Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
INTRODUCTION
The following discussion should be read in conjunction with Pinnacle West’s Condensed Consolidated Financial Statements and APS’s Condensed Consolidated Financial Statements and the related Combined Notes that appear in Item 1 of this report. For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Part 1, Item 1A of the 2021 Form 10-K, Part II, Item 1A of our 2022 1st Quarter 10-Q, and Part II, Item 1A of this report.
OVERVIEW
Business Overview
Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of about $23 billion. For over 130 years, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.
Pinnacle West derives essentially all of our revenues and earnings from our principal subsidiary, APS. APS is Arizona’s largest and longest-serving electric company that generates safe, affordable and reliable electricity for approximately 1.3 million retail customers in 11 of Arizona’s 15 counties. APS is also the operator and co-owner of Palo Verde — a primary source of electricity for the southwest United States and the largest nuclear power plant in the United States.
Inflation
Overall inflation has grown by 13% in Phoenix over the past twelve months, compared to 8% nationally; however, APS’s work with national and international companies has helped to partially reduce local cost escalation impacts on APS. The impacts from inflation have varied across separate categories of APS’s spending. Pricing increases across major categories have ranged from 8% to 10% for vendor services and up to 15% to 60% for equipment in the first three quarters of 2022. APS has seen specific inflationary impacts in individual spend categories, as well as general inflationary pricing impacts on a broader set of spend categories. Some of the highest increases so far in 2022 as compared to 2021 have been in chemical costs and contract services.
Even prior to these increases, APS has focused on its customer affordability initiative, which has enabled APS to mitigate inflationary pressure. This initiative includes identifying efficiency opportunities through APS' LEAN Sigma approach as well as other corporate decisions. For example, APS maintains its inventory to take advantage of lower pricing, when available, and to minimize supply chain delays that can increase the pricing due to expediting fees. Additionally, APS has proactively entered into long-term contracts to hedge against price volatility, which has allowed it to mitigate several procurement spend areas such as transformers.
Inflation Reduction Act of 2022
On August 16, 2022, President Biden signed the Inflation Reduction Act of 2022 (“IRA”). The IRA significantly expands the availability of tax credits for investments in clean energy generation technologies and
energy storage. Key provisions that are relevant to the Company's clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023, and (iii) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants, available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury are expected to issue regulations and other guidance which will provide additional details and clarifications regarding how the Company may be able to claim each of these credits.
In addition, the IRA contains several provisions which could create additional tax liabilities for corporations, including a 15% corporate alternative minimum tax for corporations with net profits in excess of $1 billion and a 1% excise tax on stock buybacks. We currently do not believe the Company will be subject to any material tax liabilities as a result of these legislative provisions.
COVID-19 Pandemic
Essential planned work and capital investments have continued during the COVID-19 pandemic with priority given to support fire mitigation and summer storm efforts, as well as heat related outages. Raw material shortages, rising inflation, COVID-19 related work force disruptions and natural disasters are putting increased pressure on the global supply chain. APS is experiencing some delays in finished materials and tight labor markets. To date, APS has not experienced labor or material supply chain shortages that have significantly impacted its ability to serve its customers’ needs. However, shortages are causing some delays and shifting of work projects based on material availability. If APS continues to experience delays in materials, it could experience an increase in purchased power costs for future summer generation needs. Such increased purchased power costs would be expected to be recoverable through the PSA. See Note 4 for additional information on the PSA. APS has measures in place to continually monitor and evaluate resource needs and supply chain adequacy but cannot predict whether there will be material supply chain shortages in the future.
Though the total expected impact of COVID-19 on future sales remains unknown, APS experienced higher electric residential sales and lower electric commercial and industrial sales from the outset of the pandemic through April 2021. Beginning in May 2021, electric sales to commercial and industrial customers increased to levels in line with pre-COVID sales and such sales levels have remained to date.
The Coronavirus Aid, Relief, and Economic Security (“CARES”) Act allowed employers to defer payments of the employer share of Social Security payroll taxes that would have otherwise been owed from March 27, 2020, through December 31, 2020. We deferred the cash payment of the employer’s portion of Social Security payroll taxes for the period July 1, 2020, through December 31, 2020, which was approximately $18 million. We paid half of this cash deferral by December 31, 2021, and the remainder will be paid by December 31, 2022.
On June 30, 2020, the United States Federal Energy Regulatory Commission (“FERC”) issued an order granting a waiver request related to the existing Allowance for Funds Used During Construction (“AFUDC”) rate calculation beginning March 1, 2020 through February 28, 2021. On February 23, 2021, this waiver was extended until September 30, 2021. On September 21, 2021, it was further extended until March 31, 2022. The order provided a simplified approach that companies may elect to implement in order to minimize the significant distorted effect on the AFUDC formula resulting from increased short-term debt financing during the COVID-19 pandemic. APS adopted this simplified approach to computing the AFUDC composite rate by using a simple average of the actual historical short-term debt balances for 2019, instead of current period short-term debt balances, and left all other aspects of the AFUDC formula composite rate calculation
unchanged. This change impacted the AFUDC composite rate in 2021 and for the three month ended March 31, 2022. Furthermore, the change in the composite rate calculation did not impact our accounting treatment for these costs. The change did not have a material impact on our financial statements. See Note 1.
Strategic Overview
Our strategy is to deliver shareholder value by creating a sustainable energy future for Arizona by serving our customers with clean, reliable and affordable energy.
Clean Energy Commitment
We are committed to doing our part to make the future clean and carbon-free. As Arizona stewards, we do what is right for the people and prosperity of Arizona. Our vision is to create a sustainable energy future for Arizona through providing clean, affordable, and reliable energy. We can accomplish our visions through collaboration with customers, communities, employees, policymakers, shareholders, and other stakeholders. Our clean energy goal is based on sound science and supports continued growth and economic development while maintaining reliability and affordable prices for APS’s customers.
APS’s clean energy goals consist of three parts:
-
A 2050 goal to provide 100% clean, carbon-free electricity;
-
A 2030 target of achieving a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy; and
-
A commitment to end APS’s use of coal-fired generation by 2031.
APS’s ability to successfully execute its clean energy commitment is dependent upon a number of important external factors, some of which include a supportive regulatory environment, sales and customer growth, development of clean energy technologies and continued access to capital markets.
2050 Goal: 100% Clean, Carbon-Free Electricity. Achieving a fully clean, carbon-free energy mix by 2050 is our aspiration. The 2050 goal will involve new thinking and depends on improved and new technologies.
2030 Goal: 65% Clean Energy. APS has an energy mix that is already 50% clean with existing plans to add more renewables and energy storage before 2025. By building on those plans, APS intends to attain an energy mix that is 65% clean by 2030, with 45% of APS’s generation portfolio coming from renewable energy. “Clean” is measured as percent of energy mix which includes all carbon-free resources like nuclear and demand-side management, and “renewable” is expressed as a percent of retail sales. This target will serve as a checkpoint for our resource planning, investment strategy, and customer affordability efforts as APS moves toward 100% clean, carbon-free energy mix by 2050.
2031 Goal: End APS’s Use of Coal-Fired Generation. The commitment to end APS’s use of coal-fired generation by 2031 will require APS to cease use of coal-generation at Four Corners. APS has permanently retired more than 1,000 MW of coal-fired electric generating capacity. These closures and other measures taken by APS have resulted in a total reduction of carbon emissions of 32% since 2005. In addition, APS has committed to end the use of coal at its remaining Cholla units by 2025.
APS understands that the transition away from coal-fired power plants toward a clean energy future will pose unique economic challenges for the communities around these plants. We worked collaboratively with stakeholders and leaders of the Navajo Nation to consider the impacts of ceasing operation of APS coal-
fired power plants on the communities surrounding those facilities to propose a comprehensive Coal Community Transition (“CCT”) plan. The proposed framework provided substantial financial and economic development support to build new economic opportunities and addresses a transition strategy for plant employees. We are committed to continuing our long-running partnership with the Navajo Nation in other areas as well, including expanding electrification and developing tribal renewable projects. Our proposed CCT plan supported the Navajo Nation, where Four Corners is located, the communities surrounding the Cholla Power Plant and the Hopi Tribe, which is impacted by closure of the Navajo Plant. On November 2, 2021, the ACC approved an amended 2019 Rate Case ROO that will require (i) equal payments over a three-year period that total $10 million to the Navajo Nation, (ii) a $1 million one-time payment to the Hopi Tribe within 60 days of the 2019 Rate Case decision, (iii) a $500,000 one-time payment to the Navajo County communities within 60 days of the 2019 Rate Case decision, (iv) up to $1.25 million for electrification of homes and businesses on the Hopi reservation and (v) up to $1.25 million for the electrification of homes and businesses on the Navajo Nation reservation. The payments and expenditures are attributable to the future closures of Four Corners and Cholla, along with the prior closure of the Navajo Plant. All ordered payments and expenditures would be recoverable through rates.
Consistent with the 2019 Rate Case decision, as of April 2022, APS has completed the following payments that will be recoverable through rates related to the CCT: (i) $3.33 million to the Navajo Nation; (ii) $500,000 to the Navajo County communities; and (iii) $1 million to the Hopi Tribe. Consistent with APS’s commitment to the impacted communities, APS has also completed the following payments: (i)$500,000 to the Navajo Nation for CCT; (ii) $1.1 million to the Navajo County Communities for CCT and economic development; and (iii) $1.25 million to the Hopi Tribe for CCT and economic development. Expenditure of the recoverable funds for electrification of homes and businesses on the Navajo Nation and the Hopi reservations is contingent upon completion of a census of the unelectrified homes and businesses in each that are also within APS service territory.
On September 28, 2022, the Arizona Corporation Commission staff ("ACC Staff") filed their staff report in the Matter of Impact of the Closures of Fossil-Based Generation Plan on Impacted Communities. APS and other interested parties filed comments on the report. On October 21, 2022, ACC Staff filed a revised report and proposed order. The revised report and proposed order recommend that funds for CCT shall not be collected from rate payers. APS cannot predict the outcome of this matter.
In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners beginning in fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation,
one generating unit would be shut down during seasons where electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the end of July 2022, APS anticipates that it will elect not to begin seasonal operation in November 2023, unless market conditions change.
Renewables. APS’s IRP (see Note 4 for additional information) establishes the path to meeting our clean energy commitment and maintaining reliable electric service for our customers. APS intends to strengthen its already diverse energy mix by increasing its investments in carbon-free resources. Our IRP rapidly adds clean energy and storage resources while maintaining reliable and affordable service. Its near-term actions are focused on clean energy and positive customer outcomes and includes: (a) competitive solicitations to procure clean energy resources such as solar, wind, energy storage, and DSM resources, all of which lead to a cleaner grid; and (b) strategic, short-term wholesale market purchases from a combination of existing merchant natural gas units, neighboring utility systems and wholesale market participants that ensure operational reliability.
APS has a diverse portfolio of existing and planned renewable resources, including solar, wind, geothermal, biomass and biogas, that supports our commitment to clean energy. That commitment has its
foundation in the Palo Verde generating station, which is the nation’s largest carbon-free, clean energy resource, and it provides critical reliable and affordable service for APS customers. APS’s longer-term clean energy strategy includes pursuing the right mix of purchased power contracts for new facilities, procurement of new facilities to be owned by APS, and the ongoing development of distributed energy resources. This balance will ensure an appropriately diverse portfolio designed to achieve the same operational reliability and customer affordability as APS’s near-term strategies. In addition, APS is actively seeking to include future facility purchase options in its PPAs that will enable investments with greater financial flexibility.
APS uses competitive “all source” requests for proposal (“RFPs”) to pursue market resources that meet its system needs and offer the best value for customers. APS selects projects based on cost and non-cost factors, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Available projects are guided by IRP timelines and quantities and APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the RFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection of the projects to the electric grid. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Current and Future Resources — Renewable Energy Standard — Renewable Energy Portfolio” in Item 1 for details regarding APS’s renewable energy resources.
In September 2019, APS issued an RFP that requested up to 250 MW of wind resources to be in service as soon as possible, but no later than 2022. As a result of this RFP, APS executed a 200 MW PPA for a wind resource that went into service in January 2022. In December 2020, APS issued two additional RFPs: (i) a battery storage RFP for projects to be located at two AZ Sun sites; and (ii) an all-source RFP that solicited resources to meet our clean energy needs and capacity to maintain system reliability, and was later amended to include a request for 150 MW of solar resources to be developed on APS property and owned by APS (collectively, the “December 2020 RFPs”). As a result of the all-source RFP, APS executed two solar plus storage PPAs totaling 275 combined MWs, a PPA for a 238 MW wind resource, two energy storage PPAs for a combined 300 MWs; extended an existing natural gas tolling agreement; and also executed an engineering, procurement, and construction contract in November 2021 for a 150 MW solar resource to be owned by APS and in service in early 2023.
In May 2022, APS issued an all-source RFP to address resource needs for 2025 and beyond (“2022 all-source RFP”). The 2022 all-source RFP solicits competitive proposals for approximately 1,000 MW to 1,500 MW of resources, including up to 600 MW to 800 MW of renewable resources to meet the needs of 2025 and 2026 while considering resources that can be online as late as 2027. The RFP stopped accepting bids on July 15, 2022, and APS sent notifications to shortlisted bidders on September 23, 2022.
The following table summarizes the resources in APS’s renewable energy portfolio that are in operation and under development as of September 30, 2022. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting, and interconnection of the projects to the electric grid.
| Net Capacity in Operation (MW) | Net Capacity Planned / Under Development (MW) | |||||||||||||
| Total APS Owned: Solar | 250 | 150 | ||||||||||||
| Purchased Power Agreements Renewables: | ||||||||||||||
| Solar | 310 | 435 | ||||||||||||
| Wind | 399 | 238 | ||||||||||||
| Geothermal | 10 | — | ||||||||||||
| Biomass | 14 | — | ||||||||||||
| Biogas | 3 | — | ||||||||||||
| Total Purchased Power Agreements | 736 | 673 | ||||||||||||
| Total Distributed Energy: Solar (a) | 1,369 | 129 | (b) | |||||||||||
| Total Renewable Portfolio | 2,355 | 952 |
(a) Includes rooftop solar facilities owned by third parties. Distributed generation is produced in Direct Current and is converted to Alternating Current for reporting purposes.
(b) Applications received by APS that are not yet installed and online.
Energy Storage. APS deploys a number of advanced technologies on its system, including energy storage. Energy storage provides capacity, improves power quality, can be utilized for system regulation and, in certain circumstances, be used to defer certain traditional infrastructure investments. Energy storage also aids in integrating renewable generation by storing excess energy when system demand is low and renewable production is high and then releasing the stored energy during peak demand hours later in the day and after sunset. APS is utilizing grid-scale energy storage projects to meet customer reliability requirements, increase renewable utilization, and to further our understanding of how storage works with other advanced technologies and the grid.
In 2018, APS issued an RFP for approximately 106 MW of energy storage to be located at up to five of its AZ Sun sites. Based upon its evaluation of the RFP responses, APS decided to expand the initial phase of battery deployment to 141 MW by adding a sixth AZ Sun site. These battery storage facilities are expected to be in service by the end of 2022. On August 2, 2021, APS executed a contract for an additional 60 MW of utility-owned energy storage to be located on APS’s AZ Sun sites. This contract, with a 2023 in-service date, will complete the addition of storage on current APS-owned utility-scale solar facilities.
Additionally, in February 2019, APS signed two 20-year PPAs for energy storage totaling 150 MW. These PPAs were subject to ACC approval in order to allow for cost recovery through the PSA. APS received the requested ACC approval on January 12, 2021, and service under the agreements is contracted to begin in 2022 with respect to 100 MW and in 2023 with respect to 50 MW; however, these agreements are facing delays and APS is currently working with the developers to determine revised in-service dates.
As a result of its December 2020 RFPs, as of May 2022, APS has executed four 20-year PPAs for resources that include energy storage: (a) two PPAs for standalone energy storage resources totaling 300 MW; and (b) two PPAs totaling 275 MW solar plus storage resource. The PPAs are also subject to ACC approval to enable cost recovery through the PSA. APS received the requested ACC approval for three out of four of the projects on December 16, 2021. The remaining project was filed in February 2022 for ACC approval and on
April 13, 2022, the ACC approved this application. Service under the agreements is expected to begin in 2023 and 2024.
APS currently plans to install more than 900 MW of energy storage by 2025, including the energy storage projects under PPAs and AZ Sun retrofits described above. The remaining energy storage is expected to be made up of resources solicited through current and future RFPs.
The following table summarizes the resources in APS’s energy storage portfolio that are in operation and under development as of September 30, 2022. Agreements for the development and completion of future resources are subject to various conditions.
| Net Capacity in Operation (MW) | Net Capacity Planned / Under Development (MW) | ||||||||||
| APS Owned: Energy Storage | — | 201 | |||||||||
| Purchase Power Agreements - Energy Storage | — | 725 | |||||||||
| Residential Energy Storage | 17(a) | 6 | |||||||||
| Total Energy Storage Portfolio | 17 | 932 |
(a) This includes 16.4 MW of APS customer-owned batteries and 0.2 MW of APS-owned residential batteries.
Palo Verde. Palo Verde, the nation’s largest carbon-free, clean energy resource, will continue to be a foundational part of APS’s resource portfolio. The plant currently supplies nearly 70% of our clean energy and provides the foundation for the reliable and affordable service for APS customers. Palo Verde is not just the cornerstone of our current clean energy mix; it also is a significant provider of clean energy to the southwest United States. The plant is a critical asset to the Southwest, generating more than 32 million megawatt-hours annually – enough power for more than 4 million people. Its continued operation is important to a carbon-free and clean energy future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy.
Affordable
Building upon existing cost management efforts, APS launched a customer affordability initiative in 2019. The initiative was implemented company-wide to thoughtfully and deliberately assess our business processes and organizational approaches through LEAN Sigma procedures to identify and develop internal efficiencies. We continue to drive this initiative by identifying opportunities to streamline our business processes to assist in mitigating cost increases, increasing employee retention, and improving customer satisfaction.
Participation in the Energy Imbalance Market (“EIM”) continues to be a tool for creating savings for APS’s customers from the real-time, voluntary market. APS continues to expect that its participation in EIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS continues to evaluate opportunities that benefit our customers and is exploring opportunities to move to a day-ahead market with the expectation of reliably achieving incrementally greater cost savings and using the region’s increasing renewable resources more efficiently. As part of that effort, APS is exploring several options. APS is in discussions with the current EIM operator, the CAISO, the Western Resource Adequacy Program, the Western Markets Exploratory Group, and the Southwest Power Pool. Each of these explorations also involve other entities and are being undertaken to ensure reliable operations and evaluate the feasibility and cost/benefit of creating a voluntary day-ahead market as well as potential future market steps beyond a day-ahead market.
Reliable
While our energy mix evolves, the obligation to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to other industries.
Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. Our advanced distribution management system allows operators to locate outages, control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid. The system also integrates a new meter data management system that increases grid visibility and gives customers access to more of their energy usage data.
Wildfire safety remains a critical focus for APS and other utilities. We increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. These programs contribute to customer reliability, responsible forest management and safe communities.
The new units at our modernized Ocotillo Power Plant provide cleaner-running and more efficient units. They support reliability by responding quickly to the variability of solar generation and delivering energy in the late afternoon and early evening when solar production declines as the sun sets and customer demand peaks.
In October of 2021, APS announced plans to evaluate regional market solutions as part of the informal Western Markets Exploratory Group (“WMEG”). As part of WMEG, APS is exploring the potential for a staged approach to new market services, including day-ahead energy sales, transmission system expansion, and other power supply and grid solutions consistent with existing state regulations. WMEG hopes to identify market solutions that can help achieve carbon reduction goals while supporting reliable, affordable service for customers. APS is unable to predict the outcome of these discussions.
APS’s key elements to delivering reliable power include resource planning, sufficient reserve margins, customer partnerships to manage peak demand, fire mitigation, and operational preparedness. Seasonal readiness procedures at APS also include walkdowns to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating on fire and emergency management with federal, state, and local agencies.
Customer-Focused
Recognizing that creating customer value is inextricably linked to increasing shareholder value, APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience, while demonstrating compassion and advocacy for its customers. This multi-year objective includes incrementally improving APS’s J.D. Power (“JDP”) overall customer satisfaction ratings from the fourth quartile to the first quartile of its peer set comprised of large investor-owned utilities.
As previously disclosed, APS’s JDP residential rankings for overall customer satisfaction rating improved in 2020 and 2021, and in the first half of 2022. That improvement trend continued with the latest JDP residential 2022 third-quarter results. Compared to 2021, APS has made quartile gains in every single driver of customer satisfaction and made significant headway that placed the company firmly into the second quartile, and well above industry benchmarks for overall satisfaction when compared to our large investor-owned peers. APS’s strongest performing drivers in the first three quarters of 2022 were Customer Care
(phone and digital), Power Quality and Reliability, and Corporate Citizenship, and Billing & Payment. APS’s improvement also is being recognized by our business customers, as evidenced by JDP’s Business 2022 mid-year results placing APS in the first quartile nationally for business customers. APS is among the most improved utility in the nation for both business and residential customer satisfaction.
Developing Clean Energy Technologies
Electric Vehicles
APS is making electric vehicle charging more accessible for its customers and helping Arizona businesses, schools and governments electrify their fleets. In 2021, APS continued its expansion of its Take Charge AZ Pilot Program. As of September 13, 2022, APS had installed 638 Level 2 (“L2”) charging ports at customer locations, with more stations expected to be added through the remainder of 2022. The program provides charging equipment, installation, and maintenance to business customers, government agencies, non-profits, and multifamily housing communities. In addition to the L2 charging stations, APS has begun construction of DC fast charging (“DCFC”) stations that will be owned and operated by APS at five locations in Arizona, with the first location opened for public use in March 2022 in Show Low, Arizona. The other four projects in Sedona, Prescott, Globe, and Payson are expected to be completed by the end of 2022. Each location features 2-150 kilowatt and 2-350 kilowatt DCFC ports. Charging at these stations will be accessible through the Electrify America charging network. APS has a goal of 450,000 light-duty electric vehicles in its service territory by 2030.
Additionally, as part of APS’s DSM Plan, APS has launched an Electric Vehicle Charging Demand Management Pilot Program to proactively address the growing electric demand from electric vehicle charging as electric vehicles become more widely adopted. This program includes the APS SmartCharge data gathering program, a $250 residential electric vehicle smart charger rebate for qualifying electric vehicle chargers, and a $100 rebate to home builders for new homes to be built EV ready with 240V charging station garage outlets.
The ACC ordered certain public service corporations, including APS, to develop a long-term, comprehensive statewide transportation electrification plan (“TE Plan”) for Arizona. The statewide TE Plan is intended to provide a roadmap for transportation electrification in Arizona, focused on realizing the associated air quality and economic development benefits for all residents in the state along with understanding the impact of electric vehicle charging on the grid. APS actively participated in the development of that plan, which was approved by the ACC in December 2021. In the decision, the ACC also ordered APS and another large Arizona electric public service corporation to each develop and submit for ACC approval their own TE Plans and corresponding budget for 2023. Accordingly, APS filed its first TE Annual Progress Report on March 15, 2022, its 2023 TE Plan on June 1, 2022, and its mid-year TE Progress Report on September 15, 2022. APS will file a supplement to the 2023 TE Plan later this year.
Hydrogen Production
Palo Verde, in partnership with Idaho National Laboratory (“INL”), Energy Harbor Corporation (“Energy Harbor”) and Xcel Energy Incorporated (“Xcel”), was chosen by the DOE’s Office of Nuclear Energy to participate in a series of hydrogen production projects with the goal to improve the long-term economic competitiveness of the nuclear power industry. The multi-phase projects began in 2020 with a series of small-scale hydrogen production demonstration projects led by Energy Harbor and Xcel, as well as a technical and economic assessment performed by INL of using electricity generated at Palo Verde to produce hydrogen.
Based on the experience from Palo Verde’s utility partners’ developing small scale demonstration projects and from the Palo Verde-specific preliminary technical and economic assessment performed by INL, in April 2021, PNW Hydrogen LLC (“PNW Hydrogen”), a newly formed subsidiary of Pinnacle West, applied
for DOE funding for a larger scale hydrogen production demonstration project using electricity sourced from Palo Verde. On October 7, 2021, PNW Hydrogen was notified that DOE’s Office of Energy Efficiency & Renewable Energy and Office of Nuclear Energy had selected PNW Hydrogen’s application for an award of $20 million in federal funding to support the hydrogen production demonstration project, subject to negotiation and execution of a definitive Cooperative Agreement funding instrument between PNW Hydrogen and DOE. PNW Hydrogen continues to work through negotiations with DOE, while also investigating how best to coordinate its efforts with Regional Hydrogen Hub development opportunities.
On November 15, 2021, President Biden signed the Infrastructure Investment and Jobs Act (“IIJA”), also known as the Bipartisan Infrastructure Bill, into law. Included in this bill was $8 billion for Regional Clean Hydrogen Hubs which is intended to create jobs to expand the use of clean hydrogen in the industrial sector and beyond. On February 15, 2022, the Department of Energy (“DOE”) announced a Request for Information to collect feedback from stakeholders to inform the implementation and design of the Regional Hydrogen Hub.
On May 12, 2022, APS, along with three other Arizona energy providers and the State’s three public universities announced the formation of a new, interdisciplinary coalition, called the Arizona Center for a Carbon Neutral Economy (“AzCaNE”), with the goal of attaining a carbon neutral economy in Arizona. AzCaNE’s first action is to pursue the creation of an Arizona-led approach to securing regional clean hydrogen hub funding. Leading professionals from the seven founding participants, along with representatives of Arizona, the Navajo Nation and companies working to develop a hydrogen ecosystem within Arizona make up the Governance Committee for AzCaNE’s current efforts.
On September 22, 2022 , the DOE opened applications for a $7 billion program to create six to ten regional clean hydrogen hubs across the country. These hubs are intended to be a central driver in helping communities across the country benefit from clean energy investments, good-paying jobs, and improved energy security while supporting the President’s goal of a net-zero carbon economy by 2050. Concept papers for each regional hub are due by November 7, 2022, and full applications are due by April 7, 2023.
Carbon Capture
Carbon capture technologies can isolate CO2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. Carbon capture technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology.
Environmental, Social, and Governance (“ESG”) Practices
Pinnacle West has been integrating ESG practices into its core work for almost 30 years. As a business strategy, we seek solutions that provide “shared value,” meaning solutions that address societal and environmental challenges in a way that also delivers business value. Our commitment extends beyond implementing sustainability practices; we are dedicated to working with our stakeholders to identify and address the sustainability issues that we are uniquely positioned to impact through our business. In 2020, in support of our clean energy commitment and the growing focus on ESG within our organization, we increased our efforts by dedicating a new Sustainability Department at Pinnacle West to integrating ESG best practices into the everyday work of the Company.
As a first step, the Company engaged the Electric Power Research Institute (“EPRI”) and leveraged input from employees, large customers, limited-income advocates, economic development groups, environmental non-governmental organizations, leading sustainability academics and other stakeholders to
identify and assess the sustainability issues that matter most. In total, 23 Priority Sustainability Issues (“PSIs”) were identified and prioritized. The most critical category, Integral Shared Value, includes four issues deemed most important and most able to be impacted by our actions: clean energy, customer experience, energy access and reliability and safety and health. These Integral PSIs provide the foundation for informing our strategic direction, creating a framework for incorporating best practices and driving enterprise-wide alignment and accountability. In 2021, the Company engaged EPRI for the second phase of this work, focused on benchmarking best practices within these four Integral Shared Value PSIs. We are using the benchmarking information to identify opportunities for further improvement in our ESG performance.
In 2021, the Company established a Social Issues Committee Framework. The goal of the framework is to provide a process for considering emergent social issues, and for determining whether or how best to engage. The committee’s responsibility is to determine, using a set of principles grounded in the APS Promise and the PSIs, whether engagement on specific emergent social issues is appropriate and, if so, how best to engage.
In 2021, the Company finalized an ESG Strategic Framework to guide our work. The framework is based upon three foundational pillars: ESG Policy Advocacy (we advocate for policy that supports our clean energy goals); Driving Performance (improving our ESG performance in the most important areas, including our PSIs); and effectively communicating and amplifying our ESG story to our various stakeholders, including investors, customers, employees and beyond. The framework will guide and shape our ESG work moving forward.
Regulatory Overview
2022 Retail Rate Case
APS filed an application with the ACC on October 28, 2022 (the “2022 Rate Case”) seeking an increase in annual retail base rates on the date rates become effective (“Day 1”) of a net $460 million. This Day 1 net impact represents a total base revenue deficiency of $772 million offset by proposed adjustor transfers of cost recovery to annual retail rates and adjustor mechanism modifications. The average annual customer bill impact of APS’s request on Day 1 is an increase of 13.6%.
The principal provisions of APS’s application are:
-
A test year comprised of twelve months ended June 30, 2022, adjusted as described below;
-
An original cost rate base of $10.5 billion, which approximates the ACC-jurisdictional portion of the book value of utility assets, net of accumulated depreciation and other credits;
-
The following proposed capital structure and costs of capital:
| Capital Structure | Cost of Capital | |||||||||||||||||||
| Long-term debt | 48.07 | % | 3.85 | % | ||||||||||||||||
| Common stock equity | 51.93 | % | 10.25 | % | ||||||||||||||||
| Weighted-average cost of capital | 7.17 | % |
-
A 1% return on the increment of fair value rate base above APS’s original cost rate base, as provided for by Arizona law;
-
A rate of $0.038321 per kWh for the portion of APS’s retail base rates attributable to fuel and purchased power costs;
-
Modification of its adjustment mechanisms including:
▪eliminate the Environmental Improvement Surcharge and collect costs through base rates,
▪eliminate the Lost Fixed Cost Recovery mechanism and collect costs through base rates and the Demand Side Management Adjustment Charge (“DSMAC”),
▪maintain as inactive the Tax Expense Adjustor Mechanism,
▪maintain the Transmission Cost Adjustment mechanism,
▪modify the performance incentive in the DSMAC, and
▪modify the Renewable Energy Adjustment Charge to include recovery of capital carrying costs of APS owned renewable and storage resources;
-
Changes to its limited-income program, including a second tier to provide an additional discount for customers with greater need; and
-
Twelve months of post-Test Year plant to reflect used and useful projects that will be placed into service prior to July 1, 2023.
APS requested that the increase become effective December 1, 2023. APS cannot predict the outcome of its request.
2019 Retail Rate Case
On October 31, 2019, APS filed an application with the ACC (the “2019 Rate Case”) seeking an increase in annual retail base rates. On August 2, 2021, the Administrative Law Judge issued a Recommended Opinion and Order in the 2019 Rate Case (the “2019 Rate Case ROO”) and issued corrections on September 10 and September 20, 2021. See Note 4 for information regarding the 2019 Rate Case ROO.
On October 6, 2021 and October 27, 2021, the ACC voted on various amendments to the 2019 Rate Case ROO that would result in, among other things, (i) a return on equity of 8.70%, (ii) the recovery of the deferral and rate base effects of the operating costs and construction of the Four Corners SCR project, with the exception of $215.5 million (see “Four Corners SCR Cost Recovery” below), (iii) that the CCT plan include the following components: (a) a payment of $1 million to the Hopi Tribe within 60 days of the 2019 Rate Case decision, (b) a payment of $10 million over three years to the Navajo Nation, (c) a payment of $500,000 to the Navajo County communities within 60 days of the 2019 Rate Case decision, (d) up to $1.25 million for electrification of homes and businesses on the Hopi reservation and (e) up to $1.25 million for the electrification of homes and businesses on the Navajo Nation reservation. These payments and expenditures are attributable to the future closures of Four Corners and Cholla, along with the prior closure of the Navajo Plant and all ordered payments and expenditures would be recoverable through rates, and (iv) a change in the residential on-peak time-of-use period from 3 p.m. to 8 p.m. to 4 p.m. to 7 p.m. Monday through Friday, excluding holidays. The 2019 Rate Case ROO, as amended, results in a total annual revenue decrease for APS of $4.8 million, excluding temporary CCT payments and expenditures. On November 2, 2021, the ACC approved the 2019 Rate Case ROO, as amended. On November 24, 2021, APS filed with the ACC an application for rehearing of the 2019 Rate Case and the application was deemed denied on December 15, 2021, as the ACC did not act upon it. On December 17, 2021, APS filed its Notice of Direct Appeal at the Arizona Court of Appeals and a Petition for Special Action with the Arizona Supreme Court, requesting review of the disallowance of $215 million of Four Corners SCR plant investments and deferrals (see “Four Corners SCR Cost Recovery” below for additional information) and the 20 basis point penalty reduction to the return on equity. On February 8, 2022, the Arizona Supreme Court declined to accept jurisdiction on APS’s Petition for Special Action. The appeal at the Arizona Court of Appeals is proceeding in the normal course, and oral arguments are scheduled for November 30, 2022. APS cannot predict the outcome of this proceeding. See Note 4 for addition information regarding the 2019 Rate Case and the appeal.
Consistent with the 2019 Rate Case decision, APS implemented the new rates effective as of December 1, 2021. On December 3, 2021, ACC Staff notified the ACC of a discrepancy between the written decision, which approved the change in time-of-use on-peak hours to 4 p.m. to 7 p.m. but did not explicitly
approve the 10-months contemplated in APS’s verbal testimony to implement the new time-of-use hours. On December 16, 2021, the ACC ordered APS to complete the implementation of the time-of-use peak period by April 1, 2022. On January 12, 2022, the ACC voted to extend until September 1, 2022, the deadline to complete the implementation of the new on-peak hours for residential customers. In addition, the ACC ordered extensive compliance and reporting obligations and will be continuing to explore whether penalties or rebates would be owed to certain customers. APS completed the implementation of the new on-peak hours for residential customers before the September 1, 2022 deadline. APS cannot predict the outcome of this matter.
Additionally, consistent with the 2019 Rate Case decision, as of April 2022, APS has completed the following payments that will be recoverable through rates related to the CCT: (i) $3.33 million to the Navajo Nation; (ii) $500,000 to the Navajo County communities; and (iii) $1 million to the Hopi Tribe. Consistent with APS’s commitment to the impacted communities, APS has also completed the following payments: (i) $500,000 to the Navajo Nation for CCT; (ii) $1.1 million to the Navajo County Communities for CCT and economic development; and (iii) $1.25 million to the Hopi Tribe for CCT and economic development. The ACC has also authorized $1.25 million to be recovered through rates for electrification of homes and businesses on both the Navajo Nation and Hopi reservation. Expenditure of the recoverable funds for electrification of homes and businesses on the Navajo Nation and the Hopi reservations is contingent upon completion of a census of the unelectrified homes and businesses in each that are also within APS service territory.
See Note 4 for information regarding additional regulatory matters.
Four Corners SCR Cost Recovery
As part of APS’s 2019 Rate Case, APS included recovery of the deferral and rate base effects of the Four Corners SCR project. On November 2, 2021, the 2019 Rate Case decision was approved by the ACC allowing approximately $194 million of SCR related plant investments and cost deferrals in rate base and to recover, depreciate and amortize in rates based on an end-of-life assumption of July 2031. The decision also included a partial and combined disallowance of $215.5 million on the SCR investments and deferrals. APS believes the SCR plant investments and related SCR cost deferrals were prudently incurred, and on December 17, 2021, APS filed its Notice of Direct Appeal at the Arizona Court of Appeals requesting review of the $215.5 million disallowance. The appeal is proceeding in the normal course, and oral arguments are scheduled for November 30, 2022. Based on the partial recovery of these investments and cost deferrals in current rates and the uncertainty of the outcome of the legal appeals process, APS has not recorded an impairment or write-off relating to the SCR plant investments or deferrals as of September 30, 2022. If the 2019 Rate Case decision to disallow $215.5 million of the SCRs is ultimately upheld, APS will be required to record a charge to its results of operations, net of tax, of approximately $154.4 million. We cannot predict the outcome of the legal challenges nor the timing of when this matter will be resolved. See Note 4 for additional information regarding the Four Corners SCR cost recovery.
Financial Strength and Flexibility
Pinnacle West and APS currently have ample borrowing capacity under their respective credit facilities and may readily access these facilities ensuring adequate liquidity for each company. Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.
Other Subsidiaries
Bright Canyon Energy*.* On July 31, 2014, Pinnacle West announced its creation of a wholly-owned subsidiary, BCE. BCE’s strategy is to develop, own, operate and acquire energy infrastructure in a manner that leverages the Company’s core expertise in the electric energy industry. As of September 30, 2022, BCE had total assets of approximately $83 million.
In 2014, BCE formed a 50/50 joint venture with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. The joint venture, named TransCanyon, is pursuing independent electric transmission opportunities within the 11 states that comprise the Western Electricity Coordinating Council, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates.
BCE owns a minority equity ownership interest relating to the Clear Creek wind farm. Tenaska Clear Creek Wind, LLC, the developer, owner, and operator of the Clear Creek wind farm, has disputed the proposed cost allocation of system upgrades related to connecting the Clear Creek wind farm to the transmission system and filed a complaint with FERC, which was denied on September 9, 2022, and a Petition for Review with the U.S. Court of Appeals, which is still pending. Subsequently, Tenaska Clear Creek Wind, LLC filed with FERC a request for rehearing and a motion for stay of the September 9, 2022 order. While the dispute is ongoing and the ultimate costs that will be allocated to connect the Clear Creek wind farm to the transmission system are unknown, the ultimate resolution of this dispute may have a negative impact on BCE's investment in the Clear Creek wind farm. As of September 30, 2022, Pinnacle West's Condensed Consolidated Balance Sheet included $17 million relating to the Clear Creek wind farm.
BCE has started construction on a microgrid facility in Los Alamitos, California (“Los Alamitos”) featuring 31 MW of solar, 20 MW of battery storage, and 3 MW of backup generators. Supported by a long-term power purchase agreement with San Diego Gas and Electric Company, Los Alamitos will supply 20 MW of solar and battery storage capacity to the Southern California grid and provide resilient backup power in the event of a grid emergency to the Army and California National Guard at Joint Forces Training Base Los Alamitos. The Los Alamitos project is scheduled to achieve commercial operation in 2023. See Note 3 regarding a credit agreement entered into by BCE to finance capital expenditures and related costs for this microgrid project.
BCE and Ameresco, Inc. jointly own a special purpose entity that is sponsoring the Kūpono Solar project. This project is a 42 MW solar and battery storage facility in Oʻahu, Hawaii that will supply clean renewable energy and capacity under a 20-year power purchase agreement with Hawaiian Electric Company, Inc. The Kūpono Solar project is expected to be completed in 2024.
El Dorado. El Dorado is a wholly-owned subsidiary of Pinnacle West. El Dorado owns debt investments and minority interests in several energy-related investments and Arizona community-based ventures. In particular, El Dorado committed to a $25 million investment in the Energy Impact Partners fund, which is an organization that focuses on fostering innovation and supporting the transformation of the utility industry. The investment will be made by El Dorado as investments are selected by the Energy Impact Partners fund. As of September 30, 2022, El Dorado has contributed approximately $12 million to the Energy Impact Partners fund. Additionally, El Dorado committed to a $25 million investment in AZ-VC (formally invisionAZ Fund), which is a fund focused on analyzing, investing, managing and otherwise dealing with investments in privately held early stage and emerging growth technology companies and businesses primarily based in the State of Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in the State of Arizona. As of September 30, 2022, El Dorado has contributed approximately $3 million to the AZ-VC (formally invisionAZ Fund).
Key Financial Drivers
In addition to the continuing impact of the matters described above, many factors influence our financial results and our future financial outlook, including those listed below. We closely monitor these factors to plan for the Company’s current needs, and to adjust our expectations, financial budgets and forecasts appropriately.
Electric Operating Revenues. For the years 2019 through 2021, retail electric revenues comprised approximately 94% of our total operating revenues. Our electric operating revenues are affected by customer growth or decline, variations in weather from period to period, customer mix, average usage per customer and the impacts of energy efficiency programs, distributed energy additions, electricity rates and tariffs, the recovery of PSA deferrals and the operation of other recovery mechanisms. These revenue transactions are affected by the availability of excess generation or other energy resources and wholesale market conditions, including competition, demand and prices.
Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.0% for the nine-month period ended September 30, 2022, compared with the prior-year period. For the three years through 2021, APS’s customer growth averaged 2.2% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2022, and that the average annual growth will be in the range of 1.5% to 2.5% through 2024 based on anticipated steady population growth in Arizona during that period.
Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 2.7% for the nine-month period ended September 30, 2022, compared with the prior-year period. While steady customer growth was somewhat offset by energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center customers. Though the total expected impact of COVID-19 on future sales remains unknown, APS experienced higher electric residential sales and lower electric commercial and industrial sales from the outset of the pandemic through April 2021. Beginning in May 2021, electric sales to commercial and industrial customers increased to levels in line with pre-COVID sales and such sales levels have remained to date.
For the three years through 2021, annual retail electricity sales growth averaged 1.7%, adjusted to exclude the effects of weather variations. Due to the continued strength in commercial and industrial electricity sales, we are now projecting that annual retail electricity sales in kWh will increase in the range of 2.0% to 3.0% for 2022 (increased from our prior range of 1.5% to 2.5% for 2022), while we continue to expect average annual growth in the range of 3.5% to 4.5% through 2024, including the effects of customer conservation, energy efficiency and distributed renewable generation initiatives, but excluding the effects of weather variations. This projected sales growth range includes the impacts of new, large manufacturing facilities, which are expected to contribute to average annual growth in the range of 1.0% to 2.0% through 2024. This projected sales growth range also includes our estimated contributions of several large data centers, but not all, and we will continue to estimate contributions and evaluate sales guidance as these customers develop more usage history. These estimates could be further impacted by changes in the expected growth of the Arizona economy, slower than expected ramp-up of the new data centers, larger manufacturing facilities not coming to Arizona as expected, a change in the duration of remote work, changes in the expected commercial and industrial expansions, or acceleration of the expected effects of customer conservation, energy efficiency and distributed renewable generation initiatives.
Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, ramp-up of data centers, impacts of energy efficiency programs and growth in DG, and responses to retail price
changes. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $20 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $5 million.
Weather. In forecasting the retail sales growth numbers provided above, we assume normal weather patterns based on historical data. Historically, extreme weather variations have resulted in annual variations in net income in excess of $25 million. However, our experience indicates that the more typical variations from normal weather can result in increases or decreases in annual net income of up to $15 million.
Fuel and Purchased Power Costs. Fuel and purchased power costs included on our Condensed Consolidated Statements of Income are impacted by our electricity sales volumes, existing contracts for purchased power and generation fuel, our power plant performance, transmission availability or constraints, prevailing market prices, new generating plants being placed in service in our market areas, changes in our generation resource allocation, our hedging program for managing such costs and PSA deferrals and the related amortization.
Operations and Maintenance Expenses**.** Operations and maintenance expenses are impacted by customer and sales growth, power plant operations, maintenance of utility plant (including generation, transmission, and distribution facilities), inflation, unplanned outages, planned outages (typically scheduled in the spring and fall), renewable energy and demand side management related expenses (which are offset by the same amount of operating revenues) and other factors.
Depreciation and Amortization Expenses. Depreciation and amortization expenses are impacted by net additions to utility plant and other property (such as new generation, transmission, and distribution facilities), and changes in depreciation and amortization rates. See “Liquidity and Capital Resources” below for information regarding the planned additions to our facilities.
Property Taxes. Taxes other than income taxes consist primarily of property taxes, which are affected by the value of property in-service and under construction, assessment ratios, and tax rates. The average property tax rate in Arizona for APS, which owns essentially all of our property, was 10.7% of the assessed value for 2021, 10.8% for 2020 and 10.9% for 2019. We expect property taxes to decrease in 2022 due to recent legislative changes reducing both property tax assessment ratios and rates in Arizona. As we add new generating units and continue with improvements and expansions to our existing generation, transmission and distribution facilities in future years, we anticipate property taxes may increase, though these increases will continue to be partially offset by the impacts of the recent legislative changes noted above.
Pension and other postretirement non-service credits - net*.* Pension and other postretirement non-service credits can be impacted by changes in our actuarial assumptions. The most relevant actuarial assumptions are the discount rate used to measure our net periodic costs/credit, the expected long-term rate of return on plan assets used to estimate earnings on invested funds over the long-term, the mortality assumptions and the assumed healthcare cost trend rates. We review these assumptions on an annual basis and adjust them as necessary.
Interest Expense. Interest expense is affected by the amount of debt outstanding and the interest rates on that debt (see Note 3). The primary factors affecting borrowing levels are expected to be our capital expenditures, long-term debt maturities, equity issuances and internally generated cash flow. An allowance for borrowed funds used during construction offsets a portion of interest expense while capital projects are under construction. We stop accruing AFUDC on a project when it is placed in commercial operation.
Income Taxes**.** Income taxes are affected by the amount of pretax book income, income tax rates, certain deductions and non-taxable items, such as AFUDC. In addition, income taxes may also be affected by the settlement of issues with taxing authorities.
RESULTS OF OPERATIONS
Pinnacle West’s only reportable business segment is our regulated electricity segment, which consists of traditional regulated retail and wholesale electricity businesses (primarily sales supplied under traditional cost-based rate regulation) and related activities and includes electricity generation, transmission and distribution.
Operating Results — Three-month period ended September 30, 2022, compared with three-month period ended September 30, 2021.
Our consolidated net income attributable to common shareholders for the three months ended September 30, 2022, was $326 million, compared with consolidated net income attributable to common shareholders of $340 million for the prior-year period. The results reflect a decrease of approximately $13 million for the regulated electricity segment, which include higher depreciation and amortization expense primarily due to the absence of the Ocotillo modernization project and the Four Corners SCR project regulatory deferrals that ended upon the 2019 Rate Case effective date (see Note 4), increased plant assets and updated depreciation rates. In addition, the results reflect lower revenue driven by the Lost Fixed Cost Recovery (“LFCR”) alternative revenue treatment and higher operations and maintenance expense. These negative factors were partially offset by higher revenue driven by the effects of weather and lower income taxes.
The following table presents net income attributable to common shareholders by business segment compared with the prior-year period:
| Three Months Ended September 30, | |||||||||||||||||
| 2022 | 2021 | Net Change | |||||||||||||||
| (dollars in millions) | |||||||||||||||||
| Regulated Electricity Segment: | |||||||||||||||||
| Operating revenues less fuel and purchased power expenses | $ | 913 | $ | 882 | $ | 31 | |||||||||||
| Operations and maintenance | (250) | (231) | (19) | ||||||||||||||
| Depreciation and amortization | (191) | (164) | (27) | ||||||||||||||
| Taxes other than income taxes | (53) | (58) | 5 | ||||||||||||||
| Pension and other postretirement non-service credits - net | 25 | 28 | (3) | ||||||||||||||
| All other income and expenses, net | 4 | 19 | (15) | ||||||||||||||
| Interest charges, net of allowance for borrowed funds used during construction | (63) | (59) | (4) | ||||||||||||||
| Income taxes | (53) | (72) | 19 | ||||||||||||||
| Less income related to noncontrolling interests (Note 6) | (4) | (4) | — | ||||||||||||||
| Regulated electricity segment income | 328 | 341 | (13) | ||||||||||||||
| All other | (2) | (1) | (1) | ||||||||||||||
| Net Income Attributable to Common Shareholders | $ | 326 | $ | 340 | $ | (14) |
Operating revenues less fuel and purchased power expenses. Regulated electricity segment operating revenues less fuel and purchased power expenses were $31 million higher for the three months ended September 30, 2022, compared with the prior-year period. The following table summarizes the major components of this change:
| Increase (Decrease) | |||||||||||||||||
| Operating revenues | Fuel and purchased power expenses | Net change | |||||||||||||||
| (dollars in millions) | |||||||||||||||||
| Lower refunds in the current year related to the Tax Act (Note 4) | $ | 51 | $ | — | $ | 51 | |||||||||||
| Effects of weather | 46 | 11 | 35 | ||||||||||||||
| Higher transmission revenues (Note 4) | 6 | — | 6 | ||||||||||||||
| Higher renewable energy regulatory surcharges, partially offset by operations and maintenance costs | 5 | 3 | 2 | ||||||||||||||
| Changes in net fuel and purchased power costs, including off-system sales margins and related deferrals | 111 | 111 | — | ||||||||||||||
| Retail revenue due to customer growth and changes in customer usage patterns, offset primarily by the impacts of energy efficiency and distributed generation | 4 | 4 | — | ||||||||||||||
| LFCR alternative revenue treatment (Note 4) | (15) | — | (15) | ||||||||||||||
| Impact of new retail base rates from 2019 ACC general rate case effective December 1, 2021 | (52) | — | (52) | ||||||||||||||
| Miscellaneous items, net | 4 | — | 4 | ||||||||||||||
| Total | $ | 160 | $ | 129 | $ | 31 |
Operations and maintenance. Operations and maintenance expenses increased $19 million for the three months ended September 30, 2022, compared with the prior-year period primarily because of:
-
An increase of $12 million related to employee benefits;
-
An increase of $2 million related to nuclear generation costs;
-
An increase of $1 million primarily related to strategic planning consulting costs; and
-
An increase of $4 million for corporate resources and other miscellaneous factors.
Depreciation and amortization. Depreciation and amortization expenses were $27 million higher for the three months ended September 30, 2022, compared to the prior-year period primarily due to $15 million for the Ocotillo modernization project and the Four Corners SCR project regulatory deferrals recorded in the prior year period that ended upon the 2019 Rate Case effective date and the related 2022 regulatory deferral amortization, and $12 million related to increased plant in service and updated depreciation rates.
Taxes other than income taxes. Taxes other than income taxes were $5 million lower for the three months ended September 30, 2022, compared with the prior-year period primarily due to the property tax deferrals that ended upon the 2019 Rate Case effective date and the related 2022 property tax deferral amortization.
Pension and other postretirement non-service credits, net. Pension and other postretirement non-service credits, net were $3 million lower for the three months ended September 30, 2022, compared to the prior-year period primarily due to actual market returns being lower than estimated returns in 2021.
Other income and expenses, net. Other income and expenses, net were $15 million lower for the three months ended September 30, 2022, compared to the prior-year period primarily due to the Ocotillo modernization and Four Corners SCR debt deferrals that ended upon the 2019 Rate Case effective date.
Interest charges, net of allowance for borrowed funds used during construction. Interest charges, net of allowance for borrowed funds used during construction were $4 million higher for the three months ended September 30, 2022, compared to the prior-year period primarily due to higher debt balances and higher interest rates in the current period, partially offset by higher allowance for borrowed funds due to increased capital expenditures.
Income taxes. Income taxes were $19 million lower for the three months ended September 30, 2022, compared with the prior-year period primarily due to lower pre-tax income and higher amortization of excess deferred taxes.
Operating Results — Nine-month period ended September 30, 2022, compared with nine-month period ended September 30, 2021.
Our consolidated net income attributable to common shareholders for the nine months ended September 30, 2022, was $508 million, compared with consolidated net income attributable to common shareholders of $591 million for the prior-year period. The results reflect a decrease of approximately $82 million for the regulated electricity segment, which include higher depreciation and amortization expense primarily due to the absence of the Ocotillo modernization project and the Four Corners SCR project regulatory deferrals that ended upon the 2019 Rate Case effective date (see Note 4), increased plant assets and updated depreciation rates. In addition, the results reflect lower revenue driven by the LFCR alternative revenue treatment and higher operations and maintenance expense. These negative factors were partially offset by higher revenue driven by the effects of weather, customer usage and growth, increased transmission revenue and lower income taxes.
The following table presents net income attributable to common shareholders by business segment compared with the prior-year period:
| Nine Months Ended September 30, | |||||||||||||||||
| 2022 | 2021 | Net Change | |||||||||||||||
| (dollars in millions) | |||||||||||||||||
| Regulated Electricity Segment: | |||||||||||||||||
| Operating revenues less fuel and purchased power expenses | $ | 2,137 | $ | 2,104 | $ | 33 | |||||||||||
| Operations and maintenance | (712) | (689) | (23) | ||||||||||||||
| Depreciation and amortization | (563) | (480) | (83) | ||||||||||||||
| Taxes other than income taxes | (165) | (176) | 11 | ||||||||||||||
| Pension and other postretirement non-service credits - net | 74 | 84 | (10) | ||||||||||||||
| All other income and expenses, net | 25 | 51 | (26) | ||||||||||||||
| Interest charges, net of allowance for borrowed funds used during construction | (187) | (173) | (14) | ||||||||||||||
| Income taxes | (84) | (114) | 30 | ||||||||||||||
| Less income related to noncontrolling interests (Note 6) | (13) | (13) | — | ||||||||||||||
| Regulated electricity segment income | 512 | 594 | (82) | ||||||||||||||
| All other | (4) | (3) | (1) | ||||||||||||||
| Net Income Attributable to Common Shareholders | $ | 508 | $ | 591 | $ | (83) |
Operating revenues less fuel and purchased power expenses. Regulated electricity segment operating revenues less fuel and purchased power expenses were $33 million higher for the nine months ended September 30, 2022, compared with the prior-year period. The following table summarizes the major components of this change:
| Increase (Decrease) | |||||||||||||||||
| Operating revenues | Fuel and purchased power expenses | Net change | |||||||||||||||
| (dollars in millions) | |||||||||||||||||
| Lower refunds in the current year related to the Tax Act (Note 4) | $ | 120 | $ | — | $ | 120 | |||||||||||
| Effects of weather | 38 | 9 | 29 | ||||||||||||||
| Higher retail revenue due to customer growth and changes in customer usage patterns, partially offset by the impacts of energy efficiency and distributed generation | 38 | 20 | 18 | ||||||||||||||
| Higher transmission revenues (Note 4) | 13 | — | 13 | ||||||||||||||
| Higher renewable energy regulatory surcharges, partially offset by operations and maintenance costs | 16 | 6 | 10 | ||||||||||||||
| Changes in net fuel and purchased power costs, including off-system sales margins and related deferrals | 245 | 243 | 2 | ||||||||||||||
| LFCR alternative revenue treatment (Note 4) | (42) | — | (42) | ||||||||||||||
| Impact of new retail base rates from 2019 ACC general rate case effective December 1, 2021 | (119) | — | (119) | ||||||||||||||
| Miscellaneous items, net | 2 | — | 2 | ||||||||||||||
| Total | $ | 311 | $ | 278 | $ | 33 |
Operations and maintenance. Operations and maintenance expenses increased $23 million for the nine months ended September 30, 2022, compared with the prior-year period primarily because of:
-
An increase of $14 million primarily related to a decreased recovery from contributions of administrative and general costs from Palo Verde owners and increased operating costs;
-
An increase of $9 million primarily related to costs for renewable energy and similar regulatory programs, which are partially offset in operating revenues and purchased power;
-
An increase of $6 million primarily related to strategic planning consulting costs;
-
An increase of $4 million for costs related to transmission, distribution and customer service;
-
A decrease of $19 million in non-nuclear generation costs primarily due to lower planned outages and lower operating costs; and
-
An increase of $9 million for corporate resources and other miscellaneous factors.
Depreciation and amortization. Depreciation and amortization expenses were $83 million higher for the nine months ended September 30, 2022, compared to the prior-year period primarily due to $45 million for the Ocotillo modernization project and the Four Corners SCR project regulatory deferrals recorded in the prior year period that ended upon the 2019 Rate Case effective date and the related 2022 regulatory deferral amortization, and $38 million related to increased plant in service and updated depreciation rates.
Taxes other than income taxes. Taxes other than income taxes were $11 million lower for the nine months ended September 30, 2022, compared with the prior-year period primarily due to the impacts of recent legislative changes reducing both property tax assessment ratios and rates in Arizona and property tax deferrals that ended upon the 2019 Rate Case effective date and the related 2022 property tax deferral amortization.
Pension and other postretirement non-service credits, net. Pension and other postretirement non-service credits, net were $10 million lower for the nine months ended September 30, 2022, compared to the prior-year period primarily due to actual market returns being lower than estimated returns in 2021.
Other income and expenses, net. Other income and expenses, net were $26 million lower for the nine months ended September 30, 2022, compared to the prior-year period primarily due to the Ocotillo modernization and Four Corners SCR debt deferrals that ended upon the 2019 Rate Case effective date.
Interest charges, net of allowance for borrowed funds used during construction. Interest charges, net of allowance for borrowed funds used during construction were $14 million higher for the nine months ended September 30, 2022, compared to the prior-year period primarily due to higher debt balances and higher interest rates in the current period, partially offset by higher allowance for borrowed funds due to increased capital expenditures.
Income taxes. Income taxes were $30 million lower for the nine months ended September 30, 2022, compared with the prior-year period primarily due to lower pre-tax income and higher income tax benefits associated with the amortization of excess deferred taxes which are expected to reverse by year end, partially offset by the net operating loss carryback benefit that the Company recognized during the first quarter of 2021.
LIQUIDITY AND CAPITAL RESOURCES
Overview
Pinnacle West’s primary cash needs are for dividends to our shareholders and principal and interest payments on our indebtedness. The level of our common stock dividends and future dividend growth will be dependent on declaration by our Board of Directors and based on a number of factors, including our financial condition, payout ratio, free cash flow and other factors.
Our primary sources of cash are dividends from APS and external debt and equity issuances. An ACC order requires APS to maintain a common equity ratio of at least 40%. As defined in the related ACC order, the common equity ratio is defined as total shareholder equity divided by the sum of total shareholder equity and long-term debt, including current maturities of long-term debt. At September 30, 2022, APS’s common equity ratio, as defined, was 52%. Its total shareholder equity was approximately $7.1 billion and total capitalization was approximately $13.7 billion. Under this order, APS would be prohibited from paying dividends if such payment would reduce its total shareholder equity below approximately $5.5 billion, assuming APS’s total capitalization remains the same. This restriction does not materially affect Pinnacle West’s ability to meet its ongoing cash needs or ability to pay dividends to shareholders.
APS’s capital requirements consist primarily of capital expenditures and maturities of long-term debt. APS funds its capital requirements with cash from operations and, to the extent necessary, external debt financing and equity infusions from Pinnacle West.
Summary of Cash Flows
The following tables present net cash provided by (used for) operating, investing and financing activities (dollars in millions):
Pinnacle West Consolidated
| Nine Months Ended September 30, | Net | ||||||||||||||||
| 2022 | 2021 | Change | |||||||||||||||
| Net cash flow provided by operating activities | $ | 1,032 | $ | 661 | $ | 371 | |||||||||||
| Net cash flow used for investing activities | (1,222) | (962) | (260) | ||||||||||||||
| Net cash flow provided by financing activities | 187 | 267 | (80) | ||||||||||||||
| Net change in cash and cash equivalents | $ | (3) | $ | (34) | $ | 31 |
Arizona Public Service Company
| Nine Months Ended September 30, | Net | ||||||||||||||||
| 2022 | 2021 | Change | |||||||||||||||
| Net cash flow provided by operating activities | $ | 1,040 | $ | 651 | $ | 389 | |||||||||||
| Net cash flow used for investing activities | (1,188) | (970) | (218) | ||||||||||||||
| Net cash flow provided by financing activities | 144 | 281 | (137) | ||||||||||||||
| Net change in cash and cash equivalents | $ | (4) | $ | (38) | $ | 34 |
Operating Cash Flows
Nine-month period ended September 30, 2022, compared with nine-month period ended September 30, 2021. Pinnacle West’s consolidated net cash provided by operating activities was $1,032 million in 2022, compared to $661 million in 2021, an increase of $371 million in net cash provided by operating activities primarily due to $211 million higher cash receipts from electric revenues, $103 million lower payments for operations and maintenance costs, $100 million lower pension contributions, $70 million other changes in working capital, $14 million higher cash collateral posted in 2022, $9 million lower other taxes, partially offset by $118 million higher fuel and purchased power costs and $12 million higher interest payments.
Retirement plans and other postretirement benefits. Pinnacle West sponsors a qualified defined benefit pension plan and a non-qualified supplemental excess benefit retirement plan for the employees of Pinnacle West and our subsidiaries. The requirements of the Employee Retirement Income Security Act of 1974 (“ERISA”) require us to contribute a minimum amount to the qualified plan. We contribute at least the minimum amount required under ERISA regulations, but no more than the maximum tax-deductible amount. The minimum required funding takes into consideration the value of plan assets and our pension benefit obligations. Under ERISA, the qualified pension plan was 138% funded as of January 1, 2022, and 131% as of January 1, 2021. Future year contribution amounts are dependent on plan asset performance and plan actuarial assumptions. We have not made voluntary contributions to our pension plan year-to-date in 2022. The minimum required contributions for the pension plan are zero and we do not expect to make any contributions in 2022, 2023 or 2024. With regard to contributions to our other postretirement benefit plan, we have not made a contribution year-to-date in 2022 and do not expect to make any contributions in 2022, 2023 or 2024. In 2022 and 2021, the Company has been reimbursed $26 million and $24 million, respectively, for prior years retiree medical claims from the other postretirement benefit plan trust assets. We continually monitor financial
market volatility and its impact on our retirement plans and other postretirement benefits, but we believe, our liability driven investment strategy helps to minimize the impact of market volatility on our plan’s funded status. For instance, our pension plan’s funded status, as measured for accounting principles generally accepted in the United States of America (“GAAP”) purposes, is still above 107% funded as of December 31, 2021, and our postretirement benefit plans have a funded status, also as measured for GAAP purposes at December 31, 2021, in excess of 145%. See Note 5 for additional details.
The CARES Act allowed employers to defer payments of the employer share of Social Security payroll taxes that would have otherwise been owed from March 27, 2020, through December 31, 2020. We deferred the cash payment of the employer’s portion of Social Security payroll taxes for the period July 1, 2020, through December 31, 2020, that was approximately $18 million. We paid approximately $9 million on December 28, 2021, and will pay the second half of this cash deferral by December 31, 2022.
Investing Cash Flows
Nine-month period ended September 30, 2022, compared with nine-month period ended September 30, 2021. Pinnacle West’s consolidated net cash used for investing activities was $1,222 million in 2022, compared to $962 million in 2021, an increase of $260 million primarily related to increased capital expenditures and BCE investment activity.
Capital Expenditures. The following table summarizes the estimated capital expenditures for the next three years:
Capital Expenditures
(dollars in millions)
| 2022 | 2023 | 2024 | |||||||||||||||
| APS | |||||||||||||||||
| Generation: | |||||||||||||||||
| Clean: | |||||||||||||||||
| Nuclear Generation | $ | 110 | $ | 120 | $ | 110 | |||||||||||
| Renewables and Energy Storage Systems (“ESS”) (a) | 240 | 210 | 450 | ||||||||||||||
| Other Generation (b) | 240 | 270 | 190 | ||||||||||||||
| Distribution | 560 | 530 | 500 | ||||||||||||||
| Transmission | 210 | 210 | 210 | ||||||||||||||
| Other (c) | 165 | 185 | 190 | ||||||||||||||
| Total APS | $ | 1,525 | $ | 1,525 | $ | 1,650 |
(a)APS Solar Communities program, energy storage, renewable projects, and other clean energy projects.
(b)Includes generation environmental projects.
(c)Primarily information systems and facilities projects.
The table above does not include capital expenditures related to BCE projects.
Generation capital expenditures are comprised of various additions and improvements to APS’s
clean resources, including nuclear plants, renewables and ESS. Generation capital expenditures also include improvements to existing fossil plants. Examples of the types of projects included in the forecast of generation capital expenditures are additions of renewables and energy storage, and upgrades and capital replacements of
various nuclear and fossil power plant equipment, such as turbines, boilers, and environmental equipment. We are monitoring the status of environmental matters, which, depending on their final outcome, could require modification to our planned environmental expenditures.
Distribution and transmission capital expenditures are comprised of infrastructure additions and upgrades, capital replacements, and new customer construction. Examples of the types of projects included in the forecast include power lines, substations, and line extensions to new residential and commercial developments.
Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.
Financing Cash Flows and Liquidity
Nine-month period ended September 30, 2022, compared with nine-month period ended September 30, 2021. Pinnacle West’s consolidated net cash provided by financing activities was $187 million in 2022, compared to $267 million in 2021, a decrease of $80 million in net cash provided by financing activities primarily due to $150 million higher long-term debt repayments and $142 million in lower issuances of long-term debt, partially offset by a net increase in short-term borrowing of $219 million.
APS’s consolidated net cash provided by financing activities was $144 million in 2022, compared to $281 million in 2021, a decrease of $137 million in net cash provided by financing activities primarily due to $319 million in lower issuances of long-term debt, partially offset by an equity infusion of $150 million in 2022 and a net increase in short-term borrowing of $39 million.
Significant Financing Activities. On October 20, 2022, the Pinnacle West Board of Directors declared a dividend of $0.865 per share of common stock, payable on December 1, 2022, to shareholders of record on November 1, 2022. This represents an increase in the indicated annual dividend from $3.40 per share to $3.46 per share.
Available Credit Facilities**.** Pinnacle West and APS maintain committed revolving credit facilities in order to enhance liquidity and provide credit support for their commercial paper programs, to finance indebtedness, and other general corporate purposes. See Note 3 for more information on available credit facilities.
Other Financing Matters. See Note 7 for information related to the change in our margin and collateral accounts.
Debt Provisions
Pinnacle West’s and APS’s debt covenants related to their respective bank financing arrangements include maximum debt to capitalization ratios. Pinnacle West and APS comply with these covenants. For both Pinnacle West and APS, these covenants require that the ratio of consolidated debt to total consolidated capitalization not exceed 65%. At September 30, 2022, the ratio was approximately 56% for Pinnacle West and 49% for APS. Failure to comply with such covenant levels would result in an event of default which, generally speaking, would require the immediate repayment of the debt subject to the covenants and could “cross-default” other debt. See further discussion of “cross-default” provisions below.
Neither Pinnacle West’s nor APS’s financing agreements contain “rating triggers” that would result in an acceleration of the required interest and principal payments in the event of a rating downgrade. However,
our bank credit agreements contain a pricing grid in which the interest rates we pay for borrowings thereunder are determined by our current credit ratings.
All of Pinnacle West’s loan agreements contain “cross-default” provisions that would result in defaults and the potential acceleration of payment under these loan agreements if Pinnacle West or APS were to default under certain other material agreements. All of APS’s bank agreements contain “cross-default” provisions that would result in defaults and the potential acceleration of payment under these bank agreements if APS were to default under certain other material agreements. Pinnacle West and APS do not have a material adverse change restriction for credit facility borrowings.
On December 17, 2020, the ACC issued a financing order that, subject to specified parameters and procedures, increased APS’s long-term debt limit from $5.9 billion to $7.5 billion, and authorized APS’s short-term debt authorization equal to the sum of (i) 7% of APS’s capitalization, and (ii) $500 million (which is required to be used for costs relating to purchases of natural gas and power). On April 6, 2022, APS filed an application with the ACC to increase the long-term debt limit under the terms required by APS from $7.5 billion to $8.0 billion (subject to appropriate regulatory treatment of PPA lease agreements) and to continue its authorization of short-term debt granted in the 2020 financing order. On October 31, 2022, the ACC Staff filed a report agreeing with APS’s proposal to exclude financing lease PPAs from the definition of long-term debt and adopting APS’s primary proposal to increase APS’s long-term debt limit to $8 billion. This application is pending review by the ACC’s Hearing Division and a final decision by the full Commission. APS cannot predict the outcome of this matter. See Note 3 for further discussions of liquidity matters.
Credit Ratings
The ratings of securities of Pinnacle West and APS as of October 28, 2022, are shown below. We are disclosing these credit ratings to enhance understanding of our cost of short-term and long-term capital and our ability to access the markets for liquidity and long-term debt. The ratings reflect the respective views of the rating agencies, from which an explanation of the significance of their ratings may be obtained. There is no assurance that these ratings will continue for any given period. The ratings may be revised or withdrawn entirely by the rating agencies if, in their respective judgments, circumstances so warrant. Any downward revision or withdrawal may adversely affect the market price of Pinnacle West’s or APS’s securities and/or result in an increase in the cost of, or limit access to, capital. Such revisions may also result in substantial additional cash or other collateral requirements related to certain derivative instruments, insurance policies, natural gas transportation, fuel supply, and other energy-related contracts. At this time, we believe we have sufficient available liquidity resources to respond to a potential downward revision to our credit ratings.
| Moody’s | Standard & Poor’s | Fitch | |||||||||||||||
| Pinnacle West | |||||||||||||||||
| Corporate credit rating | Baa1 | BBB+ | BBB+ | ||||||||||||||
| Senior unsecured | Baa1 | BBB | BBB+ | ||||||||||||||
| Commercial paper | P-2 | A-2 | F2 | ||||||||||||||
| Outlook | Negative | Negative | Negative | ||||||||||||||
| APS | |||||||||||||||||
| Corporate credit rating | A3 | BBB+ | BBB+ | ||||||||||||||
| Senior unsecured | A3 | BBB+ | A- | ||||||||||||||
| Commercial paper | P-2 | A-2 | F2 | ||||||||||||||
| Outlook | Negative | Negative | Negative |
Contractual Obligations
Pinnacle West has contractual obligations and other commitments that will need to be funded in the future, in addition to its capital expenditure programs. Material contractual obligations and other commitments are as follows:
-
Pinnacle West and APS have material long-term debt obligations that mature at various dates through 2050 and bear interest principally at fixed rates. Interest on variable-rate long-term debt is determined by using average rates at September 30, 2022. See Note 3.
-
Pinnacle West and APS maintain committed revolving credit facilities. See Note 3 for short-term debt details.
-
Fuel and purchased power commitments include purchases of coal, electricity, natural gas, renewable energy, nuclear fuel, and natural gas transportation. See Notes 4 and 8. Purchase obligations includes capital expenditures and other obligations. Commitments related to purchased power lease contracts are also considered fuel and purchased power commitments. See Note 8.
-
APS holds certain contracts to purchase renewable energy credits in compliance with the RES. See Notes 4 and 8.
-
APS is required to make payments to the noncontrolling interests related to the Palo Verde sale leaseback through 2033. See Note 6.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
In preparing the financial statements in accordance with GAAP, management must often make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, expenses and related disclosures at the date of the financial statements and during the reporting period. Some of those judgments can be subjective and complex, and actual results could differ from those estimates. There have been no changes to our critical accounting policies and estimates since our 2021 Form 10-K. See “Critical Accounting Policies” in Item 7 of the 2021 Form 10-K for further details about our critical accounting policies and estimates.
MARKET AND CREDIT RISKS
Market Risks
Our operations include managing market risks related to changes in interest rates, commodity prices, investments held by our nuclear decommissioning trusts, other special use funds and benefit plan assets.
Interest Rate and Equity Risk
We have exposure to changing interest rates. Changing interest rates will affect interest paid on variable-rate debt and the market value of fixed income securities held by our nuclear decommissioning trusts, other special use funds (see Notes 11 and 12), and benefit plan assets. The nuclear decommissioning trusts, other special use funds and benefit plan assets also have risks associated with the changing market value of their equity and other non-fixed income investments. Nuclear decommissioning and benefit plan costs are recovered in regulated electricity prices.
Commodity Price Risk
We are exposed to the impact of market fluctuations in the commodity price and transportation costs of electricity and natural gas. Our risk management committee, consisting of officers and key management personnel, oversees company-wide energy risk management activities to ensure compliance with our stated energy risk management policies. We manage risks associated with these market fluctuations by utilizing various commodity instruments that may qualify as derivatives, including futures, forwards, options and swaps. As part of our risk management program, we use such instruments to hedge purchases and sales of electricity and natural gas. The changes in market value of such contracts have a high correlation to price changes in the hedged commodities.
The following table shows the net pretax changes in mark-to-market of APS’s derivative positions (dollars in millions):
| Nine Months Ended September 30, | |||||||||||
| 2022 | 2021 | ||||||||||
| Mark-to-market of net positions at beginning of period | $ | 107 | $ | (13) | |||||||
| Increase in regulatory liability | 152 | 208 | |||||||||
| Mark-to-market of net positions at end of period | $ | 259 | $ | 195 |
APS had no activities or amounts recognized in OCI during the nine months ended September 30, 2022 and 2021.
The table below shows the fair value of maturities of APS’s derivative contracts (dollars in millions) at September 30, 2022, by maturities and by the type of valuation that is performed to calculate the fair values, classified in their entirety based on the lowest level of input that is significant to the fair value measurement. See Note 1, “Derivative Accounting” and “Fair Value Measurements” in Item 8 of our 2021 Form 10-K and Note 11 for more discussion of our valuation methods.
| Source of Fair Value | 2022 | 2023 | 2024 | 2025 | 2026 | Total Fair Value | ||||||||||||||||||||||||||||||||
| Observable prices provided by other external sources | $ | 48 | $ | 146 | $ | 55 | $ | — | $ | — | $ | 249 | ||||||||||||||||||||||||||
| Prices based on unobservable inputs | (1) | 8 | 3 | — | — | 10 | ||||||||||||||||||||||||||||||||
| Total by maturity | $ | 47 | $ | 154 | $ | 58 | $ | — | $ | — | $ | 259 |
The table below shows the impact that hypothetical price movements of 10% would have on the market value of our risk management assets and liabilities included on Pinnacle West’s Condensed Consolidated Balance Sheets (dollars in millions):
| September 30, 2022 | December 31, 2021 | ||||||||||||||||||||||
| Gain (Loss) | Gain (Loss) | ||||||||||||||||||||||
| Price Up 10% | Price Down 10% | Price Up 10% | Price Down 10% | ||||||||||||||||||||
| Mark-to-market changes reported in: | |||||||||||||||||||||||
| Regulatory asset (liability) (a) | |||||||||||||||||||||||
| Electricity | $ | 6 | $ | (6) | $ | — | $ | — | |||||||||||||||
| Natural gas | 62 | (62) | 50 | (50) | |||||||||||||||||||
| Total | $ | 68 | $ | (68) | $ | 50 | $ | (50) |
(a)These contracts are economic hedges of our forecasted purchases of natural gas and electricity. The impact of these hypothetical price movements would substantially offset the impact that these same price movements would have on the physical exposures being hedged. To the extent the amounts are eligible for inclusion in the PSA, the amounts are recorded as either a regulatory asset or liability.
Credit Risk
We are exposed to losses in the event of non-performance or non-payment by counterparties. See Note 7 for a discussion of our credit valuation adjustment policy.