Public Service Enterprise Group (PEG) 10-K risk factor changes: FY2025 vs FY2024
The 2025-12-31 10-K against the 2024-12-31 one, compared heading by heading and sentence by sentence.
Item 1A54 rewritten23 added33 removed322 unchanged
All filing items1,569 rewritten500 added531 removed3,699 unchanged
Summary
counted, not written
- Item 1A lists 28 risk factor headings: 2 new, 3 reworded and 23 unchanged since FY2024. 1 heading from FY2024 no longer appears.
- Sentence by sentence, 500 added, 531 removed, 1,569 rewritten and 3,699 unchanged across 20 items that differ.
New Item 1A headings (2)
- Significant resource adequacy challenges present affordability and reliability concerns that could cause policymakers to implement responsive measures that could have a material, adverse impact on our business, strategy, growth rates, cash flows, results of operation, and financial condition and increase regulatory uncertainty for utility investment initiatives and programs.
- Generation activities at the Peach Bottom plants present risks similar to those to which nuclear generation plants that we operate are subject.
Removed Item 1A headings (1)
- An increasing demand for power and load growth, potentially compounded by a shift away from natural gas toward increased electrification could cause reliability issues and higher costs for customers, which could lead to potential pressure on fair and timely recovery of our investments and proposed programs.
Reworded Item 1A headings (3)
- We may be adversely affected by asset and equipment failures, [added: gas explosions,] accidents, critical operating technology or business system failures, natural disasters, severe weather events, acts of war or terrorism or other acts of violence, sabotage, physical attacks or security breaches, cyberattacks, or other incidents, including pandemics, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses.
- The markets,
[removed: PTC]and/or[removed: ZEC program][added: PTC] may not provide sufficient financial support for our New Jersey nuclear plants which could result in the retirement of all of these nuclear plants. - We are subject to numerous federal, state and local environmental laws and regulations that may significantly limit or affect our businesses, [added: result in significant litigation,] adversely impact our business plans
[removed: or][added: and/or] expose us to significant environmental[removed: fines][added: fines, costs] and [added: other] liabilities.
A heading is new when no FY2024 heading matches it after ignoring case and punctuation, and reworded when it shares at least 60 percent of its words with one that went away. All current risk factor headings.
Sentences by item
23 items, with every count and a link to each item that changed
Underlined words on a shaded ground are new in FY2025; struck-through words were in FY2024. Sentences that are wholly new or wholly gone are labelled rather than marked.
Item 1A. RISK FACTORS
54 rewritten, 23 added, 33 removed, 322 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
Further, certain negative public and political views by certain stakeholders on [removed: natural gas and other types of] energy infrastructure could result in diminishing support for those investments.
Climate change may [removed: increasingly] drive change to existing or additional legislation and regulation that may impact our business and shape our customers’ energy preference and sustainability [removed: goals.][added: goals, including impacts of potential changes in use of natural gas and electricity due to electrification over the long-term and the impact on need for additional generation to meet those electric needs.]
[removed: Any one or all of these] [added: These] factors could impact the need to invest in our electric and gas T&D systems and, therefore, our [removed: company] growth rate.
These and other physical changes could result in changes in customer demand, increased costs associated with repairing and maintaining generation facilities and T&D systems, resulting in increased maintenance and capital costs (and [removed: potential] [added: potentially] increased financing needs), increased regulatory oversight, and lower customer satisfaction.
[removed: Climate change-related political action] [added: While the CIP protects PSE&G’s margin variances against changes in customer usage of gas] and [added: electricity, climate change-related] state [removed: and federal] policy goals, including but not limited to those related to [added: GHG emissions reductions,] energy [removed: efficient] [added: efficiency] targets, solar targets, energy storage targets, encouragement of electrification through EV adoption, policies to [removed: restrict the use of natural gas in new or existing homes and businesses, or] encourage electrification of end use equipment currently fueled by natural gas, and the associated legislative and regulatory responses, may create [removed: financial risk as] [added: additional costs for] our [removed: operations may] [added: customers and/or our business, which could] be [removed: subject to additional regulation at either the state or federal level in the future.][added: material.]
Further, our business is subject to policy, regulatory, technology and economic uncertainties and contingencies, including regulatory approvals required for our various investments, many of which are beyond our control and may affect planned [added: investments and our ability to meet GHG emissions reduction or climate-related goals that we may set from time to time, in a cost-effective manner or at all.]
We may be adversely affected by asset and equipment failures, [added: gas explosions,] accidents, critical operating technology or business system failures, natural disasters, severe weather events, acts of war or terrorism or other acts of violence, sabotage, physical attacks or security breaches, cyberattacks, or other incidents, including pandemics, that impact our ability to provide safe and reliable service to our customers and remain competitive and could result in substantial financial losses.
We are exposed to the risk of asset and equipment failures, gas [removed: explosions,] [added: explosions or leaks,] accidents, [added: pandemics,] natural disasters, severe weather events, acts of war or terrorism or other acts of violence, including active shooter situations, sabotage, physical attacks or security breaches, cyberattacks or other incidents, which could result in damage to or destruction of our substations or other facilities or infrastructure, or damage to persons or [removed: property and to] [added: property, fire, loss of life, outages, mechanical problems, environmental pollution,] electric and gas supply [removed: interruptions.][added: interruptions or other adverse impacts to our business.]
Long-lived assets represent approximately 73% and 80% of the total assets of PSEG and PSE&G, respectively, as of December 31, [removed: 2024.][added: 2025.]
[removed: Significant reductions in our expected revenues or cash flows for an extended period of time resulting from such] events could result in future asset impairment charges, which could have a material adverse impact on our financial condition and results of operations.
The supply chain of goods and services could be impacted by several factors, including sanctions, tariffs, manufacturing labor shortages, domestic and international shipping constraints, increases in demand, [added: physical alterations in technologies that create cyber risks,] and shortages of raw materials and [added: specialty components.]
our current level of indebtedness and compliance with covenants in our debt [added: instruments and credit] agreements;
Cybersecurity threats to the energy market infrastructure are increasing in sophistication, magnitude and [removed: frequency, particularly with the regularity of virtual operations.][added: frequency.]
Because of the inherent vulnerability of infrastructure and technology and operational systems to disability or failure due to hacking, viruses, malicious or destructive code, phishing and other social engineering attacks, denial of service attacks, ransomware, [removed: acts of war or terrorism, or other cybersecurity incidents, we face increased risk of cyberattack.]
We rely on information and operational technology systems and network infrastructure to operate our generation and T&D [removed: systems.][added: systems and to conduct power marketing and hedging activities.]
We also store sensitive data, intellectual property and proprietary or personally identifiable information regarding our business, infrastructure, employees, shareholders, customers and vendors on our IT [removed: systems and conduct power marketing and hedging activities.][added: systems.]
In addition, the operation of our business is dependent upon the IT systems of Nth parties (i.e., our third parties and other business relationships, including fourth parties, etc.), including our [added: vendors, regulators, RTOs and ISOs, among others.]
general business system and process interruption or compromise, including preventing us from servicing our customers, working remotely, collecting revenues or [removed: the ability to record, process] [added: recording, processing] and/or [removed: report] [added: reporting] financial information correctly, and
If a significant cybersecurity event or breach occurs within our company or with one of our material vendors, we could be exposed to [removed: significant] loss of revenue, [removed: material] repair costs to intellectual and physical property, [removed: significant] fines and penalties if determined that we were in non-compliance with existing laws and regulations, [removed: significant] litigation costs, increased costs to finance our businesses, negative publicity, damage to our reputation and loss of confidence from our customers, regulators, investors, vendors and employees.
The misappropriation, corruption or loss of personally identifiable information and other confidential data from us or one of our vendors could lead to [removed: significant] breach notification expenses, mitigation expenses such as credit monitoring, and legal and regulatory fines and penalties.
Moreover, new or updated security laws or regulations, including laws and regulations that respond to evolving application of AI, or unforeseen threat sources could require changes in current measures taken by us and our business operations, which could result in increased [removed: costs and adversely affect our financial statements.][added: costs.]
To address the risks to our information and operational technology systems, we maintain a cybersecurity program that includes policies and controls, cybersecurity insurance, cybersecurity governance and compliance, awareness [added: and] training, table-top exercises, logging and monitoring, and testing.
These preventative actions [removed: minimize] [added: reduce] the likelihood and potential impact of cybersecurity breaches.
Sustained distribution grid modernization will also be required to accommodate increased EE, EV infrastructure, increased penetration of distributed energy resources on the electric system, such as on-site solar generation and also potential deployment of [added: energy storage, fuel cells, and distributed resources technologies.]
Certain events such as an aging workforce looking to retire without an opportunity to transfer knowledge to a successor, inadequate workforce plans and replacements, lack of skill set to meet current and evolving business needs, a culture that does not foster inclusion leading to turnover, [added: a failure to successfully negotiate new collective bargaining agreements with our labor unions on mutually acceptable terms or at all,] acts of violence in the workplace, inadequate training and a workforce that is not engaged may lead to operating challenges, safety concerns and increased costs.
Higher costs from suppliers of equipment and materials, fuel and services and labor and health care costs to attract and retain our workforce, as well as policy matters such as tax rates, tariffs and other policies impacting costs, could lead to increased [removed: costs, which could reduce our earnings.][added: costs.]
[removed: PSEG’s and] [added: PSEG’s,] PSE&G’s [added: and PSEG Power’s] debt instruments contain events of default customary for financings of their type, including cross accelerations to other debt of that entity.
PSEG’s, PSE&G’s and PSEG Power’s bank credit agreements, [added: and PSEG Power’s debt instruments] contain certain limitations on the incurrence of liens and PSEG Power’s bank credit agreements [added: and debt instruments] also contain limitations on the incurrence of certain subsidiary debt.
The performance of the financial markets will affect the value of the assets that are held in trust to satisfy our future obligations under our defined benefit [removed: plans] [added: plan] and to decommission our nuclear generating plants.
[added: Additional funding requirements for our defined benefit plan could be] caused by changes in required or voluntary contributions, an increase in the number of employees becoming eligible to retire and changes in life expectancy assumptions.
[removed: Failure to manage adequately our investments in our defined benefit plan trusts] and NDT Fund could result in the need for us to make significant cash contributions in the future to maintain our funding at sufficient levels, which would negatively impact our results of operations, cash flows and financial position.
PSEG LI has an OSA with LIPA to operate LIPA’s electric T&D system in Long [removed: Island.][added: Island which was recently extended through 2030.]
[removed: It is uncertain whether] [added: Any discontinuation of] these contracts [removed: will be extended or renewed, which] may negatively affect our financial condition and operating results.
Changes in prevailing market prices [removed: below the PTC threshold] could have a material adverse effect on our financial condition and results of operations.
increases and decreases in generation capacity, including the addition of new supplies of power as a result of the development of new power plants, expansion of existing power plants, continuing retirement of existing generation units, inability [removed: of] [added: of, or delay in,] new generating units [removed: to be] [added: being] placed online, the retention of power plants that were expected to be [removed: retired or recently retired units being returned to service, the extent to which those generating units are firm or intermittent, or additional transmission capacity;]
If the realized value of our generation falls outside of the [removed: PTC thresholds,] [added: level at which we would receive PTCs,] to the extent that we have contracted obligations in excess of energy we have produced, an increase in market prices could reduce profitability.
[removed: Such developments] [added: Advances in distributed generation technologies, such as fuel cells, micro turbines, micro grids, windmills and net-metered solar installations, coupled with subsidies,] could (i) affect the price of energy, (ii) reduce energy deliveries as customer-owned generation becomes more cost-effective, (iii) require further improvements to our distribution systems to address changing load demands, and (iv) make portions of our transmission and/or distribution facilities obsolete prior to the end of their useful lives.
We [removed: sell] [added: hedge] generation output through the execution of bilateral contracts.
In addition, as capacity performance resources in PJM, PSEG’s nuclear units have been and will in the future be required to pay penalties if a forced outage at a plant occurs during a declared emergency event within PJM [added: as defined by PJM's rules] and that plant’s expected performance exceeds its actual performance during such event.
In addition, changing market design rules, including capacity performance rules and [added: the design and] timing of capacity market auctions, and/or failure to follow existing rules [removed: –] by PJM or market [removed: participants –] [added: participants, as well as any future supply/demand imbalance in PJM,] creates regulatory uncertainty and reliability risk.
Significant resource adequacy challenges present affordability and reliability concerns that could cause policymakers to implement responsive measures that could have a material, adverse impact on our business, strategy, growth rates, cash flows, results of operation, and financial condition and increase regulatory uncertainty for utility investment initiatives and programs.
PJM continues to face significant resource adequacy challenges, driven by a lack of sufficient supply to meet electric demand, which has increased significantly over the past several years and is expected to continue to increase going forward.
Increasing demand is caused by data centers, EV adoption, electrification and other factors.
Insufficient supply to meet forecasted demand has caused increases in energy and capacity prices which, in turn, have caused the customer rates by which we recover electric supply costs to materially increase.
This has resulted in continuing affordability concerns that have caused regulators and other policymakers to consider ways to reduce utility rates, including proposing to mitigate electric rate increases, and create increased regulatory uncertainty for utility investment initiatives and programs.
Actions that policymakers could implement in response to these affordability concerns could have a material, adverse impact on our business, strategy, growth rates, cash flows, results of operation, and financial condition.
In addition, both lack of supply and increasing demand pose reliability risk for customers.
In addition, inability of PJM to procure sufficient capacity to meet demand plus its reserve margin increase future risk of blackouts and load reduction, which may in turn result in litigation, political and regulatory scrutiny and reputational impacts.
Significant reductions in our expected revenues or cash flows for an extended period of time resulting from such
acts of war or terrorism, or other cybersecurity incidents, we face increased risk of cyberattack.
PSEG Power’s bank credit agreements contain limitations on sales of assets and PSEG Power’s debt instruments contain limitations on certain sale and leaseback transactions.
Failure to adequately manage our investments in our defined benefit plan trusts
retired or recently retired units being returned to service, the extent to which those generating units are firm or intermittent, or additional transmission capacity;
Generation activities at the Peach Bottom plants present risks similar to those to which nuclear generation plants that we operate are subject.
Generation activities at, and the operation of, the Peach Bottom plants present risks similar to those described above in GENERAL OPERATIONAL AND FINANCIAL RISKS and RISKS RELATED TO OUR GENERATION BUSINESS and below in REGULATORY, LEGISLATIVE AND LEGAL RISKS.
A finding by the BPU of
Note 12.
Hazardous Substance Liability—PSEG’s operations involve substances and byproducts classified by environmental regulations as hazardous.
These regulations impose handling, storage and disposal requirements for hazardous materials.
They can also impose strict and joint and several liability for damages to the environment, including cash penalties.
Federal and state environmental laws and regulations require the cleanup of discharged hazardous substances.
portfolio, the full remediation costs will likely be material in the aggregate.
Note 12.
While the CIP protects PSE&G’s margin variances against changes in customer usage of gas and electricity, customer demand for natural gas could decrease as a result of changing customer preferences favoring electrification and advanced technologies that offer energy efficient options.
Electric demand could also be impacted by electrification, including greater adoption of EVs, installation of distributed energy resources, such as behind the meter solar, installation of more energy efficient equipment, flexible load and/or energy storage, and other advances in technology.
Further, climate change may adversely impact the economy and reduced economic and consumer activity in our service areas could lower demand for electricity and gas we deliver.
Increased regulation of GHG emissions could impose significant additional costs on our electric and natural gas operations, our suppliers and ultimately, our customers.
Developing and implementing plans for compliance with GHG emissions reduction, clean/renewable energy requirements, or for achieving voluntary climate commitments can lead to additional capital and Operation and Maintenance (O&M) expenditures and could significantly affect the economic position of existing operations and proposed projects.
If our regulators do not allow us to recover all or a part of the cost of capital investment or the O&M costs incurred to comply with increasingly rigorous regulatory mandates, it could have a material adverse effect on our results of operations, financial condition or cash flows.
On the other hand, in the event that the political, policy, regulatory or legislative support for clean energy projects declines, the benefits or feasibility of certain investments we could potentially make may be reduced.
investments and our ability to meet our targets of net zero GHG emissions by 2030 for Scopes 1 and 2 emissions, or other GHG emissions reduction or climate-related goals that we may set from time to time, in a cost-effective manner or at all.
We are also exposed to the risk of pandemics, which could result in service disruptions and delays or otherwise impair our ability to timely provide service to our customers, complete our investment projects or obtain timely recovery of our costs.
specialty components.
vendors, regulators, RTOs and ISOs, among others.
An increasing demand for power and load growth, potentially compounded by a shift away from natural gas toward increased electrification could cause reliability issues and higher costs for customers, which could lead to potential pressure on fair and timely recovery of our investments and proposed programs.
Higher projected demand is driven by a number of factors, including data centers, reshoring manufacturing, port electrification, EV adoption, other electrification and a shift away from natural gas.
energy storage, fuel cells, and DR technologies.
Higher electric demand could significantly increase the prices of energy and capacity, as well as raise resource adequacy and reliability concerns within PJM, particularly if that increased demand outpaces the addition of firm generation capacity and in transmission constrained zones.
This resource adequacy challenge presents reliability concerns, as well as potential for increasing energy and capacity prices that could place pressure on customer bills, could attract political and regulatory scrutiny and increase regulatory uncertainty for utility investment initiatives and programs.
Additional funding requirements for our defined benefit plans could be
The OSA continues through 2025 and LIPA is currently conducting a process for provision of these services after 2025.
Advances in distributed generation technologies, such as fuel cells, micro turbines, micro grids, windmills and net-metered solar installations, coupled with subsidies, may reduce the cost of alternative methods of delivering electricity to customers to a level that is competitive with that of most central station electric production.
Large customers, such as universities and hospitals, continue to explore potential micro grid installation.
Certain states are also considering mandating the use of power storage resources to replace uneconomic or retiring generation facilities.
Further, a material shift away from natural gas due to customer preference or regulatory developments and initiatives could reduce the number of gas customers.
PSE&G also is pursuing a number of opportunities to expand its products and services to customers.
BPU approval is required for any new endeavor, and is not guaranteed.
Rejection or delay of such filings could have an adverse impact on our future growth, or our standing stakeholders.
Note 13.
Our business has been impacted by established rules that create locational capacity markets in PJM.
Under these rules, generators located in constrained areas are paid more for their capacity so there is an incentive to locate in those areas where generation capacity is most needed.
Further, some of the market-based mechanisms in which we participate are at times the subject of review or discussion by some of the participants in the New Jersey and federal arenas.
We can provide no assurance that these mechanisms will continue to exist in their current form, nor otherwise be modified.
We may also be unable to successfully recover certain
Actions by state and federal government agencies could also result in reduced reliance on natural gas and could potentially result in stranding natural gas assets owned and operated by PSE&G, which could materially adversely affect our business, financial condition and results of operations.
Note 13.
An excerpt. Shown here: 40 of 54 rewritten, all 23 added and all 33 removed. The counts are complete. For every sentence, read Item 1A. RISK FACTORS in the FY2025 filing and the FY2024 filing.
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A)
205 rewritten, 96 added, 90 removed, 385 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
PSE&G also invests in regulated solar generation projects and [added: regulated] energy efficiency (EE) and related programs in New Jersey, which are regulated by the BPU, and
The following discussion provides an overview of the significant events and business developments that have occurred during [removed: 2024] [added: 2025] and key factors that we expect may drive our future performance.
EXECUTIVE OVERVIEW OF [removed: 2024] [added: 2025] AND FUTURE OUTLOOK
Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business and realizing the value of the consistent and reliable [removed: carbon free] [added: carbon-free] generation from our nuclear units.
We are focused on investing to meet growing energy demand, modernize our energy infrastructure, improve reliability and resilience, increase EE [removed: and deliver clean energy] to meet customer expectations and be well aligned with public policy objectives.
With these investments and higher working capital recovery approved in the distribution rate case, our regulated rate base increased from approximately [removed: $30] [added: $34] billion as of December 31, [removed: 2023] [added: 2024] to approximately [removed: $34] [added: $36] billion as of December 31, [removed: 2024.][added: 2025.]
In addition, [removed: the passage of] [added: our nuclear facilities retain] the [removed: Inflation Reduction Act] [added: downside price protection] of [removed: 2022 (IRA) established] a production tax credit (PTC) [removed: for existing nuclear facilities] from 2024 through 2032.
For the years [removed: 2025-2029,] [added: 2026-2030,] our regulated capital investment program is estimated to be in a range of [removed: $21] [added: $22.5] billion to [removed: $24] [added: $25.5] billion.
We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of [removed: 6%] [added: 6.0%] to 7.5% from year-end [removed: 2024] [added: 2025] to year-end [removed: 2029.][added: 2030.]
The regulated capital investments represent the majority of PSEG’s total capital investment program of [removed: $22.5] [added: $24] billion to [removed: $26] [added: $28] billion.
The low end of the range includes an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future (CEF)-EE [removed: program at their current average annual investment levels plus inflation,] [added: program,] as these programs are expected to continue beyond their currently approved timeframes.
[removed: The] [added: Our] GSMP [added: II] program extension [removed: provides] [added: provided] for main replacement through December 2025 plus trailing services replacement and paving costs into 2026 [removed: and totals] [added: totaling] approximately $900 million of investment.
Of the $900 million, $750 million is recovered through three periodic rate [removed: updates] [added: adjustments] with the balance recovered through a future [removed: distribution] base rate case.
In October 2024, the BPU issued an Order approving the settlement of [removed: that] [added: PSE&G's distribution rate] case with new rates effective October 15, 2024.
The Order [removed: provides] [added: provided] for a $17.8 billion rate base, a 9.6% return on equity for PSE&G’s distribution business and a 55% equity component of its capitalization structure.
[removed: For additional information, see] [added: See] Item [removed: 8.][added: 1.]
Note [removed: 6.][added: 9.]
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through [added: hedging and] the PTC [removed: mechanism and hedging,] [added: mechanism,] and support public policies that preserve these existing carbon-free base load nuclear generating plants.
During [removed: 2024,] [added: 2025,] our nuclear units generated approximately [removed: 31] [added: 30.9] terawatt hours and operated at a capacity factor of [removed: approximately 90%.][added: 91.2%.]
[removed: Beginning in 2024, our] [added: Our] hedging strategy [removed: incorporated] [added: continues to incorporate] an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the [removed: phase out threshold.][added: level at which we would receive PTCs.]
As of December 31, [removed: 2024,] [added: 2025,] we expect that our [removed: hedged] [added: current portfolio] position for [removed: 2025 in conjunction with the PTC and market price variability] [added: 2026] will result in the realized value of our nuclear generation output being [removed: at, or above,] [added: above] the [removed: PTC phase out.][added: level at which we would receive PTCs.]
Our strategy will continue to evolve [removed: given] [added: taking into account energy market conditions,] PTC guidance uncertainty, and potential incremental changes upon [removed: final] [added: receiving] U.S. [removed: Treasury guidance.]
In addition, we [removed: are exploring] [added: continue to explore] opportunities for the potential sale of [removed: power] [added: power, capacity] and/or emission credits from our nuclear facilities pursuant to long-term agreements.
[removed: Today,] [added: We remain guided by] our vision [removed: is] to power a future where people use [removed: less energy,] [added: energy more efficiently,] and [removed: it is cleaner,] [added: it’s] safer and delivered more reliably than ever.
We have [removed: established a] [added: adjusted our] net zero greenhouse gas (GHG) emissions [removed: by 2030] goal that includes direct GHG emissions (Scope 1) and indirect GHG emissions from operations (Scope 2) across our business operations, [removed: assuming advances in technology, public policy and customer behavior,] which [removed: goal] supports New Jersey's clean energy and climate [removed: goals.][added: goals, from 2030 to 2050.]
[removed: PSE&G’s approved CEF-EE and] [added: PSE&G has undertaken a number of initiatives that support the reduction of GHG emissions, including our implementation of New Jersey's] EE [removed: II, CEF-Energy Cloud] and [removed: CEF-EV] [added: related] programs [removed: and the proposed CEF-ES program] [added: that] are intended to support New Jersey’s Energy Master Plan (EMP) and Gubernatorial Executive Orders through programs designed to help customers use energy more efficiently, reduce GHG emissions, support the expansion of the EV infrastructure in New Jersey, install energy storage capacity to supplement solar generation and enhance grid resiliency, install smart meters and supporting infrastructure to allow for the integration of other clean energy technologies and to more efficiently respond to weather and other outage events.
[removed: Through GSMP II, from] [added: From] 2018 through [removed: 2024] [added: 2025] we reduced reported methane emissions by over 30% system wide.
We also continue to focus on [removed: providing cleaner energy for our customers by] working to preserve the economic viability of our nuclear units, which provide over [removed: 85%] [added: 80%] of the carbon-free energy in New Jersey.
These efforts include reducing market risk by advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform and related generator interconnection policies at PJM Interconnection, L.L.C. (PJM) that recognize the value of our nuclear fleet’s carbon-free generation and its contribution to grid [removed: reliability,] [added: reliability] and [added: resource adequacy, and] potential long-term contracts that recognize the value of its consistent and reliable carbon-free energy.
Competitively Bid, FERC Regulated [removed: Transmission Projects][added: Transmission]
PSEG continues to evaluate [added: additional] investment opportunities in regulated [removed: transmission beyond PSE&G.][added: transmission.]
The financial results for PSEG, PSE&G and PSEG Power & Other for the years ended December 31, [removed: 2024] [added: 2025] and [removed: 2023] [added: 2024] are presented as follows:
| | | | [added: 2025 | | | |] 2024 | | | | 2023 | | | |
| | PSE&G | | $ | [added: 1,745 | | | $ |] 1,547 | | | $ | 1,515 | | |
| | PSEG Power & Other [added: (A)(B)] | | | [added: 366 | | | |] 225 | | | | 1,048 | | |
| | PSEG Net Income | | $ | [added: 2,111 | | | $ |] 1,772 | | | $ | 2,563 | | |
| | PSEG Net Income Per Share (Diluted) | | $ | [added: 4.22 | | | $ |] 3.54 | | | $ | 5.13 | | |
[removed: If] [added: However, certain regulatory or legislative actions could potentially lead to] the [added: loss of this] adder [removed: was] [added: which, if] eliminated, [removed: it] would [added: prospectively] reduce PSE&G’s annual Net Income and annual cash inflows by approximately $40 million.
In February 2023, the [added: previous] governor of New Jersey issued executive orders (EOs) that establish or accelerate previously established 2050 targets for clean-sourced energy, building decarbonization, and EV adoption goals, with new target dates of 2030 or 2035, as applicable.
In particular, the historic operations of PSEG companies and the operations of numerous other companies [removed: along] [added: within] the [removed: Passaic and Hackensack Rivers] [added: Newark Bay Complex] are alleged by federal and state agencies to have discharged substantial contamination into the [removed: Passaic River/Newark] [added: Newark] Bay Complex in violation of various statutes.
In November 2025, the BPU issued an Order approving PSE&G’s GSMP III program, authorizing $1.05 billion of capital investment to replace 525 miles of high pressure cast iron gas mains and unprotected steel mains, with cost recovery through three periodic rate adjustments as portions of the investment are put into service.
In that Order, the BPU also authorized $360 million of investment to replace an additional 75 miles of gas main, with cost recovery to be requested in a future base rate case.
Investment under the GSMP III program will begin in 2026 and continue through December 2028 plus trailing services replacement and paving costs into 2029.
In addition, the Order approved mechanisms beginning January 1, 2025 associated with the recovery of future storm costs as well as the recovery of annual pension and OPEB expenses.
Effective April 2025, PSEG Power revised the estimated useful lives for the Salem 1, Salem 2 and Hope Creek nuclear plants due to our expectation that a 20-year license extension will be approved for these facilities.
In October 2025, we completed work to extend the refueling cycle at our Hope Creek facility from 18 months to 24 months.
In addition, we are planning power uprates at Salem Units 1 and 2 that will increase generation capacity and reliability and support long-term operation of these units, including through a potential subsequent license renewal.
Treasury guidance.
Our investments remain focused on infrastructure modernization, energy efficiency, and supporting growing customer demand, as well as New Jersey's long-term energy goals.
Transition risks, including federal and/or state policy and regulation, technology availability and affordability, market demands, and customer needs likely will impact the pace of our net zero progress and our ability to achieve the 2050 goal.
However, based on the procedural timeline established by order of the Maryland Public Service Commission, we do not currently believe a 2027 in-service date for the project is reasonably achievable.
We are continuing to take all available steps to obtain approvals for timely project execution.
We cannot predict the outcome.
PSEG LI has been operating LIPA’s electric T&D system in Long Island, New York since 2014 under a 12-year OSA with LIPA that expired on December 31, 2025.
In 2025, a five year extension of the contract was approved.
A competitor in the contract bidding process filed litigation against LIPA challenging the process.
LIPA filed a motion to dismiss the competitor’s claim as untimely, which was granted by the New York Supreme Court in December 2025.
The competitor filed an appeal in January 2026.
| | | | 2025 | | | | 2024 | | | |
In November 2025 the BPU released the updated Energy Master Plan (EMP) that presents potential pathways toward meeting New Jersey’s clean energy and decarbonization goals.
Given the new administration took office in January 2026, it is not clear how the EMP might influence New Jersey’s energy policy and we cannot predict the impact on our business that might result.
The Newark Bay Complex is a tidal estuary in northern New Jersey that includes Newark Bay, as well as portions of the Passaic River, the Hackensack River and other surrounding waterways.
The U.S. Environmental Protection Agency (EPA) has designated various portions of the Newark Bay Complex as federal Superfund sites that must be investigated and remediated under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA).
In May 2025, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants zero emission certificate (ZEC) sales concluded.
Pursuant to a process established by the BPU, ZECs were purchased from these nuclear plants by the electric distribution companies (EDCs) in New Jersey.
Demand, Supply and Energy Costs
An increasing demand for power and a lack of sufficient new generation resources in PJM and in New Jersey, has raised resource adequacy concerns and has resulted in higher electricity costs for our customers in 2025.
Prices from the July 2024 PJM annual capacity market auction, which were approximately 10 times higher than prices from the 2023 auction and which impacted customer bills, provoked concern from state regulators and legislators and have created regulatory uncertainty.
Prices from the July 2025 capacity market auction were higher than those produced by the July 2024 auction and PJM indicated that the prices would have been even higher if not for the existence of a FERC-approved ceiling, which remained in effect for the December 2025 auction and which PJM has recently indicated it will seek to extend for two more auction cycles.
In January 2026, the White House’s National Energy Dominance Council signed an agreement with the governors of all 13 states in the PJM region that memorializes a “statement of principles” intended to prompt PJM to make major changes to its capacity market, including running a “reliability backstop auction” to procure new generation capacity to provide 15-year “price certainty”.
PJM has committed to run this backstop auction and is targeting a September 2026 date following FERC approval of all needed rule changes.
There are outstanding questions associated with this auction, including whether the procurement costs will be disproportionately allocated to zones where demand exceeds supply.
In addition, in 2025, FERC both issued an order that will encourage optionality for “large load” customers like data centers by facilitating co-location with generation, and initiated a rulemaking to establish definitive rules for future large customer connections intended to ensure reliability and address resource adequacy concerns.
Business—Regulatory Issues—Federal Regulation.
As a result of the capacity market price increases, the costs of which are flowed through to customers, and per direction to EDCs from the BPU, PSE&G filed a petition in May 2025 that provided proposals to mitigate bill impacts to customers.
In June 2025, the BPU approved a settlement under which PSE&G applied a credit to each residential electric customer’s monthly bill for July 2025 and August 2025, with the offset being charged on monthly bills for September 2025 through February 2026.
PSE&G agreed to waive carrying costs on the outstanding credit amount.
In addition, PSE&G agreed to: extend protections precluding the shut-off of eligible residential customers, normally available during the winter months, to the period from July 1, 2025 through September 30, 2025; offer residential customers deferred payment arrangements with terms of up to twenty-four months for the payment of overdue billed amounts; and waive all reconnection fees for residential customers during the period from July 1, 2025 through September 30, 2025.
In September 2025, the New Jersey Legislature enacted a law prohibiting disconnection for non-payment during the period June 15 through August 31, beginning in 2026, and for such period annually thereafter, for certain qualified electric and gas customers.
This new requirement for a summer shutoff moratorium and the extended deferred payment arrangements have increased our Accounts Receivable and bad debt expense in 2025 with potential additional increases in the future.
The PTC is designed to provide downside price protection for our nuclear generation fleet as the tax credit value is directly linked to a nuclear facility’s gross receipts.
A remaining component of our CEF-Electric Vehicle (EV) program related to medium- and heavy-duty charging infrastructure has been the subject of a stakeholder process that the BPU began in 2021.
In October 2024, the BPU released an Order that provided program guidance and minimum filing requirements for electric utility operated medium- and heavy-duty charging incentive programs.
The Order provides for PSE&G’s program investment up to $30 million and requires electric utilities to submit program filings by February 2025.
In November 2024, the BPU released an updated draft Storage Incentive Program proposal.
Our proposed CEF-Energy Storage (ES) program for a $109 million investment is being held in abeyance until the BPU concludes its proceedings.
In 2023, the BPU also approved a two-year extension of our current GSMP program to replace at least 400 miles of cast iron and unprotected steel mains and services in our gas system.
Pursuant to that settlement, we commenced extension discussions for our GSMP program in January 2025 with the intent of beginning a new program in January 2026.
Pursuant to our GSMP II and Energy Strong II programs, PSE&G filed a distribution base rate case as required by the BPU.
Regulatory Assets and Liabilities.
For more than a century, our purpose has been to provide safe access to an around-the-clock supply of reliable, affordable energy.
PSE&G has undertaken a number of initiatives that support the reduction of GHG emissions, including our implementation of New Jersey's EE program.
PJM has directed that the project be placed in service in 2027.
In April 2024, PSE&G submitted bids to the BPU for what the BPU has termed the Pre-Build Infrastructure (PBI) project, which is a combination of onshore and near-shore underwater infrastructure.
It is unclear when the BPU may take action on this initiative, or parallel processes it has considered for transmission projects to support New Jersey’s offshore wind goal.
In 2024, LIPA issued requests for two proposals - one for a service provider to operate its electrical transmission and distribution system and one for power supply and fuel management services, both of which are currently performed under contracts with PSEG that run through December 31, 2025.
PSEG is negotiating its proposal with LIPA to continue as operations service provider for LIPA’s electrical transmission and distribution system, though the outcome of this process is uncertain.
LIPA has selected another party for the power supply and fuel management services contract which will not have a material impact on PSEG's results of operations.
In April 2021, FERC proposed eliminating this ROE adder for Regional Transmission Owner participation.
FERC has not acted on the proposal.
The EOs direct the BPU and other state agencies to collaborate with stakeholders to develop plans to reach the targets and the BPU has convened a stakeholder proceeding to develop a plan for gas distribution utilities to reach the target of 50% natural gas emissions reductions over 2006 levels by 2030.
The BPU commenced proceedings to update the State’s EMP via public input hearings in May and June 2024.
We are unable to predict the outcomes of this proceeding, but it could have a material impact on our business, results of operations and cash flows.
Commitments and Contingent Liabilities.
In April 2021, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded zero emission certificates (ZECs) for the three-year eligibility period starting June 2022 at the same approximate $10 per megawatt hour (MWh) received during the prior ZEC period through May 2025.
Pursuant to a process established by the BPU, ZECs are purchased
from selected nuclear plants and recovered through a non-bypassable distribution charge in the amount of $0.004 per kilowatt-hour used (which is equivalent to approximately $10 per MWh generated in payments to selected nuclear plants (ZEC payment)).
As previously noted, in August 2022, the IRA was signed into law expanding incentives promoting carbon-free generation.
As of December 31, 2024, PSEG had entered into floating-to-fixed interest rate hedges totaling $1.25 billion through March 2025 in order to reduce the volatility in interest expense related to PSEG Power’s variable rate term loan due June 2025.
In addition, from time to time, we may enter into interest rate hedges to fix a portion of our interest rate exposure for anticipated long-term financing plans at PSEG and PSEG Power.
The impact, if any, that this may have on PSEG and PSE&G’s financial statements has not yet been determined.
PSEG Power & Other results in 2022 include after-tax impairments of $92 million related to certain Energy Holdings investments and additional adjustments related to the sale of PSEG Power’s fossil generation assets.
See Item 8.
Asset Dispositions and Impairments for additional information.
See Item 8.
the pension settlement charge in 2023 (see Item 8.
Note 24.
| | Operation and Maintenance (A) | | | 3,356 | | | | 3,150 | | | | 3,178 | | | | 206 | | | | 7 | | | | (28 | ) | | | (1 | ) | |
| | Losses on Asset Dispositions and Impairments | | | 6 | | | | 7 | | | | 123 | | | | (1 | ) | | | (14 | ) | | | (116 | ) | | | (94 | ) | |
| | Income from Equity Method Investments | | | 1 | | | | 1 | | | | 14 | | | | — | | | | — | | | | (13 | ) | | | (93 | ) | |
An excerpt. Shown here: 40 of 205 rewritten, 40 of 96 added and 40 of 90 removed. The counts are complete. For every sentence, read Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A) in the FY2025 filing and the FY2024 filing.
Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
15 rewritten, 2 added, 3 removed, 38 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
| | Period End | | $ | [removed: 36] [added: 63] | | | $ | [removed: 48] [added: 36] | | |
| | Average for the Period | | $ | [removed: 44] [added: 41] | | | $ | [removed: 56] [added: 44] | | |
| | High | | $ | [removed: 152] [added: 71] | | | $ | [removed: 127] [added: 152] | | |
| | Low | | $ | [removed: 25] [added: 17] | | | $ | [removed: 24] [added: 25] | | |
| | Period End | | $ | [removed: 57] [added: 99] | | | $ | [removed: 75] [added: 57] | | |
| | Average for the Period | | $ | [removed: 69] [added: 64] | | | $ | [removed: 87] [added: 69] | | |
| | High | | $ | [removed: 238] [added: 111] | | | $ | [removed: 198] [added: 238] | | |
| | Low | | $ | [removed: 39] [added: 27] | | | $ | [removed: 38] [added: 39] | | |
Exposure to this risk is managed by targeting a balanced debt maturity profile which limits refinancing in any given period or [added: interest rate environment.]
As of December 31, [removed: 2024,] [added: 2025,] a hypothetical 10% increase in market interest rates would result in an additional [removed: $4] [added: $1] million in pre-tax annual interest costs related to either the current or the long-term portion of long-term debt, and term loan agreements.
As of December 31, [removed: 2024,] [added: 2025,] we had [removed: $4.4] [added: $4.8] billion of net assets in trust for our pension and OPEB plans.
As of December 31, [removed: 2024,] [added: 2025,] the portfolio included [removed: $1.4] [added: $1.5] billion of equity securities inclusive of $0.3 billion of investments in listed real assets, and [removed: $1.3] [added: $1.4] billion in fixed income securities.
As of December 31, [removed: 2024,] [added: 2025,] a hypothetical 10% change in the equity market would impact the value of the equity securities in the NDT Fund by approximately [removed: $138] [added: $155] million.
The benchmark for the fixed income component of the NDT Fund currently has a duration of [removed: 6.08] [added: 5.98] years and a yield of [removed: 4.91%.][added: 4.32%.]
As of December 31, [removed: 2024,] [added: 2025,] a hypothetical 1% increase in interest rates would result in a decline in the market value for the fixed income portfolio of approximately [removed: $77] [added: $81] million.
| | | | 2025 | | | | 2024 | | | |
Note 15.
| | | | 2024 | | | | 2023 | | | |
Note 16.
interest rate environment.
Item 1. BUSINESS
83 rewritten, 66 added, 91 removed, 385 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
[removed: ][added: ]
MD&A—Executive Overview of [removed: 2024] [added: 2025] and Future Outlook for additional information.
The Order [removed: provides] [added: provided] for a $17.8 billion rate base, a 9.6% return on equity for PSE&G’s distribution business and a 55% equity component of its capitalization structure.
Note [removed: 6.][added: 5.]
MD&A—Executive Overview of [removed: 2024] [added: 2025] and Future Outlook.
Our load requirements are split among commercial, residential and industrial customers, as shown in the following table for [removed: 2024:][added: 2025:]
Our customer base has modestly increased since [removed: 2020,] [added: 2021,] with electric and gas loads changing as illustrated in the following table:
| | | | [removed: Number of Customers] [added: Customers] as of December 31, [removed: 2024] [added: 2025] | | Historical Annual Customer Growth [removed: 2020-2024] [added: 2021-2025] | | Electric Sales and Firm Gas Sales for the Year Ended December 31, [removed: 2024] [added: 2025] (A) | | Historical Annual Load [removed: Decline 2020-2024] [added: Increase 2021-2025] | |
| | Electric | | 2.4 [removed: Million] [added: million] | | 0.9% | | [removed: 40,651] [added: 40,561] Gigawatt [removed: hours] [added: Hours] | | [removed: —] [added: 0.4%] | |
| | Gas | | 1.9 [removed: Million] [added: million] | | 0.7% | | [removed: 2,371] [added: 2,633] Million Therms | | [removed: (1.7)%] [added: 2.1%] | |
As a result, electric [added: and] gas sales volumes and demands are no longer a driver of our margin and over 90% of our Electric and Gas Distribution margin will only vary based upon the number of customers.
| | CEF-EE | | [removed: $1] [added: $1.6] billion | | 2020 | | 5 years | (A) | | 2020 | |
| | [removed: Gas System Modernization Program] [added: GSMP] II [removed: (GSMP II)] Extension | | $902 million | | 2023 | | 2 years | (C) | | 2024 | |
The program has a small amount of trailing costs expected to be spent in year [removed: 5.][added: 4.]
MD&A—Executive Overview of [removed: 2024] [added: 2025] and Future Outlook for additional information.
Note [removed: 13.][added: 7.]
These products and services may also be [removed: transacted] [added: hedged] through exchange markets or bilaterally.
PSEG Power’s nuclear plants are [removed: expected] [added: eligible] to benefit from the PTC.
As of December 31, [removed: 2024,] [added: 2025,] PSEG Power had 3,758 MW of nuclear generation capacity.
MD&A—Executive Overview of [removed: 2024] [added: 2025] and Future Outlook and Item 8.
Note [removed: 13.][added: 5.]
Our nuclear generating units’ [removed: performance,] [added: performance and] market prices [removed: and the PTC,] have a considerable effect on our profitability.
The PTC is designed to increase with inflation, and therefore, future inflation levels will impact the [added: potential] financial support [removed: of the] [added: for our] nuclear units.
In addition, market revenues in excess of the PTC threshold [removed: would] provide [added: opportunity for] incremental benefit.
PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants [removed: have] [added: were] also [removed: been] awarded zero emission certificates (ZECs) by the BPU through May 2025.
These nuclear plants [removed: are expected to receive] [added: received] ZEC revenue from the electric distribution companies (EDCs) in New Jersey, which [removed: is] [added: was] equivalent to approximately $10/MWh.
[added: ZEC revenue recorded was reduced by the] estimated [removed: production tax credits (PTCs)] [added: PTCs] generated from PSEG Power’s Salem 1, Salem 2, and Hope Creek nuclear plants.
[removed: ZEC revenue will be adjusted based upon] the actual amount of the PTCs when guidance is issued on how to calculate gross receipts and that adjustment could be material.
[removed: The] [added: Our hedging strategy also considers the risk reduction impact of the PTC, as the] PTC is intended to provide sufficient and stable support for nuclear [removed: units and was effective January 2024.][added: units.]
We historically have sold a portion of our anticipated generation over a multi-year forward horizon, normally over a period of [removed: two] [added: up] to three [removed: years.][added: years, while also retaining the flexibility to add hedges for longer terms if market conditions are favorable.]
[removed: Beginning in 2024, our] [added: Our] hedging strategy has incorporated an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the [removed: phase out threshold.][added: level at which we would receive PTCs.]
As of December 31, [removed: 2024,] [added: 2025,] we expect that our [removed: hedged] [added: current portfolio] position for [removed: 2025 in conjunction with the PTC and market price variability] [added: 2026] will result in the realized value of our nuclear generation output being [removed: at, or above,] [added: above] the [removed: PTC phase out.][added: level at which we would receive PTCs.]
Our strategy [removed: will] [added: may] continue to evolve [removed: given] [added: taking into account energy market conditions,] PTC guidance uncertainty, and potential incremental changes upon [removed: final] [added: receiving] U.S. Treasury guidance.
Generally, we seek to hedge the financial risks of our generation through sales at PJM West or other nodes corresponding to our [added: nuclear] generation portfolio.
Our hedging practices help to manage some of the volatility of the nuclear generation business when forward prices are greater than the [removed: PTC threshold.][added: level at which we would receive PTCs.]
PSEG LI has been operating LIPA’s electric T&D system in Long Island, New York since 2014 under a 12-year OSA with LIPA that [removed: expires] [added: expired] on December 31, 2025.
Competitively Bid, FERC Regulated [removed: Transmission Projects][added: Transmission]
PSEG continues to evaluate investment opportunities in regulated [removed: transmission beyond PSE&G.][added: transmission.]
MD&A— Executive Overview of [removed: 2024] [added: 2025] and Future Outlook.
Note [removed: 8.][added: 12.]
Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business and realizing the value of the consistent and reliable carbon-free generation from our nuclear units.
PSEG Power earns revenues primarily by selling energy and capacity from its nuclear generation units and from the sale of wholesale natural gas through a full-requirements contract with PSE&G.
PSEG Power also enters into bilateral contracts for energy, gas and other energy-related contracts to optimize the value of its portfolio of generating assets and its gas supply obligations.
| | | | % of 2025 Sales | | | | | | | |
| | Gas System Modernization Program (GSMP) III | | $1.4 billion | | 2025 | | 3 years | (B) | | 2026 | |
This project was completed in 2024.
GSMP III—designed to replace at least 600 miles of cast iron and unprotected steel mains and services in our gas system.
PSEG did not record any PTCs for any of its nuclear units in 2025 as gross receipts exceeded the level at which we would receive PTCs.
However, the PTC continues to provide a benefit to our nuclear units by helping to mitigate the exposure to potential downside market volatility.
ZEC revenue will be adjusted based upon
In 2025, a five year extension of the contract was approved.
A competitor in the contract bidding process filed litigation against LIPA challenging the process.
LIPA filed a motion to dismiss the competitor’s claim as untimely, which was granted by the New York Supreme Court in December 2025.
The competitor filed an appeal in January 2026.
However, based on the procedural timeline established by order of the Maryland Public Service Commission, we do not currently believe a 2027 in-service date for the project is reasonably achievable.
We are continuing to take all available steps to obtain approvals for timely project execution.
We cannot predict the outcome.
Further, technological advances could impact the rate of growth of our gas and electric T&D businesses.
We seek to offer opportunities that
Note 12.
This order requires transmission providers like PJM to engage in long-term regional planning of not less than 20 years.
It also requires certain reforms to the local planning process, including enhancing the transparency of that process and evaluating whether local transmission facilities that need replacing can be “right-sized” to meet broader regional needs.
In December 2025, both PJM and its Transmission Owners made compliance filings at FERC seeking to implement the Final Rule’s requirements, including establishing a comprehensive set of long-term transmission needs based on a 20-year planning horizon, providing a role for the states in identifying needs and solutions, and establishing procedures for identifying and planning “right-sized” replacement facilities.
If approved by FERC, these changes will provide a regulatory framework for the planning of transmission infrastructure to help address resource adequacy challenges in PJM.
Separately, the PJM Transmission Owners, including PSE&G, are working with the states to develop cost allocation rules to decide who will pay for these long-term transmission facilities, with a FERC filing to be made later in 2026.
At the end of 2025, PSEG filed an updated market power analysis.
FERC denied rehearing of this order in June 2025 and in August 2025 accepted a PJM filing that establishes a June 1, 2026 date for elimination of reactive power compensation.
In August 2025, PSEG sought judicial review of FERC’s decision.
This appeal is pending and we cannot predict the outcome.
In addition, there are ongoing proceedings at FERC that may impact the interconnection of large loads such as data centers to the power grid, including addressing the issue of what transmission services and charges should be paid by future co-located customers.
In December 2025, FERC issued an order in this proceeding finding the PJM tariff to be unjust and unreasonable, directing PJM to file tariff revisions to reflect new types of transmission services that will be made available to co-located loads and establishing a paper hearing to set the appropriate level of charges to be paid by co-located load customers.
Relatedly, in October 2025, in response to a directive by the Secretary of Energy, FERC initiated a rulemaking proceeding to establish rules by the end of April 2026 to facilitate the interconnection of large load customers to the transmission system through a queue process.
Over the past few years, RPM has been under considerable scrutiny at both the federal and state level as clearing prices in the capacity auctions have reached unprecedented levels and there is growing concern that the capacity market is not procuring sufficient generation to meet increasing demand for electricity.
In PJM’s most recent capacity auction run in December 2025, the auction cleared at the FERC-approved price cap of $333.44/MW-day, and PJM indicated that without the price cap the clearing price would have been $529.80/MW-day.
Furthermore, for the first time, PJM was unable to procure enough generation to meet its reliability requirement, which incorporates a 20% reserve margin to meet demand during times of system stress.
In fact, PJM fell 6,625 MW short of meeting this reliability requirement.
In January 2026, the White House’s National Energy Dominance Council and governors from all 13 states in PJM signed an agreement urging PJM to expeditiously reform its capacity market to ensure reliability and lower costs to consumers.
Specifically, the agreement seeks to provide “15 year price certainty,” which may be accomplished by having PJM conduct a reliability backstop auction to procure new generation capacity.
The agreement also supports an extension of the existing price collar for two more Base Residual Auctions, which PJM has recently indicated it supports.
Over the next few months, PJM will be developing rules that will enable it to run such an auction in September 2026 following FERC approval of rules changes.
Over the past several years, we have simplified our business mix and focused our capital allocation towards PSE&G, resulting in the majority of earnings being contributed by PSE&G and providing us more predictability of earnings.
PSEG Power earns revenues from its nuclear generation and marketing of power and natural gas to hedge business risks and the value of its portfolio of nuclear power plants, other contractual arrangements and gas storage facilities.
In February 2022, we completed the sale of our 6,750 megawatt (MW) fossil generation portfolio which represented an important milestone in our strategy.
| | | | % of 2024 Sales | | | | | | | |
(A)
| | CEF-EE Extension | | $280 million | | 2023 | | 9 months | | | 2023 | |
| | CEF-EE Extension II | | $300 million | | 2024 | | 6 months | | | 2024 | |
| | Energy Strong II Program | | $842 million | | 2019 | | 4 years | (B) | | 2019 | |
Energy Strong II Program—structured to harden, modernize and improve the resiliency of our electric and gas distribution systems.
Generation Dispatch
The PTC is expected to mitigate our downside exposure to this volatility and provide support for the nuclear units.
ZEC revenue recorded is reduced by the
The expected PTC rate is up to $15/MWh subject to adjustment based upon a facility’s gross receipts.
While this limits our exposure to decreasing prices, our ability to realize benefits from rising market prices is also limited.
Our nuclear fuel commitments cover approximately 100% of our estimated uranium, enrichment and fabrication requirements through 2027 and a significant portion through 2028.
PSEG is participating in a process to continue as operations service provider for LIPA’s electrical transmission and distribution system, with resolution expected in the first half of 2025.
It is uncertain whether the OSA will be renewed.
See Item 8.
Energy Holdings also owns 50% of Garden State Offshore Energy LLC (GSOE) which holds rights to an offshore wind lease area just south of New Jersey.
We are evaluating our options for the potential sale of our interest in GSOE.
Further rate regulated recovery methods, such as net metered generation and/or changes in customer usage behavior could lead to a reduction in billed customer usage to recover our costs, resulting in higher rates overall.
Conversely, an increase in EV adoption and other factors could lead to an increase in system usage, require incremental investments to meet higher peak demands and result in a larger customer usage base.
There could also be a shift toward greater electrification and less gas usage in the coming decades.
While current costs and relative emission savings would limit any substantial change in the near term, technological advances for heat pumps, actions by certain jurisdictions in our service territory and other factors could drive these potential changes, which could result in a slowing in the growth of our gas distribution and an increase in the growth of our electric T&D business.
Our CIP reduces the impact on our distribution revenues from changes in sales volumes and demand for most customers.
The CIP, which is calculated annually, provides for a true-up of our current period revenue as compared to revenue thresholds established in our most recent
distribution base rate proceeding.
Recovery under the CIP is subject to certain limitations, including an actual versus allowed ROE test and ceilings on customer rate increases.
Note 13.
over such public utilities.
Transmission Planning Proceedings—Through rulemaking proceedings, FERC continues to determine whether changes are needed to current transmission and interconnection planning rules to facilitate the integration of renewable resources onto the grid.
FERC is also examining whether there is sufficient oversight over transmission costs to protect customers.
Among other issues, FERC is considering whether transmission competitive solicitations are working as intended, whether interconnection queue rules for new generation should dramatically change and whether some type of transmission monitor construct to oversee costs should be imposed.
On the interconnection front, in July 2023, FERC issued a Final Rule, which parties have challenged on rehearing, that will require RTOs to implement rules to speed up the processing of interconnection queue requests.
This rule may also result in penalties being imposed on generators, RTOs and transmission owners that fail to meet certain process deadlines.
In December 2024, PJM submitted proposed revisions to the PJM Tariff to provide for a reliability based expansion of the interconnection queue window so that a limited number of additional generating resources (50 projects) needed to address PJM’s reliability challenges can be added to this interconnection cycle.
FERC accepted this proposal in February 2025, which will allow PJM to accelerate the interconnection of new, "shovel-ready" generation capacity resources and may facilitate PSEG's plan to implement power uprates for both Salem Unit 1 and Unit 2.
As a result of this rule, RTOs like PJM will be required to engage in 20-year transmission planning, applying certain scenarios to the planning process.
FERC also reinstated the Right of First Refusal for a discrete category of transmission projects.
On rehearing, FERC expanded the states' role in the process for determining how transmission costs will be allocated to various sets of customers.
An excerpt. Shown here: 40 of 83 rewritten, 40 of 66 added and 40 of 91 removed. The counts are complete. For every sentence, read Item 1. BUSINESS in the FY2025 filing and the FY2024 filing.
Item 3. LEGAL PROCEEDINGS
0 rewritten, 1 added, 1 removed, 4 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
Note 12.
Note 13.
Cover and table of contents
47 rewritten, 2 added, 2 removed, 154 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
FOR THE FISCAL YEAR ENDED December [removed: 31, 2024][added: 31, 2025]
The aggregate market value of the Common Stock of Public Service Enterprise Group Incorporated held by non-affiliates as of June 30, [removed: 2024] [added: 2025] was [removed: $36,632,552,572] [added: $41,911,658,020] based upon the New York Stock Exchange Composite Transaction closing price.
The number of shares outstanding of Public Service Enterprise Group Incorporated’s sole class of Common Stock as of February [removed: 21, 2025] [added: 20, 2026] was [removed: 498,561,467.][added: 498,739,910.]
As of February [removed: 21, 2025,] [added: 20, 2026,] Public Service Electric and Gas Company had issued and outstanding 132,450,344 shares of Common Stock, without nominal or par value, all of which were held, beneficially and of record, by Public Service Enterprise Group Incorporated.
| III | | Portions of the definitive Proxy Statement for the [removed: 2025] [added: 2026] Annual Meeting of Stockholders of Public Service Enterprise Group Incorporated, which definitive Proxy Statement is expected to be filed with the Securities and Exchange Commission on or about March [removed: 13, 2025,] [added: 12, 2026,] as specified herein. |
| Item 1C. | [Cybersecurity](#item_1c_cybersecurity) | | [removed: 34] [added: 33] |
| Item 6. | [\[Reserved\]](#item_6_reserved) | | [removed: 39] [added: 40] |
| Item 7. | [Management’s Discussion and Analysis of Financial Condition and Results of Operations](#mda) | | [removed: 40] [added: 41] |
| | [Executive Overview of [removed: 2024] [added: 2025] and Future Outlook](#executive_overview_of_2023_and_future) | | [removed: 40] [added: 41] |
| | [Results of Operations](#results_of_operations) | | [removed: 46] [added: 48] |
| | [Liquidity and Capital Resources](#liquidity_and_capital_resources) | | [removed: 51] [added: 53] |
| | [Capital Requirements](#capital_requirements) | | [removed: 55] [added: 57] |
| | [Critical Accounting Estimates](#critical_accounting_estimates) | | [removed: 57] [added: 59] |
| Item 7A. | [Quantitative and Qualitative Disclosures About Market Risk](#item_7a_quantitative_and_qualitative) | | [removed: 62] [added: 64] |
| Item 8. | [Financial Statements and Supplementary Data](#item_8_financial_stmt_and_supplementary) | | [removed: 63] [added: 65] |
| | [Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)](#report) | | [removed: 64] [added: 66] |
| | [Consolidated Financial Statements](#consolidated_statements_of_operations) | | [removed: 68] [added: 70] |
| | [Note 1. Organization, Basis of Presentation and Summary of Significant Accounting Policies](#note_1) | | [removed: 80] [added: 82] |
| | [Note 2. Revenues](#note_2_revenues) | | [removed: 86] [added: 88] |
| | [Note [removed: 4.] [added: 3.] Variable Interest Entity (VIE)](#note_4) | | [removed: 91] [added: 93] |
| | [Note [removed: 5.] [added: 4.] Property, Plant and Equipment and Jointly-Owned Facilities](#note_5) | | [removed: 92] [added: 93] |
| | [Note [removed: 6.] [added: 5.] Regulatory Assets and Liabilities](#note_6) | | [removed: 93] [added: 94] |
| | [Note [removed: 7.] [added: 6.] Leases](#note_7_leases) | | [removed: 98] [added: 99] |
| | [Note [removed: 8.] [added: 7.] Long-Term Investments](#note_8) | | [removed: 102] [added: 103] |
| | [Note [removed: 9.] [added: 8.] Financing Receivables](#note_9) | | [removed: 103] [added: 104] |
| | [Note [removed: 10.] [added: 9.] Trust Investments](#note_10) | | [removed: 104] [added: 105] |
| | [Note [removed: 11.] [added: 10.] Asset Retirement Obligations (AROs)](#note_11) | | 111 |
| | [Note [removed: 12.] [added: 11.] Pension, Other Postretirement Benefits (OPEB) and Savings Plans](#note_12) | | 112 |
| | [Note [removed: 13.] [added: 12.] Commitments and Contingent Liabilities](#note_13) | | 122 |
| | [Note [removed: 14.] [added: 13.] Debt and Credit Facilities](#note_14) | | [removed: 129] [added: 128] |
| | [Note [removed: 15.] [added: 14.] Schedule of Consolidated Capital Stock](#note_15) | | 133 |
| | [Note [removed: 16.] [added: 15.] Financial Risk Management Activities](#note_16) | | [removed: 134] [added: 133] |
| | [Note [removed: 17.] [added: 16.] Fair Value Measurements](#note_17) | | [removed: 138] [added: 137] |
| | [Note [removed: 18.] [added: 17.] Stock Based Compensation](#note_18) | | 141 |
| | [Note [removed: 19.] [added: 18.] Net Other Income (Deductions)](#note_19) | | [removed: 145] [added: 144] |
| | [Note [removed: 20.] [added: 19.] Income Taxes](#note20) | | [removed: 146] [added: 145] |
| | [Note [removed: 21.] [added: 20.] Accumulated Other Comprehensive Income (Loss), Net of Tax](#note_21) | | [removed: 152] [added: 151] |
| | [Note [removed: 22.] [added: 21.] Earnings Per Share (EPS) and Dividends](#note_22) | | [removed: 154] [added: 153] |
| | [Note [removed: 23.] [added: 22.] Financial Information by Business Segment](#note_23) | | [removed: 155] [added: 154] |
| | [Note [removed: 24.] [added: 23.] Related-Party Transactions](#note_24) | | [removed: 158] [added: 157] |
significant resource adequacy challenges that present affordability and reliability concerns and that could cause policymakers to implement responsive measures that could have a material, adverse impact on our business, strategy, growth rates, cash flows, results of operation, and financial condition and increase regulatory uncertainty for utility investment initiatives and programs;
risks associated with generation activities at, and operation of, the Peach Bottom plants, which are similar to those to which nuclear generation plants that we operate are subject;
| | [Note 3. Asset Dispositions and Impairments](#note_3_asset_dispositions) | | 91 |
an increasing demand for power and load growth, potentially compounded by a shift away from natural gas toward increased electrification;
An excerpt. Shown here: 40 of 47 rewritten, all 2 added and all 2 removed. The counts are complete. For every sentence, read Cover and table of contents in the FY2025 filing and the FY2024 filing.
Item 1B. UNRESOLVED STAFF COMMENTS
0 rewritten, 0 added, 1 removed, 2 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
[Table of Contents](#toc_page)
Item 1C. CYBERSECURITY
32 rewritten, 6 added, 3 removed, 40 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
To reduce the likelihood and severity of cybersecurity incidents, we [removed: established] [added: maintain] a comprehensive cybersecurity program designed to protect and preserve the confidentiality, [removed: integrity] [added: integrity,] and availability of our technology systems and business [removed: operations more broadly.][added: operations.]
For a discussion of [removed: the risks associated with] cybersecurity [removed: threats,] [added: risks,] see Item 1A.
Ongoing [removed: Assessment—The Cybersecurity department,] [added: Assessment—Cybersecurity,] led by the VP, Chief Information Security Officer (CISO), [removed: and] reporting to the SVP, Chief Information and Digital Officer [removed: (CIDO)] [added: (CIDO),] is staffed with cyber professionals [removed: tasked with the day-to-day responsibility of assessing] [added: who assess] material risks from cybersecurity threats.
In addition, the Cybersecurity Council, comprised of senior management, is kept apprised of [removed: the state of] PSEG’s cybersecurity program, including any emerging risks, and provides guidance on the strategic [removed: directions] [added: direction] of the program.
Engagement of Nth [removed: Parties—We] [added: Parties—We] engage Nth parties (third parties and other business relationships, including fourth parties, etc.), such as cybersecurity service providers, risk management firms, and external legal counsel, to assess [removed: material risks from cybersecurity threats and assess our internal incident response preparedness and cyber posture, support incident response, conduct tabletop exercises, and comply with applicable laws and regulations.]
Regulatory agencies, [removed: including] [added: including,] but not limited [removed: to] [added: to,] the [removed: NRC and] [added: NRC,] Transportation Security Administration (TSA), [removed: as well as] [added: and] NERC, inspect applicable components of our cybersecurity program.
Nth-Party Service Provider [removed: Management—We] [added: Management—We] maintain processes to oversee and identify risks from cybersecurity threats associated with our use of Nth-party service [removed: providers.][added: providers, including a risk-based vendor management program, which incorporates cybersecurity contractual provisions, vendor security assessments and, if appropriate, periodic audits.]
Technical [removed: Safeguards—We] [added: Safeguards—We] manage controls to protect our network perimeter, internal [removed: IT] [added: IT,] and Operational Technology (OT) environments, [removed: such as] [added: including] internal and external firewalls, network intrusion detection and [removed: prevention,] [added: prevention tools,] penetration testing, vulnerability assessments, threat intelligence, endpoint [removed: security] [added: security,] and access controls.
Training and [removed: Awareness—We] [added: Awareness—We] provide mandatory annual cybersecurity training [removed: for] [added: to] all personnel with network access, and additional education [removed: for] [added: to] personnel with access to industrial control systems and/or customer information [removed: systems; and conduct phishing exercises with progressive consequences for failures.][added: systems.]
[removed: Employees] [added: We] also [removed: receive] [added: share] periodic cybersecurity awareness messages and each year, in recognition of Cybersecurity Awareness Month, [removed: are invited to] [added: we host] presentations [removed: throughout October] from internal and external cyber experts [removed: covering] [added: on] diverse cyber topics.
These efforts better enable [removed: all employees] [added: those with network access] to identify potential cybersecurity risks and escalate them appropriately.
Incident Response [removed: Plans—We] [added: Plans—We] maintain and periodically update a cyber incident response plan that [removed: addresses the life cycle of a cybersecurity incident from a] [added: covers] technical [removed: perspective] (i.e., detection, response, and [removed: recovery),] [added: recovery)] and [removed: a data breach response plan (with a focus on] [added: collaborative (i.e.] external communication/disclosure and legal [removed: compliance);] [added: compliance) aspects of cyber incident] and [added: breach response; and] conduct [removed: regular] tabletop exercises to test plan effectiveness (both internally and through external exercises).
Mobile Security—We maintain controls to prevent loss of data through mobile [removed: device channels.][added: devices.]
Physical Security—We [removed: also] maintain physical security measures to protect our OT systems, consistent with a defense in-depth and risk-tiered approach.
Physical security measures may include access control systems, video surveillance, around-the-clock command center monitoring, and physical barriers [removed: (such as] [added: (e.g.] fencing, walls, and bollards).
The ERM team, led by the SVP, Audit, Enterprise, Risk and Compliance (AERC) considers cybersecurity risks alongside other PSEG risks, and facilitates discussion [added: with PSEG subject matter experts to identify cybersecurity risks, evaluate their potential severity and likelihood, identify mitigations, including those identified above, and assess the impact of those mitigations on residual risk.]
To date, there has been no material impact or reasonably likely material impact on our business strategy, results of operations or financial condition from cybersecurity attacks or [removed: incidents, including as a result of prior cybersecurity] incidents.
PSEG Board—The PSEG Board has ultimate responsibility for the oversight of risk management at PSEG, overseeing PSEG’s risk management program and reviewing the most significant risks facing PSEG, including [removed: cybersecurity risks.]
Through this process, cybersecurity [removed: risk is] [added: risks are] mapped primarily to the Board’s Industrial Operations Committee (IOC), and also the Audit Committee.
In providing oversight of risks from cybersecurity threats, the Board is informed of cybersecurity incidents as appropriate, by way of updates from Senior Management, pursuant to PSEG’s Cybersecurity [removed: Event Escalation and] Incident Response [removed: Practice,] [added: Plan,] as administered by the CISO.
IOC—At the PSEG Board level, the IOC holds the primary responsibility, as enumerated in its charter, [removed: of] [added: for] overseeing PSEG’s cybersecurity program and assessing overall compliance through active, independent and critical oversight.
The IOC is informed [removed: about] [added: of] cybersecurity risks by the CIDO and/or the CISO, during the IOC’s four regularly scheduled meetings per year, which each include cybersecurity as a standing agenda item.
Audit Committee—The Audit Committee [removed: has the charter responsibility of] [added: is responsible for] overseeing cybersecurity risks related to financial reporting and internal controls.
The Audit Committee receives [removed: a] [added: an annual] cybersecurity update [removed: twice a year] from the CISO, either with the full Board or the IOC in attendance.
Audit Committee members have [removed: a courtesy] [added: an] invitation to all IOC meetings, have full access to IOC meeting materials, and receive the summary of IOC meetings from the IOC Chair as noted above.
As noted above, the CIDO [removed: provides cybersecurity updates to the Board or its Committees,] regularly attends and provides updates with the CISO to the [removed: IOC, and has met with the IOC, without other members of management present, during the IOC executive sessions.][added: IOC.]
The CIDO remains informed about the monitoring, prevention, detection, mitigation, and remediation of cybersecurity incidents through the CISO and other members of the cybersecurity team, [removed: as appropriate,] who are tasked with these responsibilities on a day-to-day basis.
Our CISO has over [removed: 20] [added: 24] years of experience in cybersecurity and served as a VP, CISO in the manufacturing/chemicals sector prior to joining PSEG.
Our CISO [removed: also] started her career at the Department of Defense and led cyber teams in the financial and retail sectors.
The Cybersecurity Council receives presentations from the CISO, members of the Cybersecurity team, other IT domain experts, cybersecurity managing counsel and external cybersecurity experts, and participates in tabletop [removed: exercises led by external consultants.][added: exercises.]
In addition to the CISO, the Cybersecurity Council members include the: (i) [added: SVP,] CIDO; (ii) [removed: EVP and] [added: EVP,] General Counsel; (iii) [removed: EVP and] [added: EVP,] CFO; (iv) President and COO of PSE&G; (v) President of PSEG Nuclear and Chief Nuclear Officer; (vi) [removed: SVP –] [added: SVP,] Corporate Citizenship; (vii) [removed: SVP –] [added: SVP,] Chief [added: Administrative Officer and Chief] Human Resources [removed: and Diversity] Officer; (viii) [removed: VP of] [added: VP,] Corporate Security and Properties; (ix) [removed: SVP –] [added: SVP,] AERC; (x) [removed: Project Executive Advisor;] [added: President] and [added: COO of PSEG LI;] (xi) [removed: Vice President] [added: SVP, Chief Commercial Officer] and [added: Strategic Partnerships; and (xii) Vice President,] Controller.
In providing oversight of risks from cybersecurity threats, Senior Management is informed of cybersecurity risks through updates shared during Cybersecurity Council meetings and through notifications or updates by the CISO, pursuant to PSEG’s Cybersecurity [removed: Event Escalation and] Incident Response [removed: Practice.][added: Plan.]
material risks from cybersecurity threats, assess our internal incident response preparedness and cyber posture, support incident response, conduct tabletop exercises, and comply with applicable laws and regulations.
We conduct phishing exercises with progressive consequences for failures.
Artificial Intelligence Security—We maintain AI governance, including policies and a council, incorporating AI into our Nth Party Risk Assessment process, and implementing technical controls that enable people to use AI to complete tasks more efficiently and our cyber team to better combat more sophisticated threats that make use of AI.
cybersecurity risks.
PSEG’s cybersecurity counsel is also a regular attendee at Cybersecurity Council meetings.
[Table of Contents](#toc_page)
This includes a risk-based vendor management program, which incorporates robust cybersecurity contractual provisions, vendor security assessments and, if appropriate, periodic audits.
with PSEG subject matter experts to identify cybersecurity risks, evaluate their potential severity and likelihood, identify mitigations, including those identified above, and assess the impact of those mitigations on residual risk.
PSEG’s Corporate Secretary and Managing Counsel – Cybersecurity serves as counsel to the Cybersecurity Council.
Item 2. PROPERTIES
7 rewritten, 2 added, 2 removed, 24 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
As of December 31, [removed: 2024,] [added: 2025,] PSE&G’s electric T&D system included approximately 25,000 circuit miles and [removed: 869,000] [added: 871,000] poles, of which 64% are jointly-owned.
In addition, PSE&G owns and operates [removed: 57] [added: 58] switching stations with an aggregate installed capacity of approximately 40,000 megavolt-amperes (MVA) and [removed: 234] [added: 238] substations with an aggregate installed capacity of approximately [removed: 10,750] [added: 10,890] MVA.
As of December 31, [removed: 2024,] [added: 2025,] PSE&G’s gas system included approximately 18,000 miles of gas mains, 12 gas distribution headquarters, two sub-headquarters, and two meter shops serving all of its gas territory in New Jersey.
As of December 31, [removed: 2024,] [added: 2025,] PSE&G owned 158 MW dc of installed PV solar capacity throughout New Jersey.
As of December 31, [removed: 2024,] [added: 2025,] PSEG Power’s share of installed nuclear generating capacity is shown in the following table:
| | Hope Creek | | NJ | | | [removed: 1,172] [added: 1,174] | | | | 100 | % | | | [removed: 1,172] [added: 1,174] | | |
| | Total Nuclear | | | | | [removed: 6,006] [added: 6,003] | | | | | | | | 3,758 | | |
Note 12.
| | Salem 1 & 2 | | NJ | | | 2,280 | | | | 57 | % | | | 1,309 | | |
Note 13.
| | Salem 1 & 2 | | NJ | | | 2,285 | | | | 57 | % | | | 1,311 | | |
Item 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
9 rewritten, 16 added, 7 removed, 11 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
Our common stock is listed on the New York Stock Exchange, Inc. under the trading symbol “PEG.” As of February [removed: 21, 2025,] [added: 20, 2026,] there were [removed: 45,779] [added: 43,642] registered holders.
The following graph shows a comparison of the five-year cumulative return assuming $100 invested on December 31, [removed: 2019] [added: 2020] in our common stock and the subsequent reinvestment of quarterly dividends, the S&P Composite Stock Price Index, the Dow Jones Utilities Index and the S&P Electric Utilities Index.
| | | | [removed: 2019 | | | |] 2020 | | | | 2021 | | | | 2022 | | | | 2023 | | | | 2024 | | | | [added: 2025 | | | |]
[removed: ][added: ]
On February [removed: 11, 2025,] [added: 24, 2026,] our Board of Directors approved a [removed: $0.63] [added: $0.67] per share common stock dividend for the first quarter of [removed: 2025.][added: 2026.]
This reflects an indicative annual dividend rate of [removed: $2.52] [added: $2.68] per share.
[added: We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the] discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant.
The following table indicates the securities authorized for issuance under equity compensation plans as of December 31, [removed: 2024:][added: 2025:]
| | Equity Compensation Plans Approved by Security Holders | | | — | | | $ | — | | | | [removed: 7,082,420] [added: 5,937,370] | | |
| | PSEG | | $ | 100.00 | | | $ | 118.33 | | | $ | 112.30 | | | $ | 116.36 | | | $ | 165.95 | | | $ | 162.80 | | |
| | S&P 500 | | $ | 100.00 | | | $ | 128.68 | | | $ | 105.36 | | | $ | 133.03 | | | $ | 166.28 | | | $ | 195.98 | | |
| | DJ Utilities | | $ | 100.00 | | | $ | 117.01 | | | $ | 118.96 | | | $ | 112.19 | | | $ | 129.21 | | | $ | 144.69 | | |
| | S&P Utilities | | $ | 100.00 | | | $ | 117.67 | | | $ | 119.51 | | | $ | 111.05 | | | $ | 137.07 | | | $ | 159.06 | | |
| | Total | | | — | | | $ | — | | | | 5,937,370 | | |
Note 17.
[Table of Contents](#toc_page)
From time to time, PSEG may repurchase shares to satisfy obligations under equity compensation awards and repurchase shares to satisfy purchases by employees under the Employee Stock Purchase Plan (ESPP).
In November 2025, we entered into a share repurchase plan that complies with Rule 10b5-1 of the Exchange Act, solely with respect to the repurchase of shares to satisfy obligations under equity compensation awards and the repurchase of shares to satisfy purchases by employees under the ESPP.
The following table indicates our common share repurchases in the open market during the fourth quarter of 2025 to satisfy obligations under equity compensation awards that were issued in 2025 and purchases by employees under the ESPP during 2025.
| | Three Months Ended December 31, 2025 | | Total Number of Shares Purchased | | Average Price Paid per Share | |
| | October 1 - October 31 | | — | | — | |
| | November 1 - November 30 | | — | | — | |
| | December 1 - December 31 | | 850,000 | | $79.50 | |
There are 865,000 additional shares that remain available to be repurchased under the plan to satisfy obligations under equity compensation awards anticipated to be issued in 2026 and purchases anticipated by employees under the ESPP during 2026.
The plan expires on the earlier of the completion of all trades under the plan, April 30, 2026, or the occurrence of such other termination events as specified in the plan, including but not limited to termination of the plan.
| | PSEG | | $ | 100.00 | | | $ | 102.37 | | | $ | 121.14 | | | $ | 114.98 | | | $ | 119.14 | | | $ | 169.91 | | |
| | S&P 500 | | $ | 100.00 | | | $ | 118.39 | | | $ | 152.34 | | | $ | 124.73 | | | $ | 157.48 | | | $ | 196.85 | | |
| | DJ Utilities | | $ | 100.00 | | | $ | 101.68 | | | $ | 119.44 | | | $ | 121.88 | | | $ | 115.43 | | | $ | 133.53 | | |
| | S&P Utilities | | $ | 100.00 | | | $ | 100.52 | | | $ | 118.29 | | | $ | 120.14 | | | $ | 111.63 | | | $ | 137.79 | | |
We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the
| | Total | | | — | | | $ | — | | | | 7,082,420 | | |
Note 18.
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
1,026 rewritten, 271 added, 284 removed, 1,959 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
We have audited the accompanying consolidated balance sheets of Public Service Enterprise Group Incorporated and subsidiaries (the “Company” or [removed: "PSEG")] [added: “PSEG”)] as of December 31, [removed: 2024] [added: 2025] and [removed: 2023,] [added: 2024,] the related consolidated statements of operations, comprehensive [removed: income (loss),] [added: income,] stockholders' equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2024,] [added: 2025,] and the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) (collectively referred to as the “financial statements”).
In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, [removed: 2024] [added: 2025] and [removed: 2023,] [added: 2024,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2024,] [added: 2025,] in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, [removed: 2024,] [added: 2025,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission, and our report dated February [removed: 25, 2025,] [added: 26, 2026,] expressed an unqualified opinion on the Company's internal control over financial reporting.
Accounting for the Effects of Regulation – Refer to Notes 1 and [removed: 6] [added: 5] to the financial statements
| [added: |] February [removed: 25,] [added: 11,] 2025 | [added: | 4.19% | | 21.51% | |]
We have audited the accompanying consolidated balance sheets of Public Service Electric and Gas Company and subsidiaries (the “Company” or [removed: "PSE&G")] [added: “PSE&G”)] as of December 31, [removed: 2024] [added: 2025] and [removed: 2023,] [added: 2024,] the related consolidated statements of operations, comprehensive income, common stockholder’s equity, and cash flows, for each of the three years in the period ended December 31, [removed: 2024,] [added: 2025,] and the related notes and the consolidated financial statement schedule listed in the Index at Item 15(B)(b) (collectively referred to as the “financial statements”).
In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, [removed: 2024] [added: 2025] and [removed: 2023,] [added: 2024,] and the results of its operations and its cash flows for each of the three years in the period ended December 31, [removed: 2024,] [added: 2025,] in conformity with accounting principles generally accepted in the United States of America.
Accounting for the Effects of Regulation – Refer to Notes 1 and [removed: 6] [added: 5] to the financial statements
| | | | [removed: 2024] [added: 2025] | | | | [removed: 2023] [added: 2024] | | | | [removed: 2022] [added: 2023] | | | |
| | OPERATING REVENUES | | $ | [removed: 10,290] [added: 12,168] | | | $ | [removed: 11,237] [added: 10,290] | | | $ | [removed: 9,800] [added: 11,237] | | |
| | Energy Costs | | | [removed: 3,393] [added: 4,159] | | | | [removed: 3,260] [added: 3,393] | | | | [removed: 4,018] [added: 3,260] | | |
| | Depreciation and Amortization | | | [removed: 1,182] [added: 1,257] | | | | [removed: 1,135] [added: 1,182] | | | | [removed: 1,100] [added: 1,135] | | |
| | Total Operating Expenses | | | [removed: 7,937] [added: 9,188] | | | | [removed: 7,552] [added: 7,937] | | | | [removed: 8,419] [added: 7,552] | | |
| | OPERATING INCOME | | | [removed: 2,353] [added: 2,980] | | | | [removed: 3,685] [added: 2,353] | | | | [removed: 1,381] [added: 3,685] | | |
| | [removed: Income from] Equity Method Investments [removed: | | | 1 |] [added: (B)] | | | [removed: 1] [added: 26] | | | | [removed: 14] [added: 21] | | |
| | Net Gains (Losses) on Trust Investments | | | [removed: 127] [added: 189] | | | | [removed: 189] [added: 127] | | | | [removed: (265] [added: 189] | [removed: )] | |
| | Net Other Income (Deductions) | | | [removed: 153] [added: 64] | | | | [removed: 172] [added: 64] | | | | [removed: 124] [added: 80] | | |
| | Net Non-Operating Pension and Other Postretirement Benefit (OPEB) (Costs) Credits | | | [removed: 73] [added: 65] | | | | [removed: (218] [added: 73] | [removed: )] | | | [removed: 376] [added: (218] | [added: )] | |
| | Interest Expense | | | [removed: (882] [added: (1,005] | ) | | | [removed: (748] [added: (882] | ) | | | [removed: (628] [added: (748] | ) | |
| | INCOME BEFORE INCOME TAXES | | | [removed: 1,825] [added: 2,374] | | | | [removed: 3,081] [added: 1,825] | | | | [removed: 1,002] [added: 3,081] | | |
| | [added: Total] Income Tax [removed: (Expense) Benefit] [added: Expense (Benefit)] | | [added: $] | [removed: (53] [added: 263] | [removed: )] | | [added: $] | [removed: (518] [added: 53] | [removed: )] | | [added: $] | [removed: 29] [added: 518] | | |
| | NET INCOME | | $ | [removed: 1,772] [added: 2,111] | | | $ | [removed: 2,563] [added: 1,772] | | | $ | [removed: 1,031] [added: 2,563] | | |
| | BASIC | | | [removed: 498] [added: 499] | | | | 498 | | | | 498 | | |
| | DILUTED | | | [removed: 500] [added: 501] | | | | 500 | | | | [removed: 501] [added: 500] | | |
| | BASIC | | $ | [removed: 3.56] [added: 4.23] | | | $ | [removed: 5.15] [added: 3.56] | | | $ | [removed: 2.07] [added: 5.15] | | |
| | DILUTED | | $ | [removed: 3.54] [added: 4.22] | | | $ | [removed: 5.13] [added: 3.54] | | | $ | [removed: 2.06] [added: 5.13] | | |
CONSOLIDATED STATEMENTS OF COMPREHENSIVE [removed: INCOME (LOSS)][added: INCOME]
| | | | [removed: 2024] [added: 2025] | | | | [removed: 2023] [added: 2024] | | | | [removed: 2022] [added: 2023] | | | |
| | NET INCOME | | $ | [removed: 1,772] [added: 2,111] | | | $ | [removed: 2,563] [added: 1,772] | | | $ | [removed: 1,031] [added: 2,563] | | |
| | Unrealized Gains (Losses) on Available-for-Sale Securities, net of tax (expense) benefit of [removed: $9, $(27)] [added: $(22), $9] and [removed: $85] [added: $(27)] for the years ended [removed: 2024, 2023] [added: 2025, 2024] and [removed: 2022,] [added: 2023,] respectively | | | [removed: (13] [added: 34] | [removed: )] | | | [removed: 41] [added: (13] | [added: )] | | | [removed: (132] [added: 41] | [removed: )] | |
| | Unrealized Gains (Losses) on Cash Flow Hedges, net of tax (expense) benefit of [removed: $(13), $(2)] [added: $4, $(13)] and $(2) for the years ended [removed: 2024, 2023] [added: 2025, 2024] and [removed: 2022,] [added: 2023,] respectively | | | [removed: 33] [added: (12] | [added: )] | | | [removed: 6] [added: 33] | | | | [removed: 3] [added: 6] | | |
| | Pension/OPEB adjustment, net of tax (expense) benefit of [removed: $(10), $(127)] [added: $(8), $(10)] and [removed: $28] [added: $(127)] for the years ended [removed: 2024, 2023] [added: 2025, 2024] and [removed: 2022,] [added: 2023,] respectively | | | [removed: 26] [added: 20] | | | | [removed: 324] [added: 26] | | | | [removed: (71] [added: 324] | [removed: )] | |
| | Other Comprehensive Income (Loss), net of tax | | | [removed: 46] [added: 42] | | | | [removed: 371] [added: 46] | | | | [removed: (200] [added: 371] | [removed: )] | |
| | COMPREHENSIVE INCOME [removed: (LOSS)] | | $ | [removed: 1,818] [added: 2,153] | | | $ | [removed: 2,934] [added: 1,818] | | | $ | [removed: 831] [added: 2,934] | | |
| | | | [added: 2025 | | | |] 2024 | | | | 2023 | | | |
| | Cash and Cash Equivalents | | $ | [removed: 125] [added: 132] | | | $ | [removed: 54] [added: 125] | | |
| | Accounts Receivable, net of allowance of [removed: $210] [added: $248] in [removed: 2024] [added: 2025] and [removed: $279] [added: $210] in [removed: 2023] [added: 2024] | | | [removed: 1,597] [added: 1,888] | | | | [removed: 1,482] [added: 1,597] | | |
| | Tax Receivable | | | [removed: 394] [added: 406] | | | | [removed: 10] [added: 394] | | |
| | Unbilled Revenues, net of allowance of [removed: $5] [added: $6] in [removed: 2024] [added: 2025] and [removed: $4] [added: $5] in [removed: 2023] [added: 2024] | | | [removed: 313] [added: 381] | | | | [removed: 244] [added: 313] | | |
| | Fuel | | | [removed: 232] [added: 282] | | | | [removed: 264] [added: 232] | | |
| February 26, 2026 |
| | Operation and Maintenance | | | 3,772 | | | | 3,362 | | | | 3,157 | | |
| | Balance as of December 31, 2025 | | | 534 | | | $ | 5,062 | | | | (36 | ) | | $ | (1,435 | ) | | $ | 13,446 | | | $ | (91 | ) | | $ | 16,982 | | |
Certain other contracts may be designated as normal purchases and normal sales (NPNS) and qualify for a scope exception under derivative accounting guidance.
transaction.
There were no impairments recorded for the year ended December 31, 2025.
other currently available evidence.
In September 2025, the LIPA board of trustees approved a five-year extension of the contract.
See Amended OSA below for further information.
| | Transmission | | | 1,779 | | | | — | | | | — | | | | 1,779 | | |
| | Total Operating Revenues | | $ | 9,558 | | | $ | 3,722 | | | $ | (1,112 | ) | | $ | 12,168 | | |
| | June 2026 to May 2027 | | $ | 329 | | | | 3,500 | | |
| | June 2027 to May 2028 | | $ | 333 | | | | 3,500 | | |
Amended OSA—PSEG LI has been operating LIPA’s electric T&D system in Long Island, New York since 2014 under a 12-year OSA with LIPA that expired on December 31, 2025, with annual fixed and variable components.
The fixed fee for the provision of services thereunder in 2025 was approximately $45 million.
In December 2025, PSEG LI entered into a five-year extension of the
OSA ending on December 31, 2030.
A competitor in the contract bidding process filed litigation against LIPA challenging the process.
LIPA filed a motion to dismiss the competitor’s claim as untimely, which was granted by the New York Supreme Court.
The competitor filed an appeal in January 2026.
| | | | 2025 | | | | 2024 | | | |
All amounts reflect PSE&G’s or PSEG Power’s share
| | | | | | | | 2025 | | | | | | | | 2024 | | | | | | | |
| | | | 2025 | | | | 2024 | | | |
| | | | 2025 | | | | 2024 | | | |
Under BGSS Orders issued by the BPU, New Jersey gas distribution companies (GDCs) may self-implement a rate increase resulting in no more than a 5% bill increase effective December 1 of the current year, and February 1 of the following year, with one month’s advance notice to the BPU and New Jersey Rate Counsel, and implement a decrease in its BGSS rate at any time during the year upon five days’ notice to the BPU and New Jersey Rate Counsel.
On December 1, 2025, in compliance with the BGSS Orders, PSE&G self-implemented a BGSS increase from approximately 33 cents per therm to approximately 36 cents per therm, resulting in an approximate 3% bill increase.
Clean Energy Future-Electric Vehicles (CEF-EV)—In January 2026, PSE&G filed an updated cost recovery petition to recover $8 million annually in electric base rates effective April 1, 2026.
This filing requests the return on and of investment for CEF-EV electric investments placed in service through December 31, 2025.
CIP—In February 2025, the BPU gave final approval to provisional electric CIP rates which were effective August 1, 2024.
In January 2026, the BPU gave final approval to the provisional electric CIP rates recovering annual deficient electric revenues of approximately $65 million.
The provisional rate was effective June 1, 2025.
Electric Generation/Capacity Cost Deferral (EGCCD)—In June 2025, the BPU approved an Order authorizing PSE&G to provide a $30 credit to each residential electric customer’s monthly bill for the two-month period July through August 2025.
For the six-month period September 2025 through February 2026, PSE&G is applying a charge to each residential electric customer’s monthly bill of $10.
Similar orders were issued to all other New Jersey Electric Distribution Companies (EDCs) and were as a result of state regulators’ concern about electric bill increases this summer, which the BPU attributed to the increasing demand for power and a lack of sufficient new generation resources, which led to significant price increases in the 2025/2026 PJM capacity auction.
Gas System Modernization Program II Extension (GSMP II Ext)—In July 2025, the BPU approved PSE&G’s updated GSMP II Ext petition to recover $49 million annually in gas base rates effective August 1, 2025.
This matter is pending.
Tax Adjustment Credit (TAC)—In October 2025, PSE&G submitted its annual 2025 TAC filing requesting a reduction to the tax benefits being flowed back to customers, which would result in an increase to annual electric and gas revenues by approximately $15 million and $10 million, respectively.
This matter is pending.
As a result of the collections and required ZEC payments, there were overcollected revenues totaling $5.5 million, including interest.
[Table of Contents](#toc_page)
[Table of Contents](#toc_page)
[Table of Contents](#toc_page)
| February 25, 2025 |
| | Operation and Maintenance | | | 3,356 | | | | 3,150 | | | | 3,178 | | |
| | Losses on Asset Dispositions and Impairments | | | 6 | | | | 7 | | | | 123 | | |
| | Losses on Asset Dispositions and Impairments | | | 6 | | | | 7 | | | | 123 | | |
| | Emission Allowances and Renewable Energy Credit (REC) Compliance Accrual | | | — | | | | 3 | | | | 55 | | |
| | Payments for Share Repurchase Program | | | — | | | | — | | | | (500 | ) | |
| | Balance as of December 31, 2021 | | | 534 | | | $ | 5,045 | | | | (30 | ) | | $ | (896 | ) | | $ | 10,639 | | | $ | (350 | ) | | $ | 14,438 | | |
| | Payments for Share Repurchase Program | | | — | | | | — | | | | (7 | ) | | | (500 | ) | | | — | | | | — | | | | (500 | ) | |
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
| | As of December 31, 2023 | | | | | | | | | | | | | |
Changes in the fair market value of the derivative contracts are recorded in earnings.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
Asset Dispositions and Impairments for more information on impairment assessments performed on PSEG’s long-lived assets.
December 31, 2024.
Since these
Improvements to Reportable Segment Disclosures—Accounting Standards Update (ASU) 2023-07
This ASU requires disclosure of incremental segment information, including additional detail on certain significant segment expenses, on an annual and interim basis to enable investors to develop more decision-useful financial analyses.
The ASU is effective for fiscal years beginning after December 15, 2023 and interim periods beginning after December 15, 2024.
The adoption of this standard did not have a material impact on the financial statements of PSEG and PSE&G.
PSEG and PSE&G are currently analyzing the impact of this ASU on their future disclosures.
Also, revenue for wholesale load contracts is recognized over time as the bundled service is provided to the customer.
| | PJM | | | | | | | | | | | | | | | | | |
| | ISO-NE | | | — | | | | 5 | | | | — | | | | 5 | | |
| | PJM | | | | | | | | | | | | | | | | | |
| | ISO-NE | | | — | | | | 13 | | | | — | | | | 13 | | |
| | Transmission | | | 1,589 | | | | — | | | | — | | | | 1,589 | | |
| | PJM | | | | | | | | | | | | | | | | | |
| | NYISO | | | — | | | | 88 | | | | — | | | | 88 | | |
| | ISO-NE | | | — | | | | 96 | | | | — | | | | 96 | | |
| | Total Operating Revenues | | $ | 7,935 | | | $ | 3,266 | | | $ | (1,401 | ) | | $ | 9,800 | | |
As of December 31, 2024, PSE&G had a deferred balance of $78 million from electric bad debts recorded as a Regulatory Asset, which included approximately $78 million of incremental bad debt due to the impact of the coronavirus pandemic.
In addition, as of December 31, 2024, PSE&G had deferred incremental gas bad debt expense of $68 million as a Regulatory Asset for future regulatory recovery due to the impact of the coronavirus pandemic.
In June 2024, the BPU approved recovery of the incremental electric and gas bad debt amounts of $78 million and $68 million charged to PSE&G’s electric SBC and deferred COVID-19 deferrals, respectively.
Regulatory Assets and Liabilities for additional information.
Amended OSA—In April 2022, PSEG LI entered into an amended OSA with LIPA.
The OSA remains a 12-year services contract ending in 2025 with annual fixed and variable components.
An excerpt. Shown here: 40 of 1,026 rewritten, 40 of 271 added and 40 of 284 removed. The counts are complete. For every sentence, read Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA in the FY2025 filing and the FY2024 filing.
Item 9A. CONTROLS AND PROCEDURES
3 rewritten, 1 added, 0 removed, 10 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
We have conducted assessments of our internal control over financial reporting as of December 31, [removed: 2024,] [added: 2025,] as required by Section 404 of the Sarbanes-Oxley Act, using the framework promulgated by the Committee of Sponsoring Organizations of the Treadway Commission, commonly referred to as “COSO.” Managements’ reports on PSEG’s and PSE&G’s internal control over financial reporting are included on pages 160 and 161, respectively.
Management has concluded that internal control over financial reporting is effective as of December 31, [removed: 2024.][added: 2025.]
There have been no changes in internal control over financial reporting that occurred during the fourth quarter of [removed: 2024] [added: 2025] that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.
[Table of Contents](#toc_page)
Item 9B. OTHER INFORMATION
0 rewritten, 5 added, 1 removed, 1 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
During the three months ended December 31, 2025, certain of our officers and directors adopted, terminated or modified trading plans for the sale of PSEG common stock which are intended to satisfy the affirmative defense of Rule 10b5-1(c) of the Exchange Act, as shown in the following table:
| | Name and Title | | Action | | Date | | Aggregate Number of Shares to be Sold or Purchased | | Expiration (A) | |
| | Ralph A. LaRossa | | Adoption | | November 12, 2025 | | Sell 37,500 shares | | August 31, 2027 | |
| | Chair of the Board, President and Chief Executive Officer | | | | | | | | | |
(A) Expires on the date shown or such earlier date upon the completion of all trades under the plan or the occurrence of such other termination events as specified in the plan, including but not limited to termination of the plan.
During the three months ended December 31, 2024, none of PSEG’s directors or officers adopted, terminated or modified a Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement (as such terms are defined in Item 408 of Regulation S-K of the Securities Act of 1933).
Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
8 rewritten, 3 added, 3 removed, 51 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
Based on the assessment performed, management has concluded that PSEG’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSEG’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2024] [added: 2025] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2024.][added: 2025.]
PSEG’s external auditors, Deloitte & Touche LLP, have audited PSEG’s financial statements for the year ended December 31, [removed: 2024] [added: 2025] included in this annual report on Form 10-K and, as part of that audit, have issued a report on the effectiveness of PSEG’s internal control over financial reporting, a copy of which is included in this annual report on Form 10-K.
Based on the assessment performed, management has concluded that PSE&G’s internal control over financial reporting is effective and provides reasonable assurance regarding the reliability of PSE&G’s financial reporting and the preparation of its financial statements as of December 31, [removed: 2024] [added: 2025] in accordance with generally accepted accounting principles.
Further, management has not identified any material weaknesses in internal control over financial reporting as of December 31, [removed: 2024.][added: 2025.]
We have audited the internal control over financial reporting of Public Service Enterprise Group Incorporated and subsidiaries (the “Company” or [removed: "PSEG")] [added: “PSEG”)] as of December 31, [removed: 2024,] [added: 2025,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, [removed: 2024,] [added: 2025,] based on criteria established in *Internal Control — Integrated Framework (2013)* issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements and the consolidated financial statement schedule listed in the Index at Item 15(B)(a) as of and for the year ended December 31, [removed: 2024,] [added: 2025,] of the Company and our report dated February [removed: 25, 2025,] [added: 26, 2026,] expressed an unqualified opinion on those financial statements.
| February 26, 2026 | |
| February 26, 2026 | |
February 26, 2026
| February 25, 2025 | |
| February 25, 2025 | |
February 25, 2025
Item 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
7 rewritten, 1 added, 6 removed, 19 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
The information required by Item 10 of Form 10-K with respect to (i) present directors of PSEG who are nominees for election as directors at PSEG’s [removed: 2025] [added: 2026] Annual Meeting of Stockholders, (ii) the director nomination process, and (iii) the composition of the Audit Committee of the Board, is set forth under the headings “Nominees For Director-Biographical Information,” “Overview of Board Nominees-Board Refreshment and Tenure,” and “-Board Membership Selection,” and “Corporate Governance-Board Committees,” respectively, in PSEG’s definitive Proxy Statement for such Annual Meeting of Stockholders, which definitive Proxy Statement is expected to be filed with the U.S. Securities and Exchange Commission (SEC) on or about March [removed: 13, 2025] [added: 12, 2026] and which information set forth under said heading is incorporated herein by this reference thereto.
The Standards are posted on our website, [removed: https://corporate.pseg.com/aboutpseg/leadershipandgovernance/standardsofconduct You can get a free copy of the Standards by making an oral or written request directed to:][added: https://corporate.pseg.com/aboutpseg/leadershipandgovernance/standardsofconduct.]
[removed: We] [added: To the extent required by applicable rules of the SEC and/or NYSE, we] will post on our website, https://corporate.pseg.com/aboutpseg/leadershipandgovernance/standardsofconduct:
Any amendment [removed: (other than one] that [removed: is technical, administrative or non-substantive) that] we adopt to our Standards; and
Any grant by us of a waiver from the Standards that applies to any director or executive [removed: officer and that relates to any element enumerated by the SEC.][added: officer.]
We have adopted insider trading policies and procedures governing transactions in securities of PSEG and its subsidiaries by us, our directors, officers and employees that are reasonably designed to promote compliance with insider trading laws, rules [removed: and regulations, and any listing standards applicable to us.]
A copy of our insider trading policies and procedures is filed as Exhibit 19 [removed: to] [added: as part of] this Annual Report on Form [removed: 10-K.][added: 10-K and incorporated by reference herein.]
and regulations, and any listing standards applicable to us.
Vice President, Investor Relations
PSEG Services Corporation
80 Park Plaza, 4th Floor
Newark, NJ 07102
Telephone (973) 430-6565
In 2024, we did not grant any waivers to the Standards.
Item 11. EXECUTIVE COMPENSATION
1 rewritten, 0 added, 0 removed, 3 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
The information required by Item 11 of Form 10-K is set forth in PSEG’s definitive Proxy Statement for the [removed: 2025] [added: 2026] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 13, 2025] [added: 12, 2026] and such information that is responsive to this Item 11, except for information set forth under the heading “Pay Versus Performance,” is incorporated herein by this reference thereto.
Item 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
1 rewritten, 0 added, 0 removed, 5 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
The information required by Item 12 of Form 10-K with respect to directors, executive officers and certain beneficial owners is set forth under the heading “Security Ownership of Directors, Management and Certain Beneficial Owners” in PSEG’s definitive Proxy Statement for the [removed: 2025] [added: 2026] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 13, 2025] [added: 12, 2026] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
1 rewritten, 0 added, 0 removed, 4 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
The information required by Item 13 of Form 10-K is set forth under the heading “Corporate Governance-Certain Relationships and Related Person Transactions” in PSEG’s definitive Proxy Statement for the [removed: 2025] [added: 2026] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 13, 2025] [added: 12, 2026] and such information set forth under such heading is incorporated herein by this reference thereto.
Item 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
1 rewritten, 0 added, 0 removed, 2 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
The information required by Item 14 of Form 10-K is set forth under the heading “Oversight of the Independent Auditor-Fees Billed by Deloitte for [removed: 2024] [added: 2025] and [removed: 2023”] [added: 2024”] in PSEG’s definitive Proxy Statement for the [removed: 2025] [added: 2026] Annual Meeting of Stockholders which definitive Proxy Statement is expected to be filed with the SEC on or about March [removed: 13, 2025.][added: 12, 2026.]
Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES
69 rewritten, 5 added, 4 removed, 276 unchanged
Read the full itemFY2025 item · filed February 26, 2026FY2024 item · filed February 25, 2025
Public Service Enterprise Group Incorporated’s Consolidated Balance Sheets as of December 31, [removed: 2024] [added: 2025] and [removed: 2023] [added: 2024] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Stockholders’ Equity for the three years ended December 31, [removed: 2024] [added: 2025] on pages [removed: 68] [added: 70] through [removed: 73.][added: 75.]
Public Service Electric and Gas Company’s Consolidated Balance Sheets as of December 31, [removed: 2024] [added: 2025] and [removed: 2023] [added: 2024] and the related Consolidated Statements of Operations, Comprehensive Income, Cash Flows and Common Stockholder’s Equity for the three years ended December 31, [removed: 2024] [added: 2025] on pages [removed: 74] [added: 76] through [removed: 79.][added: 81.]
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2024] [added: 2025] (page 171).
Schedule II—Valuation and Qualifying Accounts for each of the three years in the period ended December 31, [removed: 2024] [added: 2025] (page 171).
| [removed: [10a(5)](https://www.sec.gov/Archives/edgar/data/788784/000095017024128681/peg-ex10_1.htm)] [added: [10a(5)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a5.htm)] | | [Key Executive Severance Plan of Public Service Enterprise Group Incorporated, amended effective [removed: November 18, 2024 (12)](https://www.sec.gov/Archives/edgar/data/788784/000095017024128681/peg-ex10_1.htm)] [added: December 15, 2025](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a5.htm)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[6](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[)](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt) | | [Stock Plan for Outside Directors, as [removed: amended](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(13)] [added: amended](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(12)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[7](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[)](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt) | | [Compensation Plan for Outside [removed: Directors](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(14)] [added: Directors](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(13)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[8](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[)](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) | | [2004 Long-Term Incentive Plan, amended and restated as of April 16, [removed: 2013](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(15)] [added: 2013](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)(14)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)[9](https://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)) | | [Form of Agreement for Advancement of Expenses with Outside [removed: Directors](https://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(16)] [added: Directors](https://www.sec.gov/Archives/edgar/data/81033/000093041309000939/c56702_ex10-1.htm)(15)] |
| [10a(10)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm) | | [Agreement with Tamara L. Linde dated September 16, [removed: 2024(17)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm)] [added: 2024(16)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm)] |
| [removed: [10a(11)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a11.htm)] [added: [10a(11)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex10_a11.htm)] | | [Agreement with Daniel J. Cregg dated September 22, [removed: 2015](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a11.htm)] [added: 2015(17)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex10_a11.htm)] |
| [removed: [10a(20)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] [added: [10a(20)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a20.htm)] | | [Management Incentive Compensation Plan, amended [added: December 16, 2025] and effective January 1, [removed: 2024(26)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] [added: 2026](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a20.htm)] |
| [10a(21)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm) | | [Equity Deferral Plan, amended and restated effective November 20, [removed: 2023(27)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] [added: 2023(26)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] |
| [removed: [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a22.htm)] [added: [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a22.htm)] | | [2021 Long-Term Incentive Plan - Performance Share Units Award [removed: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a22.htm)] [added: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a22.htm)] |
| [removed: [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a23.htm)] [added: [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a23.htm)] | | [2021 Long-Term Incentive Plan - Restricted Stock Unit Award [removed: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a23.htm)] [added: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a23.htm)] |
| [10a(24)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a24-mcfeatersagreement.htm) | | [Agreement with Charles V. McFeaters dated April 18, [removed: 2023(28)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a24-mcfeatersagreement.htm)] [added: 2023(27)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a24-mcfeatersagreement.htm)] |
| [10a(25)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm) | | [Agreement with Grace Park dated September 16, [removed: 2024(29)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm)] [added: 2024(28)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm)] |
| [removed: [19](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex19.htm)] [added: [19](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex19.htm)] | | [Insider Trading Policies and [removed: Procedures](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex19.htm)] [added: Procedures(29)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex19.htm)] |
| [removed: [21](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex21.htm)] [added: [21](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex21.htm)] | | [Subsidiaries of the [removed: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex21.htm)] [added: Registrant](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex21.htm)] |
| [removed: [23](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex23.htm)] [added: [23](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex23.htm)] | | [Consent of Independent Registered Public Accounting [removed: Firm](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex23.htm)] [added: Firm](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex23.htm)] |
| [removed: [31](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31.htm)] [added: [31](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31.htm)] | | [Certification by Ralph A. LaRossa, pursuant to Rules 13a-14 and 15d-14 of the Securities Exchange Act of 1934 (1934 [removed: Act)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31.htm)] [added: Act)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31.htm)] |
| [removed: [31a](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_a.htm)] [added: [31a](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_a.htm)] | | [Certification by Daniel J. Cregg, pursuant to Rules 13a-14 and 15d-14 of the 1934 [removed: Act](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_a.htm)] [added: Act](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_a.htm)] |
| [removed: [32](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32.htm)] [added: [32](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32.htm)] | | [Certification by Ralph A. LaRossa, pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32.htm)] |
| [removed: [32a](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32_a.htm)] [added: [32a](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32_a.htm)] | | [Certification by Daniel J. Cregg, pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32_a.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32_a.htm)] |
| [removed: [10a(5)](https://www.sec.gov/Archives/edgar/data/788784/000095017024128681/peg-ex10_1.htm)] [added: [10a(5)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a5.htm)] | | [Key Executive Severance Plan of Public Service Enterprise Group Incorporated, amended effective [removed: November 18, 2024(12)](https://www.sec.gov/Archives/edgar/data/788784/000095017024128681/peg-ex10_1.htm)] [added: December 15, 2025](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a5.htm)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[6](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)[)](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt) | | [Stock Plan for Outside Directors, as [removed: amended](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(13)] [added: amended](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a17.txt)(12)] |
| [10a(](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[7](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)[)](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt) | | [Compensation Plan for Outside [removed: Directors](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(14)] [added: Directors](https://www.sec.gov/Archives/edgar/data/81033/000120677403000082/ex-10a20.txt)(13)] |
| [10a(8)](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm) | | [2004 Long-Term Incentive Plan amended and restated as of April 16, [removed: 2013](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[(15)](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)] [added: 2013](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)[(14)](https://www.sec.gov/Archives/edgar/data/81033/000078878413000007/pseg-3312013xq1ex10.htm)] |
| [10a(10)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm) | | [Agreement with Tamara L. Linde dated September 16, [removed: 2024(17)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm)] [added: 2024(16)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_1.htm)] |
| [removed: [10a(11)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a11.htm)] [added: [10a(11)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex10_a11.htm)] | | [Agreement with Daniel J. Cregg dated September 22, [removed: 2015](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a11.htm)] [added: 2015(17)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex10_a11.htm)] |
| [removed: [10a(20)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] [added: [10a(20)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a20.htm)] | | [Management Incentive Compensation Plan, amended [added: December 16, 2025] and effective January 1, [removed: 2024(26)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a20-managementincentiv.htm)] [added: 2026](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a20.htm)] |
| [10a(21)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm) | | [Equity Deferral Plan, amended and restated effective November 20, [removed: 2023(27)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] [added: 2023(26)](https://www.sec.gov/Archives/edgar/data/788784/000162828024006885/ex10a21-equitydeferralplan.htm)] |
| [removed: [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a22.htm)] [added: [10a(22)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a22.htm)] | | [2021 Long-Term Incentive Plan - Performance Share Units Award [removed: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a22.htm)] [added: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a22.htm)] |
| [removed: [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a23.htm)] [added: [10a(23)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a23.htm)] | | [2021 Long-Term Incentive Plan - Restricted Stock Unit Award [removed: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex10_a23.htm)] [added: Agreement](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex10_a23.htm)] |
| [10a(24)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm) | | [Agreement with Grace Park dated September 16, [removed: 2024(29)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm)] [added: 2024(28)](https://www.sec.gov/Archives/edgar/data/788784/000095017024120749/peg-ex10_2.htm)] |
| [removed: [19](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex19.htm)] [added: [19](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex19.htm)] | | [Insider Trading Policies and [removed: Procedures](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex19.htm)] [added: Procedures(29)](https://www.sec.gov/Archives/edgar/data/81033/000095017025026874/peg-ex19.htm)] |
| [removed: [23a](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex23_a.htm)] [added: [23a](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex23_a.htm)] | | [Consent of Independent Registered Public Accounting [removed: Firm](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex23_a.htm)] [added: Firm](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex23_a.htm)] |
| [removed: [31b](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_b.htm)] [added: [31b](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_b.htm)] | | [Certification by Ralph A. LaRossa, pursuant to Rules 13a-14 and 15d-14 of the 1934 [removed: Act](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_b.htm)] [added: Act](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_b.htm)] |
| [removed: [31c](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_c.htm)] [added: [31c](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_c.htm)] | | [Certification by Daniel J. Cregg, pursuant to Rules 13a-14 and 15d-14 of the 1934 [removed: Act](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex31_c.htm)] [added: Act](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex31_c.htm)] |
| [removed: [32b](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32_b.htm)] [added: [32b](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32_b.htm)] | | [Certification by Ralph A. LaRossa, pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. [removed: Code](https://www.sec.gov/Archives/edgar/data/788784/000095017025026874/peg-ex32_b.htm)] [added: Code](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex32_b.htm)] |
| [4a(17)](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex4_a17.htm) | | [December 1, 2025](https://www.sec.gov/Archives/edgar/data/788784/000119312526077446/peg-ex4_a17.htm) |
| | 2025 | | | | | | | | | | | | | | | | | | | | | | | |
| | Allowance for Credit Losses | | $ | 215 | | | $ | 145 | | (A) | | $ | — | | | $ | 106 | | (B) | | $ | 254 | | |
| | 2025 | | | | | | | | | | | | | | | | | | | | | | | |
| | Allowance for Credit Losses | | $ | 215 | | | $ | 145 | | (A) | | $ | — | | | $ | 106 | | (B) | | $ | 254 | | |
| | 2022 | | | | | | | | | | | | | | | | | | | | | | | |
| | Allowance for Credit Losses | | $ | 337 | | | $ | 114 | | (A) | | $ | — | | | $ | 112 | | (B) | | $ | 339 | | |
| | 2022 | | | | | | | | | | | | | | | | | | | | | | | |
| | Allowance for Credit Losses | | $ | 337 | | | $ | 114 | | (A) | | $ | — | | | $ | 112 | | (B) | | $ | 339 | | |
An excerpt. Shown here: 40 of 69 rewritten, all 5 added and all 4 removed. The counts are complete. For every sentence, read Item 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES in the FY2025 filing and the FY2024 filing.