Item 4. CONTROLS AND PROCEDURES

25K characters. Original on sec.gov · Markdown

Item 4. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that the Company files or submits under the Exchange Act, is recorded, processed, summarized, and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to allow timely decisions regarding required disclosures.

The Company, under the supervision and with the participation of its management, including the Company’s CEO and CFO, evaluated the effectiveness of its “disclosure controls and procedures,” as such term is defined in Rule 13a-15(e) under the Exchange Act, as of the end of the period covered by this Quarterly Report on Form 10-Q. Based on that evaluation, our CEO and CFO concluded that, as of March 31, 2025, our disclosure controls and procedures were not effective due to the material weakness in our internal control over financial reporting described below.

As previously reported in our Annual Report on Form 10-K for the year ended December 31, 2024, management identified that we did not design effective controls over the review of the disposition of AES Brasil, a complex non-routine transaction; specifically due to the use of incomplete data in the estimation of the fair value of the net assets of AES Brasil, which was used in calculation of the impairment expense after AES Brasil was classified as held-for-sale in Q2 2024.

Notwithstanding the identified material weakness, our CEO and CFO have concluded that our unaudited condensed consolidated financial statements contained in this Quarterly Report on Form 10-Q fairly present, in all material respects, our financial position, results of operations, and cash flows for the periods presented and such financial statements are presented in conformity with GAAP.

Remediation Efforts and Status

During the first quarter of 2025, management began implementing measures designed to remediate the material weakness. The remediation actions that management began implementing include: (i) policy updates detailing steps to perform in an impairment analysis of complex ownership structures, (ii) detailed instructions on considerations to be included in the fair value estimations, (iii) updates to held-for-sale and discontinued operations policies, and (iv) training to impacted personnel.

As of the date of the filing of this Quarterly Report on Form 10-Q, our management believes we have made progress toward remediating the underlying causes of the material weakness. We believe these actions will remediate the forgoing material weakness. The material weakness will not be considered remediated, however, until the applicable controls operate and management has concluded, through testing, that the controls are operating effectively. Management expects these remediation efforts to be completed by June 30, 2025.

Changes in Internal Controls over Financial Reporting

Other than the remediation efforts described above, there were no changes that occurred during the fiscal quarter covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

68 | The AES Corporation | March 31, 2025 Form 10-Q

PART II: OTHER INFORMATION

ITEM 1. LEGAL PROCEEDINGS

The Company is involved in certain claims, suits and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's condensed consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of March 31, 2025. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a governmental authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.

In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian court. GRIDCO's challenge of the costs award has been dismissed by the court, but its challenge of the liability award remains pending. A hearing on the liability award has not taken place to date. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $10 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program (“LCP”). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26, 2020, CCC staff sent AES an NOV directing AES to discontinue any operation of the water pumps in the alleged

69 | The AES Corporation | March 31, 2025 Form 10-Q

wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and, if necessary, a CDP application for their continued operation. With respect to the vault pumps, AES provided the CCC, with the requested analysis, and the CCC has not required further action. With respect to the pumps in the alleged wetlands, AES locked out those pumps to prevent further operation and submitted the CDP to the permitting authority, the City of Redondo Beach (the “City”), with respect to AES’ plans to disable or remove the pumps. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required. AES submitted all required information and waited for the City to continue processing the application. In December 2023, the City indicated it would continue processing the CDP application. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.

In October 2015, AES Indiana received an NOV alleging violations of the Clean Air Act (“CAA”), the Indiana State Implementation Plan (“SIP”), and the Title V operating permit related to alleged particulate and opacity violations at Petersburg Station Unit 3. In addition, in February 2016, AES Indiana received an NOV from the EPA alleging violations of New Source Review and other CAA regulations, the Indiana SIP, and the Title V operating permit at Petersburg Station. On August 31, 2020, AES Indiana reached a settlement with the EPA, the DOJ and the Indiana Department of Environmental Management (“IDEM”), resolving these purported violations of the CAA at Petersburg Station. The settlement agreement, in the form of a proposed judicial consent decree, was approved and entered by the U.S. District Court for the Southern District of Indiana on March 23, 2021, and includes, among other items, the following requirements: annual caps on NOx and SO2 emissions and more stringent emissions limits than AES Indiana's current Title V air permit; payment of civil penalties totaling $1.5 million; a $5 million environmental mitigation project consisting of the construction and operation of a new, non-emitting source of generation at the site; expenditure of $0.3 million on a state-only environmentally beneficial project to preserve local, ecologically-significant lands; and retirement of Units 1 and 2 prior to July 1, 2023.

In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. Preliminary hearings have taken place. The relevant AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. Subsequently, the claimants withdrew the lawsuit with respect to AES Puerto Rico. The lawsuit remains pending against the other AES defendants (“AES Defendants”) and the unaffiliated defendants. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court, namely, the Civil Court of La Vega (“CFI”). In May 2024, the CFI dismissed the entire case due to the expiry of the statute of limitations. Later in 2024, the claimants appealed the dismissal to the relevant intermediate appellate court. The claimants are attempting to formally serve the appeal on all defendants. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include exceeding generation limits, failing to reduce emissions during episodes of poor air quality, exceeding limits on discharges to the sea, and exceeding noise limits. AES Andes has submitted a proposed “Compliance Program” to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021. On December 30, 2021, the Compliance Program was approved by the SMA. However, an ex officio action was brought by the SMA due to

70 | The AES Corporation | March 31, 2025 Form 10-Q

alleged exceedances of generation limits, which would require the Company to reduce SO2, NOX and PM emissions in order to achieve the emissions offset established in the Compliance Program. On January 6, 2022, AES Andes filed a reposition with the SMA seeking modification of the means for compliance with the ex officio action. On January 17, 2023, the SMA approved street paving measures, or alternatively a program providing heaters for community members, as the means to satisfy the air emissions offsets in the approved Compliance Plan. The cost of the proposed Compliance Program is approximately $10.8 million and is in the execution stage. Fines are possible if the SMA determines there is an unsatisfactory execution of the Compliance Program. On April 21, 2023, the SMA notified AES Andes of a resolution alleging an additional “serious” non-compliance of the Ventanas Complex failing to reduce emissions during episodes of poor air quality. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. On May 10, 2024, the Company was notified of a fine for $180,515. On June 3, 2024, the Company appealed this fine to the Environmental Court. The Company believes that it has meritorious defenses and will continue to assert them vigorously in this dispute; however, there can be no assurances that it will be successful.

In March 2020, Mexico’s Comisión Federal de Electricidad (“CFE”) served an arbitration demand upon AES Mérida III. CFE alleged that AES Mérida was in breach of a power and capacity purchase agreement (“Contract”) between the two parties, even though the allegations relate to CFE’s own failure to provide fuel within the specifications of the Contract. CFE sought to recover approximately $200 million in payments made to AES Mérida under the Contract, plus approximately $480 million in alleged damages for having to acquire power from alternative sources in the Yucatan Peninsula. AES Mérida filed an answer denying liability to CFE and asserted a counterclaim for damages due to CFE’s breach of its obligations. The evidentiary hearing took place in November 2021. Closing arguments were heard in May 2022. In November 2022, the arbitration Tribunal issued its decision in the case, rejecting CFE’s claims for damages and awarding AES Mérida a net amount of damages on AES Mérida’s counterclaims ("Award"). There were proceedings in the Mexican courts concerning AES Mérida's attempt to enforce the Award and CFE's attempt to challenge the Award. In April 2025, AES Mérida and CFE finalized a settlement agreement resolving this dispute.

On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Authority”) initiated an environmental audit at the TEP thermal generating facility. On January 20, 2023, TEP was notified of the resolution issued by the Authority, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately $1.3 million). On March 3, 2023, the facility filed a nullity judgment to challenge such resolution, which has been admitted by the local judge with an injunction granted against execution of the proposed fine during the course of the underlying proceedings. However, the local tax authority rejected receiving the bond that is required to guarantee the injunction, and as a result, on September 18, 2023, TEP filed a complaint seeking to compel the tax authority to accept the bond and recognize the validity of the injunction. The Specialized Chamber has not issued a response to the complaint, despite the fact that the Company has taken several legal actions to try to expedite the proceedings. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In February 2024, at the request of the Company, the Dominican Supreme Court of Justice transferred the case to a different civil court, namely, the Civil Court of La Vega. The claimants’ attempt to recuse the presiding judge has been rejected by the relevant Dominican appellate court. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.

On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all of which are categorized by the SMA as “serious.” The alleged charges include untimely completion of intake works and insufficient capture by the provisional works, irrigation water outlet and canal contemplated by an agreement with local communities; non-compliance with the details of the forest management plans and intervention in unauthorized areas; construction of a road in a restricted paleontological area; and unlawful moving of fauna. On February 16, 2023, the Alto Maipo project submitted an initial compliance program to the SMA, which has undergone observations by the SMA and interested third parties, and been resubmitted by the project. On December 9, 2024 the SMA rejected the latest version of the Compliance Program. On December 16, 2024, Alto Maipo submitted a petition for reconsideration. If appeals are unsuccessful, the imposition of fines are possible.

71 | The AES Corporation | March 31, 2025 Form 10-Q

In May 2024, the Chilean competition agency (the Fiscalía Nacional Económica or “FNE”) opened an investigation regarding AES Andes’s declarations with respect to coal prices and coal blends used to generate electricity in Chile. The investigation was prompted by a confidential complaint filed in December 2023, which has not been disclosed to AES Andes. In general terms, the investigation seeks to determine whether the facts alleged in the complaint could be considered as an abuse of a dominant position by AES Andes. The investigation is at a very early stage; AES Andes has responded to all of the FNE’s information requests received to date. The FNE will independently conduct the investigation and will ultimately decide whether to dismiss the matter or initiate a judicial proceeding on the allegations in the confidential complaint. These types of investigations in Chile commonly last for years. AES Andes does not believe that it has violated any competition laws. Further, if the FNE ever initiates a judicial proceeding on this matter, AES Andes will defend itself vigorously. Given the early nature of this investigation, we are unable to estimate any potential impact of the investigation or its eventual outcome on our business, financial condition or results of operations.

In April 2025, an alleged shareholder of Fluence Energy, Inc. (“Fluence”) filed a putative securities class action in the U.S. District Court for the Eastern District of Virginia against Fluence and certain of Fluence’s officers and directors (the “Individual Fluence Defendants” and, together with Fluence, the “Fluence Defendants”). The complaint in the case also named the Company and AES Grid Stability, LLC as defendants (together, the “AES Defendants”). The plaintiff seeks to pursue claims on behalf of a putative class of all purchasers of Fluence Class A common stock between October 28, 2021 and February 10, 2025. The plaintiff alleges that the Fluence Defendants made allegedly false or misleading statements in violation of Section 10(b) of the Securities Exchange Act of 1934 (the “Exchange Act”), as well as Rule 10b-5 promulgated thereunder. In addition, the plaintiff asserts claims against the Individual Fluence Defendants and the AES Defendants as alleged “control persons” under Section 20(a) of the Exchange Act. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this lawsuit; however, there can be no assurances that they will be successful in their efforts.