Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:

19

IPL and WPL

Electric - At December 31, 2017, IPL’s and WPL’s EGUs by primary fuel type were as follows:

IPLExpectedPrimaryNameplateGenerating
Retirement orIn-serviceDispatchCapacityCapacity
Name of EGU and LocationFuel Switch (a)DatesType (b)in MWin MW (c)
Marshalltown Generating Station (Units 1-3); Marshalltown, IAN/A2017IN706630
Emery Generating Station (Units 1-3); Mason City, IAN/A2004IN603535
M.L. Kapp Generating Station (Unit 2); Clinton, IAN/A1967IN218101
Marshalltown Combustion Turbines (Units 1-3); Marshalltown, IAN/A1978PK189112
Prairie Creek Generating Station (Unit 4); Cedar Rapids, IAN/A1967PK149111
Burlington Combustion Turbines (Units 1-4); Burlington, IARetire by 6/1/181994-1996PK7948
Red Cedar Combustion Turbine (Unit 1); Cedar Rapids, IARetire by 6/1/181996PK2313
Total Gas1,9671,550
Ottumwa Generating Station (Unit 1); Ottumwa, IA (d)N/A1981BL348330
Lansing Generating Station (Unit 4); Lansing, IAN/A1977BL275227
Burlington Generating Station (Unit 1); Burlington, IAFuel switch by 12/31/21 (e)1968BL212199
George Neal Generating Station (Unit 4); Sioux City, IA (f)N/A1979BL179161
George Neal Generating Station (Unit 3); Sioux City, IA (g)N/A1975BL164128
Prairie Creek Generating Station (Units 1 and 3); Cedar Rapids, IAFuel switch or retire by 12/31/25 (e)1958-1997BL6537
Louisa Generating Station (Unit 1); Louisa, IA (h)N/A1983BL3229
Total Coal1,2751,111
Lime Creek Combustion Turbines (Units 1-2); Mason City, IAN/A1991PK9070
Total Oil9070
Whispering Willow - East (121 Units); Franklin Co., IAN/A2009IN20032
Franklin County (60 Units); Franklin Co., IAN/A2012IN9917
Total Wind29949
Dubuque Solar Garden; Dubuque, IA (i)N/A2017IN5—
Total capacity3,6362,780
WPLPrimaryNameplateGenerating
In-serviceDispatchCapacityCapacity
Name of EGU and LocationExpected Retirement (a)DatesType (b)in MWin MW (c)
Riverside Energy Center (Units 1-3); Beloit, WIN/A2004IN675542
Neenah Energy Facility (Units 1-2); Neenah, WIN/A2000PK371285
South Fond du Lac Combustion Turbines (2 Units); Fond du Lac, WI (j)N/A1994PK191147
Rock River Combustion Turbines (Units 3-6); Beloit, WIRetire by 12/31/201967-1972PK169138
Sheepskin Combustion Turbine (Unit 1); Edgerton, WIRetire by 12/31/201971PK4234
Total Gas1,4481,146
Columbia Energy Center (Units 1-2); Portage, WI (k)N/A1975-1978BL557550
Edgewater Generating Station (Unit 5); Sheboygan, WIN/A1985BL414410
Edgewater Generating Station (Unit 4); Sheboygan, WI (l)Retire by 9/30/18 (e)1969BL239181
Total Coal1,2101,141
Bent Tree (122 Units); Freeborn Co., MNN/A2010-2011IN20131
Cedar Ridge (41 Units); Fond du Lac Co., WIN/A2008IN6810
Total Wind26941
Prairie du Sac Hydro Plant (8 Units); Prairie due Sac, WIN/A1914-1940IN3312
Kilbourn Hydro Plant (4 Units); Wisconsin Dells, WIN/A1926-1939IN106
Total Hydro4318
Total capacity2,9702,346
20
(a)Expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. The potential retirement of other EGUs within the generation fleet continues to be evaluated. IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of certain of these actions. Final MISO studies could indicate that the retirement of an individual EGU may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors.
(b)Base load EGUs (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate EGUs (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peak load EGUs (PK) are generally low efficiency, quick response units that run primarily when there is high demand.
(c)Based on the accredited generating capacity of the EGUs as of December 31, 2017 included in MISO’s resource adequacy process for the planning period from June 2017 through May 2018.
(d)Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 687 MW (generating capacity) EGU, which is operated by IPL.
(e)Actions and plans for retirement or fuel switch meet requirements specified in IPL’s and WPL’s respective Consent Decree, which are discussed in Note 16(e).
(f)Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 626 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(g)Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 456 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(h)Represents IPL’s 4% ownership interest in this 812 MW (nameplate capacity) / 730 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company.
(i)This EGU did not receive any accredited generating capacity for the planning period from June 2017 through May 2018.
(j)Represents Units 2 and 3, which WPL owns. WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4.
(k)Represents WPL’s 50.1% ownership interest in this 1,112 MW (nameplate capacity) / 1,098 MW (generating capacity) EGU, which is operated by WPL.
(l)Represents WPL’s 68.2% ownership interest in this 351 MW (nameplate capacity) / 265 MW (generating capacity) EGU, which is operated by WPL.

At December 31, 2017, IPL owned approximately 17,300 miles of overhead electric distribution line and approximately 3,200 miles of underground electric distribution cable, as well as approximately 550 substation distribution transformers, substantially all of which are located in Iowa. At December 31, 2017, WPL owned approximately 16,100 miles of overhead electric distribution line and approximately 5,700 miles of underground electric distribution cable, as well as approximately 300 substation distribution transformers, substantially all of which are located in Wisconsin.

Gas - IPL’s and WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2017, IPL’s gas distribution facilities included approximately 5,100 miles of gas mains located in Iowa and WPL’s included approximately 4,500 miles of gas mains located in Wisconsin.

Other - IPL’s and WPL’s other property consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment. IPL’s other property also includes steam service assets. Refer to Note 10(b) for information regarding WPL’s lease of the Sheboygan Falls Energy Facility from AEF’s Non-utility Generation business.

AEF - AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2017 were as follows:

Non-utility Generation - Includes the Sheboygan Falls Energy Facility, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL. The Sheboygan Falls Energy Facility was accredited with 296 MW of generating capacity for MISO’s resource adequacy process for the planning period from June 2017 through May 2018.

Transportation - Includes a short-line railway in Iowa with 114 miles of railroad track and 10 active locomotives; and a barge terminal on the Mississippi River.

21

Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2017 consisted primarily of a customer billing and information system for IPL and WPL and other computer software, and the corporate headquarters building located in Madison, Wisconsin.