Item 2. PROPERTIES

12K characters. Original on sec.gov · Markdown

Item 2. PROPERTIES

PROPERTIES

AGGREGATES

As the largest U.S. supplier of construction aggregates, we serve markets in twenty states, Washington D.C. and the local markets surrounding our operations in Mexico and the Bahamas. Our primary focus is serving states and metropolitan markets in the U.S. that are expected to experience the most significant growth in population, households and employment. These three demographic factors are significant drivers of demand for aggregates.

Picture 39

Our current estimate of 16.2 billion tons of proven and probable aggregates reserves reflects a decrease of 0.1 billion tons from the prior year’s estimate. Estimates of reserves are of recoverable stone, sand and gravel of suitable quality for economic extraction, based on drilling and studies by our geologists and engineers, recognizing reasonable economic and operating constraints as to maximum depth of overburden and stone excavation, and subject to permit or other restrictions.

Proven, or measured, reserves are those reserves for which the quantity is computed from dimensions revealed by drill data, together with other direct and measurable observations, such as outcrops, trenches and quarry faces. The grade and quality of those reserves are computed from the results of detailed sampling, and the sampling and measurement data are spaced so closely and the geologic character is so well defined that size, shape, depth and mineral content of reserves are well established. Probable, or indicated, reserves are those reserves for which quantity, grade and quality are computed partly from specific measurements and partly from projections based on reasonable, though not drilled, geologic evidence. The degree of assurance, although lower than that for proven reserves, is high enough to assume continuity between points of observation.

Part I22

Reported proven and probable reserves include only quantities that are owned in fee or under lease, and for which all appropriate zoning and permitting have been obtained through permit, contract or grandfathered status. Leases, zoning, permits, reclamation plans and other government or industry regulations often set limits on the areas, depths and lengths of time allowed for mining, stipulate setbacks and slopes that must be left in place, and designate which areas may be used for surface facilities, berms, and overburden or waste storage, among other requirements and restrictions. Our reserve estimates take into account these factors. Technical and economic factors also affect the estimates of reported reserves regardless of what might otherwise be considered proven or probable based on a geologic analysis. For example, excessive overburden or weathered rock, rock quality issues, excessive mining depths, groundwater issues, overlying wetlands, endangered species habitats, and rights of way or easements may effectively limit the quantity of reserves considered proven and probable. In addition, computations for reserves in-place are adjusted for estimates of unsaleable sizes and materials as well as pit and plant waste.

The 16.2 billion tons of estimated proven and probable aggregates reserves reported at the end of 2019 include reserves at inactive and greenfield (undeveloped) sites. The table below presents, by division, the tons of proven and probable aggregates reserves as of December 31, 2019 and the types of facilities operated.

(millions of tons)Count of Aggregates Operating Facilities 2
Aggregates Reserves2019Sand and
Division 1ProvenProbableTotalProductionStoneGravelSales Yards
Central2,838.9819.63,658.538.95349
International540.20.0540.214.0100
Mideast2,464.5981.33,445.839.434324
Mountain West173.2119.1292.39.12122
Southeast 33,007.0874.13,881.152.644922
Southern Gulf Coast1,376.245.01,421.218.023019
Southwest1,406.60.01,406.623.915122
Western1,017.1489.71,506.821.16132
Total12,823.73,328.816,152.5217.017842100
1The divisions are defined by states/countries as follows: Central Division — Arkansas, Illinois, Kentucky and Tennessee International Division — Mexico Mideast Division — Delaware, Maryland, North Carolina, Pennsylvania, Virginia and Washington D.C. Mountain West Division — Arizona and New Mexico Southeast Division — Florida (excluding panhandle), Georgia, South Carolina and the Bahamas Southern Gulf Coast Division — Alabama, Florida Panhandle, Louisiana and Mississippi Southwest Division — Oklahoma and Texas Western Division — California
2In addition to the aggregates facilities included in the table above, we operate**d 46 recycled concrete plants which are not dependent on reserves.
3Includes a maximum of 327.0 million tons of reserves encumbered by volumetric production payments as defined in Note 2 “Revenues” in Item 8 “Financial Statements and Supplementary Data*.”*

Of the 16.2 billion tons of aggregates reserves at December 31, 2019, 9.1 billion tons or 56% are located on owned land and 7.1 billion tons or 44% are located on leased land.

‎

Part I23

The following table lists our ten largest active aggregates facilities based on the total proven and probable reserves at the sites. None of our aggregates facilities, other than Playa del Carmen, contributed more than 5% to our total revenues in 2019.

(millions of tons)
Reserves at 12/31/20192019
Location (nearest major metropolitan area)ProvenProbableTotalProduction
Playa del Carmen (Cancun), Mexico540.20.0540.214.0
Hanover (Harrisburg), Pennsylvania223.6236.4460.02.8
McCook (Chicago), Illinois101.2266.5367.74.7
Corona (Los Angeles), California12.5319.5332.02.2
Gold Hill (Charlotte), North Carolina147.7121.1268.81.0
Postell (Macon), Georgia190.972.3263.24.5
San Emidio (Bakersfield), California250.00.0250.01.4
Medina (San Antonio), Texas247.30.0247.31.0
Macon, Georgia117.4128.0245.41.9
Norcross (Atlanta), Georgia183.427.7211.13.6

ASPHALT, CONCRETE AND CALCIUM

As of December 31, 2019, we operated a number of facilities producing asphalt mix, ready-mixed concrete and calcium in several of our divisions as reflected in the table below:

Asphalt 2Concrete 3Calcium 4
Division 1FacilitiesFacilitiesFacilities
Central1100
Mideast0390
Mountain West2020
Southeast011
Southern Gulf Coast200
Southwest1570
Western2240
Total70531
1International Division has no asphalt, concrete or calcium facilities.
2Asphalt facilities for the Central, Southern Gulf Coast and Southwest Divisions are c**omprised of asphalt mix facilities and construction paving businesses*.*
3Southeast Division Concrete is c**omprised of a ready-mixed concrete plant in the Bahamas*.*
4Comprised of a ground calcium plant.

The asphalt and concrete facilities are able to meet their needs for raw material inputs with a combination of internally sourced and purchased raw materials.

Part I24

Our Calcium segment operates a quarry at Brooksville, Florida which provides feedstock for the ground calcium operation.

(millions of tons)
Reserves at 12/31/20192019
LocationProvenProbableTotalProduction
Brooksville4.87.111.90.3

Our Brooksville limestone quarry is mined and processed primarily as a supplement for end-use products, such as animal feed and plastics. High purity limestone is inert and relatively inexpensive compared to the other components used in these end-use products. The Brooksville limestone quarry has an average calcium carbonate (CaCO3) content of 97%.

HEADQUARTERS

Our headquarters are located in an office complex in Birmingham, Alabama. The office space consists of approximately 184,410 square feet and is leased through December 31, 2023, with three five-year renewal periods thereafter. The annual rental cost for the current term of the lease is approximately $3.7 million.