Operational and Structural Risks
4- Sempra’s ability to pay dividends and meet its obligations largely depends on the performance of its subsidiaries and entities accounted for as equity method investments.
- Our investments in businesses we do not control expose us to risks.
- 2025 Form 10-K | 40new
- Our business could be negatively affected by activist shareholders.
Financial and Capital Stock-Related Risks
4- Successfully executing our five-year capital expenditures plan is subject to risks.reworded
- Settlement provisions contained in forward sale agreements in connection with our ATM program subject us to certain risks.reworded
- 2025 Form 10-K | 41new
- The economic interest, voting rights and market value of our outstanding common stock may be adversely affected by any additional equity securities we may issue.reworded
Operational Risks
6- Our infrastructure and its supporting systems subject us to risks.new
- equipment or process failures due to aging infrastructure or otherwise human error loss or outage of a key technology platform or system shortages of or delays in obtaining equipment, materials, supplies, commodities or labor, which have been and may continue to be exacerbated by supply chain and gas transportation capacity constraints, tight labor markets, and cost increases due to inflation, tariffs or otherwise, that may not be recoverable in a timely manner or at all operational restrictions resulting from governmental interventions, including environmental requirements, or permitting delays inability to enter into, maintain, extend or replace long-term supply or transportation contracts performance below expected levelsnewTariffs
- 2025 Form 10-K | 42 failure to meet customer demand for electricity and/or natural gas, including electric or gas outages gas surges into homes or other properties release of hazardous or toxic substances, including gas leaks public contact with energized equipment worksite accidents and other incidents impacting the health, safety or security of employees, contractors, the public or our infrastructure failure to respond effectively to catastrophic events severe weather, which we discuss further in the following risk factorreworded
- We face risks related to severe weather, natural disasters, physical attacks and other similar events.
- 2025 Form 10-K | 43new
- We face evolving cybersecurity, technology resiliency and data security and governance risks, including with respect to increasing use of artificial intelligence.newAICybersecurity
Data Security and Governance
8- 2025 Form 10-K | 44new
- Conditions in global markets, including the impact of enacted and proposed tariffs and other trade actions, may materially and adversely affect us.newTariffs
- 2025 Form 10-K | 45new
- We actively seek opportunities in the market through acquisitions, partnerships, JVs and divestitures, and we may be unable to complete or realize the anticipated benefits from such transactions.new
- We face risks related to activities and projects intended to advance new energy-related technologies.reworded
- The operation of our facilities depends on good labor relations with our employees and our ability to attract and retain qualified personnel.
- 2025 Form 10-K | 46new
- Our businesses depend on the performance of counterparties.
Financial Risks
12- Our debt service obligations expose us to risks.new
- making it more difficult and costly to service, pay or refinance debts as they come due, particularly when interest rates increase or economic or industry conditions are otherwise unfavorable limiting flexibility to pursue strategic opportunities or react to business developments or industry changes causing lenders to require materially adverse terms for new debt, such as restricting uses of proceeds, imposing liens on our assets and limiting our ability to incur additional debt, pay dividends, repurchase stock, or receive distributions from subsidiaries or equity method investeesrewordedInterest rates
- The availability and cost of financing could be negatively affected by market and economic conditions and other factors.reworded
- adverse changes to laws and regulations for Sempra and SDG&E, risks related to California wildfires for Sempra, SDG&E and SoCalGas, any deterioration of or uncertainty in the political or regulatory environment for companies operating in California credit ratings downgradesnew
- 2025 Form 10-K | 47new
- Credit rating agencies may downgrade our credit ratings or place them on negative outlook, and our efforts to maintain these ratings could require additional equity securities issuances by Sempra or sales of equity interests in subsidiaries or projects in development.new
- weakening of certain financial measures or failure to meet certain financial credit metrics ratings downgrades at certain affiliated entities for Sempra, expansion of unregulated businesses in a manner inconsistent with its present level of credit quality for Sempra and SDG&E, catastrophic wildfires caused by SDG&E or any other California electric IOU that participates in the Wildfire Fund and Continuation Account for SDG&E and SoCalGas, a deterioration of the legislative or regulatory environment, including credit negative outcomes of regulatory proceedings for Sempra and SI Partners, the PA LNG Phase 1 project or PA LNG Phase 2 project experiencing higher construction costs, delays or other challengesnew
- We do not fully hedge our assets or contract positions against changes in commodity prices or interest rates, and for positions that are hedged, our hedging mechanisms may not mitigate our risk or reduce our losses as intended.Interest rates
- 2025 Form 10-K | 48new
- Risk management procedures may not prevent or mitigate losses.
- An impairment of our long-lived assets could result in a material charge to earnings.reworded
- Market performance, significant transactions or changes in other assumptions could require unplanned contributions to pension and PBOP plans.reworded
Legal and Regulatory Risks
5- We face risks related to the evolving regulatory environment, including failures or delays in obtaining and maintaining franchises and other required approvals and potential negative impacts of our legislative and regulatory advocacy efforts.new
- 2025 Form 10-K | 49 there is a delay in obtaining these approvals any approval is conditioned on changes or other requirements that increase costs or impose restrictions on our existing or planned operations we fail to obtain or maintain these approvals or comply with them or other applicable laws or regulations we are involved in litigation that adversely impacts any approval or rights to the applicable property or assets management decides not to proceed with a project for our regulated utilities, expenditures are required before rate recovery can be requested or remain subject to subsequent regulatory filings and/or reasonableness reviews that could result in extended delays or denial of rate recovery or disallowance of some or all incurred costsnew
- We face risks related to environmental and climate change regulation and the costs of the energy transition.
- Environmental and Climate Change Regulation
- 2025 Form 10-K | 50new
Other Energy Transition Risks
3- 2025 Form 10-K | 51new
- We are subject to complex tax and accounting requirements that expose us to risks.
- We may be negatively impacted by the outcome of litigation or other proceedings in which we are involved.
Operational Risks
3- Wildfires in California pose risks to Sempra, SDG&E and SoCalGas.
- More and Increasingly Severe Wildfires
- 2025 Form 10-K | 52new
The Wildfire Legislation
9- 2025 Form 10-K | 53new
- Cost Recovery Through Insurance or Rates
- Regulatory Actions Related to Wildfire Mitigation Effortsnew
- The electricity industry is undergoing significant change.new
- 2025 Form 10-K | 54new
- Natural gas continues to be the subject of political and public debate, including a desire by some to reduce or eliminate reliance on natural gas as an energy source.
- 2025 Form 10-K | 55new
- SDG&E may incur significant costs and liabilities from its partial ownership of a nuclear facility being decommissioned.
- the potential release of radioactive material the potential harmful effects from the former operation of the facility limitations on the insurance commercially available to cover losses associated with operating and decommissioning the facility uncertainties with respect to the technological, financial, and political aspects of decommissioning the facility and the long-term storage of radioactive materials
Legal and Regulatory Risks
3- SDG&E and SoCalGas are subject to extensive regulation.
- Rates and Other Financial Matters
- 2025 Form 10-K | 56new
Operational Matters
4- 2025 Form 10-K | 57new
- Regulatory and Legislative Changes and Influence of Other Organizationsreworded
- Failure by the CPUC to adequately reform SDG&E’s electric rate structure could negatively impact Sempra and SDG&E.reworded
- 2025 Form 10-K | 58new
Operational and Structural Risks
4- Ring-fencing measures, governance mechanisms and commitments limit our ability to influence the management, policies and operations of Oncor.reworded
- seven members of Oncor’s 13-person board of directors must be independent directors in all material respects under the rules of the NYSE in relation to Sempra and its affiliates and any other owners of Oncor, and also must have no material relationship with Sempra or its affiliates or any other owners of Oncor currently or within the previous 10 years; of the six remaining directors, two must be designated by Sempra, two must be designated by Oncor’s minority owner, TTI, and two must be current or former Oncor officers
- Oncor will not pay dividends or other distributions (except for contractual tax payments) if (i) a majority of Oncor’s independent directors or any of the directors appointed by TTI determines that it is in the best interest of Oncor to retain such amounts to meet expected future requirements, (ii) the payment would cause Oncor’s debt-to-equity ratio to exceed the debt-to-equity ratio approved by the PUCT, or (iii) unless otherwise allowed by the PUCT, Oncor’s senior secured debt credit rating by any of the Rating Agencies falls below BBB (or Baa2 for Moody’s) certain “separateness measures” must be maintained to reinforce the legal and financial separation of Oncor from Sempra, including a requirement that dealings between Oncor and Sempra or Sempra’s affiliates (other than Oncor Holdings and its subsidiaries) must be on an arm’s-length basis, limitations on affiliate transactions and a prohibition on pledging Oncor assets or membership interests for any entity other than Oncor a majority of Oncor’s independent directors and the directors designated by TTI that are present and voting (with at least one required to be present and voting) must approve any annual or multi-year budget if the aggregate amount of capital expenditures or O&M in the budget differs by more than 10% from the corresponding amounts in the budget for the preceding fiscal year or multi-year period, as applicablereworded
- 2025 Form 10-K | 59new
Industry-Related Risks
2- Changes in the regulation of Oncor or the regulation or operation of the electric utility industry and/or ERCOT market could negatively affect Oncor.reworded
- 2025 Form 10-K | 60new
Financial Risks
4- Oncor’s capital expenditures plan may not be executed as planned or achieve its business objectives.new
- Oncor’s capital expenditures plan will result in significant liquidity needs that may necessitate additional investments.new
- 2025 Form 10-K | 61new
- Sempra could incur substantial tax liabilities if EFH’s 2016 spin-off of Vistra is deemed to be taxable.
Operational Risks
3- Project development activities may not be successful, projects under construction may not be completed on schedule or within budget, and completed projects may not operate at expected levels or generate expected earnings or cash flows.
- Energy Infrastructure Projects our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities conducted before we determine whether the project is viable project assessment and design and our ability to foresee and incorporate emerging trends and technologies our ability to reach a positive FID or meet other milestones, which may be influenced by factors outside our control, including the global economy and energy and financial markets, actions by regulators, internal and external approval requirements, and many of the other factors described in this risk factor negotiation of satisfactory EPC agreements and renegotiation in the event of delays in reaching an FID or other specified deadlines identification of suitable partners, customers, contractors, suppliers and other necessary counterparties progressing relationships from MOUs, HOAs or other non-binding arrangements to execution of binding, definitive agreements negotiation and maintenance of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching an FID within agreed timelines timely receipt and maintenance of required governmental permits, licenses and other authorizations on acceptable terms our project partners’, contractors’, equipment providers’, lenders’ and other vendors’ and counterparties’ willingness and financial or other ability to fulfill their contractual commitmentsnew
- 2025 Form 10-K | 62 timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems; stakeholder relations issues, such as the opposition by some members of the Yaqui tribe to the construction of the Guaymas-El Oro segment of the Sonora pipeline, which we discuss in in Note 1 of the Notes to Consolidated Financial Statements; work stoppages; unavailability or increased costs of materials, equipment, labor and commodities due to inflation, tariffs or supply chain or other issues; and a variety of other factors, many of which we discuss above under “Risks Related to All Sempra Businesses – Operational Risks” and elsewhere in this risk factor implementation of new or changes to existing laws or regulations, including increasing influence of the Mexican government on economic and energy matters and risks related to laws and regulation in Mexico generally, which we discuss further in the risk factors below obtaining satisfactory financing for the project the absence of hidden defects or inherited environmental liabilities on the project site timely and cost-effective resolution of any litigation or unsettled property rights affecting the project geopolitical events and other uncertaintiesnewTariffs
LNG Projects
8- The proposed Cameron LNG Phase 2 project is subject to certain restrictions and conditions under the JV project financing agreements for the Cameron LNG Phase 1 facility and requires unanimous consent of all the members, including with respect to the equity investment obligation of each member. We may not be able to satisfy these conditions, receive members’ consent, obtain satisfactory conclusion on the EPC process, or obtain the extension of our non-FTA approval, in which case our ability to develop the Cameron LNG Phase 2 project would be jeopardized.reworded
- The PA LNG Phase 1 project under construction is located at a greenfield site and is therefore subject to certain disadvantages relative to projects being constructed or developed at brownfield sites, such as increased time and costs to develop and construct the project due to lack of existing infrastructure. The PA LNG Phase 2 project under construction is located at the site of the PA LNG Phase 1 project and is therefore subject to potential disadvantages, such as increased complexity of integrating new facilities with existing infrastructure.new
- 2025 Form 10-K | 63new
- We face risks from increasing competition.reworded
- We may not be able to secure, maintain, extend or replace long-term supply, sales or capacity agreements.
- 2025 Form 10-K | 64new
- We rely on transportation assets and services, much of which we do not control, to deliver natural gas and electricity.reworded
- deliver the natural gas, LNG, electricity and LPG we sell to customers or use at our LNG facilities supply natural gas to our gas storage and electric generation facilities provide retail energy services to customersreworded
Financial Risks
5- Fixed-price long-term contracts for services or commodities expose our businesses to risks.reworded
- Our international businesses and operations expose us to foreign currency exchange rate and inflation risks.
- Our businesses are exposed to fluctuations in commodity prices.
- 2025 Form 10-K | 65new
- If the CRNCI becomes redeemable, SI Partners may not have sufficient funds available to fulfill its obligation of redemption.new
Legal and Regulatory Risks
7- Our international businesses and operations expose us to increased legal, regulatory, tax, economic, geopolitical, credit and management oversight risks and challenges.
- compliance with tax, trade, environmental and other foreign laws and regulations, including legal limitations on ownership in some foreign countries and inadequate or inconsistent enforcement of regulations actions by local regulatory bodies, such as the CNE, including setting rates and tariffs that may be earned by or charged to our businesses adverse changes in social, geopolitical, economic or market conditions adverse rulings by or instability in foreign courts or tribunals challenges obtaining, maintaining and complying with permits or approvals difficulty enforcing contractual and property rights and differing legal standards expropriation or theft of assets the stability of foreign governments or such foreign governments’ relations with the U.S. government changes in the priorities and budgets of international customers, which may be driven by many of the factors listed above, among othersrewordedTariffs
- Mexican Government Influence on Economic and Energy Matters
- 2025 Form 10-K | 66new
- U.S. and Foreign Laws and International Relations
- We face risks related to unsettled property rights and titles in Mexico.
- 2025 Form 10-K | 67new
Risk Related to Planned Sales of Certain Assets and Businesses
1- We may be unable to complete or realize the anticipated benefits from our planned sales of certain of our assets and businesses as part of our capital recycling program.new
No longer in Item 1A
43Headings in the FY2024 10-K with no match this year.
- 2024 Form 10-K | 38
- an ownership event (as such term is defined in the forward sale agreement) occurs; or certain other events of default, termination events or other specified events occur, including, among other things, a change in law.
- 2024 Form 10-K | 39
- The dividend requirements of our preferred stock subject us to risks.
- Our businesses are subject to risks arising from their infrastructure and systems that support this infrastructure.
- 2024 Form 10-K | 41
- We face evolving cybersecurity and technology resiliency risks associated with the energy grid, pipelines, storage and other infrastructure as well as the collection of personal, sensitive and confidential information.
- We actively seek opportunities in the market through acquisitions, partnerships, JVs and divestitures.
- 2024 Form 10-K | 42
- 2024 Form 10-K | 43
- Our debt service obligations expose us to risks and could require additional equity securities issuances by Sempra or sales of equity interests in subsidiaries or projects under development.
- adverse changes to laws and regulations, including recent and proposed changes to energy market regulation in Mexico
- 2024 Form 10-K | 44 for Sempra and SDG&E, risks related to California wildfires for Sempra, SDG&E and SoCalGas, any deterioration of or uncertainty in the political or regulatory environment for local natural gas distribution companies operating in California credit ratings downgrades, such as S&P’s January 2025 actions that revised Sempra’s outlook to negative from stable and downgraded SoCalGas’ issuer credit rating to A- from A.
- Credit rating agencies may downgrade our credit ratings or place them on negative outlook.
- expansion of natural gas liquefaction projects or other unregulated businesses in a manner inconsistent with its present level of credit quality the PA LNG Phase 1 project experiences higher construction costs
- Sempra’s consolidated financial measures consistently weaken, or it fails to meet certain financial credit metrics catastrophic wildfires caused by SDG&E or by any California electric IOUs that participate in the Wildfire Fund, which could exhaust the fund earlier than expected a ratings downgrade at SDG&E, SoCalGas, Oncor and/or SI Partners catastrophic wildfires caused by SDG&E or by any California electric IOUs that participate in the Wildfire Fund, which could exhaust the fund earlier than expected a consistent weakening of SDG&E’s financial metrics, or it fails to meet certain financial credit metrics a deterioration in the regulatory environment, including credit negative outcomes of its pending regulatory proceedings a ratings downgrade at Sempra
- SoCalGas’ financial measures consistently weaken, or it fails to meet certain financial credit metrics
- SoCalGas experiences increased business risk due to a deterioration in the regulatory environment, including credit negative outcomes of its pending regulatory proceedings or elevated risk concerning its natural gas utility business a ratings downgrade at Sempra
- SI Partners’ failure to meet certain financial credit metrics a deterioration in SI Partners’ business risk profile, including incremental construction risk or adverse changes in the operating environment in Mexico the PA LNG Phase 1 project experiences challenges or delays in construction that have an adverse financial impact on SI Partners a ratings downgrade at Sempra, IEnova, Cameron LNG, LLC and/or Port Arthur LNG, LLC
- 2024 Form 10-K | 45
- 2024 Form 10-K | 46
- We face risks related to failures and delays in obtaining and maintaining permits, licenses, franchises and other approvals required by our businesses.
- there is a delay in obtaining these approvals any approval is conditioned on changes or other requirements that increase costs or impose restrictions on our existing or planned operations we fail to obtain or maintain these approvals or comply with them or other applicable laws or regulations we are involved in litigation that adversely impacts any approval or rights to the applicable property or assets management decides not to proceed with a project
- 2024 Form 10-K | 47
- 2024 Form 10-K | 48
- 2024 Form 10-K | 49
- 2024 Form 10-K | 50
- The electricity industry is undergoing significant change, including increased deployment of renewable energy sources and energy storage, technological advancements, evolving procurement service standards, and political and regulatory developments.
- 2024 Form 10-K | 51
- 2024 Form 10-K | 52
- CPUC Authority Over Operational Matters
- 2024 Form 10-K | 53
- SoCalGas has incurred and may continue to incur significant costs, expenses and other liabilities related to the Leak.
- 2024 Form 10-K | 54
- 2024 Form 10-K | 55
- Oncor could have liquidity needs that necessitate additional investments.
- 2024 Form 10-K | 56
- Energy Infrastructure Projects our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities conducted before we determine whether the project is feasible or economically attractive project assessment and design and our ability to foresee and incorporate new and developing trends and technologies in the energy industry, such as projects and design solutions to help enable our and our customers’ climate goals our ability to reach a final investment decision or meet other milestones, which may be influenced by external factors outside our control, including the global economy and energy and financial markets, actions by regulators, achieving necessary internal and external approvals, and many of the other factors described in this risk factor negotiation of satisfactory EPC agreements and renegotiation in the event of delays in final investment decisions or failures to meet other specified deadlines identification of suitable partners, customers, contractors, suppliers and other necessary counterparties progressing relationships from MOUs, HOAs or similar arrangements, which are non-binding, to execution of binding, definitive agreements and participation in the project negotiation and maintenance of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching a positive final investment decision within agreed timelines timely receipt and maintenance of required governmental permits, licenses and other authorizations under terms we find reasonable our project partners’, contractors’, equipment providers’ and other vendors’ and counterparties’ willingness and financial or other ability to make their required investments or fulfill their contractual commitments on a timely basis timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems, work stoppages, unavailability or increased costs of materials, equipment, labor and commodities due to inflation or supply chain or other issues, and a variety of other factors, many of which we discuss above under “Risks Related to All Sempra Businesses – Operational Risks” and elsewhere in this risk factor implementation of new or changes to existing laws or regulations that impact our infrastructure or the energy sector generally obtaining satisfactory financing for the project, particularly when inflation and interest rates are volatile the absence of hidden defects on or inherited environmental liabilities for the site of the project timely and cost-effective resolution of any litigation or unsettled property rights affecting the project geopolitical events and other uncertainties
- 2024 Form 10-K | 57
- 2024 Form 10-K | 58
- 2024 Form 10-K | 59
- Sempra Infrastructure’s business is capital-intensive and relies on various types of financing arrangements, which may not be adequate or available in the future.
- 2024 Form 10-K | 61
Headings are the lines of Item 1A set wholly in bold or italics, as the parser reads them, without the introductory paragraph that opens the section. A heading is new when no heading in the prior 10-K matches it after ignoring case and punctuation, and reworded when it shares at least 60 percent of its words with one that went away. Source: the filing on sec.gov.