Item 1. Entergy Corporation, Utility operating companies, and System Energy

103K characters. Original on sec.gov · Markdown

Item 1. Entergy Corporation, Utility operating companies, and System Energy

Entergy Corporation, Utility operating companies, and System Energy

Actual 2022 and projected 2023 sources of generation for the Utility operating companies and System Energy, including certain power purchases from affiliates under life of unit power purchase agreements, including the Unit Power Sales Agreement, are:

2022
CT / CCGT (b)Legacy GasNuclearCoalRenewables (c)Purchased Power (d)MISO Purchases (e)
Entergy Arkansas30%1%50%12%3%—%4%
Entergy Louisiana44%9%23%3%2%8%11%
Entergy Mississippi59%6%18%7%1%—%9%
Entergy New Orleans54%1%35%1%1%1%7%
Entergy Texas31%20%11%5%—%9%24%
System Energy (a)—%—%100%—%—%—%—%
Utility42%8%27%5%2%5%11%
2023
CT / CCGT (b)Legacy GasNuclearCoalRenewables (c)Purchased Power (d)MISO Purchases (e)
Entergy Arkansas26%—%58%13%3%—%—%
Entergy Louisiana47%5%30%3%3%12%—%
Entergy Mississippi63%—%26%10%1%—%—%
Entergy New Orleans48%1%45%2%3%1%—%
Entergy Texas44%31%15%9%—%1%—%
System Energy (a)—%—%100%—%—%—%—%
Utility44%6%36%7%2%5%—%

(a)Capacity and energy from System Energy’s interest in Grand Gulf is allocated as follows under the Unit Power Sales Agreement: Entergy Arkansas - 36%; Entergy Louisiana - 14%; Entergy Mississippi - 33%; and Entergy New Orleans - 17%. Pursuant to purchased power agreements, Entergy Arkansas is selling a portion of its owned capacity and energy from Grand Gulf to Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans.

(b)Represents natural gas sourced for Simple Cycle Combustion Turbine units and Combined Cycle Gas Turbine units.

(c)Includes generation from both owned and purchased power resources.

(d)Excludes MISO purchases and renewables purchased through purchased power agreements.

(e)In December 2013, Entergy integrated its transmission system into the MISO RTO. Entergy offers all of its generation into the MISO energy market on a day-ahead and real-time basis and bids for power in the MISO energy market to serve the demand of its customers, with MISO making dispatch decisions. The MISO purchases metric provided for 2022 is not projected for 2023.

Some of the Utility’s gas-fired plants are also capable of using fuel oil, if necessary. Although based on current economics the Utility does not expect fuel oil use in 2023, it is possible that various operational events including weather or pipeline maintenance may require the use of fuel oil.

Natural Gas

The Utility operating companies have long-term firm and short-term interruptible gas contracts for both supply and transportation. Over 50% of the Utility operating companies’ power plants maintain some level of long-term firm transportation. Short-term contracts and spot-market purchases satisfy additional gas requirements.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Entergy Texas owns a gas storage facility and Entergy Louisiana has a firm storage service agreement that provide reliable and flexible natural gas service to certain generating stations.

Many factors, including wellhead deliverability, storage, pipeline capacity, and demand requirements of end users, influence the availability and price of natural gas supplies for power plants. Demand is primarily tied to weather conditions as well as to the prices and availability of other energy sources. Pursuant to federal and state regulations, gas supplies to power plants may be interrupted during periods of shortage. To the extent natural gas supplies are disrupted or natural gas prices significantly increase, the Utility operating companies may in some instances use alternate fuels, such as oil when available, or rely to a larger extent on coal, nuclear generation, and purchased power.

Coal

Entergy Arkansas has committed to six two- to three-year contracts that will supply approximately 85% of the total coal supply needs in 2023. These contracts are staggered in term so that not all contracts have to be renewed the same year. If needed, additional Powder River Basin (PRB) coal will be purchased through contracts with a term of less than one year to provide the remaining supply needs. Based on the high cost of alternate sources, modes of transportation, and infrastructure improvements necessary for its delivery, no alternative coal consumption is expected at Entergy Arkansas during 2023. Coal will be transported to Arkansas via an existing Union Pacific transportation agreement that is expected to provide all of Entergy Arkansas’s rail transportation requirements for 2023.

Entergy Louisiana has committed to four two- to three-year contracts that will supply approximately 90% of Nelson Unit 6 coal needs in 2023. If needed, additional PRB coal will be purchased through contracts with a term of less than one year to provide the remaining supply needs. For the same reasons as the Entergy Arkansas plants, no alternative coal consumption is expected at Nelson Unit 6 during 2023. Coal will be transported to Nelson via an existing transportation agreement that is expected to provide all of Entergy Louisiana’s rail transportation requirements for 2023.

Coal transportation delivery rates to Entergy Arkansas- and Entergy Louisiana-operated coal-fired units became constrained and were unable to fully meet supply needs and obligations beginning in August 2021. Deliveries remained constrained through 2022 with modest improvement expected later in 2023. Both Entergy Arkansas and Entergy Louisiana control enough railcars to satisfy the rail transportation requirement.

The operator of Big Cajun 2 - Unit 3, Louisiana Generating, LLC, has advised Entergy Louisiana and Entergy Texas that it has adequate rail car and barge capacity to meet the volumes of PRB coal requested for 2023, but is also currently experiencing delivery constraints. Entergy Louisiana’s and Entergy Texas’s coal nomination requests to Big Cajun 2 - Unit 3 are made on an annual basis.

Nuclear Fuel

The nuclear fuel cycle consists of the following:

  • mining and milling of uranium ore to produce a concentrate;

  • conversion of the concentrate to uranium hexafluoride gas;

  • enrichment of the uranium hexafluoride gas;

  • fabrication of nuclear fuel assemblies for use in fueling nuclear reactors; and

  • disposal of spent fuel.

The Registrant Subsidiaries that own nuclear plants, Entergy Arkansas, Entergy Louisiana, and System Energy, are responsible through a shared regulated uranium pool for contracts to acquire nuclear material to be used in fueling Entergy’s Utility nuclear units. These companies own the materials and services in this shared regulated

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

uranium pool on a pro rata fractional basis determined by the nuclear generation capability of each company. Any liabilities for obligations of the pooled contracts are on a several but not joint basis. The shared regulated uranium pool maintains inventories of nuclear materials during the various stages of processing. The Registrant Subsidiaries purchase enriched uranium hexafluoride for their nuclear plant reload requirements at the average inventory cost from the shared regulated uranium pool. Entergy Operations, Inc. contracts separately for the fabrication of nuclear fuel as agent on behalf of each of the Registrant Subsidiaries that owns a nuclear plant. All contracts for the disposal of spent nuclear fuel are between the DOE and the owner of a nuclear power plant.

Based upon currently planned fuel cycles, the Utility nuclear units have a diversified portfolio of contracts and inventory that provides substantially adequate nuclear fuel materials and conversion and enrichment services at what Entergy believes are reasonably predictable or fixed prices through most of 2027. Entergy’s ability to purchase nuclear fuel at reasonably predictable prices, however, depends upon the performance reliability of uranium miners, including their ability to work through supply disruptions caused by global events, such as the COVID-19 pandemic, or national events, such as political disruption. There are a number of possible supply alternatives that may be accessed to mitigate any supplier performance failure, including potentially drawing upon Entergy’s inventory intended for later generation periods depending upon its risk management strategy at that time, although the pricing of any alternate uranium supply from the market will be dependent upon the market for uranium supply at that time. In addition, some nuclear fuel contracts are on a non-fixed price basis subject to prevailing prices at the time of delivery.

The effects of market price changes may be reduced and deferred by risk management strategies, such as negotiation of floor and ceiling amounts for long-term contracts, buying for inventory or entering into forward physical contracts at fixed prices when Entergy believes it is appropriate and useful. Entergy buys uranium from a diversified mix of sellers located in a diversified mix of countries, and from time to time purchases from nearly all qualified reliable major market participants worldwide that sell into the U.S.

Entergy’s ability to assure nuclear fuel supply also depends upon the performance reliability of conversion, enrichment, and fabrication services providers. There are fewer of these providers than for uranium. For conversion and enrichment services, like uranium, Entergy diversifies its supply by supplier and country and may take special measures as needed to ensure supply of enriched uranium for the reliable fabrication of nuclear fuel. For fabrication services, each plant is dependent upon the effective performance of the fabricator of that plant’s nuclear fuel, therefore, Entergy provides additional monitoring, inspection, and oversight for the fabrication process to assure reliability and quality.

Entergy Arkansas, Entergy Louisiana, and System Energy each have made arrangements to lease nuclear fuel and related equipment and services. The lessors, which are consolidated in the financial statements of Entergy and the applicable Registrant Subsidiary, finance the acquisition and ownership of nuclear fuel through credit agreements and the issuance of notes. These credit facilities are subject to periodic renewal, and the notes are issued periodically, typically for terms between three and seven years.

Natural Gas Purchased for Resale

Entergy New Orleans has several suppliers of natural gas. Its system is interconnected with one interstate and three intrastate pipelines. Entergy New Orleans has a “no-notice” service gas purchase contract with Symmetry Energy Solutions which guarantees Entergy New Orleans gas delivery at specific delivery points and at any volume within the minimum and maximum set forth in the contract amounts. The Symmetry Energy Solutions gas supply is transported to Entergy New Orleans pursuant to a transportation service agreement with Gulf South Pipeline Co. This service is subject to FERC-approved rates. Entergy New Orleans also makes interruptible spot market purchases.

Entergy Louisiana purchased natural gas for resale in 2022 under a firm contract from Sequent Energy Management L.P. The gas is delivered through a combination of intrastate and interstate pipelines.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

As a result of the implementation of FERC-mandated interstate pipeline restructuring in 1993, curtailments of interstate gas supply could occur if Entergy Louisiana’s or Entergy New Orleans’s suppliers failed to perform their obligations to deliver gas under their supply agreements. Gulf South Pipeline Co. could curtail transportation capacity only in the event of pipeline system constraints.

Federal Regulation of the Utility

State or local regulatory authorities, as described above, regulate the retail rates of the Utility operating companies. The FERC regulates wholesale sales of electricity rates and interstate transmission of electricity, including System Energy’s sales of capacity and energy from Grand Gulf to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans pursuant to the Unit Power Sales Agreement. See Note 2 to the financial statements for further discussion of federal regulation proceedings.

Transmission and MISO Markets

In December 2013 the Utility operating companies integrated into the MISO RTO. Although becoming a member of MISO did not affect the ownership by the Utility operating companies of their transmission facilities or the responsibility for maintaining those facilities, MISO maintains functional control over the combined transmission systems of its members and administers wholesale energy and ancillary services markets for market participants in the MISO region, including the Utility operating companies. MISO also exercises functional control of transmission planning and congestion management and provides schedules and pricing for the commitment and dispatch of generation that is offered into MISO’s markets, as well as pricing for load that bids into the markets. The Utility operating companies sell capacity, energy, and ancillary services on a bilateral basis to certain wholesale customers and offer available electricity production of their generating facilities into the MISO day-ahead and real-time energy markets pursuant to the MISO tariff and market rules. Each Utility operating company has its own transmission pricing zone and a formula rate template (included as Attachment O to the MISO tariff) used to establish transmission rates within MISO. The terms and conditions of the MISO tariff, including provisions related to the design and implementation of wholesale markets and the allocation of transmission upgrade costs, are subject to regulation by the FERC.

System Energy and Related Agreements

System Energy recovers costs related to its interest in Grand Gulf through rates charged to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans for capacity and energy under the Unit Power Sales Agreement (described below). In 1998 the FERC approved requests by Entergy Arkansas and Entergy Mississippi to accelerate a portion of their Grand Gulf purchased power obligations. Entergy Arkansas’s and Entergy Mississippi’s acceleration of Grand Gulf purchased power obligations ceased effective July 2001 and July 2003, respectively, as approved by the FERC. See Note 2 to the financial statements for discussion of proceedings at the FERC related to System Energy.

Unit Power Sales Agreement

The Unit Power Sales Agreement allocates capacity, energy, and the related costs from System Energy’s ownership and leasehold interests in Grand Gulf to Entergy Arkansas (36%), Entergy Louisiana (14%), Entergy Mississippi (33%), and Entergy New Orleans (17%). Each of these companies is obligated to make payments to System Energy for its entitlement of capacity and energy on a full cost-of-service basis regardless of the quantity of energy delivered. Payments under the Unit Power Sales Agreement are System Energy’s only source of operating revenue. The financial condition of System Energy depends upon the continued commercial operation of Grand Gulf and the receipt of such payments. Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans generally recover payments made under the Unit Power Sales Agreement through rates charged to their customers.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

In the case of Entergy Arkansas and Entergy Louisiana, payments are also recovered through sales of electricity from their respective retained shares of Grand Gulf. Under a settlement agreement entered into with the APSC in 1985 and amended in 1988, Entergy Arkansas retains 22% of its 36% share of Grand Gulf-related costs and recovers the remaining 78% of its share in rates. In the event that Entergy Arkansas is not able to sell its retained share to third parties, it may sell such energy to its retail customers at a price equal to its avoided cost, which is currently less than Entergy Arkansas’s cost from its retained share. Entergy Arkansas has life-of-resources purchased power agreements with Entergy Louisiana and Entergy New Orleans that sell a portion of the output of Entergy Arkansas’s retained share of Grand Gulf to those companies, with the remainder of the retained share being sold to Entergy Mississippi through a separate life-of-resources purchased power agreement. In a series of LPSC orders, court decisions, and agreements from late 1985 to mid-1988, Entergy Louisiana was granted cost recovery with respect to costs associated with Entergy Louisiana’s share of capacity and energy from Grand Gulf, subject to certain terms and conditions. Entergy Louisiana retains and does not recover from retail ratepayers 18% of its 14% share of the costs of Grand Gulf capacity and energy and recovers the remaining 82% of its share in rates. Entergy Louisiana is allowed to recover through the fuel adjustment clause at 4.6 cents per kWh for the energy related to its retained portion of these costs. Alternatively, Entergy Louisiana may sell such energy to non-affiliated parties at prices above the fuel adjustment clause recovery amount, subject to the LPSC’s approval. Entergy Arkansas also has a life-of-resources purchased power agreement with Entergy Mississippi to sell a portion of the output of Entergy Arkansas’s non-retained share of Grand Gulf. Entergy Mississippi was granted cost recovery for those purchases by the MPSC through its annual unit power cost rate mechanism.

Availability Agreement

The Availability Agreement among System Energy and Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans was entered into in 1974 in connection with the original financing by System Energy of Grand Gulf. The Availability Agreement provides that System Energy make available to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans all capacity and energy available from System Energy’s share of Grand Gulf.

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans also agreed severally to pay System Energy monthly for the right to receive capacity and energy from Grand Gulf in amounts that (when added to any amounts received by System Energy under the Unit Power Sales Agreement) would at least equal System Energy’s total operating expenses for Grand Gulf (including depreciation at a specified rate and expenses incurred in a permanent shutdown of Grand Gulf) and interest charges.

The allocation percentages under the Availability Agreement are fixed as follows: Entergy Arkansas - 17.1%; Entergy Louisiana - 26.9%; Entergy Mississippi - 31.3%; and Entergy New Orleans - 24.7%. The allocation percentages under the Availability Agreement would remain in effect and would govern payments made under such agreement in the event of a shortfall of operating expense funds available to System Energy from other sources, including payments under the Unit Power Sales Agreement.

System Energy has assigned its rights to payments and advances from Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans under the Availability Agreement as security for all of its outstanding series of first mortgage bonds, as well as for its outstanding term loan and the pollution control revenue refunding bonds issued on its behalf. In these assignments, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans further agreed that, in the event they were prohibited by governmental action from making payments under the Availability Agreement (for example, if the FERC reduced or disallowed such payments as constituting excessive rates), they would then make subordinated advances to System Energy in the same amounts and at the same times as the prohibited payments. System Energy would not be allowed to repay these subordinated advances so long as it remained in default under the related indebtedness or in other similar circumstances.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Each of the assignment agreements relating to the Availability Agreement provides that Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans will make payments directly to System Energy. However, if there is an event of default, those payments must be made directly to the holders of indebtedness that are the beneficiaries of such assignment agreements. The payments must be made pro rata according to the amount of the respective obligations secured.

The obligations of Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans to make payments under the Availability Agreement are subject to the receipt and continued effectiveness of all necessary regulatory approvals. Sales of capacity and energy under the Availability Agreement would require that the Availability Agreement be submitted to the FERC for approval with respect to the terms of such sale. No such filing with the FERC has been made because sales of capacity and energy from Grand Gulf are being made pursuant to the Unit Power Sales Agreement. If, for any reason, sales of capacity and energy are made in the future pursuant to the Availability Agreement, the jurisdictional portions of the Availability Agreement would be submitted to the FERC for approval.

Since commercial operation of Grand Gulf began, payments under the Unit Power Sales Agreement to System Energy have exceeded the amounts payable under the Availability Agreement and, therefore, no payments under the Availability Agreement have ever been required. If Entergy Arkansas or Entergy Mississippi fails to make its Unit Power Sales Agreement payments, and System Energy is unable to obtain funds from other sources, Entergy Louisiana and Entergy New Orleans could become subject to claims or demands by System Energy or certain of its creditors for payments or advances under the Availability Agreement (or the assignments thereof) equal to the difference between their required Unit Power Sales Agreement payments and their required Availability Agreement payments because their Availability Agreement obligations exceed their Unit Power Sales Agreement obligations.

The Availability Agreement may be terminated, amended, or modified by mutual agreement of the parties thereto, without further consent of any assignees or other creditors.

Service Companies

Entergy Services, a limited liability company wholly-owned by Entergy Corporation, provides management, administrative, accounting, legal, engineering, and other services primarily to the Utility operating companies, but also provides services to Entergy Wholesale Commodities. Entergy Operations is also wholly-owned by Entergy Corporation and provides nuclear management, operations and maintenance services under contract for ANO, River Bend, Waterford 3, and Grand Gulf, subject to the owner oversight of Entergy Arkansas, Entergy Louisiana, and System Energy, respectively. Entergy Services and Entergy Operations provide their services to the Utility operating companies and System Energy on an “at cost” basis, pursuant to cost allocation methodologies for these service agreements that were approved by the FERC.

Jurisdictional Separation of Entergy Gulf States, Inc. into Entergy Gulf States Louisiana and Entergy Texas

Effective December 31, 2007, Entergy Gulf States, Inc. completed a jurisdictional separation into two vertically integrated utility companies, one operating under the sole retail jurisdiction of the PUCT, Entergy Texas, and the other operating under the sole retail jurisdiction of the LPSC, Entergy Gulf States Louisiana. Entergy Texas owns all Entergy Gulf States, Inc. distribution and transmission assets located in Texas, the gas-fired generating plants located in Texas, undivided 42.5% ownership shares of Entergy Gulf States, Inc.’s 70% ownership interest in Nelson Unit 6 and 42% ownership interest in Big Cajun 2, Unit 3, which are coal-fired generating plants located in Louisiana, and other assets and contract rights to the extent related to utility operations in Texas. Entergy Louisiana, as successor in interest to Entergy Gulf States Louisiana, owns all of the remaining assets that were owned by Entergy Gulf States, Inc. On a book value basis, approximately 58.1% of the Entergy Gulf States, Inc. assets were allocated to Entergy Gulf States Louisiana and approximately 41.9% were allocated to Entergy Texas.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Entergy Texas purchases from Entergy Louisiana pursuant to a life-of-unit purchased power agreement a 42.5% share of capacity and energy from the 70% of River Bend subject to retail regulation. Entergy Texas was allocated a share of River Bend’s nuclear and environmental liabilities that is identical to the share of the plant’s output purchased by Entergy Texas under the purchased power agreement. In connection with the termination of the System Agreement effective August 31, 2016, the purchased power agreements that were put in place for certain legacy units at the time of the jurisdictional separation were also terminated at that time. See Note 2 to the financial statements for additional discussion of the purchased power agreements.

Entergy Louisiana and Entergy Gulf States Louisiana Business Combination

On October 1, 2015, the businesses formerly conducted by Entergy Louisiana (Old Entergy Louisiana) and Entergy Gulf States Louisiana (Old Entergy Gulf States Louisiana) were combined into a single public utility. In order to effect the business combination, under the Texas Business Organizations Code (TXBOC), Old Entergy Louisiana allocated substantially all of its assets to a new subsidiary, Entergy Louisiana Power, LLC, a Texas limited liability company (New Entergy Louisiana), and New Entergy Louisiana assumed the liabilities of Old Entergy Louisiana, in a transaction regarded as a merger under the TXBOC. Under the TXBOC, Old Entergy Gulf States Louisiana allocated substantially all of its assets to a new subsidiary (New Entergy Gulf States Louisiana) and New Entergy Gulf States Louisiana assumed the liabilities of Old Entergy Gulf States Louisiana, in a transaction regarded as a merger under the TXBOC. New Entergy Gulf States Louisiana then merged into New Entergy Louisiana with New Entergy Louisiana surviving the merger. Thereupon, Old Entergy Louisiana changed its name from “Entergy Louisiana, LLC” to “EL Investment Company, LLC” and New Entergy Louisiana changed its name from “Entergy Louisiana Power, LLC” to “Entergy Louisiana, LLC” (Entergy Louisiana). With the completion of the business combination, Entergy Louisiana holds substantially all of the assets, and has assumed the liabilities, of Old Entergy Louisiana and Old Entergy Gulf States Louisiana.

Entergy New Orleans Internal Restructuring

In November 2017, pursuant to the agreement in principle, Entergy New Orleans, Inc. undertook a multi-step restructuring, including the following:

  • Entergy New Orleans, Inc. redeemed its outstanding preferred stock at a price of approximately $21 million, which included a call premium of approximately $819,000, plus any accumulated and unpaid dividends.

  • Entergy New Orleans, Inc. converted from a Louisiana corporation to a Texas corporation.

  • Under the Texas Business Organizations Code (TXBOC), Entergy New Orleans, Inc. allocated substantially all of its assets to a new subsidiary, Entergy New Orleans Power, LLC, a Texas limited liability company (Entergy New Orleans Power), and Entergy New Orleans Power assumed substantially all of the liabilities of Entergy New Orleans, Inc. in a transaction regarded as a merger under the TXBOC. Entergy New Orleans, Inc. remained in existence and held the membership interests in Entergy New Orleans Power.

  • Entergy New Orleans, Inc. contributed the membership interests in Entergy New Orleans Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy New Orleans Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2017, Entergy New Orleans, Inc. changed its name to Entergy Utility Group, Inc., and Entergy New Orleans Power then changed its name to Entergy New Orleans, LLC. Entergy New Orleans, LLC holds substantially all of the assets, and has assumed substantially all of the liabilities, of Entergy New Orleans, Inc. The restructuring was accounted for as a transaction between entities under common control.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Entergy Arkansas Internal Restructuring

In November 2018, Entergy Arkansas undertook a multi-step restructuring, including the following:

  • Entergy Arkansas, Inc. redeemed its outstanding preferred stock at the aggregate redemption price of approximately $32.7 million.

  • Entergy Arkansas, Inc. converted from an Arkansas corporation to a Texas corporation.

  • Under the Texas Business Organizations Code (TXBOC), Entergy Arkansas, Inc. allocated substantially all of its assets to a new subsidiary, Entergy Arkansas Power, LLC, a Texas limited liability company (Entergy Arkansas Power), and Entergy Arkansas Power assumed substantially all of the liabilities of Entergy Arkansas, Inc., in a transaction regarded as a merger under the TXBOC. Entergy Arkansas, Inc. remained in existence and held the membership interests in Entergy Arkansas Power.

  • Entergy Arkansas, Inc. contributed the membership interests in Entergy Arkansas Power to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Arkansas Power is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2018, Entergy Arkansas, Inc. changed its name to Entergy Utility Property, Inc., and Entergy Arkansas Power then changed its name to Entergy Arkansas, LLC. Entergy Arkansas, LLC holds substantially all of the assets, and assumed substantially all of the liabilities, of Entergy Arkansas, Inc. The transaction was accounted for as a transaction between entities under common control.

Entergy Mississippi Internal Restructuring

In November 2018, Entergy Mississippi undertook a multi-step restructuring, including the following:

  • Entergy Mississippi, Inc. redeemed its outstanding preferred stock, at the aggregate redemption price of approximately $21.2 million.

  • Entergy Mississippi, Inc. converted from a Mississippi corporation to a Texas corporation.

  • Under the Texas Business Organizations Code (TXBOC), Entergy Mississippi, Inc. allocated substantially all of its assets to a new subsidiary, Entergy Mississippi Power and Light, LLC, a Texas limited liability company (Entergy Mississippi Power and Light), and Entergy Mississippi Power and Light assumed substantially all of the liabilities of Entergy Mississippi, Inc., in a transaction regarded as a merger under the TXBOC. Entergy Mississippi, Inc. remained in existence and held the membership interests in Entergy Mississippi Power and Light.

  • Entergy Mississippi, Inc. contributed the membership interests in Entergy Mississippi Power and Light to an affiliate (Entergy Utility Holding Company, LLC, a Texas limited liability company and subsidiary of Entergy Corporation). As a result of the contribution, Entergy Mississippi Power and Light is a wholly-owned subsidiary of Entergy Utility Holding Company, LLC.

In December 2018, Entergy Mississippi, Inc. changed its name to Entergy Utility Enterprises, Inc., and Entergy Mississippi Power and Light then changed its name to Entergy Mississippi, LLC. Entergy Mississippi, LLC holds substantially all of the assets, and assumed substantially all of the liabilities, of Entergy Mississippi, Inc. The restructuring was accounted for as a transaction between entities under common control.

Entergy Wholesale Commodities

See “Entergy Wholesale Commodities Exit from the Merchant Power Business” in Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for discussion of the shutdown and sale of each of the Entergy Wholesale Commodities nuclear power plants. With the sale of Palisades in June 2022, Entergy completed its multi-year strategy to exit the merchant power business.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Entergy Wholesale Commodities includes the ownership of interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers. Entergy Wholesale Commodities also provides decommissioning-related services to nuclear power plants owned by non-affiliated entities in the United States.

Property

Entergy Wholesale Commodities includes ownership in the following non-nuclear power plants:

PlantLocationOwnershipNet Owned Capacity (a)Type
Independence Unit 2; 842 MWNewark, AR14%121 MW(b)Coal
Nelson Unit 6; 550 MWWestlake, LA11%60 MW(b)Coal

(a)“Net Owned Capacity” refers to the nameplate rating on the generating unit.

(b)The owned MW capacity is the portion of the plant capacity owned by Entergy Wholesale Commodities. For a complete listing of Entergy’s jointly-owned generating stations, refer to “Jointly-Owned Generating Stations” in Note 1 to the financial statements.

All of Entergy Wholesale Commodities’ owned generation falls under the authority of MISO. Entergy Wholesale Commodities’ customers for the sale of both energy and capacity from its owned generation and its contracted power purchases include retail power providers, utilities, electric power co-operatives, power trading organizations, and other power generation companies. The majority of Entergy Wholesale Commodities’ owned generation and contracted power purchases are sold under cost-based contract.

Other Business Activities

TLG Services, a subsidiary in the Entergy Wholesale Commodities segment, offers decommissioning, engineering, and related services to nuclear power plant owners.

Regulation of Entergy’s Business

Federal Power Act

The Federal Power Act provides the FERC the authority to regulate:

  • the transmission and wholesale sale of electric energy in interstate commerce;

  • the reliability of the high voltage interstate transmission system through reliability standards;

  • sale or acquisition of certain assets;

  • securities issuances;

  • the licensing of certain hydroelectric projects;

  • certain other activities, including accounting policies and practices of electric and gas utilities; and

  • changes in control of FERC jurisdictional entities or rate schedules.

The Federal Power Act gives the FERC jurisdiction over the rates charged by System Energy for Grand Gulf capacity and energy provided to Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans and over the rates charged by Entergy Arkansas and Entergy Louisiana to unaffiliated wholesale customers. The FERC also regulates wholesale power sales between the Utility operating companies. In addition, the FERC regulates the MISO RTO, an independent entity that maintains functional control over the combined transmission systems of its members and administers wholesale energy, capacity, and ancillary services markets for market participants in the MISO region, including the Utility operating companies. FERC regulation of the MISO RTO includes regulation of the design and implementation of the wholesale markets administered by the MISO RTO, as

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

well as the rates, terms, and conditions of open access transmission service over the member systems and the allocation of costs associated with transmission upgrades.

Entergy Arkansas holds a FERC license that expires in 2053 for two hydroelectric projects totaling 65 MW of capacity.

State Regulation

Utility

Entergy Arkansas is subject to regulation by the APSC as to the following:

  • utility service;

  • utility service areas;

  • retail rates and charges, including depreciation rates;

  • fuel cost recovery, including audits of the energy cost recovery rider;

  • terms and conditions of service;

  • service standards;

  • the acquisition, sale, or lease of any public utility plant or property constituting an operating unit or system;

  • certificates of convenience and necessity and certificates of environmental compatibility and public need, as applicable, for generating and transmission facilities;

  • avoided cost payments to non-exempt Qualifying Facilities;

  • net energy metering;

  • integrated resource planning;

  • utility mergers and acquisitions and other changes of control; and

  • the issuance and sale of certain securities.

Additionally, Entergy Arkansas serves a limited number of retail customers in Tennessee. Pursuant to legislation enacted in Tennessee, Entergy Arkansas is subject to complaints before the Tennessee Regulatory Authority only if it fails to treat its retail customers in Tennessee in the same manner as its retail customers in Arkansas. Additionally, Entergy Arkansas maintains limited facilities in Missouri but does not provide retail electric service to customers in Missouri. Although Entergy Arkansas obtained a certificate with respect to its Missouri facilities, Entergy Arkansas is not subject to retail ratemaking jurisdiction in Missouri.

Entergy Louisiana’s electric and gas business is subject to regulation by the LPSC as to the following:

  • utility service;

  • retail rates and charges, including depreciation rates;

  • fuel cost recovery, including audits of the fuel adjustment clause, environmental adjustment charge, and purchased gas adjustment charge;

  • terms and conditions of service;

  • service standards;

  • certification of certain transmission projects;

  • certification of capacity acquisitions, both for owned capacity and for purchase power contracts that exceed either 5 MW or one year in term;

  • procurement process to acquire capacity over 50 MW;

  • audits of the energy efficiency rider;

  • avoided cost payment to non-exempt Qualifying Facilities;

  • integrated resource planning;

  • net energy metering; and

  • utility mergers and acquisitions and other changes of control.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Entergy Mississippi is subject to regulation by the MPSC as to the following:

  • utility service;

  • utility service areas;

  • retail rates and charges, including depreciation rates;

  • fuel cost recovery, including audits of the energy cost recovery mechanism;

  • terms and conditions of service;

  • service standards;

  • certification of generating facilities and certain transmission projects;

  • avoided cost payments to non-exempt Qualifying Facilities;

  • integrated resource planning;

  • net energy metering; and

  • utility mergers, acquisitions, and other changes of control.

Entergy Mississippi is also subject to regulation by the APSC as to the certificate of environmental compatibility and public need for the Independence Station, which is located in Arkansas.

Entergy New Orleans is subject to regulation by the City Council as to the following:

  • utility service;

  • retail rates and charges, including depreciation rates;

  • fuel cost recovery, including audits of the fuel adjustment charge and purchased gas adjustment charge;

  • terms and conditions of service;

  • service standards;

  • audit of the environmental adjustment charge;

  • certification of the construction or extension of any new plant, equipment, property, or facility that comprises more than 2% of the utility’s rate base;

  • integrated resource planning;

  • net energy metering;

  • avoided cost payments to non-exempt Qualifying Facilities;

  • issuance and sale of certain securities; and

  • utility mergers and acquisitions and other changes of control.

To the extent authorized by governing legislation, Entergy Texas is subject to the original jurisdiction of the municipal authorities of a number of incorporated cities in Texas with appellate jurisdiction over such matters residing in the PUCT. Entergy Texas is also subject to regulation by the PUCT as to the following:

  • retail rates and charges, including depreciation rates, and terms and conditions of service in unincorporated areas of its service territory, and in municipalities that have ceded jurisdiction to the PUCT;

  • fuel recovery, including reconciliations (audits) of the fuel adjustment charges;

  • service standards;

  • certification of certain transmission and generation projects;

  • utility service areas, including extensions into new areas;

  • avoided cost payments to non-exempt Qualifying Facilities;

  • net energy metering; and

  • utility mergers, sales/acquisitions/leases of plants over $10 million, sales of greater than 50% voting stock of utilities, and transfers of controlling interest in or operation of utilities.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Regulation of the Nuclear Power Industry

Atomic Energy Act of 1954 and Energy Reorganization Act of 1974

Under the Atomic Energy Act of 1954 and the Energy Reorganization Act of 1974, the operation of nuclear plants is heavily regulated by the NRC, which has broad power to impose licensing and safety-related requirements. The NRC has broad authority to impose civil penalties or shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Entergy Arkansas, Entergy Louisiana, and System Energy, as owners of all or portions of ANO, River Bend and Waterford 3, and Grand Gulf, respectively, and Entergy Operations, as the licensee and operator of these units, are subject to the jurisdiction of the NRC.

Nuclear Waste Policy Act of 1982

Spent Nuclear Fuel

Under the Nuclear Waste Policy Act of 1982, the DOE is required, for a specified fee, to construct storage facilities for, and to dispose of, all spent nuclear fuel and other high-level radioactive waste generated by domestic nuclear power reactors. Entergy’s nuclear owner/licensee subsidiaries have been charged fees for the estimated future disposal costs of spent nuclear fuel in accordance with the Nuclear Waste Policy Act of 1982. The affected Entergy companies entered into contracts with the DOE, whereby the DOE is to furnish disposal services at a cost of one mill per net kWh generated and sold after April 7, 1983, plus a one-time fee for generation prior to that date. Entergy Arkansas is the only one of the Utility operating companies that generated electric power with nuclear fuel prior to that date and has a recorded liability as of December 31, 2022 of $195.0 million for the one-time fee. The fees payable to the DOE may be adjusted in the future to assure full recovery. Entergy considers all costs incurred for the disposal of spent nuclear fuel, except accrued interest, to be proper components of nuclear fuel expense. Provisions to recover such costs have been or will be made in applications to regulatory authorities for the Utility plants. Entergy’s total spent fuel fees to date, including the one-time fee liability of Entergy Arkansas, have surpassed $1.7 billion (exclusive of amounts relating to Entergy plants that were paid or are owed by prior owners of those plants).

The permanent spent fuel repository in the U.S. has been legislated to be Yucca Mountain, Nevada. The DOE is required by law to proceed with the licensing (the DOE filed the license application in June 2008) and, after the license is granted by the NRC, proceed with the repository construction and commencement of receipt of spent fuel. Because the DOE has not begun accepting spent fuel, it is in non-compliance with the Nuclear Waste Policy Act of 1982 and has breached its spent fuel disposal contracts. The DOE continues to delay meeting its obligation. Specific steps were taken to discontinue the Yucca Mountain project, including a motion to the NRC to withdraw the license application with prejudice and the establishment of a commission to develop recommendations for alternative spent fuel storage solutions. In August 2013 the U.S. Court of Appeals for the D.C. Circuit ordered the NRC to continue with the Yucca Mountain license review, but only to the extent of funds previously appropriated by Congress for that purpose and not yet used. Although the NRC completed the safety evaluation report for the license review in 2015, the previously appropriated funds are not sufficient to complete the review, including required hearings. The government has taken no effective action to date related to the recommendations of the appointed spent fuel study commission. Accordingly, large uncertainty remains regarding the time frame under which the DOE will begin to accept spent fuel from Entergy’s facilities for storage or disposal. As a result, continuing future expenditures will be required to increase spent fuel storage capacity at Entergy’s nuclear sites.

Following the defunding of the Yucca Mountain spent fuel repository program, the National Association of Regulatory Utility Commissioners and others sued the government seeking cessation of collection of the one mill per net kWh generated and sold after April 7, 1983 fee. In November 2013 the D.C. Circuit Court of Appeals ordered the DOE to submit a proposal to Congress to reset the fee to zero until the DOE complies with the Nuclear Waste Policy Act or Congress enacts an alternative waste disposal plan. In January 2014 the DOE submitted the

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

proposal to Congress under protest, and also filed a petition for rehearing with the D.C. Circuit. The petition for rehearing was denied. The zero spent fuel fee went into effect prospectively in May 2014.

As a result of the DOE’s failure to begin disposal of spent nuclear fuel in 1998 pursuant to the Nuclear Waste Policy Act of 1982 and the spent fuel disposal contracts, Entergy’s nuclear owner/licensee subsidiaries have incurred and will continue to incur damages. These subsidiaries have been, and continue to be, involved in litigation to recover the damages caused by the DOE’s delay in performance. See Note 8 to the financial statements for discussion of final judgments recorded by Entergy in 2020, 2021, and 2022 related to Entergy’s nuclear owner licensee subsidiaries’ litigation with the DOE. Through 2022, Entergy’s subsidiaries have won and collected on judgments against the government totaling approximately $1 billion.

Pending DOE acceptance and disposal of spent nuclear fuel, the owners of nuclear plants are providing their own spent fuel storage. Storage capability additions using dry casks began operations at ANO in 1996, at River Bend in 2005, at Grand Gulf in 2006, and at Waterford 3 in 2011. These facilities will be expanded as needed.

Nuclear Plant Decommissioning

Entergy Arkansas, Entergy Louisiana, and System Energy are entitled to recover from customers through electric rates the estimated decommissioning costs for ANO, Waterford 3, and Grand Gulf, respectively. In addition, Entergy Louisiana and Entergy Texas are entitled to recover from customers through electric rates the estimated decommissioning costs for the portion of River Bend subject to retail rate regulation. The collections are deposited in trust funds that can only be used in accordance with NRC and other applicable regulatory requirements. Entergy periodically reviews and updates the estimated decommissioning costs to reflect inflation and changes in regulatory requirements and technology, and then makes applications to the regulatory authorities to reflect, in rates, the changes in projected decommissioning costs.

In December 2018 the APSC ordered collections in rates for decommissioning ANO 2 and found that ANO 1’s decommissioning was adequately funded without additional collections. In November 2021, Entergy Arkansas filed a revised decommissioning cost recovery tariff for ANO indicating that both ANO 1 and 2 decommissioning trusts were adequately funded without further collections, and in December 2021 the APSC ordered zero collections for ANO 1 and 2 decommissioning. In November 2022, Entergy Arkansas filed a revised decommissioning cost recovery tariff for ANO indicating that ANO 1’s decommissioning trust was adequately funded, but that ANO 2’s fund had a projected shortage as a result of a decline in decommissioning trust fund investment values over the past year. The filing proposes a reinstatement of decommissioning cost recovery for ANO 2. Management cannot predict the outcome of this filing.

In July 2010 the LPSC approved increased decommissioning collections for Waterford 3 and the Louisiana regulated share of River Bend to address previously identified funding shortfalls. This LPSC decision contemplated that the level of decommissioning collections could be revisited should the NRC grant license extensions for both Waterford 3 and River Bend. In July 2019, following the NRC approval of license extensions for Waterford 3 and River Bend, Entergy Louisiana made a filing with the LPSC seeking to adjust decommissioning and depreciation rates for those plants, including one proposed scenario that would adjust Louisiana-jurisdictional decommissioning collections to zero for both plants (including an offsetting increase in depreciation rates). Because of the ongoing public health emergency arising from the COVID-19 pandemic and accompanying economic uncertainty, Entergy Louisiana determined that the relief sought in the filing was no longer appropriate, and in November 2020, filed an unopposed motion to dismiss the proceeding. Following that filing, in a December 2020 order, the LPSC dismissed the proceeding without prejudice. In July 2021, Entergy Louisiana made a filing with the LPSC to adjust Waterford 3 and River Bend decommissioning collections based on the latest site-specific decommissioning cost estimates for those plants. The filing seeks to increase Waterford 3 decommissioning collections and decrease River Bend decommissioning collections. The procedural schedule in the case has been suspended pending settlement negotiations. Management cannot predict the outcome of this filing.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

In December 2010 the PUCT approved increased decommissioning collections for the Texas share of River Bend to address previously identified funding shortfalls. In December 2018 the PUCT approved a settlement that eliminated River Bend decommissioning collections for the Texas jurisdictional share of the plant based on a determination by Entergy Texas that the existing decommissioning fund was adequate following license renewal. In July 2022, Entergy Texas filed a rate case that proposed continuation of the cessation of River Bend decommissioning collections. In December 2022, Entergy Texas filed on behalf of the parties a motion to abate the hearing on the merits to give parties additional time to finalize a settlement, which was approved by the presiding ALJ along with an order for the parties to file monthly settlement status reports. Management cannot predict the outcome of this filing.

In December 2016 the NRC issued a 20-year operating license renewal for Grand Gulf. In a 2017 filing at the FERC, System Energy stated that with the renewed operating license, Grand Gulf’s decommissioning trust was sufficiently funded, and proposed, among other things, to cease decommissioning collections for Grand Gulf effective October 1, 2017. The FERC accepted a settlement including the proposed decommissioning revenue requirement by letter order in August 2018.

Entergy currently believes its decommissioning funding will be sufficient for its nuclear plants subject to retail rate regulation, although decommissioning cost inflation and trust fund performance will ultimately determine the adequacy of the funding amounts.

Plant owners are required to provide the NRC with a biennial report (annually for units that have shut down or will shut down within five years), based on values as of December 31, addressing the owners’ ability to meet the NRC minimum funding levels. Depending on the value of the trust funds, plant owners may be required to take steps, such as providing financial guarantees through letters of credit or parent company guarantees or making additional contributions to the trusts, to ensure that the trusts are adequately funded and that NRC minimum funding requirements are met. In March 2021 filings with the NRC were made reporting on decommissioning funding for all of Entergy’s subsidiaries’ nuclear plants. Those reports showed that decommissioning funding for each of the nuclear plants met the NRC’s financial assurance requirements.

Additional information with respect to Entergy’s decommissioning costs and decommissioning trust funds is found in Note 9 and Note 16 to the financial statements.

Price-Anderson Act

The Price-Anderson Act requires that reactor licensees purchase and maintain the maximum amount of nuclear liability insurance available and participate in an industry assessment program called Secondary Financial Protection in order to protect the public in the event of a nuclear power plant accident. The costs of this insurance are borne by the nuclear power industry. Congress amended and renewed the Price-Anderson Act in 2005 for a term through 2025. The Price-Anderson Act limits the contingent liability for a single nuclear incident to a maximum assessment of approximately $137.6 million per reactor (with 96 nuclear industry reactors currently participating). In the case of a nuclear event in which Entergy Arkansas, Entergy Louisiana, or System Energy is liable, protection is afforded through a combination of private insurance and the Secondary Financial Protection program. In addition to this, insurance for property damage, costs of replacement power, and other risks relating to nuclear generating units is also purchased. The Price-Anderson Act and insurance applicable to the nuclear programs of Entergy are discussed in more detail in Note 8 to the financial statements.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, and “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy’s Utility business are currently in Column 1, except Waterford 3, which is in Column 2.

In September 2022 the NRC placed Waterford 3 in Column 2 based on an error associated with a radiation monitor calibration. Entergy corrected the issue with the radiation monitor in February 2022; however, Waterford 3 is expected to remain in Column 2 until third quarter 2023 based on a subsequent radiation monitor calibration issue.

Environmental Regulation

Entergy’s facilities and operations are subject to regulation by various governmental authorities having jurisdiction over air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. Management believes that Entergy’s businesses are in substantial compliance with environmental regulations currently applicable to its facilities and operations, with reference to possible exceptions noted below. Because environmental regulations are subject to change, future compliance requirements and costs cannot be precisely estimated. Except to the extent discussed below, at this time compliance with federal, state, and local provisions regulating the discharge of materials into the environment, or otherwise protecting the environment, is incorporated into the routine cost structure of Entergy’s businesses and is not expected to have a material effect on their competitive position, results of operations, cash flows, or financial position.

Clean Air Act and Subsequent Amendments

The Clean Air Act and its amendments establish several programs that currently or in the future may affect Entergy’s fossil-fueled generation facilities and, to a lesser extent, certain operations at nuclear and other facilities. Individual states also operate similar independent state programs or delegated federal programs that may include requirements more stringent than federal regulatory requirements. These programs include:

  • new source review and preconstruction permits for new sources of criteria air pollutants, greenhouse gases, and significant modifications to existing facilities;

  • acid rain program for control of sulfur dioxide (SO2) and nitrogen oxides (NOx);

  • nonattainment area programs for control of criteria air pollutants, which could include fee assessments for air pollutant emission sources under Section 185 of the Clean Air Act if attainment is not reached in a timely manner;

  • hazardous air pollutant emissions reduction programs;

  • Interstate Air Transport;

  • operating permit programs and enforcement of these and other Clean Air Act programs;

  • Regional Haze programs; and

  • new and existing source standards for greenhouse gas and other air emissions.

National Ambient Air Quality Standards

The Clean Air Act requires the EPA to set National Ambient Air Quality Standards (NAAQS) for ozone, carbon monoxide, lead, nitrogen dioxide, particulate matter, and sulfur dioxide, and requires periodic review of those standards. When an area fails to meet an ambient standard, it is considered to be in nonattainment and is classified as “marginal,” “moderate,” “serious,” or “severe.” When an area fails to meet the ambient air standard, the EPA requires state regulatory authorities to prepare state implementation plans meant to cause progress toward bringing the area into attainment with applicable standards.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Ozone Nonattainment

Entergy Texas operates two fossil-fueled generating facilities (Lewis Creek and Montgomery County Power Station) in a geographic area that is not in attainment with the applicable NAAQS for ozone. The ozone nonattainment area that affects Entergy Texas is the Houston-Galveston-Brazoria area. Both Lewis Creek and the Montgomery County Power Station hold all necessary permits for operation and comply with applicable air quality program regulations. Measures enacted to return the area to ozone attainment could make these program regulations more stringent. Entergy will continue to work with state environmental agencies on appropriate methods for assessing attainment and nonattainment with the ozone NAAQS.

Potential SO2 Nonattainment

The EPA issued a final rule in June 2010 adopting an SO2 1-hour national ambient air quality standard of 75 parts per billion. In Entergy’s utility service territory, only St. Bernard Parish and Evangeline Parish in Louisiana are designated as nonattainment. In August 2017 the EPA issued a letter indicating that East Baton Rouge and St. Charles parishes would be designated by December 31, 2020, as monitors were installed to determine compliance. In March 2021 the EPA published a final rule designating East Baton Rouge, St. Charles, St. James, and West Baton Rouge parishes in Louisiana as attainment/unclassifiable, and, in Texas, Jefferson County as attainment/unclassifiable and Orange County as unclassifiable. No challenges to these final designations were filed within the 60 day deadline. Entergy continues to monitor this situation.

Hazardous Air Pollutants

The EPA released the final Mercury and Air Toxics Standard (MATS) rule in December 2011, which had a compliance date, with a widely granted one-year extension, of April 2016. The required controls have been installed and are operational at all affected Entergy units. In May 2020 the EPA finalized a rule that finds that it is not “appropriate and necessary” to regulate hazardous air pollutants from electric steam generating units under the provisions of section 112(n) of the Clean Air Act. This is a reversal of the EPA’s previous finding requiring such regulation. The final appropriate and necessary finding does not revise the underlying MATS rule. Several lawsuits have been filed challenging the appropriate and necessary finding. In February 2021 the D.C. Circuit granted the EPA’s motion to hold the litigation in abeyance pending the agency’s review of the appropriate and necessary rule. In February 2022 the EPA issued a proposed rule revoking the 2020 rule and determining, again, that it is “appropriate and necessary” to regulate hazardous air pollutants. The EPA is seeking additional information, which it could use to further tighten the standard. Entergy will continue to monitor this situation.

Cross-State Air Pollution

In March 2005 the EPA finalized the Clean Air Interstate Rule (CAIR), which was intended to reduce SO2 and NOx emissions from electric generation plants in order to improve air quality in twenty-nine eastern states. The rule required a combination of capital investment to install pollution control equipment and increased operating costs through the purchase of emission allowances. Entergy began implementation in 2007, including installation of controls at several facilities and the development of an emission allowance procurement strategy. Based on several court challenges, CAIR and its subsequent versions, now known as the Cross-State Air Pollution Rule (CSAPR), have been remanded to and modified by the EPA on multiple occasions.

In April 2022 the EPA published a rule to address interstate transport for the 2015 ozone NAAQS which will increase the stringency of the CSAPR program in all four of the states where the Utility operating companies operate. If finalized as proposed, the rule will significantly reduce emission allowances and would likely require the installation of post-combustion nitrogen oxides (NOx) emissions controls on any coal or large legacy gas units that will operate beyond 2026 and are not currently equipped with such controls. Fifteen Entergy-owned units, totaling approximately 9,370 MW of total unit capacity, are identified by the EPA for selective catalytic reduction retrofits.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Based on the EPA estimates, Entergy’s share of the capital costs would be approximately $1.6 billion if all the identified units were in fact retrofitted. Additionally, the EPA is proposing controls on certain non-electric generating NOx sources. Since releasing the proposed rule, the price for Group 3 NOx sources allowances has increased significantly, peaking at over $45,000 per allowance in late August 2022 before stabilizing in the range of $15,000 to $18,000 per allowance since September 2022. Comments on the proposed rule were due in June 2022. MISO, other impacted regional transmission organizations, and various state public service commissions all filed comments expressing reliability concerns if the rule is finalized as proposed. Entergy filed individual comments which assert, in addition to other issues, that the EPA’s proposal represents over-control of the Entergy units in Arkansas and Mississippi; the EPA should consider an alternative approach or provide flexibility for units with a limited remaining useful life; the EPA should consult with regional transmission organizations to determine the reliability impacts of the proposed rule; and the EPA should consider and incorporate current economic trends, including inflation, into any benefit-costs analysis supporting the rule.

Regional Haze

In June 2005 the EPA issued its final Clean Air Visibility Rule (CAVR) regulations that potentially could result in a requirement to install SO2 and NOx pollution control technology as Best Available Retrofit Control Technology to continue operating certain of Entergy’s fossil generation units. The rule leaves certain CAVR determinations to the states. This rule establishes a series of 10-year planning periods, with states required to develop State Implementation Plans (SIPs) for each planning period, with each SIP including such air pollution control measures as may be necessary to achieve the ultimate goal of the CAVR by the year 2064. The various states are currently in the process of developing SIPs to implement the second planning period of the CAVR, which addresses the 2018-2028 planning period.

In January and February 2018, Entergy Arkansas, Entergy Mississippi, Entergy Power, and other co-owners received 60-day notice of intent to sue letters from the Sierra Club and the National Parks Conservation Association concerning allegations of violations of new source review and permitting provisions of the Clean Air Act at the Independence and White Bluff coal-burning units, respectively. In November 2018, following extensive negotiations, Entergy Arkansas, Entergy Mississippi, and Entergy Power entered a proposed settlement resolving those claims and reducing the risk that Entergy Arkansas, as operator of Independence and White Bluff, might be compelled under the Clean Air Act’s regional haze program to install costly emissions control technologies. Consistent with the terms of the settlement, Entergy Arkansas, along with co-owners, agreed to begin using only low-sulfur coal at Independence and White Bluff by mid-2021; agreed to cease using coal at White Bluff and Independence by the end of 2028 and 2030, respectively; agreed to cease operation of the remaining gas unit at Lake Catherine by the end of 2027; reserved the option to develop new generating sources at each plant site; and committed to installing or proposing to regulators at least 800 MWs of renewable generation by the end of 2027, with at least half installed or proposed by the end of 2022 (which includes two existing Entergy Arkansas projects) and with all qualifying co-owner projects counting toward satisfaction of the obligation. Under the settlement, the Sierra Club and the National Parks Conservation Association also waived certain potential existing claims under federal and state environmental law with respect to specified generating plants. The settlement, which formally resolves a complaint filed by the Sierra Club and the National Parks Conservation Association, was subject to approval by the U.S. District Court for the Eastern District of Arkansas. In November 2020 the court denied motions by the Arkansas Attorney General and the Arkansas Affordable Energy Coalition to intervene and to stay the proceedings. The proposed intervenors did not appeal the ruling. The District Court approved and entered the proposed settlement in March 2021. Entergy met the settlement deadline to use low-sulfur coal and is on target to meet the other requirements of the settlement. See “Remaining Useful Lives Review” in the “State and Local Rate Regulation and Fuel-Cost Recovery” section of Entergy Arkansas, LLC and Subsidiaries Management’s Financial Discussion and Analysis for discussion of the APSC’s proceeding related to Entergy Arkansas’s utility generation units.

The second planning period (2018-2028) for the regional haze program requires states to examine sources for impacts on visibility and to prepare SIPs by July 31, 2021 to ensure reasonable progress is being made to attain

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

visibility improvements. Entergy received information collection requests from the Arkansas and Louisiana Departments of Environmental Quality requesting an evaluation of technical and economic feasibility of various NOx and SO2 control technologies for Independence, Nelson 6, Nelson Industrial Steam Company (NISCO), and Ninemile. Responses to the information collection requests have been submitted to the respective state agencies. Louisiana has issued its draft SIP which, at this time, does not propose any additional air emissions controls for the affected Entergy units in Louisiana. Some public commenters, however, believe additional air controls are cost-effective. It is not yet clear how the Louisiana Department of Environmental Quality (LDEQ) will respond in its final SIP, and the agency, like many other state agencies, did not meet the July 31, 2021 deadline to submit a SIP to the EPA for review.

Similar to the LDEQ, the Arkansas Department of Energy and Environment, Division of Environmental Quality (ADEQ) did not meet the July 31, 2021 SIP submission deadline, but subsequently submitted it to the EPA for review. The ADEQ reviewed Entergy’s Independence plant, but determined that additional air emission controls would not be cost-effective considering the facility’s commitment to cease coal-fired combustion by December 31, 2030.

The Texas Commission on Environmental Quality has completed its second-planning period SIP and submitted it to the EPA for review. There were no Entergy sources selected for additional emission controls. The Mississippi Department of Environmental Quality continues to develop its SIP, but there are no Entergy sources that are expected to be impacted.

In August 2022 the EPA issued findings of failure to submit regional haze SIPs to 15 states, including Louisiana and Mississippi. These findings were effective September 2022 and start the two-year period for the EPA to either approve a SIP submitted by the state or issue a final federal plan.

Greenhouse Gas Emissions

In July 2019 the EPA released the Affordable Clean Energy Rule (ACE), which applies only to existing coal-fired electric generating units. The ACE determines that heat rate improvements are the best system of emission reductions and lists six candidate technologies for consideration by states at each coal unit. The rule and associated rulemakings by the EPA replace the Obama administration’s Clean Power Plan, which established national emissions performance rates for existing fossil-fuel fired steam electric generating units and combustion turbines. The ACE rule provides states discretion in determining how the best system for emission reductions applies to individual units, including through the consideration of technical feasibility and the remaining useful life of the facility. The ADEQ and the LDEQ have issued information collection requests to Entergy facilities to help the states collect the information needed to determine the best system of emission reductions for each facility. Entergy responded to the requests. In January 2021 the U.S. Court of Appeals for the D.C. Circuit vacated ACE. The court held that ACE relied on an incorrect interpretation of the Clean Air Act that the statute expressly forecloses emission reduction approaches, such as emissions trading and generating shifting, that cannot be applied at and to the individual source. The court remanded ACE to the EPA for further consideration and also vacated the repeal of the Clean Power Plan. In March 2021 the D.C. Circuit issued a partial mandate vacating the ACE rule, but withheld the mandate vacating the repeal of the Clean Power Plan pending the EPA’s new rulemaking to regulate greenhouse gas emissions. Thus, there currently is no regulation in place with respect to greenhouse gas emissions from existing electric generating units and states are not expected to take further action to develop and submit plans at this time. In October 2021 the United States Supreme Court agreed to hear a challenge to the already vacated ACE rule. In June 2022 the United States Supreme Court held that the EPA could not use generation shifting as the best system of emission reduction under Section 111(d) of the Clean Air Act. The EPA does still have the authority to regulate greenhouse gas emissions, but those emissions reductions must be technology based. The EPA has announced its intent to propose a rule for existing power plants pursuant to the Clean Air Act by March 2023. The ultimate impact of the United States Supreme Court's decision cannot be determined at this time.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

In April 2021, President Biden announced a target for the United States in connection with the United Nations’ “Paris Agreement” on climate change. The target consists of a 50-52 percent reduction in economy-wide net greenhouse gas emissions from 2005 levels by 2030. President Biden has also stated that a goal of his administration is for the electric power industry to decarbonize fully by 2035. The details surrounding implementation of these targets are not finalized, and the impacts to Entergy of any potential related legislation cannot be predicted.

Entergy continues to support national legislation that would most efficiently reduce economy-wide greenhouse gas emissions and increase planning certainty for electric utilities. By virtue of its proportionally large investment in low-emitting generation technologies, Entergy has a low overall carbon dioxide emission “intensity,” or rate of carbon dioxide emitted per megawatt-hour of electricity generated. In anticipation of the imposition of carbon dioxide emission limits on the electric industry, Entergy initiated actions designed to reduce its exposure to potential new governmental requirements related to carbon dioxide emissions. These voluntary actions included a formal program to stabilize owned power plant carbon dioxide emissions at 2000 levels through 2005, and Entergy succeeded in reducing emissions below 2000 levels. In 2006, Entergy started including emissions from controllable power purchases in addition to its ownership share of generation and established a second formal voluntary program to stabilize power plant carbon dioxide emissions and emissions from controllable power purchases, cumulatively over the period, at 20% below 2000 levels through 2010. In 2011, Entergy extended this commitment through 2020, which it ultimately outperformed by approximately 8% both cumulatively and on an annual basis. In 2019, in connection with a climate scenario analysis following the recommendations of the Task Force on Climate-related Financial Disclosures describing climate-related governance, strategy, risk management, and metrics and targets, Entergy announced a 2030 carbon dioxide emission rate goal focused on a 50% reduction from Entergy’s base year - 2000. Entergy now anticipates achieving this reduction several years early. In September 2020, Entergy announced a commitment to achieve net-zero greenhouse gas emissions by 2050 inclusive of all businesses, all applicable gases, and all emission scopes. In 2022, Entergy enhanced its commitment to include an interim goal of 50% carbon-free energy generating capacity by 2030 and expanded its interim emission rate goal to include all purchased power. See “Risk Factors” in Part I Item 1A for discussion of the risks associated with achieving these climate goals. Entergy’s comprehensive, third-party verified greenhouse gas inventory and progress against its voluntary goals are published on its website.

Entergy participates in the M.J. Bradley & Associates’ Annual Benchmarking Air Emissions Report, an annual analysis of the 100 largest U.S. electric power producers. The report is available on the M.J. Bradley website. Entergy participates annually in the Dow Jones Sustainability Index and in 2022 was listed on the North American Index. Entergy has been listed on the World or North American Index, or both, for 21 consecutive years. Entergy also participated in the 2022 CDP Climate Change and CDP Water Security evaluations, receiving a ‘B’ for both responses.

Potential Legislative, Regulatory, and Judicial Developments

In addition to the specific instances described above, there are a number of legislative and regulatory initiatives that are under consideration at the federal, state, and local level. Because of the nature of Entergy’s business, the imposition of any of these initiatives could affect Entergy’s operations. Entergy continues to monitor these initiatives and activities in order to analyze their potential operational and cost implications. These initiatives include:

  • reconsideration and revision of ambient air quality standards downward which could lead to additional areas of nonattainment;

  • designation by the EPA and state environmental agencies of areas that are not in attainment with national ambient air quality standards;

  • introduction of bills in Congress and development of regulations by the EPA proposing further limits on SO2, mercury, carbon dioxide, and other air emissions. New legislation or regulations applicable to

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

stationary sources could take the form of market-based cap-and-trade programs, direct requirements for the installation of air emission controls onto air emission sources, or other or combined regulatory programs;

  • efforts in Congress or at the EPA to establish a federal carbon dioxide emission tax, control structure, or unit performance standards;

  • revisions to the estimates of the Social Cost of Carbon and its use for regulatory impact analysis of federal laws and regulations;

  • implementation of the regional cap and trade programs to limit carbon dioxide and other greenhouse gases;

  • efforts on the local, state, and federal level to codify renewable portfolio standards, clean energy standards, or a similar mechanism requiring utilities to produce or purchase a certain percentage of their power from defined renewable energy sources or energy sources with lower emissions;

  • efforts to develop more stringent state water quality standards, effluent limitations for Entergy’s industry sector, stormwater runoff control regulations, and cooling water intake structure requirements;

  • efforts to restrict the previously-approved continued use of oil-filled equipment containing certain levels of polychlorinated biphenyls (PCBs);

  • efforts by certain external groups to encourage reporting and disclosure of environmental, social, and governance risk;

  • the listing of additional species as threatened or endangered, the protection of critical habitat for these species, and developments in the legal protection of eagles and migratory birds;

  • the regulation of the management, disposal, and beneficial reuse of coal combustion residuals; and

  • the regulation of the management and disposal and recycling of equipment associated with renewable and clean energy sources such as used solar panels, wind turbine blades, hydrogen usage, or battery storage.

Clean Water Act

The 1972 amendments to the Federal Water Pollution Control Act (known as the Clean Water Act) provide the statutory basis for the National Pollutant Discharge Elimination System permit program, section 402, and the basic structure for regulating the discharge of pollutants from point sources to waters of the United States. The Clean Water Act requires virtually all discharges of pollutants to waters of the United States to be permitted. Section 316(b) of the Clean Water Act regulates cooling water intake structures, section 401 of the Clean Water Act requires a water quality certification from the state in support of certain federal actions and approvals, and section 404 regulates the dredge and fill of waters of the United States, including jurisdictional wetlands.

Federal Jurisdiction of Waters of the United States

In June 2020 the EPA’s revised definition of waters of the United States in the Navigable Waters Protection Rule (NWPR) became effective, narrowing the scope of Clean Water Act jurisdiction, as compared to a 2015 definition which had been stayed by several federal courts. In August 2021 a federal district court vacated and remanded the NWPR for further consideration. The EPA and the U.S. Army Corps of Engineers (Corps) subsequently issued a statement that the agencies would revert to pre-2015 regulations pending a new rulemaking. In December 2022 the EPA and the Corps released a final definition of waters of the United States that replaces the NWPR with a definition that is consistent with the pre-2015 regulatory regime as interpreted by several United States Supreme Court decisions. Most notably, the exclusion for waste treatment systems is retained.

Comprehensive Environmental Response, Compensation, and Liability Act of 1980

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), authorizes the EPA to mandate clean-up by, or to collect reimbursement of clean-up costs from, owners or operators of sites at which hazardous substances may be or have been released. Certain private parties also may use CERCLA to recover response costs. Parties that transported hazardous substances to these sites or arranged for the disposal of the substances are also deemed liable by CERCLA. CERCLA has been interpreted to impose strict, joint, and several liability on responsible parties. Many states have adopted programs similar to CERCLA. Entergy subsidiaries in the Utility and Entergy Wholesale Commodities businesses have sent waste materials to various

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

disposal sites over the years, and releases have occurred at Entergy facilities including nuclear facilities that have been or will be sold to decommissioning companies. In addition, environmental laws now regulate certain of Entergy’s operating procedures and maintenance practices that historically were not subject to regulation. Some disposal sites used by Entergy subsidiaries have been the subject of governmental action under CERCLA or similar state programs, resulting in site clean-up activities. Entergy subsidiaries have participated to various degrees in accordance with their respective potential liabilities in such site clean-ups and have developed experience with clean-up costs. The affected Entergy subsidiaries have established provisions for the liabilities for such environmental clean-up and restoration activities. Details of potentially material CERCLA and similar state program liabilities are discussed in the “Other Environmental Matters” section below.

Coal Combustion Residuals

In June 2010 the EPA issued a proposed rule on coal combustion residuals (CCRs) that contained two primary regulatory options: (1) regulating CCRs destined for disposal in landfills or received (including stored) in surface impoundments as so-called “special wastes” under the hazardous waste program of Resource Conservation and Recovery Act (RCRA) Subtitle C; or (2) regulating CCRs destined for disposal in landfills or surface impoundments as non-hazardous wastes under Subtitle D of RCRA. Under both options, CCRs that are beneficially reused in certain processes would remain excluded from hazardous waste regulation. In April 2015 the EPA published the final CCR rule with the material being regulated under the second scenario presented above - as non-hazardous wastes regulated under RCRA Subtitle D.

The final regulations create new compliance requirements including modified storage, new notification and reporting practices, product disposal considerations, and CCR unit closure criteria. Entergy believes that on-site disposal options will be available at its facilities, to the extent needed for CCR that cannot be transferred for beneficial reuse. As of December 31, 2022, Entergy has recorded asset retirement obligations related to CCR management of $27 million.

Pursuant to the EPA Rule, Entergy operates groundwater monitoring systems surrounding its coal combustion residual landfills located at White Bluff, Independence, and Nelson. Monitoring to date has detected concentrations of certain listed constituents in the area, but has not indicated that these constituents originated at the active landfill cells. Reporting has occurred as required, and detection monitoring will continue as the rule requires. In late-2017, Entergy determined that certain in-ground wastewater treatment system recycle ponds at its White Bluff and Independence facilities require management under the new EPA regulations. Consequently, in order to move away from using the recycle ponds, White Bluff and Independence each have installed a new permanent bottom ash handling system that does not fall under the CCR rule. As of November 2020, both sites are operating the new system and no longer are sending waste to the recycle ponds. Each site has commenced closure of its two recycle ponds (four ponds total), prior to the April 11, 2021 deadline under the finalized CCR rule for unlined recycle ponds. Any potential requirements for corrective action or operational changes under the new CCR rule continue to be assessed. Notably, ongoing litigation has resulted in the EPA’s continuing review of the rule. Consequently, the nature and cost of additional corrective action requirements may depend, in part, on the outcome of the EPA’s review.

Other Environmental Matters

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas

The EPA notified Entergy that the EPA believes Entergy is a PRP concerning PCB contamination at the F.J. Doyle Salvage facility in Leonard, Texas. The facility operated as a scrap salvage business during the 1970s to the 1990s. In May 2018 the EPA investigated the site surface and sub-surface soils and, in November 2018 the EPA conducted a removal action, including disposal of PCB contaminated soils. Entergy responded to the EPA’s information requests in May and July 2019. In November 2020 the EPA sent Entergy and other PRPs a demand letter seeking reimbursement for response costs totaling $4 million expended at the site. Liability and PRP

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

allocation of response costs are yet to be determined. In December 2020, Entergy responded to the demand letter, without admitting liability or waiving any rights, indicating that it would engage in good faith negotiations with the EPA with respect to the demand. An initial meeting between the EPA and the PRPs took place in June 2021. Negotiations between the PRPs and the EPA are ongoing.

Litigation

Entergy uses legal and appropriate means to contest litigation threatened or filed against it, but certain states in which Entergy operates have proven to be unusually litigious environments. Judges and juries in Louisiana, Mississippi, and Texas have demonstrated a willingness to grant large verdicts, including punitive damages, to plaintiffs in personal injury, property damage, and business tort cases. The litigation environment in these states poses a significant business risk to Entergy.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements for a discussion of this litigation.

Employment and Labor-related Proceedings (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 8 to the financial statements for a discussion of these proceedings.

Human Capital

Employees

Employees are an integral part of Entergy’s commitment to serving customers. As of December 31, 2022, Entergy subsidiaries employed 11,707 people.

Utility:
Entergy Arkansas1,227
Entergy Louisiana1,597
Entergy Mississippi716
Entergy New Orleans296
Entergy Texas648
System Energy—
Entergy Operations3,317
Entergy Services3,870
Entergy Nuclear Operations13
Other subsidiaries23
Total Entergy11,707

Approximately 3,084 employees are represented by the International Brotherhood of Electrical Workers, the United Government Security Officers of America, and the International Union, Security, Police, and Fire Professionals of America.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Below is the breakdown of Entergy’s employees by gender and race/ethnicity:

Gender (%)20222021
Female22.221.4
Male77.878.6
Race/Ethnicity (%)20222021
White74.876.4
Black/African American17.316.4
Hispanic/Latino3.02.7
Asian2.32.0
Other2.62.5

Entergy’s Approach to Human Resources

Entergy’s people and culture enable its success; that is why acquiring, retaining, and developing talent are important components of Entergy’s human resources strategy. Entergy focuses on an approach that includes, among other things, governance and oversight; safety; organizational health, including diversity, inclusion, and belonging; and talent management.

Governance and Oversight

Ensuring that workplace processes support the desired culture and strategy begins with the Board of Directors and the Office of the Chief Executive. The Talent and Compensation Committee (formerly Personnel Committee) establishes priorities and each quarter reviews strategies and results on a range of topics covering the workforce, the workplace, and the marketplace. It oversees Entergy’s incentive plan design and administers its executive compensation plans to incentivize the behaviors and outcomes that support achievement of Entergy’s corporate objectives. Annually, it reviews executive performance, development, succession plans, and talent pipeline to align a high performing executive team with Entergy’s priorities. The Talent and Compensation Committee also oversees Entergy’s performance through regular briefings on a wide variety of human resources topics including Entergy’s safety culture and performance; organizational health; and diversity, inclusion, and belonging initiatives and performance.

The Talent and Compensation Committee’s Charter was revised in 2021 to acknowledge the committee’s responsibility for overseeing and monitoring the effectiveness of Entergy’s human capital strategies, including its workforce diversity, inclusion, and organizational health and safety strategies, programs, and initiatives. In recognition of the importance that organizational health and diversity, inclusion, and belonging play in enabling Entergy to achieve its business strategies, the committee receives periodic reports on Entergy’s organization health and diversity, inclusion, and belonging programs, strategies, and performance, including briefings at each of its regular meetings. The committee also receives updates on Entergy’s performance to date on key workforce, workplace, and marketplace measures, including progress in the representation of women and underrepresented minorities, both in the total workforce and in director level and above placements, progress in key diversity, inclusion, and belonging initiatives and diverse supplier spend.

Other committees of the Board oversee other key aspects of Entergy’s culture. For example, the Audit Committee reviews reports on enterprise risks, ethics, and compliance training and performance, as well as regular reports on calls made to Entergy’s ethics line and related investigations. To maximize the sharing of information and facilitate the participation of all Board members in these discussions, the Board schedules its regular committee meetings in a manner such that all directors can attend.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

The Office of the Chief Executive, which includes the Senior Vice President and Chief Human Resources Officer, ensures annual business plans are designed to support Entergy’s talent objectives, reviews workforce-related metrics, and regularly discusses the development, succession planning, and performance of their direct reports and other company officers.

Safety

Entergy’s safety objective is: Everyone Safe. All Day. Every Day. The continuation of the COVID-19 pandemic and another historic hurricane season presented significant challenges. Entergy employees achieved a total recordable incident rate of 0.51 in 2022, compared to 0.46 in 2021, and 0.40 in 2020. The results of 2021 unfortunately included an employee fatality. Entergy has enhanced dramatically leadership efforts and field presence to further its objective of zero fatalities, which it achieved in 2022. Also in 2022, there was a significant decrease in the number of serious injuries. The recordable incident rate equals the number of recordable incidents per 100 full-time equivalents. Recordable incidents include fatalities, lost-time accidents, restricted-duty accidents, and medical attentions and is not inclusive of potential work-related COVID-19 cases.

Organizational Health, including Diversity, Inclusion and Belonging (DIB)

Entergy believes that organizational health fosters an engaged and productive culture that positions Entergy to deliver sustainable value to its stakeholders. Entergy measures its progress through an organizational health survey coordinated by an external third party. Since initially administering the survey in 2014, Entergy improved from an initial score of 49 (fourth quartile) to a score in 2020 of 72 (second quartile), in 2021 of 63 (third quartile), and in 2022 of 61 (third quartile). Although the score declined slightly in 2022 as compared to 2021, it improved from the 2014 baseline. Management uses the results of the annual survey to design and implement strategies to positively influence organizational health. Initial employee participation of 66 percent in 2014 rose to and remains at approximately 90 percent in 2019-2022.

Entergy believes that creating a culture of diversity, inclusion, and belonging drives foundational engagement. Entergy is committed to developing and retaining a workforce that reflects the rich diversity of the communities it serves. In 2019, Entergy embarked on a three-year phased approach to enhance inclusion for individuals and teams. In 2022, Entergy continued to focus its actions to engage a diverse workforce, infusing DIB into hiring policies, practices and procedures, aligning Employee Resource Group goals to DIB goals, growing its DIB Champion network, integrating DIB into Entergy’s leadership development programs, and facilitating training from the executive leadership ranks down to the frontline. Through these efforts, Entergy aspires to create greater understanding and accountability regarding the behaviors and outcomes that are indicative of a premier utility.

Talent Management

Entergy’s focus on talent management is organized in three areas: developing and attracting a diverse pool of talent, equipping its leaders to develop the organization, and building premier utility capability through employee performance management and succession programs. Entergy believes that developing a diverse pool of local talent equipped with the skills needed, today and in the future, and reflecting the communities Entergy serves will give it a long-term competitive advantage. The focus of Entergy’s leadership development programs is to equip managers with the skills needed to effectively develop their teams and improve the leader-employee relationship. Entergy’s talent development infrastructure, which includes a combination of business function-specific and enterprise-wide learning and development programs, is designed to ensure Entergy has qualified staff with the skills, experiences, and behaviors needed to perform today and prepare for the future. Entergy strives to achieve its strategic priorities by aligning and enhancing team and individual performance with business objectives, effectively deploying talent through succession planning, and managing workforce transitions.

Part I Item 1

Entergy Corporation, Utility operating companies, and System Energy

Availability of SEC filings and other information on Entergy’s website

Entergy electronically files reports with the SEC, including annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, proxies, and amendments to such reports. The SEC maintains an internet site that contains reports, proxy and information statements, and other information regarding registrants that file electronically with the SEC at http://www.sec.gov. Copies of the reports that Entergy files with the SEC can be obtained at the SEC’s website.

Entergy uses its website, http://www.entergy.com, as a routine channel for distribution of important information, including news releases, analyst presentations and financial information. Filings made with the SEC are posted and available without charge on Entergy’s website as soon as reasonably practicable after they are electronically filed with, or furnished to, the SEC. These filings include annual and quarterly reports on Forms 10-K and 10-Q and current reports on Form 8-K (including related filings in XBRL format); proxy statements; and any amendments to those reports or statements. All such postings and filings are available on Entergy’s Investor Relations website free of charge. Entergy is providing the address to its internet site solely for the information of investors and does not intend the address to be an active link. The contents of the website are not incorporated into this report.

Part I Item 1A and 1B

Entergy Corporation, Utility operating companies, and System Energy