UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 10-K
| (Mark One) | |||||
| ☑ | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | ||||
| FOR THE FISCAL YEAR ENDED DECEMBER 31, 2023 | |||||
| OR | |||||
| ☐ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | ||||
| FOR THE TRANSITION PERIOD FROM TO |
| Registrant, State or Other Jurisdiction of Incorporation or Organization | ||||||||||||||
| Commission file number | Address of Principal Executive Offices, Zip Code and Telephone Number | I.R.S. Employer Identification No. | ||||||||||||
| 1-31447 | CenterPoint Energy, Inc. | 74-0694415 | ||||||||||||
| (a Texas corporation) | ||||||||||||||
| 1111 Louisiana | ||||||||||||||
| Houston, | Texas | 77002 | ||||||||||||
| (713) | 207-1111 | |||||||||||||
| 1-3187 | CenterPoint Energy Houston Electric, LLC | 22-3865106 | ||||||||||||
| (a Texas limited liability company) | ||||||||||||||
| 1111 Louisiana | ||||||||||||||
| Houston, | Texas | 77002 | ||||||||||||
| (713) | 207-1111 | |||||||||||||
| 1-13265 | CenterPoint Energy Resources Corp. | 76-0511406 | ||||||||||||
| (a Delaware corporation) | ||||||||||||||
| 1111 Louisiana | ||||||||||||||
| Houston, | Texas | 77002 | ||||||||||||
| (713) | 207-1111 | |||||||||||||
| Securities registered pursuant to Section 12(b) of the Act: | |||||||||||
| Registrant | Title of each class | Trading symbol(s) | Name of each exchange on which registered | ||||||||
| CenterPoint Energy, Inc. | Common Stock, $0.01 par value | CNP | New York Stock Exchange | ||||||||
| NYSE Chicago | |||||||||||
| CenterPoint Energy Houston Electric, LLC | 6.95% General Mortgage Bonds due 2033 | n/a | New York Stock Exchange | ||||||||
| CenterPoint Energy Resources Corp. | 6.625% Senior Notes due 2037 | n/a | New York Stock Exchange | ||||||||
| Securities registered pursuant to Section 12(g) of the Act: | |||||||||||
| None |
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
| CenterPoint Energy, Inc. | Yes | þ | No o | |||||||||||
| CenterPoint Energy Houston Electric, LLC | Yes | þ | No o | |||||||||||
| CenterPoint Energy Resources Corp. | Yes | þ | No o |
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
| CenterPoint Energy, Inc. | Yes o | No | þ | |||||||||||
| CenterPoint Energy Houston Electric, LLC | Yes o | No | þ | |||||||||||
| CenterPoint Energy Resources Corp. | Yes o | No | þ |
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
| CenterPoint Energy, Inc. | Yes | þ | No o | |||||||||||
| CenterPoint Energy Houston Electric, LLC | Yes | þ | No o | |||||||||||
| CenterPoint Energy Resources Corp. | Yes | þ | No o |
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
| CenterPoint Energy, Inc. | Yes | þ | No o | |||||||||||
| CenterPoint Energy Houston Electric, LLC | Yes | þ | No o | |||||||||||
| CenterPoint Energy Resources Corp. | Yes | þ | No o |
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer”, “accelerated filer”, “smaller reporting company”, and “emerging growth company” in Rule 12b-2 of the Exchange Act.
| Large accelerated filer | Accelerated filer | Non-accelerated filer | Smaller reporting company | Emerging growth company | |||||||||||||
| CenterPoint Energy, Inc. | þ | o | o | ☐ | ☐ | ||||||||||||
| CenterPoint Energy Houston Electric, LLC | o | o | þ | ☐ | ☐ | ||||||||||||
| CenterPoint Energy Resources Corp. | o | o | þ | ☐ | ☐ |
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Act. o
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☑
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements.
| CenterPoint Energy, Inc. | o | |||||||
| CenterPoint Energy Houston Electric, LLC | o | |||||||
| CenterPoint Energy Resources Corp. | o |
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b).
| CenterPoint Energy, Inc. | o | |||||||
| CenterPoint Energy Houston Electric, LLC | o | |||||||
| CenterPoint Energy Resources Corp. | o |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
| CenterPoint Energy, Inc. | Yes | ☐ | No þ | |||||||||||
| CenterPoint Energy Houston Electric, LLC | Yes | ☐ | No þ | |||||||||||
| CenterPoint Energy Resources Corp. | Yes | ☐ | No þ |
The aggregate market values of the voting stock held by non-affiliates of the Registrants as of June 30, 2023 are as follows:
| CenterPoint Energy, Inc. (using the definition of beneficial ownership contained in Rule 13d-3 promulgated pursuant to Securities Exchange Act of 1934 and excluding shares held by directors and executive officers) | $18,251,183,835 | |||||||
| CenterPoint Energy Houston Electric, LLC | None | |||||||
| CenterPoint Energy Resources Corp. | None |
Indicate the number of shares outstanding of each of the issuers’ classes of common stock as of February 12, 2024:
| CenterPoint Energy, Inc. | 631,594,706 | shares of common stock outstanding, excluding 166 shares held as treasury stock | ||||||
| CenterPoint Energy Houston Electric, LLC | 1,000 | common shares outstanding, all held by Utility Holding, LLC, a wholly-owned subsidiary of CenterPoint Energy, Inc. | ||||||
| CenterPoint Energy Resources Corp. | 1,000 | shares of common stock outstanding, all held by Utility Holding, LLC, a wholly-owned subsidiary of CenterPoint Energy, Inc. |
CenterPoint Energy Houston Electric, LLC and CenterPoint Energy Resources Corp. meet the conditions set forth in general instruction I(1)(a) and (b) of Form 10-K and are therefore filing this Form 10-K with the reduced disclosure format specified in General Instruction I(2) of Form 10-K.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the definitive proxy statement relating to the 2024 Annual Meeting of Shareholders of CenterPoint Energy, which will be filed with the Securities and Exchange Commission within 120 days of December 31, 2023, are incorporated by reference in Item 10, Item 11, Item 12, Item 13 and Item 14 of Part III of this Form 10-K.
TABLE OF CONTENTS
| PART I | ||||||||||||||
| Page | ||||||||||||||
| Item 1. | Business | 1 | ||||||||||||
| Item 1A. | Risk Factors | 18 | ||||||||||||
| Item 1B. | Unresolved Staff Comments | 38 | ||||||||||||
| Item 1C. | Cybersecurity | 38 | ||||||||||||
| Item 2. | Properties | 40 | ||||||||||||
| Item 3. | Legal Proceedings | 43 | ||||||||||||
| Item 4. | Mine Safety Disclosures | 43 | ||||||||||||
| PART II | ||||||||||||||
| Item 5. | Market for Registrants’ Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities | 43 | ||||||||||||
| Item 6. | [Reserved] | 44 | ||||||||||||
| Item 7. | Management’s Discussion and Analysis of Financial Condition and Results of Operations | 44 | ||||||||||||
| Item 7A. | Quantitative and Qualitative Disclosures About Market Risk | 82 | ||||||||||||
| Item 8. | Financial Statements and Supplementary Data | 84 | ||||||||||||
| Item 9. | Changes in and Disagreements with Accountants on Accounting and Financial Disclosure | 172 | ||||||||||||
| Item 9A. | Controls and Procedures | 172 | ||||||||||||
| Item 9B. | Other Information | 175 | ||||||||||||
| Item 9C. | Disclosure Regarding Foreign Jurisdictions that Prevent Inspections | 175 | ||||||||||||
| PART III | ||||||||||||||
| Item 10. | Directors, Executive Officers and Corporate Governance | 176 | ||||||||||||
| Item 11. | Executive Compensation | 176 | ||||||||||||
| Item 12. | Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters | 177 | ||||||||||||
| Item 13. | Certain Relationships and Related Transactions, and Director Independence | 177 | ||||||||||||
| Item 14. | Principal Accounting Fees and Services | 177 | ||||||||||||
| PART IV | ||||||||||||||
| Item 15. | Exhibits and Financial Statement Schedules | 178 | ||||||||||||
| Item 16. | Form 10-K Summary | 178 |
i
| GLOSSARY | ||||||||
| ACE | Affordable Clean Energy | |||||||
| AFUDC | Allowance for funds used during construction | |||||||
| AGC | Alcoa Generating Corporation, a subsidiary of Alcoa, Inc. | |||||||
| AI | Artificial intelligence | |||||||
| AMAs | Asset Management Agreements | |||||||
| AMS | Advanced Metering System | |||||||
| Arevon | Arevon Energy, Inc., which was formed through the combination of Capital Dynamics, Inc.’s U.S. Clean Energy Infrastructure business unit and Arevon Asset Management | |||||||
| ARO | Asset retirement obligation | |||||||
| AROK Asset Purchase Agreement | Asset Purchase Agreement, dated as of April 29, 2021, by and between CERC Corp. and Southern Col Midco, LLC, a Delaware limited liability company and an affiliate of Summit Utilities, Inc. | |||||||
| ARP | Alternative revenue program | |||||||
| ASC | Accounting Standards Codification | |||||||
| ASU | Accounting Standards Update | |||||||
| AT&T | AT&T Inc. | |||||||
| AT&T Common | AT&T common stock | |||||||
| ATM Forward Purchasers | Bank of America, N.A., Barclays Bank PLC, Citibank, N.A., Goldman Sachs & Co. LLC, JPMorgan Chase Bank, National Association, Mizuho Markets Americas LLC, MUFG Securities EMEA plc and Royal Bank of Canada | |||||||
| ATM Forward Sellers | BofA Securities, Inc. Barclays Capital Inc., Citigroup Global Markets Inc., Goldman Sachs & Co. LLC, J.P. Morgan Securities LLC, Mizuho Securities USA LLC, MUFG Securities Americas Inc. and RBC Capital Markets, LLC | |||||||
| ATM Managers | BofA Securities, Inc., Barclays Capital Inc., Citigroup Global Markets Inc., Goldman Sachs & Co. LLC, J.P. Morgan Securities LLC, Mizuho Securities USA LLC, MUFG Securities Americas Inc. and RBC Capital Markets, LLC | |||||||
| Bcf | Billion cubic feet | |||||||
| Board | CenterPoint Energy’s Board of Directors | |||||||
| Bond Companies | Bond Company IV and Restoration Bond Company, each a wholly-owned, bankruptcy remote entity formed solely for the purpose of purchasing and owning transition or system restoration property through the issuance of Securitization Bonds | |||||||
| Bond Company IV | CenterPoint Energy Transition Bond Company IV, LLC, a wholly-owned subsidiary of Houston Electric | |||||||
| BTA | Build Transfer Agreement | |||||||
| CAMT | Corporate Alternative Minimum Tax | |||||||
| CARES Act | Coronavirus Aid, Relief, and Economic Security Act | |||||||
| CCN | Certificate of Convenience and Necessity | |||||||
| CCR | Coal Combustion Residuals | |||||||
| CECA | Clean Energy Cost Adjustment | |||||||
| CEIP | CenterPoint Energy Intrastate Pipelines, LLC, a wholly-owned subsidiary of CERC Corp. | |||||||
| CenterPoint Energy | CenterPoint Energy, Inc., and its subsidiaries | |||||||
| CERC Corp. | CenterPoint Energy Resources Corp. | |||||||
| CERC | CERC Corp., together with its subsidiaries | |||||||
| CERCLA | Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended | |||||||
| CES | CenterPoint Energy Services, Inc. (now known as Symmetry Energy Solutions, LLC), previously a wholly-owned subsidiary of CERC Corp. until its divestiture on June 1, 2020 | |||||||
| Charter Common | Charter Communications, Inc. common stock | |||||||
| CIP | Conservation Improvement Program | |||||||
| CNG | Compressed natural gas | |||||||
| Code | The Internal Revenue Code of 1986, as amended | |||||||
| CODM | Chief Operating Decision Maker | |||||||
| Common Stock | CenterPoint Energy, Inc. common stock, par value $0.01 per share | |||||||
| Compensation Committee | Compensation Committee of the Board |
ii
| GLOSSARY | ||||||||
| Convertible Notes | CenterPoint Energy’s 4.25% Convertible Senior Notes due 2026 | |||||||
| COVID-19 | Novel coronavirus disease 2019, and any mutations or variants thereof, and related global outbreak that was subsequently declared a pandemic by the World Health Organization | |||||||
| CPCN | Certificate of public convenience and necessity | |||||||
| CPP | Clean Power Plan | |||||||
| CSIA | Compliance and System Improvement Adjustment | |||||||
| DCRF | Distribution Cost Recovery Factor | |||||||
| DE&I Council | Diversity, Equity and Inclusion Council | |||||||
| DOC | U.S. Department of Commerce | |||||||
| DOT | U.S. Department of Transportation | |||||||
| DRR | Distribution Replacement Rider | |||||||
| DSMA | Demand Side Management Adjustment | |||||||
| Dth | Dekatherms | |||||||
| ECA | Environmental Cost Adjustment | |||||||
| EDF Renewables | EDF Renewables Development, Inc. | |||||||
| EDIT | Excess deferred income taxes | |||||||
| EECR | Energy Efficiency Cost Recovery | |||||||
| EECRF | Energy Efficiency Cost Recovery Factor | |||||||
| EEFC | Energy Efficiency Funding Component | |||||||
| EEFR | Energy Efficiency Funding Rider | |||||||
| ELG | Effluent Limitation Guidelines | |||||||
| EIA | U.S. Energy Information Administration | |||||||
| Elk GP Merger Sub | Elk GP Merger Sub LLC, a Delaware limited liability company and a direct wholly-owned subsidiary of Energy Transfer | |||||||
| Elk Merger Sub | Elk Merger Sub LLC, a Delaware limited liability company and a direct wholly-owned subsidiary of Energy Transfer | |||||||
| Enable | Enable Midstream Partners, LP | |||||||
| Enable Common Units | Enable common units, representing limited partnership interests in Enable | |||||||
| Enable GP | Enable GP, LLC, a Delaware limited liability company and the general partner of Enable | |||||||
| Enable Merger | The merger of Elk Merger Sub with and into Enable and the merger of Elk GP Merger Sub with and into Enable GP, in each case on the terms and subject to the conditions set forth in the Enable Merger Agreement, with Enable and Enable GP surviving as wholly-owned subsidiaries of Energy Transfer, which closed on December 2, 2021 | |||||||
| Enable Merger Agreement | Agreement and Plan of Merger by and among Energy Transfer, Elk Merger Sub, Elk GP Merger Sub, Enable, Enable GP and, solely for the purposes of Section 2.1(a)(i) therein, Energy Transfer GP, and solely for the purposes of Section 1.1(b)(i) therein, CenterPoint Energy | |||||||
| Enable Series A Preferred Units | Enable’s 10% Series A Fixed-to-Floating Non-Cumulative Redeemable Perpetual Preferred Units, representing limited partner interests in Enable | |||||||
| Energy Services | Offered competitive variable and fixed-priced physical natural gas supplies primarily to commercial and industrial customers and electric and natural gas utilities through CES and CEIP | |||||||
| Energy Services Disposal Group | Substantially all of the businesses within CenterPoint Energy’s and CERC’s Energy Services reporting unit that were sold under the Equity Purchase Agreement | |||||||
| Energy Systems Group | Energy Systems Group, LLC, a wholly-owned subsidiary of Vectren | |||||||
| Energy Transfer | Energy Transfer LP, a Delaware limited partnership | |||||||
| Energy Transfer Common Units | Energy Transfer common units, representing limited partner interests in Energy Transfer | |||||||
| Energy Transfer GP | LE GP, LLC, a Delaware limited liability company and sole general partner of Energy Transfer | |||||||
| Energy Transfer Series G Preferred Units | Energy Transfer Series G Fixed-Rate Reset Cumulative Redeemable Perpetual Preferred Units, representing limited partner interests in Energy Transfer | |||||||
| EPA | Environmental Protection Agency | |||||||
| Equity Distribution Agreement | Equity Distribution Agreement, dated as of January 10, 2024, by and between CenterPoint Energy, the ATM Managers, the ATM Forward Purchasers and the ATM Forward Sellers | |||||||
| Equity Purchase Agreement | Equity Purchase Agreement, dated as of May 21, 2023, by and between Vectren Energy Services and ESG Holdings Group |
iii
| GLOSSARY | ||||||||
| ERCOT | Electric Reliability Council of Texas | |||||||
| ERCOT ISO | ERCOT Independent System Operator | |||||||
| ERISA | Employee Retirement Income Security Act of 1974 | |||||||
| ERG | Employee Resource Group | |||||||
| ERO | Electric Reliability Organization | |||||||
| ESG Holdings Group | ESG Holdings Group, LLC a Delaware limited liability company, and an affiliate of Oaktree Capital Management | |||||||
| FAC | Fuel Adjustment Clause | |||||||
| FASB | Financial Accounting Standards Board | |||||||
| February 2021 Winter Storm Event | The extreme and unprecedented winter weather event in February 2021 (also known as Winter Storm Uri) resulting in electricity generation supply shortages, including in Texas, and natural gas supply shortages and increased wholesale prices of natural gas in the United States, primarily due to prolonged freezing temperatures. | |||||||
| FERC | Federal Energy Regulatory Commission | |||||||
| Fitch | Fitch Ratings, Inc. | |||||||
| Form 10-K | Annual Report on Form 10-K | |||||||
| FPA | Federal Power Act | |||||||
| General Mortgage | General Mortgage Indenture, dated as of October 10, 2002, between CenterPoint Energy Houston Electric, LLC and JPMorgan Chase Bank, as Trustee, as supplemented | |||||||
| GHG | Greenhouse gases | |||||||
| GRIP | Gas Reliability Infrastructure Program | |||||||
| GWh | Gigawatt-hours | |||||||
| HLPSA | Hazardous Liquid Pipeline Safety Act of 1979 | |||||||
| Houston Electric | CenterPoint Energy Houston Electric, LLC and its subsidiaries | |||||||
| HVAC | Heating, ventilation and air conditioning | |||||||
| IBEW | International Brotherhood of Electrical Workers | |||||||
| ICPA | Inter-Company Power Agreement | |||||||
| IDEM | Indiana Department of Environmental Management | |||||||
| Indiana Electric | Operations of SIGECO’s electric transmission and distribution services, and includes its power generating and wholesale power operations | |||||||
| Indiana Gas | Indiana Gas Company, Inc., a wholly-owned subsidiary of CERC Corp. | |||||||
| Indiana North | Gas operations of Indiana Gas | |||||||
| Indiana South | Gas operations of SIGECO | |||||||
| Indiana Utilities | Indiana Electric, Indiana North and Indiana South, collectively | |||||||
| IRA | Inflation Reduction Act of 2022 | |||||||
| IRP | Integrated Resource Plan | |||||||
| IRS | Internal Revenue Service | |||||||
| IURC | Indiana Utility Regulatory Commission | |||||||
| kV | Kilovolt | |||||||
| LAMS Asset Purchase Agreement | Asset Purchase Agreement, dated as of February 19, 2024, by and among CERC Corp. and the LAMS Buyers | |||||||
| LAMS Buyers | Delta Utilities No. LA, LLC, a Delaware limited liability company, Delta Utilities S. LA, LLC, a Delaware limited liability company, Delta Utilities MS, LLC, a Delaware limited liability company, and Delta Shared Services Co., LLC, a Delaware limited liability company | |||||||
| LDC | Local Distribution Company | |||||||
| LIBOR | London Interbank Offered Rate | |||||||
| LNG | Liquefied natural gas | |||||||
| Load Shed | Curtailing the amount of electricity a TDU can transmit and distribute to its customers | |||||||
| LPSC | Louisiana Public Service Commission | |||||||
| LTIPs | Long-term incentive plans | |||||||
| MCRA | MISO Cost and Revenue Adjustment | |||||||
iv
| GLOSSARY | ||||||||
| M&DOT | Mortgage and Deed of Trust, dated November 1, 1944, between Houston Lighting and Power Company and Chase Bank of Texas, National Association (formerly, South Texas Commercial National Bank of Houston), as Trustee, as amended and supplemented | |||||||
| Merger | The merger of Merger Sub with and into Vectren on the terms and subject to the conditions set forth in the Merger Agreement, with Vectren continuing as the surviving corporation and as a wholly-owned subsidiary of CenterPoint Energy, Inc., which closed on the Merger Date | |||||||
| Merger Agreement | Agreement and Plan of Merger, dated as of April 21, 2018, among CenterPoint Energy, Vectren and Merger Sub | |||||||
| Merger Date | February 1, 2019 | |||||||
| Merger Sub | Pacer Merger Sub, Inc., an Indiana corporation and wholly-owned subsidiary of CenterPoint Energy | |||||||
| MES | CenterPoint Energy Mobile Energy Solutions, Inc. (now known as Mobile Energy Solutions, Inc.), previously a wholly-owned subsidiary of CERC Corp. | |||||||
| MGP | Manufactured gas plant | |||||||
| MISO | Midcontinent Independent System Operator | |||||||
| MMBtu | One million British thermal units | |||||||
| MMcf | Million cubic feet | |||||||
| Moody’s | Moody’s Investors Service, Inc. | |||||||
| MPUC | Minnesota Public Utilities Commission | |||||||
| MPSC | Mississippi Public Service Corporation | |||||||
| Mva | Megavolt amperes | |||||||
| MW | Megawatts | |||||||
| Natural Gas | Natural gas distribution businesses | |||||||
| NECA | National Electrical Contractors Association | |||||||
| NERC | North American Electric Reliability Corporation | |||||||
| NGA | Natural Gas Act of 1938 | |||||||
| NGLs | Natural gas liquids | |||||||
| NGPA | Natural Gas Policy Act of 1978 | |||||||
| NGPSA | Natural Gas Pipeline Safety Act of 1968 | |||||||
| NOLs | Net operating losses | |||||||
| NRG | NRG Energy, Inc. | |||||||
| NYSE | New York Stock Exchange | |||||||
| OPEIU | Office & Professional Employees International Union | |||||||
| Oriden | Oriden LLC | |||||||
| Origis | Origis Energy USA Inc. | |||||||
| OUCC | Indiana Office of Utility Consumer Counselor | |||||||
| OVEC | Ohio Valley Electric Corporation | |||||||
| PHMSA | Pipeline and Hazardous Materials Safety Administration | |||||||
| PIPES Act | Protecting Our Infrastructure of Pipelines and Enhancing Safety Act of 2020 | |||||||
| PPA | Power purchase agreement | |||||||
| PRPs | Potentially responsible parties | |||||||
| PTCs | Production Tax Credits | |||||||
| PUCO | Public Utilities Commission of Ohio | |||||||
| PUCT | Public Utility Commission of Texas | |||||||
| Railroad Commission | Railroad Commission of Texas | |||||||
| RCRA | Resource Conservation and Recovery Act of 1976 | |||||||
| Registrants | CenterPoint Energy, Houston Electric and CERC, collectively | |||||||
| REP | Retail electric provider | |||||||
| Restoration Bond Company | CenterPoint Energy Restoration Bond Company, LLC, a wholly-owned subsidiary of Houston Electric | |||||||
v
| GLOSSARY | ||||||||
| Restructuring | CERC Corp.’s common control acquisition of Indiana Gas and VEDO from VUH on June 30, 2022 | |||||||
| ROE | Return on equity | |||||||
| ROU | Right of use | |||||||
| RRA | Rate Regulation Adjustment | |||||||
| RSP | Rate Stabilization Plan | |||||||
| Scope 1 emissions | Direct source of emissions from a company’s operations | |||||||
| Scope 2 emissions | Indirect source of emissions from a company’s energy usage | |||||||
| Scope 3 emissions | Indirect source of emissions from a company’s end-users | |||||||
| SEC | Securities and Exchange Commission | |||||||
| Securitization Bonds | Transition and system restoration bonds issued by the Bond Companies and SIGECO Securitization Bonds issued by the SIGECO Securitization Subsidiary | |||||||
| Series A Preferred Stock | CenterPoint Energy’s previously outstanding Series A Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Stock, par value $0.01 per share, with a liquidation preference of $1,000 per share | |||||||
| Series B Preferred Stock | CenterPoint Energy’s previously outstanding 7.00% Series B Mandatory Convertible Preferred Stock, par value $0.01 per share, with a liquidation preference of $1,000 per share | |||||||
| Series C Preferred Stock | CenterPoint Energy’s previously outstanding Series C Mandatory Convertible Preferred Stock, par value $0.01 per share, with a liquidation preference of $1,000 per share | |||||||
| SIGECO | Southern Indiana Gas and Electric Company, a wholly-owned subsidiary of Vectren | |||||||
| SIGECO Securitization Bonds | SIGECO Securitization Subsidiary’s Series 2023-A Senior Secured Securitization Bonds | |||||||
| SIGECO Securitization Subsidiary | SIGECO Securitization I, LLC, a direct, wholly-owned subsidiary of SIGECO | |||||||
| SOFR | Secured Overnight Financing Rate | |||||||
| S&P | S&P Global Ratings, a division of S&P Global Inc. | |||||||
| SRC | Sales Reconciliation Component | |||||||
| TBD | To be determined | |||||||
| TCJA | Tax reform legislation informally called the Tax Cuts and Jobs Act of 2017 | |||||||
| TCOS | Transmission Cost of Service | |||||||
| TCRF | Transmission Cost Recovery Factor | |||||||
| TDSIC | Transmission, Distribution and Storage System Improvement Charge | |||||||
| TDU | Transmission and distribution utility | |||||||
| TEEEF | Assets leased or costs incurred as “temporary emergency electric energy facilities” under Section 39.918 of the Public Utility Regulatory Act, also referred to as mobile generation | |||||||
| Texas RE | Texas Reliability Entity | |||||||
| Topic 326 | Accounting Standards Update 2016-13 - Financial Instruments - Credit Losses (Topic 326): Measurement of Credit Losses on Financial Instruments | |||||||
| TSA | Transportation Security Administration | |||||||
| USW | United Steelworkers Union | |||||||
| UWUA | Utility Workers Union of America | |||||||
| Utility Holding | Utility Holding, LLC, a wholly-owned subsidiary of CenterPoint Energy | |||||||
| Vectren | Vectren, LLC, which converted its corporate structure from Vectren Corporation to a limited liability company on June 30, 2022, a wholly-owned subsidiary of CenterPoint Energy as of the Merger Date, and, after the Restructuring, is held indirectly by CenterPoint Energy through Vectren Affiliated Utilities, Inc. | |||||||
| Vectren Energy Services | Vectren Energy Services Corporation, an Indiana corporation and a wholly-owned subsidiary of CenterPoint Energy | |||||||
| VEDO | Vectren Energy Delivery of Ohio, LLC, which converted its corporate structure from Vectren Energy Delivery of Ohio, Inc. to a limited liability company on June 13, 2022, formerly a wholly-owned subsidiary of Vectren, acquired by CERC on June 30, 2022 | |||||||
| VIE | Variable interest entity | |||||||
| Vistra Energy Corp. | Texas-based energy company focused on the competitive energy and power generation markets. | |||||||
| VRP | Voluntary Remediation Program |
vi
| GLOSSARY | ||||||||
| VUH | Vectren Utility Holdings, LLC, which converted its corporate structure from Vectren Utility Holdings, Inc. to a limited liability company on June 30, 2022, a wholly-owned subsidiary of Vectren | |||||||
| WBD Common | Warner Bros. Discovery, Inc. Series A common stock | |||||||
| Winter Storm Elliott | From December 21 to 26, 2022, a historic extratropical cyclone created winter storm conditions, including blizzards, high winds, snowfall and record cold temperatures across the majority of the United States and parts of Canada. | |||||||
| ZENS | 2.0% Zero-Premium Exchangeable Subordinated Notes due 2029 | |||||||
| ZENS-Related Securities | As of December 31, 2023 and December 31, 2022, consisted of AT&T Common, Charter Common and WBD Common | |||||||
| 2022 Form 10-K | Annual Report on Form 10-K for the fiscal year ended December 31, 2022 | |||||||
| 2022 Annuity Lift-Out | The irrevocable group annuity contract purchased in December 2022 from an insurance company to transfer $138 million of CenterPoint Energy’s pension plan’s outstanding benefit obligation |
vii
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
From time to time the Registrants make statements concerning their expectations, beliefs, plans, objectives, goals, strategies, future events or performance and underlying assumptions and other statements that are not historical facts. These statements are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. Actual results may differ materially from those expressed or implied by these statements. You can generally identify forward-looking statements by the words “anticipate,” “believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “goal,” “intend,” “may,” “objective,” “plan,” “potential,” “predict,” “projection,” “should,” “target,” “will” or other similar words.
The Registrants have based their forward-looking statements on management’s beliefs and assumptions based on information reasonably available to management at the time the statements are made. The Registrants caution you that assumptions, beliefs, expectations, intentions and projections about future events may and often do vary materially from actual results. Therefore, the Registrants cannot assure you that actual results will not differ materially from those expressed or implied by the Registrants’ forward-looking statements. In this Form 10-K, unless context requires otherwise, the terms “our,” “we” and “us” are used as abbreviated references to CenterPoint Energy, Inc. together with its consolidated subsidiaries, including Houston Electric, CERC and SIGECO.
Some of the factors that could cause actual results to differ from those expressed or implied by the Registrants’ forward-looking statements are described under “Risk Factors” in Item 1A and “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Certain Factors Affecting Future Earnings” and “ — Liquidity and Capital Resources — Other Matters — Other Factors That Could Affect Cash Requirements” in Item 7 of Part II of this report, which discussions are incorporated herein by reference.
You should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the particular statement, and the Registrants undertake no obligation to update or revise any forward-looking statements.
SUMMARY OF RISK FACTORS
An investment in CenterPoint Energy’s securities involves a significant degree of risk. Below is a summary of certain risk factors to consider in evaluating CenterPoint Energy as well as its Common Stock. However, this list is not exhaustive. Before investing in CenterPoint Energy, carefully consider the risk factors discussed or referenced below and in Item 1A. “Risk Factors” of this combined report on Form 10-K. If any of the risks discussed below and in Item 1A. “Risk Factors” were actually to occur, CenterPoint Energy’s, Houston Electric’s and CERC’s business, financial condition, results of operations or cash flows could be adversely affected. In that case, CenterPoint Energy might not be able to pay dividends on its Common Stock, or the trading price of its Common Stock could decline.
Risk Factors Affecting Operations
Electric Generation, Transmission and Distribution (CenterPoint Energy and Houston Electric)
-
Disruptions at power generation facilities, generation inadequacy or directives issued by regulatory authorities could cause interruptions in Houston Electric’s and Indiana Electric’s ability to provide transmission and distribution services and adversely affect their reputation, financial condition, results of operations and cash flows.
-
Houston Electric’s receivables are primarily concentrated in a small number of REPs, and any delay or default in payments of these receivables could adversely affect Houston Electric’s financial condition, results of operations and cash flows.
-
Indiana Electric’s execution of its generation transition plan, including its IRP, is subject to various risks, including timely recovery of capital investments and increased costs and risks related to the timing and cost of development and/or construction of new generation facilities.
-
The occurrence of extreme weather events, including winter storms and record hot temperatures, or other causes could lead to additional reforms to the Texas electric market, some measure of which, if implemented, could have an adverse impact on Houston Electric.
-
Houston Electric’s use of TEEEF is subject to various risks, including failure to obtain and deploy sufficient TEEEF resources, potential performance issues and allegations about Houston Electric’s deployment of the resources (including the planning, execution and effectiveness of the same), regulatory and environmental requirements, and timely recovery of capital.
viii
Natural Gas (CenterPoint Energy and CERC)
-
Access to natural gas supplies and pipeline transmission and storage capacity are essential components of reliable service for Natural Gas’ customers.
-
Natural Gas is subject to fluctuations in natural gas prices, which could affect the ability of its suppliers and customers to meet their obligations or may impact its operations, which could adversely affect CERC’s financial condition, results of operations and cash flows.
-
Natural Gas must compete with alternate energy sources, which could result in less natural gas delivered and have an adverse impact on CenterPoint Energy’s and CERC’s financial condition, results of operations and cash flows.
Risk Factors Affecting Regulatory, Environmental and Legal Risks
-
Rate regulation of Registrants’ Electric and Natural Gas businesses may delay or deny their ability to earn an expected return and fully and timely recover their costs.
-
We are subject to operational and financial risks and liabilities arising from environmental laws and regulations, including regulation of CCR, climate change legislation and certain local initiatives that seek to limit fossil fuel usage.
-
CenterPoint Energy is subject to operational and financial risks and liabilities associated with the implementation of and efforts to achieve its carbon emissions reduction goals.
-
We are involved in numerous legal proceedings, the outcomes of which are uncertain, and resolution adverse to us could negatively affect our financial results.
Risk Factors Affecting Financial, Economic and Market Risks
-
Disruptions to the global supply chain may lead to higher prices for goods and services and impact our operations, which could have an adverse impact on our ability to execute our capital plan and on our financial condition, results of operations and cash flows.
-
CenterPoint Energy is a holding company that derives all of its operating income from, and holds substantially all of its assets through, its subsidiaries. As a result, CenterPoint Energy depends on the performance of and distributions from its subsidiaries to meet its payment obligations and to pay dividends on its common stock, and provisions of applicable law or contractual restrictions could limit the amount of those distributions.
-
If we are unable to arrange future financings on acceptable terms, our ability to finance our capital expenditures or refinance outstanding indebtedness could be limited.
-
If CenterPoint Energy redeems the ZENS prior to their maturity in 2029, its ultimate tax liability and redemption payments would result in significant cash payments, which would adversely impact its cash flows. Similarly, a significant amount of exchanges of ZENS by ZENS holders could adversely impact CenterPoint Energy’s cash flows.
Risk Factors Affecting Safety and Security Risks
-
The Registrants’ businesses have safety risks.
-
Cyberattacks, physical security breaches, acts of terrorism or other disruptions could adversely impact our reputation, financial condition, results of operations and cash flows.
General and Other Risks
-
Our revenues and results of operations are seasonal.
-
Climate change could adversely impact financial results from our businesses and result in more frequent and more severe weather events that could adversely affect our results of operations.
-
Aging infrastructure may lead to increased costs and disruptions in operations that could negatively impact our financial results.
-
Our businesses will continue to have to adapt to technological change and may not be successful or may have to incur significant expenditures to adapt to technological change.
ix
PART I
Item 1. Business
This combined Form 10-K is filed separately by three registrants: CenterPoint Energy, Inc., CenterPoint Energy Houston Electric, LLC and CenterPoint Energy Resources Corp. Information contained herein relating to any individual registrant is filed by such registrant solely on its own behalf. Each registrant makes no representation as to information relating exclusively to the other registrants or the subsidiaries of CenterPoint Energy other than itself or its subsidiaries. Except as discussed in Note 13 to the consolidated financial statements, no registrant has an obligation in respect of any other registrant’s debt securities, and holders of such debt securities should not consider the financial resources or results of operations of any registrant other than the obligor in making a decision with respect to such securities.
The discussion of CenterPoint Energy’s consolidated financial information includes the financial results of Houston Electric and CERC, which, along with CenterPoint Energy, are collectively referred to as the Registrants. Where appropriate, information relating to a specific registrant has been segregated and labeled as such. Unless the context indicates otherwise, specific references to Houston Electric and CERC also pertain to CenterPoint Energy. In this Form 10-K, the terms “our,” “we” and “us” are used as abbreviated references to CenterPoint Energy, Inc. together with its consolidated subsidiaries.
OUR BUSINESS
Overview
CenterPoint Energy is a public utility holding company. CenterPoint Energy’s operating subsidiaries own and operate electric transmission, distribution and generation facilities and natural gas distribution facilities.
As of December 31, 2023, CenterPoint Energy’s indirect, wholly-owned subsidiaries include:
-
Houston Electric, which provides electric transmission service to transmission service customers in the ERCOT region and distribution service to REPs serving the Texas gulf coast area that includes the city of Houston. Bond Companies are wholly-owned, bankruptcy remote entities formed solely for the purpose of purchasing and owning transition or system restoration property through the issuance of Securitization Bonds.
-
CERC Corp., which (i) directly owns and operates natural gas distribution systems in Louisiana, Minnesota, Mississippi and Texas, (ii) indirectly, through Indiana Gas and VEDO, owns and operates natural gas distribution systems in Indiana and Ohio, respectively, and (iii) owns and operates permanent pipeline connections through interconnects with various interstate and intrastate pipeline companies through CEIP.
-
SIGECO, which provides energy delivery services to electric and natural gas customers located in and near Evansville in southwestern Indiana and owns and operates electric generation assets to serve its electric customers and optimizes those assets in the wholesale power market.
As of December 31, 2023, CenterPoint Energy’s reportable segments were Electric, Natural Gas and Corporate and Other. Houston Electric and CERC each consist of one reportable segment. For a description of CenterPoint Energy’s reportable segments, see Note 17. For a discussion of net income by segment, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Results of Operations by Reportable Segment” in Item 7 of Part II of this report.
Discontinued Operations. From time to time, we consider the acquisition or the disposition of assets or businesses. For a discussion of discontinued operations and divestitures, see Note 4 to the consolidated financial statements.
Subsequent Events. On February 19, 2024, CenterPoint Energy, through its subsidiary CERC Corp., entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas local distribution company businesses. The transaction is expected to close in the first quarter of 2025. For further information, see Note 21 to the consolidated financial statements.
The Registrants’ principal executive offices are located at 1111 Louisiana, Houston, Texas 77002 (telephone number: 713-207-1111).
We make available free of charge on our Internet website our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the
Securities Exchange Act of 1934, as amended, as soon as reasonably practicable after we electronically file such reports with, or furnish them to, the SEC. The SEC maintains an Internet website that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC at http://www.sec.gov. Additionally, we make available free of charge on our Internet website:
-
our Code of Ethics for our Chief Executive Officer and Senior Financial Officers;
-
our Ethics and Compliance Code;
-
our Supplier Code of Conduct;
-
our Corporate Governance Guidelines; and
-
the charters of the audit, compensation, and governance, environmental and sustainability committees of our Board of Directors.
Any shareholder who so requests may obtain a printed copy of any of these documents from us. Changes in or waivers of our Code of Ethics for our Chief Executive Officer and Senior Financial Officers and waivers of our Ethics and Compliance Code for directors or executive officers will be posted on our Internet website within five business days of such change or waiver and maintained for at least 12 months or timely reported on Item 5.05 of Form 8-K.
Our website address is www.centerpointenergy.co*m.* Investors should also note that we announce material financial information in SEC filings, press releases and public conference calls. Based on guidance from the SEC, we may use the investor relations section of our website to communicate with our investors. It is possible that the financial and other information posted there could be deemed to be material information. Except to the extent explicitly stated herein, documents and information on our website are not incorporated by reference herein.
Electric (CenterPoint Energy)
The Electric reportable segment is comprised of Houston Electric and Indiana Electric.
For information regarding the properties of the Electric reportable segment, please read “Properties — Electric (CenterPoint Energy and Houston Electric)” in Item 2 of this report, which information is incorporated herein by reference.
Houston Electric (CenterPoint Energy and Houston Electric)
Houston Electric is a transmission and distribution electric utility that operates wholly within the state of Texas. Houston Electric does not make direct retail or wholesale sales of electric energy or own or operate any power generation generating facilities other than TEEEF.
Electric Transmission
On behalf of REPs, Houston Electric delivers electricity from power plants to substations, from one substation to another and to retail electric customers taking power at or above 69 kV in locations throughout Houston Electric’s certificated service territory. Houston Electric constructs and maintains transmission facilities and provides transmission services under tariffs approved by the PUCT.
Electric Distribution
Houston Electric’s distribution network receives electricity from the transmission grid through power distribution substations and delivers electricity for REPs in its certificated service area by carrying lower-voltage power from the substation to the retail electric customer through distribution feeders. Houston Electric’s operations include construction and maintenance of distribution facilities, metering services, outage response services and call center operations. Houston Electric provides distribution services under tariffs approved by the PUCT. PUCT rules and market protocols govern the commercial operations of distribution companies and other market participants. Rates for t
Showing the first 8K of 90K characters. Open the full section
Item 1A. Risk Factors
CenterPoint Energy is a holding company that conducts all of its business operations through subsidiaries, primarily Houston Electric, CERC and SIGECO. The following, along with any additional legal proceedings identified or incorporated by reference in Item 3 of this combined report on Form 10-K, summarizes the principal risk factors associated with the holding company and the businesses conducted by its subsidiaries. However, additional risks and uncertainties either not presently known or not currently believed by management to be material may also adversely affect CenterPoint Energy’s businesses. For other factors that may cause actual results to differ from those indicated in any forward-looking statement or projection contained in this combined report on Form 10-K, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Certain Factors Affecting Future Earnings” in Item 7, which should be read in conjunction with the risk factors contained in this Item 1A. Carefully consider each of the risks described below, including those relating to Houston Electric and CERC, which, along with CenterPoint Energy, are collectively referred to as the Registrants. Unless the context indicates otherwise, where appropriate, information relating to a specific registrant has been segregated and labeled as such and specific references to Houston Electric and CERC in this section also pertain to CenterPoint Energy. In this combined report on Form 10-K, the terms “our,” “we” and “us” are used as abbreviated references to CenterPoint Energy, Inc. together with its subsidiaries.
Risk Factors Affecting Operations
Electric Generation, Transmission and Distribution (CenterPoint Energy and Houston Electric)
Disruptions at power generation facilities, generation inadequacy or directives issued by regulatory authorities could cause interruptions in Houston Electric’s and Indiana Electric’s ability to provide transmission and distribution services and adversely affect their reputation, financial condition, results of operations and cash flows.
Houston Electric owns the transmission and distribution infrastructure in its service territory that delivers electric power to its customers, but it does not own or operate any power generation facilities, except for its operation of TEEEF. Indiana Electric owns and operates power generation facilities in addition to the transmission and distribution infrastructure in its service territory. Both Houston Electric and Indiana Electric must follow the directives issued by their respective independent system operator, ERCOT and MISO, respectively. ERCOT and MISO have and may in the future issue directives requiring members to implement controlled outages as a result of an emergency or reliability issues, and Houston Electric has faced and may in the future face challenges to their planning and preparation for such directives and their implementation of Load Shed, including, for example, allegations that they had discretion as to how to shed load and which customers experienced outages and the duration of those outages. As a result, claims and lawsuits could be filed against Houston Electric and Indiana Electric for personal injury, property damage or other damage or loss as a result of their respective Load Shed planning, preparation, implementation, and decisions in order to meet the directives of ERCOT and MISO, respectively. For example, in February 2021, the ERCOT regulated Texas electric system experienced extreme winter weather conditions and an unprecedented power generation shortage. The amount of electricity generated by the state’s power generation companies was insufficient to meet the amount demanded by customers. This resulted in ERCOT directing TDUs to significantly Load Shed, which caused customer outages across the ERCOT electric grid of Texas, including in Houston Electric’s service territory. See Note 7 to the consolidated financial statements and “— Houston Electric’s use of TEEEF ...” for further information. If power generation capacity is severely disrupted or is inadequate for any reason in the future, Houston Electric’s or Indiana Electric’s transmission and distribution services may be diminished or interrupted. Further, as with the lawsuits filed in the aftermath of the February 2021 Winter Storm Event, claims and lawsuits could be filed against the Registrants, and our reputation, financial condition, results of operations and cash flows could be adversely affected.
Additionally, Indiana Electric’s generating facilities and the generating facilities that supply the power transmitted by Houston Electric and Indiana Electric are subject to operational risks that have and may in the future result in unscheduled plant outages, unanticipated operation and maintenance expenses and increased purchase power costs. For example, in June 2022, Culley 3, a coal-fired generation unit, experienced a boiler feed pump turbine failure that caused the unit to be out of service for nearly nine months. In this time frame, CenterPoint Energy purchased energy on the open market and those purchases are currently being challenged at the IURC by multiple intervenors. Such open market purchases have and may again result in increased costs and have an adverse impact on our operations, financial condition, results of operations and cash flows. Further, Indiana Electric is party to a number of PPAs with third parties. Indiana Electric’s power generation may be disrupted or otherwise insufficient if third parties do not deliver required power under our PPAs. These operational risks can arise from circumstances such as facility shutdowns or malfunctions due to equipment failure or operator error; aging infrastructure; interruption of fuel supply or increased prices of fuel as contracts expire and inflation rises; disruptions in the delivery of electricity; inability to comply with regulatory or permit requirements; labor disputes; or natural disasters, all of which could adversely affect Indiana Electric’s and Houston Electric’s businesses. Further, Indiana Electric currently relies on coal for the majority of its generation capacity. Indiana Electric purchases the majority of its coal supply from a single, unrelated party and, although the coal supply is under long-term contract, the loss of this supplier or transportation interruptions could adversely affect its ability to deliver electricity to its customers and adversely impact Indiana Electric’s financial condition, results of operations and cash flows. In 2021 and part of 2022, Indiana Electric experienced coal supply shortages due to labor shortages that the coal industry experienced. While the coal supply shortage that Indiana Electric experienced did not impact its ability to deliver electricity to its customers, labor shortages as well as supply shortages in the future, whether caused by insufficient supply or supplier bankruptcy or other regulatory and supply issues in the mining industry, may lead to increased cost and have an adverse impact on our operations, financial condition, results of operations and cash flows. See “— Disruptions to the global supply...” As Indiana Electric continues its generation transition and more renewable energy sources come online, Indiana Electric’s generating facilities may experience unanticipated disruptions as a result of renewable supply shortages, including, but not limited to, due to cloudy or windless days. Additionally, such disruptions could adversely affect its ability to deliver electricity to its customers and adversely impact Indiana Electric’s financial condition, results of operations and cash flows.
The operations of Houston Electric and Indiana Electric are subject to the usual hazards associated with high-voltage electricity transmission, including inclement weather, natural disasters, mechanical failure, contact with electrified facilities by people, equipment, and debris, u
Showing the first 8K of 116K characters. Open the full section
Item 1B. Unresolved Staff Comments
None.
Item 1C. Cybersecurity
Our processes for assessing, identifying, and managing material risks from cybersecurity threats are part of our overall enterprise risk management system and processes. Enterprise risks, including cybersecurity risks, and their associated mitigations are reviewed at least annually by senior management and the Board of Directors. Throughout the year, we regularly assess our cybersecurity program and continue to invest in hardening and maturing our cybersecurity measures as further described below.
Managing Material Risks & Integrated Overall Risk Management
As a foundation of this approach, we have implemented a layered governance structure to help assess, identify, and manage cybersecurity risks. It starts with our internal Cybersecurity Operations Center (CSOC), which routinely analyzes threat information from external sources, monitors network activity, and responds to potential security incidents. In addition, our cybersecurity and privacy policies encompass incident response procedures and information security governance. As part of our ongoing assessment of our cybersecurity program, we monitor and make adjustments, as necessary, in support of compliance with current and emerging cybersecurity and privacy laws, regulations and guidance applicable to us in jurisdictions where we do business (including NERC CIP reliability standards and TSA security directives), as further described in Item 1A “Risk Factors.” Our internal audit team conducts regular internal security audits and vulnerability assessments of CenterPoint Energy’s systems and user data security practices.
In addition, CenterPoint Energy’s cybersecurity program is increasingly leveraging intelligence-sharing capabilities about emerging threats within the energy industry, across other industries, with specialized vendors, and through public-private partnerships with U.S. government intelligence agencies. By engaging with utility-specific organizations, CenterPoint Energy benefits from quality analysis and rapid sharing of security information across the energy sector. Such intelligence helps allow for better detection and prevention of emerging cyber threats before they materialize. Just as it tests its policies and plans internally, CenterPoint Energy also engages in external exercises such as the bi-annual GridEx Security Exercise to evaluate and address the preparedness of the industry as a whole.
Oversee Third-Party Risk
We conduct security risk assessments on proposed software, hardware, and third-party technology solutions used by CenterPoint Energy, including a diligence review of enterprise and security architecture, vendor security, and a privacy impact assessment when deemed appropriate. These assessments evaluate these technologies prior to deployment in CenterPoint Energy’s network environment. Further, we maintain a vendor risk management program, a component of which assesses the maturity of certain third parties and their cybersecurity and data privacy programs to help protect information shared with approved third parties. We also leverage third-party cybersecurity ratings of companies to inform our risk rating when conducting these assessments. Additionally, CenterPoint Energy imposes contractual obligations on vendors and other third-party business partners related to privacy, confidentiality, and data security based on their access to our data and systems and the nature and sensitivity of the data and systems. Such contractual provisions may specify the measures and safeguards that the parties must implement to protect our data from unauthorized access use, disclosure, modification, or destruction.
Engage Third Parties on Risk Management
We also undergo periodic external security audits, vulnerability assessments, and penetration testing of CenterPoint Energy’s systems and user data security practice, conducted by third-party consultants. We also conduct tabletop exercises to
test our incident response processes. Further, as discussed below, we engage third parties to provide guidance and support to our cybersecurity management team.
Risks from Cybersecurity Threats
As described in Item 1A “Risk Factors,” our operations rely on the secure processing, storage, and transmission of confidential, sensitive, and other information within our computer systems and networks. Computer viruses, hackers, employee or vendor incidents, and other external hazards could expose our information systems—and those of our third parties who process our data, provide access to systems, or that have access to our systems—to security breaches, cybersecurity incidents or other disruptions, any of which could materially and adversely affect our business, reputation, results of operations and financial condition, and subject us to possible legal claims and liability. While we have experienced cybersecurity incidents in the past, to date none have materially affected us, including our business strategy, results of operations or financial condition.
Governance
As part of our overall risk management approach, we prioritize the identification and management of cybersecurity risks at several levels, including Board oversight, executive commitment, management support, and employee training.
Board of Directors Oversight
As of December 2023, our Audit Committee, comprised of independent directors from our Board, oversees the Board’s responsibilities relating to CenterPoint Energy’s cybersecurity and data privacy programs, including cybersecurity risk management. Prior to December 2023, our Governance, Environmental and Sustainability Committee, comprised of independent directors from our Board, oversaw cybersecurity responsibilities. As part of their risk oversight responsibilities, the applicable committee received quarterly reports from our Executive Vice President and General Counsel, or representatives from our cybersecurity or data privacy groups, and periodic reports from our third party consultants. Based on these reports, the applicable committee reported to the Board regarding certain cybersecurity or data privacy related items, including, among other items, CenterPoint Energy’s progress in maturing its cybersecurity program, results of audits, penetration and vulnerability testing of CenterPoint Energy’s cybersecurity program, the cybersecurity landscape and emerging threats, status of ongoing initiatives and strategies, incident reports and learnings from any cybersecurity events, compliance with regulatory requirements and industry standards, data privacy matters, and the cybersecurity budget.
Risk Management Personnel
Since January 2023, our cybersecurity program has been overseen by our Executive Vice President and General Counsel. Our Executive Vice President and General Counsel has significant risk management, governance and litigation experience. We believe these skills are needed in leadership of our cybersecurity program to help ensure that risk management, legal, disclosure and governance perspectives are considered in the design of our cybersecurity program and in evaluating and responding to potential cyber incidents. CenterPoint Energy currently engages a third-party consultant, who reports directly to the Executive Vice President and General Counsel, to provide Chief Information Security Officer (CISO) advisory services. This consultant has 15 years of experience serving in cybersecurity leadership positions, including as a CISO at a large U.S.-based power, utility, and gas company and also at a large multi-national energy products and services company. We also have management-level committees and an experienced CSOC team that support our processes to assess and manage cybersecurity risk as follows:
-
The Data Privacy Office, led by our Senior Vice President, Deputy General Counsel, Chief Ethics and Compliance Officer, and Data Privacy Officer, addresses the collection, storage, usage, disclosure and destruction of data for specific business purposes and addresses existing and emerging laws, regulations, trends, expectations and best practices with regards to maintaining a mature data privacy program.
-
The Risk Oversight Committee, which is supported by our Enterprise Risk Management function and chaired by our Executive Vice President and General Counsel, is comprised of senior executives from across CenterPoint Energy, monitors and oversees risks facing CenterPoint Energy, as well as provides risk assessments and control oversight for certain business activities, including overseeing CenterPoint Energy’s cybersecurity risks.
-
The crisis management team, which includes senior executives across CenterPoint Energy, is alerted as appropriate to cybersecurity incidents, natural disasters, and business outages. This team has established and continually assesses CenterPoint Energy’s communications plan in the event of a crisis. Additionally, as appropriate, the Audit Committee
or the Board are made aware of significant cybersecurity incidents in accordance with our cybersecurity incident response playbook.
-
The Cybersecurity Awareness Governance Committee, which includes leaders from across CenterPoint Energy’s corporate functions and business units, each with expertise in, or with specific responsibility for, managing or protecting CenterPoint Energy’s assets, information and personnel. This committee provides strategic direction and oversight for CenterPoint Energy’s cybersecurity awareness and training initiatives.
-
The Artificial Intelligence (AI) Steering Committee was established by CenterPoint Energy to provide strategic direction, oversight, and guidance in the planning, development, deployment, and management of AI initiatives within the organization. The committee's primary objective is to ensure that AI technologies are aligned with business goals, ethical considerations, appropriate security protections, and industry best practices while driving innovation and enhancing competitiveness.
These committees provide periodic summary reports on their activities and initiatives to appropriate senior executives, and the Executive Vice President and General Counsel and/or various members of the cyber and data privacy teams communicates updates to the Audit Committee or the Board.
At the employee level, we maintain an experienced information technology team that is tasked with implementing our privacy and cybersecurity programs and supporting the cybersecurity consultant in carrying out reporting, security and mitigation functions. We also hold employee trainings on privacy, cybersecurity, AI, records and information management, conduct phishing tests, and generally seek to promote awareness of cybersecurity risk through communication and education of our employee population. The Governance, Environmental and Sustainability Committee was, and now the Audit Committee will be, provided with periodic reports on our employee cybersecurity awareness efforts.
Item 2. Properties
The following discussion is based on the Registrants’ businesses as of December 31, 2023.
Character of Ownership
We lease or own our principal properties in fee, including our corporate office space and various real property. Most of our electric lines and natural gas mains are located, pursuant to easements and other rights, on public roads or on land owned by others.
Electric (CenterPoint Energy and Houston Electric)
Properties
All of Houston Electric’s properties are located in Texas. Its properties consist primarily of high-voltage electric transmission lines and poles, distribution lines, substations, service centers, service wires, telecommunications networks and meters. Most of Houston Electric’s transmission and distribution lines have been constructed over lands of others pursuant to easements or along public highways and streets under franchise agreements and as permitted by law.
All real and tangible properties of Houston Electric, subject to certain exclusions, are currently subject to the lien of the M&DOT and the lien of the General Mortgage, which is junior to the lien of the M&DOT.
No first mortgage bonds are outstanding under the M&DOT and Houston Electric is contractually obligated to not issue any additional first mortgage bonds under the M&DOT and is undertaking actions to release the lien of the M&DOT and terminate the M&DOT. For information related to debt outstanding under the General Mortgage, see Note 13 to the consolidated financial statements.
Indiana Electric’s properties are primarily located in Indiana. They consist of transmission lines in Indiana and Kentucky, distribution lines, substations, service centers, coal-fired generating facilities, gas-fired turbine peaking units, a landfill gas electric generation project and solar generation facilities.
All real and tangible properties of Indiana Electric, subject to certain exclusions, are currently subject to the lien of the Amended and Restated Mortgage Indenture dated as of January 1, 2023, between SIGECO (Indiana Electric) and Deutsche Bank Trust Company Americas (formerly known as Bankers Trust Company), as Trustee.
Electric Lines - Transmission and Distribution. As of December 31, 2023, Houston Electric and Indiana Electric owned and operated the following electric transmission and distribution lines:
| Houston Electric | Indiana Electric | |||||||||||||||||||||||||
| Description | Overhead Lines | Underground Lines | Indiana | Kentucky (1) | ||||||||||||||||||||||
| Transmission lines: | (in Circuit Miles) | |||||||||||||||||||||||||
| 69 kV | 132 | 2 | 567 | — | ||||||||||||||||||||||
| 138 kV | 2,333 | 24 | 420 | 9 | ||||||||||||||||||||||
| 345 kV | 1,445 | — | 49 | 15 | ||||||||||||||||||||||
| Total | 3,910 | 26 | 1,036 | 24 | ||||||||||||||||||||||
| (in Circuit Miles) | ||||||||||||||||||||||||||
| Distribution lines | 29,270 | 27,267 | 7,266 | — |
(1)These assets interconnect with Louisville Gas and Electric Company’s transmission system at Cloverport, Kentucky and with Big Rivers Electric Cooperative at Sebree, Kentucky.
Generating Capacity. In 2023, SIGECO completed the planned retirement of its A.B. Brown Units 1 & 2. As of December 31, 2023, Indiana Electric had 727 MW of installed generating capacity, as set forth in the following table.
| Generation Source | Unit No. | Location | Date in Service | Capacity (MW) | ||||||||||||||||||||||
| Coal | ||||||||||||||||||||||||||
| F.B. Culley | 2 | Warrick County | 1966 | 90 | ||||||||||||||||||||||
| F.B. Culley | 3 | Warrick County | 1973 | 270 | ||||||||||||||||||||||
| Warrick (1) | 4 | Warrick County | 1970 | 150 | ||||||||||||||||||||||
| Total Coal Capacity | 510 | |||||||||||||||||||||||||
| Gas | ||||||||||||||||||||||||||
| Brown (2) | 3 | Posey County | 1991 | 80 | ||||||||||||||||||||||
| Brown | 4 | Posey County | 2002 | 80 | ||||||||||||||||||||||
| Renewable Landfill Gas | Pike County | 2009 | 3 | |||||||||||||||||||||||
| Total Gas Capacity | 163 | |||||||||||||||||||||||||
| Solar | ||||||||||||||||||||||||||
| Oak Hill | Evansville, Indiana | 2018 | 2 | |||||||||||||||||||||||
| Volkman | Evansville, Indiana | 2018 | 2 | |||||||||||||||||||||||
| Troy | Spencer County | 2021 | 50 | |||||||||||||||||||||||
| Total Solar Capacity | 54 | |||||||||||||||||||||||||
| Total Generating Capacity (3) | 727 |
(1)SIGECO and AGC own a 300 MW unit at the Warrick Power Plant as tenants in common. SIGECO exited joint operations of Warrick 4 on January 1, 2024.
(2)Brown Unit 3 is also equipped to burn oil.
(3)Excludes 1.5% participation in OVEC. See Item 1. Business for more details.
Natural Gas Combustion Turbines. In 2022, Indiana Electric received approval from the IURC for a CPCN seeking approval to construct two natural gas combustion turbines to replace portions of its existing coal-fired generation fleet. The turbines are targeted to be operational by year end 2025. For further information, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources — Regulatory Matters” in Item 7 of Part II of this report, which discussion is incorporated herein by reference.
Solar. Indiana Electric entered into an amended and restated BTA to build a 191 MW solar array in Posey County, Indiana. Additionally, Indiana Electric entered into a BTA to acquire a 130 MW solar array in Pike County, Indiana through a special purpose entity for a capped purchase price. For further information about Indiana Electric’s BTA’s, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources — Regulatory Matters” in Item 7 of Part II of this report, which discussion is incorporated herein by reference.
Mobile Generation. As allowed by a law enacted by the Texas legislature after the February 2021 Winter Storm Event and amended in 2023, Houston Electric is leasing TEEEF that can aid in restoring power to customers during certain significant power outages that are impacting its distribution system. As of December 31, 2023, Houston Electric leased 505 MW of TEEEF. For more information, see Note 20 to the consolidated financial statements.
Substations. A substation is a facility that transforms electricity from a higher voltage to a lower voltage or vice versa. Generally, this facility is the interface between the transmission system and the distribution grid.
| As of December 31, 2023 | |||||||||||
| Number of Substations | Transformer Capacity (in Mva) | ||||||||||
| Houston Electric | 240 | 72,806 | |||||||||
| Indiana Electric | 108 | 6,913 | |||||||||
| Total CenterPoint Energy | 348 | 79,719 |
Service Centers. Service centers consist of office buildings, warehouses and repair facilities that are used in the business of transmitting and distributing electricity.
| As of December 31, 2023 | |||||||||||
| Number of Service Centers | Acres of Land | ||||||||||
| Houston Electric | 13 | 375 | |||||||||
| Indiana Electric | 6 | 70 | |||||||||
| Total CenterPoint Energy | 19 | 445 |
Natural Gas (CenterPoint Energy and CERC)
CenterPoint Energy’s and CERC’s Natural Gas use various third-party storage services or owned natural gas storage facilities to meet peak-day requirements and to manage the daily changes in demand due to changes in weather. CenterPoint Energy’s and CERC’s Natural Gas may also supplement contracted supplies and storage from time to time with stored LNG and propane-air plant production.
As of December 31, 2023, CenterPoint Energy’s and CERC’s Natural Gas owned and operated the following natural gas facilities:
| No. of Assets | Storage Capacity (Bcf) | Working Capacity (Bcf) | Maximum Daily Withdrawal Rate (MMcf) | ||||||||||||||||||||
| CenterPoint Energy | |||||||||||||||||||||||
| Underground Natural Gas Storage Facility | 8 | 43 | 14 | 305 | |||||||||||||||||||
| CERC | |||||||||||||||||||||||
| Underground Natural Gas Storage Facility | 5 | 32 | 9 | 205 |
| On-site Storage Capacity | |||||||||||||||||||||||
| No. of Assets | Daily Production Rate (Dth) | Millions of Gallons | Dth | ||||||||||||||||||||
| CenterPoint Energy and CERC | |||||||||||||||||||||||
| Propane Air-Gas Manufacturing Plant | 16 | 247,000 | 14.1 | 1,228,000 | |||||||||||||||||||
| LNG Plant Facility | 1 | 72,000 | 12.0 | 1,010,000 | |||||||||||||||||||
The table below reflects CenterPoint Energy’s and CERC’s Natural Gas contracted upstream storage services as of December 31, 2023:
| Storage Capacity (Bcf) | Maximum Peak Daily Delivery (MMcf) | |||||||||||||
| Upstream Storage Service | 84 | 2,241 | ||||||||||||
The table below reflects the approximate total linear miles of CenterPoint Energy’s and CERC’s Natural Gas distribution and transmission mains owned as of December 31, 2023:
| CenterPoint Energy | CERC | |||||||||||||
| All Locations | 84,000 | 81,000 | ||||||||||||
| Indiana and Ohio | 22,000 | 19,000 |
CenterPoint Energy’s and CERC’s Natural Gas owned mains varying in size from one-half inch to 24 inches in diameter. CenterPoint Energy’s and CERC’s Natural Gas Indiana and Ohio mains are located in Indiana and Ohio except for, in the case of CenterPoint Energy, pipeline facilities extending from points in northern Kentucky to points in southern Indiana so that gas may be transported to Indiana and sold or transported to customers in Indiana. Generally, in each of the cities, towns and rural areas served by CenterPoint Energy’s and CERC’s Natural Gas, they own the underground gas mains and service lines, metering and regulating equipment located on customers’ premises and the district regulating equipment necessary for pressure maintenance. With a few exceptions, the measuring stations at which CenterPoint Energy’s and CERC’s Natural Gas receives gas are owned, operated and maintained by others, and their distribution facilities begin at the outlet of the measuring equipment. These facilities, including odorizing equipment, are usually located on land owned by suppliers.
As of December 31, 2023, CenterPoint Energy and CERC, through CEIP, owned and operated over 217 miles of intrastate pipeline in Louisiana and Texas.
Item 3. Legal Proceedings
For a discussion of material legal and regulatory proceedings, including environmental legal proceedings that involve a governmental authority as a party and that the Registrants reasonably believe would result in $1,000,000 or more of monetary sanctions, exclusive of interest and costs, under federal, state and local laws that have been enacted or adopted regulating the discharge of materials into the environment or primarily for the purpose of protecting the environment, affecting the Registrants, please read “Business — Regulation” and “Business — Environmental Matters” in Item 1 of this report, “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources — Regulatory Matters” in Item 7 of Part II of this report and Note 15(d) to the consolidated financial statements, which information is incorporated herein by reference.
Item 4. Mine Safety Disclosures
Not applicable.
PART II
This combined Form 10-K is filed separately by three registrants: CenterPoint Energy, Houston Electric and CERC.
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
CenterPoint Energy
As of February 12, 2024, CenterPoint Energy’s common stock was held by approximately 22,703 shareholders of record. CenterPoint Energy’s common stock is listed on the NYSE and NYSE Chicago and is traded under the symbol “CNP.”
The amount of future cash dividends will be subject to determination based upon CenterPoint Energy’s financial condition and results of operations, future business prospects, any applicable contractual restrictions and other factors that CenterPoint Energy’s Board of Directors considers relevant and will be declared at the discretion of CenterPoint Energy’s Board of Directors. For further information on CenterPoint Energy’s dividends, see Note 12 to the consolidated financial statements.
Repurchases of Equity Securities
During the quarter ended December 31, 2023, none of CenterPoint Energy’s equity securities registered pursuant to Section 12 of the Securities Exchange Act of 1934, as amended, were purchased by or on behalf of CenterPoint Energy or any “affiliated purchasers,” as defined in Rule 10b-18(a)(3) under the Securities Exchange Act of 1934, as amended.
Houston Electric
As of February 12, 2024, all of Houston Electric’s 1,000 outstanding common shares were held by Utility Holding, LLC, a wholly-owned subsidiary of CenterPoint Energy.
CERC
As of February 12, 2024, all of CERC Corp.’s 1,000 outstanding shares of common stock were held by Utility Holding, LLC, a wholly-owned subsidiary of CenterPoint Energy.
Item 6. [Reserved]
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations
No Registrant makes any representations as to the information related solely to CenterPoint Energy or the subsidiaries of CenterPoint Energy other than itself.
The following combined discussion and analysis should be read in combination with the consolidated financial statements included in Item 8 herein. When discussing CenterPoint Energy’s consolidated financial information, it includes the results of Houston Electric and CERC, which, along with CenterPoint Energy, are collectively referred to as the Registrants. Where appropriate, information relating to a specific registrant has been segregated and labeled as such. Unless the context indicates otherwise, specific references to Houston Electric and CERC also pertain to CenterPoint Energy. In this combined Form 10-K, the terms “our,” “we” and “us” are used as abbreviated references to CenterPoint Energy, Inc. together with its consolidated subsidiaries, including Houston Electric and CERC, unless stated otherwise.
OVERVIEW
Background
CenterPoint Energy, Inc. is a public utility holding company. CenterPoint Energy’s operating subsidiaries own and operate electric transmission, distribution and generation and natural gas distribution facilities. For a detailed description of CenterPoint Energy’s operating subsidiaries, please read Note 1 to the consolidated financial statements.
Houston Electric is an indirect, wholly-owned subsidiary of CenterPoint Energy that provides electric transmission service to transmission service customers in the ERCOT region and distribution service to REPs serving the Texas gulf coast area that includes the city of Houston.
CERC Corp. is an indirect, wholly-owned subsidiary of CenterPoint Energy that (i) directly owns and operates natural gas distribution systems in Louisiana, Minnesota, Mississippi and Texas, (ii) indirectly, through Indiana Gas and VEDO, owns and operates natural gas distribution systems in Indiana and Ohio, respectively, and (iii) owns and operates permanent pipeline connections through interconnects with various interstate and intrastate pipeline companies through CEIP.
Reportable Segments
In this Management’s Discussion and Analysis, we discuss our results from continuing operations on a consolidated basis and individually for each of our reportable segments, which are listed below. We also discuss our liquidity, capital resources and critical accounting policies. We are first and foremost an energy delivery company and it is our intention to remain focused on these regulated segments. The results of our business operations are significantly impacted by weather, customer growth, economic conditions, cost management, competition, rate proceedings before regulatory agencies and other actions of the various regulatory agencies to whose jurisdiction we are subject, among other factors.
As of December 31, 2023, CenterPoint Energy’s reportable segments were Electric, Natural Gas, and Corporate and Other.
-
The Electric reportable segment includes electric transmission and distribution services that are subject to rate regulation in Houston Electric’s and Indiana Electric’s service territories, as well as the impacts of generation-related stranded costs and other true-up balances recoverable by the regulated electric utility and energy delivery services to electric customers and electric generation assets to serve electric customers and optimize those assets in the wholesale power market in Indiana Electric’s service territory. For further information about the Electric reportable segment, see “Business — Our Business — Electric” in Item 1 of Part I of this report.
-
The Natural Gas reportable segment includes (i) intrastate natural gas sales to, and natural gas transportation and distribution for residential, commercial, industrial and institutional customers in Indiana, Louisiana, Minnesota, Mississippi, Ohio and Texas; (ii) permanent pipeline connections through interconnects with various interstate and intrastate pipeline companies through CEIP; and (iii) home appliance maintenance and repair services to customers in Minnesota and home repair protection plans to natural gas customers in Indiana, Mississippi, Ohio and Texas through a third party. For further information about the Natural Gas reportable segment, see “Business — Our Business — Natural Gas” in Item 1 of Part I of this report.
-
The Corporate and Other reportable segment includes energy performance contracting and sustainable infrastructure services by Energy Systems Group through June 30, 2023, the date of the sale of Energy Systems Group, and corporate support operations that support CenterPoint Energy’s business operations. CenterPoint Energy’s Corporate and Other also includes office buildings and other real estate used for business operations.
Houston Electric and CERC each consist of a single reportable segment.
Subsequent Events. On February 19, 2024, CenterPoint Energy, through its subsidiary CERC Corp., entered into the LAMS Asset Purchase Agreement to sell its Louisiana and Mississippi natural gas local distribution company businesses. The transaction is expected to close in the first quarter of 2025. For further information, see Note 21 to the consolidated financial statements.
EXECUTIVE SUMMARY
We expect our businesses to continue to be affected by the key factors and trends discussed below. Our expectations are based on assumptions made by us and information currently available to us. To the extent our underlying assumptions about, or interpretations of, available information prove to be incorrect, our actual results may vary materially from our expected results.
Factors Influencing Our Businesses and Industry Trends
We are an energy delivery company with electric transmission and distribution, power generation, and natural gas distribution operations that serve more than seven million metered customers across six jurisdictions. The majority of our revenues are generated from the transmission and delivery of electricity and the sale of natural gas by our subsidiaries.
We continue to execute on our strategic goals for our businesses which were set in 2021. These include our ten-year capital plan from 2021 through 2030, a focus on targeting controllable operations and maintenance savings for the benefit of our customers, prudent capital funding including divestitures of non-core assets, and net zero and carbon emission reduction goals. Our focus continues to be on the growth of our regulated utility businesses including our electric and gas utility operations, which comprise over 95% of our earnings for the year ended December 31, 2023. See Note 11 to the consolidated financial statements for further details.
Pursuant to this business strategy and in light of the nature of our businesses, significant amounts of capital investment are reflected in our current capital plan, which has increased to nearly $44 billion through 2030, a nearly 10% increase from the original 10-year plan. These investments include a focus on additional system resiliency, reliability, and grid modernization. These investments are not only intended to meet our customers’ current needs, but are also in anticipation for further organic growth and load growth from increased electrification in our service territories. To fund these capital investments, we rely on internally generated cash, borrowings under our credit facilities, proceeds from commercial paper, cash proceeds from strategic transactions (such as the sale of our Arkansas and Oklahoma LDC businesses in 2022 and our Energy Systems Group divestiture in 2023), and issuances of equity and debt in the capital markets to satisfy these capital needs.
We strive to maintain investment grade ratings for our securities to access the capital markets on terms we consider reasonable. A reduction in our ratings generally would increase our borrowing costs for new issuances of debt, as well as
borrowing costs under
Showing the first 8K of 208K characters. Open the full section
Item 7A. Quantitative and Qualitative Disclosures About Market Risk
Impact of Changes in Interest Rates, Equity Prices and Energy Commodity Prices
The Registrants are exposed to various market risks. These risks arise from transactions entered into in the normal course of business and are inherent in the Registrants’ consolidated financial statements. Most of the revenues and income from the Registrants’ business activities are affected by market risks. Categories of market risk include exposure to commodity prices through non-trading activities, interest rates and equity prices. A description of each market risk is set forth below:
-
Interest rate risk primarily results from exposures to changes in the level of borrowings and changes in interest rates.
-
Equity price risk results from exposures to changes in prices of individual equity securities (CenterPoint Energy).
-
Commodity price risk results from exposures to price volatilities of commodities, such as natural gas, NGLs and other energy commodities (CenterPoint Energy).
Management has established comprehensive risk management policies to monitor and manage these market risks.
Interest Rate Risk
As of December 31, 2023, the Registrants had outstanding long-term debt and lease obligations and CenterPoint Energy had obligations under its ZENS that subject them to the risk of loss associated with movements in market interest rates.
CenterPoint Energy’s floating rate obligations aggregated $1.9 billion and $4.5 billion as of December 31, 2023 and 2022, respectively. If the floating interest rates were to increase by 100 basis points from December 31, 2023 rates, CenterPoint Energy’s combined interest expense would increase by approximately $19 million annually. CenterPoint Energy has $350 million aggregate principal amount of floating rate notes maturing in 2024 that will be refinanced at current rates.
Houston Electric did not have any floating rate obligations as of either December 31, 2023 or 2022.
CERC’s floating rate obligations aggregated $484 million and $1.4 billion as of December 31, 2023 and 2022, respectively. If the floating interest rates were to increase by 100 basis points from December 31, 2023 rates, CERC’s combined interest expense would increase by approximately $5 million annually. CERC has no floating rate notes maturing in 2024.
As of December 31, 2023 and 2022, CenterPoint Energy had outstanding fixed-rate debt (excluding indexed debt securities) aggregating $16.9 billion and $12.5 billion, respectively, in principal amount and having a fair value of $16.1 billion and $11.1 billion, respectively. Because these instruments are fixed-rate, they do not expose CenterPoint Energy to the risk of loss in earnings due to changes in market interest rates. However, the fair value of these instruments would increase by approximately $635 million if interest rates were to decline by 10% from their levels as of December 31, 2023. CenterPoint Energy has $500 million of fixed-rate senior notes and $23 million of SIGECO first mortgage bonds maturing in 2024 that will be refinanced at current rates.
As of December 31, 2023 and 2022, Houston Electric had outstanding fixed-rate debt aggregating $7.7 billion and $6.4 billion, respectively, in principal amount and having a fair value of approximately $7 billion and $5.6 billion, respectively. Because these instruments are fixed-rate, they do not expose Houston Electric to the risk of loss in earnings due to changes in market interest rates. However, the fair value of these instruments would increase by approximately $374 million if interest rates were to decline by 10% from their levels as of December 31, 2023. Houston Electric has no fixed-rate general mortgage bonds maturing in 2024.
As of December 31, 2023 and 2022, CERC had outstanding fixed-rate debt aggregating $4.2 billion and $3.5 billion, respectively, in principal amount and having a fair value of $4.2 billion and $3.3 billion, respectively. Because these instruments are fixed-rate, they do not expose CERC to the risk of loss in earnings due to changes in market interest rates. However, the fair value of these instruments would increase by approximately $152 million if interest rates were to decline by 10% from their levels at December 31, 2023. CERC has no fixed-rate senior notes maturing in 2024.
In general, such an increase in fair value would impact earnings and cash flows only if the Registrants were to reacquire all or a portion of these instruments in the open market prior to their maturity.
As discussed in Note 11 to the consolidated financial statements, the ZENS obligation is bifurcated into a debt component and a derivative component. The debt component of $5 million at December 31, 2023 was a fixed-rate obligation and, therefore, did not expose CenterPoint Energy to the risk of loss in earnings due to changes in market interest rates. However,
the fair value of the debt component would increase by approximately $1 million if interest rates were to decline by 10% from levels at December 31, 2023. Changes in the fair value of the derivative component, a $605 million recorded liability at December 31, 2023, are recorded in CenterPoint Energy’s Statements of Consolidated Income and, therefore, it is exposed to changes in the fair value of the derivative component as a result of changes in the underlying risk-free interest rate. If the risk-free interest rate were to increase by 10% from December 31, 2023 levels, the fair value of the derivative component liability would decrease by approximately $1 million, which would be recorded as an unrealized gain in CenterPoint Energy’s Statements of Consolidated Income.
Equity Market Value Risk (CenterPoint Energy)
CenterPoint Energy is exposed to equity market value risk through its ownership of 10.2 million shares of AT&T Common, 0.9 million shares of Charter Common and 2.5 million shares of WBD Common, which CenterPoint Energy holds to facilitate its ability to meet its obligations under the ZENS. See Note 11 to the consolidated financial statements for a discussion of CenterPoint Energy’s ZENS obligation. Changes in the fair value of the ZENS-Related Securities held by CenterPoint Energy are expected to substantially offset changes in the fair value of the derivative component of the ZENS. A decrease of 10% from the December 31, 2023 aggregate market value of these shares would result in a net loss of less than $1 million, which would be recorded as a loss on debt securities in CenterPoint Energy’s Statements of Consolidated Income.
Commodity Price Risk From Non-Trading Activities (CenterPoint Energy)
CenterPoint Energy’s regulated operations are exposed to commodity price risk during severe weather events such as hurricanes, tornadoes and severe winter weather conditions. Severe weather events can increase commodity prices related to natural gas, coal and purchased power, which may increase our costs of providing service, and those costs may not be recoverable in rates. Recovery of cost increases driven by rising commodity prices during severe weather events could be resisted by our regulators and our regulators might attempt to deny or defer timely recovery of those costs.
However, CenterPoint Energy’s regulated operations in Indiana have limited exposure to commodity price risk for transactions involving purchases and sales of natural gas, coal and purchased power for the benefit of retail customers due to current state regulations, which, subject to compliance with those regulations, allow for recovery of the cost of such purchases through natural gas and fuel cost adjustment mechanisms. CenterPoint Energy’s utility natural gas operations in Indiana have regulatory authority to lock in pricing for up to 50% of annual natural gas purchases using arrangements with an original term of up to 10 years. This authority has been utilized to secure fixed price natural gas using both physical purchases and financial derivatives. As of December 31, 2023, the recorded fair value of non-trading energy derivative liability was $12 million for CenterPoint Energy’s utility natural gas operations in Indiana, which is offset by a regulatory asset.
Natural gas and coal prices have other effects on working capital requirements, interest costs, and some level of price-sensitivity in volumes sold or delivered. Constructive regulatory orders, such as those authorizing lost margin recovery, other innovative rate designs and recovery of unaccounted for natural gas and other natural gas-related expenses, also mitigate the effect natural gas costs may have on CenterPoint Energy’s financial condition. In 2008, the PUCO approved an exit of the merchant function in CenterPoint Energy’s Ohio natural gas service territory, allowing Ohio customers to purchase substantially all natural gas directly from retail marketers rather than from CenterPoint Energy.
Item 8. Financial Statements and Supplementary Data
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Shareholders and the Board of Directors of
CenterPoint Energy, Inc.
Opinion on the Financial Statements
We have audited the accompanying consolidated balance sheets of CenterPoint Energy, Inc. and subsidiaries (the "Company") as of December 31, 2023 and 2022, the related statements of consolidated income, comprehensive income, changes in equity, and cash flows, for each of the three years in the period ended December 31, 2023, and the related notes (collectively referred to as the "financial statements"). In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2023 and 2022, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2023, in conformity with accounting principles generally accepted in the United States of America.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 20, 2024, expressed an unqualified opinion on the Company's internal control over financial reporting.
Basis for Opinion
These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company's financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current-period audit of the financial statements that was communicated or required to be communicated to the audit committee and that (1) relates to accounts or disclosures that are material to the financial statements and (2) involved especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.
Impact of Rate Regulation on the Financial Statements — Refer to Note 7 to the financial statements
Critical Audit Matter Description
The Company is subject to rate regulation by regulators and commissions in various jurisdictions (collectively, the “Commissions”) that have jurisdiction with respect to the rates of electric and gas transmission and distribution companies in those jurisdictions. Management has determined its regulated operations meet the requirements under accounting principles generally accepted in the United States of America to prepare its financial statements applying the specialized rules to account for the effects of cost-based rate regulation. The impacts of accounting for the economics of rate regulation are pervasive to the financial statements and disclosures.
The Company’s rates are subject to regulatory rate-setting processes by the Commissions. Rates are determined and approved in regulatory proceedings based on an analysis of the Company’s costs to provide utility service and a return on, and recovery of, the Company’s investment in the utility business. Regulatory decisions can have an impact on the recovery of costs, the rate of return earned on investment, and the timing and amount of assets to be recovered in rates. The Commissions’ regulation of rates is premised on the full recovery of prudently incurred costs and a reasonable rate of return on invested capital. Decisions to be made by the Commissions in the future will impact the accounting for regulated operations, including decisions about the amount of allowable costs and return on invested capital included in rates and any refunds that may be required. While the Company has indicated it expects to recover costs from customers through regulated rates, there is a risk that the Commissions will not approve: (1) full recovery of the costs of providing utility service, or (2) full recovery of all amounts invested in the utility business and a reasonable return on that investment.
We identified rate regulation as a critical audit matter due to the significant judgments made by management to support its assertions about certain affected account balances and disclosures and the high degree of subjectivity involved in assessing the impact of regulatory actions on the financial statements. Management’s judgments include assessing the likelihood of (1) recovery in future rates of incurred costs, (2) a disallowance of capital investments made by the Company and (3) refunds to customers. Given that certain of management’s accounting judgments are based on assumptions about the outcome of decisions by the Commissions, auditing these judgments required specialized knowledge of accounting for rate regulation and the rate setting process.
How the Critical Audit Matter Was Addressed in the Audit
Our audit procedures related to the potential uncertainty of decisions by the Commissions included the following, among others:
-
We evaluated the Company’s disclosures related to the effects of rate regulation by testing certain recorded balances and evaluating regulatory developments.
-
We read relevant regulatory orders issued by the Commissions, regulatory statutes, filings made by the Company and intervenors, and other external information. We evaluated relevant external information and compared it to certain recorded regulatory asset and liability balances for completeness.
-
For certain regulatory matters, we inspected the Company’s filings with the Commissions and the filings with the Commissions by intervenors to assess the likelihood of recovery in future rates or of a future reduction in rates based on precedents of the Commissions’ treatment of similar costs under similar circumstances.
/s/ DELOITTE & TOUCHE LLP
Houston, Texas
February 20, 2024
We have served as the Company's auditor since 1932.
CENTERPOINT ENERGY, INC. AND SUBSIDIARIES
STATEMENTS OF CONSOLIDATED INCOME
| Year Ended December 31, | |||||||||||||||||
| 2023 | 2022 | 2021 | |||||||||||||||
| (in millions, except per share amounts) | |||||||||||||||||
| Revenues: | |||||||||||||||||
| Utility revenues | $ | 8,524 | $ |
Showing the first 8K of 451K characters. Open the full section
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure
None.
Item 9A. Controls and Procedures
Disclosure Controls And Procedures
In accordance with Exchange Act Rules 13a-15 and 15d-15, the Registrants carried out separate evaluations, under the supervision and with the participation of each company’s management, including the principal executive officer and principal financial officer, of the effectiveness of the disclosure controls and procedures as of the end of the period covered by this report. Based on those evaluations, the principal executive officer and principal financial officer, in each case, concluded that the disclosure controls and procedures were effective as of December 31, 2023 to provide assurance that information required to be disclosed in the reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and such information is accumulated and communicated to management, including the principal executive officer and principal financial officer, as appropriate to allow timely decisions regarding disclosure.
There has been no change in the Registrants’ internal controls over financial reporting that occurred during the three months ended December 31, 2023 that has materially affected, or is reasonably likely to materially affect, the Registrants’ internal controls over financial reporting.
Management’s Annual Report on Internal Control over Financial Reporting
The Registrants’ management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is defined in Rule 13a-15(f) or 15d-15(f) promulgated under the Securities Exchange Act of 1934 as a process designed by, or under the supervision of, the Registrants’ principal executive and principal financial officers and effected by CenterPoint Energy’s board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles and includes those policies and procedures that:
-
Pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the Registrants;
-
Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Registrants are being made only in accordance with authorizations of management and directors of the Registrants; and
-
Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Registrants’ assets that could have a material effect on the financial statements.
Management has designed its internal control over financial reporting to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements in accordance with accounting principles generally accepted in the United States of America. Management’s assessment included review and testing of both the design effectiveness and operating effectiveness of controls over all relevant assertions related to all significant accounts and disclosures in the financial statements.
All internal control systems, no matter how well designed, have inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Under the supervision and with the participation of the Registrants’ management, including their respective principal executive officers and principal financial officers, the Registrants conducted an evaluation of the effectiveness of their internal control over financial reporting based on the framework in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on the Registrants’ evaluation under the framework in Internal Control — Integrated Framework (2013), the Registrants’ management has concluded, in each case, that their internal control over financial reporting was effective as of December 31, 2023.
Deloitte & Touche LLP, CenterPoint Energy’s independent registered public accounting firm, has issued an attestation report on the effectiveness of CenterPoint Energy’s internal control over financial reporting as of December 31, 2023 which is set forth below. This report is not applicable to Houston Electric or CERC as they are not accelerated or large accelerated filers.
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Shareholders and Board of Directors of
CenterPoint Energy, Inc.
Opinion on Internal Control over Financial Reporting
We have audited the internal control over financial reporting of CenterPoint Energy, Inc. and subsidiaries (the “Company”) as of December 31, 2023, based on criteria established in Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control — Integrated Framework (2013) issued by COSO.
We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements as of and for the year ended December 31, 2023, of the Company and our report dated February 20, 2024, expressed an unqualified opinion on those financial statements.
Basis for Opinion
The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
/s/ DELOITTE & TOUCHE LLP
Houston, Texas
February 20, 2024
Item 9B. Other Information
Amendments to Articles of Incorporation or Bylaws; Change in Fiscal Year (CenterPoint Energy)
On February 16, 2024, CenterPoint Energy filed the following statements of resolutions with the Secretary of State of the State of Texas for the purpose of deleting the Series A Preferred Stock, the Series B Preferred Stock and the Series C Preferred Stock from CenterPoint Energy’s Restated Articles of Incorporation:
-
Statement of Resolutions Deleting Series of Shares designated Series A Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Stock of CenterPoint Energy, Inc. (the Series A Statement of Resolutions);
-
Statement of Resolutions Deleting Series of Shares designated 7.00% Series B Mandatory Convertible Preferred Stock of CenterPoint Energy, Inc. (the Series B Statement of Resolutions); and
-
Statement of Resolutions Deleting Series of Shares designated Series C Mandatory Convertible Preferred Stock of CenterPoint Energy, Inc. (the Series C Statement of Resolutions and, collectively with the Series A Statement of Resolutions and the Series B Statement of Resolutions, the Statements of Resolutions).
None of the previously issued shares of Series A Preferred Stock, Series B Preferred Stock or Series C Preferred Stock remained outstanding prior to filing the Statements of Resolutions.
Effective upon filing, the Statements of Resolutions deleted all references to the Series A Preferred Stock, the Series B Preferred Stock and the Series C Preferred Stock contained in CenterPoint Energy’s Restated Articles of Incorporation. The shares that were designated to such series were returned to the status of authorized but unissued shares of preferred stock, par value $0.01 per share, of CenterPoint Energy, without designation as to series.
Copies of the Series A Statement of Resolutions, the Series B Statement of Resolutions and the Series C Statement of Resolutions are filed as Exhibits 3(m), 3(n) and 3(o), respectively, and are incorporated herein by reference.
Effective February 16, 2024, the Board amended and restated CenterPoint Energy’s bylaws (the Bylaws). The Bylaws include, among other things, the following changes:
-
revise procedures and disclosure for the nomination of directors and the submission of proposals for consideration at meetings of the shareholders of CenterPoint Energy, including, among other things, (x) consolidating the advance notice provisions applicable to all proposals (i.e., director nominations, proposals to amend CenterPoint Energy’s bylaws, proposals to remove directors and all other proposals (other than “proxy access” nominations and shareholder proposals made pursuant to Section 14a-8 of the Securities and Exchange Act of 1934, as amended (the “Exchange Act”)) into a single section and (y) adding a requirement that a shareholder seeking to nominate director(s) at an annual meeting deliver to CenterPoint Energy reasonable evidence that it has complied with the requirements of Rule 14a-19 of the Exchange Act within eight business days of the meeting;
-
clarify that for the applicability of the majority voting standard for uncontested elections of directors, an election remains “contested” (and the plurality voting standard applies) even if the Board determines that a shareholder’s nomination notice does not comply with the advance notice bylaws;
-
adopt a forum selection bylaw to provide that the U.S. federal district courts shall be the exclusive forum for the resolution of claims under the Securities Act of 1933, as amended; and
-
make certain administrative, modernizing, clarifying and conforming changes, including (x) making updates to reflect amendments to the Texas Business Organizations Code, as amended, (y) expressly providing that meetings of shareholders may be held in whole or in part by means of remote communications in accordance with applicable law and (z) adopting gender-neutral terms when referring to particular positions, offices or title holders, including the adoption of the title Chair in place of Chairman.
The foregoing description of the terms of the Bylaws does not purport to be complete and is subject to, and qualified in its entirety by, reference to the complete text of the Bylaws. The Bylaws, along with a copy marked to show changes from the prior version, are included as Exhibits 3(h) and 3(i), respectively, to this Annual Report on Form 10-K and incorporated by reference herein.
Compensatory Arrangements of Certain Officers (CenterPoint Energy)
On February 15, 2024, the Compensation Committee approved new forms of award agreement under CenterPoint Energy’s LTIP for restricted stock unit awards and performance unit awards.
The newly approved forms of award agreement for officers and director employees revise and simplify the retirement provisions by adopting a single retirement provision that provides the opportunity for full vesting if the award was granted prior to the calendar year of the participant’s retirement or pro-rata vesting if the award was granted in the calendar year of the participants retirement, in all cases subject to achievement of the relevant performance metrics. To be eligible for such retirement vesting, the participant must (i) be at least 55 years old with a sum of age and years of service of 65 or greater, (ii) provide at least three months’ written notice (or reasonable advance written notice for officers subject to Section 16 of the Exchange Act) of retirement, and (iii) provide a comprehensive transition plan. In addition, for officers subject to Section 16 of the Exchange Act, eligibility for retirement vesting is subject to approval by the Compensation Committee.
In addition, the newly approved forms of award agreement revised the non-solicitation and confidentiality provisions to reflect changes in the law.
The description of the forms of award agreement are qualified in their entirety by reference to the full text of the respective form award agreement, which are included as Exhibits 10(cc)(13), 10(cc)(14), and 10(cc)(15).
On February 15, 2024, the Compensation Committee also approved 3-year ratable vesting for annual restricted stock unit awards under which one third (1/3) of the underlying units vest and are payable as of the first three anniversaries of the grant date, subject to the participant’s continued employment and achievement of the applicable performance goal. The Compensation Committee also approved a price-to-earnings (P/E) modifier to performance share unit awards under the Company’s LTIP based on total shareholder return. Under the P/E modifier, if CenterPoint Energy’s P/E ratio ranks in the top quartile of CenterPoint Energy’s peer group, a P/E modifier will apply that provides for a minimum 75% payout level for the award regardless of the level of total shareholder return performance achieved. This vesting schedule and the P/E modifier does not apply to previously granted awards.
Rule 10b5-1 Trading Arrangements
During the three months ended December 31, 2023, no director or officer of CenterPoint Energy, Houston Electric or CERC adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K.
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections
Not Applicable.
PART III
Item 10. Directors, Executive Officers and Corporate Governance
For CenterPoint Energy, the information called for by Item 10, to the extent not set forth in “Information About Our Executive Officers” in Item 1 of Part I of this report, will be set forth in the definitive proxy statement relating to CenterPoint Energy’s 2024 annual meeting of shareholders pursuant to SEC Regulation 14A. Such definitive proxy statement relates to a meeting of shareholders involving the election of directors and the portions thereof called for by Item 10 are incorporated herein by reference pursuant to Instruction G to Form 10-K.
For Houston Electric and CERC, the information called for by Item 10 is omitted pursuant to Instruction I(2) to Form 10-K (Omission of Information by Certain Wholly-Owned Subsidiaries).
Item 11. Executive Compensation
For CenterPoint Energy, the information called for by Item 11 will be set forth in the definitive proxy statement relating to CenterPoint Energy’s 2024 annual meeting of shareholders pursuant to SEC Regulation 14A. Such definitive proxy statement relates to a meeting of shareholders involving the election of directors and the portions thereof called for by Item 11 are incorporated herein by reference pursuant to Instruction G to Form 10-K.
For Houston Electric and CERC, the information called for by Item 11 is omitted pursuant to Instruction I(2) to Form 10-K (Omission of Information by Certain Wholly-Owned Subsidiaries).
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
For CenterPoint Energy, the information called for by Item 12 will be set forth in the definitive proxy statement relating to CenterPoint Energy’s 2024 annual meeting of shareholders pursuant to SEC Regulation 14A. Such definitive proxy statement relates to a meeting of shareholders involving the election of directors and the portions thereof called for by Item 12 are incorporated herein by reference pursuant to Instruction G to Form 10-K.
For Houston Electric and CERC, the information called for by Item 12 is omitted pursuant to Instruction I(2) to Form 10-K (Omission of Information by Certain Wholly-Owned Subsidiaries).
Item 13. Certain Relationships and Related Transactions, and Director Independence
For CenterPoint Energy, the information called for by Item 13 will be set forth in the definitive proxy statement relating to CenterPoint Energy’s 2024 annual meeting of shareholders pursuant to SEC Regulation 14A. Such definitive proxy statement relates to a meeting of shareholders involving the election of directors and the portions thereof called for by Item 13 are incorporated herein by reference pursuant to Instruction G to Form 10-K.
For Houston Electric and CERC, the information called for by Item 13 is omitted pursuant to Instruction I(2) to Form 10-K (Omission of Information by Certain Wholly-Owned Subsidiaries).
Item 14. Principal Accounting Fees and Services
For CenterPoint Energy, the information called for by Item 14 will be set forth in the definitive proxy statement relating to CenterPoint Energy’s 2024 annual meeting of shareholders pursuant to SEC Regulation 14A. Such definitive proxy statement relates to a meeting of shareholders involving the election of directors and the portions thereof called for by Item 14 are incorporated herein by reference pursuant to Instruction G to Form 10-K.
Aggregate fees billed to Houston Electric and CERC during the years ended December 31, 2023 and 2022 by their principal accounting firm, Deloitte & Touche LLP, are set forth below**.**
| Year Ended December 31, | |||||||||||||||||||||||
| 2023 | 2022 | ||||||||||||||||||||||
| Houston Electric | CERC | Houston Electric | CERC | ||||||||||||||||||||
| Audit fees (1) | $ | 843,661 | $ | 1,155,700 | $ | 708,180 | $ | 965,700 | |||||||||||||||
| Audit-related fees (2) | 530,000 | 410,000 | 435,000 | 559,000 | |||||||||||||||||||
| Total audit and audit-related fees | 1,373,661 | 1,565,700 | 1,143,180 | 1,524,700 | |||||||||||||||||||
| Tax fees | — | — | — | — | |||||||||||||||||||
| All other fees | — | — | — | — | |||||||||||||||||||
| Total fees | $ | 1,373,661 | $ | 1,565,700 | $ | 1,143,180 | $ | 1,524,700 |
(1)For 2023 and 2022, amounts include fees for services provided by the principal accounting firm relating to the integrated audit of financial statements and internal control over financial reporting, statutory audits, attest services, and regulatory filings.
(2)For 2023 and 2022, amounts include fees for consultations concerning financial accounting and reporting standards and various agreed-upon or expanded procedures related to accounting records to comply with financial accounting or regulatory reporting matters.
Houston Electric and CERC each are not required to have, and do not have, an audit committee.
PART IV
Item 15. Exhibits and Financial Statement Schedules
(a)(1) Financial Statements.
| CenterPoint Energy | |||||
| Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) | 84 | ||||
| Statements of Consolidated Income for the Three Years Ended December 31, 2023 | 86 | ||||
| Statements of Consolidated Comprehensive Income for the Three Years Ended December 31, 2023 | 87 | ||||
| Consolidated Balance Sheets as of December 31, 2023 and 2022 | 88 | ||||
| Statements of Consolidated Cash Flows for the Three Years Ended December 31, 2023 | 90 | ||||
| Statements of Consolidated Changes in Equity for the Three Years Ended December 31, 2023 | 91 | ||||
| Houston Electric | |||||
| Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) | 92 | ||||
| Statements of Consolidated Income for the Three Years Ended December 31, 2023 | 94 | ||||
| Statements of Consolidated Comprehensive Income for the Three Years Ended December 31, 2022 | 1 | ||||
| Consolidated Balance Sheets as of December 31, 2023 and 2022 | 95 | ||||
| Statements of Consolidated Cash Flows for the Three Years Ended December 31, 2023 | 97 | ||||
| Statements of Consolidated Changes in Equity for the Three Years Ended December 31, 2023 | 97 | ||||
| CERC | |||||
| Report of Independent Registered Public Accounting Firm (PCAOB ID No. 34) | 99 | ||||
| Statements of Consolidated Income for the Three Years Ended December 31, 2023 | 101 | ||||
| Statements of Consolidated Comprehensive Income for the Three Years Ended December 31, 2023 | 102 | ||||
| Consolidated Balance Sheets as of December 31, 2023 and 2022 | 103 | ||||
| Statements of Consolidated Cash Flows for the Three Years Ended December 31, 2023 | 105 | ||||
| Statements of Consolidated Changes in Equity for the Three Years Ended December 31, 2023 | 106 | ||||
| Combined Notes to Consolidated Financial Statements | 107 |
The financial statements of Enable Midstream Partners, LP required pursuant to Rule 3-09 of Regulation S-X are included in this filing for CenterPoint Energy as Exhibit 99.1.
(a)(2) Financial Statement Schedules for the Three Years Ended December 31, 2023
The following schedules are omitted by the Registrants because of the absence of the conditions under which they are required or because the required information is included in the financial statements:
I, II, III, IV and V.
(a)(3) Exhibits.
See Index of Exhibits beginning on page 179, which index also includes the management contracts or compensatory plans or arrangements required to be filed as exhibits to this Form 10-K by Item 601(b)(10)(iii) of Regulation S-K.
Item 16. Form 10-K Summary
None.
CENTERPOINT ENERGY, INC. AND SUBSIDIARIES
CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC AND SUBSIDIARIES
CENTERPOINT ENERGY RESOURCES CORP. AND SUBSIDIARIES
EXHIBITS TO THE COMBINED ANNUAL REPORT ON FORM 10-K
For Fiscal Year Ended December 31, 2023
INDEX OF EXHIBITS
Exhibits included with this report are designated by a cross (†); all exhibits not so designated are incorporated herein by reference to a prior filing as indicated. Exhibits designated by an asterisk (*) are management contracts or compensatory plans or arrangements required to be filed as exhibits to this Form 10-K by Item 601(b)(10)(iii) of Regulation S-K. The Registrants have not filed the exhibits and schedules to Exhibit 2. The Registrants hereby agree to furnish supplementally a copy of any schedule omitted from Exhibit 2 to the SEC upon request.
The agreements included as exhibits are included only to provide information to investors regarding their terms. The agreements listed below may contain representations, warranties and other provisions that were made, among other things, to provide the parties thereto with specified rights and obligations and to allocate risk among them, and such agreements should not be relied upon as constituting or providing any factual disclosures about us, any other persons, any state of affairs or other matters.
| Exhibit Number | Description | Report or Registration Statement | SEC File or Registration Number | Exhibit Reference | CenterPoint Energy | Houston Electric | CERC | |||||||||||||||||||||||||||||||||||||
| 2(a) | — | Transaction Agreement dated July 21, 2004 among CenterPoint Energy, Utility Holding, LLC, NN Houston Sub, Inc., Texas Genco Holdings, Inc. (Texas Genco), HPC Merger Sub, Inc. and GC Power Acquisition LLC | CenterPoint Energy’s Form 8-K dated July 21, 2004 | 1-31447 | 10.1 | X | ||||||||||||||||||||||||||||||||||||||
| 2(b) | — | Agreement and Plan of Merger, dated as of April 21, 2018, by and among Vectren Corporation, CenterPoint Energy, Inc. and Pacer Merger Sub, Inc. | CenterPoint Energy’s Form 8-K dated April 21, 2018 | 1-31447 | 2.1 | X | ||||||||||||||||||||||||||||||||||||||
| 2(c)(1) | — | Agreement and Plan of Merger among CERC, Houston Lighting and Power Company (“HL&P”), HI Merger, Inc. and NorAm Energy Corp. (“NorAm”) dated August 11, 1996 | Houston Industries’ (“HI’s”) Form 8-K dated August 11, 1996 | 1-7629 | 2 | X | ||||||||||||||||||||||||||||||||||||||
| 2(c)(2) | — | Amendment to Agreement and Plan of Merger among CERC, HL&P, HI Merger, Inc. and NorAm dated August 11, 1996 | Registration Statement on Form S-4 | 333-11329 | 2(c) | X | ||||||||||||||||||||||||||||||||||||||
| 2(d) | — | Agreement and Plan of Merger dated December 29, 2000 merging Reliant Resources Merger Sub, Inc. with and into Reliant Energy Services, Inc. | Registration Statement on Form S-3 | 333-54526 | 2 | X | ||||||||||||||||||||||||||||||||||||||
| 2(e) | — | Master Formation Agreement dated March 14, 2013 by and among CenterPoint Energy, Inc., OGE Energy Corp., Bronco Midstream Holdings, LLC and Bronco Midstream Holdings II, LLC. | CenterPoint Energy’s Form 8-K dated March 14, 2013 | 1-31447 | 2.1 | X | X |