DTE Energy (DTE) 10-K risk factor changes: FY2021 vs FY2020
The 2021-12-31 10-K against the 2020-12-31 one, compared heading by heading and sentence by sentence.
Item 1A20 rewritten12 added15 removed140 unchanged
All filing items1,854 rewritten769 added967 removed2,623 unchanged
Summary
counted, not written
- Item 1A lists 27 risk factor headings: 2 new, 3 reworded and 22 unchanged since FY2020. 2 headings from FY2020 no longer appear.
- Sentence by sentence, 769 added, 967 removed, 1,854 rewritten and 2,623 unchanged across 13 items that differ.
- New this year: Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections.
New Item 1A headings (2)
- Weather, including extreme weather caused by climate change, significantly affects operations.
- DTE Energy may not achieve the net zero carbon emissions goals of its electric and gas utilities.
Removed Item 1A headings (2)
- Weather significantly affects operations.
- Registrants' businesses and operations.
Reworded Item 1A headings (3)
- Construction and capital improvements to the Registrants' power
[removed: facilities,][added: facilities and] DTE Energy's distribution systems[removed: and its Gas Storage and Pipelines business]subject them to risk. - The COVID-19 pandemic and resulting impact on business and economic conditions could negatively affect the [added: Registrants' businesses and operations.]
- The
[removed: proposed]spin-off of[removed: DTE][added: DT] Midstream (the[removed: "Proposed Spin-off") may not be completed on the currently contemplated timeline or terms, or at all, and][added: "Spin-off")] may not achieve[removed: the][added: its] intended[removed: benefits. The Proposed Spin-off, if completed,][added: benefits and] may[removed: also]present additional risk to DTE Energy.
A heading is new when no FY2020 heading matches it after ignoring case and punctuation, and reworded when it shares at least 60 percent of its words with one that went away. All current risk factor headings.
Sentences by item
21 items, with every count and a link to each item that changed
| Item | Added | Removed | Rewritten | Unchanged | Page headers and footers changed |
|---|---|---|---|---|---|
| Item 1A. Risk Factors | 12 | 15 | 20 | 140 | 0 |
| Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations | 96 | 172 | 313 | 289 | 0 |
| Item 7A. Quantitative and Qualitative Disclosures About Market Risk | 2 | 11 | 23 | 42 | 0 |
| Item 3. Legal Proceedings | 0 | 0 | 2 | 0 | 0 |
| Cover and table of contents | 58 | 106 | 146 | 415 | 0 |
| Item 1B. Unresolved Staff Comments | 0 | 0 | 0 | 1 | 0 |
| Item 4. Mine Safety Disclosures | 0 | 0 | 0 | 2 | 0 |
| Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters, and Issuer Purchases of Equity Securities | 7 | 7 | 13 | 16 | 0 |
| Item 6. Selected Financial Data | 1 | 17 | 0 | 0 | 0 |
| Item 8. Financial Statements and Supplementary Data | 577 | 613 | 1,259 | 1,558 | 0 |
| Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure | 0 | 0 | 0 | 1 | 0 |
| Item 9A. Controls and Procedures | 0 | 0 | 0 | 2 | 0 |
| Item 9B. Other Information | 0 | 4 | 0 | 1 | 0 |
| Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspectionsnew | 5 | 0 | 0 | 0 | 0 |
| Item 10. Directors, Executive Officers, and Corporate Governance | 0 | 0 | 0 | 0 | 0 |
| Item 11. Executive Compensation | 0 | 0 | 0 | 0 | 0 |
| Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters | 0 | 0 | 0 | 0 | 0 |
| Item 13. Certain Relationships and Related Transactions, and Director Independence | 0 | 0 | 0 | 0 | 0 |
| Item 14. Principal Accountant Fees and Services | 1 | 1 | 4 | 10 | 0 |
| Item 15. Exhibits and Financial Statement Schedules | 7 | 18 | 53 | 98 | 0 |
| Item 16. Form 10-K Summary | 3 | 3 | 21 | 48 | 0 |
Underlined words on a shaded ground are new in FY2021; struck-through words were in FY2020. Sentences that are wholly new or wholly gone are labelled rather than marked.
Item 1A. Risk Factors
20 rewritten, 12 added, 15 removed, 140 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
The Registrants' ability to recover costs may be impacted by the time lag between the [removed: incurrence] [added: incurring] of costs and the recovery of the costs in customers' rates.
If increased regulations of GHG emissions are implemented, [added: or if existing deadlines for these regulations are accelerated,] the operations of DTE Electric's fossil-fueled generation assets may be significantly impacted.
*Construction and capital improvements to the Registrants' power [removed: facilities,] [added: facilities and] DTE Energy's distribution systems [removed: and its Gas Storage and Pipelines business] subject them to risk.* The Registrants are managing ongoing, and planning future, significant construction and capital improvement projects at the Registrants' multiple power generation and distribution [removed: facilities,] [added: facilities and] at DTE Energy's gas distribution [removed: system, and at DTE Energy's Gas Storage and Pipelines business.][added: system.]
The price of energy also impacts the market for DTE Energy's non-utility businesses, particularly those that compete with utilities and alternative electric [removed: suppliers as well as midstream services that depend on the demand for natural gas.][added: suppliers.]
[removed: *Weather] [added: *Weather, including extreme weather caused by climate change,] significantly affects operations.* At both utilities, deviations from normal hot and cold weather conditions affect the Registrants' earnings and cash flows.
At DTE Electric, ice storms, [added: floods,] tornadoes, or high winds can damage the electric distribution system infrastructure and power generation facilities and require it to perform emergency repairs and incur material unplanned expenses.
DTE Gas can [added: also] experience higher than anticipated expenses from emergency repairs on its gas distribution infrastructure required as a result of weather-related issues.
*A work interruption may adversely affect the Registrants.* There are several bargaining units for DTE Energy's approximately 5,200 and DTE Electric's approximately [removed: 2,800] [added: 2,700] represented employees.
The majority of represented employees are under contracts that expire in [removed: 2021 and 2022.][added: 2027.]
*DTE Energy's non-utility businesses may not perform to its expectations.* DTE Energy relies on non-utility [removed: operations] [added: businesses] for a [removed: significant] portion of [removed: earnings.][added: earnings and will depend on the successful execution of new business development in its non-utilities to help achieve overall growth targets.]
The Registrants' long-term revolving credit facilities do not expire until [removed: 2024,] [added: 2024 and 2025,] but the Registrants regularly access capital markets to refinance existing debt or fund new projects at the Registrants' utilities and DTE Energy's non-utility businesses, and the Registrants cannot predict the pricing or demand for those future transactions.
In addition, the Registrants' generation plants and electrical distribution [removed: facilities, and DTE Energy's gas pipeline and storage] facilities [removed: in particular,] may be targets of physical security threats or terrorist activities that could disrupt the Registrants' ability to produce or distribute some portion of their products.
*The COVID-19 pandemic and resulting impact on business and economic conditions could negatively affect [removed: the*][added: the Registrants' businesses and operations.* The COVID-19 pandemic is currently impacting countries, communities, supply chains and markets.]
[added: The continued spread of COVID-19 and efforts to contain the virus, such as quarantines, closures, or reduced] operations of businesses, governmental agencies and other institutions, have [removed: caused a recession, resulting] [added: resulted] in disruptions in various public, commercial, and industrial activities and have caused employee absences which interfered with certain operation and maintenance of the Registrants' facilities.
[removed: Certain of our businesses have experienced lower sales volumes, and any] [added: Any] of the foregoing circumstances could [removed: further] adversely affect customer demand or revenues, impact the ability of the Registrants' suppliers, vendors or contractors to perform, or cause other unpredictable events, which could adversely affect the Registrants' businesses, results of operations or financial condition.
The extent to which COVID-19 may [added: continue to] impact the Registrants' liquidity, financial condition, and results of operations will depend on future developments, which are highly uncertain and cannot be predicted, including new information concerning the severity of COVID-19 and [added: its] related variants, vaccine distribution and [added: public acceptance, and] other actions taken to contain it or treat its impact, and the extent to which normal economic and operating conditions can resume, among others.
[removed: If] [added: *The spin-off of DT Midstream (the "Spin-off") may not achieve its intended benefits and may present additional risk to DTE Energy.* As a result of] the [removed: Proposed Spin-off is successfully completed,] [added: Spin-off,] DTE Energy [removed: will face] [added: faces] new and unique risks, including having fewer assets, reduced financial resources and less diversification of revenue [removed: sources, which may adversely impact DTE Energy's financial condition, results of operations, and cash flows.][added: sources.]
[removed: The] [added: In connection with the Spin-off, DTE received a legal opinion that the] distribution of shares of [removed: the new midstream company ("DT Midstream")] [added: DT Midstream] to DTE Energy shareholders [removed: in the Proposed Spin-off is expected to qualify] [added: qualifies] as tax-free under Section 355 of the U.S. Internal Revenue Code.
Following the [removed: Proposed] Spin-off, the management and directors [added: of] each of DTE Energy and DT Midstream [removed: may] own common stock in both [removed: companies] [added: companies,] and Robert Skaggs, Jr., who [removed: will be a member of] [added: is] DT Midstream's [removed: Board,] [added: Executive Chairman,] also serves on DTE Energy's Board and may be required to recuse himself from deliberations relating to arrangements between DTE Energy and DT Midstream in the future.
Potential conflicts of interest may also arise out of [removed: any] commercial arrangements that DTE Energy and DT Midstream [added: have or] may enter into in the future.
The price of environmental attributes generated by DTE Energy's renewable natural gas investments, including those related to the federal Renewable Fuel Standard and California's Low Carbon Fuel Standard, may also impact the market and financial results for DTE Energy's non-utility businesses.
Prolonged and/or more frequent outages caused by extreme weather could also negatively impact DTE Energy's reputation and customer satisfaction or result in increased regulatory oversight, and related damages to customer assets could subject DTE Energy to litigation.
*DTE Energy may not achieve the net zero carbon emissions goals of its electric and gas utilities.* DTE Energy has announced the voluntary commitments of its electric and gas utilities to achieve net zero carbon emissions by 2050.
Technology research and developments, innovations, and advancements are critical to DTE Energy's ability to achieve this commitment.
Other factors that may impact DTE Energy's ability to achieve these net zero goals include our service territory size and capacity needs remaining in line with current expectations, the impacts on our business of future regulations or legislation, the price and availability of carbon offsets, adoption of alternative energy products by the public such as greater use of electric vehicles, greater standardization of emissions reporting, and our ability over time to transition our electric generating portfolio.
DTE Energy's net zero goals require making assumptions that involve risks and uncertainties.
Should one or more of these underlying assumptions prove incorrect, our actual results and ability to achieve net zero emissions by 2050 could differ materially from expectations.
In addition, DTE Energy cannot predict the ultimate impact of achieving this objective, or the various implementation aspects on its reliability or its results of operations, financial condition, or liquidity.
DTE Energy also expects that the loss of earnings from ceasing the operations of its REF non-utility business will be offset by growth in renewable energy and industrial services projects over the long term; however, such opportunities may not materialize as anticipated.
The Registrants have experienced, and expect to continue to be subject to, cybersecurity threats and incidents.
The Spin-off may not achieve some or all of its anticipated benefits and we face risks providing DT Midstream with transition services.
Each of these factors may adversely impact DTE Energy's financial condition, results of operations, and cash flows.
For DTE Energy, future environmental regulation of natural gas extraction techniques, including hydraulic fracturing, being discussed both at the United States federal level and by some states may affect the profitability of natural gas extraction businesses which could affect demand for, and profitability of, DTE Energy's gas transportation businesses.
*Registrants' businesses and operations.* The COVID-19 pandemic is currently impacting countries, communities, supply chains
and markets.
The continued spread of COVID-19 and efforts to contain the virus, such as quarantines, closures, or reduced
In addition, the Registrants’ may be required to suspend shut offs for certain customers which may adversely impact the Registrants’ collections process and have a negative impact on our results of operations, financial condition, and liquidity.
*The proposed spin-off of DTE Midstream (the "Proposed Spin-off") may not be completed on the currently contemplated timeline or terms, or at all, and may not achieve the intended benefits.
The Proposed Spin-off, if completed, may also present additional risk to DTE Energy.* The Proposed Spin-off is subject to conditions, including, without limitation, final DTE Energy Board of Directors approval.
Unanticipated developments or changes in market conditions may delay the Proposed Spin-off, and the Proposed Spin-off may not occur on the currently contemplated timeline or at all.
DTE Energy cannot predict with certainty when the benefits expected from the Proposed Spin-off will occur or the extent to which they will be achieved, if at all.
Furthermore, there are various uncertainties and risks relating to the process of the Proposed Spin-off that could have a negative impact on our financial condition, results of operations, and cash flows, including disruption of our operations and impairment of our relationship with regulators, key personnel, customers, and vendors.
In addition, the changes in our operational and financial profile may not meet some or all of our shareholders' investment strategies, which could cause investors to sell their DTE Energy shares and otherwise decrease demand for shares of DTE Energy common stock.
Excess selling will cause the relative market price of DTE Energy common stock to decrease, and the market price of DTE Energy common stock may be subject to greater volatility following the completion of the Proposed Spin-off.
While DTE Energy does not expect its credit ratings from Standard & Poor's Rating Service, Moody's Investor Service, and Fitch Ratings Inc. to drop below investment grade as a result of completing the Proposed Spin-off, there is no assurance that we will continue to maintain such investment grade credit ratings in the future.
If a rating agency were to downgrade our rating below investment grade, our borrowing costs would increase and our funding sources could decrease.
In addition, a failure by us to maintain an investment grade rating could affect our business relationships with suppliers and operating partners.
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
313 rewritten, 96 added, 172 removed, 289 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
DTE Energy is a diversified energy company with [removed: 2020] [added: 2021] Operating Revenues of approximately [removed: $12.2] [added: $15.0] billion and Total Assets of approximately [removed: $45.5] [added: $39.7] billion.
DTE Energy also operates [removed: three] [added: two] energy-related non-utility segments with operations throughout the United States.
| | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2018] [added: 2019] | | |
| Net Income Attributable to DTE Energy Company | | | $ | [removed: 1,368] [added: 907] | | | | | $ | [removed: 1,169] [added: 1,368] | | | | | $ | [removed: 1,120] [added: 1,169] | |
The increase in 2020 Net Income Attributable to DTE Energy Company was primarily due to higher earnings in the [removed: Electric, Gas Storage and Pipelines,] [added: Electric] and Corporate and Other segments, partially offset by lower earnings in the Energy Trading segment.
The [removed: increase in 2019 Net Income Attributable to DTE Energy Company] [added: decrease] was [added: also] due to [removed: higher] [added: lower] earnings in the [removed: Electric, Gas,] Energy [removed: Trading, and Corporate and Other segments,] [added: Trading segment,] partially offset by [removed: lower] [added: higher] earnings in the [removed: Gas Storage and Pipelines and Power] [added: Electric, Gas,] and [removed: Industrial Projects] [added: DTE Vantage] segments.
Refer to Note [removed: 11] [added: 9] to the Consolidated Financial [removed: Statements in Item 8 of this Report, "Income Taxes,"] [added: Statements, "Regulatory Matters",] for additional information.
DTE Energy's strategy is to achieve long-term earnings [removed: growth,] [added: growth with] a strong balance [removed: sheet,] [added: sheet] and an attractive [removed: dividend yield.][added: dividend.]
DTE Energy's utilities are investing capital to [removed: improve customer reliability] [added: support a modern, reliable grid and cleaner, affordable energy] through investments in base infrastructure and new [removed: generation, and to comply with environmental requirements.][added: generation.]
DTE Energy expects that [removed: planned] [added: these initiatives at the electric and gas utilities will continue to provide] significant [added: opportunities for] capital investments [removed: will] [added: and] result in earnings growth.
DTE Energy is focused on executing [added: its] plans to achieve operational excellence and customer satisfaction with a focus on customer affordability.
DTE [removed: Energy operates] [added: Energy's utilities operate] in a constructive regulatory environment and [removed: has] [added: have] solid relationships with [removed: its] [added: their] regulators.
DTE Energy is committed to [removed: reduce] [added: reducing] the carbon emissions of its electric utility operations by 32% by 2023, 50% by [removed: 2030,] [added: 2028,] and 80% by 2040 from 2005 carbon emissions levels.
DTE Energy is also committed to a net zero carbon emissions goal by 2050 for its electric [removed: utility, gas utility,] and [removed: DTE Midstream] [added: gas utility] operations.
DTE Energy [added: also] has significant investments in non-utility [removed: businesses.][added: businesses and expects growth opportunities in its DTE Vantage segment.]
Specifically, DTE Energy invests in targeted [removed: energy] markets with attractive competitive dynamics where meaningful scale is in alignment with its risk profile.
DTE Electric's capital investments over the [removed: 2021-2025] [added: 2022-2026] period are estimated at [removed: $14] [added: $15] billion, comprised of [removed: $5] [added: $8] billion for [removed: capital replacements and other projects, $7] [added: distribution infrastructure, $4] billion for [removed: distribution] [added: base] infrastructure, and [removed: $2] [added: $3] billion for [removed: renewable generation.][added: cleaner generation including renewables.]
DTE Electric has retired [removed: five] [added: six] coal-fired generation units at the Trenton Channel, River Rouge, and St. Clair facilities and has announced plans to retire its remaining [removed: twelve] [added: eleven] coal-fired generating [removed: units.][added: units, including five units at Trenton Channel and St. Clair in 2022.]
The [removed: remaining coal-fired generating] [added: four] units at the [removed: Belle River and] Monroe [removed: facilities] [added: facility] are expected to be retired by 2040.
[removed: The] [added: Generation from the] retired facilities will be replaced [added: or offset] with [added: a combination of] renewables, energy waste reduction, demand response, and natural gas fueled [removed: generation.][added: generation, including the Blue Water Energy Center which will commence operations in 2022.]
DTE Gas' capital investments over the [removed: 2021-2025] [added: 2022-2026] period are estimated at [removed: $3] [added: $3.1] billion, comprised of [removed: $1.4] [added: $1.5] billion for base infrastructure and $1.6 billion for gas main renewal, meter move out, and pipeline integrity programs.
DTE Energy's non-utility businesses' capital investments are primarily for expansion, growth, and ongoing [removed: maintenance.][added: maintenance in the DTE Vantage segment, including approximately $1 billion to $1.5 billion from 2022-2026 for renewable energy and industrial energy services projects.]
The Registrants are subject to extensive environmental [removed: regulations.][added: regulations, including those to address climate change.]
Business and Properties and Note [removed: 19] [added: 18] to the Consolidated Financial [removed: Statements in Item 8 of this Report,] [added: Statements,] "Commitments and Contingencies," for further discussion of Environmental Matters.
- new electric [removed: generation;][added: generation and decarbonization;]
- employee [added: engagement, health,] safety and [removed: engagement;][added: well-being, and diversity, equity, and inclusion;]
- cost structure optimization across all business segments; [added: and]
- cash, capital, and liquidity to maintain or improve financial [removed: strength; and][added: strength.]
However, DTE Energy [removed: would remain] [added: remains] well-positioned for long-term growth and focused on the key objectives noted above.
DTE Energy [removed: will continue to monitor the impact of] [added: has been monitoring] the COVID-19 pandemic [removed: on supply chains, markets, counterparties,] and [removed: customers, and] any related impacts [removed: on the] [added: to] operating costs, customer demand, and [added: the] recoverability of assets in our business segments that could materially impact the Registrants' financial results.
DTE Energy will [removed: also] continue to monitor [removed: and evaluate the impact of] [added: these impacts as well as] any regulatory and legislative activities related to [removed: the COVID-19 pandemic.][added: COVID-19.]
Refer to Note [removed: 10] [added: 9] to the Consolidated Financial Statements, "Regulatory Matters," for [removed: further] [added: additional] information [removed: on current] [added: regarding these refunds and the related] regulatory [removed: issues.][added: liabilities.]
The Non-utility Margin relates to the [removed: Power and Industrial Projects] [added: DTE Vantage] and Energy Trading segments.
For the [removed: Power and Industrial Projects] [added: DTE Vantage] segment, Non-utility Margin primarily includes Operating Revenues net of Fuel, purchased power, and gas expenses.
| | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2018] [added: 2019] | | |
| Electric | | | $ | [removed: 777] [added: 864] | | | | | $ | [removed: 714] [added: 777] | | | | | $ | [removed: 664] [added: 714] | |
| Gas | | | [removed: 186] [added: 214] | | | | | | [removed: 185] [added: 186] | | | | | | [removed: 150] [added: 185] | | |
| Energy Trading | | | [removed: 36] [added: (83)] | | | | | | [removed: 49] [added: 36] | | | | | | [removed: 39] [added: 49] | | |
| Corporate and Other | | | [removed: (80)] [added: (367)] | | | | | | [removed: (116)] [added: (79)] | | | | | | [removed: (129)] [added: (126)] | | |
| Net Income [added: (Loss)] Attributable to DTE Energy Company | | | $ | [removed: 1,368] [added: (83)] | | | | | $ | [removed: 1,169] [added: 36] | | | | | $ | [removed: 1,120] [added: 49] | |
On July 1, 2021, DTE Energy completed the separation of its natural gas pipeline, storage and gathering non-utility business.
Effective with the separation, DTE retains no ownership in the new company, DT Midstream, which was formerly comprised of DTE Energy’s Gas Storage and Pipelines segment and certain DTE Energy holding company activity within the Corporate and Other segment.
Gas Storage and Pipelines is no longer a reportable segment of DTE Energy, and financial results of DT Midstream are presented as discontinued operations in the Consolidated Financial Statements.
Management’s Discussion and Analysis of Financial Condition and Results of Operations below reflect DTE Energy’s continuing operations, unless noted otherwise.
| Diluted Earnings per Common Share — Continuing operations | | | $ | 4.10 | | | | | $ | 5.45 | | | | | $ | 5.15 | |
The decrease in 2021 Net Income Attributable to DTE Energy Company was primarily due to lower earnings in the Corporate and Other segment, driven primarily by losses on the extinguishment of debt incurred in 2021.
An increasing amount of high wind and other extreme weather events driven by climate change, coupled with increasing electric vehicle adoption, will drive a continued need for substantial grid investment over the long-term.
To achieve the carbon reduction goals at the electric utility, DTE Energy has begun to transition away from coal-powered sources and is replacing or offsetting the generation from these facilities with renewable energy and energy waste reduction initiatives.
Refer to the "Capital Investments" section below for further discussion regarding DTE Energy's retirement of its aging coal-fired plants and transition to renewable energy and other sources.
Over the long-term, DTE Energy is also monitoring the viability of emerging technologies involving energy storage, carbon capture and sequestration, alternative fuels such as hydrogen, and advanced nuclear power.
For gas utility operations, DTE Energy aims to cut carbon emissions across the entire value chain.
To achieve net zero emissions by 2050 for both internal operations and from suppliers, DTE Energy is working to source gas with lower methane intensity, reduce emissions through its gas main renewal and pipeline integrity programs, and if necessary, use carbon offsets to address any remaining emissions.
DTE Energy is also committed to helping DTE Gas customers reduce their emissions by 35% by 2050 by increasing energy efficiency, pursuing advanced technologies such as hydrogen, and through the CleanVision Natural Gas Balance program which provides customers the option to use carbon offsets and renewable natural gas.
Capital plans may be regularly updated as these requirements change.
The two units at the Belle River facility will cease the use of coal by 2028 and will be evaluated for conversion to cleaner energy resources.
Increased costs for energy produced from traditional coal-based sources due to recent, pending, and future regulatory initiatives could also increase the economic viability of energy produced from renewable, natural gas fueled generation, and/or nuclear sources, energy waste reduction initiatives, and the potential development of market-based trading of carbon instruments which could provide new business opportunities for DTE Energy's utility and non-utility segments.
At the present time, it is not possible to quantify the financial impacts of these climate related regulatory initiatives on the Registrants or their customers.
- strategic investments in growth projects at DTE Vantage;
The separation of DT Midstream on July 1, 2021 will result in a reduction to DTE Energy's net income and cash flows in the near term.
As noted in Note 18 to the Consolidated Financial Statements, "Commitments and Contingencies," the pandemic has contributed to a shift in electric sales volumes from commercial and industrial customers to residential customers.
DTE Energy expects this shift to continue in the near term as businesses maintain more remote operations.
Other impacts from COVID-19 have related primarily to health and safety-related costs at the utilities and volumes at certain non-utility businesses, but these impacts have not been significant in 2021.
| DTE Vantage | | | 168 | | | | | | 134 | | | | | | 133 | | |
| Discontinued Operations | | | 111 | | | | | | 314 | | | | | | 214 | | |
| | | | 2021 | | | | | | 2020 | | |
| Voluntary refunds(a) | | | (60) | | | | | | (30) | | |
(a)Variances reflect the $90 million voluntary refund recognized in 2021 for the incremental tree trim surge and the $30 million COVID-19 voluntary refund recognized in 2020.
______________________________
DTE Electric sales volumes increased in 2021, primarily attributable to commercial customers which were impacted more significantly in 2020 by the COVID-19 pandemic and temporary shut-downs of certain commercial operations.
The decrease in 2021 was primarily due to lower sales volumes at DTE Sustainable Generation.
The increase in 2021 was primarily due to higher EWR expense of $45 million, higher distribution operations expense of $42 million (primarily due to higher storm costs), higher corporate support costs of $21 million, higher legal and environmental expense of $15 million, and higher benefits expense of $13 million.
These increases were partially offset by lower COVID-19 related expenses of $43 million, lower uncollectible expense of $26 million, and lower plant generation expense of $4 million.
In 2021, the increase was primarily due to higher property taxes of $22 million as a result of an increase in tax base and a favorable property tax settlement in 2020.
In 2020, the decrease was primarily due to lower property taxes of $9 million as a result of a property tax settlement, partially offset by an increase in tax base.
The decrease in 2021 was primarily due to lower activity in the current year compared to a $41 million write-off of capital expenditures related to incentive compensation in 2020.
On March 26, 2021, DTE Electric filed an application requesting a financing order approving the securitization financing of $184 million of qualified costs related to the net book value of the River Rouge generation plant and tree trimming surge program costs.
The filing requested recovery of these qualifying costs from DTE Electric's customers.
A final MPSC financing order was issued on June 23, 2021 authorizing DTE Electric to proceed with the issuance of securitization bonds for qualified costs of up to $236 million, increased for the inclusion of deferred taxes.
The financing order further authorized customer charges for the timely recovery of the debt service costs on the securitization bonds and other ongoing qualified costs.
Securitization financing is expected to occur in March 2022.
| Diluted Earnings per Common Share | | | $ | 7.08 | | | | | $ | 6.31 | | | | | $ | 6.17 | |
COVID-19 Pandemic
During the first quarter of 2020, the COVID-19 pandemic began impacting Michigan and other service territories throughout the United States in which the Registrants operate.
DTE Energy took certain safety precautions including directing employees to work remotely whenever possible and pausing all non-critical business activities.
The spread of COVID-19 and efforts to contain the virus resulted in closures and reduced operations of businesses, governmental agencies, and other institutions.
Beginning in May 2020, DTE Energy resumed business activities that had been temporarily suspended.
Local businesses and other institutions also resumed operations as new cases of COVID-19 began to decline and government restrictions were reduced.
Impacts from the COVID-19 pandemic have included a reduction in sales volumes from commercial and industrial customers and an increase in sales volumes from residential customers within the Electric segment.
COVID-19 has also impacted the Power and Industrial Projects segment, contributing to lower production in the REF business and lower demand in the Steel business.
Operation and maintenance expense has been impacted by COVID-19, primarily in the Electric segment, due to higher costs for personal protective equipment and other health and safety-related costs, including shift premiums and related expenses associated with the sequestration of certain employees critical to continued operations.
The Registrants implemented certain cost savings initiatives to offset some of these impacts, to the extent they did not affect safety or reliability of service.
To date, impacts from the COVID-19 pandemic have not had a material effect on the Registrants' uncollectible expense or capital spend.
In addition, the CARES Act was signed into law in March 2020 to assist individuals and employers with the impacts of the COVID-19 pandemic.
This legislation resulted in various tax impacts to the Registrants.
Also refer to the "Capital Resources and Liquidity" section for information on the impact of COVID-19 on the Registrants' liquidity and cost of capital.
To achieve the reduction goals in the near term, DTE Energy will transition away from coal-powered sources and incorporate more renewable energy, energy waste reduction projects, demand response, and natural gas fueled generation.
DTE Energy has already begun the transition in the way it produces power through the continued retirement of its aging coal-fired plants.
Refer to the "Capital Investments" section below for further discussion.
DTE Energy expects growth opportunities in the Gas Storage and Pipelines and Power and Industrial Projects segments.
These opportunities would be limited to Power and Industrial Projects if DTE Energy completes the planned spin-off of the DTE Midstream business and shifts its strategy to a predominantly pure-play utility, as discussed in the "Outlook" section below.
River Rouge's final unit will retire in 2021 and five additional coal-fired generating units at Trenton Channel and St. Clair will be retired in 2022.
Gas Storage and Pipelines' capital investments over the 2021-2025 period are estimated at $1.2 billion to $1.7 billion for gathering and pipeline investments and expansions.
Power and Industrial Projects' capital investments over the 2021-2025 period are estimated at $1 billion to $1.4 billion for industrial energy services and renewable energy projects.
- investments that integrate assets and leverage skills and expertise.
In addition, on October 27, 2020, DTE Energy announced its intention to spin-off the DTE Midstream business, reflecting a shift in strategy to a predominantly pure-play utility.
DTE Energy expects to complete the separation by mid-year 2021, subject to final approval by its Board of Directors and satisfaction of other conditions.
If the spin-off transaction is completed, it would result in a reduction to DTE Energy's earnings and cash flows.
DTE Energy expects reduced electric demand from commercial and industrial customers and increased demand from residential customers to continue as long as businesses maintain more remote operations.
Operation and maintenance expenses will also continue to be impacted in the near term by the need for personal protective equipment and other safety-related costs.
DTE Energy will continue to review the allowance for doubtful accounts for any additional risk related to COVID-19 and will monitor any potential challenges to demand in the Power and Industrial Projects segment.
| | | | (In millions) | | | | | | | | | | | | | | |
| Gas Storage and Pipelines | | | 315 | | | | | | 204 | | | | | | 235 | | |
| Power and Industrial Projects | | | 134 | | | | | | 133 | | | | | | 161 | | |
| COVID-19 voluntary refund | | | (30) | | | | | | — | | |
DTE Electric sales volumes decreased in 2020 primarily due to the impact of the COVID-19 pandemic on customers.
Sales volumes decreased for commercial and industrial customers, partially offset by an increase in residential sales.
The net decrease to DTE Electric sales volumes was also partially offset by slightly favorable weather in 2020 compared to 2019.
These decreases were partially offset by higher tree trim expense of $20 million (tree trim expenses increased by $63 million but were offset by amounts deferred to a regulatory asset of $43 million) and higher RPS program expense of $11 million.
In 2019, the increase was primarily due to a $126 million increase resulting from a higher depreciable base and change in depreciation rates effective May 2019 and a $4 million increase resulting from new non-utility assets at DTE Sustainable Generation, partially offset by a decrease of $17 million associated with the TRM.
In 2019, the increase was primarily due to a $2 million tax reserve released in 2018, higher property taxes of $1 million, and a $1 million increase resulting from new non-utility assets at DTE Sustainable Generation.
An excerpt. Shown here: 40 of 313 rewritten, 40 of 96 added and 40 of 172 removed. The counts are complete. For every sentence, read Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations in the FY2021 filing and the FY2020 filing.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
23 rewritten, 2 added, 11 removed, 42 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
DTE Energy manages its exposure [added: to commodity price risk] through the use of [removed: short, medium, and] long-term [removed: storage, gathering,] [added: contracts] and [removed: transportation contracts.][added: hedging instruments, when available.]
The following table displays the credit quality of DTE Energy's trading counterparties as of December 31, [removed: 2020:][added: 2021:]
| A- and Greater | | | $ | [removed: 222] [added: 325] | | | | | $ | — | | | | | $ | [removed: 222] [added: 325] | |
| BBB+ and BBB | | | [removed: 214] [added: 238] | | | | | | — | | | | | | [removed: 214] [added: 238] | | |
| BBB- | | | [removed: 12] [added: 50] | | | | | | [removed: —] [added: (12)] | | | | | | [removed: 12] [added: 38] | | |
| Total Investment Grade | | | [removed: 448] [added: 613] | | | | | | [removed: —] [added: (12)] | | | | | | [removed: 448] [added: 601] | | |
| Non-investment grade(b) | | | [removed: 10] [added: 4] | | | | | | — | | | | | | [removed: 10] [added: 4] | | |
| Internally Rated — [removed: investment grade(c)] [added: non-investment grade(d)] | | | [removed: 413] [added: 61] | | | | | | [removed: (1)] [added: (8)] | | | | | | [removed: 412] [added: 53] | | |
| Internally Rated — [removed: non-investment grade(d)] [added: investment grade(c)] | | | [removed: 62] [added: 979] | | | | | | [removed: (2)] [added: (32)] | | | | | | [removed: 60] [added: 947] | | |
The five largest counterparty exposures, combined, for this category represented [removed: 13%] [added: 2%] of the total gross credit exposure.
The five largest counterparty exposures, combined, for this category represented [removed: 1%] [added: 10%] of the total gross credit exposure.
The five largest counterparty exposures, combined, for this category represented [removed: 14%] [added: 18%] of the total gross credit exposure.
The five largest counterparty exposures, combined, for this category represented [removed: 4%] [added: less than 1%] of the total gross credit exposure.
DTE Energy's exposure to interest rate risk arises primarily from changes in U.S. Treasury rates, commercial paper rates, and [removed: LIBOR.][added: other applicable short-term reference rates.]
As of December 31, [removed: 2020,] [added: 2021,] DTE Energy had floating rate debt of [removed: $38] [added: $758] million and a floating rate debt-to-total debt ratio of [removed: 0.2%.][added: 4.2%.]
The sensitivity analyses involved increasing and decreasing forward prices and rates at December 31, [removed: 2020] [added: 2021] and [removed: 2019] [added: 2020] by a hypothetical 10% and calculating the resulting change in the fair values.
| Activity | | | | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | Change in the Fair Value of | | |
| Gas contracts | | | | | | $ | [removed: 23] [added: 33] | | | | | $ | [removed: 6] [added: 23] | | | | | $ | [removed: (23)] [added: (33)] | | | | | $ | [removed: (6)] [added: (23)] | | | | | Commodity contracts | | |
| Power contracts | | | | | | $ | [removed: 5] [added: 9] | | | | | $ | [removed: 4] [added: 5] | | | | | $ | [removed: (5)] [added: (10)] | | | | | $ | (5) | | | | | Commodity contracts | | |
| Environmental contracts | | | | | | $ | [removed: (7)] [added: (8)] | | | | | $ | [removed: (3)] [added: (7)] | | | | | $ | [removed: 5] [added: 8] | | | | | $ | [removed: 3] [added: 5] | | | | | Commodity contracts | | |
| Interest rate risk — DTE Energy | | | | | | $ | [removed: (651)] [added: (662)] | | | | | $ | [removed: (698)] [added: (651)] | | | | | $ | [removed: 671] [added: 687] | | | | | $ | [removed: 724] [added: 671] | | | | | Long-term debt | | |
| Interest rate risk — DTE Electric | | | | | | $ | [removed: (285)] [added: (329)] | | | | | $ | [removed: (286)] [added: (285)] | | | | | $ | [removed: 300] [added: 348] | | | | | $ | [removed: 305] [added: 300] | | | | | Long-term debt | | |
For further discussion of market risk, see Management's Discussion and Analysis in Item 7 of this Report and Note [removed: 14] [added: 13] to the Consolidated Financial [removed: Statements in Item 8 of this Report,] [added: Statements,] "Financial and Other Derivative Instruments."
The DTE Vantage segment is subject to price risk for electricity, natural gas, coal products, and environmental attributes generated from its renewable natural gas investments.
| Total | | | $ | 1,657 | | | | | $ | (52) | | | | | $ | 1,605 | |
DTE Energy's Gas Storage and Pipelines segment is dependent on the continued availability of natural gas production and reserves in its areas of operation.
Low prices for natural gas, including those resulting from regional basis differentials, could adversely affect development of additional reserves and production that is accessible to our pipeline and storage
assets.
DTE Energy's Power and Industrial Projects business segment is subject to electricity, natural gas, and coal product price risk.
DTE Energy manages its exposure to commodity price risk through the use of long-term contracts.
Bankruptcies
DTE Energy's Power and Industrial Projects segment holds ownership interests in, and operates, five generating plants that sell electric output from renewable sources under long-term power purchase agreements with PG&E.
PG&E filed for Chapter 11 bankruptcy protection on January 29, 2019.
PG&E emerged from Chapter 11 bankruptcy effective July 1, 2020.
DTE's renewable power purchase agreements were assumed under PG&E's Reorganization Plan and payment has been received for all past due receivables related to these agreements.
| Total | | | $ | 933 | | | | | $ | (3) | | | | | $ | 930 | |
Item 3. Legal Proceedings
2 rewritten, 0 added, 0 removed, 0 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
For more information on legal proceedings and matters related to the Registrants, see Notes [removed: 10] [added: 9] and [removed: 19] [added: 18] to the Consolidated Financial [removed: Statements in Item 8 of this Report,] [added: Statements,] "Regulatory Matters" and "Commitments and Contingencies," respectively.
For environmental proceedings in which the government is a party, the Registrants [removed: have included] [added: include] disclosures if any sanctions of $1 million or greater are expected.
Cover and table of contents
146 rewritten, 58 added, 106 removed, 415 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
For the Fiscal Year Ended December 31, [removed: 2020][added: 2021]
☐ TRANSITION REPORT PURSUANT TO SECTION [removed: 12] [added: 13] OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
[removed: ][added: ]
| DTE Energy | | | | | | [removed: 2016] [added: 2021] Series [removed: B 5.375%] [added: E 4.375%] Junior Subordinated Debentures due [removed: 2076] [added: 2081] | | | | | | [removed: DTJ] [added: DTG] | | | | | | New York Stock Exchange | | |
On June 30, [removed: 2020,] [added: 2021,] the aggregate market value of DTE Energy's voting and non voting common equity held by non-affiliates was approximately [removed: $20.5] [added: $21.2] billion (based on the New York Stock Exchange closing price on such date).
Number of shares of Common Stock outstanding at January [removed: 29, 2021:][added: 31, 2022:]
| DTE Energy | | | | | | Common Stock, without par value | | | | | | [removed: 193,773,687] [added: 193,745,891] | | |
| DTE Electric | | | | | | Common Stock, $10 par value, indirectly-owned by DTE Energy | | | | | | [removed: 138,362,324] [added: 138,632,324] | | |
Certain information in DTE Energy's definitive Proxy Statement for its [removed: 2021] [added: 2022] Annual Meeting of Common Shareholders to be held May [removed: 20, 2021,] [added: 5, 2022,] which will be filed with the Securities and Exchange Commission pursuant to Regulation 14A, not later than 120 days after the end of the [removed: registrant’s] [added: Registrants'] fiscal year covered by this report on Form 10-K, is incorporated herein by reference to Part III (Items 10, 11, 12, 13, and 14) of this Form 10-K.
| | | | [Filing [removed: Format](#if45271c755f142f2b4aede2bde30dc33_16)] [added: Format](#ia74421c34733426cbc2b2efb9b6da345_16)] | | | [removed: [4](#if45271c755f142f2b4aede2bde30dc33_16)] [added: [4](#ia74421c34733426cbc2b2efb9b6da345_16)] | | |
| | | | [Forward-Looking [removed: Statements](#if45271c755f142f2b4aede2bde30dc33_19)] [added: Statements](#ia74421c34733426cbc2b2efb9b6da345_19)] | | | [removed: [5](#if45271c755f142f2b4aede2bde30dc33_19)] [added: [4](#ia74421c34733426cbc2b2efb9b6da345_19)] | | |
| [Items 1. & [removed: 2.](#if45271c755f142f2b4aede2bde30dc33_25)] [added: 2.](#ia74421c34733426cbc2b2efb9b6da345_25)] | | | [Business and [removed: Properties](#if45271c755f142f2b4aede2bde30dc33_25)] [added: Properties](#ia74421c34733426cbc2b2efb9b6da345_25)] | | | [removed: [7](#if45271c755f142f2b4aede2bde30dc33_25)] [added: [6](#ia74421c34733426cbc2b2efb9b6da345_25)] | | |
| [Item [removed: 1A.](#if45271c755f142f2b4aede2bde30dc33_28)] [added: 1A.](#ia74421c34733426cbc2b2efb9b6da345_28)] | | | [Risk [removed: Factors](#if45271c755f142f2b4aede2bde30dc33_28)] [added: Factors](#ia74421c34733426cbc2b2efb9b6da345_28)] | | | [removed: [21](#if45271c755f142f2b4aede2bde30dc33_28)] [added: [18](#ia74421c34733426cbc2b2efb9b6da345_28)] | | |
| [Item [removed: 1B.](#if45271c755f142f2b4aede2bde30dc33_31)] [added: 1B.](#ia74421c34733426cbc2b2efb9b6da345_31)] | | | [Unresolved Staff [removed: Comments](#if45271c755f142f2b4aede2bde30dc33_31)] [added: Comments](#ia74421c34733426cbc2b2efb9b6da345_31)] | | | [removed: [27](#if45271c755f142f2b4aede2bde30dc33_31)] [added: [24](#ia74421c34733426cbc2b2efb9b6da345_31)] | | |
| [Item [removed: 3.](#if45271c755f142f2b4aede2bde30dc33_34)] [added: 3.](#ia74421c34733426cbc2b2efb9b6da345_34)] | | | [Legal [removed: Proceedings](#if45271c755f142f2b4aede2bde30dc33_34)] [added: Proceedings](#ia74421c34733426cbc2b2efb9b6da345_34)] | | | [removed: [27](#if45271c755f142f2b4aede2bde30dc33_34)] [added: [24](#ia74421c34733426cbc2b2efb9b6da345_34)] | | |
| [Item [removed: 4.](#if45271c755f142f2b4aede2bde30dc33_37)] [added: 4.](#ia74421c34733426cbc2b2efb9b6da345_37)] | | | [Mine Safety [removed: Disclosures](#if45271c755f142f2b4aede2bde30dc33_37)] [added: Disclosures](#ia74421c34733426cbc2b2efb9b6da345_37)] | | | [removed: [27](#if45271c755f142f2b4aede2bde30dc33_37)] [added: [24](#ia74421c34733426cbc2b2efb9b6da345_37)] | | |
| [Item [removed: 5.](#if45271c755f142f2b4aede2bde30dc33_43)] [added: 5.](#ia74421c34733426cbc2b2efb9b6da345_43)] | | | [Market for Registrant’s Common Equity, Related Stockholder Matters, and Issuer Purchases of Equity [removed: Securities](#if45271c755f142f2b4aede2bde30dc33_43)] [added: Securities](#ia74421c34733426cbc2b2efb9b6da345_43)] | | | [removed: [28](#if45271c755f142f2b4aede2bde30dc33_43)] [added: [25](#ia74421c34733426cbc2b2efb9b6da345_43)] | | |
| [Item [removed: 6.](#if45271c755f142f2b4aede2bde30dc33_46)] [added: 6.](#ia74421c34733426cbc2b2efb9b6da345_46)] | | | [Selected Financial [removed: Data](#if45271c755f142f2b4aede2bde30dc33_46)] [added: Data](#ia74421c34733426cbc2b2efb9b6da345_46)] | | | [removed: [30](#if45271c755f142f2b4aede2bde30dc33_46)] [added: [26](#ia74421c34733426cbc2b2efb9b6da345_46)] | | |
| [Item [removed: 7.](#if45271c755f142f2b4aede2bde30dc33_49)] [added: 7.](#ia74421c34733426cbc2b2efb9b6da345_52)] | | | [Management’s Discussion and Analysis of Financial Condition and Results of [removed: Operations](#if45271c755f142f2b4aede2bde30dc33_49)] [added: Operations](#ia74421c34733426cbc2b2efb9b6da345_52)] | | | [removed: [30](#if45271c755f142f2b4aede2bde30dc33_49)] [added: [27](#ia74421c34733426cbc2b2efb9b6da345_52)] | | |
| [Item [removed: 7A.](#if45271c755f142f2b4aede2bde30dc33_58)] [added: 7A.](#ia74421c34733426cbc2b2efb9b6da345_91)] | | | [Quantitative and Qualitative Disclosures About Market [removed: Risk](#if45271c755f142f2b4aede2bde30dc33_58)] [added: Risk](#ia74421c34733426cbc2b2efb9b6da345_91)] | | | [removed: [55](#if45271c755f142f2b4aede2bde30dc33_58)] [added: [48](#ia74421c34733426cbc2b2efb9b6da345_91)] | | |
| [Item [removed: 8.](#if45271c755f142f2b4aede2bde30dc33_61)] [added: 8.](#ia74421c34733426cbc2b2efb9b6da345_94)] | | | [Financial Statements and Supplementary [removed: Data](#if45271c755f142f2b4aede2bde30dc33_61)] [added: Data](#ia74421c34733426cbc2b2efb9b6da345_94)] | | | [removed: [58](#if45271c755f142f2b4aede2bde30dc33_61)] [added: [51](#ia74421c34733426cbc2b2efb9b6da345_94)] | | |
| [Item [removed: 9.](#if45271c755f142f2b4aede2bde30dc33_247)] [added: 9.](#ia74421c34733426cbc2b2efb9b6da345_235)] | | | [Changes in and Disagreements with Accountants on Accounting and Financial [removed: Disclosure](#if45271c755f142f2b4aede2bde30dc33_247)] [added: Disclosure](#ia74421c34733426cbc2b2efb9b6da345_235)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_247)] [added: [150](#ia74421c34733426cbc2b2efb9b6da345_235)] | | |
| [Item [removed: 9A.](#if45271c755f142f2b4aede2bde30dc33_250)] [added: 9A.](#ia74421c34733426cbc2b2efb9b6da345_238)] | | | [Controls and [removed: Procedures](#if45271c755f142f2b4aede2bde30dc33_250)] [added: Procedures](#ia74421c34733426cbc2b2efb9b6da345_238)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_250)] [added: [150](#ia74421c34733426cbc2b2efb9b6da345_238)] | | |
| [Item [removed: 9B.](#if45271c755f142f2b4aede2bde30dc33_253)] [added: 9B.](#ia74421c34733426cbc2b2efb9b6da345_241)] | | | [Other [removed: Information](#if45271c755f142f2b4aede2bde30dc33_253)] [added: Information](#ia74421c34733426cbc2b2efb9b6da345_241)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_253)] [added: [150](#ia74421c34733426cbc2b2efb9b6da345_241)] | | |
| [Item [removed: 10.](#if45271c755f142f2b4aede2bde30dc33_259)] [added: 10.](#ia74421c34733426cbc2b2efb9b6da345_247)] | | | [Directors, Executive Officers, and Corporate [removed: Governance](#if45271c755f142f2b4aede2bde30dc33_259)] [added: Governance](#ia74421c34733426cbc2b2efb9b6da345_247)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_259)] [added: [151](#ia74421c34733426cbc2b2efb9b6da345_247)] | | |
| [Item [removed: 11.](#if45271c755f142f2b4aede2bde30dc33_262)] [added: 11.](#ia74421c34733426cbc2b2efb9b6da345_250)] | | | [Executive [removed: Compensation](#if45271c755f142f2b4aede2bde30dc33_262)] [added: Compensation](#ia74421c34733426cbc2b2efb9b6da345_250)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_262)] [added: [151](#ia74421c34733426cbc2b2efb9b6da345_250)] | | |
| [Item [removed: 12.](#if45271c755f142f2b4aede2bde30dc33_265)] [added: 12.](#ia74421c34733426cbc2b2efb9b6da345_253)] | | | [Security Ownership of Certain Beneficial Owners and Management and Related Stockholder [removed: Matters](#if45271c755f142f2b4aede2bde30dc33_265)] [added: Matters](#ia74421c34733426cbc2b2efb9b6da345_253)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_265)] [added: [151](#ia74421c34733426cbc2b2efb9b6da345_253)] | | |
| [Item [removed: 13.](#if45271c755f142f2b4aede2bde30dc33_268)] [added: 13.](#ia74421c34733426cbc2b2efb9b6da345_256)] | | | [Certain Relationships and Related Transactions, and Director [removed: Independence](#if45271c755f142f2b4aede2bde30dc33_268)] [added: Independence](#ia74421c34733426cbc2b2efb9b6da345_256)] | | | [removed: [156](#if45271c755f142f2b4aede2bde30dc33_268)] [added: [151](#ia74421c34733426cbc2b2efb9b6da345_256)] | | |
| [Item [removed: 14.](#if45271c755f142f2b4aede2bde30dc33_271)] [added: 14.](#ia74421c34733426cbc2b2efb9b6da345_259)] | | | [Principal Accountant Fees and [removed: Services](#if45271c755f142f2b4aede2bde30dc33_271)] [added: Services](#ia74421c34733426cbc2b2efb9b6da345_259)] | | | [removed: [157](#if45271c755f142f2b4aede2bde30dc33_271)] [added: [151](#ia74421c34733426cbc2b2efb9b6da345_259)] | | |
| [Item [removed: 15.](#if45271c755f142f2b4aede2bde30dc33_277)] [added: 15.](#ia74421c34733426cbc2b2efb9b6da345_265)] | | | [Exhibits and Financial Statement [removed: Schedule](#if45271c755f142f2b4aede2bde30dc33_277)s] [added: Schedule](#ia74421c34733426cbc2b2efb9b6da345_265)s] | | | [removed: [158](#if45271c755f142f2b4aede2bde30dc33_277)] [added: [152](#ia74421c34733426cbc2b2efb9b6da345_265)] | | |
| [Item [removed: 16.](#if45271c755f142f2b4aede2bde30dc33_280)] [added: 16.](#ia74421c34733426cbc2b2efb9b6da345_268)] | | | [Form 10-K [removed: Summary](#if45271c755f142f2b4aede2bde30dc33_280)] [added: Summary](#ia74421c34733426cbc2b2efb9b6da345_268)] | | | [removed: [169](#if45271c755f142f2b4aede2bde30dc33_280)] [added: [161](#ia74421c34733426cbc2b2efb9b6da345_268)] | | |
| [removed: DTE] [added: DT] Midstream | | | | | | [added: DT Midstream, Inc., formerly] DTE Energy's natural gas pipeline, storage, and gathering [removed: non-utility, which comprises] [added: non-utility business comprising] the Gas Storage and Pipelines segment and certain DTE Energy holding company activity [removed: currently included] in the Corporate and Other [removed: segment] [added: segment, which separated from DTE Energy and became an independent public company on July 1, 2021] | | |
| NEXUS | | | | | | NEXUS Gas Transmission, LLC, a joint venture in which DTE Energy [removed: owns] [added: previously owned] a 50% partnership interest [added: that separated with DT Midstream effective July 1, 2021] | | |
[removed: | RDM | | | | | | A Revenue Decoupling Mechanism authorized by the MPSC that is designed to minimize the impact on revenues] [added: The impacts] of changes in [added: annual] average customer usage [removed: | | |][added: are minimized by the Revenue Decoupling Mechanism authorized by the MPSC.]
- Risks related to the [removed: spin-off] [added: separation] of [removed: DTE] [added: DT] Midstream, including that [removed: the process of exploring the transaction and potentially completing the transaction] [added: providing DT Midstream with transition services] could [removed: disrupt or] adversely affect [removed: the consolidated or separate businesses, results of operations] [added: our business] and [removed: financial condition,] that the transaction may not achieve some or all of [removed: any anticipated benefits with respect to either business, and that] the [removed: transaction may not be completed in accordance with DTE Energy’s expected plans or] anticipated [removed: timelines, or at all;][added: benefits;]
- impact of volatility in prices in the international steel markets [added: and in prices of environmental attributes generated from renewable natural gas investments] on [added: the operations of] DTE [removed: Energy's power] [added: Vantage (formerly Power] and [removed: industrial projects operations;][added: Industrial Projects);]
- the cost of protecting assets [added: and customer data] against, or damage due to, cyber incidents and terrorism;
- [added: impacts of inflation and] the timing and extent of changes in interest rates;
- the effects of weather and other natural [removed: phenomena] [added: phenomena, including climate change,] on operations and sales to customers, and purchases from suppliers;
- contract disputes, binding arbitration, litigation, and related appeals; [removed: and]
| | | | [Definitions](#ia74421c34733426cbc2b2efb9b6da345_13) | | | [1](#ia74421c34733426cbc2b2efb9b6da345_13) | | |
| [PART I](#ia74421c34733426cbc2b2efb9b6da345_22) | | | | | | | | |
| [PART II](#ia74421c34733426cbc2b2efb9b6da345_40) | | | | | | | | |
| [Item 9](#ia74421c34733426cbc2b2efb9b6da345_3848290699560)[C](#ia74421c34733426cbc2b2efb9b6da345_3848290699560)[.](#ia74421c34733426cbc2b2efb9b6da345_3848290699560) | | | [Disclosure Regarding Foreign Jurisdictions that Prevent Inspections](#ia74421c34733426cbc2b2efb9b6da345_3848290699560) | | | [150](#ia74421c34733426cbc2b2efb9b6da345_3848290699560) | | |
| [PART III](#ia74421c34733426cbc2b2efb9b6da345_244) | | | | | | | | |
| [PART IV](#ia74421c34733426cbc2b2efb9b6da345_262) | | | | | | | | |
| | | | [Signatures](#ia74421c34733426cbc2b2efb9b6da345_274) | | | [163](#ia74421c34733426cbc2b2efb9b6da345_274) | | |
| Carbon emissions | | | | | | Emissions of carbon containing compounds, including carbon dioxide and methane, that are identified as greenhouse gases | | |
| CARES Act | | | | | | Coronavirus Aid, Relief, and Economic Security Act enacted in March 2020 to assist individuals and employers with the impacts of the COVID-19 pandemic, including certain tax relief provisions | | |
| ERCOT | | | | | | Electric Reliability Council of Texas, the independent power market operator responsible for substantially all of the Texas power market. | | |
| Green Bonds | | | | | | A financing option to fund projects that have a positive environmental impact based upon a specified set of criteria. The proceeds are required to be used for eligible green expenditures | | |
| Net zero | | | | | | Collective efforts to reduce the carbon emissions of DTE Energy's utility operations and gas suppliers, as well as efforts to offset an amount equivalent to any remaining emissions. Progress towards this goal is estimated and may vary from the calculations of other utility businesses with similar targets | | |
| SGG | | | | | | Stonewall Gas Gathering is a midstream natural gas asset that was previously owned 85% by DTE Energy and separated with DT Midstream effective July 1, 2021 | | |
- successful execution of new business development and future growth plans;
- the ability of the electric and gas utilities to achieve net zero emissions goals; and
On July 1, 2021, DTE Energy completed the separation of its natural gas pipeline, storage, and gathering non-utility business.
Effective with the separation, DTE Energy retains no ownership in the new company, DT Midstream.
DTE Electric has 100% of its expected coal requirements under contract for 2022.
DTE Electric's natural gas supply requirements are expected to be met through a combination of short and long-term agreements, agreements with local distribution companies, and spot market purchases.
Natural gas purchase requirements for 2022 are expected to be approximately 52 Bcf.
DTE Electric has contracts for firm gas transportation and storage capacity to ensure reliable and flexible gas supply to its power plants.
| | | | | | | | | | | | | | | | | | | 6,480 | | |
| | | | | | | | | | | | | | | | | | | 1,336 | | |
| | | | | | | | | | | | | | | | | | | 12,043 | | |
| 4.8 kV to 13.2 kV | | | | | | 28,536 | | | | | | 15,652 | | |
| 24 kV | | | | | | 179 | | | | | | 741 | | |
| 40 kV | | | | | | 2,352 | | | | | | 430 | | |
| | | | | | | 31,129 | | | | | | 16,831 | | |
An increasing amount of high wind and other extreme weather events driven by climate change, coupled with increasing electric vehicle adoption, will drive a continued need for substantial grid investment over the long-term.
To maintain reliability and meet the carbon reduction goals in the near-term, DTE Electric plans to put in service a natural gas fueled combined cycle generation facility in 2022 and will continue its energy waste reduction initiatives and transition away from coal-fired plants to renewable energy and other sources.
To achieve long-term carbon reduction goals, DTE Electric is monitoring the viability of emerging technologies involving energy storage, carbon capture and sequestration, alternative fuels such as hydrogen, and advanced nuclear power.
DTE Electric expects that customers with retail access to alternative electric suppliers will represent approximately 10% of retail sales in 2022.
DTE Energy is also committed to a goal of net zero carbon emissions by 2050 for its gas utility, for both internal operations and from suppliers.
To achieve net zero, DTE Gas is working to source gas with lower methane intensity, reduce emissions through its main renewal and pipeline integrity programs, and if necessary, use carbon offsets to address any remaining emissions.
DTE Energy is also committed to helping DTE Gas customers reduce their emissions by 35% by 2050 by increasing energy efficiency, pursuing advanced technologies such as hydrogen, and through the CleanVision Natural Gas Balance program which provides customers the option to use carbon offsets and renewable natural gas.
DTE VANTAGE
Certain sites also refine the methane to produce pipeline-quality gas, which can then be used as vehicle fuel and generate environmental attributes.
*Environmental Controls*
The following are significant properties owned by DTE Vantage as of December 31, 2021:
| Environmental Controls(a) | | | | | | MI, OH, IL, TX, and WI | | | | | | REF Supply | | |
| DTE Energy | | | | | | 2016 Series F 6.00% Junior Subordinated Debentures due 2076 | | | | | | DTY | | | | | | New York Stock Exchange | | |
THIS PAGE INTENTIONALLY LEFT BLANK
| | | | [Definitions](#if45271c755f142f2b4aede2bde30dc33_13) | | | [1](#if45271c755f142f2b4aede2bde30dc33_13) | | |
| [PART I](#if45271c755f142f2b4aede2bde30dc33_22) | | | | | | | | |
| [PART II](#if45271c755f142f2b4aede2bde30dc33_40) | | | | | | | | |
| [PART III](#if45271c755f142f2b4aede2bde30dc33_256) | | | | | | | | |
| [PART IV](#if45271c755f142f2b4aede2bde30dc33_274) | | | | | | | | |
| | | | [Signatures](#if45271c755f142f2b4aede2bde30dc33_286) | | | [171](#if45271c755f142f2b4aede2bde30dc33_286) | | |
| AGS | | | | | | Appalachia Gathering System is a midstream natural gas asset located in Pennsylvania and West Virginia and is part of the Gas Storage and Pipelines segment. DTE Energy purchased 100% of AGS in October 2016 | | |
| Blue Union | | | | | | Blue Union gathering system is a midstream natural gas asset located in the Haynesville shale formation of Louisiana. DTE Energy purchased 100% of Blue Union in December 2019 and this asset is part of DTE Energy's Gas Storage and Pipelines segment | | |
| CARES Act | | | | | | Coronavirus Aid, Relief, and Economic Security Act | | |
| LEAP | | | | | | Louisiana Energy Access Project gathering pipeline is a midstream natural gas asset located in the Haynesville shale formation of Louisiana. DTE Energy purchased 100% of LEAP in December 2019 and this asset is part of DTE Energy's Gas Storage and Pipelines segment | | |
| LNG | | | | | | Liquefied Natural Gas | | |
| NOV | | | | | | Notice of Violation | | |
| PG&E | | | | | | Pacific Gas and Electric Corporation | | |
| SGG | | | | | | Stonewall Gas Gathering is a midstream natural gas asset located in West Virginia. DTE Energy purchased 55% of SGG in October 2016 and an additional 30% in May 2019, bringing its ownership to 85%. SGG is part of DTE Energy's Gas Storage and Pipelines segment | | |
THIS PAGE INTENTIONALLY LEFT BLANK
- DTE Energy’s intent to spin-off DTE Midstream and DTE Energy’s preliminary strategic, operational and financial considerations related thereto.
The statements with respect to the separation transaction are preliminary in nature and subject to change as additional information becomes available.
The separation transaction will be subject to the satisfaction of a number of conditions, including the final approval of DTE Energy’s Board of Directors, and there is no assurance that such separation transaction will in fact occur;
- impact of volatility of prices in the oil and gas markets on DTE Energy's gas storage and pipelines operations and volatility in the short-term natural gas storage markets impacting third-party storage revenues related to DTE Energy;
- Gas Storage and Pipelines consists of natural gas pipeline, gathering, transportation, and storage businesses.
Description
DTE Electric has purchase commitments for approximately 77% of the expected coal requirements for 2021.
Properties
| River Rouge | | | | | | Wayne | | | | | | 1958 | | | | | | 58 | | |
| | | | | | | | | | | | | | | | | | | 6,538 | | |
| | | | | | | | | | | | | | | | | | | 954 | | |
| | | | | | | | | | | | | | | | | | | 11,719 | | |
| 4.8 kV to 13.2 kV | | | | | | 28,549 | | | | | | 15,540 | | |
| 24 kV | | | | | | 181 | | | | | | 682 | | |
| 40 kV | | | | | | 2,303 | | | | | | 382 | | |
| | | | | | | 31,094 | | | | | | 16,612 | | |
Regulation
Strategy and Competition
To meet the generation needs and carbon reduction goals, continuing investments will be made in renewable resources, a natural gas fueled combined cycle generation facility, and DTE Electric's primary coal generation fleet and nuclear generating plant.
The decrease in retail access sales in 2020 was primarily due to a large customer shutting down operations.
DTE Electric expects incremental customers to move into the retail access program and for sales to return to approximately 10% in 2021.
Description
The impacts of changes in annual average customer usage are minimized by the RDM.
An excerpt. Shown here: 40 of 146 rewritten, 40 of 58 added and 40 of 106 removed. The counts are complete. For every sentence, read Cover and table of contents in the FY2021 filing and the FY2020 filing.
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters, and Issuer Purchases of Equity Securities
13 rewritten, 7 added, 7 removed, 16 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
At December 31, [removed: 2020,] [added: 2021,] there were [removed: 193,770,617] [added: 193,747,509] shares of DTE Energy common stock outstanding.
These shares were held by a total of [removed: 47,485] [added: 45,230] shareholders of record.
For information on DTE Energy dividend restrictions, see Note [removed: 17] [added: 16] to the Consolidated Financial [removed: Statements in Item 8 of this Report,] [added: Statements,] "Short-Term Credit Arrangements and Borrowings."
For additional detail, see Note [removed: 22] [added: 21] to the Consolidated Financial [removed: Statements in Item 8 of this Report,] [added: Statements,] "Stock-Based Compensation."
See the following table for information as of December 31, [removed: 2020:][added: 2021:]
| Plans approved by shareholders | | | — | | | | | | $ | — | | | | | [removed: 1,393,916] [added: 4,221,599] | | |
The following table provides information about DTE Energy's purchases of equity securities that are registered by DTE Energy pursuant to Section 12 of the Exchange Act of 1934 for the quarter ended December 31, [removed: 2020:][added: 2021:]
| Company/Index | | | | | | 2016 | | | | | | 2017 | | | | | | 2018 | | | | | | 2019 | | | | | | 2020 | | | [added: | | | 2021 | | |]
| DTE Energy Company | | | | | | [removed: 26.93] [added: 14.59] | | | | | | [removed: 14.59] [added: 4.19] | | | | | | [removed: 4.19] [added: 21.36] | | | | | | [removed: 21.36] [added: (2.90)] | | | | | | [removed: (2.90)] [added: 19.42] | | |
| S&P 500 Index | | | | | | [removed: 11.95] [added: 21.82] | | | | | | [removed: 21.82] [added: (4.39)] | | | | | | [removed: (4.39)] [added: 31.48] | | | | | | [removed: 31.48] [added: 18.39] | | | | | | [removed: 18.39] [added: 28.68] | | |
| S&P 500 Multi-Utilities Index | | | | | | [removed: 18.56] [added: 12.09] | | | | | | [removed: 12.09] [added: 1.77] | | | | | | [removed: 1.77] [added: 24.36] | | | | | | [removed: 24.36] [added: (5.87)] | | | | | | [removed: (5.87)] [added: 17.67] | | |
| Company/Index | | | | | | [removed: 2015 | | | | | | 2016] [added: 2017] | | | | | | [removed: 2017] [added: 2018] | | | | | | [removed: 2018] [added: 2019] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2020] [added: 2021] | | |
[removed: ][added: ]
| 10/01/2021 — 10/31/2021 | | | 1,028 | | | | | | $ | 108.95 | | | | | — | | | | | | — | | | | | | — | | |
| 11/01/2021 — 11/30/2021 | | | 2,653 | | | | | | $ | 105.32 | | | | | — | | | | | | — | | | | | | — | | |
| 12/01/2021 — 12/31/2021 | | | 505 | | | | | | $ | 115.23 | | | | | — | | | | | | — | | | | | | — | | |
| Total | | | 4,186 | | | | | | | | | | | | — | | | | | | | | | | | | | | |
| DTE Energy Company | | | | | | 100.00 | | | | | | 114.59 | | | | | | 119.39 | | | | | | 144.90 | | | | | | 140.69 | | | | | | 168.01 | | |
| S&P 500 Index | | | | | | 100.00 | | | | | | 121.82 | | | | | | 116.47 | | | | | | 153.14 | | | | | | 181.29 | | | | | | 233.29 | | |
| S&P 500 Multi-Utilities Index | | | | | | 100.00 | | | | | | 112.09 | | | | | | 114.07 | | | | | | 141.86 | | | | | | 133.53 | | | | | | 157.13 | | |
| 10/01/2020 — 10/31/2020 | | | 11,165 | | | | | | $ | 130.43 | | | | | — | | | | | | — | | | | | | — | | |
| 11/01/2020 — 11/30/2020 | | | 791 | | | | | | $ | 120.57 | | | | | — | | | | | | — | | | | | | — | | |
| 12/01/2020 — 12/31/2020 | | | 686 | | | | | | $ | 125.02 | | | | | — | | | | | | — | | | | | | — | | |
| Total | | | 12,642 | | | | | | | | | | | | — | | | | | | | | | | | | | | |
| DTE Energy Company | | | | | | 100.00 | | | | | | 126.93 | | | | | | 145.44 | | | | | | 151.54 | | | | | | 183.91 | | | | | | 178.57 | | |
| S&P 500 Index | | | | | | 100.00 | | | | | | 111.95 | | | | | | 136.38 | | | | | | 130.39 | | | | | | 171.44 | | | | | | 202.96 | | |
| S&P 500 Multi-Utilities Index | | | | | | 100.00 | | | | | | 118.56 | | | | | | 132.89 | | | | | | 135.24 | | | | | | 168.18 | | | | | | 158.31 | | |
Item 6. Selected Financial Data
0 rewritten, 1 added, 17 removed, 0 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
Information is no longer required as the Registrants have adopted the SEC amendment to Regulation S-K to eliminate Item 301, Selected Financial Data.
The following selected financial data of DTE Energy should be read in conjunction with the accompanying Management’s Discussion and Analysis in Item 7 of this Report and Combined Notes to Consolidated Financial Statements in Item 8 of this Report.
This information has been omitted for DTE Electric per General Instruction I (2) (a) of Form 10-K for wholly-owned subsidiaries (reduced disclosure format).
| | | | 2020 | | | | | | 2019 | | | | | | 2018 | | | | | | 2017 | | | | | | 2016 | | |
| | | | (In millions, except per share amounts) | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Operating Revenues | | | $ | 12,177 | | | | | $ | 12,669 | | | | | $ | 14,212 | | | | | $ | 12,607 | | | | | $ | 10,630 | |
| Net Income Attributable to DTE Energy Company(a) | | | $ | 1,368 | | | | | $ | 1,169 | | | | | $ | 1,120 | | | | | $ | 1,134 | | | | | $ | 868 | |
| Diluted Earnings Per Common Share | | | $ | 7.08 | | | | | $ | 6.31 | | | | | $ | 6.17 | | | | | $ | 6.32 | | | | | $ | 4.83 | |
| Financial Information | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Dividends declared per share of common stock | | | $ | 4.12 | | | | | $ | 3.85 | | | | | $ | 3.60 | | | | | $ | 3.36 | | | | | $ | 3.06 | |
| Total Assets(b) | | | $ | 45,496 | | | | | $ | 42,268 | | | | | $ | 36,288 | | | | | $ | 33,767 | | | | | $ | 32,041 | |
| Long-Term Debt(c) | | | $ | 19,001 | | | | | $ | 15,935 | | | | | $ | 12,134 | | | | | $ | 12,185 | | | | | $ | 11,269 | |
| Total DTE Energy Company Equity | | | $ | 12,425 | | | | | $ | 11,672 | | | | | $ | 10,237 | | | | | $ | 9,512 | | | | | $ | 9,011 | |
_______________________________________
(a)The 2017 results include a $105 million net income tax benefit related to the enactment of the TCJA.
(b)The 2019 increase includes $2.8 billion of Blue Union and LEAP assets acquired in December 2019.
Refer to Note 4 to the Consolidated Financial Statements in Item 8 of this Report, “Acquisitions and Dispositions,” for additional information.
(c)Long-Term Debt includes Finance lease obligations and excludes debt due within one year.
Item 8. Financial Statements and Supplementary Data
1,259 rewritten, 577 added, 613 removed, 1,558 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
| [DTE Energy — Controls and [removed: Procedures](#if45271c755f142f2b4aede2bde30dc33_64)] [added: Procedures](#ia74421c34733426cbc2b2efb9b6da345_97)] | | | [removed: [59](#if45271c755f142f2b4aede2bde30dc33_64)] [added: [52](#ia74421c34733426cbc2b2efb9b6da345_97)] | | |
| [DTE Energy — Report of Independent Registered Public Accounting [removed: Firm](#if45271c755f142f2b4aede2bde30dc33_67)] [added: Firm](#ia74421c34733426cbc2b2efb9b6da345_100) (PCAOB ID 238)] | | | [removed: [60](#if45271c755f142f2b4aede2bde30dc33_67)] [added: [53](#ia74421c34733426cbc2b2efb9b6da345_100)] | | |
| [DTE Energy — Consolidated Statements of [removed: Operations](#if45271c755f142f2b4aede2bde30dc33_70)] [added: Operations](#ia74421c34733426cbc2b2efb9b6da345_103)] | | | [removed: [62](#if45271c755f142f2b4aede2bde30dc33_70)] [added: [55](#ia74421c34733426cbc2b2efb9b6da345_103)] | | |
| [DTE Energy — Consolidated Statements of Comprehensive [removed: Income](#if45271c755f142f2b4aede2bde30dc33_73)] [added: Income](#ia74421c34733426cbc2b2efb9b6da345_106)] | | | [removed: [63](#if45271c755f142f2b4aede2bde30dc33_73)] [added: [56](#ia74421c34733426cbc2b2efb9b6da345_106)] | | |
| [DTE Energy — Consolidated Statements of Financial [removed: Position](#if45271c755f142f2b4aede2bde30dc33_79)] [added: Position](#ia74421c34733426cbc2b2efb9b6da345_109)] | | | [removed: [64](#if45271c755f142f2b4aede2bde30dc33_79)] [added: [57](#ia74421c34733426cbc2b2efb9b6da345_109)] | | |
| [DTE Energy — Consolidated Statements of Cash [removed: Flows](#if45271c755f142f2b4aede2bde30dc33_85)] [added: Flows](#ia74421c34733426cbc2b2efb9b6da345_112)] | | | [removed: [66](#if45271c755f142f2b4aede2bde30dc33_85)] [added: [58](#ia74421c34733426cbc2b2efb9b6da345_112)] | | |
| [DTE Energy — Consolidated Statements of Changes in [removed: Equity](#if45271c755f142f2b4aede2bde30dc33_88)] [added: Equity](#ia74421c34733426cbc2b2efb9b6da345_115)] | | | [removed: [67](#if45271c755f142f2b4aede2bde30dc33_88)] [added: [61](#ia74421c34733426cbc2b2efb9b6da345_115)] | | |
| [DTE Electric — Controls and [removed: Procedures](#if45271c755f142f2b4aede2bde30dc33_94)] [added: Procedures](#ia74421c34733426cbc2b2efb9b6da345_118)] | | | [removed: [68](#if45271c755f142f2b4aede2bde30dc33_94)] [added: [62](#ia74421c34733426cbc2b2efb9b6da345_118)] | | |
| [DTE Electric — Report of Independent Registered Public Accounting [removed: Firm](#if45271c755f142f2b4aede2bde30dc33_97)] [added: Firm](#ia74421c34733426cbc2b2efb9b6da345_121) (PCAOB ID 238)] | | | [removed: [69](#if45271c755f142f2b4aede2bde30dc33_97)] [added: [63](#ia74421c34733426cbc2b2efb9b6da345_121)] | | |
| [DTE Electric — Consolidated Statements of [removed: Operations](#if45271c755f142f2b4aede2bde30dc33_100)] [added: Operations](#ia74421c34733426cbc2b2efb9b6da345_124)] | | | [removed: [71](#if45271c755f142f2b4aede2bde30dc33_100)] [added: [65](#ia74421c34733426cbc2b2efb9b6da345_124)] | | |
| [DTE Electric — Consolidated Statements of Comprehensive [removed: Income](#if45271c755f142f2b4aede2bde30dc33_103)] [added: Income](#ia74421c34733426cbc2b2efb9b6da345_127)] | | | [removed: [72](#if45271c755f142f2b4aede2bde30dc33_103)] [added: [66](#ia74421c34733426cbc2b2efb9b6da345_127)] | | |
| [DTE Electric — Consolidated Statements of Financial [removed: Position](#if45271c755f142f2b4aede2bde30dc33_109)] [added: Position](#ia74421c34733426cbc2b2efb9b6da345_130)] | | | [removed: [73](#if45271c755f142f2b4aede2bde30dc33_109)] [added: [67](#ia74421c34733426cbc2b2efb9b6da345_130)] | | |
| [DTE Electric — Consolidated Statements of Cash [removed: Flows](#if45271c755f142f2b4aede2bde30dc33_115)] [added: Flows](#ia74421c34733426cbc2b2efb9b6da345_133)] | | | [removed: [75](#if45271c755f142f2b4aede2bde30dc33_115)] [added: [69](#ia74421c34733426cbc2b2efb9b6da345_133)] | | |
| [DTE Electric — Consolidated Statements of Changes in Shareholder's [removed: Equity](#if45271c755f142f2b4aede2bde30dc33_118)] [added: Equity](#ia74421c34733426cbc2b2efb9b6da345_136)] | | | [removed: [76](#if45271c755f142f2b4aede2bde30dc33_118)] [added: [70](#ia74421c34733426cbc2b2efb9b6da345_136)] | | |
[removed: | [Combined] [added: See Combined] Notes to Consolidated Financial [removed: Statements](#if45271c755f142f2b4aede2bde30dc33_121) | | | [77](#if45271c755f142f2b4aede2bde30dc33_121) | | |][added: Statements]
| [Note 1 — Organization and Basis of [removed: Presentation](#if45271c755f142f2b4aede2bde30dc33_124)] [added: Presentation](#ia74421c34733426cbc2b2efb9b6da345_142)] | | | [removed: [77](#if45271c755f142f2b4aede2bde30dc33_124)] [added: [71](#ia74421c34733426cbc2b2efb9b6da345_142)] | | |
| [Note 2 — Significant Accounting [removed: Policies](#if45271c755f142f2b4aede2bde30dc33_127)] [added: Policies](#ia74421c34733426cbc2b2efb9b6da345_145)] | | | [removed: [81](#if45271c755f142f2b4aede2bde30dc33_127)] [added: [75](#ia74421c34733426cbc2b2efb9b6da345_145)] | | |
| [Note 3 — New Accounting [removed: Pronouncements](#if45271c755f142f2b4aede2bde30dc33_133)] [added: Pronouncements](#ia74421c34733426cbc2b2efb9b6da345_148)] | | | [removed: [87](#if45271c755f142f2b4aede2bde30dc33_133)] [added: [81](#ia74421c34733426cbc2b2efb9b6da345_148)] | | |
[removed: | [Note] [added: NOTE] 4 — [removed: Acquisitions and Dispositions](#if45271c755f142f2b4aede2bde30dc33_139) | | | [89](#if45271c755f142f2b4aede2bde30dc33_139) | | |][added: DISPOSITIONS AND IMPAIRMENTS]
[removed: | [Note 7] [added: NOTE 6] — [removed: Property, Plant, and Equipment](#if45271c755f142f2b4aede2bde30dc33_154) | | | [96](#if45271c755f142f2b4aede2bde30dc33_154) | | |][added: PROPERTY, PLANT, AND EQUIPMENT]
[removed: | [Note 8] [added: NOTE 7] — [removed: Jointly-Owned Utility Plant](#if45271c755f142f2b4aede2bde30dc33_160) | | | [99](#if45271c755f142f2b4aede2bde30dc33_160) | | |][added: JOINTLY-OWNED UTILITY PLANT]
[removed: | [Note 9] [added: NOTE 8] — [removed: Asset Retirement Obligations](#if45271c755f142f2b4aede2bde30dc33_166) | | | [99](#if45271c755f142f2b4aede2bde30dc33_166) | | |][added: ASSET RETIREMENT OBLIGATIONS]
[removed: | [Note 10] [added: NOTE 9] — [removed: Regulatory Matters](#if45271c755f142f2b4aede2bde30dc33_169) | | | [101](#if45271c755f142f2b4aede2bde30dc33_169) | | |][added: REGULATORY MATTERS]
| [Note [removed: 11 —] [added: 1](#ia74421c34733426cbc2b2efb9b6da345_175)[0](#ia74421c34733426cbc2b2efb9b6da345_175) [—] Income [removed: Taxes](#if45271c755f142f2b4aede2bde30dc33_175)] [added: Taxes](#ia74421c34733426cbc2b2efb9b6da345_175)] | | | [removed: [106](#if45271c755f142f2b4aede2bde30dc33_175)] [added: [99](#ia74421c34733426cbc2b2efb9b6da345_175)] | | |
[removed: | [Note 12] [added: NOTE 11] — [removed: Earnings Per Share](#if45271c755f142f2b4aede2bde30dc33_181) | | | [110](#if45271c755f142f2b4aede2bde30dc33_181) | | |][added: EARNINGS PER SHARE]
[removed: | [Note 13] [added: NOTE 12] — [removed: Fair Value](#if45271c755f142f2b4aede2bde30dc33_187) | | | [111](#if45271c755f142f2b4aede2bde30dc33_187) | | |][added: FAIR VALUE]
[removed: | [Note 14] [added: NOTE 13] — [removed: Financial and Other Derivative Instruments](#if45271c755f142f2b4aede2bde30dc33_190) | | | [118](#if45271c755f142f2b4aede2bde30dc33_190) | | |][added: FINANCIAL AND OTHER DERIVATIVE INSTRUMENTS]
[removed: | [Note 15] [added: NOTE 14] — [removed: Long-Term Debt](#if45271c755f142f2b4aede2bde30dc33_193) | | | [123](#if45271c755f142f2b4aede2bde30dc33_193) | | |][added: LONG-TERM DEBT]
[removed: | [Note 16] [added: NOTE 15] — [removed: Preferred and Preference Securities](#if45271c755f142f2b4aede2bde30dc33_199) | | | [126](#if45271c755f142f2b4aede2bde30dc33_199) | | |][added: PREFERRED AND PREFERENCE SECURITIES]
[removed: | [Note 17] [added: NOTE 16] — [removed: Short-Term Credit Arrangements and Borrowings](#if45271c755f142f2b4aede2bde30dc33_202) | | | [126](#if45271c755f142f2b4aede2bde30dc33_202) | | |][added: SHORT-TERM CREDIT ARRANGEMENTS AND BORROWINGS]
[removed: | [Note 18] [added: NOTE 17] — [removed: Leases](#if45271c755f142f2b4aede2bde30dc33_205) | | | [128](#if45271c755f142f2b4aede2bde30dc33_205) | | |][added: LEASES]
[removed: | [Note 19] [added: NOTE 18] — [removed: Commitments and Contingencies](#if45271c755f142f2b4aede2bde30dc33_208) | | | [131](#if45271c755f142f2b4aede2bde30dc33_208) | | |][added: COMMITMENTS AND CONTINGENCIES]
[removed: | [Note 20] [added: NOTE 19] — [removed: Nuclear Operations](#if45271c755f142f2b4aede2bde30dc33_214) | | | [138](#if45271c755f142f2b4aede2bde30dc33_214) | | |][added: NUCLEAR OPERATIONS]
[removed: | [Note 21] [added: NOTE 20] — [removed: Retirement Benefits and Trusteed Assets](#if45271c755f142f2b4aede2bde30dc33_220) | | | [139](#if45271c755f142f2b4aede2bde30dc33_220) | | |][added: RETIREMENT BENEFITS AND TRUSTEED ASSETS]
[removed: | [Note 22] [added: NOTE 21] — [removed: Stock-Based Compensation](#if45271c755f142f2b4aede2bde30dc33_226) | | | [149](#if45271c755f142f2b4aede2bde30dc33_226) | | |][added: STOCK-BASED COMPENSATION]
[removed: | [Note 23] [added: NOTE 22] — [removed: Segment and Related Information](#if45271c755f142f2b4aede2bde30dc33_232) | | | [151](#if45271c755f142f2b4aede2bde30dc33_232) | | |][added: SEGMENT AND RELATED INFORMATION]
[removed: | [Note 24] [added: NOTE 23] — [removed: Related Party Transactions](#if45271c755f142f2b4aede2bde30dc33_235) | | | [153](#if45271c755f142f2b4aede2bde30dc33_235) | | |][added: RELATED PARTY TRANSACTIONS]
[removed: | [Note 25] [added: NOTE 24] — [removed: Supplementary Quarterly Financial Information (Unaudited)](#if45271c755f142f2b4aede2bde30dc33_241) | | | [155](#if45271c755f142f2b4aede2bde30dc33_241) | | |][added: SUPPLEMENTARY QUARTERLY FINANCIAL INFORMATION (UNAUDITED)]
| [Schedule II — Valuation and Qualifying [removed: Accounts](#if45271c755f142f2b4aede2bde30dc33_283)] [added: Accounts](#ia74421c34733426cbc2b2efb9b6da345_271)] | | | [removed: [170](#if45271c755f142f2b4aede2bde30dc33_283)] [added: [162](#ia74421c34733426cbc2b2efb9b6da345_271)] | | |
Management of DTE Energy carried out an evaluation, under the supervision and with the participation of DTE Energy's Chief Executive Officer (CEO) and Chief Financial Officer (CFO), of the effectiveness of the design and operation of DTE Energy's disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) as of December 31, [removed: 2020,] [added: 2021,] which is the end of the period covered by this report.
| [Combined Notes to Consolidated Financial Statements](#ia74421c34733426cbc2b2efb9b6da345_139) | | | [71](#ia74421c34733426cbc2b2efb9b6da345_139) | | |
| [Note 5 — Revenue](#ia74421c34733426cbc2b2efb9b6da345_154) | | | [85](#ia74421c34733426cbc2b2efb9b6da345_154) | | |
| Non-utility operations | | | 7,676 | | | | | | 4,578 | | | | | | 5,530 | | |
| | | | 14,964 | | | | | | 11,423 | | | | | | 12,168 | | |
| Operation and maintenance | | | 2,420 | | | | | | 2,305 | | | | | | 2,316 | | |
| Depreciation and amortization | | | 1,377 | | | | | | 1,292 | | | | | | 1,169 | | |
| Taxes other than income | | | 431 | | | | | | 395 | | | | | | 406 | | |
| | | | 13,469 | | | | | | 9,868 | | | | | | 10,738 | | |
| Operating Income | | | 1,495 | | | | | | 1,555 | | | | | | 1,430 | | |
| Interest expense | | | 630 | | | | | | 601 | | | | | | 568 | | |
| Loss on extinguishment of debt | | | 393 | | | | | | 6 | | | | | | — | | |
| Other income | | | (254) | | | | | | (259) | | | | | | (250) | | |
| | | | 839 | | | | | | 473 | | | | | | 417 | | |
| Income Before Income Taxes | | | 656 | | | | | | 1,082 | | | | | | 1,013 | | |
| Net Income from Continuing Operations | | | 786 | | | | | | 1,045 | | | | | | 942 | | |
| Net Income from Discontinued Operations, Net of Taxes (Note 4) | | | 117 | | | | | | 326 | | | | | | 230 | | |
| Continuing operations | | | (10) | | | | | | (9) | | | | | | (13) | | |
| Discontinued operations | | | 6 | | | | | | 12 | | | | | | 16 | | |
| Continuing operations | | | $ | 4.11 | | | | | $ | 5.46 | | | | | $ | 5.16 | |
| Discontinued operations | | | 0.57 | | | | | | 1.63 | | | | | | 1.16 | | |
| Total | | | $ | 4.68 | | | | | $ | 7.09 | | | | | $ | 6.32 | |
| Continuing operations | | | $ | 4.10 | | | | | $ | 5.45 | | | | | $ | 5.15 | |
| Discontinued operations | | | 0.57 | | | | | | 1.63 | | | | | | 1.16 | | |
| Total | | | $ | 4.67 | | | | | $ | 7.08 | | | | | $ | 6.31 | |
| Customer | | | 1,695 | | | | | | 1,542 | | |
| Other | | | 218 | | | | | | 185 | | |
| Current assets of discontinued operations | | | — | | | | | | 217 | | |
| | | | 3,317 | | | | | | 3,498 | | |
| | | | 2,452 | | | | | | 2,228 | | |
| | | | 26,944 | | | | | | 24,499 | | |
| Regulatory assets | | | 3,482 | | | | | | 4,125 | | |
| Notes receivable | | | 310 | | | | | | 261 | | |
| Operating lease right-of-use assets | | | 97 | | | | | | 107 | | |
| Other | | | 179 | | | | | | 126 | | |
| Noncurrent assets of discontinued operations | | | — | | | | | | 7,859 | | |
| | | | 7,006 | | | | | | 15,271 | | |
| Accounts payable | | | $ | 1,414 | | | | | $ | 1,000 | |
| Other | | | 581 | | | | | | 594 | | |
| | | | 6,346 | | | | | | 2,691 | | |
| | | | 14,531 | | | | | | 19,001 | | |
| [Note 5 — Revenue](#if45271c755f142f2b4aede2bde30dc33_145) | | | [92](#if45271c755f142f2b4aede2bde30dc33_145) | | |
| [Note 6 — Goodwill](#if45271c755f142f2b4aede2bde30dc33_151) | | | [95](#if45271c755f142f2b4aede2bde30dc33_151) | | |
February 19, 2021
| Non-utility operations | | | 5,332 | | | | | | 6,031 | | | | | | 7,542 | | |
| | | | 12,177 | | | | | | 12,669 | | | | | | 14,212 | | |
| Operation and maintenance | | | 2,443 | | | | | | 2,419 | | | | | | 2,451 | | |
| | | | 10,191 | | | | | | 10,962 | | | | | | 12,618 | | |
| Operating Income | | | 1,986 | | | | | | 1,707 | | | | | | 1,594 | | |
| Interest expense | | | 720 | | | | | | 641 | | | | | | 559 | | |
| Other income | | | (388) | | | | | | (350) | | | | | | (333) | | |
| | | | 448 | | | | | | 383 | | | | | | 378 | | |
| Income Before Income Taxes | | | 1,538 | | | | | | 1,324 | | | | | | 1,216 | | |
| | | | December 31, | | | | | | | | |
| Customer | | | 1,665 | | | | | | 1,642 | | |
| Other | | | 229 | | | | | | 209 | | |
| | | | 3,498 | | | | | | 3,086 | | |
| | | | 3,919 | | | | | | 3,788 | | |
| | | | 27,969 | | | | | | 25,317 | | |
| Goodwill | | | 2,466 | | | | | | 2,464 | | |
| Regulatory assets | | | 4,128 | | | | | | 4,171 | | |
| Other | | | 144 | | | | | | 183 | | |
| | | | 10,110 | | | | | | 10,077 | | |
| Other | | | 647 | | | | | | 504 | | |
| | | | 2,691 | | | | | | 3,997 | | |
| | | | 19,001 | | | | | | 15,935 | | |
| Operating lease liability | | | 111 | | | | | | 127 | | |
| Other | | | 371 | | | | | | 428 | | |
| | | | 11,215 | | | | | | 10,500 | | |
| Balance, December 31, 2017 | | | 179,387 | | | | | | $ | 3,989 | | | | | $ | 5,643 | | | | | $ | (120) | | | | | $ | 478 | | | | | $ | 9,990 | |
| Implementation of ASU 2016-01 | | | — | | | | | | — | | | | | | 5 | | | | | | (5) | | | | | | — | | | | | | $ | — | |
| Contribution of common stock to pension plan | | | 1,751 | | | | | | 175 | | | | | | — | | | | | | — | | | | | | — | | | | | | 175 | | |
February 19, 2021
| | | | 1,527 | | | | | | 1,357 | | |
| | | | 1,897 | | | | | | 1,699 | | |
| | | | 19,121 | | | | | | 17,573 | | |
| Other | | | 107 | | | | | | 143 | | |
| | | | 3,968 | | | | | | 3,959 | | |
| | | | 1,380 | | | | | | 1,843 | | |
| | | | 7,787 | | | | | | 6,552 | | |
| | | | 9,276 | | | | | | 8,998 | | |
An excerpt. Shown here: 40 of 1,259 rewritten, 40 of 577 added and 40 of 613 removed. The counts are complete. For every sentence, read Item 8. Financial Statements and Supplementary Data in the FY2021 filing and the FY2020 filing.
Item 9B. Other Information
0 rewritten, 0 added, 4 removed, 1 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
Part III
Information required of DTE Energy by Part III (Items 10, 11, 12, 13, and 14) of this Form 10-K is incorporated by reference from DTE Energy’s definitive Proxy Statement for its 2021 Annual Meeting of Shareholders to be held May 20, 2021.
The Proxy Statement will be filed with the SEC, pursuant to Regulation 14A, not later than 120 days after the end of DTE Energy's fiscal year covered by this report on Form 10-K, all of which information is hereby incorporated by reference in, and made part of, this Form 10-K.
Information required of DTE Electric by Part III (Items 10, 11, 12, and 13) of this Form 10-K is omitted per General Instruction I (2) (c) of Form 10-K for wholly-owned subsidiaries (reduced disclosure format).
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections
0 rewritten, 5 added, 0 removed, 0 unchanged
New section this year
Read the full itemFY2021 item · filed February 10, 2022
None.
Part III
Information required of DTE Energy by Part III (Items 10, 11, 12, 13, and 14) of this Form 10-K is incorporated by reference from DTE Energy’s definitive Proxy Statement for its 2022 Annual Meeting of Shareholders to be held May 5, 2022.
The Proxy Statement will be filed with the SEC, pursuant to Regulation 14A, not later than 120 days after the end of DTE Energy's fiscal year covered by this report on Form 10-K, all of which information is hereby incorporated by reference in, and made part of, this Form 10-K.
Information required of DTE Electric by Part III (Items 10, 11, 12, and 13) of this Form 10-K is omitted per General Instruction I (2) (c) of Form 10-K for wholly-owned subsidiaries (reduced disclosure format).
Item 14. Principal Accountant Fees and Services
4 rewritten, 1 added, 1 removed, 10 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
The following table presents fees for professional services rendered by PricewaterhouseCoopers LLP (PwC) for the audit of DTE Electric’s consolidated annual financial statements for the years ended December 31, [removed: 2020] [added: 2021] and [removed: 2019] [added: 2020] and fees billed for other services rendered by PwC during those periods.
| Audit fees(a) | | | $ | [removed: 1,492,572] [added: 1,579,000] | | | | | $ | [removed: 1,408,900] [added: 1,492,572] | |
| Audit-related fees(b) | | | [removed: 12,000] [added: 87,000] | | | | | | [removed: 52,000] [added: 12,000] | | |
| Total | | | $ | [removed: 1,504,572] [added: 1,666,000] | | | | | $ | [removed: 1,460,900] [added: 1,504,572] | |
| | | | 2021 | | | | | | 2020 | | |
| | | | 2020 | | | | | | 2019 | | |
Item 15. Exhibits and Financial Statement Schedules
53 rewritten, 7 added, 18 removed, 98 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
| [removed: [4.320](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex4320.htm)] [added: [4.1](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex41.htm)] | | | | | | Description of the [removed: Company’s: 2016 Series B 5.375% Junior Subordinated Debentures due 2076; 2016 Series F 6.00% Junior Subordinated Debentures due 2076; and] [added: Company’s] 2017 Series E 5.25% Junior Subordinated Debentures due 2077 | | | | | | X | | | | | | | | |
| [removed: [4.321](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex4321.htm)] | | | | | | [removed: Description] [added: [Description] of the Company’s 2020 Series G 4.375% Junior Subordinated Debentures due 2080 [added: (Exhibit 4.321 to DTE energy’s Form 10-K for the year ended December 31, 2020)](https://www.sec.gov/Archives/edgar/data/28385/000093634021000112/a20201231ex4321.htm)] | | | | | | X | | | | | | | | |
| [removed: [21.16](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex2116.htm)] [added: [21.1](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex211.htm)] | | | | | | Subsidiaries of DTE Energy | | | | | | X | | | | | | | | |
| [removed: [23.40](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex2340.htm)] [added: [23.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex231.htm)[1](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex231.htm)] | | | | | | Consent of PricewaterhouseCoopers LLP | | | | | | X | | | | | | | | |
| [removed: [23.41](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex2341.htm)] [added: [23.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex232.htm)[2](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex232.htm)] | | | | | | Consent of PricewaterhouseCoopers LLP | | | | | | | | | | | | X | | |
| [removed: [31.189](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex31189.htm)] [added: [31.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex311.htm)[1](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex311.htm)] | | | | | | Chief Executive Officer Section 302 Form 10-K Certification of Periodic Report | | | | | | X | | | | | | | | |
| [removed: [31.190](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex31190.htm)] [added: [31.2](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex312.htm)] | | | | | | Chief Financial Officer Section 302 Form 10-K Certification of Periodic Report | | | | | | X | | | | | | | | |
| [removed: [31.191](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex31191.htm)] [added: [31.3](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex313.htm)] | | | | | | Chief Executive Officer Section 302 Form 10-K Certification of Periodic Report | | | | | | | | | | | | X | | |
| [removed: [31.192](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex31192.htm)] [added: [31.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex314.htm)[4](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex314.htm)] | | | | | | Chief Financial Officer Section 302 Form 10-K Certification of Periodic Report | | | | | | | | | | | | X | | |
| [removed: [32.189](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex32189.htm)] [added: [32.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex321.htm)[1](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex321.htm)] | | | | | | Chief Executive Officer Section 906 Form 10-K Certification of Periodic Report | | | | | | X | | | | | | | | |
| [removed: [32.190](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex32190.htm)] [added: [32.2](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex322.htm)] | | | | | | Chief Financial Officer Section 906 Form 10-K Certification of Periodic Report | | | | | | X | | | | | | | | |
| [removed: [32.191](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex32191.htm)] [added: [32.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex323.htm)[3](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex323.htm)] | | | | | | Chief Executive Officer Section 906 Form 10-K Certification of Periodic Report | | | | | | | | | | | | X | | |
| [removed: [32.192](https://www.sec.gov/Archives/edgar/data/936340/000093634021000112/a20201231ex32192.htm)] [added: [32.](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex324.htm)[4](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex324.htm)] | | | | | | Chief Financial Officer Section 906 Form 10-K Certification of Periodic Report | | | | | | | | | | | | X | | |
| | | | | | | [removed: [Supplemental Indenture,] [added: [Sixth Supplemental Indenture] dated as of April 1, [removed: 2003,] [added: 2008, to the Indenture dated as of June 1, 1998] between [removed: DTE Energy] [added: Michigan Consolidated Gas] Company and [removed: The Bank of New York, as] [added: Citibank, N.A.,] trustee (Exhibit [removed: 4(o)] [added: 4-241] to DTE Energy’s Form 10-Q for the quarter ended March 31, [removed: 2003). (2003 Series A 6 3/8%] [added: 2008). (](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w241.htm)[6.44%] Senior [removed: Notes] [added: Notes, 2008 Series C] due [removed: 2033)](http://www.sec.gov/Archives/edgar/data/936340/000095012403001785/k76745exv4wxoy.txt)] [added: 2023)](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w241.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [Supplemental [removed: Indenture,] [added: Indenture] dated as of [removed: December] [added: August] 1, [removed: 2013,] [added: 2020, to the Amended and Restated Indenture, dated as of April 9, 1924,] between DTE Energy [added: Company] and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit [removed: 4-282] [added: 4-318] to DTE Energy’s Form [removed: 10-K] [added: 10-Q] for the [removed: year] [added: quarter] ended [removed: December 31, 2013). (2013] [added: September 30, 2020). (2020] Series [removed: F Senior Notes due 2023)](http://www.sec.gov/Archives/edgar/data/936340/000093634014000014/a20131231ex4-282.htm)] [added: F)](https://www.sec.gov/Archives/edgar/data/0000936340/000093634020000256/a20200930ex4318.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [Supplemental [removed: Indenture,] [added: Indenture] dated as of [removed: May] [added: October] 1, [removed: 2014,] [added: 2020, to the Amended and Restated Indenture, dated as of April 9, 1924,] between DTE Energy Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit [removed: 4-284] [added: 4-319] to DTE Energy’s Form 10-Q for the quarter ended [removed: June] [added: September] 30, [removed: 2014). (2014] [added: 2020). (2020] Series [removed: C due 2024)](http://www.sec.gov/Archives/edgar/data/936340/000093634014000082/a20140630ex4284.htm)] [added: H)](https://www.sec.gov/Archives/edgar/data/0000936340/000093634020000256/a20200930ex4319.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [Supplemental Indenture, dated as of [removed: May 15, 2016,] [added: September 1, 2020, to the Amended and Restated Indenture, dated as of April 9, 2001, by and] between DTE Energy Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit 4.1 to DTE [removed: Energy’s] [added: Energy's] Form 8-K dated [removed: May 27, 2016). (2016] [added: October 1, 2020). (2020] Series [removed: B)](http://www.sec.gov/Archives/edgar/data/936340/000093634016000331/exhibit41supplementalinden.htm)] [added: G)](https://www.sec.gov/Archives/edgar/data/0000936340/000093634020000240/a2020seriesgsupplement.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [Supplemental [removed: Indenture,] [added: Indenture] dated as of [removed: June] [added: March] 1, [removed: 2016,] [added: 2021, to the Mortgage and Deed of Trust dated as of October 1, 1924,] between DTE [removed: Energy] [added: Electric] Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit [removed: 4-294] [added: 4-323] to DTE Energy’s Form 10-Q for the quarter ended [removed: June 30, 2016). (2015] [added: March 31, 2021). (2021 Green] Series [removed: BR)](http://www.sec.gov/Archives/edgar/data/28385/000093634016000370/a20160630ex4294.htm)] [added: A and B)](https://www.sec.gov/Archives/edgar/data/28385/000093634021000154/a20210331ex4323.htm)] | | | | | | X | | | | | | [added: X] | | |
| | | | | | | [Supplemental Indenture, dated as of [removed: December] [added: November] 1, [removed: 2016,] [added: 2021,] to the Amended and Restated Indenture, dated as of April 9, 2001, by and between DTE Energy Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit 4.1 to DTE [removed: Energy’s] [added: Energy's] Form 8-K dated [removed: December 7, 2016). (2016] [added: November 24, 2021). (2021] Series [removed: F)](http://www.sec.gov/Archives/edgar/data/936340/000093634016000405/exhibit41.htm)] [added: E)](https://www.sec.gov/Archives/edgar/data/0000936340/000093634021000248/exhibit41-supplementalinde.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [Supplemental [removed: Indenture] [added: Indenture,] dated as of August [removed: 1, 2018,] [added: 15, 2011,] to the [removed: Amended] [added: Mortgage] and [removed: Restated Indenture,] [added: Deed of Trust,] dated as of [removed: April 9,] [added: October 1,] 1924, between [removed: DTE Energy] [added: The Detroit Edison] Company and The Bank of New York Mellon Trust Company, [removed: N.A.,] [added: N.A.] as successor trustee (Exhibit [removed: 4-301] [added: 4-277] to [removed: DTE Energy’s] [added: Detroit Edison's] Form 10-Q for the quarter ended September 30, [removed: 2018). (2018] [added: 2011). (2011] Series [removed: D)](http://www.sec.gov/Archives/edgar/data/28385/000093634018000233/a20180930ex4301.htm)] [added: D,](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2772011seriesdefsupplem.htm) [E,](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2772011seriesdefsupplem.htm) [and](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2772011seriesdefsupplem.htm) [F)](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2772011seriesdefsupplem.htm)] | | | | | | X | | | | | | [added: X] | | |
| | | | | | | [removed: [Supplemental] [added: [Fifty-first Supplemental] Indenture dated as of August 1, 2020, to [removed: the Amended] [added: Indenture of Mortgage] and [removed: Restated Indenture,] [added: Deed of Trust,] dated as of [removed: April 9, 1924,] [added: March 1, 1944,] between DTE [removed: Energy] [added: Gas] Company and [removed: The Bank of New York Mellon Trust Company,] [added: Citibank,] N.A., [removed: as successor] trustee (Exhibit [removed: 4-318] [added: 4-317] to DTE Energy’s Form 10-Q for the quarter ended September 30, 2020). (2020 Series [removed: F)](https://www.sec.gov/Archives/edgar/data/28385/000093634020000256/a20200930ex4318.htm)] [added: D and E)](https://www.sec.gov/Archives/edgar/data/0000936340/000093634020000256/a20200930ex4317.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [removed: [Supplemental Indenture] [added: [Forty-eighth Supplemental Indenture,] dated as of [removed: October] [added: September] 1, [removed: 2020,] [added: 2017] to [removed: the Amended] [added: Indenture of Mortgage] and [removed: Restated Indenture,] [added: Deed of Trust] dated as of [removed: April 9, 1924,] [added: March 1, 1944] between DTE [removed: Energy] [added: Gas] Company and [removed: The Bank of New York Mellon Trust Company, N.A., as successor trustee] [added: Citibank, N.A.] (Exhibit [removed: 4-319] [added: 10-108] to DTE Energy’s Form 10-Q for the quarter ended September 30, [removed: 2020). (2020] [added: 2017). (2017 First Mortgage Bonds] Series [removed: H)](https://www.sec.gov/Archives/edgar/data/28385/000093634020000256/a20200930ex4319.htm)] [added: C and D)](http://www.sec.gov/Archives/edgar/data/28385/000093634017000242/dtegas48thsupplementalinde.htm)] | | | | | | X | | | | | | | | |
| | | | | | | [removed: [Supplemental] [added: [Thirty-ninth Supplemental] Indenture, dated as of [removed: August] [added: April] 1, [removed: 2011,] [added: 2008] to [removed: the] [added: Indenture of] Mortgage and Deed of [removed: Trust,] [added: Trust] dated as of [removed: October] [added: March] 1, [removed: 1924,] [added: 1944] between [removed: The Detroit Edison] [added: Michigan Consolidated Gas] Company and [removed: The Bank of New York Mellon Trust Company, N.A. as successor] [added: Citibank, N.A.,] trustee (Exhibit [removed: 4-276] [added: 4-240] to [removed: Detroit Edison's] [added: DTE Energy’s] Form 10-Q for the quarter ended [removed: September 30, 2011). (2011 Series GT)](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2762011gtsupplementalmo.htm)] [added: March 31, 2008). (2008 Series](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w240.htm) [C Collateral Bonds)](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w240.htm)] | | | | | | X | | | | | | [removed: X] | | |
| [added: [4.3](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex43.htm)] | | | | | | [removed: [Fifty-first] [added: Fifty-second] Supplemental Indenture dated as of [removed: August] [added: November] 1, [removed: 2020,] [added: 2021,] to Indenture of Mortgage and Deed of Trust, dated as of March 1, 1944, between DTE Gas Company and Citibank, N.A., [removed: trustee (Exhibit 4-317 to DTE Energy’s Form 10-Q for the quarter ended](https://www.sec.gov/Archives/edgar/data/28385/000093634020000256/a20200930ex4317.htm) [September 30](https://www.sec.gov/Archives/edgar/data/28385/000093634020000256/a20200930ex4317.htm)[, 2020). (2020] [added: trustee. (2021] Series [removed: D] [added: C] and [removed: E)](https://www.sec.gov/Archives/edgar/data/28385/000093634020000256/a20200930ex4317.htm)] [added: D)] | | | | | | X | | | | | | | | |
| 10(a) | | | | | | [Form of Indemnification Agreement between DTE Energy Company and [removed: each of Gerard M. Anderson, JoAnn Chavez, David E. Meador, Gerardo Norcia](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm)[, David Ruud](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm) [](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm)[and] [added: each](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm) [Executive Officer](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm) [and] non-employee [removed: Directors (Exhibit] [added: Director](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm) [(Exhibit] 10-1 to DTE Energy’s Form 8-K dated December 6, 2007)](http://www.sec.gov/Archives/edgar/data/936340/000095012407006171/k22182exv10w1.htm) | | | | | | X | | | | | | | | |
| 10(e) | | | | | | [DTE Energy Company Long-Term Incentive Plan Amended and Restated Effective May [removed: 3, 2018] [added: 20, 2021] (Exhibit [removed: 4-3] [added: 4.3] to DTE Energy's Form S-8 filed on [removed: June 27, 2018)](http://www.sec.gov/Archives/edgar/data/936340/000093634018000169/exhibit43amendedandrestate.htm)] [added: December 21, 2021)](https://www.sec.gov/Archives/edgar/data/936340/000093634021000261/s-82021ltipexhibit43.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(f)] [added: 10(k)] | | | | | | [DTE Energy Company [removed: Retirement] Plan for [removed: Non-Employee] [added: Deferring the Payment of] Directors' Fees [removed: (as] [added: as] Amended and [removed: Restated] [added: Restated,] effective as of [removed: December 31, 1998)] [added: January 1, 2005] (Exhibit [removed: 10-31] [added: 10.79] to DTE Energy’s Form 10-K for the year ended December 31, [removed: 1998)](http://www.sec.gov/Archives/edgar/data/28385/0000950124-99-001483.txt)] [added: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w79.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(g)] [added: 10(h)] | | | | | | [removed: [The Detroit Edison] [added: [DTE Energy] Company Supplemental [removed: Long-Term Disability Plan, dated] [added: Retirement Plan as Amended and Restated, effective as of] January [removed: 27, 1997] [added: 1, 2005] (Exhibit [removed: 10-4] [added: 10.76] to [removed: The Detroit Edison Company’s] [added: DTE Energy’s] Form 10-K for the year ended December 31, [removed: 1996)](http://www.sec.gov/Archives/edgar/data/28385/0000950124-97-001779.txt)] [added: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w76.htm)] | | | | | | X | | | | | | [removed: X] | | |
| [removed: 10(h)] [added: 10(f)] | | | | | | [removed: [Description] [added: [DTE Energy Affiliates Nonqualified Plans Master Trust, effective as] of [removed: Executive Life Insurance Plan] [added: August 15, 2013] (Exhibit [removed: 10-47] [added: 10-87] to DTE Energy’s Form 10-Q for the quarter ended [removed: June] [added: September] 30, [removed: 2002)](http://www.sec.gov/Archives/edgar/data/936340/000095012402002753/k70722exv10w47.txt)] [added: 2013)](http://www.sec.gov/Archives/edgar/data/936340/000093634013000138/a2013930ex1087.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(i)] | | | | | | [removed: [DTE] [added: [First Amendment to DTE] Energy Affiliates Nonqualified Plans Master Trust, effective as of [removed: August] [added: March] 15, [removed: 2013] [added: 2015] (Exhibit [removed: 10-87] [added: 10-94] to DTE Energy’s Form 10-Q for the quarter ended [removed: September 30, 2013)](http://www.sec.gov/Archives/edgar/data/936340/000093634013000138/a2013930ex1087.htm)] [added: March 15, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634015000075/a20150331ex1094.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(j)] | | | | | | [First [removed: Amendment] [added: Amendment, dated as of June 25, 2015,] to [added: the] DTE Energy [removed: Affiliates Nonqualified Plans Master Trust,] [added: Company Plan for Deferring the Payment of Directors’ Fees (as Amended and Restated] effective as of [removed: March 15, 2015] [added: January 1, 2005)] (Exhibit [removed: 10-94] [added: 10.95] to DTE Energy’s Form 10-Q for the quarter ended [removed: March 15, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634015000075/a20150331ex1094.htm)] [added: June 30, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634015000122/a20150630ex1095.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(l)] [added: 10(g)] | | | | | | [DTE Energy Company Executive Supplemental Retirement Plan as Amended and Restated, effective as of January 1, 2005 (Exhibit 10.75 to DTE Energy’s Form 10-K for the year ended December 31, 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w75.htm) | | | | | | X | | | | | | | | |
| [removed: 10(m)] | | | | | | [First Amendment to the DTE Energy Company Executive Supplemental Retirement Plan (Amended and Restated Effective January 1, 2005) dated as of December 2, 2009 (Exhibit 10.1 to DTE Energy’s Form 8-K dated December 8, 2009)](http://www.sec.gov/Archives/edgar/data/936340/000095012309069237/c93432exv10w1.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Fourth Amendment to the DTE Energy Company Executive Supplemental Retirement Plan (Amended and Restated Effective January 1, 2005) dated as of March [removed: 13,] [added: 23,] 2020 (Exhibit 10.109 to DTE Energy’s Form 10-Q for the quarter ended March 31, 2020)](https://www.sec.gov/Archives/edgar/data/28385/000093634020000171/a20200331ex10109.htm) | | | | | | X | | | | | | | | |
| [added: 10(i)] | | | | | | [DTE Energy Company Supplemental [removed: Retirement] [added: Savings] Plan as Amended and Restated, effective as of January 1, 2005 (Exhibit [removed: 10.76] [added: 10.77] to DTE Energy’s Form 10-K for the year ended December 31, [removed: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w76.htm)] [added: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w77.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(n)] | | | | | | [First Amendment to the DTE Energy Company Supplemental Retirement Plan (Amended and Restated, effective as of January 1, 2005) dated as of March 19, 2013 (Exhibit 10.92 to Form DTE Energy’s 10-K for the year ended December 31, 2014)](http://www.sec.gov/Archives/edgar/data/936340/000093634015000014/a20141231ex1092.htm) | | | | | | X | | | | | | | | |
| [added: 10(j)] | | | | | | [DTE Energy Company [removed: Supplemental Savings] [added: Executive Deferred Compensation] Plan as Amended and Restated, effective as of January 1, 2005 (Exhibit [removed: 10.77] [added: 10.78] to DTE Energy’s Form 10-K for the year ended December 31, [removed: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w77.htm)] [added: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w78.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(o)] | | | | | | [removed: [Second] [added: [First] Amendment to the DTE Energy Supplemental Savings Plan dated as of November 13, 2012 (Exhibit 10.81 to DTE Energy’s Form 10-K for the year ended December 31, 2012)](http://www.sec.gov/Archives/edgar/data/936340/000093634013000028/a20121231ex1081.htm) | | | | | | X | | | | | | | | |
| | | | | | | [removed: [DTE] [added: [First Amendment to DTE] Energy Company Executive Deferred Compensation Plan as Amended and Restated, effective as of January 1, [removed: 2005] [added: 2005, dated as of February 4, 2016] (Exhibit [removed: 10.78] [added: 10.98] to DTE Energy’s Form 10-K for the year ended December 31, [removed: 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w78.htm)] [added: 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634016000243/a20151231ex1098.htm)] | | | | | | X | | | | | | | | |
| [removed: 10(p)] | | | | | | [removed: [First] [added: [Fifth] Amendment to [added: the] DTE Energy Company Executive [removed: Deferred Compensation] [added: Supplemental Retirement] Plan [removed: as Amended] [added: (Amended] and [removed: Restated, effective as of] [added: Restated Effective] January 1, [removed: 2005,] [added: 2005)] dated as of [removed: February 4, 2016] [added: May 5, 2021] (Exhibit [removed: 10.98] [added: 10.119] to DTE Energy’s Form [removed: 10-K] [added: 10-Q] for the [removed: year] [added: quarter] ended [removed: December 31, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634016000243/a20151231ex1098.htm)] [added: June 30, 2021)](https://www.sec.gov/Archives/edgar/data/28385/000093634021000211/a20210630ex10119.htm)] | | | | | | X | | | | | | | | |
| [4.2](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex42.htm) | | | | | | Description of the Company’s 2021 Series E 4.375% Junior Subordinated Debentures due 2081 | | | | | | X | | | | | | | | |
| [10.7](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex107.htm) | | | | | | Third Amendment to the DTE Energy Company Supplemental Retirement Plan (Amended and Restated, effective as of January 1, 2005) dated as of February 23, 2018 | | | | | | X | | | | | | | | |
| [10.8](https://www.sec.gov/Archives/edgar/data/936340/000093634022000077/a20211231ex108.htm) | | | | | | Fourth Amendment to the DTE Energy Company Supplemental Retirement Plan (Amended and Restated, effective as of January 1, 2005) dated as of November 16, 2021 | | | | | | X | | | | | | | | |
| 2(a) | | | | | | [Separation and Distribution Agreement, dated June 25, 2021, between DTE Energy Company and DT Midstream, Inc. (Exhibit 2.1 to DTE Energy’s Form 8-K dated July 1, 2021).](https://www.sec.gov/Archives/edgar/data/936340/000119312521205726/d139921dex21.htm) | | | | | | X | | | | | | | | |
| 10(q) | | | | | | [Transition Services Agreement, dated June 25, 2021, between DTE Energy Company and DT Midstream, Inc. (Exhibit 10.1 to DTE Energy Company’s Form 8-K filed on July 1, 2021)](https://www.sec.gov/Archives/edgar/data/936340/000119312521205726/d139921dex101.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Tax Matters Agreement, dated June 25, 2021, between DTE Energy Company and DT Midstream, Inc. (Exhibit 10.2 to DTE Energy Company’s Form 8-K filed on July 1, 2021)](https://www.sec.gov/Archives/edgar/data/936340/000119312521205726/d139921dex102.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Employee Matters Agreement, dated June 25, 2021, between DTE Energy Company and DT Midstream, Inc. (Exhibit 10.3 to DTE Energy Company’s Form 8-K filed on July 1, 2021)](https://www.sec.gov/Archives/edgar/data/936340/000119312521205726/d139921dex103.htm) | | | | | | X | | | | | | | | |
| Exhibit Number | | | | | | Description | | | | | | DTE Energy | | | | | | DTE Electric | | |
| | | | | | | [Supplemental Indenture, dated as of May 1, 1991, to the Mortgage and Deed of Trust, dated as of October 1, 1924, between The Detroit Edison Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit 4-178 to Detroit Edison's Form 10-K for the year ended December 31, 1996). (1991 Series CP)](http://www.sec.gov/Archives/edgar/data/28385/0000950124-97-001779.txt) | | | | | | X | | | | | | X | | |
| | | | | | | [Supplemental Indenture, dated as of May 15, 1991, to the Mortgage and Deed of Trust, dated as of October 1, 1924, between The Detroit Edison Company and The Bank of New York Mellon Trust Company, N.A., as successor trustee (Exhibit 4-179 to Detroit Edison's Form 10-K for the year ended December 31, 1996). (1991 Series DP)](http://www.sec.gov/Archives/edgar/data/28385/0000950124-97-001779.txt) | | | | | | X | | | | | | X | | |
| | | | | | | [Supplemental Indenture, dated as of May 15, 2011, to the Mortgage and Deed of Trust, dated as of October 1, 1924, between The Detroit Edison Company and The Bank of New York Mellon Trust Company, N.A. as successor trustee (Exhibit 4-275 to Detroit Edison's Form 10-Q for the quarter ended June 30, 2011). (2011 Series B)](http://www.sec.gov/Archives/edgar/data/28385/000002838511000005/exhibit4-275.htm) | | | | | | X | | | | | | X | | |
| | | | | | | [Supplemental Indenture, dated as of August 15, 2011, to the Mortgage and Deed of Trust, dated as of October 1, 1924, between The Detroit Edison Company and The Bank of New York Mellon Trust Company, N.A. as successor trustee (Exhibit 4-277 to Detroit Edison's Form 10-Q for the quarter ended September 30, 2011). (2011 Series D, 2011 Series E, 2011 Series F)](http://www.sec.gov/Archives/edgar/data/28385/000002838511000010/a4-2772011seriesdefsupplem.htm) | | | | | | X | | | | | | X | | |
| | | | | | | [Fifth Supplemental Indenture dated as of October 1, 2004, to the Indenture dated as of June 1, 1998 between Michigan Consolidated Gas Company and Citibank, N.A., trustee (Exhibit 4-6 to Michigan Consolidated Gas Company Form 10-Q for the quarter ended September 31, 2004). (5.00% Senior Notes, 2004 Series E due 2019)](http://www.sec.gov/Archives/edgar/data/65632/000095012404005400/k88640exv4w6.txt) | | | | | | X | | | | | | | | |
| | | | | | | [Sixth Supplemental Indenture dated as of April 1, 2008, to the Indenture dated as of June 1, 1998 between Michigan Consolidated Gas Company and Citibank, N.A., trustee (Exhibit 4-241 to DTE Energy’s Form 10-Q for the quarter ended March 31, 2008). (6.04% Senior Notes, 2008 Series B due 2018 and 6.44% Senior Notes, 2008 Series C due 2023)](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w241.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Thirty-ninth Supplemental Indenture, dated as of April 1, 2008 to Indenture of Mortgage and Deed of Trust dated as of March 1, 1944 between Michigan Consolidated Gas Company and Citibank, N.A., trustee (Exhibit 4-240 to DTE Energy’s Form 10-Q for the quarter ended March 31, 2008). (2008 Series B and C Collateral Bonds)](http://www.sec.gov/Archives/edgar/data/936340/000095012408002371/k26447exv4w240.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Forty-eight Supplemental Indenture, dated as of September 1, 2017 to Indenture of Mortgage and Deed of Trust dated as of March 1, 1944 between DTE Gas Company and Citibank, N.A. (Exhibit 10-108 to DTE Energy’s Form 10-Q for the quarter ended September 30, 2017). (2017 First Mortgage Bonds Series C and D)](http://www.sec.gov/Archives/edgar/data/28385/000093634017000242/dtegas48thsupplementalinde.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Form of Director Restricted Stock Agreement (Exhibit 10.1 to DTE Energy’s Form 8-K dated June 23, 2005)](http://www.sec.gov/Archives/edgar/data/936340/000095012405004022/k96274exv10w1.htm) | | | | | | X | | | | | | | | |
| 10(k) | | | | | | [Form of Director Restricted Stock Agreement pursuant to the DTE Energy Company Long-Term Incentive Plan (Exhibit 10.1 to DTE Energy’s Form 8-K dated June 29, 2006)](http://www.sec.gov/Archives/edgar/data/936340/000095012406003574/k06412exv10w1.htm) | | | | | | X | | | | | | | | |
| | | | | | | [DTE Energy Company Plan for Deferring the Payment of Directors' Fees as Amended and Restated, effective as of January 1, 2005 (Exhibit 10.79 to DTE Energy’s Form 10-K for the year ended December 31, 2008)](http://www.sec.gov/Archives/edgar/data/936340/000095015209001957/k47322exv10w79.htm) | | | | | | X | | | | | | | | |
| 10(q) | | | | | | [First Amendment, dated as of June 25, 2015, to the DTE Energy Company Plan for Deferring the Payment of Directors’ Fees (as Amended and Restated effective as of January 1, 2005) (Exhibit 10.95 to DTE Energy’s Form 10-Q for the quarter ended June 30, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634015000122/a20150630ex1095.htm) | | | | | | X | | | | | | | | |
| 10(t) | | | | | | [Request for Extension of Termination Date, dated as of April 16, 2017, to the Third Amended and Restated Five-Year Credit Agreement, dated as of October 21, 2011, amended and restated as of April 5, 2013, and amended and restated as of April 16, 2015, by and among DTE Gas the lenders party thereto, JPMorgan Chase Bank, N.A., as Administrative Agent, and Barclays Bank PLC, Citibank, N.A. and Bank of America, N.A., as Co-Syndication Agents (Exhibit 10.105 to DTE Energy’s Form 10-Q for the quarter ended June 30, 2017)](http://www.sec.gov/Archives/edgar/data/28385/000093634017000199/a20170630ex10105.htm) | | | | | | X | | | | | | | | |
| | | | | | | [Form of Third Amended and Restated DTE Electric Company Five-Year Credit Agreement, dated as of October 21, 2011 and amended and restated as of April 16, 2015, by and among DTE Electric Company, the lenders party thereto, Barclays Bank PLC, as Administrative Agent, and Citibank N.A., JPMorgan Chase Bank, N.A., and Wells Fargo Bank, National Association as Co-Syndication Agents (Exhibit 10.01 to DTE Energy Company's and DTE Electric Company's Form 8-K filed on April 21, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634015000068/exhibit1001.htm) | | | | | | X | | | | | | X | | |
| 10(u) | | | | | | [Request for Extension of Termination Date, dated as of April 16, 2017, to the Third Amended and Restated Five-Year Credit Agreement, dated as of October 21, 2011, amended and restated as of April 5, 2013, and further amended and restated as of April 16, 2015, by and among DTE Electric Company, the lenders party thereto, Barclays Bank PLC., as Administrative Agent, and Citibank, N.A., JPMorgan Chase Bank, N.A. and Wells Fargo Bank, National Association as Co-Syndication Agents (Exhibit 10.106 to DTE Energy’s and DTE Electric Company's Form 10-Q for the quarter ended June 30, 2017)](http://www.sec.gov/Archives/edgar/data/28385/000093634017000199/a20170630ex10106.htm) | | | | | | X | | | | | | X | | |
| 10(w) | | | | | | [First Amendment to DTE Energy Company Executive Performance Plan Effective May 7, 2015, dated as of February 3, 2016 (Exhibit 10.97 to DTE Energy's Form 10-K for the year ended December 31, 2015)](http://www.sec.gov/Archives/edgar/data/28385/000093634016000243/a20151231ex1097.htm) | | | | | | X | | | | | | | | |
| 10(dd) | | | | | | [Term Loan Agreement, dated as of April 16, 2020, by and among DTE Electric Company and the lenders party thereto, Mizuhu Bank, Ltd. as Administrative Agent, Lead Arranger and Sole Book Runner (Exhibit 10.114 to DTE Energy’s Form 10-Q for the quarter ended March 31, 2020)](https://www.sec.gov/Archives/edgar/data/28385/000093634020000171/a20200331ex10114.htm) | | | | | | X | | | | | | X | | |
An excerpt. Shown here: 40 of 53 rewritten, all 7 added and all 18 removed. The counts are complete. For every sentence, read Item 15. Exhibits and Financial Statement Schedules in the FY2021 filing and the FY2020 filing.
Item 16. Form 10-K Summary
21 rewritten, 3 added, 3 removed, 48 unchanged
Read the full itemFY2021 item · filed February 10, 2022FY2020 item · filed February 19, 2021
| | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2018] [added: 2019] | | |
| Balance at Beginning of Period | | | $ | [removed: 91] [added: 57] | | | | | $ | [removed: 91] [added: 46] | | | | | $ | [removed: 49] [added: 53] | |
| Charged to costs and expenses | | | [removed: 103] [added: 54] | | | | | | [removed: 111] [added: 105] | | | | | | [removed: 140] [added: 103] | | |
| Charged to other accounts(a) | | | [removed: 50] [added: 61] | | | | | | [removed: 56] [added: 50] | | | | | | [removed: 55] [added: 56] | | |
| Balance at End of Period | | | $ | [removed: 104] [added: 92] | | | | | $ | [removed: 91] [added: 104] | | | | | $ | [removed: 91] [added: 83] | |
(a)Collection of accounts previously written [removed: off.][added: off]
| | | | [removed: 2020] [added: 2021] | | | | | | [removed: 2019] [added: 2020] | | | | | | [removed: 2018] [added: 2019] | | |
| Balance at Beginning of Period | | | $ | [removed: 46] [added: 104] | | | | | $ | [removed: 53] [added: 83] | | | | | $ | [removed: 31] [added: 91] | |
| Charged to costs and expenses | | | [removed: 61] [added: 36] | | | | | | [removed: 65] [added: 61] | | | | | | [removed: 85] [added: 65] | | |
| Charged to other accounts(a) | | | [removed: 30] [added: 38] | | | | | | [removed: 36] [added: 30] | | | | | | 36 | | |
| Deductions(b) | | | [removed: (80)] [added: (77)] | | | | | | [removed: (108)] [added: (80)] | | | | | | [removed: (99)] [added: (108)] | | |
| Balance at End of Period | | | $ | [removed: 57] [added: 54] | | | | | $ | [removed: 46] [added: 57] | | | | | $ | [removed: 53] [added: 46] | |
| | | | | | | Gerardo Norcia [removed: President and] Chief Executive Officer | | |
Date: February [removed: 19, 2021][added: 10, 2022]
| | | | [removed: Mark C. Rolling Vice President, Controller, and] [added: Tracy J. Myrick] Chief Accounting Officer (Principal Accounting Officer) | | | | | | | | | Ruth G. Shaw, Director | | |
Date: February [removed: 19, 2021][added: 10, 2022]
Date: February [removed: 19, 2021][added: 10, 2022]
| | | | Gerardo Norcia [removed: President,] Chief Executive Officer, and Director (Principal Executive Officer) | | | | | | | | | David Ruud Chief Financial Officer, and Director (Principal Financial Officer) | | |
| | | | [removed: Mark C. Rolling Vice President, Controller, and] [added: Tracy J. Myrick] Chief Accounting Officer (Principal Accounting Officer) | | | | | | | | | JoAnn Chavez, Director | | |
Date: February [removed: 19, 2021][added: 10, 2022]
No annual report, proxy statement, form of proxy, or other proxy soliciting material has been sent to security holders of DTE Electric Company during the period covered by this Annual Report on Form 10-K for the fiscal year ended December 31, [removed: 2020.][added: 2021.]
| Deductions(b) | | | (127) | | | | | | (134) | | | | | | (167) | | |
| By: | | | /S/ TRACY J. MYRICK | | | | | | By: | | | /S/ RUTH G. SHAW | | |
| By: | | | /S/ TRACY J. MYRICK | | | | | | By: | | | /S/ JOANN CHAVEZ | | |
| Deductions(b) | | | (140) | | | | | | (167) | | | | | | (153) | | |
| By: | | | /S/ MARK C. ROLLING | | | | | | By: | | | /S/ RUTH G. SHAW | | |
| By: | | | /S/ MARK C. ROLLING | | | | | | By: | | | /S/ JOANN CHAVEZ | | |