Item 1. FINANCIAL STATEMENTS

212K characters. Original on sec.gov · Markdown

Item 1. FINANCIAL STATEMENTS

VISTRA CORP.

CONDENSED CONSOLIDATED STATEMENTS OF OPERATIONS

(Unaudited) (Millions of Dollars, Except Per Share Amounts)

Three Months Ended March 31,
20222021
Operating revenues (Note 4)$3,125$3,207
Fuel, purchased power costs and delivery fees(2,279)(4,745)
Operating costs(416)(371)
Depreciation and amortization(430)(423)
Selling, general and administrative expenses(288)(251)
Operating loss(288)(2,583)
Other income (Note 17)555
Other deductions (Note 17)(4)(5)
Interest expense and related charges (Note 17)(7)(29)
Impacts of Tax Receivable Agreement (Note 7)(81)37
Loss before income taxes(375)(2,525)
Income tax benefit (Note 6)91485
Net loss$(284)$(2,040)
Net income attributable to noncontrolling interest(1)(3)
Net loss attributable to Vistra$(285)$(2,043)
Cumulative dividends attributable to preferred stock(38)—
Net loss attributable to Vistra common stock$(323)$(2,043)
Weighted average shares of common stock outstanding:
Basic451,603,354484,699,267
Diluted451,603,354484,699,267
Net loss per weighted average share of common stock outstanding:
Basic$(0.72)$(4.21)
Diluted$(0.72)$(4.21)

See Notes to the Condensed Consolidated Financial Statements.

CONDENSED CONSOLIDATED STATEMENTS OF COMPREHENSIVE LOSS

(Unaudited) (Millions of Dollars)

Three Months Ended March 31,
20222021
Net loss$(284)$(2,040)
Other comprehensive income (loss), net of tax effects:
Effects related to pension and other retirement benefit obligations (net of tax benefit of $— and $—)—2
Total other comprehensive income (loss)—2
Comprehensive loss$(284)$(2,038)
Comprehensive income attributable to noncontrolling interest(1)(3)
Comprehensive loss attributable to Vistra$(285)$(2,041)

See Notes to the Condensed Consolidated Financial Statements.

Table of Contents

VISTRA CORP. CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOWS (Unaudited) (Millions of Dollars)
Three Months Ended March 31,
20222021
Cash flows — operating activities:
Net loss$(284)$(2,040)
Adjustments to reconcile net loss to cash provided by (used in) operating activities:
Depreciation and amortization542511
Deferred income tax expense (benefit), net(84)(524)
Unrealized net (gain) loss from mark-to-market valuations of commodities360(96)
Unrealized net gain from mark-to-market valuations of interest rate swaps(126)(88)
Asset retirement obligation accretion expense911
Impacts of Tax Receivable Agreement81(37)
Stock-based compensation1416
Other, net3211
Changes in operating assets and liabilities:
Margin deposits, net210(134)
Accrued interest(62)(75)
Accrued taxes(98)(79)
Accrued employee incentive(59)(128)
Other operating assets and liabilities56999
Cash provided by (used in) operating activities591(1,653)
Cash flows — investing activities:
Capital expenditures, including nuclear fuel purchases and LTSA prepayments(373)(192)
Proceeds from sales of nuclear decommissioning trust fund securities98133
Investments in nuclear decommissioning trust fund securities(103)(138)
Proceeds from sales of environmental allowances745
Purchases of environmental allowances(116)(28)
Insurance proceeds140
Other, net611
Cash used in investing activities(480)(129)
Cash flows — financing activities:
Borrowings under Term Loan A—1,000
Proceeds from forward capacity agreement—500
Repayments/repurchases of debt(132)(36)
Net borrowings under accounts receivable financing500425
Borrowings under Revolving Credit Facility—1,300
Repayments under Revolving Credit Facility—(1,000)
Share repurchases(710)(175)
Dividends paid to common stockholders(77)(74)
Other, net6(1)
Cash (used in) provided by financing activities(413)1,939
Net change in cash, cash equivalents and restricted cash(302)157
Cash, cash equivalents and restricted cash — beginning balance1,359444
Cash, cash equivalents and restricted cash — ending balance$1,057$601

See Notes to the Condensed Consolidated Financial Statements.

Table of Contents

VISTRA CORP. CONDENSED CONSOLIDATED BALANCE SHEETS (Unaudited) (Millions of Dollars)
March 31, 2022December 31, 2021
ASSETS
Current assets:
Cash and cash equivalents$1,022$1,325
Restricted cash (Note 17)2321
Trade accounts receivable — net (Note 17)1,2751,397
Income taxes receivable2115
Inventories (Note 17)546610
Commodity and other derivative contractual assets (Note 14)6,0042,513
Margin deposits related to commodity contracts1,2371,263
Uplift securitization proceeds receivable from ERCOT (Note 1)544544
Prepaid expense and other current assets241195
Total current assets10,9137,883
Restricted cash (Note 17)1213
Investments (Note 17)1,9522,049
Property, plant and equipment — net (Note 17)12,88713,056
Operating lease right-of-use assets3940
Goodwill (Note 5)2,5832,583
Identifiable intangible assets — net (Note 5)2,1582,146
Commodity and other derivative contractual assets (Note 14)545250
Accumulated deferred income taxes1,4001,302
Other noncurrent assets344361
Total assets$32,833$29,683
LIABILITIES AND EQUITY
Current liabilities:
Accounts receivable financing (Note 9)$500$—
Long-term debt due currently (Note 10)124254
Trade accounts payable1,2841,515
Commodity and other derivative contractual liabilities (Note 14)6,8353,023
Margin deposits related to commodity contracts22339
Accrued taxes other than income109207
Accrued interest81143
Asset retirement obligations (Note 17)104104
Operating lease liabilities55
Other current liabilities600553
Total current liabilities9,8655,843
Long-term debt, less amounts due currently (Note 10)10,47310,477
Operating lease liabilities3738
Commodity and other derivative contractual liabilities (Note 14)1,108804
Tax Receivable Agreement obligation (Note 7)475394
Asset retirement obligations (Note 17)2,3472,346
Other noncurrent liabilities and deferred credits (Note 17)1,2261,489
Total liabilities25,53121,391

Table of Contents

VISTRA CORP. CONDENSED CONSOLIDATED BALANCE SHEETS (Unaudited) (Millions of Dollars)
March 31, 2022December 31, 2021
Commitments and Contingencies (Note 11)
Total equity (Note 12):
Preferred stock, number of shares authorized — 100,000,000; Series A (liquidation preference — $1,000; shares outstanding: March 31, 2022 and December 31, 2021— 1,000,000); Series B (liquidation preference — $1,000; shares outstanding: March 31, 2022 and December 31, 2021 — 1,000,000)2,0002,000
Common stock (par value — $0.01; number of shares authorized — 1,800,000,000) (shares outstanding: March 31, 2022 — 438,694,982; December 31, 2021 — 469,072,597)55
Treasury stock, at cost (shares: March 31, 2022 — 95,887,643; December 31, 2021 — 63,856,879)(2,170)(1,558)
Additional paid-in-capital9,8449,824
Retained deficit(2,363)(1,964)
Accumulated other comprehensive loss(16)(16)
Stockholders' equity7,3008,291
Noncontrolling interest in subsidiary21
Total equity7,3028,292
Total liabilities and equity$32,833$29,683

See Notes to the Condensed Consolidated Financial Statements.

Table of Contents

VISTRA CORP.

NOTES TO CONDENSED CONSOLIDATED FINANCIAL STATEMENTS

(Unaudited)

**1.**BUSINESS AND SIGNIFICANT ACCOUNTING POLICIES

Description of Business

References in this report to "we," "our," "us" and "the Company" are to Vistra and/or its subsidiaries, as apparent in the context. See Glossary for defined terms.

Vistra is a holding company operating an integrated retail and electric power generation business primarily in markets throughout the U.S. Through our subsidiaries, we are engaged in competitive energy market activities including electricity generation, wholesale energy sales and purchases, commodity risk management and retail sales of electricity and natural gas to end users.

Vistra has six reportable segments: (i) Retail, (ii) Texas, (iii) East, (iv) West, (v) Sunset and (vi) Asset Closure. See Note 16 for further information concerning our reportable business segments.

Winter Storm Uri

In February 2021, a severe winter storm with extremely cold temperatures affected much of the U.S., including Texas. This severe weather resulted in surging demand for power, gas supply shortages, operational challenges for generators, and a significant load shed event that was ordered by ERCOT beginning on February 15, 2021 and continuing through February 18, 2021. Winter Storm Uri had a material adverse impact on our results of operations and operating cash flows.

Uplift Securitization Proceeds Receivable from ERCOT — As part of the 2021 regular Texas legislative sessions and in response to extraordinary costs incurred by electricity market participants during Winter Storm Uri, the Texas legislature passed House Bill (HB) 4492 for ERCOT to obtain financing to distribute to load-serving entities (LSEs) that were uplifted and paid to ERCOT exceptionally high price adders and ancillary service costs during Winter Storm Uri. In October 2021, the PUCT issued a Debt Obligation Order approving $2.1 billion financing and the methodology for allocation of proceeds to the LSEs. In December 2021, ERCOT finalized the amount of allocations to the LSEs, and we expect to receive approximately $544 million of proceeds from ERCOT. The Company accounted for the proceeds we will receive by analogy to the contribution model within Accounting Standards Codification (ASC) 958-605, Not-for-Profit Entities - Revenue Recognition and the grant model within International Accounting Standard 20, Accounting for Government Grants and Disclosure of Government Assistance, as a reduction to expenses in the statements of operations in the annual period for which the proceeds are intended to compensate. The proceeds are expected to be received from ERCOT in the second quarter of 2022, and we concluded that the threshold for recognizing a receivable was met in December 2021 as the amounts to be received were determinable and ERCOT was directed by its governing body, the PUCT, to take all actions required to effectuate the $2.1 billion funding approved in the Debt Obligation Order.

The final financial impact of Winter Storm Uri continues to be subject to the outcome of litigation arising from the event, including any resulting corrective action taken by ERCOT or the PUCT to resettle pricing during the week of the storm.

Recent Developments

Dividends Declared — In May 2022, the Board declared a quarterly dividend of $0.177 per share of common stock that will be paid in June 2022. In May 2022, the Board declared a semi-annual dividend of $35.97 per share of Series B Preferred Stock that will be paid in June 2022.

Vistra Operations Credit Agreement Amendment — In April 2022, the Vistra Operations Credit Agreement was amended to, among other things, (i) establish extended revolving credit commitments of $2.8 billion (with ability to increase up to $3.0 billion pursuant to an incremental amendment), (ii) maintain non-extended revolving credit commitments of $200 million, (iii) increase revolving letter of credit commitments to allow for the full amount of all revolving credit commitments to be utilized to issue letters of credit (and as of the closing of the amendment, the aggregate amount of revolving letter of credit commitments was $2.595 billion) and (iv) extend the maturity date for the extended revolving credit commitments from June 14, 2023 to April 29, 2027 (see Note 10).

Table of Contents

Basis of Presentation

The condensed consolidated financial statements have been prepared in accordance with U.S. GAAP and on the same basis as the audited financial statements included in our 2021 Form 10-K. The condensed consolidated financial information herein reflects all adjustments which are, in the opinion of management, necessary to fairly state the results for the interim periods presented. All such adjustments are of a normal nature. All intercompany items and transactions have been eliminated in consolidation. Certain information and footnote disclosures normally included in annual consolidated financial statements prepared in accordance with U.S. GAAP have been omitted pursuant to the rules and regulations of the SEC. Because the condensed consolidated interim financial statements do not include all of the information and footnotes required by U.S. GAAP, they should be read in conjunction with the audited financial statements and related notes contained in our 2021 Form 10-K. The results of operations for an interim period may not give a true indication of results for a full year. All dollar amounts in the financial statements and tables in the notes are stated in millions of U.S. dollars unless otherwise indicated.

Use of Estimates

Preparation of financial statements requires estimates and assumptions about future events that affect the reporting of assets and liabilities at the balance sheet dates and the reported amounts of revenue and expense, including fair value measurements, estimates of expected obligations, judgments related to the potential timing of events and other estimates. In the event estimates and/or assumptions prove to be different from actual amounts, adjustments are made in subsequent periods to reflect more current information.

2. DEVELOPMENT OF GENERATION FACILITIES

Texas Segment Solar Generation and Energy Storage Projects

We have announced the planned development of up to 768 MW of solar photovoltaic power generation facilities and 260 MW of battery ESS in Texas. The first 158 MW of solar generation came online in January and February 2022 and the battery ESS came online in April 2022. Estimated commercial operation dates for the remaining facilities range from fourth quarter of 2023 to fourth quarter of 2024. At March 31, 2022, we had accumulated approximately $309 million in construction-work-in-process for these Texas segment solar generation and battery ESS projects.

East Segment Solar Generation and Energy Storage Projects

In September 2021, we announced the planned development of up to 300 MW of solar photovoltaic power generation facilities and up to 150 MW of battery ESS at retired or to-be-retired plant sites in Illinois, based on the passage of Illinois Senate Bill 2408, the Energy Transition Act. Estimated commercial operation dates for these facilities range from 2023 to 2025.

West Segment Energy Storage Projects

Oakland — In June 2019, East Bay Community Energy (EBCE) signed a ten-year contract to receive resource adequacy capacity from the planned development of a 20 MW battery ESS at our Oakland Power Plant site in California. In April 2020, the project received necessary approvals from EBCE and from Pacific Gas and Electric Company (PG&E). The contract was amended to increase the capacity of the planned development to a 36.25 MW battery ESS. In April 2020, the concurrent Local Area Reliability Service (LARS) agreement to ensure grid reliability as part of the Oakland Clean Energy Initiative was signed, but required California Public Utilities Commission (CPUC) approval. PG&E did not receive CPUC approval as of April 15, 2021. On April 16, 2021, Vistra terminated the LARS agreement with PG&E. We are continuing development of the Oakland battery ESS project while seeking another contractual arrangement that will allow the investment to move forward.

Moss Landing — In June 2018, we announced that, subject to approval by the CPUC, we would enter into a 20-year resource adequacy contract with PG&E to develop a 300 MW battery ESS at our Moss Landing Power Plant site in California (Moss Landing Phase I). The CPUC approved the resource adequacy contract in November 2018. Under the contract, PG&E will pay us a fixed monthly resource adequacy payment, while we will receive the energy revenues and incur the costs from dispatching and charging the ESS. Moss Landing Phase I commenced commercial operations in May 2021.

Table of Contents

In May 2020, we announced that, subject to approval by the CPUC, we would enter into a 10-year resource adequacy contract with PG&E to develop an additional 100 MW battery ESS at our Moss Landing Power Plant site (Moss Landing Phase II). The CPUC approved the resource adequacy contract in August 2020. Moss Landing Phase II commenced commercial operations in July 2021.

In January 2022, we announced that, subject to approval by the CPUC, we would enter into a 15-year resource adequacy contract with PG&E to develop an additional 350 MW battery ESS at our Moss Landing Power Plant site (Moss Landing Phase III). The CPUC approved the resource adequacy contract in April 2022. Moss Landing Phase III is expected to enter commercial operations in the summer of 2023. At March 31, 2022, we had accumulated approximately $20 million in construction-work-in-process for Moss Landing Phase III.

Moss Landing Outages — In September 2021, Moss Landing Phase I experienced an incident impacting a portion of the battery ESS. A review found the root cause originated in systems separate from the battery system. The facility will be offline as we perform the work necessary to return the facility to service. Moss Landing Phase II was not affected by this incident.

In February 2022, Moss Landing Phase II experienced an incident impacting a portion of the battery ESS. A review found the root cause originated in systems separate from the battery system. The facility will be offline as we perform the work necessary to return the facility to service. Moss Landing Phase I was not affected by this incident.

We are continuing restoration work on the facilities and assuming our work continues as planned we expect to restore both facilities to service in phases beginning in June 2022 with approximately 350 MW anticipated to be online by the end of June 2022.

We do not expect these incidents to have a material impact on our results of operations.

3. RETIREMENT OF GENERATION FACILITIES

In 2020, we announced our intention to retire all of our remaining coal generation facilities in Illinois and Ohio, one coal generation facility in Texas and one natural gas facility in Illinois no later than year-end 2027 due to economic challenges, including incremental expenditures that would be required to comply with the CCR rule and ELG rule (see Note 11), and in furtherance of our efforts to significantly reduce our carbon footprint. In April 2021, we announced we would retire the Joppa generation facilities by September 1, 2022 in order to settle a complaint filed with the Illinois Pollution Control Board (IPCB) by the Sierra Club in 2018. We had previously announced that Joppa would retire no later than the end of 2027. In July 2021, we announced we would retire the Zimmer coal generation facility by May 31, 2022 due to the inability to secure capacity revenues for the plant in the latest PJM capacity auction held in May 2021. We had previously announced that Zimmer would retire no later than the end of 2027.

Operational results for plants with defined retirement dates are included in our Sunset segment beginning in the quarter when a retirement plan is announced and move to the Asset Closure segment at the beginning of the calendar year the retirement is expected to occur.

FacilityLocationISO/RTOFuel TypeNet Generation Capacity (MW)Expected Retirement Date (a)Segment
BaldwinBaldwin, ILMISOCoal1,185By the end of 2025Sunset
Coleto CreekGoliad, TXERCOTCoal650By the end of 2027Sunset
EdwardsBartonville, ILMISOCoal585January 1, 2023Sunset
JoppaJoppa, ILMISOCoal802By September 1, 2022Asset Closure
JoppaJoppa, ILMISONatural Gas221By September 1, 2022Asset Closure
KincaidKincaid, ILPJMCoal1,108By the end of 2027Sunset
Miami FortNorth Bend, OHPJMCoal1,020By the end of 2027Sunset
NewtonNewton, ILMISO/PJMCoal615By the end of 2027Sunset
ZimmerMoscow, OHPJMCoal1,300By May 31, 2022Asset Closure
Total7,486

(a)Generation facilities may retire earlier than expected dates if economic or other conditions dictate.

Table of Contents

4. REVENUE

Three Months Ended March 31, 2022
RetailTexasEastWestSunsetAsset ClosureEliminationsConsolidated
Revenue from contracts with customers:
Retail energy charge in ERCOT$1,405$—$—$—$—$—$—$1,405
Retail energy charge in Northeast/Midwest639——————639
Wholesale generation revenue from ISO/RTO—15140258170135—916
Capacity revenue from ISO/RTO (a)——(6)—3712—43
Revenue from other wholesale contracts—120243394412—458
Total revenue from contracts with customers2,04427163997251159—3,461
Other revenues:
Intangible amortization————(2)——(2)
Hedging and other revenues (b)(219)—309(28)(344)(52)—(334)
Affiliate sales (c)—(1,366)73(45)—1,401—
Total other revenues(219)(1,366)316(25)(391)(52)1,401(336)
Total revenues$1,825$(1,095)$955$72$(140)$107$1,401$3,125

(a)Represents net capacity sold (purchased) in each ISO/RTO. The East segment includes $136 million of capacity purchased offset by $130 million of capacity sold. The Sunset segment includes $2 million of capacity purchased offset by $39 million of capacity sold. The Asset Closure segment includes $12 million of capacity sold.

(b)Includes $358 million of unrealized net losses from mark-to-market valuations of commodity positions. See Note 16 for unrealized net gains (losses) by segment.

(c)Texas, East and Sunset segments include $2.011 billion, $509 million and $153 million, respectively, of affiliated unrealized net losses from mark-to-market valuations of commodity positions with the Retail segment.

Table of Contents

Three Months Ended March 31, 2021
RetailTexasEastWestSunsetAsset ClosureEliminationsConsolidated
Revenue from contracts with customers:
Retail energy charge in ERCOT$1,149$—$—$—$—$—$—$1,149
Retail energy charge in Northeast/Midwest586——————586
Wholesale generation revenue from ISO/RTO—3,2461563867944—4,163
Capacity revenue from ISO/RTO (a)——(4)—2910—35
Revenue from other wholesale contracts—2,02816321571—2,270
Total revenue from contracts with customers1,7355,2743155976555—8,203
Other revenues:
Intangible amortization(1)—1—(6)——(6)
Hedging and other revenues (b)16(4,442)63(27)(567)(33)—(4,990)
Affiliate sales (c)—251345165—(662)—
Total other revenues15(4,191)409(26)(508)(33)(662)(4,996)
Total revenues$1,750$1,083$724$33$257$22$(662)$3,207

(a)Represents net capacity sold (purchased) in each ISO/RTO. The East segment includes $115 million of capacity purchased offset by $111 million of capacity sold. The Sunset segment includes $29 million of capacity sold. The Asset Closure segment includes $10 million of capacity sold.

(b)Includes $58 million of unrealized net gains from mark-to-market valuations of commodity positions. See Note 16 for unrealized net gains (losses) by segment.

(c)Texas, East and Sunset segments include $673 million, $83 million and $34 million, respectively, of affiliated unrealized net losses, respectively, from mark-to-market valuations of commodity positions with the Retail segment.

Performance Obligations

As of March 31, 2022, we have future performance obligations that are unsatisfied, or partially unsatisfied, relating to capacity auction volumes awarded through capacity auctions held by the ISO/RTO or contracts with customers. Therefore, an obligation exists as of the date of the results of the respective ISO/RTO capacity auction or the contract execution date. These obligations total $359 million, $321 million, $210 million, $153 million and $85 million that will be recognized, in the balance of the year ended December 31, 2022 and the years ending December 31, 2023, 2024, 2025 and 2026, respectively, and $439 million thereafter. Capacity revenues are recognized as capacity is made available to the related ISOs/RTOs or counterparties.

Accounts Receivable

The following table presents trade accounts receivable (net of allowance for uncollectible accounts) relating to both contracts with customers and other activities:

March 31, 2022December 31, 2021
Trade accounts receivable from contracts with customers — net$1,074$1,087
Other trade accounts receivable — net201310
Total trade accounts receivable — net$1,275$1,397

Table of Contents

5. GOODWILL AND IDENTIFIABLE INTANGIBLE ASSETS AND LIABILITIES

Goodwill

At both March 31, 2022 and December 31, 2021, the carrying value of goodwill totaled $2.583 billion, including $2.461 billion allocated to our Retail reporting unit and $122 million allocated to our Texas Generation reporting unit. Goodwill of $1.944 billion is deductible for tax purposes over 15 years on a straight line basis.

Identifiable Intangible Assets and Liabilities

Identifiable intangible assets are comprised of the following:

March 31, 2022December 31, 2021
Identifiable Intangible AssetGross Carrying AmountAccumulated AmortizationNetGross Carrying AmountAccumulated AmortizationNet
Retail customer relationship$2,096$1,665$431$2,083$1,631$452
Software and other technology-related assets436219217421206215
Retail and wholesale contracts2482123624820642
Contractual service agreements (a)2231923221
Other identifiable intangible assets (b)1206114952075
Total identifiable intangible assets subject to amortization$2,922$2,105817$2,870$2,065805
Retail trade names (not subject to amortization)1,3411,341
Total identifiable intangible assets$2,158$2,146

(a)At March 31, 2022, amounts related to contractual service agreements that have become liabilities due to amortization of the economic impacts of the intangibles have been removed from both the gross carrying amount and accumulated amortization.

(b)Includes mining development costs and environmental allowances (emissions allowances and renewable energy certificates).

Identifiable intangible liabilities are comprised of the following:

Identifiable Intangible LiabilityMarch 31, 2022December 31, 2021
Contractual service agreements$132$125
Purchase and sale of power and capacity58
Fuel and transportation purchase contracts1314
Total identifiable intangible liabilities$150$147

Table of Contents

Expense related to finite-lived identifiable intangible assets and liabilities (including the classification in the condensed consolidated statements of operations) consisted of:

Identifiable Intangible Assets and LiabilitiesCondensed Consolidated Statements of OperationsThree Months Ended March 31,
20222021
Retail customer relationshipDepreciation and amortization$34$49
Software and other technology-related assetsDepreciation and amortization1719
Retail and wholesale contracts/purchase and sale/fuel and transportation contractsOperating revenues/fuel, purchased power costs and delivery fees28
Other identifiable intangible assetsOperating revenues/fuel, purchased power costs and delivery fees/depreciation and amortization8957
Total intangible asset expense (a)$142$133

(a)Amounts recorded in depreciation and amortization totaled $52 million and $68 million for the three months ended March 31, 2022 and 2021, respectively. Amounts exclude contractual services agreements. Amounts include all expenses associated with environmental allowances including expenses accrued to comply with emissions allowance programs and renewable portfolio standards which are presented in fuel, purchased power costs and delivery fees on our condensed consolidated statements of operations. Emissions allowance obligations are accrued as associated electricity is generated and renewable energy certificate obligations are accrued as retail electricity delivery occurs.

Estimated Amortization of Identifiable Intangible Assets and Liabilities

As of March 31, 2022, the estimated aggregate amortization expense of identifiable intangible assets and liabilities for each of the next five fiscal years is as shown below.

YearEstimated Amortization Expense
2022$208
2023$154
2024$105
2025$76
2026$51

6. INCOME TAXES

Income Tax Expense

The calculation of our effective tax rate is as follows:

Three Months Ended March 31,
20222021
Loss before income taxes$(375)$(2,525)
Income tax benefit$91$485
Effective tax rate24.3%19.2%

For the three months ended March 31, 2022, the effective tax rate of 24.3% was higher than the U.S. federal statutory rate of 21% due primarily to expenses such as the nondeductible impacts of the TRA and state income taxes. These expenses applied against the full year forecasted book income position result in an effective tax rate higher than the U.S. federal statutory rate.

For the three months ended March 31, 2021, the effective tax rate of 19.2% was lower than the U.S. federal statutory rate of 21% due primarily to expenses such as the nondeductible impacts of the TRA and state income taxes. These expenses applied against the full year forecasted book loss position result in an effective tax rate lower than the U.S. federal statutory rate.

Table of Contents

Coronavirus Aid, Relief, and Economic Security Act (CARES Act) and Final Section 163(j) Regulations

In response to the global pandemic related to COVID-19, the CARES Act was signed into law in March 2020. The CARES Act provides numerous relief provisions for corporate taxpayers, including modification of the utilization limitations on net operating losses, favorable expansion of the deduction for business interest expense under IRC Section 163(j) (Section 163(j)), the ability to accelerate timing of refundable alternative minimum tax (AMT) credits and the temporary suspension of certain payment requirements for the employer portion of social security taxes. Additionally, the final Section 163(j) regulations were issued in July 2020 and provided a critical correction to the proposed regulations with respect to the computation of adjusted taxable income. As of January 1, 2022, certain provisions in the final Section 163(j) regulations have sunset, including the addback of depreciation and amortization to adjusted taxable income. As a result, under the law as currently drafted, Vistra's deductible business interest expense will be significantly limited for the 2022 tax year. Vistra remains active in legislative monitoring and advocacy efforts to support a legislative solution to reinstate and make permanent the addback of depreciation and amortization to adjusted taxable income. Vistra is also utilizing the CARES Act payroll deferral mechanism to defer the payment of approximately $22 million from 2020 to 2021 and 2022. We paid approximately half of the previously deferred taxes in December 2021.

Liability for Uncertain Tax Positions

Vistra and its subsidiaries file income tax returns in U.S. federal, state and foreign jurisdictions and are, at times, subject to examinations by the IRS and other taxing authorities. In February 2021, Vistra was notified that the IRS had opened a federal income tax audit for tax years 2018 and 2019 and an employment tax audit for tax year 2018. Crius is currently under audit by the IRS for the tax years 2015 and 2016. Uncertain tax positions totaled $38 million at both March 31, 2022 and December 31, 2021.

7. TAX RECEIVABLE AGREEMENT OBLIGATION

On the Effective Date, Vistra entered into a tax receivable agreement (the TRA) with a transfer agent on behalf of certain former first-lien creditors of TCEH. The TRA generally provides for the payment by us to holders of TRA Rights of 85% of the amount of cash savings, if any, in U.S. federal and state income tax that we realize in periods after Emergence as a result of (a) certain transactions consummated pursuant to the Plan of Reorganization (including the step-up in tax basis in our assets resulting from the PrefCo Preferred Stock Sale), (b) the tax basis of all assets acquired in connection with the acquisition of two CCGT natural gas-fueled generation facilities in April 2016 and (c) tax benefits related to imputed interest deemed to be paid by us as a result of payments under the TRA, plus interest accruing from the due date of the applicable tax return.

Pursuant to the TRA, we issued the TRA Rights for the benefit of the first-lien secured creditors of TCEH entitled to receive such TRA Rights under the Plan of Reorganization. Such TRA Rights are entitled to certain registration rights more fully described in the Registration Rights Agreement (see Note 15).

The following table summarizes the changes to the TRA obligation, reported as other current liabilities and Tax Receivable Agreement obligation in our condensed consolidated balance sheets, for the three months ended March 31, 2022 and 2021:

Three Months Ended March 31,
20222021
TRA obligation at the beginning of the period$395$450
Accretion expense1517
Changes in tax assumptions impacting timing of payments (a)66(54)
Impacts of Tax Receivable Agreement81(37)
TRA obligation at the end of the period476413
Less amounts due currently(1)(3)
Noncurrent TRA obligation at the end of the period$475$410

(a)During the three months ended March 31, 2022, we recorded an increase to the carrying value of the TRA obligation totaling $66 million as a result of adjustments to forecasted taxable income due to increases in commodity price forecasts. During the three months ended March 31, 2021, we recorded a decrease to the carrying value of the TRA obligation totaling $54 million as a result of adjustments to forecasted taxable income due to financial impacts of Winter Storm Uri.

Table of Contents

As of March 31, 2022, the estimated carrying value of the TRA obligation totaled $476 million, which represents the discounted amount of projected payments under the TRA. The projected payments are based on certain assumptions, including but not limited to (a) the federal corporate income tax rate of 21%, (b) estimates of our taxable income in the current and future years and (c) additional states that Vistra now operates in, including the relevant tax rate and apportionment factor for each state. Our taxable income takes into consideration the current federal tax code, various relevant state tax laws and reflects our current estimates of future results of the business. The estimates of future business results include assumptions related to renewable development projects that Vistra is planning to execute that generate significant tax benefits. These benefits have a material impact on the timing of TRA obligation payments. These assumptions are subject to change, and those changes could have a material impact on the carrying value of the TRA obligation. As of March 31, 2022, the aggregate amount of undiscounted federal and state payments under the TRA is estimated to be approximately $1.4 billion, with more than half of such amount expected to be paid during the next 15 years, and the final payment expected to be made around the year 2056 (if the TRA is not terminated earlier pursuant to its terms).

The carrying value of the obligation is being accreted to the amount of the gross expected obligation using the effective interest method. Changes in the amount of this obligation resulting from changes to either the timing or amount of TRA payments are recognized in the period of change and measured using the discount rate inherent in the initial fair value of the obligation.

8. EARNINGS PER SHARE

Basic earnings per share available to common stockholders are based on the weighted average number of common shares outstanding during the period. Diluted earnings per share is calculated using the treasury stock method and includes the effect of all potential issuances of common shares under stock-based incentive compensation arrangements.

Three Months Ended March 31,
20222021
Net loss attributable to Vistra$(285)$(2,043)
Less cumulative dividends attributable to Series A Preferred Stock(20)—
Less cumulative dividends attributable to Series B Preferred Stock(18)—
Net loss attributable to common stock — basic(323)(2,043)
Weighted average shares of common stock outstanding — basic451,603,354484,699,267
Net loss per weighted average share of common stock outstanding — basic$(0.72)$(4.21)
Dilutive securities: Stock-based incentive compensation plan——
Weighted average shares of common stock outstanding — diluted451,603,354484,699,267
Net loss per weighted average share of common stock outstanding — diluted$(0.72)$(4.21)

Stock-based incentive compensation plan awards excluded from the calculation of diluted earnings per share because the effect would have been antidilutive totaled 9,776,484 and 15,254,972 shares for the three months ended March 31, 2022 and 2021, respectively.

9. ACCOUNTS RECEIVABLE FINANCING

Accounts Receivable Securitization Program

TXU Energy Receivables Company LLC (RecCo), an indirect subsidiary of Vistra, has an accounts receivable financing facility (Receivables Facility) provided by issuers of asset-backed commercial paper and commercial banks (Purchasers). In July 2021, the Receivables Facility was renewed until July 2022. The facility borrowing limit is $600 million for the remaining term of the Receivables Facility.

Table of Contents

In connection with the Receivables Facility, TXU Energy, Dynegy Energy Services, Ambit Texas, Value Based Brands and TriEagle Energy, each indirect subsidiaries of Vistra and originators under the Receivables Facility (Originators), each sell and/or contribute, subject to certain exclusions, all of its receivables (other than any receivables excluded pursuant to the terms of the Receivables Facility), arising from the sale of electricity to its customers and related rights (Receivables), to RecCo, a consolidated, wholly owned, bankruptcy-remote, direct subsidiary of TXU Energy. RecCo, in turn, is subject to certain conditions, and may draw under the Receivables Facility up to the limits described above to fund its acquisition of the Receivables from the Originators. RecCo has granted a security interest on the Receivables and all related assets for the benefit of the Purchasers under the Receivables Facility and Vistra Operations has agreed to guarantee the obligations under the agreements governing the Receivables Facility. Amounts funded by the Purchasers to RecCo are reflected as short-term borrowings on the condensed consolidated balance sheets. Proceeds and repayments under the Receivables Facility are reflected as cash flows from financing activities in our condensed consolidated statements of cash flows. Receivables transferred to the Purchasers remain on Vistra's balance sheet and Vistra reflects a liability equal to the amount advanced by the Purchasers. The Company records interest expense on amounts advanced. TXU Energy continues to service, administer and collect the Receivables on behalf of RecCo and the Purchasers, as applicable.

As of March 31, 2022, outstanding borrowings under the Receivables Facility totaled $500 million and were supported by $772 million of RecCo gross receivables. As of December 31, 2021, there were no outstanding borrowings under the Receivables Facility.

Repurchase Facility

TXU Energy and the other originators under the Receivables Facility have a repurchase facility (Repurchase Facility) that is provided on an uncommitted basis by a commercial bank as buyer (Buyer). In July 2021, the Repurchase Facility was renewed until August 2021 and the facility size was increased from $125 million to $150 million. In August 2021, the Repurchase Facility was renewed until July 2022 and the facility size was decreased from $150 million to $125 million. The Repurchase Facility is collateralized by a subordinated note (Subordinated Note) issued by RecCo in favor of TXU Energy for the benefit of Originators under the Receivables Facility and representing a portion of the outstanding balance of the purchase price paid for the Receivables sold by the Originators to RecCo under the Receivables Facility. Under the Repurchase Facility, TXU Energy may request that Buyer transfer funds to TXU Energy in exchange for a transfer of the Subordinated Note, with a simultaneous agreement by TXU Energy to transfer funds to Buyer at a date certain or on demand in exchange for the return of the Subordinated Note (collectively, the Transactions). Each Transaction is expected to have a term of one month, unless terminated earlier on demand by TXU Energy or terminated by Buyer after an event of default.

TXU Energy and the other Originators have each granted Buyer a first-priority security interest in the Subordinated Note to secure its obligations under the agreements governing the Repurchase Facility, and Vistra Operations has agreed to guarantee the obligations under the agreements governing the Repurchase Facility. Unless earlier terminated under the agreements governing the Repurchase Facility, the Repurchase Facility will terminate concurrently with the scheduled termination of the Receivables Facility.

There were no outstanding borrowings under the Repurchase Facility as of both March 31, 2022 and December 31, 2021.

Table of Contents

10. LONG-TERM DEBT

Amounts in the table below represent the categories of long-term debt obligations incurred by the Company.

March 31, 2022December 31, 2021
Vistra Operations Credit Facilities$2,536$2,543
Vistra Operations Senior Secured Notes:
3.550% Senior Secured Notes, due July 15, 20241,5001,500
3.700% Senior Secured Notes, due January 30, 2027800800
4.300% Senior Secured Notes, due July 15, 2029800800
Total Vistra Operations Senior Secured Notes3,1003,100
Vistra Operations Senior Unsecured Notes:
5.500% Senior Unsecured Notes, due September 1, 20261,0001,000
5.625% Senior Unsecured Notes, due February 15, 20271,3001,300
5.000% Senior Unsecured Notes, due July 31, 20271,3001,300
4.375% Senior Unsecured Notes, due May 15, 20291,2501,250
Total Vistra Operations Senior Unsecured Notes4,8504,850
Other:
Forward Capacity Agreements86213
Equipment Financing Agreements9092
Other36
Total other long-term debt179311
Unamortized debt premiums, discounts and issuance costs(68)(73)
Total long-term debt including amounts due currently10,59710,731
Less amounts due currently(124)(254)
Total long-term debt less amounts due currently$10,473$10,477

Vistra Operations Credit Facilities

As of March 31, 2022, the Vistra Operations Credit Facilities consisted of up to $5.261 billion in senior secured, first-lien revolving credit commitments and outstanding term loans, which consisted of revolving credit commitments of up to $2.725 billion, including a $2.350 billion letter of credit sub-facility (Revolving Credit Facility) and term loans of $2.536 billion (Term Loan B-3 Facility).

On April 29, 2022 (Amendment Effective Date), Vistra Operations entered into an amendment (Credit Agreement Amendment) to the Vistra Operations Credit Agreement, among Vistra Operations, as borrower, Vistra Intermediate, the guarantors party thereto, Credit Suisse AG, Cayman Island Branch, as administrative agent and collateral agent, and the other parties named therein. Pursuant to the Credit Agreement Amendment, effective as of the Amendment Effective Date, the Revolving Credit Maturity Date (as defined in the Vistra Operations Credit Agreement) for the extended revolving credit commitments was extended from June 14, 2023 to April 29, 2027. Further, effective as of the Amendment Effective Date, the 2022 Extended Revolving Credit Commitment (as defined in the Vistra Operations Credit Agreement) was established at $2.8 billion (with ability to increase up to $3.0 billion pursuant to an incremental amendment), the 2022 Non-Extended Revolving Credit Commitment (as defined in the Vistra Operations Credit Agreement) was maintained at $200 million. Additionally, new revolving letter of credit issuers were appointed and the aggregate Revolving Letter of Credit Commitment (as defined in the Vistra Operations Credit Agreement) was increased to allow for the full amount of all revolving credit commitments to be utilized to issue letters of credit (and as of the Amendment Effective Date, the aggregate amount of revolving letter of credit commitments was $2.595 billion).

Table of Contents

In March 2021, Vistra Operations borrowed $1.0 billion principal amount under the Term Loan A Facility. In April 2021, Vistra Operations borrowed an additional $250 million principal amount under the Term Loan A Facility. Proceeds from the Term Loan A Facility, together with cash on hand, were used to repay certain amounts outstanding under the Revolving Credit Facility. Borrowings under the Term Loan A Facility were reported in short-term borrowings in our condensed consolidated balance sheet. In May 2021, Vistra Operations used the proceeds from the issuance of the Vistra Operations 4.375% senior unsecured notes due 2029 (described below), together with cash on hand, to repay the $1.250 billion borrowings under the Term Loan A Facility. We recorded an extinguishment loss of $1 million on the transaction in the year ended December 31, 2021.

The Vistra Operations Credit Facilities and related available capacity as of March 31, 2022 are presented below.

March 31, 2022
Vistra Operations Credit FacilitiesMaturity DateFacility LimitCash BorrowingsLetters of Credit OutstandingAvailable Capacity
Revolving Credit Facility (a)June 14, 2023$2,725$—$1,612$1,113
Term Loan B-3 Facility (b)December 31, 20252,5362,536——
Total Vistra Operations Credit Facilities$5,261$2,536$1,612$1,113

(a)Revolving Credit Facility used for general corporate purposes. At March 31, 2022, the Revolving Credit Facility included a $2.35 billion letter of credit sub-facility. Letters of credit outstanding reduce our available capacity. Cash borrowings under the Revolving Credit Facility are reported in short-term borrowings in our condensed consolidated balance sheets.

(b)Cash borrowings under the Term Loan B-3 Facility are subject to a required scheduled quarterly payment in annual amount equal to 1.00% of the original principal amount with the balance paid at maturity. Amounts paid cannot be reborrowed.

As of March 31, 2022, cash borrowings under the Revolving Credit Facility would bear interest based on applicable LIBOR rates, plus a fixed spread of 1.75%, and there were no outstanding borrowings. Letters of credit issued under the Revolving Credit Facility bear interest of 1.75%. Amounts borrowed under the Term Loan B-3 Facility bears interest based on applicable LIBOR rates plus fixed spreads of 1.75%. As of March 31, 2022, the weighted average interest rates before taking into consideration interest rate swaps on outstanding borrowings was 2.20% under the Term Loan B-3 Facility. The Vistra Operations Credit Facilities also provide for certain additional fees payable to the agents and lenders, including fronting fees with respect to outstanding letters of credit and availability fees payable with respect to any unused portion of the available Revolving Credit Facility. Under the Vistra Operations Credit Agreement, as of the Amendment Effective Date, the interest applicable to the Term Loan B-3 Facility and the Revolving Credit Loans (as defined in the Vistra Operations Credit Agreement), the maturities of which are not being extended to April 29, 2027, was not changed. As of the Amendment Effective Date, the interest applicable to Revolving Credit Loans the maturities of which are being extended to April 29, 2027, is based on a Term SOFR Rate (as defined in the Vistra Operations Credit Agreement), plus a spread that will range from 1.25% to 2.00%, based on the ratings of Vistra Operations’ senior secured long-term debt securities, and the fee on any undrawn amounts with respect to revolving credit commitments the maturities of which have been extended to April 29, 2027 has been revised to range from 17.5 basis points to 35.0 basis points, based on ratings of Vistra Operations' senior secured long-term debt securities. The applicable interest rate margins for such extended Revolving Credit Loans and the fee for undrawn amounts relating to such extended commitments may further be adjusted from time to time dependent upon the Company's performance relative to certain sustainability-linked targets and thresholds, as further described in the Vistra Operations Credit Agreement.

Obligations under the Vistra Operations Credit Facilities are secured by a lien covering substantially all of Vistra Operations' (and its subsidiaries') consolidated assets, rights and properties, subject to certain exceptions set forth in the Vistra Operations Credit Facilities, provided that the amount of loans outstanding under the Vistra Operations Credit Facilities that may be secured by a lien covering certain principal properties of the Company is expressly limited by the terms of the Vistra Operations Credit Facilities. As of the Amendment Effective Date, the Vistra Operations Credit Agreement includes certain collateral suspension provisions that would take effect upon Vistra Operations achieving unsecured investment grade ratings from two ratings agencies, there being no Term Loans (under and as defined in the Vistra Operations Credit Agreement) then outstanding (or the holders thereof agreeing to release such security interests), and there being no outstanding revolving credit commitments the maturities of which have not been extended to April 29, 2027 (or the holders thereof agreeing to release such security interests), such collateral suspension provisions would continue to be in effect unless and until Vistra Operations no longer holds unsecured investment grade ratings from at least two ratings agencies, at which point collateral reversion provisions would take effect (subject to a 60-day grace period).

Table of Contents

The Vistra Operations Credit Facilities also permit certain hedging agreements to be secured on a pari-passu basis with the Vistra Operations Credit Facilities in the event those hedging agreements met certain criteria set forth in the Vistra Operations Credit Facilities.

The Vistra Operations Credit Facilities provide for affirmative and negative covenants applicable to Vistra Operations (and its restricted subsidiaries), including affirmative covenants requiring it to provide financial and other information to the agents under the Vistra Operations Credit Facilities and to not change its lines of business, and negative covenants restricting Vistra Operations' (and its restricted subsidiaries') ability to incur additional indebtedness, make investments, dispose of assets, pay dividends, grant liens or take certain other actions, in each case, except as permitted in the Vistra Operations Credit Facilities. Vistra Operations' ability to borrow under the Vistra Operations Credit Facilities is subject to the satisfaction of certain customary conditions precedent set forth therein.

The Vistra Operations Credit Facilities provide for certain customary events of default, including events of default resulting from non-payment of principal, interest or fees when due, material breaches of representations and warranties, material breaches of covenants in the Vistra Operations Credit Facilities or ancillary loan documents, cross-defaults under other agreements or instruments and the entry of material judgments against Vistra Operations. Solely with respect to the Revolving Credit Facility, and solely during a compliance period (which, in general, is applicable when the aggregate revolving borrowings and issued revolving letters of credit (in excess of $300 million) exceed 30% of the revolving commitments), the agreement includes a covenant that requires the consolidated first lien net leverage ratio, which is based on the ratio of net first lien debt compared to an EBITDA calculation defined under the terms of the Vistra Operations Credit Facilities, not to exceed 4.25 to 1.00 (or, during a collateral suspension period, a total net leverage ratio not to exceed 5.50 to 1.00). As of March 31, 2022, we were in compliance with this financial covenant. Upon the existence of an event of default, the Vistra Operations Credit Facilities provide that all principal, interest and other amounts due thereunder will become immediately due and payable, either automatically or at the election of specified lenders.

Interest Rate Swaps — Vistra employs interest rate swaps to hedge our exposure to variable rate debt. As of March 31, 2022, Vistra has entered into the following series of interest rate swap transactions.

Notional AmountExpiration DateRate Range
Swapped to fixed$3,000July 20233.67%-3.91%
Swapped to variable$700July 20233.20%-3.23%
Swapped to fixed$720February 20243.71%-3.72%
Swapped to variable$720February 20243.20%-3.20%
Swapped to fixed (a)$3,000July 20264.72%-4.79%
Swapped to variable$700July 20263.28%-3.33%

(a)Effective from July 2023 through July 2026.

During 2019, Vistra entered into $2.12 billion of new interest rate swaps, pursuant to which Vistra will pay a variable rate and receive a fixed rate. The terms of these new swaps were matched against the terms of certain existing swaps, effectively offsetting the hedge of the existing swaps and fixing the out-of-the-money position of such swaps. These matched swaps will settle over time, in accordance with the original contractual terms. The remaining existing swaps continue to hedge our exposure on $2.30 billion of debt through July 2026.

Table of Contents

Commodity-Linked Revolving Credit Facility

On February 4, 2022, Vistra Operations entered into a credit agreement by and among Vistra Operations, Vistra Intermediate, the lenders, joint lead arrangers and joint bookrunners party thereto, and Citibank, N.A., as administrative agent and collateral agent. The Credit Agreement provides for a $1.0 billion senior secured commodity-linked revolving credit facility (the Commodity-Linked Facility). Under the Commodity-Linked Facility, the borrowing base is calculated on a weekly basis based on a set of theoretical transactions which approximate the hedge portfolio of Vistra Operations and certain of its subsidiaries in certain power markets, with availability thereunder not to exceed the facility limit nor be less than zero. Vistra Operations may, at its option, borrow an amount up to the borrowing base, as adjusted from time to time, provided that if outstanding borrowings at any time would exceed the borrowing base, Vistra Operations shall make a repayment to reduce outstanding borrowings to be less than or equal to the borrowing base. Vistra Operations intends to use the liquidity provided under the Commodity-Linked Facility to make cash postings as required under various commodity contracts to which Vistra Operations and its subsidiaries are parties as power prices increase from time-to time and for other working capital and general corporate purposes. As of March 31, 2022, there were no outstanding borrowings under the Commodity-Linked Facility. In order to support our comprehensive hedging strategy, on May 5, 2022, we entered into an amendment to our Commodity-Linked Facility to increase the aggregate available commitments from $1.0 billion to $2.0 billion and to provide the flexibility, subject to our ability to obtain additional commitments, to further increase the size of the Commodity-Linked Facility by an additional $1.0 billion to $3.0 billion.

Secured Letter of Credit Facilities

In August and September 2020, Vistra entered into uncommitted standby letter of credit facilities that are each secured by a first lien on substantially all of Vistra Operations' (and its subsidiaries') assets (which ranks pari passu with the Vistra Operations Credit Facilities) (each, a Secured LOC Facility and collectively, the Secured LOC Facilities). The Secured LOC Facilities are used for general corporate purposes. In October 2021, Vistra entered into an additional Secured LOC Facility which will also be used for general corporate purposes. As of March 31, 2022, $473 million of letters of credit were outstanding under the Secured LOC Facilities.

Vistra Operations Senior Secured Notes

In 2019, Vistra Operations issued and sold $3.1 billion aggregate principal amount of senior secured notes in offerings to eligible purchasers under Rule 144A and Regulation S under the Securities Act. The indenture (as may be amended or supplemented from time to time, the Vistra Operations Senior Secured Indenture) governing the 3.550% senior secured notes due 2024, the 3.700% senior secured notes due 2027 and the 4.300% senior secured notes due 2029 (collectively, as each may be amended or supplemented from time to time, the Senior Secured Notes) provides for the full and unconditional guarantee by certain of Vistra Operations' current and future subsidiaries that also guarantee the Vistra Operations Credit Facilities. The Senior Secured Notes are secured by a first-priority security interest in the same collateral that is pledged for the benefit of the lenders under the Vistra Operations Credit Facilities, which consists of a substantial portion of the property, assets and rights owned by Vistra Operations and certain direct and indirect subsidiaries of Vistra Operations as subsidiary guarantors (collectively, the Guarantor Subsidiaries) as well as the stock of Vistra Operations held by Vistra Intermediate. The collateral securing the Senior Secured Notes will be released if Vistra Operations' senior, unsecured long-term debt securities obtain an investment grade rating from two out of the three rating agencies, subject to reversion if such rating agencies withdraw the investment grade rating of Vistra Operations' senior, unsecured long-term debt securities or downgrade such rating below investment grade. The Vistra Operations Senior Secured Indenture contains certain covenants and restrictions, including, among others, restrictions on the ability of Vistra Operations and its subsidiaries, as applicable, to create certain liens, merge or consolidate with another entity, and sell all or substantially all of their assets.

Vistra Operations Senior Unsecured Notes

In May 2021, Vistra Operations issued and sold $1.25 billion aggregate principal amount of 4.375% senior unsecured notes due 2029 in an offering to eligible purchasers under Rule 144A and Regulation S under the Securities Act. The 4.375% senior unsecured notes due 2029 were sold pursuant to a purchase agreement by and among Vistra Operations, the Guarantor Subsidiaries and J.P. Morgan Securities LLC, as representative of the several initial purchasers. The 4.375% senior unsecured notes mature in May 2029, with interest payable in arrears on May 1 and November 1 beginning November 1, 2021 with interest accrued from May 10, 2021. Net proceeds, together with cash on hand, were used to repay all amounts outstanding under the Term Loan A Facility and to pay fees and expenses of $15 million related to the offering.

Table of Contents

Since 2018, Vistra Operations has issued and sold $4.85 billion aggregate principal amount of senior unsecured notes in offerings to eligible purchasers under Rule 144A and Regulation S under the Securities Act. The indentures governing the 5.500% senior unsecured notes due 2026, the 5.625% senior unsecured notes due 2027, the 5.000% senior unsecured notes due 2027 and the 4.375% senior unsecured notes due 2029 (collectively, as each may be amended or supplemented from time to time, the Vistra Operations Senior Unsecured Indentures) provide for the full and unconditional guarantee by the Guarantor Subsidiaries of the punctual payment of the principal and interest on such notes. The Vistra Operations Senior Unsecured Indentures contain certain covenants and restrictions, including, among others, restrictions on the ability of Vistra Operations and its subsidiaries, as applicable, to create certain liens, merge or consolidate with another entity, and sell all or substantially all of their assets.

Debt Repurchase Program

In March 2021, the Board authorized up to $1.8 billion to repay or repurchase outstanding debt. Through March 31, 2022, no amounts had been repurchased under the March 2021 authorization.

Other Long-Term Debt

Forward Capacity Agreements — In March 2021, the Company sold a portion of the PJM capacity that cleared for Planning Years 2021-2022 to a financial institution (2021-2022 Forward Capacity Agreement). The buyer in this transaction will receive capacity payments from PJM during the Planning Years 2021-2022 in the amount of approximately $515 million. We will continue to be subject to the performance obligations as well as any associated performance penalties and bonus payments for those planning years. As a result, this transaction is accounted for as a debt issuance with an implied interest rate of approximately 4.25%.

On the Merger Date, the Company assumed the obligation of Dynegy's agreements under which a portion of the PJM capacity that cleared for Planning Years 2018-2019, 2019-2020 and 2020-2021 was sold to a financial institution (Legacy Forward Capacity Agreements, and, together with the 2021-2022 Forward Capacity Agreement, the Forward Capacity Agreements). In May 2021, the final capacity payment from PJM during the Planning Years 2020-2021 was paid, and the terms of the Legacy Forward Capacity were fulfilled.

Maturities

Long-term debt maturities at March 31, 2022 are as follows:

March 31, 2022
Remainder of 2022$119
202340
20241,540
20252,470
20261,006
Thereafter5,490
Unamortized premiums, discounts and debt issuance costs(68)
Total long-term debt, including amounts due currently$10,597

11. COMMITMENTS AND CONTINGENCIES

Guarantees

We have entered into contracts that contain guarantees to unaffiliated parties that could require performance or payment under certain conditions. Material guarantees are discussed below.

Table of Contents

Letters of Credit

At March 31, 2022, we had outstanding letters of credit totaling $2.085 billion as follows:

  • $1.761 billion to support commodity risk management collateral requirements in the normal course of business, including over-the-counter and exchange-traded transactions and collateral postings with ISOs/RTOs;

  • $163 million to support battery and solar development projects;

  • $27 million to support executory contracts and insurance agreements;

  • $74 million to support our REP financial requirements with the PUCT, and

  • $60 million for other credit support requirements.

Surety Bonds

At March 31, 2022, we had outstanding surety bonds totaling $539 million to support performance under various contracts and legal obligations in the normal course of business.

Litigation and Regulatory Proceedings

Our material legal proceedings and regulatory proceedings affecting our business are described below. We believe that we have valid defenses to the legal proceedings described below and intend to defend them vigorously. We also intend to participate in the regulatory processes described below. We record reserves for estimated losses related to these matters when information available indicates that a loss is probable and the amount of the loss, or range of loss, can be reasonably estimated. As applicable, we have established an adequate reserve for the matters discussed below. In addition, legal costs are expensed as incurred. Management has assessed each of the following legal matters based on current information and made a judgment concerning its potential outcome, considering the nature of the claim, the amount and nature of damages sought, and the probability of success. Unless specified below, we are unable to predict the outcome of these matters or reasonably estimate the scope or amount of any associated costs and potential liabilities, but they could have a material impact on our results of operations, liquidity, or financial condition. As additional information becomes available, we adjust our assessment and estimates of such contingencies accordingly. Because litigation and rulemaking proceedings are subject to inherent uncertainties and unfavorable rulings or developments, it is possible that the ultimate resolution of these matters could be at amounts that are different from our currently recorded reserves and that such differences could be material.

Gas Index Pricing Litigation — We, through our subsidiaries, and other companies have been named as defendants in lawsuits claiming damages resulting from alleged price manipulation through false reporting of natural gas prices to various index publications, wash trading and churn trading from 2000-2002. The plaintiffs in these cases allege that the defendants engaged in an antitrust conspiracy to inflate natural gas prices during the relevant time period and seek damages under the respective state antitrust statutes. We now remain as a defendant in only one action, which is a consolidated putative class action lawsuit pending in federal court in Wisconsin.

Winter Storm Uri Legal Proceedings

Repricing Challenges — In March 2021, we filed an appeal in the Third Court of Appeals in Austin, Texas (Third Court of Appeals), challenging the PUCT's February 15 and February 16, 2021 orders governing ERCOT's determination of wholesale power prices during load-shedding events. We filed our opening brief in June 2021, and response briefs were filed in September 2021. Oral argument was held in April 2022. In our brief, we argue that the prior PUCT rushed to adopt a rule that dramatically raised the price of electricity in ERCOT, but in doing so failed to follow any of the rulemaking procedures required for the PUCT to undertake an emergency rulemaking, and we have asked the court to vacate this rule. Other parties also filed briefs in support of our challenge to the PUCT's orders. In addition, we have also submitted settlement disputes with ERCOT over power prices and other issues during Winter Storm Uri. Following an appeal of the PUCT's March 5, 2021 verbal order and other statements made by the PUCT, the Texas Attorney General, on behalf of the PUCT, its client, represented in a letter agreement filed with the Third Court of Appeals that the PUCT has not prejudged or made a final decision on whether to reprice and that we and other parties may continue disputing the pricing through the ERCOT process.

Table of Contents

Koch Disputes — In March 2021, we filed a lawsuit in Texas state court against Odessa-Ector Power Partners, L.P., Koch Resources, LLC, Koch AG & Energy Solutions, LLC, and Koch Energy Services, LLC (Koch) seeking equitable relief in which we contested the amount of the February 2021 earnout payment under the terms of the 2017 asset purchase agreement (APA) with Koch. Koch subsequently filed its own related lawsuit in Delaware Chancery Court, and the Delaware Chancery Court ruled that all claims related to the APA dispute (including our equitable claims) would proceed in Delaware. We contested Koch's demand for $286 million for the February 2021 earnout payment as an unjust windfall and inconsistent with the parties' intent when they entered into the APA in 2017. In the three months ended March 31, 2021, we recorded a $286 million liability in other noncurrent liabilities and deferred credits in our condensed consolidated balance sheets. In March 2021, we also filed a lawsuit in New York state court against Koch for breach of contract and ineffective notice of force majeure related to Koch's failure to deliver contracted-for quantities of gas during Winter Strom Uri, which Koch removed to federal court. In November 2021, the disputes we had with Koch were resolved to the parties' mutual satisfaction and all the lawsuits have been dismissed. The matter was resolved within the amount that was reserved and will be paid in the second quarter of 2022.

Regulatory Investigations and Other Litigation Matters — Following the events of Winter Storm Uri, various regulatory bodies, including ERCOT, the ERCOT Independent Market Monitor, the Texas Attorney General, the FERC and the NRC initiated investigations or issued requests for information of various parties related to the significant load shed event that occurred during the event as well as operational challenges for generators arising from the event, including performance and fuel and supply issues. We responded to all those investigatory requests. In addition, a number of personal injury and wrongful death lawsuits related to Winter Storm Uri have been filed in various Texas state courts against us and numerous generators, transmission and distribution utilities, retail and electric providers, as well as ERCOT. We and other defendants requested that all pretrial proceedings in these personal injury cases be consolidated and transferred to a single multi-district litigation (MDL) pretrial judge. In June 2021, the MDL panel granted the request to consolidate all these cases into a MDL for pretrial proceedings. In addition, in January 2022, an insurance subrogation lawsuit was filed in Austin state court by over one hundred insurance companies against ERCOT, Vistra and several other defendants. The lawsuit seeks recovery of insurance funds paid out by these insurance companies to various policyholders for claims related to Winter Storm Uri, and that case has also now been consolidated with the MDL proceedings. The various defendants in these lawsuits will be filing motions to dismiss in May 2022. We believe we have strong defenses to these lawsuits and intend to defend against these cases vigorously.

Climate Change

In January 2021, the Biden administration issued a series of Executive Orders, including one titled Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis (the Environment Executive Order) which directed agencies, including the EPA, to review various agency actions promulgated during the prior administration and take action where the previous administration's action conflicts with national objectives. Several of the EPA agency actions discussed below are now subject to this review.

Greenhouse Gas Emissions

In July 2019, the EPA finalized a rule that repealed the Clean Power Plan (CPP) that had been finalized in 2015 and established new regulations addressing GHG emissions from existing coal-fueled electric generation units, referred to as the Affordable Clean Energy (ACE) rule. The ACE rule developed emission guidelines that states must use when developing plans to regulate GHG emissions from existing coal-fueled electric generating units. In response to challenges brought by environmental groups and certain states, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit Court) vacated the ACE rule, including the repeal of the CPP, in January 2021 and remanded the rule to the EPA for further action. In October 2021, the U.S. Supreme Court granted four petitions for certiorari of the D.C. Circuit Court's decision and consolidated the cases for review. The case is now fully briefed and the U.S. Supreme Court heard oral argument in February 2022. Additionally, in January 2021, the EPA, just prior to the transition to the Biden administration, issued a final rule setting forth a significant contribution finding for the purpose of regulating GHG emissions from new, modified, or reconstructed electric utility generating units. In April 2021, the D.C. Circuit Court granted the EPA's unopposed motion for voluntary vacatur and remand of the GHG significant contribution rule. The ACE rule and the rule on significant contribution are subject to the Environment Executive Order discussed above.

Table of Contents

Cross-State Air Pollution Rule (CSAPR)

In April 2022, the EPA proposed a revised version of the CSAPR to address the 2015 ozone National Ambient Air Quality Standards (NAAQS). The rule would apply to 25 states beginning with the 2023 ozone seasons. States where Vistra operates generation units that would be subject to this proposed rule are Illinois, New Jersey, New York, Ohio, Pennsylvania, Texas, Virginia and West Virginia. The revised Group 3 trading program (previously established in the Revised CSAPR Update Rule) would include emission budgets that the EPA says are achievable through existing controls installed at power plants. Starting in 2026, the budgets would be based on levels achieved through installation of selective catalytic reduction (SCR) controls at the approximately 20% of large coal-fueled power plants that do not currently have such controls. Starting in 2025, the budgets would be updated annually to account for source retirements. Starting in 2024, the rule would also impose a daily emissions rate limit for coal-fired units with existing controls and would impose such a limit for units installing new controls in 2027. Comments on the proposed rule are due in June 2022. We are evaluating the proposal and will make comments on the proposal. We cannot predict the outcome of the final rule or the effects of the final rule on operations of our generation fleet.

Regional Haze — Reasonable Progress and Best Available Retrofit Technology (BART) for Texas

In October 2017, the EPA issued a final rule addressing BART for Texas electricity generation units, with the rule serving as a partial approval of Texas' 2009 State Implementation Plan (SIP) and a partial Federal Implementation Plan (FIP). For SO2, the rule established an intrastate Texas emission allowance trading program as a "BART alternative" that operates in a similar fashion to a CSAPR trading program. The program includes 39 generating units (including the Martin Lake, Big Brown, Monticello, Sandow 4, Coleto Creek, Stryker 2 and Graham 2 plants). The compliance obligations in the program started on January 1, 2019. For NOX, the rule adopted the CSAPR's ozone program as BART and for particulate matter, the rule approved Texas' SIP that determines that no electricity generation units are subject to BART for particulate matter. In August 2020, the EPA issued a final rule affirming the prior BART final rule but also included additional revisions that were proposed in November 2019. Challenges to both the 2017 rule and the 2020 rules have been consolidated in the D.C. Circuit Court, where we have intervened in support of the EPA. We are in compliance with the rule, and the retirements of our Monticello, Big Brown and Sandow 4 plants have enhanced our ability to comply. The BART rule is subject to the Environment Executive Order discussed above, and the EPA has stated it is starting a proceeding for reconsideration of the BART rule. The challenges in the D.C. Circuit Court have been held in abeyance pending the EPA's action on reconsideration.

SO2 Designations for Texas

In November 2016, the EPA finalized its nonattainment designations for counties surrounding our Martin Lake generation plant and our now retired Big Brown and Monticello plants. The final designations require Texas to develop nonattainment plans for these areas. In February 2017, the State of Texas and Luminant filed challenges to the nonattainment designations in the U.S. Court of Appeals for the Fifth Circuit (Fifth Circuit Court). Subsequently, in October 2017, the Fifth Circuit Court granted the EPA's motion to hold the case in abeyance considering the EPA's representation that it intended to revisit the nonattainment rule. In December 2017, the TCEQ submitted a petition for reconsideration to the EPA. In August 2019, the EPA issued a proposed Error Correction Rule for all three areas, which, if finalized, would have revised its previous nonattainment designations and each area at issue would be designated unclassifiable. In August 2020, the EPA issued a Finding of Failure for Texas to submit an attainment plan. In May 2021, the EPA finalized a "Clean Data" determination for the areas surrounding the retired Big Brown and Monticello plants, redesignating those areas as attainment based on monitoring data supporting an attainment designation. In June 2021, the EPA published two notices; one that it was withdrawing the August 2019 Error Correction Rule and a second separate notice denying petitions from Luminant and the State of Texas to reconsider the original nonattainment designations. We, along with the State of Texas, challenged that EPA action and have consolidated it with the pending challenge in the Fifth Circuit Court, and this case was fully briefed in March 2022. In September 2021, the TCEQ considered a proposal for its nonattainment SIP revision for the Martin Lake area and an agreed order to reduce SO2 emissions from the plant. The proposed agreed order associated with the SIP proposal reduces emission limits as of January 2022. Emission reductions required are those necessary to demonstrate attainment with the NAAQS. The TCEQ's SIP action was finalized in February 2022 and has been submitted to the EPA for review and approval.

Table of Contents

Effluent Limitation Guidelines (ELGs)

In November 2015, the EPA revised the ELGs for steam electricity generation facilities, which will impose more stringent standards (as individual permits are renewed) for wastewater streams, such as flue gas desulfurization (FGD), fly ash, bottom ash and flue gas mercury control wastewaters. Various parties filed petitions for review of the ELG rule, and the petitions were consolidated in the Fifth Circuit Court. In April 2017, the EPA granted petitions requesting reconsideration of the ELG rule and administratively stayed the rule's compliance date deadlines. In August 2017, the EPA announced that its reconsideration of the ELG rule would be limited to a review of the effluent limitations applicable to FGD and bottom ash wastewaters and the agency subsequently postponed the earliest compliance dates in the ELG rule for the application of effluent limitations for FGD and bottom ash wastewaters. Based on these administrative developments, the Fifth Circuit Court agreed to sever and hold in abeyance challenges to those effluent limitations. The remainder of the case proceeded, and in April 2019 the Fifth Circuit Court vacated and remanded portions of the EPA's ELG rule pertaining to effluent limitations for legacy wastewater and leachate. The EPA published a final rule in October 2020 that extends the compliance date for both FGD and bottom ash transport water to no later than December 2025, as negotiated with the state permitting agency. Additionally, the final rule allows for a retirement exemption that exempts facilities certifying that units will retire by December 2028 provided certain effluent limitations are met. In November 2020, environmental groups petitioned for review of the new ELG revisions, and Vistra subsidiaries filed a motion to intervene in support of the EPA in December 2020. In July 2021, the EPA announced its intent to revise the ELG rule and moved to hold the 2020 ELG revision litigation in abeyance pending the EPA's completion of its reconsideration rulemaking. Notifications were made to Texas, Illinois and Ohio state agencies on the retirement exemption for applicable coal plants by the regulatory deadline of October 13, 2021.

Coal Combustion Residuals (CCR)/Groundwater

In August 2018, the D.C. Circuit Court issued a decision that vacates and remands certain provisions of the 2015 CCR rule, including an applicability exemption for legacy impoundments. In August 2020, the EPA issued a final rule establishing a deadline of April 11, 2021 to cease receipt of waste and initiate closure at unlined CCR impoundments. The final rule allows a generation plant to seek the EPA's approval to extend this deadline if no alternative disposal capacity is available and either a conversion to comply with the CCR rule is underway or retirement will occur by either 2023 or 2028 (depending on the size of the impoundment at issue). Prior to the November 2020 deadline, we submitted applications to the EPA requesting compliance extensions under both conversion and retirement scenarios. In November 2020, environmental groups petitioned for review of this rule in the D.C. Circuit Court, and Vistra subsidiaries filed a motion to intervene in support of the EPA in December 2020. Also, in November 2020, the EPA finalized a rule that would allow an alternative liner demonstration for certain qualifying facilities. In November 2020, we submitted an alternate liner demonstration for one CCR unit at Martin Lake. In August 2021, we submitted a request to transfer our conversion application for the Zimmer facility to a retirement application following announcement that Zimmer will close by May 31, 2022. In January 2022, the EPA determined that our conversion and retirement applications for our CCR facilities were complete but has not yet proposed action on any of those applications. In addition, in January 2022, the EPA also made a series of public statements, including in a press release, that purported to impose new, more onerous closure requirements for CCR units. The EPA issued these new purported requirements without prior notice and without following the legal requirements for adopting new rules. These new purported requirements announced by the EPA are contrary to existing regulations and the EPA's prior positions. In April 2022, we, along with the Utility Solid Waste Activities Group (USWAG), a trade association of over 130 utility operating companies, energy companies, and certain other industry associations, filed petitions for review with the D.C. Circuit Court and intend to ask the court to determine that the EPA cannot implement or enforce the new purported requirements because the EPA has not followed the required procedures.

MISO — In 2012, the Illinois Environmental Protection Agency (IEPA) issued violation notices alleging violations of groundwater standards onsite at our Baldwin and Vermilion facilities' CCR surface impoundments. These violation notices remain unresolved; however, in 2016, the IEPA approved our closure and post-closure care plans for the Baldwin old east, east, and west fly ash CCR surface impoundments. We have completed closure activities at those ponds at our Baldwin facility.

Table of Contents

At our retired Vermilion facility, which was not potentially subject to the EPA's 2015 CCR rule until the aforementioned D.C. Circuit Court decision in August 2018, we submitted proposed corrective action plans involving closure of two CCR surface impoundments (i.e., the old east and the north impoundments) to the IEPA in 2012, and we submitted revised plans in 2014. In May 2017, in response to a request from the IEPA for additional information regarding the closure of these Vermilion surface impoundments, we agreed to perform additional groundwater sampling and closure options and riverbank stabilizing options. In May 2018, Prairie Rivers Network (PRN) filed a citizen suit in federal court in Illinois against DMG, alleging violations of the Clean Water Act for alleged unauthorized discharges. In August 2018, we filed a motion to dismiss the lawsuit. In November 2018, the district court granted our motion to dismiss and judgment was entered in our favor. In June 2021, the U.S. Court of Appeals for the Seventh Circuit affirmed the district court's dismissal of the lawsuit, but stated that PRN may refile. In April 2019, PRN also filed a complaint against DMG before the IPCB, alleging that groundwater flows allegedly associated with the ash impoundments at the Vermilion site have resulted in exceedances both of surface water standards and Illinois groundwater standards dating back to 1992. We answered that complaint in July 2021, and this matter remains in the very early stages.

In 2012, the IEPA issued violation notices alleging violations of groundwater standards at the Newton and Coffeen facilities' CCR surface impoundments. We are addressing these CCR surface impoundments in accordance with the federal CCR rule. In June 2018, the IEPA issued a violation notice for alleged seep discharges claimed to be coming from the surface impoundments at our retired Vermilion facility, which is owned by our subsidiary DMG, and that notice was referred to the Illinois Attorney General. In June 2021, the Illinois Attorney General and the Vermilion County State Attorney filed a complaint in Illinois state court with an agreed interim consent order which the court subsequently entered. Given the violation notices and the enforcement action, the unique characteristics of the site, and the proximity of the site to the only national scenic river in Illinois, we agreed to enter into the interim consent order to resolve this matter. Per the terms of the agreed interim consent order, DMG is required to evaluate the closure alternatives under the requirements of the newly implemented Illinois Coal Ash regulation (discussed below) and close the site by removal. In addition, the interim consent order requires that during the impoundment closure process, impacted groundwater will be collected before it leaves the site or enters the nearby Vermilion river and, if necessary, DMG will be required to install temporary riverbank protection if the river migrates within a certain distance of the impoundments. These proposed closure costs are reflected in the ARO in our condensed consolidated balance sheets (see Note 17).

In July 2019, coal ash disposal and storage legislation in Illinois was enacted. The legislation addresses state requirements for the proper closure of coal ash ponds in the state of Illinois. The law tasks the IEPA and the IPCB to set up a series of guidelines, rules and permit requirements for closure of ash ponds. Under the final rule, which was finalized and became effective in April 2021, coal ash impoundment owners would be required to submit a closure alternative analysis to the IEPA for the selection of the best method for coal ash remediation at a particular site. The rule does not mandate closure by removal at any site. In May 2021, we filed an appeal in the Illinois Fourth Judicial District over certain provisions of the final rule. We filed our opening brief in October 2021. Other parties have also filed appeals of certain provisions of the final rule. In October 2021, we filed operating permit applications for 18 impoundments as required by the Illinois coal ash rule, and filed construction permit applications for three of our sites in January 2022.

For all of the above matters, if certain corrective action measures, including groundwater treatment or removal of ash, are required at any of our coal-fueled facilities, we may incur significant costs that could have a material adverse effect on our financial condition, results of operations and cash flows. The Illinois coal ash rule was finalized in April 2021 and does not require removal. However, the rule will require us to undertake further site specific evaluations required by each program. We will not know the full range of decommissioning costs, including groundwater remediation, if any, that ultimately may be required under the Illinois rule until permit applications have been submitted and approved by the IEPA. However, the currently anticipated CCR surface impoundment and landfill closure costs, as reflected in our existing ARO liabilities, reflect the costs of closure methods that our operations and environmental services teams believe are appropriate and protective of the environment for each location.

Table of Contents

MISO 2015-2016 Planning Resource Auction

In May 2015, three complaints were filed at FERC regarding the Zone 4 results for the 2015-2016 planning resource auction (PRA) conducted by MISO. Dynegy is a named party in one of the complaints. The complainants, Public Citizen, Inc., the Illinois Attorney General and Southwestern Electric Cooperative, Inc. (Complainants), challenged the results of the PRA as unjust and unreasonable, requested rate relief/refunds, and requested changes to the MISO planning resource auction structure going forward. Complainants also alleged that Dynegy may have engaged in economic or physical withholding in Zone 4 constituting market manipulation in the PRA. The Independent Market Monitor for MISO (MISO IMM), which was responsible for monitoring the PRA, determined that all offers were competitive and that no physical or economic withholding occurred. The MISO IMM also stated, in a filing responding to the complaints, that there is no basis for the remedies sought by the Complainants. We filed our answer to these complaints explaining that we complied fully with the terms of the MISO tariff in connection with the PRA and disputing the allegations. The Illinois Industrial Energy Consumers filed a related complaint at FERC against MISO in June 2015 requesting prospective changes to the MISO tariff. Dynegy also responded to this complaint with respect to Dynegy's conduct alleged in the complaint.

In October 2015, FERC issued an order of nonpublic, formal investigation (the investigation) into whether market manipulation or other potential violations of FERC orders, rules and regulations occurred before or during the PRA.

In December 2015, FERC issued an order on the complaints requiring a number of prospective changes to the MISO tariff provisions effective as of the 2016-2017 planning resource auction. The order did not address the arguments of the Complainants regarding the PRA and stated that those issues remained under consideration and would be addressed in a future order.

In July 2019, FERC issued an order denying the remaining issues raised by the complaints and noted that the investigation into Dynegy was closed. FERC found that Dynegy's conduct did not constitute market manipulation and the results of the PRA were just and reasonable because the PRA was conducted in accordance with MISO's tariff. With the issuance of the order, this matter has been resolved in Dynegy's favor. The request for rehearing was denied by FERC in March 2020. The order was appealed by Public Citizen, Inc. to the D.C. Circuit Court in May 2020, and Vistra, Dynegy and Illinois Power Marketing Company intervened in the case in June 2020. In August 2021, the D.C. Circuit Court issued a ruling denying Public Citizen, Inc.'s arguments that FERC failed to meet its obligation to ensure just and reasonable rates because it did not review the prices resulting from the auction before those prices went into effect and that FERC was arbitrary and capricious in failing to adequately explain its decision to close its investigation into whether Dynegy engaged in market manipulation. The D.C. Circuit Court of Appeals granted Public Citizen, Inc.'s petition in part finding that FERC's decision that the auction results were just and reasonable solely because the auction process complied with the filed tariff was unreasoned and remanded the case back to FERC for further proceedings on that issue. On February 4, 2022 the Illinois Attorney General and Public Citizen, Inc. filed a motion at FERC requesting that FERC on remand reverse its prior decision and either find that auction results were not just and reasonable and order Dynegy to pay refunds to Illinois or, in the alternative, initiate an evidentiary hearing and discovery. We have filed a response to this motion and will vigorously defend our position.

Other Matters

We are involved in various legal and administrative proceedings and other disputes in the normal course of business, the ultimate resolutions of which, in the opinion of management, are not anticipated to have a material effect on our results of operations, liquidity or financial condition.

Table of Contents

12. EQUITY

Share Repurchase Programs

In October 2021, we announced that the Board has authorized a new share repurchase program (Share Repurchase Program) under which up to $2.0 billion of our outstanding shares of common stock may be repurchased. The Share Repurchase Program became effective on October 11, 2021, at which time it superseded the 2020 Share Repurchase Program (described below) and any authorization remaining as of such date. We intend to use the net proceeds from the Offering (described below) to repurchase shares of our outstanding common stock. In the three months ended March 31, 2022, 27,560,901 shares of our common stock were repurchased under the Share Repurchase Program for approximately $612 million at an average price of $22.21 per share of common stock (shares repurchased include 705,000 of unsettled shares repurchased for $16 million as of March 31, 2022). As of March 31, 2022, approximately $979 million was available for additional repurchases under the Share Repurchase Program. From April 1, 2022 through May 3, 2022, 7,080,499 of our common stock had been repurchased under the Share Repurchase Program for $174 million at an average price per share of common stock of $24.61, and at May 3, 2022, $805 million was available for repurchase under the Share Repurchase Program. We expect to complete repurchases under the Share Repurchase Program by the end of 2022.

Under the Share Repurchase Program, shares of the Company's common stock may be repurchased in open-market transactions at prevailing market prices, in privately negotiated transactions, pursuant to plans complying with the Exchange Act, or by other means in accordance with federal securities laws. The actual timing, number and value of shares repurchased under the Share Repurchase Program or otherwise will be determined at our discretion and will depend on a number of factors, including our capital allocation priorities, the market price of our stock, general market and economic conditions, applicable legal requirements and compliance with the terms of our debt agreements and the certificate of designation of the Series A Preferred Stock and the Series B Preferred Stock, respectively.

In September 2020, we announced that the Board authorized a share repurchase program (2020 Share Repurchase Program) under which up to $1.5 billion of our outstanding shares of common stock may be repurchased. The 2020 Share Repurchase Program was effective on January 1, 2021. In the three months ended March 31, 2021, 8,658,153 shares of our common stock were repurchased under the 2020 Share Repurchase Program for approximately $175 million at an average price of $20.21 per share of common stock. The 2020 Share Repurchase Program was superseded by the Share Repurchase Program in October 2021.

Preferred Stock

On October 15, 2021 (Series A Issuance Date), we issued of 1,000,000 shares of Series A Preferred Stock in a private offering (Series A Offering). The net proceeds of the Series A Offering were approximately $990 million, after deducting underwriting commissions and offering expenses. We intend to use the net proceeds from the Series A Offering to repurchase shares of our outstanding common stock under the Share Repurchase Program (described above).

On December 10, 2021 (Series B Issuance Date), we issued of 1,000,000 shares of Series B Preferred Stock in a private offering (Series B Offering). The net proceeds of the Series B Offering were approximately $985 million, after deducting underwriting commissions and offering expenses. We intend to use the net proceeds from the Series B Offering to pay for or reimburse existing and new eligible renewable and battery ESS developments.

The Series A Preferred Stock and the Series B Preferred Stock are not convertible into or exchangeable for any other securities of the Company and have limited voting rights. The Series A Preferred Stock may be redeemed at the option of the Company at any time after the Series A First Reset Date (defined below) and in certain other circumstances prior to the Series A First Reset Date. The Series B Preferred Stock may be redeemed at the option of the Company at any time after the Series B First Reset Date (defined below) and in certain other circumstances prior to the Series B First Reset Date.

Dividends

Common Stock — In November 2018, Vistra announced the Board adopted a dividend program which we initiated in the first quarter of 2019. Each dividend under the program is subject to declaration by the Board and, thus, may be subject to numerous factors in existence at the time of any such declaration including, but not limited to, prevailing market conditions, Vistra's results of operations, financial condition and liquidity, Delaware law and any contractual limitations.

Table of Contents

In February 2021, April 2021, July 2021 and October 2021, the Board declared quarterly dividends of $0.15 per share of common stock that were paid in March 2021, June 2021, September 2021 and December 2021, respectively.

In February 2022, the Board declared a quarterly dividend of $0.17 per share of common stock that was paid in March 2022. In May 2022, the Board declared a quarterly dividend of $0.177 per share of common stock that will be paid in June 2022.

Preferred Stock — The annual dividend rate on each share of Series A Preferred Stock is 8.0% from the Issuance Date to, but excluding October 15, 2026 (Series A First Reset Date). On and after the Series A First Reset Date, the dividend rate on each share of Series A Preferred Stock shall equal the five-year U.S. Treasury rate as of the most recent reset dividend determination date (subject to a floor of 1.07%), plus a spread of 6.93% per annum. The Series A Preferred Stock has a liquidation preference of $1,000 per share, plus accumulated but unpaid dividends. Cumulative cash dividends on the Series A Preferred Stock are payable semiannually, in arrears, on each April 15 and October 15, commencing on April 15, 2022, when, as and if declared by the Board.

In February 2022, the Board declared a semi-annual dividend of $40.00 per share of Series A Preferred Stock that was paid in April 2022.

The annual dividend rate on each share of Series B Preferred Stock is 7.0% from the Series B Issuance Date to, but excluding December 15, 2026 (Series B First Reset Date). On and after the Series B First Reset Date, the dividend rate on each share of Series B Preferred Stock shall equal the five-year U.S. Treasury rate as of the most recent reset dividend determination date (subject to a floor of 1.26%), plus a spread of 5.74% per annum. The Series B Preferred Stock has a liquidation preference of $1,000 per share, plus accumulated but unpaid dividends. Cumulative cash dividends on the Series B Preferred Stock are payable semiannually, in arrears, on each June 15 and December 15, commencing on June 15, 2022, when, as and if declared by the Board.

In May 2022, the Board declared a semi-annual dividend of $35.97 (including amounts accrued from December 10, 2021 to December 15, 2021) per share of Series B Preferred Stock that will be paid in June 2022.

Dividend Restrictions

The Vistra Operations Credit Agreement generally restricts the ability of Vistra Operations to make distributions to any direct or indirect parent unless such distributions are expressly permitted thereunder. As of March 31, 2022, Vistra Operations can distribute approximately $7.3 billion to Parent under the Vistra Operations Credit Agreement without the consent of any party. The amount that can be distributed by Vistra Operations to Parent was partially reduced by distributions made by Vistra Operations to Parent of approximately $600 million and $230 million during the three months ended March 31, 2022 and 2021, respectively. Additionally, Vistra Operations may make distributions to Parent in amounts sufficient for Parent to make any payments required under the TRA or the Tax Matters Agreement or, to the extent arising out of Parent's ownership or operation of Vistra Operations, to pay any taxes or general operating or corporate overhead expenses. As of March 31, 2022, all of the restricted net assets of Vistra Operations may be distributed to Parent.

In addition to the restrictions under the Vistra Operations Credit Agreement, under applicable Delaware law, we are only permitted to make distributions either out of "surplus," which is defined as the excess of our net assets above our capital (the aggregate par value of all outstanding shares of our stock), or out of net profits for the fiscal year in which the distribution is declared or the prior fiscal year.

Under the terms of the Series A Preferred Stock and the Series B Preferred Stock, unless full cumulative dividends have been or contemporaneously are being paid or declared and a sum sufficient for the payment thereof set apart for payment on all outstanding Series A Preferred Stock (and any parity securities) and Series B Preferred Stock (and any parity securities), respectively, with respect to dividends through the most recent dividend payment dates, (i) no dividend may be declared or paid or set apart for payment on any junior security (other than a dividend payable solely in junior securities with respect to both dividends and the liquidation, winding-up and dissolution of our affairs), including our common stock, and (ii) we may not redeem, purchase or otherwise acquire any parity security or junior security, including our common stock, in each case subject to certain exceptions as described in the certificate of designation of the Series A Preferred Stock and the Series B Preferred Stock, respectively.

Table of Contents

Warrants

At the Merger Date, the Company entered into an agreement whereby the holder of each outstanding warrant previously issued by Dynegy would be entitled to receive, upon paying an exercise price of $35.00 (subject to adjustment from time to time), the number of shares of Vistra common stock that such holder would have been entitled to receive if it had held one share of Dynegy common stock at the closing of the Merger, or 0.652 shares of Vistra common stock. Accordingly, upon exercise, a warrant holder would effectively pay $53.68 (subject to adjustment of the exercise price from time to time) per share of Vistra common stock received. In January 2022, in accordance with the terms of the warrant agreement, the exercise price of each warrant was adjusted downward to $34.00 (subject to further adjustment from time to time), or $52.15 (subject to adjustment of the exercise price from time to time) per share of Vistra common stock received. As of March 31, 2022, nine million warrants expiring in 2024 were outstanding. The warrants were included in equity based on their fair value at the Merger Date.

Equity

The following table presents the changes to equity for the three months ended March 31, 2022:

Preferred StockCommon Stock (a)Treasury StockAdditional Paid-in CapitalRetained Earnings (Deficit)Accumulated Other Comprehensive Income (Loss)Total Stockholders' EquityNoncontrolling Interest in SubsidiaryTotal Equity
Balance at December 31, 2021$2,000$5$(1,558)$9,824$(1,964)$(16)$8,291$1$8,292
Stock repurchases——(612)———(612)—(612)
Dividends declared on common stock————(77)—(77)—(77)
Dividends declared on preferred stock————(37)—(37)—(37)
Effects of stock-based incentive compensation plans———18——18—18
Net income (loss)————(285)—(285)1(284)
Other———2——2—2
Balance at March 31, 2022$2,000$5$(2,170)$9,844$(2,363)$(16)$7,300$2$7,302

(a)Authorized shares totaled 1,800,000,000 at March 31, 2022. Outstanding common shares totaled 438,694,982 and 469,072,597 at March 31, 2022 and December 31, 2021, respectively. Treasury shares totaled 95,887,643 and 63,856,879 at March 31, 2022 and December 31, 2021, respectively.

Table of Contents

The following table presents the changes to equity for the three months ended March 31, 2021:

Common Stock (a)Treasury StockAdditional Paid-in CapitalRetained Earnings (Deficit)Accumulated Other Comprehensive Income (Loss)Total Stockholders' EquityNoncontrolling Interest in SubsidiaryTotal Equity
Balance at December 31, 2020$5$(973)$9,786$(399)$(48)$8,371$(10)$8,361
Stock repurchases—(175)———(175)—(175)
Dividends declared on common stock———(74)—(74)—(74)
Effects of stock-based incentive compensation plans——17——17—17
Net income (loss)———(2,043)—(2,043)3(2,040)
Change in accumulated other comprehensive income (loss)————22—2
Other——2——2—2
Balance at March 31, 2021$5$(1,148)$9,805$(2,516)$(46)$6,100$(7)$6,093

(a)Authorized shares totaled 1,800,000,000 at March 31, 2021. Outstanding common shares totaled 481,468,094 and 489,305,888 at March 31, 2021 and December 31, 2020, respectively. Treasury shares totaled 49,701,377 and 41,043,224 at March 31, 2021 and December 31, 2020, respectively.

Table of Contents

13. FAIR VALUE MEASUREMENTS

We utilize several different valuation techniques to measure the fair value of assets and liabilities, relying primarily on the market approach of using prices and other market information for identical and/or comparable assets and liabilities for those items that are measured on a recurring basis. We use a mid-market valuation convention (the mid-point price between bid and ask prices) as a practical expedient to measure fair value for the majority of our assets and liabilities and use valuation techniques to maximize the use of observable inputs and minimize the use of unobservable inputs. Our valuation policies and procedures were developed, maintained and validated by a centralized risk management group that reports to the Vistra Chief Financial Officer.

Fair value measurements of derivative assets and liabilities incorporate an adjustment for credit-related nonperformance risk. These nonperformance risk adjustments take into consideration master netting arrangements, credit enhancements and the credit risks associated with our credit standing and the credit standing of our counterparties (see Note 14 for additional information regarding credit risk associated with our derivatives). We utilize credit ratings and default rate factors in calculating these fair value measurement adjustments.

We categorize our assets and liabilities recorded at fair value based upon the following fair value hierarchy:

  • Level 1 valuations use quoted prices in active markets for identical assets or liabilities that are accessible at the measurement date. Our Level 1 assets and liabilities include CME or ICE (electronic commodity derivative exchanges) futures and options transacted through clearing brokers for which prices are actively quoted. We report the fair value of CME and ICE transactions without taking into consideration margin deposits, with the exception of certain margin amounts related to changes in fair value on certain CME transactions that are legally characterized as settlement of derivative contracts rather than collateral.

  • Level 2 valuations utilize over-the-counter broker quotes, quoted prices for similar assets or liabilities that are corroborated by correlations or other mathematical means, and other valuation inputs such as interest rates and yield curves observable at commonly quoted intervals. We attempt to obtain multiple quotes from brokers that are active in the markets in which we participate and require at least one quote from two brokers to determine a pricing input as observable. The number of broker quotes received for certain pricing inputs varies depending on the depth of the trading market, each individual broker's publication policy, recent trading volume trends and various other factors.

  • Level 3 valuations use unobservable inputs for the asset or liability. Unobservable inputs are used to the extent observable inputs are not available, thereby allowing for situations in which there is little, if any, market activity for the asset or liability at the measurement date. We use the most meaningful information available from the market combined with internally developed valuation methodologies to develop our best estimate of fair value. Significant unobservable inputs used to develop the valuation models include volatility curves, correlation curves, illiquid pricing delivery periods and locations and credit-related nonperformance risk assumptions. These inputs and valuation models are developed and maintained by employees trained and experienced in market operations and fair value measurements and validated by the Company's risk management group.

With respect to amounts presented in the following fair value hierarchy tables, the fair value measurement of an asset or liability (e.g., a contract) is required to fall in its entirety in one level, based on the lowest level input that is significant to the fair value measurement.

Table of Contents

Assets and liabilities measured at fair value on a recurring basis consisted of the following at the respective balance sheet dates shown below:

March 31, 2022December 31, 2021
Level 1Level 2Level 3 (a)Reclass (b)TotalLevel 1Level 2Level 3 (a)Reclass (b)Total
Assets:
Commodity contracts$4,408$1,343$778$5$6,534$1,408$889$442$5$2,744
Interest rate swaps—8—715—19——19
Nuclear decommissioning trust – equity securities (c)690———690724——724
Nuclear decommissioning trust – debt securities (c)—640—640—679—679
Sub-total$5,098$1,991$778$127,879$2,132$1,587$442$54,166
Assets measured at net asset value (d):
Nuclear decommissioning trust – equity securities (c)532557
Total assets$8,411$4,723
Liabilities:
Commodity contracts$4,905$1,539$1,407$5$7,856$2,153$650$802$5$3,610
Interest rate swaps—80—787—217——217
Total liabilities$4,905$1,619$1,407$12$7,943$2,153$867$802$5$3,827

(a)See table below for description of Level 3 assets and liabilities.

(b)Fair values are determined on a contract basis, but certain contracts result in a current asset and a noncurrent liability, or vice versa, as presented in our condensed consolidated balance sheets.

(c)The nuclear decommissioning trust investment is included in the other investments line in our condensed consolidated balance sheets. See Note 17.

(d)The fair value amounts presented in this line are intended to permit reconciliation of the fair value hierarchy to the amounts presented in our condensed consolidated balance sheets. Certain investments measured at fair value using the net asset value per share (or its equivalent) have not been classified in the fair value hierarchy.

Commodity contracts consist primarily of natural gas, electricity, coal and emissions agreements and include financial instruments entered into for economic hedging purposes as well as physical contracts that have not been designated as normal purchases or sales. Interest rate swaps are used to reduce exposure to interest rate changes by converting floating-rate interest to fixed rates. See Note 14 for further discussion regarding derivative instruments.

Nuclear decommissioning trust assets represent securities held for the purpose of funding the future retirement and decommissioning of our nuclear generation facility. These investments include equity, debt and other fixed-income securities consistent with investment rules established by the NRC and the PUCT.

Table of Contents

The following tables present the fair value of the Level 3 assets and liabilities by major contract type and the significant unobservable inputs used in the valuations at March 31, 2022 and December 31, 2021:

March 31, 2022
Fair Value
Contract Type (a)AssetsLiabilitiesTotalValuation TechniqueSignificant Unobservable InputRange (b)Average (b)
Electricity purchases and sales$539$(852)$(313)Income ApproachHourly price curve shape (c)$—to$60$30
MWh
Illiquid delivery periods for hub power prices and heat rates (d)$40to$110$74
MWh
Options—(394)(394)Option Pricing ModelGas to power correlation (e)10%to100%55%
Power and gas volatility (e)5%to490%248%
Financial transmission rights119(31)88Market Approach (f)Illiquid price differences between settlement points (g)$(15)to$10$(3)
MWh
Natural gas66(122)(56)Income ApproachGas basis and illiquid delivery periods (h)$—to$15$7
MMBtu
Coal37—37Income ApproachProbability of default (i)—%to40%20%
Recovery rate (j)—%to40%20%
Other (k)17(8)9
Total$778$(1,407)$(629)
December 31, 2021
Fair Value
Contract Type (a)AssetsLiabilitiesTotalValuation TechniqueSignificant Unobservable InputRange (b)Average (b)
Electricity purchases and sales$204$(470)$(266)Income ApproachHourly price curve shape (c)$—to$60$30
MWh
Illiquid delivery periods for hub power prices and heat rates (d)$20to$140$80
MWh
Options1(209)(208)Option Pricing ModelGas to power correlation (e)10%to100%56%
Power and gas volatility (e)5%to490%248%
Financial transmission rights122(34)88Market Approach (f)Illiquid price differences between settlement points (g)$(30)to$10$(9)
MWh
Natural gas29(86)(57)Income ApproachGas basis (h)$(1)to$16$8
MMBtu
Coal61—61Income ApproachProbability of default (i)—%to40%20%
Recovery rate (j)—%to40%20%
Other (k)25(3)22
Total$442$(802)$(360)

(a)Electricity purchase and sales contracts include power and heat rate positions in ERCOT, PJM, ISO-NE, NYISO and MISO regions. The forward purchase contracts (swaps and options) used to hedge electricity price differences between settlement points are referred to as congestion revenue rights (CRRs) in ERCOT and financial transmission rights (FTRs) in PJM, ISO-NE, NYISO and MISO regions. Options consist of physical electricity options, spread options, swaptions and natural gas options.

(b)The range of the inputs may be influenced by factors such as time of day, delivery period, season and location. The average represents the arithmetic average of the underlying inputs and is not weighted by the related fair value or notional amount.

(c)Primarily based on the historical range of forward average hourly ERCOT North Hub prices.

Table of Contents

(d)Primarily based on historical forward ERCOT and PJM power prices and ERCOT heat rate variability.

(e)Primarily based on the historical forward correlation and volatility within ERCOT and PJM.

(f)While we use the market approach, there is insufficient market data to consider the valuation liquid.

(g)Primarily based on the historical price differences between settlement points within ERCOT hubs and load zones.

(h)Primarily based on the historical forward PJM and Northeast gas basis prices and fixed prices.

(i)Estimate of the range of probabilities of default based on past experience, the length of the contract, and both the Company's and the counterparty's credit ratings.

(j)Estimate of the default recovery rate based on historical corporate rates.

(k)Other includes contracts for environmental allowances.

See the table below for discussion of transfers between Level 2 and Level 3 for the three months ended March 31, 2022 and 2021.

The following table presents the changes in fair value of the Level 3 assets and liabilities for the three months ended March 31, 2022 and 2021.

Three Months Ended March 31,
20222021
Net asset (liability) balance at beginning of period$(360)$22
Total unrealized valuation gains (losses)(449)190
Purchases, issuances and settlements (a):
Purchases3717
Issuances(10)(6)
Settlements97(19)
Transfers into Level 3 (b)11
Transfers out of Level 3 (b)55(1)
Net change (c)(269)182
Net asset (liability) balance at end of period$(629)$204
Unrealized valuation gains (losses) relating to instruments held at end of period$(354)$194

(a)Settlements reflect reversals of unrealized mark-to-market valuations previously recognized in net income. Purchases and issuances reflect option premiums paid or received, including CRRs and FTRs.

(b)Includes transfers due to changes in the observability of significant inputs. All Level 3 transfers during the periods presented are in and out of Level 2. For the three months ended March 31, 2022, transfers out of Level 3 primarily consist of power derivatives where forward pricing inputs have become observable.

(c)Activity excludes change in fair value in the month positions settle. Substantially all changes in values of commodity contracts are reported as operating revenues in our condensed consolidated statements of operations.

Table of Contents

**14.**COMMODITY AND OTHER DERIVATIVE CONTRACTUAL ASSETS AND LIABILITIES

Strategic Use of Derivatives

We transact in derivative instruments, such as options, swaps, futures and forward contracts, to manage commodity price and interest rate risk. See Note 13 for a discussion of the fair value of derivatives.

Commodity Hedging and Trading Activity — We utilize natural gas and electricity derivatives to reduce exposure to changes in electricity prices primarily to hedge future revenues from electricity sales from our generation assets and to hedge future purchased power costs for our retail operations. We also utilize short-term electricity, natural gas, coal and emissions derivative instruments for fuel hedging and other purposes. Counterparties to these transactions include energy companies, financial institutions, electric utilities, independent power producers, fuel oil and gas producers, local distribution companies and energy marketing companies. Unrealized gains and losses arising from changes in the fair value of derivative instruments as well as realized gains and losses upon settlement of the instruments are reported in our condensed consolidated statements of operations in operating revenues and fuel, purchased power costs and delivery fees.

Interest Rate Swaps — Interest rate swap agreements are used to reduce exposure to interest rate changes by converting floating-rate interest rates to fixed rates, thereby hedging future interest costs and related cash flows. Unrealized gains and losses arising from changes in the fair value of the swaps as well as realized gains and losses upon settlement of the swaps are reported in our condensed consolidated statements of operations in interest expense and related charges. During 2019, Vistra entered into $2.12 billion of new interest rate swaps, pursuant to which Vistra will pay a variable rate and receive a fixed rate. The terms of these new swaps were matched against the terms of certain existing swaps, effectively offsetting the hedge of the existing swaps and fixing the out-of-the-money position of such swaps. These matched swaps will settle over time, in accordance with the original contractual terms. The remaining existing swaps continue to hedge our exposure on $2.30 billion of debt through July 2026.

Financial Statement Effects of Derivatives

Substantially all derivative contractual assets and liabilities are accounted for under mark-to-market accounting consistent with accounting standards related to derivative instruments and hedging activities. The following tables provide detail of derivative contractual assets and liabilities as reported in our condensed consolidated balance sheets at March 31, 2022 and December 31, 2021. Derivative asset and liability totals represent the net value of the contract, while the balance sheet totals represent the gross value of the contract.

March 31, 2022
Derivative AssetsDerivative Liabilities
Commodity ContractsInterest Rate SwapsCommodity ContractsInterest Rate SwapsTotal
Current assets$6,004$—$—$—$6,004
Noncurrent assets5271134545
Current liabilities(1)(3)(6,820)(11)(6,835)
Noncurrent liabilities(1)—(1,034)(73)(1,108)
Net assets (liabilities)$6,529$8$(7,851)$(80)$(1,394)
December 31, 2021
Derivative AssetsDerivative Liabilities
Commodity ContractsInterest Rate SwapsCommodity ContractsInterest Rate SwapsTotal
Current assets$2,496$14$3$—$2,513
Noncurrent assets24451—250
Current liabilities——(2,964)(59)(3,023)
Noncurrent liabilities(1)—(645)(158)(804)
Net assets (liabilities)$2,739$19$(3,605)$(217)$(1,064)

At March 31, 2022 and December 31, 2021, there were no derivative positions accounted for as cash flow or fair value hedges.

Table of Contents

The following table presents the pre-tax effect of derivative gains (losses) on net income, including realized and unrealized effects. Amount represents changes in fair value of positions in the derivative portfolio during the period, as realized amounts related to positions settled are assumed to equal reversals of previously recorded unrealized amounts.

Derivative (condensed consolidated statements of operations presentation)Three Months Ended March 31,
20222021
Commodity contracts (Operating revenues)$(827)$86
Commodity contracts (Fuel, purchased power costs and delivery fees)9240
Interest rate swaps (Interest expense and related charges)11475
Net gain (loss)$(621)$201

Balance Sheet Presentation of Derivatives

We elect to report derivative assets and liabilities in our condensed consolidated balance sheets on a gross basis without taking into consideration netting arrangements we have with counterparties to those derivatives. We maintain standardized master netting agreements with certain counterparties that allow for the right to offset assets and liabilities and collateral in order to reduce credit exposure between us and the counterparty. These agreements contain specific language related to margin requirements, monthly settlement netting, cross-commodity netting and early termination netting, which is negotiated with the contract counterparty.

Generally, margin deposits that contractually offset these derivative instruments are reported separately in our condensed consolidated balance sheets, with the exception of certain margin amounts related to changes in fair value on CME transactions that are legally characterized as settlement of forward exposure rather than collateral. Margin deposits received from counterparties are primarily used for working capital or other general corporate purposes.

The following tables reconcile our derivative assets and liabilities on a contract basis to net amounts after taking into consideration netting arrangements with counterparties and financial collateral:

March 31, 2022December 31, 2021
Derivative Assets and LiabilitiesOffsetting Instruments (a)Cash Collateral (Received) Pledged (b)Net AmountsDerivative Assets and LiabilitiesOffsetting Instruments (a)Cash Collateral (Received) Pledged (b)Net Amounts
Derivative assets:
Commodity contracts$6,529$(5,567)$(210)$752$2,739$(2,051)$(27)$661
Interest rate swaps8(8)——19(19)——
Total derivative assets6,537(5,575)(210)7522,758(2,070)(27)661
Derivative liabilities:
Commodity contracts(7,851)5,567928(1,356)(3,605)2,051784(770)
Interest rate swaps(80)8—(72)(217)19—(198)
Total derivative liabilities(7,931)5,575928(1,428)(3,822)2,070784(968)
Net amounts$(1,394)$—$718$(676)$(1,064)$—$757$(307)

(a)Amounts presented exclude trade accounts receivable and payable related to settled financial instruments.

(b)Represents cash amounts received or pledged pursuant to a master netting arrangement, including fair value-based margin requirements, and to a lesser extent, initial margin requirements.

Table of Contents

Derivative Volumes

The following table presents the gross notional amounts of derivative volumes at March 31, 2022 and December 31, 2021:

March 31, 2022December 31, 2021
Derivative typeNotional VolumeUnit of Measure
Natural gas (a)6,6664,701Million MMBtu
Electricity521,959440,236GWh
Financial transmission rights (b)208,107224,876GWh
Coal3925Million U.S. tons
Fuel oil8487Million gallons
Emissions2518Million tons
Renewable energy certificates3032Million certificates
Interest rate swaps – variable/fixed (c)$6,720$6,720Million U.S. dollars
Interest rate swaps – fixed/variable (c)$2,120$2,120Million U.S. dollars

(a)Represents gross notional forward sales, purchases and options transactions, locational basis swaps and other natural gas transactions.

(b)Represents gross forward purchases associated with instruments used to hedge electricity price differences between settlement points within regions.

(c)Includes notional amounts of interest rate swaps with maturity dates through July 2026.

Credit Risk-Related Contingent Features of Derivatives

Our derivative contracts may contain certain credit risk-related contingent features that could trigger liquidity requirements in the form of cash collateral, letters of credit or some other form of credit enhancement. Certain of these agreements require the posting of collateral if our credit rating is downgraded by one or more credit rating agencies or include cross-default contractual provisions that could result in the settlement of such contracts if there was a failure under other financing arrangements related to payment terms or other covenants.

The following table presents the commodity derivative liabilities subject to credit risk-related contingent features that are not fully collateralized:

March 31, 2022December 31, 2021
Fair value of derivative contract liabilities (a)$(2,280)$(1,200)
Offsetting fair value under netting arrangements (b)1,468660
Cash collateral and letters of credit26195
Liquidity exposure$(551)$(445)

____________

(a)Excludes fair value of contracts that contain contingent features that do not provide specific amounts to be posted if features are triggered, including provisions that generally provide the right to request additional collateral (material adverse change, performance assurance and other clauses).

(b)Amounts include the offsetting fair value of in-the-money derivative contracts and net accounts receivable under master netting arrangements.

Concentrations of Credit Risk Related to Derivatives

We have concentrations of credit risk with the counterparties to our derivative contracts. At March 31, 2022, total credit risk exposure to all counterparties related to derivative contracts totaled $7.302 billion (including associated accounts receivable). The net exposure to those counterparties totaled $1.352 billion at March 31, 2022, after taking into effect netting arrangements, setoff provisions and collateral, with the largest net exposure to ERCOT totaling $613 million. At March 31, 2022, the credit risk exposure to the banking and financial sector represented 80% of the total credit risk exposure and 24% of the net exposure.

Table of Contents

Exposure to banking and financial sector counterparties is considered to be within an acceptable level of risk tolerance because all of this exposure is with counterparties with investment grade credit ratings. However, this concentration increases the risk that a default by any of these counterparties would have a material effect on our financial condition, results of operations and liquidity. The transactions with these counterparties contain certain provisions that would require the counterparties to post collateral in the event of a material downgrade in their credit rating.

We maintain credit risk policies with regard to our counterparties to minimize overall credit risk. These policies authorize specific risk mitigation tools including, but not limited to, use of standardized master agreements that allow for netting of positive and negative exposures associated with a single counterparty. Credit enhancements such as parent guarantees, letters of credit, surety bonds, liens on assets and margin deposits are also utilized. Prospective material changes in the payment history or financial condition of a counterparty or downgrade of its credit quality result in the reassessment of the credit limit with that counterparty. The process can result in the subsequent reduction of the credit limit or a request for additional financial assurances. An event of default by one or more counterparties could subsequently result in termination-related settlement payments that reduce available liquidity if amounts are owed to the counterparties related to the derivative contracts or delays in receipts of expected settlements if the counterparties owe amounts to us.

**15.**RELATED PARTY TRANSACTIONS

In connection with Emergence, we entered into agreements with certain of our affiliates and with parties who received shares of common stock and TRA Rights in exchange for their claims.

Registration Rights Agreement

Pursuant to the Plan of Reorganization, on the Effective Date, we entered into a Registration Rights Agreement (the RRA) with certain selling stockholders. Pursuant to the RRA, we maintain a registration statement on Form S-3 providing for registration of the resale of the Vistra common stock held by such selling stockholders. In addition, under the terms of the RRA, among other things, if we propose to file certain types of registration statements under the Securities Act with respect to an offering of equity securities, we will be required to use our reasonable best efforts to offer the other parties to the RRA the opportunity to register all or part of their shares on the terms and conditions set forth in the RRA.

Tax Receivable Agreement

On the Effective Date, Vistra entered into the TRA with a transfer agent on behalf of certain former first-lien creditors of TCEH. See Note 7 for discussion of the TRA.

**16.**SEGMENT INFORMATION

The operations of Vistra are aligned into six reportable business segments: (i) Retail, (ii) Texas, (iii) East, (iv) West, (v) Sunset and (vi) Asset Closure.

Our Chief Operating Decision Maker (CODM) reviews the results of these segments separately and allocates resources to the respective segments as part of our strategic operations. A measure of assets is not applicable, as segment assets are not regularly reviewed by the CODM for evaluating performance or allocating resources.

The Retail segment is engaged in retail sales of electricity and natural gas to residential, commercial and industrial customers. Substantially all of these activities are conducted by TXU Energy, Ambit, Value Based Brands, Dynegy Energy Services, Homefield Energy, TriEagle Energy, Public Power and U.S. Gas & Electric across 19 states in the U.S.

The Texas and East segments are engaged in electricity generation, wholesale energy sales and purchases, commodity risk management activities, fuel production and fuel logistics management. The Texas segment represents results from Vistra's electricity generation operations in the ERCOT market. The East segment represents results from Vistra's electricity generation operations in the Eastern Interconnection of the U.S. electric grid, other than assets that are now part of the Sunset or Asset Closure segments, respectively, and includes operations in the PJM, ISO-NE and NYISO markets. We determined it was appropriate to aggregate results from these markets into one reportable segment, East, given similar economic characteristics.

The West segment represents results from the CAISO market, including our development of battery ESS projects at our Moss Landing and Oakland power plant sites (see Note 2).

Table of Contents

The Sunset segment consists of generation plants with announced retirement dates after December 31, 2022. Separately reporting the Sunset segment differentiates operating plants with announced retirement plans from our other operating plants in the Texas, East and West segments. We have allocated unrealized gains and losses on the commodity risk management activities to the Sunset segment for the generation plants that have announced retirement dates after December 31, 2022.

The Asset Closure segment is engaged in the decommissioning and reclamation of retired plants and mines (see Note 3). The Asset Closure segment also includes results from generation plants we plan to retire in the year ended December 31, 2022. Separately reporting the Asset Closure segment provides management with better information related to the performance and earnings power of Vistra's ongoing operations and facilitates management's focus on minimizing the cost associated with decommissioning and reclamation of retired plants and mines. We have allocated unrealized gains and losses on the commodity risk management activities attributable to the plants scheduled to be retired in 2022.

Corporate and Other represents the remaining non-segment operations consisting primarily of general corporate expenses, interest, taxes and other expenses related to our support functions that provide shared services to our operating segments.

The accounting policies of the business segments are the same as those described in the summary of significant accounting policies in Note 1 of our 2021 Form 10-K. Our CODM uses more than one measure to assess segment performance, including segment net income (loss), which is the measure most comparable to consolidated net income (loss) prepared based on U.S. GAAP. We account for intersegment sales and transfers as if the sales or transfers were to third parties, that is, at market prices. Certain shared services costs are allocated to the segments.

Three Months endedRetailTexasEastWestSunsetAsset ClosureCorporate and Other (b)EliminationsConsolidated
Operating revenues (a):
March 31, 2022$1,825$(1,095)$955$72$(140)$107$—$1,401$3,125
March 31, 20211,7501,0837243325722—(662)3,207
Depreciation and amortization:
March 31, 2022$(36)$(123)$(179)$(42)$(19)$(14)$(17)$—$(430)
March 31, 2021(53)(124)(196)(5)(25)(4)(16)—(423)
Operating income (loss):
March 31, 2022$2,432$(1,977)$(126)$(61)$(450)$(63)$(43)$—$(288)
March 31, 202194(2,556)2(35)4(64)(28)—(2,583)
Net income (loss) (b):
March 31, 2022$2,428$(1,972)$(128)$(61)$(450)$(62)$(39)$—$(284)
March 31, 202188(2,518)1(31)5(48)463—(2,040)
Capital expenditures, including nuclear fuel and excluding LTSA prepayments and development and growth expenditures:
March 31, 2022$—$139$5$19$3$—$14$—$180
March 31, 2021—46614—(2)—55

(a)The following unrealized net gains (losses) from mark-to-market valuations of commodity positions are included in operating revenues:

Three Months endedRetailTexasEastWestSunsetAsset ClosureCorporate and OtherEliminations (1)Consolidated
March 31, 2022$(369)$(1,973)$(200)$(47)$(435)$(7)$—$2,673$(358)
March 31, 2021(4)(541)(35)(53)(71)(28)—790$58

(1)Amounts attributable to generation segments offset in fuel, purchased power costs and delivery fees in the Retail segment, with no impact to consolidated results.

(b)Income tax expense is generally not reflected in net income of the segments but is reflected almost entirely in Corporate and Other net income.

Table of Contents

**17.**SUPPLEMENTARY FINANCIAL INFORMATION

Interest Expense and Related Charges

Three Months Ended March 31,
20222021
Interest paid/accrued$126$112
Unrealized mark-to-market net gains on interest rate swaps(126)(88)
Amortization of debt issuance costs, discounts and premiums65
Capitalized interest(6)(8)
Other78
Total interest expense and related charges$7$29

The weighted average interest rate applicable to the Vistra Operations Credit Facilities, taking into account the interest rate swaps discussed in Note 10, was 3.94% and 3.88% at March 31, 2022 and 2021.

Other Income and Deductions

Three Months Ended March 31,
20222021
Other income:
Insurance settlements (a)$1$38
Gain on settlement of rail transportation disputes (b)—15
All other42
Total other income$5$55
Other deductions:
All other45
Total other deductions$4$5

(a)For the three months ended March 31, 2022, reported in the Corporate and Other non-segment. For the three months ended March 31, 2021, $36 million reported in the Texas segment and $2 million reported in the Corporate and Other non-segment.

(b)Reported in the Asset Closure segment.

Restricted Cash

March 31, 2022December 31, 2021
Current AssetsNoncurrent AssetsCurrent AssetsNoncurrent Assets
Amounts related to remediation escrow accounts$23$12$21$13
Total restricted cash$23$12$21$13

Trade Accounts Receivable

March 31, 2022December 31, 2021
Wholesale and retail trade accounts receivable$1,324$1,442
Allowance for uncollectible accounts(49)(45)
Trade accounts receivable — net$1,275$1,397

Gross trade accounts receivable at March 31, 2022 and December 31, 2021 included unbilled retail revenues of $403 million and $426 million, respectively.

Table of Contents

Allowance for Uncollectible Accounts Receivable

Three Months Ended March 31,
20222021
Allowance for uncollectible accounts receivable at beginning of period$45$45
Increase for bad debt expense2928
Decrease for account write-offs(25)(30)
Allowance for uncollectible accounts receivable at end of period$49$43

Inventories by Major Category

March 31, 2022December 31, 2021
Materials and supplies$263$260
Fuel stock266314
Natural gas in storage1736
Total inventories$546$610

Investments

March 31, 2022December 31, 2021
Nuclear plant decommissioning trust$1,862$1,960
Assets related to employee benefit plans4142
Land4444
Miscellaneous other53
Total investments$1,952$2,049

Nuclear Decommissioning Trust

Investments in a trust that will be used to fund the costs to decommission the Comanche Peak nuclear generation plant are carried at fair value. Decommissioning costs are being recovered from Oncor Electric Delivery Company LLC's (Oncor) customers as a delivery fee surcharge over the life of the plant and deposited by Vistra (and prior to the Effective Date, a subsidiary of TCEH) in the trust fund. Income and expense, including gains and losses associated with the trust fund assets and the decommissioning liability are offset by a corresponding change in a regulatory asset/liability (currently a regulatory liability reported in other noncurrent liabilities and deferred credits) that will ultimately be settled through changes in Oncor's delivery fees rates. If funds recovered from Oncor's customers held in the trust fund are determined to be inadequate to decommission the Comanche Peak nuclear generation plant, Oncor would be required to collect all additional amounts from its customers, with no obligation from Vistra, provided that Vistra complied with PUCT rules and regulations regarding decommissioning trusts. A summary of the fair market value of investments in the fund follows:

March 31, 2022December 31, 2021
Debt securities (a)$640$679
Equity securities (b)1,2221,281
Total$1,862$1,960

(a)The investment objective for debt securities is to invest in a diversified tax efficient portfolio with an overall portfolio rating of AA or above as graded by S&P or Aa2 by Moody's. The debt securities are heavily weighted with government and municipal bonds and investment grade corporate bonds. The debt securities had an average coupon rate 2.59% and 2.54% at March 31, 2022 and December 31, 2021, respectively, and an average maturity of 11 years and 10 years at March 31, 2022 and December 31, 2021, respectively.

(b)The investment objective for equity securities is to invest tax efficiently and to match the performance of the S&P 500 Index for U.S. equity investments and the MSCI EAFE Index for non-U.S. equity investments.

Table of Contents

Debt securities held at March 31, 2022 mature as follows: $240 million in one to five years, $167 million in five to 10 years and $233 million after 10 years.

The following table summarizes proceeds from sales of securities and investments in new securities.

Three Months Ended March 31,
20222021
Proceeds from sales of securities$98$133
Investments in securities$(103)$(138)

Property, Plant and Equipment

March 31, 2022December 31, 2021
Power generation and structures$16,275$16,195
Land590608
Office and other equipment190183
Total17,05516,986
Less accumulated depreciation(5,128)(4,801)
Net of accumulated depreciation11,92712,185
Finance lease right-of-use assets (net of accumulated depreciation)175173
Nuclear fuel (net of accumulated amortization of $147 million and $125 million)257212
Construction work in progress528486
Property, plant and equipment — net$12,887$13,056

Depreciation expenses totaled $378 million and $355 million for three months ended March 31, 2022 and 2021, respectively.

Asset Retirement and Mining Reclamation Obligations (ARO)

These liabilities primarily relate to nuclear generation plant decommissioning, land reclamation related to lignite mining, remediation or closure of coal ash basins, and generation plant disposal costs. There is no earnings impact with respect to changes in the nuclear plant decommissioning liability, as all costs are recoverable through the regulatory process as part of delivery fees charged by Oncor. As of March 31, 2022 and December 31, 2021, asbestos removal liabilities totaled $1 million and $3 million, respectively. We have also identified conditional AROs for asbestos removal and disposal, which are specific to certain generation assets.

At March 31, 2022, the carrying value of our ARO related to our nuclear generation plant decommissioning totaled $1.648 billion, which is lower than the fair value of the assets contained in the nuclear decommissioning trust. Since the costs to ultimately decommission that plant are recoverable through the regulatory rate making process as part of Oncor's delivery fees, a corresponding regulatory liability has been recorded to our condensed consolidated balance sheet of $214 million in other noncurrent liabilities and deferred credits.

Table of Contents

The following table summarizes the changes to these obligations, reported as AROs (current and noncurrent liabilities) in our condensed consolidated balance sheets, for the three months ended March 31, 2022 and 2021.

Three Months Ended March 31, 2022Three Months Ended March 31, 2021
Nuclear Plant Decom- missioningMining Land ReclamationCoal Ash and OtherTotalNuclear Plant Decom- missioningMining Land ReclamationCoal Ash and OtherTotal
Liability at beginning of period$1,635$320$495$2,450$1,585$359$492$2,436
Additions:
Accretion133622125623
Adjustment for change in estimates——22——(5)(5)
Reductions:
Payments—(18)(5)(23)—(15)(3)(18)
Liability at end of period1,6483054982,4511,5973494902,436
Less amounts due currently—(88)(16)(104)—(82)(17)(99)
Noncurrent liability at end of period$1,648$217$482$2,3471,5972674732,337

Other Noncurrent Liabilities and Deferred Credits

The balance of other noncurrent liabilities and deferred credits consists of the following:

March 31, 2022December 31, 2021
Retirement and other employee benefits$276$276
Winter Storm Uri impact (a)200261
Identifiable intangible liabilities (Note 5)150147
Regulatory liability214325
Finance lease liabilities240235
Uncertain tax positions, including accrued interest1313
Liability for third-party remediation1917
Accrued severance costs3539
Other accrued expenses79176
Total other noncurrent liabilities and deferred credits$1,226$1,489

(a)Includes the allocation of ERCOT default uplift charges and future bill credits related to large commercial and industrial customers that curtailed during Winter Storm Uri.

Fair Value of Debt

March 31, 2022December 31, 2021
Long-term debt (see Note 10):Fair Value HierarchyCarrying AmountFair ValueCarrying AmountFair Value
Long-term debt under the Vistra Operations Credit FacilitiesLevel 2$2,541$2,507$2,549$2,518
Vistra Operations Senior NotesLevel 27,8837,7827,8808,193
Forward Capacity AgreementsLevel 38686211211
Equipment Financing AgreementsLevel 384858585
Building FinancingLevel 2——33
Other debtLevel 33333

We determine fair value in accordance with accounting standards as discussed in Note 13. We obtain security pricing from an independent party who uses broker quotes and third-party pricing services to determine fair values. Where relevant, these prices are validated through subscription services, such as Bloomberg.

Table of Contents

Supplemental Cash Flow Information

The following table reconciles cash, cash equivalents and restricted cash reported in our condensed consolidated statements of cash flows to the amounts reported in our condensed consolidated balance sheets at March 31, 2022 and December 31, 2021:

March 31, 2022December 31, 2021
Cash and cash equivalents$1,022$1,325
Restricted cash included in current assets2321
Restricted cash included in noncurrent assets1213
Total cash, cash equivalents and restricted cash$1,057$1,359

The following table summarizes our supplemental cash flow information for the three months ended March 31, 2022 and 2021:

Three Months Ended March 31,
20222021
Cash payments related to:
Interest paid$190$191
Capitalized interest(6)(8)
Interest paid (net of capitalized interest)$184$183
Income taxes paid (refunds received) (a)$1$7

(a)For the three months ended March 31, 2022 and 2021, we paid state income taxes of $1 million and $8 million, respectively, and received state tax refunds of zero and $1 million, respectively.

Table of Contents

Previous: Cover and table of contents · Next: Item 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS