantee arrangements on behalf of its consolidated subsidiaries, primarily to facilitate their commercial transactions with third parties. If any of these subsidiaries fail to perform or pay under the contracts and the counterparties seek performance or payment, Dominion Energy would be obligated to satisfy such obligation. To the extent that a liability subject to a guarantee has been incurred by one of Dominion Energy’s consolidated subsidiaries, that liability is included in the Consolidated Financial Statements. Dominion Energy is not required to recognize liabilities for guarantees issued on behalf of its subsidiaries unless it becomes probable that it will have to perform under the guarantees. Terms of the guarantees typically end once obligations have been paid. Dominion Energy currently believes it is unlikely that it would be required to perform or otherwise incur any losses associated with guarantees of its subsidiaries’ obligations.

At December 31, 2024, Dominion Energy had issued the following subsidiary guarantees:

Maximum Exposure
(millions)
Commodity transactions(1)$2,731
Nuclear obligations(2)220
Solar(3)207
Other(4)853
Total(5)(6)$4,011

(1)

Guarantees related to commodity commitments of certain subsidiaries. These guarantees were provided to counterparties in order to facilitate physical and financial transaction related commodities and services.

(2)

Guarantees primarily related to certain DGI subsidiaries regarding all aspects of running a nuclear facility.

(3)

Includes guarantees to facilitate the development of solar projects.

(4)

Guarantees related to other miscellaneous contractual obligations such as leases, environmental obligations, construction projects and insurance programs. Due to the uncertainty of workers’ compensation claims, the parental guarantee has no stated limit.

(5)

Excludes Dominion Energy’s guarantee of an offshore wind installation vessel discussed in Note 15.

(6)

In July 2016, Dominion Energy signed an agreement (subsequently amended) with a lessor to construct and lease a new corporate office property in Richmond, Virginia and commenced an initial five-year lease term in August 2019, with certain options at the end of the term to extend the lease, purchase or sell the property. In July 2024, the agreement was amended to reflect Dominion Energy’s election to extend the lease term through July 2029. At the end of the lease term, Dominion Energy can (i) extend the term of the lease for at least one year*, subject to the approval of the participants, at current market terms, (ii) purchase the property for an amount equal to the project costs or, (iii) subject to certain terms and conditions, sell the property on behalf of the lessor to a third party using commercially reasonable efforts to obtain the highest cash purchase price for the property. If the project is sold and the proceeds from the sale are insufficient to repay the investors for the project costs, Dominion Energy may be required to make a payment to the lessor equal to the recorded lease balance.*

In addition, Dominion Energy had issued an additional $20 million of guarantees at December 31, 2024, primarily to support third parties. No amounts related to these guarantees have been recorded.

Dominion Energy also had issued four guarantees as of December 31, 2024 related to Cove Point, previously an equity method investment, in support of terminal services, transportation and construction. Two of the Cove Point guarantees have a cumulative maximum exposure of $1.9 billion while the other two guarantees have no maximum limit. No amounts related to these guarantees have been recorded.

Additionally, at December 31, 2024, Dominion Energy had purchased $329 million of surety bonds, including $259 million at Virginia Power, and authorized the issuance of letters of credit by financial institutions, as discussed in Note 17, to facilitate commercial transactions by its subsidiaries with third parties. Under the terms of surety bonds, the Companies are obligated to indemnify the respective surety bond company for any amounts paid.

Indemnifications

As part of commercial contract negotiations in the normal course of business, the Companies may sometimes agree to make payments to compensate or indemnify other parties for possible future unfavorable financial consequences resulting from specified events. The specified events may involve an adverse judgment in a lawsuit or the imposition of additional taxes due to a change in tax law or interpretation of the tax law. The Companies are unable to develop an estimate of the maximum potential amount of any other future payments under these contracts because events that would obligate them have not yet occurred or, if any such event has occurred, they have not been notified of its occurrence. However, at December 31, 2024, the Companies believe any other future payments, if any, that could ultimately become payable under these contract provisions, would not have a material impact on their results of operations, cash flows or financial position.

Charitable Commitments

Dominion Energy’s Consolidated Balance Sheets include $32 million and $8 million in other deferred credits and other liabilities at December 31, 2024 and 2023, respectively and $21 million and $6 million in other current liabilities at December 31, 2024 and 2023, respectively, for charitable commitments. In 2024, Dominion Energy made unconditional promises to charitable organizations and as a result recorded charges totaling $72 million ($54 million after-tax) in other income (expense) in its Consolidated Statements of Income for the year ended December 31, 2024 reflected in the Corporate and Other segment. These commitments are primarily to be funded at various intervals through 2028.

NOTE 24. CREDIT RISK

Dominion Energy

As a diversified energy company, Dominion Energy transacts primarily with major companies in the energy industry and with commercial and residential energy consumers. These transactions principally occur in the Northeast, mid-Atlantic and Southeast regions of the U.S. Dominion Energy does not believe that this geographic concentration contributes significantly to its overall exposure to credit risk. In addition, as a result of its large and diverse customer base, Dominion Energy is not exposed to a significant concentration of credit risk for receivables arising from electric and gas utility operations.

Dominion Energy’s exposure to credit risk is concentrated primarily within its energy marketing and price risk management activities, as Dominion Energy transacts with a smaller, less diverse group of counterparties and transactions may involve large notional volumes and potentially volatile commodity prices. Energy marketing and price risk management activities include marketing of nonregulated generation output, structured transactions and the use of financial contracts for enterprise-wide hedging purposes. Gross credit exposure for each counterparty is calculated as outstanding receivables plus any unrealized on- or off-balance sheet exposure, taking into account contractual netting rights. Gross credit exposure is calculated prior to the application of any collateral. At December 31, 2024, Dominion Energy’s credit exposure totaled $173 million. Of this amount, investment grade counterparties, including those internally rated, represented 81%, and no single counterparty, whether investment grade or non-investment grade, exceeded $55 million of exposure.

Virginia Power

Virginia Power sells electricity and provides distribution and transmission services to customers in Virginia and northeastern North Carolina. Management believes that this geographic concentration risk is mitigated by the diversity of Virginia Power’s customer base, which includes residential, commercial and industrial customers, as well as rural electric cooperatives and municipalities. Credit risk associated with trade accounts receivable from energy consumers is limited due to the large number of customers. Virginia Power’s exposure to potential concentrations of credit risk results primarily from sales to wholesale customers. Virginia Power’s gross credit exposure for each counterparty is calculated as outstanding receivables plus any unrealized on- or off-balance sheet exposure, taking into account contractual netting rights. Gross credit exposure is calculated prior to the application of collateral. At December 31, 2024, Virginia Power’s credit exposure totaled $67 million. Of this amount, investment grade counterparties, including those internally rated, represented 53%, and no single counterparty exceeded $10 million of exposure.

Credit-Related Contingent Provisions

Certain of Dominion Energy and Virginia Power’s derivative instruments contain credit-related contingent provisions. These provisions require Dominion Energy and Virginia Power to provide collateral upon the occurrence of specific events, primarily a credit rating downgrade. If the credit-related contingent features underlying these instruments that are in a liability position and not fully collateralized with cash were fully triggered, Dominion Energy and Virginia Power would have been required to post additional collateral to its counterparties of $13 million and $12 million, respectively, as of December 31, 2024, and $28 million and $14 million, respectively, as of December 31, 2023. The collateral that would be required to be posted includes the impacts of any offsetting asset positions and any amounts already posted for derivatives, non-derivative contracts and derivatives elected under the normal purchases and normal sales exception, per contractual terms. At both December 31, 2024 and 2023, Dominion Energy and Virginia Power had no amounts of collateral posted related to derivatives with credit related contingent provisions that are in a liability position and not fully collateralized with cash. Dominion Energy and Virginia Power had both posted letters of credit as collateral with counterparties covering less than $1 million of fair value of derivative instruments in a liability position at December 31, 2023. There were no letters of credits posted as collateral at December 31, 2024 for both Dominion Energy and Virginia Power. The aggregate fair value of all derivative instruments with credit-related contingent provisions that are in a liability position and not fully collateralized with cash for Dominion Energy and Virginia Power was $13 million and $12 million, respectively, as of December 31, 2024 and $28 million and $14 million, respectively, as of December 31, 2023, which does not include the impact of any offsetting asset positions.

See Note 7 for further information about derivative instruments.

NOTE 25. RELATED-PARTY TRANSACTIONS

Dominion Energy’s transactions with equity method investments are described in Note 9. Virginia Power engages in related party transactions primarily with other Dominion Energy subsidiaries (affiliates). Virginia Power’s receivable and payable balances with affiliates are settled based on contractual terms or on a monthly basis, depending on the nature of the underlying transactions. Virginia Power is included in Dominion Energy’s consolidated federal income tax return and, where applicable, combined income tax returns for Dominion Energy are filed in various states. See Note 2 for further information. A discussion of Virginia Power’s significant related party transactions follows.

Virginia Power transacts with affiliates for certain quantities of natural gas and other commodities in the ordinary course of business. Virginia Power also enters into certain commodity derivative contracts with affiliates. Virginia Power uses these contracts, which are principally comprised of forward commodity purchases, to manage commodity price risks associated with purchases of natural gas. See Note 7 for additional information. At December 31, 2024, Virginia Power’s derivative assets and liabilities with affiliates were $19 million and $17 million, respectively. At December 31, 2023, Virginia Power’s derivative assets and liabilities with affiliates were $1 million and $79 million, respectively.

Virginia Power participates in certain Dominion Energy benefit plans as described in Note 22. At December 31, 2024 and 2023, Virginia Power’s amounts due to Dominion Energy associated with the Dominion Energy Pension Plan and reflected in other deferred credits and other liabilities in the Consolidated Balance Sheets were $505 million and $456 million, respectively. At December 31, 2024 and 2023, Virginia Power’s amounts due from Dominion Energy associated with the Dominion Energy Retiree Health and Welfare Plan and reflected in noncurrent pension and other postretirement benefit assets in the Consolidated Balance Sheets were $663 million and $584 million, respectively.

DES and other affiliates provide accounting, legal, finance and certain administrative and technical services to Virginia Power. In addition, Virginia Power provides certain services to affiliates, including charges for facilities and equipment usage.

The financial statements for all years presented include costs for certain general, administrative and corporate expenses assigned by DES to Virginia Power on the basis of direct and allocated methods in accordance with Virginia Power’s services agreements with DES. Where costs incurred cannot be determined by specific identification, the costs are allocated based on the proportional level of effort devoted by DES resources that is attributable to the entity, determined by reference to number of employees, salaries and wages and other similar measures for the relevant DES service. Management believes the assumptions and methodologies underlying the allocation of general corporate overhead expenses are reasonable.

Presented below are Virginia Power’s significant transactions with DES and other affiliates:

Year Ended December 31,202420232022
(millions)
Commodity purchases from affiliates$585$582$1,423
Services provided by affiliates(1)667605519
Services provided to affiliates222018

(1)

*Includes capitalized expenditures of $*234 *million, $*210 million and $177 million for the years ended December 31, 2024, 2023 and 2022, respectively.

Virginia Power has borrowed funds from Dominion Energy under short-term borrowing arrangements. In November 2022, Virginia Power amended its intercompany credit facility with Dominion Energy to increase the maximum capacity to $3.0 billion. In addition in December 2024, Virginia Power amended this facility to extend the maturity date to December 2027. There were $500 million in short-term demand note borrowings from Dominion Energy as of both December 31, 2024 and 2023. The weighted-average interest rate of these borrowings was 4.71% and 5.61% at December 31, 2024 and 2023, respectively. Virginia Power had no outstanding borrowings, net of repayments under the Dominion Energy money pool for its nonregulated subsidiaries as of December 31, 2024 and 2023. Interest charges related to Virginia Power’s borrowings from Dominion Energy were $29 million, $80 million and $15 million for the years ended December 31, 2024, 2023 and 2022, respectively.

In the fourth quarter of 2024, Virginia Power declared a dividend of $407 million.

In the fourth quarter of 2023, Virginia Power issued common stock to Dominion Energy as discussed in Note 20. There were no issuances of Virginia Power’s common stock to Dominion Energy in 2024 or 2022.

In January 2023, Virginia Power entered into a lease contract with an affiliated entity for the use of a Jones Act compliant offshore wind installation vessel currently under development with commencement of the 20-month lease term in August 2025 at a total cost of approximately $240 million plus ancillary services. Virginia Power filed an application with the Virginia Commission to amend the lease agreement to potentially accelerate the commencement of the lease term in August 2024 and received approval in October 2024. Virginia Power filed a corresponding application with the North Carolina Commission in September 2024 and received approval in December 2024. In December 2024, the lease was amended.

NOTE 26. OPERATING SEGMENTS

The Companies are organized primarily on the basis of products and services sold in the U.S. A description of the operations included in the Companies’ primary operating segments is as follows:

Primary Operating SegmentDescription of OperationsDominion EnergyVirginia Power
Dominion Energy VirginiaRegulated electric distributionXX
Regulated electric transmissionXX
Regulated electric generation fleet(1)XX
Dominion Energy South CarolinaRegulated electric distributionX
Regulated electric transmissionX
Regulated electric generation fleetX
Regulated gas distribution and storageX
Contracted Energy(2)Nonregulated electric generation fleetX

(1)

Includes Virginia Power’s non-jurisdictional solar generation operations.

(2)

Includes renewable natural gas operations.

In addition to the operating segments above, the Companies also report a Corporate and Other segment.

Dominion Energy

The Corporate and Other Segment of Dominion Energy includes its corporate, service company and other functions (including unallocated debt) as well as its noncontrolling interest in Dominion Privatization, its noncontrolling interest in Wrangler (through March 2022) and Hope (through August 2022). In addition, Corporate and Other includes specific items attributable to Dominion Energy’s operating segments that are not included in profit measures evaluated by executive management in assessing the segments’ performance or in allocating resources, including the net impact of the operations reflected as discontinued operations, which includes the entities included in the East Ohio (through March 2024), Questar Gas (through May 2024) and PSNC (through September 2024) Transactions, a noncontrolling interest in Cove Point (through September 2023), certain solar generation facility development operations (through April 2024) and a noncontrolling interest in Atlantic Coast Pipeline as discussed in Notes 3 and 9.

Dominion Energy’s CODM for the year ended December 31, 2024 was the COO. The Dominion Energy CODM uses net income (loss) as the primary profit or loss measure at each segment. The Dominion Energy CODM considers budget-to-actual variances on a quarterly basis when making decisions about allocating operating and capital resources to each segment, when assessing the performance of each segment and when determining the compensation of certain employees.

In 2024, Dominion Energy reported after-tax net expenses of $644 million in the Corporate and Other segment, including $268 million of after-tax net expenses for specific items with $132 million of after-tax net expenses attributable to its operating segments.

The net expenses for specific items attributable to Dominion Energy’s operating segments in 2024 primarily related to the impact of the following items:

A $232 million ($176 million after-tax) loss related to economic hedging activities, attributable to Contracted Energy;

A $122 million ($89 million after-tax) charge related to the revision of AROs for Millstone Unit 1, attributable to Contracted Energy;

A $103 million ($77 million after-tax) charge for Virginia Power’s share of costs not expected to be recovered from customers on the CVOW Commercial Project, attributable to Dominion Energy Virginia;

$60 million ($46 million after-tax) of charges for the impairment of certain nonregulated renewable natural gas facilities, attributable to Contracted Energy;

A $58 million ($44 million after-tax) charge in connection with the electric base rate case in South Carolina, attributable to Dominion Energy South Carolina;

A $47 million ($35 million after-tax) charge in connection with a settlement of an agreement, attributable to Contracted Energy;

$40 million ($30 million after-tax) of charges for dismantling costs associated with the early retirement of certain electric generation facilities, attributable to Dominion Energy Virginia;

A $30 million ($22 million after-tax) charge related to the write-off of certain early-stage development costs, attributable to Dominion Energy Virginia; and

A $25 million ($19 million after-tax) charge associated with an accrual for remediation costs at a manufactured gas plant site, attributable to Dominion Energy Virginia; partially offset by

A $565 million ($434 million after-tax) gain related to investments in nuclear decommissioning trust funds, attributable to:

Contracted Energy ($372 million after-tax); and

Dominion Energy Virginia ($62 million after-tax).

In 2023, Dominion Energy reported after-tax net expenses of $129 million in the Corporate and Other segment, including $316 million of after-tax net income for specific items with $405 million of after-tax net income attributable to its operating segments.

The net income for specific items attributable to Dominion Energy’s operating segments in 2023 primarily related to the impact of the following items:

A $586 million ($447 million after-tax) gain related to economic hedging activities, attributable to Contracted Energy;

A $411 million ($305 million after-tax) gain related to investments in nuclear decommissioning trust funds, attributable to:

Contracted Energy ($262 million after-tax); and

Dominion Energy Virginia ($43 million after-tax); and

A $28 million ($21 million after-tax) benefit related to real estate transactions, including gains on the transfer of property to satisfy litigation associated with the NND Project, attributable to Dominion Energy South Carolina; partially offset by

A $244 million ($182 million after-tax) charge for amortization of a regulatory asset established in connection with the settlement of the 2021 Triennial Review, attributable to Dominion Energy Virginia;

An $83 million ($60 million after-tax) charge related to the revision of AROs for Millstone Unit 1, attributable to Contracted Energy;

A $65 million ($48 million after-tax) charge for an easement related to the CVOW Commercial Project for which Virginia Power will not seek recovery, attributable to Dominion Energy Virginia;

A $36 million ($27 million after-tax) charge for the write-off of certain previously deferred amounts related to the cessation of certain riders effective July 2023, attributable to Dominion Energy Virginia;

A $35 million ($26 million after-tax) decrease from Dominion Energy’s share of an impairment of certain property, plant and equipment at Align RNG, attributable to Contracted Energy; and

A $25 million ($19 million after-tax) charge associated with the abandonment of certain regulated solar generation and other facilities, attributable to Dominion Energy Virginia.

In 2022, Dominion Energy reported after-tax net expenses of $1.4 billion in the Corporate and Other segment, including $1.5 billion of after-tax net expenses for specific items with $2.4 billion of after-tax net expenses attributable to its operating segments.

The net expenses for specific items attributable to Dominion Energy’s operating segments in 2022 primarily related to the impact of the following items:

A $829 million ($633 million after-tax) charge associated with the impairment of certain nonregulated solar generation facilities, attributable to Contracted Energy;

A $649 million ($513 million after-tax) loss associated with the sale of Kewaunee, attributable to Contracted Energy;

A $559 million ($451 million after-tax) loss related to investments in nuclear decommissioning trust funds, attributable to:

Contracted Energy ($393 million after-tax); and

Dominion Energy Virginia ($58 million after-tax);

A $243 million ($181 million after-tax) charge for amortization of a regulatory asset established in connection with the settlement of the 2021 Triennial Review, attributable to Dominion Energy Virginia;

A $213 million ($159 million after-tax) charge for RGGI compliance costs deemed recovered through base rates, attributable to Dominion Energy Virginia;

A $191 million ($142 million after-tax) charge in connection with a comprehensive settlement agreement for Virginia fuel expenses, attributable to Dominion Energy Virginia;

$167 million ($124 million after-tax) of charges for dismantling costs associated with the early retirement of certain electric generation facilities, attributable to Dominion Energy Virginia;

$125 million ($93 million after-tax) of charges associated with storm damage and service restoration, attributable to:

Dominion Energy Virginia ($87 million after-tax); and

Contracted Energy ($6 million after-tax);

A $40 million ($30 million after-tax) charge associated with the write-off of inventory, attributable to:

Contracted Energy ($16 million after-tax); and

Dominion Energy Virginia ($14 million after-tax); partially offset by

A $67 million ($49 million after-tax) gain related to economic hedging activities, attributable to Contracted Energy.

The following table presents segment information pertaining to Dominion Energy’s 2024 operations:

Year Ended December 31, 2024Dominion Energy VirginiaDominion Energy South CarolinaContracted EnergyCorporate and OtherAdjustments & EliminationsConsolidated Total
(millions)
Total revenue from external customers$10,226$3,295$1,099$**(**161)$—$14,459
Intersegment revenue99101,002**(**1,030)—
Total Operating Revenue10,2353,3041,109841**(**1,030)14,459
Electric fuel and other energy-related purchases(1)2,743775102—**(**6)3,614
Purchased electric capacity(1)688——**(**2)74
Purchased gas(1)—260———260
Other operations and maintenance(1)(2)2,2176714871,827**(**1,014)4,188
Depreciation and amortization(1)1,6355467688—2,345
Other taxes(1)3322925362**(**8)731
Total Operating Expenses6,9952,5527181,977**(**1,030)11,212
Interest and related charges(1)85627636906**(**187)1,887
Income tax expense (benefit)(1)44380105**(**320)—308
Equity in earnings (losses) of equity method investees(3)——9**(**6)—3
Other income (expense)(3)100**(**5)**(**15)614—694
Interest income(3)207115170**(**187)125
Net Income from Discontinued Operations Including Noncontrolling Interests———197—197
Noncontrolling Interests50——**(**103)—**(**53)
Net Income (Loss) Attributable to Dominion Energy2,011398359**(**644)—2,124
Investment in equity method investees(4)——9147—138
Capital expenditures9,9681,105772582—12,427
Total assets (billions)70.018.49.510.2**(**5.7)102.4

(1)

The significant expense categories and amounts in the segment information presented above align with the segment-level information that is regularly provided to Dominion Energy’s CODM.

(2)

Includes impairment of assets and other charges (benefits) and losses (gains) on sale of assets.

(3)

Items designated are other segment items for each reportable segment.

(4)

Excludes liability to Atlantic Coast Pipeline.

The following table presents segment information pertaining to Dominion Energy’s 2023 operations:

Year Ended December 31, 2023Dominion Energy VirginiaDominion Energy South CarolinaContracted EnergyCorporate and OtherAdjustments & EliminationsConsolidated Total
(millions)
Total revenue from external customers$9,575$3,369$835$614$—$14,393
Intersegment revenue(2)616939(959)—
Total Operating Revenue9,5733,3758511,553(959)14,393
Electric fuel and other energy-related purchases(1)2,91894780—(10)3,935
Purchased electric capacity(1)4612——(3)55
Purchased gas(1)—285———285
Other operations and maintenance(1)(2)1,8426125441,381(939)3,440
Depreciation and amortization(1)1,622531105322—2,580
Other taxes(1)2982854860(7)684
Total Operating Expenses6,7262,6727771,763(959)10,979
Interest and related charges(1)77224944815(206)1,674
Income tax expense(1)47179153—568
Equity in earnings (losses) of equity method investees(3)——(34)8—(26)
Other income (expense)(3)65(4)22820—903
Interest income(3)15696196(206)107
Net Loss From Discontinued Operations Including Noncontrolling Interests———(125)—(125)
Net Income (Loss) Attributable to Dominion Energy1,68437799(129)—2,031
Investment in equity method investees(4)——80188—268
Capital expenditures7,1969577401,342—10,235
Total assets (billions)60.717.39.126.1(4.1)109.1

(1)

The significant expense categories and amounts in the segment information presented above align with the segment-level information that is regularly provided to Dominion Energy’s CODM.

(2)

Includes impairment of assets and other charges (benefits) and losses (gains) on sale of assets.

(3)

Items designated are other segment items for each reportable segment.

(4)

Excludes liability to Atlantic Coast Pipeline.

The following table presents segment information pertaining to Dominion Energy’s 2022 operations:

Year Ended December 31, 2022Dominion Energy VirginiaDominion Energy South CarolinaContracted EnergyCorporate and OtherAdjustments & EliminationsConsolidated Total
(millions)
Total revenue from external customers$9,658$3,323$884$73$—$13,938
Intersegment revenue(15)718849(859)—
Total Operating Revenue9,6433,330902922(859)13,938
Electric fuel and other energy-related purchases(1)2,91371990—(11)3,711
Purchased electric capacity(1)3815—9(3)59
Purchased gas(1)—383—43—426
Other operations and maintenance(1)(2)1,9566044483,009(839)5,178
Depreciation and amortization(1)1,452507123360—2,442
Other taxes(1)3012694368(6)675
Total Operating Expenses6,6602,4977043,489(859)12,491
Interest and related charges(1)64522018169(50)1,002
Income tax expense (benefit)(1)51413255(642)—59
Equity in earnings of equity method investees(3)——219—21
Other income (expense)(3)6418(14)(315)—(247)
Interest income(3)1767561(50)109
Net Income from Discontinued Operations Including Noncontrolling Interests———922—922
Net Income (Loss) Attributable to Dominion Energy1,905505188(1,407)—1,191
Capital expenditures5,1877086831,180—7,758

(1)

The significant expense categories and amounts in the segment information presented above align with the segment-level information that is regularly provided to Dominion Energy’s CODM.

(2)

Includes impairment of assets and other charges (benefits) and losses (gains) on sale of assets.

(3)

Items designated are other segment items for each reportable segment.

Intersegment sales and transfers for Dominion Energy are based on contractual arrangements and may result in intersegment profit or loss that is eliminated in consolidation, including amounts related to entities presented within discontinued operations.

Virginia Power

The Corporate and Other Segment of Virginia Power primarily includes specific items attributable to its operating segment that are not included in profit measures evaluated by executive management in assessing the segment’s performance or in allocating resources.

Virginia Power’s CODM for the year ended December 31, 2024 was the COO. The Virginia Power CODM uses net income (loss) as the primary profit or loss measure at each segment. The Virginia Power CODM considers budget-to-actual variances on a quarterly basis when making decisions about allocating operating and capital resources to each segment, when assessing the performance of each segment and when determining the compensation of certain employees.

In 2024, Virginia Power reported after-tax net expenses of $101 million in the Corporate and Other segment, including $102 million of after-tax net expenses for specific items all of which were attributable to its operating segment.

The net expenses for specific items attributable to its operating segment in 2024 primarily related to the impact of the following items:

A $103 million ($77 million after-tax) charge for Virginia Power’s share of costs not expected to be recovered from customers on the CVOW Commercial Project;

$40 million ($30 million after-tax) of charges for dismantling costs associated with the early retirement of certain electric generation facilities;

A $30 million ($22 million after-tax) charge related to the write-off of certain early-stage development costs; and

A $25 million ($19 million after-tax) charge associated with an accrual for remediation costs at a manufactured gas plant site; partially offset by

A $83 million ($62 million after-tax) gain related to investments in nuclear decommissioning trust funds.

In 2023, Virginia Power reported after-tax net expenses of $232 million in the Corporate and Other segment, including $232 million of after-tax net expenses for specific items all of which were attributable to its operating segment.

The net expenses for specific items attributable to its operating segment in 2023 primarily related to the impact of the following items:

A $244 million ($182 million after-tax) charge for amortization of a regulatory asset established in connection with the settlement of the 2021 Triennial Review;

A $65 million ($48 million after-tax) charge for an easement related to the CVOW Commercial Project for which Virginia Power will not seek recovery;

A $36 million ($27 million after-tax) charge for the write-off of certain previously deferred amounts related to the cessation of certain riders effective July 2023; and

A $25 million ($19 million after-tax) charge associated with the abandonment of certain regulated solar generation and other facilities; partially offset by

A $59 million ($43 million after-tax) gain related to investments in nuclear decommissioning trust funds.

In 2022, Virginia Power reported after-tax net expenses of $793 million in the Corporate and Other segment, including $773 million of after-tax net expenses for specific items all of which were attributable to its operating segment.

The net expenses for specific items attributable to its operating segment in 2022 primarily related to the impact of the following items:

A $243 million ($181 million after-tax) charge for amortization of a regulatory asset established in connection with the settlement of the 2021 Triennial Review;

A $213 million ($159 million after-tax) charge for RGGI compliance costs deemed recovered through base rates;

A $191 million ($142 million after-tax) charge in connection with a comprehensive settlement agreement for Virginia fuel expenses;

$167 million ($124 million after-tax) of charges for dismantling costs associated with the early retirement of certain electric generation facilities;

$117 million ($87 million after-tax) of charges associated with storm damage and service restoration in its service territory; and

A $78 million ($58 million after-tax) loss related to investments in nuclear decommissioning trust funds.

The following table presents segment information pertaining to Virginia Power’s operations:

Year Ended December 31,Dominion Energy VirginiaCorporate and OtherConsolidated Total
(millions)
2024
Operating Revenue$10,235$—$10,235
Electric fuel and other energy-related purchases(1)2,743—2,743
Purchased electric capacity(1)68—68
Other operations and maintenance(1)(2)2,2173122,529
Depreciation and amortization(1)1,63591,644
Other taxes(1)3321333
Total Operating Expenses6,9953227,317
Interest and related charges (benefit)(1)856**(**8)848
Income tax expense (benefit)(1)443**(**35)408
Other income (expense)(3)10069169
Interest income(3)20626
Noncontrolling Interests50**(**103)**(**53)
Net Income (Loss) Attributable to Virginia Power2,011**(**101)1,910
Capital expenditures9,968—9,968
Total assets (billions)68.4—68.4
2023
Operating Revenue$9,573$—$9,573
Electric fuel and other energy-related purchases(1)2,918—2,918
Purchased electric capacity(1)46—46
Other operations and maintenance(1)(2)1,8421241,966
Depreciation and amortization(1)1,6222491,871
Other taxes(1)298—298
Total Operating Expenses6,7263737,099
Interest and related charges (benefit)(1)772(8)764
Income tax expense (benefit)(1)471(82)389
Other income (expense)(3)6551116
Interest income(3)15—15
Net Income (Loss) Attributable to Virginia Power1,684(232)1,452
Capital expenditures7,196—7,196
Total assets (billions)58.6—58.6
2022
Operating Revenue$9,643$11$9,654
Electric fuel and other energy-related purchases(1)2,913—2,913
Purchased electric capacity(1)38846
Other operations and maintenance(1)(2)1,9566522,608
Depreciation and amortization(1)1,4522841,736
Other taxes(1)3012303
Total Operating Expenses6,6609467,606
Interest and related charges (benefit)(1)645(3)642
Income tax expense (benefit)(1)514(220)294
Other income (expense)(3)64(81)(17)
Interest income(3)17—17
Net Income (Loss) Attributable to Virginia Power1,905(793)1,112
Capital expenditures5,187—5,187

(1)

The significant expense categories and amounts in the segment information presented above align with the segment-level information that is regularly provided to Virginia Power’s CODM.

(2)

Includes impairment of assets and other charges (benefits).

(3)

Items designated are other segment items for each reportable segment.

NOTE 27. QUARTERLY FINANCIAL DATA (UNAUDITED)

A summary of Dominion Energy’s quarterly results of operations for the years ended December 31, 2024 and 2023 is as follows. Amounts reflect all adjustments necessary in the opinion of management for a fair statement of the results for the interim periods. Results for interim periods may fluctuate as a result of weather conditions, changes in rates and other factors.

Dominion Energy

First QuarterSecond QuarterThird QuarterFourth Quarter
(millions)
2024
Operating revenue$3,632$3,486$3,941$3,400
Income from continuing operations8338051,218391
Net income from continuing operations including noncontrolling interests32348397395
Net income (loss) from discontinued operations including noncontrolling interest11897**(**15)**(**3)
Net income including noncontrolling interests44158095892
Noncontrolling interests———**(**53)
Net income attributable to Dominion Energy441580958145
Basic EPS:
Net income from continuing operations0.360.541.140.15
Net income (loss) from discontinued operations0.140.12**(**0.02)—
Net income attributable to Dominion Energy0.500.661.120.15
Diluted EPS:
Net income from continuing operations0.360.541.140.15
Net income (loss) from discontinued operations0.140.12**(**0.02)—
Net income attributable to Dominion Energy0.500.661.120.15
Dividends declared per preferred share (Series B)(1)11.6259.92211.6259.688
Dividends declared per preferred share (Series C)10.87510.87510.87510.875
Dividends declared per common share0.66750.66750.66750.6675
2023
Operating revenue$3,883$3,166$3,810$3,534
Income from continuing operations1,0795941,029712
Net income from continuing operations including noncontrolling interests691407694364
Net income (loss) from discontinued operations including noncontrolling interest281168(541)(33)
Net income including noncontrolling interests972575153331
Net income attributable to Dominion Energy972575153331
Basic EPS:
Net income from continuing operations0.800.460.810.41
Net income (loss) from discontinued operations0.340.20(0.65)(0.04)
Net income attributable to Dominion Energy1.140.660.160.37
Diluted EPS:
Net income from continuing operations0.800.460.810.41
Net income (loss) from discontinued operations0.340.20(0.65)(0.04)
Net income attributable to Dominion Energy1.140.660.160.37
Dividends declared per preferred share (Series B)11.62511.62511.62511.625
Dividends declared per preferred share (Series C)10.87510.87510.87510.875
Dividends declared per common share0.66750.66750.66750.6675

(1) See Note 19 for a discussion of repurchases and redemptions during the second and fourth quarters*.*

Dominion Energy’s 2024 results include the impact of the following significant items:

First quarter results include $238 million of after-tax losses from lower market related impacts on pension and other postretirement plans and a $108 million after-tax loss on the closing of the East Ohio Transaction, offset by $202 million of after-tax gains related to investments in nuclear decommissioning trust funds.

Third quarter results include $132 million of after-tax gains related to investments in nuclear decommissioning trust funds and $103 million of after-tax gains related to the mark-to-market impact of economic hedging activities.

Fourth quarter results include $93 million of after-tax losses related to the mark-to-market impact of economic hedging activities and a $77 million after-tax charge for Virginia Power’s share of costs not expected to be recovered from customers on the CVOW Commercial Project.

Dominion Energy’s 2023 results include the impact of the following significant items:

Fourth quarter results include a $275 million after-tax charge for an impairment of certain goodwill associated with the East Ohio and Questar Gas Transactions.

Third quarter results include $939 million of charges reflecting the recognition of deferred taxes on the outside basis of stock associated with East Ohio, PSNC, Questar Gas and Wexpro meeting the classification as held for sale that will reverse when the sale is completed and a $348 million after-tax gain on the sale of Dominion Energy’s remaining noncontrolling interest in Cove Point.