Item 5. Other Information
6K characters. Original on sec.gov ·
Item 5. Other Information
Rule 10b5-1 Trading Agreements
During the three months ended June 30, 2023, no director or officer of Entergy or any of the Registrant Subsidiaries adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” as each term is defined in Item 408(a) of Regulation S-K.
Regulation of the Nuclear Power Industry
Following is an update to the “Regulation of the Nuclear Power Industry” section of Part I, Item 1 of the Form 10-K.
Nuclear Waste Policy Act of 1982
Nuclear Plant Decommissioning
In March 2023 filings with the NRC were made reporting on decommissioning funding for all of Entergy’s subsidiaries’ nuclear plants. Those reports showed that decommissioning funding for each of the nuclear plants met the NRC’s financial assurance requirements.
NRC Reactor Oversight Process
In September 2022 the NRC placed Waterford 3 in Column 2 based on an error associated with a radiation monitor calibration. Entergy corrected the issue with the radiation monitor in February 2022 and also corrected a subsequent radiation monitor calibration issue. In May 2023 the NRC completed a supplemental inspection of Waterford 3 in accordance with its inspection procedures for nuclear plants in Column 2 and Waterford 3 was returned to Column 1.
In July 2023 the NRC placed River Bend in Column 2, effective April 2023, based on failure to inspect wiring associated with the high pressure core spray system. River Bend will remain in Column 2 pending successful completion of a supplemental inspection.
Environmental Regulation
Following are updates to the “Environmental Regulation” section of Part I, Item 1 of the Form 10-K.
National Ambient Air Quality Standards
See the Form 10-K for discussion of the National Ambient Air Quality Standards (NAAQS) set by the EPA in accordance with the Clean Air Act. Following are updates to that discussion.
Hazardous Air Pollutants
As discussed in the Form 10-K, the EPA released the final Mercury and Air Toxics Standard (MATS) rule in December 2011, which had a compliance date, with a widely granted one-year extension, of April 2016. The required controls have been installed and are operational at all affected Entergy units. In April 2023 the EPA issued a regulatory proposal to revise portions of the MATS rule, including a proposed reduction to the emission limit for filterable particulate matter. If finalized, the proposed lower filterable particulate matter emission limitation could require additional capital investment and/or additional other operation and maintenance expenditures at Entergy’s coal-fired generating units. Entergy is closely monitoring this rulemaking, in part through its various trade associations.
Good Neighbor Plan/Cross-State Air Pollution Rule
In March 2023 the EPA released its final Federal Implementation Plan (FIP), known as the Good Neighbor Plan, to address interstate transport for the 2015 ozone NAAQS which will increase the stringency of the Cross-State Air Pollution Rule (CSAPR) program in all four of the states where the Utility operating companies operate. The FIP will significantly reduce ozone season nitrogen oxides (NOx) emission allowance budgets and allocations for electric generating units. Entergy is currently assessing its compliance options for the FIP. This may include the installation of post-combustion NOx emissions controls on certain coal or large legacy gas units that will operate beyond 2026 and are not currently equipped with such controls. Since the release of the proposed rule in April 2022, the price for Group 3 ozone season NOx emission allowances has fluctuated significantly, peaking at over $45,000 per allowance in late August 2022, and has recently ranged between $8,000 to $10,000 per allowance. Prior to issuance of the FIP, in February 2023 the EPA issued related State Implementation Plan (SIP) disapprovals for many states, including the four states in which the Utility operating companies operate, and these SIP disapprovals are the subject of many legal challenges, including a petition for review filed by Entergy Louisiana challenging the disapproval of Louisiana’s SIP. Stays of the SIP disapprovals have been granted in all four states in which the Utility operating companies operate, and the Good Neighbor Plan will not go into effect while the stays are in place. Decisions on the merits regarding the SIP disapprovals are not expected until 2024. The final FIP also is subject to numerous legal challenges.
Greenhouse Gas Emissions
In May 2023 the EPA proposed several rules regulating greenhouse gas emissions from new and existing (coal and gas-fired) power plants. If finalized, the proposed requirements for existing “large and frequently used” gas turbine generating units could require significant investments in carbon dioxide (CO2) emission reduction technologies at certain of Entergy’s existing gas turbine units with a capacity of greater than 300 MW per combustion turbine and which operate at an annual capacity factor of greater than 50 percent. Comments are due in August 2023. Entergy is closely monitoring this rulemaking, in part through its various trade associations.
Coal Combustion Residuals
As discussed in the Form 10-K, in April 2015 the EPA published the final coal combustion residuals (CCR) rule. In May 2023 the EPA released a proposed rule establishing management standards for legacy CCR surface impoundments (i.e., inactive surface impoundments at inactive power plants) and establishing a new class of units referred to as CCR management units (i.e., non-containerized CCR located at a regulated CCR facility). Entergy does not have any legacy impoundments; however, the proposed definition of CCR management units appears to regulate on-site areas where CCR was beneficially used. This is contrary to the current CCR rule which exempts beneficial uses that meet certain criteria. Comments on the proposed rule were due in July 2023 and Entergy is monitoring the rulemaking, in part through its trade associations.