Dominion Energy 10-Q 2022-06-30

Filed 2022-08-08. 7 sections, 399K characters. Original on sec.gov · Markdown · JSON

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

(Mark one)

☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended June 30, 2022

or

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File NumberExact name of registrants as specified in their charters, address of principal executive offices and registrants’ telephone numberI.R.S. Employer Identification Number
001-08489DOMINION ENERGY, INC.54-1229715
000-55337VIRGINIA ELECTRIC AND POWER COMPANY54-0418825
120 Tredegar Street Richmond, Virginia 23219 (804) 819-2000

State or other jurisdiction of incorporation or organization of the registrants: Virginia

Securities registered pursuant to Section 12(b) of the Act:

RegistrantTrading SymbolTitle of Each ClassName of Each Exchange on Which Registered
DOMINION ENERGY, INC.DCommon Stock, no par valueNew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “non-accelerated filer,” “smaller reporting company,” and "emerging growth company" in Rule 12b-2 of the Exchange Act.

Dominion Energy, Inc.

Large accelerated filer☒Accelerated filer☐Emerging growth company☐
Non-accelerated filer☐Smaller reporting company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Virginia Electric and Power Company

Large accelerated filer☐Accelerated filer☐Emerging growth company☐
Non-accelerated filer☒Smaller reporting company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒

At August 1, 2022, the latest practicable date for determination, Dominion Energy, Inc. had 832,502,797 shares of common stock outstanding and Virginia Electric and Power Company had 274,723 shares of common stock outstanding. Dominion Energy, Inc. is the sole holder of Virginia Electric and Power Company’s common stock.

This combined Form 10-Q represents separate filings by Dominion Energy, Inc. and Virginia Electric and Power Company. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Virginia Electric and Power Company makes no representation as to the information relating to Dominion Energy, Inc.’s other operations.

VIRGINIA ELECTRIC AND POWER COMPANY MEETS THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION H(1)(a) AND (b) OF FORM 10-Q AND IS FILING THIS FORM 10-Q UNDER THE REDUCED DISCLOSURE FORMAT.

COMBINED INDEX

Page Number
Glossary of Terms3
PART I. Financial Information
Item 1.Financial Statements9
Item 2.Management’s Discussion and Analysis of Financial Condition and Results of Operations74
Item 3.Quantitative and Qualitative Disclosures About Market Risk92
Item 4.Controls and Procedures93
PART II. Other Information
Item 1.Legal Proceedings94
Item 1A.Risk Factors94
Item 2.Unregistered Sales of Equity Securities and Use of Proceeds94
Item 6.Exhibits95

GLOSSARY OF TERMS

The following abbreviations or acronyms used in this Form 10-Q are defined below:

Abbreviation or AcronymDefinition
2019 Equity UnitsDominion Energy’s 2019 Series A Equity Units issued in June 2019, initially in the form of 2019 Series A Corporate Units, consisting of a stock purchase contract and a 1/10 interest in a share of the Series A Preferred Stock
2017 Tax Reform ActAn Act to Provide for Reconciliation Pursuant to Titles II and V of the Concurrent Resolution on the Budget for Fiscal Year 2018 (previously known as The Tax Cuts and Jobs Act) enacted on December 22, 2017
2021 Triennial ReviewVirginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the four successive 12-month test periods beginning January 1, 2017 and ending December 31, 2020
ACE RuleAffordable Clean Energy Rule
AFUDCAllowance for funds used during construction
Align RNGAlign RNG, LLC, a joint venture between Dominion Energy and Smithfield Foods, Inc.
AOCIAccumulated other comprehensive income (loss)
AROAsset retirement obligation
Atlantic Coast PipelineAtlantic Coast Pipeline, LLC, a limited liability company owned by Dominion Energy and Duke Energy
Atlantic Coast Pipeline ProjectA previously proposed approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina which would have been owned by Dominion Energy and Duke Energy
bcfBillion cubic feet
Bear GardenA 622 MW combined-cycle, natural gas-fired power station in Buckingham County, Virginia
Brunswick CountyA 1,376 MW combined-cycle, natural gas-fired power station in Brunswick County, Virginia
CAAClean Air Act
CCRCoal combustion residual
CCROCustomer credit reinvestment offset
CEOChief Executive Officer
CEPCapital Expenditure Program, as established by House Bill 95, Ohio legislation enacted in 2011, deployed by East Ohio to recover certain costs associated with capital investment
CERCLAComprehensive Environmental Response, Compensation and Liability Act of 1980, also known as Superfund
CFOChief Financial Officer
ClearwayThe legal entity, Clearway Energy, Inc. (a subsidiary of Global Infrastructure Partners), one or more of its consolidated subsidiaries, or the entirety of Clearway Energy, Inc. and its consolidated subsidiaries
CO2Carbon dioxide
Colonial Trail WestA 142 MW utility-scale solar power station located in Surry County, Virginia
CompaniesDominion Energy and Virginia Power, collectively
Contracted AssetsContracted Assets operating segment
Cooling degree daysUnits measuring the extent to which the average daily temperature is greater than 65 degrees Fahrenheit, or 75 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 75 degrees, as applicable, and the average temperature for that day
Cove PointCove Point LNG, LP (formerly known as Dominion Energy Cove Point LNG, LP)
CPCNCertificate of Public Convenience and Necessity
CVOW Commercial ProjectA proposed 2.6 GW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters adjacent to the CVOW Pilot Project and associated interconnection facilities in and around Virginia Beach, Virginia
CVOW Pilot ProjectA 12 MW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters
CWAClean Water Act
DEQPSMountainWest Pipeline Services, Inc. (formerly known as Dominion Energy Questar Pipeline Services, Inc.)
DESDominion Energy Services, Inc.
DESCThe legal entity, Dominion Energy South Carolina, Inc., one or more of its consolidated entities or operating segment, or the entirety of Dominion Energy South Carolina, Inc. and its consolidated entities
DGIDominion Generation, Inc.
DOEU.S. Department of Energy
Dominion EnergyThe legal entity, Dominion Energy, Inc., one or more of its consolidated subsidiaries (other than Virginia Power) or operating segments, or the entirety of Dominion Energy, Inc. and its consolidated subsidiaries
Dominion Energy Questar PipelineThe legal entity, MountainWest Pipeline, LLC (formerly known as Dominion Energy Questar Pipeline, LLC), one or more of its consolidated subsidiaries (including its 50% noncontrolling interest in White River Hub), or the entirety of Dominion Energy Questar Pipeline, LLC and its consolidated subsidiaries
Dominion Energy South CarolinaDominion Energy South Carolina operating segment
Dominion Energy VirginiaDominion Energy Virginia operating segment
Dominion PrivatizationDominion Utility Privatization, LLC, a partnership between Dominion Energy and Patriot
DSMDemand-side management
DthDekatherm
Duke EnergyThe legal entity, Duke Energy Corporation, one or more of its consolidated subsidiaries, or the entirety of Duke Energy Corporation and its consolidated subsidiaries
East OhioThe East Ohio Gas Company, doing business as Dominion Energy Ohio
EnergySolutionsEnergySolutions, LLC
EPAU.S. Environmental Protection Agency
EPSEarnings per common share
FERCFederal Energy Regulatory Commission
Four BrothersFour Brothers Solar, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Four Brothers Holdings, LLC, a subsidiary of Clearway
FTRsFinancial transmission rights
GAAPU.S. generally accepted accounting principles
Gas DistributionGas Distribution operating segment
GHGGreenhouse gas
Granite MountainGranite Mountain Holdings, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Granite Mountain Renewables, LLC, a subsidiary of Clearway
GTSAVirginia Grid Transformation and Security Act of 2018
GWGigawatt
Heating degree daysUnits measuring the extent to which the average daily temperature is less than 65 degrees Fahrenheit, or 60 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 60 degrees, as applicable, and the average temperature for that day
HopeHope Gas, Inc., doing business as Dominion Energy West Virginia
Iron SpringsIron Springs Holdings, LLC, a limited liability company owned by Dominion Energy (through December 2021) and Iron Springs Renewables, LLC, a subsidiary of Clearway
ISOIndependent system operator
Jones ActThe Coastwise Merchandise Statute (commonly known as the Jones Act) 46 U.S.C. §55102 regulating U.S. maritime commerce
KewauneeKewaunee nuclear power station
kVKilovolt
LNGLiquefied natural gas
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations
MGDMillion gallons per day
MillstoneMillstone nuclear power station
MWMegawatt
MWhMegawatt hour
NAVNet asset value
NND ProjectV.C. Summer Units 2 and 3 nuclear development project under which DESC and Santee Cooper undertook to construct two Westinghouse AP1000 Advanced Passive Safety nuclear units in Jenkinsville, South Carolina
North AnnaNorth Anna nuclear power station
North Carolina CommissionNorth Carolina Utilities Commission
NRCU.S. Nuclear Regulatory Commission
Ohio CommissionPublic Utilities Commission of Ohio
Order 1000Order issued by FERC adopting requirements for electric transmission planning, cost allocation and development
PatriotPatriot Utility Privatizations, LLC, a partnership between Foundation Infrastructure Partners, LLC and John Hancock Life Insurance Company (U.S.A.) and affiliates
PIPPPercentage of Income Payment Plan deployed by East Ohio
PIRPipeline Infrastructure Replacement program deployed by East Ohio
PJMPJM Interconnection, LLC
PREPPipeline Replacement and Expansion Program, a program of replacing, upgrading and expanding natural gas utility infrastructure deployed by Hope
PSDPrevention of significant deterioration
PSNCPublic Service Company of North Carolina, Incorporated, doing business as Dominion Energy North Carolina
Q-Pipe GroupCollectively, Dominion Energy Questar Pipeline, DEQPS and MountainWest Energy Holding Company, LLC (formerly known as QPC Holding Company, LLC and its subsidiary MountainWest Southern Trails Pipeline Company (formerly known as Questar Southern Trails Pipeline Company))
Q-Pipe TransactionA previously proposed sale by Dominion Energy to Berkshire Hathaway Energy Company of the Q-Pipe Group pursuant to a purchase and sale agreement entered into on October 5, 2020 and terminated on July 9, 2021
Questar GasQuestar Gas Company, doing business as Dominion Energy Utah, Dominion Energy Wyoming and Dominion Energy Idaho
RGGIRegional Greenhouse Gas Initiative
Rider BA rate adjustment clause associated with the recovery of costs related to the conversion of three of Virginia Power’s coal-fired power stations to biomass
Rider BWA rate adjustment clause associated with the recovery of costs related to Brunswick County
Rider CCRA rate adjustment clause associated with the recovery of costs related to the removal of CCR at certain power stations
Rider CEA rate adjustment clause associated with the recovery of costs related to certain renewable generation facilities in Virginia
Rider GTA rate adjustment clause associated with the recovery of costs associated with electric distribution grid transformation projects that the Virginia Commission has approved as authorized by the GTSA
Rider OSWA rate adjustment clause associated with costs incurred to construct, own and operate the CVOW Commercial Project
Rider RA rate adjustment clause associated with the recovery of costs related to Bear Garden
Rider RGGIA rate adjustment clause associated with the recovery of costs related to the purchase of allowances through the RGGI market-based trading program for CO2
Rider RPSA rate adjustment clause associated with the recovery of costs related to the mandatory renewable portfolio standard program established by the VCEA
Rider SNAA rate adjustment clause associated with costs relating to the preparation of the applications for subsequent license renewal to the NRC to extend the operating licenses of Surry and North Anna and related projects
Rider T1A rate adjustment clause to recover the difference between revenues produced from transmission rates included in base rates, and the new total revenue requirement developed annually for the rate years effective September 1
Rider UA rate adjustment clause associated with the recovery of costs of new underground distribution facilities
Rider US-2A rate adjustment clause associated with the recovery of costs related to Woodland Solar, Scott Solar and Whitehouse Solar
Rider US-3A rate adjustment clause associated with the recovery of costs related to Colonial Trail West and Spring Grove 1
Rider US-4A rate adjustment clause associated with the recovery of costs related to Sadler Solar
Rider WA rate adjustment clause associated with the recovery of costs related to Warren County
ROEReturn on equity
RTORegional transmission organization
Sadler SolarA 100 MW utility-scale solar power station located in Greensville County, Virginia, also referred to as Dry Bread
Santee CooperSouth Carolina Public Service Authority
SCANAThe legal entity, SCANA Corporation, one or more of its consolidated subsidiaries, or the entirety of SCANA Corporation and its consolidated subsidiaries
SCANA CombinationDominion Energy’s acquisition of SCANA completed on January 1, 2019 pursuant to the terms of the agreement and plan of merger entered on January 2, 2018 between Dominion Energy and SCANA
SCANA Merger Approval OrderFinal order issued by the South Carolina Commission on December 21, 2018 setting forth its approval of the SCANA Combination
SCDORSouth Carolina Department of Revenue
Scott SolarA 17 MW utility-scale solar power station in Powhatan County, Virginia
SECU.S. Securities and Exchange Commission
Series A Preferred StockDominion Energy’s Series A Cumulative Perpetual Convertible Preferred Stock, without par value, with a liquidation preference of $1,000 per share (previously designated the 1.75% Series A Cumulative Perpetual Convertible Preferred Stock)
Series B Preferred StockDominion Energy’s 4.65% Series B Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share
Series C Preferred StockDominion Energy’s 4.35% Series C Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share
South Carolina CommissionPublic Service Commission of South Carolina
Southwest GasThe legal entity, Southwest Gas Holdings, Inc., one or more of its consolidated subsidiaries, or the entirety of Southwest Gas Holdings, Inc. and its consolidated subsidiaries
Spring Grove 1A 98 MW utility-scale solar power station located in Surry County, Virginia
Standard & Poor’sStandard & Poor’s Ratings Services, a division of S&P Global Inc.
SummerV.C. Summer nuclear power station
SurrySurry nuclear power station
Terra Nova Renewable PartnersThe legal entity, Terra Nova Renewable Partners, LLC, a partnership comprised primarily of institutional investors advised by J.P. Morgan Asset Management-Global Real Assets, or one or more of its consolidated subsidiaries
Three CedarsGranite Mountain and Iron Springs, collectively
UEXUncollectible Expense Rider deployed by East Ohio
UllicoThe legal entity, Ullico Inc., one or more of its consolidated subsidiaries, or the entirety of Ullico Inc. and its consolidated subsidiaries
Utah CommissionUtah Public Service Commission
VCEAVirginia Clean Economy Act of March 2020
VEBAVoluntary Employees’ Beneficiary Association
VIEVariable interest entity
Virginia CommissionVirginia State Corporation Commission
Virginia FacilitiesProposed electric interconnection and transmission facilities in and around Virginia Beach, Virginia, comprising transmission facilities required to interconnect the CVOW Commercial Project reliably with the existing transmission system; including 3 miles of 230 kV offshore export circuits, 4 miles of underground 230 kV onshore export circuits, a new Harpers switching station, 14 miles of three new overhead 230 kV transmission circuits between a new Harpers switching station and the Fentress substation, rebuild eight miles of two existing 230 kV overhead lines and an expansion of the Fentress substation
Virginia PowerThe legal entity, Virginia Electric and Power Company, one or more of its consolidated subsidiaries or operating segment, or the entirety of Virginia Electric and Power Company and its consolidated subsidiaries
Warren CountyA 1,349 MW combined-cycle, natural gas-fired power station in Warren County, Virginia
West Virginia CommissionPublic Service Commission of West Virginia
WestinghouseWestinghouse Electric Company LLC
WexproThe legal entity, Wexpro Company, one or more of its consolidated subsidiaries, or the entirety of Wexpro Company and its consolidated subsidiaries
Whitehouse SolarA 20 MW utility-scale solar power station in Louisa County, Virginia
White River HubMountainWest White River Hub, LLC (formerly known as White River Hub, LLC)
Wisconsin CommissionPublic Service Commission of Wisconsin
Woodland SolarA 19 MW utility-scale solar power station in Isle of Wight County, Virginia
WP&LWisconsin Power and Light Company, a subsidiary of Alliant Energy Corporation
WPSCWisconsin Public Service Corporation, a subsidiary of WEC Energy Group
WranglerWrangler Retail Gas Holdings, LLC, a partnership between Dominion Energy (through March 2022) and Interstate Gas Supply, Inc.

PART I. FINANCIAL INFORMATION

Item 1. FINANCIAL STATEMENTS

DOMINION ENERGY, INC.

CONSOLIDATED STATEMENTS OF INCOME

(Unaudited)

Three Months Ended June 30,Six Months Ended June 30,
2022202120222021
(millions, except per share amounts)
Operating Revenue$3,596$3,038$7,875$6,908
Operating Expenses
Electric fuel and other energy-related purchases7304871,4081,037
Purchased electric capacity16252936
Purchased gas202121847605
Other operations and maintenance9858952,0391,881
Depreciation, depletion and amortization6956041,3931,212
Other taxes235222488479
Impairment of assets and other charges415321405416
Losses (gains) on sales of assets636—6081
Total operating expenses3,9142,6757,2175,667
Income (loss) from operations(318)3636581,241
Earnings from equity method investees8365163145
Other income (expense)(287)312(241)599
Interest and related charges47518221571
Income (loss) from continuing operations including noncontrolling interests before income tax expense (benefit)(569)2223591,414
Income tax expense (benefit)(117)(47)119165
Net Income (Loss) From Continuing Operations(452)2692401,249
Net Income (Loss) From Discontinued Operations(1)(1)261854
Net Income (Loss) Including Noncontrolling Interests(453)2952581,303
Noncontrolling Interests—10—10
Net Income (Loss) Attributable to Dominion Energy$(453)$285$258$1,293
Amounts attributable to Dominion Energy
Net income (loss) from continuing operations$(452)$259$240$1,239
Net income (loss) from discontinued operations(1)261854
Net income (loss) attributable to Dominion Energy$(453)$285$258$1,293
EPS - Basic
Net income (loss) from continuing operations$(0.58)$0.30$0.23$1.49
Net income (loss) from discontinued operations—0.030.020.07
Net income (loss) attributable to Dominion Energy$(0.58)$0.33$0.25$1.56
EPS - Diluted
Net income (loss) from continuing operations$(0.58)$0.30$0.23$1.49
Net income (loss) from discontinued operations—0.030.020.07
Net income (loss) attributable to Dominion Energy$(0.58)$0.33$0.25$1.56
(1)Includes income tax expense (benefit) of $(2) million and $4 million for the three months ended June 30, 2022 and 2021, respectively, and $4 million and $11 million for the six months ended June 30, 2022 and 2021, respectively.

The accompanying notes are an integral part of Dominion Energy’s Consolidated Financial Statements.

DOMINION ENERGY, INC.

CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(Unaudited)

Three Months Ended June 30,Six Months Ended June 30,
2022202120222021
(millions)
Net income (loss) including noncontrolling interests$(453)$295$258$1,303
Other comprehensive income (loss), net of taxes:
Net deferred gains (losses) on derivatives-hedging activities(1)29(16)5423
Changes in unrealized net gains (losses) on investment securities(2)(27)12(89)(19)
Changes in net unrecognized pension and other postretirement benefit costs(3)2—306
Amounts reclassified to net income (loss):
Net derivative (gains) losses-hedging activities(4)11122125
Net realized (gains) losses on investment securities(5)9(3)12(2)
Net pension and other postretirement benefit costs(6)16263344
Changes in other comprehensive income from equity method investees(7)——1—
Total other comprehensive income40316277
Comprehensive income (loss) including noncontrolling interests(413)3263201,380
Comprehensive income (loss) attributable to noncontrolling interests—10—10
Comprehensive income (loss) attributable to Dominion Energy$(413)$316$320$1,370
(1)Net of $(10) million and $5 million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $(18) million and $(8) million tax for the six months ended June 30, 2022 and 2021, respectively.
(2)Net of $9 million and $(2) million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $28 million and $8 million tax for the six months ended June 30, 2022 and 2021, respectively.
(3)Net of $2 million and $(3) million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $(8) million and $(7) million tax for the six months ended June 30, 2022 and 2021, respectively.
(4)Net of $(3) million and $(4) million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $(7) million and $(8) million tax for the six months ended June 30, 2022 and 2021, respectively.
(5)Net of $(3) million and $1 million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $(4) million and $1 million tax for the six months ended June 30, 2022 and 2021, respectively.
(6)Net of $(6) million and $(9) million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $(12) million and $(16) million tax for the six months ended June 30, 2022 and 2021, respectively.

| (7) | Net of $— and $— million tax for the three months ended June 30, 2022 and 2021, respectively, and net of $— million and $— million tax for

Showing the first 8K of 277K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS

OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

MD&A discusses Dominion Energy’s results of operations and general financial condition and Virginia Power’s results of operations. MD&A should be read in conjunction with the Companies’ Consolidated Financial Statements. Virginia Power meets the conditions to file under the reduced disclosure format, and therefore has omitted certain sections of MD&A.

Contents of MD&A

MD&A consists of the following information:

•Forward-Looking Statements
•Accounting Matters – Dominion Energy
•Dominion Energy
•Results of Operations
•Outlook
•Segment Results of Operations
•Virginia Power
•Results of Operations
•Liquidity and Capital Resources – Dominion Energy
•Future Issues and Other Matters – Dominion Energy

Forward-Looking Statements

This report contains statements concerning the Companies’ expectations, plans, objectives, future financial performance and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. In most cases, the reader can identify these forward-looking statements by such words as “anticipate,” “estimate,” “forecast,” “expect,” “believe,” “should,” “could,” “plan,” “may,” “continue,” “target” or other similar words.

The Companies make forward-looking statements with full knowledge that risks and uncertainties exist that may cause actual results to differ materially from predicted results. Factors that may cause actual results to differ are often presented with the forward-looking statements themselves. Additionally, other factors may cause actual results to differ materially from those indicated in any forward-looking statement. These factors include but are not limited to:

•Unusual weather conditions and their effect on energy sales to customers and energy commodity prices;
•Extreme weather events and other natural disasters, including, but not limited to, hurricanes, high winds, severe storms, earthquakes, flooding, climate changes and changes in water temperatures and availability that can cause outages and property damage to facilities;
•The impact of extraordinary external events, such as the current pandemic health event resulting from COVID-19, and their collateral consequences, including extended disruption of economic activity in our markets and global supply chains;
•Federal, state and local legislative and regulatory developments, including changes in or interpretations of federal and state tax laws and regulations;
•Risks of operating businesses in regulated industries that are subject to changing regulatory structures;
•Changes to regulated electric rates collected by the Companies and regulated gas distribution, transportation and storage rates collected by Dominion Energy;
•Changes in rules for RTOs and ISOs in which the Companies join and/or participate, including changes in rate designs, changes in FERC’s interpretation of market rules and new and evolving capacity models;
•Risks associated with Virginia Power’s membership and participation in PJM, including risks related to obligations created by the default of other participants;
•Risks associated with entities in which Dominion Energy shares ownership with third parties, including risks that result from lack of sole decision making authority, disputes that may arise between Dominion Energy and third party participants and difficulties in exiting these arrangements;
•Changes in future levels of domestic and international natural gas production, supply or consumption;
•Impacts to Dominion Energy’s noncontrolling interest in Cove Point from fluctuations in future volumes of LNG imports or exports from the U.S. and other countries worldwide or demand for, purchases of and prices related to natural gas or LNG;
•Timing and receipt of regulatory approvals necessary for planned construction or growth projects and compliance with conditions associated with such regulatory approvals;
•The inability to complete planned construction, conversion or growth projects at all, or with the outcomes or within the terms and time frames initially anticipated, including as a result of increased public involvement, intervention or litigation in such projects;
•Risks and uncertainties that may impact the Companies’ ability to develop and construct the CVOW Commercial Project within the currently proposed timeline, or at all, and consistent with current cost estimates along with the ability to recover such costs from customers;
•Changes to federal, state and local environmental laws and regulations, including those related to climate change, the tightening of emission or discharge limits for GHGs and other substances, more extensive permitting requirements and the regulation of additional substances;
•Cost of environmental strategy and compliance, including those costs related to climate change;
•Changes in implementation and enforcement practices of regulators relating to environmental standards and litigation exposure for remedial activities;
•Difficulty in anticipating mitigation requirements associated with environmental and other regulatory approvals or related appeals;
•Unplanned outages at facilities in which the Companies have an ownership interest;
•The impact of operational hazards, including adverse developments with respect to pipeline and plant safety or integrity, equipment loss, malfunction or failure, operator error and other catastrophic events;
•Risks associated with the operation of nuclear facilities, including costs associated with the disposal of spent nuclear fuel, decommissioning, plant maintenance and changes in existing regulations governing such facilities;
•Changes in operating, maintenance and construction costs;
•Domestic terrorism and other threats to the Companies’ physical and intangible assets, as well as threats to cybersecurity;
•Additional competition in industries in which the Companies operate, including in electric markets in which Dominion Energy’s nonregulated generation facilities operate and potential competition from the development and deployment of alternative energy sources, such as self-generation and distributed generation technologies, and availability of market alternatives to large commercial and industrial customers;
•Competition in the development, construction and ownership of certain electric transmission facilities in the Companies’ service territory in connection with Order 1000;
•Changes in technology, particularly with respect to new, developing or alternative sources of generation and smart grid technologies;
•Changes in demand for the Companies’ services, including industrial, commercial and residential growth or decline in the Companies’ service areas, changes in supplies of natural gas delivered to Dominion Energy’s pipeline system, failure to maintain or replace customer contracts on favorable terms, changes in customer growth or usage patterns, including as a result of energy conservation programs, the availability of energy efficient devices and the use of distributed generation methods;

| • | Receipt of approvals for, and timing o

Showing the first 8K of 76K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE

QUANTITATIVE AND QUALITATIVE

DISCLOSURES ABOUT MARKET RISK

The matters discussed in this Item may contain “forward-looking statements” as described in the introductory paragraphs under Part I., Item 2. MD&A in this report. The reader’s attention is directed to those paragraphs for discussion of various risks and uncertainties that may impact the Companies.

Market Risk Sensitive Instruments and Risk Management

The Companies’ financial instruments, commodity contracts and related financial derivative instruments are exposed to potential losses due to adverse changes in commodity prices, interest rates, foreign currency exchange rates and equity securities prices as described below. Commodity price risk is present in the Companies’ electric operations and Dominion Energy’s natural gas procurement and marketing operations due to the exposure to market shifts in prices received and paid for electricity, natural gas and other commodities. The Companies use commodity derivative contracts to manage price risk exposures for these operations. Interest rate risk is generally related to their outstanding debt and future issuances of debt. In addition, the Companies are exposed to investment price risk through various portfolios of equity and debt securities. The Companies’ exposure to foreign currency exchange rate risk is related to certain fixed price contracts entered into in 2021 in connection with the CVOW Commercial Project. The contracts include services denominated in currencies other than the U.S. dollar for approximately €2.6 billion and 5.1 billion kr. In addition, certain of the fixed price contracts, approximately €0.7 billion, contain commodity indexing provisions linked to steel. As a result, any changes in applicable exchange rates or commodity indices could result in a change to the ultimate cost of the project. In May 2022, Virginia Power entered into forward purchase agreements with a notional amount of approximately €3.2 billion to economically hedge its foreign currency rate risk exposure to certain fixed price contracts for the major offshore construction and equipment components of the CVOW Commercial Project.

The following sensitivity analysis estimates the potential loss of future earnings or fair value from market risk sensitive instruments over a selected time period due to a 10% change in commodity prices, interest rates or foreign currency exchange rates.

Commodity Price Risk

To manage price risk, the Companies hold commodity-based derivative instruments held for non-trading purposes associated with purchases and sales of electricity, natural gas and other energy-related products.

The derivatives used to manage commodity price risk are executed within established policies and procedures and may include instruments such as futures, forwards, swaps, options and FTRs that are sensitive to changes in the related commodity prices. For sensitivity analysis purposes, the hypothetical change in market prices of commodity-based derivative instruments is determined based on models that consider the market prices of commodities in future periods, the volatility of the market prices in each period, as well as the time value factors of the derivative instruments. Prices and volatility are principally determined based on observable market prices.

A hypothetical 10% increase in commodity prices would have resulted in a decrease of $49 million and $16 million in the fair value of Dominion Energy’s commodity-based derivative instruments as of June 30, 2022 and December 31, 2021, respectively.

A hypothetical 10% decrease in commodity prices would have resulted in a decrease of $1 million in the fair value of Virginia Power’s commodity-based derivative instruments as of June 30, 2022. A hypothetical 10% increase in commodity prices would have resulted in a decrease of $6 million in the fair value of Virginia Power’s commodity-based derivative instruments as of December 31, 2021.

The impact of a change in energy commodity prices on the Companies' commodity-based derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net losses from commodity-based financial derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction, such as revenue from physical sales of the commodity.

Interest Rate Risk

The Companies manage their interest rate risk exposure predominantly by maintaining a balance of fixed and variable rate debt. For variable rate debt outstanding for Dominion Energy and Virginia Power, a hypothetical 10% increase in market interest rates would not have resulted in a material change in earnings at June 30, 2022 or December 31, 2021.

The Companies also use interest rate derivatives, including forward-starting swaps, interest rate swaps and interest rate lock agreements to manage interest rate risk. As of June 30, 2022, Dominion Energy and Virginia Power had $13.0 billion and $2.8 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $233 million and $119 million, respectively, in the fair value of Dominion Energy

and Virginia Power’s interest rate derivatives at June 30, 2022. As of December 31, 2021, Dominion Energy and Virginia Power had $11.4 billion and $2.8 billion, respectively, in aggregate notional amounts of these interest rate derivatives outstanding. A hypothetical 10% decrease in market interest rates would have resulted in a decrease of $191 million and $111 million, respectively, in the fair value of Dominion Energy and Virginia Power’s interest rate derivatives at December 31, 2021.

The impact of a change in interest rates on the Companies’ interest rate-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from interest rate derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.

Foreign Currency Exchange Rate Risk

The Companies utilize foreign currency swaps to economically hedge the foreign currency exchange risk associated with fixed price contracts related to the CVOW Commercial Project denominated in foreign currencies. As of June 30, 2022, Dominion Energy had €3.2 billion in aggregate notional amounts of these foreign currency forward purchase agreements outstanding. A hypothetical 10% increase in exchange rates would have resulted in a decrease of $312 million in the fair value of Dominion Energy’s foreign currency swaps at June 30, 2022.

The impact of a change in exchange rates on the Companies’ foreign currency-based financial derivative instruments at a point in time is not necessarily representative of the results that will be realized when the contracts are ultimately settled. Net gains and/or losses from foreign exchange derivative instruments used for hedging purposes, to the extent realized, will generally be offset by recognition of the hedged transaction.

Investment Price Risk

The Companies are subject to investment price risk due to securities held as investments in nuclear decommissioning and rabbi trust funds that are managed by third-party investment managers. These trust funds primarily hold marketable securities that are reported in the Companies’ Consolidated Balance Sheets at fair value.

Dominion Energy recognized net investment losses (including investment income) on nuclear decommissioning and rabbi trust investments of $981 million for the six months ended June 30, 2022, and net investment gains (including investment income) on nuclear decommissioning and rabbi trust investments of $675 million and $1.1 billion for the six months ended June 30, 2021 and the year ended December 31, 2021, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Dominion Energy recorded in AOCI and regulatory liabilities, a net decrease in unrealized gains on debt investments of $191 million, $41 million and $64 million for the six months ended June 30, 2022 and 2021 and the year ended December 31, 2021, respectively.

Virginia Power recognized net investment losses (including investment income) on nuclear decommissioning trust investments of $468 million for the six months ended June 30, 2022, and net investment gains (including investment income) on nuclear decommissioning trust investments of $327 million and $568 million for the six months ended June 30, 2021 and the year ended December 31, 2021, respectively. Net realized gains and losses include gains and losses from the sale of investments as well as any other-than-temporary declines in fair value. Virginia Power recorded in AOCI and regulatory liabilities, a net decrease in unrealized gains on debt investments of $106 million, $12 million and $31 million for the six months ended June 30, 2022 and 2021 and the year ended December 31, 2021, respectively.

Dominion Energy sponsors pension and other postretirement employee benefit plans that hold investments in trusts to fund employee benefit payments. Virginia Power employees participate in these plans. Differences between actual and expected returns on plan assets are accumulated and amortized during future periods. As such, any investment-related declines in these trusts will result in future increases in the net periodic cost recognized for employee benefit plans and will be included in the determination of the amount of cash to be contributed to the employee benefit plans.

Item 4. CONTROLS AND PROCEDURES

Senior management of both Dominion Energy and Virginia Power, including Dominion Energy and Virginia Power’s CEO and CFO, evaluated the effectiveness of each company’s disclosure controls and procedures as of the end of the period covered by this report. Based on this evaluation process, each of Dominion Energy and Virginia Power’s CEO and CFO have concluded that each company’s disclosure controls and procedures are effective.

There were no changes that occurred during the last fiscal quarter that materially affected, or are reasonably likely to materially affect, Dominion Energy or Virginia Power’s internal control over financial reporting.

PART II. OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

From time to time, the Companies are parties to various legal, environmental or other regulatory proceedings, including in the ordinary course of business. SEC regulations require disclosure of certain environmental matters when a governmental authority is a party to the proceedings and such proceedings involve potential monetary sanctions that the Companies reasonably believe will exceed a specified threshold. Pursuant to the SEC regulations, the Companies use a threshold of $1 million for such proceedings.

See the following for discussions on various legal, environmental and other regulatory proceedings to which the Companies are a party, which information is incorporated herein by reference:

•Notes 13 and 23 to the Consolidated Financial Statements and Future Issues and Other Matters in MD&A in the Companies’ Annual Report on Form 10-K for the year ended December 31, 2021.
•Notes 13 and 17 to the Consolidated Financial Statements in this report.

Item 1A. RISK FACTORS

The Companies’ businesses are influenced by many factors that are difficult to predict, involve uncertainties that may materially affect actual results and are often beyond the Companies’ control. A number of these risk factors have been identified in the Companies’ Annual Report on Form 10-K for the year ended December 31, 2021, which should be taken into consideration when reviewing the information contained in this report. There have been no material changes with regard to the risk factors previously disclosed in the Companies’ Annual Report on Form 10-K for the year ended December 31, 2021. For other factors that may cause actual results to differ materially from those indicated in any forward-looking statement or projection contained in this report, see Forward-Looking Statements in MD&A in this report.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Dominion Energy

Purchases of Equity Securities

PeriodTotal Number of Shares (or Units) Purchased(1)Average Price Paid per Share (or Unit)(2)Total Number of Shares (or Units) Purchased as Part of Publicly Announced Plans or ProgramsMaximum Number (or Approximate Dollar Value) of Shares (or Units) that May Yet Be Purchased under the Plans or Programs(3)
4/1/22 - 4/30/2270$86.33—$ 0.92 billion
5/1/22 - 5/31/2235181.64—0.92 billion
6/1/22 - 6/30/221,11183.71—0.92 billion
Total1,53283.36—$ 0.92 billion
(1)Represents shares of common stock that were tendered by employees to satisfy tax withholding obligations on vested restricted stock.
(2)Represents the weighted-average price paid per share.
(3)In November 2020, the Dominion Energy Board of Directors authorized the repurchase of up to $1.0 billion of shares of common stock. This repurchase program has no expiration date or price or volume targets and may be modified, suspended or terminated at any time. Shares may be purchased through open market or privately negotiated transactions or otherwise at the discretion of management subject to prevailing market conditions, applicable securities laws and other factors.

Item 6. EXHIBITS

Exhibit NumberDescriptionDominion EnergyVirginia Power
3.1.aDominion Energy, Inc. Articles of Incorporation, as amended, effective June 1, 2022 (Exhibit 3.1, Form 8-K filed June 1, 2022, File No.1-8489).X
3.1.bVirginia Electric and Power Company Amended and Restated Articles of Incorporation, as in effect on October 30, 2014 (Exhibit 3.1.b, Form 10-Q filed November 3, 2014, File No. 1-2255).X
3.2.aDominion Energy, Inc. Bylaws, as amended and restated, effective May 11, 2022 (Exhibit 3.1, Form 8-K filed May 12, 2022, File No. 1-8489).X
3.2.bVirginia Electric and Power Company Amended and Restated Bylaws, effective June 1, 2009 (Exhibit 3.1, Form 8-K filed June 3, 2009, File No. 1-2255).X
4Dominion Energy, Inc. and Virginia Electric and Power Company agree to furnish to the Securities and Exchange Commission upon request any other instrument with respect to long-term debt as to which the total amount of securities authorized does not exceed 10% of any of their total consolidated assets.XX
4.1Registration Rights Agreement, dated May 5, 2022, by and between Dominion Energy, Inc. and South Carolina Department of Revenue (Exhibit 4.2, Form 10-Q filed May 5, 2022, File No. 1-8489).X
4.2Senior Indenture, dated as of September 1, 2017, between Virginia Electric and Power Company and U.S. Bank National Association, as Trustee (Exhibit 4.1, Form 8-K filed September 13, 2017, File No.000-55337); First Supplemental Indenture, dated as of September 1, 2017 (Exhibit 4.2, Form 8-K filed September 13, 2017, File No.000-55337); Second Supplemental Indenture, dated as of March 1, 2018 (Exhibit 4.2, Form 8-K filed March 22, 2018, File No. 000-55337); Third Supplemental Indenture, dated as of November 1, 2018 (Exhibit 4.2, Form 8-K filed November 28, 2018, File No. 000-55337); Fourth Supplemental Indenture, dated as of July 1, 2019 (Exhibit 4.2, Form 8-K filed July 10, 2019, File No. 00-55337); Fifth Supplemental Indenture, dated as of December 1, 2019 (Exhibit 4.2, Form 8-K filed December 5, 2019, File No. 000-55337); Sixth Supplemental Indenture, dated as of December 1, 2020 (Exhibit 4.2, Form 8-K filed December 15, 2020, File No. 00-55337); Seventh Supplemental Indenture, dated as of November 1, 2021 (Exhibit 4.2, Form 8-K filed November 22, 2021, File No.000-55337); Eighth Supplemental Indenture, dated as of November 1, 2021 (Exhibit 4.3, Form 8-K filed November 22, 2021, File No.000-55337); Ninth Supplemental Indenture, dated as of January 1, 2022 (Exhibit 4.3, Form 8-K filed January 13, 2022, File No.000-55337); Tenth Supplemental Indenture, dated as of May 1, 2022, (Exhibit 4.2, Form 8-K filed May 31, 2022, File No. 000-55337); Eleventh Supplemental Indenture, dated as of May 1, 2022, (Exhibit 4.3, Form 8-K filed May 31, 2022, File No. 000-55337).XX
31.aCertification by Chief Executive Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.bCertification by Chief Financial Officer of Dominion Energy, Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.cCertification by Chief Executive Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
31.dCertification by Chief Financial Officer of Virginia Electric and Power Company pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 (filed herewith).X
32.aCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Dominion Energy, Inc. as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
32.bCertification to the Securities and Exchange Commission by Chief Executive Officer and Chief Financial Officer of Virginia Electric and Power Company as required by Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).X
99Condensed consolidated earnings statements (filed herewith).XX
Exhibit NumberDescriptionDominion EnergyVirginia Power
101The following financial statements from Dominion Energy, Inc.’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2022, filed on August 8, 2022, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Equity, (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements. The following financial statements from Virginia Electric and Power Company’s Quarterly Report on Form 10-Q for the quarter ended June 30, 2022, filed on August 8, 2022, formatted in iXBRL (Inline eXtensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Common Shareholder’s Equity (v) Consolidated Statements of Cash Flows, and (vi) the Notes to Consolidated Financial Statements.XX
104Cover Page Interactive Data File formatted in iXBRL (Inline eXtensible Business Reporting Language) and contained in Exhibit 101.XX

SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

DOMINION ENERGY, INC. Registrant
August 8, 2022/s/ Michele L. Cardiff
Michele L. Cardiff Senior Vice President, Controller and Chief Accounting Officer
VIRGINIA ELECTRIC AND POWER COMPANY Registrant
August 8, 2022/s/ Michele L. Cardiff
Michele L. Cardiff Senior Vice President, Controller and Chief Accounting Officer