Item 4. Controls and Procedures

378K characters. Original on sec.gov ·

Item 4. Controls and Procedures

The 75 tables in Item 4. Controls and Procedures as one CSV, figures in aligned columns. For subscribers: paste your API key. One API call. Plans from $19 a month, see pricing.

Disclosure Controls and Procedures

As of September 30, 2026 evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy (each individually a “Registrant” and collectively the “Registrants”) management, including their respective Principal Executive Officers (PEO) and Principal Financial Officers (PFO). The evaluations assessed the effectiveness of the Registrants’ disclosure controls and procedures. Based on the evaluations, each PEO and PFO has concluded that, as to the Registrant or Registrants for which they serve as PEO or PFO, the Registrant’s or Registrants’ disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant’s or Registrants’ disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant’s or Registrants’ management, including their respective PEOs and PFOs, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

Under the supervision and with the participation of each Registrant’s management, including its respective PEO and PFO, each Registrant evaluated changes in internal control over financial reporting that occurred during the quarter ended September 30, 2026 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Winter Storm Fern

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Arkansas’s cost of mobilizing crews and restoring power was approximately $50 million, including approximately $40 million in capital costs and approximately $10 million in non-capital costs. Natural gas purchases for Entergy Arkansas were $74 million in January 2026 compared to $25 million in January 2025.

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $71.4 million primarily due to higher retail electric price and higher volume/weather, partially offset by higher other operation and maintenance expenses and higher interest expense.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $53.8 million primarily due to higher retail electric price, higher volume/weather, and higher other income, partially offset by higher interest expense, higher other operation and maintenance expenses, and higher depreciation and amortization expenses.

Operating Revenues

Third Quarter 2026 Compared to Third Quarter 2025

Following is an analysis of the change in operating revenues comparing the third quarter 2026 to the third quarter 2025:

Amount
(In Millions)
2025 operating revenues$864.1
Fuel, rider, and other revenues that do not significantly affect net income(0.9)
Retail electric price68.2
Volume/weather56.2
2026 operating revenues$987.6

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2026 and the implementation of the Generating Arkansas Jobs Act rider effective June 2026. See Note 2 to the

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

financial statements in the Form 10-K for discussion of the 2025 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the Generating Arkansas Jobs Act rider filing.

The volume/weather variance is primarily due to the effect of more favorable weather on residential and commercial sales and an increase in weather-adjusted residential usage.

Total electric energy sales for Entergy Arkansas for the three months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential2,7342,35716
Commercial1,8511,7247
Industrial3,4433,3802
Governmental4959(17)
Total retail8,0777,5207
Sales for resale:
Associated companies273592(54)
Non-associated companies6601,336(51)
Total9,0109,448(5)

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Following is an analysis of the change in operating revenues comparing the nine months ended September 30, 2026 to the nine months ended September 30, 2025:

Amount
(In Millions)
2025 operating revenues$2,175.3
Fuel, rider, and other revenues that do not significantly affect net income(16.3)
Retail electric price122.9
Volume/weather45.4
2026 operating revenues$2,327.3

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2026 and the implementation of the Generating Arkansas Jobs Act rider effective June 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the 2025 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the Generating Arkansas Jobs Act rider filing.

The volume/weather variance is primarily due to the effect of more favorable weather on residential and commercial sales and an increase in industrial usage, partially offset by a decrease in weather-adjusted commercial

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily primary metals customers.

Total electric energy sales for Entergy Arkansas for the nine months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential6,3716,2422
Commercial4,4864,3772
Industrial9,8198,9869
Governmental133147(10)
Total retail20,80919,7525
Sales for resale:
Associated companies6971,688(59)
Non-associated companies2,1443,792(43)
Total23,65025,232(6)

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Other Income Statement Variances

Third Quarter 2026 Compared to Third Quarter 2025

Other operation and maintenance expenses increased primarily due to:

  • an increase of $5.1 million in power delivery expenses primarily due to higher vegetation maintenance costs;

  • an increase of $3.7 million in non-nuclear generation expenses primarily due to a higher scope of work in 2026 as compared to 2025;

  • an increase of $2.2 million in compensation and benefits costs primarily due to higher healthcare claims activity; and

  • several individually insignificant items.

Taxes other than income taxes decreased primarily due to an increase in ad valorem tax accruals for the 2025 tax year as a result of updated tax rates received in third quarter 2025.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in FERC jurisdictional depreciation rates effective January 2026.

Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to an increase of $4.9 million in the amortization of tax gross-up on customer advances, including customer advances for construction.

Interest expense increased primarily due to the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026, and $4.2 million in carrying costs in third

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits. The increase was partially offset by the repayment of $600 million of 3.5% Series mortgage bonds in February 2026.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Other operation and maintenance expenses increased primarily due to:

  • an increase of $22.5 million in power delivery expenses primarily due to higher vegetation maintenance costs;

  • an increase of $8.9 million in compensation and benefits costs primarily due to higher healthcare claims activity, the timing of the recognition of prescription drug rebates, and a larger revision to estimated incentive-based compensation expense in 2025;

  • an increase of $4.5 million in non-nuclear generation expenses primarily due to a higher scope of work performed in 2026 as compared to 2025; and

  • several individually insignificant items.

The increase was partially offset by:

  • a decrease of $10.5 million in energy efficiency expenses primarily due to the timing of recovery from customers;

  • a decrease of $5.4 million in insurance expense primarily due to higher nuclear insurance refunds; and

  • a decrease of $5.1 million in loss provisions.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in FERC jurisdictional depreciation rates effective January 2026.

Other regulatory charges (credits) - net includes a regulatory charge of $8.8 million, recorded in second quarter 2026, to reflect the amount of the 2025 historical year netting adjustment to be returned to Entergy Arkansas’s customers during the 2027 rate effective period as included in the 2026 formula rate plan filing. See Note 2 to the financial statements herein for discussion of the 2026 formula rate plan filing. In addition, Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to:

  • changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in first quarter 2026;

  • an increase of $8.3 million in interest earned on money pool investments; and

  • an increase of $7.8 million in the amortization of tax gross-up on customer advances, including customer advances for construction.

Interest expense increased primarily due to:

  • the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

  • the issuance of $300 million of 5.45% Series mortgage bonds in May 2025; and

  • $12.2 million in carrying costs in 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The increase was partially offset by the repayment of $600 million of 3.5% Series mortgage bonds in February 2026.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Income Taxes

The effective income tax rate was 22.3% for the third quarter 2026. The difference in the effective income tax rate for the third quarter 2026 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items.

The effective income tax rate was 20.5% for the nine months ended September 30, 2026. The difference in the effective income tax rate for the nine months ended September 30, 2026 versus the federal statutory rate of 21% was primarily due to the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items, substantially offset by the accrual for state income taxes.

The effective income tax rates were 22% for the third quarter 2025 and 21.4% for the nine months ended September 30, 2025. The differences in the effective income tax rates for the third quarter 2025 and the nine months ended September 30, 2025 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$275,570$4,747
Net cash provided by (used in):
Operating activities947,6751,081,700
Investing activities(1,296,773)(896,720)
Financing activities696,842286,679
Net increase in cash and cash equivalents347,744471,659
Cash and cash equivalents at end of period$623,314$476,406

Operating Activities

Net cash flow provided by operating activities decreased $134.0 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • the timing of recovery of fuel and purchased power costs. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery;

  • the receipt of $99.2 million in proceeds from the transfer of 2025 nuclear production tax credits to third parties in 2026 as compared to the receipt of $160.2 million in proceeds from the transfer of 2024 nuclear and solar production tax credits to third parties in 2025. See Note 3 to the financial statements in the Form

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

10-K and Note 10 to the financial statements herein for discussion of the nuclear and solar production tax credits;

  • higher ad valorem tax payments as a result of the timing of payments in 2026 as compared to 2025;

  • an increase of $31.7 million in spending on nuclear refueling outage costs in 2026 as compared to 2025; and

  • an increase of $22.1 million in interest paid.

The decrease was partially offset by:

  • higher collections from customers;

  • the receipt of $104.5 million in advance payments related to customer agreements in 2026, including $84.9 million in customer advances and $19.6 million in tax gross-up on customer advances for construction; and

  • the timing of payments to vendors.

Investing Activities

Net cash flow used in investing activities increased $400.1 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • an increase of $538 million in non-nuclear generation construction expenditures primarily due to higher spending on the Jefferson Power Station project, the Ironwood Power Station project, and the Arkansas Cypress Solar project;

  • an increase of $41.8 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2026; and

  • an increase of $16.5 million in cash used as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle.

The increase was partially offset by:

  • money pool activity;

  • a decrease of $43.1 million in capital expenditures related to storm restoration primarily due to lower spending on minor storms in 2026 as compared to 2025, partially offset by an increase due to Winter Storm Fern restoration efforts in 2026. See “Winter Storm Fern” above for discussion of storm restoration efforts in 2026;

  • a decrease of $37 million in cash collateral posted to support Entergy Arkansas’s obligations to MISO in 2026; and

  • a decrease of $20.3 million in decommissioning trust fund investment activity.

Increases in Entergy Arkansas’s receivable from the money pool are a use of cash flow, and Entergy Arkansas’s receivable from the money pool increased $2.6 million for the nine months ended September 30, 2026 compared to increasing by $120.3 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $410.2 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • the issuances of $500 million of 5.75% Series mortgage bonds and $500 million of 4.95% Series mortgage bonds, each in January 2026;

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

  • a capital contribution of $200 million received from Entergy Corporation in 2026 in order to maintain Entergy Arkansas’s capital structure;

  • the issuance of $120 million of 5.28% Series P notes by the Entergy Arkansas nuclear fuel company variable interest entity in July 2026;

  • an increase of $94.6 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements; and

  • money pool activity.

The increase was partially offset by:

  • the repayment of $600 million of 3.5% Series mortgage bonds in February 2026;

  • the issuance of $300 million of 5.45% Series mortgage bonds in May 2025;

  • the repayment of $90 million of 1.84% Series N notes by the Entergy Arkansas nuclear fuel company variable interest entity in July 2026; and

  • net repayments of $13.7 million in 2026 as compared to net long-term borrowings of $1.6 million in 2025 on the nuclear fuel company variable interest entity’s credit facility.

Decreases in Entergy Arkansas’s payable to the money pool are a use of cash flow, and Entergy Arkansas’s payable to the money pool decreased $15.2 million for the nine months ended September 30, 2025.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Arkansas’s debt to capital ratio is shown in the following table. The decrease in the debt to capital ratio for Entergy Arkansas is primarily due to net income in 2026 and a capital contribution of $200 million received from Entergy Corporation in 2026, partially offset by the net issuance of long-term debt in 2026.

September 30, 2026December 31, 2025
Debt to capital52.4%53.7%
Effect of subtracting cash(2.8%)(1.3%)
Net debt to net capital (non-GAAP)49.6%52.4%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Arkansas also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition because net debt indicates Entergy Arkansas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Arkansas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy Arkansas is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions) (a)
Planned construction and capital investments:
Generation$2,055$1,360$725$440
Transmission270275190145
Distribution340375340310
Utility Support70706060
Total$2,735$2,080$1,315$955

(a)Amounts exclude expenditures expected to be funded through customer advances for construction.

In addition to routine capital spending to maintain operations, the capital plan for Entergy Arkansas includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Arkansas’s portfolio, as well as to support customer growth, including Ironwood Power Station, Jefferson Power Station, Arkansas Cypress Solar, the White Bluff Unit 1 fuel conversion, and battery energy storage systems; investments in ANO 1 and 2; distribution and Utility support spending to improve reliability and customer experience; transmission spending to improve reliability while also supporting customer growth and renewables expansion; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. Entergy Arkansas is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

Entergy Arkansas’s receivables from or (payables to) the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$24,279$21,715$120,316($15,190)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Arkansas has a credit facility in the amount of $300 million scheduled to expire in June 2031. Entergy Arkansas also has a $25 million credit facility scheduled to expire in April 2028. The $300 million credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of September 30, 2026, there were no cash borrowings under either credit facility and no letters of credit outstanding under the $300 million credit facility. In addition, Entergy Arkansas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

September 30, 2026, $177.5 million in letters of credit were outstanding under Entergy Arkansas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Arkansas nuclear fuel company variable interest entity has a credit facility in the amount of $80 million scheduled to expire in June 2029. As of September 30, 2026, there were no loans outstanding under the credit facility for the Entergy Arkansas nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for discussion of the nuclear fuel company variable interest entity credit facility.

Jefferson Power Station

As discussed in the Form 10-K, in August 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of Jefferson Power Station, an approximately 754 MW natural gas-fired combined cycle combustion turbine facility to be located in Jefferson County, Arkansas. The estimated cost of the project is $1,602 million. In January 2026 the APSC issued its order finding that Entergy Arkansas had demonstrated a need for the resource but had not met its burden with respect to supporting the prudence of the costs to construct the resource. The APSC acknowledged that the costs would be greater if Entergy Arkansas waited to pursue the resource. The APSC authorized Entergy Arkansas to proceed with Jefferson Power Station as a strategic investment with estimated costs set at a benchmark, which the APSC erroneously believed reflected the current cost estimate but was, in fact, $90 million below the cost presented. In its January 2026 order, the APSC also approved Entergy Arkansas’s recovery of the costs of constructing Jefferson Power Station through the Generating Arkansas Jobs Act rider. Additionally, in its January 2026 order, the APSC found that Entergy Arkansas should conduct all-source competitive solicitations for future generation additions, with limited exceptions where Entergy Arkansas believes that a specific solicitation should be restricted to a certain resource and provides a detailed explanation to the APSC supporting this belief, which the APSC later determined in its March 2026 order is a narrow exception. In February 2026, Entergy Arkansas filed for rehearing seeking to correct the benchmark. In March 2026 the APSC issued an order denying Entergy Arkansas’s petition and maintained the benchmark, although costs over the benchmark were not found to be disallowed. Also in its March 2026 order, the APSC ordered Entergy Arkansas to submit a draft of an all-source request for proposals within thirty days of the order, which Entergy Arkansas filed in April 2026. Also in March 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of its construction costs, as required by the APSC order. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s cost independent monitor proposals for three pending resources, including Jefferson Power Station, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. No alternative recommendations were made by the other parties, and the APSC approved Entergy Arkansas’s independent monitor proposal in September 2026. The facility is expected to be in service by the end of 2029.

Special Rate Contract and Arkansas Cypress Solar

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking approval of a long-term special rate contract between Altitude Capital, LLC, a subsidiary of Alphabet Inc. (Google) and Entergy Arkansas for the sale of electricity to a new large-scale data center in West Memphis, Arkansas. In December 2025 the APSC issued an order approving the special rate contract but denying the requested ratemaking treatment of Google’s upfront payments and deferring a decision on the treatment under the contract pricing providing for the deferral and amortization of the investment tax credits from the Arkansas Cypress Solar facility (discussed below). Also in December 2025, Entergy Arkansas filed a petition with the APSC regarding these findings, noting that they would require renegotiation of the special rate contract. In January 2026 the APSC issued an order maintaining its position on the ratemaking treatment of Google’s upfront payments but reversing itself on the treatment of the Arkansas Cypress Solar facility investment tax credits and allowing those to be used in the pricing of the Arkansas Cypress Solar facility to Google as provided for in the contract. In October 2026, Entergy Arkansas filed for approval of an amendment to the special rate contract regarding the expansion and

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

acceleration of Google’s project in West Memphis. Subject to APSC approval, investments proposed under the amended contract included a 250 MW battery energy storage system to be located at the Driver Solar facility in Mississippi County, Arkansas (Driver Solar battery energy storage system), a 100 MW battery energy storage system to be located adjacent to the existing Arklahoma substation near the in-progress Ironwood Power Station in Hot Spring County, Arkansas (Jones Mill battery energy storage system), a 440 MW solar power purchase agreement from the Big Island Solar facility, and related transmission upgrades and facilities. A procedural schedule has been set with a hearing scheduled for January 2027.

As discussed in the Form 10-K, in September 2025, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Arkansas Cypress Solar facility, a planned 600 MW solar photovoltaic array with a 350 MW battery energy storage system and associated transmission facilities interconnecting at Entergy Arkansas’s White Bluff substation. The estimated cost of the project is $1,602 million. In March 2026 the APSC approved the Arkansas Cypress Solar facility and Entergy Arkansas’s recovery of the costs of the facility through the Generating Arkansas Jobs Act rider. The APSC also ordered implementation of an independent monitor to oversee costs. In April 2026, Entergy Arkansas filed with the APSC its proposal for an independent monitor to oversee the reasonableness of costs. In April 2026 the APSC issued an order consolidating Entergy Arkansas’s independent monitor proposals for three pending resources, including the Arkansas Cypress Solar facility, into a single docket and directing parties with full intervention status to respond to the proposals and recommend independent monitor candidates. No alternative recommendations were made by the other parties, and the APSC approved Entergy Arkansas’s independent monitor proposal in September 2026. The facility is expected to be in service by the end of 2028.

In October 2026, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of the Driver Solar battery energy storage system and the Jones Mill battery energy storage system. The battery energy storage systems are being developed to help support the expansion and acceleration of Google’s project in West Memphis. The estimated cost of the Driver Solar battery energy storage system is $389.4 million, and the estimated cost of the Jones Mill battery energy storage system is $161.2 million. Pending receipt of APSC approval, each battery energy storage system is expected to be in service in 2028.

White Bluff Unit 1 Fuel Conversion

In August 2026, Entergy Arkansas filed an application with the APSC seeking a certificate of convenience and necessity or, in the alternative, a certificate of environmental compatibility and public need for the conversion of White Bluff Unit 1 to operate on natural gas. White Bluff Unit 1 is one of two coal-burning generating units at the White Bluff Steam Electric Station facility, which provides dispatchable capacity of approximately 1,659 MW. The estimated cost of the project is $301.3 million, which Entergy Arkansas proposes to recover through the Generating Arkansas Jobs Act rider. In September 2026 the APSC general staff filed testimony opposing the conversion, criticizing Entergy Arkansas’s demonstration of need and asserting that a prior APSC order required Entergy Arkansas to have performed a market test on the conversion. Entergy Arkansas filed a motion seeking a declaratory order to gain procedural clarity from the APSC regarding the interpretation of its prior order. In October 2026 the APSC found Entergy Arkansas’s interpretation of the prior order to be correct and granted Entergy Arkansas’s motion for declaratory order. In October 2026, Entergy Arkansas filed rebuttal testimony addressing the APSC general staff’s recommendations and misinterpretation of key forecast and modeling information. The APSC general staff’s surrebuttal testimony was filed in October 2026. Pending receipt of APSC approval, construction is expected to begin in 2028 and continue through mid 2029.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

2026 Base Rate Case

In February 2026, Entergy Arkansas filed with the APSC a general change in rates, charges, and tariffs. The filing requested a base rate increase to recover a base rate revenue deficiency of $44.6 million and notified the APSC of Entergy Arkansas’s intent to implement a forward test year formula rate plan pursuant to Arkansas legislation passed in 2015. The primary drivers of the revenue deficiency were increased depreciation expense and the impact of net capital additions. Additionally, the filing requested a 9.90% return on common equity and increased depreciation rates as the result of a depreciation study. In March 2026 the APSC issued an order suspending the proposed rates and tariffs filed by Entergy Arkansas. In June 2026 the APSC established a procedural schedule with an evidentiary hearing scheduled to begin in November 2026, and in July 2026 a number of intervenors moved to modify the schedule to conduct additional discovery. Entergy Arkansas opposed the motion in part based on the voluminous discovery conducted to date. In August 2026 the APSC general staff and intervenors filed responsive testimony recommending rate reductions comprised primarily of adjustments to the return on common equity, capital structure, depreciation, working capital, vegetation management, and incentive compensation. In September 2026, Entergy Arkansas filed rebuttal testimony addressing each of the proposed adjustments and supporting its update to actuals, made in accordance with APSC rules, resulting in a reduced base rate revenue deficiency of $28.6 million. In October 2026 the APSC general staff and intervenors filed their last round of testimony, and Entergy Arkansas filed its final round of responsive testimony, which included a revised base rate revenue deficiency of $28.9 million. Also in October 2026, Entergy Arkansas, the APSC general staff, and an intervenor filed a joint motion with the APSC requesting approval of a settlement agreement in the base rate case proceeding. The settlement agreement proposes, among other items: (1) no change in retail revenues as a result of a settlement base rate revenue deficiency of zero; (2) an authorized return on common equity of 9.7%; (3) a capital structure of 47.5% equity and 52.5% debt; and (4) adjustments to depreciation rates reflecting changes to the useful lives of certain assets and net salvage curves. In addition, the settlement includes an acceleration of an estimated credit to customers, resulting from the netting adjustment for the 2026 historical year. That netting adjustment would normally be provided as part of the 2027 evaluation report and included in rates effective January 1, 2028. The settlement proposes that the credit would be included in formula rate plan rates beginning January 1, 2027. Following the filing of the October 2026 joint motion with the APSC, the APSC issued an order clarifying that, because the settlement agreement is not unanimous, the hearing currently scheduled for November 2026 will not be conducted solely as a settlement hearing and directing Entergy Arkansas to file additional information to allow the APSC to fully evaluate the settlement agreement.

2026 Formula Rate Plan Filing

In July 2026, Entergy Arkansas filed with the APSC its 2026 formula rate plan filing to set its formula rate for the 2027 calendar year. The filing contained an evaluation of Entergy Arkansas’s earnings and a netting adjustment for the 2025 historical year. The filing showed that Entergy Arkansas’s earned rate of return on common equity for the 2025 historical year was 8.8%, resulting in a $47.2 million formula rate plan revenue increase to produce a 9.65% earned rate of return on common equity. When combined with 2025 historical year formula rate plan revenues of $56.0 million, the total proposed revenue change for the 2025 historical year netting adjustment is a reduction of $8.8 million. By operation of the formula rate plan, Entergy Arkansas’s recovery of the revenue requirement is subject to a four percent annual revenue constraint. Entergy Arkansas’s revenue requirement in this filing did not exceed the constraint. In second quarter 2026, Entergy Arkansas recorded a regulatory liability of $8.8 million to reflect the amount of the 2025 historical year netting adjustment that it

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

collected from customers during the 2025 rate effective period. In October 2026, Entergy Arkansas and the APSC staff filed a joint motion requesting to cancel the hearing scheduled for November 2026, and, as there are no contested issues between the parties to the proceeding, requesting the APSC decide this matter consistent with the pleadings and testimony in the record.

Generating Arkansas Jobs Act Rider

In March 2026, Entergy Arkansas filed its first annual update to the Generating Arkansas Jobs Act rider, requesting recovery of $110.4 million of financing costs during construction of generation and transmission strategic investments related to Ironwood Power Station, Jefferson Power Station, and the Arkansas Cypress Solar facility. The revised rates were requested to be effective with the first billing cycle of June 2026. In April 2026 the APSC general staff filed testimony arguing that the APSC had not issued an order designating Ironwood Power Station as a strategic investment and that related costs should therefore be removed from the annual update. Also in April 2026, Entergy Arkansas filed testimony asserting that the APSC general staff’s position is contrary to the plain language of the statute, which includes an exception for facilities like Ironwood Power Station that were certified by the APSC within a certain timeframe. A hearing was held in April 2026. In June 2026 the APSC approved Entergy Arkansas’s annual update, and rates became effective June 4, 2026.

Production Tax Credit Tariffs

As discussed in Note 3 to the financial statements in the Form 10-K, in January 2026 the APSC opened a docket to investigate the sale of Entergy Arkansas’s nuclear production tax credits and the appropriate ratemaking treatment of production tax credits for all of Entergy Arkansas’s eligible resources, including how the proceeds of any sales should flow through to customers. For nuclear production tax credits, Entergy Arkansas proposed a nuclear production tax credit rider, which would provide for the immediate flow through to customers of the weighted average cost of capital return on the net proceeds of the monetized nuclear production tax credits. Recognizing that the timing and determination from the IRS is uncertain, the nuclear production tax credit rider also proposes that, if there is an unfavorable IRS determination, Entergy Arkansas would collect applicable costs from customers. As directed by the APSC, in February 2026, Entergy Arkansas submitted a compliance filing to the APSC verifying the status of the solar production tax credits. The filing also verified that the net proceeds from the sale of the nuclear production tax credits were recorded in FERC accounts that are accruing a return for customers’ benefit at a rate that is above the customer deposit rate. Subsequently, in March 2026, Entergy Arkansas filed testimony setting forth its proposal for the solar production tax credits. Specifically, Entergy Arkansas requested the same ratemaking treatment for all of the solar facilities that the APSC already approved for Walnut Bend (i.e., the total net monetized proceeds from production tax credits expected to be generated over the first ten years of a solar facility’s operation are estimated and then amortized over the expected useful life of the asset, which is typically 30 years). Additionally, consistent with prior orders for these resources, the regulatory liabilities associated with the net cash proceeds from monetized solar production tax credits will be included in Entergy Arkansas’s calculation of its weighted average cost of capital providing a return on the unamortized balance for the benefit of customers. Further, Entergy Arkansas proposes to flow the benefits of the solar production tax credits to customers through Entergy Arkansas’s formula rate plan, effective with the formula rate plan rates that will go into effect January 1, 2027. Entergy Arkansas’s proposal would result in the benefits of the production tax credits being passed through to customers, if approved, as reductions in revenue requirement evenly over the life of the assets, rather than only during the 10-year period in which the production tax credits are generated. In April 2026 the APSC general staff filed testimony proposing an amortization period of no more than 15 years for the monetized proceeds for the tax credits associated with the West Memphis Solar and Driver Solar facilities. An evidentiary hearing was initiated in July 2026 and completed in August 2026.

Energy Cost Recovery Rider

In March 2026, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.01333 per kWh to $0.01508 per kWh.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The primary reason for the rate increase was an under-recovered balance as a result of higher natural gas prices in 2025. Based on circumstances related to ANO 2’s refueling outage, Entergy Arkansas made an adjustment to projected energy costs to phase-in the rate increase gradually. The redetermined rate of $0.01508 per kWh became effective with the first billing cycle in April 2026 through the normal operation of the tariff.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$987,552$864,063$2,327,335$2,175,261
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale88,706111,248217,853271,900
Purchased power96,70973,737242,533197,648
Nuclear refueling outage expenses13,44910,77037,19132,019
Other operation and maintenance223,537203,797597,478555,825
Decommissioning26,78825,35979,33774,969
Taxes other than income taxes47,09152,953129,635124,364
Depreciation and amortization122,840118,005366,209348,394
Other regulatory charges (credits) - net(12,960)(11,323)59,206(24,203)
TOTAL606,160584,5461,729,4421,580,916
OPERATING INCOME381,392279,517597,893594,345
OTHER INCOME
Allowance for equity funds used during construction3,8356,83813,86716,455
Interest and investment income20,81219,566139,96647,946
Miscellaneous - net4,586(2,366)6,117(8,691)
TOTAL29,23324,038159,95055,710
INTEREST EXPENSE
Interest expense73,89660,819222,076177,619
Allowance for borrowed funds used during construction(1,914)(3,234)(6,873)(7,929)
TOTAL71,98257,585215,203169,690
INCOME BEFORE INCOME TAXES338,643245,970542,640480,365
Income taxes75,51354,230111,391102,909
NET INCOME263,130191,740431,249377,456
Net income (loss) attributable to noncontrolling interest15(752)488(2,832)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$263,115$192,492$430,761$380,288
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$431,249$377,456
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization512,100489,931
Deferred income taxes, tax credits, and non-current taxes accrued245,602290,262
Changes in assets and liabilities:
Receivables(158,746)(100,623)
Fuel inventory(2,522)(3,462)
Accounts payable43,18962,799
Taxes accrued(49,365)2,797
Interest accrued34,23332,550
Deferred fuel costs(137,909)(49,533)
Other working capital accounts(25,675)(2,310)
Provisions for estimated losses3,6211,729
Other regulatory assets74,827(22,707)
Other regulatory liabilities29,691160,749
Customer advances - non-current84,900—
Pension and other postretirement funded status(27,845)(28,104)
Other assets and liabilities(109,675)(129,834)
Net cash flow provided by operating activities947,6751,081,700
INVESTING ACTIVITIES
Construction expenditures(1,279,787)(721,721)
Allowance for equity funds used during construction13,86716,455
Payment for purchase of plant and assets(263)(3,517)
Nuclear fuel purchases(121,250)(81,859)
Proceeds from sale of nuclear fuel63,45340,601
Proceeds from nuclear decommissioning trust fund sales458,301101,314
Investment in nuclear decommissioning trust funds(465,507)(128,792)
Changes in money pool receivable - net(2,564)(120,316)
Other36,9771,115
Net cash flow used in investing activities(1,296,773)(896,720)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt1,401,252402,018
Retirement of long-term debt(999,317)(101,218)
Capital contribution from parent200,000—
Change in money pool payable - net—(15,190)
Customer advances received for construction268,54195,876
Customer advances used for construction(169,181)(91,068)
Other(4,453)(3,739)
Net cash flow provided by financing activities696,842286,679
Net increase in cash and cash equivalents347,744471,659
Cash and cash equivalents at beginning of period275,5704,747
Cash and cash equivalents at end of period$623,314$476,406
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$165,122$143,065
Income taxes - net (includes proceeds from the transfer of production tax credits to third parties of $99,153 in 2026 and $160,179 in 2025)($99,153)($160,179)
Noncash investing activities:
Accrued construction expenditures$81,360$55,510
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$6,284$7,048
Temporary cash investments617,030268,522
Total cash and cash equivalents623,314275,570
Accounts receivable:
Customer307,055164,296
Allowance for doubtful accounts(8,215)(7,303)
Associated companies52,35743,859
Other71,42287,029
Accrued unbilled revenues160,071130,950
Total accounts receivable582,690418,831
Deferred fuel costs165,61327,704
Fuel inventory - at average cost41,90439,382
Materials and supplies449,570430,662
Deferred nuclear refueling outage costs45,74736,718
Prepayments and other81,53098,975
TOTAL1,990,3681,327,842
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,905,3891,816,331
Other790793
TOTAL1,906,1791,817,124
UTILITY PLANT
Electric17,455,06217,022,476
Construction work in progress1,319,724621,218
Nuclear fuel220,618302,706
TOTAL UTILITY PLANT18,995,40417,946,400
Less - accumulated depreciation and amortization6,768,9106,585,693
UTILITY PLANT - NET12,226,49411,360,707
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,669,0211,743,848
Other251,970221,381
TOTAL1,920,9911,965,229
TOTAL ASSETS$18,044,032$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$—$690,000
Accounts payable:
Associated companies67,836103,411
Other367,242346,541
Customer deposits142,335136,587
Taxes accrued65,628114,993
Interest accrued73,94239,709
Other76,99756,083
TOTAL793,9801,487,324
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued2,082,1551,846,713
Accumulated deferred investment tax credits23,96724,868
Regulatory liability for income taxes - net441,762422,740
Other regulatory liabilities1,054,7291,044,060
Customer advances94,90010,000
Decommissioning1,856,4991,791,372
Accumulated provisions89,16085,539
Long-term debt5,833,6544,733,604
Other432,324314,495
TOTAL11,909,15010,273,391
Commitments and Contingencies
EQUITY
Member's equity5,330,1304,699,369
Noncontrolling interest10,77210,818
TOTAL5,340,9024,710,187
TOTAL LIABILITIES AND EQUITY$18,044,032$16,470,902
See Notes to Financial Statements.
ENTERGY ARKANSAS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Noncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2024$15,168$4,448,837$4,464,005
Net income (loss)(1,191)87,71486,523
Distributions to noncontrolling interest(181)—(181)
Balance at March 31, 202513,7964,536,5514,550,347
Net income (loss)(889)100,08299,193
Distributions to noncontrolling interest(275)—(275)
Balance at June 30, 202512,6324,636,6334,649,265
Net income (loss)(752)192,492191,740
Distributions to noncontrolling interest(460)—(460)
Balance at September 30, 2025$11,420$4,829,125$4,840,545
Balance at December 31, 2025$10,818$4,699,369$4,710,187
Net income59082,11182,701
Distributions to noncontrolling interest(79)—(79)
Balance at March 31, 202611,3294,781,4804,792,809
Net income (loss)(117)85,53585,418
Capital contribution from parent—200,000200,000
Distributions to noncontrolling interest(131)—(131)
Balance at June 30, 202611,0815,067,0155,078,096
Net income15263,115263,130
Distributions to noncontrolling interest(324)—(324)
Balance at September 30, 2026$10,772$5,330,130$5,340,902
See Notes to Financial Statements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Winter Storm Fern

See the “Winter Storm Fern” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis for a discussion of Winter Storm Fern. Entergy Louisiana’s cost of mobilizing crews and restoring power was approximately $240 million, including approximately $205 million in capital costs and approximately $35 million in non-capital costs. Natural gas purchases for Entergy Louisiana were $256 million in January 2026 compared to $115 million in January 2025. See Note 2 to the financial statements herein and in the Form 10-K for discussion of fuel cost recovery at Entergy Louisiana. See Note 2 to the financial statements herein for discussion of restoration costs from Winter Storm Fern included in the 2025 formula rate plan filing.

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $94.1 million primarily due to higher retail electric price, higher volume/weather, higher other income, and higher revenues resulting from the return on construction work in progress for certain utility plant investments. The increase was partially offset by higher interest expense, higher other operation and maintenance expenses, higher depreciation and amortization expenses, and higher taxes other than income taxes.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $128.4 million primarily due to higher retail electric price, higher revenues resulting from the return on construction work in progress for certain utility plant investments, higher volume/weather, higher other income, and a lower effective income tax rate. The increase was partially offset by higher interest expense, higher other operation and maintenance expenses, higher depreciation and amortization expenses, and higher taxes other than income taxes.

Operating Revenues

Third Quarter 2026 Compared to Third Quarter 2025

Following is an analysis of the change in operating revenues comparing the third quarter 2026 to the third quarter 2025:

Amount
(In Millions)
2025 operating revenues$1,633.2
Fuel, rider, and other revenues that do not significantly affect net income(79.0)
Retail electric price95.7
Volume/weather54.0
Return on construction work in progress for certain utility plant investments35.0
2026 operating revenues$1,738.9

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to:

  • an increase in formula rate plan rates effective September 2026;

  • a decrease in formula rate plan revenues for a two-month period beginning September 2025 resulting from earnings above the authorized return on common equity for the 2024 test year; and

  • increases in the resilience plan cost recovery rider effective March 2026 and September 2026.

See Note 2 to the financial statements herein for discussion of the resilience plan cost recovery rider filings and the 2025 formula rate plan proceeding and Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan proceeding.

The volume/weather variance is primarily due to an increase in weather-adjusted residential and commercial usage and the effect of more favorable weather on residential and commercial sales.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related construction costs are incurred.

Total electric energy sales for Entergy Louisiana for the three months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential5,0284,54611
Commercial3,4383,2974
Industrial9,3389,442(1)
Governmental200213(6)
Total retail18,00417,4983
Sales for resale:
Associated companies1,1232,064(46)
Non-associated companies38325749
Total19,51019,819(2)

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Following is an analysis of the change in operating revenues comparing the nine months ended September 30, 2026 to the nine months ended September 30, 2025:

Amount
(In Millions)
2025 operating revenues$4,444.8
Fuel, rider, and other revenues that do not significantly affect net income83.7
Retail electric price133.3
Return on construction work in progress for certain utility plant investments78.2
Volume/weather73.6
Effect of sale of natural gas distribution business(44.3)
2026 operating revenues$4,769.3

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to:

  • an increase in formula rate plan rates effective September 2026;

  • a decrease in formula rate plan revenues for a two-month period beginning September 2025 resulting from earnings above the authorized return on common equity for the 2024 test year; and

  • increases in the resilience plan cost recovery rider effective March 2025, March 2026, and September 2026.

See Note 2 to the financial statements herein for discussion of the resilience plan cost recovery rider filings and the 2025 formula rate plan proceeding and Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan proceeding.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related construction costs are incurred.

The volume/weather variance is primarily due to increases in industrial and residential usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily petroleum refining, chlor-alkali, and petrochemicals customers, and an increase in demand from co-generation customers.

The effect of sale of natural gas distribution business variance represents the decrease in operating revenues resulting from the absence of natural gas revenues following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Louisiana for the nine months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential11,46311,2991
Commercial8,7238,6151
Industrial28,19927,1594
Governmental588611(4)
Total retail48,97347,6843
Sales for resale:
Associated companies4,0345,045(20)
Non-associated companies89165237
Total53,89853,3811

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Other Income Statement Variances

Third Quarter 2026 Compared to Third Quarter 2025

Other operation and maintenance expenses increased primarily due to:

  • a $17.5 million gain, recorded in third quarter 2025, resulting from the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy Louisiana’s natural gas distribution business;

  • an increase of $7.7 million in power delivery expenses primarily due to higher vegetation maintenance costs;

  • an increase of $5 million in energy efficiency expenses primarily due to the timing of recovery from customers; and

  • several individually insignificant items.

The increase was partially offset by the expensing of $10.8 million of project costs associated with the Bayou Power Station project following Entergy Louisiana’s election in third quarter 2025 to cancel the project and evaluate an alternative transmission solution. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for discussion of the Bayou Power Station project.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Depreciation and amortization expenses increased primarily due to additions to plant in service, an increase in FERC jurisdictional depreciation rates effective January 2026, and increases in nuclear depreciation rates effective September 2025 and September 2026 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other income increased primarily due to:

  • an increase of $15.4 million in interest earned on money pool investments;

  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects;

  • an increase of $11.1 million in the amortization of tax gross-up on customer advances, including customer advances for construction; and

  • changes in decommissioning trust fund activity, including portfolio rebalancing of the River Bend decommissioning trust fund in third quarter 2026.

The increase was partially offset by a decrease of $4.6 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitizations. See Note 2 to the financial statements in the Form 10-K for discussion of the storm cost securitizations.

Interest expense increased primarily due to:

  • an increase of $23 million in carrying costs on customer advances, including customer advances for construction;

  • the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026;

  • the issuances of $500 million of 5.50% Series mortgage bonds and $500 million of 6.20% Series mortgage bonds, each in August 2026; and

  • $4.2 million in carrying costs in third quarter 2026 on retained net proceeds from the monetization of nuclear production tax credits.

The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Other operation and maintenance expenses increased primarily due to:

  • a $17.5 million gain, recorded in third quarter 2025, resulting from the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy Louisiana’s natural gas distribution business;

  • an increase of $16.3 million in power delivery expenses primarily due to higher vegetation maintenance costs;

  • an increase of $11.6 million in compensation and benefits costs primarily due to a larger revision to estimated incentive-based compensation expense in 2025, higher healthcare claims activity, and the timing of the recognition of prescription drug rebates;

  • an increase of $8.5 million in nuclear generation expenses primarily due to a higher scope of work performed in 2026 as compared to 2025;

  • an increase of $6 million in energy efficiency expenses primarily due to the timing of recovery from customers; and

  • several individually insignificant items.

The increase was partially offset by the expensing of $10.8 million of project costs associated with the Bayou Power Station project following Entergy Louisiana’s election in third quarter 2025 to cancel the project and evaluate an alternative transmission solution and a decrease of $7.4 million in loss provisions. See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for discussion of the Bayou Power Station project.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Depreciation and amortization expenses increased primarily due to additions to plant in service, an increase in FERC jurisdictional depreciation rates effective January 2026, and increases in nuclear depreciation rates effective September 2025 and September 2026 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to:

  • changes in decommissioning trust fund activity, including portfolio rebalancing of certain decommissioning trust funds in 2026;

  • an increase of $40.2 million in the amortization of tax gross-up on customer advances, including customer advances for construction;

  • an increase of $25.1 million in interest earned on money pool investments; and

  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects.

The increase was partially offset by a $17.1 million true-up in 2025 of Entergy Louisiana's MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025, and a decrease of $13.6 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitizations. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing and the storm cost securitizations.

Interest expense increased primarily due to:

  • the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026;

  • an increase of $45.8 million in carrying costs on customer advances, including customer advances for construction;

  • $12.3 million in carrying costs in 2026 on retained net proceeds from the monetization of nuclear production tax credits; and

  • the issuances of $500 million of 5.50% Series mortgage bonds and $500 million of 6.20% Series mortgage bonds, each in August 2026.

The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2026, including the Amite South transmission projects, and lower interest expense due to the repayment of $250 million of 4.44% Series mortgage bonds in January 2026.

Income Taxes

The effective income tax rates were 19.7% for the third quarter 2026 and 17.8% for the nine months ended September 30, 2026. The differences in the effective income tax rates for the third quarter 2026 and the nine months ended September 30, 2026 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, the amortization of excess accumulated deferred income taxes as a result of tax rate changes, book and tax differences

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

The effective income tax rates were 19.5% for the third quarter 2025 and 19% for the nine months ended September 30, 2025. The differences in the effective income tax rates for the third quarter 2025 and the nine months ended September 30, 2025 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, partially offset by the accrual for state income taxes.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

Sale of Natural Gas Distribution Business

See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy Louisiana natural gas distribution business on July 1, 2025.

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$776,961$327,102
Net cash provided by (used in):
Operating activities2,672,9631,762,375
Investing activities(3,740,742)(2,021,195)
Financing activities2,572,647307,958
Net increase in cash and cash equivalents1,504,86849,138
Cash and cash equivalents at end of period$2,281,829$376,240

Operating Activities

Net cash flow provided by operating activities increased $910.6 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • an increase of $906.8 million in receipts of advance payments related to customer agreements, including $803.5 million in customer advances and $103.3 million in tax gross-up on customer advances for construction;

  • higher collections from customers;

  • a decrease of $39.2 million in spending on nuclear refueling outage costs in 2026 as compared to 2025; and

  • a decrease of $31.5 million in interest paid.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The increase was partially offset by:

  • the receipt of $55.8 million in proceeds from the transfer of 2025 nuclear production tax credits to third parties in 2026 as compared to the receipt of $146.4 million in proceeds from the transfer of 2024 nuclear production tax credits to third parties in 2025. See Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein for discussion of the nuclear production tax credits;

  • higher fuel and purchased power payments. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery;

  • the timing of payments to vendors; and

  • an increase of $13 million in non-capital storm spending primarily due to Winter Storm Fern restoration efforts in 2026. See “Winter Storm Fern” above for discussion of storm restoration efforts in 2026.

Investing Activities

Net cash flow used in investing activities increased $1,719.5 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • an increase of $1,249.3 million in non-nuclear generation construction expenditures primarily due to higher spending on the Richland Parish Power Station Units 1-4 project, the Waterford 5 Power Station project, the Westlake Power Station project, the Pointe Coupee Units 1-3 project, and the Waterford 6 Power Station project;

  • an increase of $475.6 million in transmission construction expenditures primarily due to higher capital expenditures as a result of higher spending on the Amite South transmission projects and on various other transmission projects in 2026;

  • the receipt of $203 million in proceeds from the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy Louisiana’s natural gas distribution business on July 1, 2025;

  • an increase of $152.8 million in capital expenditures related to storm restoration primarily due to Winter Storm Fern restoration efforts in 2026. See “Winter Storm Fern” above for discussion of storm restoration efforts in 2026; and

  • the receipt of $33.5 million from the storm reserve escrow account in 2025. See Note 2 to the financial statements in the Form 10-K for a discussion of the storm reserve funds.

The increase was partially offset by:

  • a decrease of $125.2 million in nuclear construction expenditures primarily due to decreased spending on various nuclear projects in 2026;

  • cash collateral of $37 million posted to support Entergy Louisiana's obligations to MISO in 2025, of which $32.8 million was returned by MISO to Entergy Louisiana in 2026;

  • payments totaling $41.4 million to Entergy Texas for the transfer of assets related to the Segno Solar and Votaw Solar facilities to Entergy Louisiana in 2025;

  • money pool activity;

  • a decrease of $24 million in cash used as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle; and

  • a decrease of $18.9 million in decommissioning trust fund investment activity.

Increases in Entergy Louisiana’s receivable from the money pool are a use of cash flow, and Entergy Louisiana’s receivable from the money pool increased $26.6 million for the nine months ended September 30, 2026 compared to increasing by $64.8 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements,

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $2,264.7 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • the issuances of $750 million of 5.65% Series mortgage bonds and $750 million of 4.90% Series mortgage bonds, each in February 2026;

  • the issuances of $500 million of 5.50% Series mortgage bonds and $500 million of 6.20% Series mortgage bonds, each in August 2026;

  • $546 million in common equity distributions paid in 2025 in order to maintain Entergy Louisiana’s capital structure. No common equity distributions were paid in 2026;

  • the repayment of $190 million of 3.78% Series mortgage bonds in March 2025; and

  • the repayment of $110 million of 3.78% Series mortgage bonds in March 2025.

The increase was partially offset by:

  • the issuance of $750 million of 5.80% Series mortgage bonds in January 2025;

  • the repayment of $250 million of 4.44% Series mortgage bonds in January 2026; and

  • net repayments of $2.4 million in 2026 compared to net long-term borrowings of $82.2 million in 2025 on the nuclear fuel company variable interest entities’ credit facilities.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Louisiana’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Louisiana is primarily due to the net issuance of long-term debt in 2026, partially offset by net income in 2026.

September 30, 2026December 31, 2025
Debt to capital49.4%46.6%
Effect of subtracting cash(5.0%)(2.0%)
Net debt to net capital (non-GAAP)44.4%44.6%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Louisiana also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition because net debt indicates Entergy Louisiana’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Louisiana’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy Louisiana is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions) (a)
Planned construction and capital investments:
Generation$8,460$8,060$6,670$5,075
Transmission1,5951,415950570
Distribution910545610535
Utility Support105657580
Total$11,070$10,085$8,305$6,260

(a)Amounts exclude expenditures expected to be funded through customer advances for construction.

In addition to routine capital spending to maintain operations, the capital plan for Entergy Louisiana includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Louisiana’s portfolio, as well as to support customer growth, including Segno Solar, Votaw Solar, Bogalusa West Solar, Cypress Harvest Solar, Franklin Farms Power Station Units 1 and 2, Waterford 5 Power Station, Cottonwood Power Station, Westlake Power Station, Richland Parish Units 1-4, Pointe Coupee Units 1-3, Waterford 6 Power Station, battery energy storage systems, and other new generation resources; investments in River Bend and Waterford 3; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting customer growth and renewables expansion; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. Entergy Louisiana is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

Entergy Louisiana’s receivables from the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$90,081$63,435$97,462$32,668

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Louisiana has a credit facility in the amount of $400 million scheduled to expire in June 2031. The credit facility includes fronting commitments for the issuance of letters of credit against $15 million of the borrowing capacity of the facility. As of September 30, 2026, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy Louisiana is a party to two uncommitted letter of credit

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

facilities as a means to post collateral to support its obligations to MISO and for other purposes. As of September 30, 2026, $161.2 million in MISO letters of credit and $20 million in non-MISO letters of credit were outstanding under Entergy Louisiana’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Louisiana nuclear fuel company variable interest entities have two separate credit facilities, each in the amount of $105 million and scheduled to expire in June 2029. As of September 30, 2026, $67.8 million in loans were outstanding under the credit facility for the Entergy Louisiana Waterford nuclear fuel company variable interest entity and $23.8 million in loans were outstanding under the credit facility for the Entergy Louisiana River Bend nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for additional discussion of the nuclear fuel company variable interest entity credit facilities.

Renewables

Cypress Harvest Solar

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification for the Cypress Harvest Solar facility, a 200 MW solar facility to be located in Iberville Parish, Louisiana. In March 2026 the LPSC staff filed an affidavit attesting that the Cypress Harvest Solar facility meets the applicable parameters for Entergy Louisiana’s expedited certification process and recommending that the LPSC grant certification. At its April 2026 meeting, the LPSC voted to grant the requested approval and certification, with a written order issued in May 2026. In July 2026 the Iberville Parish Council adopted a two-year moratorium on battery energy storage system development to allow time for further evaluation of the community impacts of the technology. In response to the battery moratorium, Entergy Louisiana is planning to replace the 200 MW battery planned for the Cypress Harvest Solar facility with a 110 MW battery at the Segno Solar facility and a 90 MW battery at the Votaw Solar facility. In both August and September 2026, the Iberville Parish Council voted to deny the permit for the Cypress Harvest Solar facility. In October 2026, Entergy Louisiana filed a petition for declaratory and injunctive relief in the 18th Judicial District Court for the Parish of Iberville challenging the Iberville Parish Council’s failure to comply with the requirements of its solar farm regulation. Entergy Louisiana is evaluating the effect of these recent actions on the Cypress Harvest Solar facility, including on the facility’s scheduled in service date of 2028. As of September 30, 2026, Entergy Louisiana has incurred approximately $30 million of project costs for the Cypress Harvest Solar facility.

Segno Solar and Votaw Solar

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application with the LPSC seeking approval and certification to construct the Segno Solar facility and Votaw Solar facility. The application asks that the LPSC approve, subject to certain ongoing discussions, allocation of the two facilities to a designated renewable resources subscription to Entergy Louisiana’s Rider Geaux Zero, and further asserts that the two solar resources fall below certain breakeven parameters established in connection with the LPSC’s order allowing Entergy Louisiana to procure up to 3 gigawatts of solar resources, thus supporting that the resources should be certified as being in the public interest. The application requested consideration by the LPSC at or before its August 2026 meeting. A procedural schedule was set with a hearing initially scheduled for July 2026. In June 2026, Entergy Louisiana filed an unopposed motion asking that the procedural schedule be suspended to allow for settlement negotiations. The motion was granted and the procedural schedule was suspended. Based on a contractual right exercised by the developer in September 2026, Entergy must elect during the fourth quarter of 2026 whether to (i) purchase the assets included in the development agreement as they exist as of October 30, 2026 or (ii) waive the right to purchase the assets, remove the project from the MISO interconnection queue, and retain any MISO refund. Entergy Louisiana is in discussions with the developer regarding these options as well as considering other options for the continued development of the Votaw Solar facility. Subject to approval by the LPSC for each facility and resolution of the development issues at the Votaw Solar facility, each facility is expected to be in service by 2029.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other Generation and Transmission

Additional Generation and Transmission Resources

See the Form 10-K for discussion of Entergy Louisiana’s October 2024 application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an electric service agreement was previously executed.

In March 2026, Entergy Louisiana entered into an electric service agreement with Evest LLC (Evest), a subsidiary of Meta Platforms, Inc., in connection with establishing service to a second new data center to be developed by Evest in north Louisiana. The obligations pursuant to the agreement will commence following construction of certain transmission facilities needed to serve Evest, and the effectiveness of the agreement is conditioned upon receipt of required governmental approvals, including approval from the LPSC. Also in March 2026, Entergy Louisiana filed an application with the LPSC for certification to construct seven new combined cycle combustion turbine generation resources totaling 5,278 MW at a total cost of approximately $12.9 billion, each of which will be enabled for future carbon capture and storage, and three battery energy storage systems, including two that were originally proposed to be co-located with solar resources at the Cypress Harvest Solar facility in Iberville Parish and the Bogalusa West Solar facility in Washington Parish. The application also seeks approval to construct a new 500 kV transmission line, from West Fork Creek to St. Landry, estimated to cost $1.4 billion, and other related transmission facilities. In response to a two-year battery moratorium enacted by the Iberville Parish Council in July 2026, Entergy Louisiana is planning to replace the 200 MW battery planned for the Cypress Harvest Solar facility with a 110 MW battery at the Segno Solar facility and a 90 MW battery at the Votaw Solar facility. Four of the new combined cycle combustion turbine generation resources are to be located near the customer site in north Louisiana (Richland Parish Units 1-4), while the remaining three units will be located near the existing Big Cajun site in Pointe Coupee Parish (Pointe Coupee Units 1-3). The seven new combined cycle combustion turbine generation resources have various estimated in-service dates in 2030 and 2031. The application also requests certain approvals related to a corporate sustainability agreement with the new customer. The corporate sustainability agreement contemplates the new customer contributing to the costs of the future addition of 2,500 MW of new renewable and energy storage resources, agreements involving nuclear-related efforts and contributions to bill assistance and other programs for low-income residents. Entergy Louisiana anticipates recovering the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The application is pending before the LPSC. At its April 2026 meeting, the LPSC voted to direct the administrative hearings division to adopt a procedural schedule that would allow for LPSC consideration of the matter at its December 2026 meeting, and also to have the administrative hearings division serve as a hearing examiner and compile a record for the LPSC to consider without the issuance of a formal recommendation from the ALJ. Testimony of the LPSC staff and certain intervenors was filed in July 2026 and cross answering testimony of the LPSC staff and certain intervenors was filed in August 2026. Entergy Louisiana’s rebuttal testimony was filed in September 2026. The hearing in this matter took place in October 2026. Ahead of the hearing, Entergy Louisiana reached a settlement with the LPSC staff and one intervenor. The settlement resolves all outstanding issues among Entergy Louisiana, the LPSC staff, and the intervenor and recommends, among other things, that the LPSC certify the proposed resources. An LPSC decision is expected in December 2026.

The electric service agreement and related contracts contain provisions that protect Entergy Louisiana’s current customers in a manner consistent with the LPSC’s Lightning Initiative and Entergy Louisiana’s Fair Share Plus guidelines, which the LPSC and Entergy Louisiana, respectively, developed in response to increased investment in large data centers in Louisiana. The protections include terms requiring the customer to pay Entergy Louisiana’s incremental costs to serve the customer, including through contributions in aid of construction, other advanced payments and minimum monthly bills. The agreements also include specified financial obligations in the event that Evest terminates the contracts early, restructures the project, or in the event of default. These specified

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

financial obligations would be based on Entergy Louisiana’s unrecovered incremental costs to serve Evest at the time of such an event. Evest’s obligations under the electric service agreement and related contracts are secured by various forms of collateral, including a guaranty from Meta Platforms, Inc.

Finally, the electric service agreement also includes provisions relating to Entergy Louisiana’s performance obligations, including the timely construction of the facilities supporting service to Evest, audit rights for the construction costs supported by Evest, and service standards during the term of the electric service agreement. Entergy Louisiana’s failure to meet one or more of these performance obligations could result in specified financial and/or non-financial penalties. Such penalties would vary based on the nature and severity of the failure, including the potential termination of the electric service agreement.

In June 2026 certain intervenors filed a motion requesting that the LPSC issue a subpoena to Meta Platforms, Inc. to obtain certain information about the data center project, including the level of expected investment, job creation, load characteristics, and other aspects of the project, as well as certain financial information. In July 2026, after briefing and argument, the ALJ issued a ruling granting this motion in part and denying it in part. In July 2026, Meta Platforms, Inc. filed a motion to quash the subpoena and a motion for interlocutory review of the ruling that granted the issuance of the subpoena. Meta Platforms, Inc.’s motion for interlocutory review of the ruling was granted by the LPSC at its August 2026 Business and Executive Session. In September 2026 the intervenors seeking the subpoena filed a Petition for Appeal and Judicial Review or in the Alternative Supervisory Writ naming the LPSC as respondent and seeking judicial review of the LPSC’s decision.

Babel - Webre 500 kV Transmission Project

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application with the LPSC seeking a certificate of public convenience and necessity for a 500 kV transmission project that includes the construction of a new 147-mile Babel to Webre 500 kV transmission line, the reconstruction of the Webre 500 kV switching station in Louisiana, and coordination with Entergy Texas on the construction of an approximately 4-mile 500 kV transmission line in Texas. The project was approved by MISO in the 2025 MISO Transmission Expansion Plan and has an estimated cost of $1,238 million and an estimated in-service date of August 2029. In May 2026 the LPSC staff and the Southern Renewable Energy Association (SREA), an intervenor, filed direct testimony. The LPSC staff’s testimony and SREA’s testimony recommended that the LPSC find the project to be in the public interest and grant certification under the LPSC’s general order on transmission siting. The parties entered into an uncontested stipulated settlement agreement and participated in a settlement hearing in September 2026. The LPSC voted to accept the settlement and approve the project at its October 2026 Business and Executive Session.

Waterford 6 Power Station and Westlake Power Station

As discussed in the Form 10-K, in February 2026, Entergy Louisiana filed an application seeking LPSC approval and certification to construct two 754 MW combined cycle combustion turbine generators, the Waterford 6 Power Station and the Westlake Power Station, to be located at Entergy Louisiana’s existing Waterford site near Killona, Louisiana and existing Roy S. Nelson site in Westlake, Louisiana, respectively. In its application, Entergy Louisiana noted the estimated costs are approximately $2,027 million for the Waterford 6 Power Station and $2,091 million for the Westlake Power Station. The LPSC staff and intervenors in the proceeding filed direct testimony in July 2026. The LPSC staff’s testimony expressed support for the LPSC’s approval of Entergy Louisiana’s proposed new generation projects subject to certain conditions. Certain intervenors oppose such approval. Entergy Louisiana filed rebuttal testimony in September 2026. In October 2026, Entergy Louisiana entered into a third-party financing arrangement for the Waterford 6 Power Station. A hearing was held in October 2026. An LPSC decision is expected in first quarter 2027. Subject to timely approval by the LPSC and receipt of other permits and approvals, the estimated in-service dates for the Waterford 6 Power Station and Westlake Power Station are July 2030 and October 2030, respectively. See Note 1 to the financial statements herein for discussion of the build-to-suit lease arrangement for the Waterford 6 Power Station.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Cottonwood Power Station

As discussed in the Form 10-K, in December 2025, Entergy Louisiana filed an application seeking LPSC approval and a certificate of convenience and necessity to acquire the Cottonwood combined cycle combustion turbine facility, a 1,263 MW combined cycle facility in Deweyville, Texas that was originally placed in commercial service in 2003. The filing seeks findings from the LPSC that the costs of the acquisition, including the approximately $1.5 billion purchase price and $309.3 million in capital upgrades and maintenance items needed to bring the Cottonwood facility into alignment with Entergy Louisiana’s fleet standards with respect to operations and safety, are eligible for recovery in customer rates. In June 2026 the LPSC staff filed direct testimony raising various concerns and objections to the proposed transaction as presented in Entergy Louisiana’s application. The LPSC staff asserts that the need for the Cottonwood facility is driven predominantly by loads associated with certain large data center projects and opines that the costs and future operational risks of the Cottonwood facility should be borne by these customers in particular, not Entergy Louisiana’s customers generally. The LPSC staff’s direct testimony also raises issues regarding the acquisition premium, potential stranded costs, and future operating risks associated with the Cottonwood facility. Discovery is ongoing, and Entergy Louisiana filed rebuttal testimony in July 2026. A hearing is scheduled for February 2027. The acquisition is currently targeted to close in the first or second quarter of 2027, subject to regulatory approvals and other conditions to closing.

Build-to-Suit Lease Arrangement for the Waterford 6 Power Station

In October 2026, Entergy Louisiana entered a build-to-suit lease arrangement for the Waterford 6 Power Station as the lessee with a consortium of investors (the Investors). Under the terms of the arrangement, the Investors purchased the in-process Waterford 6 Power Station construction project from Entergy Louisiana at a cost of $167.5 million and will spend up to $1.875 billion (including the initial purchase price) to construct the Waterford 6 project as designed by Entergy Louisiana. Entergy Louisiana is engaged to serve as the construction agent for the Waterford 6 Power Station project. The Investors, however, control the asset during construction. If Entergy Louisiana defaults in its role as construction agent, the Investors have various options available to remedy the default, including the replacement of Entergy Louisiana as construction agent, the acceleration of the lease balance payable by Entergy Louisiana, causing a sale of the Waterford 6 Power Station project to a third party, and certain other options. If the LPSC rejects the Waterford 6 Power Station project or certain other circumstances occur that are outside of Entergy Louisiana’s control, then either the Investors or Entergy Louisiana could exercise the right to terminate the arrangement, in which case Entergy Louisiana would be required to purchase the in-process Waterford 6 Power Station project from the Investors at an amount equal to their costs incurred to date, including carrying costs. Because Entergy Louisiana does not control the in-process construction project, it will not recognize the asset (i.e., construction work in progress) or an associated liability during construction.

Upon the Waterford 6 Power Station’s readiness for first synchronization to the grid, expected in late 2029, a triple-net lease will commence under which Entergy Louisiana will have control of the Waterford 6 Power Station and receive all output from the plant. The initial term of the lease will end seven years from the closing of the arrangement, or approximately four years after the Waterford 6 Power Station’s expected readiness for first synchronization to the grid. The lease cost will be equal to the Secured Overnight Financing Rate plus a margin which is based on the credit rating of Entergy Louisiana, multiplied by the total costs (including carrying costs) incurred by the Investors as of the commencement of the lease. Entergy Louisiana will have the option to purchase the Waterford 6 Power Station at any time during the lease term at a price equal to the total cost of the plant to the Investors, plus any fees and carrying charges owed to the Investors. If the purchase price option is exercised within two years of commencement of the triple-net lease, Entergy Louisiana must enter into a secured note payable to the Investors for the amount of the purchase price. The note payable would be due at the end of the initial lease term, but may be prepaid at any time beginning two years after the commencement date of the lease. The note will be secured by the Waterford 6 Power Station and related equipment and collateral.

At the end of the initial lease term, Entergy Louisiana must exercise one of the following options: (1) renew the lease for an additional five year term, subject to unanimous consent of the Investors; (2) purchase the plant at a

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

price equal to the total cost of the plant to Investors, plus any fees and carrying charges owed to the Investors; or (3) sell the plant on behalf of the Investors. If Entergy Louisiana chooses the third option, then it will owe or be owed any difference between the total cost of the plant to Investors and the sale price.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

Resilience Plan Cost Recovery Rider

In December 2022, Entergy Louisiana filed an application with the LPSC seeking a public interest finding regarding Phase I of Entergy Louisiana’s Future Ready resilience plan and approval of a rider mechanism to recover the program’s costs. Phase I in the December 2022 application reflected the first five years of a ten-year resilience plan and included investment of approximately $5 billion, including hardening investment, transmission dead-end structures, enhanced vegetation management, and telecommunications improvement. In April 2024 the LPSC approved a framework which includes an initial five-year resilience plan providing for an investment of approximately $1.9 billion with cost recovery via a forward-looking rider with semi-annual true-ups. The plan is subject to specified reporting requirements and includes a performance review of the hardened assets. The LPSC order approving the framework does not include any restrictions on Entergy Louisiana’s ability to file applications for approval of additional investments in resilience.

In January 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $40.4 million, or $38.9 million in incremental annual revenues from Entergy Louisiana’s first semi-annual filing in July 2024, for projects expected to be placed in service during the rate-effective period of March 2025 through August 2025. In February 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2025, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $50.2 million, or $9.8 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2025 through February 2026. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $5.6 million to be implemented in the January 2026 semi-annual filing. In August 2025 the LPSC staff reviewed the filed rider rates and identified no material issues.

In January 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $101.8 million, or $51.6 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of March 2026 through August 2026. Additionally, Entergy Louisiana’s true-up filing included an over-recovery totaling $16.6 million to be implemented in the July 2026 semi-annual filing. In February 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

In July 2026, Entergy Louisiana’s semi-annual filing sought to collect from Entergy Louisiana’s retail customers approximately $114.2 million, or $12.4 million in incremental annual revenues, for projects expected to be placed in service during the rate-effective period of September 2026 through February 2027. Additionally, Entergy Louisiana’s true-up filing included an under-recovery totaling $2.5 million to be implemented in the January 2027 semi-annual filing. In August 2026 the LPSC staff reviewed the filed rider rates and identified no material issues.

In September 2026, Entergy Louisiana filed an application for the LPSC’s approval of Phase IA of Entergy Louisiana’s Future Ready resilience plan, which consists of additional distribution and transmission hardening

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

projects representing approximately $600 million of investment to be completed over the period 2027 to 2030. The application seeks LPSC approval to extend the previously-approved Phase I of Entergy Louisiana’s Future Ready resilience plan with these additional projects to further improve the resilience of Entergy Louisiana’s electric system and further seeks approval to continue to use the resilience plan cost recovery rider to recover the costs of the plan from customers. The primary purpose of Phase IA is to serve as a bridge between Phase I, which is currently expected to conclude by 2028, and a Phase II plan, which Entergy Louisiana expects to develop in accordance with guidance from the LPSC that is expected to be issued in the LPSC’s ongoing resiliency rulemaking docket. Discovery is ongoing. In October 2026 a procedural schedule was established that provides for a hearing in June 2027. Entergy Louisiana has requested an LPSC decision by July 2027.

Vegetation Management Rider

In November 2025 the LPSC staff issued notice of its initiation of a rulemaking to implement a vegetation management pilot program for LPSC jurisdictional electric utilities. The pilot program would be voluntary and would allow utilities to establish a rider for distribution vegetation management for up to 100% of the utility’s prior calendar year vegetation management spending. The rider may not exceed 1% of a customer’s bill, and the utility would be required to maintain its prior calendar year level of spending on vegetation management as reflected in its base rates or formula rate plan. In February 2026 the LPSC staff filed a report and recommendation along with a proposed final rule providing for the adoption of the pilot program consistent with the terms outlined in the original notice. In March 2026 the LPSC voted to accept the LPSC staff’s recommendation and adopt the proposed pilot program as presented. In April 2026, Entergy Louisiana filed its vegetation management rider for the rate-effective period of May 2026 through December 2026, which included a revenue requirement of $20 million for incremental spending on distribution vegetation management above the prior calendar year level of spending on vegetation management.

2025 Formula Rate Plan Filing

In June 2026, Entergy Louisiana filed its formula rate plan evaluation report for its 2025 calendar year operations. Consistent with the global stipulated settlement agreement approved by the LPSC in August 2024, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the test year 2025, the formula produced an earned return on equity of 9.63%, which falls within the established bandwidth and therefore results in no adjustment to base rider formula rate plan revenue.

Additional changes in formula rate plan revenue include: (1) the removal of approximately $73 million in annual customer credits associated with the global stipulated settlement agreement, which have been fully credited to customers in accordance with the agreement; (2) a reduction in customer credits through the tax adjustment mechanism, attributable to the return of Entergy Louisiana’s over-collection of income tax expense associated with Louisiana state tax law changes effective in 2025 and the expiration of certain ad valorem exemptions; (3) increases in transmission and distribution plant in service, as recognized through the transmission and distribution recovery mechanisms, including restoration costs from Winter Storm Fern, for which Entergy Louisiana does not intend to seek relief or exception to the formula rate plan; (4) increases to the additional capacity mechanism; and (5) the final phase-in of additional nuclear depreciation expense, in accordance with the global stipulated settlement agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement. Collectively, these factors contributed to a net increase of $222 million in formula rate plan revenue for the period. In August 2026 the LPSC staff filed its errors and objections report. The report did not identify any specific errors, objections, or adjustments. However, the LPSC staff reserved its rights with respect to three issues pending further review: (1) the allocation between Entergy Louisiana and Entergy Texas of River Bend’s undepreciated plant balances, costs, and related liabilities; (2) certain projects included in the transmission recovery mechanism filing; and (3) the use of a blended retail/FERC depreciation rate for River Bend depreciation expense. Subject to LPSC review, the resulting changes from the 2025 formula rate plan evaluation report became effective for bills rendered during the first billing cycle of September 2026, subject to refund.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Request for Extension of Formula Rate Plan

In June 2026, Entergy Louisiana submitted a motion requesting the LPSC approve a one-year extension of its current formula rate plan, with all material provisions left unchanged, including the allowed return on common equity of 9.7% with a bandwidth of 40 basis points above and below the midpoint. LPSC action on the proposed extension is expected by November 2026.

River Bend Deregulated Asset Plan Filing

In September 2025, Entergy Louisiana filed an application seeking LPSC approval to recover from customers, prospectively, approximately $49 million in annual revenues associated with the Louisiana retail deregulated portion of River Bend. Costs associated with the deregulated portion of River Bend have historically been excluded from retail ratemaking as a result of a 1988 LPSC decision. Instead, Entergy Louisiana has been allowed by the LPSC to either recover 4.6 cents per kWh for the power generated from that portion of the plant, or sell the power into the applicable market (subject to certain restrictions). The filing presents evidence that River Bend is a cost-effective and prudent source of needed baseload supply with value to Entergy Louisiana customers and seeks to recover the previously excluded costs, on a prospective basis. In March 2026 the LPSC staff and certain intervenors filed direct testimony recommending that the LPSC deny Entergy Louisiana’s application. The LPSC staff’s testimony further recommends that, if the LPSC were to grant any relief, notwithstanding the LPSC staff’s recommendation, such relief should be limited to allowing only prospective capital additions at River Bend to be included in Entergy Louisiana’s customer rates. Entergy Louisiana filed rebuttal testimony in August 2026. In October 2026, Entergy Louisiana filed a motion requesting to suspend all remaining procedural deadlines without date, noting the significant number of dockets currently pending before the LPSC, including many initiated by Entergy Louisiana, and the need for thorough review of these matters. In October 2026 the presiding ALJ issued an order granting the motion and suspending the procedural schedule, including continuing the hearing in the matter without date.

Fuel and purchased power cost recovery

As discussed in the Form 10-K, in March 2020 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2016 through 2019. The LPSC staff issued its audit report in September 2021, and although certain internal record keeping recommendations were made, the LPSC staff did not recommend any disallowances. In October 2026 the LPSC staff and Entergy Louisiana filed a joint audit report addressing the issues identified in the LPSC staff’s September 2021 audit report and stating that there were no unresolved issues. The LPSC voted to approve the joint audit report at its October 2026 Business and Executive Session.

As discussed in the Form 10-K, in June 2025 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings (for Entergy Louisiana’s gas operations). The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from January 2023 through June 2025. The LPSC staff issued its audit report in March 2026. In October 2026 the LPSC staff and Entergy Louisiana filed a joint audit report. The joint audit report noted that an issue identified in its March 2026 report had been addressed and that, as a result, there were no outstanding unresolved issues. The joint audit report recommended and requested that an LPSC order be issued finding that all costs included in Entergy Louisiana’s purchased gas adjustment filings in the audit period were reasonable, prudent, and necessary and in compliance with applicable LPSC orders, and thus were appropriately eligible for recovery from customers. The LPSC voted to approve the joint audit report at its October 2026 Business and Executive Session.

In February 2026, Entergy Louisiana, in its monthly filing to update its fuel adjustment clause, requested to defer approximately $141.9 million of fuel costs incurred in January 2026 that were primarily attributable to the effects of Winter Storm Fern, consistent with the LPSC’s general order approved at its February 2026 meeting

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

permitting temporary modifications to the LPSC’s fuel adjustment clause general order. The filing proposed to defer the recovery of these fuel costs over a four-month period from March 2026 through June 2026 to mitigate the customer bill impacts of these fuel costs. In March 2026 the LPSC issued a special order delegating authority to the LPSC executive secretary to review and approve utility-specific requests for deferral of fuel costs from Winter Storm Fern, subject to audit as per the LPSC’s fuel clause general order. In April 2026 the LPSC executive secretary approved Entergy Louisiana’s request for deferral.

In April 2026 the LPSC staff provided notice of an audit of Entergy Louisiana’s fuel adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s fuel adjustment clause for the period from 2023 through 2025. Discovery is ongoing, and no audit report has been filed.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. Waterford 3 is currently in Column 1, and River Bend is currently in Column 2.

In August 2026 the NRC issued a final significance determination and notice of violation for River Bend, in which it finalized a “white” finding with “low safety significance” related to one of the service water pumps at River Bend, resulting in River Bend’s placement in Column 2, effective third quarter 2026. River Bend will remain in Column 2 until the satisfactory completion of an NRC supplemental inspection.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$1,738,871$1,633,050$4,769,311$4,400,500
Natural gas—147—44,307
TOTAL1,738,8711,633,1974,769,3114,444,807
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale364,044457,4051,158,497997,513
Purchased power194,153191,852606,962750,819
Nuclear refueling outage expenses9,97710,26029,84243,440
Other operation and maintenance319,967288,595881,048821,819
Decommissioning20,88519,85761,87458,882
Taxes other than income taxes79,72470,661230,640204,892
Depreciation and amortization218,486204,742643,617604,206
Other regulatory charges (credits) - net(19,073)(38,283)(61,640)(147,431)
TOTAL1,188,1631,205,0893,550,8403,334,140
OPERATING INCOME550,708428,1081,218,4711,110,667
OTHER INCOME
Allowance for equity funds used during construction29,13917,78074,29751,456
Interest and investment income50,23663,095208,580117,782
Interest and investment income - affiliated69,94974,351212,446226,117
Miscellaneous - net7,221(42,636)(23,276)(59,362)
TOTAL156,545112,590472,047335,993
INTEREST EXPENSE
Interest expense173,748121,008470,088358,866
Allowance for borrowed funds used during construction(10,775)(6,498)(27,674)(19,374)
TOTAL162,973114,510442,414339,492
INCOME BEFORE INCOME TAXES544,280426,1881,248,1041,107,168
Income taxes107,27583,299222,429209,902
NET INCOME437,005342,8891,025,675897,266
Net income attributable to noncontrolling interests6867312,0932,228
EARNINGS APPLICABLE TO MEMBER'S EQUITY$436,319$342,158$1,023,582$895,038
See Notes to Financial Statements.
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
Net Income$437,005$342,889$1,025,675$897,266
Other comprehensive loss
Pension and other postretirement plan changes (net of tax benefit of $369, $618, $1,107, and $3,225)(1,087)(1,818)(3,262)(4,921)
Other comprehensive loss(1,087)(1,818)(3,262)(4,921)
Comprehensive Income435,918341,0711,022,413892,345
Net income attributable to noncontrolling interests6867312,0932,228
Comprehensive Income Applicable to Member’s Equity$435,232$340,340$1,020,320$890,117
See Notes to Financial Statements.

(Page left blank intentionally)

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$1,025,675$897,266
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization786,902725,547
Deferred income taxes, tax credits, and non-current taxes accrued384,664466,155
Changes in working capital:
Receivables(249,279)(130,177)
Fuel inventory1,62314,049
Accounts payable19,71877,648
Taxes accrued109,34645,112
Interest accrued(4,703)(51,451)
Deferred fuel costs37,8687,455
Customer advances - current1,047,285194,759
Other working capital accounts(315,321)(219,464)
Changes in provisions for estimated losses5,676(19,742)
Changes in other regulatory assets(25,166)105,800
Changes in other regulatory liabilities(118,055)(89,444)
Changes in pension and other postretirement funded status(29,135)(31,098)
Other(4,135)(230,040)
Net cash flow provided by operating activities2,672,9631,762,375
INVESTING ACTIVITIES
Construction expenditures(3,910,913)(2,176,426)
Allowance for equity funds used during construction74,29738,486
Payment for purchase of assets—(41,435)
Proceeds from sale of business and assets—203,330
Nuclear fuel purchases(165,874)(139,361)
Proceeds from sale of nuclear fuel67,70817,240
Payments to storm reserve escrow account(6,365)(7,530)
Receipt from storm reserve escrow account—33,456
Redemption of preferred membership interests of affiliate210,746202,517
Proceeds from nuclear decommissioning trust fund sales943,742485,421
Investment in nuclear decommissioning trust funds(974,566)(535,139)
Changes in money pool receivable - net(26,646)(64,794)
Insurance proceeds received for property damages14,282—
Decrease (increase) in other investments32,847(36,960)
Net cash flow used in investing activities(3,740,742)(2,021,195)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt3,147,1701,821,175
Retirement of long-term debt(911,529)(1,302,628)
Customer advances received for construction773,828583,479
Customer advances used for construction(430,031)(241,142)
Common equity distributions paid—(546,250)
Other(6,791)(6,676)
Net cash flow provided by financing activities2,572,647307,958
Net increase in cash and cash equivalents1,504,86849,138
Cash and cash equivalents at beginning of period776,961327,102
Cash and cash equivalents at end of period$2,281,829$376,240
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$372,018$403,534
Income taxes - net (includes proceeds from the transfer of production tax credits to third parties of $55,810 in 2026 and $146,355 in 2025)($55,810)($146,355)
Noncash investing activities:
Accrued construction expenditures$503,296$242,395
See Notes to Financial Statements.
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$770$237
Temporary cash investments2,281,059776,724
Total cash and cash equivalents2,281,829776,961
Accounts receivable:
Customer499,468292,366
Allowance for doubtful accounts(12,122)(9,069)
Associated companies165,725164,911
Other70,40450,471
Accrued unbilled revenues249,822194,429
Total accounts receivable973,297693,108
Deferred fuel costs—15,672
Fuel inventory - at average cost34,34535,968
Materials and supplies836,312792,217
Deferred nuclear refueling outage costs19,94640,683
Prepayments and other360,848187,832
TOTAL4,506,5772,542,441
OTHER PROPERTY AND INVESTMENTS
Investment in affiliate preferred membership interests3,797,1734,007,919
Decommissioning trust funds2,912,5662,753,828
Non-utility property - at cost (less accumulated depreciation)457,549459,706
Storm reserve escrow account241,326234,961
Other10,20810,132
TOTAL7,418,8227,466,546
UTILITY PLANT
Electric31,868,54630,408,352
Construction work in progress4,590,9462,031,650
Nuclear fuel336,319323,052
TOTAL UTILITY PLANT36,795,81132,763,054
Less - accumulated depreciation and amortization11,649,59711,275,981
UTILITY PLANT - NET25,146,21421,487,073
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,565,8751,540,709
Deferred fuel costs168,122168,122
Other194,166132,679
TOTAL1,928,1631,841,510
TOTAL ASSETS$38,999,776$33,337,570
See Notes to Financial Statements.
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$920,000$720,000
Accounts payable:
Associated companies102,25392,126
Other1,205,979761,359
Customer deposits176,823172,594
Taxes accrued174,13964,793
Interest accrued121,646126,349
Deferred fuel costs22,196—
Customer advances1,590,597543,312
Other120,56594,876
TOTAL4,434,1982,575,409
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued3,530,6083,093,218
Accumulated deferred investment tax credits80,86684,177
Regulatory liability for income taxes - net264,438312,684
Other regulatory liabilities1,560,9541,630,763
Decommissioning2,006,2241,932,412
Accumulated provisions266,336260,660
Pension and other postretirement liabilities155,572159,075
Long-term debt11,686,5949,646,835
Customer advances for construction1,482,9701,152,530
Other579,623558,621
TOTAL21,614,18518,830,975
Commitments and Contingencies
EQUITY
Member’s equity12,880,60411,857,063
Accumulated other comprehensive income30,65433,916
Noncontrolling interests40,13540,207
TOTAL12,951,39311,931,186
TOTAL LIABILITIES AND EQUITY$38,999,776$33,337,570
See Notes to Financial Statements.
ENTERGY LOUISIANA, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Noncontrolling InterestsMember’s EquityAccumulated Other Comprehensive IncomeTotal
(In Thousands)
Balance at December 31, 2024$42,706$11,503,030$53,658$11,599,394
Net income752253,445—254,197
Other comprehensive loss——(971)(971)
Common equity distributions—(36,250)—(36,250)
Distributions to LURC(888)——(888)
Other—(12)—(12)
Balance at March 31, 202542,57011,720,21352,68711,815,470
Net income745299,435—300,180
Other comprehensive loss——(2,132)(2,132)
Common equity distributions—(458,750)—(458,750)
Distributions to LURC(319)——(319)
Other—(12)—(12)
Balance at June 30, 202542,99611,560,88650,55511,654,437
Net income731342,158—342,889
Other comprehensive loss——(1,818)(1,818)
Common equity distributions—(51,250)—(51,250)
Distributions to LURC(873)——(873)
Other—(14)—(14)
Balance at September 30, 2025$42,854$11,851,780$48,737$11,943,371
Balance at December 31, 2025$40,207$11,857,063$33,916$11,931,186
Net income707275,193—275,900
Other comprehensive loss——(1,087)(1,087)
Distributions to LURC(919)——(919)
Other—(14)—(14)
Balance at March 31, 202639,99512,132,24232,82912,205,066
Net income700312,070—312,770
Other comprehensive loss——(1,088)(1,088)
Distributions to LURC(339)——(339)
Other—(10)—(10)
Balance at June 30, 202640,35612,444,30231,74112,516,399
Net income686436,319—437,005
Other comprehensive loss——(1,087)(1,087)
Distributions to LURC(907)——(907)
Other—(17)—(17)
Balance at September 30, 2026$40,135$12,880,604$30,654$12,951,393
See Notes to Financial Statements.

ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $26.6 million primarily due to higher volume/weather, higher retail electric price, and higher revenues resulting from the return on construction work in progress for certain utility plant investments. The increase was partially offset by $15 million of liquidated damages recognized in third quarter 2025 resulting from a counterparty’s termination of a purchased power agreement, higher other operation and maintenance expenses, and higher interest expense.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $83.9 million primarily due to higher retail electric price, higher revenues resulting from the return on construction work in progress for certain utility plant investments, higher volume/weather, a regulatory charge, recorded in first quarter 2025, to reflect an adjustment to the grid modernization over/under recovery deferral balance, and higher other income. The increase was partially offset by higher interest expense, higher other operation and maintenance expenses, and $15 million of liquidated damages recognized in third quarter 2025 resulting from a counterparty’s termination of a purchased power agreement.

Operating Revenues

Third Quarter 2026 Compared to Third Quarter 2025

Following is an analysis of the change in operating revenues comparing the third quarter 2026 to the third quarter 2025:

Amount
(In Millions)
2025 operating revenues$577.1
Fuel, rider, and other revenues that do not significantly affect net income97.1
Volume/weather26.7
Retail electric price22.3
Return on construction work in progress for certain utility plant investments17.2
Purchased power agreement termination proceeds(15.0)
2026 operating revenues$725.4

Entergy Mississippi’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The volume/weather variance is primarily due to the effect of favorable weather on residential and commercial sales and an increase in industrial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily data center customers.

The retail electric price variance is primarily due to an increase in formula rate plan rates resulting from an increase in interim facilities rate adjustment revenues effective January 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the interim facilities rate adjustment filing.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related construction costs are incurred.

The purchased power agreement termination proceeds variance represents $15 million of liquidated damages recognized in third quarter 2025 resulting from a counterparty’s termination of a purchased power agreement.

Total electric energy sales for Entergy Mississippi for the three months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential2,0571,81014
Commercial1,4831,3946
Industrial1,15874356
Governmental1171161
Total retail4,8154,06319
Sales for resale:
Non-associated companies1,6591,6053
Total6,4745,66814

See Note 12 to the financial statements herein for additional discussion of Entergy Mississippi’s operating revenues.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Following is an analysis of the change in operating revenues comparing the nine months ended September 30, 2026 to the nine months ended September 30, 2025:

Amount
(In Millions)
2025 operating revenues$1,492.7
Fuel, rider, and other revenues that do not significantly affect net income202.0
Retail electric price50.5
Return on construction work in progress for certain utility plant investments44.1
Volume/weather34.4
Purchased power agreement termination proceeds(15.0)
2026 operating revenues$1,808.7

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Mississippi’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates resulting from an increase in interim facilities rate adjustment revenues effective January 2026. See Note 2 to the financial statements in the Form 10-K for discussion of the interim facilities rate adjustment filing.

The return on construction work in progress for certain utility plant investments variance represents the revenue related to the amortization of certain customer advances designed to provide a return on investment in construction work in progress for certain utility plant investments, which is recognized as the related construction costs are incurred.

The volume/weather variance is primarily due to increases in industrial, residential, and commercial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily data center customers.

The purchased power agreement termination proceeds variance represents $15 million of liquidated damages recognized in third quarter 2025 resulting from a counterparty’s termination of a purchased power agreement.

Total electric energy sales for Entergy Mississippi for the nine months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential4,5614,4283
Commercial3,6303,5682
Industrial3,4091,91578
Governmental304305—
Total retail11,90410,21617
Sales for resale:
Non-associated companies4,1604,0243
Total16,06414,24013

See Note 12 to the financial statements herein for additional discussion of Entergy Mississippi’s operating revenues.

Other Income Statement Variances

Third Quarter 2026 Compared to Third Quarter 2025

Other operation and maintenance expenses increased primarily due to:

  • an increase of $4 million in non-nuclear generation expenses primarily due to a higher scope of work performed, including during plant outages, in 2026 as compared to 2025;

  • an increase of $3.4 million in power delivery expenses primarily due to higher vegetation maintenance costs; and

  • several individually insignificant items.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other income increased primarily due to an increase of $6.5 million in the amortization of tax gross-up on customer advances, including customer advances for construction.

Interest expense increased primarily due to the issuance of $650 million of 5.05% Series mortgage bonds in March 2026.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Other operation and maintenance expenses increased primarily due to:

  • an increase of $7 million in power delivery expenses primarily due to higher vegetation maintenance costs and increased contract labor costs;

  • an increase of $4.1 million in non-nuclear generation expenses primarily due to a higher scope of work performed, including during plant outages, in 2026 as compared to 2025;

  • an increase of $2.9 million in compensation and benefits costs primarily due to higher healthcare claims activity and the timing of the recognition of prescription drug rebates;

  • an increase of $1.9 million in energy efficiency costs; and

  • several individually insignificant items.

The increase was partially offset by a decrease of $3.9 million in storm damage provisions. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of storm cost recovery.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Other regulatory charges (credits) – net includes a regulatory charge of $21 million, recorded in first quarter 2025, to reflect an adjustment to the grid modernization over/under recovery deferral balance.

Other income increased primarily due to an increase of $14.7 million in the amortization of tax gross-up on customer advances, including customer advances for construction, and an increase of $8.5 million in interest earned on money pool investments. The increase was partially offset by a decrease in the allowance for equity funds used during construction due to lower construction work in progress in 2026.

Interest expense increased primarily due to the issuance of $650 million of 5.05% Series mortgage bonds in March 2026 and the issuance of $600 million of 5.80% Series mortgage bonds in March 2025.

Income Taxes

The effective income tax rates were 25.3% for the third quarter 2026 and 24.8% for the nine months ended September 30, 2026. The differences in the effective income tax rates for the third quarter 2026 and the nine months ended September 30, 2026 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

The effective income tax rates were 24.1% for the third quarter 2025 and 23.9% for the nine months ended September 30, 2025. The differences in the effective income tax rates for the third quarter 2025 and the nine months ended September 30, 2025 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$341,484$155,693
Net cash provided by (used in):
Operating activities767,610559,353
Investing activities(1,422,983)(1,121,132)
Financing activities927,965734,761
Net increase in cash and cash equivalents272,592172,982
Cash and cash equivalents at end of period$614,076$328,675

Operating Activities

Net cash flow provided by operating activities increased $208.3 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to higher collections from customers and an increase of $159.7 million in receipts of advance payments related to customer agreements, including $133.8 million in customer advances and $25.9 million in tax gross-up on customer advances for construction. The increase was partially offset by:

  • higher fuel and purchased power payments. See Note 2 to the financial statements in the Form 10-K for a discussion of fuel and purchased power cost recovery;

  • the timing of payments to vendors;

  • an increase of $18.7 million in non-capital storm spending primarily due to Winter Storm Fern restoration efforts in 2026. See Note 2 to the financial statements herein for discussion of the storm cost recovery filing made by Entergy Mississippi in October 2026;

  • higher ad valorem tax payments as a result of increased assessments in 2026; and

  • the receipt of a $15 million liquidated damages payment in third quarter 2025 resulting from a counterparty’s termination of a purchased power agreement.

Investing Activities

Net cash flow used in investing activities increased $301.9 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • an increase of $316.8 million in non-nuclear generation construction expenditures primarily due to higher spending on the Penton Solar project and the Traceview Advanced Power Station project;

  • an increase of $68.3 million in capital expenditures related to storm restoration primarily due to Winter Storm Fern restoration efforts in 2026. See Note 2 to the financial statements herein for discussion of the storm cost recovery filing made by Entergy Mississippi in October 2026; and

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

  • the receipt of a $14.5 million initial payment for the sale of transmission rights and excess land related to Entergy Mississippi’s interest in the Independence power plant in third quarter 2025.

The increase was partially offset by money pool activity.

Decreases in Entergy Mississippi’s receivable from the money pool are a source of cash flow, and Entergy Mississippi’s receivable from the money pool decreased $3.4 million for the nine months ended September 30, 2026 compared to increasing by $68.9 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $193.2 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to the issuance of $650 million of 5.05% Series mortgage bonds in March 2026 and an increase of $135.5 million in capital contributions received from Entergy Corporation in 2026 as compared to 2025 in order to maintain Entergy Mississippi’s capital structure. The increase was partially offset by the issuance of $600 million of 5.80% Series mortgage bonds in March 2025. See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Mississippi’s debt to capital ratio is shown in the following table.

September 30, 2026December 31, 2025
Debt to capital51.2%50.5%
Effect of subtracting cash(4.5%)(2.9%)
Net debt to net capital (non-GAAP)46.7%47.6%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Mississippi uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Mississippi also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition because net debt indicates Entergy Mississippi’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Mississippi’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy Mississippi is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions) (a)
Planned construction and capital investments:
Generation$1,170$570$170$340
Transmission135170205175
Distribution345315340315
Utility Support65303030
Total$1,715$1,085$745$860

(a)Amounts exclude expenditures expected to be funded through customer advances for construction.

In addition to routine capital spending to maintain operations, the capital plan for Entergy Mississippi includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Mississippi’s portfolio, as well as to support customer growth, including Delta Blues Advanced Power Station, Delta Solar, Penton Solar, Traceview Advanced Power Station, Vicksburg Advanced Power Station, and battery energy storage systems; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting customer growth and renewables expansion; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. Entergy Mississippi is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

Entergy Mississippi’s receivables from the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$24,070$27,422$84,151$15,218

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Mississippi has a credit facility in the amount of $300 million scheduled to expire in June 2031. The credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of September 30, 2026, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy Mississippi is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. As of September 30, 2026, $125.6 million in MISO letters of credit and $1.3 million in non-MISO letters of credit were

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

outstanding under Entergy Mississippi’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

Additional Generation and Transmission Resources

As discussed in the Form 10-K, in March 2024, Entergy Mississippi executed a large customer supply and service agreement to serve two data center campuses located in Madison County, Mississippi in which Amazon Web Services is investing. In February 2025, Entergy Mississippi executed a large customer supply and service agreement to serve a data center campus located in Warren County, Mississippi in which Amazon Web Services is investing. In April 2026, Amazon Web Services announced the expansion of the data center campuses located in Madison County, Mississippi. The February 2025 agreement will apply to this expansion. Also, in April 2026, Entergy Mississippi executed a large customer supply and service agreement to serve a data center campus located in Hinds County, Mississippi in which Amazon Web Services is investing. Consistent with Entergy Mississippi’s Fair Share Plus guidelines, the large customer supply and service agreements are structured to ensure that the customer pays its incremental cost to serve and include protections in the event of early termination.

Winter Storm Fern

In January 2026, Entergy Mississippi’s service territory experienced the effects of Winter Storm Fern, including prolonged freezing temperatures, heavy ice accumulations, and wind, which caused severe damage to Entergy Mississippi’s infrastructure. Following Winter Storm Fern, the “Mississippi 2026 Severe Winter Storm Electric Utility Customer Relief and Electric Utility System Restoration Act” was enacted by the Mississippi Legislature in April 2026. This legislation provides that the MPSC may issue an electric utility financing order authorizing the issuance of system restoration bonds, the proceeds of which shall be used to securitize the system restoration costs and storm damage reserve levels of those utilities affected by Winter Storm Fern. The legislation requires that an electric utility affected by the storm must first petition the MPSC for such a financing order that complies with the requirements outlined in the legislation. The legislation states that any system restoration bonds issued under a financing order will not be considered debt of the electric utility. These bonds will only be secured by the system restoration property specified in the financing order.

In October 2026, Entergy Mississippi filed a petition with the MPSC requesting an electric utility financing order authorizing the Mississippi State Bond Commission to act as the issuing agent for the State of Mississippi to issue system restoration bonds, the proceeds of which would be used by Entergy Mississippi to securitize approximately $237.8 million in total Winter Storm Fern system restoration costs, consisting of $145.7 million in non-fuel system restoration costs, $65.0 million in incremental fuel costs attributable to Winter Storm Fern, $7.6 million in retired damaged assets, $14.3 million in carrying costs estimated through the date of bond issuance, and $5.2 million in bond issuance costs and financing costs. Within the petition, Entergy Mississippi also requested that the MPSC find that the non-fuel system restoration costs and incremental fuel costs attributable to Winter Storm Fern were prudently incurred. The MPSC is expected to rule on the petition in December 2026.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following is an update to that discussion.

Retail Rates

2026 Formula Rate Plan Filing

In February 2026, Entergy Mississippi submitted its formula rate plan 2026 test year filing and 2025 look-back filing showing Entergy Mississippi’s earned return on rate base for the historical 2025 calendar year to be

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

within the formula rate plan bandwidth and projected earned return for the 2026 calendar year to also be within the formula rate plan bandwidth. The 2026 test year filing resulted in an earned return on rate base of 7.64% and reflected no change in formula rate plan revenues. The 2025 look-back filing compared actual 2025 results to the approved benchmark return on rate base and reflected no change in formula rate plan revenues, although Entergy Mississippi proposed to adjust interim rates by $293 thousand to reflect one outside-the-bandwidth change, a true-up of demand side management costs.

In June 2026, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation that confirmed the 2026 test year filing, with the exception of immaterial adjustments to certain operations and maintenance expenses. The formula rate plan reflected an earned return on rate base of 7.68% for calendar year 2026, resulting in no change in formula rate plan revenues for 2026. Pursuant to the stipulation, Entergy Mississippi’s 2025 look-back filing reflected an earned return on rate base of 8.10%, which also resulted in no change in formula rate plan revenues for 2025. In addition, the stipulation included the recovery of the outside-the-bandwidth change discussed above as well as the ratemaking treatment of certain customer contributions, the mechanism for recovery of the benefits of nuclear production tax credits, and the realignment of the first project from the interim facilities rate adjustment to the formula rate plan. In June 2026 the MPSC approved the joint stipulation with rates effective in July 2026. See Note 10 to the financial statements herein for further discussion of the mechanism for recovery of the benefits of nuclear production tax credits included in the joint stipulation.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Mississippi’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$725,428$577,132$1,808,694$1,492,716
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale131,00155,639309,078134,751
Purchased power131,146102,140322,580280,311
Other operation and maintenance105,99792,577282,227256,443
Taxes other than income taxes54,50851,641138,975138,951
Depreciation and amortization70,40069,081209,609205,543
Other regulatory charges (credits) - net2,09219,79614,19772,150
TOTAL495,144390,8741,276,6661,088,149
OPERATING INCOME230,284186,258532,028404,567
OTHER INCOME
Allowance for equity funds used during construction1,9935,4925,51215,904
Interest and investment income6,7615,12621,57513,996
Miscellaneous - net6,186(306)23,6733,011
TOTAL14,94010,31250,76032,911
INTEREST EXPENSE
Interest expense47,24237,912136,617110,632
Allowance for borrowed funds used during construction(818)(2,054)(2,246)(6,036)
TOTAL46,42435,858134,371104,596
INCOME BEFORE INCOME TAXES198,800160,712448,417332,882
Income taxes50,21038,672111,33379,704
NET INCOME148,590122,040337,084253,178
Net income (loss) attributable to noncontrolling interest(26)6637(2,825)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$148,616$121,974$337,047$256,003
See Notes to Financial Statements.

(Page left blank intentionally)

ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$337,084$253,178
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation and amortization209,609205,543
Deferred income taxes, tax credits, and non-current taxes accrued43,09227,643
Changes in assets and liabilities:
Receivables(119,236)(54,324)
Fuel inventory2,027(6,055)
Accounts payable(7,667)(10,353)
Taxes accrued50,91732,390
Interest accrued43,91132,568
Deferred fuel costs(22,789)(103,852)
Customer advances - current152,62798,654
Other working capital accounts(12,749)(15,531)
Provisions for estimated losses(23,589)(1,350)
Other regulatory assets3,79971,677
Other regulatory liabilities15,0282,850
Customer advances - non-current68,49825,000
Pension and other postretirement funded status(5,909)(8,418)
Other assets and liabilities32,9579,733
Net cash flow provided by operating activities767,610559,353
INVESTING ACTIVITIES
Construction expenditures(1,425,797)(1,074,274)
Allowance for equity funds used during construction5,5127,679
Proceeds from sale of assets—14,469
Changes in money pool receivable - net3,352(68,933)
Increase in other investments(6,050)(73)
Net cash flow used in investing activities(1,422,983)(1,121,132)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt643,770592,562
Capital contributions from parent198,00062,500
Customer advances received for construction209,704159,955
Customer advances used for construction(121,296)(78,170)
Other(2,213)(2,086)
Net cash flow provided by financing activities927,965734,761
Net increase in cash and cash equivalents272,592172,982
Cash and cash equivalents at beginning of period341,484155,693
Cash and cash equivalents at end of period$614,076$328,675
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$77,157$76,202
Noncash investing activities:
Accrued construction expenditures$220,021$51,995
See Notes to Financial Statements.
ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$26$27
Temporary cash investments614,050341,457
Total cash and cash equivalents614,076341,484
Accounts receivable:
Customer218,029115,813
Allowance for doubtful accounts(5,176)(3,509)
Associated companies42,10137,723
Other21,36220,641
Accrued unbilled revenues100,47190,235
Total accounts receivable376,787260,903
Deferred fuel costs33,54610,757
Fuel inventory - at average cost16,45418,481
Materials and supplies115,976112,082
Prepayments and other51,23936,911
TOTAL1,208,078780,618
OTHER PROPERTY AND INVESTMENTS
Non-utility property - at cost (less accumulated depreciation)4,4564,467
Other754864
TOTAL5,2105,331
UTILITY PLANT
Electric8,592,4948,366,079
Construction work in progress2,447,4661,396,075
TOTAL UTILITY PLANT11,039,9609,762,154
Less - accumulated depreciation and amortization2,752,0392,635,823
UTILITY PLANT - NET8,287,9217,126,331
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets451,915455,714
Other120,773108,480
TOTAL572,688564,194
TOTAL ASSETS$10,073,897$8,476,474
See Notes to Financial Statements.
ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Accounts payable:
Associated companies$62,184$61,135
Other371,789397,756
Customer deposits100,38097,875
Taxes accrued214,137163,220
Interest accrued72,37828,467
Customer advances242,16589,538
Other26,98123,678
TOTAL1,090,014861,669
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued975,430926,734
Accumulated deferred investment tax credits12,87213,191
Regulatory liability for income taxes - net165,353170,902
Other regulatory liabilities164,701144,124
Customer advances93,49825,000
Asset retirement cost liabilities27,66326,538
Accumulated provisions27,97551,564
Long-term debt3,666,5553,021,324
Customer advances for construction267,843184,564
Other63,69367,648
TOTAL5,465,5834,631,589
Commitments and Contingencies
EQUITY
Member's equity3,513,1972,978,150
Noncontrolling interest5,1035,066
TOTAL3,518,3002,983,216
TOTAL LIABILITIES AND EQUITY$10,073,897$8,476,474
See Notes to Financial Statements.
ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Noncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2024$8,202$2,400,786$2,408,988
Net income (loss)(2,479)49,34546,866
Capital contribution from parent—62,50062,500
Balance at March 31, 20255,7232,512,6312,518,354
Net income (loss)(412)84,68484,272
Balance at June 30, 20255,3112,597,3152,602,626
Net income66121,974122,040
Balance at September 30, 2025$5,377$2,719,289$2,724,666
Balance at December 31, 2025$5,066$2,978,150$2,983,216
Net income1284,30684,318
Capital contribution from parent—198,000198,000
Balance at March 31, 20265,0783,260,4563,265,534
Net income51104,125104,176
Balance at June 30, 20265,1293,364,5813,369,710
Net income (loss)(26)148,616148,590
Balance at September 30, 2026$5,103$3,513,197$3,518,300
See Notes to Financial Statements.

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $18.7 million primarily due to a $12.8 million ($9.6 million net-of-tax) charge, recorded in third quarter 2025, to reflect the write-off of retained natural gas plant assets that were not included in the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025, and which will not be recovered from customers, higher volume/weather, higher retail electric price, and lower interest expense, partially offset by higher other operation and maintenance expenses. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $10.3 million primarily due to a $12.8 million ($9.6 million net-of-tax) charge, recorded in third quarter 2025, to reflect the write-off of retained natural gas plant assets that were not included in the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025, and which will not be recovered from customers. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

Operating Revenues

Third Quarter 2026 Compared to Third Quarter 2025

Following is an analysis of the change in operating revenues comparing the third quarter 2026 to the third quarter 2025:

Amount
(In Millions)
2025 operating revenues$220.3
Fuel, rider, and other revenues that do not significantly affect net income14.8
Volume/weather6.5
Retail electric price2.5
2026 operating revenues$244.1

Entergy New Orleans’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in residential usage.

The retail electric price variance is primarily due to an increase in formula rate plan rates resulting from an increase in the resilience and storm hardening cost recovery rider revenue requirement effective January 2026. See

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Note 2 to the financial statements herein for discussion of the resilience and storm hardening cost recovery rider filing.

Total electric energy sales for Entergy New Orleans for the three months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential8307668
Commercial6196052
Industrial90116(22)
Governmental2272175
Total retail1,7661,7044
Sales for resale:
Non-associated companies651762(15)
Total2,4172,466(2)

See Note 12 to the financial statements herein for additional discussion of Entergy New Orleans’s operating revenues.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Following is an analysis of the change in operating revenues comparing the nine months ended September 30, 2026 to the nine months ended September 30, 2025:

Amount
(In Millions)
2025 operating revenues$611.4
Fuel, rider, and other revenues that do not significantly affect net income66.7
Effect of sale of natural gas distribution business(68.4)
Retail electric price(2.1)
Volume/weather(1.3)
2026 operating revenues$606.3

Entergy New Orleans’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The effect of sale of natural gas distribution business variance represents the decrease in operating revenues resulting from the absence of natural gas revenues following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

The retail electric price variance is primarily due to a decrease in formula rate plan rates effective September 2025 in accordance with the terms of the 2025 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the formula rate plan filing.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The volume/weather variance is primarily due to the effect of less favorable weather on residential and commercial sales, partially offset by an increase in weather-adjusted residential usage.

Total electric energy sales for Entergy New Orleans for the nine months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential1,8981,893—
Commercial1,5741,578—
Industrial293293—
Governmental6025892
Total retail4,3674,353—
Sales for resale:
Non-associated companies2,0291,11482
Total6,3965,46717

See Note 12 to the financial statements herein for additional discussion of Entergy New Orleans’s operating revenues.

Other Income Statement Variances

Third Quarter 2026 Compared to Third Quarter 2025

Other operation and maintenance expenses increased primarily due to:

  • an increase of $2.5 million in energy efficiency expenses primarily due to the timing of recovery from customers;

  • a $2.4 million gain, recorded in third quarter 2025, resulting from the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025; and

  • several individually insignificant items.

Asset write-offs includes a $12.8 million charge, recorded in third quarter 2025, to reflect the write-off of retained natural gas plant assets that were not included in the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025, and which will not be recovered from customers. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025.

Interest expense decreased primarily due to a decrease of $2.3 million in carrying costs on regulatory liability balances.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Other operation and maintenance expenses decreased primarily due to a decrease of $6.2 million in gas operations expenses resulting from the absence of expenses following the sale of the natural gas distribution business on July 1, 2025 and a decrease of $2.6 million in non-nuclear generation expenses primarily due to a lower scope of work performed during plant outages in 2026 as compared to 2025. The decrease was partially offset by an increase of $2.6 million in energy efficiency expenses primarily due to the timing of recovery from customers and a $2.4 million gain, recorded in third quarter 2025, resulting from the sale of the natural gas distribution

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025.

Asset write-offs includes a $12.8 million charge, recorded in third quarter 2025, to reflect the write-off of retained natural gas plant assets that were not included in the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025, and which will not be recovered. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025.

Taxes other than income taxes decreased primarily due to a decrease in franchise fees as a result of lower retail revenues in 2026 as compared to 2025, including the absence of natural gas revenues in 2026 following the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025, and the repeal of the Louisiana corporation franchise tax, effective January 2026, as a result of state legislation enacted in December 2024. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

Depreciation and amortization expenses decreased primarily due to the absence of depreciation and amortization expenses associated with natural gas plant in service following the sale of the natural gas distribution business on July 1, 2025. See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

Interest expense decreased primarily due to a decrease of $8.3 million in carrying costs on regulatory liability balances.

Income Taxes

The effective income tax rate was 24.5% for the third quarter 2026 and 22.1% for the nine months ended September 30, 2026. The differences in the effective income tax rates for the third quarter 2026 and the nine months ended September 30, 2026 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes and a provision for uncertain tax positions, partially offset by the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items.

The effective income tax rate was 25.5% for the third quarter 2025. The difference in the effective income tax rate for the third quarter 2025 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by the amortization of excess accumulated deferred income taxes.

The effective income tax rate was 24.6% for the nine months ended September 30, 2025. The difference in the effective income tax rate for the nine months ended September 30, 2025 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

Sale of Natural Gas Distribution Business

See Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans natural gas distribution business on July 1, 2025.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$110,264$31,777
Net cash provided by (used in):
Operating activities77,50497,801
Investing activities(111,845)156,869
Financing activities3,226(217,747)
Net increase (decrease) in cash and cash equivalents(31,115)36,923
Cash and cash equivalents at end of period$79,149$68,700

Operating Activities

Net cash flow provided by operating activities decreased $20.3 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to lower collections from customers, partially offset by lower fuel and purchased power payments in 2026 as compared to 2025 and the timing of payments to vendors.

Investing Activities

Entergy New Orleans’s investing activities used $111.8 million for the nine months ended September 30, 2026 compared to providing $156.9 million for the nine months ended September 30, 2025 primarily due to the following activity:

  • the receipt of $288.3 million in proceeds from the sale of the natural gas distribution business on July 1, 2025;

  • an increase of $28.7 million in distribution construction expenditures primarily due to increased investment in the resilience and reliability of the distribution system;

  • the receipt of $10.3 million from the storm reserve escrow account in 2025;

  • a decrease of $8.8 million in gas operations construction expenditures resulting from the absence of construction expenditures following the sale of the natural gas distribution business on July 1, 2025;

  • money pool activity; and

  • a decrease of $22.4 million in non-nuclear generation construction expenditures primarily due to a lower scope of work during plant outages performed in 2026 as compared to 2025.

See Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s natural gas distribution business on July 1, 2025.

Decreases in Entergy New Orleans’s receivable from the money pool are a source of cash flow, and Entergy New Orleans’s receivable from the money pool decreased by $5.9 million for the nine months ended September 30, 2026 compared to increasing by $14.7 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Financing Activities

Entergy New Orleans’s financing activities provided $3.2 million for the nine months ended September 30, 2026 compared to using $217.7 million the nine months ended September 30, 2025 primarily due to the following activity:

  • $140 million in common equity distributions paid in 2025 in order to maintain Entergy New Orleans’s capital structure;

  • the issuances of $55 million of 6.65% Series mortgage bonds and $35 million of 5.91% Series mortgage bonds, each in May 2026;

  • the repayment, at maturity, of $78 million of 3.00% Series mortgage bonds in March 2025; and

  • the repayment of $85 million of 4% Series mortgage bonds in June 2026.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy New Orleans’s debt to capital ratio is shown in the following table. The decrease in the debt to capital ratio for Entergy New Orleans is primarily due to net income in 2026.

September 30, 2026December 31, 2025
Debt to capital49.8%52.1%
Effect of subtracting cash(3.1%)(4.6%)
Net debt to net capital (non-GAAP)46.7%47.5%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, long-term debt, including the currently maturing portion, and the long-term payable due to an associated company. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy New Orleans uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy New Orleans also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition because net debt indicates Entergy New Orleans’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy New Orleans’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy New Orleans is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions) (a)
Planned construction and capital investments:
Generation$5$15$15$5
Transmission10202015
Distribution130140155150
Utility Support10101015
Total$155$185$200$185

(a)Amounts exclude expenditures expected to be funded through customer advances for construction.

In addition to routine capital spending to maintain operations, the capital plan for Entergy New Orleans includes distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. Entergy New Orleans is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

Entergy New Orleans’s receivables from the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$3,125$9,009$17,843$3,146

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy New Orleans has a credit facility in the amount of $25 million scheduled to expire in June 2027. The credit facility includes fronting commitments for the issuance of letters of credit against $10 million of the borrowing capacity of the facility. As of September 30, 2026, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy New Orleans is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of September 30, 2026, a $0.5 million letter of credit was outstanding under Entergy New Orleans’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

State and Local Rate Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation” in the Form 10-K for a discussion of state and local rate regulation. The following are updates to that discussion.

Retail Rates

2026 Formula Rate Plan Filing

In April 2026, Entergy New Orleans submitted to the City Council its formula rate plan 2025 test year filing. The 2025 evaluation report produced an earned return on equity of 7.55% compared to the authorized return on equity of 9.35%. Without adjustments, this would result in an increase in rates of $16.6 million. The increase in rates is driven, in part, by an increase in plant in service, as well as the cost of known and measurable capital additions. The increase is also driven by a decrease in total revenues due to a decline in kWh sales. The filing is subject to a 75-day review and discovery period followed by a 25-day period to resolve any disputes among the parties.

In July 2026 the City Council’s advisors issued a report seeking a reduction in Entergy New Orleans’s requested formula rate plan revenues of approximately $4.4 million due to certain proposed cost realignments, imputation of revenues, and disallowances. The City Council’s advisors also recommended that Entergy New Orleans be permitted to collect $20 million over five years beginning in September 2026 to recover amounts that it might be required to pay Entergy Louisiana and Entergy Arkansas pursuant to a FERC order issued in June 2026, relating to an alleged MSS-4R violation. However, the FERC order is unclear on its face, and the specific amount of a payment, if any, is unknown. Requests for rehearing and clarification of the FERC order are pending. See “MSS-4 Replacement Tariff - Net Operating Loss Carryforward Proceeding” in Note 2 to the financial statements herein for additional discussion of the FERC order. Subsequent to the original recommendation from the City Council’s advisors regarding the FERC order, Entergy New Orleans reached a resolution with the City Council’s advisors, and the original proposed $20 million amount was reduced to $10 million over five years. Effective with the first billing cycle of September 2026, Entergy New Orleans implemented rates reflecting a formula rate plan increase of $13.8 million, as agreed upon by Entergy New Orleans and the City Council, per the approved process for formula rate plan implementation. Moreover, with respect to the FERC order, in October 2026 the City Council passed a resolution directing Entergy New Orleans to collect $2.3 million for year one, beginning in September 2026 from customers in anticipation of surcharge obligations resulting from the FERC order, to be collected outside the bandwidth. Until either the FERC determines or it is otherwise agreed that Entergy New Orleans must pay a surcharge, amounts collected from customers beginning September 2026 in anticipation of surcharge obligations resulting from the FERC order are being recorded as a regulatory liability. If the FERC determines or it is otherwise agreed that Entergy New Orleans must pay a surcharge, Entergy New Orleans will record a regulatory asset for the remaining uncollected balance, with carrying costs, including credit balances reflecting collections from customers that commenced in September 2026. If the FERC determines or it is otherwise agreed that Entergy New Orleans is owed payments, Entergy New Orleans will cease collecting amounts from customers beginning with the next base rate action and will return collected amounts to customers, including carrying costs.

Request for Extension of Formula Rate Plan

In July 2026, Entergy New Orleans submitted a motion requesting the City Council’s approval of a four-year extension of its current formula rate plan, with all material provisions left unchanged. In October 2026 the City Council approved Entergy New Orleans’s motion, authorizing the extension of Entergy New Orleans’s electric formula rate plan for test years 2026 through 2029.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Resilience and Storm Hardening Cost Recovery Rider Adjustment to the Formula Rate Plan

In October 2024 the City Council approved a rider mechanism for Entergy New Orleans to recover the costs of certain approved accelerated resilience projects to be constructed by Entergy New Orleans in 2025 and 2026. The rider allows for recovery of project costs through a formula rate plan rate adjustment. As required by the rider, in November 2024, Entergy New Orleans filed the first of its compliance filings, seeking a rate adjustment increase of approximately $1.1 million, and the increase in formula rate plan rates became effective in the first billing cycle of January 2025 in accordance with the terms of the rider. In October 2025, Entergy New Orleans made its second compliance filing, seeking a rate adjustment increase of approximately $11.8 million, and the increase in formula rate plan rates became effective in the first billing cycle of January 2026.

Distributed Energy Resource Program

As discussed in the Form 10-K, in October 2024 the City Council opened a docket to evaluate potential opportunities to increase the availability of distributed energy resources, battery storage, and related facilities in New Orleans. In December 2025 the City Council issued a resolution establishing a distributed energy resources program to be implemented and operated under the existing Energy Smart program, with $28 million in customer incentives available through credits funded by the settlement between System Energy and the City Council. In March 2026, as required by the City Council, Entergy New Orleans submitted to the City Council a proposed battery storage implementation plan, in which program costs would be offset by credits from the System Energy settlement, with no incremental impact on customer rates. See “Complaints Against System Energy - System Energy Settlement with the City Council” in Note 2 to the financial statements in the Form 10-K for discussion of the System Energy settlement with the City Council.

An intervenor in the proceeding challenged the plan submitted by Entergy New Orleans and sought additional incentives for participating customers, including accelerated use of the credits. In July 2026 certain stakeholders submitted comments in support of that intervenor’s position. In August 2026 the City Council’s advisors issued a report that, among other things, summarized the parties’ positions and identified various issues for determination by the City Council.

In October 2026 the City Council approved a resolution that increased the amount of upfront incentives for participating customers and did not clearly address the total cost of ongoing customer incentives, such that all incentives and costs associated with the program could exceed the credits from the System Energy settlement, in which case incremental costs would have to be borne more broadly by customers through rates, including those customers who do not participate in the program. Pursuant to the resolution, Entergy New Orleans expects to submit an implementation plan to the City Council in November 2026, providing for implementation by the end of first quarter 2027. The resolution further directs Entergy New Orleans and the City Council’s advisors to collaborate to develop certain protections for customers participating in the program and to report to the City Council on such efforts in November 2026.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy New Orleans’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$244,105$220,290$606,304$542,996
Natural gas—8—68,357
TOTAL244,105220,298606,304611,353
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale26,65233,79876,59372,707
Purchased power80,48567,849219,991204,716
Other operation and maintenance43,26236,341114,713119,268
Asset write-offs—12,795—12,795
Taxes other than income taxes14,35615,45438,50445,326
Depreciation and amortization19,48019,06457,78763,267
Other regulatory charges (credits) - net(526)(3,786)(5,938)(10,376)
TOTAL183,709181,515501,650507,703
OPERATING INCOME60,39638,783104,654103,650
OTHER INCOME
Allowance for equity funds used during construction9024912,2031,291
Interest and investment income7461,1722,3801,774
Miscellaneous - net(461)(1,001)(2,709)(2,374)
TOTAL1,1876621,874691
INTEREST EXPENSE
Interest expense9,99611,97229,38337,683
Allowance for borrowed funds used during construction(529)(270)(1,292)(709)
TOTAL9,46711,70228,09136,974
INCOME BEFORE INCOME TAXES52,11627,74378,43767,367
Income taxes12,7947,08017,34916,563
NET INCOME$39,322$20,663$61,088$50,804
See Notes to Financial Statements.

(Page left blank intentionally)

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$61,088$50,804
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation and amortization57,78763,267
Deferred income taxes, tax credits, and non-current taxes accrued4,0119,979
Asset write-offs—12,795
Changes in assets and liabilities:
Receivables(44,600)(8,667)
Fuel inventory1123,961
Accounts payable7,244(7,430)
Prepaid taxes and taxes accrued14,0868,564
Interest accrued3,8651,326
Deferred fuel costs(1,844)4,053
Other working capital accounts(8,386)(3,290)
Provisions for estimated losses674(10,156)
Other regulatory assets4,49048,029
Other regulatory liabilities(17,563)(41,353)
Pension and other postretirement funded status(6,342)10,393
Other assets and liabilities2,882(44,474)
Net cash flow provided by operating activities77,50497,801
INVESTING ACTIVITIES
Construction expenditures(117,136)(127,504)
Allowance for equity funds used during construction2,2031,291
Changes in money pool receivable - net5,884(14,697)
Receipt from storm reserve escrow account—10,333
Payments to storm reserve escrow account(1,997)(2,450)
Proceeds from sale of business—288,285
Changes in securitization account—1,611
Increase in other investments(799)—
Net cash flow provided by (used in) investing activities(111,845)156,869
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt89,05379,693
Retirement of long-term debt(85,000)(158,000)
Common equity distributions paid—(140,000)
Other(827)560
Net cash flow provided by (used in) financing activities3,226(217,747)
Net increase (decrease) in cash and cash equivalents(31,115)36,923
Cash and cash equivalents at beginning of period110,26431,777
Cash and cash equivalents at end of period$79,149$68,700
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$20,670$35,553
Income taxes - net$150$—
Noncash investing activities:
Accrued construction expenditures$12,907$8,102
See Notes to Financial Statements.
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$26$26
Temporary cash investments79,123110,238
Total cash and cash equivalents79,149110,264
Accounts receivable:
Customer91,22255,972
Allowance for doubtful accounts(2,724)(3,845)
Associated companies5,36010,459
Other5,3073,668
Accrued unbilled revenues34,10828,303
Total accounts receivable133,27394,557
Fuel inventory - at average cost704816
Materials and supplies38,59830,539
Prepayments and other19,28412,992
TOTAL271,008249,168
OTHER PROPERTY AND INVESTMENTS
Storm reserve escrow account75,81973,822
Other9,1529,485
TOTAL84,97183,307
UTILITY PLANT
Electric2,335,7452,267,691
Construction work in progress72,50743,055
TOTAL UTILITY PLANT2,408,2522,310,746
Less - accumulated depreciation and amortization811,326778,401
UTILITY PLANT - NET1,596,9261,532,345
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets105,200109,690
Deferred fuel costs4,0804,080
Other87,40880,090
TOTAL196,688193,860
TOTAL ASSETS$2,149,593$2,058,680
See Notes to Financial Statements.
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$—$85,000
Payable due to associated company720720
Accounts payable:
Associated companies47,83547,709
Other39,37132,067
Customer deposits31,09530,632
Taxes accrued30,42216,336
Interest accrued10,6946,829
Deferred fuel costs1,3653,209
Other17,65310,659
TOTAL179,155233,161
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued211,338201,345
Accumulated deferred investment tax credits15,35615,425
Regulatory liability for income taxes - net9,57815,656
Other regulatory liabilities301,477312,962
Accumulated provisions79,60778,933
Long-term debt655,434565,985
Long-term payable due to associated company5,1445,144
Other23,40422,057
TOTAL1,301,3381,217,507
Commitments and Contingencies
EQUITY
Member's equity669,100608,012
TOTAL669,100608,012
TOTAL LIABILITIES AND EQUITY$2,149,593$2,058,680
See Notes to Financial Statements.
ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN MEMBER'S EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Member's Equity
(In Thousands)
Balance at December 31, 2024$697,601
Net income12,099
Balance at March 31, 2025709,700
Net income18,042
Balance at June 30, 2025727,742
Net income20,663
Common equity distributions(140,000)
Balance at September 30, 2025$608,405
Balance at December 31, 2025$608,012
Net income6,384
Balance at March 31, 2026614,396
Net income15,382
Balance at June 30, 2026629,778
Net income39,322
Balance at September 30, 2026$669,100
See Notes to Financial Statements.

ENTERGY TEXAS, INC. AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $46.8 million primarily due to higher volume/weather, higher retail electric price, and higher other income, partially offset by higher taxes other than income taxes, higher interest expense, higher unrecovered capacity costs in 2026, and higher other operation and maintenance expenses.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $65.2 million primarily due to higher volume/weather, higher retail electric price, higher other income, and higher unrecovered capacity costs in 2025, partially offset by higher other operation and maintenance expenses, higher taxes other than income taxes, and higher interest expense.

Operating Revenues

Third Quarter 2026 Compared to Third Quarter 2025

Following is an analysis of the change in operating revenues comparing the third quarter 2026 to the third quarter 2025:

Amount
(In Millions)
2025 operating revenues$640.3
Fuel, rider, and other revenues that do not significantly affect net income42.7
Volume/weather52.7
Retail electric price16.8
2026 operating revenues$752.5

Entergy Texas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in industrial usage, an increase in weather-adjusted residential usage, and the effect of more favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily agricultural and other chemicals, transportation, and petrochemicals customers. The increase in weather-adjusted residential usage is primarily due to an increase in customers.

The retail electric price variance is primarily due to increases in the distribution cost recovery factor rider effective December 2025 and July 2026 and an increase in the transmission cost recovery factor rider effective April 2026. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the distribution and transmission cost recovery factor rider filings.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Texas for the three months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential2,5142,21314
Commercial1,5821,4797
Industrial3,0252,57418
Governmental807310
Total retail7,2016,33914
Sales for resale:
Non-associated companies17512046
Total7,3766,45914

See Note 12 to the financial statements herein for additional discussion of Entergy Texas’s operating revenues.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Following is an analysis of the change in operating revenues comparing the nine months ended September 30, 2026 to the nine months ended September 30, 2025:

Amount
(In Millions)
2025 operating revenues$1,613.9
Fuel, rider, and other revenues that do not significantly affect net income106.9
Volume/weather61.0
Retail electric price42.9
2026 operating revenues$1,824.7

Entergy Texas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in industrial usage and an increase in weather-adjusted residential usage, partially offset by the effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily agricultural and other chemicals, transportation, and industrial gases customers. The increase in weather-adjusted residential usage is primarily due to an increase in customers.

The retail electric price variance is primarily due to increases in the distribution cost recovery factor rider effective June 2025, December 2025, and July 2026 and an increase in the transmission cost recovery factor rider effective April 2026. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the distribution and transmission cost recovery factor rider filings.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Texas for the nine months ended September 30, 2026 and 2025 are as follows:

20262025% Change
(GWh)
Residential5,6625,5143
Commercial3,9983,8693
Industrial8,3937,35514
Governmental2192019
Total retail18,27216,9398
Sales for resale:
Non-associated companies43226464
Total18,70417,2039

See Note 12 to the financial statements herein for additional discussion of Entergy Texas’s operating revenues.

Other Income Statement Variances

Third Quarter 2026 Compared to Third Quarter 2025

Purchased power includes:

  • $14.6 million of unrecovered capacity cost charges in 2026 under a new short-term, one-year power purchase agreement beginning in June 2026; and

  • $11.5 million of higher unrecovered costs in 2025 related to the procurement of capacity through MISO’s annual planning resource auction. Higher costs in third quarter 2025 resulted from the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months in 2025. Prior to June 2026, Entergy Texas also did not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates. In June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. In May 2026, Entergy Texas filed a request with the PUCT for a capacity cost recovery rider to recover eligible capacity procurement costs associated with its participation in MISO’s annual planning resource auction, and the PUCT approved the request in July 2026. See Note 2 to the financial statements herein for discussion of the capacity cost recovery rider.

Other operation and maintenance expenses increased primarily due to an increase of $1.7 million in energy efficiency expenses primarily due to the timing of recovery from customers and several individually insignificant items. The increase was partially offset by a decrease of $1.6 million in loss provisions and a decrease of $1.4 million in bad debt expense.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Other income increased primarily due to higher interest earned on money pool investments and an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026, including the Orange County Advanced Power Station project and the Lone Star Power Station project, partially offset by lower construction work in progress in 2026 on the Legend Power Station project as a result of the sale of

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

assets related to the in-process project in December 2025. See Note 8 to the financial statements in the Form 10-K for discussion of the Entergy Texas build-to-suit lease arrangement for the Legend Power Station.

Interest expense increased primarily due to the issuance of $425 million of 5.20% Series mortgage bonds in May 2026.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Purchased power includes:

  • $27.2 million of higher unrecovered costs in 2025 related to the procurement of capacity through MISO’s annual planning resource auction. Higher costs in 2025 resulted from the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months in 2025. Prior to June 2026, Entergy Texas also did not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates. In June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. In May 2026, Entergy Texas filed a request with the PUCT for a capacity cost recovery rider to recover eligible capacity procurement costs associated with its participation in MISO’s annual planning resource auction, and the PUCT approved the request in July 2026. See Note 2 to the financial statements herein for discussion of the capacity cost recovery rider; and

  • $19.4 million of unrecovered capacity cost charges in 2026 under a new short-term, one-year power purchase agreement beginning in June 2026.

Other operation and maintenance expenses increased primarily due to:

  • an increase of $2.6 million in energy efficiency expenses primarily due to the timing of recovery from customers;

  • an increase of $2.2 million in compensation and benefits costs primarily due to higher healthcare claims activity, the timing of the recognition of prescription drug rebates, and a larger revision to estimated incentive-based compensation expense in 2025;

  • an increase of $2.1 million in power delivery expenses primarily due to higher vegetation maintenance costs and increased contract labor costs;

  • an increase of $1.9 million in insurance expense primarily due to higher premiums in 2026 as compared to 2025;

  • an increase of $1.5 million in transmission costs allocated by MISO; and

  • several individually insignificant items.

The increase was partially offset by a decrease of $7.5 million in bad debt expense and a decrease of $1.5 million in loss provisions.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Other income increased primarily due to higher interest earned on money pool investments and an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2026, including the Orange County Advanced Power Station project and the Lone Star Power Station project, partially offset by lower construction work in progress in 2026 on the Legend Power Station project as a result of the sale of assets related to the in-process project in December 2025. See Note 8 to the financial statements in the Form 10-K for discussion of the Entergy Texas build-to-suit lease arrangement for the Legend Power Station.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Interest expense increased primarily due to the issuance of $425 million of 5.20% Series mortgage bonds in May 2026 and the issuance of $500 million of 5.25% Series mortgage bonds in February 2025, partially offset by lower carrying costs on the deferred fuel balance.

Income Taxes

The effective income tax rates were 18.9% for the third quarter 2026 and 18.0% for the nine months ended September 30, 2026. The differences in the effective income tax rates for the third quarter 2026 and the nine months ended September 30, 2026 versus the federal statutory rate of 21% were primarily due to book and tax differences related to the allowance for equity funds used during construction and certain book and tax differences related to utility plant items.

The effective income tax rates were 18.3% for the third quarter 2025 and 17.2% for the nine months ended September 30, 2025. The differences in the effective income tax rates for the third quarter 2025 and the nine months ended September 30, 2025 versus the federal statutory rate of 21% were primarily due to book and tax differences related to the allowance for equity funds used during construction.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$275,108$184,997
Net cash provided by (used in):
Operating activities496,060413,075
Investing activities(751,848)(1,201,029)
Financing activities393,199603,746
Net increase (decrease) in cash and cash equivalents137,411(184,208)
Cash and cash equivalents at end of period$412,519$789

Operating Activities

Net cash flow provided by operating activities increased $83.0 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to higher collections from customers, partially offset by higher fuel and purchased power payments and the timing of payments to vendors. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Investing Activities

Net cash flow used in investing activities decreased $449.2 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to a decrease of $408.2

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

million in non-nuclear generation construction expenditures primarily due to lower spending on the Legend Power Station project as a result of the sale of assets related to the in-process project in December 2025 and lower spending on the Orange County Advanced Power Station project in 2026 and a decrease of $95.1 million in transmission construction expenditures primarily due to decreased spending on various transmission projects in 2026. The decrease was partially offset by proceeds of $41.4 million received in 2025 from the transfer of assets related to the Segno Solar and Votaw Solar facilities from Entergy Texas to Entergy Louisiana and money pool activity. See Note 8 to the financial statements in the Form 10-K for discussion of the Entergy Texas build-to-suit lease arrangement for the Legend Power Station.

Decreases in Entergy Texas’s receivable from the money pool are a source of cash flow, and Entergy Texas’s receivable from the money pool decreased $6.2 million for the nine months ended September 30, 2026 compared to decreasing by $18.5 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities decreased $210.5 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to:

  • the issuance of $500 million of 5.25% Series mortgage bonds in February 2025;

  • a $248.3 million payment in June 2026 associated with a financed portion of construction work in progress related to the Orange County Advanced Power Station;

  • the repayment of $130 million of 1.50% Series mortgage bonds in September 2026; and

  • money pool activity.

The decrease was partially offset by the issuance of $425 million of 5.20% Series mortgage bonds in May 2026 and a capital contribution of $365 million received from Entergy Corporation in 2026 in order to maintain Entergy Texas’s capital structure and in anticipation of various capital expenditures.

Increases in Entergy Texas’s payable to the money pool are a source of cash flow, and Entergy Texas’s payable to the money pool increased by $142.2 million for the nine months ended September 30, 2025.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Texas’s debt to capital ratio is shown in the following table. The decrease in the debt to capital ratio for Entergy Texas is primarily due to a capital contribution of $365 million received from Entergy Corporation in 2026.

September 30, 2026December 31, 2025
Debt to capital48.4%50.9%
Effect of excluding securitization bonds(1.2%)(1.4%)
Debt to capital, excluding securitization bonds (non-GAAP) (a)47.2%49.5%
Effect of subtracting cash(2.7%)(1.9%)
Net debt to net capital, excluding securitization bonds (non-GAAP) (a)44.5%47.6%

(a)Calculation excludes the securitization bonds, which are non-recourse to Entergy Texas.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Net debt consists of debt less cash and cash equivalents. Debt consists of finance lease obligations and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. The debt to capital ratio excluding securitization bonds and net debt to net capital ratio excluding securitization bonds are non-GAAP measures. Entergy Texas uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because the securitization bonds are non-recourse to Entergy Texas, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy Texas also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because net debt indicates Entergy Texas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Texas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Entergy Texas is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions) (a)
Planned construction and capital investments:
Generation$320$1,570$75$125
Transmission615735645255
Distribution420370340340
Utility Support40303535
Total$1,395$2,705$1,095$755

(a)Amounts exclude expenditures expected to be funded through customer advances for construction.

In addition to routine capital spending to maintain operations, the capital plan for Entergy Texas includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Texas’s portfolio, including Lone Star Power Station and Legend Power Station; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting customer growth and renewables expansion; and other investments. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. Entergy Texas is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Texas’s receivables from or (payables to) the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$16,291$22,467($142,209)$18,504

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Texas has a credit facility in the amount of $300 million scheduled to expire in June 2031. The credit facility includes fronting commitments for the issuance of letters of credit against $25 million of the borrowing capacity of the facility. As of September 30, 2026, there were no cash borrowings and $1.1 million in letters of credit outstanding under the credit facility. In addition, Entergy Texas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of September 30, 2026, $95.1 million in letters of credit were outstanding under one of Entergy Texas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

Cypress to Legend 500 kV Transmission Line

As discussed in the Form 10-K, in May 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 500 kV transmission line. The transmission line is expected to be approximately 40 to 49 miles in length and the estimated cost of the project ranges from $392.7 million to $436.2 million, depending on the route ultimately approved by the PUCT. In June 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings and a hearing on the merits was held in August 2025. In October 2025 the ALJs with the State Office of Administrative Hearings issued a proposal for decision recommending the PUCT approve Entergy Texas’s application to construct the transmission line and recommending the PUCT’s approval include selection of a specific route with an estimated cost of $398.7 million. In December 2025 the PUCT issued a final order approving the requested amendment to Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the new single-circuit 500 kV transmission line, and selecting the final route previously recommended. In February 2026, landowners not party to the PUCT proceeding filed in the 345th District Court of Travis County, Texas a petition for declaratory relief and temporary and permanent injunction against the PUCT’s final order. The petition, which names the PUCT, its commissioners, and Entergy Texas as defendants, challenges Entergy Texas’s notice, the application of the PUCT’s notice rule, and the PUCT order’s approval of a route the petitioners assert was not adequately noticed. In March 2026, Entergy Texas and the PUCT filed answers disputing all aspects of the petition. In April 2026 petitioners filed an amended petition with minor adjustments to their original petition. In May 2026 petitioners filed a supplemental application for temporary injunction and opposition to pleas to the jurisdiction in response to jurisdictional defenses raised in the answers filed by Entergy Texas and the PUCT. In June 2026 the court set a hearing for July 2026 on petitioners’ requested temporary injunction and any pleas to the jurisdiction and motions for summary judgment. In June 2026 the PUCT filed its plea to the jurisdiction. In June 2026 petitioners filed a motion for summary judgment and Entergy Texas filed an amended answer addressing the amended petition, a plea to the jurisdiction, and, in the alternative, a motion for summary judgment. In July 2026 the court issued a written order granting Entergy Texas’s and the PUCT’s pleas to the jurisdiction and, in the alternative, Entergy Texas’s motion for summary judgment. In August 2026 petitioners filed a notice of appeal to the Fifteenth Court of Appeals. In October 2026 the appellate record was filed with the Fifteenth Court of Appeals, triggering a 30-day deadline for the appellants to file a brief on the merits. Also in October 2026, the appellants filed a motion for temporary relief requesting that Entergy Texas be restrained from exercising eminent domain and construction activities on the appellants’ properties. Entergy Texas expects to respond in opposition to the motion for temporary relief by the November 2026 deadline established by the court. Subject to receipt of required permits and other conditions, the project is expected to be in service by the end of 2028.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Forest to War Eagle to Porter 138 kV Transmission Line

In August 2026, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 138 kV transmission line. The transmission line is expected to be approximately 9 to 11 miles in length and the estimated cost of the project ranges from $88.8 million to $99.4 million, depending on the route ultimately approved by the PUCT. Also in August 2026, the PUCT referred the proceeding to the State Office of Administrative Hearings. In September 2026 the ALJ with the State Office of Administrative Hearings adopted a procedural schedule that set a hearing for November 2026. In October 2026 the PUCT staff filed direct testimony recommending the PUCT approve Entergy Texas’s application and identifying the proposed route it concluded to best meet the statutory criteria for certification. The statutory deadline for a PUCT decision is February 2027.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

Distribution Cost Recovery Factor (DCRF) Rider

In April 2026, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $112.5 million annually, or $20.4 million in incremental annual revenues beyond Entergy Texas’s then-effective DCRF rider based on its capital invested in distribution between July 1, 2025 and December 31, 2025. In July 2026 the PUCT approved the DCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after July 8, 2026.

In September 2026, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The proposed rider is designed to collect from Entergy Texas’s retail customers approximately $127.3 million annually, or $14.8 million in incremental annual revenues beyond Entergy Texas’s currently effective DCRF rider based on its capital invested in distribution between January 1, 2026 and June 30, 2026. In September 2026 the ALJ with the State Office of Administrative Hearings adopted a procedural schedule requiring the PUCT staff to file a recommendation on the merits of Entergy Texas’s application by November 2, 2026.

Transmission Cost Recovery Factor (TCRF) Rider

As discussed in the Form 10-K, in October 2025, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $30.3 million annually, or $20.6 million in incremental annual revenues beyond Entergy Texas’s then-effective TCRF rider based on its capital invested in transmission between July 1, 2024 and June 30, 2025 and changes in other transmission charges. In April 2026 the PUCT approved the TCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after April 6, 2026.

In October 2026, Entergy Texas filed with the PUCT a request to amend its TCRF rider. The proposed rider is designed to collect from Entergy Texas’s retail customers approximately $56.7 million annually, or $26.4 million in incremental annual revenues beyond Entergy Texas’s currently effective TCRF rider based on its capital invested in transmission between July 1, 2025 and June 30, 2026 and changes in other transmission charges.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Generation Cost Recovery Rider

In March 2026, Entergy Texas filed an application to establish a generation cost recovery rider to begin recovering a return of and on its capital investment in the Orange County Advanced Power Station. The proposed generation cost recovery rider, which includes Entergy Texas’s capital invested in generation for the Orange County Advanced Power Station through December 31, 2025, was designed to collect approximately $150.4 million annually from Entergy Texas’s retail customers. In July 2026 the ALJ with the State Office of Administrative Hearings approved a proposed procedural schedule that included a hearing on the merits in September 2026 and provided for interim rates to become effective for usage on and after the Orange County Advanced Power Station in-service date, to the extent final rates were not in place by that time. In September 2026, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a joint motion to abate the procedural schedule and cancel the hearing on the merits to give the parties to the proceeding additional time to finalize a settlement. Interim rates became effective when the Orange County Advanced Power Station was placed into service in October 2026. Also in October 2026, Entergy Texas filed an unopposed stipulation resolving all issues in case, supporting testimony, a joint motion to adjust the interim rates previously implemented to correspond to the stipulated revenue requirement, and a joint motion to admit evidence and remand the proceeding to the PUCT. The unopposed stipulation would result in no disallowance of recoverable investment but would reduce the annual revenue requirement collected through the generation cost recovery rider by $5.7 million while the rider remains in effect. The PUCT is expected to issue a final order on the settlement by the end of 2026.

Fuel and purchased power cost recovery

In September 2026, Entergy Texas filed an application with the PUCT to reconcile its fuel and purchased power costs for the period from April 2024 through March 2026. During the reconciliation period, Entergy Texas incurred approximately $1.2 billion in eligible fuel and purchased power expenses to generate and purchase electricity to serve its customers, net of certain revenues credited to such expenses and other adjustments. Entergy Texas’s cumulative over-recovery balance for the reconciliation period was approximately $90.1 million, including interest, which Entergy Texas requested authority to carry over as part of the cumulative fuel balance for the subsequent reconciliation period beginning April 2026.

Capacity Cost Recovery Rider (CCRR)

In May 2026, Entergy Texas filed with the PUCT a request to establish a new CCRR. The new CCRR was designed to collect approximately $58 million annually from Entergy Texas’s retail customers based on Entergy Texas’s eligible capacity-related costs and revenues for the 12 months beginning June 1, 2026. The eligible capacity-related costs and revenues are associated with Entergy Texas’s participation in MISO’s annual planning resource auction. In July 2026 the PUCT approved the CCRR, consistent with Entergy Texas’s as-filed request, and rates became effective on July 10, 2026.

Frontier Power Purchase Agreement

In June 2026, Entergy Texas filed an application for PUCT pre-approval of a long-term 14-year PPA for 300 MW of capacity and energy from the Tenaska Frontier Generating Station, an 830 MW natural gas-fired combined-cycle combustion turbine plant in Grimes County, Texas. As a result of accelerated load growth in Texas and other factors in Entergy Texas’s service territory, Entergy Texas has a significant near- and long-term need for capacity and energy to serve its customers. Within the application, Entergy Texas requested the PUCT find that the PPA will satisfy Entergy Texas’s identified reliability needs in allowing for cost recovery of the associated purchased power. The 14-year PPA has a total estimated cost of $883 million. In September 2026 the ALJ with the State Office of Administrative Hearings adopted a procedural schedule with a hearing on the merits scheduled in October 2026. In October 2026, Entergy Texas filed on behalf of the parties a joint motion to abate the procedural schedule noting that the parties had reached a settlement in principle and the ALJ with the State Office of Administrative Hearings approved the joint motion to allow the parties time to finalize the settlement.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Texas’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$752,528$640,291$1,824,717$1,613,871
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale91,762142,264272,027263,392
Purchased power211,901114,286474,549371,784
Other operation and maintenance93,87190,278263,401248,551
Taxes other than income taxes37,15430,60499,70691,023
Depreciation and amortization80,17982,551241,054244,061
Other regulatory charges (credits) - net9,2605,35316,50811,197
TOTAL524,127465,3361,367,2451,230,008
OPERATING INCOME228,401174,955457,472383,863
OTHER INCOME
Allowance for equity funds used during construction24,25121,14862,56458,483
Interest and investment income4,80023013,8444,964
Miscellaneous - net284(2,426)(3,050)(6,057)
TOTAL29,33518,95273,35857,390
INTEREST EXPENSE
Interest expense50,37243,881139,241130,100
Allowance for borrowed funds used during construction(10,550)(9,010)(27,292)(24,897)
TOTAL39,82234,871111,949105,203
INCOME BEFORE INCOME TAXES217,914159,036418,881336,050
Income taxes41,08529,03075,36957,692
NET INCOME176,829130,006343,512278,358
Preferred dividend requirements5185181,5541,554
EARNINGS APPLICABLE TO COMMON STOCK$176,311$129,488$341,958$276,804
See Notes to Financial Statements.
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$343,512$278,358
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation and amortization241,054244,061
Deferred income taxes, tax credits, and non-current taxes accrued80,07650,978
Changes in assets and liabilities:
Receivables(61,244)(99,373)
Fuel inventory7,06014,598
Accounts payable33312,604
Taxes accrued(4,236)(3,689)
Interest accrued(8,128)(9,372)
Deferred fuel costs(39,500)(48,081)
Other working capital accounts(2,476)(23,657)
Provisions for estimated losses(2,646)2,652
Other regulatory assets(683)86,203
Other regulatory liabilities22,682(20,878)
Pension and other postretirement funded status(10,694)(10,012)
Other assets and liabilities(69,050)(61,317)
Net cash flow provided by operating activities496,060413,075
INVESTING ACTIVITIES
Construction expenditures(812,156)(1,313,129)
Allowance for equity funds used during construction62,56458,483
Proceeds from sale of assets—41,435
Changes in money pool receivable - net6,17618,504
Changes in securitization account(8,432)(6,322)
Net cash flow used in investing activities(751,848)(1,201,029)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt419,491493,616
Retirement of long-term debt(138,673)(9,359)
Repayment of accrued construction expenditures(248,322)—
Capital contribution from parent365,000—
Change in money pool payable - net—142,209
Preferred stock dividends paid(1,554)(1,554)
Other(2,743)(21,166)
Net cash flow provided by financing activities393,199603,746
Net increase (decrease) in cash and cash equivalents137,411(184,208)
Cash and cash equivalents at beginning of period275,108184,997
Cash and cash equivalents at end of period$412,519$789
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$141,469$136,763
Income taxes - net($3,275)$2,077
Noncash investing activities:
Accrued construction expenditures$58,858$154,965
See Notes to Financial Statements.
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$28$200
Temporary cash investments412,491274,908
Total cash and cash equivalents412,519275,108
Securitization recovery trust account9,9121,480
Accounts receivable:
Customer186,098107,287
Allowance for doubtful accounts(8,346)(8,598)
Associated companies31,22928,747
Other20,74167,400
Accrued unbilled revenues105,17580,503
Total accounts receivable334,897275,339
Deferred fuel costs28,147—
Fuel inventory - at average cost23,77330,833
Materials and supplies180,262190,322
Prepayments and other63,31749,161
TOTAL1,052,827822,243
OTHER PROPERTY AND INVESTMENTS
Investments in affiliates - at equity1456
Other15,72115,607
TOTAL15,73515,663
UTILITY PLANT
Electric9,759,8349,491,159
Construction work in progress2,150,3361,761,028
TOTAL UTILITY PLANT11,910,17011,252,187
Less - accumulated depreciation and amortization2,888,3762,764,308
UTILITY PLANT - NET9,021,7948,487,879
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $200,665 as of September 30, 2026 and $216,107 as of December 31, 2025)511,489510,806
Other211,934191,555
TOTAL723,423702,361
TOTAL ASSETS$10,813,779$10,028,146
See Notes to Financial Statements.
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$—$130,000
Accounts payable:
Associated companies65,53273,178
Other232,024518,613
Customer deposits45,06842,109
Taxes accrued82,94487,180
Interest accrued33,77941,907
Deferred fuel costs—11,353
Other20,91516,801
TOTAL480,262921,141
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued1,048,396947,067
Accumulated deferred investment tax credits6,0266,467
Regulatory liability for income taxes - net36,69557,755
Other regulatory liabilities182,711138,969
Asset retirement cost liabilities15,72215,097
Accumulated provisions10,91213,558
Long-term debt (includes securitization bonds of $212,738 as of September 30, 2026 and $221,139 as of December 31, 2025)4,313,1313,900,188
Other114,755129,693
TOTAL5,728,3485,208,794
Commitments and Contingencies
EQUITY
Common stock, no par value, authorized 200,000,000 shares; issued and outstanding 46,525,000 shares in 2026 and 202549,45249,452
Paid-in capital1,790,1251,425,125
Retained earnings2,726,8422,384,884
Total common shareholder's equity4,566,4193,859,461
Preferred stock without sinking fund38,75038,750
TOTAL4,605,1693,898,211
TOTAL LIABILITIES AND EQUITY$10,813,779$10,028,146
See Notes to Financial Statements.
ENTERGY TEXAS, INC. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Common Equity
Preferred StockCommon StockPaid-in CapitalRetained EarningsTotal
(In Thousands)
Balance at December 31, 2024$38,750$49,452$1,200,125$2,052,885$3,341,212
Net income———66,85666,856
Preferred stock dividends———(518)(518)
Balance at March 31, 202538,75049,4521,200,1252,119,2233,407,550
Net income———81,49681,496
Preferred stock dividends———(518)(518)
Balance at June 30, 202538,75049,4521,200,1252,200,2013,488,528
Net income———130,006130,006
Preferred stock dividends———(518)(518)
Balance at September 30, 2025$38,750$49,452$1,200,125$2,329,689$3,618,016
Balance at December 31, 2025$38,750$49,452$1,425,125$2,384,884$3,898,211
Net income———73,43573,435
Capital contribution from parent——365,000—365,000
Preferred stock dividends———(518)(518)
Balance at March 31, 202638,75049,4521,790,1252,457,8014,336,128
Net income———93,24893,248
Preferred stock dividends———(518)(518)
Balance at June 30, 202638,75049,4521,790,1252,550,5314,428,858
Net income———176,829176,829
Preferred stock dividends———(518)(518)
Balance at September 30, 2026$38,750$49,452$1,790,125$2,726,842$4,605,169
See Notes to Financial Statements.

SYSTEM ENERGY RESOURCES, INC.

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

System Energy’s principal asset consists of an ownership interest and a leasehold interest in Grand Gulf. The capacity and energy from its 90% interest is sold under the Unit Power Sales Agreement to its only three customers, Entergy Arkansas, Entergy Mississippi, and Entergy New Orleans. System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% interest in Grand Gulf pursuant to the Unit Power Sales Agreement. Payments under the Unit Power Sales Agreement are System Energy’s only source of operating revenues.

Results of Operations

Net Income

Third Quarter 2026 Compared to Third Quarter 2025

Net income increased $1.7 million primarily due to higher operating revenues resulting from changes in rate base.

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Net income increased $3.4 million primarily due to higher operating revenues resulting from changes in rate base.

Income Taxes

The effective income tax rates were 16.8% for the third quarter 2026 and 16.7% for the nine months ended September 30, 2026. The differences in the effective income tax rates for the third quarter 2026 and the nine months ended September 30, 2026 versus the federal statutory rate of 21% were primarily due to certain book and tax differences related to utility plant items, book and tax differences related to the allowance for equity funds used during construction, and the amortization of investment tax credits, partially offset by the accrual for state income taxes.

The effective income tax rate was 21.1% for the third quarter 2025. The difference in the effective income tax rate for the third quarter 2025 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, substantially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rate was 20.6% for the nine months ended September 30, 2025. The difference in the effective income tax rate for the nine months ended September 30, 2025 versus the federal statutory rate of 21% was primarily due to certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction, substantially offset by the accrual for state income taxes.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Liquidity and Capital Resources

Cash Flow

Cash flows for the nine months ended September 30, 2026 and 2025 were as follows:

20262025
(In Thousands)
Cash and cash equivalents at beginning of period$56$28,908
Net cash provided by (used in):
Operating activities255,537327,440
Investing activities(253,926)(146,126)
Financing activities29,792(82,435)
Net increase in cash and cash equivalents31,40398,879
Cash and cash equivalents at end of period$31,459$127,787

Operating Activities

Net cash flow provided by operating activities decreased $71.9 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to an increase of $30.3 million in spending on nuclear refueling outage costs in 2026 as compared to 2025 and the receipt of $68.8 million in proceeds from the transfer of 2025 nuclear production tax credits to third parties in 2026 as compared to the receipt of $98.7 million in proceeds from the transfer of 2024 nuclear production tax credits to third parties in 2025. See Note 10 to the financial statements herein and Note 3 to the financial statements in the Form 10-K for discussion of the nuclear production tax credits.

Investing Activities

Net cash flow used in investing activities increased $107.8 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 primarily due to an increase of $108.2 million in cash used as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, material and services deliveries, and the timing of cash payments during the nuclear fuel cycle and an increase of $49.2 million in nuclear construction expenditures primarily due to higher spending in 2026 on Grand Gulf outage projects and upgrades. The increase was partially offset by money pool activity and a decrease of $17.1 million in decommissioning trust fund investment activity.

Increases in System Energy’s receivable from the money pool are a use of cash flow, and System Energy’s receivable from the money pool increased $1.2 million for the nine months ended September 30, 2026 compared to increasing by $30.3 million for the nine months ended September 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Financing Activities

System Energy’s financing activities provided $29.8 million of cash for the nine months ended September 30, 2026 compared to using $82.4 million of cash for the nine months ended September 30, 2025 primarily due to the following activity:

  • the issuance of $80 million of 5.28% Series L notes by the System Energy nuclear fuel company variable interest entity in January 2026;

  • a decrease of $45 million in common stock dividends and distributions paid in 2026 in order to maintain System Energy’s capital structure;

  • net long-term borrowings of $1.5 million in 2026 compared to net repayments of $33.1 million in 2025 on the nuclear fuel company variable interest entity’s credit facility;

  • the repayment, prior to maturity, of $200 million of 2.14% Series mortgage bonds in June 2025;

  • the issuance of $240 million of 5.30% Series mortgage bonds in May 2025; and

  • money pool activity.

Decreases in System Energy’s payable to the money pool are a use of cash flow, and System Energy’s payable to the money pool decreased $16.3 million for the nine months ended September 30, 2026.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

System Energy’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for System Energy is primarily due to the net issuance of long-term debt in 2026.

September 30, 2026December 31, 2025
Debt to capital54.2%53.1%
Effect of subtracting cash(0.7%)—%
Net debt to net capital (non-GAAP)53.5%53.1%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings and long-term debt, including the currently maturing portion. Capital consists of debt and common equity. Net capital consists of capital less cash and cash equivalents. System Energy uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition. The net debt to net capital ratio is a non-GAAP measure. System Energy also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition because net debt indicates System Energy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of System Energy’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

System Energy is developing its capital investment plan for 2027 through 2030 and currently anticipates making the following construction and other capital investments during that period:

2027202820292030
(In Millions)
Planned construction and capital investments:
Generation$105$160$175$200
Utility Support10103015
Total$115$170$205$215

In addition to routine capital spending to maintain operations, the capital plan for System Energy includes amounts associated with Grand Gulf investments and initiatives. Estimated capital expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints and requirements, governmental policies and actions, including trade-related governmental actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, environmental regulations, business opportunities, market volatility, economic trends, business restructuring, changes in project plans, and the ability to access capital, including any changes to governmental programs, such as loans, grants, guarantees, and other subsidies. System Energy is not able to predict the effect of potential changes in regulation and law, changes to governmental programs, such as loans, grants, guarantees, and other subsidies, and governmental policies and actions, such as tariffs, executive orders, and other measures, including Executive Order 14421 and the Section 232 Proclamation, on its current and planned capital projects, including project delays, modifications, and cost increases.

System Energy’s receivables from or (payables to) the money pool were as follows:

September 30, 2026December 31, 2025September 30, 2025December 31, 2024
(In Thousands)
$1,238($16,299)$33,179$2,851

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

The System Energy nuclear fuel company variable interest entity has a credit facility in the amount of $120 million scheduled to expire in June 2029. As of September 30, 2026, $37.9 million in loans were outstanding under the System Energy nuclear fuel company variable interest entity credit facility. See Note 4 to the financial statements herein for additional discussion of the variable interest entity credit facility.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Federal Regulation

See the “Rate, Cost-recovery, and Other Regulation - Federal Regulation” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation. The following is an update to that discussion.

Unit Power Sales Agreement

See Note 2 to the financial statements in the Form 10-K for discussion of the Unit Power Sales Agreement. The following is an update to that discussion.

Pension Costs Amendment Proceeding

As discussed in the Form 10-K, in October 2021, System Energy submitted to the FERC proposed amendments to the Unit Power Sales Agreement to include in rate base the prepaid and accrued pension costs associated with System Energy’s qualified pension plans. In November 2025 the FERC issued an order approving System Energy’s proposed prepaid and accrued pension recovery mechanism. System Energy has been utilizing this methodology in billings since December 1, 2022 and will continue to utilize it going forward. As a result of the FERC’s order, System Energy did not owe any refunds. In December 2025 the APSC filed a request for rehearing of the November 2025 order. In January 2026 the FERC denied the APSC’s rehearing request by operation of law. In May 2026 the FERC issued a follow-up substantive order denying the APSC’s rehearing and sustaining its finding that no refunds are owed.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. Grand Gulf is currently in Column 2.

In April 2026 the NRC issued a final significance determination and notice of violation for Grand Gulf, in which it finalized a “white” finding with “low safety significance” related to one of Grand Gulf’s emergency diesel generators, resulting in Grand Gulf’s placement in Column 2, effective first quarter 2026.  In September 2026, Grand Gulf successfully completed an NRC supplemental inspection related to the emergency diesel generator issue. The NRC is expected to issue an inspection report in fourth quarter 2026 documenting Grand Gulf’s return to Column 1, effective third quarter 2026.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in System Energy’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

SYSTEM ENERGY RESOURCES, INC.
INCOME STATEMENTS
For the Three and Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Three Months EndedNine Months Ended
2026202520262025
(In Thousands)(In Thousands)
OPERATING REVENUES
Electric$162,108$148,071$449,426$433,740
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale20,83316,74851,18147,686
Nuclear refueling outage expenses6,4254,19415,39412,419
Other operation and maintenance54,08848,454142,692138,949
Decommissioning11,83511,36935,15233,770
Taxes other than income taxes6,7576,85519,93820,214
Depreciation and amortization31,39331,12593,67492,952
Other regulatory charges (credits) - net2404,42760,6382,047
TOTAL131,571123,172418,669348,037
OPERATING INCOME30,53724,89930,75785,703
OTHER INCOME
Allowance for equity funds used during construction1,2932,1365,0525,620
Interest and investment income13,11917,40498,87140,515
Miscellaneous - net301(537)853(244)
TOTAL14,71319,003104,77645,891
INTEREST EXPENSE
Interest expense18,36217,99755,33051,289
Allowance for borrowed funds used during construction(784)(1,045)(3,031)(2,754)
TOTAL17,57816,95252,29948,535
INCOME BEFORE INCOME TAXES27,67226,95083,23483,059
Income taxes4,6605,67913,87917,074
NET INCOME$23,012$21,271$69,355$65,985
See Notes to Financial Statements.

(Page left blank intentionally)

SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF CASH FLOWS
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
20262025
(In Thousands)
OPERATING ACTIVITIES
Net income$69,355$65,985
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization169,734168,382
Deferred income taxes, tax credits, and non-current taxes accrued82,807116,094
Changes in assets and liabilities:
Receivables13,187(4,282)
Accounts payable(1,872)(7,745)
Taxes accrued(5,251)(6,387)
Interest accrued8,5167,533
Other working capital accounts(37,322)(205)
Other regulatory assets53,350(4,319)
Other regulatory liabilities(15,142)131,917
Pension and other postretirement funded status(9,807)(9,882)
Other assets and liabilities(72,018)(129,651)
Net cash flow provided by operating activities255,537327,440
INVESTING ACTIVITIES
Construction expenditures(135,843)(90,616)
Allowance for equity funds used during construction5,0525,620
Nuclear fuel purchases(145,799)(46,290)
Proceeds from sale of nuclear fuel34,88943,555
Proceeds from nuclear decommissioning trust fund sales656,497504,710
Investment in nuclear decommissioning trust funds(667,484)(532,777)
Changes in money pool receivable - net(1,238)(30,328)
Net cash flow used in investing activities(253,926)(146,126)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt476,084655,455
Retirement of long-term debt(394,840)(657,890)
Change in money pool payable - net(16,299)—
Common stock dividends and distributions paid(35,000)(80,000)
Other(153)—
Net cash flow provided by (used in) financing activities29,792(82,435)
Net increase in cash and cash equivalents31,40398,879
Cash and cash equivalents at beginning of period5628,908
Cash and cash equivalents at end of period$31,459$127,787
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$49,050$43,179
Income taxes - net (includes proceeds from the transfer of production tax credits to third parties of $68,855 in 2026 and $98,722 in 2025)($68,855)($98,722)
Noncash investing activities:
Accrued construction expenditures$15,598$6,716
See Notes to Financial Statements.
SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
ASSETS
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT ASSETS
Cash and cash equivalents:
Cash$106$56
Temporary cash investments31,353—
Total cash and cash equivalents31,45956
Accounts receivable:
Associated companies55,04265,083
Other4,9256,833
Total accounts receivable59,96771,916
Materials and supplies153,276149,847
Deferred nuclear refueling outage costs40,1979,096
Prepayments and other12,8515,101
TOTAL297,750236,016
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,822,3631,730,722
TOTAL1,822,3631,730,722
UTILITY PLANT
Electric5,869,1845,753,963
Construction work in progress104,527123,172
Nuclear fuel258,580208,932
TOTAL UTILITY PLANT6,232,2916,086,067
Less - accumulated depreciation and amortization3,733,8733,679,886
UTILITY PLANT - NET2,498,4182,406,181
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets547,835601,185
Other43,25134,301
TOTAL591,086635,486
TOTAL ASSETS$5,209,617$5,008,405
See Notes to Financial Statements.
SYSTEM ENERGY RESOURCES, INC.
BALANCE SHEETS
LIABILITIES AND EQUITY
September 30, 2026 and December 31, 2025
(Unaudited)
20262025
(In Thousands)
CURRENT LIABILITIES
Currently maturing long-term debt$90,218$140
Accounts payable:
Associated companies12,11025,528
Other35,22166,611
Taxes accrued6,43411,685
Interest accrued21,73113,215
Other4,3684,089
TOTAL170,082121,268
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued723,505625,165
Accumulated deferred investment tax credits41,93543,045
Regulatory liability for income taxes - net91,85299,960
Other regulatory liabilities890,267897,301
Decommissioning1,208,1191,172,967
Long-term debt1,083,2361,088,563
Other6,1322
TOTAL4,045,0463,927,003
Commitments and Contingencies
COMMON EQUITY
Common stock, no par value, authorized 1,000,000 shares; issued and outstanding 789,350 shares in 2026 and 2025908,944908,944
Retained earnings85,54551,190
TOTAL994,489960,134
TOTAL LIABILITIES AND EQUITY$5,209,617$5,008,405
See Notes to Financial Statements.
SYSTEM ENERGY RESOURCES, INC.
STATEMENTS OF CHANGES IN COMMON EQUITY
For the Nine Months Ended September 30, 2026 and 2025
(Unaudited)
Common StockRetained EarningsTotal
(In Thousands)
Balance at December 31, 2024$958,944$13,095$972,039
Net income—23,38923,389
Common stock dividends and distributions(20,000)(15,000)(35,000)
Balance at March 31, 2025938,94421,484960,428
Net income—21,32521,325
Common stock dividends and distributions(30,000)(10,000)(40,000)
Balance at June 30, 2025908,94432,809941,753
Net income—21,27121,271
Common stock dividends and distributions—(5,000)(5,000)
Balance at September 30, 2025$908,944$49,080$958,024
Balance at December 31, 2025$908,944$51,190$960,134
Net income—23,01623,016
Balance at March 31, 2026908,94474,206983,150
Net income—23,32723,327
Balance at June 30, 2026908,94497,5331,006,477
Net income—23,01223,012
Common stock dividends and distributions—(35,000)(35,000)
Balance at September 30, 2026$908,944$85,545$994,489
See Notes to Financial Statements.

ENTERGY CORPORATION AND SUBSIDIARIES

PART II. OTHER INFORMATION

Previous: Item 3. Quantitative and Qualitative Disclosures About Market Risk · Next: Item 1. Legal Proceedings