Item 2. PROPERTIES
23K characters. Original on sec.gov ·
Item 2. PROPERTIES
GENERATION FACILITIES
As of December 31, 2021, the AEP System owned (or leased where indicated) generation plants, with locations and net maximum power capabilities (winter rating), are shown in the following tables:
Vertically Integrated Utilities Segment
| AEGCo | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Rockport, Units 1 and 2 – 50% of each (a) | 2 | IN | Steam - Coal | 1,310 | 1984 |
(a)Rockport Plant, Unit 2 is leased. In April 2021, AEGCo and I&M executed an agreement to purchase 100% of the interests in Rockport Plant, Unit 2 effective at the end of the lease term in December 2022.
| APCo | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Buck | 3 | VA | Hydro | 11 | 1912 | |||||||||||||||||||||||||||
| Byllesby | 4 | VA | Hydro | 19 | 1912 | |||||||||||||||||||||||||||
| Claytor | 4 | VA | Hydro | 76 | 1939 | |||||||||||||||||||||||||||
| Leesville | 2 | VA | Hydro | 50 | 1964 | |||||||||||||||||||||||||||
| London | 3 | WV | Hydro | 14 | 1935 | |||||||||||||||||||||||||||
| Marmet | 3 | WV | Hydro | 14 | 1935 | |||||||||||||||||||||||||||
| Niagara | 2 | VA | Hydro | 1 | 1906 | |||||||||||||||||||||||||||
| Winfield | 3 | WV | Hydro | 15 | 1938 | |||||||||||||||||||||||||||
| Ceredo | 6 | WV | Natural Gas | 516 | 2001 | |||||||||||||||||||||||||||
| Dresden | 3 | OH | Natural Gas | 665 | 2012 | |||||||||||||||||||||||||||
| Smith Mountain | 5 | VA | Pumped Storage | 585 | 1965 | |||||||||||||||||||||||||||
| Amos | 3 | WV | Steam - Coal | 2,930 | 1971 | |||||||||||||||||||||||||||
| Mountaineer | 1 | WV | Steam - Coal | 1,320 | 1980 | |||||||||||||||||||||||||||
| Clinch River | 2 | VA | Steam - Natural Gas | 465 | 1958 | |||||||||||||||||||||||||||
| Total MWs | 6,681 |
| I&M | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Berrien Springs | 12 | MI | Hydro | 7 | 1908 | |||||||||||||||||||||||||||
| Buchanan | 10 | MI | Hydro | 3 | 1919 | |||||||||||||||||||||||||||
| Constantine | 4 | MI | Hydro | 1 | 1921 | |||||||||||||||||||||||||||
| Elkhart | 3 | IN | Hydro | 3 | 1913 | |||||||||||||||||||||||||||
| Mottville | 4 | MI | Hydro | 2 | 1923 | |||||||||||||||||||||||||||
| Twin Branch Hydro | 8 | IN | Hydro | 4 | 1904 | |||||||||||||||||||||||||||
| Deer Creek Solar Farm | NA | IN | Solar | 3 | 2016 | |||||||||||||||||||||||||||
| Olive Solar Farm | NA | IN | Solar | 5 | 2016 | |||||||||||||||||||||||||||
| St. Joseph | NA | IN | Solar | 20 | 2021 | |||||||||||||||||||||||||||
| Twin Branch Solar Farm | NA | IN | Solar | 3 | 2016 | |||||||||||||||||||||||||||
| Watervliet | NA | MI | Solar | 5 | 2016 | |||||||||||||||||||||||||||
| Rockport (Units 1 and 2, 50% of each) (a) | 2 | IN | Steam - Coal | 1,310 | 1984 | |||||||||||||||||||||||||||
| Cook | 2 | MI | Steam - Nuclear | 2,296 | 1975 | |||||||||||||||||||||||||||
| Total MWs | 3,662 |
(a)Rockport Plant, Unit 2 is leased. In April 2021, AEGCo and I&M executed an agreement to purchase 100% of the interests in Rockport Plant, Unit 2 effective at the end of the lease term in December 2022.
NA Not applicable.
The following table provides operating information related to the Cook Plant:
| Cook Plant | |||||||||||
| Unit 1 | Unit 2 | ||||||||||
| Year Placed in Operation | 1975 | 1978 | |||||||||
| Year of Expiration of NRC License | 2034 | 2037 | |||||||||
| Nominal Net Electrical Rating in MWs | 1,084 | 1,212 | |||||||||
| Annual Capacity Utilization | |||||||||||
| 2021 | 96.0 | % | 84.2 | % | |||||||
| 2020 | 87.2 | % | 94.2 | % | |||||||
| 2019 | 77.3 | % | 84.3 | % |
| KPCo | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Mitchell (a)(b) | 2 | WV | Steam - Coal | 780 | 1971 | |||||||||||||||||||||||||||
| Big Sandy | 1 | KY | Steam - Natural Gas | 295 | 1963 | |||||||||||||||||||||||||||
| Total MWs | 1,075 |
(a)KPCo owns a 50% interest in the Mitchell Plant units. WPCo owns the remaining 50%. Figures presented reflect only the portion owned by KPCo.
(b)In November 2021, KPCo made filings with KPSC, WVPSC and FERC to approve a new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement between KPCo and WPCo pursuant to which WPCo will replace KPCo as the operator of Mitchell Plant. See “Dispositions of KPCo and KTCo” section of Note 7 included in the 2021 Annual Report for additional information.
| PSO | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Comanche | 3 | OK | Natural Gas | 248 | 1973 | |||||||||||||||||||||||||||
| Northeastern, Unit 1 | 1 | OK | Natural Gas | 470 | 1961 | |||||||||||||||||||||||||||
| Riverside, Units 3 and 4 | 2 | OK | Natural Gas | 160 | 2008 | |||||||||||||||||||||||||||
| Southwestern, Units 4 and 5 | 2 | OK | Natural Gas | 168 | 2008 | |||||||||||||||||||||||||||
| Weleetka | 2 | OK | Natural Gas | 100 | 1975 | |||||||||||||||||||||||||||
| Northeastern, Unit 3 | 1 | OK | Steam - Coal | 465 | 1979 | |||||||||||||||||||||||||||
| Northeastern, Unit 2 | 1 | OK | Steam - Natural Gas | 434 | 1961 | |||||||||||||||||||||||||||
| Riverside, Units 1 and 2 | 2 | OK | Steam - Natural Gas | 896 | 1974 | |||||||||||||||||||||||||||
| Southwestern, Units 1, 2 and 3 | 3 | OK | Steam - Natural Gas | 446 | 1952 | |||||||||||||||||||||||||||
| Tulsa | 2 | OK | Steam - Natural Gas | 322 | 1956 | |||||||||||||||||||||||||||
| Maverick (a) | NA | OK | Wind | 131 | 2021 | |||||||||||||||||||||||||||
| Sundance (a) | NA | OK | Wind | 91 | 2021 | |||||||||||||||||||||||||||
| Total MWs | 3,931 |
(a)SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance and Maverick.
NA Not applicable.
| SWEPCo | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Mattison | 4 | AR | Natural Gas | 314 | 2007 | |||||||||||||||||||||||||||
| Stall | 3 | LA | Natural Gas | 534 | 2010 | |||||||||||||||||||||||||||
| Flint Creek (a) | 1 | AR | Steam - Coal | 258 | 1978 | |||||||||||||||||||||||||||
| Turk (a) | 1 | AR | Steam - Coal | 477 | 2012 | |||||||||||||||||||||||||||
| Welsh (b) | 2 | TX | Steam - Coal | 1,053 | 1977 | |||||||||||||||||||||||||||
| Pirkey (a)(c) | 1 | TX | Steam - Lignite | 580 | 1985 | |||||||||||||||||||||||||||
| Arsenal Hill | 1 | LA | Steam - Natural Gas | 110 | 1960 | |||||||||||||||||||||||||||
| Knox Lee | 1 | TX | Steam - Natural Gas | 344 | 1950 | |||||||||||||||||||||||||||
| Lieberman | 3 | LA | Steam - Natural Gas | 217 | 1947 | |||||||||||||||||||||||||||
| Wilkes | 3 | TX | Steam - Natural Gas | 889 | 1964 | |||||||||||||||||||||||||||
| Maverick (d) | NA | OK | Wind | 156 | 2021 | |||||||||||||||||||||||||||
| Sundance (d) | NA | OK | Wind | 108 | 2021 | |||||||||||||||||||||||||||
| Total MWs | 5,040 |
(a)Jointly-owned with nonaffiliated entities. Figures presented reflect only the portion owned by SWEPCo. The Arkansas jurisdictional portion of SWEPCo’s interest in Turk Plant is not in rate base.
(b)In November 2020, management announced it will cease using coal at the Welsh Plant in 2028.
(c)In November 2020, management announced plans to retire the plant in 2023.
(d)SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance and Maverick.
NA Not applicable.
| WPCo | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Mitchell (a)(b) | 2 | WV | Steam - Coal | 780 | 1971 |
(a)WPCo owns 50% in the Mitchell Plant units. KPCo owns the remaining 50%. Figures presented reflect only the portion owned by WPCo.
(b)In November 2021, KPCo made filings with KPSC, WVPSC and FERC to approve a new proposed Mitchell Plant Operations and Maintenance Agreement and Mitchell Plant Ownership Agreement between KPCo and WPCo pursuant to which WPCo will replace KPCo as the operator of Mitchell Plant. See “Dispositions of KPCo and KTCo” section of Note 7 included in the 2021 Annual Report for additional information.
Generation & Marketing Segment
| AGR | ||||||||||||||||||||||||||||||||
| Plant Name | Units | State | Fuel Type | Net Maximum Capacity (MWs) | Year Plant or First Unit Commissioned | |||||||||||||||||||||||||||
| Cardinal | 1 | OH | Steam - Coal | 595 | 1967 |
| Renewable Power | ||||||||||||||||||||||||||
| Size of Energy Resource | AEP Energy Supply, LLC Division | Renewable Energy Resource | Location | In-Service or Under Construction | ||||||||||||||||||||||
| 1,435 MW | AEP Renewables | Wind | Eight states (a) | In-service | ||||||||||||||||||||||
| 20 MW | AEP Renewables | Solar | California | In-service | ||||||||||||||||||||||
| 20 MW | AEP Renewables | Solar | Utah | In-service | ||||||||||||||||||||||
| 125 MW | AEP Renewables | Solar | Nevada | In-service | ||||||||||||||||||||||
| 161 MW | AEP OnSite Partners | Solar | Seventeen states (b) | In-service | ||||||||||||||||||||||
| 27 MW | AEP OnSite Partners | Solar | Two states (c) | Under Construction |
(a) Colorado, Hawaii, Indiana, Kansas, Michigan, Minnesota, Pennsylvania and Texas.
(b) California, Colorado, Florida, Hawaii, Illinois, Iowa, Minnesota, Nebraska, New Hampshire, New Jersey, New Mexico, New York, Ohio, Rhode Island, Texas, Vermont and Wisconsin.
(c) Ohio and New Mexico.
TRANSMISSION AND DISTRIBUTION FACILITIES
The following tables set forth the total overhead circuit miles of transmission and distribution lines of the AEP System and its operating companies.
Vertically Integrated Utilities Segment
| Total Overhead Circuit Miles of Transmission and Distribution Lines | ||||||||
| APCo | 51,714 | |||||||
| I&M | 20,943 | |||||||
| KGPCo | 1,408 | |||||||
| KPCo | 11,166 | |||||||
| PSO | 18,145 | |||||||
| SWEPCo | 26,162 | |||||||
| WPCo | 1,730 | |||||||
| Total Circuit Miles | 131,268 |
Transmission and Distribution Utilities Segment
| Total Overhead Circuit Miles of Transmission and Distribution Lines | ||||||||
| OPCo | 44,703 | |||||||
| AEP Texas | 46,353 | |||||||
| Total Circuit Miles | 91,056 |
AEP Transmission Holdco Segment
The following table sets forth the total overhead circuit miles of transmission lines of certain wholly-owned and joint venture-owned entities:
| Total Overhead Circuit Miles of Transmission Lines | ||||||||
| ETT | 1,883 | |||||||
| IMTCo | 990 | |||||||
| OHTCo | 1,026 | |||||||
| OKTCo | 1,015 | |||||||
| WVTCo | 261 | |||||||
| Pioneer | 43 | |||||||
| Prairie Wind Transmission | 216 | |||||||
| Transource Missouri | 167 | |||||||
| Transource West Virginia | 27 | |||||||
| Total Circuit Miles | 5,628 |
TITLE TO PROPERTY
The AEP System’s generating facilities are generally located on lands owned in fee simple. The greater portion of the transmission and distribution lines of the AEP System has been constructed over lands of private owners pursuant to easements or along public highways and streets pursuant to appropriate statutory authority. The rights of AEP’s public utility subsidiaries in the realty on which their facilities are located are considered adequate for use in the conduct of their business. Minor defects and irregularities customarily found in title to properties of like size and character may exist, but such defects and irregularities do not materially impair the use of the properties. AEP’s public utility subsidiaries generally have the right of eminent domain which permits them, if necessary, to acquire, perfect or secure titles to or easements on privately held lands used or to be used in their utility operations.
SYSTEM TRANSMISSION LINES AND FACILITY SITING
Laws in the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Tennessee, Texas, Virginia and West Virginia require prior approval of sites of generating facilities and/or routes of high-voltage transmission lines. AEP has experienced delays and additional costs in constructing facilities as a result of proceedings conducted pursuant to such statutes and in proceedings in which AEP’s operating companies have sought to acquire rights-of-way through condemnation. These proceedings may result in additional delays and costs in future years.
CONSTRUCTION PROGRAM
With input from its state utility commissions, the AEP System continuously assesses the adequacy of its transmission, distribution, generation and other facilities to plan and provide for the reliable supply of electric power and energy to its customers. In this assessment process, assumptions are continually being reviewed as new information becomes available and assessments and plans are modified, as appropriate. AEP forecasts approximately $7.6 billion of construction expenditures for 2022. Estimated construction expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, supply chain issues, weather, legal reviews and the ability to access capital. See the “Budgeted Capital Expenditures” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations included in the 2021 Annual Report for additional information.
POTENTIAL UNINSURED LOSSES
Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including liabilities relating to damage to AEP’s generation plants and costs of replacement power. Unless allowed to be recovered through rates, future losses or liabilities which are not completely insured could reduce net income and impact the financial conditions of AEP and other AEP System companies. For risks related to owning a nuclear generating unit, see the “Nuclear Contingencies” section of Note 6 - Commitments, Guarantees and Contingencies included in the 2021 Annual Report for additional information.
Previous: Item 1B. UNRESOLVED STAFF COMMENTS · Next: Item 3. LEGAL PROCEEDINGS