Item 2. PROPERTIES
4K characters. Original on sec.gov · Markdown
Item 2. PROPERTIES
The first mortgage indentures for the Ohio Companies, Penn, MP, PE and WP constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures. See Note 9, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Utilities’ properties.
FirstEnergy controls the following generation sources as of December 31, 2021, shown in the table below, and operates in PJM. Except for the OVEC participation referenced in the footnotes to the table, the Regulated Distribution segment generating units are owned by MP.
| Plant (Location) | Unit | Total | Corp/Other | Regulated Distribution | ||||||||||||||||||||||
| Net Demonstrated Capacity (MW) | ||||||||||||||||||||||||||
| Super-critical Coal-fired: | ||||||||||||||||||||||||||
| Harrison (Haywood, WV) | 1-3 | 1,984 | — | 1,984 | ||||||||||||||||||||||
| Fort Martin (Maidsville, WV) | 1-2 | 1,098 | — | 1,098 | ||||||||||||||||||||||
| 3,082 | — | 3,082 | ||||||||||||||||||||||||
| Sub-critical and Other Coal-fired: | ||||||||||||||||||||||||||
| OVEC (Cheshire, OH) (Madison, IN) | 1-11 | 78 | (1) | 67 | 11 | |||||||||||||||||||||
| Pumped-storage Hydro: | ||||||||||||||||||||||||||
| Bath County (Warm Springs, VA) | 1-6 | 487 | (2) | — | 487 | |||||||||||||||||||||
| Total | 3,647 | 67 | 3,580 |
(1)Represents AE Supply's 3.01% and MP's 0.49% entitlement based on their participation in OVEC.
(2)Represents AGC's 16.25% undivided interest in Bath County. The station is operated by VEPCO.
As of December 31, 2021, FirstEnergy’s distribution and transmission circuit miles are located in PJM and were as follows:
| Distribution Line Miles**(1)** | Transmission Line Miles | |||||||||||||||||||
| ATSI | — | 7,916 | ||||||||||||||||||
| CEI | 33,066 | — | ||||||||||||||||||
| JCP&L | 23,950 | 2,601 | ||||||||||||||||||
| MAIT | — | 4,267 | ||||||||||||||||||
| ME | 19,072 | — | ||||||||||||||||||
| MP | 22,707 | 2,619 | ||||||||||||||||||
| OE | 68,002 | — | ||||||||||||||||||
| PE | 20,696 | 2,087 | ||||||||||||||||||
| Penn | 13,673 | — | ||||||||||||||||||
| PN | 27,766 | — | ||||||||||||||||||
| TE | 19,189 | — | ||||||||||||||||||
| TrAIL | — | 262 | ||||||||||||||||||
| WP | 25,174 | 4,322 | ||||||||||||||||||
| Total | 273,295 | 24,074 |
(1) Includes overhead pole line and underground conduit carrying primary, secondary and street lighting circuits