Overview
Consolidated Edison, Inc. (Con Edison), incorporated in New York State in 1997, is a holding company that owns all of the outstanding common stock of Consolidated Edison Company of New York, Inc. (CECONY), Orange and Rockland Utilities, Inc. (O&R) and Con Edison Transmission, Inc. As used in this report, the term the “Companies” refers to Con Edison and CECONY.
| Con Edison | ||||||||||||||||||||||||||
| CECONY | O&R | Con Edison Transmission | ||||||||||||||||||||||||
| •RECO | ||||||||||||||||||||||||||
Con Edison’s principal business operations are those of CECONY, O&R and Con Edison Transmission. CECONY’s principal business operations are its regulated electric, gas and steam delivery businesses. O&R’s principal business operations are its regulated electric and gas delivery businesses. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets while seeking to develop electric transmission projects. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses and therefore 2023 reflects the financial results for the two months ended February 2023. See Note W and Note X to the financial statements in Item 8.
Con Edison seeks to provide shareholder value through continued dividend growth, supported by earnings growth in regulated utilities and contracted electric transmission assets. The company invests to provide reliable, resilient, safe and clean energy critical for its New York customers. Con Edison is a responsible neighbor, helping the communities it serves become more sustainable.
CECONY
Electric
CECONY provides electric service to approximately 3.7 million customers in all of New York City (except a part of Queens) and most of Westchester County, an approximately 660 square mile service area with a population of more than nine million.
Gas
CECONY delivers gas to approximately 1.1 million customers in Manhattan, the Bronx, parts of Queens and most of Westchester County.
Steam
CECONY operates the largest steam distribution system in the United States by producing and delivering approximately 15,444 MMlb of steam annually to approximately 1,530 customers in parts of Manhattan.
| 14 | CON EDISON ANNUAL REPORT 2023 |
O&R
Electric
O&R and its utility subsidiary, Rockland Electric Company (RECO) (together referred to herein as O&R) provide electric service to approximately 0.3 million customers in southeastern New York and northern New Jersey, an approximately 1,300 square mile service area.
Gas
O&R delivers gas to over 0.2 million customers in southeastern New York.
Con Edison Transmission
Con Edison Transmission owns a 45.7 percent interest in New York Transco LLC (New York Transco), a New York limited liability company that was formed in November 2014 by affiliates of the four investor-owned electric utilities in New York, including Con Edison Transmission, to develop and own new electric transmission projects for the New York bulk electric system. Con Edison Transmission’s ownership interest in New York Transco is comprised of: (1) a 45.7 percent interest in New York Transco's Transmission Owner Transmission Solutions, a group of three electric power bulk transmission projects, (2) a 45.7 percent interest in New York Transco’s New York Energy Solution, an electric transmission project built to relieve transmission congestion between upstate and downstate New York, and a 41.7 percent interest in New York Transco’s share of Propel NY Energy, a proposed electric transmission project expected to deliver offshore wind electricity and increase high voltage transmission connections between Long Island and the rest of New York State.
Con Edison Transmission also owns a 71.2 percent interest in Honeoye Storage Corporation (Honeoye), a gas storage facility in upstate New York, with the remaining 28.8 percent held by CECONY. In addition, Con Edison Transmission owns a 7.9 percent interest (that is expected to be reduced to approximately 7.0 percent based on Con Edison Transmission’s previous capping of its cash contributions to the joint venture) in Mountain Valley Pipeline LLC, a joint venture developing a proposed 300-mile gas transmission project in West Virginia and Virginia.
Utility Regulation
State Utility Regulation
Regulators
The Utilities are subject to regulation by the NYSPSC, that under the New York Public Service Law, is authorized to set the terms of service and the rates the Utilities charge for providing service in New York. See “Rate Plans,” below and in Note B to the financial statements in Item 8. The NYSPSC also approves the issuance of the Utilities’ securities and transactions between the Utilities and Con Edison and its other subsidiaries. See “Capital Resources,” below and Note U to the financial statements in Item 8. The NYSPSC exercises jurisdiction over the siting of electric transmission lines in New York State (see “Con Edison Transmission,” below) and approves mergers or other business combinations involving New York utilities.
In addition, under the New York Public Service Law, the NYSPSC has the authority to (i) impose penalties on New York utilities, which could be material, for violating state utility laws and regulations and its orders; (ii) review, at least every five years, an electric and gas utility’s capability to provide safe, adequate and reliable service, order the utility to comply with additional and more stringent terms of service than existed prior to the review, assess the continued operation of the utility as the provider of electric service in its service territory and propose, and act upon, such measures as are necessary to ensure safe and adequate service; and (iii) based on findings of repeated violations of the New York Public Service Law or rules or regulations adopted thereto that demonstrate a failure of a combination gas and electric utility to continue to provide safe and adequate service, revoke or modify an operating certificate issued to the utility by the NYSPSC (following consideration of certain factors, including public interest and standards deemed necessary by the NYSPSC to ensure continuity of service, and due process). See "Risk Factors" in Item 1A and “Other Regulatory Matters” in Note B to the financial statements in Item 8. O&R’s New Jersey subsidiary, RECO, is subject to regulation by the New Jersey Board of Public Utilities (NJBPU). The NYSPSC, together with the NJBPU, are referred to herein as state utility regulators.
| CON EDISON ANNUAL REPORT 2023 | 15 |
New York Utility Industry
Restructuring in the 1990s
In the 1990s, the NYSPSC restructured the electric utility industry in the state. In accordance with NYSPSC orders, the Utilities sold all of their electric generating facilities other than those that also produce steam for CECONY’s steam business (see "Electric Operations – Electric Facilities," below) and provided all of their customers the choice to buy electricity or gas from the Utilities or other suppliers (see "Electric Operations – Electric Sales and Deliveries" and "Gas Operations – Gas Sales and Deliveries," below). In 2023, 57 percent of the electricity and 31 percent of the gas CECONY delivered to its customers, and 47 percent of the electricity and 22 percent of the gas O&R delivered to its customers, was purchased by the customers from other suppliers. In addition, the Utilities no longer control and operate their bulk power electric transmission facilities. See “New York Independent System Operator (NYISO),” below.
Following industry restructuring, there were several utility mergers as a result of which substantially all of the electric and gas delivery service in New York State is now provided by one of five investor-owned utility companies – Con Edison, National Grid plc, Avangrid, Inc. (an affiliate of Iberdrola, S.A.), National Fuel Gas Company or CH Energy Group, Inc. (a subsidiary of Fortis Inc.) – or one of two state authorities – New York Power Authority (NYPA) or Long Island Power Authority.
Rate Plans
Investor-owned utilities in the United States provide delivery service to customers according to the terms of tariffs approved by the appropriate state utility regulator. The tariffs include schedules of rates for service that limit the rates charged by the utilities to amounts that the utilities recover from their customers for costs approved by the regulator, including capital costs, of providing service to customers as defined by the tariff. The tariffs implement rate plans adopted by state utility regulators in rate orders issued at the conclusion of rate proceedings. The utilities’ earnings depend on the limits on rates authorized in, and the other provisions of, their rate plans and their ability to operate their businesses in a manner consistent with such rate plans.
The utilities’ rate plans cover specified periods, but rates determined pursuant to a plan generally continue in effect until a new rate plan is approved by the state utility regulator. In New York, either the utility or the NYSPSC can commence a proceeding for a new rate plan, and a new rate plan filed by the utility will generally take effect automatically in approximately 11 months unless prior to such time the NYSPSC approves a rate plan. The NYSPSC may request that the utility agree to suspend its request for new rates beyond the 11 month period, but if the utility agrees then the NYSPSC typically allows the utility to recover its new rates as if they went into effect at the 11-month date.
In each rate proceeding, rates are determined by the state utility regulator following the submission by the utility of testimony and supporting information, which are subject to review by the staff of the regulator. Other parties with an interest in the proceeding can also review the utility’s proposal and become involved in the rate proceeding. In New York State, the review process is overseen by an administrative law judge who is employed by the NYSPSC. After an administrative law judge issues a recommended decision that generally considers the interests of the utility, the regulatory staff, other parties and legal requisites, the regulator will issue a rate order. The utility and the regulator’s staff and interested parties may enter jointly into a proposed settlement agreement prior to the completion of this administrative process, in which case the agreement could be approved by the regulator with or without modification.
For each rate plan, the revenues needed to provide the utility a return on invested capital is determined by multiplying the utilities’ rate base by the pre-tax weighted average cost of capital determined in the rate plan. In general, rate base, as reflected in a utility's rate plans, is the sum of the utility’s net plant, working capital and certain regulatory assets less deferred taxes and certain regulatory liabilities. The NYSPSC uses a forecast of the average rate base for the year that new rates would be in effect (rate year). The NJBPU uses the rate base balances that exist at the end of the historical 12-month period on which base rates are set. The capital structure used in the weighted average cost of capital is determined using actual and forecast data for the same time periods as rate base. The costs of long-term debt, customer deposits and the allowed return on common equity represent a combination of actual and forecast financing information. The allowed return on common equity is determined by each state’s respective utility regulator. The NYSPSC’s current methodology for determining the allowed return on common equity assigns a one-third weight to an estimate determined from a capital asset pricing model applied to a peer group of utility companies and a two-thirds weight to an estimate determined from a dividend discount model using stock prices and dividend forecasts for a peer group of utility companies. Both methodologies employ market measurements of equity capital to estimate returns rather than the accounting measurements to which such estimates are applied in setting rates.
| 16 | CON EDISON ANNUAL REPORT 2023 |
Pursuant to the Utilities’ rate plans, there generally can be no change to the rates charged to customers during the respective terms of the rate plans other than specified adjustments provided for in the rate plans.
For information about the Utilities’ rate plans, see Note B to the financial statements in Item 8.
Liability for Service Interruptions
The tariff provisions under which CECONY provides electric, gas and steam service, and O&R provides electric and gas service, limit each company’s liability to pay for damages resulting from service interruptions to circumstances resulting from its gross negligence or willful misconduct. Under RECO's tariff provisions for electric service, the company is not liable for interruptions that are due to causes beyond its control.
CECONY’s and O&R’s tariffs for electric and gas service also provide for compensation to residential and small business customers that experience widespread prolonged outages lasting more than seventy-two consecutive hours, subject to certain exceptions, including: for residential customers, a bill credit of $25 for each twenty-four hour period of service outage beyond the first seventy-two consecutive hour outage; for residential and small business customers, reimbursement for food spoilage of up to $540; and reimbursement of affected residential customers for prescription medicine spoilage losses without limitation. Any such costs incurred by utilities are not recoverable from customers. Utilities may petition the NYSPSC to request a waiver of the requirement that it compensate customers after widespread prolonged outages. CECONY’s electric tariff requires it to also compensate customers for certain other service outages resulting from malfunctions in the company’s lines and cable of 33 kV or less or associated equipment, including, for residential customers, up to $580 for food spoilage and actual losses for prescription medicine losses, and for all other customers, up to $11,460 for losses of perishable merchandise.
The NYSPSC has approved a scorecard for use as a guide to assess electric utility performance in restoring electric service during outages that result from a major storm. The scorecard could also be applied by the NYSPSC for other outages or actions. The scorecard includes performance metrics in categories for preparation, operations response, and communications.
Each New York electric utility is required to submit to the NYSPSC annually an emergency response plan for the reasonably prompt restoration of service in the case of widespread outages in the utility’s service territory due to storms or other events beyond the control of the utility. If, after evidentiary hearings or other investigatory proceedings, the NYSPSC finds that the utility failed to reasonably implement its plan during an event, the NYSPSC may impose penalties or deny recovery of any part of the service restoration costs caused by such failure. In April 2023, the NYSPSC approved CECONY’s and O&R's emergency response plans. In December 2023, CECONY and O&R each submitted updated emergency response plans for 2024.
Generic Proceedings
The NYSPSC from time to time conducts “generic” proceedings to consider issues relating to all electric and gas utilities operating in New York State. Proceedings include clean energy and related implementation proceedings, such as the Climate Leadership and Community Protection Act proceeding, and proceedings relating to energy affordability, data access, retail access, gas planning, energy efficiency and renewable energy programs, and negative revenue adjustments for billing delays related to community solar generation projects. The Utilities typically are active participants in such proceedings.
Federal Utility Regulation
The Federal Energy Regulatory Commission (FERC), among other things, regulates the transmission and wholesale sales of electricity in interstate commerce and the transmission and sale of natural gas for resale in interstate commerce. In addition, the FERC can impose substantial penalties, including penalties for violations of reliability and cybersecurity rules. Certain activities of the Utilities and Con Edison Transmission are subject to the jurisdiction of the FERC. The Utilities are subject to regulation by the FERC with respect to electric transmission rates and to regulation by the NYSPSC with respect to electric and gas retail commodity sales and local delivery service. As a matter of practice, the NYSPSC has approved delivery service rates for the Utilities that include both transmission and distribution costs. The electric and gas transmission projects in which Con Edison Transmission invests are also subject to regulation by the FERC. See “Con Edison Transmission,” below.
| CON EDISON ANNUAL REPORT 2023 | 17 |
New York Independent System Operator (NYISO)
The NYISO is a not-for-profit organization that controls and directs the operation of most of the electric transmission facilities in New York State, including those of the Utilities, as an integrated system. It also administers wholesale markets for electricity in New York State and facilitates the construction of new transmission it considers necessary to meet identified reliability, economic or public policy needs. The New York State Reliability Council (NYSRC) promulgates reliability standards subject to FERC oversight, and the NYISO has agreed to comply with those standards. Pursuant to a requirement that is set annually by the NYSRC, the NYISO requires that entities supplying electricity to customers in New York State have generating capacity (owned, procured through the NYISO capacity markets or contracted for) in an amount equal to the peak demand of their customers plus the applicable reserve margin. In addition, the NYISO has determined that entities that serve customers in New York City must procure sufficient capacity from resources that are electrically located in New York City to cover a substantial percentage of the peak demands of their New York City customers. The NYISO also requires entities that serve customers in the Lower Hudson Valley and New York City customers that are served through the Lower Hudson Valley to procure sufficient capacity from resources electrically located in the Lower Hudson Valley. These requirements apply both to regulated utilities such as CECONY and O&R for the customers they supply under regulated tariffs and to other load serving entities that supply customers on market terms. See “CECONY – Electric Operations – Electric Supply” and “O&R – Electric Operations – Electric Supply,” below.
Cyber Regulation
The Companies are subject to cyber regulation by federal agencies, including FERC, the Transportation Security Agency and the Cybersecurity and Infrastructure Security Agency. The Utilities are subject to cyber regulation by the NYSPSC, that under the New York Public Service Law, is authorized to evaluate annually the utility’s customer privacy protections, including, but not limited to, customer electric and gas consumption data, and protection of critical energy infrastructure. In March 2023, the New York State legislature amended the New York State Public Service Law, directing the NYSPSC to develop rules to direct electric and gas utilities to, among other things, protect customer privacy, including customer consumption data, from unauthorized disclosure; (ii) develop and implement tools to monitor operational control networks to detect unauthorized network behavior; and (iii) mandate that utilities’ emergency response plans include cyberattack response plans. O&R’s subsidiary, RECO, is subject to cyber regulation by the NJBPU. See “The Companies Are Extensively Regulated And Are Subject To Penalties” and "A Cyber Attack Could Adversely Affect the Companies" in Item 1A and Item 1C: Cybersecurity.
Competition
The subset of distributed energy resources (DER) that produce electricity is collectively called distributed generation (DG). DG includes solar energy production facilities, fuel cells, and micro-turbines, and provides an alternative source of electricity for the Utilities’ electric delivery customers. Energy storage, though not a form of DG, is also a source of electricity for the Utilities’ electric delivery customers. Typically, customers with DG remain connected to the utility’s delivery system and do not pay a different rate. Gas delivery customers have electricity, oil and propane as alternatives, and steam customers have electricity, oil and natural gas as alternative sources for heating and cooling their buildings. Micro-grids and community-based micro-grids enable DG to serve multiple locations and multiple customers. Demand reduction and energy efficiency investments provide ways for energy consumers within the Utilities’ service areas to lower their energy usage. The Companies expect DERs and electric alternatives to gas and steam, to increase, and for gas and steam usage to decrease, as the Climate Leadership and Community Protection Act enacted by New York State and the Climate Mobilization Act enacted by New York City continue to be implemented. See “Environmental Matters – Clean Energy Future,” below. CECONY’s smart solutions for gas customers include energy efficiency and heating electrification programs. See “CECONY- Gas Operations - Gas Peak Demand,” below. The following table shows the aggregate capacities of the DG projects connected to the Utilities’ distribution systems at the end of the last five years:
| 18 | CON EDISON ANNUAL REPORT 2023 |
| Technology | CECONY | O&R | ||||||||||||||||||||||||||||||
| Total MW, except project number | 2019 | 2020 | 2021 | 2022 | 2023 | 2019 | 2020 | 2021 | 2022 | 2023 | ||||||||||||||||||||||
| Internal-combustion engines | 114 | 129 | 155 | 157 | 160 | 3 | 3 | 3 | 3 | 3 | ||||||||||||||||||||||
| Photovoltaic solar | 276 | 323 | 398 | 487 | 579 | 121 | 154 | 183 | 213 | 243 | ||||||||||||||||||||||
| Battery energy storage | 8 | 13 | 18 | 25 | 47 | 1 | 6 | 11 | 25 | 36 | ||||||||||||||||||||||
| Gas turbines | 48 | 53 | 61 | 61 | 61 | 20 | 20 | 20 | 20 | 20 | ||||||||||||||||||||||
| Micro turbines | 18 | 21 | 23 | 24 | 24 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||
| Fuel cells | 20 | 30 | 30 | 45 | 46 | — | — | — | — | — | ||||||||||||||||||||||
| Steam turbines | 6 | 6 | 6 | 6 | 6 | — | — | — | — | — | ||||||||||||||||||||||
| Landfill | — | — | — | — | — | 2 | 2 | 2 | 2 | 2 | ||||||||||||||||||||||
| Total distribution-level DG | 490 | 575 | 691 | 805 | 923 | 148 | 186 | 220 | 264 | 305 | ||||||||||||||||||||||
| Number of DG projects | 30,539 | 36,194 | 43,702 | 53,498 | 65,758 | 8,687 | 9,643 | 10,913 | 12,448 | 14,201 |
The Utilities do not consider it reasonably likely that another company would be authorized to provide utility delivery service of electricity, gas or steam where the company already provides service. Any such other company would need to obtain NYSPSC consent, satisfy applicable local requirements, install facilities to provide the service, meet applicable services standards and charge customers comparable taxes and other fees and costs imposed on the service. A new delivery company would also be subject to extensive ongoing regulation by the NYSPSC. See “Utility Regulation – State Utility Regulation – Regulators,” above, "The Companies Are Extensively Regulated And Are Subject To Substantial Penalties" in Item 1A and “Other Regulatory Matters” in Note B to the financial statements in Item 8. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets, the current and prospective customers of which may have competitive alternatives. See "Con Edison Transmission," below.
The Utilities
CECONY
CECONY, incorporated in New York State in 1884, is a subsidiary of Con Edison and has no significant subsidiaries of its own. Its principal business segments are its regulated electric, gas and steam businesses.
For a discussion of the company’s operating revenues and operating income for each segment, see “Results of Operations” in Item 7. For additional information about the segments, see Note P to the financial statements in Item 8.
Electric Operations
Electric Facilities
CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $23,238 million and $22,130 million at December 31, 2023 and 2022, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $4,333 million and $3,916 million at December 31, 2023 and 2022, respectively, and for its portion of the steam-electric generation facilities, the costs for utility plant, net of accumulated depreciation, were $580 million and $534 million, at December 31, 2023 and 2022, respectively. See "CECONY – Steam Operations – Steam Facilities," below.
Distribution Facilities
CECONY owns 63 area distribution substations and various distribution facilities located throughout New York City and Westchester County. At December 31, 2023, the company’s distribution system had a transformer capacity of 32,636 MVA, with 37,633 miles of overhead distribution lines and 98,789 miles of underground distribution lines. The underground distribution lines represent the single longest underground electric delivery system in the United States.
Transmission Facilities
CECONY’s transmission facilities are located in New York City and Westchester, Orange, Rockland, Putnam and Dutchess counties in New York State. On December 31, 2023, the company owned or jointly owned 490 miles of overhead circuits operating at 138, 230, 345 and 500 kV and 760 miles of underground circuits operating at 69, 138 and 345 kV. The company’s 40 transmission substations and 63 area stations are supplied by circuits operated at 69 kV and above. CECONY’s transmission facilities interconnect with those of National Grid, Central Hudson Gas & Electric Corporation, O&R, New York State Electric & Gas, Eversource Energy, Long Island Power Authority, NYPA, New York Transco and Public Service Electric and Gas Company.
| CON EDISON ANNUAL REPORT 2023 | 19 |
Generating Facilities
CECONY’s electric generating facilities consist of plants located in Manhattan whose primary purpose is to produce steam for the company's steam business and also co-produce electricity. The facilities have a combined electric nameplate capacity of approximately 694 MW. The company expects to have sufficient amounts of gas and fuel oil available in 2024 for use in these facilities.
Electric Sales and Deliveries
CECONY delivers electricity to its full-service customers who purchase electricity from the company. Under the company's retail choice program, CECONY also delivers electricity to its customers who choose to purchase electricity from other load serving entities. In addition, the company delivers electricity to state and municipal customers of the NYPA.
The company charges all customers in its service area for the delivery of electricity. The company generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. CECONY’s electric delivery revenues are subject to a revenue decoupling mechanism. As a result, its electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s electric sales and deliveries for the last five years were:
| Year Ended December 31, | ||||||||||||||||||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | ||||||||||||||||||||||||||||
| Electric Energy Delivered (millions of kWh) | ||||||||||||||||||||||||||||||||
| CECONY full service customers | 20,579 | 20,544 | 20,710 | 22,547 | 22,657 | |||||||||||||||||||||||||||
| Delivery service for retail choice customers | 24,754 | 22,000 | 21,549 | 21,116 | 20,315 | |||||||||||||||||||||||||||
| Delivery service to NYPA customers and others | 9,821 | 9,027 | 9,069 | 9,357 | 9,284 | |||||||||||||||||||||||||||
| Total Deliveries in Franchise Area | 55,154 | 51,571 | 51,328 | 53,020 | 52,256 | |||||||||||||||||||||||||||
| Electric Energy Delivered ($ in millions) | ||||||||||||||||||||||||||||||||
| CECONY full service customers | $4,535 | $4,804 | $5,299 | $6,192 | $6,305 | |||||||||||||||||||||||||||
| Delivery service for retail choice customers | 2,470 | 2,391 | 2,613 | 2,526 | 2,394 | |||||||||||||||||||||||||||
| Delivery service to NYPA customers and others | 644 | 638 | 683 | 715 | 758 | |||||||||||||||||||||||||||
| Other operating revenues | 413 | 270 | 211 | 318 | 621 | |||||||||||||||||||||||||||
| Total Deliveries in Franchise Area | $8,062 | $8,103 | $8,806 | $9,751 | $10,078 | |||||||||||||||||||||||||||
| Average Revenue per kWh Sold (Cents) | ||||||||||||||||||||||||||||||||
| Residential | $25.3 | $26.1 | $27.3 | $28.8 | $30.1 | |||||||||||||||||||||||||||
| Commercial and industrial | $18.6 | $20.2 | $23.5 | $26.0 | $25.4 |
For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.
Electric Peak Demand
The electric peak demand in CECONY’s service area typically occurs during the summer air conditioning season. CECONY’s 2023 service area actual hourly peak demand (June-August) was 11,565 MW, which occurred on July 27, 2023. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs' potential impact. However, the CECONY forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2024 service area hourly peak demand will be 12,800 MW. As of January 2024, the company forecasts an average annual increase in hourly electric peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.7 percent per year, including the effect of certain electric energy efficiency programs, the anticipated phase-out of natural gas in certain new construction buildings in CECONY's service territory, and the anticipated increase in electric vehicles in CECONY's service territory. The five-year forecast in peak demand is used by the company for electric supply and capital planning purposes.
Electric Supply
Most of the electricity sold by CECONY to its full-service customers in 2023 was purchased through the wholesale electricity market administered by the NYISO. The company expects that resources will again be adequate to meet the requirements of its customers in 2024. The company plans to meet its continuing obligation to supply electricity
| 20 | CON EDISON ANNUAL REPORT 2023 |
to its full-service customers through a combination of electricity purchased under contract, purchased through the NYISO’s wholesale electricity market, or generated from its electricity generating facilities. For information about the company’s contracts for electric generating capacity, see Notes I and Q to the financial statements in Item 8. To reduce the volatility of its full-service customers’ electric energy costs, the company enters into derivative transactions to hedge the costs of a portion of its expected purchases through the NYISO’s wholesale electricity market.
CECONY owns generating stations in New York City associated primarily with its steam system. The generating stations have a combined electric nameplate capacity of approximately 780 MW. For information about electric generating capacity owned by the company, see “Electric Operations – Electric Facilities – Generating Facilities,” above.
In general, the Utilities recover their costs of purchasing power for full-service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8.
Electric Reliability Needs
CECONY monitors the adequacy of the electric capacity resources and related developments in its service area, and works with other parties on long-term resource adequacy within the framework of the NYISO reliability planning process.
In 2019, the New York State Department of Environmental Conservation issued regulations (Peaker Rule) that may require the retirement or seasonal unavailability of fossil-fueled electric generating units owned by CECONY and others in New York City. The Peaker Rule limits nitrous oxides emissions during the ozone season from May through September and affects older peaking units that are generally located downstate and needed during periods of high electric demand or for local reliability purposes. Compliance with the Peaker Rule would impact approximately 1,700 MW (nameplate capacity) of generating units in CECONY's service territory (including 70 MW owned by CECONY), of which approximately 989 MW (including 70 MW owned by CECONY) have since been retired or limited operation. An additional 709 MW (in nameplate capacity) of peaker plants were expected to become unavailable beginning May 1, 2025. In July 2023, the NYISO found an electric reliability need beginning in the summer of 2025 in CECONY’s New York City territory primarily driven by forecasted increases in peak demand and the unavailability of units impacted by the Peaker Rule. In November 2023, after soliciting and evaluating both regulated and market-based solutions, the NYISO determined that there were no viable and sufficient solutions submitted that meet the reliability need in 2025. As a result, the NYISO stated that it will temporarily retain 672 MW of the remaining units impacted by the Peaker Rule until May 2027 to ensure the continued reliability of electric service in New York City.
In January 2021, CECONY updated its Local Transmission Plan to address identified reliability needs on its local system resulting from the Peaker Rule through the construction of three transmission projects, the Reliable Clean City (RCC) projects. In April 2021, the NYSPSC approved CECONY’s December 2020 petition to recover $780 million of costs to construct the RCC projects. In May 2023, the first of the three RCC projects was completed and placed in service; the remaining two are expected to be completed in 2025.
In April 2023, the NYSPSC approved CECONY’s December 2022 petition seeking cost recovery approval for a proposed clean energy hub in Brooklyn, New York (Brooklyn Clean Energy Hub) at an estimated cost of $810 million and an estimated in-service date of December 2027, that is in addition to the capital expenditures approved in CECONY's 2023 electric rate plan. The Brooklyn Clean Energy Hub primarily addresses an identified reliability need in 2028 due to a forecasted increase in electric demand. The Brooklyn Clean Energy Hub also provides the flexibility for offshore wind resources to interconnect to it during construction and after it commences operation. Construction began in September 2023 and is expected to be completed by 2028.
In January 2024, the NYSPSC approved CECONY's August 2023 petition requesting authorization and cost recovery to construct two new substations in Jamaica, Queens (the Reliable Clean City - Idlewild Project) that is in addition to the capital expenditures approved in CECONY's 2023 electric rate plan. The project is expected to be completed by May 2028 to meet anticipated reliability needs and to support New York State’s goals set forth in the Climate Leadership and Community Protection Act (CLCPA). CECONY estimates that construction will cost $1,200 million.
Capital expenditures approved in CECONY’s 2023 electric rate plan to address identified reliability needs in New York City include CECONY’s projects to: transfer electric customers from its Brownsville substation to its Glendale substation (estimated completion in 2026 and estimated cost of $115 million); build a transmission feeder between
| CON EDISON ANNUAL REPORT 2023 | 21 |
Vernon and Newtown (estimated completion in 2026 and estimated cost of $125.4 million); and build the Gateway Park area substation (estimated completion in 2028 and estimated cost of $1,100 million).
Gas Operations
Gas Facilities
CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for gas facilities, which are primarily distribution facilities, were $11,226 million and $10,567 million at December 31, 2023 and 2022, respectively.
Natural gas is delivered by interstate pipelines to CECONY at various points in or near its service territory and is distributed to customers by the company through an estimated 4,363 miles of mains and 380,870 service lines. The company owns a natural gas liquefaction facility and storage tank at its Astoria property in Queens, New York. The plant can store 1,062 MDt of which a maximum of about 240 MDt can be withdrawn per day. The company has approximately 1,226 MDt of additional natural gas storage capacity available to it at a field in upstate New York, owned and operated by Honeoye Storage Corporation, a corporation 71.2 percent owned by Con Edison Transmission and 28.8 percent owned by CECONY.
Gas Sales and Deliveries
CECONY delivers gas to its full-service customers who purchase gas from the company. The company generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. Under the company's retail choice program, CECONY also delivers gas to its customers who choose to purchase gas from other suppliers. CECONY’s gas delivery revenues are subject to a weather normalization clause and a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s gas sales and deliveries for the last five years were:
| Year Ended December 31, | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Gas Delivered (MDt) | |||||||||||||||||
| Firm sales | |||||||||||||||||
| Full service | 87,637 | 78,515 | 81,637 | 85,246 | 77,525 | ||||||||||||
| Firm transportation | 81,710 | 76,614 | 76,765 | 75,172 | 72,740 | ||||||||||||
| Total Firm Sales | 169,347 | 155,129 | 158,402 | 160,418 | 150,265 | ||||||||||||
| Interruptible sales (a) | 9,903 | 8,482 | 5,927 | 6,098 | 7,892 | ||||||||||||
| Total Gas Delivered to CECONY Customers | 179,250 | 163,611 | 164,329 | 166,516 | 158,157 | ||||||||||||
| Transportation of customer-owned gas | |||||||||||||||||
| NYPA | 39,643 | 41,577 | 43,094 | 45,085 | 53,541 | ||||||||||||
| Other (mainly generating plants and interruptible transportation) | 72,712 | 70,537 | 67,871 | 72,448 | 80,378 | ||||||||||||
| Off-system sales | 12 | 12 | 12 | 12 | 12 | ||||||||||||
| Total Sales | 291,617 | 275,737 | 275,306 | 284,061 | 292,088 | ||||||||||||
| Gas Delivered ($ in millions) | |||||||||||||||||
| Firm sales | |||||||||||||||||
| Full service | $1,327 | $1,229 | $1,473 | $1,850 | $1,791 | ||||||||||||
| Firm transportation | 593 | 649 | 704 | 798 | 853 | ||||||||||||
| Total Firm Sales | 1,920 | 1,878 | 2,177 | 2,648 | 2,644 | ||||||||||||
| Interruptible sales | 42 | 27 | 29 | 51 | 49 | ||||||||||||
| Total Gas Delivered to CECONY Customers | 1,962 | 1,905 | 2,206 | 2,699 | 2,693 | ||||||||||||
| Transportation of customer-owned gas | |||||||||||||||||
| NYPA | 2 | 2 | 2 | 2 | 2 | ||||||||||||
| Other (mainly generating plants and interruptible transportation) | 54 | 55 | 59 | 64 | 58 | ||||||||||||
| Other operating revenues (mainly regulatory amortizations) | 114 | 74 | 111 | 159 | 76 | ||||||||||||
| Total Sales | $2,132 | $2,036 | $2,378 | $2,924 | $2,829 | ||||||||||||
| Average Revenue per Dt Sold | |||||||||||||||||
| Residential | $17.33 | $18.59 | $20.71 | $24.67 | $26.63 | ||||||||||||
| General | $11.55 | $10.77 | $13.67 | $17.17 | $18.03 |
(a)Includes 5,484, 3,510, 1,920, 2,015 and 2,574 MDt for 2019, 2020, 2021, 2022 and 2023, respectively, which are also reflected in delivery service for firm retail choice customers and other.
| 22 | CON EDISON ANNUAL REPORT 2023 |
For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.
Gas Peak Demand
The gas actual peak day demand for firm gas customers in CECONY’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 20, 2024 when the firm gas customers' demand reached approximately 1,188 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2024/2025 service area peak day demand for firm gas customers will be 1,698 MDt. The forecasted peak day demand for firm gas customers at design conditions does not include gas used by interruptible gas customers including electric and steam generating stations. As of January 2024, the company forecasts an average annual decrease of the gas peak day demand for firm gas customers over the next five years at design conditions of approximately 0.8 percent in its service area, including the effect of certain gas energy efficiency programs, the electrification of space heating and the anticipated phase-out of natural gas in certain new construction buildings in CECONY's service territory. The five-year forecast in peak demand is used by the company for gas supply and capital planning purposes.
Gas Supply
CECONY and O&R have combined their gas requirements, and contracts to meet those requirements, into a single portfolio. The combined portfolio is administered by, and related management services are provided by, CECONY (for itself and as agent for O&R) and costs are allocated between the Utilities in accordance with provisions approved by the NYSPSC. See Note U to the financial statements in Item 8.
Charges from suppliers for the firm purchase of gas, which are based on formulas or indexes or are subject to negotiation, are generally designed to approximate market prices. The Utilities have contracts with interstate pipeline companies for the purchase of firm transportation from upstream points where gas has been purchased to the Utilities’ distribution systems, and for upstream storage services. Charges under these transportation and storage contracts are approved by the FERC. The Utilities are required to pay certain fixed charges under the supply, transportation and storage contracts whether or not the contracted capacity is actually used. These fixed charges amounted to approximately $371.7 million in 2023, including $326.8 million for CECONY. At December 31, 2023, the contracts were for various terms extending to 2027 for supply and 2044 for transportation and storage. During 2023, CECONY entered into one new transportation contract. In addition, the Utilities purchase gas on the spot market and contract for interruptible gas transportation. See “Contractual Obligations,” below and “Recoverable Energy Costs” in Note A, Note Q and Note U to the financial statements in Item 8.
In July 2020, CECONY filed a gas planning analysis with the NYSPSC that stated that the company is monitoring a gas supply constraint for the New York City portion of its service territory. In May 2022, the NYSPSC issued orders on gas planning and moratorium management. The orders set forth a schedule for filing future gas planning analyses and the process for initiating, operating and lifting a natural gas moratorium.
In December 2023, CECONY ended a temporary moratorium on new applications for firm gas service that had been implemented in March 2019 due to interstate pipeline gas transportation constraints that affected most of Westchester County. CECONY lifted the moratorium due to increased interstate pipeline capacity upon completion of Tennessee Gas Pipeline’s East 300 Upgrade Project.
Steam Operations
Steam Facilities
CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for steam facilities, including steam's portion of the steam-electric generation facilities, were $1,990 million and $1,962 million at December 31, 2023 and 2022, respectively. See "CECONY – Electric Operations – Electric Facilities," above.
CECONY generates steam at one steam-electric generating station and four steam-only generating stations and distributes steam to its customers through approximately 106 miles of transmission, distribution and service piping.
| CON EDISON ANNUAL REPORT 2023 | 23 |
Steam Sales and Deliveries
CECONY’s steam sales and deliveries for the last five years were:
| Year Ended December 31, | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Steam Sold (MMlb) | |||||||||||||||||
| General | 536 | 445 | 504 | 513 | 428 | ||||||||||||
| Apartment house | 5,919 | 5,131 | 5,013 | 5,122 | 4,657 | ||||||||||||
| Annual power | 13,340 | 10,977 | 11,367 | 11,792 | 10,359 | ||||||||||||
| Total Steam Delivered to CECONY Customers | 19,795 | 16,553 | 16,884 | 17,427 | 15,444 | ||||||||||||
| Steam Sold ($ in millions) | |||||||||||||||||
| General | $27 | $23 | $25 | $27 | 25 | ||||||||||||
| Apartment house | 160 | 136 | 137 | 155 | 150 | ||||||||||||
| Annual power | 395 | 321 | 340 | 391 | 363 | ||||||||||||
| Other operating revenues | 45 | 28 | 30 | 20 | 31 | ||||||||||||
| Total Steam Delivered to CECONY Customers | $627 | $508 | $532 | $593 | $569 | ||||||||||||
| Average Revenue per Mlb Sold | $29.40 | $29.00 | $29.73 | $32.88 | $34.84 |
For further discussion of the company’s steam operating revenues and its steam results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.
Steam Peak Demand and Capacity
The steam actual hourly peak demand in CECONY’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 17, 2024 when the actual hourly demand reached approximately 6.7 MMlb per hour. “Design Weather Conditions” for the steam system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. The company’s estimate for the winter of 2024/2025 hourly peak demand of its steam customers is about 7.7 MMlb per hour under Design Weather Conditions. The company forecasts an average annual decrease in steam hourly peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.5 percent. The slight decrease reflects continued lower commercial building occupancy levels in the aftermath of the COVID-19 pandemic and customer migration to other heating sources. The five-year forecast in peak demand is used by the company for steam supply and capital planning purposes.
On December 31, 2023, the steam system was capable of delivering approximately 11.4 MMlb of steam per hour, and CECONY estimates that the system will have the same capability in the 2024/2025 winter.
Steam Supply
35 percent of the steam produced by CECONY in 2023 was supplied by the company’s steam-only generating assets; 43 percent was produced by the company’s steam-electric generating assets, where steam and electricity are primarily cogenerated; and 22 percent was purchased under an agreement with Brooklyn Navy Yard Cogeneration Partners L.P.
O&R
Electric Operations
Electric Facilities
O&R’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $1,253 million and $1,215 million at December 31, 2023 and 2022, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $319 million and $307 million at December 31, 2023 and 2022, respectively.
O&R and RECO own, in whole or in part, transmission and distribution facilities which include 545 circuit miles of transmission lines, 15 transmission substations, 63 distribution substations, 90,051 in-service line transformers, 3,788 pole miles of overhead distribution lines and 2,314 miles of underground distribution lines. O&R’s transmission system is part of the NYISO system except that portions of RECO’s system are located within the transmission area controlled by PJM.
Electric Sales and Deliveries
O&R delivers electricity to its full-service customers who purchase electricity from the company. Under the company's retail choice program, O&R also delivers electricity to its customers who purchase electricity from load serving entities.
| 24 | CON EDISON ANNUAL REPORT 2023 |
The company charges all customers in its service area for the delivery of electricity. O&R generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. O&R’s New York electric revenues (which accounted for 76 percent of O&R’s electric revenues in 2023) are subject to a revenue decoupling mechanism. As a result, O&R’s New York electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. Effective July 2021, the majority of O&R’s electric distribution revenues in New Jersey are subject to a conservation incentive program, as a result of which distribution revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s electric transmission revenues in New Jersey are not subject to a conservation incentive program, and as a result, changes in such volumes do impact revenues. O&R’s electric sales and deliveries for the last five years were:
| Year Ended December 31, | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Electric Energy Delivered (millions of kWh) | |||||||||||||||||
| Total deliveries to O&R full service customers | 2,617 | 2,712 | 2,702 | 2,973 | 2,988 | ||||||||||||
| Delivery service for retail choice customers | 2,885 | 2,622 | 2,839 | 2,580 | 2,397 | ||||||||||||
| Total Deliveries in Franchise Area | 5,502 | 5,334 | 5,541 | 5,553 | 5,385 | ||||||||||||
| Electric Energy Delivered ($ in millions) | |||||||||||||||||
| Total deliveries to O&R full service customers | $429 | $442 | $453 | $576 | $578 | ||||||||||||
| Delivery service for retail choice customers | 191 | 186 | 223 | 198 | 172 | ||||||||||||
| Other operating revenues | 14 | 1 | 5 | (1) | 9 | ||||||||||||
| Total Deliveries in Franchise Area | $634 | $629 | $681 | $773 | $759 | ||||||||||||
| Average Revenue Per kWh Sold (Cents) | |||||||||||||||||
| Residential | $18.20 | $17.80 | $19.00 | $21.50 | $21.90 | ||||||||||||
| Commercial and Industrial | $13.90 | $14.20 | $13.00 | $15.60 | $15.30 | ||||||||||||
For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.
Electric Peak Demand
The electric peak demand in O&R’s service area typically occurs during the summer air conditioning season. O&R’s 2023 service area actual hourly peak demand (June-August) was 1,342 MW, which occurred on July 28, 2023. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs' potential impact. However, the O&R forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2024 service area peak demand will be 1,530 MW. As of January 2024, the company forecasts an average annual increase in hourly electric peak demand in its service area at design conditions over the next five years to be approximately 2.0 percent, including the effect of certain electric energy efficiency programs distributed generation additions, the anticipated phase-out of natural gas in certain new construction buildings in New York State, and the anticipated increase in electric vehicles in O&R's service territory. The five-year forecast in peak demand is used by the company for electric supply and capital planning purposes.
Electric Supply
The electricity O&R sold to its full-service customers in 2023 was purchased under firm power contracts or through the wholesale electricity market. The company expects that these resources will again be adequate to meet the requirements of its customers in 2024. O&R does not own any electric generating capacity. The company plans to meet its continuing obligation to supply electricity to its customers through a combination of electricity purchased under contracts or purchased through the wholesale electricity market. To reduce the volatility of its customers’ electric energy costs, the company has contracts to purchase electric energy and enters into derivative transactions to hedge the costs of a portion of its expected purchases. For information about the company’s contracts, see Note Q to the financial statements in Item 8.
In general, the Utilities recover their costs of purchasing power for full service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk,” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8. From time to time, certain parties have petitioned the NYSPSC to review these provisions, the elimination of which could have a material adverse effect on the Companies’ financial position, results of operations or liquidity.
| CON EDISON ANNUAL REPORT 2023 | 25 |
Gas Operations
Gas Facilities
O&R’s capitalized costs for utility plant, net of accumulated depreciation for gas facilities, which are primarily distribution facilities, were $792 million and $756 million at December 31, 2023 and 2022, respectively. Natural gas is delivered by pipeline to O&R at various points in or near its service territory and is distributed to customers by the company through an estimated 1,896 miles of mains and 107,425 service lines.
Gas Sales and Deliveries
O&R delivers gas to its full-service customers who purchase gas from the company. O&R generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. Under the company's retail choice program, O&R also delivers gas to its customers who choose to purchase gas from other suppliers. O&R’s gas delivery revenues are subject to a weather normalization clause and to a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s gas sales and deliveries for the last five years were:
| Year Ended December 31, | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Gas Delivered (MDt) | |||||||||||||||||
| Firm sales | |||||||||||||||||
| Full service | 12,537 | 11,877 | 13,998 | 15,353 | 14,357 | ||||||||||||
| Firm transportation | 9,459 | 8,271 | 7,584 | 6,396 | 5,055 | ||||||||||||
| Total Firm Sales | 21,996 | 20,148 | 21,582 | 21,749 | 19,412 | ||||||||||||
| Interruptible sales | 3,668 | 3,633 | 3,821 | 3,911 | 3,301 | ||||||||||||
| Total Gas Delivered to O&R Customers | 25,664 | 23,781 | 25,403 | 25,660 | 22,713 | ||||||||||||
| Transportation of customer-owned gas | |||||||||||||||||
| Sales for resale | 914 | 658 | 468 | 673 | 334 | ||||||||||||
| Sales to electric generating stations | 4 | 59 | 26 | 10 | 4 | ||||||||||||
| Off-system sales | 1 | 19 | 81 | 73 | 20 | ||||||||||||
| Total Sales | 26,583 | 24,517 | 25,978 | 26,416 | 23,071 |
| Year Ended December 31, | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Gas Delivered ($ in millions) | |||||||||||||||||
| Firm sales | |||||||||||||||||
| Full service | $161 | $141 | $190 | $245 | $230 | ||||||||||||
| Firm transportation | 63 | 62 | 55 | 45 | 38 | ||||||||||||
| Total Firm Sales | 224 | 203 | 245 | 290 | 268 | ||||||||||||
| Interruptible Sales | 6 | 6 | 6 | 6 | 6 | ||||||||||||
| Total Gas Delivered to O&R Customers | 230 | 209 | 251 | 296 | 274 | ||||||||||||
| Transportation of customer-owned gas | |||||||||||||||||
| Sales to electric generating stations | — | — | — | — | — | ||||||||||||
| Other operating revenues | 29 | 24 | 9 | 16 | 23 | ||||||||||||
| Total Sales | $259 | $233 | $260 | $312 | $297 | ||||||||||||
| Average Revenue Per Dt Sold | |||||||||||||||||
| Residential | $13.32 | $12.40 | $14.09 | $16.49 | $16.90 | ||||||||||||
| General | $10.68 | $9.51 | $11.24 | $13.62 | $12.64 |
For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.
Gas Peak Demand
The gas actual peak day demand for firm sales customers in O&R’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 20, 2024 when the firm sales customers' demand reached approximately 169 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2024/2025 service area peak day demand for firm sales customers will be 235 MDt. The forecasted peak day demand at design conditions does not include gas used by
| 26 | CON EDISON ANNUAL REPORT 2023 |
interruptible gas customers including electric generating stations. As of January 2024, the company forecasts an average annual decrease of the gas peak day demand for firm gas customers over the next five years at design conditions of approximately 0.2 percent in its service area, including the effect of certain gas energy efficiency programs, the electrification of space heating and the anticipated phase-out of natural gas in certain new construction buildings in New York State. The five-year forecast in peak demand is used by the company for gas supply and capital planning purposes.
Gas Supply
O&R and CECONY have combined their gas requirements and purchase contracts to meet those requirements into a single portfolio. See “CECONY – Gas Operations – Gas Supply” above.
Con Edison Transmission
Con Edison Transmission owns a 45.7 percent interest in New York Transco that is comprised of: a 45.7 percent interest in New York Transco's Transmission Owner Transmission Solutions (TOTS) projects; a 45.7 percent interest in New York Transco’s New York Energy Solution (NYES) project; and a 41.7 percent interest in New York Transco’s share of the Propel NY Energy project. Con Edison Transmission also owns a 71.2 percent interest in Honeoye Storage Corporation (Honeoye) and a 7.9 percent interest in Mountain Valley Pipeline, LLC (MVP) that is expected to be reduced to approximately 7.0 percent as described below.
TOTS is a group of three electric power bulk transmission projects constructed on the New York bulk transmission system to increase transfer capability between upstate and downstate New York that went in service in 2016. In March 2016, the FERC approved a November 2015 settlement agreement that provides a 10 percent return on common equity (which is comprised of 9.5 percent base return on equity plus an additional 50 basis points) and a maximum actual common equity ratio of 53 percent. The revenues for these TOTS projects costs are collected by the NYISO and allocated across NYISO transmission customers in New York State, with 63 percent allocated to load serving entities in the CECONY and O&R service areas.
The NYES project was selected by the NYISO in April 2019 to relieve transmission congestion between upstate and downstate ($600 million estimated cost, excluding certain interconnection costs). During the second quarter of 2023, construction was completed for the NYES project and the associated Rock Tavern to Sugarloaf segment, and a majority of the assets were placed in service. Construction of the associated Dover Station, an additional network upgrade to support the NYES project, has not been completed and its permits are the subject of litigation in New York State. In November 2017, FERC approved a settlement agreement that provides for a 10.65 percent return on common equity (which is comprised of a 9.65 percent base ROE, with 100 basis points added for congestion reduction and a cost containment mechanism applicable to certain capital costs) and a maximum actual common equity ratio of 53 percent. The interconnection costs of the awarded project segment include network upgrades identified by the NYISO and NYSPSC that earn the same base ROE, with a 50-basis point adder. Revenues for the NYES project, including the Dover Station, are collected by the NYISO including 100 percent of construction work-in-progress, and are allocated across NYISO transmission customers in New York State with 84 percent allocated to load serving entities in the CECONY and O&R service areas.
The Propel NY Energy project that was selected by the NYISO in June 2023 is a proposed 90-mile electric transmission project with an anticipated in-service date of 2030. Propel NY Energy is expected to enable delivery of a minimum of 3,000 MW of offshore wind electricity, increase high voltage transmission connections between Long Island and the rest of New York State and provide New Yorkers with greater access to diverse energy resources. New York Transco’s share is quantified as $2,200 million, excluding its interconnection costs and the cost of projects expected to be built by local transmission owners, including CECONY. The siting, construction and operation of the project will require approvals and permits from appropriate governmental agencies and authorities, including the NYSPSC. In October 2023, NYSERDA announced that it selected three new offshore wind projects for contract negotiations, one of which is expected to connect 1,314 MW of offshore wind electricity using the capability of the Propel NY Energy project. See "Environmental Matters - Clean Energy Future," below. In December 2023, FERC, subject to refund and the outcome of settlement procedures, conditionally accepted a 53 percent equity capital structure for the Propel NY Energy project with a base return on equity of 10.7 percent, plus a 125 basis-point return on equity adder (50 basis points for participation in the NYISO and 75 basis points for risk).
Con Edison Transmission owns a 71.2 percent interest in Honeoye, a company that operates a gas storage facility in upstate New York and in which CECONY owns the remaining interest. A goodwill impairment loss of $7 million was recorded related to Con Edison Transmission's and CECONY’s investment in Honeoye for the year ended December 31, 2021, of which $5 million was attributed to Con Edison Transmission. See Note K to the financial statements in Item 8.
MVP is a joint venture among five partners, including Con Edison Transmission, to construct and operate the Mountain Valley Pipeline, a proposed 300-mile gas transmission project in West Virginia and Virginia. Con Edison
| CON EDISON ANNUAL REPORT 2023 | 27 |
Transmission owns a 7.9 percent interest in MVP that is expected to be reduced to approximately 7.0 percent based on Con Edison Transmission's previous capping of its cash contributions to the joint venture. In June 2023, construction activities for the Mountain Valley Pipeline resumed after resolution of certain legal challenges. In January 2024, the operator of the Mountain Valley Pipeline indicated that it is targeting an in-service date for the project in the first quarter of 2024 at an overall project cost of approximately $7,200 million excluding allowance for funds used during construction. Con Edison Transmission recorded pre-tax impairment losses on its interest in MVP of $231 million ($162 million after-tax) and $320 million ($223 million after-tax) for the years ended December 31, 2021 and December 31, 2020, respectively. At December 31, 2023, Con Edison Transmission’s carrying value of its investment in MVP was $111 million and its cash contributions to the joint venture amounted to $530 million. See "Investment in Mountain Valley Pipeline, LLC (MVP)" in Note A to the financial statements in Item 8.
During 2021, Con Edison Transmission sold its 50 percent interest in Stagecoach Gas Services LLC (Stagecoach), a gas pipeline and storage business located in northern Pennsylvania and southern New York for $629 million. Con Edison Transmission recorded pre-tax impairment losses of $212 million ($147 million after-tax). See "Investments - 2021 Partial Impairment of Investment in Stagecoach Gas Services" in Note A and Note W to the financial statements in Item 8.
For information about Con Edison Transmission's results, see "Results of Operations" in Item 7 and Note P to the financial statements in Item 8.
Clean Energy Businesses
On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.
Capital Requirements and Resources
Capital Requirements
The following table contains the Companies’ capital requirements for the years 2021 through 2023 and their current estimate of amounts for 2024 through 2028:
| Actual | Estimate | |||||||||||||||||||||||||
| (Millions of Dollars) | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | 2027 | 2028 | ||||||||||||||||||
| CECONY (a)(b) | ||||||||||||||||||||||||||
| Electric | $2,189 | $2,522 | $2,909 | $3,277 | $3,554 | $4,171 | $4,128 | $4,115 | ||||||||||||||||||
| Gas | 1,126 | 1,128 | 1,046 | 1,152 | 1,116 | 1,126 | 1,156 | 1,177 | ||||||||||||||||||
| Steam | 103 | 108 | 128 | 104 | 107 | 110 | 138 | 142 | ||||||||||||||||||
| Sub-total | 3,418 | 3,758 | 4,083 | 4,533 | 4,777 | 5,407 | 5,422 | 5,434 | ||||||||||||||||||
| O&R (b) | ||||||||||||||||||||||||||
| Electric | 147 | 167 | 211 | 209 | 350 | 380 | 367 | 353 | ||||||||||||||||||
| Gas | 70 | 76 | 85 | 80 | 85 | 92 | 85 | 80 | ||||||||||||||||||
| Sub-total | 217 | 243 | 296 | 289 | 435 | 472 | 452 | 433 | ||||||||||||||||||
| Con Edison Transmission | 31 | 65 | 49 | 27 | 31 | 108 | 113 | 119 | ||||||||||||||||||
| Clean Energy Businesses (c) | 298 | 399 | 81 | — | — | — | — | — | ||||||||||||||||||
| Total capital investments | 3,964 | 4,465 | 4,509 | 4,849 | 5,243 | 5,987 | 5,987 | 5,986 | ||||||||||||||||||
| Retirement of long-term securities | ||||||||||||||||||||||||||
| Con Edison – parent company | 1,178 | 293 | 650 | — | — | — | — | — | ||||||||||||||||||
| CECONY | 640 | — | — | 250 | — | 250 | 350 | 800 | ||||||||||||||||||
| O&R | — | — | — | — | — | — | 80 | — | ||||||||||||||||||
| Clean Energy Businesses (c) | 141 | 147 | 60 | — | — | — | — | — | ||||||||||||||||||
| Total retirement of long-term securities | 1,959 | 440 | 710 | 250 | — | 250 | 430 | 800 | ||||||||||||||||||
| Total capital requirements | $5,923 | $4,905 | $5,219 | $5,099 | $5,243 | $6,237 | $6,417 | $6,786 |
(a)CECONY’s capital investments for environmental protection facilities and related studies were $731 million, $733 million and $589 million in 2021, 2022 and 2023, respectively, and are estimated to be $600 million in 2024.
(b)Amounts and estimates shown do not include amounts for the system peak reduction, energy efficiency and electric vehicle make ready programs. See "Regulatory Assets and Liabilities" in Note B to the financial statements in Item 8.
(c)On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.
| 28 | CON EDISON ANNUAL REPORT 2023 |
Contractual Obligations
The following table summarizes the Companies’ material obligations at December 31, 2023 to make payments pursuant to contracts. Long-term debt, operating and capital lease obligations and other noncurrent liabilities are included on their balance sheets. Electricity and gas purchase agreements (for which undiscounted future annual payments are shown) are described in the notes to the financial statements.
| Payments Due by Period | |||||||||||||||||
| (Millions of Dollars) | Total | 1 year or less | Years 2 & 3 | Years 4 & 5 | After 5 years | ||||||||||||
| Long-term debt (Statement of Capitalization) (a) | |||||||||||||||||
| CECONY | $21,275 | $250 | $250 | $1,150 | $19,625 | ||||||||||||
| O&R | 1,125 | — | — | 80 | 1,045 | ||||||||||||
| Parent | — | — | — | — | — | ||||||||||||
| Interest on long-term debt (b) | 20,319 | 1,006 | 1,997 | 1,956 | 15,360 | ||||||||||||
| Total long-term debt, including interest (a)(b) | 42,719 | 1,256 | 2,247 | 3,186 | 36,030 | ||||||||||||
| Finance lease obligations (Note J) | |||||||||||||||||
| CECONY | 1 | 1 | — | — | — | ||||||||||||
| O&R | 1 | — | — | — | 1 | ||||||||||||
| Total capital lease obligations | 2 | 1 | — | — | 1 | ||||||||||||
| Operating leases (Note J) | |||||||||||||||||
| CECONY | 688 | 66 | 132 | 125 | 365 | ||||||||||||
| O&R | 1 | 1 | — | — | — | ||||||||||||
| Total operating leases (c) | 689 | 67 | 132 | 125 | 365 | ||||||||||||
| Purchase obligations | |||||||||||||||||
| Electricity power purchase agreements – Utilities (Note I) | |||||||||||||||||
| CECONY | |||||||||||||||||
| Energy | 1,606 | 102 | 242 | 251 | 1,011 | ||||||||||||
| Capacity (d) | 728 | 151 | 143 | 88 | 346 | ||||||||||||
| Total CECONY | 2,334 | 253 | 385 | 339 | 1,357 | ||||||||||||
| O&R | |||||||||||||||||
| Energy and Capacity (d) | 142 | 72 | 70 | — | — | ||||||||||||
| Total electricity and power purchase agreements – Utilities | 2,476 | 325 | 455 | 339 | 1,357 | ||||||||||||
| Natural gas supply, transportation, and storage contracts – Utilities (Note I) (e) | |||||||||||||||||
| CECONY | |||||||||||||||||
| Natural gas supply | 282 | 258 | 18 | 6 | — | ||||||||||||
| Transportation and storage | 4,268 | 450 | 818 | 613 | 2,387 | ||||||||||||
| Total CECONY | 4,550 | 708 | 836 | 619 | 2,387 | ||||||||||||
| O&R | |||||||||||||||||
| Natural gas supply | 45 | 41 | 3 | 1 | — | ||||||||||||
| Transportation and storage | 681 | 71 | 128 | 98 | 384 | ||||||||||||
| Total O&R | 726 | 112 | 131 | 99 | 384 | ||||||||||||
| Total natural gas supply, transportation and storage contracts | 5,276 | 820 | 967 | 718 | 2,771 | ||||||||||||
| Other purchase obligations (f) | |||||||||||||||||
| CECONY | 4,156 | 1,350 | 1,650 | 743 | 413 | ||||||||||||
| O&R | 169 | 93 | 20 | 14 | 42 | ||||||||||||
| Total other purchase obligations | 4,325 | 1,443 | 1,670 | 757 | 455 | ||||||||||||
| Total | $55,487 | $3,912 | $5,471 | $5,125 | $40,979 |
(a)Excludes amounts reclassified as Liabilities Held For Sale on Con Edison's balance sheet. Amounts excluded are $2 million, $5 million, $6 million, and $49 million of long-term debt amortization under 1 year, 2-3 years, 4-5 years, and over 5 years, respectively. See Note W and Note X to the financial statements in Item 8.
(b)Amounts exclude interest on fixed rate debt calculated at rates in effect at December 31, 2023. Amounts excluded are $3 million, $6 million, $5 million, and $14 million of interest due under 1 year, 2-3 years, 4-5 years, and over 5 years, respectively, reclassified as Liabilities Held For Sale on Con Edison's balance sheet. See Note W and Note X to the financial statements in Item 8.
(c)Amounts exclude operating lease future minimum lease payments reclassified as Liabilities Held For Sale on Con Edison's balance sheet, of $3 million in total for years ended December 31, 2024 through 2028, and $10 million for all years thereafter, and imputed interest of $6 million. See Note W and Note X to the financial statements in Item 8.
(d)Included in these amounts is the cost of minimum quantities of natural gas supply, transportation and storage that the Utilities are obligated to purchase at both fixed and variable prices.
(e)Included in these amounts is the cost of minimum quantities of energy that the Utilities are obligated to purchase at both fixed and variable prices.
| CON EDISON ANNUAL REPORT 2023 | 29 |
(f)Amounts shown for other purchase obligations, which reflect capital and operations and maintenance costs incurred by the Utilities in running their day-to-day operations, were derived from the Utilities’ purchasing system as the difference between the amounts authorized and the amounts paid (or vouchered to be paid) for each obligation. For many of these obligations, the Utilities are committed to purchase less than the amount authorized. Payments for the “Other Purchase Obligations” are generally assumed to be made ratably over the term of the obligations. Long-term Purchase Obligations, which comprises $3,468 million of "Other Purchase Obligations," were derived from the Utilities' purchasing system by using a method that identifies the remaining purchase obligations. The Utilities believe that unreasonable effort and expense would be involved to enable them to report their “Other Purchase Obligations” in a different manner.
The Companies’ commitments to make payments in addition to these contractual commitments include their other liabilities reflected on their balance sheets, any funding obligations for their pension and other postretirement benefit plans, financial hedging activities, their collective bargaining agreements and Con Edison’s guarantee of certain obligations. See Notes E, F, Q and “Guarantees” in Note H to the financial statements in Item 8.
Capital Resources
Con Edison is a holding company that operates only through its subsidiaries and has no material assets other than its interests in its subsidiaries. Con Edison finances its capital requirements primarily through internally-generated funds, the sale of its common shares or external borrowings. Con Edison’s ability to make payments on external borrowings and dividends on its common shares depends on receipt of dividends from its subsidiaries, proceeds from the sale of additional common shares or its interests in its subsidiaries or additional external borrowings. See "Con Edison's Ability To Pay Dividends Or Interest Depends On Dividends From Its Subsidiaries" in Item 1A and Note U to the financial statements in Item 8.
For information about restrictions on the payment of dividends by the Utilities and significant debt covenants, see Note C to the financial statements in Item 8.
For information on the Companies’ commercial paper program and revolving credit agreements with banks, see Note D to the financial statements in Item 8.
The Companies require access to the capital markets to fund capital requirements that are substantially in excess of available internally-generated funds. See “Capital Requirements,” above and "The Companies Require Access To Capital Markets to Satisfy Funding Requirements” in Item 1A. Each of the Companies believes that it will continue to be able to access capital, although capital market conditions may affect the timing and cost of the Companies’ financing activities. The Companies monitor the availability and costs of various forms of capital, and will seek to issue Con Edison common shares and other securities when it is necessary or advantageous to do so. For information about the Companies’ long-term debt and short-term borrowing, see Notes C and D to the financial statements in Item 8.
The Utilities finance their operations, capital requirements and payment of dividends to Con Edison from internally-generated funds, contributions of equity capital from Con Edison, if any, and external borrowings. See "Liquidity and Capital Resources" in Item 7.
Con Edison plans to meet its capital requirements for 2024 through 2028 through internally-generated funds and the issuance of long-term debt and common equity. See “Capital Requirements and Resources - Capital Requirements" in Item 1. Con Edison's plans include the issuance of up to $3,250 million of long-term debt in 2024 and up to $1,000 million of long-term debt in 2025, including for maturing securities, at the Utilities and approximately $6,000 million in aggregate of long-term debt, including for maturing securities, at the Utilities during 2026 through 2028. Except for equity issued under its dividend reinvestment, employee stock purchase and long-term incentive plans, Con Edison does not plan to issue common equity in 2024 and plans to issue common equity of approximately $1,300 million in 2025 and up to $2,800 million in aggregate during 2026 through 2028. Con Edison’s estimates of its capital requirements and related financing plans reflect information available and assumptions at the time the statements are made and include, among other things, the assumptions that Con Edison’s non-utility gas transmission investments remain unchanged through 2028 and the Utilities’ forecasted capital investments and financing plans through 2028 are approved by the New York State Public Service Commission. Actual developments and the timing and amount of funding may differ materially.
In 2021, the NYSPSC authorized CECONY, through 2025, to issue up to $4,025 million of debt securities ($3,450 million of which the company had issued as of December 31, 2023). In 2022, the NYSPSC authorized O&R, through 2025, to issue up to $285 million of debt securities ($150 million of which the company had issued as of December 31, 2023). The NYSPSC also authorized CECONY and O&R for such periods to issue debt securities to refund existing debt securities of up to $2,500 million and $125 million, respectively. As of December 31, 2023, the Utilities had not refunded any securities pursuant to these authorizations.
Con Edison Transmission has financed its operations and capital requirements primarily with capital contributions and borrowings from Con Edison and internally-generated funds. See "Liquidity and Capital Resources" in Item 7.
| 30 | CON EDISON ANNUAL REPORT 2023 |
For each of the Companies, the common equity ratio for the last five years was:
| Common Equity Ratio (Percent of total capitalization) | |||||||||||||||||
| 2019 | 2020 | 2021 | 2022 | 2023 | |||||||||||||
| Con Edison | 49.6 | 48.3 | 47.4 | 50.9 | 49.1 | ||||||||||||
| CECONY | 49.2 | 47.9 | 47.0 | 46.9 | 47.9 |
The credit ratings assigned by Moody’s, S&P and Fitch to the senior unsecured debt and commercial paper of Con Edison, CECONY and O&R are as follows:
| Moody's | S&P | Fitch | |||||||||
| Con Edison | |||||||||||
| Senior Unsecured Debt | Baa1 | BBB+ | BBB+ | ||||||||
| Commercial Paper | P-2 | A-2 | F2 | ||||||||
| CECONY | |||||||||||
| Senior Unsecured Debt | A3 | A- | A- | ||||||||
| Commercial Paper | P-2 | A-2 | F2 | ||||||||
| O&R | |||||||||||
| Senior Unsecured Debt | Baa2 | A- | A- | ||||||||
| Commercial Paper | P-2 | A-2 | F2 |
Credit ratings assigned by rating organizations are expressions of opinion and are not recommendations to buy, sell or hold securities. A credit rating is subject to revision or withdrawal at any time by the assigning rating organization. Each rating should be evaluated independently of any other rating. See “The Companies Require Access To Capital Markets To Satisfy Funding Requirements” and “Changes To Tax Laws Could Adversely Affect the Companies” in Item 1A.
Environmental Matters
Clean Energy Future
New York State’s Climate Leadership and Community Protection Act
In 2019, New York State enacted the Climate Leadership and Community Protection Act (CLCPA) that established a goal of 70 percent of the electricity procured by load serving entities regulated by the NYSPSC to be produced by renewable energy systems by 2030 and requires the statewide electrical demand system to have zero emissions by 2040. The law also codified state targets for energy efficiency (end-use energy savings of 185 trillion British thermal units below 2025 energy-use forecast), offshore wind (9,000 MW by 2035), solar (6,000 MW by 2025) and energy storage (3,000 MW by 2030). The CLCPA established a climate action council that made recommendations for meeting the statewide greenhouse gas (GHG) emission reduction requirements through displacing fossil-fuel fired electricity with renewable electricity, transitioning heating and transportation to lower GHG impact fuels (including substantial electrification), implementing energy efficiency measures and providing 35 percent to 40 percent of the benefits of CLCPA-related investments to disadvantaged communities. As required by the law, the New York State Department of Environmental Conservation (NYSDEC) adopted regulations establishing statewide GHG emissions limits that are 60 percent of 1990 emissions levels by 2030 and 15 percent of 1990 emissions by 2050. The Utilities are unable to predict the impact on them of the implementation of this law.
CECONY and O&R have been required to obtain renewable energy credits (RECs) and zero-emissions credits (ZECs) for their full service customers since 2017. In October 2020, the NYSPSC, in response to the CLCPA, established a new RECs program to support increased renewable energy availability in New York City for which the costs would be borne by load serving entities across New York State on a volumetric basis. Load serving entities may satisfy their REC obligation by either purchasing RECs acquired through central procurement by the New York State Energy Research and Development Authority (NYSERDA), by self-supply through direct purchase of tradable RECs, or by making alternative compliance payments. Load serving entities purchase ZECs from NYSERDA at prices determined by the NYSPSC. In April 2022, the NYSPSC issued an order approving contracts between NYSERDA and two project sponsors selected by NYSERDA to provide RECs directly to New York City (Clean Path New York and H.Q. Energy Services (U.S.) Inc.) that anticipate in-service dates of 2026 and 2027, respectively.
| CON EDISON ANNUAL REPORT 2023 | 31 |
Both projects have submitted requests to the NYISO to interconnect to CECONY’s high-voltage transmission system.
In June 2023, the NYISO selected the Propel NY Energy transmission project that was jointly proposed by New York Transco and the New York Power Authority (NYPA). Con Edison Transmission has a 41.7 percent interest in New York Transco’s share of the Propel NY Energy project, a 90-mile electric transmission project with an in-service date of 2030. The project is expected to enable delivery of a minimum of 3,000 MW of offshore wind electricity, increase high voltage transmission connections between Long Island and the rest of New York State and provide New Yorkers with greater access to diverse energy resources. See "Con Edison Transmission," below.
Also in June 2023, CECONY filed a petition with FERC to add a formula rate to the NYISO tariff to enable CECONY to recover the costs of, and a return on investment for, two types of projects: (1) local transmission upgrades determined by the NYSPSC to be necessary or appropriate to meet the CLCPA goals of New York State and (2) any regulated transmission projects (or portions thereof) eligible for recovery under the NYISO’s public policy transmission planning process. For local transmission upgrades, CECONY proposed the return on equity to be the lower of the NYSPSC-determined rates or 10.87 percent. For NYISO projects, CECONY proposed a return on equity of 11.10 percent. CECONY anticipates that the formula rate, once in place, will be applied to recover the costs of the upgrades associated with the Propel NY Energy offshore wind project.
In November 2023, CECONY and O&R filed their combined gas system long-term plan. The Utilities’ plan has a 20-year horizon to achieve the greenhouse gas emissions reduction targets of the CLCPA and includes three pathways: (1) a reference pathway based on investments approved by the NYSPSC, (2) an alternate hybrid electric generation and low-carbon fuels pathway and (3) an alternate deep electrification pathway. The plan outlines objectives in clean energy, climate resilience, core service, and customer engagement and includes forecasts of annual customer bill charges. The plan concludes that gas sales and emissions in CECONY’s and O&R’s service territories are projected to fall in all three pathways.
Offshore Wind
In an effort to meet the CLCPA’s offshore wind goals, load serving entities, such as CECONY and O&R, will be required to purchase offshore wind renewable energy credits beginning in 2025 when projects are expected to begin operation.
In October 2023, NYSERDA announced that it selected three new offshore wind projects for contract negotiations, representing 4,032 MW of energy by 2030 One of the conditional awards, the Community Offshore Wind project, is expected to connect 1,314 MW of offshore wind electricity through CECONY’s Brooklyn Clean Energy Hub by 2030 (see “Electric Reliability Needs,” above) and another conditional award, the Excelsior Wind project, is expected to connect 1,314 MW of offshore wind electricity using the capability of the Propel NY Energy project. See "Con Edison Transmission," above.
Energy Efficiency
In January 2020, and updated in August 2022, the NYSPSC issued an order directing energy efficiency targets and budgets for New York utilities. The order approved electric and gas energy efficiency programs and heat pump budgets, and associated targets, for the years 2020 through 2025 to meet the NYSPSC’s goal of reducing electric use by 3 percent annually and gas use by 1.3 percent annually by 2025. The order and subsequent update authorized budgets for the years 2020 through 2025 for: electric energy efficiency programs of $688 million and $71 million for CECONY and O&R, respectively; gas energy efficiency programs of $338 million and $17 million for CECONY and O&R, respectively; and heat pump programs of $746 million and $15 million for CECONY and O&R, respectively. CECONY’s current electric and gas rate plans allow it to recover the costs of energy efficiency expenditures, including a full rate of return, in rates from customers. See Note B to the financial statements in Item 8.
In November 2023, and updated in January 2024, CECONY and O&R filed preliminary proposals for energy efficiency and heat pump programs for 2026-2030 with aggregate budgets of approximately $2,744 million and $129 million, respectively. The aggregate amounts are comprised of average annual budgets of up to: $373 million and $22 million for electric energy efficiency and heat pump programs for CECONY and O&R, respectively, $150 million and $4 million for gas energy efficiency programs for CECONY and O&R, respectively, and $26 million for steam energy efficiency programs for CECONY.
| 32 | CON EDISON ANNUAL REPORT 2023 |
Electric Vehicles
In July 2020, the NYSPSC established light-duty electric vehicle make-ready and other infrastructure programs that included budgets of $290 million and $24 million for CECONY and O&R, respectively, through 2025. In November 2023, the light-duty infrastructure and other programs, including medium and heavy-duty make-ready pilot projects and a new micromobility infrastructure incentive program, were expanded to approximately $823 million for CECONY and $56 million for O&R, with the ability to extend beyond 2025. The NYSPSC authorized CECONY and O&R to recover these costs, including a full rate of return, through surcharge mechanisms and subsequently in rates from customers.
In July 2022, the NYSPSC issued an order that provides CECONY and O&R with up to a total of $31 million and $5.8 million, respectively, through 2025, for implementation of residential vehicle managed charging programs and administration costs. The NYSPSC authorized CECONY and O&R to recover these costs through surcharge mechanisms. The order also provides CECONY and O&R with authorization to offer incentives to encourage electric vehicle charging to occur overnight and during off-peak times totaling approximately $71.8 million and $8.2 million, respectively, through 2025, that would be recovered through the respective company’s revenue reconciliation mechanisms.
In October 2022, the NJBPU approved RECO’s electric vehicle make-ready program that includes a budget of $7.6 million through 2026 for electric vehicle infrastructure and related program costs. The NJBPU authorized RECO to recover these costs, including a full rate of return, in rates from customers.
In November 2023, the NYSPSC issued an order that provides CECONY and O&R with up to $432 million and $18 million, respectively, for the implementation of commercial managed charging programs and demand charge rebates, participant incentives and administration costs. The NYSPSC authorized CECONY and O&R to recover these costs, including a full rate of return, through surcharge mechanisms and subsequently in rates from customers.
Energy Storage
In December 2018, the NYSPSC issued an order establishing an energy storage goal of up to 3,000 MW of energy storage by 2030 with an interim objective of 1,500 MW by 2025. The order required CECONY and O&R to file implementation plans for a competitive procurement process to deploy 300 MW and 10 MW, respectively, of energy storage. CECONY and O&R filed their implementation plans in February 2019. CECONY is in contract negotiations with storage developers and O&R is evaluating bids from storage developers. The Utilities expect to recover the cost of energy storage services, including a full rate of return, in rates and surcharges from customers. In December 2022, NYSDPS and NYSERDA issued an updated storage roadmap that proposes to increase the storage goal from 3,000 MW to 6,000 MW by 2030. The proposal includes the recommendation that New York State’s utilities study the potential of energy storage to provide non-market transmission and distribution services and identify services that are cost-effective compared to traditional alternatives.
Thermal Energy Networks
In September 2023, the NYSPSC issued an order providing guidance on the development and implementation of utility-scale thermal energy network pilot projects throughout New York State. The order introduced a framework for the NYSPSC to evaluate whether the proposed pilot projects are in the public interest. In December 2023, CECONY and O&R filed pilot project proposals with budgets of $255 million and $46 million, respectively. The proposed pilots are subject to approval by the NYSPSC.
Distribution System and Distributed Resources
The NYSPSC is directing development by New York electric utilities of a distributed system platform to manage and coordinate distributed energy resources in their service areas under NYSPSC regulation and to provide customers, together with third parties, with data and tools to better manage their energy use. The NYSPSC has required the Utilities to file distributed system implementation plans and ordered the Utilities to develop demonstration projects to inform distributed system platform business models. As of December 31, 2023, CECONY and O&R had one shared active demonstration project, and individually, CECONY had four and O&R had three active demonstration projects.
The NYSPSC approved CECONY’s advanced metering infrastructure (AMI) installation plan for its electric and gas delivery businesses, subject to a cap on capital expenditures of $1,285 million. CECONY substantially completed its smart meter installations in 2023 and expects to complete its AMI installation plan in 2024. The NYSPSC also authorized O&R to expend $98.5 million to install AMI for its New York customers, which work was complete as of December 31, 2020.
| CON EDISON ANNUAL REPORT 2023 | 33 |
The NYSPSC began to change compensation for DERs and place limits on net energy metering (NEM) in 2015. In New York, NEM compensates kilowatt-hours exported to the electric distribution system at the full-service rate for production, delivery, taxes and fees. NYSPSC’s policy is to phase in changes to limit annual bill increases on non-participating customers to two percent. In addition, NEM projects interconnected on or after January 1, 2022 are charged for their share of energy efficiency and other public policy benefit programs.
New York City’s Clean Energy Goals
In 2014, New York City announced a goal to reduce GHG emissions 80 percent below 2005 levels by 2050. In May 2019, New York City enacted a package of legislation known as the Climate Mobilization Act, that includes provisions intended to reduce GHG emissions from large buildings by 40 percent from 2005 levels by 2030. Building owners may achieve compliance through operational changes, building retrofits, the purchase of GHG offsets, the purchase of renewable energy credits and the use of clean distributed energy resources. CECONY is unable to predict the impact on it of the implementation of this law.
Federal Regulation
In June 2022, the U.S. Supreme Court issued a decision that restricts the authority of the United States Environmental Protection Agency (EPA) to establish GHG emission reduction measures under Section 111 of the federal Clean Air Act for technologies that reduce GHG emissions from fossil fuel combustion at the source. Con Edison, as part of a coalition of public and private utilities, was a party in the case and had argued that the U.S. Supreme Court should not adopt this restrictive statutory reading of the Clean Air Act. Depending on how it is implemented in future final EPA regulations, which are currently undergoing federal rulemaking, the U.S. Supreme Court’s decision could have potential cost implications for CECONY because it could limit its flexibility to use measures such as trading emissions allowances from higher emitting sources to lower emitting sources and averaging emissions across different sources, to cost-effectively meet federal GHG emissions limits for its limited portfolio of steam and electric generating assets. The decision could also indirectly impact CECONY's and O&R's initiatives to develop renewable energy sources. Certain CECONY electric generating units could be subject to the final rule, depending on its applicability criteria. The Companies are unable to predict the impact on them as a result of the decision or any final regulations that may be promulgated by the EPA.
Climate Change
As indicated by the Intergovernmental Panel on Climate Change, emissions of greenhouse gases (GHG) from manmade sources are changing the world’s climate.
Climate change could affect customer demand for the Companies’ energy services. It might also cause physical damage to the Companies’ facilities and disruption of their operations due to more frequent and more extreme weather. Past major weather events such as Superstorm Sandy in 2012 and Tropical Storm Isaias in 2020 caused large power outages in the Utilities’ territories and resulted in the Utilities incurring substantial response and restoration costs.
In September 2023, CECONY updated the climate change vulnerability study it issued in 2019 and O&R published its first climate change vulnerability study. The studies were developed pursuant to a New York State Public Service law that requires all New York electric utilities to release a climate change vulnerability study and file with the NYSPSC a subsequent climate change resilience plan at least every five years. The law authorizes utilities to recover costs incurred outside of the rate plans through a surcharge and to subsequently include approved costs into base rates during the next rate case proceeding. The Utilities’ studies identified rising temperatures, inland flooding, sea level rise, storm surge, high winds, ice accumulation and extreme and compound weather events to be the biggest risks to their systems. The resulting extreme weather events brought about by climate change are manifested in increased system load, asset degradation, equipment damage and worker safety and accessibility concerns.
In November 2023, CECONY and O&R filed climate change resilience plans with the NYSPSC that proposed to make investments of $903 million and $411 million, respectively, between 2025 and 2029 to enhance the resilience of their electric systems against extreme weather events brought about by climate change. The projected total cost of CECONY’s and O&R’s resilience investments from 2025 through 2044 are expected to be $5,600 million and $1,400 million, respectively. These investments are subject to approval by the NYSPSC.
GHG Emissions Reporting
| 34 | CON EDISON ANNUAL REPORT 2023 |
Based on the most recent data (2021) published by the U.S. Environmental Protection Agency (EPA), Con Edison estimates that its direct GHG emissions constitute less than 0.1 percent of the nation’s GHG emissions. Con Edison’s estimated Scope 1 emissions of GHG during the past five years were:
| (Metric tons, in millions (a)) | 2019 | 2020 | 2021 | 2022 | 2023 | ||||||||||||
| CO2 equivalent emissions | 2.9 | 2.7 | 2.8 | 2.9 | 2.7 |
(a)Estimated emissions for 2023 are based on preliminary data and are subject to third-party verification. Scope 1 emissions are GHG emitted into the atmosphere by assets owned by Con Edison. Con Edison’s Scope 1 emissions primarily include emissions from CECONY’s operation of steam, electric, and co-generation plants. Con Edison’s Scope 1 emissions also include fugitive emissions that occur when pressurized equipment and infrastructure containing a GHG has a controlled or uncontrolled emission and emissions from Con Edison’s vehicle fleet.
Con Edison’s more than 54 percent decrease in direct GHG emissions (carbon dioxide, methane and sulfur hexafluoride) from the 2005 baseline (6.0 million metric tons) reflects emission reductions resulting from equipment and repair projects, reduced steam demand, the increased use of natural gas in lieu of fuel oil at CECONY’s steam production facilities and projects to reduce sulfur hexafluoride emissions and to replace leak-prone gas distribution pipes. As a result of the Utilities’ participation in the NYISO wholesale markets, a portion of the Utilities’ NYISO energy purchases are sourced from renewable electric production facilities. The electricity produced by renewable generation offsets the energy that the Utilities would otherwise have procured, thereby reducing the amount of electricity produced by non-renewable production facilities. The Utilities also actively promote energy efficiency and the use of renewable generation to help their customers reduce their GHG emissions.
CECONY has participated for several years in voluntary initiatives with the EPA to reduce its methane and sulfur hexafluoride emissions. The Utilities reduce methane emissions from the operation of their gas distribution systems through pipe maintenance and replacement programs and by utilizing technologies to reduce fugitive emissions from leaks or when work is performed on operating assets. The Utilities reduce emissions of sulfur hexafluoride by using improved technologies to locate and repair leaks and by replacing older equipment. In December 2023, NYSDEC issued a proposed regulation that would impose an emissions limit on owners of gas insulated equipment containing sulfur hexafluoride, including equipment used in electric power transmission and distribution.
In January 2016, the NYSPSC approved a 10-year clean energy fund to be managed by NYSERDA under the NYSPSC's supervision. The Utilities collect clean energy fund surcharges from their customers through the system benefit charge. The Utilities billed customers clean energy fund surcharges of $224 million, $216 million and $224 million in 2023, 2022, and 2021, respectively.
CECONY is subject to carbon dioxide emissions regulations established by New York State under the Regional Greenhouse Gas Initiative (RGGI) due to its ownership of electric generation assets. The initiative established a decreasing cap on carbon dioxide emissions resulting from the generation of electricity. Under RGGI, affected electric generators are required to obtain emission allowances to cover their carbon dioxide emissions. CECONY will purchase RGGI allowances for the sixth control period (2024 – 2026) based on anticipated emissions, which are expected to be similar to past compliance periods.
The cost to the Companies to comply with legislation, regulations or initiatives limiting GHG emissions could be substantial.
Environmental Sustainability
Con Edison’s sustainability strategy, as it relates to the environment, provides that the company seeks, among other things, to reduce direct and indirect GHG emissions; enhance the efficiency of its water use; reduce its impact to natural ecosystems; focus on reducing, reusing and recycling to lower materials consumption and disposal; and design its work in consideration of climate projections.
Con Edison has adopted a Clean Energy Commitment whereby it commits to the transition to the clean energy future. Con Edison's Clean Energy Commitment is supported by five pillars:
-
Build the grid of the future
-
Empower Con Edison's customers to meet their climate goals
-
Reimagine the gas system
-
Lead by reducing Con Edison's carbon footprint
-
Partner with stakeholders
CECONY
Superfund
| CON EDISON ANNUAL REPORT 2023 | 35 |
The Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 and similar state statutes (Superfund) impose joint and several liability, regardless of fault, upon generators of hazardous substances for investigation costs, remediation costs and environmental damages. The sites as to which CECONY has been asserted to have liability under Superfund include its and its predecessor companies’ former manufactured gas sites, its multi-purpose Astoria site, the Gowanus Canal site, the Newtown Creek site and other Superfund sites discussed below. There may be additional sites as to which assertions will be made that the company has liability. For a further discussion of claims and possible claims against the company under Superfund, estimated liability accrued for Superfund claims and recovery from customers of site investigation and remediation costs, see Note G to the financial statements in Item 8.
Manufactured Gas Sites
CECONY and its predecessors formerly owned and operated manufactured gas plants at 51 sites (MGP Sites) in New York City and Westchester County. Many of these sites have been subdivided and are now owned by parties other than CECONY and have been redeveloped for other uses, including schools, residential and commercial developments and hospitals. The NYSDEC is requiring CECONY to investigate, and if necessary, develop and implement remediation programs for the sites, including any neighboring areas to which contamination may have migrated.
CECONY has started remedial investigations at all 51 MGP Sites. After investigations, no MGP impacts have been detected at all or portions of 15 sites, and the NYSDEC has issued No Further Action (NFA) letters for these sites.
Coal tar or other MGP-related contaminants have been detected at the remaining 36 sites. Remedial actions have been completed at all or portions of 14 sites and the NYSDEC has issued NFA letters for these sites. In addition, remedial actions have been completed by property owners at all or portions of four sites under the New York State Brownfield Cleanup Program and Certificates of Completion have been issued by the NYSDEC for these sites. Remedial design, planning or action is ongoing for the remaining sites or portions of sites; however, the information as to the extent of contamination and scope of the remediation likely to be required for many of these sites is incomplete. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on MGP sites (other than the Astoria site, which is discussed below) could range from $686 million to $2,548 million.
Astoria Site
CECONY is permitted by the NYSDEC to operate a hazardous waste storage facility on property owned by it in the Astoria section of Queens, New York. Portions of the property were formerly the location of a manufactured gas plant and also have been used or are being used for, among other things, electric generation operations, electric substation operations, the storage of fuel oil, the manufacture and storage of liquefied natural gas and the maintenance and storage of electric equipment. As a condition of its NYSDEC permit, the company is required to investigate the property and, where environmental contamination is found and action is necessary, to remediate the contamination. The company’s investigations are ongoing. The company has submitted reports to the NYSDEC and the New York State Department of Health and in the future will be submitting additional reports identifying the known areas of contamination. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on the property could range from $301 million to $884 million.
Gowanus Canal
In August 2009, CECONY received a notice of potential liability and request for information from the EPA about the operations of the company and its predecessors at sites adjacent to or near the 1.8 mile Gowanus Canal in Brooklyn, New York. In March 2010, the EPA added the Gowanus Canal to its National Priorities List of Superfund sites. The canal’s adjacent waterfront is primarily commercial and industrial, currently consisting of concrete plants, warehouses and parking lots. The canal is near several residential neighborhoods. In September 2013, the EPA issued its record of decision for the site. The EPA concluded that there was significant contamination at the site, including polycyclic aromatic hydrocarbons, polychlorinated biphenyls (PCBs), pesticides, metals and volatile organic compounds. The EPA selected a remedy for the site that includes dredging and disposal of some contaminated sediments and stabilization and capping of contamination that will not be removed. The EPA estimated the cost of the selected remedy to be $506 million (and has indicated the actual cost could be significantly higher). The EPA has identified 39 potentially responsible parties (PRPs) with respect to the site, including CECONY (which the EPA indicated has facilities that may be a source of PCBs at the site). The EPA ordered the PRPs, including CECONY, to coordinate and cooperate with each other to perform and/or fund the remedial design for the selected remedy, which current estimates indicate could cost approximately $113 million. CECONY is funding its allocated share of the remedial design costs along with the other PRPs. In April 2019, the EPA issued an order that requires the PRPs, including CECONY, to: (1) design and perform bulkhead structural support work, including associated access dredging, along certain portions of the upper reaches of the canal, and (2) complete the design
| 36 | CON EDISON ANNUAL REPORT 2023 |
work for bulkhead structural support along certain portions of the middle part of the canal. The PRPs and CECONY are coordinating the implementation of this order. In January 2020, the EPA issued an order that requires six PRPs, including CECONY, to initiate the remedial action work in the upper reaches of the canal following the completion of the bulkhead upgrades. The EPA estimated that this work would cost approximately $125 million, although actual costs may be significantly higher. In November 2020, the PRPs began implementation of the work required under this order. Cleanup in other areas of the canal is not addressed by this order. In addition, other Federal agencies and the NYSDEC have previously notified the PRPs of their intent to perform a natural resource damage assessment for the site. CECONY is unable to estimate its exposure to liability for the Gowanus Canal site.
Newtown Creek
In June 2017, CECONY received a notice of potential liability from the EPA with respect to the Newtown Creek site that was listed in 2010 on the EPA’s National Priorities List of Superfund sites. The EPA has identified 21 potentially responsible parties (PRPs) with respect to the site, including CECONY, and has indicated that it will notify the company as additional PRPs are identified and notified by the EPA. Newtown Creek and its tributaries (collectively, Newtown Creek) form a 3.8 mile border between Brooklyn and Queens, New York. Currently, the predominant land use around Newtown Creek includes industrial, petroleum, recycling, manufacturing and distribution facilities and warehouses. Other uses include trucking, concrete manufacture, transportation infrastructure and a wastewater treatment plant. Newtown Creek is near several residential neighborhoods. Six PRPs, not including CECONY, pursuant to an administrative settlement agreement and order on consent the EPA issued to them in 2011, have been performing a remedial investigation of the site. The EPA indicated that sampling events have shown the sediments in Newtown Creek to be contaminated with a wide variety of hazardous substances including PCBs, metals, pesticides, polycyclic aromatic hydrocarbons and volatile organic compounds. The EPA also indicated that it has reason to believe that hazardous substances have come to be released from CECONY facilities into Newtown Creek. The current schedule anticipates completion of a feasibility study for the site during 2027 and issuance of the EPA's record of decision selecting a remedy for the site thereafter. CECONY is unable to estimate its exposure to liability for the Newtown Creek site.
Other Superfund Sites
CECONY is a PRP at additional Superfund sites involving other PRPs and participates in PRP groups at those sites. The company generally is not managing the site investigation and remediation at these multiparty sites. Work at these sites is in various stages, and investigation, remediation and monitoring activities at some of these sites can be expected to continue over extended periods of time. The company believes that it is unlikely that monetary sanctions, such as penalties, will be imposed by any governmental authority with respect to these sites.
The following table lists each of the additional Superfund sites for which the company anticipates it may have liability. The table also shows for each such site its location, the year in which the company was designated or alleged to be a PRP or to otherwise have responsibilities for the site (shown in the table under “Start”), the name of the court or agency in which proceedings for the site are pending and CECONY’s estimated percentage of the total liability for each site. The company currently estimates that its potential liability for investigation, remediation, monitoring and environmental damages in aggregate for the sites below, other than the sites where the percentage of total liability has not been determined, is less than $2 million. Superfund liability is joint and several. The company’s estimate of its liability for each site was determined pursuant to consent decrees, settlement agreements or otherwise and in light of the financial condition of other PRPs. The company’s actual liability could differ substantially from amounts estimated.
| Site | Location | Start | Court or Agency | % of Total Liability | ||||||||||
| Cortese Landfill | Narrowsburg, NY | 1987 | EPA | 6.0% | ||||||||||
| Curcio Scrap Metal | Saddle Brook, NJ | 1987 | EPA | 100.0% | ||||||||||
| Metal Bank of America | Philadelphia, PA | 1987 | EPA | 1.0% | ||||||||||
| Global Landfill | Old Bridge, NJ | 1988 | EPA | 0.4% | ||||||||||
| Borne Chemical | Elizabeth, NJ | 1997 | NJDEP | 0.7% | ||||||||||
| Pure Earth | Vineland, NJ | 2018 | EPA | to be determined | ||||||||||
| Scientific Chemical Processing | Carlstadt, NJ | 2023 | EPA | to be determined |
Other Environmental Matters
Following media reports, in July 2023, the Environmental Protection Agency, New York State Department of Environmental Conservation, New York State Department of Health and NYSDPS began investigating the potential public health risks associated with lead-jacketed cables in the fixed-line telecommunications industry. The use of
| CON EDISON ANNUAL REPORT 2023 | 37 |
lead-jacketed electric cables began in the 1880s to protect conducting wires from exposure to the elements. All of the Utilities’ transmission cables that are in service and lead-jacketed are covered with an outer plastic layer and comprise less than 2 percent of CECONY’s transmission system and less than 5 percent of O&R’s transmission system. CECONY installed lead-jacketed cables without an outer plastic layer in its distribution system until the 1980’s. CECONY’s distribution cables that are in service and lead-jacketed may or may not have an outer plastic layer and may be located within a conduit and manhole system, directly buried or strung in the air between poles and comprise less than 14 percent of its distribution system. O&R’s distribution cables are not lead-jacketed. CECONY’s transmission and distribution systems also contain lead-jacketed cables that were retired in place. CECONY continues to replace lead-jacketed distribution cables, as needed, and recover the costs for cable replacements, pursuant to its electric rate plan. The Companies are unable to predict the impact on them, if any, resulting from potential developments to legal or public policy doctrines regarding cable that contains lead.
In July 2021, a CECONY feeder failure led to the discharge of thousands of gallons of dielectric fluid from a street manhole in New Rochelle, New York. Dielectric fluid reached nearby streets, properties and the New Rochelle Harbor. CECONY, the U.S. Coast Guard, the NYSDEC and other agencies responded to the incident. CECONY stopped the feeder leak on the same day the discharge occurred and has completed the spill recovery and associated cleanup operations. As a result of the discharge, CECONY received third-party damage claims. The costs associated with this matter are not expected to have a material adverse effect on CECONY’s financial condition, results of operations and liquidity. In connection with the incident, CECONY may incur monetary sanctions of more than $0.3 million for violations of certain provisions regulating the discharge of materials into, and for the protection of, the environment.
In 2016, CECONY and another utility responded to a reported dielectric fluid leak at a New Jersey marina on the Hudson River associated with one or two underwater transmission lines, the New Jersey portion of which is owned and operated by the other utility and the New York portion of which is owned and operated by CECONY. In 2017, after the marina owner had cleared substantial debris from its collapsed pier and rip rap material that it had previously placed over and in the vicinity of the underwater transmission lines in an attempt to shore up its failing pier, a dielectric fluid leak was found and repaired on one of the underwater transmission lines. In August 2018, the EPA declared the leak response complete. In August 2020, CECONY and the other utility entered into a settlement with the United States federal government, under which the utilities settled the federal government’s claims for outstanding response costs. In December 2023, CECONY, the other utility and the marina owner settled all of the claims in a litigation regarding response and repair costs and related damages.
O&R
Superfund
The sites at which O&R has been asserted to have liability under Superfund include its manufactured gas sites and the Superfund sites discussed below. There may be additional sites as to which assertions will be made that O&R has liability. For a further discussion of claims and possible claims against O&R under Superfund, see Note G to the financial statements in Item 8.
Manufactured Gas Sites
O&R and its predecessors formerly owned and operated manufactured gas plants at seven sites (O&R MGP Sites) in Orange County and Rockland County, New York. Three of these sites are now owned by parties other than O&R, and have been redeveloped by them for residential, commercial or industrial uses. The NYSDEC is requiring O&R to develop and implement remediation programs for the O&R MGP Sites including any neighboring areas to which contamination may have migrated.
O&R has completed remedial investigations and has received the NYSDEC’s decision regarding the remedial work to be performed at all seven of its MGP sites. Of the seven sites, O&R has completed remediation at four sites. Remedial construction was conducted on a portion of one of the remaining sites in 2019 and remedial design is ongoing for the other remaining sites. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on MGP sites could range from $92 million to $145 million.
Superfund Sites
O&R is a PRP at Superfund sites involving other PRPs and participates in PRP groups at those sites. The company is not managing the site investigation and remediation at these multiparty Superfund sites. Work at these sites is in various stages, and investigation, remediation and monitoring activities at some of these sites is expected to continue over extended periods of time. The company believes that it is unlikely that monetary sanctions, such as penalties, will be imposed by any governmental authority with respect to these sites.
| 38 | CON EDISON ANNUAL REPORT 2023 |
The following table lists each of the Superfund sites for which the company anticipates it may have liability. The table also shows for each such site its location, the year in which the company was designated or alleged to be a PRP or to otherwise have responsibilities for the site (shown in the table under “Start”), the name of the court or agency in which proceedings for the site are pending and O&R’s estimated percentage of the total liability for each site. The company currently estimates that its potential liability for investigation, remediation, monitoring and environmental damages in aggregate for the sites below is less than $1 million. Superfund liability is joint and several. The company’s estimate of its liability for each site was determined pursuant to consent decrees, settlement agreements or otherwise and in light of the financial condition of other PRPs. The company’s actual liability could differ substantially from amounts estimated.
| Site | Location | Start | Court or Agency | % of Total Liability | ||||||||||
| Metal Bank of America | Philadelphia, PA | 1993 | EPA | 4.6% | ||||||||||
| Borne Chemical | Elizabeth, NJ | 1997 | NJDEP | 2.3% | ||||||||||
| Ellis Road | Jacksonville, FL | 2011 | EPA | 0.2% |
Other Federal, State and Local Environmental Provisions
Toxic Substances Control Act
Virtually all electric utilities, including CECONY and O&R, own equipment that may contain PCBs. PCBs are regulated under the Federal Toxic Substances Control Act of 1976. The Utilities have procedures in place to manage and dispose of oil and equipment containing PCBs properly when they are removed from service.
Water Quality
Under NYSDEC regulations, the operation of CECONY’s generating facilities requires permits for water discharges and water withdrawals. Conditions to the renewal of such permits may include limitations on the operations of the permitted facility or requirements to install certain equipment, the cost of which could be substantial. For information about the company’s generating facilities, see “CECONY – Electric Operations – Electric Facilities” and “Steam Operations – Steam Facilities” above in this Item 1.
Certain governmental authorities are investigating contamination in the Hudson River and the New York Harbor. These waters run through portions of CECONY’s service area. Governmental authorities could require entities that released hazardous substances that contaminated these waters to bear the cost of investigation and remediation, which could be substantial.
Air Quality
Under the Clean Air Act and New York State law, certain of CECONY’s facilities qualify as major facilities that are required to obtain Clean Air Act Title V operating permits. Consistent with the governing regulations, CECONY applies to renew these permits prior to their expiration and seeks to modify them when needed.
Under new source review regulations, an owner of a major facility, including CECONY’s steam and steam-electric generating facilities, is required to obtain a permit before making certain modifications to the facility, other than routine maintenance, repair, or replacement, that cause the increase of emissions of pollutants from the facility above specified thresholds. To obtain a permit, the facility owner could be required to install additional pollution controls or otherwise limit emissions from the facility. The company reviews on an on-going basis its planned modifications to its facilities to determine the potential applicability of new source review and similar regulations.
The EPA's Transport Rule (also referred to as the Cross-State Air Pollution Rule), which was implemented in January 2015, established a new cap-and-trade program requiring further reductions in air emissions than the Clean Air Intrastate Rule (CAIR) that it replaced. Under the Transport Rule, utilities are to be allocated emissions allowances and may sell the allowances or buy additional allowances. CECONY requested and received NYSPSC approval to change the provisions under which the company recovers its purchased power costs to provide for costs incurred to purchase emissions allowances and revenues received from the sale of allowances. In 2021, the EPA finalized changes to the Transport Rule in response to a court decision. In 2023, the EPA finalized an updated version of the Transport Rule (known as the Good Neighbor Rule) that includes a more recent federal ozone standard than the Transport Rule initially implemented. Since its promulgation, the Good Neighbor Rule has been the subject of litigation in the federal Circuit Courts of Appeals which have stayed its effectiveness in several states (but not New York State). Elements of this litigation are before the U.S. Supreme Court and the Circuit Courts of Appeals. The revised Transport Rule reduced the number of allowances allocated to CECONY and required the company to purchase allowances to offset the decreased allocation. CECONY has complied with the Transport Rule in 2023 and expects to comply with the rule in 2024.
The NYSDEC issued regulations in 2019 that limit nitrous oxides (NOx) emissions during the ozone season from May through September and affect older peaking units that are generally located downstate and needed during
| CON EDISON ANNUAL REPORT 2023 | 39 |
periods of high electric demand or for local reliability purposes. See “CECONY – Electric Operations – Electric Supply,” above.
Environmental Matters
For information concerning climate change, environmental sustainability, potential liabilities arising from laws and regulations protecting the environment and other environmental matters, see “Environmental Matters” in Item 1, "Air Quality," above and Note G to the financial statements in Item 8.
State Anti-Takeover Law
New York State law provides that a “domestic corporation,” such as Con Edison, may not consummate a merger, consolidation or similar transaction with the beneficial owner of a 20 percent or greater voting stock interest in the corporation, or with an affiliate of the owner, for five years after the acquisition of the voting stock interest, unless the transaction or the acquisition of the voting stock interest was approved by the corporation’s board of directors prior to the acquisition of the voting stock interest. After the expiration of the five-year period, the transaction may be consummated only pursuant to a stringent “fair price” formula or with the approval of a majority of the disinterested stockholders.
Human Capital
Con Edison is committed to attracting, developing, and retaining a talented, diverse workforce. It values and supports a wide range of employee needs and interests. The company’s skilled and experienced workforce enables the company to maintain best-in-class reliability and progress towards achieving a clean energy future. Human capital measures focus on employee safety, hiring the right talent, employee development and retention and diversity and inclusion.
On December 31, 2023, Con Edison and its subsidiaries had 14,592 employees, based entirely in the United States including 13,416 at CECONY; 1,167 at O&R and 9 at Con Edison Transmission. Of the total CECONY and O&R employees, 7,661 and 603 employees, respectively, were represented by a collective bargaining unit. The collective bargaining agreement covering most of the CECONY employees expires in June 2024. Agreements covering other CECONY employees and O&R employees expire in June 2025 and May 2026, respectively.
Con Edison measures the voluntary attrition rate of its employees in assessing the company’s overall human capital. The company's turnover rate in 2023 was approximately 6.7 percent, 31 percent of which is attributed to retirements. The average length of service is 13.4 years. Con Edison strives to have a diverse and inclusive workforce. A comprehensive diversity and inclusion strategy underlies the corporate culture; informing how its employees engage with one another, and setting the foundation for a respectful and inclusive environment. On December 31, 2023, women represented 23.2 percent of the total workforce and people of color represented 53.6 percent of the workforce, with ethnicity breaking down as follows: 46.4 percent White, 23.3 percent Black, 19.3 percent Hispanic, 9.8 percent Asian and 1.2 percent other.
In managing the business, the company emphasizes a strong safety culture. Continuous focus on safety while performing work is paramount, and leaders and managers are committed to implementing programs and practices that promote the right knowledge, skills, and attitudes to undertake the responsibilities of safety, including required training for both field and office employees. To that end, the company has a dedicated facility, the Learning Center, that offers classes to employees covering technical courses, skills enhancement, safety and leadership development. During 2023, employees spent over 680,000 hours in instructor-led, leadership and skill-based training. Further, the company maintains a career development and succession planning program that is committed to helping employees grow their careers, talents, skills and abilities. In addition to their daily job functions, employees of the Utilities are assigned to and trained for a position for emergency response that is mobilized in the event of a weather event or emergency.
Although working remotely for certain positions has been made possible by digital software and smart device capabilities that enable employees to collaborate with each other and remain productive, the entire CECONY and O&R workforce is available in the event of an emergency that requires on-site presence.
Available Information
For the sources of information about the Companies, see “Available Information” in the “Introduction” appearing before this Item 1.
Previous: Cover and table of contents · Next: Item 1A. Risk Factors