Dominion Energy 10-K 2025-12-31

Filed 2026-02-23. 22 sections, 1013K characters. Original on sec.gov · Markdown · JSON

What changed since the 2024-12-31 10-KNew, removed and reworded risk factor headings, then every item sentence by sentence.

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

☒ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

F****or the fiscal year ended December 31**,** 2025

OR

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File NumberExact name of registrants as specified in their chartersI.R.S. Employer Identification Number
001-08489DOMINION ENERGY, INC.54-1229715
000-55337Virginia ELECTRIC AND POWER COMPANY54-0418825
Virginia (S**tate or other jurisdiction of incorporation or organization)
600 EAST CANAL STREET RICHMOND**,** Virginia (Address of principal executive offices)23219 (Zip Code)
(804) 819-2284 (Registrants’ telephone number)

Securities registered pursuant to Section 12(b) of the Act:

RegistrantTrading SymbolTitle of Each ClassName of Each Exchange on Which Registered
DOMINION ENERGY, INC.DCommon Stock, no par valueNew York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act:

VIRGINIA ELECTRIC AND POWER COMPANY

Common Stock, no par value

Indicate by check mark whether the registrant is a well-known seasoned issuer as defined in Rule 405 of the Securities Act.

Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “non-accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Dominion Energy, Inc.

Large accelerated filer☒Accelerated filer☐Emerging growth company☐
Non-accelerated filer☐Smaller reporting company☐

Virginia Electric and Power Company

Large accelerated filer☐Accelerated filer☐Emerging growth company☐
Non-accelerated filer☒Smaller reporting company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.

Dominion Energy, Inc. ☒ Virginia Electric and Power Company ☐

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☒

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☒

Indicate by check mark whether the registrant is a shell company (as defined by Rule 12b-2 of the Act).

Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒

The aggregate market value of Dominion Energy, Inc. common stock held by non-affiliates of Dominion Energy, Inc. was approximately $48.2 billion based on the closing price of Dominion Energy, Inc.’s common stock as reported on the New York Stock Exchange as of the last day of Dominion Energy, Inc.’s most recently completed second fiscal quarter. Dominion Energy, Inc. is the sole holder of Virginia Electric and Power Company common stock. At February 16, 2026, Dominion Energy, Inc. had 878,785,631 shares of common stock outstanding and Virginia Electric and Power Company had 373,881 shares of common stock outstanding.

DOCUMENT INCORPORATED BY REFERENCE

Portions of Dominion Energy, Inc.’s 2026 Proxy Statement are incorporated by reference in Part III.

This combined Form 10-K represents separate filings by Dominion Energy, Inc. and Virginia Electric and Power Company. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Virginia Electric and Power Company makes no representations as to the information relating to Dominion Energy, Inc.’s other operations.

VIRGINIA ELECTRIC AND POWER COMPANY MEETS THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION I(1)(a) AND (b) OF FORM 10-K AND IS FILING THIS FORM 10-K UNDER THE REDUCED DISCLOSURE FORMAT.

Dominion Energy, Inc. and Virginia Electric and Power Company

Item NumberPage Number
Glossary of Terms3
Part I
1.Business8
1A.Risk Factors25
1B.Unresolved Staff Comments34
1C.Cybersecurity35
2.Properties36
3.Legal Proceedings41
4.Mine Safety Disclosures41
Information about our Executive Officers41
Part II
5.Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities42
6.[Reserved]42
7.Management’s Discussion and Analysis of Financial Condition and Results of Operations43
7A.Quantitative and Qualitative Disclosures About Market Risk63
8.Financial Statements and Supplementary Data65
9.Changes in and Disagreements with Accountants on Accounting and Financial Disclosure158
9A.Controls and Procedures158
9B.Other Information160
9C.Disclosure Regarding Foreign Jurisdictions that Prevent Inspections160
Part III
10.Directors, Executive Officers and Corporate Governance161
11.Executive Compensation161
12.Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters161
13.Certain Relationships and Related Transactions, and Director Independence161
14.Principal Accountant Fees and Services161
Part IV
15.Exhibits and Financial Statement Schedules162
16.Form 10-K Summary167

Glossary of Terms

The following abbreviations or acronyms used in this Form 10-K are defined below:

Abbreviation or AcronymDefinition
2017 Tax Reform ActAn Act to Provide for Reconciliation Pursuant to Titles II and V of the Concurrent Resolution on the Budget for Fiscal Year 2018 (previously known as The Tax Cuts and Jobs Act) enacted on December 22, 2017
2021 Triennial ReviewVirginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the four successive 12-month test periods beginning January 1, 2017 and ending December 31, 2020
2023 Biennial ReviewVirginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2021 and ending December 31, 2022 and prospective rate base setting for the succeeding annual periods beginning January 1, 2024 and ending December 31, 2025
2024 Series A JSNsDominion Energy’s 2024 Series A Enhanced Junior Subordinated Notes due 2055
2024 Series B JSNsDominion Energy’s 2024 Series B Enhanced Junior Subordinated Notes due 2054
2024 Series C JSNsDominion Energy’s 2024 Series C Enhanced Junior Subordinated Notes due 2055
2025 Biennial ReviewVirginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2023 and ending December 31, 2024 and prospective rate base setting for the succeeding annual periods beginning January 1, 2026 and ending December 31, 2027
2025 Series A JSNsDominion Energy’s 2025 Series A Junior Subordinated Notes due 2056
2025 Series B JSNsDominion Energy’s 2025 Series B Junior Subordinated Notes due 2056
2026 Proxy StatementDominion Energy 2026 Proxy Statement, File No. 001-08489
2027 Biennial ReviewFuture Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2025 and ending December 31, 2026 and prospective rate base setting for the succeeding annual periods beginning January 1, 2028 and ending December 31, 2029
ABOAccumulated benefit obligation
AEPThe legal entity American Electric Power Company, Inc., one or more of its consolidated subsidiaries, or the entirety of American Electric Power Company, Inc. and its consolidated subsidiaries
AESThe legal entity The AES Corporation, one or more of its consolidated subsidiaries, or the entirety of The AES Corporation and its consolidated subsidiaries
AFUDCAllowance for funds used during construction
Align RNGAlign RNG, LLC, a joint venture between Dominion Energy and Smithfield Foods, Inc.
AltavistaAltavista biomass power station
AOCIAccumulated other comprehensive income (loss)
AROAsset retirement obligation
Atlantic Coast PipelineAtlantic Coast Pipeline, LLC, a limited liability company owned by Dominion Energy and Duke Energy
Atlantic Coast Pipeline ProjectA previously proposed approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina which would have been owned by Dominion Energy and Duke Energy
bcfBillion cubic feet
Bear GardenA 622 MW combined-cycle, natural gas-fired power station in Buckingham County, Virginia
BedfordA 70 MW solar generation facility in Chesapeake, Virginia
BHEThe legal entity, Berkshire Hathaway Energy Company, one or more of its consolidated subsidiaries (including Eastern Energy Gas Holdings, LLC, Northeast Midstream Partners, LP and Cove Point effective November 2020), or the entirety of Berkshire Hathaway Energy Company and its consolidated subsidiaries
BirdseyeBirdseye Renewable Energy, LLC
BLS Industry Average OSHA Recordable RateAn average of the OSHA Recordable Rate published by the Bureau of Labor Statistics for electric power generation, transmission and distribution (NAICS code 2211) and natural gas distribution (NAICS code 2212)
BOEMU.S. Department of Interior’s Bureau of Ocean Energy Management
Brunswick CountyA 1,376 MW combined-cycle, natural gas-fired power station in Brunswick County, Virginia
CAAClean Air Act
CAISOCalifornia ISO
Canadys StationA proposed 2.2 GW advanced class combined cycle natural gas-fired power station in Colleton County, South Carolina, to be jointly owned by DESC and Santee Cooper
CAOChief Accounting Officer
CCRCoal combustion residual
CCROCustomer credit reinvestment offset
CEACommodity Exchange Act
CEOChief Executive Officer
CERCLAComprehensive Environmental Response, Compensation and Liability Act of 1980, also known as Superfund
Abbreviation or AcronymDefinition
CFIUSThe Committee on Foreign Investment in the U.S.
CFOChief Financial Officer
CH4Methane
Chesterfield Energy Reliability CenterA proposed 944 MW simple-cycle, natural gas-fired power station in Chesterfield County, Virginia
CNGConsolidated Natural Gas Company
CO2Carbon dioxide
CODMChief Operating Decision Maker
Community Energy ActHouse Bill 2346, known as the Community Energy Act, which was signed into law in the Commonwealth of Virginia in May 2025
CompaniesDominion Energy and Virginia Power, collectively
Contracted EnergyContracted Energy operating segment
Cooling degree daysUnits measuring the extent to which the average daily temperature is greater than 65 degrees Fahrenheit, or 75 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 75 degrees, as applicable, and the average temperature for that day
Cove PointCove Point LNG, LP (formerly known as Dominion Energy Cove Point LNG, LP)
CPCNCertificate of Public Convenience and Necessity
CVOW Commercial ProjectA proposed 2.6 GW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters adjacent to the CVOW Pilot Project and associated interconnection facilities in and around Virginia Beach, Virginia
CVOW Pilot ProjectA 12 MW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters
CWAClean Water Act
DECP HoldingsThe legal entity DECP Holdings, Inc., which held Dominion Energy’s noncontrolling interest in Cove Point (through September 2023)
DESDominion Energy Services, Inc.
DESCThe legal entity, Dominion Energy South Carolina, Inc., one or more of its consolidated entities or operating segment, or the entirety of Dominion Energy South Carolina, Inc. and its consolidated entities
Dodd-Frank ActThe Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010
DOEU.S. Department of Energy
Dominion EnergyThe legal entity, Dominion Energy, Inc., one or more of its consolidated subsidiaries (other than Virginia Power) or operating segments, or the entirety of Dominion Energy, Inc. and its consolidated subsidiaries
Dominion Energy Direct®A dividend reinvestment and open enrollment direct stock purchase plan
Dominion Energy South CarolinaDominion Energy South Carolina operating segment
Dominion Energy VirginiaDominion Energy Virginia operating segment
Dominion PrivatizationDominion Utility Privatization, LLC, a joint venture between Dominion Energy and Patriot
DSMDemand-side management
DSM RidersRate adjustment clauses, designated Riders C1A, C2A, C3A and C4A, associated with the recovery of costs related to certain Virginia DSM programs in approved DSM cases
DthDekatherm
Duke EnergyThe legal entity, Duke Energy Corporation, one or more of its consolidated subsidiaries, or the entirety of Duke Energy Corporation and its consolidated subsidiaries
Eagle SolarEagle Solar, LLC, a wholly-owned subsidiary of Dominion Generation, Inc.
East OhioThe East Ohio Gas Company (a subsidiary of Enbridge effective March 2024)
East Ohio TransactionThe sale by Dominion Energy to Enbridge of all issued and outstanding capital stock in Dominion Energy Questar Corporation and its consolidated subsidiaries, which following a reorganization included East Ohio and Dominion Energy Gas Distribution, LLC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on March 6, 2024
EnbridgeThe legal entity, Enbridge Inc., one or more of its consolidated subsidiaries (including Enbridge Elephant Holdings, LLC, Enbridge Parrot Holdings, LLC and Enbridge Quail Holdings, LLC), or the entirety of Enbridge Inc. and its consolidated subsidiaries
EPAU.S. Environmental Protection Agency
EPACTEnergy Policy Act of 2005
EPSEarnings per common share
ERISAEmployee Retirement Income Security Act of 1974
ESAEndangered Species Act
Excess Tax BenefitsBenefits of tax deductions in excess of the compensation cost recognized for stock-based compensation
FASBFinancial Accounting Standards Board
FCCFederal Communications Commission
FERCFederal Energy Regulatory Commission
Abbreviation or AcronymDefinition
FirstEnergyThe legal entity FirstEnergy Corp., one or more of its consolidated subsidiaries, or the entirety of FirstEnergy Corp. and its consolidated subsidiaries
FitchFitch Ratings Ltd.
FTRsFinancial transmission rights
GAAPU.S. generally accepted accounting principles
GENCOSouth Carolina Generating Company, Inc.
GHGGreenhouse gas
Green MountainGreen Mountain Power Corporation
Greensville CountyA 1,605 MW combined-cycle, natural gas-fired power station in Greensville County, Virginia
GTSAVirginia Grid Transformation and Security Act of 2018
GWGigawatt
Heating degree daysUnits measuring the extent to which the average daily temperature is less than 65 degrees Fahrenheit, or 60 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 60 degrees, as applicable, and the average temperature for that day
HopewellPolyester biomass power station
Idaho CommissionIdaho Public Utilities Commission
IRAAn Act to Provide for Reconciliation Pursuant to Title II of Senate Concurrent Resolution 14 of the 117th Congress (also known as the Inflation Reduction Act of 2022) enacted on August 16, 2022
IRSInternal Revenue Service
ISOIndependent system operator
ISO-NEISO New England
Jones ActThe Coastwise Merchandise Statute (commonly known as the Jones Act) 46 U.S.C. §55102 regulating U.S. maritime commerce
kVKilovolt
LNGLiquefied natural gas
LTIPLong-term incentive program
Massachusetts MunicipalMassachusetts Municipal Wholesale Electric Company
mcfeThousand cubic feet equivalent
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations
MGDMillion gallons per day
MillstoneMillstone nuclear power station
Millstone 2019 power purchase agreementsPower purchase agreements with Eversource Energy and The United Illuminating Company for Millstone to provide nine million MWh per year of electricity for ten years
MMBtuMetric Million British thermal unit
Moody’sMoody’s Investors Service
MWMegawatt
MWhMegawatt hour
N2ONitrous oxide
Natural Gas Rate Stabilization ActLegislation effective February 2005 designed to improve and maintain natural gas service infrastructure to meet the needs of customers in South Carolina
NAVNet asset value
NEILNuclear Electric Insurance Limited
NERCNorth American Electric Reliability Corporation
NND ProjectV.C. Summer Units 2 and 3 nuclear development project under which DESC and Santee Cooper undertook to construct two Westinghouse AP1000 Advanced Passive Safety nuclear units in Jenkinsville, South Carolina
North AnnaNorth Anna nuclear power station
North Carolina CommissionNorth Carolina Utilities Commission
NOXNitrogen oxide
NRCU.S. Nuclear Regulatory Commission
NYSENew York Stock Exchange
OBBBAAn Act to Provide for Reconciliation Pursuant to Title II of House Concurrent Resolution 14 of the 119th Congress (also known as the One Big Beautiful Bill Act) enacted on July 4, 2025
October 2014 hybridsDominion Energy’s 2014 Series A Enhanced Junior Subordinated Notes due 2054
ODECOld Dominion Electric Cooperative
Ohio CommissionPublic Utilities Commission of Ohio
Order 1000Order issued by FERC adopting requirements for electric transmission planning, cost allocation and development
Abbreviation or AcronymDefinition
OSHA Recordable RateNumber of recordable cases, as defined by the Occupational Safety and Health Administration, a division of the U.S. Department of Labor, for every 100 employees over the course of a year
OSWPOSW Project LLC, a limited liability company owned by Virginia Power and Stonepeak
ozone seasonThe period May 1 through September 30, as determined on a federal level
PatriotPatriot Utility Privatizations, LLC, a joint venture between Foundation Infrastructure Partners, LLC and John Hancock Life Insurance Company (U.S.A.) and affiliates
PFASPer- and polyfluorinated substances, a group of widely used chemicals that break down very slowly over time in the environment
PHMSAPipeline and Hazardous Materials Safety Administration
PJMPJM Interconnection, LLC
PSDPrevention of significant deterioration
PSNCPublic Service Company of North Carolina, Incorporated (a subsidiary of Enbridge effective September 2024)
PSNC TransactionThe sale by Dominion Energy to Enbridge of all of its membership interests in Fall North Carolina Holdco LLC and its consolidated subsidiaries, which following a reorganization included PSNC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on September 30, 2024
PumpkinseedA 60 MW solar generation facility in Emporia, Virginia
Questar GasQuestar Gas Company (a subsidiary of Enbridge effective May 2024)
Questar Gas TransactionThe sale by Dominion Energy to Enbridge of all of its membership interests in Fall West Holdco LLC and its consolidated subsidiaries, which following a reorganization included Questar Gas, Wexpro, Wexpro II Company, Wexpro Development Company, Dominion Energy Wexpro Services Company, Questar InfoComm Inc. and Dominion Gas Projects Company, LLC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on May 31, 2024
Regulation ActLegislation effective July 1, 2007, that amended the Virginia Electric Utility Restructuring Act and fuel factor statute, which legislation is also known as the Virginia Electric Utility Regulation Act, as amended in 2015, 2018 and 2023
RGGIRegional Greenhouse Gas Initiative
Rider CCRA rate adjustment clause associated with the recovery of costs related to the removal of CCR at certain power stations
Rider CEA rate adjustment clause associated with the recovery of costs related to certain renewable generation, energy storage and related transmission facilities in Virginia, certain small-scale distributed generation projects and related transmission facilities and, beginning May 2024, power purchase agreements for the energy, capacity, ancillary services and renewable energy credits owned by third parties
Rider DISTA rate adjustment clause associated with the recovery of costs related to electric distribution grid transformation projects that the Virginia Commission has approved as authorized by the GTSA and costs of new underground distribution facilities
Rider GENA rate adjustment clause associated with the recovery of costs related to Altavista, Hopewell, Southampton, Brunswick County, Greensville County, certain solar facilities and the Virginia LNG Storage Facility
Rider OSWA rate adjustment clause associated with costs incurred to construct, own and operate the CVOW Commercial Project
Rider RPSA rate adjustment clause associated with the recovery of costs related to the mandatory renewable portfolio standard program established by the VCEA
Rider SNAA rate adjustment clause associated with costs relating to the preparation of the applications for subsequent license renewal to the NRC to extend the operating licenses of Surry and North Anna and related projects
Rider T1A rate adjustment clause to recover the difference between revenues produced from transmission rates included in base rates, and the new total revenue requirement developed annually for the rate years effective September 1
Rider UA rate adjustment clause associated with the recovery of costs of new underground distribution facilities
ROEReturn on equity
ROICReturn on invested capital
RTEPRegional transmission expansion plan
RTORegional transmission organization
SAIDISystem Average Interruption Duration Index, metric used to measure electric service reliability
Santee CooperSouth Carolina Public Service Authority
SCANAThe legal entity, SCANA Corporation, one or more of its consolidated subsidiaries, or the entirety of SCANA Corporation and its consolidated subsidiaries
SCANA CombinationDominion Energy’s acquisition of SCANA completed on January 1, 2019 pursuant to the terms of the agreement and plan of merger entered on January 2, 2018 between Dominion Energy and SCANA
Abbreviation or AcronymDefinition
SCANA Merger Approval OrderFinal order issued by the South Carolina Commission on December 21, 2018 setting forth its approval of the SCANA Combination
SCDORSouth Carolina Department of Revenue
SCESASouth Carolina Energy Security Act
Scope 1 emissionsEmissions that are produced directly by an entity’s own operations
Scope 2 emissionsEmissions from electricity a company consumes but does not generate from its own facilities
Scope 3 emissionsEmissions generated downstream of company operations by customers and upstream by suppliers
SECU.S. Securities and Exchange Commission
Section 232Section 232 of the Trade Expansion Act of 1962
SEEMSoutheast Energy Exchange Market
SERCSoutheast Electric Reliability Council
Series B Preferred StockDominion Energy’s 4.65% Series B Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share
Series C Preferred StockDominion Energy’s 4.35% Series C Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share
SF6Sulfur hexafluoride
SO2Sulfur dioxide
South Carolina CommissionPublic Service Commission of South Carolina
SouthamptonSouthampton biomass power station
SouthernThe legal entity, The Southern Company, one or more of its consolidated subsidiaries, or the entirety of The Southern Company and its consolidated subsidiaries
Spruce PowerThe legal entity, Spruce Power Holding Corporation, one or more of its consolidated subsidiaries, or the entirety of Spruce Power Holding Corporation and its consolidated subsidiaries
Standard & Poor’sStandard & Poor’s Ratings Services, a division of S&P Global Inc.
StonepeakThe legal entity Stonepeak Partners, LLC, one or more of its affiliated investment vehicles (including Dunedin Member LLC) or the entirety of Stonepeak Partners, LLC and its affiliated investment vehicles
SummerV.C. Summer nuclear power station
SurrySurry nuclear power station
ToshibaToshiba Corporation, parent company of Westinghouse
Toshiba settlementSettlement Agreement dated as of July 27, 2017, by and among Toshiba, DESC and Santee Cooper
TSRTotal shareholder return
Utah CommissionUtah Public Service Commission
Valley LinkValley Link Transmission Company, LLC, a limited liability company owned by Dominion Energy, AEP and FirstEnergy, one or more of its consolidated subsidiaries or the entirety of Valley Link Transmission Company, LLC and its consolidated subsidiaries
VCEAVirginia Clean Economy Act of March 2020
VEBAVoluntary Employees’ Beneficiary Association
VIEVariable interest entity
Virginia City Hybrid Energy CenterA 610 MW baseload carbon-capture compatible, clean coal powered electric generation facility in Wise County, Virginia
Virginia CommissionVirginia State Corporation Commission
Virginia FacilitiesProposed electric interconnection and transmission facilities in and around Virginia Beach, Virginia, comprising transmission facilities required to interconnect the CVOW Commercial Project reliably with the existing transmission system; including 3 miles of 230 kV offshore export circuits, 4 miles of underground 230 kV onshore export circuits, a new Harpers switching station, 14 miles of three new overhead 230 kV transmission circuits between a new Harpers switching station and the Fentress substation, rebuild eight miles of two existing 230 kV overhead lines and an expansion of the Fentress substation
Virginia LNG Storage FacilityA proposed LNG storage facility in Brunswick and Greensville Counties, Virginia
Virginia PowerThe legal entity, Virginia Electric and Power Company, one or more of its consolidated subsidiaries or operating segment, or the entirety of Virginia Electric and Power Company and its consolidated subsidiaries
VOCVolatile organic compounds
VPFSVirginia Power Fuel Securitization, LLC
VPPVirtual power plant
Warren CountyA 1,349 MW combined-cycle, natural gas-fired power station in Warren County, Virginia
WestinghouseWestinghouse Electric Company LLC
WexproThe legal entity, Wexpro Company, one or more of its consolidated subsidiaries, or the entirety of Wexpro Company and its consolidated subsidiaries (a subsidiary of Enbridge effective May 2024)
Wyoming CommissionWyoming Public Service Commission

Part I

Item 1. Business

General

Dominion Energy, headquartered in Richmond, Virginia and incorporated in Virginia in 1983, provides service to approximately 4.1 million primarily electric utility customers in Virginia, North Carolina and South Carolina. At December 31, 2025, Dominion Energy’s portfolio of assets includes approximately 30.7 GW of electric generating capacity, 10,800 miles of electric transmission lines and 80,400 miles of electric distribution lines. Dominion Energy is one of the nation’s leading developers and operators of regulated offshore wind and solar power and the largest producer of carbon-free electricity in New England. Dominion Energy’s mission is to provide the reliable, affordable and increasingly clean energy that powers its customers every day.

In connection with the comprehensive business review concluded in March 2024, Dominion Energy entered into agreements in September 2023 to sell all of its regulated gas distribution operations, except for DESC’s, to Enbridge. In addition, Dominion Energy completed the sale in September 2023 of its remaining 50% noncontrolling partnership interest in Cove Point to BHE under an agreement entered into in July 2023. Dominion Energy continues to focus on expanding and improving its regulated electric utilities and long-term contracted businesses while transitioning to a cleaner energy future. Its approximately $65 billion capital expenditure plan for 2026 through 2030 advances its “all-of-the-above” strategy through investments in zero-carbon and renewable generation, grid transformation, generation reliability and transmission and distribution resiliency to meet projected demand growth. Renewable generation facilities are expected to include significant investments in utility-scale solar and the CVOW Commercial Project. In addition, Dominion Energy has received license extensions for its regulated nuclear power stations in Virginia and South Carolina and intends to apply for license extensions for Millstone.

Dominion Energy currently expects approximately 95% of earnings to come from state-regulated utility operations in Virginia, North Carolina and South Carolina. Dominion Energy’s nonregulated operations consist primarily of long-term contracted electric generation operations. Dominion Energy’s operations are conducted through various subsidiaries, including DESC and Virginia Power. DESC is an SEC registrant; however, its Form 10-K is filed separately and is not combined herein.

Virginia Power, headquartered in Richmond, Virginia and incorporated in Virginia in 1909 as a Virginia public service corporation, is a wholly-owned subsidiary of Dominion Energy and a regulated public utility that generates, transmits and distributes electricity for sale in Virginia and North Carolina. In Virginia, Virginia Power conducts business under the name “Dominion Energy Virginia” and primarily serves retail customers. In North Carolina, it conducts business under the name “Dominion Energy North Carolina” and serves retail customers located in the northeastern region of the state, excluding certain municipalities. In addition, Virginia Power sells and transmits electricity at wholesale prices to rural electric cooperatives, municipalities and into wholesale electricity markets. All of Virginia Power’s stock is owned by Dominion Energy.

Amounts and information disclosed for Dominion Energy are inclusive of Virginia Power, where applicable.

Where You Can Find More Information About the Companies

The Companies file their annual, quarterly and current reports, proxy statements and other information with the SEC. Their SEC filings are available to the public over the Internet at the SEC’s website at https://www.sec.gov.

The Companies make their SEC filings, including the annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and any amendments to those reports, available, free of charge, through Dominion Energy’s website, https://www.dominionenergy.com, as soon as reasonably practicable after filing or furnishing the material to the SEC. The Companies also make available on the “Investors” page of Dominion Energy’s website additional information which may be important to investors, such as investor presentations, earnings release kits and other materials and presentations. Information contained on Dominion Energy’s website, including, but not limited to reports mentioned in Environmental Strategy, is not incorporated by reference in this report.

Acquisitions and Dispositions

The following acquisitions and divestitures within the last three years are considered significant to the Companies.

Gas Distribution Operations

Sales to Enbridge

In March 2024, Dominion Energy completed the East Ohio Transaction with Enbridge for $4.3 billion in cash consideration and the assumption by Enbridge of approximately $2.3 billion of related long-term debt.

In May 2024, Dominion Energy completed the Questar Gas Transaction with Enbridge for $3.0 billion in cash consideration and the assumption by Enbridge of approximately $1.3 billion of related long-term debt.

In September 2024, Dominion Energy completed the PSNC Transaction with Enbridge for $2.0 billion in cash consideration and the assumption by Enbridge of approximately $1.3 billion of related long-term debt.

See Note 3 to the Consolidated Financial Statements for additional information.

Electric Generation Facilities

Sale of Noncontrolling Interest in CVOW Commercial Project

In October 2024, Virginia Power completed the sale of a 50% noncontrolling interest in the CVOW Commercial Project to Stonepeak through the formation of OSWP. At closing, Virginia Power received $2.6 billion, representing 50% of the CVOW Commercial Project construction costs incurred through closing, less an initial withholding of $145 million.

See Note 10 to the Consolidated Financial Statements for additional information.

Acquisition of Nonregulated Solar Projects

In 2023, Dominion Energy entered into an agreement to acquire a nonregulated solar project in Virginia and completed the acquisition in 2024. The project was completed at a total cost of approximately $195 million, including initial acquisition cost, and generates approximately 83 MW.

See Note 10 to the Consolidated Financial Statements for additional information.

Acquisition of Offshore Wind Project

In October 2024, Virginia Power completed the acquisition of an approximately 40,000-acre area lease 27 miles off the coast of North Carolina in federal waters and associated project assets in the early stages of development for approximately $160 million.

See Note 10 to the Consolidated Financial Statements for additional information.

Equity Method Investment

Sale of Interest in Cove Point

In September 2023, Dominion Energy completed the sale of its 50% noncontrolling limited partnership interest in Cove Point to BHE for approximately $3.3 billion in cash proceeds.

See Note 9 to the Consolidated Financial Statements for additional information.

Human Capital

One of Dominion Energy’s greatest strengths is its employees, and their unique skills, knowledge, expertise and backgrounds allow Dominion Energy to fulfill its mission to provide the reliable, affordable and increasingly clean energy that powers its customers every day. At December 31, 2025, Dominion Energy had approximately 15,200 full-time employees, of which approximately 3,400 are subject to collective bargaining agreements, including approximately 6,700 full-time employees at Virginia Power, of which approximately 2,700 are subject to collective bargaining agreements.

Safety is the highest priority of Dominion Energy’s five core values with the fundamental goal to send every employee home safe and sound every day. In 2025, Dominion Energy experienced an OSHA Recordable Rate of 0.26 compared to 0.42 in 2024 and 0.45 in 2023. These rates reflect Dominion Energy’s dedication to safety

Showing the first 8K of 112K characters. Open the full section

Item 1A. Risk Factors

The Companies’ businesses are influenced by many factors that are difficult to predict, involve risks and uncertainties that may materially affect actual results and are often beyond their control. A number of these risks and uncertainties are identified below. There may be other factors, either not presently known or currently believed not to be material, that may cause actual results to differ materially from those indicated in this report. For additional information concerning any forward-looking statement or projection contained in this report, see Forward-Looking Statements in Item 7. MD&A.

Regulatory, Legislative and Legal Risks

The rates of the Companies’ principal electric transmission, distribution and generation operations and gas distribution operations are subject to regulatory review. Revenue provided by the Companies’ electric transmission, distribution and generation operations and by gas distribution operations is based primarily on rates approved by state and federal regulatory agencies. The profitability of the Companies’ businesses is dependent on their ability, through the rates that they are permitted to charge, to recover costs and earn a reasonable rate of return on their capital investment.

At the federal level, the Companies’ wholesale rates for electric transmission service are regulated by FERC. Rates for electric transmission services are updated annually according to a FERC-approved formula rate mechanism, and may be subject to additional prospective adjustments and retroactive corrections. A failure by the Companies to justify the appropriateness of these rates or a change in FERC policy or the application of FERC policy could result in rate decreases from current rate levels, which could adversely affect the Companies’ results of operations, cash flows and financial condition.

At the state level, Virginia Power’s retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia Commission in a biennial proceeding that involves the determination of Virginia Power’s actual earned ROE during a historic test period, and the determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances described in the Regulation Act, Virginia Power may be required to refund a portion of its earnings to customers through a refund process and to reduce its rates. Virginia Power makes assessments throughout the review period and will record a regulatory liability for refunds to customers in any period such refunds are determined probable, which could negatively impact the Companies’ results of operations in the period recognized and to cash flows on completion of any biennial review.

In states other than Virginia, the Companies’ retail electric base rates for generation and distribution services to customers are regulated on a cost-of-service/rate-of-return basis subject to the statutes, rules and procedures of such states. Dominion Energy’s rates for gas distribution to retail customers are similarly regulated at the state level. If retail electric or gas earnings exceed the returns established by state utility commissions, retail electric rates or gas rates may be subject to review and possible reduction, which may decrease the Companies’ future earnings. Additionally, if any state utility commission does not allow recovery through base rates, on a timely basis, of costs incurred in providing service, the Companies’ financial condition, results of operations and/or cash flows could be negatively impacted.

Under certain circumstances, state utility regulators may impose a moratorium on increases to retail base rates for a specified period of time, which could delay recovery of costs incurred in providing service. Additionally, governmental officials, stakeholders and advocacy groups may challenge any of the regulatory reviews or proceedings referred to above. Such challenges may result in changes to the regulatory framework under which the Companies’ currently operate and/or lengthen the time, complexity and costs associated with such regulatory reviews or proceedings.

The Companies’ generation business may be negatively affected by possible FERC actions that could change market design in the wholesale markets or affect pricing rules or revenue calculations in the RTO markets. The Companies’ generation stations operating in RTO markets sell capacity, energy and ancillary services into wholesale electricity markets regulated by FERC. The wholesale markets allow these generation stations to take advantage of market price opportunities, but also expose them to market risk. Properly functioning competitive wholesale markets depend upon FERC, PJM and/or ISO-NE’s continuation of clearly identified market rules. From time to time, FERC may investigate and/or receive requests from PJM or ISO-NE to authorize changes in market design. FERC also periodically reviews the Companies’ authority to sell at market-based rates. Changes by FERC, PJM or ISO-NE to the design of the wholesale markets or its interpretation of market rules, the Companies’ authority to sell power at market-based rates, or changes to pricing rules or rules involving revenue calculations, could adversely impact the future results of the Companies’ generation business. For example, in April 2024, FERC issued an order that accepted proposed changes to the PJM wholesale capacity market that significantly changed how a generation resource’s capacity value is calculated and decreased the total amount of capacity recognized in the PJM region as eligible to meet reserve requirements. In addition, changes to the interpretation and application of FERC’s market manipulation rules may occur from time to time. A failure to comply with these market manipulation rules could lead to civil and criminal penalties.

The Companies are subject to complex governmental regulation, including tax regulation, that could adversely affect their results of operations and subject the Companies to monetary penalties. The Companies’ operations are subject to extensive federal, state and local laws and regulations and require numerous permits, approvals and certificates from various governmental agencies. Such laws and regulations govern the terms and conditions of the services the Companies offer, relationships with affiliates, protection of critical electric infrastructure assets and mandatory reliability standards and interaction in the wholesale markets, among other matters. The Companies are also subject to legislation and associated regulation governing taxation at the federal, state and local level. They must also comply with environmental legislation and associated regulations. Some such legislation and regulation have not yet been finalized and changes in either interpretation or final laws or regulations could have a negative impact on the Companies. For example, the OBBBA and IRA include various provisions, such as investment and production tax credits and

corporate alternative minimum tax, that the Companies have considered in recording their provisions for income taxes. The ultimate impact of these tax laws is subject to pending guidance and interpretations that could adversely impact the Companies’ ability to qualify for and maintain tax credits, which could affect the Companies’ results of operations, financial condition and/or cash flows. Management believes that the necessary approvals have been obtained for existing operations and that the Companies’ businesses are conducted in accordance with applicable laws. The Companies’ businesses are subject to regulatory regimes which could result in substantial monetary penalties if either of the Companies is found not to be in compliance. New laws or regulations, the revision or reinterpretation of existing laws or regulations, the imposition of new tariffs or changes to existing tariffs, changes in enforcement practices of regulato

Showing the first 8K of 70K characters. Open the full section

Item 1B. Unresolved Staff Comments

None.

Item 1C. Cybersecurity

Risk Management And Strategy

In an effort to reduce the likelihood and severity of cyber intrusions, the Companies have a comprehensive cybersecurity program designed to protect and preserve the confidentiality, integrity and availability of data and systems. Consideration of cybersecurity risks is a key component of the Companies’ overall risk management and integrated into processes such as evaluation of potential new vendors or suppliers. The Companies are subject to mandatory cybersecurity regulatory requirements, interface regularly with a wide range of external organizations and participate in classified briefings to maintain an awareness of current cybersecurity threats and vulnerabilities.

The Companies’ corporate intelligence and security program includes both cybersecurity and threat intelligence components as part of its evaluation and mitigation of risks. The evaluation of risks includes consideration of cybersecurity and privacy risk, including potential impact on the Companies’ employees, customers, supply chain and other stakeholders, intelligence briefings on notable cyber events impacting the industry and evaluation of insider threats. The Companies utilize a robust set of internal and third-party assessment tools to test its cyber risk management policies, practices and procedures as well as challenge assumptions upon which its defenses are built. These assessments provide opportunities for self-critical analysis and constructive feedback needed to build cyber resilience. Trainings are routinely provided to employees to help identify, avoid and mitigate cybersecurity threats and to ensure an understanding of the Companies’ cyber risk management policies. In addition, risk assessments are conducted as a component of the evaluation of vendors and suppliers.

The Companies’ current security posture and regulatory compliance efforts are intended to address the evolving and changing cyber threats. During the past three years, the Companies have not experienced any cybersecurity incidents resulting in a material impact to their business strategy, results of operations or financial condition. The Companies have identified the risk that a hostile cyber intrusion could severely impair the Companies’ operations, lead to disclosure of confidential information, damage the Companies’ reputation or otherwise have an adverse effect on the Companies’ business as disclosed under the Operational Risks header within Item 1A. Risk Factors.

Governance

Dominion Energy’s Board of Directors, including its operations committee, provides oversight of the Companies’ risks from cybersecurity threats. Dominion Energy’s Board of Directors as well as its operations committee receive presentations and reports throughout the year on cybersecurity and information security risk from management, including Dominion Energy’s chief security officer, vice president of cybersecurity (CISO) and chief information officer. These presentations and reports address a broad range of topics, including the Companies’ cyber risk management program, updates on recent cybersecurity threats and incidents across the industry, policies and practices, industry trends, threat environment and vulnerability assessments and specific and ongoing efforts to prevent, detect and respond to internal and external critical threats, including management’s hosting in 2025 of its fourth annual practical exercise with external federal, state and local incident response partners. In addition, Dominion Energy’s Board of Directors receives briefings from time to time from outside experts for an independent view on cybersecurity risks, including assessments by independent consulting firms and legal counsel of the Companies’ readiness and resilience.

The Companies utilize an organization structure known as a converged security model that brings together cybersecurity, physical security and threat intelligence within one department led by the chief security officer. The chief security officer joined Dominion Energy in this role in 2018 and has an extensive background in security having retired from the Federal Bureau of Investigation after a more than 20-year career focused on criminal, counter-terrorism, counter-intelligence and cyber investigations. The chief security officer belongs to the Federal Bureau of Investigation’s Domestic Security Alliance Council, the Department of Homeland Security’s Classified Intelligence Forum and is a member of the national Government/Business Executive Forum. In addition to serving on multiple university advisory boards, the chief security officer also serves on the Commonwealth of Virginia’s Informational Technology Advisory Council.

The vice president of cybersecurity (CISO) has over 30 years of experience at Dominion Energy primarily in various roles within the information technology department, including information technology risk management, as well as cybersecurity. The vice president of cybersecurity (CISO) has been involved in designing and evolving the Companies’ cyber risk management policies, practices and procedures. This individual has deep relationships with key external partners and is recognized within the industry and the U.S. as a leading cybersecurity expert.

In addition, management of cybersecurity threats is shared with the chief information officer who is responsible for the Companies’ technology assets including hardware, software, networks, servers and telecommunications. The chief information officer has over 25 years of experience at Dominion Energy primarily in various roles within the information technology department, including information technology risk management. In addition, the chief information officer previously served on the board of the Virginia Cybersecurity Partnership, a collaboration between private industry and the Federal Bureau of Investigation.

The chief security officer, vice president of cybersecurity (CISO) and chief information officer are supported by the senior vice president of administrative services as well as the Companies’ operations, compliance, legal, audit, corporate risk, supply chain, human resources and accounting departments in executing its cybersecurity program. In addition, the chief security officer and chief information officer provide periodic updates concerning recent developments affecting cybersecurity and privacy risk to the Companies’ executive cyber risk council, which includes executive officers responsible for administrative services, corporate affairs, supply chain, corporate secretary and corporate risk along with legal counsel.

The Companies maintain a robust, tested and regularly revised Cyber Security Incident Response Plan and a Vendor Compromise Response Plan. These plans detail roles, responsibilities and actions to be taken in response to a detected event whether internal or associated with a third-party service provider. The plans provide clear direction for escalation of information to leadership, including Dominion Energy’s Board of Directors as appropriate, and drive collaboration amongst relevant members of management representing cybersecurity, information technology, operations, supply chain, legal and accounting departments. As necessary, the chief administrative and projects officer, CFO and chief legal officer will advise the CEO on any incidents which could potentially have a material effect on the Companies’ business operations, results of operations or financial condition.

Item 2. PROPERTIES

Dominion Energy owns five corporate offices in Richmond, Virginia and other cities in which its subsidiaries operate. Dominion Energy also leases corporate offices in Richmond, Virginia and other cities in which its subsidiaries operate, including its principal executive office in Richmond, Virginia. Virginia Power shares Dominion Energy’s principal executive office in Richmond, Virginia. In addition, Virginia Power leases certain buildings and equipment.

Dominion Energy’s assets consist primarily of its investments in its subsidiaries, the principal properties of which are described below by operating segment.

Certain of Virginia Power’s properties are subject to the lien of the Indenture of Mortgage securing its First and Refunding Mortgage Bonds. There were no bonds outstanding at December 31, 2025; however, by leaving the indenture open, Virginia Power retains the flexibility to issue mortgage bonds in the future. Additionally, DESC’s bond indenture, which secures its first mortgage bonds, constitutes a direct mortgage lien on substantially all of its electric utility property.

Dominion Energy Virginia

Virginia Power has approximately 7,000 miles of electric transmission lines of 69 kV or more located in Virginia, North Carolina and West Virginia. Portions of Virginia Power’s electric transmission lines cross national parks and forests under permits entitling the federal government to use, at specified charges, any surplus capacity that may exist in these lines. While Virginia Power owns and maintains its electric transmission facilities, they are a part of PJM, which coordinates the planning, operation, emergency assistance and exchange of capacity and energy for such facilities.

In addition, Virginia Power’s electric distribution network includes approximately 61,000 miles of distribution lines, exclusive of service level lines, in Virginia and North Carolina. The grants for most of its electric lines contain rights-of-way that have been obtained from the apparent owners of real estate, but underlying titles have not been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, Virginia Power owns 486 substations.

The following tables list Virginia Power’s generating units and capability at December 31, 2025.

Virginia Power Utility Generation

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Gas
Greensville County (CC)Greensville County, VA1,605
Brunswick County (CC)Brunswick County, VA1,376
Warren County (CC)Warren County, VA1,349
Ladysmith (CT)Ladysmith, VA782
Bear Garden (CC)Buckingham County, VA622
Remington (CT)Remington, VA619
Possum Point (CC)Dumfries, VA571
Chesterfield (CC)Chester, VA386
Elizabeth River (CT)Chesapeake, VA327
Gordonsville Energy (CC)Gordonsville, VA218
Gravel Neck (CT)Surry, VA170
Darbytown (CT)Richmond, VA168
Total Gas8,19342%
Nuclear
SurrySurry, VA1,676
North AnnaMineral, VA1,672(1)
Total Nuclear3,34817
Coal
Mt. StormMt. Storm, WV1,614
Virginia City Hybrid Energy CenterWise County, VA610
CloverClover, VA439(2)
Total Coal2,66313
Hydro
Bath CountyWarm Springs, VA1,758(3)
GastonRoanoke Rapids, NC220
Roanoke RapidsRoanoke Rapids, NC95
Other1
Total Hydro2,07411
Oil
Gravel Neck (CT)Surry, VA198
Darbytown (CT)Richmond, VA168
Rosemary (CC)Roanoke Rapids, NC155
Possum Point (CT)Dumfries, VA72
Low Moor (CT)Covington, VA48
Northern Neck (CT)Lively, VA47
Chesapeake (CT)Chesapeake, VA39
Total Oil7274
Solar**(4)**
Colonial Trail WestSurry County, VA142
Bookers MillFarnham, VA127
Sadler SolarEmporia, VA100
Spring GroveSurry County, VA98
Fountain CreekGreensville, VA80
Piney CreekHalifax, VA80
Otter CreekMecklenburg County, VA60
SycamoreGretna, VA42
CamelliaGloucester County, VA20
GrassfieldChesapeake, VA20
NorgeWilliamsburg, VA20
North RidgePowhatan, VA20
SolidagoWindsor, VA20
Whitehouse SolarLouisa County, VA20
WinterberryGloucester County, VA20
Woodland SolarIsle of Wight County, VA19
QuillwortPowhatan, VA18
SeberaPrince George, VA18
Scott SolarPowhatan, VA17
Total Solar9414
PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Biomass
AltavistaAltavista, VA51
PolyesterHopewell, VA51
SouthamptonSouthampton, VA51
Total Biomass1531
Battery
Dry BridgeChesterfield, VA20
Scott BatteryPowhatan, VA12
Total Battery32—
Wind
CVOW Pilot ProjectVirginia Beach, VA12—
Various
Mt. Storm (CT)Mt. Storm, WV11—
Total Excluding Power Purchase Agreements18,154
Power Purchase Agreements1,5608
Total Utility Generation19,714100%

Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

(1)

Excludes 11.6% undivided interest owned by ODEC.

(2)

Excludes 50% undivided interest owned by ODEC.

(3)

Excludes 23.75% undivided interest owned by LS Power Equity Advisors LLC and 16.25% undivided interest owned by Allegheny Generating Company, a subsidiary of FirstEnergy.

(4)

All solar facilities are alternating current.

Virginia Power Non-Jurisdictional Generation

PlantLocationNet Summer Capability (MW)
Solar(1)
Ft. PowhatanDisputanta, VA150
MaplewoodChatham, VA120
BelcherLouisa, VA88
GutenbergGarysburg, NC80
GrasshopperChase City, VA80
PecanPleasant Hill, NC75
ChestnutHalifax County, NC75
Bedford(2)Chesapeake, VA70
Pumpkinseed(2)Emporia, VA60
GloucesterGloucester County, VA20
MontrossWestmoreland County, VA20
Morgans CornerPasquotank County, NC20
RemingtonFauquier County, VA20
RochambeauJames City County, VA20
OceanaVirginia Beach, VA18
HollyfieldManquin, VA17
PullerTopping, VA15
Total Non-Jurisdictional Generation948

(1)

All solar facilities are alternating current.

(2)

Virginia Power in October 2025 proposed to recover the cost of this facility through Rider CE. If approved by the Virginia Commission, this facility will be considered Utility Generation.

Dominion Energy South Carolina

DESC has approximately 3,800 miles and 19,400 miles of electric transmission and distribution lines, respectively, exclusive of service level lines, in South Carolina. The grants for most of DESC’s electric lines contain rights-of-way that have been obtained from the apparent owners of real estate, but underlying property titles have not been examined. Where rights-of-way have not been obtained, they could be acquired from private owners by condemnation, if necessary. Many electric lines are on publicly-owned property, where permission to operate can be revoked. In addition, DESC owns 454 substations.

DESC’s natural gas system includes approximately 20,000 miles of distribution mains and related service facilities, which are supported by approximately 400 miles of transmission pipeline.

DESC owns two LNG facilities, one located near Charleston, South Carolina, and the other in Salley, South Carolina. The Charleston facility can store the liquefied equivalent of approximately 1.0 bcf of natural gas, can regasify approximately 6% of its storage capacity per day and can liquefy less than 1% of its storage capacity per day. The Salley facility can store the liquefied equivalent of approximately 0.9 bcf of natural gas and can regasify approximately 10% of its storage capacity per day. The Salley facility has no liquefying capabilities.

The following table lists DESC’s generating units and capability at December 31, 2025.

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Gas
Jasper (CC) (1)Hardeeville, SC902
Columbia Energy Center (CC) (1)Gaston, SC522
Urquhart (CC) (1)Beech Island, SC458
McMeekinIrmo, SC250
Hagood (CT) (1)Charleston, SC118
Urquhart Unit 3Beech Island, SC95
Urquhart (CT) (1)Beech Island, SC87
Parr (CT) (1)Jenkinsville, SC84
Bushy Park (CT) (1)Goose Creek, SC42
Total Gas2,55837%
Coal
WatereeEastover, SC684
WilliamsGoose Creek, SC595
Cope (2)Cope, SC415
Total Coal1,69425
Hydro
FairfieldJenkinsville, SC576
SaludaIrmo, SC190
OtherVarious18
Total Hydro78412
Nuclear
SummerJenkinsville, SC644(3)9
Total Excluding Power Purchase Agreements5,680
Power Purchase Agreements1,187(4)17
Total Utility Generation6,867100%

Note: (CT) denotes combustion turbine and (CC) denotes combined cycle.

(1)

Capable of burning fuel oil as a secondary source.

(2)

Capable of burning natural gas as a secondary source.

(3)

Excludes 33.3% undivided interest owned by Santee Cooper.

(4)

Includes 189 MW from agreements with certain solar facilities within Contracted Energy.

Contracted Energy

The following table lists Contracted Energy’s generating units and capability at December 31, 2025.

PlantLocationNet Summer Capability (MW)Percentage Net Summer Capability
Nuclear
MillstoneWaterford, CT2,013(1)
Total Nuclear2,01361%
Solar(2)
Atlanta FarmsPickaway County, OH200
Hardin IHardin County, OH150
Amazon Solar Farm Virginia – SouthamptonNewsoms, VA100
Foxhound SolarClover, VA83
Amazon Solar Farm Virginia – AccomackOak Hall, VA80
GreensvilleGreensville County, VA80
Innovative Solar 37Morven, NC79
WilkinsonPantego, NC74
SeabrookBeaufort County, SC73
Moffett Solar 1Ridgeland, SC71
Summit Farms SolarMoyock, NC60
Midway IICalipatria, CA30
Amazon Solar Farm Virginia – BuckinghamCumberland, VA20
Amazon Solar Farm Virginia – CorrectionalBarhamsville, VA20
Hecate CherrydaleCape Charles, VA20
Amazon Solar Farm Virginia – Sussex DriveStoney Creek, VA20
Amazon Solar Farm Virginia – Scott IIPowhatan, VA20
MyrtleSuffolk, VA15
TraskBeaufort County, SC12
Hecate Energy Clarke CountyWhite Post, VA10
Ridgeland Solar Farm IRidgeland, SC10
YemasseeHampton County, SC10
BlackvilleBlackville, SC7
DenmarkDenmark, SC6
OtherVarious35
Total Solar1,28539
Total Nonregulated Generation3,298100%

(1)

Excludes 6.53% undivided interest in Unit 3 owned by Massachusetts Municipal and Green Mountain.

(2)

All solar facilities are alternating current.

Additionally, Dominion Energy’s renewable natural gas facilities include 21 facilities in Colorado, Georgia, Idaho, Kansas, New Mexico, Nevada and Texas, which capture methane from dairy farms and convert it into pipeline quality natural gas. These facilities produce approximately 5,500 MMBtu per day.

Corporate And Other

Dominion Energy owns various solar facilities, primarily at schools in Virginia, with an aggregate generation capacity of 33 MW.

Item 3. Legal Proceedings

From time to time, the Companies are parties to various legal, environmental or other regulatory proceedings, including in the ordinary course of business. SEC regulations require disclosure of certain environmental matters when a governmental authority is a party to the proceedings and such proceedings involve potential monetary sanctions that the Companies reasonably believe will exceed a specified threshold. Pursuant to the SEC regulations, the Companies use a threshold of $1 million for such proceedings. See Notes 13 and 23 to the Consolidated Financial Statements, which information is incorporated herein by reference, for discussion of certain legal, environmental and other regulatory proceedings to which the Companies are a party.

Item 4. Mine Safety Disclosures

Not applicable.

Information about our Executive Office****rs

Information concerning the executive officers of Dominion Energy, each of whom is elected annually, is as follows:

Name and AgeBusiness Experience Past Five Years**(1)**
Robert M. Blue (58)Chair of the Board of Directors from April 2021 to present; President and CEO from October 2020 to present; Director from November 2020 to present.
Edward H. Baine (52)Executive Vice President—Utility Operations and President—Dominion Energy Virginia from July 2025 to present; President—Utility Operations and Dominion Energy Virginia from January 2025 to June 2025; President—Dominion Energy Virginia from October 2020 to December 2024.
Carlos M. Brown (51)Executive Vice President, Chief Administrative and Projects Officer, and Corporate Secretary and President—DES from June 2025 to present; President—DES and Executive Vice President, Chief Legal Officer and Corporate Secretary from January 2024 to May 2025; Senior Vice President, Chief Legal Officer and General Counsel from September 2022 to December 2023; Senior Vice President, General Counsel and Chief Compliance Officer from December 2019 to August 2022.
Eric S. Carr (52)Chief Nuclear Officer and President—Nuclear Operations and Contracted Energy from January 2025 to present; President—Nuclear Operations and Chief Nuclear Officer from July 2023 to December 2024; President—Nuclear Operations during June 2023; President and Chief Nuclear Officer for PSEG Nuclear, LLC, a subsidiary of Public Service Enterprise Group, Incorporated, from July 2019 to May 2023.
Regina J. Elbert (45)Senior Vice President and Chief Legal and Human Resources Officer from June 2025 to present; Senior Vice President and Chief Human Resources Officer from January 2024 to May 2025; Senior Vice President—Human Resources from April 2022 to December 2023; Vice President—Human Resources Business Services from March 2019 to March 2022.
W. Keller Kissam (59)President—Dominion Energy South Carolina from January 2022 to present; President—Electric Operations of DESC from January 2019 to December 2021.
Gary G. Ratliff (47)Vice President, Controller and CAO from October 2025 to present; Vice President—Accounting from April 2025 to September 2025; Controller—Corporate Research & Reporting from February 2024 to March 2025; Director—Accounting from September 2015 to January 2024.
Steven D. Ridge (45)Executive Vice President and CFO from January 2024 to present; Senior Vice President and CFO from November 2022 to December 2023; President of Questar Gas from October 2022 to November 2022; Vice President and General Manager—Western Distribution from October 2021 to September 2022; Vice President—Investor Relations of DES from April 2019 to September 2021.

(1)

All positions held at Dominion Energy, unless otherwise noted. Any service listed for Virginia Power, DESC, Questar Gas and DES reflects service at a subsidiary of Dominion Energy.

Part II

Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

Dominion Energy

Dominion Energy’s common stock is listed on the NYSE under the ticker symbol D. At February 16, 2026, there were approximately 106,000 record holders of Dominion Energy’s common stock. The number of record holders is comprised of individual shareholder accounts maintained on Dominion Energy’s transfer agent records and includes accounts with shares held in (1) certificate form, (2) book-entry in the Direct Registration System and (3) book-entry under Dominion Energy Direct®. Discussions of expected dividend payments required by this Item are contained in Liquidity and Capital Resources in Item 7. MD&A.

Purchases of Equity Securities

PeriodTotal Number of Shares (or Units) Purchased (1)Average Price Paid per Share (or Unit)(2)Total Number of Shares (or Units) Purchased as Part of Publicly Announced Plans or ProgramsMaximum Number (or Approximate Dollar Value) of Shares (or Units) that May Yet Be Purchased under the Plans or Programs(3)
10/1/25-10/31/2568,646$60.90—$ 0.92 billion
11/1/25-11/30/2541258.69—0.92 billion
12/1/25-12/31/252,51660.80—0.92 billion
Total71,574$60.88—$ 0.92 billion

(1)

Represents shares of common stock that were tendered by employees to satisfy tax withholding obligations on vested restricted stock.

(2)

Represents the weighted-average price paid per share.

(3)

In November 2020, the Dominion Energy Board of Directors authorized the repurchase of up to $1.0 billion of shares of common stock. This repurchase program has no expiration date or price or volume targets and may be modified, suspended or terminated at any time. Shares may be purchased through open market or privately negotiated transactions or otherwise at the discretion of management subject to prevailing market conditions, applicable securities laws and other factors. At December 31, 2025, approximately $920 million remained available under the program.

Virginia Power

There is no established public trading market for Virginia Power’s common stock, all of which is owned by Dominion Energy. Virginia Power may pay cash dividends in 2026 but is neither required to nor restricted, except as described in Note 21 to the Consolidated Financial Statements, from making such payments.

Item 6. [RESERVED]

I****tem 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

MD&A discusses Dominion Energy’s results of operations, general financial condition and liquidity and Virginia Power’s results of operations. MD&A should be read in conjunction with Item 1. Business and the Consolidated Financial Statements in Item 8. Financial Statements and Supplementary Data. Virginia Power meets the conditions to file under the reduced disclosure format, and therefore has omitted certain sections of MD&A.

Contents of MD&A

MD&A consists of the following information:

Forward-Looking Statements—Dominion Energy and Virginia Power

Accounting Matters—Dominion Energy

Results of Operations—Dominion Energy and Virginia Power

Segment Results of Operations—Dominion Energy

Outlook—Dominion Energy

Liquidity and Capital Resources—Dominion Energy

Future Issues and Other Matters—Dominion Energy

Forward-Looking Statements

This report contains statements concerning the Companies’ expectations, plans, objectives, future financial performance and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. In most cases, the reader can identify these forward-looking statements by such words as “path”, “anticipate”, “believe”, “forecast”, “could”, “estimate”, “expect”, “intend”, “may”, “plan”, “outlook”, “predict”, “project”, “should”, “strategy”, “continue”, “target”, “will”, “potential” or other similar words.

The Companies make forward-looking statements with full knowledge that risks and uncertainties exist that may cause actual results to differ materially from predicted results. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Additionally, other factors may cause actual results to differ materially from those indicated in any forward-looking statement. These factors include but are not limited to:

Unusual weather conditions and their effect on energy sales to customers and energy commodity prices;

Extreme weather events and other natural disasters, including, but not limited to, hurricanes, high winds, severe storms, earthquakes, flooding, wildfires, climate changes and changes in water temperatures and availability that can cause outages and property damage to facilities;

The impact of extraordinary external events, such as the pandemic health event resulting from COVID-19, and their collateral consequences, including extended disruption of economic activity in the Companies’ markets and global supply chains;

Federal, state and local legislative and regulatory developments;

Changes in or interpretations of federal and state tax laws and regulations, including those related to tax credits or other incentives;

Risks of operating businesses in regulated industries that are subject to changing regulatory structures;

Changes to regulated electric rates collected by the Companies and regulated gas distribution rates collected by Dominion Energy;

Changes in rules for RTOs and ISOs in which the Companies join and/or participate, including changes in rate designs, changes in FERC’s interpretation of market rules and new and evolving capacity models;

Risks associated with Virginia Power’s membership and participation in PJM, including risks related to obligations created by the default of other participants;

Risks associated with entities in which the Companies share ownership with third parties, such as Stonepeak’s noncontrolling interest in the CVOW Commercial Project, including risks that result from lack of sole decision-making authority, disputes that may arise between the Companies and third-party participants and difficulties in exiting these arrangements;

Timing and receipt of regulatory approvals necessary for planned construction or growth projects and compliance with conditions associated with such regulatory approvals;

The inability to complete planned construction, conversion or growth projects at all, or with the outcomes or within the terms and time frames initially anticipated, including as a result of increased public involvement, intervention or litigation in such projects;

Risks and uncertainties that may impact the Companies’ ability to construct the CVOW Commercial Project within the currently proposed timeline, or at all, and consistent with current cost estimates along with the ability to recover such costs from customers;

Risks and uncertainties associated with the timely receipt of future capital contributions, including optional capital contributions, if any, from Stonepeak associated with the construction of the CVOW Commercial Project;

Changes to federal, state and local environmental laws and regulations, including those related to climate change, the tightening of emission or discharge limits for GHGs and other substances, more extensive permitting requirements and the regulation of additional substances;

Cost of environmental strategy and compliance, including those costs related to climate change;

Changes in implementation and enforcement practices of regulators relating to environmental standards and litigation exposure for remedial activities;

Difficulty in anticipating mitigation requirements associated with environmental and other regulatory approvals or related appeals;

Unplanned outages at facilities in which the Companies have an ownership interest;

The impact of operational hazards, including adverse developments with respect to plant safety or integrity,

Management’s Discussion and Analysis of Financial Condition and Results of Operations, Continued

equipment loss, malfunction or failure, operator error and other catastrophic events;

Risks associated with the operation of nuclear facilities, including costs associated with the disposal of spent nuclear fuel, decommissioning, plant maintenance and changes in existing regulations governing such facilities;

Changes in operating, maintenance and construction costs;

The availability of nuclear fuel, natural gas, purchased power or other materials utilized by the Companies to provide electric generation, transmission and distribution and/or gas distribution services to their customers;

Domestic terrorism and other threats to the Companies’ physical and intangible assets, as well as cybersecurity threats or incidents;

Additional competition in industries in which the Companies operate, including in electric markets in which Dominion Energy’s nonregulated generation facilities operate and potential competition from the development and deployment of alternative energy sources, such as self-generation and distributed generation technologies, and availability of market alternatives to large commercial and industrial customers;

Competition in the development, construction and ownership of certain electric transmission facilities in the Companies’ service territory in connection with Order 1000;

Changes in technology, particularly with respect to new, developing or alternative sources of generation and smart grid technologies;

Changes in demand for the Companies’ services, including industrial, commercial and residential growth or decline in the Companies’ service areas, failure to maintain or replace customer contracts on favorable terms, changes in customer growth or usage patterns, including as a result of energy conservation programs, the availability of energy efficient devices and the use of distributed generation methods;

Risks and uncertainties associated with increased energy demand or significant accelerated growth in demand due to new data centers, including the concentration of data centers primarily in Loudoun County, Virginia and the ability to obtain regulatory approvals, environmental

Showing the first 8K of 135K characters. Open the full section

Item 7A. Quantitative and Qualitative Disclosures About Market Risk

The matters discussed in this Item may contain “forward-looking statements” as described in the introductory paragraphs of Item 7. MD&A. The reader’s attention is directed to those paragraphs and Item 1A. Risk Factors for discussion of various risks and uncertainties that may impact the Companies.

Market Risk Sensitive Instruments and Risk Management

The Companies’ financial instruments, commodity contracts and related financial derivative instruments are exposed to potential losses due to adverse changes in commodity prices, interest rates, foreign currency exchange rates and equity securities prices as described below. Commodity price risk is present in the Companies’ electric operations and Dominion Energy’s natural gas procurement and marketing operations due to the exposure to market shifts in prices received and paid for electricity, natural gas and other commodities. The Companies use commodity derivative contracts to manage price risk exposures for these operations. Interest rate risk is generally related to their outstanding debt and future issuances of debt. In addition, the Companies are exposed to investment price risk through various portfolios of equity and debt securities. The Companies’ exposure to foreign currency exchange rate risk is related to certain fixed price contracts associated with the CVOW Commercial Project which it manages through foreign currency exchange rate derivatives. The contracts include services denominated in currencies other than the U.S. dollar for approximately €2.6 billion and 5.1 billion kr. In addition, certain of the fixed price contracts, approximately €0.7 billion, contain commodity indexing provisions linked to steel.

The following sensitivity analyses estimate the potential loss of future earnings or fair value from market risk sensitive instruments over a selected time period due to a 10% change in commodity prices, interest rates or foreign currency exchange rates.

Commodity Price Risk

To manage price risk, the Companies hold commodity-based derivative instruments held for non-trading purposes associated with purchases and sales of electricity, natural gas and other energy-related products.

The derivatives used to manage commodity price risk are executed within established policies and procedures and may include instruments such as futures, forwards, swaps, options and FTRs that are sensitive to changes in the related commodity prices. For sensitivity analysis purposes, the hypothetical change in market prices of commodity-based derivative instruments is determined based on models that consider the market prices of commodities in future periods, the volatility of the market prices in each period, as well as the time value factors of the derivative instruments. Prices and volatility are principally determined based on observable market prices.

A hypothetical 10% decrease in commodity prices would have resulted in a decrease of $15 million and a hypothetical 10% increase in commodity prices would have resulted in a decrease of $18 million in the fair value of Dominion Energy’s commodity-based derivative instruments at December 31, 2025 and 2024, respectively.

A hypothetical 10% decrease in commodity prices would have resulted in a decrease of $71 million and $15 million in the fair value of Virginia Power’s commodity-based derivative instruments at December 31, 2025 and 2024, respectively.

The impact of a change in energy commodity prices on the Companies’ commodity-based derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net losses from commodity-based financial derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction, such as revenue from physical sales of the commodity.

Interest Rate Risk

The Companies manage their interest rate risk exposure predominantly by maintaining a balance of fixed and variable rate debt. For variable rate debt outstanding for Dominion Energy, a hypothetical 10% increase in market interest rates would result in a $10 million and $12 million decrease in earnings at December 31, 2025 and 2024, respectively. For variable rate debt outstanding for Virginia Power, a hypothetical 10% increase in market interest rates would result in a $7 million decrease in earnings at both December 31, 2025 and 2024.

The Companies also use interest rate derivatives, including forward-starting swaps, interest rate swaps and interest rate lock agreements to manage interest rate risk. At December 31, 2025, Dominion Energy and Virginia Power had $10.7 billion and $8.1 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding in combined absolute value of their long and short positions, except in the case of offsetting transactions, for which they represent the absolute value of the net volume of their long and short positions. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $459 million and $382 million, respectively, in the fair value of Dominion Energy and Virginia Power’s interest rate derivatives at December 31, 2025. At December 31, 2024, Dominion Energy and Virginia Power had $10.8 billion and $3.8 billion, respectively, of these interest rate derivatives outstanding in combined absolute value of their long and short positions, except in the case of offsetting transactions, for which they represent the absolute value of the net volume of their long and short positions. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $157 million and $155 million, respectively, in the fair value of Dominion Energy and Virginia Power’s interest rate derivatives at December 31, 2024.

The impact of a change in interest rates on the Companies’ interest rate-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from interest rate derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.

Foreign Currency Exchange Rate Risk

The Companies utilize foreign currency exchange rate swaps to economically hedge the foreign currency exchange risk associated with fixed price contracts related to the CVOW Commercial Project denominated in foreign currencies. At December 31, 2025 and 2024, Dominion Energy had €0.9 billion and €1.1 billion,

Management’s Discussion and Analysis of Financial Condition and Results of Operations, Continued

respectively, in aggregate notional amounts of these foreign currency forward purchase agreements outstanding. A hypothetical 10% increase in the U.S. dollar to Euro exchange rate would have resulted in a decrease of $35 million and $106 million in the fair value of Dominion Energy’s foreign currency swaps at December 31, 2025 and 2024, respectively.

The impact of a change in exchange rates on the Companies’ foreign currency-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from foreign exchange derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.

Investment Price Risk

The Companies are subject to investment price risk due to securities held as investments in nuclear decommissioning and rabbi trust funds that are managed by third-party investment managers. These trust funds primarily hold marketable securities that are reported in the Companies’ Consolidated Balance Sheets at fair value.

Dominion Energy recognized net investment gains (losses) (including investment income) on nuclear decommissioning and rabbi trust investments of $1.1 billion for both the years ended December 31, 2025 and 2024. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Dominion Energy recorded, in AOCI and regulatory liabilities, a net increase in unrealized (losses) gains on debt investments of $41 million and $(28) million for the years ended December 31, 2025 and 2024, respectively.

Virginia Power recognized net investment gains (losses) (including investment income) on nuclear decommissioning and rabbi trust investments of $555 million and $580 million for the years ended December 31, 2025 and 2024, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Virginia Power recorded, in AOCI and regulatory liabilities, a net increase in unrealized gains (losses) on debt investments of $23 million and $(10) million for the years ended December 31, 2025 and 2024, respectively.

Dominion Energy sponsors pension and other postretirement employee benefit plans that hold investments in trusts to fund employee benefit payments. Virginia Power employees participate in these plans. Dominion Energy’s pension and other postretirement plan assets experienced aggregate actual returns of $1.2 billion and $738 million in 2025 and 2024, respectively, compared to expected returns of $835 million and $982 million, respectively. Differences between actual and expected returns on plan assets are immediately recognized in earnings annually in the fourth quarter of each fiscal year as well as whenever a plan is determined to qualify for a remeasurement. A hypothetical 0.25% decrease in the expected long-term rate of return on plan assets would have had a $28 million and $31 million impact in the years ending December 31, 2025 and 2024, respectively, to the expected returns on plan assets.

Risk Management Policies

The Companies have established operating procedures with corporate management to ensure that proper internal controls are maintained. In addition, Dominion Energy has established an independent function at the corporate level to monitor compliance with the credit and commodity risk management policies of all subsidiaries, including Virginia Power. Dominion Energy maintains credit policies that include the evaluation of a prospective counterparty’s financial condition, collateral requirements where deemed necessary and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty. In addition, Dominion Energy also monitors the financial condition of existing counterparties on an ongoing basis. Based on these credit policies and the Companies’ December 31, 2025 provision for credit losses, management believes that it is unlikely that a material adverse effect on the Companies’ financial position, results of operations or cash flows would occur as a result of counterparty nonperformance.

Item 8. Financial Statements and Supplementary Data

Page Number
Dominion Energy, Inc.
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)66
Consolidated Statements of Income for the years ended December 31, 2025, 2024 and 202368
Consolidated Statements of Comprehensive Income for the years ended December 31, 2025, 2024 and 202369
Consolidated Balance Sheets at December 31, 2025 and 202470
Consolidated Statements of Equity at December 31, 2025, 2024 and 2023 and for the years then ended72
Consolidated Statements of Cash Flows for the years ended December 31, 2025, 2024 and 202373
Virginia Electric and Power Company
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)74
Consolidated Statements of Income for the years ended December 31, 2025, 2024 and 202376
Consolidated Statements of Comprehensive Income for the years ended December 31, 2025, 2024 and 202377
Consolidated Balance Sheets at December 31, 2025 and 202478
Consolidated Statements of Equity at December 31, 2025, 2024 and 2023 and for the years then ended80
Consolidated Statements of Cash Flows for the years ended December 31, 2025, 2024 and 202381
Combined Notes to Consolidated Financial Statements82

Report of Independent Registered Public Accounting Firm

To the Shareholders and the Board of Directors of Dominion Energy, Inc.

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated balance sheets of Dominion Energy, Inc. and subsidiaries ("Dominion Energy") at December 31, 2025 and 2024, the related consolidated statements of income, comprehensive income, equity, and cash flows, for each of the three years in the period ended December 31, 2025, and the related notes (collectively referred to as the "consolidated financial statements"). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of Dominion Energy at December 31, 2025 and 2024, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2025, in conformity with accounting principles generally accepted in the United States of America.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), Dominion Energy’s internal control over financial reporting at December 31, 2025, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 23, 2026, expressed an unqualified opinion on Dominion Energy’s internal control over financial reporting.

Basis for Opinion

These consolidated financial statements are the responsibility of Dominion Energy’s management. Our responsibility is to express an opinion on Dominion Energy’s consolidated financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matter

The critical audit matter communicated below is a matter arising from the current-period audit of the consolidated financial statements that were communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the consolidated financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.

Regulatory Assets and Liabilities - Impact of Rate Regulation on the Consolidated Financial Statements — Refer to Notes 2, 12 and 13 to the Consolidated Financial Statements

Critical Audit Matter Description

Dominion Energy, through its regulated electric and gas subsidiaries, is subject to rate regulation by certain state public utility commissions and the Federal Energy Regulatory Commission (“FERC”) (collectively, the “relevant commissions”) which have jurisdiction with respect to the rates of electric and gas utility companies. Management has determined its rate-regulated subsidiaries meet the requirements under accounting principles generally accepted in the United States of America to apply the specialized rules to account for the effects of cost-based rate regulation. Accounting for the economics of rate regulation impacts multiple financial statement line items and disclosures, such as property, plant and equipment, net; regulatory assets; regulatory liabilities; operating revenues; electric fuel and other energy-related purchases; purchased electric capacity; purchased gas; other operations and maintenance expense; depreciation and amortization expense; and impairment of assets and other charges, collectively, the “financial statement impacts of rate regulation.”

Revenue provided by Dominion Energy’s electric transmission, distribution and generation operations and its gas distribution operations is primarily based on rates approved by the relevant commissions. Further, Virginia Electric and Power Company’s (“Virginia Power”) retail base rates, terms and conditions for generation and distribution services to customers in Virginia are reviewed by the Virginia State Corporation Commission (the “Virginia Commission”) in a proceeding that involves the determination of Virginia Power’s actual earned return on equity (“ROE”) during a historic test period, and determination of Virginia Power’s authorized ROE prospectively. Under certain circumstances, Virginia Power may be required to credit a portion of its earnings to customers.

When it is probable that regulators will permit the recovery of current costs through future rates charged to customers, these costs that otherwise would be expensed by nonregulated companies are deferred as regulatory assets. Likewise, regulatory liabilities are recognized when it is probable that regulators will require customer refunds or other benefits through future rates or when revenue is collected from customers for expenditures that have yet to be incurred. In addition, a loss is recognized if it becomes probabl

Showing the first 8K of 562K characters. Open the full section

Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosure

None.

Item 9A. Controls and Procedures

Dominion Energy

Senior management of Dominion Energy, including Dominion Energy’s CEO and CFO, evaluated the effectiveness of Dominion Energy’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Dominion Energy’s CEO and CFO have concluded that Dominion Energy’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Dominion Energy’s internal control over financial reporting.

Management’s Annual Report on Internal Control Over Financial Reporting

Management of Dominion Energy understands and accepts responsibility for Dominion Energy’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Dominion Energy continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as Dominion Energy does throughout all aspects of its business.

Dominion Energy maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Audit Committee of the Board of Directors of Dominion Energy, composed entirely of independent directors, meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss auditing, internal control, and financial reporting matters of Dominion Energy and to ensure that each is properly discharging its responsibilities. Both the independent registered public accounting firm and the internal auditors periodically meet alone with the Audit Committee and have free access to the Audit Committee at any time.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act of 2002 require Dominion Energy’s 2025 Annual Report to contain a management’s report and a report of the independent registered public accounting firm regarding the effectiveness of internal control. As a basis for the report, Dominion Energy tested and evaluated the design and operating effectiveness of internal controls. Based on its assessment as of December 31, 2025, Dominion Energy makes the following assertions:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Dominion Energy.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Dominion Energy’s internal control over financial reporting as of December 31, 2025. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Dominion Energy maintained effective internal control over financial reporting as of December 31, 2025.

Dominion Energy’s independent registered public accounting firm is engaged to express an opinion on Dominion Energy’s internal control over financial reporting, as stated in their report which is included herein.

February 23, 2026

Report of Independent Registered Public Accounting Firm

To the Shareholders and the Board of Directors of Dominion Energy, Inc.

Opinion on Internal Control over Financial Reporting

We have audited the internal control over financial reporting of Dominion Energy, Inc. and subsidiaries (“Dominion Energy”) as of December 31, 2025, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, Dominion Energy maintained, in all material respects, effective internal control over financial reporting as of December 31, 2025, based on criteria established in Internal Control — Integrated Framework (2013) issued by COSO.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements at and for the year ended December 31, 2025, of Dominion Energy and our report dated February 23, 2026, expressed an unqualified opinion on those consolidated financial statements.

Basis for Opinion

Dominion Energy’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management's Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on Dominion Energy’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to Dominion Energy in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

Definition and Limitations of Internal Control over Financial Reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/ Deloitte & Touche LLP

Richmond, Virginia

February 23, 2026

Part III

Virginia Power

Senior management of Virginia Power, including Virginia Power’s CEO and CFO, evaluated the effectiveness of Virginia Power’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, Virginia Power’s CEO and CFO have concluded that Virginia Power’s disclosure controls and procedures are effective. There were no changes that occurred during the last fiscal quarter that have materially affected, or are reasonably likely to materially affect, Virginia Power’s internal control over financial reporting.

Management’s Annual Report on Internal Control Over Financial Reporting

Management of Virginia Power understands and accepts responsibility for Virginia Power’s financial statements and related disclosures and the effectiveness of internal control over financial reporting (internal control). Virginia Power continuously strives to identify opportunities to enhance the effectiveness and efficiency of internal control, just as it does throughout all aspects of its business.

Virginia Power maintains a system of internal control designed to provide reasonable assurance, at a reasonable cost, that its assets are safeguarded against loss from unauthorized use or disposition and that transactions are executed and recorded in accordance with established procedures. This system includes written policies, an organizational structure designed to ensure appropriate segregation of responsibilities, careful selection and training of qualified personnel and internal audits.

The Board of Directors also serves as Virginia Power’s Audit Committee and meets periodically with the independent registered public accounting firm, the internal auditors and management to discuss Virginia Power’s auditing, internal accounting control and financial reporting matters and to ensure that each is properly discharging its responsibilities.

SEC rules implementing Section 404 of the Sarbanes-Oxley Act require Virginia Power’s 2025 Annual Report to contain a management’s report regarding the effectiveness of internal control. As a basis for the report, Virginia Power tested and evaluated the design and operating effectiveness of internal controls. Based on the assessment as of December 31, 2025, Virginia Power makes the following assertions:

Management is responsible for establishing and maintaining effective internal control over financial reporting of Virginia Power.

There are inherent limitations in the effectiveness of any internal control, including the possibility of human error and the circumvention or overriding of controls. Accordingly, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation. Further, because of changes in conditions, the effectiveness of internal control may vary over time.

Management evaluated Virginia Power’s internal control over financial reporting as of December 31, 2025. This assessment was based on criteria for effective internal control over financial reporting described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management believes that Virginia Power maintained effective internal control over financial reporting as of December 31, 2025.

This annual report does not include an attestation report of Virginia Power’s registered public accounting firm regarding internal control over financial reporting. Management’s report is not subject to attestation by Virginia Power’s independent registered public accounting firm pursuant to a permanent exemption under the Dodd-Frank Act.

February 23, 2026

Item 9B. Other Information

During the last fiscal quarter, none of the Companies’ directors or officers (as defined in Rule 16a-1(f) under the Exchange Act) adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.

Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections

Not applicable.

Part III

Item 10. Directors, Executive Officers and Corporate Governance

Dominion Energy

The information required by this item is incorporated by reference to the sections entitled Item 1—Election of Directors, Corporate Governance—The Committees of the Board, Corporate Governance—Other Governance Practices and Policies—Code of Ethics and Business Conduct and Corporate Governance—Other Governance Practices and Policies—Securities Trading Policy in the Dominion Energy 2026 Proxy Statement.

The information concerning the executive officers of Dominion Energy required by this item is included in Part I of this Form 10-K under the caption Information about our Executive Officers. Each executive officer of Dominion Energy is elected annually.

Item 11. Executive Compensation

Dominion Energy

The information required by this item is incorporated by reference to the sections entitled Executive Compensation, Compensation of Non-Employee Directors and Corporate Governance—The Committees of the Board—Compensation and Talent Development Committee—Compensation Committee Interlocks and Insider Participation in the 2026 Proxy Statement*.*

Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

Dominion Energy

The information required by this item is incorporated by reference to the sections entitled Security Ownership of Certain Beneficial Owners and Management and Executive Compensation—Equity Compensation Plans in the 2026 Proxy Statement.

Item 13. Certain Relationships and Related Transactions, and Director Independence

Dominion Energy

The information required by this item is incorporated by reference to the sections entitled Corporate Governance—Other Governance Practices and Policies —Certain Relationships and Related Party Transactions and Corporate Governance —Director Independence in the 2026 Proxy Statement.

Item 14. Principal Accountant Fees and Services

Dominion Energy

The information required by this item is incorporated by reference to the section entitled Audit Committee Matters—Auditor Fees and Pre-Approval Policy in the 2026 Proxy Statement.

Virginia Power

The following table presents fees paid to Deloitte & Touche LLP for services related to Virginia Power for the fiscal years ended December 31, 2025 and 2024.

Type of Fees20252024
(millions)
Virginia Power
Audit fees$3.50$3.22
Audit-related fees—0.15
Tax fees——
All other fees——
Total Fees$3.50$3.37

Audit fees represent fees of Deloitte & Touche LLP for the audit of Virginia Power’s annual consolidated financial statements, the review of financial statements included in Virginia Power’s quarterly Form 10-Q reports, and the services that an independent auditor would customarily provide in connection with subsidiary audits, statutory requirements, regulatory filings and similar engagements for the fiscal year, such as comfort letters, attest services, consents and assistance with review of documents filed with the SEC.

Audit-related fees consist of assurance and related services that are reasonably related to the performance of the audit or review of Virginia Power’s consolidated financial statements or internal control over financial reporting. This category may include fees related to the performance of audits and attest services not required by statute or regulations, due diligence related to mergers, acquisitions and investments, and accounting consultations about the application of GAAP to proposed transactions.

Virginia Power’s Board of Directors has adopted the Dominion Energy Audit Committee pre-approval policy for their independent auditor’s services and fees and have delegated the execution of this policy to the Dominion Energy Audit Committee. All services performed in 2025 and 2024 by the independent auditor were approved by the Dominion Energy Audit Committee pursuant to the pre-approval policy.

Part IV

Item 15. Exhibits and Financial Statement Schedules

(a) Certain documents are filed as part of this Form 10-K and are incorporated by reference and found on the pages noted.

  1. Financial Statements

See Index on page 65.

  1. All schedules are omitted because they are not applicable, or the required information is either not material or is shown in the financial statements or the related notes.

  2. Exhibits (incorporated by reference unless otherwise noted)

Exhibit NumberDescriptionDominion EnergyVirginia Power
2.1.aPurchase and Sale Agreement, dated as of September 5, 2023, by and between Dominion Energy, Inc. and Enbridge Elephant Holdings, LLC (Exhibit 2.1, Form 8-K filed September 5, 2023, File No. 1-8489).X
2.1.bPurchase and Sale Agreement, dated as of September 5, 2023, by and between Dominion Energy, Inc. and Enbridge Parrot Holdings, LLC (Exhibit 2.2, Form 8-K filed September 5, 2023, File No. 1-8489).X
2.1.cPurchase and Sale Agreement, dated as of September 5, 2023, by and between Dominion Energy, Inc. and Enbridge Quail Holdings, LLC (Exhibit 2.3, Form 8-K filed September 5, 2023, File No. 1-8489).X
2.2Equity Capital Contribution Agreement, dated as of February 21, 2024, by and between Virginia Electric and Power Company and Dunedin Member LLC (Exhibit 2.1, Form 8-K filed February 26, 2024, File No. 1-8489 and File No. 000-55337).XX
3.1.aDominion Energy, Inc. Amended and Restated Articles of Incorporation, dated as of December 17, 2024 (Exhibit 3.1, Form 8-K filed December 17, 2024, File No.1-8489).X
3.1.bVirginia Electric and Power Company Amended and Restated Articles of Incorporation, as in effect on October 30, 2014 (Exhibit 3.1.b, Form 10-Q filed November 3, 2014, File No. 1-2255).X
3.2.aDominion Energy, Inc. Bylaws, as amended and restated, effective June 26, 2025 (Exhibit 3.1, Form 8-K filed June 27, 2025, File No. 1-8489).X
3.2.bVirginia Electric and Power Company Amended and Restated Bylaws, effective June 1, 2009 (Exhibit 3.1, Form 8-K filed June 3, 2009, File No. 1-2255).X
4Dominion Energy, Inc. and Virginia Electric and Power Company agree to furnish to the Securities and Exchange Commission upon request any other instrument with respect to long-term debt as to which the total amount of securities authorized does not exceed 10% of any of their total consolidated assets.XX
4.1.aSee Exhibit 3.1.a above.X
4.1.bSee Exhibit 3.1.b above.X
4.2Indenture of Mortgage of Virginia Electric and Power Company, dated November 1, 1935, as supplemented and modified by Fifty-Eighth Supplemental Indenture (Exhibit 4(ii), Form 10-K for the fiscal year ended December 31, 1985, File No. 1-2255); Ninety-Second Supplemental Indenture, dated as of July 1, 2012 (Exhibit 4.1, Form 10-Q for the quarter ended June 30, 2012 filed August 1, 2012, File No. 1-2255).XX
4.3Form of Senior Indenture, dated June 1, 1998, between Virginia Electric and Power Company and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)), as Trustee (Exhibit 4(iii), Form S-3 Registration Statement filed February 27, 1998, File No. 333-47119); Form of Thirteenth Supplemental Indenture, dated as of January 1, 2006 (Exhibit 4.3, Form 8-K filed January 12, 2006, File No. 1-2255); Form of Fourteenth Supplemental Indenture, dated May 1, 2007 (Exhibit 4.2, Form 8-K filed May 16, 2007, File No. 1-2255); Form of Seventeenth Supplemental Indenture, dated November 1, 2007 (Exhibit 4.3, Form 8-K filed November 30, 2007, File No. 1-2255); Form of Nineteenth Supplemental and Amending Indenture, dated November 1, 2008 (Exhibit 4.2, Form 8-K filed November 5, 2008, File No. 1-2255); Twenty-Fourth Supplemental Indenture, dated as of January 1, 2013 (Exhibit 4.4, Form 8-K filed January 8, 2013, File No. 1-2255); Twenty-Sixth Supplemental Indenture, dated as of August 1, 2013 (Exhibit 4.3, Form 8-K filed August 15, 2013, File No. 1-2255); Twenty-Seventh Supplemental Indenture, dated February 1, 2014 (Exhibit 4.3, Form 8-K filed February 7, 2014, File No. 1-2255); Twenty-Eighth Supplemental Indenture, dated February 1, 2014 (Exhibit 4.4, Form 8-K filed February 7, 2014, File No. 1-2255); Twenty-Ninth Supplemental Indenture, dated May 1, 2015 (Exhibit 4.3, Form 8-K filed May 13, 2015, File No. 1-02255); Thirtieth Supplemental Indenture, dated May 1, 2015 (Exhibit 4.4, Form 8-K filed May 13, 2015, File No. 1-02255); Thirty-First Supplemental Indenture, dated January 1, 2016 (Exhibit 4.3, Form 8-K filed January 14, 2016, File No. 000-55337); Thirty-SecondXX
Exhibit NumberDescriptionDominion EnergyVirginia Power
Supplemental Indenture, dated November 1, 2016 (Exhibit 4.3, Form 8-K filed November 16, 2016, File No. 000-55337); Thirty-Third Supplemental Indenture, dated November 1, 2016 (Exhibit 4.4, Form 8-K filed November 16, 2016, File No. 000-55337); Thirty-Fourth Supplemental Indenture, dated March 1, 2017 (Exhibit 4.3, Form 8-K filed March 16, 2017; File No. 000-55337).
4.4Senior Indenture, dated as of September 1, 2017, between Virginia Electric and Power Company and U.S. Bank National Association, as Trustee (Exhibit 4.1, Form 8-K filed September 13, 2017, File No.000-55337); First Supplemental Indenture, dated as of September 1, 2017 (Exhibit 4.2, Form 8-K filed September 13, 2017, File No.000-55337); Second Supplemental Indenture, dated as of March 1, 2018 (Exhibit 4.2, Form 8-K filed March 22, 2018, File No. 000-55337); Third Supplemental Indenture, dated as of November 1, 2018 (Exhibit 4.2, Form 8-K filed November 28, 2018, File No. 000-55337); Fourth Supplemental Indenture, dated as of July 1, 2019 (Exhibit 4.2, Form 8-K filed July 10, 2019, File No. 00-55337); Fifth Supplemental Indenture, dated as of December 1, 2019 (Exhibit 4.2, Form 8-K filed December 5, 2019, File No. 000-55337); Sixth Supplemental Indenture, dated as of December 1, 2020 (Exhibit 4.2, Form 8-K filed December 15, 2020, File No. 00-55337); Seventh Supplemental Indenture, dated as of November 1, 2021 (Exhibit 4.2, Form 8-K filed November 22, 2021, File No.000-55337); Eighth Supplemental Indenture, dated as of November 1, 2021 (Exhibit 4.3, Form 8-K filed November 22, 2021, File No.000-55337); Ninth Supplemental Indenture, dated as of January 1, 2022 (Exhibit 4.3, Form 8-K filed January 13, 2022, File No.000-55337); Tenth Supplemental Indenture, dated as of May 1, 2022 (Exhibit 4.2, Form 8-K filed May 31, 2022, File No. 000-55337); Eleventh Supplemental Indenture, dated as of May 1, 2022 (Exhibit 4.3, Form 8-K filed May 31, 2022, File No. 000-55337); Twelfth Supplemental Indenture, dated as of March 1, 2023 (Exhibit 4.2. Form 8-K filed March 30, 2023, File No. 000-55337); Thirteenth Supplemental Indenture, dated as of March 1, 2023 (Exhibit 4.3. Form 8-K filed March 30, 2023, File No. 000-55337); Fourteenth Supplemental Indenture, dated as of August 1, 2023 (Exhibit 4.2. Form 8-K filed August 10, 2023, File No. 000-55337); Fifteenth Supplemental Indenture, dated as of August 1, 2023 (Exhibit 4.3. Form 8-K filed August 10, 2023, File No. 000-55337); Sixteenth Supplemental Indenture, dated as of January 1, 2024 (Exhibit 4.2. Form 8-K filed January 8, 2024, File No. 000-55337); Seventeenth Supplemental Indenture, dated as of January 1, 2024 (Exhibit 4.3. Form 8-K filed January 8, 2024, File No. 000-55337); Eighteenth Supplemental Indenture, dated as of August 1, 2024 (Exhibit 4.2, Form 8-K filed August 12, 2024, File No. 000-55337); Nineteenth Supplemental Indenture, dated as of August 1, 2024 (Exhibit 4.3, Form 8-K filed August 12, 2024, File No. 000-55337); Twentieth Supplemental Indenture, dated as of March 1, 2025 (Exhibit 4.2, Form 8-K filed March 5, 2025, File No. 000-55337); Twenty-First Supplemental Indenture, dated as of March 1, 2025 (Exhibit 4.3, Form 8-K filed March 5, 2025, File No. 000-55337); Twenty-Second Supplemental Indenture, dated as of September 1, 2025 (Exhibit 4.2, Form 8-K filed September 10, 2025, File No. 000-55337); Twenty-Third Supplemental Indenture, dated as of September 1, 2025 (Exhibit 4.3, Form 8-K filed September 10, 2025, File No. 000-55337).XX
4.5Indenture, Junior Subordinated Debentures, dated December 1, 1997, between Dominion Resources, Inc. and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)) as supplemented by a Form of Second Supplemental Indenture, dated January 1, 2001 (Exhibit 4.6, Form 8-K filed January 12, 2001, File No. 1-8489).X
4.6Indenture, dated April 1, 1995, between Consolidated Natural Gas Company and The Bank of New York Mellon (as successor trustee to United States Trust Company of New York) (Exhibit (4), Certificate of Notification No. 1 filed April 19, 1995, File No. 70-8107); Securities Resolution No. 2 effective as of October 16, 1996 (Exhibit 2, Form 8-A filed October 18, 1996, File No. 1-3196 and relating to the 6 7/8% Debentures Due October 15, 2026); Securities Resolution No. 4 effective as of December 9, 1997 (Exhibit 2, Form 8-A filed December 12, 1997, File No. 1-3196 and relating to the 6.80% Debentures Due December 15, 2027).X
4.7Form of Senior Indenture, dated June 1, 2000, between Dominion Resources, Inc. and The Bank of New York Mellon (as successor trustee to JP Morgan Chase Bank (formerly The Chase Manhattan Bank)), as Trustee (Exhibit 4(iii), Form S-3 Registration Statement filed December 21, 1999, File No. 333-93187); Form of Sixteenth Supplemental Indenture, dated December 1, 2002 (Exhibit 4.3, Form 8-K filed December 13, 2002, File No. 1-8489); Form of Twenty-First Supplemental Indenture, dated March 1, 2003 (Exhibits 4.3, Form 8-K filed March 4, 2003, File No. 1-8489); Form of Twenty-Second Supplemental Indenture, dated July 1, 2003 (Exhibit 4.2, Form 8-K filed July 22, 2003, File No. 1-8489); Form of Twenty-Ninth Supplemental Indenture, dated June 1, 2005 (Exhibit 4.3, Form 8-K filed June 17, 2005, File No. 1-8489); Form of Thirty-Sixth Supplemental Indentures, dated June 1, 2008 (Exhibit 4.3, Form 8-K filed June 16, 2008, File No. 1-8489); Forty-Third Supplemental Indenture, dated August 1, 2011 (Exhibit 4.3, Form 8-K, filed August 5, 2011, File No. 1-8489); Forty-Seventh Supplemental Indenture, dated September 1, 2012 (Exhibit 4.5, Form 8-K, filed September 13, 2012, File No. 1-8489); Fifty-First Supplemental Indenture, dated November 1, 2014 (Exhibit 4.5, Form 8-K, filed November 25, 2014, File No. 1-8489).X
Exhibit NumberDescriptionDominion EnergyVirginia Power
4.8Indenture, dated as of June 1, 2015, between Dominion Resources, Inc. and Deutsche Bank Trust Company Americas, as Trustee (Exhibit 4.1, Form 8-K filed June 15, 2015, File No. 1-8489); Second Supplemental Indenture, dated as of September 1, 2015 (Exhibit 4.2, Form 8-K filed September 24, 2015, File No. 1-8489); Sixth Supplemental Indenture, dated as of August 1, 2016 (Exhibit 4.4, Form 8-K filed August 9, 2016, File No. 1-8489); Eleventh Supplemental Indenture, dated as of March 1, 2017 (Exhibit 4.3, Form 10-Q filed May 4, 2017, File No. 1-8489); Fifteenth Supplemental Indenture, dated June 1, 2018 (Exhibit 4.2, Form 8-K, filed June 5, 2018, File No. 1-8489); Sixteenth Supplemental Indenture, dated March 1, 2019 (Exhibit 4.2, Form 8-K filed March 13, 2019, File No. 1-8489); Eighteenth Supplemental Indenture, dated as of March 1, 2020 (Exhibit 4.2, Form 8-K, filed March 19, 2020, File No. 1-8489); Nineteenth Supplemental Indenture, dated as of March 1, 2020 (Exhibit 4.3, Form 8-K, filed March 19, 2020, File No. 1-8489); Twentieth Supplemental Indenture, dated as of April 1, 2020 (Exhibit 4.2, Form 8-K, filed April 3, 2020, File No. 1-8489); Twenty-Second Supplemental Indenture, dated as of April 1, 2021 (Exhibit 4.2, Form 8-K, filed April 5, 2021, File No. 1-8489); Twenty-Third Supplemental Indenture, dated as of April 1, 2021 (Exhibit 4.3, Form 8-K, filed April 5, 2021, File No. 1-8489); Twenty-Fourth Supplemental Indenture, dated as of August 1, 2021 (Exhibit 4.2, Form 8-K filed August 12, 2021, File No. 1-8489); Twenty-Fifth Supplemental Indenture, dated as of August 1, 2022 (Exhibit 4.2, Form 8-K filed August 19, 2022, File No. 1-8489); Twenty-Sixth Supplemental Indenture, dated as of August 1, 2022 (Exhibit 4.3, Form 8-K filed August 19, 2022, File No. 1-8489); Twenty-Seventh Supplemental Indenture, dated as of November 1, 2022 (Exhibit 4.2, Form 8-K filed November 18, 2022, File No. 1-8489); Twenty-Eighth Supplemental Indenture, dated as of March 1, 2025 (Exhibit 4.2, Form 8-K filed March 11, 2025, File No. 1-8489; Twenty-Ninth Supplemental Indenture, dated as of March 1, 2025 (Exhibit 4.3, Form 8-K filed March 11, 2025, File No. 1-8489); Thirtieth Supplemental Indenture, dated as of May 1, 2025 (Exhibit 4.2, Form 8-K filed May 13, 2025, File No. 1-8489).X
4.9Junior Subordinated Indenture II, dated June 1, 2006, between Dominion Resources, Inc. and The Bank of New York Mellon (successor to JPMorgan Chase Bank, N.A.), as Trustee (Exhibit 4.1, Form 10-Q for the quarter ended June 30, 2006 filed August 3, 2006, File No. 1-8489); Third Supplemental and Amending Indenture, dated as of June 1, 2009 (Exhibit 4.2, Form 8-K filed June 15, 2009, File No. 1-8489); Seventh Supplemental Indenture, dated as of September 1, 2014 (Exhibit 4.3, Form 8-K filed October 3, 2013, File No. 1-8489); Fifteenth Supplemental Indenture, dated June 27, 2019 (Exhibit 4.6, Form 8-K filed June 27, 2019, File No. 1-8489); Sixteenth Supplemental Indenture, dated as of May 1, 2024 (Exhibit 4.3, Form 8-K filed May 20, 2024, File No. 1-8489); Seventeenth Supplemental Indenture, dated as of May 1, 2024 (Exhibit 4.4, Form 8-K filed May 20, 2024, File No. 1-8489); Eighteenth Supplemental Indenture, dated as of November 1, 2024 (Exhibit 4.3, Form 8-K filed November 18, 2024, File No. 1-8489); Nineteenth Supplemental Indenture, dated as of August 1, 2025 (Exhibit 4.3, Form 8-K filed August 6, 2025, File No. 1-8489); Twentieth Supplemental Indenture, dated as of August 1, 2025 (Exhibit 4.4, Form 8-K filed August 6, 2025, File No. 1-8489).X
4.10Description of Dominion Energy, Inc.’s Common Stock (filed herewith).X
4.11Description of Virginia Electric and Power Company’s Common Stock (Exhibit 4.19, Form 10-K for the fiscal year ended December 31, 2019 filed February 28, 2020, File No.1-8489).X
10.1$7,000,000,000 Sixth Amended and Restated Revolving Credit Agreement, dated as of April 8, 2025, among Dominion Energy, Inc., Virginia Electric and Power Company, Dominion Energy South Carolina, Inc., JPMorgan Chase Bank, N.A., as Administrative Agent, Mizuho Bank, Ltd., Bank of America, N.A., The Bank of Nova Scotia and Wells Fargo Bank, N.A., as Syndication Agents, JPMorgan Chase Bank, N.A., Mizuho Bank, LTD., BOFA Securities, Inc., The Bank of Nova Scotia and Wells Fargo Securities, LLC, as Joint Lead Arrangers and Joint Bookrunners, and the other agents and lenders thereto (Exhibit 10.1, Form 8-K filed April 9, 2025, File No. 1-8489).XX
10.2Sustainability Revolving Credit Agreement, dated as of June 9, 2021, among Dominion Energy, Inc., Sumitomo Mitsui Banking Corporation, as Administrative Agent and Sustainability Coordinator, Sumitomo Mitsui Banking Corporation, The Bank of Nova Scotia and The Toronto- Dominion Bank, New York Branch, as Joint Lead Arrangers and Joint Bookrunners, and the other lenders named therein (Exhibit 10.2, Form 8-K filed June 10, 2021, File No. 1-8489); as amended by the First Amendment, dated October 12, 2022, to the Sustainability Revolving Credit Agreement (Exhibit 10.1, Form 8-K filed October 14, 2022, File No. 1-8489), the Second Amendment, dated June 7, 2024, to the Sustainability Revolving Credit Agreement (Exhibit 10.1, Form 8-K filed June 7, 2024 (File No. 1-8489) and the Third Amendment, dated as of April 8, 2025, to the Sustainability Revolving Credit Agreement (Exhibit 10.2, Form 8-K filed April 9, 2025, File No. 1-8489).X
Exhibit NumberDescriptionDominion EnergyVirginia Power
10.3DRS Services Agreement, dated January 1, 2003, between Dominion Resources, Inc. and Dominion Resources Services, Inc. (Exhibit 10.1, Form 10-K for the fiscal year ended December 31, 2011 filed February 28, 2012, File No. 1-8489).X
10.4DES Services Agreement, dated January 1, 2024, between Dominion Energy Services, Inc. and Virginia Electric and Power Company (Exhibit 10.4, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No.1-8489).X
10.5Agreement between PJM Interconnection, L.L.C. and Virginia Electric and Power Company (Exhibit 10.1, Form 8-K filed April 26, 2005, File No. 1-2255 and File No. 1-8489).XX
10.6Form of Settlement Agreement in the form of a proposed Consent Decree among the United States of America, on behalf of the United States Environmental Protection Agency, the State of New York, the State of New Jersey, the State of Connecticut, the Commonwealth of Virginia and the State of West Virginia and Virginia Electric and Power Company (Exhibit 10, Form 10-Q for the quarter ended March 31, 2003 filed May 9, 2003, File No. 1-8489 and File No. 1-2255).XX
10.7Limited Liability Company Agreement of OSW Project LLC, dated as of October 22, 2024 (Exhibit 10.1, Form 8-K filed October 25, 2024, File No. 1-8489 and File No. 000-55337).XX
10.8*Form of Employment Continuity Agreement for certain officers of Dominion Resources, Inc., amended and restated July 15, 2003 (Exhibit 10.1, Form 10-Q for the quarter ended June 30, 2003 filed August 11, 2003, File No. 1-8489), as amended, March 31, 2006 (Exhibit 10.1, Form 8-K filed April 4, 2006, File No. 1-8489).X
10.9*Form of Employment Continuity Agreement for certain officers of Dominion Resources, Inc. dated January 24, 2013 (effective for certain officers elected subsequent to February 1, 2013) (Exhibit 10.9, Form 10-K for the fiscal year ended December 31, 2013 filed February 28, 2014, File No. 1-8489 and File No. 1-2255).X
10.10*Dominion Resources, Inc. Executives’ Deferred Compensation Plan, amended and restated effective December 31, 2004 (Exhibit 10.7, Form 8-K filed December 23, 2004, File No. 1-8489).X
10.11*Dominion Resources, Inc. New Executive Supplemental Retirement Plan, as amended and restated effective July 1, 2013 (Exhibit 10.2, Form 10-Q for the quarter ended June 30, 2013 filed August 6, 2013 File No. 1-8489), as amended September 26, 2014 (Exhibit 10.3, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014), as amended effective October 1, 2019 (Exhibit 10.1, Form 8-K filed October 2, 2019, File No. 1-8489), as amended December 11, 2020 (Exhibit 10.9, Form 10-K for the fiscal year ended December 31, 2020 filed February 25, 2021, File No.1-8489), as amended June 21, 2024 (Exhibit 10.4, Form 10-Q for the fiscal quarter ended June 30, 2024 filed August 1, 2024, File No. 1-8489).X
10.12*Dominion Resources, Inc. New Retirement Benefit Restoration Plan, as amended and restated effective January 1, 2009 (Exhibit 10.17, Form 10-K for the fiscal year ended December 31, 2008 filed February 26, 2009, File No. 1-8489, as amended September 26, 2014 (Exhibit 10.4, Form 10-Q for the fiscal quarter ended September 30, 2014 filed November 3, 2014), File No. 1-8489), as amended June 21, 2024 (Exhibit 10.5, Form 10-Q for the fiscal quarter ended June 30, 2024 filed August 1, 2024, File No. 1-8489).X
10.13*Dominion Resources, Inc. Non-Employee Directors’ Compensation Plan, effective January 1, 2005, as amended and restated effective December 15, 2021 (Exhibit 10.13, Form 10-K for the fiscal year ended December 31, 2021 filed February 24, 2022, File No. 1-8489).X
10.14*Dominion Resources, Inc. Executive Stock Purchase Tool Kit, effective September 1, 2001, amended and restated May 7, 2014 (Exhibit 10.4, Form 10-Q for the fiscal quarter ended June 30, 2014 filed July 30, 2014, File No. 1-8489), as amended and restated May 7, 2024 (Exhibit 10.6, Form 10-Q for the fiscal quarter ended June 30, 2024 filed August 1, 2024, File No. 1-8489).X
10.15*Form of Advancement of Expenses for certain directors and officers of Dominion Energy, Inc., approved by the Dominion Energy, Inc. Board of Directors on October 24, 2008 (Exhibit 10.2, Form 10-Q for the quarter ended September 30, 2008 filed October 30, 2008, File No. 1-8489).X
10.16*Dominion Resources, Inc. 2014 Incentive Compensation Plan, effective May 7, 2014 (Exhibit 10.1, Form 8-K filed May 7, 2014, File No. 1-8489).X
10.17*Dominion Energy, Inc. Deferred Compensation Plan, effective July 1, 2021 (Exhibit 10.18, Form 10-K for the fiscal year ended December 31, 2020, filed February 25, 2021, File No. 1-8489), as amended September 23, 2021 (Exhibit 10.1, Form 10-Q filed November 5, 2021, File No. 1-8489), as amended May 10, 2023 (Exhibit 10.1, Form 10-Q filed August 4, 2023, File No. 1-8489).X
Exhibit NumberDescriptionDominion EnergyVirginia Power
10.18*Form of 2024 Performance Grant Agreement under the 2024 Long-Term Incentive Program approved January 25, 2024 (Exhibit 10.25, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
10.19*Form of 2024 Performance Share Award Agreement under the 2024 Long-Term Incentive Program approved January 25, 2024 (Exhibit 10.26, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
10.20*Form of Restricted Stock Agreement under the 2024 Long-Term Incentive Program approved January 25, 2024 (Exhibit 10.27, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
10.21*2024 Performance Share Award Agreement for Robert M. Blue under the 2024 Long-Term Incentive Program approved January 25, 2024 (Exhibit 10.28, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
10.22*2024 Performance Grant Agreement for Robert M. Blue under the 2024 Long-Term Incentive Program approved January 25, 2024 (Exhibit 10.29, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
10.23*Dominion Energy, Inc. 2024 Incentive Compensation Plan, effective May 7, 2024 (Exhibit 10.1, Form 8-K filed May 8, 2024, File No. 1-2255).X
10.24*Form of 2025 Performance Grant Agreement under the 2025 Long-Term Incentive Program approved January 23, 2025 (Exhibit 10.29, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.25*Form of 2025 Performance Share Award Agreement under the 2025 Long-Term Incentive Program approved January 23, 2025 (Exhibit 10.30, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.26*Form of 2025 Restricted Stock Agreement under the 2025 Long-Term Incentive Program approved January 23, 2025 (Exhibit 10.31, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.27*2025 Performance Share Award Agreement for Robert M. Blue under the 2025 Long-Term Incentive Program approved January 23, 2025 (Exhibit 10.32, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.28*2025 Performance Grant Agreement for Robert M. Blue under the 2025 Long-Term Incentive Program approved January 23, 2025 (Exhibit 10.33, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.29*Form of 2025 Key Contributor Restricted Stock Recognition Award (Exhibit 10.34, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
10.30*Form of 2025 Key Contributor Cash Recognition Award (Exhibit 10.35, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No.1-8489).X
19Securities Trading Policy (Exhibit 19, Form 10-K for the fiscal year ended December 31, 2024 filed February 27, 2025, File No. 1-8489).X
21Subsidiaries of Dominion Energy, Inc. (filed herewith).X
23Consent of Deloitte & Touche LLP, Independent Registered Public Accounting Firm for Dominion Energy, Inc. and Virginia Electric and Power Company (filed herewith).XX
31.aCertification by Chief Executive Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.bCertification by Chief Financial Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.cCertification by Chief Executive Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.dCertification by Chief Financial Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
Exhibit NumberDescriptionDominion EnergyVirginia Power
32.aCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Dominion Energy, Inc. as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
32.bCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Virginia Electric and Power Company as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
97Dominion Energy, Inc. Policy for Recovery of Previously Awarded Compensation effective October 2, 2023 (Exhibit 97, Form 10-K for the fiscal year ended December 31, 2023 filed February 23, 2024, File No. 1-8489).X
101The following financial statements from Dominion Energy, Inc.’s Annual Report on Form 10-K for the year ended December 31, 2025, filed on February 23, 2026, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Equity, (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements. The following financial statements from Virginia Electric and Power Company’s Annual Report on Form 10-K for the year ended December 31, 2025, filed on February 23, 2026, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Equity (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements.XX
104Cover Page Interactive Data File formatted in iXBRL (Inline eXtensible Business Reporting Language) and contained in Exhibit 101.XX

** Indicates management contract or compensatory plan or arrangement.*

Item 16. Form 10-K Summary

None.

Signatures

Dominion Energy

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

DOMINION ENERGY, INC.
By:/s/ Robert M. Blue
(Robert M. Blue, President and Chief Executive Officer)

Date: February 23, 2026

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 23rd day of February, 2026.

SignatureTitle
/s/ Robert M. Blue Robert M. BlueChair of the Board of Directors, President and Chief Executive Officer
/s/ James A. Bennett James A. BennettDirector
/s/ D. Maybank HagoodDirector
D. Maybank Hagood
/s/ Mark J. Kington Mark J. KingtonDirector
/s/ Kristin G. LovejoyDirector
Kristin G. Lovejoy
/s/ Jeffrey J. LyashDirector
Jeffrey J. Lyash
/s/ Joseph M. Rigby Joseph M. RigbyDirector
/s/ Pamela J. Royal Pamela J. RoyalDirector
/s/ Robert H. Spilman, Jr. Robert H. Spilman, Jr.Director
/s/ Susan N. Story Susan N. StoryDirector
/s/ Vanessa Allen Sutherland Vanessa Allen SutherlandDirector
/s/ Steven D. Ridge Steven D. RidgeExecutive Vice President and Chief Financial Officer
/s/ Gary G. Ratliff, Jr. Gary G. Ratliff, Jr.Vice President, Controller and Chief Accounting Officer

Virginia Power

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

VIRGINIA ELECTRIC AND POWER COMPANY
By:/s/ Robert M. Blue
(Robert M. Blue, Chief Executive Officer)

Date: February 23, 2026

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 23rd day of February, 2026.

SignatureTitle
/s/ Edward H. Baine Edward H. BaineDirector
/s/ Robert M. Blue Robert M. BlueDirector and Chief Executive Officer
/s/ Carlos M. Brown Carlos M. BrownDirector
/s/ Steven D. Ridge Steven D. RidgeExecutive Vice President and Chief Financial Officer
/s/ Gary G. Ratliff, Jr. Gary G. Ratliff, Jr.Vice President, Controller and Chief Accounting Officer