Cover and table of contents

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-K

(Mark One)

☑ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the FISCAL YEAR ended December 31, 2024

OR

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from ___________________ to ___________________

FE Logo.jpg

CommissionRegistrant; State of Incorporation;I.R.S. Employer
File NumberAddress; and Telephone NumberIdentification No.
333-21011FIRSTENERGY CORP34-1843785
(AnOhioCorporation)
76 South Main Street
AkronOH44308
Telephone(800)736-3402

SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:

Title of Each ClassTrading SymbolName of Each Exchange on Which Registered
Common Stock, $0.10 par value per shareFENew York Stock Exchange

SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT:

None.

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes☐No☑

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Yes☐No☑

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes☑No☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Yes☑No☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and "emerging growth company" in Rule 12b-2 of the Exchange Act.

Large Accelerated Filer☑
Accelerated Filer☐
Non-accelerated Filer☐
Smaller Reporting Company☐
Emerging Growth Company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☑

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).

Yes☐No☑

State the aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the price at which the common equity was last sold, or the average bid and asked price of such common equity, as of the last business day of the registrant’s most recently completed second fiscal quarter.

$22,003,636,801 as of June 30, 2024

Indicate the number of shares outstanding of each of the registrant’s classes of common stock, as of the latest practicable date:

CLASSAS OF JANUARY 31, 2025
Common Stock, $0.10 par value576,697,425

Documents Incorporated By Reference

PART OF FORM 10-K INTO WHICH
DOCUMENTDOCUMENT IS INCORPORATED
Portions of the Definitive Proxy Statement for the 2025 Annual Meeting of Shareholders of FirstEnergy Corp. to be held May 21, 2025.Part III

TABLE OF CONTENTS

Page
Glossary of Termsiii
Part I
Item 1. Business1
The Companies1
Capital Requirements4
Supply Plan4
System Demand5
Regional Reliability5
Competition5
Seasonality5
Human Capital5
Information About Our Executive Officers8
FirstEnergy Website and Other Social Media Sites and Applications9
Item 1A. Risk Factors10
Item 1B. Unresolved Staff Comments24
Item 1C. Cybersecurity24
Item 2. Properties26
Item 3. Legal Proceedings28
Item 4. Mine Safety Disclosures28
Part II29
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities29
Item 6. [Reserved]29
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations30
Item 7A. Quantitative and Qualitative Disclosures About Market Risk88
Item 8. Financial Statements and Supplementary Data88
Report of Independent Registered Public Accounting Firm89
Financial Statements
Consolidated Statements of Income91
Consolidated Statements of Comprehensive Income92
Consolidated Balance Sheets93
Consolidated Statements of Stockholders' Equity94
Consolidated Statements of Cash Flows95
Notes to Consolidated Financial Statements96
Item 9. Changes In and Disagreements with Accountants on Accounting and Financial Disclosure149
Item 9A. Controls and Procedures149
Item 9B. Other Information149

i

Item 9C. Disclosure Regarding Foreign Jurisdictions That Prevent Inspections149
Part III149
Item 10. Directors, Executive Officers and Corporate Governance149
Item 11. Executive Compensation150
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters150
Item 13. Certain Relationships and Related Transactions, and Director Independence150
Item 14. Principal Accountant Fees and Services151
Part IV151
Item 15. Exhibit and Financial Statement Schedules151
Item 16. Form 10-K Summary156

ii

GLOSSARY OF TERMS

The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:

AE SupplyAllegheny Energy Supply Company, LLC, an unregulated generation subsidiary of FE
AGCAllegheny Generating Company, a generation subsidiary of MP
ATSIAmerican Transmission Systems, Incorporated, a transmission subsidiary of FET
CEIThe Cleveland Electric Illuminating Company, an Ohio electric utility subsidiary of FE
Electric CompaniesOE, CEI, TE, JCP&L, MP, PE and FE PA (as successor-in-interest to Penn, ME, PN and WP)
FEFirstEnergy Corp., a public utility holding company
FENOCEnergy Harbor Nuclear Corp. (formerly known as FirstEnergy Nuclear Operating Company), a subsidiary of EH, which operates EH’s nuclear generating facilities
FE PAFirstEnergy Pennsylvania Electric Company, a Pennsylvania electric utility subsidiary of FirstEnergy Pennsylvania Holding Company LLC, a wholly owned subsidiary of FE
FESEnergy Harbor LLC (formerly known as FirstEnergy Solutions Corp.), a subsidiary of EH, which provides energy-related products and services
FESCFirstEnergy Service Company, which provides legal, financial, and other corporate support services
FES DebtorsFENOC, FES, and FES’ subsidiaries as of March 31, 2018
FETFirstEnergy Transmission, LLC a consolidated VIE of FE, and the parent company of ATSI, MAIT and TrAIL, and having a joint venture in PATH
FEVFirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FirstEnergyFirstEnergy Corp., together with its consolidated subsidiaries
Global HoldingGlobal Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
JCP&LJersey Central Power & Light Company, a New Jersey electric utility subsidiary of FE
KATCoKeystone Appalachian Transmission Company, a transmission subsidiary of FE
MAITMid-Atlantic Interstate Transmission, LLC, a transmission subsidiary of FET
MEMetropolitan Edison Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024
MPMonongahela Power Company, a West Virginia electric utility subsidiary of FE
OEOhio Edison Company, an Ohio electric utility subsidiary of FE
Ohio CompaniesCEI, OE and TE
PATHPotomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-AlleghenyPATH Allegheny Transmission Company, LLC
PATH-WVPATH West Virginia Transmission Company, LLC
PEThe Potomac Edison Company, a Maryland and West Virginia electric utility subsidiary of FE
PennPennsylvania Power Company, a former Pennsylvania electric utility subsidiary of OE, which merged with and into FE PA on January 1, 2024
Pennsylvania CompaniesME, PN, Penn and WP, each of which merged with and into FE PA on January 1, 2024
PNPennsylvania Electric Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024
Signal PeakSignal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TEThe Toledo Edison Company, an Ohio electric utility subsidiary of FE
TrAILTrans-Allegheny Interstate Line Company, a transmission subsidiary of FET
Transmission CompaniesATSI, KATCo, MAIT and TrAIL
WPWest Penn Power Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024

iii

The following abbreviations and acronyms are used to identify frequently used terms in this report:
2021 Credit FacilitiesCollectively, the six separate senior unsecured five-year syndicated revolving credit facilities entered into by FE, the Electric Companies and the Transmission Companies, on October 18, 2021, as amended through October 24, 2024
2023 Credit FacilitiesCollectively, the FET Revolving Facility and KATCo Revolving Facility
2026 Convertible NotesFE's 4.00% convertible senior notes, due 2026
2031 NotesFE’s 7.375% Notes, Series C, due 2031
A&R FET LLC AgreementFourth Amended and Restated Limited Liability Company Operating Agreement of FET
ACEAffordable Clean Energy
AEPAmerican Electric Power Company, Inc.
AFSAvailable-for-sale
AFSIAdjusted Financial Statement Income
AFUDCAllowance for Funds Used During Construction
AMIAdvanced Metering Infrastructure
AMTAlternative Minimum Tax
AOCIAccumulated Other Comprehensive Income (Loss)
AROAsset Retirement Obligation
ARPAlternative Revenue Program
ASCAccounting Standards Codification
ASUAccounting Standards Update
Bankruptcy CourtU.S. Bankruptcy Court in the Northern District of Ohio in Akron
BGSBasic Generation Service
BrookfieldNorth American Transmission Company II L.P., a controlled investment vehicle entity of Brookfield Infrastructure Partners
Brookfield GuarantorsBrookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P., and Brookfield Super-Core Infrastructure Partners (ER) SCSp
CAAClean Air Act
CCRCoal Combustion Residual
CERCLAComprehensive Environmental Response, Compensation, and Liability Act of 1980
CFIUSCommittee on Foreign Investments in the United States
CFRCode of Federal Regulations
CISOChief Information Security Officer
CO2Carbon Dioxide
CODMChief Operating Decision Maker
COVID-19Coronavirus disease
CPPEPA's Clean Power Plan
CSAPRCross-State Air Pollution Rule
D.C. CircuitUnited States Court of Appeals for the District of Columbia Circuit
DCPDFE Deferred Compensation Plan for Outside Directors
DCRDelivery Capital Recovery
DMRDistribution Modernization Rider
DOEU.S. Department of Energy
DPADeferred Prosecution Agreement entered into on July 21, 2021 between FE and the U.S. Attorney’s Office for the S.D. Ohio
DSICDistribution System Improvement Charge
EBRGEmployee Business Resource Group
EDCElectric Distribution Company
EDCPFE Amended and Restated Executive Deferred Compensation Plan
EE&CEnergy Efficiency and Conservation
EEIThe Edison Electric Institute

iv

EGSElectric Generation Supplier
EGUElectric Generation Unit
EHEnergy Harbor Corp.
ELGEffluent Limitation Guidelines
EmPOWER MarylandEmPOWER Maryland Energy Efficiency Act
ENECExpanded Net Energy Cost
Energize365FirstEnergy's Transmission and Distribution Infrastructure Investment Program.
EnergizeNJJCP&L's second Infrastructure Investment Program
EPAUnited States Environmental Protection Agency
EPSEarnings per Share
ESPElectric Security Plan
Exchange ActSecurities and Exchange Act of 1934, as amended
FASBFinancial Accounting Standards Board
FE BoardFE Board of Directors
FE Revolving FacilityFE and the Electric Companies’ former five-year syndicated revolving credit facility, as amended, and replaced by the 2021 Credit Facilities on October 18, 2021
FERCFederal Energy Regulatory Commission
FET BoardFET Board of Directors
FET Equity Interest SaleSale of an additional 30% membership interest of FET, such that Brookfield will own 49.9% of FET
FET LLC AgreementThird Amended and Restated Limited Liability Company Operating Agreement of FET
FET P&SA IPurchase and Sale Agreement entered into on November 6, 2021, by and between FE, FET, Brookfield and the Brookfield Guarantors
FET P&SA IIPurchase and Sale Agreement entered into on February 2, 2023, by and between FE, FET, Brookfield, and the Brookfield Guarantors
FET Revolving FacilityFET’s five-year syndicated revolving credit facility, dated as of October 20, 2023, as amended through October 24, 2024
FIPFederal Implementation Plan
FitchFitch Ratings Service
FMBFirst Mortgage Bond
FTRFinancial Transmission Right
GAAPGenerally Accepted Accounting Principles in the United States of America
GHGGreenhouse Gas
HB 6House Bill 6, as passed by Ohio's 133rd General Assembly
IBEWInternational Brotherhood of Electrical Workers
ICP 2015FirstEnergy Corp. 2015 Incentive Compensation Plan
ICP 2020FirstEnergy Corp. 2020 Incentive Compensation Plan
IRA of 2022Inflation Reduction Act of 2022
IRSInternal Revenue Service
KATCo Revolving FacilityKATCo’s four-year syndicated revolving credit facility, dated as of October 20, 2023, as amended through October 24, 2024
kVKilovolt
kWhKilowatt-hour
LOCLetter of Credit
LTIIPLong-Term Infrastructure Improvement Plan
MDPSCMaryland Public Service Commission
MGPManufactured Gas Plants
Moody’sMoody’s Investors Service, Inc.
MWMegawatt
MWhMegawatt-hour
N.D. OhioFederal District Court, Northern District of Ohio
NAVNet Asset Value

v

NCINoncontrolling Interest
NERCNorth American Electric Reliability Corporation
NJBPUNew Jersey Board of Public Utilities
NOLNet Operating Loss
NOxNitrogen Oxide
NSRNew Source Review
NUGNon-Utility Generation
NYPSCNew York State Public Service Commission
OAGOhio Attorney General
OCCOhio Consumers' Counsel
ODSAOhio Development Service Agency
Ohio StipulationStipulation and Recommendation, dated November 1, 2021, entered into by and among the Ohio Companies, the OCC, PUCO staff, and several other signatories
OOCICOhio Organized Crime Investigations Commission, which is composed of members of the Ohio law enforcement community and is chaired by the OAG
OPEBOther Postemployment Benefits
OPEIUOffice and Professional Employees International Union
OPICOther paid-in capital
OSMREUnited States Department of the Interior, Office of Surface Mining Reclamation and Enforcement
OVECOhio Valley Electric Corporation
PA ConsolidationConsolidation of the Pennsylvania Companies
PEERFirstEnergy's Program for Enhanced Employee Retirement, as announced in 2023
PJMPJM Interconnection, LLC, an RTO
PJM RegionThe territory that PJM coordinates the movement of electricity through, including all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia.
PJM TariffPJM Open Access Transmission Tariff
POLRProvider of Last Resort
PPAPurchase Power Agreement
PPUCPennsylvania Public Utility Commission
PUCOPublic Utilities Commission of Ohio
Regulation FDRegulation Fair Disclosure promulgated by the SEC
RFCReliabilityFirst Corporation
ROEReturn on Equity
RTORegional Transmission Organization
S&PStandard & Poor’s Ratings Service
S&P 500Standard & Poor’s 500 index
S.D. OhioFederal District Court, Southern District of Ohio
SECUnited States Securities and Exchange Commission
Securities ActSecurities Act of 1933, as amended
SEETSignificantly Excessive Earnings Test
SIPState Implementation Plan(s) under the CAA
SLCSpecial Litigation Committee of the FE Board
SO2Sulfur Dioxide
SOFRSecured Overnight Financing Rate
SOSStandard Offer Service
SPESpecial Purpose Entity
SSOStandard Service Offer
Tax ActTax Cuts and Jobs Act adopted December 22, 2017
UWUAUtility Workers Union of America
Valley LinkValley Link Transmission Company, LLC, a holding company formed by FET, Dominion High Voltage MidAtlantic, Inc., and Transource Energy, LLC, on November 24, 2024

vi

VEPCOVirginia Electric and Power Company, a subsidiary of Dominion Energy, Inc.
VIEVariable Interest Entity
VSCCVirginia State Corporation Commission
WVPSCPublic Service Commission of West Virginia

vii

PART I

Item 1. BUSINESS

The Companies

FE and its subsidiaries are principally involved in the transmission, distribution, and generation of electricity. FirstEnergy’s electric operating companies comprise one of the nation’s largest investor-owned electric systems, serving over six million customers in the Midwest and Mid-Atlantic regions. FirstEnergy’s transmission operations include more than 24,000 miles of transmission lines and two regional transmission operation centers. As of December 31, 2024, MP and AGC control 3,604 MWs of total capacity.

Regulated Electric Company Operating Subsidiaries

The Electric Companies’ combined service areas encompass approximately 65,000 square miles in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey, and New York, providing distribution services for over six million customers in an area with a population of approximately 14 million and include more than 9,900 miles of transmission lines. Total rate base was approximately $20.6 billion as of December 31, 2024.

OE owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 1.1 million customers in central and northeastern Ohio, with a rate base of $2.1 billion as of December 31, 2024. OE has 1,061 employees and serves an area that has a population of approximately 2.4 million.

CEI owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 0.8 million customers in northeastern Ohio, with a rate base of $1.7 billion as of December 31, 2024. CEI has 819 employees and serves an area that has a population of approximately 1.7 million.

TE owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 0.3 million customers in northwestern Ohio, with a rate base of $0.6 billion as of December 31, 2024. TE has 324 employees and serves an area that has a population of approximately 0.7 million.

FE PA owns property and does business as an electric public utility in Pennsylvania and New York, providing distribution services to approximately 2.1 million customers in Pennsylvania and four thousand customers in Waverly, New York, with a rate base of $6.6 billion as of December 31, 2024. FE PA has 2,083 employees and serves an area that has a population of approximately 4.5 million. On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, rendering FE PA a new, single operating entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. As of January 1, 2024, FE PA is FE’s only regulated distribution power company in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies.

JCP&L owns property and does business as an electric public utility in New Jersey, providing distribution services to approximately 1.2 million customers, as well as transmission services in northern, western, and east central New Jersey, with a combined rate base of $4.7 billion as of December 31, 2024. JCP&L has 1,296 employees and serves an area that has a population of approximately 2.8 million.

PE owns property and does business as an electric public utility in Maryland, Virginia, and West Virginia, providing distribution services to approximately 0.5 million customers in Maryland and West Virginia and provides transmission services in Maryland, West Virginia and Virginia. PE had a combined rate base of approximately $1.6 billion as of December 31, 2024. PE has 505 employees and serves an area that has a population of approximately 1.0 million.

MP owns property and does business as an electric public utility in West Virginia, providing distribution services to approximately 0.4 million customers, as well as generation and transmission services in northern West Virginia, with a combined rate base of $3.3 billion as of December 31, 2024. MP has 1,040 employees and serves an area with a population of approximately 0.8 million. MP is contractually obligated to provide power to PE to meet its load obligations in West Virginia. MP owns or contractually controls 3,604 MWs of net maximum generation capacity that is supplied to its electric utility business, including 24 MWs of Solar generation and 487 MWs of pumped-storage hydroelectric generation from its 16.25% undivided interest in the Bath County facility in Virginia through its wholly-owned subsidiary AGC.

Regulated Transmission Company Operating Subsidiaries

FET, a holding company and parent of ATSI, MAIT, TrAIL, and PATH, is a VIE of FE, which holds 50.1% of its issued and outstanding membership interests. Brookfield owns the remaining 49.9% of the issued and outstanding membership interests of FET. Through its subsidiaries, FET owns and operates high-voltage transmission facilities in the PJM Region and has a rate base of $8.5 billion. FET's subsidiaries are subject to regulation by FERC and applicable state regulatory authorities. FET and its subsidiaries have no direct employees. Each of these companies, however, relies on employees of their affiliates, including FESC, for the performance of necessary services. On January 1, 2024, PN and ME contributed their respective Class B equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET.

So long as FE holds the FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.

On July 26, 2024, FE, VEPCO and Transource Energy, LLC, a subsidiary of AEP, entered into a joint proposal agreement in connection with PJM’s 2024 Regional Transmission Expansion Plan Open Window 1 process. Pursuant to such joint proposal agreement, FET, VEPCO and Transource Energy, LLC jointly proposed certain regional electric transmission projects for PJM's consideration during the Open Window process. On November 25, 2024, FET, Dominion High Voltage MidAtlantic, Inc., as affiliate of VEPCO, and Transource Energy, LLC, formed Valley Link, which is the holding company responsible for managing and executing any projects awarded by PJM, and entered into a limited liability agreement. On February 26, 2025, PJM selected certain of the joint proposed projects, which included approximately $3 billion in investments for Valley Link to both build new and upgrade existing transmission infrastructure.

ATSI owns high-voltage transmission facilities in PJM, which consist of 7,964 circuit miles of transmission lines with nominal voltages of 345 kV, 138 kV and 69 kV in Ohio and Pennsylvania and has a rate base of $4.3 billion as of December 31, 2024.

MAIT owns high-voltage transmission facilities in PJM, which consist of 4,287 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV, 138 kV, 115 kV, 69 kV and 46 kV in Pennsylvania, and has a rate base of $2.8 billion as of December 31, 2024.

TrAIL owns high-voltage transmission facilities in PJM, which consists of 269 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV, 138 kV, including a 500 kV transmission line extending approximately 150 miles from southwestern Pennsylvania through West Virginia to a point of interconnection with VEPCO in northern Virginia, and has a rate base of $1.4 billion as of December 31, 2024.

PATH was a proposed transmission line from West Virginia through Virginia into Maryland which PJM cancelled in 2012. In March 2024, PATH completed the process of terminating all of its FERC-jurisdictional rates and facilities, with the result that PATH no longer is a “public utility” and no longer is subject to FERC jurisdiction. FET and its non-affiliated joint venture partner are completing the process of terminating the PATH corporate entities.

KATCo owns high-voltage transmission facilities formerly owned by WP in PJM, which consist of 1,696 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV, 138 kV, and 115 kV in Pennsylvania, and has a rate base of $0.5 billion as of December 31, 2024. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo. See Note 1, "Organization and Basis of Presentation," for more information.

Service Company

FESC has 5,166 employees and provides corporate support and other services, including executive administration, accounting and finance, risk management, human resources, corporate affairs, communications, information technology, legal services and other similar services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies under FESC agreements.

Segments Overview

During the first quarter of 2024, FirstEnergy’s segment reporting structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities, and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. FirstEnergy’s reportable segments are as follows, and FirstEnergy continues to evaluate segment performance based on earnings attributable to FE from continuing operations:

  • Distribution Segment, which consists of the Ohio Companies and FE PA;

  • Integrated Segment, which consists of MP, PE and JCP&L; and

  • Stand-Alone Transmission Segment, which consists of FE's ownership in FET and KATCo.

FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission.

The Distribution segment, which consists of the Ohio Companies and FE PA, representing $11 billion in rate base as of December 31, 2024, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its provider of last resort, SOS, standard service offer and default service requirements. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.

The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $9.6 billion in rate base as of December 31, 2024. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and

operates 3,604 MWs of regulated net maximum generation capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of solar generation at five sites in West Virginia once complete. The first two solar generation sites were completed and placed in service in January and September 2024, representing 24 MWs of net maximum generating capacity. The remaining three sites, once completed, are expected to provide 26 MWs of additional net maximum generation capacity.

The Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.3 billion in rate base as of December 31, 2024, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities. KATCo, which was a subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of the FET P&SA I and remains in the Stand-Alone Transmission segment. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo and prior year results in the Stand-Alone Transmission segment reflect the earnings and results of those WP transmission assets.

Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies, including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Also included in Corporate/Other for segment reporting is 67 MWs of net maximum generation capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2024, Corporate/Other had approximately $6.1 billion of external FE holding company debt.

Regulatory Accounting

FirstEnergy accounts for the effects of regulation through the application of regulatory accounting to the Electric Companies and the Transmission Companies as their rates are established by third-party regulators with the authority to set binding rates that are cost-based and can be charged to and collected from customers.

The Electric Companies and the Transmission Companies recognize, as regulatory assets and regulatory liabilities, costs that FERC and the various state utility commissions, as applicable, have authorized for recovery from or return to customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets and regulatory liabilities would have been charged or credited to income as incurred. All regulatory assets and liabilities are expected to be recovered from or returned to customers. Based on current ratemaking procedures, the Electric Companies and the Transmission Companies continue to collect cost-based rates for their distribution and transmission services; accordingly, it is appropriate that the Electric Companies and the Transmission Companies continue the application of regulatory accounting to those operations. Regulatory accounting is applied only to the parts of the business that meet the above criteria. If a portion of the business applying regulatory accounting no longer meets those requirements, previously recorded regulatory assets and liabilities are removed from the balance sheet in accordance with GAAP.

State Regulation and Federal Regulation

The following table summarizes the allowed ROE and the aggregate actual ROE of the Electric Companies and Transmission Companies as determined for regulatory purposes as of and for the year ended December 31, 2024:

SegmentEntity/StateAllowed ROEActual ROE
Stand-Alone TransmissionFET9.88%(1) - 12.7%10.4%(2)
KATCo9.6%10.45%
IntegratedMaryland9.5% - Distribution 10.45% - Transmission8.3%
New Jersey9.6% - Distribution 10.2% - Transmission9.3%
West Virginia9.8%8.4%
DistributionOhio10.8%(3)4.7%(3)
PennsylvaniaSettled(4)9.0%

(1) Reflects a 0.5% reduction to ATSI's 10.38% approved ROE due to the January 2025 Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO membership (see Transmission ROE Incentive: OCC v. ATSI, et al. below)

(2) FET ROE is a weighted average allowed ROE of ATSI, MAIT and TrAIL

(3) As filed on July 31, 2024, in pending base rate case before revenue adjustment

(4) Commission-approved settlement agreement did not disclose ROE

See "Outlook - State Regulation" in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.

See "Outlook - FERC Regulatory Matters" in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.

Environmental Matters

See "Outlook - Environmental Matters" in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.

Capital Requirements

FirstEnergy’s business is capital intensive, requiring significant resources to fund operating expenses, construction and other investment expenditures, scheduled debt maturities and interest payments, dividend payments and potential contributions to its pension plan. See "Capital Resources and Liquidity" in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.

Supply Plan

Supply Chain

Economic conditions have stabilized across numerous material categories, but not all lead times have returned to pre-pandemic levels. Several key suppliers have seen improvements with capacity, but FirstEnergy continues to monitor the situation as demand increases across the industry, including due to data center usage. Inflationary pressures have moderated, which has improved the cost of materials, but certain categories have remained elevated. FirstEnergy continues to implement mitigation strategies to address supply constraints and does not expect any corresponding service disruptions or any material impact on its capital investment plan. However, the situation remains fluid and a prolonged continuation or further increase in demand, or the continuation of uncertain or adverse macroeconomic conditions, including inflationary pressures and new or increased existing tariffs, could lead to an increase in supply chain disruptions that could, in turn, have an adverse effect on FirstEnergy’s results of operations, cash flow and financial condition.

In February 2025, the new U.S. presidential administration announced the imposition of widespread and substantial tariffs on imports, with plans for additional tariffs to potentially be adopted in the future. Although certain of these tariffs were subsequently temporarily stayed, the situation is dynamic and subject to rapid change. The imposition of these or any other new or increased tariffs or resultant trade wars could have an adverse effect on FirstEnergy's results of operations, cash flow and financial condition.

Default Service

Certain of the Electric Companies have default service obligations to provide power to non-shopping customers who have elected to continue to receive service under regulated retail tariffs. These default service plans vary by state and service territory, and volume of sales can vary depending on the level of shopping that occurs. JCP&L’s default service, or BGS supply, is secured through a statewide competitive procurement process approved by the NJBPU. Default service for the Ohio Companies, FE PA and PE's Maryland jurisdiction are provided through a competitive procurement process approved by the PUCO (under the current ESP), PPUC (under the Default Service Plan) and MDPSC (under the SOS), respectively. If any supplier fails to deliver power to any one of those Electric Companies’ service areas, the Utility serving that area may need to procure the required power in the market in their role as the default load serving entity. West Virginia electric generation continues to be regulated by the WVPSC.

Fuel Supply

MP has coal contracts with various terms to purchase approximately 3 million tons of coal for the year 2025, which, along with its 2024 year-end inventory levels, accounts for approximately 80% of its forecasted 2025 coal requirements. MP has the ability to acquire additional tonnage through options available in its current contracts, as well as purchases through the spot market. The contracts expire at various times through 2027. This contracted coal is produced primarily from mines located in Pennsylvania and West Virginia. In order to meet emission requirements, MP holds contracts for a variety of reagents expiring at various times through 2026, as well as the ability to purchase additional reagents through the spot market. Additionally, MP is granted emission allowances by the EPA and purchases additional allowances as needed to meet emission requirements. See "Outlook - Environmental Matters" in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information pertaining to the impact of increased environmental regulations on fuel supply.

System Demand

The maximum hourly demand in 2024, 2023 and 2022 for each of the Electric Companies was:

For the Years Ended December 31,
System Demand202420232022
(In MWs)
CEI3,9713,8684,266
FE PA110,40410,05810,255
JCP&L6,1845,7316,122
MP2,0962,0512,124
OE5,5825,1925,652
PE3,8603,1033,514
TE2,0742,2202,277

(1) On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, making it a new, single operating entity.

Regional Reliability

All of FirstEnergy's facilities are located within the PJM Region and operate under the reliability oversight of a regional entity known as RFC. This regional entity operates under the oversight of NERC in accordance with a delegation agreement approved by FERC.

Competition

Within FirstEnergy’s Electric Companies' distribution business, there generally is no competition for electric distribution service in the Electric Companies’ respective service territories in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York. Additionally, pursuant to FERC’s Order No. 1000 and subject to state and local siting and permitting approvals, non-incumbent developers can compete for certain PJM transmission projects in the service territories of certain of FirstEnergy’s Electric Companies' providing transmission services and the Transmission Companies. This has resulted in additional competition to build transmission facilities in the respective service territories while also allowing the opportunity to seek to build facilities in non-incumbent service territories.

Seasonality

The sale of electric power is generally a seasonal business, and weather patterns can have, and have in the past had, a material impact on FirstEnergy’s Electric Companies' operating results. Demand for electricity in our service territories historically peaks during the summer and winter months. Accordingly, FirstEnergy’s annual results of operations and liquidity position may depend disproportionately on its operating performance during the summer and winter. Mild weather conditions may result in lower power sales, and consequently, lower revenue, earnings and cash flow.

Human Capital

FirstEnergy focuses on a number of human capital resources, measures and objectives in managing its business, including through striving to achieve its core values.

FirstEnergy believes that creating a sense of belonging among our employees positions the company to deliver better service to customers, strengthen operational performance, and help create a work environment where employees feel valued and respected. FirstEnergy remains focused advancing a culture of belonging for employees.

During 2024, FirstEnergy continued to promote these values by:

  • Sponsoring a council of select senior management and other leaders and influential employees across the company, who work together to promote our core values throughout the workforce;

  • Sharing the results of our most recent employee engagement survey designed to capture our employees’ perspectives on their work experience and progress toward embracing a more welcoming culture; and

  • Supporting multiple employee business resource groups, known as "EBRGs," to further support our values through networking, mentoring, coaching, recruiting, development and community outreach. There are currently 9 EBRGs across 21 chapters, which are open to all employees.

Safety

Safety is an unwavering core value of FirstEnergy. FirstEnergy employees have the power and responsibility to keep each other safe and eliminate life-changing events, which are injuries that have life-changing impacts or fatal results. Safety metrics, such as injuries that result in days away or restricted time and life-changing events, are regularly monitored, internally reported, and included in FirstEnergy’s annual incentive compensation program to reinforce that a safe work environment is crucial to FirstEnergy’s success.

FirstEnergy continues to focus on mitigating life-changing event exposure to strengthen FirstEnergy’s safety-first culture and drive safer decisions from an engaged workforce who puts safety first. FirstEnergy continues to embed its "Leading with Safety" learnings where leaders and employees receive safety training and reinforcement of exposure control concepts that are designed to improve job site exposure identification, communication and mitigation to ultimately prevent life changing events.

Employee Development

FirstEnergy’s employees are empowered to take ownership of their careers with increased transparency into FirstEnergy’s internal and external hiring process and availability of tools and processes that support career management, talent reviews, succession planning and leadership selection. FirstEnergy is committed to preparing its high-performing workforce for the future and helping employees reach their full potential, which includes developing employee skills and competencies and preparing aspiring, emerging and experienced leaders for future leadership responsibilities.

Understanding FirstEnergy’s rapidly changing industry and strategy is key to its employees’ ability to support FirstEnergy’s mission and meet its customers’ evolving needs. Key FirstEnergy development programs include:

  • Talent management**, which includes a commitment to transparency in career management and development opportunities, consistent with FirstEnergy’s core values;

  • A mentoring program that gives employees the opportunity to select a mentor from within the organization to promote enhanced learning, teamwork and collaboration;

  • Leadership development opportunities** that include training for new supervisors and managers, experienced leader programming and coaching, aspiring leader programs that build leadership capabilities for employees who are ready near-term leadership roles; and external partnership with the Center for Creative Leadership® and BeingFirst® for senior and executive leadership development;

  • Educational opportunities** through FirstEnergy’s "Educate to Elevate" program, which provides access to post-secondary education and a path to both associate’s and bachelor’s degrees for employees; and

  • Workforce development programs** that include an apprentice line worker program designed to attract technical entry-level talent to FirstEnergy.

Compensation and Benefits

FirstEnergy’s total rewards program is designed to attract, motivate, retain and reward employees for their role in the success of FirstEnergy. The base pay program is designed to balance an employee’s value to FirstEnergy in a manner that is commensurate with comparable jobs at peer companies. FirstEnergy aims to ensure that its internal policies and processes support pay equity.

The annual incentive compensation program is designed to align compensation with the achievement of near-term corporate and business unit objectives, as well as outstanding individual performance. Additionally, FirstEnergy’s long-term incentive compensation program is designed to reward eligible leaders for FirstEnergy’s achievement of longer-term goals intended to drive shareholder value and growth. In addition to base pay and incentive compensation plans, FirstEnergy offers a comprehensive benefits program, including healthcare, dental, prescription, vision, a 401(k) savings plan and a defined benefit pension plan to eligible employees.

Employees and Collective Bargaining Agreements

As of December 31, 2024, FirstEnergy had 12,294 employees, all of whom were located in the United States as follows:

Total EmployeesBargaining Unit Employees
FESC5,166521
CEI819570
FE PA2,0831,536
JCP&L1,296992
MP1,040396
OE1,061666
PE505246
TE324249
Total12,2945,176

As of December 31, 2024, the IBEW, the UWUA and the OPEIU unions collectively represented approximately 40% of FirstEnergy’s employees. There are currently 15 collective bargaining agreements between FirstEnergy’s subsidiaries and its unions, which have multi-year contracts. In 2024, FirstEnergy’s subsidiaries reached new collective bargaining agreements with IBEW Local 1289, IBEW Local 459 and OPEIU 792. One collective bargaining agreement was set to expire in 2025, with a settlement reached in January 2025, representing approximately 3% of FirstEnergy’s employees.

Information About Our Executive Officers (as of February 27, 2025)

NameAgePositions Held During Past Five YearsDates
Brian X. Tierney57Chair, President and Chief Executive Officer (A)2024-Present
President and Chief Executive Officer (A)2023-2024
President and Chief Executive Officer (B)2023-Present
Blackstone Infrastructure Partners, Senior Managing Director2021-2023
AEP, Executive Vice President - Strategy2021
AEP, Executive Vice President and Chief Financial Officer*-2020
Hyun Park63Senior Vice President and Chief Legal Officer (A) (B)2021-Present
Senior Vice President and General Counsel (C) (D)2021-2022
LimNexus, Partner and General Counsel*-2021
Jason J. Lisowski43Vice President, Controller and Chief Accounting Officer (A) (B)*-Present
Vice President and Controller (C) (E)*-Present
K. Jon Taylor51Senior Vice President, Chief Financial Officer and Strategy (A) (B)2021-Present
Senior Vice President and Chief Financial Officer (C) (E)2020-2024
Senior Vice President and Chief Financial Officer (A) (B)2020-2021
Vice President, Utility Operations (B)*-2020
President (D)*-2020
Toby L. Thomas53Chief Operating Officer (A) (B)2023-Present
AEP, Senior Vice President2021-2023
Indiana Michigan Power, President and Chief Operating Officer*-2021
A. Wade Smith60President, FirstEnergy Utilities (A) (B)2023-Present
Puget Sound Energy, Inc., Executive Vice President and Chief Operating Officer2022-2023
Pacific Gas & Electric, Senior Vice President2021-2022
AEP, Senior Vice President*-2021
* Indicates position held at least since January 1, 2020
(A) Denotes position held at FE
(B) Denotes position held at FESC
(C) Denotes position held at the Ohio Companies, the Pennsylvania Companies(1), MP, PE, FET, ATSI, MAIT, TrAIL and KATCo.
(D) Denotes position held at AGC
(E) Denotes position held at FE PA(1)

(1) On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, making it a new, single operating entity. Upon consolidation, executive officers of the Pennsylvania Companies were named as executive officers of FE PA.

FirstEnergy Website and Other Social Media Sites and Applications

FirstEnergy's Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, amendments to those reports, and all other documents filed with or furnished to the SEC pursuant to Section 13(a) of the Exchange Act are made available free of charge on FirstEnergy’s website at investors.firstenergycorp.com. These documents are also available to the public from commercial document retrieval services and the website maintained by the SEC at www.sec.gov.

FirstEnergy has adopted, and posted on its website at www.firstenergycorp.com/responsibility, a Code of Conduct, The Power of Integrity, which applies to all employees, including FirstEnergy’s Chief Executive Officer, Chief Financial Officer and Chief Accounting Officer. The Code of Conduct is available, without charge, upon written request to the Corporate Secretary, FirstEnergy Corp., 76 South Main Street, Akron, Ohio 44308-1890. Within the time period required by the SEC, FirstEnergy will post on its website any substantive amendment to the Code of Conduct and any waiver applicable to an FE director or FE executive officer.

These SEC filings are posted on the website as soon as reasonably practicable after they are electronically filed with or furnished to the SEC. Additionally, FirstEnergy routinely posts additional important information, including press releases, investor presentations, investor factbooks and notices of upcoming events under the "Investors" section of FirstEnergy’s website and recognizes FirstEnergy’s website as a channel of distribution to reach public investors and as a means of disclosing (including initially or exclusively) material non-public information for complying with disclosure obligations under Regulation FD. Investors may be notified of postings to the website by signing up for email alerts and Rich Site Summary feeds on the “Investors” page of FirstEnergy’s website. FirstEnergy also uses X (the social networking site formerly known as Twitter®), LinkedIn®, YouTube® and Facebook® as additional channels of distribution to reach public investors and as a supplemental means of disclosing material non-public information for complying with its disclosure obligations under Regulation FD. Information contained on FirstEnergy’s website, X (the social networking site formerly known as Twitter®) handle, LinkedIn® profile, YouTube® channel or Facebook® page, and any corresponding applications of those sites, shall not be deemed incorporated into, or to be part of, this report.

Item 1A. RISK FACTORS

We operate in a business environment that involves significant risks, many of which are beyond our control. Management regularly evaluates the most significant risks of its businesses and reviews those risks with the FE Board and appropriate Committees of the FE Board. The following risk factors and all other information contained in this report should be considered carefully when evaluating FirstEnergy. These risk factors could affect our financial results and cause such results to differ materially from those expressed in any forward-looking statements made by or on behalf of us. Below, we have identified risks we consider material. The risks that we face are not limited to those in this section. There may be additional risks and uncertainties (either currently unknown or not currently believed to be material) that could adversely affect our business, financial condition, results of operations, liquidity or cash flows. Although the risks are organized by headings, and each risk is discussed separately, many are interrelated. These risk factors should be read in conjunction with Item 1, "Business,” Item 7, "Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in other sections of this Form 10-K that include forward-looking and other statements involving risks and uncertainties that could impact our business, financial condition, results of operations, liquidity or cash flows.

Risks Associated with Damage to Our Reputation and HB 6 Related Litigation and Investigations

HB 6-related investigations and litigation could have a material adverse effect on our reputation, business, financial condition, results of operations, our ability to access capital, liquidity or cash flows.

On July 21, 2021, we entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the previously disclosed U.S. Attorney’s Office investigation into us relating to our lobbying and governmental affairs activities concerning HB 6. Under the DPA, we paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FirstEnergy with one count of conspiracy to commit honest services wire fraud.

As of July 22, 2024, we successfully completed the obligations required within the three-year term of the DPA. Under the DPA, and until the conclusion of any related investigation, criminal prosecution and civil proceeding brought by the U.S. Attorney’s Office, we have an obligation to continue (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by us to be operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office for the S.D. Ohio of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office for the S.D. Ohio. In accordance with the DPA, these obligations will continue until the completion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office related to the conduct set forth in the DPA’s statement of facts, including the January 17, 2025 indictment against two former FirstEnergy senior officers, described below in “Outlook—Other Legal Proceeding – United States v. Larry Householder, et al.” Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U. S. Attorney’s Office will dismiss the criminal information.

If we are found to have breached the terms of the DPA, the U.S. Attorney’s Office may elect to prosecute, or bring a civil action against, us for conduct alleged in the DPA or known to the government, which could result in fines or penalties and could have a material adverse impact on our reputation or relationships with regulatory and legislative authorities, customers and other stakeholders, as well as our consolidated financial statements. Failure to comply with the DPA, including alleged failures to comply with anti-corruption and anti-bribery laws, may also result in a breach of certain covenants contained in our credit agreements and could result in an event of default under such agreements, and we would not be able to access our credit facilities for additional borrowings and letters of credit during the existence of any such default.

Following the announcement by the U.S. Attorney’s Office for the S.D. Ohio of the investigation surrounding HB 6 in July 2020, certain of our stockholders and customers filed several lawsuits against us and certain current and former directors, officers and other employees, including the federal securities class action litigation In re FirstEnergy Corp. Securities Litigation (Federal District Court, S.D. Ohio). We believe that it is probable that FE will incur a loss in connection with the resolution of In re FirstEnergy Corp. Securities Litigation. Given the ongoing nature and complexity of such litigation, we cannot yet reasonably estimate a loss or range of loss that may arise from its resolution. However, if it is resolved against us substantial monetary damages could result and our reputation, business, financial condition, results of operations, liquidity or cash flows may be materially adversely affected.

The litigation related to HB 6 could divert management’s focus and have resulted in, and could continue to result in, substantial expenses, and the commitment of substantial corporate resources. The outcome, duration, scope, result or related costs of the in securities class action litigation In re: FirstEnergy Corp. Securities Litigation discussed above, are inherently uncertain. Therefore, any of these risks could impact us significantly beyond expectations. See Note 15, "Commitments, Guarantees and Contingencies" of the Notes to Consolidated Financial Statements and “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Critical Accounting Policies and Estimates.”

These matters are likely to continue to have an adverse impact on the trading prices of our securities, which could be material. See Note 15, “Commitments, Guarantees and Contingencies,” of the Notes to Consolidated Financial Statements, for additional details on the government investigations and subsequent litigation surrounding HB 6.

The HB 6 related state regulatory investigations could have a material adverse effect on our reputation, business, financial condition, results of operations, liquidity or cash flows.

There are several ongoing HB 6 related state regulatory matters including, but not limited to, the below HB 6-related matters, each of which was stayed for a third time by the PUCO on August 23, 2023, at the request of the U.S. Attorney for the Southern District of Ohio, for a period of an additional six months. The stay on the following matters was lifted on February 26, 2024:

  • On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On February 26, 2024, this proceeding was consolidated with the expanded DCR rider audit proceeding described below and on November 22, 2024, the administrative law judge ordered that the bifurcated portion of the corporate separation audit, discussed further below, be consolidated with the already-consolidated DMR audit and expanded DCR rider audit proceeding. Evidentiary hearings are scheduled to begin May 13, 2025;

  • On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the subsequent referendum effort. On Se

Showing the first 8K of 95K characters. Open the full section

Item 1B. UNRESOLVED STAFF COMMENTS

None.

Item 1C. CYBERSECURITY

FirstEnergy seeks to protect its customers, employees, facilities and the ongoing reliability of the electric system. FirstEnergy works closely with state and federal agencies and its peers in the electric utility industry to identify physical and cyber security

risks, exchange information, and put safeguards in place to comply with strict reliability and security standards. From a security standpoint, the electric utility sector is one of the most regulated industries.

Risk Management and Strategy

FirstEnergy has established a broad framework to assess, identify and manage material risks from cyber security threats. This program is established at the executive level, with regular reporting to, and oversight by, the FE Board as described below. At the highest level, FirstEnergy’s program includes multi-layered governance by management, the Audit Committee, the Operations and Safety Committee, and the FE Board, as described in greater detail below.

Central management and coordination of the program helps FirstEnergy to comprehensively evaluate and protect against cyber threats. FirstEnergy’s written policies and procedures identify how cyber security measures and controls are developed, implemented, and regularly reviewed and updated. FirstEnergy aims to align its cyber security program with national standards. For example, FirstEnergy has implemented and maintains a set of controls to manage cyber security risk based on the National Institute of Standards and Technology Cyber Security Framework and, for Bulk Electric System assets, the NERC Critical Infrastructure Protection standards. FirstEnergy also complies with various state laws and regulations on cyber security.

FirstEnergy’s Cyber Security Program identifies security controls and user responsibilities for the organization to identify and manage the risk of a cyber security incident. FirstEnergy also conducts various internal and external risk assessments each year. These include required annual compliance assessments, such as requirements under the Sarbanes-Oxley Act and Payment Card Industry Data Security Standard compliance audits, as well as ad-hoc assessments driven by emerging risks, changes in FirstEnergy’s environment, or benchmark/roadmap needs. Risks identified in such assessments are considered for inclusion in FirstEnergy’s risk portfolio, or incorporated directly into the Cyber Security Program, and are then prioritized and addressed as needed through the organization’s written policies and procedures. The risk assessment along with risk-based analysis and judgment are used to select security controls to address risks. During this process, the following factors, among others, are considered: likelihood and severity of risk, impact on FirstEnergy and others, such as vendors and customers, if a risk materializes, feasibility and cost of controls, and impact of controls on operations and others. FirstEnergy also regularly evaluates the adequacy and sufficiency of specific controls.

To further protect its information and cyber assets, FirstEnergy has required since late 2022 that applicable prospective third-party vendors complete a privacy impact assessment, which is designed to identify potential privacy and cyber security risks for those vendors requiring access to personally identifiable information, and based on the results, include appropriate contractual provisions to mitigate any identified risks. In 2024, FirstEnergy also evaluated its current third-party vendors to identify which vendors had similar access to personally identifiable information and is currently reviewing the results of its analysis.

FirstEnergy conducts cyber security exercises and training. For example, all personnel with any form of computer system access must complete cyber security training on a recurring basis, which educates personnel on FirstEnergy’s policies and procedures for using FirstEnergy systems, keeping FirstEnergy information secure, and for safe, reliable operation of electric utility systems. FirstEnergy also conducts various tests of its cyber incident response plans, disaster recovery plans and business continuity plans with key stakeholders and responders for various areas of FirstEnergy’s utility and business functions. FirstEnergy’s management also holds executive cyber security incident tabletop exercises to train on cyber security incident response.

Additionally, FirstEnergy leverages third-party security firms in various capacities to assist with various aspects of FirstEnergy’s cyber security program, including risk assessments, vulnerability scans, and penetration testing. FirstEnergy uses a variety of processes to address cyber security threats related to the use of third-party technology and services, such as reviewing independent assessments of the third party’s cyber/information security controls, such as Systems and Organization Controls 2 audits or other standards-based assessments, where appropriate. As part of FirstEnergy’s process to continuously improve its cyber and information security programs, FirstEnergy also engages third-party subject matter experts to assess and evaluate the effectiveness of various aspects of such programs.

In addition to the aforementioned efforts, FirstEnergy also strongly considers cyber security risks as a part of its overall strategy and invests heavily in sophisticated and layered security measures that use both technology and hard defenses to protect critical transmission facilities and its digital communications networks. For example, security enhancements to FirstEnergy’s transmission infrastructure, such as enhanced cyber security monitoring and alarming are a key component of FirstEnergy’s transmission investment program.

Despite the security measures and safeguards FirstEnergy has employed, including certain measures implemented pursuant to mandatory NERC Critical Infrastructure Protection standards, FirstEnergy’s infrastructure may be increasingly vulnerable to such attacks as a result of the rapidly evolving and increasingly sophisticated means by which attempts to defeat security measures and gain access to information technology systems may be made. Also, FirstEnergy, or its vendors and service providers, may be at an increased risk of a cyber-attack and/or data security breach due to the nature of its business. Any such cyber incident could result in significant lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time, the use of significant management resources, legal claims or proceedings, regulatory penalties, significant remediation costs, increased regulation, increased capital costs, increased protection costs for enhanced cyber security systems

or personnel, damage to FirstEnergy's reputation and/or the rendering of its internal controls ineffective, all of which could materially adversely affect FirstEnergy's business, results of operations, financial condition and reputation.

Board Governance and Management

The FE Board has identified cyber security as a key enterprise risk and prioritizes the mitigation of this risk through FirstEnergy’s enterprise risk management process. Responsibility for oversight of risk management generally lies with the FE Board and the Audit Committee has primary responsibility to oversee enterprise risk management. To effectively manage oversight of FirstEnergy’s cyber security risk management practices, since 2022, the FE Board has delegated oversight authority to each of FirstEnergy’s Audit and Operations and Safety Committees, respectively, as detailed in each Committees’ charters. The Audit Committee has primary responsibility to oversee the disclosure of material cyber security incidents, as well as the general obligation to ensure the proper risk oversight structure of cyber security as part of FirstEnergy’s overall enterprise risk management program and the internal controls applicable to cyber security matters. The Operations and Safety Oversight Committee has primary responsibility to oversee the operational aspects of FirstEnergy’s cyber security policies, programs, initiatives and strategies, as well as operational risk considerations related to cyber security matters. FirstEnergy’s CISO regularly provides reports at the Audit Committee, Operations and Safety Oversight Committee, and to the full FE Board. Each such Committee and the full FE Board work collaboratively to ensure fulsome oversight with the proper focus of each respective Board body. These reports include, among other things, current and emerging cyber security risks to FirstEnergy, incidents that were escalated to management during the prior quarter, including those that did not require immediate escalation to the appropriate Committee and/or full FE Board, internal and external assessments of FirstEnergy’s cyber security program, and a roadmap of projects to manage its cyber security posture.

At the executive and management level, the CISO has primary responsibility for the development, operation, and maintenance of FirstEnergy’s cyber security program. The CISO has 6 years of experience in technology risk management, all of which have been with FirstEnergy, and an additional 23 years of experience in information technology. The CISO has passed examinations and received the International Information System Security Certification Consortium Certified Information Systems Security Professional certification. The CISO reports directly to FirstEnergy’s Senior Vice President, Shared Services, who is responsible for all of FirstEnergy’s digital and technology services and is FirstEnergy’s most senior information technology executive. Under the CISO’s oversight, FirstEnergy’s cyber security team implements and provides governance and functional oversight for cyber security controls and services. Cyber security processes include escalation of certain risks and incidents, including those that originate or occur at third parties, to the Senior Vice President, Shared Services, legal, and the executive leaders as appropriate based on the severity of any such risk or incident. In addition, regular updates from the cyber security teams, in conjunction with real-time escalation on an as-needed basis, are also used to update the risk landscape.

In the event of any significant cyber security incident, FirstEnergy’s Cyber Security Incident Response Plan provides for a severity determination by the cyber security incident response team based on factors such as the number of assets affected, the likelihood of inappropriate data exposure, operational impact, reliability impact, and regulatory impact. Dependent upon the severity of an incident, it is FirstEnergy’s practice to escalate the incident to the Senior Vice President, Shared Services, the Chief Risk Officer, and the FE senior leadership team, including the Chief Legal Officer, Chief Financial Officer, and Chief Executive Officer. Such members of management then determine whether, based on various factors, the incident requires immediate escalation to the Audit Committee and Operations and Safety Committee, or the full FE Board.

Although the risks from cyber threats have not materially affected FirstEnergy’s business strategy, results of operations, or financial condition to date, FirstEnergy continues to closely monitor cyber risk. Overall, FirstEnergy has implemented tactical processes for assessing, identifying, and managing material risks from cyber security threats to FirstEnergy including governance at the executive and board level of FirstEnergy’s Cyber Security Program, including FE’s risk management strategy and the controls designed to protect its operations. Additionally, FirstEnergy, through its Disclosure Committee, has updated its disclosure controls and procedures to ensure appropriate disclosure of any material cyber security incidents. See Item 1A. Risk Factors for additional information regarding FirstEnergy’s cyber security risks. Those sections of Item 1A. Risk Factors should be read in conjunction with this Item 1C. Cybersecurity.

Item 2. PROPERTIES

The first mortgage indentures for the Ohio Companies, FE PA, MP and PE constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures. The outstanding debt under the FMBs of specific FE PA predecessors (WP and Penn) were assumed by FE PA in connection with the PA Consolidation. See Note 12, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Electric Companies' properties.

FirstEnergy controls the following generation sources as of December 31, 2024, shown in the table below, and operates in the PJM Region. Except for the OVEC participation referenced in the footnotes to the table, the Integrated segment generating units are owned by MP.

Plant (Location)UnitTotalCorporate / OtherIntegratedTotalCorporate / OtherIntegrated
Net Maximum Capacity (MW)Net Generation for the year ended December 31, 2024**(3)** (Thousand MWh)
Coal-fired:
Harrison Power Station (Haywood, WV)1-31,984—1,98410,618—10,618
Fort Martin Power Station (Maidsville, WV)1-21,098—1,0983,860—3,860
OVEC (Cheshire, OH) (Madison, IN)(1)1-1178671135030149
3,160673,09314,82830114,527
Pumped-storage Hydro:
Bath County Pumped Storage Station (Warm Springs, VA)(2)1-6487—487990—990
Solar
Fort Martin Solar (Maidsville, WV)19—1928—28
Rivesville Solar (Rivesville, WV)5—52—2
24—2430—30
Total3,671673,60415,84830115,547

(1) Represents AE Supply's 3.01% and MP's 0.49% entitlement based on their participation in OVEC.

(2) Represents AGC's 16.25% undivided interest in Bath County. The station is operated by VEPCO.

(3) Each plant is net of station use, except for Bath County, which is shown gross of pumping usage.

MP and PE are constructing 50 MWs of solar generation at five sites in West Virginia. The WVPSC approved the construction of three of the five solar sites. The first solar generation site, Fort Martin Solar, located in Maidsville, West Virginia, was completed and placed in-service on January 8, 2024, representing 19 MWs of capacity. The second solar generation site, Rivesville Solar, located in Rivesville, West Virginia, went into service on September 25, 2024. Construction of the remaining three sites, once completed, are expected to provide 26 MWs of additional net maximum generation capacity.

As of December 31, 2024, FirstEnergy’s distribution and transmission circuit miles are located in PJM and were as follows:

Distribution Line Miles**(1)**Transmission Line Miles
ATSI—7,964
CEI31,855—
FE PA(2)(3)82,4672,623
JCP&L24,7812,609
KATCo(3)—1,696
MAIT—4,287
MP23,0362,607
OE54,760—
PE20,2532,088
TE15,092—
TrAIL—269
Total252,24424,143

(1) Includes overhead pole line and underground conduit carrying primary, secondary and street lighting circuits.

(2) On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, making it a new, single operating entity.

(3) On January 1, 2024, WP's Pennsylvania-based transmission assets of 115 kV and above were transferred to KATCo, while the remaining transmission assets below 115 kV continue to be held by FE PA.

Item 3. LEGAL PROCEEDINGS

Reference is made to Note 14, "Regulatory Matters," and Note 15, "Commitments, Guarantees and Contingencies," of the Notes to Consolidated Financial Statements for a description of certain legal proceedings involving FirstEnergy.

Item 4. MINE SAFETY DISCLOSURES

Not applicable.

PART II

Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

COMMON STOCK

The common stock of FirstEnergy Corp. is listed on the New York Stock Exchange under the symbol “FE” and is traded on other registered exchanges.

HOLDERS OF COMMON STOCK

There were 53,295 holders of 576,612,245 shares of FE’s common stock as of December 31, 2024, and 52,730 holders of 576,697,425 shares of FE's common stock as of January 31, 2025. FE has historically paid quarterly cash dividends on its common stock. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings growth, cash flows, credit metrics and other business conditions. Information regarding equity available for payment of cash dividends is given in Note 12, "Capitalization," of the Notes to Consolidated Financial Statements.

SHAREHOLDER RETURN

The following graph shows the total cumulative return from a $100 investment on December 31, 2019, in FE’s common stock compared with the total cumulative returns of EEI’s Index of Investor-Owned Electric Utility Companies and the S&P 500.

1230

FirstEnergy had no transactions regarding purchases of FE common stock during the fourth quarter of 2024.

FirstEnergy does not have any publicly announced plan or program for share purchases.

Item 6. [RESERVED]

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Forward-Looking Statements: This Form 10-K includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project," “estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):

  • The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those associated with compliance with or failure to comply with the DPA, and settlements with the OAG's office and SEC.

  • The risks and uncertainties associated with government investigations and audits regarding HB 6 and related matters, including potential adverse impacts on federal or state regulatory matters, including, but not limited to, matters relating to rates.

  • The risks and uncertainties associated with litigation, arbitration, mediation and similar proceedings, particularly regarding HB 6 related matters.

  • Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher fuel costs, and workforce impacts, affecting us and/or our customers and those vendors with which we do business.

  • Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters, which may result in increased storm restoration expenses and negatively affect future operating results.

  • The potential liabilities and increased costs arising from regulatory actions or outcomes in response to severe weather conditions and other natural disasters.

  • Legislative and regulatory developments, and executive orders, including, but not limited to, matters related to rates, energy regulatory policies, compliance and enforcement activity, cyber security, climate change, and diversity, equity and inclusion.

  • The risks associated with physical attacks, such as acts of war, terrorism, sabotage or other acts of violence, and cyber-attacks and other disruptions to our, or our vendors’, information technology system, which may compromise our operations, and data security breaches of sensitive data, intellectual property and proprietary or personally identifiable information.

  • The ability to meet our goals relating to climate-related and environmental, social and governance matters, opportunities, improvements, and efficiencies, including our GHG reduction goals.

  • The ability to accomplish or realize anticipated benefits through establishing a culture of continuous improvement and our other strategic and financial goals, including, but not limited to, executing Energize365*,* our transmission and distribution investment plan, executing on our rate filing strategy, controlling costs, improving credit metrics, maintaining investment grade ratings, strengthening our balance sheet and growing earnings.

  • Changing market conditions affecting the measurement of certain liabilities and the value of assets held in our pension trusts may negatively impact our forecasted growth rate, results of operations and may also cause us to make contributions to our pension sooner or in amounts that are larger than currently anticipated.

  • Mitigating exposure for remedial activities associated with retired and formerly owned electric generation assets, including those sites impacted by the legacy CCR rules that were finalized during 2024.

  • Changes to environmental laws and regulations, including, but not limited to, rules finalized by the EPA and SEC, including those currently stayed, related to climate change, and potential changes to such laws and regulations as a result of the new U.S. presidential administration.

  • Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, emerging technology, particularly with respect to electrification, energy storage and distributed sources of generation.

  • The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate change on their investment decisions, and the loss of our status as a well-known seasoned issuer.

  • Future actions taken by credit rating agencies that could negatively affect either our access to or terms of financing or our financial condition and liquidity.

  • Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system, generation resource planning, or the availability of capital or other resources supporting identified transmission and distribution investment opportunities.

  • The potential of non-compliance with debt covenants in our credit facilities.

  • The ability to comply with applicable reliability standards and energy efficiency and peak demand reduction mandates.

  • Human capital management challenges, including among other things, attracting and retaining appropriately trained and qualified employees and labor disruptions by our unionized workforce.

  • Changes to significant accounting policies.

  • Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, or adverse tax audit results or rulings and potential changes to such laws and regulations as a result of the new U.S. presidential administration.

  • The risks and other factors discussed from time to time in our SEC filings.

Dividends declared from time to time on our common stock during any period may in the aggregate vary from prior periods due to circumstances considered by the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.

These forward-looking statements are also qualified by, and should be read together with, the risk factors included in (a) Item 1A. Risk Factors, (b) Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, and (c) other factors discussed herein and in FirstEnergy's other filings with the SEC. The foregoing review of factors also should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on our business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. We expressly disclaim any obligation to update or revise, except as required by law, any forward-looking statements contained herein or in the information incorporated by reference as a result of new information, future events or otherwise.

Forward-looking and other statements in this Annual Report on Form 10-K regarding our Climate Strategy, including our GHG emis

Showing the first 8K of 343K characters. Open the full section

Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

The information required by Item 7A relating to market risk is set forth in Item 7, "Management's Discussion and Analysis of Financial Condition and Results of Operations."

Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

The consolidated financial statements and supplementary data of FirstEnergy required in this item are set forth beginning on page 91.

Report of Independent Registered Public Accounting Firm

To the Board of Directors and Stockholders of FirstEnergy Corp.

Opinions on the Financial Statements and Internal Control over Financial Reporting

We have audited the accompanying consolidated balance sheets of FirstEnergy Corp. and its subsidiaries (the "Company") as of December 31, 2024 and 2023, and the related consolidated statements of income, of comprehensive income, of stockholders' equity and of cash flows for each of the three years in the period ended December 31, 2024, including the related notes (collectively referred to as the "consolidated financial statements"). We also have audited the Company's internal control over financial reporting as of December 31, 2024, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).

In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31, 2024 and 2023, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2024 in conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2024, based on criteria established in Internal Control - Integrated Framework (2013) issued by the COSO.

Basis for Opinions

The Company's management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting, included in Management’s Report on Internal Control over Financial Reporting appearing under Item 9A. Our responsibility is to express opinions on the Company’s consolidated financial statements and on the Company's internal control over financial reporting based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal control over financial reporting was maintained in all material respects.

Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.

Definition and Limitations of Internal Control over Financial Reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Critical Audit Matters

The critical audit matter communicated below is a matter arising from the current period audit of the consolidated financial statements that was communicated or required to be communicated to the audit committee and that (i) relates to accounts or disclosures that are material to the consolidated financial statements and (ii) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.

Accounting for the Effects of Rate Regulation

As described in Note 1 to the consolidated financial statements, the Company’s Regulated Distribution, Regulated Transmission and Integrated segments are subject to regulation that sets the prices (rates) the Company is permitted to charge customers based on costs that the regulatory agencies determine are permitted to be recovered. At times, regulatory agencies permit the future recovery of costs that would be currently charged to expense by an unregulated company. The ratemaking process results in the recording of regulatory assets and liabilities based on anticipated future cash inflows and outflows. Management reviews the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new events occur. Factors that may affect probability include changes in the regulatory environment, issuance of a regulatory commission order, or passage of new legislation. Upon material changes to these factors, where applicable, management will record new regulatory assets or liabilities and will assess whether it is probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates. As of December 31, 2024, there were $617 million of regulatory assets and $995 million of regulatory liabilities.

The principal considerations for our determination that performing procedures relating to accounting for the effects of rate regulation is a critical audit matter is a high degree of auditor effort in performing procedures and evaluating audit evidenc

Showing the first 8K of 368K characters. Open the full section

Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

Item 9A. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

FirstEnergy, through the oversight of its Disclosure Committee, has established disclosure controls and procedures to ensure that information is accumulated and communicated to management, including the chief executive officer and chief financial officer, as appropriate to allow timely decisions regarding required disclosure, and ensure that information required to be disclosed in the reports FirstEnergy files or submits under the Exchange Act, is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms.

The management of FirstEnergy, with the participation of the chief executive officer and chief financial officer, has evaluated the effectiveness of its disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of December 31, 2024. Based on that evaluation, the chief executive officer and chief financial officer of FirstEnergy have concluded that its disclosure controls and procedures were effective as of December 31, 2024.

Management’s Report on Internal Control over Financial Reporting

Management of FirstEnergy is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. FirstEnergy’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management conducted an evaluation of the effectiveness of FirstEnergy's internal control over financial reporting as of December 31, 2024, based on the framework in "Internal Control-Integrated Framework" (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on that evaluation, management concluded that FirstEnergy's internal control over financial reporting was effective as of December 31, 2024.

The effectiveness of FirstEnergy’s internal control over financial reporting as of December 31, 2024 has been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report, which is included herein.

Changes in Internal Control over Financial Reporting

During the quarter ended December 31, 2024, there were no changes in internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that have materially affected, or are reasonably likely to materially affect, FirstEnergy's internal control over financial reporting.

Item 9B. OTHER INFORMATION

Trading Arrangements

During the quarter ended December 31, 2024, no director or officer (as defined in Rule 16a-1(f) promulgated under the Exchange Act) of FE adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (as each term is defined in Item 408 of Regulation S-K).

Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

Not applicable.

PART III

Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

The information required by Item 10 is incorporated herein by reference to FirstEnergy's 2025 Proxy Statement to be filed with the SEC pursuant to Regulation 14A under the Exchange Act.

FirstEnergy has adopted an insider trading compliance policy regarding securities transactions (the "Insider Trading Practice") that applies to its directors, officers, employees, consultants, and contractors and our subsidiaries, as well as the company itself. FirstEnergy believes that the Insider Trading Compliance Practice is reasonably designed to promote compliance with insider trading laws, rules and regulations with respect to the purchase, sale and/or other dispositions of FirstEnergy’s securities, as well as the applicable rules and regulations of the New York Stock Exchange. A copy of the Insider Trading Practice is filed as Exhibit 19 to this Annual Report on Form 10-K.

Item 11. EXECUTIVE COMPENSATION

The information required by Item 11 is incorporated herein by reference to FirstEnergy’s 2025 Proxy Statement to be filed with the SEC pursuant to Regulation 14A under the Exchange Act.

Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

The Item 403 of Regulation S-K information required by Item 12 is incorporated herein by reference to FirstEnergy's 2025 Proxy Statement to be filed with the SEC pursuant to Regulation 14A under the Exchange Act.

The following table contains information as of December 31, 2024, regarding compensation plans for which shares of FE common stock may be issued.

Plan categoryNumber of Securities to be Issued Upon Exercise of Outstanding Options, Warrants and RightsWeighted-Average Exercise Price of Outstanding Options, Warrants and RightsNumber of Securities Remaining Available for Future Issuance Under Equity Compensation Plans (Excluding Securities Reflected in First Column)
Equity compensation plans approved by security holders4,428,103(1)$—(2)8,529,960(3)
Equity compensation plans not approved by security holders(4)—$——
Total4,428,103$—8,529,960

(1) Includes 256,061 shares related to the DCPD that is expected to be paid in stock, 2,086,021 shares subject to outstanding awards of stock based Restricted Stock Units granted under the ICP 2020 if paid at target for the 2022-2024, 2023-2025, and 2024-2026 cycles of stock based Restricted Stock Units, as well as 2,086,021 additional shares to be paid if maximum performance metrics are achieved for the three outstanding cycles.

(2) There are no outstanding options, therefore, no consideration is required from participants for the exercise or vesting of any outstanding equity compensation awards.

(3) Additional shares may become available due to cancellations, forfeitures, cash settlements or other similar circumstances with respect to outstanding awards.

(4) All equity compensation plans have been approved by FE's shareholders.

Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required by Item 13 is incorporated herein by reference to FirstEnergy’s 2025 Proxy Statement to be filed with the SEC pursuant to Regulation 14A under the Exchange Act.

Item 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES

A summary of the audit and all other fees for services rendered by PricewaterhouseCoopers LLP are as follows:

For the Years Ended December 31,
20242023
(In thousands)
Audit Fees(1)$11,235$9,915
Audit-Related Fees(2)60—
Tax Fees(3)110110
All Other Fees(4)48282
Total Fees$11,453$10,307

(1) Professional services rendered for the audits of FirstEnergy's and certain of its subsidiary annual financial statements and reviews of unaudited financial statements included in FirstEnergy's Quarterly Reports on Form 10-Q filings made with the SEC, and for services in connection with statutory and regulatory filings or engagements, including comfort letters, agreed upon procedures and consents for financings. 2024 and 2023 audit fees also include newly required regulatory audits for certain subsidiaries and additional audit services to support the registration of certain subsidiaries with the SEC during 2024.

(2) Audit-related fees in 2024 were related to services rendered for climate-related reporting assessments.

(3) Tax fees in 2024 and 2023 were primarily related to the performance of tax services related to the FET equity interest sales.

(4) All other fees in 2024 and 2023 primarily reflect certain costs related to the SEC investigation.

Additional information required by this item is incorporated herein by reference to FirstEnergy’s 2025 Proxy Statement to be filed with the SEC pursuant to Regulation 14A under the Exchange Act.

PART IV

Item 15. EXHIBIT AND FINANCIAL STATEMENT SCHEDULES

(a) The following documents are filed as a part of this report on Form 10-K:

1. Financial Statements:

Management’s Report on Internal Control Over Financial Reporting for FirstEnergy Corp. is listed under Item 9A, "Controls and Procedures" herein.

Report of Independent Registered Public Accounting Firm (PCAOB ID 238) for FirstEnergy Corp. is listed under Item 8, "Financial Statements and Supplementary Data," herein.

The financial statements filed as a part of this report for FirstEnergy Corp. are listed under Item 8, "Financial Statements and Supplementary Data," herein.

2. Financial Statement Schedules:

N/A - Schedules not included are omitted because of the absence of conditions under which they are required or because the required information is provided in the consolidated financial statements, including the notes thereto.

3. Exhibits

Exhibit Number
3.1Amended and Restated Articles of Incorporation of FirstEnergy Corp. (incorporated by reference to FE’s Form 10-Q filed July 23, 2019, Exhibit 3-1, File No. 333-21011).
3.2Third Amended and Restated Code of Regulations of FirstEnergy Corp., effective May 17, 2022 (incorporated by reference to FE’s Form 8-K on May 23, 2022, Exhibit 3.1, File No. 333-21011).
3.3Amendment to the Third Amended and Restated Code of Regulations (incorporated by reference to FE’s Form 10-Q filed August 1, 2023, Exhibit 3.1, File No. 333-21011).
4.1Indenture, dated November 15, 2001, between FirstEnergy Corp. and The Bank of New York Mellon, as Trustee (incorporated by reference to FE’s Form S-3 filed September 21, 2001, Exhibit 4(a), File No. 333-69856).
4.2Indenture, dated as of May 4, 2023, between FirstEnergy Corp. and The Bank of New York Mellon Trust Company, N.A., as trustee. (incorporated by reference to FirstEnergy’s Form 8-K filed May 4, 2023, Exhibit 4.1, File No. 333-21011)
Exhibit Number
4.3Officer’s Certificate relating to FirstEnergy Corp.'s 2.85% Notes, Series A, due 2022, 3.90% Notes, Series B, due 2027 and 4.85% Notes, Series C, due 2047 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
4.4Form of 3.90% Note, Series B, due 2027 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
4.5Form of 4.85% Note, Series C, due 2047 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
4.6Officer’s Certificate relating to FirstEnergy Corp.'s 2.050% Notes, Series A, due 2025, 2.650% Notes, Series B, due 2030 and 3.400% Notes, Series C, due 2050 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.1, File No. 333-21011).
4.7Form of 2.050% Note, Series A, due 2025 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.2, File No. 333-21011).
4.8Form of 2.650% Note, Series B, due 2030 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.3, File No. 333-21011).
4.9Form of 3.400% Note, Series C, due 2050 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.4, File No. 333-21011).
4.10Officer’s Certificate relating to FirstEnergy Corp.'s 1.600% Notes, Series A, due 2026, 2.250% Notes, Series B, due 2030 (incorporated by reference to FE’s Form 8-K filed June 8, 2020, Exhibit 4.1, File No. 333-21011).
4.11Form of 1.600% Note, Series A, due 2026 (incorporated by reference to FE’s Form 8-K filed June 8, 2020, Exhibit 4.2, File No. 333-21011).
4.12Form of 2.250% Note, Series B, due 2030 (incorporated by reference to FE’s Form 8-K filed June 8, 2020, Exhibit 4.3, File No. 333-21011).
4.13Description of Securities Registered under Section 12(b) of the Securities Exchange Act of 1934 (incorporated by reference to FE's Form 10-K filed February 10, 2020, Exhibit 4-10, File No. 333-21011).
4.14Form of 4.00% Convertible Senior Notes due 2026 (included hereto in Exhibit 4.2)
10.1Credit Agreement, dated as of October 18, 2021, by and among FirstEnergy Corp., FirstEnergy Transmission, LLC, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 8-K filed October 18, 2021, Exhibit 10.1, File No. 333-210111).
10.2Credit Agreement, dated as of October 18, 2021, by and among The Cleveland Electric Illuminating Company, Ohio Edison Company, The Toledo Edison Company, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.2, File No. 333-21011).
10.3Credit Agreement, dated as of October 18, 2021, by and among Metropolitan Edison Company, Pennsylvania Power Company, Pennsylvania Electric Company, West Penn Power Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.3, File No. 333-21011).
10.4Credit Agreement, dated as of October 18, 2021, by and among Jersey Central Power & Light Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.4, File No. 333-21011).
10.5Credit Agreement, dated as of October 18, 2021, by and among American Transmission Systems, Incorporated, Mid-Atlantic Interstate Transmission, LLC, and Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.5, File No. 333-21011).
10.6Credit Agreement, dated as of October 18, 2021, by and among Monongahela Power Company, The Potomac Edison Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.6, File No. 333-21011).
10.7Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among FirstEnergy Corp., FirstEnergy Transmission, LLC, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.1, File No. 333-21011)
10.8Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among The Cleveland Electric Illuminating Company, Ohio Edison Company, The Toledo Edison Company, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.2, File No. 333-21011)
10.9Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among Metropolitan Edison Company, Pennsylvania Power Company, Pennsylvania Electric Company, West Penn Power Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.3, File No. 333-21011)
10.10Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among American Transmission Systems, Incorporated, Mid-Atlantic Interstate Transmission, LLC, Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.4, File No. 333-21011)
Exhibit Number
10.11Amendment No. 1 to Credit Agreement, dated as of April 27, 2023, by and among Jersey Central Power & Light Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.5, File No. 333-21011)
10.12Amendment No. 1 to Credit Agreement, dated as of April 27, 2023, by and among Monongahela Power Company, The Potomac Edison Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.6, File No. 333-21011)
10.13Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among FirstEnergy Corp., the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.1, File No. 333-21011).
10.14Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among The Cleveland Electric Illuminating Company, Ohio Edison Company, The Toledo Edison Company, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.2, File No. 333-21011).
10.15Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among Metropolitan Edison Company, Pennsylvania Power Company, Pennsylvania Electric Company, West Penn Power Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.3, File No. 333-21011).
10.16Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among American Transmission Systems, Incorporated, Mid-Atlantic Interstate Transmission, LLC, Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.4, File No. 333-21011).
10.17Amendment No. 2 to Credit Agreement, dated as of October 20, 2023, by and among Jersey Central Power & Light Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.5, File No. 333-21011).
10.18Amendment No. 2 to Credit Agreement, dated as of October 20, 2023, by and among Monongahela Power Company, The Potomac Edison Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.6, File No. 333-21011).
10.19Credit Agreement, dated as of October 20, 2023, by and among Keystone Appalachian Transmission Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.7, File No. 333-21011).
10.20Credit Agreement, dated as of October 20, 2023, by and among FirstEnergy Transmission, LLC, the banks and other financial institutions party thereto on the date hereof, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.8, File No. 333-21011).
10.21Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among FE, as borrower, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.2, File No. 333-21011)
10.22Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among CEI, OE and TE, as borrowers, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.3, File No. 333-21011)
10.23Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among FE PA, as borrower, the banks and other financial institutions party thereto, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.4, File No. 333-21011)
10.24Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among JCP&L, as borrower, the banks and other financial institutions party thereto, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.5, File No. 333-21011)
10.25Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among MP and PE, the banks and other financial institutions party thereto, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.6, File No. 333-21011)
10.26Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among ATSI, MAIT and TrAIL, as borrower, the banks and other financial institutions party thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.7, File No. 333-21011)
10.27Amendment No. 1 to Credit Agreement and Consent, dated as of October 24, 2024, among FET, as borrower, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.8, File No. 333-21011)
10.28Amendment No. 1 to Credit Agreement, dated as of October 24, 2024, among KATCo, as borrower, the banks and other financial institutions party thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.9, File No. 333-21011)
10.29Consent Decree dated March 18, 2005 (incorporated by reference to FE’s Form 8-K filed March 18, 2005, Exhibit 10-1, File No. 333-21011).
Exhibit Number
10.30Settlement Agreement, dated as of August 26, 2018, by and among the Debtors, the FE Non-Debtor Parties, the Ad Hoc Noteholders Group, the Bruce Mansfield Certificateholders Group and the Committee (in each case, as defined therein) (incorporated by reference to FE’s Form 8-K filed August 27, 2018, Exhibit 10.1, File No. 333-21011).
10.31Deferred Prosecution Agreement, dated as of July 21, 2021 (incorporated by reference to FE’s Form 8-K filed July 22, 2021, Exhibit 10.1, File No. 333-21011).
10.32Agreement between the Office of the Ohio Attorney General, the Office of the Summit County Prosecutor and FirstEnergy Corp. dated August 12, 2024 (incorporated by reference to FE’s Form 8-K filed August 13, 2024, Exhibit 99.2, File No. 333-21011).
10.33Settlement Order, dated as of September 12, 2024 (incorporated by reference to FE’s Form 8-K filed September 12, 2024, Exhibit 99.2, File No. 333-21011).
10.34Purchase and Sale Agreement, dated as of November 6, 2021, among the FirstEnergy Corp. and North American Transmission Company II LLC, and Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P. and Brookfield Super-Core Infrastructure Partners (ER) SCSp, as guarantors. (incorporated by reference to FE’s Form 10-K filed February 16, 2022, Exhibit 10-10, File No. 333-21011).
10.35Purchase and Sale Agreement, dated as of February 2, 2023, among the FirstEnergy Corp., and FirstEnergy Transmission, LLC, and North American Transmission Company II L.P., and North American Transmission FINCO L.P., Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P. and Brookfield Super-Core Infrastructure Partners (ER) SCSp, as guarantors. (incorporated by reference to FE’s Form 10-Q filed April 27, 2023, Exhibit 10.1, File No. 333-21011).
10.36Fourth Amended and Restated Limited Liability Company Agreement of FirstEnergy Transmission, LLC, dated March 25, 2024 (incorporated by reference to FE’s Form 8-K filed March 25, 2024, Exhibit 10.1, File No. 333-21011).
10.37Common Stock Purchase Agreement, dated as of November 6, 2021, among the FirstEnergy Corp. and BIP Securities II-B L.P. (incorporated by reference to FE’s Form S-3 filed on December 13, 2021, Exhibit 4(d), File No. 333-210111).
10.38(B)FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, amended and restated January 1, 2005, further amended December 31, 2010 (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-6, File No. 333-21011).
10.39(B)Amendment No. 1 to Deferred Compensation Plan for Outside Directors, effective as of January 1, 2012 (incorporated by reference to FE's Form 10-Q filed May 3, 2011, Exhibit 10.7, File No. 333-21011).
10.40(B)Amendment No. 2 to FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, effective January 21, 2014, (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-8, File No. 333-21011).
10.41(B)Amendment No. 3 to FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, dated January 14, 2019 and effective as of April 1, 2018 (incorporated by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-7, File No.333-21011).
10.42(B)FirstEnergy Corp. Supplemental Executive Retirement Plan, amended and restated January 1, 2005, further amended December 31, 2010 (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-9, File No. 333-21011).
10.43(B)Amendment No. 1 to FirstEnergy Corp. Supplemental Executive Retirement Plan, effective January 1, 2012 (incorporated by reference to FE's Form 10-Q filed May 3, 2011, Exhibit 10.8, File No. 333-21011).
10.44(B)Amendment No. 2 to FirstEnergy Corp. Supplemental Executive Retirement Plan, dated January 14, 2019 and effective as of April 1, 2018 (incorporated by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-10, File No. 333-21011).
10.45(B)FirstEnergy Corp. Cash Balance Restoration Plan, effective January 1, 2014 (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-11, File No. 333-21011).
10.46(B)Retirement Plan for Outside Directors of GPU, Inc. as amended and restated as of August 8, 2000 (incorporated by reference to GPU, Inc. Form 10-K filed March 21, 2001, Exhibit 10-N, File No. 001-06047).
10.47(B)Allegheny Energy, Inc. Non-Employee Director Stock Plan (incorporated by reference to FE's Form 8-K filed February 25, 2011, Exhibit 10.4, File No. 21011).
10.48(B)Allegheny Energy, Inc. Amended and Restated Revised Plan for Deferral of Compensation of Directors (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-29, File No. 333-21011).
10.49(B)Amendment No. 1 to Allegheny Energy, Inc. Amended and Restated Revised Plan for Deferral of Compensation of Directors (incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-30, File No. 333-21011).
10.50(B)Form of Director and Officer Indemnification Agreement (incorporated by reference to FE’s Form 8-K filed May 16, 2018, Exhibit 10.1, File No. 333-21011).
10.51(B)Guarantee, dated as of September 16, 2013 by FirstEnergy Corp. in favor of participants under the FirstEnergy Corp. Executive Deferred Compensation Plan (incorporated by reference to FE’s Form 10-Q filed November 5, 2013, Exhibit 10.2, File No. 333-21011).
10.52(B)FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated July 20, 2015, and effective as of November 1, 2015 (incorporated by reference to FE's Form 8-K filed July 24, 2015, Exhibit 10.1, File No. 333-21011).
10.53(B)Amendment No. 1 to FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated January 14, 2019 and effective as of April 1, 2018 (incorporated by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-23, File No. 333-21011).
10.54(B)FirstEnergy Corp. 2017 Change in Control Severance Plan, dated as of September 15, 2015, and effective as of January 1, 2017 (incorporated by reference to FE's Form 8-K filed September 18, 2015, Exhibit 10.1, File No. 333-21011).
10.55(B)Waiver of Participation in the FirstEnergy Corp. Change in Control Severance Plan, entered into by Charles E. Jones dated as of September 15, 2015 (incorporated by reference to FE's Form 8-K filed September 18, 2015, Exhibit 10.2, File No. 333-21011).
Exhibit Number
10.56(B)Non-Competition and Non-Disparagement Agreement, entered into by Charles E. Jones, dated as of September 15, 2015 (incorporated by reference to FE's Form 8-K filed September 18, 2015, Exhibit 10.3, File No. 333-21011).
10.57(B)FirstEnergy Corp. 2015 Incentive Compensation Plan (incorporated by reference to FE's Definitive Proxy Statement filed April 1, 2015, Appendix A, File No. 333-21011).
10.58(B)Amendment No. 1 to the FirstEnergy Corp. 2015 Incentive Compensation Plan, effective February 21, 2017 (incorporated by reference to FE's Form 10-K filed February 21, 2017, Exhibit 10-51, File No. 333-21011).
10.59(B)Executive Severance Benefits Plan, as amended and restated as of December 20, 2016 (incorporated by reference to FE’s Form 8-K filed December 21, 2016, Exhibit 10.1, File No. 333-21011).
10.60(B)Amendment No. 2 to FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated September 18, 2019 and effective as of November 1, 2015 (incorporated by reference to FE's Form 10-Q filed November 4, 2019, Exhibit 10.3, File No.333-21011).
10.61(B)Guarantee, dated as of February 21, 2017, by FirstEnergy Corp. in favor of participants under the FirstEnergy Corp. Cash Balance Pension Restoration Plan (incorporated by reference to FE’s Form 10-Q filed July 27, 2017, Exhibit 10.1, File No. 333-21011).
10.62(B)FirstEnergy Solutions Corp. Voluntary Enhanced Retirement Option, effective as of January 2, 2019 (incorporated by reference to FE’s Form 8-K filed November 21, 2018, Exhibit 10.1, File No. 333-21011).
10.63Consent and Waiver to the Settlement Agreement, dated April 18, 2019, by and among the Debtors and the FE Non-Debtor Parties (incorporated by reference to FE's Form 10-Q filed April 23, 2019, Exhibit 10.1, File No.333-21011).
10.64First Amendment to Settlement Agreement dated November 21, 2019, by and among the Debtors, FE Non-Debtor Parties, Ad Hoc Noteholders Group, Bruce Mansfield Certificateholders Group, and the Committee (incorporated by reference to FE’s Form 8-K filed November 26, 2019, Exhibit 10.1, File No. 333-21011).
10.65(B)Form of 2020 Restricted Stock Award Agreement (incorporated by reference to FE's Form 10-Q filed April 23, 2020, Exhibit 10.3, File No.333-21011).
10.66(B)FirstEnergy Corp. 2020 Incentive Compensation Plan (incorporated by reference to FE's Form 8-K filed May 20, 2020, Exhibit 10.1, File No.333-21011).
10.67(B)Form of Restricted Stock Award Agreement (incorporated by reference to FE’s Form 10-Q filed July 22, 2021, Exhibit 10.3, File No. 333-21011).
10.68(B)Restricted Stock Award Agreement to John W. Somerhalder II (incorporated by reference to FE’s Form 10-Q filed July 22, 2021, Exhibit 10.5, File No. 333-21011).
10.69(B)Form of 2022-2024 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 21, 2022, Exhibit 10.1, File No. 333-21011).
10.70(B)Form of 2022-2024 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 21, 2022, Exhibit 10.2, File No. 333-21011).
10.71(B)Form of 2023-2025 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed August 1, 2023, Exhibit 10.7, File No. 333-21011).
10.72(B)Form of 2023-2025 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed August 1, 2023, Exhibit 10.8, File No. 333-21011).
10.73(B)Form of 2024-2026 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 25, 2024, Exhibit 10.2, File No. 333-21011).
10.74(B)Form of 2024-2026 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 25, 2024, Exhibit 10.3, File No. 333-21011).
10.75(B)Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement to John W. Somerhalder II (incorporated by reference to FE’s Form 10-Q filed July 26, 2022, Exhibit 10.3, File No. 333-21011).
10.76(B)Offer letter, dated March 26, 2023, between FirstEnergy Corp. and Brian X. Tierney (incorporated by reference to FE’s Form 10-Q filed April 27, 2023, Exhibit 10.2, File No. 333-21011).
10.77(B)2022 Interim Chief Executive Officer Restricted Stock Units Award Agreement to John W. Somerhalder II. (incorporated by reference to FE’s Form 10-K filed February 13, 2023, Exhibit 10.59, File No. 333-21011).
10.78(B)2023 Interim Chief Executive Officer Restricted Stock Units Award Agreement to John W. Somerhalder II. (incorporated by reference to FE’s Form 10-K filed February 13, 2023, Exhibit 10.60, File No. 333-21011).
10.79(B)Severance Agreement and Release of Claims of Christine L. Walker (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.1, File No. 333-21011).
14Code of Business Conduct and Ethics (incorporated by reference to FE’s Form 10-Q filed July 22, 2021, Exhibit 14.1, File No. 333-21011).
19(A)Insider Trading Practice
21(A)List of Subsidiaries of the Registrant at December 31, 2024.
23(A)Consent of Independent Registered Public Accounting Firm.
31.1(A)Certification of chief executive officer, pursuant to Rule 13a-14(a).
31.2(A)Certification of chief financial officer, pursuant to Rule 13a-14(a).
32(A)Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. §1350.
97Policy relating to recovery of erroneously awarded compensation (incorporated by reference to FE’s Form 10-K filed February 13, 2024, Exhibit 97, File No. 333-21011).
Exhibit Number
101The following materials from the Annual Report on Form 10-K for FirstEnergy Corp. for the period ended December 31, 2024, formatted in iXBRL (Inline Extensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Common Stockholders' Equity, (v) Consolidated Statements of Cash Flows, (vi) related notes to these financial statements and (vii) document and entity information.
104Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document)
(A)Provided herein in electronic format as an exhibit.
(B)Management contract or compensatory plan contract or arrangement filed pursuant to Item 601 of Regulation S-K.

Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, FirstEnergy has not filed as an exhibit to this Form 10-K any instrument with respect to long-term debt if the respective total amount of securities authorized thereunder does not exceed 10% of its respective total assets, but hereby agrees to furnish to the SEC on request any such documents.

Item 16. FORM 10-K SUMMARY

None.

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

FIRSTENERGY CORP.
BY:/s/ Brian X. Tierney
Brian X. Tierney
Chair, President and Chief Executive Officer

Date: February 27, 2025

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the date indicated:

FIRSTENERGY CORP.
/s/ Brian X. Tierney
Brian X. Tierney
Chair, President and Chief Executive Officer
(Principal Executive Officer)
/s/ Lisa Winston Hicks
Lisa Winston Hicks
Lead Independent Director
/s/ K. Jon Taylor/s/ Jason J. Lisowski
K. Jon TaylorJason J. Lisowski
Senior Vice President, Chief Financial Officer and StrategyVice President, Controller and Chief Accounting Officer
(Principal Financial Officer)(Principal Accounting Officer)
/s/ Heidi L. Boyd/s/ James F. O'Neil III
Heidi L. BoydJames F. O'Neil III
DirectorDirector
/s/ Jana T. Croom/s/ John W. Somerhalder II
Jana T. CroomJohn W. Somerhalder II
DirectorDirector
/s/ Steven J. Demetriou/s/ Leslie M. Turner
Steven J. DemetriouLeslie M. Turner
DirectorDirector
/s/ Paul Kaleta/s/ Melvin D. Williams
Paul KaletaMelvin D. Williams
DirectorDirector

Date: February 27, 2025