| UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C., 20549 | |||||||||||||||||||||||||||||||||||||||||
| FORM | 10-Q | ||||||||||||||||||||||||||||||||||||||||
| (Mark One) | |||||||||||||||||||||||||||||||||||||||||
| ☒ | QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | ||||||||||||||||||||||||||||||||||||||||
| For the quarterly period ended | March 31, 2022 | ||||||||||||||||||||||||||||||||||||||||
| OR | |||||||||||||||||||||||||||||||||||||||||
| ☐ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | ||||||||||||||||||||||||||||||||||||||||
| For the transition period from ___________ to __________ | |||||||||||||||||||||||||||||||||||||||||
| Commission File Number | Exact Name of Registrant as Specified in its Charter | State or Other Jurisdiction of Incorporation | IRS Employer Identification Number | ||||||||||||||||||||||||||||||||||||||
| 1-12609 | PG&E Corporation | California | 94-3234914 | ||||||||||||||||||||||||||||||||||||||
| 1-2348 | Pacific Gas and Electric Company | California | 94-0742640 | ||||||||||||||||||||||||||||||||||||||
| PG&E Corporation | Pacific Gas and Electric Company | ||||||||||||||||||||||||||||||||||||||||
| 77 Beale Street | 77 Beale Street | ||||||||||||||||||||||||||||||||||||||||
| P.O. Box 770000 | P.O. Box 770000 | ||||||||||||||||||||||||||||||||||||||||
| San Francisco, | California | 94177 | San Francisco, | California | 94177 | ||||||||||||||||||||||||||||||||||||
| Address of principal executive offices, including zip code | |||||||||||||||||||||||||||||||||||||||||
| PG&E Corporation | Pacific Gas and Electric Company | ||||||||||||||||||||||||||||||||||||||||
| 415 | 973-1000 | 415 | 973-7000 | ||||||||||||||||||||||||||||||||||||||
| Registrant’s telephone number, including area code |
| Securities registered pursuant to Section 12(b) of the Act: | ||||||||
| Title of each class | Trading Symbol(s) | Name of each exchange on which registered | ||||||
| Common stock, no par value | PCG | The New York Stock Exchange | ||||||
| Equity Units | PCGU | The New York Stock Exchange | ||||||
| First preferred stock, cumulative, par value $25 per share, 5% series A redeemable | PCG-PE | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 5% redeemable | PCG-PD | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 4.80% redeemable | PCG-PG | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 4.50% redeemable | PCG-PH | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 4.36% series A redeemable | PCG-PI | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 6% nonredeemable | PCG-PA | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 5.50% nonredeemable | PCG-PB | NYSE American LLC | ||||||
| First preferred stock, cumulative, par value $25 per share, 5% nonredeemable | PCG-PC | NYSE American LLC |
| Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. | |||||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☒ | Yes | ☐ | No | |||||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☒ | Yes | ☐ | No | |||||||||||||||||||||||||||||||
| Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). | |||||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☒ | Yes | ☐ | No | |||||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☒ | Yes | ☐ | No |
| Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act. | ||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☒ | Large accelerated filer | ☐ | Accelerated filer | ||||||||||||||||||||||||||||
| ☐ | Non-accelerated filer | |||||||||||||||||||||||||||||||
| ☐ | Smaller reporting company | ☐ | Emerging growth company | |||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☐ | Large accelerated filer | ☐ | Accelerated filer | ||||||||||||||||||||||||||||
| ☒ | Non-accelerated filer | |||||||||||||||||||||||||||||||
| ☐ | Smaller reporting company | ☐ | Emerging growth company | |||||||||||||||||||||||||||||
| If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. | ||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☐ | |||||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☐ | |||||||||||||||||||||||||||||||
| Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). | ||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☐ | Yes | ☒ | No | ||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☐ | Yes | ☒ | No | ||||||||||||||||||||||||||||
| Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court. | ||||||||||||||||||||||||||||||||
| PG&E Corporation: | ☒ | Yes | ☐ | No | ||||||||||||||||||||||||||||
| Pacific Gas and Electric Company: | ☒ | Yes | ☐ | No |
| Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date. | ||||||||||||||||||||||||||
| Common stock outstanding as of April 21, 2022: | ||||||||||||||||||||||||||
| PG&E Corporation: | 2,465,220,279* | |||||||||||||||||||||||||
| Pacific Gas and Electric Company: | 264,374,809 | |||||||||||||||||||||||||
| *Includes 377,743,590 shares of common stock held by PG&E ShareCo LLC, a wholly-owned subsidiary of PG&E Corporation, and 100,000,000 shares of common stock held by Pacific Gas and Electric Company. |
PG&E CORPORATION AND
PACIFIC GAS AND ELECTRIC COMPANY
FORM 10-Q
FOR THE QUARTERLY PERIOD ENDED MARCH 31, 2022
TABLE OF CONTENTS
| EXHIBITS | Part II, Item 6 | |||||||
| SIGNATURES |
GLOSSARY
The following terms and abbreviations appearing in the text of this report have the meanings indicated below.
| 2021 Form 10-K | PG&E Corporation’s and Pacific Gas and Electric Company’s combined Annual Report on Form 10-K for the year ended December 31, 2021 | ||||
| AB | Assembly Bill | ||||
| Amended Articles | Amended and Restated Articles of Incorporation of PG&E Corporation and the Utility, each filed on June 22, 2020 | ||||
| ARO | asset retirement obligation | ||||
| ASU | accounting standard update issued by the FASB | ||||
| Bankruptcy Code | the United States Bankruptcy Code | ||||
| Bankruptcy Court | the U.S. Bankruptcy Court for the Northern District of California | ||||
| CAISO | California Independent System Operator Corporation | ||||
| Cal Fire | California Department of Forestry and Fire Protection | ||||
| CAPP | California Arrearage Payment Program | ||||
| CARE | California Alternate Rates for Energy Program | ||||
| CCA | Community Choice Aggregator | ||||
| CEMA | Catastrophic Event Memorandum Account | ||||
| Chapter 11 | Chapter 11 of Title 11 of the U.S. Code | ||||
| Chapter 11 Cases | the voluntary cases commenced by each of PG&E Corporation and the Utility under Chapter 11 on January 29, 2019 | ||||
| Confirmation Order | the order confirming the Plan, dated as of June 20, 2020 with the Bankruptcy Court | ||||
| CHT | Customer Harm Threshold | ||||
| CPPMA | COVID-19 Pandemic Protections Memorandum Account | ||||
| CPUC | California Public Utilities Commission | ||||
| CRRs | congestion revenue rights | ||||
| DA | Direct Access | ||||
| Diablo Canyon | Diablo Canyon nuclear power plant | ||||
| District Court | United States District Court for the Northern District of California | ||||
| DTA | deferred tax asset | ||||
| DTSC | Department of Toxic Substances Control | ||||
| EMANI | European Mutual Association for Nuclear Insurance | ||||
| Emergence Date | July 1, 2020, the effective date of the Plan in the Chapter 11 Cases | ||||
| EO | Executive Order | ||||
| EOEP | Enhanced Oversight and Enforcement Process | ||||
| EPS | earnings per common share | ||||
| EPSS | Enhanced Powerline Safety Settings | ||||
| EVM | enhanced vegetation management | ||||
| Exchange Act | Securities Exchange Act of 1934 | ||||
| FASB | Financial Accounting Standards Board | ||||
| FERC | Federal Energy Regulatory Commission | ||||
| FHPMA | Fire Hazard Prevention Memorandum Account | ||||
| Fire Victim Trust | The trust established pursuant to the Plan for the benefit of holders of the Fire Victim Claims into which the Aggregate Fire Victim Consideration (as defined in the Plan) has been, and will continue to be funded | ||||
| FRMMA | Fire Risk Mitigation Memorandum Account | ||||
| GAAP | U.S. Generally Accepted Accounting Principles | ||||
| GO | general order | ||||
| GRC | general rate case | ||||
| GT&S | gas transmission and storage |
| HSM | hazardous substance memorandum account | ||||
| IRC | Internal Revenue Code | ||||
| IOUs | investor-owned utility(ies) | ||||
| Kincade Amended Complaint | The amended criminal complaint filed by the Sonoma County District Attorney’s Office on January 28, 2022 in connection with the 2019 Kincade fire | ||||
| Kincade Complaint | The criminal complaint filed by the Sonoma County District Attorney’s Office on April 6, 2021 in connection with the 2019 Kincade fire | ||||
| Lakeside Building | 300 Lakeside Drive, Oakland, California, 94612 | ||||
| LSE | Load-serving entity | ||||
| MD&A | Management’s Discussion and Analysis of Financial Condition and Results of Operations set forth in Part I, Item 2, of this Form 10-Q | ||||
| MGMA | Microgrids Memorandum Account | ||||
| MGP | manufactured gas plants | ||||
| NAV | net asset value | ||||
| NEIL | Nuclear Electric Insurance Limited | ||||
| NEM | net energy metering | ||||
| New Shares | Shares of PG&E Corporation common stock held by ShareCo that may be exchanged for Plan Shares as contemplated by the Share Exchange and Tax Matters Agreement | ||||
| NRC | Nuclear Regulatory Commission | ||||
| OEIS | Office of Energy Infrastructure Safety (successor to the Wildfire Safety Division of the CPUC) | ||||
| OII | order instituting investigation | ||||
| OIR | order instituting rulemaking | ||||
| PD | proposed decision | ||||
| PERA | Public Employees Retirement Association | ||||
| Plan | PG&E Corporation and the Utility, Knighthead Capital Management, LLC, and Abrams Capital Management, LP Joint Chapter 11 Plan of Reorganization, dated as of June 19, 2020 | ||||
| Plan Shares | Shares of PG&E Corporation common stock issued to the Fire Victim Trust pursuant to the Plan | ||||
| PSPS | Public Safety Power Shutoff | ||||
| RA | Resource Adequacy | ||||
| Receivables Securitization Program | The accounts receivable securitization program entered into by the Utility on October 5, 2020, providing for the sale of a portion of the Utility's accounts receivable and certain other related rights to the SPV, which, in turn, obtains loans secured by the receivables from financial institutions | ||||
| ROE | return on equity | ||||
| ROU asset | right-of-use asset | ||||
| RTBA | Risk Transfer Balancing Account | ||||
| RUBA | Residential Uncollectibles Balancing Account | ||||
| SB | Senate Bill | ||||
| SEC | U.S. Securities and Exchange Commission | ||||
| SED | Safety and Enforcement Division of the CPUC | ||||
| SFGO | The Utility’s San Francisco General Office headquarters complex | ||||
| Share Exchange and Tax Matters Agreement | Share Exchange and Tax Matters Agreement dated July 8, 2021 between PG&E Corporation, the Utility, ShareCo and the Fire Victim Trust | ||||
| ShareCo | PG&E ShareCo LLC, a limited liability company whose sole member is PG&E Corporation | ||||
| SOFR | Secured Overnight Financing Rate | ||||
| SPV | PG&E AR Facility, LLC | ||||
| Tax Act | Tax Cuts and Jobs Act of 2017 | ||||
| TO | transmission owner | ||||
| TURN | The Utility Reform Network |
| Utility | Pacific Gas and Electric Company | ||||
| VIE(s) | variable interest entity(ies) | ||||
| VMBA | Vegetation Management Balancing Account | ||||
| WEMA | Wildfire Expense Memorandum Account | ||||
| Wildfire Fund | statewide fund established by AB 1054 that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment | ||||
| WMBA | Wildfire Mitigation Balancing Account | ||||
| WMCE | Wildfire Mitigation and Catastrophic Events | ||||
| WMP | wildfire mitigation plan | ||||
| WMPMA | Wildfire Mitigation Plan Memorandum Account | ||||
| Zogg Complaint | The criminal complaint filed by the Shasta County District Attorney’s Office on September 24, 2021 |
FORWARD-LOOKING STATEMENTS
This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of capital expenditures; forecasts of expense reduction; estimates and assumptions used in critical accounting estimates, including those relating to insurance receivables, regulatory assets and liabilities, environmental remediation, litigation, third-party claims, the Wildfire Fund, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:
-
the extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigates the risk of liability for damages arising from catastrophic wildfires, including whether the Utility maintains an approved WMP and a valid safety certification and whether the Wildfire Fund has sufficient remaining funds;
-
the risks and uncertainties associated with wildfires that have occurred or may occur in the Utility’s service territory, including the wildfire that began on October 23, 2019 northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), the wildfire that began on September 27, 2020 in the area of Zogg Mine Road and Jenny Bird Lane, north of Igo in Shasta County, California (the “2020 Zogg fire”), the wildfire that began on July 13, 2021 near the Cresta Dam in the Feather River Canyon in Plumas County, California (the “2021 Dixie fire”), and any other wildfires for which the causes have yet to be determined; the damage caused by such wildfires; the extent of the Utility’s liability in connection with such wildfires (including the risk that the Utility may be found liable for damages regardless of fault); investigations into such wildfires, including those being conducted by the CPUC; the outcome of the criminal proceeding initiated against the Utility in connection with the 2020 Zogg fire and three other fires in Shasta County, California; potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other enforcement agency were to bring an enforcement action in respect of any such fire; the risk that the Utility is not able to recover costs from insurance, from the Wildfire Fund or through rates; and the effect on PG&E Corporation’s and the Utility’s reputations of such wildfires, investigations and proceedings;
-
the extent to which the Utility’s wildfire mitigation initiatives are effective, including the Utility’s ability to comply with the targets and metrics set forth in its WMP; to retain or contract for the workforce necessary to execute its WMP; the effectiveness of its system hardening, including undergrounding; and the cost of the program and the timing and outcome of any proceeding to recover such costs through rates;
-
the impact of the Utility’s implementation of its PSPS program, and whether any fines, penalties or civil liability for damages will be imposed on the Utility as a result; the costs in connection with PSPS events, the timing and outcome of any proceeding to recover such costs through rates, and the effects on PG&E Corporation’s and the Utility’s reputations caused by implementation of the PSPS program;
-
the Utility’s ability to safely, reliably, and efficiently construct, maintain, operate, protect, and decommission its facilities, and provide electricity and natural gas services safely and reliably;
-
the availability, cost, coverage, and terms of the Utility’s insurance, including insurance for wildfire, nuclear, and other liabilities, the timing of any insurance recoveries, and recovery of the costs of such insurance or, in the event liabilities exceed insured amounts, the ability to recover uninsured losses through rates or from other third parties;
-
significant changes to the electric power and gas industries driven by technological advancements and a decarbonized economy;
-
cyber or physical attacks, including acts of terrorism, war, and vandalism, on the Utility or its third-party vendors, contractors, or customers (or others with whom they have shared data) which could result in operational disruption; the misappropriation or loss of confidential or proprietary assets, information or data, including customer, employee, financial, or operating system information, or intellectual property; corruption of data; or potential costs, lost revenues, litigation, or reputational harm incurred in connection therewith;
-
the impact of severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events, drought, earthquakes, lightning, tsunamis, rising sea levels, mudslides, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, and other events that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the effectiveness of the Utility’s efforts to prevent, mitigate, or respond to such conditions or events; the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is able to procure replacement power; and whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events;
-
the ability of the Utility to meet the conditions in its corrective action plan and exit the EOEP;
-
the timing and outcome of future regulation and federal, state or local legislation, their implementation, and their interpretation; the cost to comply with such regulation and legislation; and the extent to which the Utility recovers its associated compliance and investment costs, including those regarding:
◦wildfires, including inverse condemnation reform, wildfire insurance, and additional wildfire mitigation measures or other reforms targeted at the Utility or its industry;
◦the environment, including the costs incurred to discharge the Utility’s remediation obligations or the costs to comply with standards for greenhouse gas emissions, renewable energy targets, energy efficiency standards, distributed energy resources, and electric vehicles;
◦the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, and cooling water intake, and the Utility’s ability to continue operating Diablo Canyon until its planned retirement;
◦the regulation of utilities and their holding companies, including the conditions imposed on PG&E Corporation when it became the Utility’s holding company and whether the Utility can make distributions to PG&E Corporation; and
◦taxes and tax audits;
-
the timing and outcomes of the Utility’s pending and future ratemaking and regulatory proceedings, including the extent to which PG&E Corporation and the Utility are able to recover their costs through rates as recorded in memorandum accounts or balancing accounts, or as otherwise requested;
-
whether the Utility can control its operating costs within the authorized levels of spending, and timely recover its costs through rates; whether the Utility can continue implementing a streamlined organizational structure and achieve projected savings; the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;
-
the outcome of current and future self-reports, investigations or other enforcement actions, or notices of violation that could be issued related to the Utility’s compliance with laws, rules, regulations, or orders applicable to its gas and electric operations; the construction, expansion, or replacement of its electric and gas facilities; electric grid reliability; audit, inspection and maintenance practices; customer billing and privacy; physical and cybersecurity protections; environmental laws and regulations; or otherwise, such as fines, penalties, remediation obligations, the transfer of ownership of the Utility’s assets to municipalities or other public entities, or the implementation of corporate governance, operational or other changes in connection with the EOEP;
-
the risks and uncertainties associated with PG&E Corporation’s and the Utility’s substantial indebtedness and the limitations on their operating flexibility in the documents governing that indebtedness;
-
the risks and uncertainties associated with the timing and outcomes of PG&E Corporation’s and the Utility’s ongoing litigation, including appeals of the Confirmation Order; certain indemnity obligations to current and former officers and directors, as well as potential indemnity obligations to underwriters for certain of the Utility’s note offerings; three purported class actions that have been consolidated and denominated In re PG&E Corporation Securities Litigation, U.S. District Court for the Northern District of California, Case No. 18-03509; the debarment proceeding; the purported PSPS class action filed in December 2019; and other third-party claims, including the extent to which related costs can be recovered through insurance, rates, or from other third parties;
-
the ability of PG&E Corporation and the Utility to securitize (i) the remaining $2.4 billion of fire risk mitigation capital expenditures that were or will be incurred by the Utility and (ii) $7.5 billion of costs related to the multiple wildfires that began on October 8, 2017 and spread through Northern California, including Napa, Sonoma, Butte, Humboldt, Mendocino, Lake, Nevada and Yuba Counties, as well as in the area surrounding Yuba City (the “2017 Northern California wildfires”), in a financing transaction that is designed to be rate neutral to customers;
-
the risks and uncertainties associated with any future substantial sales of shares of common stock of PG&E Corporation by existing shareholders, including the Fire Victim Trust;
-
whether PG&E Corporation or the Utility undergoes an “ownership change” within the meaning of Section 382 of the IRC, as a result of which tax attributes could be limited;
-
PG&E Corporation’s and the Utility’s historical financial information not being indicative of future financial performance as a result of the Chapter 11 Cases and the financial and other restructuring undergone by PG&E Corporation and the Utility in connection with their emergence from Chapter 11;
-
the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility’s fossil fuel-fired generation sites;
-
the impact that reductions in Utility customer demand for electricity and natural gas, driven by customer departures to CCAs, DA providers and legislative mandates to replace gas-fuel technologies, have on the Utility’s ability to make and recover its investments through rates and earn its authorized ROE, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, and changing customer demand for its natural gas and electric services;
-
the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;
-
the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;
-
the risks and uncertainties associated with the Utility’s ability to accurately forecast major capital expenditures, weighted average annual rate base and expense reduction associated with implementation of the Lean operating system;
-
the risks and uncertainties associated with rising rates for the Utility’s customers;
-
actions by credit rating agencies to downgrade PG&E Corporation’s or the Utility’s credit ratings;
-
the severity, extent and duration of the global COVID-19 pandemic and its impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, as well as on energy demand in the Utility’s service territory, the ability of the Utility to collect on customer receivables, the ability of the Utility to mitigate these effects, including with spending reductions, the ability of the Utility to recover any losses incurred in connection with the COVID-19 pandemic, and the impact of workforce disruptions caused either by illness of workers and their family members or workforce attrition related to potential new workplace regulations such as vaccine mandates;
-
whether PG&E Corporation’s and the Utility’s counterparties are available and able to meet their financial and performance obligations with respect to contracts, credit agreements, and financial instruments, which could be affected by disruptions in the global supply chain caused by the COVID-19 pandemic or otherwise; and
-
the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.
For more information about the significant risks that could affect the outcome of the forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors below and a detailed discussion of these matters contained in Item 2. MD&A. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.
PG&E Corporation’s and the Utility’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and proxy statements, are available free of charge on both PG&E Corporation’s website, www.pgecorp.com, and the Utility's website, www.pge.com, as promptly as practicable after they are filed with, or furnished to, the SEC. Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at http://investor.pgecorp.com, under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. PG&E Corporation and the Utility also routinely post or provide direct links to presentations, documents, and other information that may be of interest to investors at http://investor.pgecorp.com, under the “Chapter 11,” “Wildfire and Safety Updates” and “News & Events: Events & Presentations” tabs, respectively, in order to publicly disseminate such information. Specifically, within two hours during business hours or four hours outside of business hours of the determination that an incident is attributable or allegedly attributable to the Utility’s electric facilities and has resulted in property damage estimated to exceed $50,000, a fatality or injury requiring overnight in-patient hospitalization, or significant public or media attention, the Utility is required to submit an electric incident report including information about such incident. The information included in an electric incident report is limited and may not include important information about the facts and circumstances about the incident due to the limited scope of the reporting requirements and timing of the report and is necessarily limited to information to which the Utility has access at the time of the report. Ignitions are also reportable under CPUC Decision 14-02-015 when they involve self-propagating fire of material other than electrical or communication facilities; the fire traveled greater than one linear meter from the ignition point; and the Utility has knowledge that the fire occurred. It is possible that any of these filings or information included therein could be deemed to be material information. The information contained on such website is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend the address to be an active link.
PART I. FINANCIAL INFORMATION
Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
OVERVIEW
This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in Item 1. It should also be read in conjunction with the 2021 Form 10-K.
Summary of Changes in Net Income and Earnings per Share
PG&E Corporation’s net income available for common shareholders was $475 million for the three months ended March 31, 2022, compared to $120 million in the same period in 2021. In the three months ended March 31, 2022, revenues increased as authorized through the 2020 GRC and the FERC formula rate.
Key Factors Affecting Financial Results
PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:
- The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054. While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. To the extent that future wildfires occur in the Utility’s service territory, the Utility may incur costs associated with the investigations of the causes and origins of such fires, even if it is subsequently determined that such fires were not caused by the Utility’s facilities. The financial impact of future wildfires could be mitigated through insurance, the Wildfire Fund or other forms of cost recovery. However, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, or at all, and any such coverage may include limitations that could result in substantial uninsured losses depending on the amount and type of damages resulting from covered events, including coverage limitations applicable to different insurance layers. The Utility will not be able to obtain any recovery from the Wildfire Fund for wildfire-related losses in any Wildfire Fund coverage year (“Coverage Year”) that do not exceed the greater of $1.0 billion in the aggregate and the amount of insurance coverage required under AB 1054. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund is available to the Utility to pay eligible claims for liabilities arising from wildfires and serves as an alternative to traditional insurance products, provided that the Utility satisfies the conditions to the Utility’s ongoing participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds. See “Loss Recoveries” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.
However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable and therefore not subject to reimbursement, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. Finally, even if the Utility satisfies the ongoing eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising from wildfires that occurred between July 12, 2019 and the Utility’s emergence from Chapter 11 on July 1, 2020, the availability of the Wildfire Fund to pay such claims would be capped at 40% of the allowed amount of such claims. See “Wildfire Fund under AB 1054” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.
- The Costs, Effectiveness, and Execution of the Utility’s Wildfire Mitigation Initiatives. In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires, the spread of wildfires should they occur and the impact of PSPS events.
PG&E Corporation and the Utility have incurred substantial expenditures in connection with the 2020-2022 WMP. For more information, see Note 4 of the Notes to the Condensed Consolidated Financial Statements in Item 1. The Utility expects that its wildfire mitigation initiatives will continue to involve substantial and ongoing expenditures. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain.
The Utility has implemented operational changes and investments that reduce wildfire risk, including the EPSS, PSPS, vegetation management, asset inspection, and system hardening programs. These programs, particularly the PSPS and EPSS programs, have been the subject of scrutiny and criticism by various stakeholders, including the California governor, the CPUC, and the court that oversaw the Utility’s probation. The PSPS and EPSS programs have had an adverse impact on PG&E Corporation’s and the Utility’s reputation with customers, regulators, and policymakers, and future PSPS and EPSS events may increase these negative perceptions.
The Utility is subject to a number of legal and regulatory requirements related to its wildfire mitigation efforts, which require periodic inspections of electric assets and ongoing reporting related to this work. Although the Utility believes that it has complied substantially with these requirements, it is undertaking a review and has identified instances of noncompliance. The Utility intends to update the CPUC and OEIS as its review progresses. The Utility could face fines, penalties, enforcement action, or other adverse legal or regulatory consequences for the late inspections or other noncompliance related to wildfire mitigation efforts. See “Self-Reports to the CPUC” in “Regulatory Matters” below.
While PG&E Corporation and the Utility are committed to taking aggressive wildfire mitigation actions, if additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows. The success of the Utility’s wildfire mitigation efforts depends on many factors, including on whether the Utility is able to retain or contract for the workforce necessary to execute its wildfire mitigation actions.
-
The Timing and Outcome of Ratemaking Proceedings. The Utility’s financial results may be impacted by the timing and outcome of its FERC TO18 rate case and the resulting impact on the TO19 and TO20 rate cases, 2023 GRC, WMCE, and cost of capital applications and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, WMPMA, FRMMA, CPPMA, VMBA, WMBA, and RTBA. The outcome of regulatory proceedings can be affected by many factors, including intervening parties’ testimonies, potential rate impacts, the regulatory and political environments, and other factors. See Notes 4 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and “Regulatory Matters” below.
-
The Impact of Wildfires. PG&E Corporation’s and the Utility’s liabilities for the 2019 Kincade fire, the 2020 Zogg fire, and the 2021 Dixie fire, are significant and may be excluded from any potential amounts recoverable under applicable insurance policies, the WEMA, FERC TO rates, or the Wildfire Fund under AB 1054. Recorded liabilities in connection with the 2019 Kincade fire and the 2021 Dixie fire have already exceeded potential amounts recoverable under applicable insurance policies. Liabilities in excess of recov
Showing the first 8K of 114K characters. Open the full section
Item 1. CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
PG&E CORPORATION
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
(in millions, except per share amounts)
| (Unaudited) | ||||||||||||||
| Three Months Ended March 31, | ||||||||||||||
| 2022 | 2021 | |||||||||||||
| Operating Revenues | ||||||||||||||
| Electric | $ | 4,158 | $ | 3,395 | ||||||||||
| Natural gas | 1,640 | 1,321 | ||||||||||||
| Total operating revenues | 5,798 | 4,716 | ||||||||||||
| Operating Expenses | ||||||||||||||
| Cost of electricity | 502 | 590 | ||||||||||||
| Cost of natural gas | 561 | 307 | ||||||||||||
| Operating and maintenance | 3,110 | 2,336 | ||||||||||||
| Wildfire-related claims, net of recoveries | (1) | 172 | ||||||||||||
| Wildfire Fund expense | 118 | 119 | ||||||||||||
| Depreciation, amortization, and decommissioning | 972 | 888 | ||||||||||||
| Total operating expenses | 5,262 | 4,412 | ||||||||||||
| Operating Income | 536 | 304 | ||||||||||||
| Interest income | 8 | 2 | ||||||||||||
| Interest expense | (419) | (408) | ||||||||||||
| Other income, net | 149 | 127 | ||||||||||||
| Income Before Income Taxes | 274 | 25 | ||||||||||||
| Income tax benefit | (204) | (98) | ||||||||||||
| Net Income | 478 | 123 | ||||||||||||
| Preferred stock dividend requirement of subsidiary | 3 | 3 | ||||||||||||
| Income Available for Common Shareholders | $ | 475 | $ | 120 | ||||||||||
| Weighted Average Common Shares Outstanding, Basic | 1,986 | 1,985 | ||||||||||||
| Weighted Average Common Shares Outstanding, Diluted | 2,134 | 2,131 | ||||||||||||
| Net Income Per Common Share, Basic | $ | 0.24 | $ | 0.06 | ||||||||||
| Net Income Per Common Share, Diluted | $ | 0.22 | $ | 0.06 |
See accompanying Notes to the Condensed Consolidated Financial Statements.
PG&E CORPORATION
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
| (Unaudited) | |||||||||||
| Three Months Ended March 31, | |||||||||||
| (in millions) | 2022 | 2021 | |||||||||
| Net Income | $ | 478 | $ | 123 | |||||||
| Other Comprehensive Income | |||||||||||
| Pension and other postretirement benefit plans obligations (net of taxes of $0 and $0, respectively) | — | 1 | |||||||||
| Total other comprehensive income | — | 1 | |||||||||
| Comprehensive Income | 478 | 124 | |||||||||
| Preferred stock dividend requirement of subsidiary | 3 | 3 | |||||||||
| Comprehensive Income Available for Common Shareholders | $ | 475 | $ | 121 |
See accompanying Notes to the Condensed Consolidated Financial Statements.
PG&E CORPORATION
CONDENSED CONSOLIDATED BALANCE SHEETS
(in millions)
| (Unaudited) | |||||||||||
| Balance At | |||||||||||
| March 31, 2022 | December 31, 2021 | ||||||||||
| ASSETS | |||||||||||
| Current Assets | |||||||||||
| Cash and cash equivalents | $ | 247 | $ | 291 | |||||||
| Restricted cash | 29 | 16 | |||||||||
| Accounts receivable | |||||||||||
| Customers (net of allowance for doubtful accounts of $180 million and $171 million at respective dates) (includes $1.84 billion and $2.06 billion related to VIEs, net of allowance for doubtful accounts of $180 million and $171 million at respective dates) | 2,080 | 2,345 | |||||||||
| Accrued unbilled revenue (includes $976 million and $1.09 billion related to VIEs at respective dates) | 1,070 | 1,207 | |||||||||
| Regulatory balancing accounts | 3,165 | 2,999 | |||||||||
| Other | 1,695 | 1,784 | |||||||||
| Regulatory assets | 384 | 496 | |||||||||
| Inventories | |||||||||||
| Gas stored underground and fuel oil | 29 | 44 | |||||||||
| Materials and supplies | 589 | 552 | |||||||||
| Wildfire Fund asset | 461 | 461 | |||||||||
| Other | 627 | 882 | |||||||||
| Total current assets | 10,376 | 11,077 | |||||||||
| Property, Plant, and Equipment | |||||||||||
| Electric | 71,001 | 69,482 | |||||||||
| Gas | 26,474 | 25,979 | |||||||||
| Construction work in progress | 3,666 | 3,479 | |||||||||
| Financing lease and other | 20 | 20 | |||||||||
| Total property, plant, and equipment | 101,161 | 98,960 | |||||||||
| Accumulated depreciation | (29,656) | (29,134) | |||||||||
| Net property, plant, and equipment | 71,505 | 69,826 | |||||||||
| Other Noncurrent Assets | |||||||||||
| Regulatory assets | 9,167 | 9,207 | |||||||||
| Nuclear decommissioning trusts | 3,635 | 3,798 | |||||||||
| Operating lease right of use asset | 1,139 | 1,234 | |||||||||
| Wildfire Fund asset | 5,198 | 5,313 | |||||||||
| Income taxes receivable | 9 | 9 | |||||||||
| Other (includes net noncurrent accounts receivable of $115 million and $187 million related to VIEs, net of noncurrent allowance for doubtful accounts of $11 million and $15 million at respective dates) | 2,902 | 2,863 | |||||||||
| Total other noncurrent assets | 22,050 | 22,424 | |||||||||
| TOTAL ASSETS | $ | 103,931 | $ | 103,327 |
See accompanying Notes to the Condensed Consolidated Financial Statements.
PG&E CORPORATION
CONDENSED CONSOLIDATED BALANCE SHEETS
(in millions, except share amounts)
| (Unaudited) | |||||||||||
| Balance At | |||||||||||
| March 31, 2022 | December 31, 2021 | ||||||||||
| LIABILITIES AND EQUITY | |||||||||||
| Current Liabilities | |||||||||||
| Short-term borrowings | $ | 1,854 | $ | 2,184 | |||||||
| Long-term debt, classified as current (includes $32 million and $18 million related to VIEs at respective dates) | 4,553 | 4,481 | |||||||||
| Accounts payable | |||||||||||
| Trade creditors | 2,389 | 2,855 | |||||||||
| Regulatory balancing accounts | 1,676 |
Showing the first 8K of 224K characters. Open the full section
Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. See the section above entitled “Risk Management Activities” in MD&A and in Notes 8 and 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.
Item 4. CONTROLS AND PROCEDURES
Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31, 2022, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Exchange Act, is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.
There were no changes in internal control over financial reporting that occurred during the quarter ended March 31, 2022, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.
PART II. OTHER INFORMATION
ITEM 1. LEGAL PROCEEDINGS
PG&E Corporation and the Utility are parties to various lawsuits and regulatory proceedings in the ordinary course of their business. For more information regarding material lawsuits and proceedings, see Notes 2, 10, and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Part I, MD&A: “Enforcement and Litigation Matters.”
Each of PG&E Corporation and the Utility has elected to disclose environmental proceedings described in Item 103(c)(3)(iii) of Regulation S- K unless it reasonably believes that such proceeding will result in no monetary sanctions, or in monetary sanctions, exclusive of interest and costs, of less than $1 million.
Item 1A. RISK FACTORS
For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see the section of the 2021 Form 10-K entitled “Risk Factors,” as supplemented below, and the section of this quarterly report entitled “Forward-Looking Statements.”
PG&E Corporation and the Utility could be liable for a failure to comply with privacy laws.
PG&E Corporation and the Utility collect and retain certain personal information of their customers, shareholders, and employees in connection with their business. Although PG&E Corporation and the Utility invest in risk management and information security measures, the personal information that they collect, as well as other commercially-sensitive data that they possess, could become compromised because of certain events, including a cyber incident, the insufficiency or failure of such measures, human error, the misappropriation of data, or the occurrence of any of the foregoing at any third party with which PG&E Corporation or the Utility has shared information. If any of these events were to transpire, it could subject PG&E Corporation and the Utility to financial liability.
PG&E Corporation and the Utility are subject to federal and state privacy laws, which grant consumers rights and protections, including, among other things, the ability to opt out of receiving certain communications and certain data sharing with third parties. Non-compliance with these privacy laws could result in the imposition of material fines on PG&E Corporation and the Utility, other regulatory exposure, significant litigation, and reputational harm, which could materially affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows.
ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
During the quarter ended March 31, 2022, PG&E Corporation did not contribute any equity securities to the Utility. Also during the quarter ended March 31, 2022, PG&E Corporation did not make any sales of unregistered equity securities in reliance on an exemption from registration under the Securities Act.
On July 8, 2021, PG&E Corporation, the Utility, ShareCo and the Fire Victim Trust entered into the Share Exchange and Tax Matters Agreement, pursuant to which PG&E Corporation and the Utility made a “grantor trust” election for the Fire Victim Trust effective retroactively to the inception of the Fire Victim Trust. As a result of the grantor trust election, shares of PG&E Corporation common stock owned by the Fire Victim Trust are treated as held by the Utility and, in turn attributed to PG&E Corporation for income tax purposes. On January 31, 2022 and April 14, 2022, the Fire Victim Trust exchanged 40,000,000 and 60,000,000 Plan Shares, respectively, for an equal number of New Shares in the manner contemplated by the Share Exchange and Tax Matters Agreement; in each case, the Fire Victim Trust thereafter reported that it sold the applicable New Shares. As of March 31, 2022, to the knowledge of PG&E Corporation, the Fire Victim Trust had sold 40,000,000 shares of PG&E Corporation common stock.
Issuer Purchases of Equity Securities
During the quarter ended March 31, 2022, PG&E Corporation did not redeem or repurchase any shares of common stock outstanding. PG&E Corporation does not have any preferred stock outstanding. During the quarter ended March 31, 2022, the Utility did not redeem or repurchase any shares of its various series of preferred stock outstanding.
On January 31, 2022 and April 14, 2022, the Fire Victim Trust exchanged 40,000,000 and 60,000,000 Plan Shares, respectively, for an equal number of New Shares in the manner contemplated by the Share Exchange and Tax Matters Agreement. The exchange was effected in reliance on the exemption from registration under Section 3(a)(10) of the Securities Act. See “Tax Matters” in Part I, Item 2. MD&A above and “Share Exchange and Tax Matters Agreement” in Note 6 of the Notes to the Consolidated Financial Statements in Item 8 of the 2021 Form 10-K for a detailed discussion of the exchange and the terms of the Share Exchange and Tax Matters Agreement, respectively.
Item 6. EXHIBITS
EXHIBIT INDEX
| 32.1 | ** | Certifications of Principal Executive Officer and Principal Financial Officer of PG&E Corporation required by Section 906 of the Sarbanes-Oxley Act of 2002 | ||||||
| 32.2 | ** | Certifications of Principal Executive Officers and Principal Financial Officer of Pacific Gas and Electric Company required by Section 906 of the Sarbanes-Oxley Act of 2002 | ||||||
| 101.INS | XBRL Instance Document | |||||||
| 101.SC | XBRL Taxonomy Extension Schema Document | |||||||
| 101.CA | XBRL Taxonomy Extension Calculation Linkbase Document | |||||||
| 101.LA | XBRL Taxonomy Extension Labels Linkbase Document | |||||||
| 101.PRE | XBRL Taxonomy Extension Presentation Linkbase Document | |||||||
| 101.DE | XBRL Taxonomy Extension Definition Linkbase Document | |||||||
| 104 | Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101) |
*Management contract or compensatory agreement
**Pursuant to Item 601(b)(32) of SEC Regulation S-K, these exhibits are furnished rather than filed with this report.
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this Quarterly Report on Form 10-Q to be signed on their behalf by the undersigned thereunto duly authorized.
| PG&E CORPORATION | ||
| /s/ CHRISTOPHER A. FOSTER | ||
| Christopher A. Foster Executive Vice President and Chief Financial Officer (duly authorized officer and principal financial officer) |
| PACIFIC GAS AND ELECTRIC COMPANY | ||
| /s/ DAVID S. THOMASON | ||
| David S. Thomason Vice President, Chief Financial Officer and Controller (duly authorized officer and principal financial officer) |
Dated: April 28, 2022