The following discussion and analysis by management focuses on those factors that had a material effect on Xcel Energy’s financial condition, results of operations and cash flows during the periods presented or are expected to have a material impact in the future. It should be read in conjunction with the accompanying unaudited consolidated financial statements and the related notes to consolidated financial statements. Due to the seasonality of Xcel Energy’s operating results, quarterly financial results are not an appropriate base from which to project annual results.

The demand for electric power and natural gas is affected by seasonal differences in the weather. In general, peak sales of electricity occur in the summer months, and peak sales of natural gas occur in the winter months. As a result, the overall operating results may fluctuate substantially on a seasonal basis. Additionally, Xcel Energy’s operations have historically generated less revenues and income when weather conditions are milder in the winter and cooler in the summer.

Non-GAAP Financial Measures

The following discussion includes financial information prepared in accordance with GAAP, as well as certain non-GAAP financial measures such as ongoing earnings and ongoing diluted EPS. Generally, a non-GAAP financial measure is a measure of a company’s financial performance, financial position or cash flows that adjusts measures calculated and presented in accordance with GAAP.

Xcel Energy’s management uses non-GAAP measures for financial planning and analysis, for reporting of results to the Board of Directors, in determining performance-based compensation and communicating its earnings outlook to analysts and investors. Non-GAAP financial measures are intended to supplement investors’ understanding of our performance and should not be considered alternatives for financial measures presented in accordance with GAAP. These measures are discussed in more detail below and may not be comparable to other companies’ similarly titled non-GAAP financial measures.

Earnings Adjusted for Certain Items (Ongoing Earnings and Ongoing Diluted EPS)

GAAP diluted EPS reflects the potential dilution that could occur if securities or other agreements to issue common stock (i.e., common stock equivalents) were settled. The weighted average number of potentially dilutive shares outstanding used to calculate Xcel Energy Inc.’s diluted EPS is calculated using the treasury stock method.

Table of Contents

Ongoing earnings reflect adjustments to GAAP earnings (net income) for certain items. Ongoing diluted EPS for Xcel Energy is calculated by dividing net income or loss, adjusted for certain items, by the weighted average fully diluted Xcel Energy Inc. common shares outstanding for the period. Ongoing diluted EPS for each subsidiary is calculated by dividing the net income or loss for such subsidiary, adjusted for certain items, by the weighted average fully diluted Xcel Energy Inc. common shares outstanding for the period.

We use these non-GAAP financial measures to evaluate and provide details of Xcel Energy’s core earnings and underlying performance. For instance, to present ongoing earnings and ongoing diluted EPS, we may adjust the related GAAP amounts for certain items that are non-recurring in nature. We believe these measurements are useful to investors to evaluate the actual and projected financial performance and contribution of our subsidiaries. These non-GAAP financial measures should not be considered as an alternative to measures calculated and reported in accordance with GAAP.

Results of Operations

The only common equity securities that are publicly traded are common shares of Xcel Energy Inc. Diluted earnings and EPS of each subsidiary discussed below do not represent a direct legal interest in the assets and liabilities allocated to such subsidiary but rather represent a direct interest in our assets and liabilities as a whole.

Summarized diluted EPS for Xcel Energy:

Three Months Ended March 31
Diluted Earnings (Loss) Per Share20252024
PSCo$0.45$0.39
NSP-Minnesota0.320.38
SPS0.100.10
NSP-Wisconsin0.070.08
Earnings from equity method investments — WYCO0.010.01
Regulated utility0.950.96
Xcel Energy Inc. and Other(0.11)(0.08)
GAAP and ongoing diluted EPS$0.84$0.88

(a)Amounts may not add due to rounding.

Summary of Earnings

Xcel Energy — Xcel Energy’s first quarter GAAP and ongoing diluted earnings were $0.84 per share compared with $0.88 per share in the same period in 2024. The change in earnings per share was primarily driven by higher O&M expenses, depreciation and interest charges, partially offset by increased recovery of infrastructure investments. Fluctuations in electric and natural gas revenues associated with changes in fuel and purchased power and/or natural gas sold and transported generally do not significantly impact earnings (changes in costs are offset by the related variation in revenues).

PSCo — GAAP and ongoing earnings increased $0.06 per share for the first quarter of 2025. The change was driven by higher recovery of electric and natural gas infrastructure investments, which was partially offset by increased depreciation and interest charges.

NSP-Minnesota — GAAP and ongoing earnings decreased $0.06 per share for the first quarter of 2025. The change was driven by increased O&M expenses and depreciation, partially offset by higher recovery of electric and natural gas infrastructure investments.

SPS — GAAP and ongoing earnings were flat for the first quarter of 2025 largely due to higher recovery of electric infrastructure investments and sales growth, offset by increased depreciation and O&M expenses.

NSP-Wisconsin — GAAP and ongoing earnings decreased $0.01 per share for the first quarter of 2025. The change was driven by higher O&M expenses, depreciation and interest charges.

Xcel Energy Inc. and Other — Primarily includes financing costs and interest income at the holding company and earnings from investment funds, which are accounted for as equity method investments. The decline in earnings was largely due to higher debt levels and the performance of the equity method investments, which primarily invest in energy technology companies.

Changes in GAAP and Ongoing EPS

Components significantly contributing to changes in 2025 EPS compared to 2024:

Diluted Earnings (Loss) Per ShareThree Months Ended March 31
GAAP and ongoing EPS — 2024$0.88
Components of change - 2025 vs. 2024
Higher electric revenues0.20
Higher natural gas revenues0.15
Higher O&M expenses(0.11)
Higher electric fuel and purchased power (a)(0.10)
Higher depreciation and amortization(0.09)
Higher interest charges(0.06)
Higher costs of natural gas sold and transported (a)(0.04)
Other, net0.01
GAAP and ongoing EPS — 2025$0.84

(a)Cost of electric fuel and purchased power and natural gas sold and transported are generally recovered through regulatory recovery mechanisms and offset in revenue.

Statement of Income Analysis

The following summarizes the items that affected the individual revenue and expense items reported in the consolidated statements of income.

Estimated Impact of Temperature Changes on Regulated Earnings —Unusually hot summers or cold winters increase electric and natural gas sales, while mild weather reduces electric and natural gas sales. The estimated impact of weather on earnings is based on the number of customers, temperature variances, the amount of natural gas or electricity historically used per degree of temperature and excludes any incremental related operating expenses that could result due to storm activity or vegetation management requirements.

As a result, weather deviations from normal levels can affect Xcel Energy’s financial performance. However, electric sales true-up and gas decoupling mechanisms in Minnesota predominately mitigate the positive and adverse impacts of weather in that jurisdiction.

Table of Contents

Degree-day or THI data is used to estimate amounts of energy required to maintain comfortable indoor temperature levels based on each day’s average temperature and humidity. HDD is the measure of the variation in the weather based on the extent to which the average daily temperature falls below 65° Fahrenheit. CDD is the measure of the variation in the weather based on the extent to which the average daily temperature rises above 65° Fahrenheit.

Each degree of temperature above 65° Fahrenheit is counted as one CDD, and each degree of temperature below 65° Fahrenheit is counted as one HDD. In Xcel Energy’s more humid service territories, a THI is used in place of CDD, which adds a humidity factor to CDD. HDD, CDD and THI are most likely to impact the usage of Xcel Energy’s residential and commercial customers. Industrial customers are less sensitive to weather. Typically, sales are not impacted in the first or fourth quarter due to THI or CDD.

Normal weather conditions are defined as either the 10, 20 or 30 year average of actual historical weather conditions. The historical period of time used in the calculation of normal weather differs by jurisdiction, based on regulatory practice. To calculate the impact of weather on demand, a demand factor is applied to the weather impact on sales. Extreme weather variations, windchill and cloud cover may not be reflected in weather-normalized estimates.

Percentage increase (decrease) in normal and actual HDD:

Three Months Ended March 31
2025 vs. Normal2024 vs. Normal2025 vs. 2024
HDD—%(11.4)%10.7%

Weather — Estimated impact of temperature variations on EPS compared with normal weather conditions:

Three Months Ended March 31
2025 vs. Normal2024 vs. Normal2025 vs. 2024
Retail electric$0.006$(0.029)$0.035
Sales true-up—0.016(0.016)
Electric total$0.006$(0.013)$0.019
Firm natural gas0.005(0.027)0.032
Decoupling0.0020.017(0.015)
Natural gas total$0.007$(0.010)$0.017
Total$0.013$(0.023)$0.036

Sales — Sales growth (decline) for actual and weather-normalized sales in 2025 compared to 2024:

Three Months Ended March 31
PSCoNSP-MinnesotaSPSNSP-WisconsinXcel Energy
Actual
Electric residential1.3%5.5%6.2%9.3%4.3%
Electric C&I(1.0)1.13.90.21.3
Total retail electric sales(0.3)2.54.12.92.1
Firm natural gas sales3.217.4N/A26.08.8
Three Months Ended March 31
PSCoNSP-MinnesotaSPSNSP-WisconsinXcel Energy
Weather-Normalized
Electric residential(0.1)%0.2%3.3%1.9%0.7%
Electric C&I(1.3)0.23.9(0.4)0.8
Total retail electric sales(1.0)0.23.70.30.7
Firm natural gas sales(1.7)(0.3)N/A5.1(0.8)
Three Months Ended March 31 (Leap Year Adjusted)
PSCoNSP-MinnesotaSPSNSP-WisconsinXcel Energy
Weather-Normalized
Electric residential1.1%1.3%4.5%3.1%1.8%
Electric C&I(0.2)1.35.00.71.9
Total retail electric sales0.11.34.81.41.9
Firm natural gas sales(0.4)1.0N/A6.40.5

Weather-normalized and leap-year adjusted electric sales growth (decline) — year-to-date

  • PSCo — Residential sales increased due to customer growth of 1.4%, partially offset by a 0.3% decrease in use per customer. The C&I sales decline was related to lower use per customer, primarily in the wholesale trade and transportation sectors.

  • NSP-Minnesota — Residential sales increased due to customer growth of 1.2% and a 0.1% increase in use per customer. C&I sales increased due to customer growth and higher use per customer, largely in the manufacturing sector.

  • SPS — Residential sales increased as a result of a 3.7% increase in use per customer and customer growth of 0.8%. C&I sales increased due to higher use per customer, primarily driven by the energy sector.

  • NSP-Wisconsin — Residential sales increased due to a 2.0% increase in use per customer and customer growth of 1.0%. C&I sales increased due to customer growth, experienced largely in the professional services and manufacturing sectors.

Weather-normalized and leap-year adjusted natural gas sales growth (decline) — year-to-date

  • Increase in natural gas sales was driven primarily by residential and C&I customer growth in all jurisdictions and higher residential use per customer in NSP-Minnesota and NSP-Wisconsin. This was offset by decreased use per customer in PSCo residential and NSP-Minnesota C&I.

Electric Revenues

Electric revenues are impacted by fluctuations in the price of natural gas, coal and uranium, regulatory outcomes, market prices and seasonality. In addition, electric customers receive a credit for PTCs generated, which reduce electric revenue and income taxes.

Table of Contents

(Millions of Dollars)Three Months Ended March 31, 2025 vs. 2024
Recovery of higher cost of electric fuel and purchased power$61
Non-fuel riders58
Regulatory rate outcomes (MN, TX and ND)29
Estimated impact of weather14
PTCs flowed back to customers (offset by lower ETR)(16)
Conservation and demand side management (offset in expense)(7)
Other, net11
Total increase$150

Natural Gas Revenues

Natural gas revenues vary with changing sales, the cost of natural gas and regulatory outcomes.

(Millions of Dollars)Three Months Ended March 31, 2025 vs. 2024
Regulatory rate outcomes (CO and ND)$57
Recovery of higher cost of natural gas30
Conservation revenue (offset in expense)20
Estimated impact of weather (net of decoupling)13
Retail sales growth (net of decoupling)(4)
Other, net(2)
Total increase$114

Electric Fuel and Purchased Power — Expenses incurred for electric fuel and purchased power are impacted by fluctuations in market prices of electricity, natural gas, coal and uranium, as well as seasonality. These incurred expenses are generally recovered through various regulatory recovery mechanisms. As a result, changes in these expenses are largely offset in operating revenues and have minimal earnings impact.

Electric fuel and purchased power expenses increased $72 million for the first quarter of 2025. The increase was primarily due to increased volumes and commodity prices partially offset by timing of fuel recovery mechanisms.

Cost of Natural Gas Sold and Transported — Expenses incurred for the cost of natural gas sold are impacted by market prices and seasonality. These costs are generally recovered through various regulatory recovery mechanisms. As a result, changes in these expenses are largely offset in operating revenues and have minimal earnings impact.

Natural gas sold and transported increased $30 million for the first quarter of 2025. The increase was primarily due to higher volumes and commodity prices, partially offset by timing of fuel recovery mechanisms.

Non-Fuel Operating Expenses and Other Items

O&M Expenses — O&M expenses increased $81 million for the first quarter of 2025. The increase was primarily due to operational activities, including higher nuclear generation costs and distribution system maintenance (vegetation management, storm response and wildfire mitigation), the impact of a 2024 gain on land sale and increased insurance and benefits costs.

Depreciation and Amortization — Depreciation and amortization increased $70 million for the first quarter of 2025. The increase was largely the result of system investment as well as depreciation rate updates through regulatory proceedings.

Interest Charges — Interest charges increased $41 million for the first quarter of 2025, largely due to increased debt levels and higher interest rates.

Public Utility Regulation and Other

The FERC and various state and local regulatory commissions regulate Xcel Energy Inc.’s utility subsidiaries and West Gas Interstate. Xcel Energy is subject to rate regulation by state utility regulatory agencies, which have jurisdiction with respect to the rates of electric and natural gas distribution companies in Minnesota, North Dakota, South Dakota, Wisconsin, Michigan, Colorado, New Mexico and Texas.

Rates are designed to recover plant investment, operating costs and an allowed return on investment. Our utility subsidiaries request changes in utility rates through commission filings. Changes in operating costs can affect Xcel Energy’s financial results, depending on the timing of rate cases and implementation of final rates. Other factors affecting rate filings are new investments, sales, conservation and demand side management efforts, and the cost of capital.

In addition, the regulatory commissions authorize the ROE, capital structure and depreciation rates in rate proceedings. Decisions by these regulators can significantly impact Xcel Energy’s results of operations.

Except to the extent noted below, the circumstances set forth in Public Utility Regulation included in Item 7 of Xcel Energy’s Annual Report on Form 10-K for the year ended Dec. 31, 2024 appropriately represent, in all material respects, the current status of public utility regulation and are incorporated herein by reference.

NSP-Minnesota

Pending and Recently Concluded Regulatory Proceedings

2024 Minnesota Natural Gas Rate Case — In November 2023, NSP-Minnesota filed a request with the MPUC for a natural gas rate increase of approximately $59 million, or 9.6%. The request was based on a ROE of 10.2%, a 52.5% equity ratio and a 2024 forward test year with rate base of approximately $1.27 billion. In December 2023, the MPUC approved NSP-Minnesota’s request for interim rates, subject to refund, of approximately $51 million (implemented on Jan. 1, 2024).

In February 2025, the MPUC verbally approved the uncontested settlement agreement filed by NSP-Minnesota and various parties, which includes the following terms:

  • Natural gas rate increase of $46 million, or 7.5%.

  • ROE of 9.6%.

  • Equity ratio of 52.5%.

  • Rate base of $1.25 billion.

  • No change to Commission approved decoupling.

2022 Minnesota Electric Rate Case — In October 2021, NSP-Minnesota filed a three-year electric rate case with the MPUC.

In July 2023, the MPUC approved a three-year rate increase of approximately $332 million for 2022-2024, based on a ROE of 9.25% and an equity ratio of 52.5%. The MPUC also approved a continuation of the sales true-up mechanism.

In November 2023, NSP-Minnesota filed an appeal to the Minnesota Court of Appeals regarding MPUC decisions relating to executive compensation, insurance expense and treatment of prepaid pension assets.

In January 2025, the Court issued its opinion, which upheld the commission's determination on insurance expense, but reversed and remanded the executive compensation and prepaid pension asset decisions back to the MPUC. The opinion is currently pending further action from the MPUC.

Table of Contents

2024 Minnesota Electric Rate Case — In November 2024, NSP-Minnesota filed an electric rate case in Minnesota, seeking a total revenue increase of $491 million (13.2%) over two years, based on an ROE of 10.3%, a 52.5% equity ratio and rate base of $13.2 billion in 2025 and $14 billion in 2026. NSP-Minnesota also requested interim rates of $224 million for 2025. In December 2024, the MPUC reduced the interim rate request for wildfire mitigation costs (as these costs were deemed as new costs not previously approved in a rate case) and approved interim rates of $192 million, effective January 1, 2025.

In March 2025, NSP-Minnesota filed supplemental direct testimony, updating its total revenue request to $473 million. The procedural schedule is as follows:

  • Intervenor direct testimony: August 22, 2025

  • Rebuttal testimony: October 10, 2025

  • ALJ Report: April 30, 2026

  • MPUC Decision: July 31, 2026

2024 North Dakota Electric Rate Case — In December 2024, NSP-Minnesota filed a request with the NDPSC for an annual electric rate increase of approximately $45 million, or 19.3% over current rates established in 2021. The filing is based on a 2025 forecast test year and includes a requested ROE of 10.3%, rate base of approximately $817 million and an equity ratio of 52.5%. In January 2025, the NDPSC approved interim rates, subject to refund, of approximately $27 million (implemented on Feb. 1, 2025). A NDPSC decision is expected in late 2025.

NSP-Wisconsin

Pending Regulatory Proceedings

Excess Liability Insurance Deferral – In February 2025, NSP-Wisconsin filed a request with the PSCW for deferred accounting treatment for excess liability insurance expense of $9.6 million incurred as a result of the October 2024 policy renewal. A PSCW decision is expected in the third quarter of 2025.

Wisconsin Electric and Natural Gas Rate Case – In March 2025, NSP-Wisconsin filed a request with the PSCW for a multi-year electric and natural gas rate increase.

For the electric utility, NSP-Wisconsin is seeking a total electric revenue increase of $94 million (11.8%) in 2026 and an incremental $57 million (7.1%) in 2027, for a total of $151 million over the two-year period of 2026 and 2027. The electric rate increase is based on electric rate base of $2.9 billion in 2026 and $3.2 billion in 2027. For the natural gas utility, NSP-Wisconsin requested a total natural gas revenue increase of $20 million (12.7%) in 2026 and an incremental $4 million (1.5%) in 2027, for a total of $24 million (14.2%) over the two-year period of 2026 and 2027. The natural gas rate increase is based on natural gas rate base of $0.3 billion in 2026 and $0.4 billion in 2027. Both the electric and natural gas rate requests are based on forward-looking test years, with a 10.0% ROE and an equity ratio of 53.5%. 

The rate request is primarily driven by investments in NSP-Wisconsin’s electric and natural gas systems to enhance reliability and resiliency while ensuring safe operation. The investments also enable additional clean energy generation; the benefits of wind, solar and nuclear tax credits are incorporated in the table below.    

A PSCW decision is anticipated in the fourth quarter of 2025.

(Millions of Dollars)ElectricNatural Gas
NSPW rate base-related investment$176$17
Interchange agreement billings (a)(72)—
O&M expenses3010
Sales18(1)
Other(1)(2)
NSP-Wisconsin’s filed rate request$151$24

(a)The Interchange Agreement is a FERC cost sharing tariff under which NSP-Wisconsin and its affiliate, NSP-Minnesota allocate the costs of the integrated electric generation and transmission system.

NSP System

Resource Acquisition — In February 2024, NSP filed its Upper Midwest Resource Plan with the MPUC. In October 2024, NSP-Minnesota filed a settlement with several parties reaching agreement on the resource plan, as well as the proposed projects to be approved in the pending 800 MW firm dispatchable resource acquisition.

In February 2025, the MPUC approved the terms of the settlement agreement, including:

  • The selection of the company owned 420 MW Lyon County combustion turbine.

  • The selection of the company owned 300 MW 4-hour Sherco battery energy storage system.

  • Multiple PPAs to proceed to the negotiation stage.

  • The addition of 3,200 MW of wind, 400 MW of solar and 600 MW of stand-alone storage to be added through 2030 based on an RFP process (a portion of which is expected to be fulfilled with the resources acquired as part of the 2024 RFPs). Of these amounts, approximately 2,800 MW of wind are projected to utilize the Minnesota Energy Connection transmission line.

  • Planned life extensions of the Prairie Island and Monticello nuclear plants through the early 2050s.

Additionally, the MPUC approved life extensions of the Red Wing and Mankato RDF plants to 2037 and ordered NSP-Minnesota to file a proposed tariff for customers with super-large load, largely data centers, by July 15, 2025.

NSP-Minnesota will file additional RFPs for approved resource needs beginning in late 2025 or early 2026.

NSP-Minnesota and NSP-Wisconsin are actively engaged in multiple processes and proceedings to acquire resources to meet their identified generation resource needs.

  • In October 2023, NSP-Minnesota issued an RFP seeking 1,200 MW of wind assets to replace capacity and reutilize interconnection rights associated with the retiring Sherco coal facilities. The RFP closed in December 2023. NSP-Minnesota expects to file for approval of recommended projects in summer 2025.

  • In 2024, NSP-Minnesota and NSP-Wisconsin each issued an RFP collectively seeking up to 1,600 MW of wind, solar, storage or hybrid resources to interconnect to the NSP System, including reutilization of the interconnection rights associated with the retiring Sherco coal units, and 650 MW of solar and storage resources to specifically reutilize the interconnection rights associated with the retiring King coal unit. NSP-Minnesota and NSP-Wisconsin announced the short listed projects in January 2025 and plan to file for the requisite approvals of the selected resources with the MPUC and PSCW, respectively, in the second half of 2025.

Table of Contents

PSCo

Pending and Recently Concluded Regulatory Proceedings

Colorado Natural Gas Rate Case — In January 2024, PSCo, filed a request with the CPUC seeking an increase to retail natural gas rates of $171 million (9.5%). The request was based on a 10.25% ROE, an equity ratio of 55%, a 2023 test year and a $4.2 billion year-end rate base.

In October 2024, as modified on ARRR in January 2025, the CPUC issued an order including the following key decisions:

  • Use of a historic 2023 test year, with a 13-month average rate base.

  • Weighted-average cost of capital of 7.0%, based on an ROE range of 9.2%-9.5% and an equity ratio range of 52%-55%.

  • Acceleration of $15 million per year of depreciation expense (incremental to PSCo’s original rate request), to be held in an external trust for future decommissioning costs.

  • Modifications to recoverability of certain operating expenses.

  • Denial of PSCo’s decoupling proposal.

PSCo placed new rates into effect in November, as modified on ARRR in February 2025, with an annual revenue increase of approximately $125 million, inclusive of $15 million of accelerated depreciation. The UCA filed a second ARRR in February 2025. The CPUC held deliberations in April 2025 and did not order changes to the approved annual revenue increase. A written decision remains pending.

Colorado Resource Plan — In December 2023, the CPUC approved a portfolio of 5,835 MW, which includes approximately 3,100 MW of company owned resources and 2,700 MW of PPAs.

In December 2023, the CPUC approved a framework for PIMs associated with the generation projects in the portfolio. In September 2024, PSCo filed a proposal for implementation of the PIMs. In April 2025, PSCo filed an unopposed settlement, which establishes key details of the various symmetrical PIMs. Key terms include:

  • A cost-to-construct PIM, in which costs over or under a deadband will be used to calculate a PIM to be shared with customers over 10 years, beginning after the in-service date.

  • An operational PIM on wind and solar projects based on annual weather-normalized, curtailment-adjusted energy amounts, subject to a cap of approximately $8 million per year.

  • An availability PIM on new gas generation approved in the resource plan, subject to a cap of $1 million per year.

A CPUC decision on the settlement is expected by the third quarter of 2025.

In September 2024, PSCo filed a proposed framework for CPUC review of pricing adjustments for both company owned and PPA resources to enable delivery of the approved portfolio in light of supply chain and geopolitical developments. In January 2025, the CPUC issued a decision granting limited potential pricing relief including potential tariff impacts, subject to evaluation in future CPCN proceedings for company owned projects.

PSCo filed or expects to file generation and transmission CPCNs throughout 2024 and 2025.

2024 Colorado Electric Resource Plan — In October 2024, PSCo filed its electric resource plan with the CPUC. The filing reflects the expected growth on the system, the generation resources needed to meet the projected growth and the future evaluation of competitive bids for new generation resources.

  • The plan reflects a base sales forecast with 7% compound annual sales growth through 2031.

  • The plan also presents a low sales forecast with a 3% compound annual sales growth through 2031.

  • The resource plan includes forecasted need of 5-14 GW of new generation capacity through 2031, including renewables and firm dispatchable resources to meet the two different scenarios. The acquisitions of generation resources will be determined through a competitive solicitation after the CPUC determines the portfolio. The table below summarizes two of the proposed portfolios based on the different sales scenarios:

(Megawatts)Base PlanLow Load
Wind7,2502,800
Solar3,0771,200
Natural gas combustion turbine1,5751,400
Storage (long duration)1,600—
Other storage450—
Total13,9525,400

Answer testimony was received in April 2025. The remaining procedural schedule is as follows:

  • Rebuttal testimony: May 23, 2025

  • Settlement deadline: June 2, 2025

  • Hearing: June 10-20, 2025

  • Statements of position: July 14, 2025

A CPUC decision on the resource plan is expected by the fall of 2025 (Phase I) with the competitive solicitation for resource additions expected in early 2026.

Wildfire Mitigation Plan — In June 2024, PSCo filed an updated WMP and request for recovery of costs covering the years 2025 to 2027 with the CPUC. The estimated total cost for this plan is approximately $1.9 billion.

The WMP integrates industry experience; incorporates evolving risk assessment methodologies; adds new technology; and expands the scope, pace and scale of our work to reduce wildfire risk in a comprehensive and efficient manner.

In April 2025, PSCo filed with the CPUC a comprehensive and unanimous settlement. Key terms include:

  • Approval of the updated WMP, including scope of mitigation activities and the Public Safety Power Shutoffs plan, with certain modifications.

  • Cost recovery of proposed investments through a Wildfire Mitigation Adjustment rider and recovery of transmission investments through the Transmission Cost Adjustment rider.

  • PSCo agrees to request approval to pursue securitization of an estimated $1.2 billion of proposed WMP investments, with a target to complete the transaction by Jan. 1, 2029.

  • Extension of the excess liability insurance deferral, with a cap of $50 million after PSCo’s current policy year, which ends October 2025.

A CPUC decision is expected by the third quarter of 2025.

Colorado Senate Bill 23-291 — In May 2023, Colorado Senate Bill 23-291 was signed into law. The legislation included a number of topics including for the CPUC to adopt rules to establish fuel cost mechanisms to align the financial incentives of a utility with the interests of the utility’s customers.

Table of Contents

In December 2024, the CPUC adopted final rules applicable to PSCo’s natural gas utility that would assign to the Company four percent of the change in the price per MMbtu of natural gas compared to the three-year average, subject to rolling 12-month cap based on a percentage of rate base, currently estimated at $7 million. The rules require PSCo to make a filing to implement the mechanism within sixty days of becoming effective, expected later in 2025.

In December 2024, the CPUC also adopted rules for electric utilities but did not adopt a specific PIM framework, which will be further considered through additional proceedings in 2025.

SPS

Pending and Recently Concluded Regulatory Proceedings

New Mexico Resource Plan (IRP) — In October 2023, SPS filed its IRP with the NMPRC, which supports projected load growth and increasing reliability requirements, and secures replacement energy and capacity for retiring resources. SPS’ projected resource needs ranging from approximately 5,300 MW to 10,200 MW by 2030. In February 2024, the NMPRC accepted the IRP.

In July 2024, SPS issued a RFP, seeking approximately 3,200 MW of accredited generation capacity by 2030. The total capacity to be added to the system is expected to align with the range identified in the SPS IRP, depending on the types of resources proposed in the RFP and their accredited capacity factors.

Bids from the RFP were received in January and are currently being evaluated. A portfolio selection filing is expected in the second quarter of 2025 followed by a certificate of need filing for the specific assets in the third quarter of 2025. The PUCT and NMPRC are expected to rule on the portfolio in 2026.

Texas System Resiliency Plan — In December 2024, SPS filed its Texas SRP with the PUCT. Consistent with PUCT requirements, SPS’ proposed plan discusses resiliency-related risks and the five measures that have been designed to help SPS prevent, withstand, mitigate or more promptly recover from resiliency events, including wildfire.

The proposed SRP covers 2025-2028 and includes a proposed $538 million of investment across the following measures:

  • Distribution overhead hardening — Replacing and reinforcing key components of the distribution overhead system.

  • Distribution system protection modernization — Installing enhanced reclosers, communications equipment and replacing substation relay panels and breakers.

  • Communication modernization — Building out a private LTE network, installing fiber optic cable and adding remote terminal units.

  • Operational flexibility — Procuring mobile substation equipment and installing additional switching devices.

  • Wildfire mitigation — Weather stations, modeling, deploying artificial intelligence and vegetation management.

In April 2025, SPS filed a unanimous stipulation and settlement agreement which includes approximately $490 million of spend over the plan period, adjusted largely to reflect the removal of the operational flexibility measure for investment in the normal course of business. The settlement also includes the deferral of distribution-related costs, including depreciation expense and carrying costs at SPS’ weighted average cost of capital.

SPS expects a PUCT decision on the settlement by the third quarter of 2025.

Excess Liability Insurance Deferral – In March 2025, SPS filed a request with the PUCT and in April 2025, SPS filed a request with the NMPRC for deferred accounting treatment for incremental excess liability insurance expense incurred as a result of the October 2024 policy renewal, estimated at approximately $30 million across the two jurisdictions. SPS has requested commission decisions by September 2025.

Other

Supply Chain

Xcel Energy’s ability to meet customer energy requirements and growing customer demand, respond to storm-related disruptions, and execute our capital expenditure program are dependent on maintaining an efficient supply chain.

Large global demand for energy-related infrastructure has stretched equipment supply chains, extended delivery dates and increased prices for items like combustion turbines, transformers and other large electrical equipment. The labor market for skilled engineering and construction resources to build renewables and gas generation has also been strained, impacting cost and availability.

In addition, manufacturing processes have experienced disruptions related to the scarcity of certain raw materials and interruptions in production and shipping. The impact of inflationary pressures, geopolitical events and federal policies have exacerbated the situation. Xcel Energy continues to monitor the situation as it remains fluid and seeks to mitigate the impacts by securing alternative suppliers and key vendor partners, increasing procurement lead times, modifying design standards, and adjusting the timing of work.

Tariffs and Trade Complaints

In May 2024, the U.S. Department of Commerce announced the initiation of anti-dumping and countervailing duty investigations of CSPV cells from Cambodia, Malaysia, Thailand and Vietnam, whether or not assembled into modules.

In April 2025, the U.S. Department of Commerce announced its final determination in the countervailing duty circumvention and anti-dumping investigations. The rates will go into effect after the U.S. International Trade Commission makes its final determination, expected in the second quarter of 2025. Xcel Energy does not expect these determinations to impact its projects.

In January of 2025, the U.S. International Trade Commission made an affirmative determination in the preliminary phase of the anti-dumping and countervailing duty investigations concerning Active Anode Material, a component of lithium-ion batteries, from China. This case will be reviewed by the U.S. Department of Commerce and the International Trade Commission over the course of 2025.

In 2025, several executive orders have been issued imposing new global and country-specific tariffs on many imports, which may impact our procurement and development activities. Due to the current tariff level on Chinese products, utility-scale battery projects are at most risk to be impacted in terms of cost and/or schedule. Additionally, executive orders have been issued relating to the permitting of wind projects and the retirement of coal facilities.

Xcel Energy continues to assess the impacts of these tariffs, executive orders, trade complaints and federal policies on its business, including company owned projects and PPAs. Xcel Energy may seek regulatory relief, if required, in its jurisdictions.

Table of Contents

Continued and/or further policy actions or other restrictions, disruptions in imports from key suppliers, or any new trade complaint could impact viability, timelines and costs of various projects and PPAs.

Excess Liability Insurance Coverage

Xcel Energy maintains excess liability coverage, which is intended to insure against liability to third parties. Through the third quarter of 2024, Xcel Energy had approximately $600 million of excess liability coverage; including $520 million of wildfire coverage with an annual premium of approximately $40 million. Examples of claims paid under this policy include property damage or bodily injury to members of the public caused by Xcel Energy’s employees, equipment or facilities. The increased wildfire liability risk and claims are driving a significant increase of premiums and reductions in insurance coverage in the excess liability markets, especially in the western United States. In October 2024, Xcel Energy renewed its excess liability coverage and now has $450 million of total coverage; including $450 million of wildfire coverage for the NSP System and $300 million of wildfire coverage for PSCo and SPS. The annual premium for this excess liability insurance is approximately $130 million. Xcel Energy has received an approved deferral at PSCo, and has filed for recovery through a deferral request or rate filings in other jurisdictions.

Critical Accounting Policies and Estimates

Preparation of the consolidated financial statements requires the application of accounting rules and guidance, as well as the use of estimates. Application of these policies involves judgments regarding future events, including the likelihood of success of particular projects, legal and regulatory challenges and anticipated recovery of costs. These judgments could materially impact the consolidated financial statements, based on varying assumptions. The financial and operating environment also may have a significant effect on the operation of the business and results reported. Items considered critical are included within the Xcel Energy Inc. Annual Report on Form 10-K for the year ended Dec. 31, 2024.

Environmental Regulation

In March 2025, the EPA announced that the agency will undertake various regulatory actions addressing a wide range of environmental regulations. This includes action on the 2024 power plant greenhouse gas regulations, Effluent Limitation Guidelines, the 2024 amendments to the CCR Rule and the 2023 Good Neighbor Plan, though no formal actions have been taken on these regulations to date. We will continue to monitor and respond as appropriate to EPA’s administrative efforts to take action.

Clean Air Act

Power Plant Greenhouse Gas Regulations — In April 2024, the EPA published final rules addressing control of CO2 emissions from the power sector. The rules regulate new natural gas generating units and emission guidelines for existing coal and certain natural gas generation. The rules create subcategories of coal units based on planned retirement date and subcategories of natural gas combustion turbines and combined cycle units based on utilization. The CO2 control requirements vary by subcategory. Based on current estimates and assumptions, Xcel Energy has determined that due to scheduled plant retirements, there is minimal financial or operational impact associated with these requirements and believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.

Waste-to-Energy Air Regulations — In January 2024, the EPA proposed air regulations addressing new and existing large municipal waste combustors. The proposed rules lower current emission standards for certain pollutants and would require installation of new pollution controls and/or more intense use of existing pollution controls at French Island Generating Station, Red Wing Generating Plant and Wilmarth Generating Plant. Until final rules are issued, it is not certain what the impact will be on Xcel Energy. Xcel Energy believes that the cost of these initiatives or replacement generation would be recoverable through rates based on prior state commission practices.

Emerging Contaminants of Concern

PFAS are man-made chemicals that are widely used in consumer products and can persist and bio-accumulate in the environment. Xcel Energy does not manufacture PFAS, but because PFAS are so ubiquitous in products and the environment, it may impact our operations.

In June 2024, the EPA finalized a rule that designated certain PFAS as hazardous substances under CERCLA. In July 2024, the EPA finalized another rule that set enforceable drinking water standards for certain PFAS.

Potential costs for these rules and any additional proposed regulations related to PFAS are uncertain and will be determined on a site specific basis where applicable. If costs are incurred, Xcel Energy believes the costs will be recoverable through rates based on prior state commission practices.

Effluent Limitation Guidelines

In April 2024, the EPA published final rules under the Clean Water Act, setting Effluent Limitations Guidelines and Standards for steam generating coal plants. This rule establishes more stringent wastewater discharge standards for bottom ash transport water, flue-gas desulfurization wastewater, and combustion residuals leachate from steam electric power plants, particularly coal-fired power plants. Based on current estimates and assumptions, Xcel Energy has determined that there is minimal financial or operational impact associated with these requirements and that any costs would be recoverable through rates based on prior state commission practices.

Derivatives, Risk Management and Market Risk

We are exposed to a variety of market risks in the normal course of business. Market risk is the potential loss that may occur as a result of adverse changes in the market or fair value for a particular instrument or commodity. All financial and commodity-related instruments, including derivatives, are subject to market risk.

Xcel Energy is exposed to the impact of adverse changes in price for energy and energy-related products, which is partially mitigated by the use of commodity derivatives. In addition to ongoing monitoring and maintaining credit policies intended to minimize overall credit risk, management takes steps to mitigate changes in credit and concentration risks associated with its derivatives and other contracts, including parental guarantees and requests of collateral. While we expect that the counterparties will perform on the contracts underlying our derivatives, the contracts expose us to credit and non-performance risk.

Distress in the financial markets may impact counterparty risk and the fair value of the securities in the nuclear decommissioning fund and pension fund.

Table of Contents

Commodity Price Risk — We are exposed to commodity price risk in our electric and natural gas operations. Commodity price risk is managed by entering into long and short-term physical purchase and sales contracts for electric capacity, energy and energy-related products and fuels used in generation and distribution activities.

Commodity price risk is also managed through the use of financial derivative instruments. Our risk management policy allows us to manage commodity price risk within each rate-regulated operation per commission approved hedge plans.

Wholesale and Commodity Trading Risk — Xcel Energy conducts various wholesale and commodity trading activities, including the purchase and sale of electric capacity, energy, energy-related instruments and natural gas-related instruments, including derivatives. Our risk management policy allows management to conduct these activities within guidelines and limitations as approved by our risk management committee.

Fair value of net commodity trading contracts as of March 31, 2025:

Futures / Forwards Maturity
(Millions of Dollars)Less Than 1 Year1 to 3 Years4 to 5 YearsGreater Than 5 YearsTotal Fair Value
NSP-Minnesota (a)$(17)$(20)$(4)$—$(41)
NSP- Minnesota (b)55(3)29
PSCo (a)14——5
$(11)$(11)$(7)$2$(27)
Options Maturity
(Millions of Dollars)Less Than 1 Year1 to 3 Years4 to 5 YearsGreater Than 5 YearsTotal Fair Value
NSP-Minnesota (b)$—$2$13$—$15
$—$2$13$—$15

(a)Prices actively quoted or based on actively quoted prices.

(b)Prices based on models and other valuation methods.

Changes in the fair value of commodity trading contracts before the impacts of margin-sharing for the three months ended March 31:

(Millions of Dollars)20252024
Fair value of commodity trading net contracts outstanding at Jan. 1$(2)$1
Contracts realized or settled during the period3(1)
Commodity trading contract additions and changes during the period(13)2
Fair value of commodity trading net contracts outstanding at March 31$(12)$2

A 10% increase and 10% decrease in forward market prices for Xcel Energy’s commodity trading contracts would have likewise increased and decreased pretax income from continuing operations, by approximately $3 million and $4 million at March 31, 2025 and March 31, 2024, respectively.

The utility subsidiaries’ commodity trading operations measure the outstanding risk exposure to price changes on contracts and obligations using an industry standard methodology known as VaR. VaR expresses the potential change in fair value of the outstanding contracts and obligations over a particular period of time under normal market conditions.

The VaRs for the NSP-Minnesota and PSCo commodity trading operations, excluding both non-derivative transactions and derivative transactions designated as normal purchases and normal sales, calculated on a consolidated basis using a Monte Carlo simulation with a 95% confidence level and a one-day holding period, were as follows:

(Millions of Dollars)Three Months Ended March 31AverageHighLow
2025$1$—$1$—
20241—1—

Interest Rate Risk — Xcel Energy is subject to interest rate risk. Our risk management policy allows interest rate risk to be managed through the use of fixed rate debt, floating rate debt and interest rate derivatives.

A 100-basis point change in the benchmark rate on Xcel Energy’s variable rate debt would impact pretax interest expense annually by approximately $8 million in March 31, 2025 and 2024.

NSP-Minnesota maintains a nuclear decommissioning fund, as required by the NRC. The nuclear decommissioning fund is subject to interest rate and equity price risk. The fund is invested in a diversified portfolio of debt securities, equity securities and other investments. These investments may be used only for the purpose of decommissioning NSP-Minnesota’s nuclear generating plants.

Fluctuations in equity prices or interest rates affecting the nuclear decommissioning fund do not have a direct impact on earnings due to the application of regulatory accounting. Realized and unrealized gains on the decommissioning fund investments are deferred as an offset of NSP-Minnesota’s regulatory asset for nuclear decommissioning costs.

The value of pension and postretirement plan assets and benefit costs are impacted by changes in discount rates and expected return on plan assets. Xcel Energy’s ongoing pension and postretirement investment strategy is based on plan-specific investment recommendations that seek to optimize potential investment risk and minimize interest rate risk associated with changes in the obligations as a plan’s funded status increases over time. The impacts of fluctuations in interest rates on pension and postretirement costs are mitigated by pension cost calculation methodologies and regulatory mechanisms that minimize the earnings impacts of such changes.

Credit Risk — Xcel Energy is also exposed to credit risk. Credit risk relates to the risk of loss resulting from counterparties’ nonperformance on their contractual obligations. Xcel Energy maintains credit policies intended to minimize overall credit risk and actively monitors these policies to reflect changes and scope of operations.

Credit exposure is monitored, and when necessary, the activity with a specific counterparty is limited until credit enhancement is provided. Distress in the financial markets could increase our credit risk.

Xcel Energy’s subsidiaries are subject to credit risk from contracts with generating equipment manufacturers and other suppliers that require deposits or milestone payments. In the event of non-performance by these counterparties, the Xcel Energy subsidiaries could experience credit losses, increased costs or project delays. Xcel Energy frequently seeks to mitigate this risk by requiring parent guarantees, letters of credit or other types of credit support.

Xcel Energy is also subject to credit risk for all wholesale, trading and non-trading commodity counterparties and employs credit risk controls, such as letters of credit, parental guarantees, master netting agreements and termination provisions.

Table of Contents

At March 31, 2025, a 10% increase in commodity prices would have resulted in an increase in credit exposure of $28 million, while a decrease in prices of 10% would have resulted in a decrease in credit exposure of $27 million. At March 31, 2024, a 10% increase in commodity prices would have resulted in an increase in credit exposure of $25 million, while a decrease in prices of 10% would have resulted in a decrease in credit exposure of $25 million.

Fair Value Measurements

Derivative contracts, with the exception of those designated as normal purchases and normal sales, are reported at fair value. Xcel Energy’s investments held in the nuclear decommissioning fund, rabbi trusts, pension and other postretirement funds are also subject to fair value accounting. See Note 8 to the consolidated financial statements for further information.

Liquidity and Capital Resources

Cash Flows

Operating Cash Flows

(Millions of Dollars)Three Months Ended March 31
Cash provided by operating activities — 2024$1,050
Components of change — 2025 vs. 2024
Lower net income(5)
Non-cash transactions81
Changes in deferred income taxes(141)
Changes in working capital65
Changes in net regulatory and other assets and liabilities(22)
Cash provided by operating activities — 2025$1,028

Net cash provided by operating activities decreased $22 million for the three months ended March 31, 2025 compared with the prior year. The decrease was largely due to the change in deferred income taxes due to PTC transfers and the timing of working capital payments, partially offset by interim rate refunds in Minnesota in the prior year.

Investing Cash Flows

(Millions of Dollars)Three Months Ended March 31
Cash used in investing activities — 2024$(1,556)
Components of change — 2025 vs. 2024
Increased capital expenditures(451)
Other investing activities16
Cash used in investing activities — 2025$(1,991)

Net cash used in investing activities increased $435 million for the three months ended March 31, 2025 compared with the prior year. The increase in capital expenditures was largely due to continued system investment in renewable and transmission projects.

Financing Cash Flows

(Millions of Dollars)Three Months Ended March 31
Cash provided by financing activities — 2024$878
Components of change — 2025 vs. 2024
Lower net short-term repayments346
Higher long-term debt issuances, net of repayments599
Higher proceeds from issuance of common stock114
Other financing activities(30)
Cash provided by financing activities — 2025$1,907

Net cash provided by financing activities increased $1,029 million for the three months ended March 31, 2025 compared with the prior year. The increase was largely related to additional debt and common stock issuances to fund capital investment.

Capital Requirements

Xcel Energy expects to meet future financing requirements by periodically issuing short-term debt, long-term debt, common stock, hybrid and other securities to maintain desired capitalization ratios.

Pension Fund — Xcel Energy’s pension assets are invested in a diversified portfolio of domestic and international equity securities, short-term to long-duration fixed income securities, and alternative investments, including private equity, real estate and hedge funds.

  • In January 2025, contributions of $125 million were made to Xcel Energy’s pension plans.

  • In 2024, contributions of $100 million were made across four of Xcel Energy’s pension plans.

  • For future years, contributions will be made as deemed appropriate based on evaluation of various factors including the funded status of the plans, minimum funding requirements, interest rates and expected investment returns.

Capital Sources

Short-Term Funding Sources — Xcel Energy uses a number of sources to fulfill short-term funding needs, including operating cash flow, notes payable, commercial paper and bank lines of credit. The amount and timing of short-term funding needs depend on financing needs for construction expenditures, working capital and dividend payments.

Short-Term Investments — Xcel Energy Inc., NSP-Minnesota, NSP-Wisconsin, PSCo and SPS maintain cash operating and short-term investment accounts.

As of Apr. 21, 2025, Xcel Energy Inc. and its utility subsidiaries had the following committed credit facilities available to meet liquidity needs:

(Millions of Dollars)Credit Facility (a)Drawn (b)AvailableCashLiquidity
Xcel Energy Inc.$1,500$200$1,300$115$1,415
PSCo700306703771,047
NSP-Minnesota7007262819647
SPS50025524510255
NSP-Wisconsin150—15023173
Total$3,550$557$2,993$544$3,537

(a)Credit facilities expire in September 2027.

(b)Includes outstanding commercial paper and letters of credit.

Table of Contents

Short-Term Debt — Xcel Energy Inc., NSP-Minnesota, NSP-Wisconsin, PSCo and SPS each have individual commercial paper programs. As of March 31, 2025, the authorized levels for these commercial paper programs are:

  • $1.5 billion for Xcel Energy Inc.

  • $700 million for PSCo.

  • $700 million for NSP-Minnesota.

  • $500 million for SPS.

  • $150 million for NSP-Wisconsin.

Money Pool — Xcel Energy received FERC approval to establish a utility money pool arrangement with the utility subsidiaries, subject to receipt of required state regulatory approvals. The utility money pool allows for short-term investments in and borrowings between the utility subsidiaries.

Xcel Energy may make investments in the utility subsidiaries at market-based interest rates; however, the money pool arrangement does not allow the utility subsidiaries to make investments in Xcel Energy. The money pool balances are eliminated in consolidation. NSP-Minnesota, NSP-Wisconsin, PSCo and SPS participate in the money pool pursuant to approval from their respective state regulatory commissions.

2025 Planned Financing Activity — Xcel Energy and its utility subsidiaries issued or plan to issue the following long-term debt:

IssuerSecurityAmountStatusTenorCoupon
Xcel Energy Inc.Senior Unsecured Notes$1,100millionCompleted3 Year & 10 Year4.75% & 5.60%
PSCoFirst Mortgage Bonds1,000millionCompleted9 Year & 30 Year5.35% & 5.85%
NSP-MinnesotaFirst Mortgage Bonds1,100millionSecond Quarter10 Year & 30 YearN/A
SPSFirst Mortgage Bonds450millionSecond Quarter30 YearN/A
NSP-WisconsinFirst Mortgage Bonds250millionSecond Quarter30 YearN/A
PSCoFirst Mortgage Bonds1,000millionThird Quarter10 Year & 30 YearN/A

In the three months ended March 31, 2025, 1.75 million shares ($122 million in net proceeds) were issued under an ATM program.

Long-Term Borrowings, Equity Issuances and Other Financing Instruments — Xcel Energy may issue equity through its ATM program or other offerings. Financing plans are subject to change, depending on capital expenditures, regulatory outcomes, internal cash generation, market conditions, changes in tax policies and other factors.

See Note 4 to the consolidated financial statements for further information.

Off-Balance-Sheet Arrangements

Xcel Energy does not have any off-balance-sheet arrangements, other than those currently disclosed, that have or are reasonably likely to have a current or future effect on financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to investors.

Earnings Guidance and Long-Term EPS and Dividend Growth Rate Objectives

Xcel Energy 2025 Earnings Guidance — Xcel Energy’s 2025 ongoing earnings guidance is a range of $3.75 to $3.85 per share.(a)

Key assumptions as compared with 2024 actual levels unless noted:

  • Constructive outcomes in all pending rate case and regulatory proceedings, including requests for deferral of incremental insurance costs associated with wildfire risk and recovery of O&M costs associated with wildfire mitigation plans.

  • Normal weather patterns for the year.

  • Weather-normalized retail electric sales are projected to increase ~3%.

  • Weather-normalized retail firm natural gas sales are projected to increase ~1%.

  • Capital rider revenue is projected to increase $200 million to $210 million (net of PTCs). The update is primarily driven by earnings neutral changes, including PTC updates.

  • O&M expenses are projected to increase ~3%.

  • Depreciation expense is projected to increase approximately $210 million to $220 million.

  • Property taxes are projected to increase $45 million to $55 million.

  • Interest expense (net of AFUDC - debt) is projected to increase $165 million to $175 million, net of interest income.

  • AFUDC - equity is projected to increase $110 million to $120 million.

(a)Ongoing earnings is calculated using net income and adjusting for certain nonrecurring or infrequent items that are, in management’s view, not reflective of ongoing operations. Ongoing earnings could differ from those prepared in accordance with GAAP for unplanned and/or unknown adjustments. As Xcel Energy is unable to quantify the financial impacts of any additional adjustments that may occur for the year, we are unable to provide a quantitative reconciliation of the guidance for ongoing EPS to corresponding GAAP EPS.

Long-Term EPS and Dividend Growth Rate Objectives — Xcel Energy expects to deliver an attractive total return to our shareholders through a combination of earnings growth and dividend yield, based on the following long-term objectives:

  • Deliver long-term annual EPS growth of 6% to 8% based off of $3.55 per share (the mid-point of 2024 original ongoing earnings guidance of $3.50 to $3.60 per share).

  • Deliver annual dividend increases of 4% to 6%.

  • Target a dividend payout ratio of 50% to 60%.

  • Maintain senior secured debt credit ratings in the A range.