Item 2. PROPERTIES
20K characters. Original on sec.gov ·
Item 2. PROPERTIES
Generation
The following table presents Generation’s interests in net electric generating capacity by station at December 31, 2019:
| Station**(a)** | Location | No. of Units | Percent Owned**(b)** | Primary Fuel Type | Primary Dispatch Type**(c)** | Net Generation Capacity (MW)****(d) | |||||
| Midwest | |||||||||||
| Braidwood | Braidwood, IL | 2 | Uranium | Base-load | 2,386 | ||||||
| Byron | Byron, IL | 2 | Uranium | Base-load | 2,347 | ||||||
| LaSalle | Seneca, IL | 2 | Uranium | Base-load | 2,320 | ||||||
| Dresden | Morris, IL | 2 | Uranium | Base-load | 1,845 | ||||||
| Quad Cities | Cordova, IL | 2 | 75 | Uranium | Base-load | 1,403 | (e) | ||||
| Clinton | Clinton, IL | 1 | Uranium | Base-load | 1,069 | ||||||
| Michigan Wind 2 | Sanilac Co., MI | 50 | 51 | (g) | Wind | Base-load | 46 | (e) | |||
| Beebe | Gratiot Co., MI | 34 | 51 | (g) | Wind | Base-load | 42 | (e) | |||
| Michigan Wind 1 | Huron Co., MI | 46 | 51 | (g) | Wind | Base-load | 35 | (e) | |||
| Harvest 2 | Huron Co., MI | 33 | 51 | (g) | Wind | Base-load | 30 | (e) | |||
| Harvest | Huron Co., MI | 32 | 51 | (g) | Wind | Base-load | 27 | (e) | |||
| Beebe 1B | Gratiot Co., MI | 21 | 51 | (g) | Wind | Base-load | 26 | (e) | |||
| Ewington | Jackson Co., MN | 10 | 99 | Wind | Base-load | 20 | (e) | ||||
| City Solar | Chicago, IL | 1 | Solar | Base-load | 9 | ||||||
| Solar Ohio | Toledo, OH | 2 | Solar | Base-load | 4 | ||||||
| Blue Breezes | Faribault Co., MN | 2 | Wind | Base-load | 3 | ||||||
| CP Windfarm | Faribault Co., MN | 2 | 51 | (g) | Wind | Base-load | 2 | (e) | |||
| Southeast Chicago | Chicago, IL | 8 | Gas | Peaking | 296 | (k) | |||||
| Clinton Battery Storage | Blanchester, OH | 1 | Energy Storage | Peaking | 10 | ||||||
| Total Midwest | 11,920 | ||||||||||
| Mid-Atlantic | |||||||||||
| Limerick | Sanatoga, PA | 2 | Uranium | Base-load | 2,317 | ||||||
| Peach Bottom | Delta, PA | 2 | 50 | Uranium | Base-load | 1,324 | (e) | ||||
| Salem | Lower Alloways Creek Township, NJ | 2 | 42.59 | Uranium | Base-load | 998 | (e) | ||||
| Calvert Cliffs | Lusby, MD | 2 | 50.01 | (f) | Uranium | Base-load | 895 | (e) | |||
| Conowingo | Darlington, MD | 11 | Hydroelectric | Base-load | 572 | ||||||
| Criterion | Oakland, MD | 28 | 51 | (g) | Wind | Base-load | 36 | (e) | |||
| Fair Wind | Garrett County, MD | 12 | Wind | Base-load | 30 | ||||||
| Solar MC | Various, MD | 41 | Solar | Base-load | 39 | ||||||
| Fourmile Ridge | Garrett County, MD | 16 | 51 | (g) | Wind | Base-load | 20 | (e) |
| Station**(a)** | Location | No. of Units | Percent Owned**(b)** | Primary Fuel Type | Primary Dispatch Type**(c)** | Net Generation Capacity (MW)****(d) | |||||
| Solar New Jersey 1 | Various, NJ | 5 | Solar | Base-load | 18 | ||||||
| Solar New Jersey 2 | Various, NJ | 2 | Solar | Base-load | 11 | ||||||
| Solar Horizons | Emmitsburg, MD | 1 | 51 | (g) | Solar | Base-load | 8 | (e) | |||
| Solar Maryland | Various, MD | 11 | Solar | Base-load | 8 | ||||||
| Solar Maryland 2 | Various, MD | 3 | Solar | Base-load | 8 | ||||||
| JBAB Solar | District of Columbia | 4 | Solar | Base-load | 7 | ||||||
| Gateway Solar | Berlin, MD | 1 | Solar | Base-load | 7 | ||||||
| Constellation New Energy | Gaithersburg, MD | 3 | Solar | Base-load | 6 | ||||||
| Solar Federal | Trenton, NJ | 1 | Solar | Base-load | 5 | ||||||
| Solar New Jersey 3 | Middle Township, NJ | 5 | 51 | (g) | Solar | Base-load | 1 | (e) | |||
| Solar DC | District of Columbia | 1 | Solar | Base-load | 1 | ||||||
| Muddy Run | Drumore, PA | 8 | Hydroelectric | Intermediate | 1,070 | ||||||
| Eddystone 3, 4 | Eddystone, PA | 2 | Oil/Gas | Peaking | 760 | ||||||
| Perryman | Aberdeen, MD | 5 | Oil/Gas | Peaking | 404 | ||||||
| Croydon | West Bristol, PA | 8 | Oil | Peaking | 391 | ||||||
| Handsome Lake | Kennerdell, PA | 5 | Gas | Peaking | 268 | ||||||
| Notch Cliff | Baltimore, MD | 8 | Gas | Peaking | 117 | (j) | |||||
| Westport | Baltimore, MD | 1 | Gas | Peaking | 116 | (j) | |||||
| Richmond | Philadelphia, PA | 2 | Oil | Peaking | 98 | ||||||
| Philadelphia Road | Baltimore, MD | 4 | Oil | Peaking | 61 | ||||||
| Eddystone | Eddystone, PA | 4 | Oil | Peaking | 60 | ||||||
| Fairless Hills | Fairless Hills, PA | 2 | Landfill Gas | Peaking | 60 | (j) | |||||
| Delaware | Philadelphia, PA | 4 | Oil | Peaking | 56 | ||||||
| Southwark | Philadelphia, PA | 4 | Oil | Peaking | 52 | ||||||
| Falls | Morrisville, PA | 3 | Oil | Peaking | 51 | ||||||
| Moser | Lower PottsgroveTwp., PA | 3 | Oil | Peaking | 51 | ||||||
| Chester | Chester, PA | 3 | Oil | Peaking | 39 | ||||||
| Schuylkill | Philadelphia, PA | 2 | Oil | Peaking | 30 | ||||||
| Salem | Lower Alloways Creek Township, NJ | 1 | 42.59 | Oil | Peaking | 16 | (e) | ||||
| Pennsbury | Morrisville, PA | 2 | Landfill Gas | Peaking | 4 | (e) | |||||
| Total Mid-Atlantic | 10,015 | ||||||||||
| ERCOT | |||||||||||
| Whitetail | Webb County, TX | 57 | 51 | (g) | Wind | Base-load | 46 | (e) | |||
| Sendero | Jim Hogg and Zapata County, TX | 39 | 51 | (g) | Wind | Base-load | 40 | (e) |
| Station**(a)** | Location | No. of Units | Percent Owned**(b)** | Primary Fuel Type | Primary Dispatch Type**(c)** | Net Generation Capacity (MW)****(d) | |||||
| Constellation Solar Texas | Various, TX | 11 | Solar | Base-load | 13 | ||||||
| Colorado Bend II | Wharton, TX | 3 | Gas | Intermediate | 1,140 | ||||||
| Wolf Hollow II | Granbury, TX | 3 | Gas | Intermediate | 1,115 | ||||||
| Handley 3 | Fort Worth, TX | 1 | Gas | Intermediate | 395 | ||||||
| Handley 4, 5 | Fort Worth, TX | 2 | Gas | Peaking | 870 | ||||||
| Total ERCOT | 3,619 | ||||||||||
| New York | |||||||||||
| Nine Mile Point | Scriba, NY | 2 | 50.01 | (f) | Uranium | Base-load | 838 | (e) | |||
| FitzPatrick | Scriba, NY | 1 | Uranium | Base-load | 842 | ||||||
| Ginna | Ontario, NY | 1 | 50.01 | (f) | Uranium | Base-load | 288 | (e) | |||
| Solar New York | Bethlehem, NY | 1 | Solar | Base-load | 3 | ||||||
| Total New York | 1,971 | ||||||||||
| Other | |||||||||||
| Antelope Valley | Lancaster, CA | 1 | Solar | Base-load | 242 | ||||||
| Bluestem | Beaver County, OK | 60 | 51 | (g)(h) | Wind | Base-load | 101 | (e) | |||
| Shooting Star | Kiowa County, KS | 65 | 51 | (g) | Wind | Base-load | 53 | (e) | |||
| Albany Green Energy | Albany, GA | 1 | 99 | (i) | Biomass | Base-load | 53 | ||||
| Solar Arizona | Various, AZ | 127 | Solar | Base-load | 46 | ||||||
| Bluegrass Ridge | King City, MO | 27 | 51 | (g) | Wind | Base-load | 29 | (e) | |||
| California PV Energy 2 | Various, CA | 90 | Solar | Base-load | 28 | ||||||
| Conception | Barnard, MO | 24 | 51 | (g) | Wind | Base-load | 26 | (e) | |||
| Cow Branch | Rock Port, MO | 24 | 51 | (g) | Wind | Base-load | 26 | (e) | |||
| Solar Arizona 2 | Various, AZ | 56 | Solar | Base-load | 34 | ||||||
| California PV Energy | Various, CA | 53 | Solar | Base-load | 21 | ||||||
| Mountain Home | Glenns Ferry, ID | 20 | 51 | (g) | Wind | Base-load | 21 | (e) | |||
| High Mesa | Elmore Co., ID | 19 | 51 | (g) | Wind | Base-load | 20 | (e) | |||
| Echo 1 | Echo, OR | 21 | 50.49 | (g) | Wind | Base-load | 17 | (e) | |||
| Sacramento PV Energy | Sacramento, CA | 4 | 51 | (g) | Solar | Base-load | 15 | (e) | |||
| Cassia | Buhl, ID | 14 | 51 | (g) | Wind | Base-load | 15 | (e) | |||
| Wildcat | Lovington, NM | 13 | 51 | (g) | Wind | Base-load | 14 | (e) | |||
| Echo 2 | Echo, OR | 10 | 51 | (g) | Wind | Base-load | 10 | (e) | |||
| High Plains | Panhandle, TX | 8 | 99.5 | Wind | Base-load | 10 | (e) | ||||
| Solar Georgia 2 | Various, GA | 8 | Solar | Base-load | 10 | ||||||
| Tuana Springs | Hagerman, ID | 8 | 51 | (g) | Wind | Base-load | 9 | (e) | |||
| Solar Georgia | Various, GA | 10 | Solar | Base-load | 8 | ||||||
| Greensburg | Greensburg, KS | 10 | 51 | (g) | Wind | Base-load | 7 | (e) | |||
| Solar Massachusetts | Various, MA | 10 | Solar | Base-load | 7 | ||||||
| Outback Solar | Christmas Valley, OR | 1 | Solar | Base-load | 6 | ||||||
| Echo 3 | Echo, OR | 6 | 50.49 | (g) | Wind | Base-load | 5 | (e) |
| Station**(a)** | Location | No. of Units | Percent Owned**(b)** | Primary Fuel Type | Primary Dispatch Type**(c)** | Net Generation Capacity (MW)****(d) | |||||
| Holyoke Solar | Various, MA | 2 | Solar | Base-load | 5 | ||||||
| Three Mile Canyon | Boardman, OR | 6 | 51 | (g) | Wind | Base-load | 5 | (e) | |||
| Loess Hills | Rock Port, MO | 4 | Wind | Base-load | 5 | ||||||
| California PV Energy 3 | Various, CA | 19 | Solar | Base-load | 6 | ||||||
| Mohave Sunrise Solar | Fort Mohave, AZ | 1 | Solar | Base-load | 5 | ||||||
| Denver Airport Solar | Denver, CO | 1 | 51 | (g) | Solar | Base-load | 2 | (e) | |||
| Solar Net Metering | Uxbridge, MA | 1 | Solar | Base-load | 2 | ||||||
| Solar Connecticut | Various, CT | 1 | Solar | Base-load | 1 | ||||||
| Mystic 8, 9 | Charlestown, MA | 6 | Gas | Intermediate | 1,417 | ||||||
| Hillabee | Alexander City, AL | 3 | Gas | Intermediate | 753 | ||||||
| Mystic 7 | Charlestown, MA | 1 | Oil/Gas | Intermediate | 542 | (j) | |||||
| Wyman 4 | Yarmouth, ME | 1 | 5.9 | Oil | Intermediate | 35 | (e) | ||||
| Grand Prairie | Alberta, Canada | 1 | Gas | Peaking | 105 | ||||||
| West Medway | West Medway, MA | 3 | Oil | Peaking | 123 | ||||||
| West Medway II | West Medway, MA | 2 | Oil/Gas | Peaking | 190 | ||||||
| Framingham | Framingham, MA | 3 | Oil | Peaking | 31 | ||||||
| Mystic Jet | Charlestown, MA | 1 | Oil | Peaking | 9 | (j) | |||||
| Total Other | 4,069 | ||||||||||
| Total | 31,594 |
| (a) | All nuclear stations are boiling water reactors except Braidwood, Byron, Calvert Cliffs, Ginna, and Salem, which are pressurized water reactors. |
| (b) | 100%, unless otherwise indicated. |
| (c) | Base-load units are plants that normally operate to take all or part of the minimum continuous load of a system and, consequently, produce electricity at an essentially constant rate. Intermediate units are plants that normally operate to take load of a system during the daytime higher load hours and, consequently, produce electricity by cycling on and off daily. Peaking units consist of lower-efficiency, quick response steam units, gas turbines and diesels normally used during the maximum load periods. |
| (d) | For nuclear stations, capacity reflects the annual mean rating. Fossil stations reflect a summer rating. Wind and solar facilities reflect name plate capacity. |
| (e) | Net generation capacity is stated at proportionate ownership share. |
| (f) | Reflects Generation’s interest in CENG, a joint venture with EDF. See ITEM 1. — BUSINESS — Exelon Generation Company, LLC — Nuclear Facilities for additional information. |
| (g) | Reflects the prior sale of 49% of EGRP to a third party. See Note 22 — Variable Interest Entities of the Combined Notes to Consolidated Financial Statements for additional information. |
| (h) | EGRP owns 100% of the Class A membership interests and a tax equity investor owns 100% of the Class B membership interests of the entity that owns the Bluestem generating assets. |
| (i) | Generation directly owns a 50% interest in the Albany Green Energy station and an additional 49% through the consolidation of a Variable Interest Entity. |
| (j) | Generation has plans to retire and cease generation operations at certain plants in 2020 and 2021. |
| (k) | Generation has deactivated the site and is evaluating for potential return of service or retirement in 2020. |
The net generation capability available for operation at any time may be less due to regulatory restrictions, transmission congestion, fuel restrictions, efficiency of cooling facilities, level of water supplies or generating units being temporarily out of service for inspection, maintenance, refueling, repairs or modifications required by regulatory authorities.
Generation maintains property insurance against loss or damage to its principal plants and properties by fire or other perils, subject to certain exceptions. For additional information regarding nuclear insurance of generating
facilities, see ITEM 1. BUSINESS — Exelon Generation Company, LLC. For its insured losses, Generation is self-insured to the extent that any losses are within the policy deductible or exceed the amount of insurance maintained. Any such losses could have a material adverse effect in Generation’s consolidated financial condition or results of operations.
The Utility Registrants
The Utility Registrants electric substations and a portion of their transmission rights are located on property that they own. A significant portion of their electric transmission and distribution facilities are located above or underneath highways, streets, other public places or property that others own. The Utility Registrants believe that they have satisfactory rights to use those places or property in the form of permits, grants, easements, licenses and franchise rights; however, they have not necessarily undertaken to examine the underlying title to the land upon which the rights rest.
Transmission and Distribution
The Utility Registrants’ high voltage electric transmission lines owned and in service at December 31, 2019 were as follows:
| Voltage | Circuit Miles | |||||||||||
| (Volts) | ComEd | PECO | BGE | Pepco | DPL | ACE | ||||||
| 765,000 | 90 | — | — | — | — | — | ||||||
| 500,000(a) | — | 188 | (a) | 216 | 109 | 16 | (a) | — | (a) | |||
| 345,000 | 2,716 | — | — | — | — | — | ||||||
| 230,000 | — | 549 | 358 | 769 | 472 | 274 | ||||||
| 138,000 | 2,224 | 135 | 55 | 50 | 586 | 209 | ||||||
| 115,000 | — | — | 705 | 25 | — | — | ||||||
| 69,000 | — | 177 | — | — | 569 | 661 |
| (a) | In addition, PECO, DPL, and ACE have an ownership interest located in Delaware and New Jersey. See Note 8 - Jointly Owned Electric Utility Plant - for additional information. |
The Utility Registrant’s electric distribution system includes the following number of circuit miles of overhead and underground lines:
| Circuit Miles | ComEd | PECO | BGE | Pepco | DPL | ACE | |
| Overhead | 35,385 | 12,964 | 9,176 | 4,104 | 6,010 | 7,350 | |
| Underground | 31,799 | 9,417 | 17,489 | 6,993 | 6,316 | 2,942 |
Gas
The following table presents PECO’s, BGE’s and DPL’s natural gas pipeline miles at December 31, 2019:
| PECO | BGE | DPL | ||
| Transmission | 9 | 161 | 8 | (a) |
| Distribution | 6,932 | 7,386 | 2,114 | |
| Service piping | 6,414 | 6,345 | 1,447 | |
| Total | 13,355 | 13,892 | 3,569 |
| (a) | DPL has a 10% undivided interest in approximately 8 miles of natural gas transmission mains located in Delaware which are used by DPL for its natural gas operations and by 90% owner for distribution of natural gas to its electric generating facilities. |
The following table presents PECO’s, BGE’s and DPL’s natural gas facilities:
| Registrant | Facility | Location | Storage Capacity (mmcf) | Send-out or Peaking Capacity (mmcf/day) |
| PECO | LNG Facility | West Conshohocken, PA | 1,200 | 160 |
| PECO | Propane Air Plant | Chester, PA | 105 | 25 |
| BGE | LNG Facility | Baltimore, MD | 1,056 | 332 |
| BGE | Propane Air Plant | Baltimore, MD | 550 | 85 |
| DPL | LNG Facility | Wilmington, DE | 250 | 25 |
PECO, BGE and DPL also own 30, 32, and 10 natural gas city gate stations and direct pipeline customer delivery points at various locations throughout their gas service territory, respectively.
First Mortgage and Insurance
The principal properties of ComEd, PECO, PEPCO, DPL, and ACE are subject to the lien of their respective Mortgages under which their respective First Mortgage Bonds are issued. See Note 16 — Debt and Credit Agreements of the Combined Notes to Consolidated Financial Statements for additional information.
The Utility Registrants maintain property insurance against loss or damage to their properties by fire or other perils, subject to certain exceptions. For their insured losses, the Utility Registrants are self-insured to the extent that any losses are within the policy deductible or exceed the amount of insurance maintained. Any such losses could have a material adverse effect in the consolidated financial condition or results of operations of the Utility Registrants.
Exelon
Security Measures
The Registrants have initiated and work to maintain security measures. On a continuing basis, the Registrants evaluate enhanced security measures at certain critical locations, enhanced response and recovery plans, long-term design changes and redundancy measures. Additionally, the energy industry has strategic relationships with governmental authorities to ensure that emergency plans are in place and critical infrastructure vulnerabilities are addressed in order to maintain the reliability of the country’s energy systems.
Previous: Item 1B. UNRESOLVED STAFF COMMENTS · Next: Item 3. LEGAL PROCEEDINGS