A Dark Vector Cognition product

Item 2. PROPERTIES

12K characters. Original on sec.gov ·

Item 2. PROPERTIES

Generation Facilities

APS’s portfolio of owned generating facilities as of December 31, 2020 is provided in the table below:

NameNo. of Units% Owned (a)Principal Fuels UsedPrimary Dispatch TypeOwned Capacity (MW)
Nuclear:
Palo Verde (b)329.1%UraniumBase Load1,146
Total Nuclear1,146
Steam:
Four Corners 4, 5 (c)263%CoalBase Load970
Cholla 1,32CoalBase Load387
Total Steam1,357
Combined Cycle:
Redhawk (e)2GasLoad Following1,088
West Phoenix5GasLoad Following887
Total Combined Cycle1,975
Combustion Turbine:
Ocotillo (d)7GasPeaking620
Saguaro3GasPeaking189
Douglas/Fairview1OilPeaking16
Sundance10GasPeaking420
West Phoenix2GasPeaking110
Yucca 1, 2, 33GasPeaking93
Yucca 41OilPeaking54
Yucca 5, 62GasPeaking96
Total Combustion Turbine1,598
Solar:
Cotton Center (f)1SolarAs Available17
Hyder I (f)1SolarAs Available16
Paloma (f)1SolarAs Available17
Chino Valley1SolarAs Available19
Gila Bend (f)1SolarAs Available32
Hyder II (f)1SolarAs Available14
Foothills (f)1SolarAs Available35
Luke AFB1SolarAs Available10
Desert Star (f)1SolarAs Available10
Red Rock1SolarAs Available40
APS Owned Distributed EnergySolarAs Available31
Multiple facilitiesSolarAs Available4
Total Solar245
Total Capacity6,321

(a)100% unless otherwise noted.

(b)Our 29.1% ownership in Palo Verde includes leased interests. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Nuclear” in Item 1 for details regarding leased interests in Palo Verde. The other participants are Salt River Project (17.49%), SCE (15.8%), El Paso (15.8%), Public Service Company of New Mexico (10.2%), Southern California Public Power Authority (5.91%), and Los Angeles Department of Water & Power (5.7%). The plant is operated by APS.

(c)The other participants are Salt River Project (10%), Public Service Company of New Mexico (13%), Tucson Electric Power Company (7%) and NTEC (7%). The plant is operated by APS.

(d)Ocotillo Steam Units 1 and 2 were retired on January 10, 2019. Units 3 through 7 all went into service on or prior to May 30, 2019 which increased generation capacity by 510 MW.

(e)Redhawk generation capacity increased by 104 MW following the Advanced Gas Path upgrade installed on both units.

(f)APS is under contract and currently plans to add battery storage at these AZ Sun sites. (See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Energy Storage” above for details related to these and other energy storage agreements.)

See “Business of Arizona Public Service Company — Environmental Matters” in Item 1 with respect to matters having a possible impact on the operation of certain of APS’s generating facilities.

See “Business of Arizona Public Service Company” in Item 1 for a map detailing the location of APS’s major power plants and principal transmission lines.

4CA

4CA, a wholly-owned subsidiary of Pinnacle West, purchased El Paso’s 7% interest in Units 4 and 5 of Four Corners on July 6, 2016 and subsequently sold the interest to NTEC on July 3, 2018. (See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Coal-Fueled Generating Facilities — Four Corners” in Item 1 and “Four Corners — 4CA Matter” in Note 11 for additional information about 4CA’s interest in Four Corners.)

Transmission and Distribution Facilities

Current Facilities**.** APS’s transmission facilities consist of approximately 5,728 pole miles of overhead lines and approximately 74 miles of underground lines, 5,591 miles of which are located in Arizona. APS’s distribution facilities consist of approximately 11,225 miles of overhead lines and approximately 22,453 miles of underground primary cable, all of which are located in Arizona. APS also owns and maintains 80 transmission substations and 443 distribution substations. APS shares ownership of some of its transmission facilities with other companies.

The following table shows APS’s jointly-owned interests in those transmission facilities recorded on the Consolidated Balance Sheets at December 31, 2020:

Percent Owned (Weighted-Average)
Morgan — Pinnacle Peak System64.6%
Palo Verde — Rudd 500kV System50.0%
Round Valley System50.0%
ANPP 500kV System33.5%
Navajo Southern System26.0%
Four Corners Switchyards61.8%
Palo Verde — Yuma 500kV System25.3%
Phoenix — Mead System17.1%
Palo Verde — Morgan System88.9%
Hassayampa — North Gila System80.0%
Cholla 500kV Switchyard85.7%
Saguaro 500kV Switchyard60.0%
Kyrene — Knox System50.0%

Expansion. Each year APS prepares and files with the ACC a ten-year transmission plan. In APS’s 2021 plan, APS projects it will develop 26 miles of new transmission lines over the next ten years. One significant project, the Palo Verde to Morgan project recently completed all phases and provides a new 500kV path that spans from the Palo Verde hub around the western and northern edges of the Phoenix metropolitan area and terminates at a bulk substation in the northeast part of Phoenix. The Palo Verde to Morgan project includes Palo Verde-Delaney-Sun Valley-Morgan-Pinnacle Peak. The project consisted of four phases and the fourth phase, Morgan to Sun Valley 500kV, was energized in April of 2018. In total, the project consisted of over 100 miles of new 500kV lines, with many of those miles constructed with the capability to employ a 230kV line as a second circuit.

APS continues to work with regulators to identify transmission projects necessary to support renewable energy facilities. Two such projects, which have been completed and were included in previous APS transmission plans, are the Delaney to Palo Verde line and the North Gila to Hassayampa line, both of which support the transmission of renewable energy to Phoenix and California. The North Gila to Hassayampa line went into service in May 2015 and the Delaney to Palo Verde line went into service in May 2016.

Plant and Transmission Line Leases and Rights-of-Way on Indian Lands

The Navajo Plant and Four Corners are located on land held under leases from the Navajo Nation and also under rights-of-way from the federal government. The Navajo Plant ceased operations in November 2019. The co-owners and the Navajo Nation executed a lease extension on November 29, 2017 that allows for decommissioning activities to begin after the plant ceased operations.

APS, on behalf of the Four Corners participants, negotiated amendments to the Four Corners facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generating Facilities — Coal-Fueled Generating Facilities — Four Corners” in Item 1 for additional information about the Four Corners right-of-way and lease matters.

Certain portions of our transmission lines are located on Indian lands pursuant to rights-of-way that are effective for specified periods. Some of these rights-of-way have expired and our renewal applications have not yet been acted upon by the appropriate Indian tribes or federal agencies. Other rights expire at various times in the future and renewal action by the applicable tribe or federal agencies will be required at that time. In recent negotiations, certain of the affected Indian tribes have required payments substantially in excess of amounts that we have paid in the past for such rights-of-way. The ultimate cost of renewal of certain of the rights-of-way for our transmission lines is therefore uncertain.

Previous: Item 1B. UNRESOLVED STAFF COMMENTS · Next: Item 3. LEGAL PROCEEDINGS