PG&E 10-Q 2024-03-31

Filed 2024-04-25. 8 sections, 356K characters. Original on sec.gov · Markdown · JSON

Cover and table of contents

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C., 20549
FORM10-Q
(Mark One)
☒QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period endedMarch 31, 2024
OR
☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ___________ to __________
Commission File NumberExact Name of Registrant as Specified in its CharterState or Other Jurisdiction of IncorporationIRS Employer Identification Number
1-12609PG&E CorporationCalifornia94-3234914
1-2348Pacific Gas and Electric CompanyCalifornia94-0742640
PG&E CorporationPacific Gas and Electric Company
300 Lakeside Drive300 Lakeside Drive
Oakland,California94612Oakland,California94612
Address of principal executive offices, including zip code
PG&E CorporationPacific Gas and Electric Company
415973-1000415973-7000
Registrant’s telephone number, including area code
Securities registered pursuant to Section 12(b) of the Act:
Title of each classTrading Symbol(s)Name of each exchange on which registered
Common stock, no par valuePCGThe New York Stock Exchange
First preferred stock, cumulative, par value $25 per share, 6% nonredeemablePCG-PANYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5.50% nonredeemablePCG-PBNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% nonredeemablePCG-PCNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% redeemablePCG-PDNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% series A redeemablePCG-PENYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.80% redeemablePCG-PGNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.50% redeemablePCG-PHNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.36% redeemablePCG-PINYSE American LLC
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
PG&E Corporation:☒Large accelerated filer☐Accelerated filer
☐Non-accelerated filer
☐Smaller reporting company☐Emerging growth company
Pacific Gas and Electric Company:☐Large accelerated filer☐Accelerated filer
☒Non-accelerated filer
☐Smaller reporting company☐Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
PG&E Corporation:☐
Pacific Gas and Electric Company:☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Sections 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date.
Common stock outstanding as of April 17, 2024:
PG&E Corporation:2,614,901,996*
Pacific Gas and Electric Company:264,374,809
*Includes 477,743,590 shares of common stock held by Pacific Gas and Electric Company.

PG&E CORPORATION AND

PACIFIC GAS AND ELECTRIC COMPANY

FORM 10-Q

FOR THE QUARTERLY PERIOD ENDED MARCH 31, 2024

TABLE OF CONTENTS

SEC Form 10-Q Reference Number
UNITS OF MEASUREMENT
GLOSSARY
FORWARD-LOOKING STATEMENTS
RISK FACTORSPart II, Item 1A
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSPart I, Item 2
OVERVIEW
RESULTS OF OPERATIONS
LIQUIDITY AND FINANCIAL RESOURCES
LITIGATION MATTERS
REGULATORY MATTERS
ENVIRONMENTAL MATTERS
RISK MANAGEMENT ACTIVITIES
CRITICAL ACCOUNTING ESTIMATES
CONDENSED CONSOLIDATED FINANCIAL STATEMENTSPart I, Item 1
PG&E CORPORATION
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONDENSED CONSOLIDATED BALANCE SHEETS
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
CONDENSED CONSOLIDATED STATEMENTS OF EQUITY
PACIFIC GAS AND ELECTRIC COMPANY
CONDENSED CONSOLIDATED STATEMENTS OF INCOME
CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONDENSED CONSOLIDATED BALANCE SHEETS
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS
CONDENSED CONSOLIDATED STATEMENTS OF SHAREHOLDERS’ EQUITY
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)
NOTE 1: ORGANIZATION AND BASIS OF PRESENTATION
NOTE 2: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
NOTE 3: REGULATORY ASSETS, LIABILITIES, AND BALANCING ACCOUNTS
NOTE 4: DEBT
NOTE 5: SB 901 SECURITIZATION AND CUSTOMER CREDIT TRUST
NOTE 6: EQUITY
NOTE 7: EARNINGS PER SHARE
NOTE 8: DERIVATIVES
NOTE 9: FAIR VALUE MEASUREMENTS
NOTE 10: WILDFIRE-RELATED CONTINGENCIES
NOTE 11: OTHER CONTINGENCIES AND COMMITMENTS
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKPart I, Item 3
CONTROLS AND PROCEDURESPart I, Item 4
LEGAL PROCEEDINGSPart II, Item 1
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDSPart II, Item 2
OTHER INFORMATIONPart II, Item 5
EXHIBITSPart II, Item 6
SIGNATURES

UNITS OF MEASUREMENT

1 Kilowatt (kW)=One thousand watts
1 Kilowatt-Hour (kWh)=One kilowatt continuously for one hour
1 Megawatt (MW)=One thousand kilowatts
1 Megawatt-Hour (MWh)=One megawatt continuously for one hour
1 Gigawatt (GW)=One million kilowatts
1 Gigawatt-Hour (GWh)=One gigawatt continuously for one hour
1 Kilovolt (kV)=One thousand volts
1 MVA=One megavolt ampere
1 Mcf=One thousand cubic feet
1 MMcf=One million cubic feet
1 Bcf=One billion cubic feet
1 MDth=One thousand decatherms

GLOSSARY

The following terms and abbreviations appearing in the text of this report have the meanings indicated below.

2023 Form 10-KPG&E Corporation’s and the Utility’s joint Annual Report on Form 10-K for the year ended December 31, 2023
Form 10-QPG&E Corporation’s and the Utility’s joint Quarterly Report on Form 10-Q for the period ended March 31, 2024
ABAssembly Bill
ALJadministrative law judge
Amended ArticlesAmended and Restated Articles of Incorporation of PG&E Corporation and the Utility, each filed on June 22, 2020, and for PG&E Corporation, as amended by the Certificate of Amendment of Articles of Incorporation, filed on May 24, 2022
Bankruptcy Courtthe United States Bankruptcy Court for the Northern District of California
CAISOCalifornia Independent System Operator Corporation
Cal FireCalifornia Department of Forestry and Fire Protection
CEMACatastrophic Event Memorandum Account
Chapter 11Chapter 11 of Title 11 of the United States Code
Chapter 11 Casesthe voluntary cases commenced by each of PG&E Corporation and the Utility under Chapter 11 on January 29, 2019
CPPMACOVID-19 Pandemic Protections Memorandum Account
CPUCCalifornia Public Utilities Commission
CRRcongestion revenue rights
Diablo CanyonDiablo Canyon nuclear power plant
District CourtUnited States District Court for the Northern District of California
DOEUnited States Department of Energy
DTSCCalifornia Department of Toxic Substances Control
DWRCalifornia Department of Water Resources
EMANIEuropean Mutual Association for Nuclear Insurance
Emergence DateJuly 1, 2020, the effective date of the Plan in the Chapter 11 Cases
EOEPEnhanced Oversight and Enforcement Process
EPSearnings per common share
Exchange ActSecurities Exchange Act of 1934, as amended
FERCFederal Energy Regulatory Commission
Fire Victim TrustThe trust established pursuant to the Plan for the benefit of holders of the Fire Victim Claims into which the Aggregate Fire Victim Consideration (as defined in the Plan) has been, and will continue to be, funded
First Mortgage Bondsbonds issued pursuant to the Indenture of Mortgage, dated as of June 19, 2020, between the Utility and The Bank of New York Mellon Trust Company, N.A., as amended and supplemented
FRMMAFire Risk Mitigation Memorandum Account
GAAPUnited States Generally Accepted Accounting Principles
GOgeneral order
GRCgeneral rate case
HSMAHazardous Substance Memorandum Account
IOUsinvestor-owned utility(ies)
IRCInternal Revenue Code of 1986, as amended
Lakeside Building300 Lakeside Drive, Oakland, California, 94612
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations set forth in Part I, Item 2, of this Form 10-Q
MGPmanufactured gas plants
NAVnet asset value
NEILNuclear Electric Insurance Limited
NRCNuclear Regulatory Commission
OEISOffice of Energy Infrastructure Safety (successor to the Wildfire Safety Division of the CPUC)
Pacific GenerationPacific Generation LLC, a subsidiary of the Utility
PCWAPlacer County Water Agency
PDproposed decision
PERAPublic Employees Retirement Association of New Mexico
PlanPG&E Corporation and the Utility, Knighthead Capital Management, LLC, and Abrams Capital Management, LP Joint Chapter 11 Plan of Reorganization, dated as of June 19, 2020
PSPSPublic Safety Power Shutoff
Receivables Securitization ProgramThe accounts receivable securitization program entered into by the Utility on October 5, 2020, providing for the sale of a portion of the Utility's accounts receivable and certain other related rights to the SPV, which, in turn, obtains loans secured by the receivables from financial institutions
ROEreturn on equity
ROU assetright-of-use asset
RUBAResidential Uncollectibles Balancing Account
SBSenate Bill
SECUnited States Securities and Exchange Commission
SEDSafety and Enforcement Division of the CPUC
SFGOThe Utility’s former San Francisco General Office headquarters complex
SPVPG&E AR Facility, LLC
TCJATax Cuts and Jobs Act of 2017
TOtransmission owner
USFSUnited States Forest Service
UtilityPacific Gas and Electric Company
Utility Revolving Credit AgreementCredit Agreement, dated as of July 1, 2020, as amended, by and among the Utility, the several banks and other financial institutions or entities party thereto from time to time and Citibank, N.A., as Administrative Agent and Designated Agent
VIE(s)variable interest entity(ies)
VMBAVegetation Management Balancing Account
WEMAWildfire Expense Memorandum Account
WGSCWildfire and Gas Safety Costs
Wildfire Fundstatewide fund established by AB 1054 that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment
WMBAWildfire Mitigation Balancing Account
WMCEWildfire Mitigation and Catastrophic Events
WMPWildfire Mitigation Plan
WMPMAWildfire Mitigation Plan Memorandum Account

FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management’s knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines associated with various investigations and proceedings; forecasts of capital expenditures; forecasts of cost savings; estimates and assumptions used in critical accounting estimates, including those relating to insurance receivables, regulatory assets and liabilities, environmental remediation, litigation, third-party claims, the Wildfire Fund, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “commit,” “goal,” “target,” “will,” “may,” “should,” “would,” “could,” “potential,” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

  • the extent to which the Wildfire Fund and revised prudency standard under AB 1054 effectively mitigate the risk of liability for damages arising from catastrophic wildfires, including whether the Utility maintains an approved WMP and a valid safety certification and whether the Wildfire Fund has sufficient remaining funds;

  • the risks and uncertainties associated with wildfires that have occurred or may occur in the Utility’s service area, including the wildfire that began on October 23, 2019 northeast of Geyserville in Sonoma County, California (the “2019 Kincade fire”), the wildfire that began on September 27, 2020 in the area of Zogg Mine Road and Jenny Bird Lane, north of Igo in Shasta County, California (the “2020 Zogg fire”), the wildfire that began on July 13, 2021 near the Cresta Dam in the Feather River Canyon in Plumas County, California (the “2021 Dixie fire”), the wildfire that began on September 6, 2022 near Oxbow Reservoir in Placer County, California (the “2022 Mosquito fire”), and any other wildfires for which the causes have yet to be determined; the damage caused by such wildfires; the extent of the Utility’s liability in connection with such wildfires (including the risk that the Utility may be found liable for damages regardless of fault); investigations into such wildfires, including those being conducted by the CPUC; potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other enforcement agency were to bring an enforcement action in respect of any such fire; the risk that the Utility is not able to recover costs from the Wildfire Fund or other third parties or through rates; and the effect on PG&E Corporation’s and the Utility’s reputations of such wildfires, investigations, and proceedings;

  • the extent to which the Utility’s wildfire mitigation initiatives are effective, including the Utility’s ability to comply with the targets and metrics set forth in its WMP; the effectiveness of its system hardening, including undergrounding; the cost of the program and the timing and outcome of any proceeding to recover such costs through rates; and any determination by the OEIS that the Utility has not complied with its WMP;

  • the Utility’s ability to safely, reliably, and efficiently construct, maintain, operate, protect, and decommission its facilities, and provide electricity and natural gas services safely and reliably;

  • significant changes to the electric power and natural gas industries driven by technological advancements, electrification, and the transition to a decarbonized economy; the impact of reductions in Utility customer demand for electricity and natural gas, driven by customer self-generation, customer departures to community choice aggregators, direct access providers, and government-owned utilities, and legislative mandates to reduce the use of natural gas; and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources and changing customer demand for its natural gas and electric services;

  • cyber or physical attacks, including acts of terrorism, war, and vandalism, on the Utility or its third-party vendors, contractors, or customers (or others with whom they have shared data) which could result in operational disruption; the misappropriation or loss of confidential or proprietary assets, information or data, including customer, employee, financial, or operating system information, or intellectual property; corruption of data; or potential costs, lost revenues, litigation, or reputational harm incurred in connection therewith;

  • the Utility’s ability to attract or retain specialty personnel;

  • the impact of severe weather events and other natural disasters, including wildfires and other fires, storms, tornadoes, floods, extreme heat events, drought, earthquakes, lightning, tsunamis, rising sea levels, mudslides, pandemics, solar events, electromagnetic events, wind events or other weather-related conditions, climate change, or natural disasters, and other events that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the effectiveness of the Utility’s efforts to prevent, mitigate, or respond to such conditions or events; the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is able to procure replacement power; and whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events;

  • existing and future regulation and federal, state or local legislation, their implementation, and their interpretation; the cost to comply with such regulation and legislation; and the extent to which the Utility recovers its associated compliance and investment costs, including those regarding:

◦wildfires, including inverse condemnation reform, wildfire insurance, and additional wildfire mitigation measures or other reforms targeted at the Utility or its industry;

◦the environment, including the costs incurred to discharge the Utility’s remediation obligations or the costs to comply with standards for greenhouse gas emissions, renewable energy targets, energy efficiency standards, distributed energy resources, and electric vehicles;

◦the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, and cooling water intake, and whether Diablo Canyon’s operations are extended; and the Utility’s ability to continue operating Diablo Canyon until its planned retirement;

◦the regulation of utilities and their affiliates, including the conditions that apply to PG&E Corporation as the Utility’s holding company;

◦privacy and cybersecurity; and

◦taxes and tax audits;

  • the timing and outcomes of the Utility’s pending and future ratemaking and regulatory proceedings, including the extent to which PG&E Corporation and the Utility are able to recover their costs through rates as recorded in memorandum accounts or balancing accounts, or as otherwise requested; the Utility’s application to transfer its non-nuclear generation assets to Pacific Generation and the potential sale of a minority interest in Pacific Generation; and the transfer of ownership of the Utility’s assets to municipalities or other public entities, including as a result of the City and County of San Francisco’s valuation petition;

  • whether the Utility can control its operating costs within the authorized levels of spending; whether the Utility can continue implementing the Lean operating system and achieve projected savings; the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; the risks and uncertainties associated with inflation; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;

  • the outcome of current and future self-reports, investigations or other enforcement actions, agency compliance reports, or notices of violation that could be issued related to the Utility’s compliance with laws, rules, regulations, or orders applicable to its gas and electric operations; the construction, expansion, or replacement of its electric and gas facilities; electric grid reliability; audit, inspection and maintenance practices; customer billing and privacy; physical and cybersecurity protections; environmental laws and regulations; or otherwise, such as fines; penalties; remediation obligations; or the implementation of corporate governance, operational or other changes in connection with the EOEP;

  • the risks and uncertainties associated with PG&E Corporation’s and the Utility’s substantial indebtedness and the limitations on their operating flexibility in the documents governing that indebtedness;

  • the risks and uncertainties associated with the resolution of the Subordinated Claims and the timing and outcomes of PG&E Corporation’s and the Utility’s ongoing litigation, including certain indemnity obligations to current and former officers and directors, the Wildfire-Related Non-Bankruptcy Securities Claims, and other third-party claims, as well as potential indemnity obligations to underwriters for certain of the Utility’s note offerings, including the extent to which related costs can be recovered through insurance, rates, or from other third parties;

  • the ability of PG&E Corporation and the Utility to use securitization to finance the recovery of the remaining $1.385 billion of fire risk mitigation capital expenditures that were or will be incurred by the Utility;

  • whether PG&E Corporation or the Utility undergoes an “ownership change” within the meaning of Section 382 of the IRC, as a result of which tax attributes could be limited;

  • the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility’s fossil fuel-fired generation sites;

  • the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;

  • the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner on acceptable terms;

  • the risks and uncertainties associated with high rates for the Utility’s customers;

  • actions by credit rating agencies to downgrade PG&E Corporation’s or the Utility’s credit ratings;

  • the severity, extent and duration of the global COVID-19 pandemic and the Utility’s ability to collect on customer receivables; and

  • the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of the forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors in this Form 10-Q and the 2023 Form 10-K and a detailed discussion of these matters contained in Item 7. MD&A in the 2023 Form 10-K and Item 2 in this Form 10-Q. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

PG&E Corporation’s and the Utility’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and proxy statements are available free of charge on both PG&E Corporation’s website, www.pgecorp.com, and the Utility's website, www.pge.com, as promptly as practicable after they are filed with, or furnished to, the SEC. Additionally, PG&E Corporation and the Utility routinely provide links to the Utility’s principal regulatory proceedings before the CPUC and the FERC at http://investor.pgecorp.com, under the “Regulatory Filings” tab, so that such filings are available to investors upon filing with the relevant agency. PG&E Corporation and the Utility also routinely post or provide direct links to presentations, documents, and other information that may be of interest to investors at http://investor.pgecorp.com, under the “Wildfire and Safety Updates” and “News & Events: Events & Presentations” tabs, respectively, in order to publicly disseminate such information. Specifically, within two hours during business hours or four hours outside of business hours of the determination that an incident is attributable or allegedly attributable to the Utility’s electric facilities and has resulted in property damage estimated to exceed $50,000, a fatality or injury requiring overnight in-patient hospitalization, or significant public or media attention, the Utility is required to submit an electric incident report including information about such incident to the CPUC. The information included in an electric incident report is limited and may not include important information about the facts and circumstances about the incident due to the limited scope of the reporting requirements and timing of the report and is necessarily limited to information to which the Utility has access at the time of the report. Ignitions are also reportable under CPUC Decision 14-02-015 when they involve self-propagating fire of material other than electrical or communication facilities; the fire traveled greater than one linear meter from the ignition point; and the Utility has knowledge that the fire occurred. It is possible that any of these filings or information included therein could be deemed to be material information. The information contained on such websites is not part of this or any other report that PG&E Corporation or the Utility files with, or furnishes to, the SEC. PG&E Corporation and the Utility are providing the address to this website solely for the information of investors and do not intend the address to be an active link.

Item 1A. RISK FACTORS

For information about the significant risks that could affect PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors in the 2023 Form 10-K, as supplemented below and the section of this quarterly report entitled “Forward-Looking Statements.”

PG&E Corporation is a holding company and relies on dividends, distributions and other payments, advances, and transfers of funds from the Utility to pay dividends on its common stock and meet its obligations.

PG&E Corporation conducts its operations primarily through its subsidiary, the Utility, and substantially all of PG&E Corporation’s consolidated assets are held by the Utility. Accordingly, PG&E Corporation’s cash flow, ability to pay dividends on its common stock, and ability to meet its debt service obligations under its existing and future indebtedness largely depend upon the earnings and cash flows of the Utility and the distribution of these earnings and cash flows to PG&E Corporation. The ability of the Utility to pay dividends or make other advances, distributions, and transfers of funds will depend on its results of operations and is restricted by, among other things, applicable laws limiting the amount of funds available for payment of dividends and certain restrictive covenants contained in financing agreements. See “Liquidity and Financial Resources” in Item 7. MD&A in the 2023 Form 10-K. The Utility must use its resources to satisfy its own obligations, including its obligation to serve customers, to pay principal and interest on outstanding debt, to meet its obligations to employees and creditors, and to pay preferred stock dividends, before it can distribute cash to PG&E Corporation. In particular, the CPUC requires PG&E Corporation’s and the Utility’s Boards of Directors to give first priority to the capital requirements of the Utility, as determined to be necessary and prudent to meet the Utility’s obligation to serve or to operate the Utility in a prudent and efficient manner. The CPUC also regulates the Utility’s capital structure. Dividend payments on PG&E Corporation’s common stock are also subject to the discretion of PG&E Corporation’s Board of Directors. See Note 6 of the Notes to the Condensed Consolidated Financial Statements included in Item 1.

The deterioration of income from, or other available assets of, the Utility for any reason could limit or impair the Utility’s ability to pay dividends or make other distributions to PG&E Corporation, which could, in turn, materially and adversely affect PG&E Corporation’s ability to pay common stock dividends or meet other obligations.

PART I. FINANCIAL INFORMATION

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

OVERVIEW

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company’s Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in Item 1. It should also be read in conjunction with the 2023 Form 10-K.

Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

  • The Uncertainties in Connection with Wildfires, Wildfire Mitigation, and Associated Cost Recovery. PG&E Corporation’s and the Utility’s financial condition, results of operations, liquidity, and cash flows may be materially affected by the costs and effectiveness of the Utility’s wildfire mitigation initiatives; the extent of damages from wildfires that do occur; the financial impacts of wildfires; and PG&E Corporation’s and the Utility’s ability to mitigate those financial impacts with insurance, the Wildfire Fund, and regulatory recovery.

In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires. The Utility’s wildfire mitigation initiatives include Enhanced Powerline Safety Settings (“EPSS”), PSPS, vegetation management, asset inspections, and system hardening. In particular, in 2023, the Utility introduced or expanded its use of several measures including downed conductor detection, partial voltage force outs, and transmission operational controls. The Utility is also focused on undergrounding more lines each year while using economies of scale to make undergrounding more cost efficient. These initiatives have significantly reduced the number of CPUC-reportable ignitions and the number of acres burned. The success of the Utility’s wildfire mitigation efforts depends on many factors, including whether the Utility can retain or contract for the workforce necessary to execute its wildfire mitigation actions.

PG&E Corporation and the Utility have incurred and will continue to incur substantial expenditures in connection with these initiatives. For more information on incurred expenditures, see Note 3 of the Notes to the Condensed Consolidated Financial Statements in Item 1. The extent to which the Utility will be able to recover these expenditures and other potential costs through rates is uncertain. If additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on the costs of the Utility’s wildfire mitigation initiatives.

The Utility is subject to a number of legal and regulatory requirements related to its wildfire mitigation efforts, which require periodic inspections of electric assets and ongoing reporting related to this work. Although the Utility believes that it has complied substantially with these requirements, it continually reviews and has identified instances of noncompliance. The Utility intends to update the CPUC and the OEIS as its review progresses. The Utility could face fines, penalties, enforcement action, or other adverse legal or regulatory consequences for late inspections or other noncompliance related to wildfire mitigation efforts. See “Self-Reports to the CPUC” in “Regulatory Matters” below.

Despite these extensive measures, the potential that the Utility’s equipment will be involved in the ignition of future wildfires, including catastrophic wildfires, is significant. This risk may be attributable to, and exacerbated by, a variety of factors, including climate (in particular, extended periods of seasonal dryness coupled with periods of high wind velocities and other storms), infrastructure, and vegetation conditions. Once an ignition has occurred, the Utility is unable to control the extent of damages, which is primarily determined by environmental conditions (including weather and vegetation conditions), third-party suppression efforts, and the location of the wildfire.

The financial impact of past wildfires is significant. As of March 31, 2024, PG&E Corporation and the Utility had recorded aggregate liabilities of $1.125 billion, $400 million, $1.6 billion, and $100 million for claims in connection with the 2019 Kincade fire, the 2020 Zogg fire, the 2021 Dixie fire, and the 2022 Mosquito fire, respectively, and in each case before available insurance, and, in the case of the 2021 Dixie fire and the 2022 Mosquito fire, other probable cost recoveries. These liability amounts correspond to the lower end of the range of reasonably estimable probable losses, with the exception of amounts relating to the 2020 Zogg fire, which represent the best estimate of the liability, but do not include all categories of potential damages and losses.

PG&E Corporation and the Utility may be able to mitigate the financial impact of future wildfires in excess of insurance coverage through the Wildfire Fund, or cost recovery through rates. Each of these mitigations involves uncertainties, and liabilities could exceed available recoveries. See “Loss Recoveries” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

Recorded liabilities in connection with the 2019 Kincade fire and the 2021 Dixie fire have exceeded potential amounts recoverable under applicable insurance policies. As of March 31, 2024, the Utility has recorded insurance receivables of $430 million for the 2019 Kincade fire, $374 million for the 2020 Zogg fire, $526 million for the 2021 Dixie fire, and $68 million for the 2022 Mosquito fire.

If the eligible claims for liabilities arising from wildfires were to exceed $1.0 billion in any Wildfire Fund coverage year (“Coverage Year”), the Utility may be eligible to make a claim against the Wildfire Fund under AB 1054 for such excess amount. The Wildfire Fund is available to the Utility to pay eligible claims for liabilities arising from wildfires, provided that the Utility satisfies the conditions to the Utility’s ongoing participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds. However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility’s ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable and therefore not subject to reimbursement, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. Finally, recoveries for the 2019 Kincade fire would be subject to a 40% limitation on the allowed amount of claims arising before emergence from bankruptcy. As of March 31, 2024, the Utility has recorded a Wildfire Fund receivable of $600 million for the 2021 Dixie fire. See “Wildfire Fund under AB 1054” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

The Utility will be permitted to recover its wildfire-related claims in excess of insurance and legal fees through rates unless the CPUC or the FERC, as applicable, determines that the Utility has not met the applicable prudency standard. The revised prudency standard under AB 1054 has not been interpreted or applied by the CPUC, and it is possible that the CPUC could interpret the standard or apply it to the relevant facts differently from how the Utility has interpreted and applied the standard, in which case the Utility may not be able to recover all or a portion of expenses that it has recorded as receivables. As of March 31, 2024, the Utility has recorded receivables for regulatory recovery of $576 million for the 2021 Dixie fire and $60 million for the 2022 Mosquito fire. See “2021 Dixie Fire,” and “2022 Mosquito Fire” in Note 10 of the Notes to the Condensed Consolidated Financial Statements in Item 1 for more information.

  • *The Timing and Outcome of Ratemaking and Ot

Showing the first 8K of 77K characters. Open the full section

Item 1. CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

PG&E CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF INCOME

(in millions, except per share amounts)

(Unaudited)
Three Months Ended March 31,
20242023
Operating Revenues
Electric$4,052$4,119
Natural gas1,8092,090
Total operating revenues5,8616,209
Operating Expenses
Cost of electricity321522
Cost of natural gas529916
Operating and maintenance2,6362,677
SB 901 securitization charges, net—273
Wildfire-related claims, net of recoveries(1)(2)
Wildfire Fund expense78117
Depreciation, amortization, and decommissioning1,0221,077
Total operating expenses4,5855,580
Operating Income1,276629
Interest income137112
Interest expense(715)(602)
Other income, net7685
Income Before Income Taxes774224
Income tax provision (benefit)39(348)
Net Income735572
Preferred stock dividend requirement of subsidiary33
Income Available for Common Shareholders$732$569
Weighted Average Common Shares Outstanding, Basic2,1341,991
Weighted Average Common Shares Outstanding, Diluted2,1392,132
Net Income Per Common Share, Basic$0.34$0.29
Net Income Per Common Share, Diluted$0.34$0.27

See accompanying Notes to the Condensed Consolidated Financial Statements.

PG&E CORPORATION

CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

(in millions)

(Unaudited)
Three Months Ended March 31,
20242023
Net Income$735$572
Other Comprehensive Income
Net unrealized gains (losses) on available-for-sale securities (net of taxes of $1 and $2, respectively)(1)5
Total other comprehensive income (loss)(1)5
Comprehensive Income734577
Preferred stock dividend requirement of subsidiary33
Comprehensive Income Available for Common Shareholders$731$574

See accompanying Notes to the Condensed Consolidated Financial Statements.

PG&E CORPORATION

CONDENSED CONSOLIDATED BALANCE SHEETS

(in millions)

(Unaudited)
Balance at
March 31, 2024December 31, 2023
ASSETS
Current Assets
Cash and cash equivalents$658$635
Restricted cash (includes $345 million and $282 million related to VIEs at respective dates)362297
Accounts receivable
Customers (net of allowance for doubtful accounts of $400 million and $445 million at respective dates) (includes $1.8 billion and $1.7 billion related to VIEs, net of allowance for doubtful accounts of $400 million and $445 million at respective dates)2,1602,048
Accrued unbilled revenue (includes $1.2 billion and $1.1 billion related to VIEs at respective dates)1,3231,254
Regulatory balancing accounts6,4425,660
Other1,5091,494
Regulatory assets256300
Inventories
Gas stored underground and fuel oil4465
Materials and supplies777805
Wildfire Fund asset305450
Other1,3951,375
Total current assets15,231

Showing the first 8K of 225K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

PG&E Corporation’s and the Utility’s primary market risk results from changes in energy commodity prices. PG&E Corporation and the Utility engage in price risk management activities for non-trading purposes only. Both PG&E Corporation and the Utility may engage in these price risk management activities using forward contracts, futures, options, and swaps to hedge the impact of market fluctuations on energy commodity prices and interest rates. See the section above entitled “Risk Management Activities” in MD&A and in Notes 8 and 9 of the Notes to the Condensed Consolidated Financial Statements in Item 1.

Item 4. CONTROLS AND PROCEDURES

Based on an evaluation of PG&E Corporation’s and the Utility’s disclosure controls and procedures as of March 31, 2024, PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers have concluded that such controls and procedures are effective to ensure that information required to be disclosed by PG&E Corporation and the Utility in reports that the companies file or submit under the Exchange Act is (i) recorded, processed, summarized, and reported within the time periods specified in the SEC rules and forms, and (ii) accumulated and communicated to PG&E Corporation’s and the Utility’s management, including PG&E Corporation’s and the Utility’s respective principal executive officers and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

There were no changes in internal control over financial reporting that occurred during the quarter ended March 31, 2024, that have materially affected, or are reasonably likely to materially affect, PG&E Corporation’s or the Utility’s internal control over financial reporting.

PART II. OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

PG&E Corporation and the Utility are parties to various lawsuits and regulatory proceedings in the ordinary course of their business. For more information regarding material lawsuits and proceedings, including updates to information reported under Item 3. Legal Proceedings of the 2023 Form 10-K, see Notes 10 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Part I, MD&A: “Litigation Matters.”

Each of PG&E Corporation and the Utility has elected to disclose environmental proceedings described in Item 103(c)(3)(iii) of Regulation S-K unless it reasonably believes that such proceeding will result in no monetary sanctions, or in monetary sanctions, exclusive of interest and costs, of less than $1 million.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

None.

Item 5. OTHER INFORMATION

On February 29, 2024, John R. Simon, who serves as Executive Vice President, General Counsel and Chief Ethics & Compliance Officer of PG&E Corporation, adopted a Rule 10b5-1 trading arrangement that is intended to satisfy the affirmative defense of Rule 10b5-1(c), for the sale of up to 50,000 shares of PG&E Corporation common stock. The trading arrangement will terminate on the earlier of March 1, 2025 or the execution of the sale of all 50,000 shares.

Certain officers have made elections to participate in, and are participating in, the PG&E Corporation Retirement Savings Plan (the 401(k) plan), which includes a PG&E Corporation Common Stock Fund investment option, and non-qualified deferred compensation plans, which may have a similar option and are described in PG&E Corporation’s and the Utility’s joint proxy statement. Also, certain officers have made, and may from time to time make, elections to have shares withheld to cover withholding taxes upon the vesting of restricted stock units or performance share units, or to pay the exercise price and withholding taxes for stock options, which may be designed to satisfy the affirmative defense conditions of Rule 10b5-1 under the Exchange Act or may constitute non-Rule 10b5-1 trading arrangements (as defined in Item 408(c) of Regulation S-K).

Item 6. EXHIBITS

EXHIBIT INDEX

3.1Conformed Version Amended and Restated Articles of Incorporation of PG&E Corporation, filed on June 22, 2020, as amended by the Certificate of Amendment of Articles of Incorporation of PG&E Corporation, filed May 24, 2022 (incorporated by reference to PG&E Corporation’s Form 10-K dated December 31, 2022 (File No. 1-12609), Exhibit 3.1)
3.2Bylaws of PG&E Corporation, Amended and Restated as of May 18, 2023 (incorporated by reference to PG&E Corporation’s Form 8-K dated May 18, 2023 (File No. 1-12609), Exhibit 3.1)
3.3Amended and Restated Articles of Incorporation of Pacific Gas and Electric Company, effective as of June 22, 2020 (incorporated by reference to Pacific Gas and Electric Company’s Form 8-K dated June 20, 2020 (File No. 1-2348), Exhibit 3.2)
3.4Bylaws of Pacific Gas and Electric Company, Amended and Restated as of May 18, 2023 (incorporated by reference to Pacific Gas and Electric Company’s Form 8-K dated May 18, 2023 (File No. 1-2348), Exhibit 3.2)
4.1Twenty-Fourth Supplemental Indenture, dated as of February 28, 2024 (incorporated by reference to Pacific Gas and Electric Company’s Form 8-K dated February 26, 2024 (File No. 1-2348), Exhibit 4.1)
10.1Amendment No. 3 to Credit Agreement, dated as of April 16, 2024, among Pacific Gas and Electric Company, the lenders party thereto and Bank of America, N.A., as administrative agent
10.2Amendment No. 10 to Receivables Financing Agreement, dated as of December 8, 2023, among PG&E AR Facility, LLC, as borrower, Pacific Gas and Electric Company, in its capacity as initial Servicer, the financial institutions from time to time and part thereto and listed therein as lenders and MUFG Bank, Ltd., as administrative agent
10.3Amendment No. 11 to Receivables Financing Agreement, dated as of March 28, 2024, among PG&E AR Facility, LLC, as borrower, Pacific Gas and Electric Company, in its capacity as initial Servicer, the financial institutions from time to time and party thereto and listed therein as lenders and MUFG Bank, Ltd., as administrative agent
10.4Update to Schedule 1 to Collection Account Intercreditor Agreement, dated as of March 28, 2024, among Pacific Gas and Electric Company, PG&E Recovery Funding LLC, PG&E Wildfire Recovery Funding LLC, Citibank, N.A., MUFG Bank, Ltd., and The Bank of New York Mellon Trust Company, N.A. (redacted)
10.5*Retention Letter Agreement between PG&E Corporation and Carla J. Peterman, dated February 20, 2024 (redacted)
10.6*Retention Letter Agreement between PG&E Corporation and John R. Simon, dated February 20, 2024 (redacted)
31.1Certifications of the Principal Executive Officer and the Principal Financial Officer of PG&E Corporation required by Section 302 of the Sarbanes-Oxley Act of 2002
31.2Certifications of the Principal Executive Officers and the Principal Financial Officer of Pacific Gas and Electric Company required by Section 302 of the Sarbanes-Oxley Act of 2002
32.1**Certifications of the Principal Executive Officer and the Principal Financial Officer of PG&E Corporation required by Section 906 of the Sarbanes-Oxley Act of 2002
32.2**Certifications of the Principal Executive Officers and the Principal Financial Officer of Pacific Gas and Electric Company required by Section 906 of the Sarbanes-Oxley Act of 2002
101.INSXBRL Instance Document
101.SCHXBRL Taxonomy Extension Schema Document
101.CALXBRL Taxonomy Extension Calculation Linkbase Document
101.LABXBRL Taxonomy Extension Labels Linkbase Document
101.PREXBRL Taxonomy Extension Presentation Linkbase Document
101.DEFXBRL Taxonomy Extension Definition Linkbase Document
104Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)

*Management contract or compensatory agreement **Pursuant to Item 601(b)(32) of SEC Regulation S-K, these exhibits are furnished rather than filed with this report.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrants have duly caused this Quarterly Report on Form 10-Q to be signed on their behalf by the undersigned thereunto duly authorized.

PG&E CORPORATION
/s/ CAROLYN J. BURKE
Carolyn J. Burke Executive Vice President and Chief Financial Officer (duly authorized officer and principal financial officer)
PACIFIC GAS AND ELECTRIC COMPANY
/s/ STEPHANIE N. WILLIAMS
Stephanie N. Williams Vice President, Chief Financial Officer, and Controller (duly authorized officer and principal financial officer)

Dated: April 24, 2024