Public Service Enterprise Group 10-Q 2024-03-31

Filed 2024-04-30. 8 sections, 349K characters. Original on sec.gov · Markdown · JSON

Cover and table of contents

Table of Contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 10-Q

(Mark One)

☒ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE

SECURITIES EXCHANGE ACT OF 1934

FOR THE QUARTERLY PERIOD ENDED March 31, 2024

OR

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE

SECURITIES EXCHANGE ACT OF 1934

FOR THE TRANSITION PERIOD FROM TO

Commission File NumberName of Registrant, Address, and Telephone NumberState or other jurisdiction of Incorporation or OrganizationI.R.S. Employer Identification Number
001-09120Public Service Enterprise Group IncorporatedNew Jersey22-2625848
80 Park Plaza
Newark,New Jersey07102
973430-7000
001-00973Public Service Electric and Gas CompanyNew Jersey22-1212800
80 Park Plaza
Newark,New Jersey07102
973430-7000

Securities registered pursuant to Section 12(b) of the Act:

Title of Each ClassTrading Symbol(s)Name of Each Exchange On Which Registered
Public Service Enterprise Group Incorporated
Common Stock without par valuePEGNew York Stock Exchange
Public Service Electric and Gas Company
8.00% First and Refunding Mortgage Bonds, due 2037PEG37DNew York Stock Exchange
5.00% First and Refunding Mortgage Bonds, due 2037PEG37JNew York Stock Exchange

Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrants have submitted electronically every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit such files). Yes ☒ No ☐

Indicate by check mark whether each registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Public Service Enterprise Group IncorporatedLarge accelerated filer☒Accelerated filer☐Non-accelerated filer☐Smaller reporting company☐Emerging growth company☐
Public Service Electric and Gas CompanyLarge accelerated filer☐Accelerated filer☐Non-accelerated filer☒Smaller reporting company☐Emerging growth company☐

(Cover continued on next page)

Table of Contents

(Cover continued from previous page)

If any of the registrants is an emerging growth company, indicate by check mark if such registrant has elected not to use

the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether any of the registrants is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒

As of April 16, 2024, Public Service Enterprise Group Incorporated had outstanding 498,080,467 shares of its sole class of Common Stock, without par value.

As of April 16, 2024, Public Service Electric and Gas Company had issued and outstanding 132,450,344 shares of Common Stock, without nominal or par value, all of which were privately held, beneficially and of record, by Public Service Enterprise Group Incorporated.

Public Service Electric and Gas Company is a wholly owned subsidiary of Public Service Enterprise Group Incorporated and meets the conditions set forth in General Instruction H(1) of Form 10-Q. Public Service Electric and Gas Company is filing its Quarterly Report on Form 10-Q with the reduced disclosure format authorized by General Instruction H.

Table of Contents

Page
FORWARD-LOOKING STATEMENTSii
FILING FORMATiii
PART I. FINANCIAL INFORMATION
Item 1.Financial Statements
Public Service Enterprise Group Incorporated1
Public Service Electric and Gas Company7
Notes to Condensed Consolidated Financial Statements
Note 1. Organization, Basis of Presentation and Significant Accounting Policies13
Note 2. Revenues14
Note 3. Variable Interest Entity (VIE)18
Note 4. Rate Filings18
Note 5. Leases19
Note 6. Financing Receivables19
Note 7. Trust Investments

Showing the first 8K of 273K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A)

This combined MD&A is separately filed by Public Service Enterprise Group Incorporated (PSEG) and Public Service Electric and Gas Company (PSE&G). Information contained herein relating to any individual company is filed by such company on its own behalf.

PSEG’s business consists of two reportable segments, PSE&G and PSEG Power LLC (PSEG Power) & Other, primarily comprised of our principal direct wholly owned subsidiaries, which are:

  • PSE&G**—which is a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey. PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU), the Federal Energy Regulatory Commission (FERC), and other federal and New Jersey state regulators. PSE&G also invests in regulated solar generation projects and energy efficiency (EE) and related programs in New Jersey, which are regulated by the BPU, and

  • PSEG Power**—which is an energy supply company that integrates the operations of its merchant nuclear generating assets with its fuel supply functions through competitive energy sales via its principal direct wholly owned subsidiaries. PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC) and other federal regulators and state regulators in the states in which they operate.

The PSEG Power & Other reportable segment also includes amounts related to the parent company as well as PSEG’s other direct wholly owned subsidiaries, which are: PSEG Long Island LLC (PSEG LI), which operates the Long Island Power Authority’s (LIPA) transmission and distribution (T&D) system under an Operations Services Agreement (OSA); PSEG Energy Holdings L.L.C. (Energy Holdings), which primarily holds legacy lease investments and competitively bid, FERC regulated transmission; and PSEG Services Corporation (Services), which provides certain management, administrative and general services to PSEG and its subsidiaries at cost.

Our business discussion in Item 1. Business of our 2023 Annual Report on 10-K (Form 10-K) provides a review of the regions and markets where we operate and compete, as well as our strategy for conducting our businesses within these markets, focusing on operational excellence, financial strength and making disciplined investments. Our risk factor discussion in Item 1A. Risk Factors of Form 10-K provides information about factors that could have a material adverse impact on our businesses. The following supplements that discussion and the discussion included in the Executive Overview of 2023 and Future Outlook provided in Item 7 in our Form 10-K by describing significant events and business developments that have occurred during 2024 and changes to the key factors that we expect may drive our future performance. The following discussion refers to the Condensed Consolidated Financial Statements (Statements) and the Related Notes to Condensed Consolidated Financial Statements (Notes). This discussion should be read in conjunction with such Statements, Notes and the Form 10-K.

EXECUTIVE OVERVIEW OF 2024 AND FUTURE OUTLOOK

We are a public utility holding company that, acting through our wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business. Our business plan focuses on achieving growth by allocating capital primarily toward regulated investments in an effort to continue to improve the sustainability and predictability of our business. We are focused on investing to modernize our energy infrastructure, improve reliability and resilience, increase EE and deliver cleaner energy to meet customer expectations and be well aligned with public policy objectives. In furtherance of these goals, our investments in PSE&G have adjusted our business mix to reflect a higher percentage of earnings contribution by PSE&G. In addition, the passage of the Inflation Reduction Act of 2022 (IRA) established a production tax credit (PTC) for existing nuclear facilities from 2024 through 2032. The PTC is expected to provide downside price protection for our nuclear generation fleet as the tax credit value is directly linked to a nuclear facility’s gross receipts.

For the years 2024-2028, our regulated capital investment program is estimated to be in a range of $18 billion to $21 billion. We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6% to 7.5% from year-end 2023 to year-end 2028. The regulated capital investments represent the majority of PSEG’s total capital investment program of $19 billion to $22.5 billion. The low end of the range includes an extension of our Gas System Modernization Program (GSMP) and Clean Energy Future (CEF)-EE program at their current average annual investment levels plus inflation, as these programs are expected to continue beyond their currently approved timeframes. The upper end of our capital investment range includes incremental investments, particularly for an expansion of our current EE programs as well as other clean energy and infrastructure investments.

Table of Contents

PSE&G

At PSE&G, our focus is on investing capital in T&D infrastructure and clean energy programs to enhance the reliability and resiliency of our T&D system, meet customer expectations and support public policy objectives.

During 2023, the BPU approved a $280 million nine-month extension of our CEF-EE program through June 2024 and a two-year extension of our current GSMP program to replace at least 400 miles of cast iron and unprotected steel mains and services in our gas system. The GSMP program extension provides for main replacement through December 2025 plus trailing services replacement and paving costs into 2026 and totals approximately $900 million of investment. Of the $900 million, $750 million is recovered through three periodic rate updates with the balance recovered through a future distribution base rate case.

Our broader GSMP III, which also included projects to introduce renewable natural gas and hydrogen blending into our existing distribution system is being held in abeyance, with negotiations to be reinitiated by January 2025 with the intent of beginning the work in January 2026. A remaining component of our CEF-Electric Vehicle (EV) program related to medium- and heavy-duty charging infrastructure has been the subject of a stakeholder process that the BPU began in 2021 and we expect that this effort will result in PSE&G submitting a filing targeting infrastructure investments for the medium-and heavy-duty EV market after the BPU finalizes its program and filing requirements. In September 2022, the BPU released a draft Storage Incentive Program proposal and is currently undertaking a stakeholder process to determine the details of the program. In the meantime, our CEF-Energy Storage (ES) program is being held in abeyance.

In November 2023, we filed for a second extension of our CEF-EE program, which would cover a commitment period of six months from July 2024 through December 2024 for approximately $300 million. In December 2023, we filed for our CEF-EE II program, which proposed a $3.1 billion investment for a second program cycle covering commitments from January 2025 through June 2027, with investments being made over a six-year period. This EE filing is a significant increase from our prior filings, driven by an increase in the savings targets required under the BPU Energy Efficiency Framework and higher costs to achieve those targeted savings. The filing also includes demand response programs and building decarbonization programs. The CEF-EE extension filing is expected to be resolved in the first half of 2024 and the EE II filing is expected to be resolved in the second half of 2024.

Pursuant to our GSMP II and Energy Strong II programs, we filed a distribution base rate case as required by the BPU in December 2023. Among other things, the distribution base rate case is seeking to recover capital expenditures associated with the portion of our infrastructure investment programs that are not already in rates, as well as the Advanced Metering Infrastructure and EV programs, other investments that are not recovered through periodic rate roll-ins, and several other cost and return factors. The filing proposes an overall revenue increase of 9% with a 12% increase for the combined typical residential electric and gas customer. We expect to conclude the distribution base rate case later in 2024.

PSEG Power

At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through the PTC mechanism and hedging, and support public policies that preserve these existing carbon-free base load nuclear generating plants. During the first three months of 2024, our nuclear units generated approximately 8.2 terawatt hours and operated at a capacity factor of 96.8%. As of March 31, 2024, PSEG Power has hedged approximately 90% to 95% of its expected generation output for 2024. Beginning in 2024, our hedging strategy has incorporated an estimated range of risk reduction impacts from the PTCs with potential incremental changes upon final U.S. Treasury guidance.

Climate Strategy and Sustainability Efforts

For more than a century, our purpose has been to provide safe access to an around-the-clock supply of reliable, affordable energy. Today, our vision is to power a future where people use less energy, and it is cleaner, safer and delivered more reliably than ever. We have established a net zero greenhouse gas (GHG) emissions by 2030 goal that includes direct GHG emissions (Scope 1) and indirect GHG emissions from operations (Scope 2) across our business operations, assuming advances in technology, public policy and customer behavior.

PSE&G has undertaken a number of initiatives that support the reduction of GHG emissions and the implementation of EE initiatives. PSE&G’s approved CEF-EE, CEF-Energy Cloud and CEF-EV programs and the proposed CEF-ES and CEF-EE II programs are intended to support New Jersey’s Energy Master Plan (EMP) and recent Gubernatorial Executive Orders through programs designed to help customers use energy more efficiently, reduce GHG emissions, support the expansion of the EV infrastructure in New Jersey, install energy storage capacity to supplement solar generation and enhance grid resiliency, install smart meters and supporting infrastructure to allow for the integration of other clean energy technologies and to more efficiently respond to weather and other outage events.

In addition, PSE&G is committed to the safe and reliable delivery of natural gas to approximately 1.9 million customers throughout New Jersey and we are equally committed to reducing GHG emissions associated with such operations. The GSMP is designed to significantly reduce natural gas leaks in our distribution system, which would reduce the release of methane, a potent GHG, into the air. Through GSMP II, from 2018 through 2023 we reduced reported methane emissions by

Table of Contents

approximately 27% system wide and assuming continuation of GSMP, we expect to achieve an overall reduction in methane emissions of at least 60% over the 2011 baseline through 2030 period. We also continue to assess physical risks of climate change and adapt our capital investment program to improve the reliability and resiliency of our system in an environment of increasing frequency and severity of weather events.

We also continue to focus on providing cleaner energy for our customers by working to preserve the economic viability of our nuclear units, which provide over 85% of the carbon-free energy in New Jersey. These efforts include reducing market risk by advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform at PJM Interconnection, L.L.C. (PJM) that recognize the value of our nuclear fleet’s carbon-free generation and its contribution to grid reliability.

Competitively Bid, FERC Regulated Transmission Projects

PSEG continues to evaluate investment opportunities in regulated transmission beyond PSE&G. In December 2023, PJM awarded a subsidiary of Energy Holdings an approximately $424 million project to address increasing load and reliability issues in Maryland and northern Virginia as part of its 2022 Window 3 competitive solicitation. The project has an expected in-service date of 2027.

In April 2024, PSE&G submitted bids to the BPU for what the BPU has termed the Pre-Build Infrastructure (PBI) project, which is a combination of onshore and near-shore underwater infrastructure. The BPU is expected to announce the winner(s) of the PBI solicitation in the second half of 2024.

We also continue to evaluate regulated transmission opportunities to support offshore wind development in the New Jersey area. In April 2023, the BPU issued an order requesting that PJM conduct a second public policy transmission solicitation process utilizing the State Agreement Approach (SAA2) for transmission projects to support New Jersey’s expanded offshore wind goal. This solicitation is expected to open in July 2024.

PJM has also announced its intent to open the 2024 Regional Transmission Expansion Plan (RTEP) Window 1 solicitation in July 2024, which is expected to include the impacts of higher load growth forecasts.

PSEG will evaluate the SAA2 and 2024 RTEP Window 1 solicitations when more information becomes available and may decide to submit bids in one or both opportunities.

Financial Results

The results for PSEG, PSE&G and PSEG Power & Other for the three months ended March 31, 2024 and 2023 are presented as follows:

Three Months Ended
March 31,
20242023
Millions
PSE&G$488$487
PSEG Power & Other (A)44800
PSEG Net Income$532$1,287
PSEG Net Income Per Share (Diluted)$1.06$2.58

(A)Other includes after-tax activities at the parent company, PSEG LI, and Energy Holdings as well as intercompany eliminations.

PSEG Power’s results above include the Nuclear Decommissioning Trust (NDT) Fund activity and the impacts of non-trading commodity mark-to-market (MTM) activity, which consist of the financial impact from positions with future delivery dates.

Table of Contents

The variances in our Net Income attributable to changes related to the NDT Fund and MTM are shown in the following table:

Three Months Ended
March 31,
20242023
Millions, after tax
NDT Fund Income (Expense) (A) (B)$57$25
Non-Trading MTM Gains (Losses) (C)$(186)$555

(A)NDT Fund Income (Expense) includes gains and losses on NDT securities which are recorded in Net Gains (Losses) on Trust Investments. See Item 1. Note 7. Trust Investments for additional information. NDT Fund Income (Expense) also includes interest and dividend income and other costs related to the NDT Fund recorded in Net Other Income (Deductions), interest accretion expense on PSEG Power’s nuclear Asset Retirement Obligation (ARO) recorded in Operation and Maintenance (O&M) Expense and the depreciation related to the ARO asset recorded in Depreciation and Amortization (D&A) Expense.

(B)Net of tax (expense) benefit of $(38) million and $(17) million for the three months ended March 31, 2024 and 2023, respectively.

(C)Net of tax (expense) benefit of $72 million and $(217) million for the three months ended March 31, 2024 and 2023, respectively.

Our Net Income for the three months ended March 31, 2024 decreased as compared to the comparable period in 2023 driven primarily by changes in the MTM and NDT Fund as shown in the table above.

Regulatory, Legislative and Other Developments

We closely monitor and engage with stakeholders on significant regulatory and legislative developments.

Transmission Rate Proceedings and Return on Equity (ROE)

Under current FERC rules, PSE&G continues to earn a 50 basis point adder to its base ROE for its membership in PJM as a transmission owner. In April 2021, FERC proposed eliminating this ROE adder for Regional Transmission Owner participation. FERC has not acted on the proposal. If the adder was eliminated, it would reduce PSE&G’s annual Net Income and annual cash inflows by approximately $40 million.

New Jersey Stakeholder Proceedings

In February 2023, the governor of New Jersey issued executive orders (EOs) that establish or accelerate previously established 2050 targets for clean-sourced energy, building decarbonization, and EV adoption goals, with new target dates of 2030 or 2035, as applicable. The EOs direct the BPU and other state agencies to collaborate with stakeholders to develop plans to reach the targets and the BPU has convened a stakeholder proceeding to develop a plan for gas distribution utilities to reach the target of 50% natural gas emissions reductions over 2006 levels by 2030. The BPU will begin proceedings to update the State’s EMP via public input hearings scheduled for May and June, 2024. We are unable to predict the outcomes of this proceeding, but it could have a material impact on our business, results of operations and cash flows.

Environmental Regulation

We are subject to liability under environmental laws for the costs and penalties of remediating contamination of property now or formerly owned by us and of property contaminated by hazardous substances that we generated. In particular, the historic operations of PSEG companies and the operations of numerous other companies along the Passaic and Hackensack Rivers are alleged by federal and state agencies to have discharged substantial contamination into the Passaic River/Newark Bay Complex in violation of various statutes. In addition, PSEG Power has retained ownership of certain liabilities excluded from the sale of its fossil generation portfolio, primarily related to obligations under New Jersey and Connecticut state law to investigate and remediate the sites. We are also currently involved in a number of proceedings relating to sites where other hazardous substances may have been discharged and may be subject to additional proceedings in the future, and the costs and penalties of any such remediation efforts could be material.

For further information regarding the matters described above, as well as other matters that may impact our financial condition and results of operations, see Item 1. Note 9. Commitments and Contingent Liabilities.

Nuclear

In April 2021, PSEG Power’s Salem 1, Salem 2 and Hope Creek nuclear plants were awarded zero emission certificates (ZECs) for the three-year eligibility period starting June 2022 at the same approximate $10 per megawatt hour (MWh) received during the prior ZEC period through May 2022. Pursuant to a process established by the BPU, ZECs are purchased from selected

Table of Contents

nuclear plants and recovered through a non-bypassable distribution charge in the amount of $0.004 per kilowatt-hour used (which is equivalent to approximately $10 per MWh generated in payments to selected nuclear plants (ZEC payment)). As previously noted, in August 2022, the IRA was signed into law expanding incentives promoting carbon-free generation. The enacted legislation established a PTC for electricity generated using existing nuclear energy, which began January 1, 2024 and continues through 2032. The expected PTC rate is up to $15/MWh subject to adjustment based upon a facility’s gross receipts. The PTC rate and the gross receipts threshold are subject to annual inflation adjustments. The establishment of the PTC impacted PSEG Power’s decision not to apply for the next ZEC three-year eligibility period starting June 2025. We continue to analyze the impact of the IRA on our nuclear units, and will analyze any future guidance from the U.S. Treasury to assess any impact of PTCs on expected ZEC payments and/or any future ZEC application periods.

Interest Rate Matters

Federal Reserve policy to reduce inflation has resulted in a higher interest rate environment which may persist as the Federal Reserve continues to assess the economic outlook. If it persists, higher interest rates on borrowings will contribute to higher interest expense on variable-rate debt and long-term rates on future financing plans. As of March 31, 2024, PSEG had entered into floating-to-fixed interest rate swaps totaling $1.75 billion in order to reduce the volatility in interest expense related to a $1.25 billion variable rate term loan at PSEG Power due March 2025 and PSEG’s $500 million variable rate term loan due April 2024. PSE&G’s interest rate risk is moderated due to annual transmission rate filings and distribution recoveries through base rate filings and clause-based investment programs.

Tax Legislation

Future federal and state tax legislation and clarification of enacted legislation could have a material impact on our effective tax rate and cash tax position.

In April 2023, the U.S. Treasury issued Revenue Procedure 2023-15 that provides a safe harbor method of accounting to determine the annual repair tax deduction for gas T&D property. The impact, if any, that this may have on PSEG and PSE&G’s financial statements has not yet been determined.

The IRA enacted a new 15% corporate alternative minimum tax (CAMT), a PTC for existing nuclear generation facilities and allows energy tax credits to be transferable. The U.S. Treasury has issued several Notices pertaining to the CAMT and proposed regulations pertaining to the prevailing wage requirements and transferability rules of energy tax credits. Many aspects of the IRA remain unclear and in need of further guidance; therefore, we continue to analyze the impact the IRA will have on PSEG’s and PSE&G’s results of operations, financial condition and cash flows, which could be material.

Future Outlook

Our future success will depend on our ability to continue to maintain strong operational and financial performance, address regulatory and legislative developments that impact our business and respond to the issues and challenges described below. In order to do this, we will continue to:

  • seek approval of and execute on our utility capital investment program to modernize our infrastructure, improve the reliability and resilience of the service we provide to our customers, and align our sustainability and climate goals with New Jersey’s energy policy,

  • seek a fair return for our T&D investments through our transmission formula rate, existing rate incentives, distribution infrastructure and clean energy investment programs and periodic distribution base rate case proceedings,

  • focus on controlling costs while maintaining safety, reliability and customer satisfaction and complying with applicable standards and requirements,

  • manage the risks and opportunities in federal and state clean energy policies,

  • advocate for appropriate regulatory guidance on the federal nuclear PTC to ensure long-term support for New Jersey’s largest carbon-free generation resource, and adapt our hedging program accordingly,

  • engage constructively with our multiple stakeholders, including regulators, government officials, customers, employees, investors, suppliers and the communities in which we do business, and

  • deliver on our human capital management strategy to attract, develop and retain a diverse, high-performing workforce.

In addition to the risks described elsewhere in this Form 10-Q for 2024 and beyond, the key issues and challenges we expect our business to confront include:

  • regulatory and political uncertainty, both with regard to transmission planning and rates policy, the role of distribution utilities and decarbonization impacts, future energy policy, tax regulations, design of energy and capacity markets, and environmental regulation, as well as with respect to the outcome of any legal, regulatory or other proceedings,

Table of Contents

  • performance of the financial markets, including the impact on our pension and interest rates on our future financing plans,

  • continuing to manage costs and maintain affordable customer rates in an inflationary environment, which could impact customer collections and future regulatory proceedings,

  • the increasing frequency, sophistication and magnitude of cybersecurity attacks against us and our respective vendors and business partners who may have our sensitive information and/or access to our environment, and the increasing frequency and magnitude of physical attacks on electric and gas infrastructure,

  • future changes in federal and state tax laws or any other associated tax guidance, and

  • the impact of changes in demand, natural gas and electricity prices, and expanded efforts to decarbonize several sectors of the economy.

We continually assess a broad range of strategic options to maximize long-term shareholder value and address the interests of our multiple stakeholders. We consider a wide variety of factors when determining how and when to efficiently deploy capital, including the performance and prospects of our businesses; returns and the sustainability and predictability of future earnings streams; the views of investors, regulators, public policy initiatives, rating agencies, customers and employees; our existing indebtedness and restrictions it imposes; and tax considerations, among other things. Strategic options available to us include:

  • investments in PSE&G, including T&D facilities to enhance reliability, resiliency and modernize the system to meet the growing needs and increasingly higher expectations of customers, and clean energy investments such as CEF-EE, CEF-EV, CEF-ES and solar,

  • continued operation of our nuclear generation facilities that are expected to be supported through the PTC through 2032 and can enable certain investments to increase the capacity of the units as well as potential license extensions, and offtake contracts with potential customers such as data centers and hydrogen producers, and others seeking reliable, around-the-clock carbon-free power,

  • investments in competitive, regulated transmission investments through PJM processes and BPU solicitations that provide revenue predictability and reasonable risk-adjusted returns, and

  • acquisitions, dispositions, development and other transactions involving our common stock, assets or businesses that could provide value to customers and shareholders.

There can be no assurance, however, that we will successfully develop and execute any of the strategic options noted above, or any additional options we may consider in the future. The execution of any such strategic plan may not have the expected benefits or may have unexpected adverse consequences.

Table of Contents

RESULTS OF OPERATIONS

PSEG

Our results of operations are comprised of the results of operations of our reportable segments, PSE&G and PSEG Power & Other, excluding charges related to intercompany transactions, which are eliminated in consolidation. For additional information on intercompany transactions, see Item 1. Note 18. Related-Party Transactions.

Three Months EndedIncrease/ (Decrease)
March 31,
202420232024 vs. 2023
MillionsMillions%
Operating Revenues$2,760$3,755$(995)(26)
Energy Costs9971,082(85)(8)
Operation and Maintenance (A)783743405
Depreciation and Amortization295282135
Income from Equity Method Investments—1(1)N/A
Net Gains (Losses) on Trust Investments954649N/A
Net Other Income (Deductions)3542(7)(17)
Net Non-Operating Pension and OPEB Credits (Costs)1928(9)(32)
Interest Expense2051802514
Income Tax Expense (Benefit)97298(201)(67)

The following discussions for PSE&G and PSEG Power & Other provide a detailed explanation of their respective variances.

PSE&G

Three Months EndedIncrease/ (Decrease)
March 31,
202420232024 vs. 2023
MillionsMillions%
Operating Revenues$2,333$2,293$402
Energy Costs928984(56)(6)
Operation and Maintenance (A)46546051
Depreciation and Amortization257244135
Net Other Income (Deductions)1621(5)(24)
Net Non-Operating Pension and OPEB Credits (Costs)1928(9)(32)
Interest Expense1381132522
Income Tax Expense (Benefit)92543870

(A)Includes amortization of EE programs regulatory investment expenditures of $27 million and $17 million for the three months ended March 31, 2024 and 2023, respectively.

Three Months Ended March 31, 2024 as Compared to Three Months Ended March 31, 2023

Operating Revenues increased $40 million due to changes in delivery, commodity, clause and other operating revenues.

Delivery Revenues increased $44 million due primarily to

  • Transmission revenues were $33 million higher due primarily to an increase in revenue requirements attributable to higher rate base investment.

  • Electric and gas distribution revenues increased $11 million due primarily to a $48 million increase from higher volumes and a $6 million increase in Green Program Recovery Charge (GPRC) collections. These increases were partially offset by a $37 million reduction from Conservation Incentive Program decoupling and a $7 million increase

Table of Contents

in the flowback to customers of excess deferred tax liabilities and tax repair-related accumulated deferred income tax benefits resulting from rate reductions, which is offset in Income Tax Expense.

Commodity Revenues decreased $73 million as a result of lower Gas and Electric revenues. The changes in Commodity revenues for both gas and electric are entirely offset by the changes in Energy Costs. PSE&G earns no margin on the provision of basic gas supply service (BGSS) and BGS (basic generation service) to retail customers.

  • Gas commodity revenues decreased $95 million due primarily to a decrease of $122 million from lower BGSS prices, partially offset by $27 million from higher BGSS sales volumes.

  • Electric commodity revenues increased $22 million due to $15 million from higher sales volumes and $7 million from higher BGS prices.

Clause Revenues increased $54 million due primarily to a $66 million net increase in Tax Adjustment Credit (TAC) and GPRC deferrals, partially offset by lower Societal Benefits Clause (SBC) revenues of $12 million. The changes in TAC and GPRC deferral amounts and SBC revenues are entirely offset by changes in the amortization of Regulatory Assets and Regulatory Liabilities and related costs in O&M, D&A, Interest and Income Tax Expenses. PSE&G does not earn margin on TAC and GPRC deferrals or on SBC revenue.

Other Operating Revenues increased $15 million due primarily from Renewable Energy Credit (REC) programs. The changes in revenues from REC programs are entirely offset by changes to Energy Costs.

Operating Expenses

Energy Costs decreased $56 million. This is entirely offset by changes in Commodity Revenues and Other Operating Revenues.

Depreciation and Amortization increased $13 million due primarily to increases in depreciation due to higher plant placed in service, partially offset by a decrease in the amortization of Regulatory Assets.

Net Non-Operating Pension and OPEB Credits decreased $9 million due primarily to an $11 million decrease in the amortization of net prior service credits and a $1 million increase in the amortization of the net actuarial loss, partially offset by a $2 million increase in the expected return on plan assets and a $1 million decrease in interest cost.

Interest Expense increased $25 million due primarily to March and August 2023 debt issuances.

Income Tax Expense increased $38 million due primarily to higher pre-tax income and a decrease in the flowback of excess deferred income tax benefits.

Table of Contents

PSEG Power & Other

Three Months EndedIncrease/ (Decrease)
March 31,
202420232024 vs. 2023
MillionsMillions%
Operating Revenues$872$2,027$(1,155)(57)
Energy Costs514663(149)(22)
Operation and Maintenance3182833512
Depreciation and Amortization3838——
Income from Equity Method Investments—1(1)N/A
Net Gains (Losses) on Trust Investments954649N/A
Net Other Income (Deductions)2022(2)(9)
Interest Expense6868——
Income Tax Expense (Benefit)5244(239)(98)

Three Months Ended March 31, 2024 as Compared to Three Months Ended March 31, 2023

Operating Revenues decreased $1,155 million due primarily to changes in generation and gas supply and other operating revenues.

Generation Revenues decreased $1,060 million due primarily to

  • a net decrease of $1,057 million due to MTM losses in 2024 as compared to MTM gains in 2023. Of this amount, there was a $680 million decrease due to changes in forward prices in 2024 as compared to 2023 coupled with a $377 million decrease due to positions reclassified to realized upon settlement,

  • a net decrease of $22 million due primarily to electricity sold under the BGS contracts, which ended in May 2023, and lower volumes sold under other load contracts, and

  • a net decrease of $12 million in capacity revenue due primarily to lower capacity prices, partially offset by decreases in capacity expenses due to lower load volumes served,

  • partially offset by a net increase of $14 million due primarily to higher average realized prices and volumes sold in 2024.

Gas Supply Revenues decreased $114 million due primarily to

  • a net decrease of $151 million in sales under the BGSS contract due primarily to $198 million from lower prices, partially offset by $47 million from higher sales volumes,

  • partially offset by a net increase of $27 million due primarily to lower MTM losses, primarily due to positions reclassified to realized upon settlement, and

  • a net increase of $10 million related to sales to third parties due primarily to $12 million from higher sales volumes, partially offset by $2 million from lower sales prices.

Operating Expenses

Energy Costs represent the cost of generation, which includes fuel costs for generation as well as purchased energy in the market, and gas purchases to meet PSEG Power’s obligation under its BGSS contract with PSE&G. Energy Costs decreased $149 million due to

Gas costs decreased $151 million due mainly to

  • a net decrease of $158 million related to sales under the BGSS contract, of which $200 million was due to the lower average cost of gas, partially offset by $42 million due to higher send out volumes,

  • partially offset by a net increase of $8 million related to sales to third parties due primarily to higher volumes sold.

Generation costs were essentially flat as compared to the prior year.

Operation and Maintenance increased $35 million due primarily to a refueling outage in 2024 at our 100%-owned Hope

Table of Contents

Creek nuclear plant as compared to an outage at our 57%-owned Salem 2 nuclear plant in 2023, and higher Long Island Electric Utility Servco, LLC’s (Servco) operating costs paid by LIPA. See Note 3. Variable Interest Entity for additional information on Servco and LIPA.

Net Gains (Losses) on Trust Investments increased $49 million due primarily to $26 million of net unrealized gains, and $17 million of net realized gains on equity securities in 2024 as compared to $6 million of net realized losses in 2023 on fixed income securities in the NDT Fund.

Income Tax Expense decreased $239 million due primarily to lower pre-tax income in 2024.

LIQUIDITY AND CAPITAL RESOURCES

The following discussion of our liquidity and capital resources is on a consolidated basis, noting the uses and contributions, where material, of our two direct major operating subsidiaries.

Operating Cash Flows

We continue to expect our operating cash flows combined with cash on hand and financing activities to be sufficient to fund planned capital expenditures and shareholder dividends.

For the three months ended March 31, 2024, our operating cash flow decreased $1,176 million, as compared to the same period in 2023. The net decrease was primarily due to an outflow of $168 million in net cash collateral postings in 2024 as compared to a $794 million inflow in 2023 at PSEG Power and lower tax refunds, partially offset by a net change at PSE&G, as discussed below.

PSE&G

PSE&G’s operating cash flow increased $30 million from $378 million to $408 million for the three months ended March 31, 2024, as compared to the same period in 2023. The increase was due primarily to higher cash collateral postings returned to BGS suppliers in 2023, partially offset by an increase in net accounts receivable and unbilled revenues and a net increase in regulatory deferrals.

Short-Term Liquidity

PSEG meets its short-term liquidity requirements, as well as those of PSEG Power, primarily through the issuance of commercial paper and, from time to time, short-term loans. PSE&G maintains its own separate commercial paper program to meet its short-term liquidity requirements. Each commercial paper program is fully back-stopped by its own separate credit facility.

Each of our credit facilities is restricted as to availability and use to the specific companies as listed below; however, if necessary, the PSEG facilities can also be used to support our subsidiaries’ liquidity needs.

In March 2024, PSEG, PSEG Power, and PSE&G executed a one year extension to their existing $3.75 billion revolving credit facilities, extending the maturity through March 2028.

Our total committed credit facilities and available liquidity as of March 31, 2024 were as follows:

Company/FacilityAs of March 31, 2024
Total FacilityUsageAvailable Liquidity
Millions
PSEG$1,500$2$1,498
PSE&G1,00045955
PSEG Power1,5251671,358
Total$4,025$214$3,811

PSEG Power has an uncommitted credit facility for $100 million, which can be utilized for letters of credit. A subsidiary of PSEG Power has an uncommitted credit facility for $150 million, which can be utilized for cash collateral postings. As of March 31, 2024, there were an no outstanding balances under these facilities.

We continually monitor our liquidity and seek to add capacity as needed to meet our liquidity requirements, including to satisfy any additional collateral requirements. As of March 31, 2024, our liquidity position, including our credit facilities and access to external financing, was expected to be sufficient to meet our projected stressed requirements over our 12-month planning horizon. PSEG analyzes its liquidity requirements using stress scenarios that consider different events, including changes in commodity prices and the potential impact of PSEG Power losing its investment grade credit rating from S&P or Moody’s,

Table of Contents

which would represent a two level downgrade from its current Moody’s and S&P ratings. In the event of a deterioration of PSEG Power’s credit rating, certain of PSEG Power’s agreements allow the counterparty to demand further performance assurance. The potential additional collateral that we would be required to post under these agreements if PSEG Power were to lose its investment grade credit rating was approximately $690 million and $751 million as of March 31, 2024 and December 31, 2023, respectively.

For additional information, see Item 1. Note 10. Debt and Credit Facilities.

Long-Term Debt Financing

During the next twelve months,

  • PSEG has $750 million of 2.88% Senior Notes maturing in June 2024,

  • PSE&G has $250 million of 3.15% Secured Medium-Term Notes, Series J, due August 2024,

  • PSE&G has $250 million of 3.05% Secured Medium-Term Notes, Series J, due November 2024, and

  • PSEG Power has a $1.25 billion term loan due March 2025.

PSEG, PSEG Power, Energy Holdings, PSEG LI and Services participate in a corporate money pool, an aggregation of daily cash balances designed to efficiently manage their respective short-term liquidity needs, which are accounted for as intercompany loans. Servco does not participate in the corporate money pool. Servco’s short-term liquidity needs are met through an account funded and owned by LIPA.

For additional information see Item 1. Note 10. Debt and Credit Facilities.

Common Stock Dividends

On April 16, 2024, PSEG’s Board of Directors approved a $0.60 per share common stock dividend for the second quarter of 2024. This reflects an indicative annual dividend rate of $2.40 per share. We expect to continue to pay cash dividends on our common stock; however, the declaration and payment of future dividends to holders of our common stock will be at the discretion of the Board of Directors and will depend upon many factors, including our financial condition, earnings, capital requirements of our businesses, alternate investment opportunities, legal requirements, regulatory constraints, industry practice and other factors that the Board of Directors deems relevant. For additional information related to cash dividends on our common stock, see Item 1. Note 16. Earnings Per Share (EPS) and Dividends.

Credit Ratings

If the rating agencies lower or withdraw our credit ratings, such revisions may adversely affect the market price of our securities and serve to materially increase our cost of capital and limit access to capital. Credit Ratings shown are for securities that we typically issue. Outlooks are shown for the credit ratings at each entity and can be Stable, Negative, or Positive. There is no assurance that the ratings will continue for any given period of time or that they will not be revised by the rating agencies, if in their respective judgments, circumstances warrant. Each rating given by an agency should be evaluated independently of the other agencies’ ratings. The ratings should not be construed as an indication to buy, hold or sell any security.

Moody’s (A)S&P (B)
PSEG
OutlookStableStable
Senior NotesBaa2BBB
Commercial PaperP2A2
PSE&G
OutlookStableStable
Mortgage BondsA1A
Commercial PaperP2A2
PSEG Power
OutlookPositiveStable
Issuer RatingBaa2BBB

(A)Moody’s ratings range from Aaa (highest) to C (lowest) for long-term securities and P1 (highest) to NP (lowest) for short-term securities.

(B)S&P ratings range from AAA (highest) to D (lowest) for long-term securities and A1 (highest) to D (lowest) for short-term securities.

Table of Contents

CAPITAL REQUIREMENTS

We expect that all of our capital requirements over the next three years will come from a combination of internally generated funds and external debt financing. There were no material changes to our projected capital expenditures as compared to amounts disclosed in our 2023 Form 10-K.

PSE&G

During the three months ended March 31, 2024, PSE&G made capital expenditures of $739 million, primarily for T&D system reliability and advanced electric metering. In addition, PSE&G had cost of removal, net of salvage, of $45 million associated with capital replacements, and expenditures for EE programs of approximately $118 million, which are included in operating cash flows.

PSEG Power & Other

During the three months ended March 31, 2024, PSEG Power & Other made capital expenditures of $49 million, excluding $9 million for nuclear fuel, primarily related to various nuclear projects at PSEG Power and various information technology projects at Services.

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

The risk inherent in our market-risk sensitive instruments and positions is the potential loss arising from adverse changes in commodity prices, equity security prices and interest rates as discussed in the Notes to Consolidated Financial Statements. It is our policy to use derivatives to manage risk consistent with business plans and prudent practices. We have a Risk Management Committee comprised of executive officers who utilize a risk oversight function to ensure compliance with our corporate policies and risk management practices.

Additionally, we are exposed to counterparty credit losses in the event of non-performance or non-payment. We have a credit management process, which is used to assess, monitor and mitigate counterparty exposure. In the event of non-performance or non-payment by a major counterparty, there may be a material adverse impact on our financial condition, results of operations or net cash flows.

Commodity Contracts

The availability and price of energy-related commodities are subject to fluctuations from factors such as weather, environmental policies, changes in supply and demand, state and federal regulatory policies, market rules and other events. To reduce price risk caused by market fluctuations, we enter into supply contracts and derivative contracts, including forwards, futures, swaps, treasury locks, and options with approved counterparties. These contracts, in conjunction with physical sales and other services, help reduce risk and optimize the value of owned electric generation capacity.

Value-at-Risk (VaR) Models

VaR represents the potential losses, under normal market conditions, for instruments or portfolios due to changes in market factors, for a specified time period and confidence level. We estimate VaR across our commodity businesses.

MTM VaR consists of MTM derivatives that are economic hedges. The calculation does not include market risks associated with activities that are subject to accrual accounting, primarily our generating facilities and some load-serving activities.

The VaR models used are variance/covariance models adjusted for the change of positions with 95% and 99.5% confidence levels and a one-day holding period for the MTM activities. The models assume no new positions throughout the holding periods; however, we actively manage our portfolio.

From January through March 2024, MTM VaR varied between a low of $30 million and a high of $152 million at the 95% confidence level. The range of VaR was wider for the three months ended March 31, 2024 as compared with the year ended December 31, 2023.

Table of Contents

MTM VaR
Three Months Ended March 31, 2024Year Ended December 31, 2023
Millions
95% Confidence Level, Loss could exceed VaR one day in 20 days
Period End$38$48
Average for the Period$50$56
High$152$127
Low$30$24
99.5% Confidence Level, Loss could exceed VaR one day in 200 days
Period End$60$75
Average for the Period$79$87
High$238$198
Low$47$38

See Item 1. Note 11. Financial Risk Management Activities for a discussion of credit risk.

Item 4. CONTROLS AND PROCEDURES

Disclosure Controls and Procedures

PSEG and PSE&G

We have established and maintain disclosure controls and procedures as defined under Rule 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934, as amended (the “Exchange Act”) that are designed to provide reasonable assurance that information required to be disclosed in the reports that are filed or submitted under the Exchange Act is recorded, processed, summarized and reported and is accumulated and communicated to the Chief Executive Officer (CEO) and Chief Financial Officer (CFO) of each respective company, as appropriate, by others within the entities to allow timely decisions regarding required disclosure. We have established a disclosure committee which includes several key management employees and which reports directly to the CFO and CEO of each of PSEG and PSE&G. The committee monitors and evaluates the effectiveness of these disclosure controls and procedures. The CFO and CEO of each of PSEG and PSE&G have evaluated the effectiveness of the disclosure controls and procedures and, based on this evaluation, have concluded that disclosure controls and procedures at each respective company were effective at a reasonable assurance level as of the end of the period covered by the report.

Internal Controls

PSEG and PSE&G

There have been no changes in internal control over financial reporting that occurred during the first quarter of 2024 that have materially affected, or are reasonably likely to materially affect, each registrant’s internal control over financial reporting.

PART II. OTHER INFORMATION

Item 1. LEGAL PROCEEDINGS

We are party to various lawsuits and environmental and regulatory matters, including in the ordinary course of business. For information regarding material legal proceedings, including updates to information reported in Item 3 of Part I of the Form 10-K, see Part I, Item 1. Note 9. Commitments and Contingent Liabilities in this Quarterly Report on Form 10-Q.

Item 1A. RISK FACTORS

The discussion of our business and operations in this Quarterly Report on Form 10-Q should be read together with the risk factors contained in Part I, Item 1A of our Form 10-K which describes various risks and uncertainties that could have a material adverse impact on our business, prospects, financial position, results of operations or cash flows and could cause results to differ materially from those expressed elsewhere in this report.

Table of Contents

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

From time to time, PSEG may repurchase shares to satisfy obligations under equity compensation awards and repurchase shares to satisfy purchases by employees under the Employee Stock Purchase Plan (ESPP). In March 2024, we entered into a share repurchase plan that complies with Rule 10b5-1 of the Securities Exchange Act of 1934, as amended, solely with respect to the repurchase of shares to satisfy obligations under equity compensation awards that are expected to be issued in 2024 and the repurchase of shares to satisfy purchases by employees under the ESPP during 2024. There were no common share repurchases in the open market during the first quarter of 2024.

Item 5. OTHER INFORMATION

Certain information is provided below for new matters that have arisen subsequent to the filing of the Form 10-K.

Director and Officer Rule 10b5-1 and non-Rule 10b5-1 Trading Plans

During the three months ended March 31, 2024, none of the Company’s directors or officers adopted, terminated or modified a Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement (as such terms are defined in Item 408 of Regulation S-K of the Securities Act of 1933).

Federal Regulation

Regulation of Wholesale Sales—Generation/Market Issues/Market Power

December 31, 2023 Form 10-K page 10. In March 2024, FERC issued a notice of proposed rulemaking proposing to eliminate compensation for reactive power in circumstances when the generator is operating within the normal power factor range specified in its interconnection agreement. PSEG Power receives reactive power compensation for its nuclear units. Therefore, we plan to actively participate in this rulemaking proceeding but cannot predict the outcome.

Capacity Market Issues

December 31, 2023 Form 10-K page 10. In October 2023, PJM submitted two related filings at FERC proposing reforms to its capacity market design. However, in February 2024, FERC issued an order rejecting PJM’s second package of reforms, including PJM’s proposed changes to its supply-side market power mitigation rules. Several parties have sought rehearing of FERC’s rejection order. In February 2024, PJM submitted a request asking FERC to delay the commencement of the base residual auction for the 2025/26 Delivery Year to mid-July 2024, which FERC granted.

In March 2024, the U.S. Court of Appeals for the Third Circuit (Third Circuit Court) issued a decision vacating an order in which FERC accepted PJM’s proposal to revise its planning parameters for one capacity market zone and to apply those revised planning parameters to the capacity auction for the 2024/2025 delivery that had already begun. The Third Circuit Court found that FERC’s order constituted retroactive ratemaking and vacated FERC’s decision. Before the Third Circuit Court remanded the matter back to FERC, PJM submitted a petition asking FERC to issue an order confirming the original results (those not reflecting revised planning parameters) of the auction for the 2024/2025 Delivery Year and to authorize PJM to rerun the third incremental auction. We cannot predict whether FERC will grant PJM’s petition.

Nuclear Regulatory Commission (NRC)

December 31, 2023 Form 10-K page 11. In March 2024, PSEG notified the NRC of our intent to seek a second license renewal for our Salem and Hope Creek units. This second license renewal would extend the operating licenses through 2056 and 2060 for Salem Units 1 and 2, respectively, and 2066 for Hope Creek.

Environmental Matters

Hazardous Substance Liability

December 31, 2023 Form 10-K page 15. In April 2024, the EPA released a final regulation designating perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS), along with their salts and structural isomers, as hazardous substances under the federal Superfund law. We are unable to predict the impact of this regulation at this point on PSEG, but it could have a material impact on our business, results of operations and cash flows due to the retroactive, strict, and joint and several nature of liability under the federal Superfund law.

Table of Contents

Item 6. EXHIBITS

A listing of exhibits being filed with this document is as follows:

a. PSEG:
Exhibit 10:2021 Equity Compensation Plan for Outside Directors - Restricted Stock Unit Award Agreement
Exhibit 31:Certification by Ralph LaRossa Pursuant to Rules 13a-14 and 15d-14 of the 1934 Act
Exhibit 31.1:Certification by Daniel J. Cregg Pursuant to Rules 13a-14 and 15d-14 of the 1934 Act
Exhibit 32:Certification by Ralph LaRossa Pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. Code
Exhibit 32.1:Certification by Daniel J. Cregg Pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. Code
Exhibit 101.INS:Inline XBRL Instance Document - The Instance Document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
Exhibit 101.SCH:Inline XBRL Taxonomy Extension Schema
Exhibit 101.CAL:Inline XBRL Taxonomy Extension Calculation Linkbase
Exhibit 101.LAB:Inline XBRL Taxonomy Extension Labels Linkbase
Exhibit 101.PRE:Inline XBRL Taxonomy Extension Presentation Linkbase
Exhibit 101.DEF:Inline XBRL Taxonomy Extension Definition Document
Exhibit 104:Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
b. PSE&G:
Exhibit 4a(16):Supplemental Indenture dated February 1, 2024
Exhibit 10:2021 Equity Compensation Plan for Outside Directors - Restricted Stock Unit Award Agreement
Exhibit 31.2:Certification by Ralph LaRossa Pursuant to Rules 13a-14 and 15d-14 of the 1934 Act
Exhibit 31.3:Certification by Daniel J. Cregg Pursuant to Rules 13a-14 and 15d-14 of the 1934 Act
Exhibit 32.2:Certification by Ralph LaRossa Pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. Code
Exhibit 32.3:Certification by Daniel J. Cregg Pursuant to Section 1350 of Chapter 63 of Title 18 of the U.S. Code
Exhibit 101.INS:Inline XBRL Instance Document - The Instance Document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
Exhibit 101.SCH:Inline XBRL Taxonomy Extension Schema
Exhibit 101.CAL:Inline XBRL Taxonomy Extension Calculation Linkbase
Exhibit 101.LAB:Inline XBRL Taxonomy Extension Labels Linkbase
Exhibit 101.PRE:Inline XBRL Taxonomy Extension Presentation Linkbase
Exhibit 101.DEF:Inline XBRL Taxonomy Extension Definition Document
Exhibit 104:Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)

Table of Contents

SIGNATURE

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

P****UBLIC S****ERVICE E****NTERPRISE G****ROUP I****NCORPORATED
(Registrant)
By:/S/ ROSE M. CHERNICK
Rose M. Chernick Vice President and Controller (Principal Accounting Officer)

Date: April 30, 2024

SIGNATURE

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized. The signature of the undersigned company shall be deemed to relate only to matters having reference to such company and any subsidiaries thereof.

P****UBLIC S****ERVICE E****LECTRIC A****ND G****AS C****OMPANY
(Registrant)
By:/S/ ROSE M. CHERNICK
Rose M. Chernick Vice President and Controller (Principal Accounting Officer)

Date: April 30, 2024