Item 2. PROPERTIES

15K characters. Original on sec.gov · Markdown

Item 2. PROPERTIES

Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:

IPL and WPL

Electric - At December 31, 2025, IPL’s and WPL’s facilities by primary fuel type were as follows:

IPLGenerating
In-serviceCapacity
Name of Facility and LocationDatesin MW (a)
Marshalltown Generating Station (Units 1-3); Marshalltown, IA2017666
Emery Generating Station (Units 1-3); Mason City, IA2004531
Marshalltown Combustion Turbines (Units 1-3); Marshalltown, IA1978155
Burlington Generating Station (Unit 1); Burlington, IA1968143
Prairie Creek Generating Station (Unit 4); Cedar Rapids, IA1967126
Burlington Combustion Turbines (Units 1-4); Burlington, IA1994-199634
Total Gas1,655
Upland Prairie (121 Units); Clay and Dickinson Cos., IA2019299
Whispering Willow - North (81 Units); Franklin Co., IA2020201
Whispering Willow - East (121 Units); Franklin Co., IA2009200
Golden Plains (82 Units); Winnebago and Kossuth Cos., IA2020200
English Farms (69 Units); Poweshiek Co., IA2019172
Richland (53 Units); Sac Co., IA2020131
Franklin County (60 Units); Franklin Co., IA201299
Total Wind1,302
Pleasant Creek (Units 1-2), Linn Co., IA2024200
Wever; Lee Co., IA2024150
Creston; Union Co., IA202450
Dubuque; Dubuque, IA20175
Marshalltown; Marshalltown, IA20203
Customer-hosted and Community Solar; various locations in IA2024-202518
Total Solar426
Ottumwa Generating Station (Unit 1); Ottumwa, IA (b)1981336
George Neal Generating Station (Unit 4); Sioux City, IA (c)1979165
George Neal Generating Station (Unit 3); Sioux City, IA (d)1975143
Prairie Creek Generating Station (Units 1 and 3); Cedar Rapids, IA (e)1958-199737
Louisa Generating Station (Unit 1); Louisa, IA (f)198330
Total Coal711
Lime Creek Combustion Turbines (Units 1-2); Mason City, IA199172
Total Oil72
Wever; Lee Co., IA202599
Energy Storage; various locations in IA2019-20239
Total Energy Storage108
Total capacity4,274
25
WPLGenerating
In-serviceCapacity
Name of Facility and LocationDatesin MW (a)
Riverside Energy Center (Units 1-3); Beloit, WI2004530
West Riverside Energy Center (Units 1-3); Beloit, WI (g)2020390
Neenah Energy Facility (Units 1-2); Neenah, WI2000296
South Fond du Lac Combustion Turbines (2 Units); Fond du Lac, WI (h)1994164
Total Gas1,380
Bent Tree (122 Units); Freeborn Co., MN2010-2011201
Kossuth (56 Units); Kossuth Co., IA2020152
Cedar Ridge (41 Units); Fond du Lac Co., WI200868
Forward Wind Energy Center (37 Units); Dodge and Fond du Lac Cos., WI (i)200859
Total Wind480
Grant County, Grant Co., WI2024200
Wood County, Wood Co., WI2022150
Onion River, Sheboygan Co., WI2023150
Springfield, Dodge Co., WI2023100
Wautoma, Waushara Co., WI202399
Crawfish River, Jefferson Co., WI202375
Paddock, Rock Co., WI202365
Bear Creek, Richland Co., WI202250
North Rock, Rock Co., WI202250
Albany, Green Co., WI202350
Beaver Dam, Dodge Co., WI202350
Cassville, Grant Co., WI202350
West Riverside, Beloit, WI (f)20212
Customer-hosted and Community Solar; various locations in WI2021-202511
Total Solar1,102
Columbia Energy Center (Units 1-2); Portage, WI (j)1975-1978596
Edgewater Generating Station (Unit 5); Sheboygan, WI1985405
Total Coal1,001
Prairie du Sac (8 Units); Prairie du Sac, WI1914-194013
Kilbourn (4 Units); Wisconsin Dells, WI1926-19396
Total Hydro19
Grant County, Grant Co., WI2025100
Wood County, Wood Co., WI202575
Energy Storage; various locations in WI2022-20239
Total Energy Storage184
Total capacity4,166

(a)Based on the summer installed generating capacity included in MISO’s resource adequacy process for the planning period from June 2025 through May 2026, except for wind facilities, solar facilities and energy storage, which are based on nameplate capacity.

(b)Represents IPL’s 48% ownership interest, which is operated by IPL.

(c)Represents IPL’s 25.695% ownership interest, which is operated by MidAmerican Energy Company.

(d)Represents IPL’s 28% ownership interest, which is operated by MidAmerican Energy Company.

(e)Subsequent to December 31, 2025, IPL retired Prairie Creek Unit 1 and fuel switched Prairie Creek Unit 3 to natural gas.

(f)Represents IPL’s 4% ownership interest, which is operated by MidAmerican Energy Company.

(g)Represents WPL’s 56.6% ownership interest, which is operated by WPL.

(h)Represents Units 2 and 3, which WPL owns. WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4.

(i)Represents WPL’s 42.64% ownership interest, which is operated by Invenergy Services, LLC.

(j)Represents WPL’s 53.5% ownership interest, which is operated by WPL.

IPL and WPL own overhead electric distribution line, underground electric distribution cable and substation distribution transformers, substantially all of which are located in Iowa for IPL and Wisconsin for WPL.

26

Gas - IPL’s and WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. IPL’s and WPL’s gas distribution facilities include gas mains located in Iowa and Wisconsin, respectively.

Other - Refer to Note 9 for information regarding WPL’s lease of the Sheboygan Falls Energy Facility from AEF’s Non-utility Generation business.

Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2025 consisted primarily of computer software, and the corporate headquarters building located in Madison, Wisconsin.

AEF - AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2025 were as follows:

Non-utility Generation - Includes the Sheboygan Falls Energy Facility, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL. The summer installed generating capacity included in MISO’s resource adequacy process for the planning period from June 2025 through May 2026 for the Sheboygan Falls Energy Facility was 298 MW.

Travero - Includes a short-line rail freight service in Iowa; a Mississippi River barge, rail and truck freight terminal in Illinois; and a rail-served warehouse in Iowa.

Development-ready Sites - includes various rail-served and ready-to-build manufacturing and industrial sites throughout Iowa and Wisconsin, with access to various airports, interstate freeways and Alliant Energy’s electric services.