Combined Management’s Discussion and Analysis of Financial Condition and Results of OperationsPage
General54
Company Outlook56
Results of Operations61
Williams61
Transco73
NWP75
Management’s Discussion and Analysis of Financial Condition and Liquidity76

General

Williams is an energy company committed to being the leader in providing infrastructure that safely delivers natural gas products to reliably fuel the clean energy economy. Its operations are located in the United States.

Williams’ interstate natural gas pipeline strategy is to create value by maximizing the utilization of its pipeline capacity by providing high-quality, low-cost transportation of natural gas to large and growing markets. Williams’ gas pipeline businesses’ interstate transmission and storage activities are subject to regulation by the FERC. As such, Williams’ rates and charges for the transportation of natural gas in interstate commerce; the extension, expansion, or abandonment of jurisdictional facilities; and accounting, among other things, are subject to regulation. The rates are established primarily through the FERC’s ratemaking process, but Williams may also negotiate rates with its customers pursuant to the terms of its tariffs and FERC policy. Changes in commodity prices and volumes transported have limited near-term impact on these revenues because the majority of the cost of service is recovered through firm capacity reservation charges in transportation rates.

The ongoing strategy of Williams’ midstream operations is to safely and reliably operate large-scale midstream infrastructure where its assets can be fully utilized and drive low per-unit costs. Williams focuses on consistently attracting new business by providing highly reliable service to its customers. These services include natural gas gathering and processing, treating, compression and storage; NGL fractionation, transportation and storage; and crude oil production handling and transportation, as well as marketing services for NGL, crude oil, and natural gas.

Consistent with the manner in which Williams’ CODM evaluates performance and allocates resources, Williams’ operations are conducted, managed, and presented within the following reportable segments: Transmission, Power & Gulf; Northeast G&P; West; and Gas & NGL Marketing Services (See Note 1 – Description of Business and Basis of Presentation). All remaining business activities, including upstream operations and corporate activities, are included in Other.

Unless indicated otherwise, the following discussion and analysis of results of operations and financial condition and liquidity relates to Williams’ current continuing operations and should be read in conjunction with the financial statements and combined notes thereto of this Form 10-Q and the Annual Report on Form 10-K for the year ended December 31, 2025, as filed with the SEC on February 24, 2026.

Dividends

In September 2026, Williams paid a regular quarterly dividend of $0.525 per share.

Overview of Nine Months Ended September 30, 2026

Net income (loss) attributable to The Williams Companies, Inc. for the nine months ended September 30, 2026, increased $508 million compared to the nine months ended September 30, 2025. Further discussion of the results is found in this report in the Results of Operations.

Management’s Discussion and Analysis (Continued)

Recent Developments

Momentum Acquisition

On September 3, 2026, Williams closed on the acquisition of Momentum for total consideration of approximately $5.1 billion. Momentum’s assets in the Haynesville Shale region include 6 Bcf/d of gathering capacity and 4 Bcf/d of pipeline capacity. See Note 3 – Acquisitions and Divestitures.

Sale of Partial Interest in Pantheon

In July 2026, Williams sold a noncontrolling interest in five power projects, Socrates, Apollo, Aquila, Socrates the Younger, and Neo, to an investor in exchange for $5.34 billion of committed capital. The initial contribution of $3.74 billion was received in July 2026 and the remaining committed capital is expected to be received through first quarter of 2027, including $1 billion received in October 2026. See Note 1 – Description of Business and Basis of Presentation.

Sale of Permian Interests

Consolidated Permian Gathering Assets

In August 2026, Williams completed the sale of certain gas gathering assets in the Permian basin within its West segment for total consideration of $139 million, resulting in the recognition of an $83 million gain in the third quarter of 2026. See Note 3 – Acquisitions and Divestitures.

Brazos Permian II Equity-Method Investment

In June 2026, Williams completed the sale of an equity-method investment in Brazos Permian II, LLC within its West segment for total consideration of $143 million, resulting in the recognition of a $127 million gain reflected in the second quarter of 2026. See Note 3 – Acquisitions and Divestitures.

Transco FERC Rate Case Filing

On August 30, 2024, Transco filed a general rate case with the FERC for an overall increase in rates and to comply with the terms of the settlement of its prior rate case. On September 30, 2024, the FERC issued an order accepting and suspending Transco’s general rate filing to be effective March 1, 2025, subject to refund and the outcome of hearing procedures established by the FERC. The order also accepted rate decreases for certain services to be effective as of October 1, 2024. During the third quarter of 2025, Transco reached an agreement in principle with its customers and the other participants to settle all aspects of the rate case and accrued a related liability for rate refunds. Transco filed with the FERC in October 2025 for approval of the settlement. On December 30, 2025, the FERC approved the settlement which became effective March 1, 2026. The refunds were paid in April 2026.

Sale of Mid-Continent Gathering Assets

In February 2026, Williams closed on the sale of certain gas gathering assets in the Mid-Continent region. These operations were designated as held for sale at December 31, 2025 and an impairment, within the West segment, was recognized. See Note 8 – Fair Value Measurements and Guarantees.

Sale of South Mansfield Upstream Interests

In January 2026, Williams closed on the sale of its interests in certain upstream ventures in the South Mansfield area of the Haynesville Shale region, included in Other, for consideration of $398 million with additional contingent consideration to possibly be received through 2029. Upon closing, Williams recognized a gain of $182 million in the first quarter of 2026 and an additional gain of $12 million in the second quarter of 2026. See Note 3 – Acquisitions and Divestitures.

Management’s Discussion and Analysis (Continued)

Expansion Project Updates

Expansion projects placed into service for the current year are described below. Ongoing major expansion projects are discussed later in Company Outlook.

Transmission, Power & Gulf

Gillis West

This project involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity from receipt points in Louisiana to delivery points in Texas. Transco placed the project into service in late October 2026. The project is expected to increase capacity by 115 Mdth/d.

Ryckman Creek Lateral

This project involves an expansion of NWP’s existing natural gas transmission system to provide incremental firm transportation capacity from a receipt point in northeast Oregon to multiple delivery points in southwest Wyoming. NWP placed the project into service in late October 2026. The project is expected to increase contracted capacity by 50 Mdth/d.

Huntingdon Connector

This project involves an expansion of NWP’s existing natural gas transmission system that will provide year-round transportation capacity from the Sumas receipt point to various delivery points in Washington. NWP placed the project into service in late October 2026. The project is expected to increase capacity by 78 Mdth/d.

Power - Socrates

The project consists of the Socrates North and South power generation facilities and associated gas pipeline infrastructure in New Albany, Ohio, which together have an expected 556 MW of capacity. Socrates South was placed into service in late July 2026. Socrates North remains under construction and is expected to be placed into service later in the fourth quarter of 2026. The project is supported by a 10‑year, primarily fixed‑price power purchase agreement, with an option for the customer to extend the term of the agreement. Williams has received necessary approvals from the Ohio Power Siting Board.

Naughton Coal-to-Gas Conversion

The project involves an expansion of NWP’s existing natural gas transmission system to provide year-round transportation capacity to a power plant in southwest Wyoming. NWP placed the project into service in April 2026, increasing NWP’s contracted capacity by 98 Mdth/d.

Company Outlook

Williams’ strategy is to provide a large-scale, reliable, and clean energy infrastructure designed to maximize the opportunities created by the vast supply of natural gas and natural gas products that exists in the United States. Williams accomplishes this by connecting the growing demand for cleaner fuels and feedstocks with our major positions in the premier natural gas and natural gas products supply basins. Williams continues to maintain a strong commitment to safety, environmental stewardship including seeking opportunities for renewable energy ventures, operational excellence, and customer satisfaction. Williams believes that accomplishing these goals will position it to deliver safe, reliable, clean energy services to its customers and an attractive return to shareholders. Williams’ business plan for 2026 includes a continued focus on earnings and cash flow growth.

In 2026, Williams’ operating results are expected to benefit from the continued growth in the Transmission, Power & Gulf segment, primarily reflecting the impacts of the Socrates Power project, as well as numerous

Management’s Discussion and Analysis (Continued)

expansion projects at Transco and the Gulf of America. Growth in 2026 will benefit from a full year of the Louisiana Energy Gateway expansion project as well as expected increases in Haynesville Shale volumes, including the Momentum acquisition. Additionally, Williams expects higher gathering and processing results in the Northeast. These increases are partially offset by the divestiture of the South Mansfield upstream interests, and lower expected Eagle Ford results in our West segment which relate to contractual step-downs in minimum volume commitments.

Williams seeks to maintain a strong financial position and liquidity, as well as manage a diversified portfolio of safe, clean, and reliable energy infrastructure assets that continue to serve key growth markets and supply basins in the United States. Williams’ growth capital and investment expenditures in 2026 are expected to range from $7.3 billion to $7.9 billion, excluding acquisitions and certain long-lead time equipment for power projects which are backed by reimbursement from the customer if the equipment order is canceled. Growth capital spending in 2026 primarily includes the Power projects, Transco expansions, all of which are fully contracted with firm transportation agreements, projects supporting growth in the Haynesville Shale basin, and projects supporting the Northeast G&P business. Williams is investing capital in the Louisiana LNG and Driftwood Pipeline projects, as well as the development of its Wamsutter upstream oil and gas properties. In addition to growth capital and investment expenditures, Williams also remains committed to projects that maintain its assets for safe and reliable operations, as well as projects that reduce emissions, and meet legal, regulatory, and/or contractual commitments.

Potential risks and obstacles that could impact the execution of Williams’ plan include:

  • A global recession, which could result in downturns in financial markets and commodity prices, as well as impact demand for natural gas and related products;

  • Opposition to, and regulations affecting, our infrastructure projects, including the risk of delay or denial in permits and approvals needed for our projects;

  • Counterparty credit and performance risk;

  • Unexpected significant increases in capital expenditures or delays in capital project execution, including increases from inflation or delays caused by supply chain disruptions;

  • Unexpected changes in customer drilling and production activities, which could negatively impact gathering and processing volumes;

  • Lower than anticipated demand for natural gas and natural gas products which could result in lower-than-expected volumes, energy commodity prices, and margins;

  • General economic, financial markets, or industry downturns, including increased inflation, interest rates, or tariffs;

  • Physical damages to facilities, including damage to offshore facilities by weather-related events;

  • Other risks set forth under Part I, Item 1A. Risk Factors in the Annual Report on Form 10-K for the year ended December 31, 2025, as filed with the SEC on February 24, 2026, as may be supplemented by disclosure in Part II, Item 1A. Risk Factors in subsequent Quarterly Reports on Form 10‑Q.

Management’s Discussion and Analysis (Continued)

Expansion Projects

Williams’ ongoing major expansion projects include the following:

Transmission, Power & Gulf

Southeast Supply Enhancement

In January 2026, Transco received FERC approval for the project, which involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity from receipt points in Virginia to delivery points in Virginia, North Carolina, South Carolina, Georgia, and Alabama. Transco plans to place the project into service as early as the third quarter of 2027, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity by 1,597 Mdth/d.

Northeast Supply Enhancement

In August 2025, the FERC issued an order granting Transco’s petition for reissuance of the certificate authorization for the project, which involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity from Transco’s Compressor Station 195 in Pennsylvania to the Rockaway Delivery Lateral transfer point in New York. In October and November 2025, Transco’s applications for Clean Water Act and related permits with the states of Pennsylvania, New York and New Jersey were approved. In August 2025, Transco executed precedent agreements with customers subscribing to all of the capacity under the project. Transco plans to place the project into service as early as the fourth quarter of 2027, assuming timely receipt of all necessary regulatory approvals. However, on September 8, 2026, the Third Circuit Court of Appeals granted petitions for review of the Clean Water Act Water Quality Certification issued by the New Jersey Department of Environmental Protection (NJDEP), vacating such certification and remanding the matter to the NJDEP for appropriate action. The project is expected to increase capacity by 400 Mdth⁄d.

Leidy Access

In September 2026, Transco filed a certificate application with the FERC for the project, which involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity on the Leidy Line. Transco plans to place the project into service as early as the fourth quarter of 2027, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity by 183 Mdth/d.

Line 200

In April 2023, Driftwood received FERC approval for Line 200, which will connect a pipeline to the Louisiana LNG facility. Williams will be the operator of the pipeline and plans to place the project into service as early as the second quarter of 2028. The pipeline has an expected capacity of 3,100 Mdth/d.

Pine Prairie Phase IV Expansion

In May 2026, Williams received the FERC approval for the project, which will involve an expansion of storage capacity and the injection and withdrawal capabilities of one of its existing storage facilities in the Gulf Coast region. Williams plans to place the project into service during the fourth quarter of 2028, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase working gas storage capacity by 10 Bcf.

Management’s Discussion and Analysis (Continued)

Dalton Lateral II

Transco plans to file a certificate application for the project with the FERC in 2027. The project involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity from Transco’s main line near existing Station 115 to an existing power plant in Georgia. Transco plans to place the project into service as early as the fourth quarter of 2029, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity up to 460 Mdth/d.

Power Express

Transco plans to file an application with the FERC as early as the second quarter 2027 for the project, which involves an expansion of Transco’s existing natural gas transmission system to provide incremental firm transportation capacity in Virginia. Transco plans to place the project into service as early as the third quarter of 2030, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity by 800 Mdth/d.

Wild Trail

In March 2026, NWP received FERC approval for the project, which involves an expansion of NWP’s existing natural gas transmission system that will provide year-round transportation capacity from the White River Hub receipt point in western Colorado to various delivery points in southwest Wyoming and southern Colorado. The Wild Trail project is fully subscribed by an affiliate of NWP. NWP plans to place the project into service during the fourth quarter of 2027, assuming timely receipt of all necessary regulatory approvals. The project is expected to provide 83 Mdth/d of new firm transportation service through a combination of increasing capacity and utilizing existing capacity.

Kelso-Beaver Reliability

In November 2025, NWP received FERC approval for the project, which will provide year-round transportation capacity to various receipt and delivery points in Oregon. NWP plans to place the project into service during the fourth quarter of 2028, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity by 183 Mdth/d. In May 2026, NWP purchased the 17-mile Kelso-Beaver pipeline, a key milestone for this project.

Silver Spur

NWP plans to file an application with the FERC as early as the second half of 2027 for the project, which will provide year-round transportation capacity from the Rockies Supply hub at Opal, Wyoming, to various delivery points in Idaho. NWP plans to place the project into service as early as second quarter of 2030, assuming timely receipt of all necessary regulatory approvals. The project is expected to increase capacity by 275 Mdth/d.

Power

Williams has agreed to provide committed power generation and associated gas pipeline infrastructure for four additional Power projects, Apollo, Aquila, Socrates the Younger, and Neo. The projects are backed by primarily fixed-price power purchase agreements, with options for the customer to extend the term of the agreements. The Apollo project, in Ohio, has a term of 12.5 years, and Williams expects the project to be placed into service in the second half of 2027 and to provide 490 MW of capacity. The Aquila project, in Utah, also has a term of 12.5 years, and Williams expects the project to be placed into service in the second half of 2027 and the first half of 2028 and to provide 520 MW of capacity. The Socrates the Younger project, in Ohio, has a term of 10 years, and Williams expects the project to be placed into service the second half of 2028 and to provide 340 MW of capacity. The Neo project, in Ohio, has a term of 12.5 years, and Williams expects the

Management’s Discussion and Analysis (Continued)

project to be placed into service in the second half of 2028 and to provide 682 MW of capacity. All expected in-service dates assume timely receipt of permits.

West

Dorne

Williams will construct and operate a greenfield treating and dehydration facility in the Haynesville region, with a capacity of 400 MMcf/d. This project is expected to be placed into service in the third quarter of 2027.

Shelby Trough Connector

The project is designed to provide access to growing Haynesville production in the Shelby Trough area through the construction of 64 miles of new lateral pipeline and additional compression facilities connecting to the Louisiana Energy Gateway system. The project is expected to provide 750 MMcf/d of transportation capacity, with expansion capabilities up to 1.5 Bcf/d, and is expected to be placed into service during the second quarter of 2028.

Delta Access

The project is designed to provide additional transmission capacity to serve growing power generation and LNG demand through an expansion along the Transco corridor. The project is expected to provide 2,250 Mdth/d of transportation capacity, with additional expansion opportunities, and is expected to be placed into service during the first quarter of 2029.

Other

Lakeland Solar Project

Williams is constructing and will operate a 75 MW alternating current solar power facility interconnecting with Lakeland Electric in Florida. This project is expected to be placed in service in the fourth quarter of 2026.

Management’s Discussion and Analysis (Continued)

Results of Operations

Williams’ Consolidated Overview

The following table and discussion is a summary of Williams’ consolidated results of operations for the three and nine months ended September 30, 2026, compared to the three and nine months ended September 30, 2025, and should be read in conjunction with the results of operations by segment, as discussed in further detail following this consolidated overview discussion.

Three Months Ended September 30,Change*Nine Months Ended September 30,Change*
20262025$%20262025$%
(Dollars in millions)
Revenues:
Service revenues$2,319$2,121+198+9%$6,677$6,165+512+8%
Product sales and service revenues – commodity consideration902746+156+21%2,8922,557+335+13%
Net gain (loss) from commodity derivatives256-54-96%(263)30-293NM
Total revenues3,2232,9239,3068,752
Costs and expenses:
Product costs and net processing commodity expenses632485-147-30%1,7051,606-99-6%
Operating and maintenance expenses639583-56-10%1,8011,697-104-6%
Depreciation, depletion, and amortization expenses620564-56-10%1,7961,754-42-2%
General and administrative expenses275168-107-64%648530-118-22%
Gain on sale of certain assets(83)—+83NM(277)—+277NM
Other operating (income) expense – net414+10+71%(6)17+23NM
Total costs and expenses2,0871,8145,6675,604
Operating income (loss)1,1361,1093,6393,148
Equity earnings (losses)157152+5+3%477449+28+6%
Other investing income (loss) – net3019+11+58%18831+157NM
Interest expense(385)(372)-13-3%(1,132)(1,071)-61-6%
Other income (expense) – net5021+29+138%10851+57+112%
Income (loss) before income taxes9889293,2802,608
Less: Provision (benefit) for income taxes221246+25+10%725613-112-18%
Net income (loss)7676832,5551,995
Less: Net income (loss) attributable to noncontrolling interests6736-31-86%163111-52-47%
Net income (loss) attributable to The Williams Companies, Inc.$700$647+53+8%$2,392$1,884+508+27%

    • = Favorable change; - = Unfavorable change; NM = A percentage calculation is not meaningful due to a change in signs, a zero-value denominator, or a percentage change greater than 200.

Management’s Discussion and Analysis (Continued)

Three months ended September 30, 2026 vs. three months ended September 30, 2025

Service revenues increased primarily due to:

  • Higher revenues associated with the Momentum Acquisition (See Note 3 – Acquisitions and Divestitures) and expansion projects at the West and the Transmission, Power & Gulf segments;

  • Higher power revenues primarily associated with Socrates South placed in service in late July 2026 at the Transmission, Power & Gulf segment;

  • Increased Gulf Coast storage rates at the Transmission, Power & Gulf segment;

  • Higher volumes from the Northeast JV at the Northeast G&P segment.

The net sum of Product sales and service revenues – commodity consideration, Product costs and net processing commodity expenses, and net realized gains and losses on commodity derivatives related to sales of product and shrink gas purchases for processing plants for the reportable segments comprise Commodity Margins. Service revenues - commodity consideration represent payments received in the form of commodities for processing services provided. Most of these commodity volumes are sold during the month processed and are offset within Product costs and net processing commodity expenses. The sum of Product sales and net realized gains and losses on commodity derivatives related to the upstream operations comprise Net realized product sales.

The Product sales and service revenues – commodity consideration increase primarily consists of:

  • Higher marketing sales activities primarily related to higher NGL marketing sales activities at the Gas & NGL Marketing Services segment and the Momentum Acquisition;

  • Higher equity NGL sales and commodity consideration revenues associated with equity NGL production activity primarily at the West segment;

  • Higher product sales from upstream operations primarily related to higher prices in the Wamsutter region, substantially offset by lower volumes from the January 2026 sale of interests in certain upstream ventures in the South Mansfield area of the Haynesville Shale region (See Note 3 – Acquisitions and Divestitures).

As Williams is acting as agent for natural gas marketing customers, its natural gas marketing product sales are presented net of the related costs of those activities within the Gas & NGL Marketing Services segment.

Net gain (loss) from commodity derivatives includes realized and unrealized gains and losses from derivative instruments reflected within Total revenues primarily in the Gas & NGL Marketing Services segment, as well as upstream operations (see Note 9 – Commodity Derivatives).

Williams experiences significant earnings volatility from the fair value accounting required for the derivatives used to hedge a portion of the economic value of the underlying transportation and storage capacity portfolios as well as upstream-related production. However, the unrealized fair value measurement gains and losses on the derivatives are generally offset by valuation changes in the economic value of the underlying production or transportation and storage capacity contracts, which are not recognized until the underlying transaction occurs.

The Product costs and net processing commodity expenses increase primarily consists of:

  • Higher marketing activities related to NGLs at the Transmission, Power & Gulf and Gas & NGL Marketing Services segments and the Momentum Acquisition at the West segment;

  • Higher shrink natural gas purchases and commodity consideration costs associated with Williams’ equity NGL production activities primarily at the West segment.

Management’s Discussion and Analysis (Continued)

Operating and maintenance expenses increased primarily due to higher employee-related costs, operating costs associated with the Momentum Acquisition, and operating taxes.

Depreciation, depletion, and amortization expenses increased primarily related to the absence of adjustments associated with the rate case to Transco depreciation rates in 2025 as well as assets placed in service at the Transmission, Power & Gulf segment and the Momentum Acquisition, partially offset by the sale of the South Mansfield upstream interests.

General and administrative expenses increased due to higher employee-related costs, including incentive compensation, and transaction and acquisition-related costs at the Transmission, Power & Gulf and West segments.

Gain on sale of certain assets reflects a gain from the 2026 sale of certain gas gathering assets in the Permian Basin at the West segment (see Note 3 – Acquisitions and Divestitures).

Other operating (income) expense – net reflects the absence of the 2025 write-off of certain DJ Basin region assets in the West segment.

Interest expense was unfavorably impacted by 2025 and 2026 debt issuances including the debt retained in the Momentum Acquisition, partially offset by 2025 and 2026 debt retirements (see Note 6 – Debt and Banking Arrangements) and higher interest capitalized due to ongoing expansion projects.

The favorable change in Other income (expense) – net includes an increase in equity AFUDC primarily as a result of higher eligible capital expenditures at the regulated businesses.

Provision (benefit) for income taxes changed favorably primarily due to the absence of a provision associated with an increase in our estimate of the state deferred income tax rate in 2025, partially offset by higher pre-tax income. See Note 5 – Provision (Benefit) for Income Taxes for a discussion of the effective tax rate compared to the federal statutory rate for both periods.

The unfavorable change in Net income (loss) attributable to noncontrolling interests is primarily due to higher results at Pantheon.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Service revenues increased primarily due to:

  • Higher revenues associated with expansion projects and the Momentum Acquisition at the Transmission, Power & Gulf and the West segments;

  • Increased Gulf Coast storage rates;

  • Higher volumes from the Northeast JV;

  • Higher power revenues primarily associated with Socrates South;

  • Higher revenues associated with reimbursable expenses primarily in the Northeast G&P segment, which is substantially offset by similar changes reflected in Operating and maintenance expenses.

The Product sales and service revenues – commodity consideration increase primarily consists of:

  • Higher marketing sales activities primarily related to higher NGL marketing sales activities and net gas marketing sales activities at the Gas & NGL Marketing Services segment and the Momentum Acquisition;

  • Higher equity NGL sales and commodity consideration revenues associated with equity NGL production activity primarily at the West segment; partially offset by

Management’s Discussion and Analysis (Continued)

  • Lower product sales from upstream operations primarily related to lower volumes from the sale of the South Mansfield upstream interests; partially offset by higher volumes and prices in the Wamsutter region.

Net gain (loss) from commodity derivatives includes realized and unrealized gains and losses from derivative instruments reflected within Total revenues primarily in the Gas & NGL Marketing Services segment, as well as upstream operations.

The Product costs and net processing commodity expenses increase primarily consists of:

  • Higher marketing activities related to NGLs at the Gas & NGL Marketing Services segment and the Momentum Acquisition;

  • Higher shrink natural gas purchases and commodity consideration costs associated with Williams’ equity NGL production activities primarily at the West segment.

Operating and maintenance expenses increased primarily due to higher employee-related expenses, operating taxes, electricity and fuel, which is substantially offset by similar changes in Service revenues, and higher operating costs of the assets acquired in the Momentum Acquisition.

Depreciation, depletion, and amortization expenses increased primarily related to assets placed in service at the West and Transmission, Power & Gulf segments and the Momentum Acquisition, partially offset by the sale of the South Mansfield upstream interests.

General and administrative expenses increased due to higher employee-related costs, including incentive compensation, and transaction and acquisition-related costs at the Transmission, Power & Gulf and West segments.

Gain on sale of certain assets reflects gains from the 2026 sales of the South Mansfield upstream interests and certain gas gathering assets in the Permian Basin.

Other operating (income) expense – net reflects the absence of the 2025 write-off of certain DJ Basin region assets.

Equity earnings (losses) changed favorably primarily due to an increase at Appalachia Midstream Investments.

Other investing income (loss) – net reflects a gain from the 2026 sale of an equity-method investment in Brazos Permian II, LLC and higher interest income.

Interest expense was unfavorably impacted by 2025 and 2026 debt issuances including the debt retained in the Momentum Acquisition, partially offset by 2025 and 2026 debt retirements and higher interest capitalized due to ongoing expansion projects.

The favorable change in Other income (expense) – net includes an increase in equity AFUDC primarily as a result of higher eligible capital expenditures at the regulated businesses.

Provision (benefit) for income taxes changed unfavorably primarily due to higher pre-tax income.

The unfavorable change in Net income (loss) attributable to noncontrolling interests is primarily due to higher results at the Northeast JV and Pantheon.

Period-Over-Period Operating Results – Williams’ Segments

Williams’ CODM evaluates segment operating performance based upon Modified EBITDA. Note 11 – Segment Disclosures includes a reconciliation of this non-GAAP measure to Income (loss) before income taxes. Management uses Modified EBITDA because it is an accepted financial indicator used by investors to compare company performance. In addition, management believes that this measure provides investors an enhanced perspective of the

Management’s Discussion and Analysis (Continued)

operating performance of Williams’ assets. Modified EBITDA should not be considered in isolation or as a substitute for a measure of performance prepared in accordance with GAAP.

Transmission, Power & Gulf

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
(Millions)
Service revenues$1,328$1,237$3,852$3,548
Product sales and service revenues – commodity consideration (1)202154509428
Net realized gain (loss) from commodity derivatives (1)(4)1(9)—
Segment revenues1,5261,3924,3523,976
Product costs and net processing commodity expenses (1)(175)(139)(446)(381)
Other segment costs and expenses(389)(317)(1,048)(983)
Proportional Modified EBITDA of equity-method investments3837111110
Transmission, Power & Gulf Modified EBITDA$1,000$973$2,969$2,722
Commodity margins$23$16$54$47

(1)Included as a component of Commodity margins.

Three months ended September 30, 2026 vs. three months ended September 30, 2025

Transmission, Power & Gulf Modified EBITDA increased primarily due to higher Service revenues, partially offset by higher Other segment costs and expenses.

Service revenues increased primarily due to:

  • A $53 million increase in power revenues primarily associated with Socrates South placed in service in late July 2026, as well as revenues associated with reimbursable fuel expenses (which are substantially offset by similar changes reflected in Other segment costs and expenses);

  • A $21 million increase in Gulf Coast Storage’s revenues primarily associated with higher storage rates;

*•*A $7 million increase in the Western Gulf Coast region primarily due to higher natural gas gathering and crude oil transportation volumes from the Whale expansion project that went in-service in January 2025;

  • A $7 million increase in MountainWest’s revenues primarily due to the Overthrust Westbound Compression expansion project that went in-service in November 2025.

Other segment costs and expenses increased primarily due to:

*•*Higher operating expenses and administrative costs including higher transaction expenses, employee-related costs, and corporate allocations, as well as higher fuel expenses (substantially offset by higher Service revenues discussed above);

  • An unfavorable change related to certain asset retirements in the Gulf Coast region; partially offset by

  • A favorable change in equity AFUDC primarily from higher eligible capital expenditures at Transco and Driftwood Pipeline’s Line 200.

Management’s Discussion and Analysis (Continued)

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Transmission, Power & Gulf Modified EBITDA increased primarily due to higher Service revenues, partially offset by higher Other segment costs and expenses.

Service revenues increased primarily due to:

  • A $77 million increase in Transco’s revenues primarily associated with expansion projects placed in service, as well as higher park and loan services and revenues associated with reimbursable expenses (which are substantially offset by similar changes reflected in Other segment costs and expenses), partially offset by decreases in commodity revenues;

  • A $62 million increase in Gulf Coast Storage’s revenues primarily associated with higher storage rates and higher park and loan services;

  • A $58 million increase in power revenues primarily associated with Socrates South, as well as revenues associated with reimbursable fuel expenses (which are substantially offset by similar changes reflected in Other segment costs and expenses);

  • A $29 million increase in Discovery’s revenues primarily in natural gas gathering revenues due to volumes from the Shenandoah expansion project that went in-service in July 2025;

  • A $19 million increase in NWP’s revenues primarily due to transportation rate increases;

*•*A $19 million increase in the Western Gulf Coast region primarily due to higher natural gas gathering and crude oil transportation volumes from the Whale expansion project;

*•*A $17 million increase in MountainWest’s revenues primarily due to the Overthrust Westbound Compression expansion project;

  • A $16 million increase in the Eastern Gulf Coast region primarily due to higher crude oil transportation and natural gas gathering volumes from new wells at Blind Faith in the Ballymore field, partially offset by a decrease at Devil’s Tower related to lower volumes and lower revenues associated with reimbursable expenses (which are substantially offset by similar changes reflected in Other segment costs and expenses) from the Kodiak field.

Other segment costs and expenses increased primarily due to:

*•*Higher operating expenses and administrative costs including higher transaction expenses, employee-related costs, and corporate allocations, as well as higher net electricity and fuel expenses (substantially offset by higher Service revenues discussed above);

  • An unfavorable change related to certain asset retirements in the Gulf Coast region; partially offset by

  • A favorable change in equity AFUDC primarily from higher eligible capital expenditures at Transco and Driftwood Pipeline’s Line 200.

Management’s Discussion and Analysis (Continued)

Northeast G&P

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
(Millions)
Service revenues$536$499$1,569$1,493
Product sales and service revenues – commodity consideration (1)163173133
Segment revenues5525301,6421,626
Product costs and net processing commodity expenses (1)(16)(25)(73)(115)
Other segment costs and expenses(163)(161)(468)(465)
Proportional Modified EBITDA of equity-method investments169161505474
Northeast G&P Modified EBITDA$542$505$1,606$1,520
Commodity margins$—$6$—$18

(1)Included as a component of Commodity margins.

Three months ended September 30, 2026 vs. three months ended September 30, 2025

Northeast G&P Modified EBITDA increased primarily due to higher Service revenues and higher Proportional Modified EBITDA of equity-method investments.

Service revenues increased primarily due to:

*•*A $22 million increase in revenues at the Northeast JV primarily related to higher gathering, processing, transportation, and fractionation volumes;

*•*A $9 million increase in gathering revenues at Susquehanna Supply Hub primarily related to increased gathering volumes and escalated gathering rates.

Proportional Modified EBITDA of equity-method investments increased at Appalachia Midstream Investments primarily driven by higher gathering volumes.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Northeast G&P Modified EBITDA increased primarily due to higher Service revenues and higher Proportional Modified EBITDA of equity-method investments, partially offset by lower Commodity margins.

Service revenues increased primarily due to:

*•*A $60 million increase in revenues at the Northeast JV primarily related to higher gathering, processing, transportation, and fractionation volumes;

  • A $21 million increase in revenues associated with reimbursable expenses, which is substantially offset by similar changes reflected in Other segment costs and expenses; partially offset by

*•*A $4 million decrease in gathering revenues at Susquehanna Supply Hub primarily related to lower volumes, partially offset by escalated rates.

Other segment costs and expenses increased due higher electricity and fuel (substantially offset by higher Service revenues), partially offset by lower maintenance expenses.

Management’s Discussion and Analysis (Continued)

Proportional Modified EBITDA of equity-method investments increased at Appalachia Midstream Investments primarily driven by higher gathering volumes and escalated gathering rates; and at Blue Racer primarily driven by new MVC revenue, higher gathering rates, and higher volumes.

Commodity margins decreased as a result of the expiration of a restructured gas purchase agreement in 2025.

West

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
(Millions)
Service revenues$538$470$1,520$1,354
Product sales and service revenues – commodity consideration (1)321240820758
Net realized gain (loss) from commodity derivatives relating to service revenues1211
Net realized gain (loss) from commodity derivatives relating to product sales (1)(1)—(3)—
Net realized gain (loss) from commodity derivatives—2(2)1
Segment revenues8597122,3382,113
Product costs and net processing commodity expenses (1)(285)(211)(723)(666)
Other segment costs and expenses(234)(195)(580)(516)
Gain on sale of certain assets83—83—
Proportional Modified EBITDA of equity-method investments283699106
West Modified EBITDA$451$342$1,217$1,037
Commodity margins$35$29$94$92

(1) Included as a component of Commodity margins.

Three months ended September 30, 2026 vs. three months ended September 30, 2025

West Modified EBITDA increased primarily due to Gain on sale of certain assets and higher Service revenues, partially offset by higher Other segment costs and expenses.

Service revenues increased primarily due to:

  • An $87 million increase in the Haynesville Shale region primarily due to the Momentum Acquisition (see Note 3 – Acquisitions and Divestitures) in the third quarter of 2026 and contributions from Louisiana Energy Gateway which was placed into service in the third quarter of 2025; partially offset by

  • An $11 million decrease in the Mid-Continent and Permian basin regions due to the sale of certain gas gathering assets in February 2026 and August 2026, respectively.

Management’s Discussion and Analysis (Continued)

Other segment costs and expenses increased primarily due to higher operating expenses and acquisition-related costs associated with the Momentum Acquisition, partially offset by the absence of the third-quarter 2025 $25 million write-off of certain compression assets in the DJ Basin region (see Note 8 – Fair Value Measurements and Guarantees).

Gain on sale of certain assets reflects the gain from the sale of certain gas gathering assets in the Permian basin in the third quarter of 2026.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

West Modified EBITDA increased primarily due to higher Service revenues and Gain on sale of certain assets*,* partially offset by higher Other segment costs and expenses.

Service revenues increased primarily due to:

  • A $188 million increase in the Haynesville Shale region primarily due to contributions from Louisiana Energy Gateway which was placed into service in the third quarter of 2025, the Momentum Acquisition in the third quarter of 2026, as well as higher gathering volumes including those from the acquisition of Saber Midstream, LLC in June 2025;

  • A $20 million increase in the Piceance region primary due to higher commodity-price driven processing rates and higher volumes; partially offset by

  • A $26 million decrease in the Eagle Ford Shale region primarily due to lower MVC revenue and lower gathering volumes due to decreased producer activity;

  • A $16 million decrease in the Mid-Continent region due to the sale of certain gas gathering assets in February 2026.

Other segment costs and expenses increased primarily due to higher operating expenses and acquisition-related costs associated with the Momentum Acquisition, as well as higher operating taxes associated with Louisiana Energy Gateway, partially offset by the absence of the third-quarter 2025 $25 million write-off of certain compression assets in the DJ Basin region.

Gain on sale of certain assets reflects the gain from the sale of certain gas gathering assets in the Permian basin in the third quarter of 2026.

Management’s Discussion and Analysis (Continued)

Gas & NGL Marketing Services

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
(Millions)
Product sales (1)$557$415$1,958$1,557
Net realized gain (loss) from commodity derivative instruments (1)(3)(11)(159)(44)
Net unrealized gain (loss) from commodity derivative instruments3244(41)35
Net gain (loss) from commodity derivatives2933(200)(9)
Segment revenues5864481,7581,548
Product costs (1)(545)(398)(1,530)(1,332)
Net unrealized gain (loss) from commodity derivative instruments within Net processing commodity expenses—214
Other segment costs and expenses(19)(14)(72)(71)
Proportional Modified EBITDA of equity-method investments17164527
Gas & NGL Marketing Services Modified EBITDA$39$54$202$176
Commodity margins$9$6$269$181

(1) Included as a component of Commodity margins.

Three months ended September 30, 2026 vs. three months ended September 30, 2025

Gas & NGL Marketing Services Modified EBITDA decreased primarily due to an unfavorable change in Net unrealized gain (loss) from commodity derivative instruments.

Commodity margins increased $3 million primarily due to a $6 million increase in NGL marketing margins including a favorable change in net realized gains and losses on sales of inventory driven by a favorable change in NGL prices.

Net unrealized gain (loss) from commodity derivative instruments within Segment revenues and Net processing commodity expenses changed from 2025 primarily due to a change in forward commodity prices relative to hedge positions in 2026 compared to 2025.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Gas & NGL Marketing Services Modified EBITDA increased primarily due to higher Commodity margins and Proportional Modified EBITDA of equity-method investments, partially offset by an unfavorable change in Net unrealized gain (loss) from commodity derivative instruments.

Commodity margins increased $88 million primarily due to:

  • A $68 million increase in natural gas marketing margins, including $62 million of higher natural gas transportation capacity marketing margins primarily driven by favorable net realized pricing spreads;

  • A $20 million increase in NGL marketing margins including a favorable change in net realized gains and losses on sales of inventory driven by a favorable change in NGL prices.

Net unrealized gain (loss) from commodity derivative instruments within Segment revenues and Net processing commodity expenses changed from 2025 primarily due to a change in forward commodity prices relative to hedge positions in 2026 compared to 2025.

Management’s Discussion and Analysis (Continued)

Proportional Modified EBITDA of equity-method investments increased driven by the investment in Cogentrix, which was purchased in March 2025.

Other

Three Months Ended September 30,Nine Months Ended September 30,
2026202520262025
(Millions)
Service revenues$13$4$21$12
Product sales (1)141136422428
Net realized gain (loss) from derivative instruments (1)(13)15(31)22
Net unrealized gain (loss) from derivative instruments(10)5(21)16
Net gain (loss) from commodity derivatives(23)20(52)38
Net revenues from upstream operations, corporate, and other business activities131160391478
Other costs and expenses(79)(67)(203)(192)
Gain on sale of certain assets——194—
Modified EBITDA from upstream operations, corporate, and other business activities$52$93$382$286
Net realized product sales$128$151$391$450

(1) Included as a component of Net realized product sales.

Three months ended September 30, 2026 vs. three months ended September 30, 2025

Modified EBITDA from upstream operations, corporate, and other business activities decreased primarily due to lower Net realized product sales, an unfavorable change in Net unrealized gain (loss) from derivative instruments, and higher Other costs and expenses, partially offset by higher Service revenues.

Service revenues increased primarily due to lease revenues from certain corporate office properties.

Net realized product sales from our upstream operations decreased primarily due to:

  • A $30 million decrease driven by the January 2026 sale of certain South Mansfield upstream interests; partially offset by

  • A $7 million increase at the Wamsutter region due to $11 million associated with higher production volumes driven by new wells, partially offset by a $4 million decrease driven by lower net realized natural gas prices.

Net unrealized gain (loss) from derivative instruments changed from 2025 primarily due to a change in forward commodity prices relative to hedge positions in 2026 compared to 2025.

Other costs and expenses increased primarily due to higher employee-related incentive compensation and higher Wamsutter upstream operating expenses, partially offset by the absence of upstream operating expenses associated with the disposed South Mansfield upstream interests and higher income associated with regulatory assets related to the effects of deferred taxes on equity funds used during construction.

Management’s Discussion and Analysis (Continued)

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Modified EBITDA from upstream operations, corporate, and other business activities increased primarily due to the Gain on sale of certain assets driven by the January 2026 sale of certain South Mansfield upstream interests and higher Service revenues, partially offset by lower Net realized product sales, an unfavorable change in Net unrealized gain (loss) from derivative instruments, and higher Other costs and expenses.

Service revenues increased primarily due to lease revenues from certain corporate office properties.

Net realized product sales from our upstream operations decreased primarily due to:

  • A $73 million decrease driven by the January 2026 sale of certain South Mansfield upstream interests; partially offset by

  • A $14 million increase at the Wamsutter region due to $47 million associated with higher production volumes driven by new wells, partially offset by a $33 million decrease driven by lower net realized natural gas prices.

Net unrealized gain (loss) from derivative instruments changed from 2025 primarily due to a change in forward commodity prices relative to hedge positions in 2026 compared to 2025.

Other costs and expenses increased primarily due to higher Wamsutter upstream operating expenses and higher employee-related incentive compensation, partially offset by the absence of upstream operating expenses associated with the disposed South Mansfield upstream interests and higher income associated with regulatory assets related to the effects of deferred taxes on equity funds used during construction.

Gain on sale of certain assets relates to the January 2026 sale of the South Mansfield upstream interests.

Management’s Discussion and Analysis (Continued)

Transco - Results of Operations

Nine Months Ended September 30,
Change*
2026$%2025
(Dollars in Millions)
Revenues:
Natural gas transportation service revenues$2,188+54+3%$2,134
Natural gas storage service revenues175+6+4%169
Natural gas product sales91+10+12%81
Other service revenues37+16+76%21
Total revenues2,4912,405
Costs and expenses:
Natural gas product costs91-10-12%81
Operating and maintenance expenses393-21-6%372
Depreciation and amortization expenses438-12-3%426
General and administrative expenses174-8-5%166
Taxes, other than income taxes96-5-5%91
Other operating (income) expense – net13+12+48%25
Total costs and expenses1,2051,161
Operating income (loss)1,2861,244
Interest expense(251)-7-3%(244)
Interest income32+9+39%23
Allowance for equity and borrowed funds used during construction (AFUDC)52+27+108%25
Other income (expense) – net1+4NM(3)
Net income (loss)$1,120+75+7%$1,045

    • = Favorable change; - = Unfavorable change; NM = A percentage calculation is not meaningful due to a change in signs, a zero-value denominator, or a percentage change greater than 200.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Variances due to the changes in natural gas prices and transportation volumes have little impact on revenues because, under our rate design methodology, the majority of overall cost of service is recovered through firm capacity reservation charges in Transco’s transportation rates.

Transco has cash out sales, which settle gas imbalances with shippers. In the course of providing transportation services to customers, Transco may receive different quantities of gas from shippers than the quantities delivered on behalf of those shippers. Additionally, Transco transports gas on various pipeline systems, which may deliver different quantities of gas on Transco’s behalf than the quantities of gas received from Transco. These transactions result in gas transportation and exchange imbalance receivables and payables. Transco’s tariff includes a method whereby the majority of transportation imbalances are settled on a monthly basis through cash out sales or purchases. The net cash out activity has no impact on Transco’s operating income.

Revenues increased primarily due to:

  • An increase in Natural gas transportation service revenues primarily due to placing the following projects into service:

◦The Commonwealth Energy Connector in November 2025;

Management’s Discussion and Analysis (Continued)

◦The Alabama Georgia Connector in October 2025;

◦The Texas Louisiana Energy Pathway in April 2025;

◦The Southeast Energy Connector in April 2025.

The increase in Natural gas transportation service revenues is also due to higher electric power revenue, partially offset by decreases in commodity revenues, short-term firm transportation, and a cash out surcharge (offset in Other operating (income) expense – net resulting in no net impact on results of operations). Electric power costs are recovered from Transco’s customers through transportation rates and are offset in Operating and maintenance expenses resulting in no net impact on Transco’s results of operations.

  • An increase in Natural gas storage service revenues primarily due to an increase in rates.

  • An increase in Natural gas product sales due to higher cash-out pricing and volumes, which directly offsets in Natural gas product costs resulting in no net impact on our results of operations.

  • An increase in Other service revenues due to higher park and loan services.

Operating and maintenance expenses increased primarily due to higher electric power costs and an increase in labor-related costs. Electric power costs are recovered from customers through transportation rates and are offset in Natural gas transportation service revenues resulting in no net impact on results of operations. This was partially offset by lower natural gas fuel expense due to favorable pricing.

Depreciation and amortization expenses increased primarily due to the 2025 depreciation rate change and new assets placed into service.

General and administrative expenses increased primarily due to higher labor-related costs.

Taxes, other than income taxes increased primarily due to higher property taxes related to new assets placed into service.

Other operating (income) expense – net changed favorably primarily due to lower project feasibility costs and a cash out surcharge (offset in Natural gas transportation service revenues resulting in no net impact on results of operations).

Interest expense was primarily impacted by 2025 debt issuances and a retirement.

Interest income increased due to higher interest income on advances to Williams during 2026.

Allowance for equity and borrowed funds used during construction (AFUDC) increased as a result of higher eligible capital expenditures.

Management’s Discussion and Analysis (Continued)

NWP - Results of Operations

Nine Months Ended September 30,
Change*
2026$%2025
(Dollars in Millions)
Revenues:
Natural gas transportation service revenues$340+20+6%$320
Natural gas storage service revenues11——%11
Other service revenues6-1-14%7
Total revenues357338
Costs and expenses:
Operating and maintenance expenses78-5-7%73
Depreciation and amortization expenses92-4-5%88
General and administrative expenses38-1-3%37
Taxes, other than income taxes11——%11
Other operating (income) expense – net(16)——%(16)
Total costs and expenses203193
Operating income (loss)154145
Interest expense(25)-4-19%(21)
Interest income10+6+150%4
Allowance for equity and borrowed funds used during construction (AFUDC)10+3+43%7
Other income (expense) – net3+3NM—
Net income (loss)$152+17+13%$135

    • = Favorable change; - = Unfavorable change; NM = A percentage calculation is not meaningful due to a change in signs, a zero-value denominator, or a percentage change greater than 200.

Nine months ended September 30, 2026 vs. nine months ended September 30, 2025

Variances due to changes in natural gas prices and transportation volumes have little impact on revenues because, under our rate design methodology, the majority of overall cost of service is recovered through firm capacity reservation charges in NWP’s transportation rates.

Revenues increased primarily due to higher Natural gas transportation service revenues driven by rate increases and increased firm transportation revenues from new contracts.

Operating and maintenance expenses increased primarily due to higher contracted services related to integrity assessments.

Depreciation and amortization expenses increased primarily due to new assets placed in service.

Interest expense was primarily impacted by a 2025 term loan issuance and retirement.

Interest income increased primarily due to higher interest income on advances to Williams during 2026.

Management’s Discussion and Analysis (Continued)

Management’s Discussion and Analysis of Financial Condition and Liquidity

Outlook

As previously discussed in Company Outlook, Williams’ growth capital and investment expenditures in 2026 are expected to range from $7.3 billion to $7.9 billion, excluding acquisitions and certain long-lead time equipment for power projects that are backed by reimbursement from the customer if the equipment order is canceled.

In September 2026, Williams acquired Momentum for total consideration of approximately $5.1 billion, including cash, approximately 27 million shares of Williams common stock that is subject to certain holding restrictions, and retention of $869 million outstanding principal amount of Momentum long-term debt (see Note 3 – Acquisitions and Divestitures).

In July 2026, Williams received approximately $3.74 billion related to selling a 49 percent noncontrolling interest in Pantheon. Williams is expected to receive the remainder of the $5.34 billion of committed capital through early 2027, including $1 billion received in October 2026. See Note 1 – Description of Business and Basis of Presentation.

As of September 30, 2026, Williams, including consolidated subsidiaries, had $2.2 billion of long-term debt due within one year. Williams’ potential sources of liquidity available to address these maturities include cash on hand, proceeds from refinancing, the credit facility, or the commercial paper program, as well as proceeds from asset monetizations.

2026 Long-Term Debt Activity

During the first three quarters of 2026, Williams issued $5.5 billion of senior unsecured long-term debt and retired approximately $1.1 billion of senior unsecured long-term debt (see Note 6 – Debt and Banking Arrangements).

Liquidity

Williams expects to have sufficient liquidity to manage its businesses in 2026 based on forecasted levels of cash flow from operations and other sources of liquidity. Williams’ potential material internal and external sources and uses of liquidity are as follows:

Sources:
Cash and cash equivalents on hand
Cash generated from operations
Distributions from equity-method investees
Utilization of the credit facility and/or commercial paper program
Cash proceeds from issuance of debt and/or equity securities
Proceeds from asset monetizations
Uses:
Working capital requirements
Capital and investment expenditures
Product costs
Gas & NGL Marketing Services payments for transportation and storage capacity and gas supply
Other operating costs, including human capital expenses
Quarterly dividends to shareholders
Repayments of borrowings under the credit facility and/or commercial paper program
Debt service payments, including payments of long-term debt
Distributions to noncontrolling interests
Share repurchase program

Management’s Discussion and Analysis (Continued)

As of September 30, 2026, Williams had $31.7 billion of long-term debt due after one year. Potential sources of liquidity available to address these maturities include cash generated from operations, proceeds from refinancing, the credit facility, the commercial paper program, and proceeds from asset monetizations.

Potential risks associated with Williams’ planned levels of liquidity discussed above include those previously discussed in Company Outlook*.*

As of September 30, 2026, Williams had a working capital deficit of $1.6 billion, including cash and cash equivalents and long-term debt due within one year.

Effective May 19, 2026, Williams, together with Transco and NWP, extended the maturity of the Williams Credit Agreement to 2031 and entered into the new 364-Day Credit Agreement. Transco and NWP are each subject to borrowing sublimits of $500 million under the existing facility and $100 million under the new facility. See Note 6 – Debt and Banking Arrangements.

Williams’ available liquidity is as follows:

September 30, 2026
(Millions)
Cash and cash equivalents$1,756
Capacity available under the Williams Credit Agreement, less amounts outstanding under Williams’ $3.5 billion commercial paper program (1)(2)3,750
Capacity available under the 364-Day Credit Agreement (2)1,000
$6,506

(1)In managing its available liquidity, Williams does not expect a maximum outstanding amount in excess of the capacity of its credit facility inclusive of any outstanding amounts under its commercial paper program. Williams had no Commercial paper outstanding at September 30, 2026. Through September 30, 2026, the highest amount outstanding under the commercial paper program and credit facility during 2026 was $950 million.

(2)Williams, Transco, and NWP expect to be in compliance with the associated financial covenants for the September 30, 2026, reporting period.

Dividends

Williams increased the regular quarterly cash dividend to common stockholders from $0.500 per share paid in each quarter of 2025 to $0.525 per share paid in the first three quarters of 2026.

Distributions from Equity-Method Investees

The organizational documents of entities in which Williams has an equity-method investment generally require periodic distributions of their available cash to their members. In each case, available cash is reduced, in part, by reserves appropriate for operating their respective businesses.

Management’s Discussion and Analysis (Continued)

Credit Ratings

The interest rates at which Williams is able to borrow money are impacted by its credit ratings, which are currently as follows:

Rating AgencyOutlookSenior Unsecured Debt Rating
S&P Global RatingsStableBBB+
Moody’s Investors ServicePositiveBaa2
Fitch RatingsPositiveBBB

These credit ratings are included for informational purposes and are not recommendations to buy, sell, or hold Williams securities, and each rating should be evaluated independently of any other rating. No assurance can be given that the credit rating agencies will continue to assign Williams investment-grade ratings even if it meets or exceeds their current criteria for investment-grade ratios. A downgrade of its credit ratings might increase Williams’ future cost of borrowing and, if ratings were to fall below investment-grade, could require it to provide additional collateral to third parties, negatively impacting Williams’ available liquidity.

Sources (Uses) of Cash

The following table summarizes the sources (uses) of cash and cash equivalents for each of the periods presented in Williams’ Consolidated Statement of Cash Flows:

Cash FlowNine Months Ended September 30,
Category20262025
(Millions)
Sources of cash and cash equivalents:
Proceeds from long-term debtFinancing$5,538$2,994
Net cash provided (used) by operating activitiesOperating4,4844,322
Proceeds from sale of partial interest in consolidated subsidiary (Note 1)Financing3,737—
Dispositions – net (Note 3)Investing324—
Proceeds from sale of business (Note 3)Investing187—
Uses of cash and cash equivalents:
Capital expendituresInvesting(5,682)(2,938)
Purchases of businesses, net of cash acquired (Note 3)Investing(2,816)(1)
Common dividends paidFinancing(1,940)(1,832)
Payments of long-term debtFinancing(1,137)(1,733)
Payments of commercial paper – netFinancing(700)(284)
Dividends and distributions paid to noncontrolling interestsFinancing(215)(197)
Purchases of and contributions to equity-method investmentsInvesting(156)(192)
Other sources / (uses) – netFinancing and Investing69(129)
Increase (decrease) in cash and cash equivalents$1,693$10

Management’s Discussion and Analysis (Continued)

Operating activities

The factors that determine Williams’ operating activities are largely the same as those that affect Net income (loss), with the exception of noncash items, such as Depreciation, depletion, and amortization, Provision (benefit) for deferred income taxes, Equity (earnings) losses, Gain on sale of certain assets, Net unrealized (gain) loss from commodity derivative instruments, Gain on disposition of equity-method investments, Inventory write-downs, and Amortization of stock-based awards.

Williams’ Net cash provided (used) by operating activities for the nine months ended September 30, 2026, increased from the nine months ended September 30, 2025, primarily due to higher operating income (excluding noncash items previously discussed) and higher Distributions from equity-method investees, partially offset by unfavorable changes in net operating working capital, which includes the payment of Transco’s rate refunds in 2026, and unfavorable changes in margin requirements.