UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

(Mark One)

☑ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended September 30, 2024

OR

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from ___________________ to ___________________

FE Logo.jpg

CommissionRegistrant; State of Incorporation;I.R.S. Employer
File NumberAddress; and Telephone NumberIdentification No.
333-21011FIRSTENERGY CORP.34-1843785
(AnOhioCorporation)
76 South Main Street
AkronOH44308
Telephone(800)736-3402

SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:

Title of Each ClassTrading SymbolName of Each Exchange on Which Registered
Common Stock, $0.10 par valueFENew York Stock Exchange

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes☑No☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Yes☑No☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large Accelerated Filer☑
Accelerated Filer☐
Non-accelerated Filer☐
Smaller Reporting Company☐
Emerging Growth Company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes☐No☑

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:

OUTSTANDING
CLASSAs of September 30, 2024
Common Stock, $0.10 par value576,317,004

FirstEnergy Website and Other Social Media Sites and Applications

FirstEnergy’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, amendments to those reports, and all other documents filed with or furnished to the SEC pursuant to Section 13(a) of the Exchange Act are made available free of charge on or through the “Investors” page of FirstEnergy’s website at www.firstenergycorp.com. These documents are also available to the public from commercial document retrieval services and the website maintained by the SEC at www.sec.gov.

These SEC filings are posted on FirstEnergy’s website as soon as reasonably practicable after they are electronically filed with or furnished to the SEC. Additionally, FirstEnergy routinely posts additional important information, including press releases, investor presentations, investor factbooks, regulatory activity updates, and notices of upcoming events under the “Investors” section of FirstEnergy’s website and recognizes FirstEnergy’s website as a channel of distribution to reach public investors and as a means of disclosing (including initially or exclusively) material non-public information for complying with disclosure obligations under Regulation FD. Investors may be notified of postings to the website by signing up for email alerts and Rich Site Summary feeds on the “Investors” page of FirstEnergy’s website. FirstEnergy also uses X (the social networking site formerly known as Twitter®), LinkedIn®, YouTube® and Facebook® as additional channels of distribution to reach public investors and as a supplemental means of disclosing material non-public information for complying with its disclosure obligations under Regulation FD. Information contained on FirstEnergy’s website, X (the social networking site formerly known as Twitter®) handle, LinkedIn® profile, YouTube® channel or Facebook® page, and any corresponding applications of those sites, shall not be deemed incorporated into, or to be part of, this report.

Forward-Looking Statements: This Form 10-Q includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project," “estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):

  • The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those associated with compliance with or failure to comply with the DPA.

  • The risks and uncertainties associated with government investigations and audits regarding HB 6 and related matters, including potential adverse impacts on federal or state regulatory matters, including, but not limited to, matters relating to rates.

  • The risks and uncertainties associated with litigation, arbitration, mediation and similar proceedings, particularly regarding HB 6 related matters.

  • Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher fuel costs, and workforce impacts, affecting us and/or our customers and those vendors with which we do business.

  • Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters affecting future operating results and associated regulatory actions or outcomes in response to such conditions.

  • Legislative and regulatory developments, including, but not limited to, matters related to rates, energy regulatory policies, compliance and enforcement activity, cyber security and climate change.

  • The risks associated with physical attacks, such as acts of war, terrorism, sabotage or other acts of violence, and cyber-attacks and other disruptions to our, or our vendors’, information technology system, which may compromise our operations, and data security breaches of sensitive data, intellectual property and proprietary or personally identifiable information.

  • The ability to meet our goals relating to EESG opportunities, improvements, and efficiencies, including our GHG reduction goals.

  • The ability to accomplish or realize anticipated benefits through establishing a culture of continuous improvement and our other strategic and financial goals, including, but not limited to, overcoming current uncertainties and challenges associated with the ongoing government investigations, executing Energize365*,* our transmission and distribution investment plan, executing on our rate filing strategy, controlling costs, improving credit metrics, maintaining investment grade ratings and growing earnings.

  • Changing market conditions affecting the measurement of certain liabilities and the value of assets held in our pension trusts may negatively impact our forecasted growth rate, results of operations and may also cause us to make contributions to our pension sooner or in amounts that are larger than currently anticipated.

  • Mitigating exposure for remedial activities associated with retired and formerly owned electric generation assets, including those sites impacted by the legacy CCR rules that were finalized during 2024.

  • Changes to environmental laws and regulations, including, but not limited to, rules finalized by the EPA and the SEC related to climate change.

  • Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, emerging technology, particularly with respect to electrification, energy storage and distributed sources of generation.

  • The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate change on their investment decisions.

  • Future actions taken by credit rating agencies that could negatively affect either our access to or terms of financing or our financial condition and liquidity.

  • Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system, generation resource planning, or the availability of capital or other resources supporting identified transmission and distribution investment opportunities.

  • The potential of non-compliance with debt covenants in our credit facilities.

  • The ability to comply with applicable reliability standards and energy efficiency and peak demand reduction mandates.

  • Human capital management challenges, including among other things, attracting and retaining appropriately trained and qualified employees and labor disruptions by our unionized workforce.

  • Changes to significant accounting policies.

  • Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, or adverse tax audit results or rulings.

  • The risks and other factors discussed from time to time in our SEC filings.

Dividends declared from time to time on our common stock during any period may in the aggregate vary from prior periods due to circumstances considered by the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.

Forward-looking and other statements in this Quarterly Report on Form 10-Q regarding our Climate Strategy, including our GHG emission reduction goals, are not an indication that these statements are necessarily material to investors or required to be disclosed in our filings with the SEC. In addition, historical, current and forward-looking statements regarding climate matters, including GHG emissions, may be based on standards for measuring progress that are still developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.

TABLE OF CONTENTS

Page
Part I. Financial Information
Glossary of Termsii
Item 1. Financial Statements
FirstEnergy Corp.
Consolidated Statements of Income1
Consolidated Statements of Comprehensive Income2
Consolidated Balance Sheets3
Consolidated Statements of Equity4
Consolidated Statements of Cash Flows6
Notes To Consolidated Financial Statements7
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations41
Item 3. Quantitative and Qualitative Disclosures About Market Risk83
Item 4. Controls and Procedures83
Part II. Other Information
Item 1. Legal Proceedings83
Item 1A. Risk Factors84
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds84
Item 3. Defaults Upon Senior Securities84
Item 4. Mine Safety Disclosures84
Item 5. Other Information84
Item 6. Exhibits85

i

GLOSSARY OF TERMS

The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:

AE SupplyAllegheny Energy Supply Company, LLC, an unregulated generation subsidiary of FE
AGCAllegheny Generating Company, a generation subsidiary of MP
ATSIAmerican Transmission Systems, Incorporated, a transmission subsidiary of FET
CEIThe Cleveland Electric Illuminating Company, an Ohio electric power company subsidiary of FE
Electric CompaniesOE, CEI, TE, FE PA, JCP&L, MP and PE
FEFirstEnergy Corp., a public electric power holding company
FE PAFirstEnergy Pennsylvania Electric Company, a Pennsylvania electric power company subsidiary of FirstEnergy Pennsylvania Holding Company LLC, a wholly owned subsidiary of FE
FESCFirstEnergy Service Company, which provides legal, financial and other corporate support services
FES DebtorsEnergy Harbor LLC (formerly known as FirstEnergy Solutions Corp.), a subsidiary of EH, and its subsidiaries as of March 31, 2018, and Energy Harbor Nuclear Corp. (formerly known as FirstEnergy Nuclear Operating Company), a subsidiary of EH, which operates EH’s nuclear generating facilities.
FETFirstEnergy Transmission, LLC a consolidated VIE of FE, and the parent company of ATSI, MAIT and TrAIL, and having a joint venture in PATH
FEVFirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FirstEnergyFirstEnergy Corp., together with its consolidated subsidiaries
Global HoldingGlobal Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
JCP&LJersey Central Power & Light Company, a New Jersey electric power company subsidiary of FE
KATCoKeystone Appalachian Transmission Company, a transmission subsidiary of FE
MAITMid-Atlantic Interstate Transmission, LLC, a transmission subsidiary of FET
MEMetropolitan Edison Company, a former Pennsylvania electric power company subsidiary of FE, which merged with and into FE PA on January 1, 2024
MPMonongahela Power Company, a West Virginia electric power company subsidiary of FE
OEOhio Edison Company, an Ohio electric power company subsidiary of FE
Ohio CompaniesCEI, OE and TE
PATHPotomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-AlleghenyPATH Allegheny Transmission Company, LLC
PATH-WVPATH West Virginia Transmission Company, LLC
PEThe Potomac Edison Company, a Maryland and West Virginia electric power company subsidiary of FE
PennPennsylvania Power Company, a former Pennsylvania electric power company subsidiary of OE, which merged with and into FE PA on January 1, 2024
Pennsylvania CompaniesME, PN, Penn and WP, each of which merged with and into FE PA on January 1, 2024
PNPennsylvania Electric Company, a former Pennsylvania electric power company subsidiary of FE, which merged with and into FE PA on January 1, 2024
Signal PeakSignal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TEThe Toledo Edison Company, an Ohio electric power company subsidiary of FE
TrAILTrans-Allegheny Interstate Line Company, a transmission subsidiary of FET
Transmission CompaniesATSI, KATCo, MAIT and TrAIL
WPWest Penn Power Company, a former Pennsylvania electric power company subsidiary of FE, which merged with and into FE PA on January 1, 2024

ii

The following abbreviations and acronyms may be used to identify frequently used terms in this report:
2021 Credit FacilitiesCollectively, the six separate senior unsecured five-year syndicated revolving credit facilities entered into by FE, the Electric Companies and the Transmission Companies, on October 18, 2021, as amended through October 20, 2023
2023 Credit FacilitiesCollectively, the FET Revolving Facility and KATCo Revolving Facility
2026 Convertible NotesFE’s 4.00% convertible senior notes, due 2026
A&R FET LLC AgreementFourth Amended and Restated Limited Liability Company Agreement of FET
ACEAffordable Clean Energy
AEPAmerican Electric Power Company, Inc.
AFSAvailable-for-sale
AFSIAdjusted Financial Statement Income
AFUDCAllowance for Funds Used During Construction
AMIAdvanced Metering Infrastructure
AMTAlternative Minimum Tax
AOCIAccumulated Other Comprehensive Income (Loss)
AROAsset Retirement Obligation
ASUAccounting Standards Update
BGSBasic Generation Service
BrookfieldNorth American Transmission Company II L.P., a controlled investment vehicle entity of Brookfield Infrastructure Partners
Brookfield GuarantorsBrookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P., and Brookfield Super-Core Infrastructure Partners (ER) SCSp
CAAClean Air Act
CCRCoal Combustion Residual
CERCLAComprehensive Environmental Response, Compensation, and Liability Act of 1980
CFIUSCommittee on Foreign Investments in the United States
CFRCode of Federal Regulations
CO2Carbon Dioxide
CODMChief Operating Decision Maker
COVID-19Coronavirus disease
CPPEPA's Clean Power Plan
CSAPRCross-State Air Pollution Rule
D.C. CircuitUnited States Court of Appeals for the District of Columbia Circuit
DCRDelivery Capital Recovery
DMRDistribution Modernization Rider
DOEUnited States Department of Energy
DPADeferred Prosecution Agreement entered into on July 21, 2021 between FE and the U.S. Attorney’s Office for the S.D. Ohio
DSICDistribution System Improvement Charge
EDCElectric Distribution Company
EE&CEnergy Efficiency and Conservation
EESGEmployee, Environmental, Social and Corporate Governance
EGSElectric Generation Supplier
EGUElectric Generation Unit
EHEnergy Harbor Corp.
ELGEffluent Limitation Guideline
EmPOWER MarylandEmPOWER Maryland Energy Efficiency Act
ENECExpanded Net Energy Cost
Energize365FirstEnergy's Transmission and Distribution Infrastructure Investment Program

iii

EnergizeNJJCP&L's second Infrastructure Investment Program
EPAUnited States Environmental Protection Agency
EPSEarnings Per Share
ESPElectric Security Plan
Exchange ActSecurities and Exchange Act of 1934, as amended
FASBFinancial Accounting Standards Board
FE BoardFE Board of Directors
FE Revolving FacilityFE and the Electric Companies’ former five-year syndicated revolving credit facility, as amended, and replaced by the 2021 Credit Facilities on October 18, 2021
FERCFederal Energy Regulatory Commission
FET BoardFET Board of Directors
FET Equity Interest SaleSale of an additional 30% equity interest in FET that closed on March 25, 2024, such that Brookfield’s interest in FET increased from 19.9% to 49.9%
FET P&SA IPurchase and Sale Agreement entered into on November 6, 2021, by and between FE, FET, Brookfield and the Brookfield Guarantors
FET P&SA IIPurchase and Sale Agreement entered into on February 2, 2023, by and between FE, FET, Brookfield and the Brookfield Guarantors
FET Revolving FacilityFET’s five-year syndicated revolving credit facility, dated as of October 20, 2023
FIPFederal Implementation Plan(s) under the CAA
FitchFitch Ratings Service
FMBFirst Mortgage Bond
FTRFinancial Transmission Right
GAAPGenerally Accepted Accounting Principles in the United States of America
GHGGreenhouse Gas
HB 6House Bill 6, as passed by Ohio's 133rd General Assembly
IRA of 2022Inflation Reduction Act of 2022
IRSInternal Revenue Service
KATCo Revolving FacilityKATCo’s four-year syndicated revolving credit facility, dated as of October 20, 2023
LOCLetter of Credit
LTIIPLong-Term Infrastructure Improvement Plan
MDPSCMaryland Public Service Commission
MGPManufactured Gas Plants
Moody’sMoody’s Investors Service, Inc.
MWMegawatt
MWhMegawatt-hour
NCINoncontrolling Interest
N.D. OhioFederal District Court, Northern District of Ohio
NERCNorth American Electric Reliability Corporation
NJBPUNew Jersey Board of Public Utilities
NOLNet Operating Loss
NOxNitrogen Oxide
NYPSCNew York State Public Service Commission
OAGOhio Attorney General
OCCOhio Consumers' Counsel
ODSAOhio Development Service Agency
Ohio StipulationStipulation and Recommendation, dated November 1, 2021, entered into by and among the Ohio Companies, the OCC, PUCO Staff and several other signatories
OOCICOhio Organized Crime Investigations Commission, which is composed of members of the Ohio law enforcement community and is chaired by the OAG
OPEBOther Post-Employment Benefits
OPICOther Paid-In Capital
OVECOhio Valley Electric Corporation

iv

PA ConsolidationConsolidation of the Pennsylvania Companies, effective January 1, 2024
PEERFirstEnergy’s Program for Enhanced Employee Retirement
PJMPJM Interconnection, LLC, an RTO
PJM TariffPJM Open Access Transmission Tariff
PPAPurchase Power Agreement
PPUCPennsylvania Public Utility Commission
PUCOPublic Utilities Commission of Ohio
Regulation FDRegulation Fair Disclosure promulgated by the SEC
RFCReliabilityFirst Corporation
ROEReturn on Equity
RTORegional Transmission Organization
S.D. OhioFederal District Court, Southern District of Ohio
SECUnited States Securities and Exchange Commission
SEETSignificantly Excessive Earnings Test
SIPState Implementation Plan(s) under the CAA
SLCSpecial Litigation Committee of the FE Board
SO2Sulfur Dioxide
SOFRSecured Overnight Financing Rate
SOSStandard Offer Service
SPESpecial Purpose Entity
S&PStandard & Poor’s Ratings Service
Tax ActTax Cuts and Jobs Act adopted December 22, 2017
U.S.United States
U.S.C.United States Code
VIEVariable Interest Entity
VSCCVirginia State Corporation Commission
WVPSCPublic Service Commission of West Virginia

v

PART I. FINANCIAL INFORMATION

ITEM I. Financial Statements

FIRSTENERGY CORP.

CONSOLIDATED STATEMENTS OF INCOME

(Unaudited)

For the Three Months Ended September 30,For the Nine Months Ended September 30,
(In millions, except per share amounts)2024202320242023
REVENUES:
Distribution services and retail generation$3,069$2,869$8,381$7,924
Transmission5565081,6501,486
Other104110265314
Total revenues(1)3,7293,48710,2969,724
OPERATING EXPENSES:
Fuel139166372439
Purchased power1,0861,1552,9993,173
Other operating expenses1,0999673,2752,698
Provision for depreciation4003661,1781,088
Deferral of regulatory assets, net(33)(140)(205)(253)
General taxes311307915881
Total operating expenses3,0022,8218,5348,026
OPERATING INCOME7276661,7621,698
OTHER INCOME (EXPENSE):
Debt redemption costs (Note 6)——(85)(36)
Equity method investment earnings (Note 1)214364134
Miscellaneous income, net5324156102
Pension and OPEB mark-to-market adjustment (Note 4)———59
Interest expense(276)(289)(866)(828)
Capitalized financing costs35269469
Total other expense(167)(196)(637)(500)
INCOME BEFORE INCOME TAXES5604701,1251,198
INCOME TAXES9429294193
INCOME FROM CONTINUING OPERATIONS4664418311,005
Discontinued operations (Note 1)(2)—(21)—(21)
NET INCOME$466$420$831$984
Income attributable to noncontrolling interest472011457
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP.$419$400$717$927
AMOUNTS ATTRIBUTABLE TO FIRSTENERGY CORP.:
Earnings from continuing operations$419$421$717$948
Earnings from discontinued operations—(21)—(21)
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP.$419$400$717$927
EARNINGS PER SHARE ATTRIBUTABLE TO FIRSTENERGY CORP. (Note 3):
Basic - continuing operations$0.73$0.74$1.25$1.66
Basic - discontinued operations—(0.04)—(0.04)
Basic$0.73$0.70$1.25$1.62
Diluted - continuing operations$0.73$0.73$1.24$1.65
Diluted - discontinued operations—(0.04)—(0.04)
Diluted$0.73$0.69$1.24$1.61
WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING:
Basic576573575573
Diluted577574576574

(1) Includes excise and gross receipts tax collections of $116 million and $114 million during the three months ended September 30, 2024 and 2023, respectively, and $329 million and $315 million during the nine months ended September 30, 2024 and 2023, respectively.

(2) Consists of income taxes of $21 million during the three and nine months ended September 30, 2023.

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(Unaudited)

For the Three Months Ended September 30,For the Nine Months Ended September 30,
(In millions)2024202320242023
NET INCOME$466$420$831$984
OTHER COMPREHENSIVE INCOME (LOSS):
Pension and OPEB prior service credits—(2)—(5)
Amortized losses on derivative hedges——42
Other comprehensive income (loss)—(2)4(3)
Income taxes (benefits) on other comprehensive income (loss)—(1)1(1)
Other comprehensive income (loss), net of tax—(1)3(2)
COMPREHENSIVE INCOME$466$419$834$982
Income attributable to noncontrolling interest472011457
COMPREHENSIVE INCOME ATTRIBUTABLE TO FIRSTENERGY CORP.$419$399$720$925

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

CONSOLIDATED BALANCE SHEETS

(Unaudited)

(In millions, except share amounts)September 30, 2024December 31, 2023
ASSETS
CURRENT ASSETS:
Cash and cash equivalents$439$137
Restricted cash2642
Receivables-
Customers1,5591,382
Less — Allowance for uncollectible customer receivables4964
1,5101,318
Other, net of allowance for uncollectible accounts of $8 in 2024 and $15 in 2023271266
Materials and supplies, at average cost536512
Prepaid taxes and other286293
3,0682,568
PROPERTY, PLANT AND EQUIPMENT:
In service51,74750,107
Less — Accumulated provision for depreciation14,36113,811
37,38636,296
Construction work in progress2,7332,116
40,11938,412
INVESTMENTS AND OTHER NONCURRENT ASSETS:
Goodwill5,6185,618
Investments (Note 6)688663
Regulatory assets485369
Other7781,137
7,5697,787
TOTAL ASSETS$50,756$48,767
LIABILITIES AND EQUITY
CURRENT LIABILITIES:
Currently payable long-term debt$2,027$1,250
Short-term borrowings75775
Accounts payable1,5201,362
Accrued interest272292
Accrued taxes729700
Accrued compensation and benefits156304
Customer deposits228227
Dividends payable245235
Other221241
5,4735,386
NONCURRENT LIABILITIES:
Long-term debt and other long-term obligations21,60322,885
Accumulated deferred income taxes5,4924,530
Retirement benefits1,6511,663
Regulatory liabilities9161,214
Other1,9292,173
31,59132,465
TOTAL LIABILITIES37,06437,851
EQUITY:
Common stockholders’ equity-
Common stock, $0.10 par value, authorized 700,000,000 shares - 576,317,004 and 574,335,396 shares outstanding as of September 30, 2024 and December 31, 2023, respectively.5857
Other paid-in capital12,35610,494
Accumulated other comprehensive loss(14)(17)
Retained earnings (Accumulated deficit)27(97)
Total common stockholders’ equity12,42710,437
Noncontrolling interest1,265479
TOTAL EQUITY13,69210,916
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 10)
TOTAL LIABILITIES AND EQUITY$50,756$48,767

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

CONSOLIDATED STATEMENTS OF EQUITY

(Unaudited)

Nine Months Ended September 30, 2024
Common stockOPICAOCIRetained earnings (Accumulated deficit)Total Common Stockholders’ EquityNCITotal Equity
(In millions)SharesAmount
Balance, January 1, 2024574$57$10,494$(17)$(97)$10,437$479$10,916
Net income————25325314267
Stock Investment Plan and share-based benefit plans2—9——9—9
Cash dividends declared on common stock ($0.425 per share in March)——(88)—(156)(244)—(244)
FET Equity Interest Sale (Note 1)——1,942——1,9427312,673
Noncontrolling interest distributions declared——————(8)(8)
Balance, March 31, 2024576$57$12,357$(17)$—$12,397$1,216$13,613
Net income————45455398
Other comprehensive income, net of tax———3—3—3
Stock Investment Plan and share-based benefit plans—120——21—21
Noncontrolling interest distributions declared——————(7)(7)
Other——8——8(8)—
Balance, June 30, 2024576$58$12,385$(14)$45$12,474$1,254$13,728
Net income————41941947466
Other comprehensive loss, net of tax————————
Stock Investment Plan and share-based benefit plans——24——24—24
Cash dividends declared on common stock ($0.425 per share in July and September)——(53)—(437)(490)(490)
Noncontrolling interest distributions declared——————(36)(36)
Balance, September 30, 2024576$58$12,356$(14)$27$12,427$1,265$13,692

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

CONSOLIDATED STATEMENTS OF EQUITY

(Unaudited)

.

Nine Months Ended September 30, 2023
Common stockOPICAOCIAccumulated deficitTotal Common Stockholders’ EquityNCITotal Equity
(In millions)SharesAmount
Balance, January 1, 2023572$57$11,322$(14)$(1,199)$10,166$477$10,643
Net income————29229218310
Other comprehensive loss, net of tax———(1)—(1)—(1)
Stock Investment Plan and share-based benefit plans1—19——19—19
Cash dividends declared on common stock ($0.39 per share in March)——(223)——(223)—(223)
Noncontrolling interest distributions declared——————(17)(17)
Balance, March 31, 2023573$57$11,118$(15)$(907)$10,253$478$10,731
Net income————23523519254
Stock Investment Plan and share-based benefit plans——22——22—22
Noncontrolling interest distributions declared——————(36)(36)
Balance, June 30, 2023573$57$11,140$(15)$(672)$10,510$461$10,971
Net income————40040020420
Other comprehensive loss, net of tax———(1)—(1)—(1)
Stock Investment Plan and share-based benefit plans1—24——24—24
Cash dividends declared on common stock ($0.39 per share in July and $0.41 per share in September)——(459)——(459)—(459)
Noncontrolling interest distributions declared——————(10)(10)
Balance, September 30, 2023574$57$10,705$(16)$(272)$10,474$471$10,945

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

CONSOLIDATED STATEMENTS OF CASH FLOWS

(Unaudited)

For the Nine Months Ended September 30,
(In millions)20242023
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income$831$984
Adjustments to reconcile net income to net cash from operating activities-
Depreciation, amortization and impairments1,197893
Charges associated with increase in ARO207—
Deferred income taxes and investment tax credits, net224157
Employee benefit costs, net(7)(4)
Pension trust contribution—(750)
Pension and OPEB mark-to-market adjustment—(59)
Transmission revenue collections, net40(93)
Loss on disposal, net of tax (Note 1)—21
Changes in current assets and liabilities-
Receivables(197)(2)
Materials and supplies(24)(60)
Prepaid taxes and other current assets(77)(66)
Accounts payable87(241)
Accrued taxes(250)(147)
Accrued interest(21)49
Accrued compensation and benefits(174)(46)
Other current liabilities(68)55
Collateral, net97(216)
Employee benefit plan funding and related payments(44)(39)
Other26(7)
Net cash provided from operating activities1,847429
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments(2,736)(2,266)
Sales of investment securities held in trusts10428
Purchases of investment securities held in trusts(114)(37)
Asset removal costs(212)(190)
Other(3)(8)
Net cash used for investing activities(2,961)(2,473)
CASH FLOWS FROM FINANCING ACTIVITIES:
New financing-
Long-term debt1,2003,150
Short-term borrowings, net—170
Redemptions and repayments-
Long-term debt(1,710)(537)
Short-term borrowings, net(700)—
Proceeds from FET Equity Interest Sale (Note 1)3,500—
Noncontrolling interest cash distributions(51)(63)
Common stock dividend payments(725)(670)
Debt issuance and redemption costs, and other(114)(68)
Net cash provided from financing activities1,4001,982
Net change in cash, cash equivalents, and restricted cash286(62)
Cash, cash equivalents, and restricted cash at beginning of period179206
Cash, cash equivalents, and restricted cash at end of period$465$144
SUPPLEMENTAL CASH FLOW INFORMATION:
Significant non-cash transactions:
Accrued capital investments$296$212

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.

FIRSTENERGY CORP.

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(Unaudited)

Note NumberPage Number
1Organization and Basis of Presentation8
2Revenue12
3Earnings Per Share13
4Pension and Other Post-Employment Benefits14
5Income Taxes16
6Fair Value Measurements17
7Variable Interest Entities20
8Asset Retirement Obligations22
9Regulatory Matters23
10Commitments, Guarantees and Contingencies31
11Segment Information37

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)

1. ORGANIZATION AND BASIS OF PRESENTATION

Unless otherwise indicated, defined terms and abbreviations used herein have the meanings set forth in the accompanying Glossary of Terms.

FE was incorporated under Ohio law in 1996. FE’s principal business is the holding, directly or indirectly, of all of the outstanding equity of its principal subsidiaries as of September 30, 2024: OE, CEI, TE, FE PA, JCP&L, FESC, MP, AGC (a wholly owned subsidiary of MP), PE and KATCo. Additionally, FET is a consolidated VIE of FE, and is the parent company of ATSI, MAIT, PATH and TrAIL. FE also holds all of the outstanding equity of other direct subsidiaries including FEV, which currently holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations.

On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, including OE subsidiary Penn, rendering FE PA a new, single operating entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. As of January 1, 2024, FE PA is FE’s only regulated distribution power company in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies. FE PA serves an area with a population of approximately 4.5 million and operates under the rate districts of the former Pennsylvania Companies. FirstEnergy continues to evaluate the legal, financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio power company.

Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.

FESC provides legal, financial and other corporate support services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies. FE does not bill directly or allocate any of its costs to any subsidiary company. Costs are charged to FE's subsidiaries for services received from FESC either through direct billing or through an allocation process. Allocated costs are for services that are provided on behalf of more than one company and are allocated using formulas developed by FESC. Intercompany transactions are generally settled under commercial terms within thirty days.

FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity. FirstEnergy’s electric operating companies comprise one of the nation’s largest investor-owned electric systems, serving over 6 million customers in the Midwest and Mid-Atlantic regions. FirstEnergy’s transmission operations include more than 24,000 miles of lines and two regional transmission operation centers. As of September 30, 2024, AGC and MP control 3,604 MWs of net maximum generation capacity.

FE and its subsidiaries follow GAAP and comply with the related regulations, orders, policies and practices prescribed by the SEC, FERC, and, as applicable, the PUCO, the PPUC, the MDPSC, the NYPSC, the WVPSC, the VSCC and the NJBPU. The accompanying interim financial statements as of September 30, 2024, and the three and nine months ended September 30, 2024 and 2023 are unaudited, but reflect all adjustments, consisting of normal recurring adjustments, that, in the opinion of management, are necessary for a fair statement of the financial statements. The December 31, 2023 Consolidated Balance Sheets were derived from audited financial statements. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates. The reported results of operations are not necessarily indicative of results of operations for any future period.

FE and its subsidiaries have evaluated events and transactions for potential recognition or disclosure through the date the financial statements were issued. These interim financial statements have been prepared pursuant to the rules and regulations of the SEC for Quarterly Reports on Form 10-Q. Certain information and disclosures normally included in financial statements and notes prepared in accordance with GAAP have been condensed or omitted pursuant to such rules and regulations. These interim financial statements should be read in conjunction with the financial statements and notes included in the Annual Report on Form 10-K for the year ended December 31, 2023.

FE and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a controlling financial interest. Intercompany transactions and balances are eliminated in consolidation as appropriate and permitted pursuant to GAAP. FE and its subsidiaries consolidate a variable interest entity when it is determined that it is the primary beneficiary. Investments in affiliates over which FE and its subsidiaries have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the equity method, the interest in the entity is reported as an investment in the Consolidated Balance Sheets and the percentage of FE’s ownership share of the entity’s earnings is reported in the Consolidated Statements of Income and Comprehensive Income.

Certain prior year amounts have been reclassified to conform to the current year presentation. During the first quarter of 2024, FirstEnergy’s segment reporting structure was modified to increase transparency for leadership and investors, simplify the

presentation to corresponding legal entities, and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. The modification to the segments resulted in a reallocation of goodwill between the segments based on the relative fair value of the reporting units, as described further below. Disclosures for FirstEnergy's reportable operating segments for 2023 have been reclassified to conform to the current presentation reflecting the new reportable segments. In addition, on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo and for comparability, prior year results in the Stand-Alone Transmission segment reflect the earnings and results of those WP transmission assets.

Economic Conditions

Post-pandemic economic conditions have stabilized across numerous material categories, but lead times have not returned to pre-pandemic levels. Several key suppliers have seen improvements with labor shortages and raw material availability and FirstEnergy continues to monitor the situation as capacity can be constrained with increased demand. Inflationary pressures have moderated, which has positively impacted the cost of materials, but certain categories have remained elevated. FirstEnergy continues to implement mitigation strategies to address supply constraints and does not expect service disruptions or any material impact on its capital investment plan. However, the situation remains fluid and a prolonged continuation or further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial condition.

FET Noncontrolling Interest

FirstEnergy presents Brookfield’s ownership portion of FET’s net income and net assets as NCI. NCI is included as a component of equity on FirstEnergy’s Consolidated Balance Sheets.

On May 31, 2022, Brookfield acquired 19.9% of the issued and outstanding membership interests of FET. On February 2, 2023, FE, along with FET, entered into the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to Brookfield at the closing, and Brookfield agreed to purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET Equity Interest Sale closed on March 25, 2024 and FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part by the issuance of two promissory notes at closing having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity date of December 31, 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. On July 17, 2024, Brookfield paid FE approximately $1.2 billion in full satisfaction of the promissory notes**.** Interest income associated with the promissory notes was $24 million for the nine months ended September 30, 2024 and is reported within “Miscellaneous income, net” on FirstEnergy’s Consolidated Statements of Income. As a result of the consummation of the transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the remaining 50.1% ownership interests of FET. The difference between the purchase price, net of transaction costs and deferred taxes of approximately $30 million and $797 million, respectively, and the carrying value of the NCI of $731 million, was recorded as an increase to OPIC by $1.9 billion during the first quarter of 2024.

Pursuant to the terms of the FET P&SA II, in connection with the closing, Brookfield, FET and FE entered into the A&R FET LLC Agreement, which amended and restated in its entirety the Third Amended and Restated Limited Liability Company Agreement of FET. The A&R FET LLC Agreement, among other things, provides for the governance, exit, capital and distribution, and other arrangements for FET from and following the closing. Under the A&R FET LLC Agreement, as of the closing, the FET Board consists of five directors, two of whom are appointed by Brookfield and three of whom are appointed by FE.

Capitalized Financing Costs

For the three months ended September 30, 2024 and 2023, capitalized financing costs on FirstEnergy’s Consolidated Statements of Income include $16 million and $12 million, respectively, of allowance for equity funds used during construction and $19 million and $14 million, respectively, of capitalized interest.

For the nine months ended September 30, 2024 and 2023, capitalized financing costs on FirstEnergy’s Consolidated Statements of Income include $42 million and $31 million, respectively, of allowance for equity funds used during construction and $52 million and $38 million, respectively, of capitalized interest.

Discontinued Operations

On February 27, 2020, the FES Debtors emerged from bankruptcy and were deconsolidated from FirstEnergy’s consolidated federal income tax group. The bankruptcy, emergence and deconsolidation resulted in FirstEnergy recognizing certain income tax benefits and charges, which were classified as discontinued operations. During the third quarter of 2023, FirstEnergy recognized a $21 million tax-effected charge to income tax expense related to the allocation of certain deferred income tax liabilities associated with the FES Debtors and their tax return deconsolidation in 2020. Discontinued operations are reflected at Corporate/Other for segment reporting and within “Discontinued Operations” on the Consolidated Statements of Income and Comprehensive Income and “Loss on disposal, net of tax” on the Consolidated Statements of Cash Flow.

Equity Method Investments

Investments over which FE and its subsidiaries have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the equity method, the interest in the entity is reported as an investment on the Consolidated Balance Sheets. The percentage of FE's ownership share of the entity’s earnings is reported in the Consolidated Statements of Income and Comprehensive Income and reflected in “Other Income (Expense)”.

Equity method investments, which are included within "Investments" on the Consolidated Balance Sheets, were approximately $109 million and $104 million as of September 30, 2024, and December 31, 2023, respectively.

Global Holding - FEV currently holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations with coal sales primarily focused on international markets. FEV is not the primary beneficiary of the joint venture, as it does not have control over the significant activities affecting the joint venture’s economic performance. FEV's ownership interest is subject to the equity method of accounting. For the three months ended September 30, 2024 and 2023, pre-tax income related to FEV’s ownership in Global Holding was $21 million and $43 million, respectively, and $63 million and $132 million for the nine months ended September 30, 2024 and 2023, respectively. FEV’s pre-tax equity earnings and investment in Global Holding are included in Corporate/Other for segment reporting.

As of September 30, 2024, and December 31, 2023, the carrying value of the equity method investment was $69 million and $66 million, respectively. During the nine months ended September 30, 2024 and 2023, FEV received cash dividends from Global Holding of $60 million and $135 million, respectively, which were classified with “Cash from Operating Activities” on the Consolidated Statements of Cash Flows.

PATH WV - PATH, a proposed transmission line from West Virginia through Virginia into Maryland, which PJM cancelled in 2012, is a series limited liability company that is comprised of multiple series, each of which has separate rights, powers and duties regarding specified property and the series profits and losses associated with such property. A subsidiary of FE owns 100% of the Allegheny Series (PATH-Allegheny) and 50% of the West Virginia Series (PATH-WV), which is a joint venture with a subsidiary of AEP. FirstEnergy is not the primary beneficiary of PATH-WV, as it does not have control over the significant activities affecting the economics of PATH-WV. FirstEnergy's ownership interest in PATH-WV is subject to the equity method of accounting. As of September 30, 2024 and December 31, 2023, the carrying value of the equity method investment was $17 million.

Facility Optimization

FirstEnergy continues implementing its facility optimization plans, which are focused on cost savings and alignment with our flexible working arrangements and EESG priorities. This will result in exiting the general office in Akron, Ohio, and other corporate facilities in Brecksville, Ohio, Greensburg, Pennsylvania, and Morristown, New Jersey. In December 2023, FirstEnergy purchased the general office building with the intention to sell in the future. During the third quarter of 2024, the Akron general office building was classified as held-for-sale. Upon classification as held-for-sale, FirstEnergy recognized a $62 million pre-tax impairment charge within “Other operating expenses” on the Consolidated Statements of Income. Of the $62 million, $17 million is included with Integrated, $31 million is included within Distribution, $11 million is included within Stand-Alone Transmission and $3 million at Corporate/Other for segment reporting. The remaining carrying value of the held-for-sale asset is immaterial, and therefore has not been presented separately on the Consolidated Balance Sheets. The corporate headquarters will remain in Akron, Ohio, moving to FirstEnergy’s campus located in west Akron, Ohio, and FirstEnergy continues to explore real estate options and relocation opportunities for the other corporate facilities. As FirstEnergy continues to transform the business and implement initiatives to reduce costs, including the facility optimization plan, the impact of such actions may result in future impairments or other charges that may be significant. The aim of these combined efforts will be to help build a stronger, more sustainable company for the near and long term.

Goodwill

In accordance with GAAP, the modification to the segments in the first quarter of 2024 resulted in a transfer of goodwill between the segments based on the relative fair value of the reporting units, and as such, the segment goodwill balances do not necessarily represent the goodwill balances of the specific legal entities within the segments. The external segment reporting is consistent with the internal financial reports used by FirstEnergy's Chief Executive Officer (its CODM) to regularly assess performance of the business and allocate resources.

The fair values of the reporting units were calculated using a discounted cash flow analysis. Key assumptions incorporated in the discounted cash flow analysis included discount rates, growth rates, projected operating income, changes in working capital, projected capital investments, and terminal multiples. The discounted cash flow analysis was also utilized to complete an impairment assessment before and after the segment change, with no impairment of goodwill indicated.

FirstEnergy evaluates goodwill for impairment annually on July 31 and more frequently if indicators of impairment arise. For 2024, FirstEnergy performed a qualitative assessment of its reporting units' goodwill, assessing economic, industry and market considerations in addition to the reporting units' overall financial performance. Key factors used in the assessment included: growth rates, interest rates, expected capital expenditures, utility sector market performance, regulatory and legal developments,

and other market considerations. It was determined that the fair values of these reporting units were, more likely than not, greater than their carrying values and a quantitative analysis was not necessary.

FirstEnergy's reporting units are consistent with its reportable segments and consist of Distribution, Integrated and Stand-Alone Transmission. The following table presents goodwill by reporting unit as of September 30, 2024:

(In millions)Distribution SegmentIntegrated SegmentStand-Alone Transmission SegmentFirstEnergy Consolidated
Goodwill$3,222$1,953$443$5,618

New Accounting Pronouncements

Recently Issued Pronouncements - The following new authoritative accounting guidance issued by the FASB has not yet been adopted. Unless otherwise indicated, FirstEnergy is currently assessing the impact such guidance may have on its financial statements and disclosures, as well as the potential to early adopt where applicable. FirstEnergy has assessed other FASB issuances of new standards not described below based upon the current expectation that such new standards will not significantly impact FirstEnergy's financial reporting.

ASU 2023-07, "Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures " (Issued in November 2023): ASU 2023-07 enhances interim disclosure requirements, clarifies circumstances in which an entity can disclose multiple segment measures of profit or loss, provides new segment disclosure requirements for entities with a single reportable segment, and contain other disclosure requirements. Disclosure requirements within ASU 2023-07 include disclosing significant segment expenses by reportable segment if they are regularly provided to the CODM and included in each reported measure of segment profit or loss. A public entity is also required to disclose the title and position of the individual(s) identified as the CODM as well as an explanation of how the CODM uses the reported measure(s) of segment profit or loss in assessing segment performance and deciding how to allocate resources. Disclosures are required on both an annual and an interim basis. For FirstEnergy, the guidance will be effective for fiscal years beginning after December 15, 2023 and interim periods within fiscal years beginning after December 15, 2024, with early adoption permitted.

ASU 2023-09, "Income taxes (Topic 280): Improvements to Income Tax Disclosures " (Issued in December 2023): ASU 2023-09 enhances disclosures primarily related to existing rate reconciliation and income taxes paid information to help investors better assess how a company’s operations and related tax risks and tax planning and operational opportunities affect the tax rate and prospects for future cash flows. Disclosure requirements include a tabular reconciliation using both percentages and amounts, separated out into specific categories with certain reconciling items at or above 5% of the statutory tax as well as by nature and/or jurisdiction. In addition, entities will be required to disclose income taxes paid (net of refunds received), broken out between federal, state/local and foreign, and amounts paid to an individual jurisdiction when 5% or more of the total income taxes are paid to such jurisdiction. For FirstEnergy, the guidance will be effective for fiscal years beginning after December 15, 2024, with early adoption permitted. The amendments within ASU 2023-09 are to be applied on a prospective basis, with retrospective application permitted.

Recently Adopted Pronouncements - ASU 2022-03, "Fair Value Measurements of Equity Securities Subject to Contractual Sale Restrictions " (Issued in June 2022): ASU 2022-03 clarifies current guidance in Topic 820, Fair Value Measurement, when measuring the fair value of an equity security subject to contractual restrictions that prohibit the sale of an equity security, and introduces new disclosure requirements for those equity securities subject to contractual restrictions. FirstEnergy adopted ASU 2022-03 on January 1, 2024 with no material impact to its financial statements.

2. REVENUE

The following represents a disaggregation of revenue from contracts with customers for the three and nine months ended September 30, 2024 and 2023:

Three Months Ended September 30,Nine Months Ended September 30,
(In millions)2024202320242023
Distribution
Retail generation and distribution services
Residential$1,222$1,174$3,460$3,312
Commercial3954051,1531,156
Industrial138150437575
Other18185652
Wholesale27420
Other revenue from contracts with customers23236369
Total revenues from contracts with customers1,7981,7775,1735,184
Other revenue unrelated to contracts with customers19185955
Total Distribution$1,817$1,795$5,232$5,239
Integrated
Retail generation and distribution services
Residential$802$692$1,954$1,621
Commercial335281863777
Industrial151140436408
Other892223
Wholesale5058118153
Transmission8674283224
Other revenue from contracts with customers551817
Total revenues from contracts with customers1,4371,2593,6943,223
Other revenue unrelated to contracts with customers1573127
Total Integrated$1,452$1,266$3,725$3,250
Stand-Alone Transmission
ATSI$262$245$766$712
TrAIL6872206204
MAIT116101330288
KATCo24166758
Other——(2)—
Total revenues from contracts with customers4704341,3671,262
Other revenue unrelated to contracts with customers551413
Total Stand-Alone Transmission$475$439$1,381$1,275
Corporate/Other, Eliminations and Reconciling Adjustments
Wholesale$2$1$6$6
Eliminations and reconciling adjustments(17)(14)(48)(46)
Total Corporate/Other, Eliminations and Reconciling Adjustments$(15)$(13)$(42)$(40)
FirstEnergy Total Revenues$3,729$3,487$10,296$9,724

Customer Receivables

Receivables from contracts with customers include distribution services and retail generation sales to residential, commercial and industrial customers of the Electric Companies. Billed and unbilled customer receivables as of September 30, 2024, and December 31, 2023, are included below:

Customer ReceivablesSeptember 30, 2024December 31, 2023
(In millions)
Billed$955$717
Unbilled604665
1,5591,382
Less: Uncollectible Reserve4964
Total Customer Receivables$1,510$1,318

The allowance for uncollectible customer receivables is based on historical loss information comprised of a rolling 36-month average net write-off percentage of revenues, in conjunction with a qualitative assessment of elements that impact the collectability of receivables to determine if allowances for uncollectible customer receivables should be further adjusted in accordance with the accounting guidance for credit losses.

FirstEnergy reviews its allowance for uncollectible customer receivables utilizing a quantitative and qualitative assessment. Management contemplates available current information such as changes in economic factors, regulatory matters, industry trends, customer credit factors, amount of receivable balances that are past-due, payment options and programs available to customers, and the methods that the Electric Companies are able to utilize to ensure payment. FirstEnergy’s uncollectible risk on PJM receivables, resulting from transmission and wholesale sales, is minimal due to the nature of PJM’s settlement process and as a result there is no current allowance for doubtful accounts.

Activity in the allowance for uncollectible accounts on customer receivables for the nine months ended September 30, 2024, and for the year ended December 31, 2023 are as follows:

(In millions)
Balance, January 1, 2023$137
Provision for expected credit losses(1)8
Charged to other accounts(2)34
Write-offs(115)
Balance, December 31, 2023$64
Provision for expected credit losses(1)40
Charged to other accounts(2)27
Write-offs(82)
Balance, September 30, 2024$49

(1) Approximately $7 million and $(15) million of which was deferred for future recovery (refund) in the nine months ended September 30, 2024 and the year ended December 31, 2023, respectively.

(2) Represents recoveries and reinstatements of accounts written off for uncollectible accounts.

3. EARNINGS PER SHARE

EPS is calculated by dividing earnings attributable to FE by the weighted average number of common shares outstanding.

Basic EPS is computed using the weighted average number of common shares outstanding during the relevant period as the denominator. The denominator for diluted EPS of common stock reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if dilutive securities and other agreements to issue common stock were exercised.

Diluted EPS reflects the dilutive effect of potential common shares from share-based awards and convertible securities. The dilutive effect of outstanding share-based awards was computed using the treasury stock method, which assumes any proceeds that could be obtained upon the exercise of the award would be used to purchase common stock at the average market price for the period. The dilutive effect of the 2026 Convertible Notes is computed using the if-converted method.

The following table reconciles basic and diluted EPS attributable to FE:

For the Three Months Ended September 30,For the Nine Months Ended September 30,
Reconciliation of Basic and Diluted EPS2024202320242023
(In millions, except per share amounts)
Earnings attributable to FE - continuing operations$419$421$717$948
Earnings attributable to FE - discontinued operations, net of tax—(21)—(21)
Earnings attributable to FE$419$400$717$927
Share count information:
Weighted average number of basic shares outstanding576573575573
Assumed exercise of dilutive awards1111
Weighted average number of diluted shares outstanding577574576574
EPS attributable to FE:
Basic - continuing operations$0.73$0.74$1.25$1.66
Basic - discontinued operations—(0.04)—(0.04)
Basic EPS$0.73$0.70$1.25$1.62
Diluted - continuing operations$0.73$0.73$1.24$1.65
Diluted - discontinued operations—(0.04)—(0.04)
Diluted EPS$0.73$0.69$1.24$1.61

For the three and nine months ended September 30, 2024 and 2023, no shares from awards were excluded from the calculation of diluted shares outstanding, as their inclusion would have been antidilutive.

The dilutive effect of the 2026 Convertible Notes is limited to the conversion obligation in excess of the aggregate principal amount of the 2026 Convertible Notes being converted. For the three and nine months ended September 30, 2024, there was no dilutive effect resulting from the 2026 Convertible Notes as the average market price of FE shares of common stock was below the initial conversion price of $46.81 per share.

4. PENSION AND OTHER POST-EMPLOYMENT BENEFITS

On May 12, 2023, FirstEnergy made a $750 million voluntary cash contribution to the qualified pension plan, which was funded by FE. FirstEnergy does not currently expect to have a required contribution to the pension plan until 2028, which based on various assumptions, including an expected rate of return on assets of 8.0%, is expected to be approximately $260 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily.

FirstEnergy recognizes a pension and OPEB mark-to-market adjustment for the change in fair value of plan assets and net actuarial gains and losses annually in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for remeasurement. The size of the voluntary contribution made on May 12, 2023, in relation to total pension assets triggered a remeasurement of the pension plan, and as a result, FirstEnergy recognized a non-cash, pre-tax pension mark-to-market adjustment gain of approximately $59 million in the second quarter of 2023. The pension mark-to-market adjustment primarily reflected higher than expected return on assets, partially offset by a 29 basis points decrease in the discount rate used to measure benefit obligations.

The components of FirstEnergy’s net periodic benefit costs (credits) for pension and OPEB were as follows:

Components of Net Periodic Benefit Costs (Credits)PensionOPEB
For the Three Months Ended September 30,2024202320242023
(In millions)
Service costs$35$35$1$1
Interest costs9910655
Expected return on plan assets(132)(151)(9)(7)
Amortization of prior service costs (credits)—1—(3)
Special termination benefits(1)—13—5
Net periodic benefit costs (credits)$2$4$(3)$1
Net periodic benefit costs (credits), net of amounts capitalized$(15)$(15)$(4)$1

(1) Related to benefits provided in connection with the PEER program.

Components of Net Periodic Benefit Costs (Credits)PensionOPEB
For the Nine Months Ended September 30,2024202320242023
(In millions)
Service cost$105$104$2$2
Interest cost2983221516
Expected return on plan assets(397)(421)(26)(23)
Amortization of prior service cost (credit)(1)12(1)(7)
Special termination benefits(2)—18—7
Pensions & OPEB mark-to-market adjustment—(59)——
Net periodic benefit costs (credits)7(34)(10)(5)
Net periodic benefit costs (credits), net of amounts capitalized$(45)$(88)$(11)$(6)

(1) The income tax benefits associated with the pension and OPEB prior service costs amortized out of AOCI were $1 million for the nine months ended September 30, 2023. Amounts were immaterial for the nine months ended September 30, 2024.

(2) Related to benefits provided in connection with the PEER program.

Service costs, net of capitalization, are reported within Other operating expenses on FirstEnergy’s Consolidated Statements of Income. Non-service costs, other than the pension and OPEB mark-to-market adjustment, which is separately shown, are reported within “Miscellaneous income, net”, within “Other Income (Expense)” on FirstEnergy’s Consolidated Statements of Income.

Cash flows from operating activities for the nine months ended September 30, 2024 and 2023, includes approximately $44 million and $39 million, respectively, of employee benefit plan funding and related payments. These payments are primarily related to short-term benefit payment liabilities owed to retirees under plan obligations in the respective periods.

5. INCOME TAXES

FirstEnergy’s interim effective income tax rates reflect the estimated annual effective income tax rates for 2024 and 2023. These tax rates are affected by estimated annual permanent items, such as AFUDC equity and other flow-through items, as well as certain discrete items. The following tables reconcile the effective income tax rate to the federal income tax statutory rate for the three and nine months ended September 30, 2024 and 2023:

For the Three Months Ended September 30,For the Nine Months Ended September 30,
2024202320242023
(In millions)
Income before income taxes$560$470$1,125$1,198
Federal income tax expense at statutory rate (21%)$118$99$236$252
Increases (reductions) in tax expense resulting from:
State and municipal income taxes, net of federal tax benefit33257649
AFUDC equity and other flow-through(6)(15)(19)(25)
Deductions associated with certain equity method investments(14)—(14)—
Deferred taxes related to sale of equity interest in FET, net——7—
Excess deferred tax amortization due to the Tax Act(13)2(40)(30)
Federal tax credits claimed—(2)—(2)
Nondeductible SEC and OOCIC settlements——27—
Remeasurement of excess deferred taxes(21)—(21)—
Uncertain tax positions—50—50
Valuation allowances(3)(122)33(113)
Other, net—(8)912
Total income taxes$94$29$294$193
Effective income tax rate16.8%6.2%26.1%16.1%

The IRA of 2022, among other things, imposes a new 15% corporate AMT based on AFSI applicable to corporations with a three-year average AFSI over $1 billion. The AMT is effective for the 2023 tax year and, if applicable, corporations must pay the greater of the regular corporate income tax or the AMT. The IRA of 2022 requires the U.S. Treasury to provide regulations and other guidance necessary to administer the AMT, including further defining allowable adjustments to determine AFSI, which directly impacts the amount of AMT to be paid. On September 12, 2024, the U.S. Treasury issued proposed regulations for the AMT for comment. The U.S. Treasury will issue final regulations after it has reviewed comments and held a public hearing on the proposed regulations, which is not expected to occur until next year. Although FirstEnergy is assessing the proposed regulations, it continues to believe that it is more likely than not that it will be subject to AMT going forward, however, the completion of the U.S. Treasury’s rulemaking process and the future issuance of final regulations could significantly change FirstEnergy’s AMT estimates or its conclusion as to whether it is an AMT payer at all. Additionally, the regulatory treatment of the impacts of this legislation may also be subject to regulation by FERC and/or applicable state regulatory authorities. Any adverse development in this legislation, including guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment, could negatively impact FirstEnergy’s cash flows, results of operations, and financial condition. As further discussed below, FirstEnergy expects to pay regular federal corporate income tax in 2024, due in large part to the gain realized from closing the FET Equity Interest Sale.

As discussed above, on March 25, 2024, FirstEnergy closed on the FET Equity Interest Sale, realizing an approximate $7.3 billion tax gain from the combined sale of 49.9% of the membership interests in FET for the consideration received and recapture of negative tax basis in FET. In the first quarter of 2024, FirstEnergy recognized a net tax charge of approximately $46 million, comprised of updates to estimated deferred tax liability for the deferred gain from the 19.9% sale of FET in May 2022, deferred tax liability related to its ongoing investment in FET, and valuation allowance associated with the expected utilization of certain state NOL carryforwards impacted by the sale and the PA Consolidation. During the first quarter of 2024, FirstEnergy also recognized a reduction to OPIC of approximately $797 million for federal and state income tax associated with the tax gain from closing on the FET Equity Interest Sale. As of December 31, 2023, FirstEnergy had approximately $8.1 billion of gross federal NOL carryforwards that will be used to offset a majority of the tax gain from the FET Equity Interest Sale and expected taxable income in 2024, however, due to certain limitations on NOL utilization enacted in the Tax Act, FirstEnergy expects that a portion of the NOL will carry into 2025 and possibly beyond. As a result of the FET Equity Interest Sale, FET and its subsidiaries deconsolidated from FirstEnergy’s consolidated federal income tax group and now constitute their own consolidated federal income tax group subject to their own income tax allocation agreement.

Due to a private letter ruling recently issued by the IRS to an unaffiliated utility company, FirstEnergy is evaluating the potential requirement to transition certain of its Electric Companies and Transmission Companies to stand-alone treatment of NOL carryforwards for ratemaking purposes. Currently, none of FirstEnergy’s Electric Companies or Transmission Companies have transitioned to stand-alone treatment. FirstEnergy expects that if and where transitioning is required, those impacted Electric Companies and Transmission Companies will make the appropriate regulatory filing(s) in their applicable jurisdiction to include the NOL carryforward deferred tax asset in rate base and revenue requirement, which could have a material, favorable impact on future net income.

6. FAIR VALUE MEASUREMENTS

RECURRING FAIR VALUE MEASUREMENTS

Authoritative accounting guidance establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. This hierarchy gives the highest priority to Level 1 measurements and the lowest priority to Level 3 measurements. The three levels of the fair value hierarchy and a description of the valuation techniques are as follows:

Level 1-Quoted prices for identical instruments in active market.
Level 2-Quoted prices for similar instruments in active market.
-Quoted prices for identical or similar instruments in markets that are not active.
-Model-derived valuations for which all significant inputs are observable market data.

Models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value, volatility factors and current market and contractual prices for the underlying instruments, as well as other relevant economic measures.

Level 3-Valuation inputs are unobservable and significant to the fair value measurement.

FirstEnergy produces a long-term power and capacity price forecast annually with periodic updates as market conditions change. When underlying prices are not observable, prices from the long-term price forecast are used to measure fair value.

FTRs are financial instruments that entitle the holder to a stream of revenues (or charges) based on the hourly day-ahead congestion price differences across transmission paths. FTRs are acquired by FirstEnergy in the annual, monthly and long-term PJM auctions and are initially recorded using the auction clearing price less cost. After initial recognition, FTRs’ carrying values are periodically adjusted to fair value using a mark-to-model methodology, which approximates market. The primary inputs into the model, which are generally less observable than objective sources, are the most recent PJM auction clearing prices and the FTRs’ remaining hours. The model calculates the fair value by multiplying the most recent auction clearing price by the remaining FTR hours less the prorated FTR cost. Significant increases or decreases in inputs in isolation may have resulted in a higher or lower fair value measurement.

FirstEnergy primarily applies the market approach for recurring fair value measurements using the best information available. Accordingly, FirstEnergy maximizes the use of observable inputs and minimizes the use of unobservable inputs. There were no changes in valuation methodologies used as of September 30, 2024, from those used as of December 31, 2023. The determination of the fair value measures takes into consideration various factors, including but not limited to, nonperformance risk, counterparty credit risk and the impact of credit enhancements (such as cash deposits, LOCs and priority interests). The impact of these forms of risk was not significant to the fair value measurements.

The following table sets forth the recurring assets and liabilities that are accounted for at fair value by level within the fair value hierarchy:

September 30, 2024December 31, 2023
Level 1Level 2Level 3TotalLevel 1Level 2Level 3Total
Assets(In millions)
Derivative assets FTRs(1)$—$—$9$9$—$—$4$4
Equity securities2——22——2
U.S. state and municipal debt securities—277—277—275—275
Cash, cash equivalents and restricted cash(2)465——465179——179
Other(3)—47—47—40—40
Total assets$467$324$9$800$181$315$4$500
Liabilities
Derivative liabilities FTRs(1)$—$—$1$1$—$—$1$1
Total liabilities$—$—$1$1$—$—$1$1
Net assets$467$324$8$799$181$315$3$499

(1) Contracts are subject to regulatory accounting treatment and changes in market values do not impact earnings.

(2) Restricted cash of $26 million and $42 million as of September 30, 2024 and December 31, 2023, respectively, primarily relates to cash collected from MP, PE and the Ohio Companies’ customers that is specifically used to service debt of their respective securitization or funding companies.

(3) Primarily consists of short-term investments.

INVESTMENTS

All temporary cash investments purchased with an initial maturity of three months or less are reported as “Cash equivalents” on the Consolidated Balance Sheets at cost, which approximates their fair market value. Investments other than cash and cash equivalents include equity securities, AFS debt securities and other investments. FirstEnergy has no debt securities held for trading purposes.

Generally, unrealized gains and losses on equity securities are recognized in income whereas unrealized gains and losses on AFS debt securities are recognized in AOCI. However, the spent nuclear fuel disposal trusts of JCP&L are subject to regulatory accounting with all gains and losses on equity and AFS debt securities offset against regulatory assets.

Spent Nuclear Fuel Disposal Trusts

JCP&L holds debt securities within the spent nuclear fuel disposal trust, which are classified as AFS securities, recognized at fair market value. The trust is intended for funding spent nuclear fuel disposal fees to the DOE associated with the previously owned Oyster Creek and Three Mile Island Unit 1 nuclear power plants.

The following table summarizes the amortized cost basis, unrealized gains, unrealized losses and fair values of investments held in spent nuclear fuel disposal trusts as of September 30, 2024, and December 31, 2023:

September 30, 2024**(1)**December 31, 2023**(2)**
Cost BasisUnrealized GainsUnrealized LossesFair ValueCost BasisUnrealized GainsUnrealized LossesFair Value
(In millions)
Debt securities$295$1$(19)$277$301$1$(27)$275

(1) Excludes short-term cash investments of $9 million as of September 30, 2024.

(2) Excludes short-term cash investments of $6 million December 31, 2023.

Proceeds from the sale of investments in AFS debt securities, realized gains and losses on those sales and interest and dividend income for the three and nine months ended September 30, 2024 and 2023, were as follows:

For the Three Months Ended September 30,For the Nine Months Ended September 30,
2024202320242023
(In millions)
Sale proceeds$87$10$104$28
Realized gains————
Realized losses(11)—(13)(2)
Interest and dividend income3399

Other Investments

Other investments include employee benefit trusts, which are primarily invested in corporate-owned life insurance policies, and equity method investments. Earnings and losses associated with corporate-owned life insurance policies are reflected in “Miscellaneous income, net” on FirstEnergy’s Consolidated Statements of Income. The total carrying value of other investments were $402 million and $382 million as of September 30, 2024, and December 31, 2023, respectively, and are excluded from the amounts reported above. See Note 1, "Organization and Basis of Presentation," for additional information on FirstEnergy's equity method investments.

For the three months ended September 30, 2024 and 2023, pre-tax income (loss) related to corporate-owned life insurance policies was $10 million and $(4) million, respectively, and $20 million and $6 million for the nine months ended September 30, 2024 and 2023, respectively. Corporate-owned life insurance policies are valued using the cash surrender value and any changes in value during the period are recognized as income or expense.

LONG-TERM DEBT AND OTHER LONG-TERM OBLIGATIONS

All borrowings with initial maturities of less than one year are defined as short-term financial instruments under GAAP and are reported as “Short-term borrowings” on the Consolidated Balance Sheets at cost. Since these borrowings are short-term in nature, FirstEnergy believes that their costs approximate their fair market value. The following table provides the approximate fair value and related carrying amounts of long-term debt, which excludes finance lease obligations and net unamortized debt issuance costs, unamortized fair value adjustments, premiums and discounts as of September 30, 2024 and December 31, 2023:

September 30, 2024December 31, 2023
(In millions)
Carrying value$23,744$24,254
Fair value$23,113$23,003

The fair values of long-term debt and other long-term obligations reflect the present value of the cash outflows relating to those securities based on the current call price, the yield to maturity or the yield to call, as deemed appropriate at the end of each respective period. The yields assumed were based on securities with similar characteristics offered by corporations with credit ratings similar to those of FirstEnergy. FirstEnergy classified short-term borrowings, long-term debt and other long-term obligations as Level 2 in the fair value hierarchy as of September 30, 2024, and December 31, 2023.

FirstEnergy had the following issuances and redemptions during the nine months ended September 30, 2024:

CompanyTypeRedemption / Issuance DateInterest RateMaturityAmount (In millions)Description
Redemptions
FEUnsecured NotesApril, 20247.375%2031$463FE redeemed all of its remaining $463 million of 2031 Notes, including a premium of approximately $80 million ($63 million after-tax). In addition, FE recognized approximately $4 million ($3 million after-tax) of deferred cash flow hedge losses and $1 million in other unamortized debt costs and fees associated with the FE debt redemptions.
JCP&LUnsecured NotesApril, 20244.70%2024$500JCP&L redeemed unsecured notes that became due.
MPFMBsApril, 20244.10%2024$400MP redeemed FMBs that became due.
CEIFMBsAugust, 20245.50%2024$300CEI redeemed FMBs that became due.
Issuances
ATSIUnsecured NotesMarch, 20245.63%2034$150Proceeds were used to repay short-term borrowings, to finance capital expenditures and for other general corporate purposes.
MAITUnsecured NotesMay, 20245.94%2034$250Proceeds were used to repay short-term borrowings, to finance capital expenditures and for other general corporate purposes.
FETUnsecured Notes with registration rightsSeptember, 20244.55%2030$400Proceeds were or will be used to repay short-term borrowings, to redeem FET's $600 million 4.35% notes due 2025, to finance capital expenditures and for other general corporate purposes.
FETUnsecured Notes with registration rightsSeptember, 20245.00%2035$400Proceeds were or will be used to repay short-term borrowings, to redeem FET's $600 million 4.35% notes due 2025, to finance capital expenditures and for other general corporate purposes.

On September 3, 2024, KATCo priced $200 million of senior notes due 2035 at 5.17%, which will be issued and funded on November 20, 2024.

As noted above, on September 5, 2024, FET issued $800 million of unsecured senior notes due in 2030 and 2035 in a private offering that included a registration rights agreement in which FET agreed to conduct an exchange offer of these senior notes for like principal amounts registered with the SEC. FET also agreed to file a shelf registration statement with the SEC to cover resales of the senior notes under certain circumstances. In the event FET's exchange offer is not completed or the shelf registration statement, if required, is not effective by the 366th day after September 5, 2024, or the effective shelf registration stops being effective for 60 days during any 12-month period, then additional interest will accrue on the coupon. Interest will accrue at a rate of 25 basis points for the first 90 days and an additional 25 basis points in the subsequent 90-day period, but not to exceed 50 basis points per year. However, if the additional interest is triggered, the interest rate will reset to the original notes rate once the registration statement is effective, or the shelf registration, if required, becomes effective. FET filed a registration statement on Form S-4 with the SEC on October 8, 2024.

7. VARIABLE INTEREST ENTITIES

FirstEnergy performs qualitative analyses to determine whether a variable interest qualifies FirstEnergy as the primary beneficiary (a controlling financial interest) of a VIE. An enterprise has a controlling financial interest if it has both: (i) the power to direct the activities of a VIE that most significantly impact the entity’s economic performance; and (ii) the obligation to absorb losses of the entity that could potentially be significant to the VIE or the right to receive benefits from the entity that could potentially be significant to the VIE. FirstEnergy consolidates a VIE when it is determined that it is the primary beneficiary.

In order to evaluate contracts for consolidation treatment and entities for which FirstEnergy has an interest, FirstEnergy aggregates variable interests into categories based on similar risk characteristics and significance.

Consolidated VIEs

Total assets on the FirstEnergy consolidated balance sheets include approximately $11.6 billion and $11.0 billion of consolidated VIE assets, as of September 30, 2024 and December 31, 2023, respectively, that can only be used to settle the liabilities of the applicable VIE. Total liabilities include approximately $9.0 billion and $7.8 billion as of September 30, 2024 and December 31, 2023, respectively, of consolidated VIE liabilities for which the VIE's creditors do not have recourse to FirstEnergy.

VIEs in which FirstEnergy is the primary beneficiary consist of the following (included in FirstEnergy’s consolidated financial statements):

Securitization Companies

  • Ohio Securitization Companies - In June 2013, the SPEs formed by the Ohio Companies issued approximately $445 million of pass-through trust certificates supported by phase-in recovery bonds to securitize the recovery of certain all-electric customer heating discounts, fuel and purchased power regulatory assets. The phase-in recovery bonds are payable only from, and secured by, phase in recovery property owned by the SPEs. The bondholder has no recourse to the general credit of FirstEnergy or any of the Ohio Companies. Each of the Ohio Companies, as servicer of its respective SPE, manages and administers the phase in recovery property including the billing, collection and remittance of usage-based charges payable by retail electric customers. The SPEs are considered VIEs and each one is consolidated into its applicable electric company. As of September 30, 2024 and December 31, 2023, $175 million and $191 million of the phase-in recovery bonds were outstanding, respectively.

  • MP and PE Environmental Funding Companies - The consolidated financial statements of FirstEnergy include environmental control bonds issued by two bankruptcy remote, special purpose limited liability companies that are indirect subsidiaries of MP and PE. Proceeds from the bonds were used to construct environmental control facilities. Principal and interest owed on the environmental control bonds is secured by, and payable solely from, the proceeds of the environmental control charges. Creditors of FirstEnergy, other than the limited liability company SPEs, have no recourse to any assets or revenues of the special purpose limited liability companies. As of September 30, 2024 and December 31, 2023, $188 million and $218 million of environmental control bonds were outstanding, respectively.

Cash of $24 million and $40 million, respectively, as of September 30, 2024 and December 31, 2023 collected from MP, PE and the Ohio Companies' customers that is specifically used to service debt of their respective funding companies is included in “Restricted cash” on the FirstEnergy Consolidated Balance Sheets.

FET

FET is a holding company that owns equity interests in ATSI, MAIT, TrAIL and PATH. As further discussed above, on February 2, 2023, FE entered into an agreement with Brookfield to sell an incremental 30% equity interest in FET, which closed on March 25, 2024. As of September 30, 2024, FE’s equity ownership in FET is 50.1% and Brookfield’s is 49.9%. FirstEnergy has concluded that FET is a VIE and that FE is the primary beneficiary because FE has exposure to the economics of FET and the power to direct significant activities of FET through the FESC services agreement, which represents a separate variable interest.

Although Brookfield was granted incremental consent rights upon the closing of the FET Equity Interest Sale, Brookfield will not have unilateral control over any activities that most significantly impact FET’s economic performance. However, FE will continue to retain power over the activities that most significantly impact FET’s economic performance through its incremental decision making rights under the existing FESC services agreement, through which executive management and workforce services are provided to FET. As a result, FE is the primary beneficiary of FET, which will continue to be consolidated in FirstEnergy’s financial statements.

The following shows the carrying amounts and classification of the FET assets and liabilities included in the consolidated financial statements as of September 30, 2024 and December 31, 2023. Amounts exclude intercompany balances which were eliminated in consolidation. The assets of FET can only be used to settle its obligations, and creditors of FET do not have recourse to the general credit of FirstEnergy.

AssetsSeptember 30, 2024December 31, 2023
(In millions)
Cash and cash equivalents$245$76
Receivables9088
Materials and supplies, at average cost11
Prepaid taxes and other2323
Total current assets359188
Property, plant and equipment, net10,87510,227
Goodwill224224
Investments1919
Regulatory assets3316
Other114310
Total noncurrent assets11,26510,796
TOTAL ASSETS$11,624$10,984
LiabilitiesSeptember 30, 2024December 31, 2023
(In millions)
Currently payable long-term debt$1,225$—
Short-term borrowings——
Accounts payable—2
Accrued interest7063
Accrued taxes290262
Other714
Total current liabilities1,592341
Long-term debt and other long-term obligations5,2415,275
Accumulated deferred income taxes1,3891,218
Regulatory liabilities363307
Other24285
Total noncurrent liabilities7,0177,085
TOTAL LIABILITIES$8,609$7,426

Unconsolidated VIEs

FirstEnergy is not the primary beneficiary of its equity method investments in Global Holding and PATH WV, as further discussed above, or its PPAs.

FirstEnergy evaluated its PPAs and determined that certain Non-Utility Generation entities may be VIEs to the extent that they own a plant that sells substantially all of its output to the applicable utilities and the contract price for power is correlated with the plant’s variable costs of production. As of September 30, 2024, FirstEnergy maintains four long-term PPAs with Non-Utility Generation entities that were entered into pursuant to the Public Utility Regulatory Policies Act of 1978. FirstEnergy was not involved in the creation of, and has no equity or debt invested in, any of these entities. FirstEnergy has determined that, it does not have a variable interest, or the entities do not meet the criteria to be considered a VIE.

Because FirstEnergy has no equity or debt interests in the Non-Utility Generation entities, its maximum exposure to loss relates primarily to the above-market costs incurred for power, which are expected to be recovered from customers.

8. ASSET RETIREMENT OBLIGATIONS

FirstEnergy recognizes an ARO for its legal obligation to perform asset retirement activities associated with its long-lived assets. The ARO liability represents an estimate of the fair value of FirstEnergy's current obligation such that the ARO is accreted monthly to reflect the time value of money.

A fair value measurement inherently involves uncertainty in the amount and timing of settlement of the liability. FirstEnergy uses an expected cash flow approach to measure the fair value of the remediation AROs, taking into account the expected timing of settlement of the ARO based on the expected economic useful life of associated asset and/or regulatory requirements. The fair value of an ARO is recognized in the period in which it is incurred. The associated asset retirement costs are capitalized as part of the carrying value of the long-lived asset and are depreciated over the life of the related asset. For instances where asset retirement costs relate to assets that have no future cash flows, the costs are recorded as an operating expense. In certain circumstances, FirstEnergy has recovery of asset retirement costs and, as such, certain accretion and depreciation is offset against regulatory assets. Conditional retirement obligations associated with tangible long-lived assets are recognized at fair value in the period in which they are incurred if a reasonable estimate can be made, even though there may be uncertainty about timing or method of settlement. When settlement is conditional on a future event occurring, it is reflected in the measurement of the liability, not the timing of the liability recognition.

FirstEnergy has recognized applicable legal obligations for AROs and their associated costs, including reclamation of sludge disposal ponds, closure of CCR sites, underground and above-ground storage tanks and wastewater treatment lagoons. In addition, FirstEnergy has recognized conditional retirement obligations, primarily for asbestos remediation.

The following table summarizes the changes to the ARO balances as of September 30, 2024 and December 31, 2023:

ARO Reconciliation(In millions)
Balance, January 1, 2023$185
Changes in timing and amount of estimated cash flows10
Liabilities settled(2)
Accretion16
Balance, December 31, 2023209
Changes in timing and amount of estimated cash flows137
Liabilities incurred95
Liabilities settled(4)
Accretion16
Balance, September 30, 2024$453

On November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. As of September 30, 2024, AE Supply continues to operate the dry landfill adjacent to McElroy’s Run as a disposal facility for Pleasants Power Station. AE Supply continues to evaluate closure options for McElroy’s Run and the adjacent landfill, including the potential transfer of the site and remediation obligations to a third-party as well as other interpretation changes to its closure plans. As a result, during the second quarter of 2024, AE Supply reviewed its ARO and future expected costs to remediate McElroy’s Run and the adjacent dry landfill, resulting in an increase to the ARO liability and corresponding increase to “Other operating expense” of $87 million at Corporate/Other for segment reporting. Final acceptance of the closure plan or the transfer of the obligation to a third-party could result in further adjustments to the ARO recognized by FirstEnergy.

As further discussed below, on May 8, 2024, the EPA finalized changes to the CCR rule addressing certain legacy CCR disposal sites which were not included in previous CCR rules. During the second quarter of 2024, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate applying historical experience in remediating comparable sites. As a result, FirstEnergy recorded a $125 million increase to its ARO, of which $120 million is included in “Other operating expenses” on the Consolidated Statements of Income and was not capitalized as an asset retirement cost since the associated plants do not have future cash flows. Of the $120 million, $16 million is included with Integrated, $46 million is included within Distribution and $58 million at Corporate/Other for segment reporting. During the third quarter of 2024, FirstEnergy determined that an additional site became applicable under the CCR rules, which resulted in a $25 million increase to the ARO, with a corresponding increase to the asset retirement cost.

The ARO increase related to certain legacy CCR disposal sites represents the discounted cash flows for estimated closure costs based upon the potential closure requirements as evaluated on a site-by-site basis. Actual costs to be incurred will be dependent upon factors that vary from site to site. The most significant factors include the method and time frame of closure at the individual sites, which will be determined based on the groundwater monitoring and, if applicable, EPA approval of closure plans. In determining the estimated closure costs for each site, FirstEnergy has assumed the anticipated applicable closure method, however, alternative closure methods may be required, resulting in greater or lesser cost. As a result, the ARO liability may be adjusted as additional information is gained through the evaluation and closure process, including further inspection of the sites, results of groundwater monitoring and changes in interpretation of the CCR regulations which may change management assumptions, and could result in a material change to the ARO liability balance and FirstEnergy’s results of operations.

9. REGULATORY MATTERS

STATE REGULATION

Each of the Electric Companies retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in West Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility.

MARYLAND

PE operates under MDPSC approved base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC order dated January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.

The EmPOWER Maryland program previously required each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal of 2% annual savings. The passage of the Climate Solutions Now Act of 2022 modified the annual incremental energy efficiency targets to 2% per year from 2022 through 2024, 2.25% per year in 2025 and 2026, and 2.5% per year in 2027 and thereafter. On August 1, 2023, PE filed its proposed plan for the 2024-2026 cycle as required by the MDPSC. Additionally at the direction of the MDPSC, PE together with other Maryland utilities were required to address GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a three-year cycle of $311 million, $354 million, and $510 million, respectively. The MDPSC conducted hearings on the proposed plans for all Maryland utilities on November 6-8, 2023. On December 29, 2023, the MDPSC issued an order approving the $311 million scenario for most programs, with some modifications. On August 15, 2024, in accordance with the MDPSC directive, PE filed a revised plan for the remainder of the 2024-2026 cycle to comply with refined GHG reduction targets with a total budget of $314 million. Hearings were held regarding the revised plan on October 22-24, 2024. An MDPSC order regarding PE’s revised plan remains pending. PE recovers EmPOWER program costs with a return on unamortized balances through an annually reconciled surcharge, with certain costs subject to recovery over a five-year amortization period. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding. Consistent with a December 29, 2022, order by the MDPSC phasing out the unamortized balances of EmPOWER investments, PE is required to expense 33% of its EmPOWER program costs in 2024, 67% in 2025, and 100% in 2026 and beyond. Notwithstanding the order to phase out the unamortized balances of EmPOWER investments, all previously unamortized costs for prior cycles were to be collected by the end of 2029, consistent with the plan PE submitted on January 11, 2023. In the 2024-2026 order issued on December 29, 2023, the period to pay down the unamortized balances was extended through the end of 2030. On February 21, 2024, the MDPSC approved PE’s tariff to recover costs in 2024 but directed PE to analyze alternative amortization methods for possible use in later years. New legislation signed into law on May 9, 2024, and effective July 1, 2024, is expected to reduce the return on the EmPOWER unamortized balances for PE by a total of $25 to $30 million over the period of 2024-2030. On July 31, 2024, the MDPSC issued an order implementing revised EmPOWER surcharge rates for PE in accordance with the new law and denying PE’s request for a hearing that sought to challenge certain portions of the law. On August 30, 2024, PE filed a petition seeking judicial review of the law.

NEW JERSEY

JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and became effective for customers as of June 1, 2024. JCP&L provides BGS for retail customers who do not choose a third-party EGS and for customers of third- party EGSs that fail to provide the contracted service. All New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.

The base rate increase approved by the NJBPU on February 14, 2024, took effect on February 15, 2024, and became effective for customers on June 1, 2024. Until those new rates became effective for customers, JCP&L was amortizing an existing regulatory liability totaling approximately $18 million to offset the base rate increase that otherwise would have occurred in this period. Under the base rate case settlement agreement, JCP&L also agreed to a two-phase reliability improvement plan to enhance the reliability related to 18 high-priority circuits, the first phase of which began on February 14, 2024, and represents an approximate investment of $95 million. Additionally, JCP&L recognized a $53 million pre-tax charge in the first quarter 2024 at the Integrated segment within “Other operating expenses” on the FirstEnergy Consolidated Statements of Income, associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the settlement agreement, to be disallowed from future recovery.

JCP&L has implemented energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the NJBPU in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan (July 2021-June 2024) including total program costs of $203 million, of which $160 million of investment is recovered over a ten-year amortization period with a return as well as $43 million in operations and maintenance expenses and financing costs recovered on an annual basis. On May 22, 2024, the NJBPU approved JCP&L’s request for a six-month extension of the EE&C Plan I, to December 31, 2024. The budget for the extension period adds approximately $69 million to the original program cost and JCP&L will recover the costs of the extension period and the revenue impact of sales losses resulting therefrom through two separate tariff riders. On December 1, 2023, JCP&L filed a related petition with the NJBPU requesting approval of its EE&C Plan II, which covers the January 1, 2025 through June 30, 2027 period and has a proposed budget of approximately $964 million. EE&C Plan II consists of a portfolio of ten energy efficiency programs, one peak demand reduction program and one building decarbonization program. Under the proposal, JCP&L would recover its EE&C Plan II revenue requirements and lost revenues from reduced electricity sales associated with EE&C Plan II. Public hearings

were held on June 11, 2024, and the parties are currently engaged in settlement discussions. On July 1, 2024, the NJBPU suspended the procedural schedule. A final NJBPU decision and order was required no later than October 15, 2024, however, the parties submitted a stipulation to extend this deadline to October 31, 2024, which was approved on October 15, 2024. On October 18, 2024, the parties entered into and filed with the NJBPU a stipulation of settlement, wherein the parties agreed to a budget of approximately $817 million for EE&C Plan II, including $784 million of investments that will earn a return on equity of 9.6%, with an equity ratio of 52%, and be recovered over 10 years.

The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May 2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on the report by May 22, 2023, which deadline was extended until July 31, 2023. JCP&L and one other party filed comments on July 31, 2023.

On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US and EDF Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond JCP&L’s control. On August 21, 2023, FERC approved JCP&L’s application, effective August 22, 2023. On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. Orsted’s cancellation does not affect JCP&L’s awarded projects and JCP&L is moving forward with preconstruction activities for the planned transmission infrastructure. Construction is expected to begin in 2025.

Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the DOE to finance a substantial portion of the project using low-interest rate loans available under the DOE’s Energy Infrastructure Reinvestment Program of the IRA of 2022. JCP&L submitted the second part of its two-part application on March 13, 2024, which was approved on May 17, 2024. The DOE Loan Program Office has initiated a due diligence review of the application, during which period the DOE and JCP&L will continue to negotiate the terms of the loan.

On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be implemented over a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital investments and $29 million is operating and maintenance expenses. Under the proposal, the capital costs of EnergizeNJ would be recovered through JCP&L’s base rates via annual and semi-annual base rate adjustment filings. The 2023 base rate case stipulation that was filed on February 2, 2024, necessitated amendments to the EnergizeNJ program. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional upgrades. EnergizeNJ, if approved as amended, will result in the investment of approximately $930.5 million of total estimated costs over five years. JCP&L and various parties are engaged in settlement discussions with respect to the pending EnergizeNJ petition.

OHIO

The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies operated under ESP IV through May 31, 2024, which provided for the supply of power to non-shopping customers at a market-based price set through an auction process. ESP IV also continued the DCR rider, which supports continued investment related to the distribution system for the benefit of customers, with revenue cap increases of $15 million per year through May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a goal across FirstEnergy to reduce CO2 emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio. Since June 1, 2024, the Ohio Companies have operated under ESP V, as modified by the PUCO, and as further described below. On October 29, 2024, the Ohio Companies filed notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV. The Ohio Companies’ application is subject to PUCO review and approval.

On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing through May 31, 2032. On May 15, 2024, the PUCO issued an order approving ESP V with modifications. ESP V, as modified by the PUCO, became effective June 1, 2024 and continues through May 31, 2029, and provides for, among other things, the continuation of existing riders related to purchased power, transmission and uncollectibles, the continuation of the DCR rider with proposed annual revenue cap increases until new base rates are established, the continuation of the AMI rider, and the addition of new riders for storm recovery and vegetation management, with terms and conditions to be established in the base rate case. The ESP V order additionally directed the Ohio Companies to file another base distribution rate case not later than May 31, 2028, develop an electric vehicle education program to assist customers in transitioning to electric vehicles and contribute $32.5 million during the term of ESP V to fund low-income customer bill assistance programs and bill assistance for income-eligible senior citizens, which was recognized in the second quarter of 2024 within “Other operating expenses” at the Regulated Distribution segment and on FirstEnergy’s Consolidated Statements of Income. On June 14, 2024, the Ohio Companies filed an Application for Rehearing seeking greater certainty regarding the key terms of ESP V over the approved term and proposed modifications to the May 15, 2024 order. The Ohio Companies also proposed modifications to ESP V to resolve their Application for Rehearing including, among other things, a reduced three-year ESP V term, approval of certain riders over the full three-year proposed ESP V term, full recovery of investments in the DCR and proposed modifications to preserve the economic value of the order for customers, including a commitment to forego pursuit of the Ohio Companies' request for an enhanced vegetation management program in the 2024 base distribution rate case. Other parties also filed applications for rehearing. As the PUCO did not rule on any applications for rehearing within 30 days of filing, all applications for rehearing were denied by operation of law. Due to the risks and uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV. The Ohio Companies’ application is subject to PUCO review and approval. The Ohio Companies expect to file an application with the PUCO for ESP VI by early next year in an effort to align with the ongoing base distribution rate case proceedings.

On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and AMI. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual annual amount each year using this method. Additionally, the Ohio Companies request recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony. On July 31, 2024, the Ohio Companies filed an update that adjusted the net increase in base distribution revenues to approximately $190 million and incorporated matters in the rate case as directed by the PUCO’s ESP V order. The Ohio Companies would expect to update their application for an increase in base distribution rates after the PUCO issues its order with respect to the Ohio Companies’ withdrawal of ESP V.

On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. On May 15, 2023, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2022, which demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. On May 15, 2024, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2023, which demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. These matters remain pending before the PUCO.

On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would, among other things, provide for the installation of an additional 700 thousand smart meters, distribution automation equipment on approximately 240 distribution circuits, voltage regulating equipment on approximately 220 distribution circuits, and other investments and pilot programs in related technologies designed to provide enhanced customer benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital investments of approximately $626 million and operations and maintenance expenses of approximately $144 million over the deployment period. Under the proposal, costs of phase two of the grid modernization plan would be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions approved in ESP IV. On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase two of its grid modernization plan. The stipulation, which is subject to PUCO approval, provides for the deployment of smart meters to the balance of the Ohio Companies’ customers or approximately 1.4 million meters. Phase two of the distribution grid modernization plan, as modified by the stipulation would be completed over a four-year budget period with estimated capital investments of approximately $421 million. On April 15, 2024, the Ohio Companies filed a motion to consolidate their phase two distribution grid modernization plan proceeding with three audit proceedings pending before the PUCO, which was granted on May 23, 2024. Evidentiary hearings began on June 5, 2024 and concluded on July 2, 2024.

On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or violate any utility regulatory laws, rules or orders in its

activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers through the DMR were only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor, and the auditor filed the final audit report on January 14, 2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be tracked, and that DMR revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity. Therefore, the report could not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that there was no documented evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR funds to support the passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio Companies adopt formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded DCR rider audit proceeding described below. Evidentiary hearings are scheduled to begin February 3, 2025.

On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the subsequent referendum effort, and directed the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the DPA and the findings of the DCR rider audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On September 30, 2024, the third-party auditor’s report was filed. The audit examined 53 payments totaling approximately $75 million made in support of the passage of HB 6 and subsequent referendum efforts, and concluded that less than $5 million was allocated to the Ohio Companies. The audit report affirmed the Ohio Companies’ conclusion in its August 6, 2021 filing that a rate impact of less than $15 thousand was charged to the Ohio Companies’ pole attachment customers associated with political and charitable spending in support of HB 6. On October 22, 2024, parties filed comments on the audit report.

In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4, 2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020, as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On September 20, 2024, intervenors filed testimony recommending fines for alleged violations of the Ohio corporate separation requirements. Evidentiary hearings were held on October 9 and 10, 2024; the scope of the hearings excluded allegations involving activities related to the passage of HB 6 and the former PUCO chairman, which will be addressed at a later time. To the extent the PUCO ultimately accepts the intervenors’ recommendations and issues a fine to the Ohio Companies, FirstEnergy does not expect any such fine to be material to FirstEnergy.

On September 3, 2024, the Ohio Companies filed an application to amend their corporate separation plan to incorporate certain recommendations from prior audit reports, which include, but are not limited to, improving non-regulated competitive employees’ physical space and access to data, updating and implementing a process to annually review the cost allocation manual, developing state specific codes of conduct practices, and implementing additional training related to the cost allocation manual and the state codes of conduct. On October 24, 2024, the administrative law judge issued an entry suspending automatic approval of the amended corporate separation plan and establishing a procedural schedule.

In connection with an ongoing annual audit of the Ohio Companies’ DCR rider for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through the DCR rider or

through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15, 2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’ ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the Rider DMR audit proceeding described above, and further lifted the stay of the portion of the investigation relating to an apparent nondisclosure of a side agreement. Evidentiary hearings are scheduled to begin February 3, 2025.

On March 1, 2024, the Attorney Examiner issued an Entry in all four PUCO investigations that, among other things, precluded taking or offering the testimony of Charles E. Jones, Michael J. Dowling, or the now-deceased, former chairman of the PUCO through deposition or other means, or requiring these individuals to produce documents, in any PUCO proceeding, until otherwise ordered.

On September 22, 2023, OCC filed an application for rehearing challenging the PUCO’s August 23, 2023, order to stay the pending HB 6 related matters above, which the PUCO denied on October 18, 2023. On November 17, 2023, OCC filed an application for rehearing challenging the October 18, 2023 entry to the extent the PUCO decided not to stay pending proceedings regarding ESP V as well as phases one and two of the Ohio Companies’ distribution grid modernization plans. On November 27, 2023, the Ohio Companies filed a memorandum contra OCC’s application for rehearing. As the PUCO did not rule on OCC’s November 17, 2023 application for rehearing within 30 days of filing, the application for rehearing was denied by operation of law.

In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO.

See Note 10, “Commitments, Guarantees and Contingencies” below for additional details on the government investigations and ongoing litigation surrounding the investigation of HB 6.

PENNSYLVANIA

The Pennsylvania Companies operated under rates approved by the PPUC, effective as of January 27, 2017. On January 1, 2024, each of the Pennsylvania Companies merged with and into FE PA. As a result of the PA Consolidation, FE PA will have five rate districts in Pennsylvania – four that correspond to the territories previously serviced by ME, PN, Penn, and WP and one rate district that corresponds to WP’s service provided to The Pennsylvania State University. The rate districts created by the PA Consolidation will not reach full rate unity until the earlier of 2033 or the conclusion of three base rate cases filed after January 1, 2025.

Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME, 3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing through cost recovery of approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.

Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for accelerated infrastructure improvements and costs related to highway relocation projects, after which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement initiatives. On July 22, 2024, FE PA filed its application with the PPUC seeking approval for the next phase of its LTIIP program, which is expected to result in approximately $1.6 billion in investments, with approximately $1.4 billion of such investments going in service during the five-year period beginning January 1, 2025 and ending December 31, 2029.

On May 5, 2023, FirstEnergy and Brookfield submitted applications to FERC and to the PPUC to facilitate the FET Equity Interest Sale. On May 12, 2023, the parties also filed an application with the VSCC, which was approved on June 20, 2023. On August 14, 2023, FERC issued an order approving the FET Equity Interest Sale. On November 24, 2023, CFIUS notified FET, Brookfield and the Abu Dhabi Investment Authority, as an indirect investor in FET through Brookfield, that it had determined that

there were no unresolved national security issues and its review of the transaction was concluded. On November 29, 2023, the parties filed a settlement agreement recommending that the PPUC approve the transaction subject to the terms of the settlement, which includes among other things, a number of ring-fencing provisions and a commitment to improve transmission reliability over the next five years. The settlement was approved by the PPUC on March 14, 2024. The transaction closed on March 25, 2024.

On April 2, 2024, FE PA filed a base rate case with the PPUC, based on a projected 2025 annual test year. The rate case requests a net increase in base distribution revenues of approximately $502 million with a return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and reflects a roll-in of several current riders such as DSIC, Tax Act and smart meter. The increase represents an overall net average rate increase in FE PA rates by approximately 7.7%, and a 10.5% average residential rate increase. Key components of the base rate case filing include a proposal to change pension recovery from average cash contributions to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension expense requested in the proceeding and the actual annual amount each year using this method. Additionally, FE PA requested an enhanced ten-year vegetation management program and recovery of certain incurred costs, including major storms, COVID-19, a program to convert streetlights to LEDs, and others. On September 13, 2024, FE PA and the active parties to the proceeding filed a joint settlement agreement requesting that the administrative law judges to approve FE PA’s requested distribution base rate case increase subject to the terms and conditions of the settlement, which includes, among other things, an annual net revenue increase of $225 million. Other key components of the settlement agreement include recovery of costs incurred for storms and COVID-19, additional cost recovery of ongoing storm costs, inspection and maintenance of overhead lines and transformers, and rate case expenses, as well as an enhanced vegetation management program. On October 15, 2024, the administrative law judges issued a decision recommending that the PPUC approve, without modification, the September 13, 2024 settlement agreement. The settlement agreement is pending PPUC approval. A PPUC decision is expected in December 2024, with new rates becoming effective in January 2025.

WEST VIRGINIA

MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is typically updated annually.

On August 31, 2023, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $167.5 million beginning January 1, 2024, which represented a 9.9% increase in overall rates. This increase, which was driven primarily by higher fuel expenses, included the approximate $92 million carried over from the 2022 ENEC proceeding and a portion of the approximately $267 million under recovery balance at the end of the review period (July 1, 2022 to June 30, 2023). The remaining $75.6 million of the under recovery balance not recovered in 2024 was to be deferred for collection during 2025, with an annual carrying charge of 4%. A hearing was held on November 30, 2023, at which time a joint stipulation for settlement that was agreed to by all but one party was presented to the WVPSC. The settlement provided for a net $55.4 million increase in ENEC rates beginning March 27, 2024 with the net deferred ENEC balance of approximately $184 million to be recovered from 2025 through 2026. There will be no 2024 ENEC case unless MP and PE over or under recover by more than $50 million from January through June 2024 and a party elects to invoke a case filing, neither of which occurred. An order was issued on March 26, 2024 approving the settlement without modification and rates became effective on March 27, 2024. MP and PE will file their next ENEC filing on or before September 1, 2025.

On April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022, a tariff to offer solar power on a voluntary basis to West Virginia customers and requiring MP and PE to subscribe at least 85% of the planned 50 MWs of solar generation before seeking approval for surcharge cost recovery. MP and PE must seek separate approval from the WVPSC to recover any solar generation costs in excess of the approved solar power tariff. On April 24, 2023, MP and PE sought approval for surcharge cost recovery from the WVPSC for three of the five solar sites, representing 30 MWs of generation. On August 23, 2023, the WVPSC approved the customer surcharge and granted approval to construct three of the five solar sites. The surcharge went into effect January 1, 2024. The first solar generation site went into service in January 2024 and the second solar generation site went into service in September 2024. Construction of the remaining sites are expected to be completed by the end of 2025 at a total investment cost of approximately $110 million.

On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. Specifically, MP and PE were seeking to increase depreciation expense by approximately $76 million per year, primarily for regulated generation-related assets. Any depreciation rates approved by the WVPSC would not become effective until new base rates were established. On August 22, 2023, a unanimous settlement of the case was filed recommending a $33 million per year increase in depreciation expense, effective April 1, 2024. An order from the WVPSC was issued on March 26, 2024 approving the settlement without modification and new depreciation rates became effective on April 1, 2024.

On May 31, 2023, MP and PE filed a base rate case with the WVPSC requesting a total revenue increase of approximately $207 million utilizing a test year of 2022 with adjustments plus a request to establish a regulatory asset (or liability) to recover (or

refund) in a subsequent base rate case the net differences between the amount of pension and OPEB expense requested in the proceeding (based on average expense from 2018 to 2022) and the actual annual amount each year using the delayed recognition method. Among other things, the increase included the approximate $75 million requested in a depreciation case filed on January 13, 2023 and described above, and amounts to support a new low-income customer advocacy program, storm restoration work and service reliability investments. On January 23, 2024, MP, PE and various parties filed a joint settlement agreement with the WVPSC, which recommended a base rate increase of $105 million, inclusive of the $33 million increase in depreciation expense, but deferred issues related to a change in the net energy metering credit. Additionally, the settlement included a new low-income customer advocacy program, a pilot program for service reliability investments and recovery of costs related to storm restoration, retired generation assets and COVID-19. The settlement did not include the request to establish a regulatory asset (or liability) for recovery (or refund) associated with pension and OPEB expense, however, it did not preclude MP and PE from pursuing that in a future separate proceeding. On February 16, 2024, interested parties filed a settlement on the net energy metering credit for consideration by the WVPSC. An order was issued on March 26, 2024 approving the $105 million increase and accepting the settlements with slight non-material modifications with new rates going into effect on March 27, 2024. Additionally, due to the order including approval by the WVPSC to recover certain costs associated with retired generation assets, MP recognized a $60 million pre-tax benefit in the first quarter of 2024 to establish a regulatory asset.

FERC REGULATORY MATTERS

Under the Federal Power Act, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under the Uniform System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and rates, the Electric Companies, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and the Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM Tariff. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo.

FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Electric Companies and AE Supply each have the necessary authorization from FERC to sell their wholesale power, if any, in interstate commerce at market-based rates, although in the case of the Electric Companies major wholesale purchases remain subject to review and regulation by the relevant state commissions.

Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements on the Electric Companies, AE Supply, and the Transmission Companies. NERC is the Electric Reliability Organization designated by FERC to establish and enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional entities, including RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and enforced by RFC.

FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have a material adverse effect on its financial condition, results of operations, and cash flows.

FERC Audit

FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the period of January 1, 2015 through September 30, 2021, which included several findings and recommendations that FirstEnergy has accepted. The audit report included a finding and related recommendation on FirstEnergy’s methodology for allocation of certain corporate support costs to regulatory capital accounts under certain FERC regulations and reporting. Effective in the first quarter of 2022 and in response to the finding, FirstEnergy had implemented a new methodology for the allocation of these corporate support costs to regulatory capital accounts for its regulated distribution and transmission companies on a prospective basis. With the assistance of an independent outside firm, FirstEnergy completed an analysis during the third quarter of 2022 of these costs and how it impacted certain FERC-jurisdictional wholesale transmission customer rates for the audit period of 2015 through 2021. As a result of this analysis, FirstEnergy recorded in the third quarter of 2022 approximately $45 million ($34 million after-tax) in expected customer refunds, plus interest, due to its wholesale transmission customers and reclassified approximately $195 million of certain transmission capital assets to

operating expenses for the audit period, of which $90 million ($67 million after-tax) are not expected to be recoverable and impacted FirstEnergy’s earnings since they relate to costs capitalized during stated transmission rate time periods. FirstEnergy is currently recovering approximately $105 million of costs reclassified to operating expenses in its transmission formula rate revenue requirements, of which $85 million of costs have been recovered as of September 30, 2024. These reclassifications also resulted in a reduction to the Regulated Transmission segment’s rate base by approximately $160 million, which is not expected to materially impact FirstEnergy or the segment’s future earnings. The expected wholesale transmission customer refunds were recognized as a reduction to revenue, and the amount of reclassified transmission capital assets that are not expected to be recoverable were recognized within “Other operating expenses” at the Regulated Transmission segment and on FirstEnergy’s Consolidated Statements of Income. Furthermore, FirstEnergy’s Electric Companies are in the process of addressing the outcomes of the FERC Audit with the applicable state commissions and proceedings, which includes seeking continued rate base treatment of approximately $200 million of certain corporate support costs allocated to distribution capital assets in Ohio and Pennsylvania.

On December 8, 2023, FERC audit staff issued a letter advising that two unresolved audit matters, primarily related to FirstEnergy’s plan to recover the reclassified operating expenses in formula transmission rates, were being referred to other offices within FERC for further review. On July 5, 2024, the FERC Office of Enforcement issued a set of data requests related to the 2022 reclassification of operating expenses, to which FirstEnergy replied. In addition, on September 26, 2024, the FERC Office of Energy Market Regulation issued data requests to FirstEnergy, which was also related to the 2022 reclassification of operating expenses, to which FirstEnergy replied. If the FERC Office of Energy Market Regulation and the FERC Office of Enforcement were to successfully challenge the recovery of the 2022 reclassified operating expenses and formula transmission rates it could have material adverse effect on FirstEnergy financial conditions, result of operations, and cash flows. In addition, on September 10, 2024, the FERC Office of Enforcement issued a second set of data requests related to the classification and recovery of a since terminated fuel consulting contract, to which FirstEnergy replied.

ATSI ROE – Ohio Consumers Counsel v. ATSI, et al.

On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliates and American Electric Power Service Corporation, and Duke Energy Ohio, LLC asserting that FERC should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder associated with RTO membership, effective February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission owning utilities join an RTO and that the 50 basis point adder is applicable only where RTO membership is voluntary. On December 15, 2022, FERC denied the complaint as to ATSI and Duke, but granted it as to AEP. AEP and OCC appealed FERC’s orders to the Sixth Circuit and the case remains pending. FirstEnergy is unable to predict the outcome of this proceeding, but it is not expected to have a material impact.

Transmission ROE Methodology

A proposed rulemaking proceeding concerning transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act was initiated in March of 2020 remains pending before FERC. Among other things, the rulemaking explored whether utilities should collect an “RTO membership” ROE incentive adder for more than three years. FirstEnergy is a member of PJM, and its transmission subsidiaries could be affected by the proposed rulemaking. FirstEnergy participated in comments on the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If there were to be any changes to FirstEnergy's transmission incentive ROE, such changes will be applied on a prospective basis.

Transmission Planning Supplemental Projects: Ohio Consumers Counsel v ATSI, et al.

On September 27, 2023, the OCC filed a complaint against ATSI, PJM and other transmission utilities in Ohio alleging that the PJM Tariff and operating agreement are unjust, unreasonable, and unduly discriminatory because they include no provisions to ensure PJM’s review and approval for the planning, need, prudence and cost-effectiveness of the PJM Tariff Attachment M-3 “Supplemental Projects.” Supplemental Projects are projects that are planned and constructed to address local needs on the transmission system. The OCC demands that FERC: (i) require PJM to review supplemental projects for need, prudence and cost-effectiveness; (ii) appoint an independent transmission monitor to assist PJM in such review; and (iii) require that Supplemental Projects go into rate base only through a “stated rate” procedure whereby prior FERC approval would be needed for projects with costs that exceed an established threshold. ATSI and the other transmission utilities in Ohio and PJM filed comments and the complaint is pending before FERC.

10. COMMITMENTS, GUARANTEES AND CONTINGENCIES

GUARANTEES AND OTHER ASSURANCES

FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the transaction to the third party.

As of September 30, 2024, outstanding guarantees and other assurances aggregated $978 million, consisting of parental guarantees on behalf of its consolidated subsidiaries ($517 million) and other assurances ($461 million).

COLLATERAL AND CONTINGENT-RELATED FEATURES

In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty.

As of September 30, 2024, $160 million of collateral, mainly in the form of LOCs, has been posted by FE or its subsidiaries. FE or its subsidiaries are holding $35 million of net cash collateral as of September 30, 2024, from certain generation suppliers, and such amount is included in “Other current liabilities” on FirstEnergy’s Consolidated Balance Sheets.

These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent contractual collateral obligations as of September 30, 2024:

Potential Collateral ObligationsElectric Companies and Transmission CompaniesFETotal
(In millions)
Contractual obligations for additional collateral
Upon downgrade$66$1$67
Surety bonds (collateralized amount)(1)9779176
Total Exposure from Contractual Obligations$163$80$243

(1) Surety Bonds are not tied to a credit rating. Surety Bonds’ impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond except with respect to $38 million of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.

ENVIRONMENTAL MATTERS

Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations, such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and financial condition.

Clean Air Act

FirstEnergy complies with SO2 and NOx emission reduction requirements under the CAA and SIP by burning lower-sulfur fuel, utilizing combustion controls and post-combustion controls and/or using emission allowances.

CSAPR requires reductions of NOx and SO2 emissions in two phases (2015 and 2017), ultimately capping SO2 emissions in affected states to 2.4 million tons annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO2 emission allowances between power plants located in the same state and interstate trading of NOx and SO2 emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA to reconsider the CSAPR caps on NOx and SO2 emissions from power plants in 13 states, including West Virginia. This followed the 2014 U.S. Supreme Court ruling generally upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to reduce emissions by more than their contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing summertime NOx emissions from power plants in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR Update to the D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the CSAPR Update to the EPA citing that the rule did not eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements within applicable attainment deadlines.

Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from nine states (including West Virginia) significantly contribute to New York’s inability to attain the ozone National Ambient Air Quality Standards. The petition sought suitable emission rate limits for large stationary sources that are allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA denied New York’s CAA Section 126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020, the D.C. Circuit reversed and remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA

issued a revised CSAPR Update that addressed, among other things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NOx emissions allowances to comply with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant reductions in EGU NOx emissions in 25 upwind states, including West Virginia, with the stated purpose of allowing downwind states to attain or maintain compliance with the 2015 ozone National Ambient Air Quality Standards. On February 13, 2023, the EPA disapproved 21 SIPs, which was a prerequisite for the EPA to issue a final Good Neighbor Plan or FIP. On June 5, 2023, the EPA issued the final Good Neighbor Plan with an effective date 60 days thereafter. Certain states, including West Virginia, have appealed the disapprovals of their respective SIPs, and some of those states have obtained stays of those disapprovals precluding the Good Neighbor Plan from taking effect in those states. On August 10, 2023, the 4th Circuit granted West Virginia an interim stay of the disapproval of its SIP and on January 10, 2024, after a hearing held on October 27, 2023, granted a full stay which precludes the Good Neighbor Plan from going into effect in West Virginia. In addition to West Virginia, certain other states, and certain trade organizations, including the Midwest Ozone Group of which FE is a member, separately filed petitions for review and motions to stay the Good Neighbor Plan itself at the D.C. Circuit. On September 25, 2023, the D.C. Circuit denied the motions to stay the Good Neighbor Plan. On October 13, 2023, the aggrieved parties filed an Emergency Application for an Immediate Stay of the Good Neighbor Plan with the U.S. Supreme Court. Oral argument was heard on February 21, 2024. On June 27, 2024, the U.S. Supreme Court granted a stay of the Good Neighbor Plan pending disposition of the petition for review in the D.C. Circuit.

Climate Change

In March 2024, the SEC issued final rules to require public companies to disclose certain climate-related information in registration statements and annual reports filed with the SEC. As adopted, the final climate disclosure rules mandate the disclosure of climate-related risks and the material impacts that severe weather events and other natural conditions have had, or are reasonably likely to have, on FirstEnergy, as well as disclosures related to management and FE Board oversight of such risks. In April 2024, the SEC voluntarily stayed the final climate disclosure rules pending resolution of legal challenges. FirstEnergy currently is assessing the impact of the final climate disclosure rules on its business. There are several initiatives to reduce GHG emissions at the state, federal and international level. Certain northeastern states are participating in the Regional Greenhouse Gas Initiative and western states, including California, have implemented programs to control emissions of certain GHGs and enhance public disclosures relating to the same. Additional policies reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the nation.

As part of its climate strategy, FirstEnergy has pledged to achieve carbon neutrality by 2050 with respect to GHGs within FirstEnergy’s direct operational control (known as Scope 1 emissions). With respect to our coal-fired plants in West Virginia, which serve as the primary source of our Scope 1 emissions, we have identified that the end of the useful life date is 2035 for Fort Martin and 2040 for Harrison. Determination of the useful life of the regulated coal-fired generation could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale, impairment, or regulatory disallowances. If MP is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results of operations, and cash flow. FirstEnergy cannot currently estimate the financial impact of climate change policies, including the final SEC rules, although potential legislative or regulatory programs restricting CO2 emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or result in changes to its operations.

In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” concluding that concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and reporting of GHG emissions from certain sources, including electric generating plants. Subsequently, the EPA released its final CPP regulations in August 2015 to reduce CO2 emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO2 emission limits for new, modified, and reconstructed fossil fuel-fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28, 2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing GHG emissions and suspend, revise or rescind the rules if appropriate. On June 19, 2019, the EPA repealed the CPP and replaced it with the ACE rule that established guidelines for states to develop standards of performance to address GHG emissions from existing coal-fired generation. On January 19, 2021, the D.C. Circuit vacated and remanded the ACE rule declaring that the EPA was “arbitrary and capricious” in its rule making and, as such, the ACE rule is no longer in effect and all actions thus far taken by states to implement the federally mandated rule are now null and void. Vacating the ACE rule had the unintended effect of reinstating the CPP because the repeal of the CPP was a provision within the ACE rule. The D.C. Circuit decision was appealed by several states and interested parties, including West Virginia, arguing that the EPA did not have the authorization under Section 111(d) of the CAA to require “generation shifting” as a way to limit GHGs. On June 30, 2022, the U.S. Supreme Court in West Virginia v. Environmental Protection Agency held that the method the EPA used to regulate GHGs (generation shifting) under Section 111(d) of the CAA (the CPP) was not authorized by Congress and remanded the rule to the EPA for further reconsideration. In response, on May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West Virginia v. Environmental Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. The rule, which proposed stringent GHG emissions limitations based on fuel type and unit retirement date, was issued as final by the EPA on April 25, 2024. In May 2024, a group of 25 states, including West Virginia, filed a challenge to the rule in the D.C. Circuit. Also in May 2024, other utility groups, including the Midwest Ozone Group and Electric Generators for a

Sensible Transition, both of which MP is a member, filed petitions for review of the GHG rule as well as motions to stay the rule in the D.C. Circuit. On July 19, 2024, the D.C. Circuit denied the stay motions and on July 23 and 26, 2024 the aggrieved petitioners filed emergency stay applications to the U.S. Supreme Court. Depending on the outcome of any appeals, compliance with these standards could require additional capital expenditures or changes in operation at the Ft. Martin and Harrison power stations.

Clean Water Act

Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy’s facilities. In addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.

On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic, mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations were to phase-in as permits are renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration and on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the effluent limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited discharge allowances), and extending the deadline for compliance to December 31, 2025 for both. In addition, the EPA allows for less stringent limits for sub-categories of generating units based on capacity utilization, flow volume from the scrubber system, and unit retirement date. On March 29, 2023, the EPA published proposed revised ELGs applicable to coal-fired power plants that include more stringent effluent limitations for wet scrubber systems and ash transport water, and new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024. On May 30, 2024, the Utility Water Act Group, of which FirstEnergy is a member, filed a Petition for Review of the 2024 ELG Rule with the U.S. Court of Appeals for the Fifth and Eighth Circuit Courts, and on June 18, 2024, the Utility Water Group filed a motion to stay the Rule pending disposition on the merits. A number of other parties have challenged the final rule in various petitions for review across several circuits. Those petitions have been consolidated and will be reviewed by the U.S. Court of Appeals for the Eighth Circuit Court. Depending on the outcome of appeals and how final revised rules are ultimately implemented, compliance with these standards could require additional capital expenditures or changes in operation at closed and active landfills, and at the Ft. Martin and Harrison power stations from what was approved by the WVPSC in September 2022 to comply with the 2020 ELG rule. FirstEnergy is currently assessing the impact of the final rule.

Regulation of Waste Disposal

Federal and state hazardous waste regulations have been promulgated as a result of the Resource Conservation and Recovery Act, as amended, and the Toxic Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the need for future regulation.

In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and initiate closure to April 11, 2021. The final rule allowed for an extension of the closure deadline based on meeting identified site-specific criteria. On November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. As of September 30, 2024, AE Supply continues to operate the dry landfill adjacent to McElroy’s Run as a disposal facility for Pleasants Power Station. AE Supply continues to evaluate closure options for McElroy’s Run, including the potential transfer of the site and remediation obligations to a third-party, as well as other interpretation changes to its closure plans. As a result, during the second quarter of 2024, AE Supply reviewed its ARO and future expected costs to remediate McElroy’s Run and the adjacent dry landfill, resulting in an increase to the ARO liability and corresponding increase to “Other operating expense” of $87 million, which is further described above in Note 8, “Asset Retirement Obligations.”

On May 8, 2024, the EPA finalized changes to the CCR regulations addressing inactive surface impoundments at inactive electric utilities, known as legacy CCR surface impoundments. The rule extends 2015 CCR Rule requirements for groundwater monitoring and protection, operational and reporting procedures as well as closure requirements to impoundments and landfills that were not originally included for coverage by the 2015 CCR Rule. Furthermore, the EPA’s interpretations of the EPA CCR regulations continue to evolve through enforcement and other regulatory actions. FirstEnergy is currently assessing the potential impacts of the final rule, including a review of additional sites to which the new rule might be applicable. Depending on the outcome of appeals and the ultimate implementation of the final rule, compliance with these standards could require remedial actions, including removal of coal ash. See Note 8, “Asset Retirement Obligations,” above for a description of the $125 million increase to its ARO FirstEnergy recorded during the second quarter of 2024 as a result of its analysis. During the third quarter of

2024, FirstEnergy determined that an additional site became applicable under the CCR rules, which resulted in a $25 million increase to the ARO, with a corresponding increase to the asset retirement cost.

FE or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been recognized on FirstEnergy’s Consolidated Balance Sheets as of September 30, 2024 based on estimates of the total costs of cleanup, FirstEnergy’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $96 million have been accrued through September 30, 2024, of which approximately $69 million are for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being recovered by JCP&L through a non-bypassable societal benefits charge. FE or its subsidiaries could be found potentially responsible for additional amounts or additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.

OTHER LEGAL PROCEEDINGS

United States v. Larry Householder, et al.

On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. In March 2023, a jury found Mr. Householder and his co-defendant, Matthew Borges, guilty and in June 2023, the two were sentenced to prison for 20 and five years, respectively. Messrs. Householder and Borges have appealed their sentences. Also, on July 21, 2020, and in connection with the U.S. Attorney’s Office’s investigation, FirstEnergy received subpoenas for records from the U.S. Attorney’s Office for the Southern District Ohio. FirstEnergy was not aware of the criminal allegations, affidavit or subpoenas before July 21, 2020.

On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter. Under the DPA, FE has agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA requires that FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, which shall consist of (x) $115 million paid by FE to the United States Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the ODSA, for the benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known by FirstEnergy to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA; (iv) issue a public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics program, internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of the U.S. laws throughout its operations, and to take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as expense in the second quarter of 2021 and paid in the third quarter of 2021. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.

Legal Proceedings Relating to United States v. Larry Householder, et al.

On August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by FE, and on September 1, 2020, issued subpoenas to FE and certain FE officers relating to the conduct described in the DPA. On April 28, 2021, July 11, 2022, and May 25, 2023, the SEC issued additional subpoenas to FE, with which FE has complied. FirstEnergy cooperated fully with the SEC investigation, and on September 12, 2024, the SEC issued a settlement order that concluded and resolved the investigation in its entirety. Under the terms of the settlement, FE agreed to pay a civil penalty of $100 million and to cease and desist from committing or causing any violations and any future violations of specified provisions of the federal securities laws and rules promulgated thereunder. The civil penalty was paid on September 25, 2024. FE previously recognized a loss contingency of $100 million in the second quarter of 2024 at Corporate/Other for segment reporting.

On June 29, 2023, the OOCIC served FE a subpoena, seeking information relating to the conduct described in the DPA. FirstEnergy was not aware of the OOCIC’s investigation prior to receiving the subpoena and understood that the OOCIC’s investigation was also focused on the conduct described in the DPA, other than with respect to the March 25, 2024, felony indictment of Mr. Householder brought in Cuyahoga County, Ohio. FirstEnergy is cooperating with the OOCIC in its investigation.

On February 12, 2024, and in connection with the OOCIC’s ongoing investigation, an indictment by a grand jury of Summit County, Ohio was unsealed against the now-deceased, former chairman of the PUCO, and two former FirstEnergy senior officers, Charles E. Jones, and Michael J. Dowling, charging each of them with several felony counts, including bribery, telecommunications fraud, money laundering and aggravated theft, related to payments described in the DPA. On August 12, 2024, FirstEnergy entered into a settlement with the OOCIC, the Ohio Attorney General’s Office, and the Summit County Prosecutor’s Office to resolve both the investigation and State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp., noted below. The settlement includes, among other things, a non-prosecution agreement and a payment of $19.5 million by FE, which was recorded as a loss contingency in the second quarter of 2024 at Corporate/Other for segment reporting. The settlement payment was paid on August 16, 2024.

In addition to the subpoenas referenced above under “United States v. Larry Householder, et. al.” and the SEC investigation, certain FE stockholders and FirstEnergy customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other employees, and the complaints in each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek, among other things, to recover an unspecified amount of damages (unless otherwise noted). Unless otherwise indicated, no contingency has been reflected in FirstEnergy’s consolidated financial statements with respect to these lawsuits as a loss is neither probable, nor is a loss or range of a loss reasonably estimable.

  • In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020 and August 21, 2020, purported stockholders of FE filed putative class action lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los Angeles County Employees Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The consolidated complaint alleges, on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020, that FE and certain current or former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing misrepresentations or omissions concerning FE’s business and results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors, and a group of underwriters violated Sections 11, 12(a)(2) and 15 of the Securities Act of 1933 as a result of alleged misrepresentations or omissions in connection with offerings of senior notes by FE in February and June 2020. On March 30, 2023, the court granted plaintiffs’ motion for class certification. On April 14, 2023, FE filed a petition in the U.S. Court of Appeals for the Sixth Circuit seeking to appeal that order; the Sixth Circuit granted FE’s petition on November 16, 2023, and heard oral argument on July 17, 2024. On November 30, 2023, FE filed a motion with the S.D. Ohio to stay all proceedings pending that circuit court appeal. Discovery was stayed during the pendency of that motion to stay all proceedings and on August 20, 2024, the S.D. Ohio denied FE’s motion and lifted the stay as to fact discovery. On July 29, 2024, FE filed in the U.S. Court of Appeals for the Sixth Circuit a Petition for Writ of Mandamus asking the Sixth Circuit to direct the district court to deny plaintiffs’ motion to compel disclosure of FE’s privileged internal investigation materials. On September 11, 2024, FE filed in the U.S. Court of Appeals for the Sixth Circuit a motion to stay discovery of the privileged internal investigation materials pending resolution of the Petition for Writ of Mandamus. FE believes that it is probable that it will incur a loss in connection with the resolution of this lawsuit. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.

  • MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (S.D. Ohio); on December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former officers, and certain current and former officers of EH. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange Act by issuing alleged misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re FirstEnergy Corp. Securities Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these lawsuits. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.

  • State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp. (Common Pleas Court, Franklin County, OH, all actions have been consolidated); on September 23, 2020 and October 27, 2020, the OAG and the cities of Cincinnati and Columbus, respectively, filed complaints against several parties including FE, each alleging civil violations of the Ohio Corrupt Activity Act and related claims in connection with the passage of HB 6. On January 13, 2021, the OAG filed a motion for a temporary restraining order and preliminary injunction against FirstEnergy seeking to enjoin FirstEnergy from collecting the Ohio Companies' decoupling rider. On January 31, 2021, FE reached a partial settlement with the OAG and the cities of Cincinnati and Columbus with respect to the temporary restraining order and preliminary injunction request and related issues. In connection with the partial settlement, the Ohio Companies filed an application on February 1, 2021, with the PUCO to set their respective decoupling riders (Conservation Support Rider) to zero. On February 2, 2021, the PUCO approved the application of the Ohio Companies setting the rider to zero, and no additional customer bills will include new decoupling rider charges after February 8, 2021. On August 13, 2021, new defendants were added to the complaint, including two former officers of FirstEnergy. On December 2, 2021, the cities and FE entered a stipulated dismissal with prejudice of the cities’ suit. This matter was stayed through a criminal trial in United States v. Larry Householder, et al. described above, but resumed pursuant to an order, dated March 15, 2023. On July 31, 2023, FE and other defendants filed motions to dismiss in part the OAG’s amended complaint, which the OAG opposed. On February 16, 2024, the OAG moved to stay discovery in the case in light of the February 9, 2024, indictments against defendants in this action,

which the court granted on March 14, 2024. As described above, FE reached a settlement with the OAG of this civil action and the OOCIC investigation, which resolves this civil action. FE recognized a loss contingency of $19.5 million in the second quarter of 2024, which was paid on August 16, 2024.

On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve the following shareholder derivative lawsuits relating to HB 6 and the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder that were filed in the S.D. Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County:

  • Gendrich v. Anderson, et al. and Sloan v. Anderson, et al. (Common Pleas Court, Summit County, Ohio, all actions have been consolidated); on July 26, 2020 and July 31, 2020, respectively, purported stockholders of FE filed shareholder derivative action lawsuits against certain current and former FE directors and officers, alleging, among other things, breaches of fiduciary duty. On August 30, 2022, the parties filed a joint motion to dismiss the state court action, which the court granted on September 2, 2022.

  • Miller v. Anderson, et al. (N.D. Ohio); on August 7, 2020, purported stockholders of FE filed shareholder derivative actions alleging the then FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act. On August 24, 2022, the parties filed a joint motion to dismiss the action pending in the N.D. Ohio based upon the approval of the settlement by the S.D. Ohio, which was granted on May 17, 2024.

  • Bloom, et al. v. Anderson, et al.; Employees Retirement System of the City of St. Louis v. Jones, et al.; Electrical Workers Pension Fund, Local 103, I.B.E.W. v. Anderson et al.; Massachusetts Laborers Pension Fund v. Anderson et al.; The City of Philadelphia Board of Pensions and Retirement v. Anderson et al.; Atherton v. Dowling et al.; Behar v. Anderson, et al. (S.D. Ohio, all actions have been consolidated); on September 1, 2020, purported stockholders of FE filed shareholder derivative actions alleging the then FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act. On March 11, 2022, the parties executed a stipulation and agreement of settlement, and filed a motion the same day requesting preliminary settlement approval in the S.D. Ohio, which the S.D. Ohio granted on May 9, 2022. Subsequently, following a hearing on August 4, 2022, the S.D. Ohio granted final approval of the settlement on August 23, 2022, which was appealed by a purported FE stockholder on June 15, 2023. The U.S. Court of Appeals for the Sixth Circuit affirmed the district court’s final settlement approval. All appeal options were exhausted on May 16, 2024.

The above settlement included a series of corporate governance enhancements and a payment to FE of $180 million, less approximately $36 million in court-ordered attorney’s fees awarded to plaintiffs, and a $7 million net return on deposited funds, which was received in the second quarter of 2024. The judgment and settlement are final and, therefore, the derivative lawsuits are now fully resolved.

The outcome of any of these lawsuits, governmental investigations and audit is uncertain and could have a material adverse effect on FE’s or its subsidiaries’ reputation, business, financial condition, results of operations, liquidity, and cash flows.

Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material items not otherwise discussed above are described under Note 9, “Regulatory Matters.”

FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition, results of operations, and cash flows.

11. SEGMENT INFORMATION

On January 1, 2024, FirstEnergy changed its reportable segments as follows, and continues to evaluate segment performance based on earnings attributable to FE from continuing operations:

  • Distribution Segment, which consists of the Ohio Companies and FE PA;

  • Integrated Segment, which consists of MP, PE and JCP&L; and

  • Stand-Alone Transmission Segment, which consists of FE's ownership in FET and KATCo.

FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission.

The segment reporting structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities, and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. In accordance with GAAP, the modification to the segments in the first quarter of 2024 resulted in a transfer of goodwill between the segments based on the relative fair value of the reporting units, and as such, the segment goodwill balances do not necessarily represent the goodwill balances of the specific legal entities within the segments. The external segment reporting is consistent with the internal financial reports used by FirstEnergy's Chief Executive Officer (its CODM) to regularly assess performance of the business and allocate resources. Disclosures for FirstEnergy's reportable operating segments for 2023 have been reclassified to conform to the current presentation reflecting the new reportable segments.

The Distribution segment, which consists of the Ohio Companies and FE PA, representing $10.9 billion in 2023 rate base, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.2 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its provider of last resort, SOS, standard service offer and default service requirements. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.

The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $8.7 billion in 2023 rate base. The Integrated segment distributes electricity to approximately two million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,604 MWs of regulated net maximum generation capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of solar generation at five sites in West Virginia once complete. The first two solar generation sites were completed and placed in-service in January and September 2024, representing 24 MWs of net maximum generation capacity. Construction of the remaining three sites is expected to be completed no later than the end of 2025. The remaining three sites are expected to provide 26 MWs of net maximum generation capacity.

The Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $7.7 billion in 2023 rate base, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities. KATCo, which was a subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of the FET P&SA I and remains in the Stand-Alone Transmission segment. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo and for comparability, prior year results in the Stand-Alone Transmission segment reflects the earnings and results of those WP transmission assets.

Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies, including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Reconciling adjustments for the elimination of inter-segment transactions are shown separately in the following table of Segment Financial Information. Also included in Corporate/Other for segment reporting is 67 MWs of net maximum generation capacity, representing AE Supply’s OVEC capacity entitlement. As of September 30, 2024, Corporate/Other had approximately $6.1 billion of FE’s holding company debt.

Financial information for FirstEnergy’s reportable segments and reconciliations to consolidated amounts is presented below:

(In millions) For the Three Months EndedDistributionIntegratedStand-Alone TransmissionTotal Reportable SegmentsCorporate/ OtherReconciling AdjustmentsFirstEnergy Consolidated
September 30, 2024
External revenues$1,806$1,451$470$3,727$2$—$3,729
Internal revenues111517—(17)—
Total revenues$1,817$1,452$475$3,744$2$(17)$3,729
Depreciation1631328437921—400
Amortization (deferral) of regulatory assets, net(55)202(33)——(33)
Equity method investment earnings————21—21
Interest expense106627023880(42)276
Income taxes (benefits)343640110(16)—94
Earnings (losses) attributable to FE from continuing operations19319772462(43)—419
Cash Flows from Investing Activities:
Capital investments$289$382$299$970$34$—$1,004
September 30, 2023
External revenues$1,786$1,266$434$3,486$1$—$3,487
Internal revenues9—514—(14)—
Total revenues$1,795$1,266$439$3,500$1$(14)$3,487
Depreciation1551167734818—366
Amortization (deferral) of regulatory assets, net(124)(17)1(140)——(140)
Equity method investment earnings————43—43
Interest expense100676222987(27)289
Income taxes (benefits)46123391(62)—29
Earnings attributable to FE from continuing operations1751451004201—421
Cash Flows from Investing Activities:
Capital investments$233$312$289$834$14$—$848
For the Nine Months Ended
September 30, 2024
External revenues$5,202$3,721$1,367$10,290$6$—$10,296
Internal revenues3041448—(48)—
Total revenues$5,232$3,725$1,381$10,338$6$(48)$10,296
Depreciation4863862491,12157—1,178
Amortization (deferral) of regulatory assets, net(152)(58)5(205)——(205)
Equity method investment earnings————64—64
Interest expense331198201730281(145)866
Income taxes (benefits)96107141344(50)—294
Earnings (losses) attributable to FE from continuing operations$426$387$237$1,050$(333)$—$717
Cash Flows from Investing Activities:
Capital investments$758$1,045$875$2,678$58$—$2,736
September 30, 2023
External revenues$5,209$3,247$1,262$9,718$6$—$9,724
Internal revenues3031346—(46)—
Total revenues$5,239$3,250$1,275$9,764$6$(46)$9,724
Depreciation4643432261,03355—1,088
Amortization (deferral) of regulatory assets, net(174)(85)6(253)——(253)
Equity method investment earnings————134—134
Interest expense290187179656248(76)828
Income taxes (benefits)12243102267(74)—193
Earnings (losses) attributable to FE from continuing operations$506$290$301$1,097$(149)$—$948
Cash Flows from Investing Activities:
Capital investments$662$824$747$2,233$33$—$2,266
As of September 30, 2024
Total assets$19,795$18,082$13,363$51,240$1,879$(2,363)$50,756
Total goodwill(1)$3,222$1,953$443$5,618$—$—$5,618
As of December 31, 2023
Total assets$19,235$17,466$12,142$48,843$2,372$(2,448)$48,767
Total goodwill(1)$3,222$1,953$443$5,618$—$—$5,618

(1) In accordance with GAAP, the modification to the segments in the first quarter of 2024, as discussed above, resulted in a transfer of goodwill between the segments based on the relative fair value of the reporting units, and as such, the segment goodwill balances do not necessarily represent the goodwill balances of the specific legal entities within the segments.