Cover and table of contents

44K characters. Original on sec.gov · Markdown

Cover and table of contents

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C., 20549
FORM10-Q
(Mark One)
☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period endedJune 30, 2022
OR
☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ___________ to __________
Commission File NumberExact Name of Registrant as Specified in its CharterState or Other Jurisdiction of IncorporationIRS Employer Identification Number
1-12609PG&E CorporationCalifornia94-3234914
1-2348Pacific Gas and Electric CompanyCalifornia94-0742640
PG&E CorporationPacific Gas and Electric Company
77 Beale Street77 Beale Street
P.O. Box 770000P.O. Box 770000
San Francisco,California94177San Francisco,California94177
Address of principal executive offices, including zip code
PG&E CorporationPacific Gas and Electric Company
415973-1000415973-7000
Registrant’s telephone number, including area code
Securities registered pursuant to Section 12(b) of the Act:
Title of each classTrading Symbol(s)Name of each exchange on which registered
Common stock, no par valuePCGThe New York Stock Exchange
Equity UnitsPCGUThe New York Stock Exchange
First preferred stock, cumulative, par value $25 per share, 5% series A redeemablePCG-PENYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% redeemablePCG-PDNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.80% redeemablePCG-PGNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.50% redeemablePCG-PHNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.36% series A redeemablePCG-PINYSE American LLC
First preferred stock, cumulative, par value $25 per share, 6% nonredeemablePCG-PANYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5.50% nonredeemablePCG-PBNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% nonredeemablePCG-PCNYSE American LLC
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
PG&E Corporation:☒Large accelerated filer☐Accelerated filer
☐Non-accelerated filer
☐Smaller reporting company☐Emerging growth company
Pacific Gas and Electric Company:☐Large accelerated filer☐Accelerated filer
☒Non-accelerated filer
☐Smaller reporting company☐Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
PG&E Corporation:☐
Pacific Gas and Electric Company:☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date.
Common stock outstanding as of July 21, 2022:
PG&E Corporation:2,465,411,810*
Pacific Gas and Electric Company:264,374,809
*Includes 377,743,590 shares of common stock held by PG&E ShareCo LLC, a wholly-owned subsidiary of PG&E Corporation, and 100,000,000 shares of common stock held by Pacific Gas and Electric Company.

PG&E CORPORATION AND

PACIFIC GAS AND ELECTRIC COMPANY

FORM 10-Q

FOR THE QUARTERLY PERIOD ENDED JUNE 30, 2022

TABLE OF CONTENTS

SEC Form 10-Q Reference Number
GLOSSARY
FORWARD-LOOKING STATEMENTS
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSPart I, Item 2
OVERVIEW
RESULTS OF OPERATIONS
LIQUIDITY AND FINANCIAL RESOURCES
ENFORCEMENT AND LITIGATION MATTERS
REGULATORY MATTERS
LEGISLATIVE AND REGULATORY INITIATIVES
ENVIRONMENTAL MATTERS
RISK MANAGEMENT ACTIVITIES
CRITICAL ACCOUNTING ESTIMATES
ACCOUNTING STANDARDS ISSUED BUT NOT YET ADOPTED
CONDENSED CONSOLIDATED FINANCIAL STATEMENTSPart I, Item 1
PG&E CORPORATION
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONDENSED CONSOLIDATED BALANCE SHEETS
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
CONDENSED CONSOLIDATED STATEMENTS OF EQUITY
PACIFIC GAS AND ELECTRIC COMPANY
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONDENSED CONSOLIDATED BALANCE SHEETS
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
CONDENSED CONSOLIDATED STATEMENTS OF SHAREHOLDERS’ EQUITY
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)
NOTE 1: ORGANIZATION AND BASIS OF PRESENTATION
NOTE 2: BANKRUPTCY FILING
NOTE 3: SIGNIFICANT ACCOUNTING POLICIES
NOTE 4: REGULATORY ASSETS, LIABILITIES, AND BALANCING ACCOUNTS
NOTE 5: DEBT
NOTE 6: SB 901 SECURITIZATION AND CUSTOMER CREDIT TRUST
NOTE 7: EQUITY
NOTE 8: EARNINGS PER SHARE
NOTE 9: DERIVATIVES
NOTE 10: FAIR VALUE MEASUREMENTS
NOTE 11: WILDFIRE-RELATED CONTINGENCIES
NOTE 12: OTHER CONTINGENCIES AND COMMITMENTS
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKPart I, Item 3
CONTROLS AND PROCEDURESPart I, Item 4
LEGAL PROCEEDINGSPart II, Item 1
RISK FACTORSPart II, Item 1A
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDSPart II, Item 2
EXHIBITSPart II, Item 6
SIGNATURES

GLOSSARY

The following terms and abbreviations appearing in the text of this report have the meanings indicated below.

2021 Form 10-KPG&E Corporation’s and the Utility’s joint Annual Report on Form 10-K for the year ended December 31, 2021
Form 10-QPG&E Corporation’s and Utility’s joint Quarterly Report on Form 10-Q for the period ended June 30, 2022
ABAssembly Bill
Amended ArticlesAmended and Restated Articles of Incorporation of PG&E Corporation and the Utility, each filed on June 22, 2020, and for PG&E Corporation, as amended by the Certificate of Amendment of Articles of Incorporation, filed on May 24, 2022
AROasset retirement obligation
ASUaccounting standard update issued by the FASB
Bankruptcy Codethe United States Bankruptcy Code
Bankruptcy Courtthe U.S. Bankruptcy Court for the Northern District of California
CAISOCalifornia Independent System Operator Corporation
Cal FireCalifornia Department of Forestry and Fire Protection
CAPPCalifornia Arrearage Payment Program
CEMACatastrophic Event Memorandum Account
Chapter 11Chapter 11 of Title 11 of the U.S. Code
Chapter 11 Casesthe voluntary cases commenced by each of PG&E Corporation and the Utility under Chapter 11 on January 29, 2019
Confirmation Orderthe order confirming the Plan, dated as of June 20, 2020 with the Bankruptcy Court
CHTCustomer Harm Threshold
CPPMACOVID-19 Pandemic Protections Memorandum Account
CPUCCalifornia Public Utilities Commission
CRRscongestion revenue rights
D&O Insurancedirectors’ and officers’ liability insurance
Diablo CanyonDiablo Canyon nuclear power plant
District CourtUnited States District Court for the Northern District of California
DTSCDepartment of Toxic Substances Control
EMANIEuropean Mutual Association for Nuclear Insurance
Emergence DateJuly 1, 2020, the effective date of the Plan in the Chapter 11 Cases
EOEPEnhanced Oversight and Enforcement Process
EPSearnings per common share
EPSSEnhanced Powerline Safety Settings
EVMenhanced vegetation management
Exchange ActSecurities Exchange Act of 1934
FERCFederal Energy Regulatory Commission
FHPMAFire Hazard Prevention Memorandum Account
Fire Victim TrustThe trust established pursuant to the Plan for the benefit of holders of the Fire Victim Claims into which the Aggregate Fire Victim Consideration (as defined in the Plan) has been, and will continue to be funded
FRMMAFire Risk Mitigation Memorandum Account
GAAPU.S. Generally Accepted Accounting Principles
GRCgeneral rate case
GT&Sgas transmission and storage
HSMAhazardous substance memorandum account
IRCInternal Revenue Code
IOUsinvestor-owned utility(ies)
Kincade Amended ComplaintThe amended criminal complaint filed by the Sonoma County District Attorney’s Office on January 28, 2022 in connection with the 2019 Kincade fire
Kincade ComplaintThe criminal complaint filed by the Sonoma County District Attorney’s Office on April 6, 2021 in connection with the 2019 Kincade fire
Lakeside Building300 Lakeside Drive, Oakland, California, 94612
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations set forth in Part I, Item 2, of this Form 10-Q
MGMAMicrogrids Memorandum Account
MGPmanufactured gas plants
NAVnet asset value
NEILNuclear Electric Insurance Limited
NEMnet energy metering
New SharesShares of PG&E Corporation common stock held by ShareCo that may be exchanged for Plan Shares as contemplated by the Share Exchange and Tax Matters Agreement
NRCNuclear Regulatory Commission
OEISOffice of Energy Infrastructure Safety (successor to the Wildfire Safety Division of the CPUC)
OIIorder instituting investigation
OIRorder instituting rulemaking
PDproposed decision
PERAPublic Employees Retirement Association
PlanPG&E Corporation and the Utility, Knighthead Capital Management, LLC, and Abrams Capital Management, LP Joint Chapter 11 Plan of Reorganization, dated as of June 19, 2020
Plan SharesShares of PG&E Corporation common stock issued to the Fire Victim Trust pursuant to the Plan
PSPSPublic Safety Power Shutoff
RAResource Adequacy
Receivables Securitization ProgramThe accounts receivable securitization program entered into by the Utility on October 5, 2020, providing for the sale of a portion of the Utility's accounts receivable and certain other related rights to the SPV, which, in turn, obtains loans secured by the receivables from financial institutions
ROEreturn on equity
ROU assetright-of-use asset
RTBARisk Transfer Balancing Account
RUBAResidential Uncollectibles Balancing Account
SBSenate Bill
SECU.S. Securities and Exchange Commission
SEDSafety and Enforcement Division of the CPUC
SFGOThe Utility’s San Francisco General Office headquarters complex
Share Exchange and Tax Matters AgreementShare Exchange and Tax Matters Agreement dated July 8, 2021 between PG&E Corporation, the Utility, ShareCo and the Fire Victim Trust
ShareCoPG&E ShareCo LLC, a limited liability company whose sole member is PG&E Corporation
SOFRSecured Overnight Financing Rate
SPVPG&E AR Facility, LLC
Tax ActTax Cuts and Jobs Act of 2017
TOtransmission owner
UtilityPacific Gas and Electric Company
Utility Revolving Credit AgreementCredit Agreement, dated as of July 1, 2020, as amended, by and among the Utility, the several banks and other financial institutions or entities party thereto from time to time, JPMorgan Chase Bank, N.A. and Citibank, N.A., as Co-Administrative Agents, and Citibank, N.A., as Designated Agent
VIE(s)variable interest entity(ies)
VMBAVegetation Management Balancing Account
WEMAWildfire Expense Memorandum Account
Wildfire Fundstatewide fund established by AB 1054 that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment
WMBAWildfire Mitigation Balancing Account
WMCEWildfire Mitigation and Catastrophic Events
WMPwildfire mitigation plan
WMPMAWildfire Mitigation Plan Memorandum Account
Zogg ComplaintThe criminal complaint filed by the Shasta County District Attorney’s Office on September 24, 2021

FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of capital expenditures; forecasts of expense reduction; estimates and assumptions used in critical accounting estimates, including those relating to insurance receivables, regulatory assets and liabilities, environmental remediation, litigation, third-party claims, the Wildfire Fund, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

  • the extent to which the Wildfire Fund and revised recoverability standard under AB 1054 effectively mitigate the risk of liability for damages arising from catastrophic wildfires, including whether the Utility maintains an approved WMP and a valid safety certification and whether the Wildfire Fund has sufficient remaining funds;

  • the risks and uncertainties associated with wildfires that have occurred or may occur in the Utility’s service territory, including the wildfire that began on October 23, 2019 northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), the wildfire that began on September 27, 2020 in the area of Zogg Mine Road and Jenny Bird Lane, north of Igo in Shasta County, California (the “2020 Zogg fire”), the wildfire that began on July 13, 2021 near the Cresta Dam in the Feather River Canyon in Plumas County, California (the “2021 Dixie fire”), and any other wildfires for which the causes have yet to be determined; the damage caused by such wildfires; the extent of the Utility’s liability in connection with such wildfires (including the risk that the Utility may be found liable for damages regardless of fault); investigations into such wildfires, including those being conducted by the CPUC; the outcome of the criminal proceeding initiated against the Utility in connection with the 2020 Zogg fire and three other fires in Shasta County, California; potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other enforcement agency were to bring an enforcement action in respect of any such fire; the risk that the Utility is not able to recover costs from insurance, from the Wildfire Fund or through rates; and the effect on PG&E Corporation’s and the Utility’s reputations of such wildfires, investigations and proceedings;

  • the extent to which the Utility’s wildfire mitigation initiatives are effective, including the Utility’s ability to comply with the targets and metrics set forth in its WMP; to retain or contract for the workforce necessary to execute its WMP; the effectiveness of its system hardening, including undergrounding; and the cost of the program and the timing and outcome of any proceeding to recover such costs through rates;

  • the impact of the Utility’s implementation of its PSPS program, and whether any fines, penalties or civil liability for damages will be imposed on the Utility as a result; the costs in connection with PSPS events, the timing and outcome of any proceeding to recover such costs through rates, and the effects on PG&E Corporation’s and the Utility’s reputations caused by implementation of the PSPS program;

  • the Utility’s ability to safely, reliably, and efficiently construct, maintain, operate, protect, and decommission its facilities, and provide electricity and natural gas services safely and reliably;

  • the availability, cost, coverage, and terms of the Utility’s insurance, including insurance for wildfire, nuclear, and other liabilities, the timing of any insurance recoveries, and recovery of the costs of such insurance or, in the event liabilities exceed insured amounts, the ability to recover uninsured losses through rates or from other third parties;

  • significant changes to the electric power and gas industries driven by technological advancements and a decarbonized economy;

  • cyber or physical attacks, including acts of terrorism, war, and vandalism, on the Utility or its third-party vendors, contractors, or customers (or others with whom they have shared data) which could result in operational disruption; the misappropriation or loss of confidential or proprietary assets, information or data, including customer, employee, financial, or operating system information, or intellectual property; corruption of data; or potential costs, lost revenues, litigation, or reputational harm incurred in connection therewith;

  • the impact of severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events, drought, earthquakes, lightning, tsunamis, rising sea levels, mudslides, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, and other events that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the effectiveness of the Utility’s efforts to prevent, mitigate, or respond to such conditions or events; the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is able to procure replacement power; and whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events;

  • the ability of the Utility to meet the conditions in its corrective action plan and exit the EOEP;

  • existing and future regulation and federal, state or local legislation, their implementation, and their interpretation; the cost to comply with such regulation and legislation; and the extent to which the Utility recovers its associated compliance and investment costs, including those regarding:

◦wildfires, including inverse condemnation reform, wildfire insurance, and additional wildfire mitigation measures or other reforms targeted at the Utility or its industry;

◦the environment, including the costs incurred to discharge the Utility’s remediation obligations or the costs to comply with standards for greenhouse gas emissions, renewable energy targets, energy efficiency standards, distributed energy resources, and electric vehicles;

◦the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, and cooling water intake, and the Utility’s ability to continue operating Diablo Canyon until its planned retirement;

◦the regulation of utilities and their holding companies, including the conditions imposed on PG&E Corporation when it became the Utility’s holding company;

◦privacy and cybersecurity; and

◦taxes and tax audits;

  • the timing and outcomes of the Utility’s pending and future ratemaking and regulatory proceedings, including the extent to which PG&E Corporation and the Utility are able to recover their costs through rates as recorded in memorandum accounts or balancing accounts, or as otherwise requested;

  • whether the Utility can control its operating costs within the authorized levels of spending, and timely recover its costs through rates; whether the Utility can continue implementing a streamlined organizational structure and achieve projected savings; the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;

  • the outcome of current and future self-reports, investigations or other enforcement actions, or notices of violation that could be issued related to the Utility’s compliance with laws, rules, regulations, or orders applicable to its gas and electric operations; the construction, expansion, or replacement of its electric and gas facilities; electric grid reliability; audit, inspection and maintenance practices; customer billing and privacy; physical and cybersecurity protections; environmental laws and regulations; or otherwise, such as fines; penalties; remediation obligations; the transfer of ownership of the Utility’s assets to municipalities or other public entities, including as a result of the City and County of San Francisco’s valuation petition; or the implementation of corporate governance, operational or other changes in connection with the EOEP;

  • the risks and uncertainties associated with PG&E Corporation’s and the Utility’s substantial indebtedness and the limitations on their operating flexibility in the documents governing that indebtedness;

  • the risks and uncertainties associated with the timing and outcomes of PG&E Corporation’s and the Utility’s ongoing litigation, including appeals of the Confirmation Order; certain indemnity obligations to current and former officers and directors, as well as potential indemnity obligations to underwriters for certain of the Utility’s note offerings; three purported class actions that have been consolidated and denominated In re PG&E Corporation Securities Litigation, U.S. District Court for the Northern District of California, Case No. 18-03509; the debarment proceeding; the purported PSPS class action filed in December 2019; and other third-party claims, including the extent to which related costs can be recovered through insurance, rates, or from other third parties;

  • the ability of PG&E Corporation and the Utility to securitize the remaining $2.4 billion of fire risk mitigation capital expenditures that were or will be incurred by the Utility;

  • the risks and uncertainties associated with any future substantial sales of shares of common stock of PG&E Corporation by existing shareholders, including the Fire Victim Trust;

  • whether PG&E Corporation or the Utility undergoes an “ownership change” within the meaning of Section 382 of the IRC, as a result of which tax attributes could be limited;

  • PG&E Corporation’s and the Utility’s historical financial information not being indicative of future financial performance as a result of the Chapter 11 Cases and the financial and other restructuring undergone by PG&E Corporation and the Utility in connection with their emergence from Chapter 11;

  • the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility’s fossil fuel-fired generation sites;

  • the impact that reductions in Utility customer demand for electricity and natural gas, driven by customer departures to community choice aggregators, direct access providers and legislative mandates to replace gas-fuel technologies, have on the Utility’s ability to make and recover its investments through rates and earn its authorized ROE, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, and changing customer demand for its natural gas and electric services;

  • the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;

  • the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;

  • the risks and uncertainties associated with the Utility’s ability to accurately forecast major capital expenditures, weighted average annual rate base, and expense reduction associated with implementation of the Lean operating system;

  • the risks and uncertainties associated with rising rates for the Utility’s customers;

  • actions by credit rating agencies to downgrade PG&E Corporation’s or the Utility’s credit ratings;

  • the severity, extent and duration of the global COVID-19 pandemic and its impact on PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, as well as on energy demand in the Utility’s service territory, the ability of the Utility to collect on customer receivables, the ability of the Utility to mitigate these effects, including with spending reductions, the ability of the Utility to recover any losses incurred in connection with the COVID-19 pandemic, and the impact of workforce disruptions caused either by illness of workers and their family members or workforce attrition related to potential new workplace regulations such as vaccine mandates;

  • whether PG&E Corporation’s and the Utility’s counterparties are available and able to meet their financial and performance obligations with respect to contracts, credit agreements, and financial instruments, which could be affected by disruptions in the global supply chain caused by the COVID-19 pandemic or otherwise; and

  • the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of the forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors in this Form 10-Q and the 2021 Form 10-K and a detailed discussion of these matters contained in Item 2. MD&A in the 2021 Form 10-K and this Form 10-Q. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

PG&E Corporation’s and the Utility’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and proxy statements, are available free of charge on both PG&E Corporation’s website, www.pgecorp.com, and the Utility's website, www.pge.com, as promptly as practicable after they are filed with, or furnished to, the SEC. Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at http://investor.pgecorp.com, under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. PG&E Corporation and the Utility also routinely post or provide direct links to presentations, documents, and other information that may be of interest to investors at http://investor.pgecorp.com, under the “Chapter 11,” “Wildfire and Safety Updates” and “News & Events: Events & Presentations” tabs, respectively, in order to publicly disseminate such information. Specifically, within two hours during business hours or four hours outside of business hours of the determination that an incident is attributable or allegedly attributable to the Utility’s electric facilities and has resulted in property damage estimated to exceed $50,000, a fatality or injury requiring overnight in-patient hospitalization, or significant public or media attention, the Utility is required to submit an electric incident report including information about such incident. The information included in an electric incident report is limited and may not include important information about the facts and circumstances about the incident due to the limited scope of the reporting requirements and timing of the report and is necessarily limited to information to which the Utility has access at the time of the report. Ignitions are also reportable under CPUC Decision 14-02-015 when they involve self-propagating fire of material other than electrical or communication facilities; the fire traveled greater than one linear meter from the ignition point; and the Utility has knowledge that the fire occurred. It is possible that any of these filings or information included therein could be deemed to be material information. The information contained on such website is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend the address to be an active link.

PART I. FINANCIAL INFORMATION

Next: Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS