UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

FORM 10-K

(Mark One)

☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2024

OR

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission File NumberExact Name of Each Registrant as specified in its charter; State of Incorporation; Address; and Telephone NumberIRS Employer Identification No.
1-8962PINNACLE WEST CAPITAL CORPORATION86-0512431
(an Arizona corporation)
400 North Fifth Street, P.O. Box 53999
PhoenixArizona85072-3999
(602)250-1000
1-4473ARIZONA PUBLIC SERVICE COMPANY86-0011170
(an Arizona corporation)
400 North Fifth Street, P.O. Box 53999
PhoenixArizona85072-3999
(602)250-1000

Securities registered pursuant to Section 12(b) of the Act:

Title Of Each ClassTrading SymbolName Of Each Exchange On Which Registered
PINNACLE WEST CAPITAL CORPORATIONCommon Stock, No Par ValuePNWNew York Stock Exchange

Securities registered pursuant to Section 12(g) of the Act:

ARIZONA PUBLIC SERVICE COMPANY Common Stock, Par Value $2.50 per share

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act

PINNACLE WEST CAPITAL CORPORATIONYes☒No☐
ARIZONA PUBLIC SERVICE COMPANYYes☒No☐

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

PINNACLE WEST CAPITAL CORPORATIONYes☐No☒
ARIZONA PUBLIC SERVICE COMPANYYes☐No☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

PINNACLE WEST CAPITAL CORPORATIONYes☒No☐
ARIZONA PUBLIC SERVICE COMPANYYes☒No☐

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such

files).

PINNACLE WEST CAPITAL CORPORATIONYes☒No☐
ARIZONA PUBLIC SERVICE COMPANYYes☒No☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company.

PINNACLE WEST CAPITAL CORPORATION

Large accelerated filer☒Accelerated filer☐Non-accelerated filer☐Smaller reporting company☐
Emerging growth company☐

ARIZONA PUBLIC SERVICE COMPANY

Large accelerated filer☐Accelerated filer☐Non-accelerated filer☒Smaller reporting company☐
Emerging growth company☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant's executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

Indicate by check mark whether each registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

PINNACLE WEST CAPITAL CORPORATIONYes☐No☒
ARIZONA PUBLIC SERVICE COMPANYYes☐No☒

State the aggregate market value of the voting and non-voting common equity held by non-affiliates, computed by reference to the price at which the common equity was last sold, or the average bid and asked price of such common equity, as of the last business day of each registrant’s most recently completed second fiscal quarter:

PINNACLE WEST CAPITAL CORPORATION$8,663,553,568as of June 30, 2024
ARIZONA PUBLIC SERVICE COMPANY$0as of June 30, 2024

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date.

PINNACLE WEST CAPITAL CORPORATIONNumber of shares of common stock, no par value, outstanding as of February 20, 2025:119,099,064
ARIZONA PUBLIC SERVICE COMPANYNumber of shares of common stock, $2.50 par value, outstanding as of February 20, 2025:71,264,947

DOCUMENTS INCORPORATED BY REFERENCE

Portions of Pinnacle West Capital Corporation’s definitive Proxy Statement relating to its Annual Meeting of Shareholders to be held on May 21, 2025 are incorporated by reference into Part III hereof.

Arizona Public Service Company meets the conditions set forth in General Instruction I(1)(a) and (b) of Form 10-K and is therefore filing this form with the reduced disclosure format allowed under that General Instruction.

TABLE OF CONTENTS

Page
GLOSSARY OF NAMES AND TECHNICAL TERMSii
FORWARD-LOOKING STATEMENTS1
PART I3
Item 1.Business3
Item 1A.Risk Factors33
Item 1B.Unresolved Staff Comments48
Item 1C.Cybersecurity48
Item 2.Properties50
Item 3.Legal Proceedings52
Item 4.Mine Safety Disclosures52
Information about our Executive Officers53
PART II55
Item 5.Market for Registrants’ Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities55
Item 6.[Reserved]56
Item 7.Management’s Discussion and Analysis of Financial Condition and Results of Operations57
Item 7A.Quantitative and Qualitative Disclosures About Market Risk88
Item 8.Financial Statements and Supplementary Data89
Pinnacle West Financial Statements95
APS Financial Statements106
Item 9.Changes in and Disagreements with Accountants on Accounting and Financial Disclosure202
Item 9A.Controls and Procedures202
Item 9B.Other Information203
Item 9C.Disclosure Regarding Foreign Jurisdictions that Prevent Inspections203
PART III203
Item 10.Directors, Executive Officers and Corporate Governance of Pinnacle West203
Item 11.Executive Compensation203
Item 12.Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters203
Item 13.Certain Relationships and Related Transactions, and Director Independence205
Item 14.Principal Accountant Fees and Services205
PART IV206
Item 15.Exhibits and Financial Statement Schedules206
Item 16.Form 10-K Summary227
SIGNATURES228

This combined Form 10-K is separately filed by Pinnacle West Capital Corporation (“Pinnacle West”) and Arizona Public Service Company (“APS”). Any use of the words “Company,” “we,” “us,” and “our” refer to Pinnacle West unless the context otherwise requires. Each registrant is filing on its own behalf all of the information contained in this Form 10-K that relates to such registrant and, where required, its subsidiaries. Except as stated in the preceding sentence, neither registrant is filing any information that does not relate to such registrant, and therefore makes no representation as to any such information. The information required with respect to each company is set forth within the applicable items. Item 8 of this report includes Consolidated Financial Statements of Pinnacle West and Consolidated Financial Statements of APS. Item 8 also includes Combined Notes to Consolidated Financial Statements.

i

GLOSSARY OF NAMES AND TECHNICAL TERMS

ACAlternating Current
ACCArizona Corporation Commission
ADEQArizona Department of Environmental Quality
AFUDCAllowance for Funds Used During Construction
ANPPArizona Nuclear Power Project, also known as Palo Verde
APSArizona Public Service Company, a subsidiary of the Company
AROAsset retirement obligations
ATM ProgramAt-the-market equity distribution program
Base Fuel RateThe portion of APS’s retail base rates attributable to fuel and purchased power costs
BCEBright Canyon Energy Corporation
CAISOCalifornia Independent System Operator
CaptiveCaptive Insurance Cell
CCRCoal combustion residuals
ChollaCholla Power Plant
DGDistributed Generation
DOEUnited States Department of Energy
DOIUnited States Department of the Interior
DSMDemand side management
EESEnergy Efficiency Standard
EGUElectric generating unit
El DoradoEl Dorado Investment Company, a subsidiary of the Company
EPAUnited States Environmental Protection Agency
FERCUnited States Federal Energy Regulatory Commission
Four CornersFour Corners Power Plant
GHGGreenhouse gas
GWhGigawatt-hour, one billion watts per hour
kVKilovolt, one thousand volts
kWhKilowatt-hour, one thousand watts per hour
LFCRLost Fixed Cost Recovery Mechanism
MWMegawatt, one million watts
MWhMegawatt-hour, one million watts per hour
Native LoadRetail and wholesale sales supplied under traditional cost-based rate regulation
Navajo PlantNavajo Generating Station
NERCNorth American Electric Reliability Corporation
NRCUnited States Nuclear Regulatory Commission
NTECNavajo Transitional Energy Company, LLC
OCIOther comprehensive income
Palo VerdePalo Verde Generating Station or PVGS
Pinnacle WestPinnacle West Capital Corporation (any use of the words “Company,” “we,” “us,” and “our” refer to Pinnacle West unless the context requires otherwise)
PNW PowerPinnacle West Power, LLC, a subsidiary of the Company
PPAPower Purchase Agreement
PSAPower Supply Adjustor
RedhawkRedhawk Power Plant
RESArizona Renewable Energy Standard and Tariff
Salt River Project or SRPSalt River Project Agricultural Improvement and Power District
SCESouthern California Edison Company
SundanceSundance Power Plant
TCATransmission cost adjustor
TEAMTax expense adjustor mechanism
VIEVariable interest entity

ii

FORWARD-LOOKING STATEMENTS

This document contains forward-looking statements based on current expectations. These forward-looking statements are often identified by words such as “estimate,” “predict,” “may,” “believe,” “plan,” “expect,” “require,” “intend,” “assume,” “project,” “anticipate,” “goal,” “seek,” “strategy,” “likely,” “should,” “will,” “could,” and similar words. Because actual results may differ materially from expectations, we caution readers not to place undue reliance on these statements. A number of factors could cause future results to differ materially from historical results, or from outcomes currently expected or sought by Pinnacle West or APS. In addition to the Risk Factors described in Item 1A and in Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this report, these factors include, but are not limited to:

  • uncertainties associated with the current and future economic environment, including economic growth rates, labor market conditions, inflation, supply chain delays, increased expenses, volatile capital markets, or other unpredictable effects;

  • current and future economic conditions in Arizona, such as the housing market and overall business and regulatory environment;

  • our ability to manage capital expenditures and operations and maintenance costs while maintaining reliability and customer service levels;

  • the direct or indirect effect on our facilities or business from cybersecurity threats or intrusions, data security breaches, terrorist attack, physical attack, severe storms, or other catastrophic events, such as fires, explosions, pandemic health events, or similar occurrences;

  • variations in demand for electricity, including those due to weather, seasonality (including large increases in ambient temperatures), the general economy or social conditions, customer and sales growth (or decline), the effects of energy conservation measures and DG, and technological advancements;

  • the potential effects of climate change on our electric system, including as a result of weather extremes, such as prolonged drought and high temperature variations in the area where APS conducts its business;

  • power plant and transmission system performance and outages;

  • competition in retail and wholesale power markets;

  • regulatory and judicial decisions, developments, and proceedings;

  • new legislation, ballot initiatives, and regulation or interpretations of existing legislation or regulations, including those relating to environmental requirements, regulatory and energy policy, nuclear plant operations, and potential deregulation of retail electric markets;

  • fuel and water supply availability;

  • our ability to achieve timely and adequate rate recovery of our costs through our rates and adjustor recovery mechanisms, including returns on and of debt and equity capital investment;

  • the ability of APS to meet renewable energy and energy efficiency mandates and recover related costs;

  • the ability of APS to achieve its clean energy goals (including a goal by 2050 of 100% clean, carbon-free electricity) and, if these goals are achieved, the impact of such achievement on APS, its customers, and its business, financial condition, and results of operations;

  • risks inherent in the operation of nuclear facilities, including spent fuel disposal uncertainty;

  • the development of new technologies which may affect electric sales or delivery, including as a result of delays in the development and application of new technologies;

  • the cost of debt, including increased cost as a result of rising interest rates, and equity capital and our ability to access capital markets when required;

  • environmental, economic, and other concerns surrounding coal-fired generation, including regulation of GHG;

  • volatile fuel and purchased power costs;

  • the investment performance of the assets of our nuclear decommissioning trust, captive insurance cell, pension, and other postretirement benefit plans, and the resulting impact on future funding requirements;

  • the liquidity of wholesale power markets and the use of derivative contracts in our business;

  • potential shortfalls in insurance coverage;

  • new accounting requirements or new interpretations of existing requirements;

  • generation, transmission, and distribution facilities and system conditions and operating costs;

  • our ability to meet the anticipated future need for additional generation and associated transmission facilities in our region;

  • the willingness or ability of counterparties, power plant participants, and power plant landowners to meet contractual or other obligations or extend the rights for continued power plant operations; and

  • restrictions on dividends or other provisions in our credit agreements and ACC orders.

These and other factors are discussed in the Risk Factors described in Item 1A of this report, and in Item 7 — “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this report, which readers should review carefully before placing any reliance on our financial statements or disclosures. Neither Pinnacle West nor APS assumes any obligation to update these statements, even if our internal estimates change, except as required by law.

PART I

Item 1. BUSINESS

Pinnacle West

Pinnacle West is a holding company incorporated in Arizona that conducts business through its subsidiaries. We derive essentially all of our revenues and earnings from our wholly-owned subsidiary, APS. APS is incorporated in Arizona and is a vertically-integrated electric utility that provides either retail or wholesale electric service to most of Arizona, with the major exceptions of about one-half of the Phoenix metropolitan area, the Tucson metropolitan area and Mohave County in northwestern Arizona.

Pinnacle West’s other active subsidiaries are El Dorado, an Arizona corporation, and PNW Power, a Delaware limited liability company. BCE was a subsidiary of Pinnacle West, but was sold in January 2024. Additional information related to these subsidiaries is provided later in this report.

Our reportable business segment is our regulated electricity segment, which consists of traditional regulated retail and wholesale electricity businesses (primarily electric service to Native Load customers) and related activities, and includes electricity generation, transmission, and distribution. Our reportable business segment activities are conducted primarily through our wholly-owned subsidiary, APS.

BUSINESS OF ARIZONA PUBLIC SERVICE COMPANY

APS currently provides electric service to approximately 1.4 million customers. We own or lease 6,540 MW of regulated generation capacity and we hold a mix of both long-term and short-term purchased power agreements for additional capacity. During 2024, no single purchaser or user of energy accounted for more than 1.4% of our electric revenues.

The following map shows APS’s retail service territory, including the locations of its generating facilities and principal transmission lines.

2212051 8.5x11_2022_Service_Territory_Map_FL.jpg

Energy Sources and Resource Planning

To serve its customers, APS obtains power through its various generation stations and through purchased power agreements. Resource planning is an important function necessary to meet Arizona’s future energy needs. APS’s sources of energy by type used to supply energy to Native Load customers during 2024 were approximately as follows:

1934

*Utility Scale Renewables include energy from biogas, biomass, geothermal, solar, and wind.

The share of APS’s energy supply being derived from clean resources was approximately 54% in 2024, which includes energy from nuclear, renewables and DSM.

Clean Energy Focus Initiatives

In response to climate change, APS has undertaken a number of initiatives to reduce carbon, including renewable energy procurement and development, and promotion of programs and rates that promote energy conservation, renewable energy use, and energy efficiency. See “Energy Sources and Resource Planning — Current and Future Resources” below for details of these plans and initiatives. APS currently has a diverse portfolio of renewable resources, including biogas, biomass, geothermal, solar, and wind. In addition, in January 2020, APS announced its Clean Energy Commitment, a three-pronged approach aimed at ultimately eliminating carbon-emitting resources from its electric generation resource portfolio.

APS’s Clean Energy Commitment consists of three parts:

  • A 2050 goal to provide 100% clean, carbon-free electricity;

  • A 2030 target to achieve a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy; and

  • A plan to exit from coal-fired generation by 2031.

Among other strategies, APS intends to achieve these goals through various methods such as relying on Palo Verde, one of the nation’s largest producers of carbon-free energy; increasing clean energy resources, including renewables; developing energy storage; exiting from coal-generated electricity; managing demand with a modern interactive grid; promoting customer technology and energy efficiency; and optimizing regional resources. Management takes into consideration climate change and other environmental risks in its strategy development, business planning, and enterprise risk management processes. See Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information about APS’s Clean Energy Commitment.

Over this same period of time, APS also intends to harden its infrastructure in order to improve climate resiliency, which involves system and operational improvements aimed at reducing the impact of extreme weather events and other climate-related disruptions upon APS’s operations. Among other resiliency strategies, APS anticipates increasing investments in a modern and more flexible electricity grid with advanced distribution technologies. APS plans to continue its forest management programs aimed at reducing wildfires, as those risks become compounded by shorter, drier winters and longer, hotter summers as a result of climate change.

APS prepares an annual inventory of GHG emissions from its operations. For APS’s operations involving fossil-fuel electricity generation and electricity transmission and distribution, APS’s annual GHG inventory is reported to the EPA under the EPA GHG Reporting Program. In addition to reporting to the EPA, we publicly report Scope 1 and 2, as well as a limited number of Scope 3, GHG emissions. This data is then communicated to the public in Pinnacle West’s annual Corporate Responsibility Report as performance data and in CDP Reports, which are available on our website (www.pinnaclewest.com/corporate-responsibility). The reports provide information related to the Company and its approach to sustainability and its workplace and environmental performance. The information on Pinnacle West’s website, including Corporate Responsibility Reports and CDP Reports, is not incorporated by reference into or otherwise a part of this report.

Generation Facilities

APS has ownership interests in or leases the nuclear, gas, oil, coal, and solar generating facilities as well as energy storage facilities described below. For additional information regarding these facilities, see Item 2.

Nuclear

Palo Verde Generating Station — Palo Verde is a 3-unit nuclear power plant located approximately 50 miles west of Phoenix, Arizona. APS operates the plant and owns 29.1% of Palo Verde Units 1 and 3 and approximately 17% of Unit 2. In addition, APS leases approximately 12.1% of Unit 2, resulting in a 29.1% combined ownership and leasehold interest in that unit. APS has a total entitlement from Palo Verde of 1,146 MW.

Palo Verde Leases — In 1986, APS entered into agreements with three separate lessor trust entities in order to sell and lease back approximately 42% of its share of Palo Verde Unit 2 and certain common facilities. The leaseback was originally scheduled to expire at the end of 2015 and contained options to renew the leases or to purchase the leased property for fair market value at the end of the lease terms. On July 7, 2014, APS exercised the fixed rate lease renewal options. The exercise of the renewal options originally resulted in APS retaining the assets through 2023 under one lease and 2033 under the other two leases. On April 1, 2021, APS executed an amendment relating to the lease agreement with the term ending in 2023. The amendment extends the lease term for this lease through 2033 and changes the lease payment. As a result of this amendment, APS will now retain the assets through 2033 under all three lease agreements. At the end of the lease renewal periods, APS will have the option to purchase the leased assets at their fair market value, extend the leases for up to two years, or return the assets to the lessors. See Note 17 for additional information regarding the Palo Verde Unit 2 sale leaseback transactions.

*Palo Verde

Showing the first 8K of 107K characters. Open the full section

Item 1A. RISK FACTORS

In addition to the factors affecting specific business operations identified in the description of these operations contained elsewhere in this report, set forth below are risks and uncertainties that could affect our financial results. Unless otherwise indicated or the context otherwise requires, the following risks and uncertainties apply to Pinnacle West and its subsidiaries, including APS.

REGULATORY RISKS

Our financial condition depends upon APS’s ability to recover costs in a timely manner from customers through regulated rates and otherwise execute its business strategy.

APS is subject to comprehensive regulation by several federal, state and local regulatory agencies that significantly influence its business, liquidity and results of operations and its ability to fully recover costs from utility customers in a timely manner. The ACC regulates APS’s retail electric rates and FERC regulates rates for wholesale power sales and transmission services. The profitability of APS is affected by the rates it may charge and the timeliness of recovering costs incurred through its rates and adjustor recovery mechanisms. Consequently, our financial condition and results of operations are dependent upon the satisfactory resolution of any APS rate proceedings, adjustor recovery and ancillary matters which may come before the ACC and FERC, including in some cases how court challenges to these regulatory decisions are resolved. Arizona, like certain other states, has a statute that allows the ACC to reopen prior decisions and modify otherwise final orders under certain circumstances. Additionally, given that APS is subject to oversight by several regulatory agencies, a resolution by one may not foreclose potential actions by others for similar or related matters. See Note 10.

The ACC must also approve APS’s issuance of equity and debt securities, and any significant transfer or encumbrance of APS property used to provide retail electric service and must approve or receive prior notification of certain transactions between us, APS, and our respective affiliates, including the infusion of equity into APS. Decisions made by the ACC or FERC could have a material adverse impact on our financial condition, results of operations, or cash flows.

APS’s ability to conduct its business operations and avoid negative operational and financial impacts depends in part upon compliance with federal, state and local laws, judicial decisions, statutes, regulations and ACC requirements, which may be revised from time to time by legislative or other action, and obtaining and maintaining certain regulatory permits, approvals, and certificates.

APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, labor and employment, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.

Changes in laws or regulations that govern APS, new interpretations of laws and regulations, or the imposition of new or revised laws or regulations could have an adverse impact on the manner in which we operate our business and our results of operations. In particular, new or revised laws or interpretations of existing laws or regulations may impact or call into question the ACC’s permissive regulatory authority, which may result in uncertainty as to jurisdictional authority within our state, and uncertainty as to whether ACC decisions will be binding or challenged by other agencies or bodies asserting jurisdiction. We are unable to predict the impact on our business and operating results from any pending or future regulatory or legislative rulemaking.

The operation of APS’s nuclear power plant exposes it to substantial regulatory oversight and potentially significant liabilities and capital expenditures.

The NRC has broad authority under federal law to impose safety-related, security-related and other licensing requirements for the operation of nuclear generating facilities. Events at nuclear facilities of other operators or impacting the industry generally may lead the NRC to impose additional requirements and regulations on all nuclear generating facilities, including Palo Verde. In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increased inspection regime that could ultimately result in the shut-down of a unit or civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. The increased costs resulting from penalties, a heightened level of scrutiny and implementation of plans to achieve compliance with NRC requirements may adversely affect APS’s financial condition, results of operations and cash flows.

APS is subject to numerous environmental laws and regulations, and changes in, or liabilities under, existing or new laws or regulations may increase APS’s cost of operations or impact its business plans.

APS is, or may become, subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions of conventional pollutants and GHGs, water quality, discharges of wastewater and waste streams originating from fly ash and bottom ash handling facilities, solid waste, hazardous waste, and coal combustion products, which consist of bottom ash, fly ash, and air pollution control wastes. These laws and regulations can result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emissions obligations. They could also impact the overall business environment in Arizona and affect APS’s customer and sales growth rates. Additionally, these laws and regulations generally require APS to obtain and comply with a wide variety of environmental licenses, permits, and other approvals. If there is a delay or failure to obtain any required environmental regulatory approval, or if APS fails to obtain,

maintain, or comply with any such approval, operations at affected facilities could be suspended or subject to additional expenses. In addition, failure to comply with applicable environmental laws and regulations could result in civil liability as a result of government enforcement actions or private claims or criminal penalties. Both public officials and private individuals may seek to enforce applicable environmental laws and regulations. APS cannot predict the outcome (financial or operational) of any related litigation that may arise.

Environmental Clean Up. APS has been named as a PRP for Superfund sites in Phoenix, Arizona, and it could be named a PRP in the future for other environmental clean-up at sites identified by a regulatory body. APS cannot predict with certainty the amount and timing of all future expenditures related to environmental matters because of the difficulty of estimating clean-up costs. There is also uncertainty in quantifying liabilities under environmental laws that impose joint and several liability on all PRPs.

Coal Ash. In December 2014, the EPA issued final regulations governing the handling and disposal of

Showing the first 8K of 62K characters. Open the full section

Item 1B. UNRESOLVED STAFF COMMENTS

Neither Pinnacle West nor APS has received written comments regarding its periodic or current reports from the SEC staff that were issued 180 days or more preceding the end of its 2024 fiscal year and that remain unresolved.

Item 1C. CYBERSECURITY

The Company prioritizes and maintains a high level of commitment to responsible and secure cybersecurity practices given the critical nature of its services and the potential consequences of a successful cyber-attack on the Company and the electric grid. A successful cyber-attack could have far-reaching consequences, from compromising the integrity of sensitive data to disrupting power supply. To that end, the Company implements a robust risk management, strategy, and governance regime aimed at ensuring effective controls are in place to identify, mitigate, remediate, and communicate cyber threats at appropriate levels within the organization.

APS’s cybersecurity group (the “Cybersecurity Group”) is comprised of cybersecurity analysts, engineers, architects, and others, led by the Director of Cybersecurity, who reports to APS’s Vice President, Operations Support. The Director of Cybersecurity has more than twenty years of experience in information technology and cybersecurity roles, with more than ten of those years at the Company. The Director of Cybersecurity also holds cybersecurity certifications from multiple certifying bodies and is active in utility cybersecurity professional organizations. The Cybersecurity Group has day-to-day responsibility for safeguarding the Company’s critical assets and assessing, identifying, and managing material risks from cybersecurity threats.

In fulfilling its responsibility, the Cybersecurity Group manages formal documented internal processes such as risk management and vulnerability scanning, as well as other processes, such as assessing threat intelligence, that include outside partners. Intelligence sharing comes from industry sources such as the Electricity Information Sharing and Analysis Center, government sources, as well as commercially purchased information sources. The Cybersecurity Group also engages third parties for assessments and audits of its systems periodically and as needed. Such assessments and audits may include, among other things, pre-production evaluation of technologies, overall program assessments, and compliance program assessments including audits by our regulators.

Depending on the products and services provided and the potential for data exchange and technology risk, we may require vendors and service providers to pass APS’s vendor risk management program, which sets forth security and data protection requirements, as a condition to doing or continuing to do business with us. For contracts with vendors that will handle or have access to certain sensitive data, APS requires contractual provisions setting forth cybersecurity controls, vulnerability management, secure development practices, and other security and data protection requirements. A subset of vendors that meet a predetermined risk profile due to strategic relationships, technology risk, or other factors is continually monitored by a third-party risk management service, and the Company annually reviews independent assessments of these vendors.

The Cybersecurity Group also has documented processes for identifying, responding to, and internally escalating cybersecurity incidents to management and the Board of Directors. Once an incident meets certain criteria, the Company’s Cybersecurity Incident Command or, in the most severe cases that

impact the entire Company, the Corporate Emergency Operations Center is activated and formal response procedures are followed to address the incident. The Cybersecurity Group has a formal incident response plan that details response and escalation procedures, including activation of a Cybersecurity Disclosure Committee, consisting of the Chief Financial Officer and the General Counsel, to assess an incident’s materiality with input as needed from the Director of Cybersecurity, Chief Accounting Officer, Chief Information Officer, and others, including outside advisors.

Cybersecurity risk management has been integrated into the Company’s overall enterprise risk management program (the “Enterprise Risk Management Program”) through policies and processes that implement a risk management framework designed to identify, manage, and monitor business unit risks throughout the organization. The Enterprise Risk Management Program is overseen by an executive committee (the “Executive Risk Committee”), which meets at least quarterly and is comprised of members holding executive leadership positions in the Company, including the Chairman and Chief Executive Officer, President, and other Executive and Senior Vice Presidents, and is chaired and sponsored by the Chief Financial Officer. Every year, as a part of the Enterprise Risk Management Program, risks affecting the Company are identified. For 2024, cybersecurity was identified as a risk. The applicable subject matter experts brief the Company’s Board of Directors on the status of all top enterprise risks at least once per year. Finally, the Nuclear and Operating Committee of the Company’s Board of Directors provides ultimate oversight of cybersecurity risk and also receives briefings at least twice per year from the Cybersecurity Group, and notable audit findings relating to cybersecurity are aggregated and provided to the Board of Directors’ Audit Committee.

To date, we do not believe there have been risks from cybersecurity threats, including as a result of any previous cybersecurity incidents, that have materially affected or are reasonably likely to materially affect Pinnacle West or APS. However, there is no assurance that will continue to be the case. If a significant cybersecurity event or incident were to occur, our ability to fulfill our critical business functions and our business strategy, results of operations, and financial condition could all be materially impacted. See the risk factor entitled, “We are subject to cybersecurity risks and risks of unauthorized access to our systems that could adversely affect our business and financial condition” in Item 1A—Risk Factors for more information.

Item 2. PROPERTIES

Generation Facilities

APS’s portfolio of owned generating facilities as of December 31, 2024 is provided in the table below:

NameNo. of Units% Owned (a)Principal Fuels UsedPrimary Dispatch TypeOwned Capacity (MW)
Nuclear:
Palo Verde (b)329.1%UraniumBase Load1,146
Total Nuclear1,146
Steam:
Four Corners 4, 5 (c)263%CoalBase Load970
Cholla 1,32CoalBase Load380
Total Steam1,350
Combined Cycle:
Redhawk2GasLoad Following1,136
West Phoenix5GasLoad Following874
Total Combined Cycle2,010
Combustion Turbine:
Ocotillo7GasPeaking630
Saguaro3GasPeaking189
Douglas1OilPeaking18
Sundance10GasPeaking430
West Phoenix2GasPeaking114
Yucca 1, 2, 33GasPeaking93
Yucca 41OilPeaking54
Yucca 5, 62GasPeaking90
Total Combustion Turbine1,618
Solar: (d)
Cotton Center1SolarAs Available17
Hyder I1SolarAs Available17
Paloma1SolarAs Available17
Chino Valley1SolarAs Available20
Gila Bend1SolarAs Available36
Hyder II1SolarAs Available14
Foothills1SolarAs Available38
Luke AFB1SolarAs Available11
Desert Star1SolarAs Available10
Red Rock1SolarAs Available44
Agave Solar1SolarAs Available150
APS Owned Distributed EnergySolarAs Available38
Multiple facilitiesSolarAs Available4
Total Solar416
Total Capacity6,540

(a)100% unless otherwise noted.

(b)APS’s 29.1% ownership in Palo Verde includes leased interests and is the largest capacity interest of all the participants. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Nuclear” in Item 1 for details regarding leased interests in Palo Verde. The other participants are Salt River Project, SCE, El Paso Electric Company, Public Service Company of New Mexico, Southern California Public Power Authority, and Los Angeles Department of Water and Power.

(c)The other participants are Salt River Project (10%), Public Service Company of New Mexico (13%), Tucson Electric Power Company (7%) and NTEC (7%). The plant is operated by APS.

(d)See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Energy Storage” above for details related to APS’s energy storage facilities and agreements.

See “Business of Arizona Public Service Company — Environmental Matters” in Item 1 with respect to matters having a possible impact on the operation of certain of APS’s generating facilities.

See “Business of Arizona Public Service Company” in Item 1 for a map detailing the location of APS’s major power plants and principal transmission lines.

Transmission and Distribution Facilities

Current Facilities**.** As of January 24, 2025, APS’s transmission facilities consist of approximately 5,817 pole miles of overhead lines and approximately 86 miles of underground lines, 5,757 miles of which are located in Arizona. APS’s distribution facilities consist of approximately 11,317 miles of overhead lines and approximately 24,031 miles of underground primary cable (20,893 when excluding abandoned conductor), all of which are located in Arizona. APS also owns and maintains 485 substations, including both transmission and distribution yards. APS shares ownership of some of its transmission facilities with other companies.

The following table shows APS’s jointly-owned interests in those transmission facilities recorded on the Consolidated Balance Sheets at December 31, 2024:

Percent Owned (Weighted-Average)
Arizona Nuclear Power Project 500kV System33.3%
Navajo Southern System24.7%
Palo Verde — Yuma 500kV System25.5%
Four Corners Switchyards58.0%
Phoenix — Mead System17.1%
Palo Verde — Rudd 500kV System50.0%
Morgan — Pinnacle Peak System63.2%
Round Valley System50.0%
Palo Verde — Morgan System87.5%
Hassayampa — North Gila System80.0%
Cholla 500kV Switchyard85.7%
Saguaro 500kV Switchyard60.0%
Kyrene — Knox System50.0%
Agua Fria Switchyard10.0%

Expansion. Each year, APS prepares and files with the ACC a Ten-Year Transmission Plan. In APS’s 2025 Ten-Year Plan, APS projects it will develop 184 miles of new transmission lines over the next 10 years. Additionally, APS plans to upgrade 687 miles of existing transmission lines over the same

horizon. The 2025 Ten-Year Plan includes a 28-mile 500kV line from the Jojoba substation to the Rudd substation. The purpose of this 500kV line project is to bring in a new source to the west and southwest parts of the Phoenix metropolitan area which is experiencing rapid economic development. This new source will provide customers in the area greater access to a diverse mix of resources from around the region. Additionally, the 2025 Ten-Year Plan includes the rebuild of both Four Corners to Pinnacle Peak 345kV lines which span 289 miles each. This rebuild will replace aging towers to ensure continued reliability and safety, increase important capability to the Metro Phoenix area, and improve access to a diverse mix of resources from the Four Corners region throughout the Southwest. The 2025 Ten-Year Plan includes numerous projects with the purpose to interconnect new renewable energy resources to the transmission system.

Plant and Transmission Line Leases and Rights-of-Way on Indian Lands

The Navajo Plant and Four Corners are located on land held under leases from the Navajo Nation and also under rights-of-way from the federal government. The Navajo Plant ceased operations in November 2019. The co-owners and the Navajo Nation executed a lease extension on November 29, 2017, that allows for decommissioning activities to begin after the plant ceased operations.

APS, on behalf of the Four Corners participants, negotiated amendments to the Four Corners facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Coal-Fueled Generating Facilities — Four Corners” in Item 1 for additional information about the Four Corners right-of-way and lease matters.

Certain portions of our transmission lines are located on Indian lands pursuant to rights-of-way that are effective for specified periods. Some of these rights-of-way have expired and our renewal applications have not yet been acted upon by the appropriate Indian tribes or federal agencies. Other rights expire at various times in the future and renewal action by the applicable tribe or federal agencies will be required at that time. In recent negotiations, certain of the affected Indian tribes have required payments substantially in excess of amounts that we have paid in the past for such rights-of-way. The ultimate cost of renewal of certain of the rights-of-way for our transmission lines is therefore uncertain.

Item 3. LEGAL PROCEEDINGS

See “Business of Arizona Public Service Company — Environmental Matters” in Item 1 with regard to pending or threatened litigation and other disputes.

See Note 3 for ACC and FERC-related matters.

See Note 10 for information regarding environmental matters, Superfund–related matters and other disputes.

Item 4. MINE SAFETY DISCLOSURES

Not applicable.

INFORMATION ABOUT OUR EXECUTIVE OFFICERS

Pinnacle West’s executive officers are elected no less often than annually and may be removed by the Board of Directors, or in certain cases also by the Human Resources Committee, at any time. The executive officers, their ages at February 25, 2025, current positions and principal occupations for the past five years are as follows:

NameAgePositionPeriod
Jeffrey B. Guldner (a)59Chairman of the Board, Chief Executive Officer and President of Pinnacle West2019-Present
Chairman of the Board and Chief Executive Officer of APS2022-Present
Chairman of the Board, Chief Executive Officer and President of APS2021-2022
Chairman of the Board and Chief Executive Officer of APS2020-2021
President of APS2018-2020
Executive Vice President, Public Policy of Pinnacle West2017-2019
Elizabeth A. Blankenship53Vice President, Controller and Chief Accounting Officer of Pinnacle West and APS2019-Present
General Manager, Accounting Operations of APS2019-2019
Director, Accounting Operations of APS2014-2019
Andrew D. Cooper46Senior Vice President and Chief Financial Officer of Pinnacle West and APS2022-Present
Vice President and Treasurer of Pinnacle West and APS2020-2022
Director, Corporate Finance of Consolidated Edison Company of New York, Inc.2017-2020
Jose L. Esparza50Senior Vice President, Public Policy of APS2022-Present
Vice President, Regulatory of APS2022
Officer and Senior Vice President, Customer Engagement and Information Technology of Southwest Gas2019-2021
Vice President, Customer Engagement of Southwest Gas2012-2019
Theodore N. Geisler (a)46President of APS, Director on the Pinnacle West and APS Boards of Directors2024-Present
President of APS2022-Present
Senior Vice President and Chief Financial Officer of Pinnacle West and APS2020-2022
Vice President and Chief Information Officer of APS2018-2020
Adam C. Heflin61Executive Vice President and Chief Nuclear Officer, PVGS, of APS2022-Present
Chief Executive Officer of Wolf Creek Nuclear Operating Corporation2014-2019
Paul J. Mountain47Vice President, Finance and Planning of Pinnacle West and APS2024-Present
Vice President, Finance and Treasurer of Pinnacle West and APS2022-2024
Vice President, Finance and Planning of Pinnacle West and APS2020-2022
General Manager, Finance of Pinnacle West2017-2020
Robert E. Smith55Executive Vice President, Chief Legal Officer and Chief Development Officer of Pinnacle West and APS2025-Present
Executive Vice President, General Counsel and Chief Development Officer of Pinnacle West and APS2021-2025
Senior Vice President and General Counsel of Pinnacle West and APS2018-2021
Jacob Tetlow52Executive Vice President and Chief Operating Officer of APS2024-Present
Executive Vice President, Operations of APS2021-2024
Senior Vice President, Non-Nuclear Operations of APS2020-2021
Vice President, Transmission and Distributions Operations of APS2017-2020

(a) On December 12, 2024, Pinnacle West announced that Jeffrey B. Guldner will retire from his position as Chairman of the Board, President, Chief Executive Officer and member of the Board of Directors of Pinnacle West and Chairman of the Board, Chief Executive Officer and member of the Board of Directors of APS, effective April 1, 2025. On April 1, 2025, Theodore N. Geisler will replace Mr. Guldner as Chairman of the Board, President, and Chief Executive Officer of Pinnacle West and Chairman of the Board and Chief Executive Officer of APS. He will continue to serve as President of APS and as a director on the Pinnacle West and APS Boards of Directors.

PART II

Item 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED

STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Pinnacle West’s common stock is publicly held and is traded on the New York Stock Exchange under stock symbol PNW. At the close of business on February 20, 2025, Pinnacle West’s common stock was held of record by approximately 13,686 shareholders.

APS’s common stock is wholly-owned by Pinnacle West and is not listed for trading on any stock exchange. The sole holder of APS’s common stock, Pinnacle West, is entitled to dividends when and as declared out of legally available funds. At December 31, 2024, APS did not have any outstanding preferred stock.

Table of Contents

Stock Performance Chart

This graph compares the cumulative total shareholder return on Pinnacle West’s common stock during the five years ended December 31, 2024, to the cumulative total returns on the S&P 500 Index and the Edison Electric Index. The comparison assumes that $100 was invested on December 31, 2019, in Pinnacle West’s common stock and in each of the indices shown and that all of the dividends were reinvested.

Picture2.jpg

Year Ended December 31,
Company/Index201920202021202220232024
Pinnacle West Common Stock$100$92$85$96$95$117
Edison Electric Institute Index$100$99$116$117$107$127
S&P 500 Index$100$118$152$125$157$197

Item 6. [RESERVED]

Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS

OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

INTRODUCTION

The following discussion should be read in conjunction with Pinnacle West’s Consolidated Financial Statements and APS’s Consolidated Financial Statements and the related Notes that appear in Item 8 of this report. This discussion provides a comparison of the 2024 results with 2023 results. For the discussion of 2023 compared to 2022, see Part II. Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of Pinnacle West Capital Corporation’s Annual Report on Form 10-K for the year ended December 31, 2023, which specific discussion is incorporated herein by reference. For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Item 1A.

OVERVIEW

Business Overview

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $26 billion. Since 1886, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Pinnacle West derives essentially all of our revenues and earnings from our principal subsidiary, APS. APS is Arizona’s largest and longest-serving electric company that generates safe, affordable and reliable electricity for approximately 1.4 million retail customers in 11 of Arizona’s 15 counties. APS is also the operator and co-owner of Palo Verde — a primary source of electricity for the southwestern United States.

Strategic Overview

Our strategy is to create a sustainable energy future for Arizona that delivers shareholder value and shared value by serving our customers with reliable, affordable, and clean energy.

Customer-Focused

APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience. This multi-year objective includes incrementally improving APS’s J.D. Power (“JDP”) residential and business customer satisfaction ratings from the fourth to the top of second quartile for its customers. For 2024, APS ranked at the top of the second quartile for large investor-owned utilities for both business and residential customers, with the residential results being APS’s highest rank and placement since 2016.

In furtherance of a customer-centric culture, APS employees have delivered an enhanced customer experience in recent years through a number of past and ongoing initiatives, such as improving the ease-of-use of APS’s automated phone system, improving the speed of answering customer calls, advancing phone advisor soft skill development through updated training curriculum, and adding 1,100-plus in-person payment locations, as well as introducing new customer payment channels. Recently, APS redesigned its customer bills with the aim of increasing personalization and helping customers better understand their

energy use and find ways to save. APS also implemented numerous enhancements to its website, including improving page-loading speeds, adding user-friendly dashboards, and making content more simple, relevant, and useful. APS enhanced other customer touchpoints, such as communications throughout outages and the online outage center in addition to continuing to communicate with customers in their preferred channels about topics that matter most to them, such as reliability, energy-efficiency, financial assistance, the environment, and programs that enable them to design their own personalized energy experience. Finally, APS continues to focus on employee learning, training, tools, and resources to ensure all employees understand their role in APS customers’ experiences.

Additionally, APS has implemented a variety of financial assistance programs to support customers struggling to pay their energy bills. Among these assistance programs are discounts for qualified limited-income customers, including a new tier with larger discounts for APS’s lowest income customers added in the second quarter of 2024 and other non-income-based assistance programs, such as flexible payment arrangements and emergency utility bill assistance. To ensure our most vulnerable customers are connected to these programs, we train and partner with more than one hundred community action agencies across our service territory.

Reliable

While our energy mix evolves, APS’s commitment to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to those experienced in other industries.

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in customer energy needs, APS has developed a future-focused, strategic transmission plan (the “Ten-Year Transmission Plan”). The Ten-Year Transmission Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represent a significant upgrade to our transmission system. These five projects, along with other projects included in the Ten-Year Transmission Plan, will support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Our advanced distribution management system allows operators to locate outages and control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid. The system will also integrate a new meter data management system that will increase grid visibility and give customers access to more of their energy usage data.

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii, California, and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of fire modelling software that we are utilizing to more surgically identify and calculate risk and target future

system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. In 2024, APS began installing a system of artificial intelligence-based fire sensing cameras with the ability to detect and alert on fire ignitions. These alerts are sent both to APS and fire response dispatch centers to speed fire response in APS’s service territory regardless of the cause of the fire. APS also implemented a PSPS program on certain feeders that began in the 2024 fire season, leveraging the additional real-time analysis provided by the new modelling software, and has educated and is continuing education outreach to customers and communities that may potentially be impacted by the PSPS program. APS continues to evaluate policy and regulatory options, as well as

Showing the first 8K of 115K characters. Open the full section

Item 7A. QUANTITATIVE AND QUALITATIVE

DISCLOSURES ABOUT MARKET RISK

See “Market and Credit Risks” in Item 7 above for a discussion of quantitative and qualitative disclosures about market risks.

Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

INDEX TO FINANCIAL STATEMENTS AND

FINANCIAL STATEMENT SCHEDULES

Page
Management’s Report on Internal Control over Financial Reporting (Pinnacle West Capital Corporation)90
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)91
Pinnacle West Consolidated Statements of Income for 2024, 2023 and 202295
Pinnacle West Consolidated Statements of Comprehensive Income for 2024, 2023 and 202296
Pinnacle West Consolidated Balance Sheets as of December 31, 2024 and 202397
Pinnacle West Consolidated Statements of Cash Flows for 2024, 2023 and 202299
Pinnacle West Consolidated Statements of Changes in Equity for 2024, 2023 and 2022100
Management’s Report on Internal Control over Financial Reporting (Arizona Public Service Company)101
Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34)102
APS Consolidated Statements of Income for 2024, 2023 and 2022106
APS Consolidated Statements of Comprehensive Income for 2024, 2023 and 2022107
APS Consolidated Balance Sheets as of December 31, 2024 and 2023108
APS Consolidated Statements of Cash Flows for 2024, 2023 and 2022110
APS Consolidated Statements of Changes in Equity for 2024, 2023 and 2022111
Combined Notes to Consolidated Financial Statements112
Note 1. Summary of Significant Accounting Policies112
Note 2. Revenue122
Note 3. Regulatory Matters123
Note 4. Income Taxes138
Note 5. Lines of Credit and Short-Term Borrowings143
Note 6. Long-Term Debt and Liquidity Matters145
Note 7. Retirement Plans and Other Postretirement Benefits150
Note 8. Leases158
Note 9. Jointly-Owned Facilities162
Note 10. Commitments and Contingencies163
Note 11. Asset Retirement Obligations172
Note 12. Fair Value Measurements174
Note 13. Common Stock Equity and Earnings Per Share180
Note 14. Stock-Based Compensation182
Note 15. Derivative Accounting185
Note 16. Other Income and Other Expense189
Note 17. Variable Interest Entities190
Note 18. Investments in Nuclear Decommissioning Trusts and Other Special Use Funds192
Note 19. Changes in Accumulated Other Comprehensive Loss195
Note 20. Sale of Bright Canyon Energy196
Note 21. New Accounting Standards197

**MANAGEMENT’S

Showing the first 8K of 426K characters. Open the full section

Item 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS

ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

Item 9A. CONTROLS AND PROCEDURES

(a)Disclosure Controls and Procedures

The term “disclosure controls and procedures” means controls and other procedures of a company that are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Securities Exchange Act of 1934 (the “Exchange Act”) (15 U.S.C. 78a et seq.) is recorded, processed, summarized, and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to a company’s management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

Pinnacle West’s management, with the participation of Pinnacle West’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of Pinnacle West’s disclosure controls and procedures as of December 31, 2024. Based on that evaluation, Pinnacle West’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, Pinnacle West’s disclosure controls and procedures were effective.

APS’s management, with the participation of APS’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of APS’s disclosure controls and procedures as of December 31, 2024. Based on that evaluation, APS’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, APS’s disclosure controls and procedures were effective.

(b)Management’s Annual Reports on Internal Control Over Financial Reporting

Reference is made to “Management’s Report on Internal Control over Financial Reporting (Pinnacle West Capital Corporation)” in Item 8 of this report and “Management’s Report on Internal Control over Financial Reporting (Arizona Public Service Company)” in Item 8 of this report.

(c)Attestation Reports of the Registered Public Accounting Firm

Reference is made to “Report of Independent Registered Public Accounting Firm” in Item 8 of this report and “Report of Independent Registered Public Accounting Firm” in Item 8 of this report on the internal control over financial reporting of Pinnacle West and APS, respectively.

(d)Changes In Internal Control Over Financial Reporting

No change in Pinnacle West’s or APS’s internal control over financial reporting occurred during the fiscal quarter ended December 31, 2024, that materially affected, or is reasonably likely to materially affect, Pinnacle West’s or APS’s internal control over financial reporting.

Item 9B. OTHER INFORMATION

Rule 10b5-1 Trading Plans

During the fiscal quarter ended December 31, 2024, none of our directors or executive officers adopted or terminated any contract, instruction or written plan for the purchase or sale of our securities to satisfy the affirmative defense conditions of Rule 10b5-1(c) or any “non-Rule 10b5-1 trading arrangement.”

Item 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

Not applicable.

PART III

Item 10. DIRECTORS, EXECUTIVE OFFICERS

AND CORPORATE GOVERNANCE OF PINNACLE WEST

Reference is hereby made to “Information About Our Board and Corporate Governance” and “Proposal 1 — Election of Directors” in the Pinnacle West Proxy Statement relating to the Annual Meeting of Shareholders to be held on May 21, 2025 (the “2025 Proxy Statement”) and to the “Information about our Executive Officers” section in Part I of this report.

Pinnacle West has adopted a Code of Ethics for Financial Executives that applies to financial executives including Pinnacle West’s Chief Executive Officer, Chief Financial Officer, Chief Accounting Officer, Controller, Treasurer, and General Counsel, the President and Chief Operating Officer of APS and other persons designated as financial executives by the Chair of the Audit Committee. The Code of Ethics for Financial Executives is posted on Pinnacle West’s website (www.pinnaclewest.com). Pinnacle West intends to satisfy the requirements under Item 5.05 of Form 8-K regarding disclosure of amendments to, or waivers from, provisions of the Code of Ethics for Financial Executives by posting such information on Pinnacle West’s website.

Pinnacle West has adopted an insider trading policy governing the purchase, sale, and/or other dispositions of its securities by directors, officers and employees, and Pinnacle West itself, that Pinnacle West believes are reasonably designed to promote compliance with insider trading laws, rules and regulations, and New York Stock Exchange listing standards. This policy is set forth in our Securities Trading Policy included as Exhibit 19.1 to this report.

Item 11. EXECUTIVE COMPENSATION

Reference is hereby made to “Director Compensation,” “Executive Compensation,” and “Human Resources Committee Interlocks and Insider Participation” in the 2025 Proxy Statement.

Item 12. SECURITY OWNERSHIP OF

CERTAIN BENEFICIAL OWNERS AND MANAGEMENT

AND RELATED STOCKHOLDER MATTERS

Reference is hereby made to “Ownership of Pinnacle West Stock” in the 2025 Proxy Statement.

Securities Authorized for Issuance Under Equity Compensation Plans

The following table sets forth information as of December 31, 2024, with respect to the 2021 Plan, 2012 Plan, the 2007 Plan, under which our equity securities are outstanding or currently authorized for issuance.

Equity Compensation Plan Information

Plan CategoryNumber of securities to be issued upon exercise of outstanding options, warrants and rights (a)Weighted- average exercise price of outstanding options, warrants and rights (b)Number of securities remaining available for future issuance under equity compensation plans (excluding securities reflected in column (a)) (c)
Equity compensation plans approved by security holders1,632,699—2,941,625
Equity compensation plans not approved by security holders———
Total1,632,699—2,941,625

(a) This amount includes shares subject to outstanding performance share awards and restricted stock unit awards at the maximum amount of shares issuable under such awards. However, payout of the performance share awards is contingent on the Company reaching certain levels of performance during a three-year performance period. If the performance criteria for these awards are not fully satisfied, the award recipient will receive less than the maximum number of shares available under these grants and may receive nothing from these grants.

(b) The weighted-average exercise price in this column does not take performance share awards or restricted stock unit awards into account, as those awards have no exercise price.

(c) Awards under the 2021 Plan, as amended, can take the form of options, stock appreciation rights, restricted stock, performance shares, performance share units, performance cash, stock grants, stock units, dividend equivalents, and restricted stock units. Additional shares cannot be awarded under the 2012 Plan, as amended, and the 2007 Plan. However, if an award under the 2012 Plan, as amended, or the 2007 Plan is forfeited, terminated or canceled or expires, the shares subject to such award, to the extent of the forfeiture, termination, cancellation, or expiration, may be added back to the shares available for issuance under the 2021 Plan.

Equity Compensation Plans Approved By Security Holders

Amounts in column (a) in the table above include shares subject to awards outstanding under three equity compensation plans that were previously approved by our shareholders: (a) the 2007 Plan, which was approved by our shareholders at our 2007 Annual Meeting of Shareholders, under which no new stock awards may be granted; (b) the 2012 Plan, which was approved by our shareholders at our 2012 Annual Meeting of Shareholders, as amended by the First Amendment to the 2012 Plan, which was approved by our shareholders at our 2017 Annual Meeting of Shareholders, under which no new stock awards may be granted; and (c) the 2021 Plan, which was approved by our shareholders at our 2021 Annual Meeting of Shareholders, as amended by the First Amendment to the 2021 Plan, which was approved by our shareholders at our 2023 Annual Meeting of Shareholders. See Note 14 of the Notes to Consolidated Financial Statements for additional information regarding these plans.

Equity Compensation Plans Not Approved by Security Holders

The Company does not have any equity compensation plans under which shares can be issued that have not been approved by the shareholders.

Item 13. CERTAIN RELATIONSHIPS AND RELATED

TRANSACTIONS, AND DIRECTOR INDEPENDENCE

Reference is hereby made to “Information About Our Board and Corporate Governance” and “Related Party Transactions” in the 2025 Proxy Statement.

Item 14. PRINCIPAL ACCOUNTANT

FEES AND SERVICES

Pinnacle West

Reference is hereby made to “Audit Matters — Audit Fees and — Pre-Approval Policies” in the 2025 Proxy Statement.

APS

The following fees were paid to APS’s independent registered public accountants, Deloitte & Touche LLP, for the last two fiscal years:

Type of Service20242023
Audit Fees (1)$2,967,862$2,707,633
Audit-Related Fees (2)384,372372,040
Tax Fees——
All Other Fees (3)—1,672,676

(1) The aggregate fees billed for services rendered for the audit of annual financial statements and for review of financial statements included in Reports on Form 10-K and Form 10-Q, respectively.

(2) The aggregate fees billed for assurance and related services that are reasonably related to the performance of the audit or review of the financial statements and are not included in Audit Fees reported above, which primarily consist of fees for employee benefit plan audits in 2023 and 2024.

(3) The aggregate fees billed for independent third-party advisory (quality assurance) services related to a large-scale information technology project.

Pinnacle West’s Audit Committee pre-approves each audit service and non-audit service to be provided by APS’s registered public accounting firm. The Audit Committee has delegated to the Chair of the Audit Committee the authority to pre-approve audit and non-audit services to be performed by the independent public accountants if the services are not expected to cost more than $100,000. The Chair must report any pre-approval decisions to the Audit Committee at its next scheduled meeting. All of the services performed by Deloitte & Touche LLP for APS in 2024 were pre-approved by the Audit Committee or the Chair consistent with the pre-approval policy.

PART IV

Item 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES

Financial Statements and Financial Statement Schedules

See the Index to Financial Statements and Financial Statement Schedule in Part II, Item 8.

Exhibits Filed

The documents listed below are being filed or have previously been filed on behalf of Pinnacle West or APS and are incorporated herein by reference from the documents indicated and made a part hereof. Exhibits not identified as previously filed are filed herewith.

Exhibit No.Registrant(s)DescriptionPreviously Filed as Exhibit: aDate Filed
3.1Pinnacle WestArticles of Incorporation, restated as of May 21, 20083.1 to Pinnacle West/APS June 30, 2008 Form 10-Q Report, File No. 1-89628/7/2008
3.2Pinnacle WestPinnacle West Capital Corporation Bylaws, amended as of February 19, 20203.1 to Pinnacle West/APS February 25, 2020 Form 8-K Report, File Nos. 1-8962 and 1-44732/25/2020
3.3APSArticles of Incorporation, restated as of May 25, 19884.2 to APS’s Form 18 Registration Nos. 33-33910 and 33-55248 by means of September 24, 1993 Form 8-K Report, File No. 1-44739/29/1993
3.3(1)APSAmendment to the Articles of Incorporation of Arizona Public Service Company, amended May 16, 20123.1 to Pinnacle West/APS May 22, 2012 Form 8-K Report, File Nos. 1-8962 and 1-44735/22/2012
3.4APSArizona Public Service Company Bylaws, amended as of December 16, 20083.4 to Pinnacle West/APS December 31, 2008 Form 10-K Report, File No. 1-44732/20/2009
4.1Pinnacle WestSpecimen Certificate of Pinnacle West Capital Corporation Common Stock, no par value4.1 to Pinnacle West June 20, 2017 Form 8-K Report, File No. 1-89626/20/2017
4.2Pinnacle West APSIndenture dated as of January 1, 1995 among APS and The Bank of New York Mellon, as Trustee4.6 to APS’s Registration Statement Nos. 33-61228 and 33-55473 by means of January 1, 1995 Form 8-K Report, File No. 1-44731/11/1995
4.3Pinnacle West APSIndenture dated as of November 15, 1996 between APS and The Bank of New York, as Trustee4.5 to APS’s Registration Statements Nos. 33-61228, 33-55473, 33-64455 and 333-15379 by means of November 19, 1996 Form 8-K Report, File No. 1-447311/22/1996
4.4Pinnacle WestIndenture dated as of December 1, 2000 between the Company and The Bank of New York, as Trustee, relating to Senior Unsecured Debt Securities4.1 to Pinnacle West’s Registration Statement No. 333-5247612/21/2000
4.4(a)Pinnacle WestFourth Supplemental Indenture dated as of June 17, 20204.1 to Pinnacle West June 10, 2020 Form 8-K Report, File No. 1-89626/16/2020
Exhibit No.Registrant(s)DescriptionPreviously Filed as Exhibit: aDate Filed
4.4(b)Pinnacle WestFifth Supplemental Indenture dated as of June 10, 20244.1 to Pinnacle West June 5, 2024 Form 8-K Report, File No. 1-89626/10/2024
4.5Pinnacle WestIndenture dated as of December 1, 2000 between the Company and The Bank of New York, as Trustee, relating to Subordinated Unsecured Debt Securities4.2 to Pinnacle West’s Registration Statement No. 333-5247612/21/2000
4.6Pinnacle West APSIndenture dated as of January 15, 1998 between APS and The Bank of New York Mellon Trust Company N.A. (successor to JPMorgan Chase Bank, N.A., formerly known as The Chase Manhattan Bank), as Trustee4.10 to APS’s Registration Statement Nos. 333-15379 and 333-27551 by means of January 13, 1998 Form 8-K Report, File No. 1-44731/16/1998
4.6(a)Pinnacle West APSSeventh Supplemental Indenture dated as of May 1, 20034.1 to APS’s Registration Statement No. 333-90824 by means of May 7, 2003 Form 8-K Report, File No. 1-44735/9/2003

Showing the first 8K of 114K characters. Open the full section

Item 16. FORM 10-K SUMMARY

None.

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

PINNACLE WEST CAPITAL CORPORATION
(Registrant)
Date: February 25, 2025/s/ Jeffrey B. Guldner
(Jeffrey B. Guldner, Chairman of the Board of Directors, President and Chief Executive Officer)

Power of Attorney

We, the undersigned directors and executive officers of Pinnacle West Capital Corporation, hereby severally appoint Andrew Cooper and Robert E. Smith, and each of them, our true and lawful attorneys with full power to them and each of them to sign for us, and in our names in the capacities indicated below, any and all amendments to this Annual Report on Form 10-K filed with the Securities and Exchange Commission.

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated.

SignatureTitleDate
/s/ Jeffrey B. GuldnerPrincipal Executive OfficerFebruary 25, 2025
(Jeffrey B. Guldner, Chairmanand Director
of the Board of Directors, President
and Chief Executive Officer)
/s/ Andrew CooperPrincipal Financial OfficerFebruary 25, 2025
(Andrew Cooper,
Senior Vice President and
Chief Financial Officer)
/s/ Elizabeth A. BlankenshipPrincipal Accounting OfficerFebruary 25, 2025
(Elizabeth A. Blankenship,
Vice President, Controller and
Chief Accounting Officer)
/s/ Glynis A. BryanDirectorFebruary 25, 2025
(Glynis A. Bryan)
/s/ Ronald Butler, Jr.DirectorFebruary 25, 2025
(Ronald Butler, Jr.)
/s/ Gonzalo A. de la Melena, Jr.DirectorFebruary 25, 2025
(Gonzalo A. de la Melena, Jr.)
/s/ Carol S. EicherDirectorFebruary 25, 2025
(Carol S. Eicher)
/s/ Susan T. FlanaganDirectorFebruary 25, 2025
(Susan T. Flanagan)
/s/ Richard P. FoxDirectorFebruary 25, 2025
(Richard P. Fox)
/s/ Theodore N. GeislerDirectorFebruary 25, 2025
(Theodore N. Geisler)
/s/ Bruce J. NordstromDirectorFebruary 25, 2025
(Bruce J. Nordstrom)
/s/ Paula J. SimsDirectorFebruary 25, 2025
(Paula J. Sims)
/s/ William H. SpenceDirectorFebruary 25, 2025
(William H. Spence)
/s/ Kristine L. SvinickiDirectorFebruary 25, 2025
(Kristine L. Svinicki)
/s/ James E Trevathan, Jr.DirectorFebruary 25, 2025
(James E. Trevathan, Jr.)

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

ARIZONA PUBLIC SERVICE COMPANY
(Registrant)
Date: February 25, 2025/s/ Jeffrey B. Guldner
(Jeffrey B. Guldner, Chairman of the Board of Directors and Chief Executive Officer)

Power of Attorney

We, the undersigned directors and executive officers of Arizona Public Service Company, hereby severally appoint Andrew Cooper and Robert E. Smith, and each of them, our true and lawful attorneys with full power to them and each of them to sign for us, and in our names in the capacities indicated below, any and all amendments to this Annual Report on Form 10-K filed with the Securities and Exchange Commission.

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities and on the dates indicated.

SignatureTitleDate
/s/ Jeffrey B. GuldnerPrincipal Executive OfficerFebruary 25, 2025
(Jeffrey B. Guldner, Chairmanand Director
of the Board of Directors and
Chief Executive Officer)
/s/ Andrew CooperPrincipal Financial OfficerFebruary 25, 2025
(Andrew Cooper,
Senior Vice President and
Chief Financial Officer)
/s/ Elizabeth A. BlankenshipPrincipal Accounting OfficerFebruary 25, 2025
(Elizabeth A. Blankenship
Vice President, Controller and
Chief Accounting Officer)
/s/ Glynis A. BryanDirectorFebruary 25, 2025
(Glynis A. Bryan)
/s/ Ronald Butler, Jr.DirectorFebruary 25, 2025
(Ronald Butler, Jr.)
/s/ Gonzalo A. de la Melena, Jr.DirectorFebruary 25, 2025
(Gonzalo A. de la Melena, Jr.)
/s/ Carol S. EicherDirectorFebruary 25, 2025
(Carol S. Eicher)
/s/ Susan T. FlanaganDirectorFebruary 25, 2025
(Susan T. Flanagan)
/s/ Richard P. FoxDirectorFebruary 25, 2025
(Richard P. Fox)
/s/ Theodore N. GeislerDirectorFebruary 25, 2025
(Theodore N. Geisler)
/s/ Bruce J. NordstromDirectorFebruary 25, 2025
(Bruce J. Nordstrom)
/s/ Paula J. SimsDirectorFebruary 25, 2025
(Paula J. Sims)
/s/ William H. SpenceDirectorFebruary 25, 2025
(William H. Spence)
/s/ Kristine L. SvinickiDirectorFebruary 25, 2025
(Kristine L. Svinicki)
/s/ James E Trevathan, Jr.DirectorFebruary 25, 2025
(James E. Trevathan, Jr.)