Item 2. PROPERTIES

Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:

IPL

Electric - At December 31, 2015, IPL’s EGUs by primary fuel type were as follows:

PrimaryNameplateGenerating
In-serviceDispatchCapacityCapacity
Name of EGULocationDatesType (a)in MWin MW (b)
Ottumwa Generating Station (Unit 1) (c)Ottumwa, IA1981BL348324
Lansing Generating Station (Unit 4)Lansing, IA1977BL275235
Prairie Creek Generating Station (Units 1,3,4) (d)Cedar Rapids, IA1958-1997BL213148
Burlington Generating Station (Unit 1) (d)Burlington, IA1968BL212197
George Neal Generating Station (Unit 4) (e)Sioux City, IA1979BL179155
George Neal Generating Station (Unit 3) (f)Sioux City, IA1975BL164134
Louisa Generating Station (Unit 1) (g)Louisa, IA1983BL3229
Total Coal1,4231,222
Emery Generating Station (Units 1-3)Mason City, IA2004IN603516
M.L. Kapp Generating Station (Unit 2) (h)Clinton, IA1967IN21894
Sutherland Generating Station (Units 1,3) (d)Marshalltown, IA1955-1961IN11987
Fox Lake Generating Station (Units 1,3) (d)Sherburn, MN1950-1962IN9389
Burlington Combustion Turbines (Units 1-4) (d)Burlington, IA1994-1996PK7952
Dubuque Generating Station (Units 3-4) (d)Dubuque, IA1952-1959IN6658
Grinnell Combustion Turbines (Units 1-2) (d)Grinnell, IA1990-1991PK4840
Red Cedar Combustion Turbine (Unit 1)Cedar Rapids, IA1996PK236
Total Gas1,249942
Marshalltown Combustion Turbines (Units 1-3)Marshalltown, IA1978PK189139
Lime Creek Combustion Turbines (Units 1-2)Mason City, IA1991PK9069
Centerville Combustion Turbines (Units 1-2) (d)Centerville, IA1990PK5447
Diesel Stations (5 Units) (d)Iowa1963-1966PK105
Total Oil343260
Whispering Willow - East (121 Units) (i)Franklin Co., IA2009IN20032
Total Wind20032
Total capacity3,2152,456
(a)Base load EGUs (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate EGUs (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peak load EGUs (PK) are generally low efficiency, quick response units that run primarily when there is high demand.
(b)Based on the accredited generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2015 through May 2016.
(c)Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 675 MW (generating capacity) EGU, which is operated by IPL.
(d)Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
(e)Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 602 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(f)Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 477 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(g)Represents IPL’s 4% ownership interest in this 812 MW (nameplate capacity) / 728 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(h)The fuel type at M.L. Kapp Unit 2 was switched from coal to natural gas in 2015.
(i)Generating capacity represents 16% of the capacity of this wind farm based upon the MISO resource adequacy process, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.

At December 31, 2015, IPL owned approximately 17,567 miles of overhead electric distribution line and 2,872 miles of underground electric distribution cable, as well as 573 substation distribution transformers, substantially all of which are located in Iowa.

Gas - IPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2015, IPL’s gas distribution facilities included approximately 5,119 miles of gas mains located in Iowa.

Other - IPL’s other property consists primarily of steam service assets, operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

WPL

Electric - At December 31, 2015, WPL’s EGUs by primary fuel type were as follows:

PrimaryNameplateGenerating
In-serviceDispatchCapacityCapacity
Name of EGULocationDatesType (a)in MWin MW (b)
Columbia Energy Center (Units 1-2) (c)Portage, WI1975-1978BL514499
Edgewater Generating Station (Unit 5)Sheboygan, WI1985BL414413
Edgewater Generating Station (Unit 4) (d) (e)Sheboygan, WI1969BL239204
Total Coal1,1671,116
Riverside Energy Center (Units 1-3)Beloit, WI2004IN675539
Neenah Energy Facility (Units 1-2)Neenah, WI2000PK371275
South Fond du Lac Combustion Turbines (2 Units) (f)Fond du Lac, WI1994PK191146
Rock River Combustion Turbines (Units 3-6) (e)Beloit, WI1967-1972PK169108
Sheepskin Combustion Turbine (Unit 1) (e)Edgerton, WI1971PK4236
Total Gas1,4481,104
Bent Tree (122 Units) (g)Freeborn Co., MN2010-2011IN20129
Cedar Ridge (41 Units) (h)Fond du Lac Co., WI2008IN688
Total Wind26937
Prairie du Sac Hydro Plant (8 Units)Prairie du Sac, WI1914-1940IN3114
Kilbourn Hydro Plant (4 Units)Wisconsin Dells, WI1926-1939IN106
Total Hydro4120
Total capacity2,9252,277
(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run primarily when there is high demand.
(b)Based on the accredited generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2015 through May 2016.
(c)Represents WPL’s 46.2% ownership interest in this 1,112 MW (nameplate capacity) / 1,080 MW (generating capacity) EGU, which is operated by WPL.
(d)Represents WPL’s 68.2% ownership interest in this 351 MW (nameplate capacity) / 299 MW (generating capacity) EGU, which is operated by WPL.
(e)Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired in the next few years.
(f)Represents Units 2 and 3, which WPL owns. WPL also operates South Fond du Lac Combustion Turbines Units 1 and 4.
(g)Generating capacity represents 14% of the capacity of this wind farm based upon the MISO resource adequacy process, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.
(h)Generating capacity represents 12% of the capacity of this wind farm based upon the MISO resource adequacy process, which is determined separately for each wind farm, during the planning period from June 2015 through May 2016.

At December 31, 2015, WPL owned approximately 16,281 miles of overhead electric distribution line and 5,315 miles of underground electric distribution cable, as well as 302 substation distribution transformers, substantially all of which are located in Wisconsin. Refer to Notes 2 and 3 for discussion of Nelson Dewey Units 1 and 2 and Edgewater Unit 3, which were retired in 2015.

Gas - WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2015, WPL’s gas distribution facilities included approximately 4,307 miles of gas mains located in Wisconsin.

Other - Refer to Note 10(b) for information regarding WPL’s lease of Sheboygan Falls from Resources’ Non-regulated Generation business. WPL’s other property consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

Resources - Resources’ principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2015 were as follows:

Non-regulated Generation - Includes Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL, and the 99 MW (60 Units) Franklin County wind farm in Franklin County, Iowa that was placed in service in 2012. Sheboygan Falls was accredited with 282 MW of generating capacity for MISO’s resource adequacy process for the planning period from June 2015 through May 2016.

Transportation - Includes a short-line railway in Iowa with 114 miles of railroad track, 13 active locomotives and 72 rail-cars; a barge terminal on the Mississippi River; and a coal terminal in Williams, Iowa.

Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2015 consisted primarily of computer software, the corporate headquarters building located in Madison, Wisconsin, and a new customer billing and information system for IPL and WPL, which was placed in service in 2015.