Alliant Energy 10-Q 2022-09-30
Filed 2022-11-08. 8 sections, 263K characters. Original on sec.gov · Markdown · JSON
Cover and table of contents
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-Q
☒ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended September 30, 2022
or
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from to

Name of Registrant, State of Incorporation, Address of Principal Executive Offices, Telephone Number, Commission File Number, IRS Employer Identification Number
ALLIANT ENERGY CORPORATION
(a Wisconsin Corporation)
4902 N. Biltmore Lane
Madison, Wisconsin 53718
Telephone (608) 458-3311
Commission File Number - 1-9894
IRS Employer Identification Number - 39-1380265
INTERSTATE POWER & LIGHT COMPANY
(an Iowa corporation)
Alliant Energy Tower
Cedar Rapids, Iowa 52401
Telephone (319) 786-4411
Commission File Number - 1-4117
IRS Employer Identification Number - 42-0331370
WISCONSIN POWER & LIGHT COMPANY
(a Wisconsin corporation)
4902 N. Biltmore Lane
Madison, Wisconsin 53718
Telephone (608) 458-3311
Commission File Number - 0-337
IRS Employer Identification Number - 39-0714890
This combined Form 10-Q is separately filed by Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company. Information contained in the Form 10-Q relating to Interstate Power and Light Company and Wisconsin Power and Light Company is filed by each such registrant on its own behalf. Each of Interstate Power and Light Company and Wisconsin Power and Light Company makes no representation as to information relating to registrants other than itself.
Securities registered pursuant to Section 12(b) of the Act:
Alliant Energy Corporation, Common Stock, $0.01 Par Value, Trading Symbol LNT, Nasdaq Global Select Market
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Alliant Energy Corporation - Yes ☒ No ☐
Interstate Power and Light Company - Yes ☒ No ☐
Wisconsin Power and Light Company - Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Alliant Energy Corporation - Yes ☒ No ☐
Interstate Power and Light Company - Yes ☒ No ☐
Wisconsin Power and Light Company - Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Alliant Energy Corporation - Large Accelerated Filer ☒ Accelerated Filer ☐ Non-accelerated Filer ☐ Smaller Reporting Company ☐ Emerging Growth Company ☐
Interstate Power and Light Company - Large Accelerated Filer ☐ Accelerated Filer ☐ Non-accelerated Filer ☒ Smaller Reporting Company ☐ Emerging Growth Company ☐
Wisconsin Power and Light Company - Large Accelerated Filer ☐ Accelerated Filer ☐ Non-accelerated Filer ☒ Smaller Reporting Company ☐ Emerging Growth Company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Alliant Energy Corporation ☐
Interstate Power and Light Company ☐
Wisconsin Power and Light Company ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Alliant Energy Corporation - Yes ☐ No ☒
Interstate Power and Light Company - Yes ☐ No ☒
Wisconsin Power and Light Company - Yes ☐ No ☒
Number of shares outstanding of each class of common stock as of September 30, 2022:
Alliant Energy Corporation, Common Stock, $0.01 par value, 251,021,830 shares outstanding
Interstate Power and Light Company, Common Stock, $2.50 par value, 13,370,788 shares outstanding (all outstanding shares are owned beneficially and of record by Alliant Energy Corporation)
Wisconsin Power and Light Company, Common Stock, $5 par value, 13,236,601 shares outstanding (all outstanding shares are owned beneficially and of record by Alliant Energy Corporation)
TABLE OF CONTENTS
DEFINITIONS
The following abbreviations or acronyms used in this report are defined below:
| Abbreviation or Acronym | Definition | Abbreviation or Acronym | Definition | ||||||||
| 2021 Form 10-K | Combined Annual Report on Form 10-K filed by Alliant Energy, IPL and WPL for the year ended Dec. 31, 2021 | IPL | Interstate Power and Light Company | ||||||||
| AEF | Alliant Energy Finance, LLC | IUB | Iowa Utilities Board | ||||||||
| AFUDC | Allowance for funds used during construction | MDA | Management’s Discussion and Analysis of Financial Condition and Results of Operations | ||||||||
| Alliant Energy | Alliant Energy Corporation | MISO | Midcontinent Independent System Operator, Inc. | ||||||||
| ATC | American Transmission Company LLC | MW | Megawatt | ||||||||
| ATC Holdings | Interest in American Transmission Company LLC and ATC Holdco LLC | MWh | Megawatt-hour | ||||||||
| Corporate Services | Alliant Energy Corporate Services, Inc. | N/A | Not applicable | ||||||||
| DAEC | Duane Arnold Energy Center | Note(s) | Combined Notes to Condensed Consolidated Financial Statements | ||||||||
| Dth | Dekatherm | OPEB | Other postretirement benefits | ||||||||
| EGU | Electric generating unit | PPA | Purchased power agreement | ||||||||
| EPA | U.S. Environmental Protection Agency | PSCW | Public Service Commission of Wisconsin | ||||||||
| EPS | Earnings per weighted average common share | SEC | Securities and Exchange Commission | ||||||||
| FERC | Federal Energy Regulatory Commission | U.S. | United States of America | ||||||||
| Financial Statements | Condensed Consolidated Financial Statements | West Riverside | West Riverside Energy Center | ||||||||
| FTR | Financial transmission right | Whiting Petroleum | Whiting Petroleum Corporation | ||||||||
| GAAP | U.S. generally accepted accounting principles | WPL | Wisconsin Power and Light Company |
FORWARD-LOOKING STATEMENTS
Statements contained in this report that are not of historical fact are forward-looking statements intended to qualify for the safe harbors from liability established by the Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified as such because the statements include words such as “may,” “believe,” “expect,” “anticipate,” “plan,” “project,” “will,” “projections,” “estimate,” or other words of similar import. Similarly, statements that describe future financial performance or plans or strategies are forward-looking statements. Such forward-looking statements are subject to certain risks and uncertainties that could cause actual results to differ materially from those expressed in, or implied by, such statements. Some, but not all, of the risks and uncertainties of Alliant Energy, IPL and WPL that could materially affect actual results include:
-
the direct or indirect effects resulting from terrorist incidents, including physical attacks and cyber attacks, or responses to such incidents;
-
the impact of penalties or third-party claims related to, or in connection with, a failure to maintain the security of personally identifiable information, including associated costs to notify affected persons and to mitigate their information security concerns;
-
the impact of customer- and third party-owned generation, including alternative electric suppliers, in IPL’s and WPL’s service territories on system reliability, operating expenses and customers’ demand for electricity;
-
the impact of energy efficiency, franchise retention and customer disconnects on sales volumes and margins;
-
the impact that price changes may have on IPL’s and WPL’s customers’ demand for electric, gas and steam services and their ability to pay their bills;
-
inflation and higher interest rates;
-
changes in the price of delivered natural gas, transmission, purchased electricity and coal, particularly during elevated market prices, and any resulting changes to counterparty credit risk, due to shifts in supply and demand caused by market conditions, regulations and MISO’s seasonal resource adequacy process;
-
IPL’s and WPL’s ability to obtain adequate and timely rate relief to allow for, among other things, the recovery of and/or the return on costs, including fuel costs, operating costs, transmission costs, deferred expenditures, deferred tax assets, tax expense, capital expenditures, and remaining costs related to EGUs that may be permanently closed and certain other retired assets, decreases in sales volumes, earning their authorized rates of return, and the payments to their parent of expected levels of dividends;
-
the ability to complete construction of renewable generation and storage projects by planned in-service dates and within the cost targets set by regulators due to cost increases of and access to materials, equipment and commodities including due to tariffs, duties or other assessments, such as any additional tariffs resulting from U.S. Department of Commerce investigations into the sourcing of solar project materials and equipment from certain countries, labor issues or supply shortages, the ability to successfully resolve warranty issues or contract disputes, the ability to achieve the expected level of tax benefits based on tax guidelines and project costs, and the ability to efficiently utilize the renewable generation and storage project tax benefits for the benefit of customers;
-
federal and state regulatory or governmental actions, including the impact of legislation, and regulatory agency orders;
-
the ability to utilize tax credits and net operating losses generated to date, and those that may be generated in the future, before they expire, as well as the ability to transfer tax credits that may be generated in the future at adequate pricing;
-
the impacts of changes in the tax code, including tax rates, minimum tax rates, and adjustments made to deferred tax assets and liabilities;
| 1 |
-
employee workforce factors, including the ability to hire and retain employees with specialized skills, impacts from employee retirements, changes in key executives, ability to create desired corporate culture, collective bargaining agreements and negotiations, work stoppages or restructurings;
-
disruptions in the supply and delivery of natural gas, purchased electricity and coal;
-
changes to the creditworthiness of, or performance of obligations by, counterparties with which Alliant Energy, IPL and WPL have contractual arrangements, including participants in the energy markets and fuel suppliers and transporters;
-
any material post-closing payments related to any past asset divestitures, including the sale of Whiting Petroleum, which could result from, among other things, indemnification agreements, warranties, guarantees or litigation;
-
weather effects on results of utility operations;
-
disruptions to ongoing operations and the supply of materials, services, equipment and commodities needed to construct solar generation, battery storage and electric and gas distribution projects, which may result from geopolitical issues, supplier manufacturing constraints, labor issues or transportation issues, as well as affect the ability to meet capacity requirements and result in increased capacity expense;
-
continued access to the capital markets on competitive terms and rates, and the actions of credit rating agencies;
-
the direct or indirect effects resulting from the ongoing novel coronavirus (COVID-19) pandemic and the spread of variant strains;
-
issues associated with environmental remediation and environmental compliance, including compliance with all environmental and emissions permits, the Coal Combustion Residuals Rule, future changes in environmental laws and regulations, including federal, state or local regulations for carbon dioxide emissions reductions from new and existing fossil-fueled EGUs, and litigation associated with environmental requirements;
-
increased pressure from customers, investors and other stakeholders to more rapidly reduce carbon dioxide emissions;
-
the ability to defend against environmental claims brought by state and federal agencies, such as the EPA, state natural resources agencies or third parties, such as the Sierra Club, and the impact on operating expenses of defending and resolving such claims;
-
changes to MISO’s methodology establishing capacity planning reserve margin and capacity accreditation requirements that may impact how and when new generating facilities such as IPL’s and WPL’s additional solar generation may be accredited with energy capacity and may require IPL and WPL to adjust their current resource plans, the need to add resources to comply with MISO’s methodology, or procure capacity in the market whereby such costs might not be recovered in rates;
-
the direct or indirect effects resulting from breakdown or failure of equipment in the operation of electric and gas distribution systems, such as mechanical problems and explosions or fires, and compliance with electric and gas transmission and distribution safety regulations, including regulations promulgated by the Pipeline and Hazardous Materials Safety Administration;
-
issues related to the availability and operations of EGUs, including start-up risks, breakdown or failure of equipment, availability of warranty coverage for equipment breakdowns or failures, performance below expected or contracted levels of output or efficiency, operator error, employee safety, transmission constraints, compliance with mandatory reliability standards and risks related to recovery of resulting incremental operating, fuel-related and capital costs through rates;
-
impacts that excessive heat, excessive cold, storms or natural disasters may have on Alliant Energy’s, IPL’s and WPL’s operations and recovery of costs associated with restoration activities or on the operations of Alliant Energy’s investments;
-
Alliant Energy’s ability to sustain its dividend payout ratio goal;
-
changes to costs of providing benefits and related funding requirements of pension and OPEB plans due to the market value of the assets that fund the plans, economic conditions, financial market performance, interest rates, timing and form of benefits payments, life expectancies and demographics;
-
material changes in employee-related benefit and compensation costs, including settlement losses related to pension plans;
-
risks associated with operation and ownership of non-utility holdings;
-
changes in technology that alter the channels through which customers buy or utilize Alliant Energy’s, IPL’s or WPL’s products and services;
-
impacts on equity income from unconsolidated investments from changes in valuations of the assets held, as well as potential changes to ATC’s authorized return on equity;
-
impacts of IPL’s future tax benefits from Iowa rate-making practices, including deductions for repairs expenditures, allocation of mixed service costs and state depreciation, and recoverability of the associated regulatory assets from customers, when the differences reverse in future periods;
-
current or future litigation, regulatory investigations, proceedings or inquiries;
-
reputational damage from negative publicity, protests, fines, penalties and other negative consequences resulting in regulatory and/or legal actions;
-
the effect of accounting standards issued periodically by standard-setting bodies;
-
the ability to successfully complete tax audits and changes in tax accounting methods with no material impact on earnings and cash flows; and
-
other factors listed in MDA and Risk Factors in Item 1A in the 2021 Form 10-K.
Alliant Energy, IPL and WPL each assume no obligation, and disclaim any duty, to update the forward-looking statements in this report, except as required by law.
| 2 |
PART I. FINANCIAL INFORMATION
Item 1. CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (UNAUDITED)
ALLIANT ENERGY CORPORATION
CONDENSED CONSOLIDATED STATEMENTS OF INCOME (UNAUDITED)
| For the Three Months | For the Nine Months | ||||||||||||||||||||||
| Ended September 30, | Ended September 30, | ||||||||||||||||||||||
| 2022 | 2021 | 2022 | 2021 | ||||||||||||||||||||
| (in millions, except per share amounts) | |||||||||||||||||||||||
| Revenues: | |||||||||||||||||||||||
| Electric utility | $1,039 | $939 | $2,624 | $2,357 | |||||||||||||||||||
| Gas utility | 62 | 50 | 418 | 289 | |||||||||||||||||||
| Other utility | 11 | 13 | 35 | 36 | |||||||||||||||||||
| Non-utility | 23 | 22 | 70 | 60 | |||||||||||||||||||
| Total revenues | 1,135 | 1,024 | 3,147 | 2,742 | |||||||||||||||||||
| Operating expenses: | |||||||||||||||||||||||
| Electric production fuel and purchased power | 274 | 207 | 633 | 478 | |||||||||||||||||||
| Electric transmission service | 157 | 148 | 428 | 403 | |||||||||||||||||||
| Cost of gas sold | 26 | 18 | 242 | 149 | |||||||||||||||||||
| Other operation and maintenance | 172 | 171 | 492 | 477 | |||||||||||||||||||
| Depreciation and amortization | 169 | 165 | 501 | 494 | |||||||||||||||||||
| Taxes other than income taxes | 28 | 26 | 82 | 78 | |||||||||||||||||||
| Total operating expenses | 826 | 735 | 2,378 | 2,079 | |||||||||||||||||||
| Operating income | 309 | 289 | 769 | 663 | |||||||||||||||||||
| Other (income) and deductions: | |||||||||||||||||||||||
| Interest expense | 83 | 68 | 235 | 206 | |||||||||||||||||||
| Equity income from unconsolidated investments, net | (5) | (13) | (37) | (47) | |||||||||||||||||||
| Allowance for funds used during construction | (10) | (7) | (34) | (16) | |||||||||||||||||||
| Other | — | 3 | — | 7 | |||||||||||||||||||
| Total other (income) and deductions | 68 | 51 | 164 | 150 | |||||||||||||||||||
| Income before income taxes | 241 | 238 | 605 | 513 | |||||||||||||||||||
| Income tax expense (benefit) | 14 | (21) | 26 | (66) | |||||||||||||||||||
| Net income | 227 | 259 | 579 | 579 | |||||||||||||||||||
| Preferred dividend requirements of Interstate Power and Light Company | — | 3 | — | 8 | |||||||||||||||||||
| Net income attributable to Alliant Energy common shareowners | $227 | $256 | $579 | $571 | |||||||||||||||||||
| Weighted average number of common shares outstanding: | |||||||||||||||||||||||
| Basic | 251.0 | 250.3 | 250.8 | 250.2 | |||||||||||||||||||
| Diluted | 251.3 | 250.8 | 251.1 | 250.6 | |||||||||||||||||||
| Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted) | $0.90 | $1.02 | $2.31 | $2.28 | |||||||||||||||||||
Refer to accompanying Combined Notes to Condensed Consolidated Financial Statements.
| 3 |
ALLIANT ENERGY CORPORATION
CONDENSED CONSOLIDATED BALANCE SHEETS (UNAUDITED)
| September 30, 2022 | December 31, 2021 | ||||||||||
| (in millions, except per share and share amounts) | |||||||||||
| ASSETS | |||||||||||
| Current assets: | |||||||||||
| Cash and cash equivalents | $344 | $39 | |||||||||
| Accounts receivable, less allowance for expected credit losses | 509 | 440 | |||||||||
| Production fuel, at weighted average cost | 49 | 51 | |||||||||
| Gas stored underground, at weighted average cost | 124 | 82 | |||||||||
| Materials and supplies, at weighted average cost | 126 | 113 | |||||||||
| Regulatory assets | 177 | 104 | |||||||||
| Other | 364 | 240 | |||||||||
| Total current assets | 1,693 | 1,069 | |||||||||
| Property, plant and equipment, net | 15,858 | 14,987 | |||||||||
| Investments: | |||||||||||
| ATC Holdings | 351 | 338 | |||||||||
| Other | 200 | 179 | |||||||||
| Total investments | 551 | 517 | |||||||||
| Other assets: | |||||||||||
| Regulatory assets | 1,864 | 1,836 | |||||||||
| Deferred charges and other | 239 | 144 | |||||||||
| Total other assets | 2,103 | 1,980 | |||||||||
| Total assets | $20,205 | $18,553 |
| LIABILITIES AND EQUITY | |||||||||||
| **Current lia |
Showing the first 8K of 165K characters. Open the full section
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
This MDA includes information relating to Alliant Energy, and IPL and WPL (collectively, the Utilities), as well as ATC Holdings, AEF and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Financial Statements and the Notes included in this report, as well as the financial statements, notes and MDA included in the 2021 Form 10-K. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.
| 27 |
2022 HIGHLIGHTS
Key highlights since the filing of the 2021 Form 10-K include the following:
Customer Investments:
-
In response to a petition from a U.S.-based solar panel assembler, in March 2022, the U.S. Department of Commerce initiated an investigation into whether the sourcing of solar project materials and equipment from certain Southeast Asian countries circumvent tariffs and duties imposed on such materials and equipment imported from China. In June 2022, a presidential executive order postponed through 2024 any additional tariffs on solar project materials and equipment while the U.S. Department of Commerce completes its investigation. Alliant Energy, IPL and WPL are currently unable to predict with certainty the future outcome or impact of these matters, including from any related legal challenges; however, this could result in delays and/or higher costs for IPL’s and WPL’s planned development and acquisition of additional renewable energy, and impact Alliant Energy’s, IPL’s and WPL’s anticipated future construction and acquisition expenditures.
-
In June 2022, the PSCW issued an order approving WPL’s second certificate of authority to acquire, construct, own, and operate up to 414 MW of new solar generation in the following Wisconsin counties: Dodge (150 MW), Waushara (99 MW), Rock (65 MW), Grant (50 MW) and Green (50 MW).
-
In June 2022, IPL filed for a revised fixed cost cap of $1,934/kilowatt with the IUB related to IPL’s November 2021 advance rate-making principles filing for up to 400 MW of solar generation with in-service dates in 2023 and 2024 and approximately 75 MW of battery storage in 2024, which reflects higher materials, labor and shipping costs. The revised fixed cost cap includes allowance for funds used during construction and transmission upgrade costs among other costs. In September 2022, IPL provided the IUB with a summary of the Inflation Reduction Act of 2022, as well as an economic analysis indicating full ownership for its planned solar and battery storage projects is currently expected to result in lower costs for its customers compared to previous plans to utilize tax equity financing. IPL currently expects a decision from the IUB on its filing by the end of 2022.
-
In August 2022, FERC approved MISO’s proposal to change its methodology for procuring capacity in the energy market effective with the 2023/2024 MISO Planning Year, as a result of changes in the overall generation resource mix due to the shift to renewable generation and the retirement of certain fossil-fueled generation. The capacity construct will change from the current Summer-based annual construct to four distinct seasons to help ensure the continued reliability of the electric transmission grid. FERC’s approval also includes establishing planning reserve margin requirements for all market participants on a seasonal basis and determining a seasonal accredited capacity value for certain classes of generating resources, including higher accredited capacity for wind generation during the Spring, Fall and Winter seasons and lower accredited capacity for solar generation during the Winter season. Alliant Energy, IPL and WPL are currently unable to predict with certainty the future outcome or impact of these matters, but anticipate additional generating resources will be needed to comply with the requirements of the new capacity construct. Refer to “Liquidity and Capital Resources” for discussion of proposed changes to IPL’s and WPL’s current resource plans resulting from these matters.
-
In September 2022, WPL filed a request with the PSCW for approval to construct, own and operate 175 MW of battery storage, with 100 MW and 75 MW at the Grant County and Wood County solar projects, respectively. Estimated capital expenditures for these planned projects for 2023 through 2025 are included in the “Renewables and battery storage” line in the construction and acquisition table in “Liquidity and Capital Resources.”
-
In September 2022, after the enactment of the Inflation Reduction Act of 2022, WPL informed the PSCW of its decision to retain full ownership of its planned solar projects instead of financing a portion of the projects with tax equity partners, which is currently expected to result in lower costs for its customers compared to previous plans to utilize tax equity financing.
-
In September 2022, WPL completed the construction of the Bear Creek Solar Garden in Richland County, Wisconsin (50 MW).
-
In October 2022, WPL completed the construction of the North Rock Solar Garden in Rock County, Wisconsin (50 MW).
-
Refer to Note 3 for discussion of revised expected timing for the retirements of various IPL and WPL coal-fired EGUs.
Rate Matters:
-
In June 2022, WPL filed a limited reopener request with the PSCW to increase annual retail gas rates for the 2023 forward-looking Test Period by approximately $10 million, which reflects changes in weighted average cost of capital, updated depreciation rates and modifications to certain regulatory asset and regulatory liability amortizations. WPL currently expects a decision from the PSCW on its request by the end of 2022.
-
In August 2022, the PSCW authorized WPL to collect $37 million in 2023 from its retail electric customers, plus interest, for an under-collection of fuel-related costs incurred by WPL in 2021 that were higher than fuel-related costs used to determine rates for such period. In addition, in November 2022, WPL filed updated fuel-related cost information for 2023 with the PSCW, which reflects an increase in annual retail electric rates of approximately $63 million in 2023 compared to WPL’s approved 2022 fuel-related costs. WPL currently expects a decision from the PSCW on its request by the end of 2022.
| 28 |
-
WPL currently expects to file a retail electric and gas rate review with the PSCW in the second quarter of 2023 for the 2024/2025 forward-looking Test Period. The key drivers for the anticipated filing include revenue requirement impacts of increasing electric and gas rate base, including investments in solar generation and battery storage. Any rate changes granted from this pending request are expected to be effective on January 1, 2024, with a decision from the PSCW expected by the end of 2023.
-
IPL currently expects to file a retail electric and gas rate review with the IUB by the first half of 2024. The key drivers for the anticipated filing include revenue requirement impacts of increasing electric and gas rate base, incl
Showing the first 8K of 64K characters. Open the full section
Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Quantitative and Qualitative Disclosures About Market Risk are reported in the 2021 Form 10-K and have not changed materially.
Item 4. CONTROLS AND PROCEDURES
Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s Chief Executive Officer, Chief Financial Officer and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Securities Exchange Act of 1934, as amended) as of September 30, 2022 pursuant to the requirements of the Securities Exchange Act of 1934, as amended. Based on their evaluation, the Chief Executive Officer and the Chief Financial Officer concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of the quarter ended September 30, 2022.
There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended September 30, 2022 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.
PART II. OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
None. SEC regulations require Alliant Energy, IPL and WPL to disclose information about certain proceedings arising under federal, state or local environmental provisions when a governmental authority is a party to the proceedings and such proceedings involve potential monetary sanctions that Alliant Energy, IPL and WPL reasonably believe will exceed a specified threshold. Pursuant to the SEC regulations, Alliant Energy, IPL and WPL use a threshold of $1 million for purposes of determining whether disclosure of any such proceedings is required. Applying this threshold, there are no environmental matters to disclose for this period.
Item 1A. RISK FACTORS
The risk factors described in Item 1A in the 2021 Form 10-K have not changed materially.
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
A summary of Alliant Energy common stock repurchases for the quarter ended September 30, 2022 was as follows:
| Total Number | Average Price | Total Number of Shares | Maximum Number (or Approximate | |||||||||||||||||||||||
| of Shares | Paid Per | Purchased as Part of | Dollar Value) of Shares That May | |||||||||||||||||||||||
| Period | Purchased (a) | Share | Publicly Announced Plan | Yet Be Purchased Under the Plan (a) | ||||||||||||||||||||||
| July 1 through July 31 | 4,429 | $57.92 | — | N/A | ||||||||||||||||||||||
| August 1 through August 31 | 2,668 | 63.83 | — | N/A | ||||||||||||||||||||||
| September 1 through September 30 | 61 | 58.18 | — | N/A | ||||||||||||||||||||||
| 7,158 | 60.12 | — |
(a)All shares were purchased on the open market and held in a rabbi trust under the Alliant Energy Deferred Compensation Plan. There is no limit on the number of shares of Alliant Energy common stock that may be held under the Deferred Compensation Plan, which currently does not have an expiration date.
Item 5. OTHER INFORMATION
On November 4, 2022, the Board of Directors of Alliant Energy Corporation (the “Company”) approved an amendment and restatement of the Amended and Restated Bylaws of the Company, effective November 8, 2022. The amendments update Section 3.14 related to notice of shareowner business and nomination of directors by conforming the bylaw provision to
| 36 |
universal proxy rules promulgated by the SEC, requiring additional information be provided by shareowners utilizing the bylaw provision, and amending the deadline to submit proposals or nominees under the bylaws to not later than the close of business on the 90th day nor earlier than the close of business on the 120th day prior to the first anniversary of the preceding year’s annual meeting except in certain circumstances. The amendments also include certain technical and clarifying changes to the bylaws.
The foregoing summary is qualified in its entirety by reference to the copy of the Amended and Restated Bylaws of Alliant Energy filed as Exhibit 3.1 to this Quarterly Report on Form 10-Q and is incorporated by reference herein. A blackline of the Amended and Restated Bylaws against the prior version of the bylaws is filed herewith as Exhibit 3.2.
Item 6. EXHIBITS
The following Exhibits are filed herewith or incorporated herein by reference.
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company have each duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized on the 8th day of November 2022.
| ALLIANT ENERGY CORPORATION | |||||
| Registrant | |||||
| By: /s/ Benjamin M. Bilitz | Chief Accounting Officer and Controller | ||||
| Benjamin M. Bilitz | (Principal Accounting Officer and Authorized Signatory) |
| INTERSTATE POWER AND LIGHT COMPANY | |||||
| Registrant | |||||
| By: /s/ Benjamin M. Bilitz | Chief Accounting Officer and Controller | ||||
| Benjamin M. Bilitz | (Principal Accounting Officer and Authorized Signatory) |
| WISCONSIN POWER AND LIGHT COMPANY | |||||
| Registrant | |||||
| By: /s/ Benjamin M. Bilitz | Chief Accounting Officer and Controller | ||||
| Benjamin M. Bilitz | (Principal Accounting Officer and Authorized Signatory) |