Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:
IPL and WPL
Electric - At December 31, 2017, IPL’s and WPL’s EGUs by primary fuel type were as follows:
| | | | | | | | | | | | |
|---|
| | | | | | | | | | | | |
| IPL | | Expected | | | | Primary | | Nameplate | | | Generating | |
| | Retirement or | | In-service | | Dispatch | | Capacity | | | Capacity | |
| Name of EGU and Location | | Fuel Switch (a) | | Dates | | Type (b) | | in MW | | | in MW (c) | |
| Marshalltown Generating Station (Units 1-3); Marshalltown, IA | | N/A | | 2017 | | IN | | 706 | | | 630 | |
| Emery Generating Station (Units 1-3); Mason City, IA | | N/A | | 2004 | | IN | | 603 | | | 535 | |
| M.L. Kapp Generating Station (Unit 2); Clinton, IA | | N/A | | 1967 | | IN | | 218 | | | 101 | |
| Marshalltown Combustion Turbines (Units 1-3); Marshalltown, IA | | N/A | | 1978 | | PK | | 189 | | | 112 | |
| Prairie Creek Generating Station (Unit 4); Cedar Rapids, IA | | N/A | | 1967 | | PK | | 149 | | | 111 | |
| Burlington Combustion Turbines (Units 1-4); Burlington, IA | | Retire by 6/1/18 | | 1994-1996 | | PK | | 79 | | | 48 | |
| Red Cedar Combustion Turbine (Unit 1); Cedar Rapids, IA | | Retire by 6/1/18 | | 1996 | | PK | | 23 | | | 13 | |
| Total Gas | | | | | | | | 1,967 | | | 1,550 | |
| | | | | | | | | | | | |
| Ottumwa Generating Station (Unit 1); Ottumwa, IA (d) | | N/A | | 1981 | | BL | | 348 | | | 330 | |
| Lansing Generating Station (Unit 4); Lansing, IA | | N/A | | 1977 | | BL | | 275 | | | 227 | |
| Burlington Generating Station (Unit 1); Burlington, IA | | Fuel switch by 12/31/21 (e) | | 1968 | | BL | | 212 | | | 199 | |
| George Neal Generating Station (Unit 4); Sioux City, IA (f) | | N/A | | 1979 | | BL | | 179 | | | 161 | |
| George Neal Generating Station (Unit 3); Sioux City, IA (g) | | N/A | | 1975 | | BL | | 164 | | | 128 | |
| Prairie Creek Generating Station (Units 1 and 3); Cedar Rapids, IA | | Fuel switch or retire by 12/31/25 (e) | | 1958-1997 | | BL | | 65 | | | 37 | |
| Louisa Generating Station (Unit 1); Louisa, IA (h) | | N/A | | 1983 | | BL | | 32 | | | 29 | |
| Total Coal | | | | | | | | 1,275 | | | 1,111 | |
| | | | | | | | | | | | |
| Lime Creek Combustion Turbines (Units 1-2); Mason City, IA | | N/A | | 1991 | | PK | | 90 | | | 70 | |
| Total Oil | | | | | | | | 90 | | | 70 | |
| | | | | | | | | | | | |
| Whispering Willow - East (121 Units); Franklin Co., IA | | N/A | | 2009 | | IN | | 200 | | | 32 | |
| Franklin County (60 Units); Franklin Co., IA | | N/A | | 2012 | | IN | | 99 | | | 17 | |
| Total Wind | | | | | | | | 299 | | | 49 | |
| | | | | | | | | | | | |
| Dubuque Solar Garden; Dubuque, IA (i) | | N/A | | 2017 | | IN | | 5 | | | — | |
| | | | | | | | | | | | |
| Total capacity | | | | | | | | 3,636 | | | 2,780 | |
| | | | | | | | | | | | |
|---|
| | | | | | | | | | | | |
| WPL | | | | | | Primary | | Nameplate | | | Generating | |
| | | | In-service | | Dispatch | | Capacity | | | Capacity | |
| Name of EGU and Location | | Expected Retirement (a) | | Dates | | Type (b) | | in MW | | | in MW (c) | |
| Riverside Energy Center (Units 1-3); Beloit, WI | | N/A | | 2004 | | IN | | 675 | | | 542 | |
| Neenah Energy Facility (Units 1-2); Neenah, WI | | N/A | | 2000 | | PK | | 371 | | | 285 | |
| South Fond du Lac Combustion Turbines (2 Units); Fond du Lac, WI (j) | | N/A | | 1994 | | PK | | 191 | | | 147 | |
| Rock River Combustion Turbines (Units 3-6); Beloit, WI | | Retire by 12/31/20 | | 1967-1972 | | PK | | 169 | | | 138 | |
| Sheepskin Combustion Turbine (Unit 1); Edgerton, WI | | Retire by 12/31/20 | | 1971 | | PK | | 42 | | | 34 | |
| Total Gas | | | | | | | | 1,448 | | | 1,146 | |
| | | | | | | | | | | | |
| Columbia Energy Center (Units 1-2); Portage, WI (k) | | N/A | | 1975-1978 | | BL | | 557 | | | 550 | |
| Edgewater Generating Station (Unit 5); Sheboygan, WI | | N/A | | 1985 | | BL | | 414 | | | 410 | |
| Edgewater Generating Station (Unit 4); Sheboygan, WI (l) | | Retire by 9/30/18 (e) | | 1969 | | BL | | 239 | | | 181 | |
| Total Coal | | | | | | | | 1,210 | | | 1,141 | |
| | | | | | | | | | | | |
| Bent Tree (122 Units); Freeborn Co., MN | | N/A | | 2010-2011 | | IN | | 201 | | | 31 | |
| Cedar Ridge (41 Units); Fond du Lac Co., WI | | N/A | | 2008 | | IN | | 68 | | | 10 | |
| Total Wind | | | | | | | | 269 | | | 41 | |
| | | | | | | | | | | | |
| Prairie du Sac Hydro Plant (8 Units); Prairie due Sac, WI | | N/A | | 1914-1940 | | IN | | 33 | | | 12 | |
| Kilbourn Hydro Plant (4 Units); Wisconsin Dells, WI | | N/A | | 1926-1939 | | IN | | 10 | | | 6 | |
| Total Hydro | | | | | | | | 43 | | | 18 | |
| | | | | | | | | | | | |
| Total capacity | | | | | | | | 2,970 | | | 2,346 | |
| |
|---|
| (a) | Expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. The potential retirement of other EGUs within the generation fleet continues to be evaluated. IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of certain of these actions. Final MISO studies could indicate that the retirement of an individual EGU may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors. |
| |
|---|
| (b) | Base load EGUs (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate EGUs (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peak load EGUs (PK) are generally low efficiency, quick response units that run primarily when there is high demand. |
| |
|---|
| (c) | Based on the accredited generating capacity of the EGUs as of December 31, 2017 included in MISO’s resource adequacy process for the planning period from June 2017 through May 2018. |
| |
|---|
| (d) | Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 687 MW (generating capacity) EGU, which is operated by IPL. |
| |
|---|
| (e) | Actions and plans for retirement or fuel switch meet requirements specified in IPL’s and WPL’s respective Consent Decree, which are discussed in Note 16(e). |
| |
|---|
| (f) | Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 626 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (g) | Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 456 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (h) | Represents IPL’s 4% ownership interest in this 812 MW (nameplate capacity) / 730 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (i) | This EGU did not receive any accredited generating capacity for the planning period from June 2017 through May 2018. |
| |
|---|
| (j) | Represents Units 2 and 3, which WPL owns. WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4. |
| |
|---|
| (k) | Represents WPL’s 50.1% ownership interest in this 1,112 MW (nameplate capacity) / 1,098 MW (generating capacity) EGU, which is operated by WPL. |
| |
|---|
| (l) | Represents WPL’s 68.2% ownership interest in this 351 MW (nameplate capacity) / 265 MW (generating capacity) EGU, which is operated by WPL. |
At December 31, 2017, IPL owned approximately 17,300 miles of overhead electric distribution line and approximately 3,200 miles of underground electric distribution cable, as well as approximately 550 substation distribution transformers, substantially all of which are located in Iowa. At December 31, 2017, WPL owned approximately 16,100 miles of overhead electric distribution line and approximately 5,700 miles of underground electric distribution cable, as well as approximately 300 substation distribution transformers, substantially all of which are located in Wisconsin.
Gas - IPL’s and WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2017, IPL’s gas distribution facilities included approximately 5,100 miles of gas mains located in Iowa and WPL’s included approximately 4,500 miles of gas mains located in Wisconsin.
Other - IPL’s and WPL’s other property consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment. IPL’s other property also includes steam service assets. Refer to Note 10(b) for information regarding WPL’s lease of the Sheboygan Falls Energy Facility from AEF’s Non-utility Generation business.
AEF - AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2017 were as follows:
Non-utility Generation - Includes the Sheboygan Falls Energy Facility, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL. The Sheboygan Falls Energy Facility was accredited with 296 MW of generating capacity for MISO’s resource adequacy process for the planning period from June 2017 through May 2018.
Transportation - Includes a short-line railway in Iowa with 114 miles of railroad track and 10 active locomotives; and a barge terminal on the Mississippi River.
Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2017 consisted primarily of a customer billing and information system for IPL and WPL and other computer software, and the corporate headquarters building located in Madison, Wisconsin.