Item 2. PROPERTIES

IPL

Electric - At December 31, 2013, IPL’s EGUs by primary fuel type were as follows:

PrimaryNameplateGenerating
In-serviceDispatchCapacityCapacity
Name of EGULocationDatesType (a)in MWin MW (b)
Ottumwa Generating Station (Unit 1) (c)Ottumwa, IA1981BL348309
Lansing Generating Station (Unit 4)Lansing, IA1977BL275230
M.L. Kapp Generating Station (Unit 2) (d)Clinton, IA1967BL218177
Burlington Generating Station (Unit 1)Burlington, IA1968BL212177
George Neal Generating Station (Unit 4) (e)Sioux City, IA1979BL165160
George Neal Generating Station (Unit 3) (f)Sioux City, IA1975BL154136
Prairie Creek Generating Station (Units 1,3,4)Cedar Rapids, IA1958-1997BL213126
Louisa Generating Station (Unit 1) (g)Louisa, IA1983BL3229
Total Coal1,6171,344
Emery Generating Station (Units 1-3)Mason City, IA2004IN603494
Fox Lake Generating Station (Units 1,3) (d)Sherburn, MN1950-1962IN9382
Sutherland Generating Station (Units 1,3) (d)Marshalltown, IA1955-1961IN11979
Dubuque Generating Station (Units 3-4) (d)Dubuque, IA1952-1959IN6658
Burlington Combustion Turbines (Units 1-4) (d)Burlington, IA1994-1996PK7958
Grinnell Combustion Turbines (Units 1-2) (d)Grinnell, IA1990-1991PK4844
Red Cedar Combustion Turbine (Unit 1)Cedar Rapids, IA1996PK2311
Total Gas1,031826
Marshalltown Combustion Turbines (Units 1-3)Marshalltown, IA1978PK189143
Lime Creek Combustion Turbines (Units 1-2)Mason City, IA1991PK9056
Centerville Combustion Turbines (Units 1-2) (d)Centerville, IA1990PK5429
Diesel Stations (9 Units) (d)Iowa and Minnesota1963-1996PK1611
Total Oil349239
Whispering Willow - East (121 Units) (h)Franklin Co., IA2009IN200—
Total Wind200—
Total generating capacity3,1972,409
(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run primarily when there is high demand.
(b)Based on the generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2013 through May 2014.
(c)Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 644 MW (generating capacity) EGU, which is operated by IPL.
(d)Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
(e)Represents IPL’s 25.695% ownership interest in this 641 MW (nameplate capacity) / 623 MW (generating capacity) EGU, which is operated by MidAmerican.
(f)Represents IPL’s 28% ownership interest in this 550 MW (nameplate capacity) / 486 MW (generating capacity) EGU, which is operated by MidAmerican.
(g)Represents IPL’s 4% ownership interest in this 810 MW (nameplate capacity) / 725 MW (generating capacity) EGU, which is operated by MidAmerican.
(h)Generating capacity represents 0% of the capacity of this wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2013 through May 2014. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2013 through May 2014.

At December 31, 2013, IPL owned approximately 19,696 miles of overhead electric distribution line and 2,843 miles of underground electric distribution cable, as well as 714 substation distribution transformers, substantially all of which are located in Iowa and Minnesota.

Gas - IPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related distribution equipment. At December 31, 2013, IPL’s gas distribution facilities included approximately 5,051 miles and 238 miles of gas mains located in Iowa and Minnesota, respectively.

Other - IPL’s other property included in “Property, plant and equipment - Other” on its Consolidated Balance Sheets consists primarily of steam service assets, operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

WPL

Electric - At December 31, 2013, WPL’s EGUs by primary fuel type were as follows:

PrimaryNameplateGenerating
In-serviceDispatchCapacityCapacity
Name of EGULocationDatesType (a)in MWin MW (b)
Columbia Energy Center (Units 1-2) (c)Portage, WI1975-1978BL473504
Edgewater Generating Station (Unit 5)Sheboygan, WI1985BL380402
Edgewater Generating Station (Unit 4) (d) (e)Sheboygan, WI1969BL225211
Nelson Dewey Generating Station (Units 1-2) (e)Cassville, WI1959-1962BL200207
Edgewater Generating Station (Unit 3) (e)Sheboygan, WI1951IN6054
Total Coal1,3381,378
Riverside Energy Center (Units 1-3) (f)Beloit, WI2004IN675568
Neenah Energy Facility (Units 1-2)Neenah, WI2000PK371279
South Fond du Lac Combustion Turbines (2 Units) (g)Fond du Lac, WI1994PK191143
Rock River Combustion Turbines (Units 3-6) (h)Beloit, WI1967-1972PK16985
Sheepskin Combustion Turbine (Unit 1)Edgerton, WI1971PK4233
Total Gas1,4481,108
Bent Tree - Phase I (122 Units) (i)Freeborn Co., MN2010-2011IN201—
Cedar Ridge (41 Units) (j)Fond du Lac Co., WI2008IN688
Total Wind2698
Prairie du Sac Hydro Plant (8 Units)Prairie du Sac, WI1914-1940IN3114
Kilbourn Hydro Plant (4 Units)Wisconsin Dells, WI1926-1939IN106
Total Hydro4120
Total generating capacity3,0962,514
(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run primarily when there is high demand.
(b)Based on the generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2013 through May 2014.
(c)Represents WPL’s 46.2% ownership interest in this 1,023 MW (nameplate capacity) / 1,091 MW (generating capacity) EGU, which is operated by WPL.
(d)Represents WPL’s 68.2% ownership interest in this 330 MW (nameplate capacity) / 309 MW (generating capacity) EGU, which is operated by WPL.
(e)Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
(f)WPL was credited 568 MW of generating capacity for this EGU for the planning period from June 2013 through May 2014. WPL is utilizing 468 MW of the accredited generating capacity from Riverside to satisfy its PRM requirements and has sold 100 MW of the accredited capacity to a third party with a PPA through May 2014.
(g)Represents Units 2 and 3, which WPL owns. WPL also operates South Fond du Lac Combustion Turbines Units 1 and 4.
(h)Rock River Combustion Turbine Unit 6 was not operating during the testing period for MISO’s resource adequacy process for the planning period from June 2013 through May 2014, resulting in no capacity being credited to the EGU for that planning period.
(i)Generating capacity represents 0% of the capacity of this wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2013 through May 2014. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2013 through May 2014.
(j)Generating capacity represents 12% of the capacity of this wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2013 through May 2014.

At December 31, 2013, WPL owned approximately 16,379 miles of overhead electric distribution line and 5,070 miles of underground electric distribution cable, as well as 303 substation distribution transformers, substantially all of which are located in Wisconsin. Refer to Note 10(b) of the “Combined Notes to Consolidated Financial Statements” for information regarding WPL’s lease of Sheboygan Falls from Resources’ Non-regulated Generation business.

Gas - WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related distribution equipment. At December 31, 2013, WPL’s gas distribution facilities included approximately 4,131 miles of gas mains located in Wisconsin.

Other - WPL’s other property included in “Property, plant and equipment - Other” on its Consolidated Balance Sheets consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

Resources - Resources’ principal properties included in “Property, plant and equipment - Non-regulated and other” on Alliant Energy’s Consolidated Balance Sheet at December 31, 2013 were as follows:

Non-regulated Generation - Includes Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL, and the 99 MW (60 Units) Franklin County wind project in Franklin County, Iowa that was placed in service in 2012. Sheboygan Falls was credited with 282 MW of generating capacity for MISO’s resource adequacy process for the planning period from June 2013 through May 2014.

Transportation - Includes a short-line railway in Iowa with 114 railroad track miles, 13 active locomotives and 102 railcars; a barge terminal on the Mississippi River; and a coal terminal in Williams, Iowa.

Other non-regulated investments - Includes two corporate airplanes and real estate investments.

Corporate Services - Corporate Services’ property included in “Property, plant and equipment - Non-regulated and other” on Alliant Energy’s Consolidated Balance Sheet at December 31, 2013 consisted primarily of computer software and the corporate headquarters building located in Madison, Wisconsin.

Previous: Item 1B. UNRESOLVED STAFF COMMENTS · Next: Item 3. LEGAL PROCEEDINGS