Cover and table of contents
32K characters. Original on sec.gov · Markdown
Cover and table of contents
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
| ☒ | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
F****or the fiscal year ended December 31**,** 2025
OR
| ☐ | TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 |
For the transition period from to
| Commission File Number | Exact name of registrants as specified in their charters | I.R.S. Employer Identification Number |
| 001-08489 | DOMINION ENERGY, INC. | 54-1229715 |
| 000-55337 | Virginia ELECTRIC AND POWER COMPANY | 54-0418825 |
| Virginia (S**tate or other jurisdiction of incorporation or organization) | ||
| 600 EAST CANAL STREET RICHMOND**,** Virginia (Address of principal executive offices) | 23219 (Zip Code) | |
| (804) 819-2284 (Registrants’ telephone number) |
Securities registered pursuant to Section 12(b) of the Act:
| Registrant | Trading Symbol | Title of Each Class | Name of Each Exchange on Which Registered |
| DOMINION ENERGY, INC. | D | Common Stock, no par value | New York Stock Exchange |
Securities registered pursuant to Section 12(g) of the Act:
VIRGINIA ELECTRIC AND POWER COMPANY
Common Stock, no par value
Indicate by check mark whether the registrant is a well-known seasoned issuer as defined in Rule 405 of the Securities Act.
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Dominion Energy, Inc. Yes ☒ No ☐ Virginia Electric and Power Company Yes ☒ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “non-accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Dominion Energy, Inc.
| Large accelerated filer | ☒ | Accelerated filer | ☐ | Emerging growth company | ☐ |
| Non-accelerated filer | ☐ | Smaller reporting company | ☐ | ||
Virginia Electric and Power Company
| Large accelerated filer | ☐ | Accelerated filer | ☐ | Emerging growth company | ☐ | |
| Non-accelerated filer | ☒ | Smaller reporting company | ☐ | |||
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.
Dominion Energy, Inc. ☒ Virginia Electric and Power Company ☐
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☒
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☒
Indicate by check mark whether the registrant is a shell company (as defined by Rule 12b-2 of the Act).
Dominion Energy, Inc. Yes ☐ No ☒ Virginia Electric and Power Company Yes ☐ No ☒
The aggregate market value of Dominion Energy, Inc. common stock held by non-affiliates of Dominion Energy, Inc. was approximately $48.2 billion based on the closing price of Dominion Energy, Inc.’s common stock as reported on the New York Stock Exchange as of the last day of Dominion Energy, Inc.’s most recently completed second fiscal quarter. Dominion Energy, Inc. is the sole holder of Virginia Electric and Power Company common stock. At February 16, 2026, Dominion Energy, Inc. had 878,785,631 shares of common stock outstanding and Virginia Electric and Power Company had 373,881 shares of common stock outstanding.
DOCUMENT INCORPORATED BY REFERENCE
Portions of Dominion Energy, Inc.’s 2026 Proxy Statement are incorporated by reference in Part III.
This combined Form 10-K represents separate filings by Dominion Energy, Inc. and Virginia Electric and Power Company. Information contained herein relating to an individual registrant is filed by that registrant on its own behalf. Virginia Electric and Power Company makes no representations as to the information relating to Dominion Energy, Inc.’s other operations.
VIRGINIA ELECTRIC AND POWER COMPANY MEETS THE CONDITIONS SET FORTH IN GENERAL INSTRUCTION I(1)(a) AND (b) OF FORM 10-K AND IS FILING THIS FORM 10-K UNDER THE REDUCED DISCLOSURE FORMAT.
Dominion Energy, Inc. and Virginia Electric and Power Company
Glossary of Terms
The following abbreviations or acronyms used in this Form 10-K are defined below:
| Abbreviation or Acronym | Definition | |
| 2017 Tax Reform Act | An Act to Provide for Reconciliation Pursuant to Titles II and V of the Concurrent Resolution on the Budget for Fiscal Year 2018 (previously known as The Tax Cuts and Jobs Act) enacted on December 22, 2017 | |
| 2021 Triennial Review | Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the four successive 12-month test periods beginning January 1, 2017 and ending December 31, 2020 | |
| 2023 Biennial Review | Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2021 and ending December 31, 2022 and prospective rate base setting for the succeeding annual periods beginning January 1, 2024 and ending December 31, 2025 | |
| 2024 Series A JSNs | Dominion Energy’s 2024 Series A Enhanced Junior Subordinated Notes due 2055 | |
| 2024 Series B JSNs | Dominion Energy’s 2024 Series B Enhanced Junior Subordinated Notes due 2054 | |
| 2024 Series C JSNs | Dominion Energy’s 2024 Series C Enhanced Junior Subordinated Notes due 2055 | |
| 2025 Biennial Review | Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2023 and ending December 31, 2024 and prospective rate base setting for the succeeding annual periods beginning January 1, 2026 and ending December 31, 2027 | |
| 2025 Series A JSNs | Dominion Energy’s 2025 Series A Junior Subordinated Notes due 2056 | |
| 2025 Series B JSNs | Dominion Energy’s 2025 Series B Junior Subordinated Notes due 2056 | |
| 2026 Proxy Statement | Dominion Energy 2026 Proxy Statement, File No. 001-08489 | |
| 2027 Biennial Review | Future Virginia Commission review of Virginia Power’s earned return on base rate generation and distribution services for the two successive 12-month test periods beginning January 1, 2025 and ending December 31, 2026 and prospective rate base setting for the succeeding annual periods beginning January 1, 2028 and ending December 31, 2029 | |
| ABO | Accumulated benefit obligation | |
| AEP | The legal entity American Electric Power Company, Inc., one or more of its consolidated subsidiaries, or the entirety of American Electric Power Company, Inc. and its consolidated subsidiaries | |
| AES | The legal entity The AES Corporation, one or more of its consolidated subsidiaries, or the entirety of The AES Corporation and its consolidated subsidiaries | |
| AFUDC | Allowance for funds used during construction | |
| Align RNG | Align RNG, LLC, a joint venture between Dominion Energy and Smithfield Foods, Inc. | |
| Altavista | Altavista biomass power station | |
| AOCI | Accumulated other comprehensive income (loss) | |
| ARO | Asset retirement obligation | |
| Atlantic Coast Pipeline | Atlantic Coast Pipeline, LLC, a limited liability company owned by Dominion Energy and Duke Energy | |
| Atlantic Coast Pipeline Project | A previously proposed approximately 600-mile natural gas pipeline running from West Virginia through Virginia to North Carolina which would have been owned by Dominion Energy and Duke Energy | |
| bcf | Billion cubic feet | |
| Bear Garden | A 622 MW combined-cycle, natural gas-fired power station in Buckingham County, Virginia | |
| Bedford | A 70 MW solar generation facility in Chesapeake, Virginia | |
| BHE | The legal entity, Berkshire Hathaway Energy Company, one or more of its consolidated subsidiaries (including Eastern Energy Gas Holdings, LLC, Northeast Midstream Partners, LP and Cove Point effective November 2020), or the entirety of Berkshire Hathaway Energy Company and its consolidated subsidiaries | |
| Birdseye | Birdseye Renewable Energy, LLC | |
| BLS Industry Average OSHA Recordable Rate | An average of the OSHA Recordable Rate published by the Bureau of Labor Statistics for electric power generation, transmission and distribution (NAICS code 2211) and natural gas distribution (NAICS code 2212) | |
| BOEM | U.S. Department of Interior’s Bureau of Ocean Energy Management | |
| Brunswick County | A 1,376 MW combined-cycle, natural gas-fired power station in Brunswick County, Virginia | |
| CAA | Clean Air Act | |
| CAISO | California ISO | |
| Canadys Station | A proposed 2.2 GW advanced class combined cycle natural gas-fired power station in Colleton County, South Carolina, to be jointly owned by DESC and Santee Cooper | |
| CAO | Chief Accounting Officer | |
| CCR | Coal combustion residual | |
| CCRO | Customer credit reinvestment offset | |
| CEA | Commodity Exchange Act | |
| CEO | Chief Executive Officer | |
| CERCLA | Comprehensive Environmental Response, Compensation and Liability Act of 1980, also known as Superfund |
| Abbreviation or Acronym | Definition | |
| CFIUS | The Committee on Foreign Investment in the U.S. | |
| CFO | Chief Financial Officer | |
| CH4 | Methane | |
| Chesterfield Energy Reliability Center | A proposed 944 MW simple-cycle, natural gas-fired power station in Chesterfield County, Virginia | |
| CNG | Consolidated Natural Gas Company | |
| CO2 | Carbon dioxide | |
| CODM | Chief Operating Decision Maker | |
| Community Energy Act | House Bill 2346, known as the Community Energy Act, which was signed into law in the Commonwealth of Virginia in May 2025 | |
| Companies | Dominion Energy and Virginia Power, collectively | |
| Contracted Energy | Contracted Energy operating segment | |
| Cooling degree days | Units measuring the extent to which the average daily temperature is greater than 65 degrees Fahrenheit, or 75 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 75 degrees, as applicable, and the average temperature for that day | |
| Cove Point | Cove Point LNG, LP (formerly known as Dominion Energy Cove Point LNG, LP) | |
| CPCN | Certificate of Public Convenience and Necessity | |
| CVOW Commercial Project | A proposed 2.6 GW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters adjacent to the CVOW Pilot Project and associated interconnection facilities in and around Virginia Beach, Virginia | |
| CVOW Pilot Project | A 12 MW wind generation facility 27 miles off the coast of Virginia Beach, Virginia in federal waters | |
| CWA | Clean Water Act | |
| DECP Holdings | The legal entity DECP Holdings, Inc., which held Dominion Energy’s noncontrolling interest in Cove Point (through September 2023) | |
| DES | Dominion Energy Services, Inc. | |
| DESC | The legal entity, Dominion Energy South Carolina, Inc., one or more of its consolidated entities or operating segment, or the entirety of Dominion Energy South Carolina, Inc. and its consolidated entities | |
| Dodd-Frank Act | The Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 | |
| DOE | U.S. Department of Energy | |
| Dominion Energy | The legal entity, Dominion Energy, Inc., one or more of its consolidated subsidiaries (other than Virginia Power) or operating segments, or the entirety of Dominion Energy, Inc. and its consolidated subsidiaries | |
| Dominion Energy Direct® | A dividend reinvestment and open enrollment direct stock purchase plan | |
| Dominion Energy South Carolina | Dominion Energy South Carolina operating segment | |
| Dominion Energy Virginia | Dominion Energy Virginia operating segment | |
| Dominion Privatization | Dominion Utility Privatization, LLC, a joint venture between Dominion Energy and Patriot | |
| DSM | Demand-side management | |
| DSM Riders | Rate adjustment clauses, designated Riders C1A, C2A, C3A and C4A, associated with the recovery of costs related to certain Virginia DSM programs in approved DSM cases | |
| Dth | Dekatherm | |
| Duke Energy | The legal entity, Duke Energy Corporation, one or more of its consolidated subsidiaries, or the entirety of Duke Energy Corporation and its consolidated subsidiaries | |
| Eagle Solar | Eagle Solar, LLC, a wholly-owned subsidiary of Dominion Generation, Inc. | |
| East Ohio | The East Ohio Gas Company (a subsidiary of Enbridge effective March 2024) | |
| East Ohio Transaction | The sale by Dominion Energy to Enbridge of all issued and outstanding capital stock in Dominion Energy Questar Corporation and its consolidated subsidiaries, which following a reorganization included East Ohio and Dominion Energy Gas Distribution, LLC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on March 6, 2024 | |
| Enbridge | The legal entity, Enbridge Inc., one or more of its consolidated subsidiaries (including Enbridge Elephant Holdings, LLC, Enbridge Parrot Holdings, LLC and Enbridge Quail Holdings, LLC), or the entirety of Enbridge Inc. and its consolidated subsidiaries | |
| EPA | U.S. Environmental Protection Agency | |
| EPACT | Energy Policy Act of 2005 | |
| EPS | Earnings per common share | |
| ERISA | Employee Retirement Income Security Act of 1974 | |
| ESA | Endangered Species Act | |
| Excess Tax Benefits | Benefits of tax deductions in excess of the compensation cost recognized for stock-based compensation | |
| FASB | Financial Accounting Standards Board | |
| FCC | Federal Communications Commission | |
| FERC | Federal Energy Regulatory Commission |
| Abbreviation or Acronym | Definition | |
| FirstEnergy | The legal entity FirstEnergy Corp., one or more of its consolidated subsidiaries, or the entirety of FirstEnergy Corp. and its consolidated subsidiaries | |
| Fitch | Fitch Ratings Ltd. | |
| FTRs | Financial transmission rights | |
| GAAP | U.S. generally accepted accounting principles | |
| GENCO | South Carolina Generating Company, Inc. | |
| GHG | Greenhouse gas | |
| Green Mountain | Green Mountain Power Corporation | |
| Greensville County | A 1,605 MW combined-cycle, natural gas-fired power station in Greensville County, Virginia | |
| GTSA | Virginia Grid Transformation and Security Act of 2018 | |
| GW | Gigawatt | |
| Heating degree days | Units measuring the extent to which the average daily temperature is less than 65 degrees Fahrenheit, or 60 degrees Fahrenheit in DESC’s service territory, calculated as the difference between 65 or 60 degrees, as applicable, and the average temperature for that day | |
| Hopewell | Polyester biomass power station | |
| Idaho Commission | Idaho Public Utilities Commission | |
| IRA | An Act to Provide for Reconciliation Pursuant to Title II of Senate Concurrent Resolution 14 of the 117th Congress (also known as the Inflation Reduction Act of 2022) enacted on August 16, 2022 | |
| IRS | Internal Revenue Service | |
| ISO | Independent system operator | |
| ISO-NE | ISO New England | |
| Jones Act | The Coastwise Merchandise Statute (commonly known as the Jones Act) 46 U.S.C. §55102 regulating U.S. maritime commerce | |
| kV | Kilovolt | |
| LNG | Liquefied natural gas | |
| LTIP | Long-term incentive program | |
| Massachusetts Municipal | Massachusetts Municipal Wholesale Electric Company | |
| mcfe | Thousand cubic feet equivalent | |
| MD&A | Management’s Discussion and Analysis of Financial Condition and Results of Operations | |
| MGD | Million gallons per day | |
| Millstone | Millstone nuclear power station | |
| Millstone 2019 power purchase agreements | Power purchase agreements with Eversource Energy and The United Illuminating Company for Millstone to provide nine million MWh per year of electricity for ten years | |
| MMBtu | Metric Million British thermal unit | |
| Moody’s | Moody’s Investors Service | |
| MW | Megawatt | |
| MWh | Megawatt hour | |
| N2O | Nitrous oxide | |
| Natural Gas Rate Stabilization Act | Legislation effective February 2005 designed to improve and maintain natural gas service infrastructure to meet the needs of customers in South Carolina | |
| NAV | Net asset value | |
| NEIL | Nuclear Electric Insurance Limited | |
| NERC | North American Electric Reliability Corporation | |
| NND Project | V.C. Summer Units 2 and 3 nuclear development project under which DESC and Santee Cooper undertook to construct two Westinghouse AP1000 Advanced Passive Safety nuclear units in Jenkinsville, South Carolina | |
| North Anna | North Anna nuclear power station | |
| North Carolina Commission | North Carolina Utilities Commission | |
| NOX | Nitrogen oxide | |
| NRC | U.S. Nuclear Regulatory Commission | |
| NYSE | New York Stock Exchange | |
| OBBBA | An Act to Provide for Reconciliation Pursuant to Title II of House Concurrent Resolution 14 of the 119th Congress (also known as the One Big Beautiful Bill Act) enacted on July 4, 2025 | |
| October 2014 hybrids | Dominion Energy’s 2014 Series A Enhanced Junior Subordinated Notes due 2054 | |
| ODEC | Old Dominion Electric Cooperative | |
| Ohio Commission | Public Utilities Commission of Ohio | |
| Order 1000 | Order issued by FERC adopting requirements for electric transmission planning, cost allocation and development |
| Abbreviation or Acronym | Definition | |
| OSHA Recordable Rate | Number of recordable cases, as defined by the Occupational Safety and Health Administration, a division of the U.S. Department of Labor, for every 100 employees over the course of a year | |
| OSWP | OSW Project LLC, a limited liability company owned by Virginia Power and Stonepeak | |
| ozone season | The period May 1 through September 30, as determined on a federal level | |
| Patriot | Patriot Utility Privatizations, LLC, a joint venture between Foundation Infrastructure Partners, LLC and John Hancock Life Insurance Company (U.S.A.) and affiliates | |
| PFAS | Per- and polyfluorinated substances, a group of widely used chemicals that break down very slowly over time in the environment | |
| PHMSA | Pipeline and Hazardous Materials Safety Administration | |
| PJM | PJM Interconnection, LLC | |
| PSD | Prevention of significant deterioration | |
| PSNC | Public Service Company of North Carolina, Incorporated (a subsidiary of Enbridge effective September 2024) | |
| PSNC Transaction | The sale by Dominion Energy to Enbridge of all of its membership interests in Fall North Carolina Holdco LLC and its consolidated subsidiaries, which following a reorganization included PSNC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on September 30, 2024 | |
| Pumpkinseed | A 60 MW solar generation facility in Emporia, Virginia | |
| Questar Gas | Questar Gas Company (a subsidiary of Enbridge effective May 2024) | |
| Questar Gas Transaction | The sale by Dominion Energy to Enbridge of all of its membership interests in Fall West Holdco LLC and its consolidated subsidiaries, which following a reorganization included Questar Gas, Wexpro, Wexpro II Company, Wexpro Development Company, Dominion Energy Wexpro Services Company, Questar InfoComm Inc. and Dominion Gas Projects Company, LLC, pursuant to a purchase and sale agreement entered into on September 5, 2023, which was completed on May 31, 2024 | |
| Regulation Act | Legislation effective July 1, 2007, that amended the Virginia Electric Utility Restructuring Act and fuel factor statute, which legislation is also known as the Virginia Electric Utility Regulation Act, as amended in 2015, 2018 and 2023 | |
| RGGI | Regional Greenhouse Gas Initiative | |
| Rider CCR | A rate adjustment clause associated with the recovery of costs related to the removal of CCR at certain power stations | |
| Rider CE | A rate adjustment clause associated with the recovery of costs related to certain renewable generation, energy storage and related transmission facilities in Virginia, certain small-scale distributed generation projects and related transmission facilities and, beginning May 2024, power purchase agreements for the energy, capacity, ancillary services and renewable energy credits owned by third parties | |
| Rider DIST | A rate adjustment clause associated with the recovery of costs related to electric distribution grid transformation projects that the Virginia Commission has approved as authorized by the GTSA and costs of new underground distribution facilities | |
| Rider GEN | A rate adjustment clause associated with the recovery of costs related to Altavista, Hopewell, Southampton, Brunswick County, Greensville County, certain solar facilities and the Virginia LNG Storage Facility | |
| Rider OSW | A rate adjustment clause associated with costs incurred to construct, own and operate the CVOW Commercial Project | |
| Rider RPS | A rate adjustment clause associated with the recovery of costs related to the mandatory renewable portfolio standard program established by the VCEA | |
| Rider SNA | A rate adjustment clause associated with costs relating to the preparation of the applications for subsequent license renewal to the NRC to extend the operating licenses of Surry and North Anna and related projects | |
| Rider T1 | A rate adjustment clause to recover the difference between revenues produced from transmission rates included in base rates, and the new total revenue requirement developed annually for the rate years effective September 1 | |
| Rider U | A rate adjustment clause associated with the recovery of costs of new underground distribution facilities | |
| ROE | Return on equity | |
| ROIC | Return on invested capital | |
| RTEP | Regional transmission expansion plan | |
| RTO | Regional transmission organization | |
| SAIDI | System Average Interruption Duration Index, metric used to measure electric service reliability | |
| Santee Cooper | South Carolina Public Service Authority | |
| SCANA | The legal entity, SCANA Corporation, one or more of its consolidated subsidiaries, or the entirety of SCANA Corporation and its consolidated subsidiaries | |
| SCANA Combination | Dominion Energy’s acquisition of SCANA completed on January 1, 2019 pursuant to the terms of the agreement and plan of merger entered on January 2, 2018 between Dominion Energy and SCANA |
| Abbreviation or Acronym | Definition | |
| SCANA Merger Approval Order | Final order issued by the South Carolina Commission on December 21, 2018 setting forth its approval of the SCANA Combination | |
| SCDOR | South Carolina Department of Revenue | |
| SCESA | South Carolina Energy Security Act | |
| Scope 1 emissions | Emissions that are produced directly by an entity’s own operations | |
| Scope 2 emissions | Emissions from electricity a company consumes but does not generate from its own facilities | |
| Scope 3 emissions | Emissions generated downstream of company operations by customers and upstream by suppliers | |
| SEC | U.S. Securities and Exchange Commission | |
| Section 232 | Section 232 of the Trade Expansion Act of 1962 | |
| SEEM | Southeast Energy Exchange Market | |
| SERC | Southeast Electric Reliability Council | |
| Series B Preferred Stock | Dominion Energy’s 4.65% Series B Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share | |
| Series C Preferred Stock | Dominion Energy’s 4.35% Series C Fixed-Rate Cumulative Redeemable Perpetual Preferred Stock, without par value, with a liquidation preference of $1,000 per share | |
| SF6 | Sulfur hexafluoride | |
| SO2 | Sulfur dioxide | |
| South Carolina Commission | Public Service Commission of South Carolina | |
| Southampton | Southampton biomass power station | |
| Southern | The legal entity, The Southern Company, one or more of its consolidated subsidiaries, or the entirety of The Southern Company and its consolidated subsidiaries | |
| Spruce Power | The legal entity, Spruce Power Holding Corporation, one or more of its consolidated subsidiaries, or the entirety of Spruce Power Holding Corporation and its consolidated subsidiaries | |
| Standard & Poor’s | Standard & Poor’s Ratings Services, a division of S&P Global Inc. | |
| Stonepeak | The legal entity Stonepeak Partners, LLC, one or more of its affiliated investment vehicles (including Dunedin Member LLC) or the entirety of Stonepeak Partners, LLC and its affiliated investment vehicles | |
| Summer | V.C. Summer nuclear power station | |
| Surry | Surry nuclear power station | |
| Toshiba | Toshiba Corporation, parent company of Westinghouse | |
| Toshiba settlement | Settlement Agreement dated as of July 27, 2017, by and among Toshiba, DESC and Santee Cooper | |
| TSR | Total shareholder return | |
| Utah Commission | Utah Public Service Commission | |
| Valley Link | Valley Link Transmission Company, LLC, a limited liability company owned by Dominion Energy, AEP and FirstEnergy, one or more of its consolidated subsidiaries or the entirety of Valley Link Transmission Company, LLC and its consolidated subsidiaries | |
| VCEA | Virginia Clean Economy Act of March 2020 | |
| VEBA | Voluntary Employees’ Beneficiary Association | |
| VIE | Variable interest entity | |
| Virginia City Hybrid Energy Center | A 610 MW baseload carbon-capture compatible, clean coal powered electric generation facility in Wise County, Virginia | |
| Virginia Commission | Virginia State Corporation Commission | |
| Virginia Facilities | Proposed electric interconnection and transmission facilities in and around Virginia Beach, Virginia, comprising transmission facilities required to interconnect the CVOW Commercial Project reliably with the existing transmission system; including 3 miles of 230 kV offshore export circuits, 4 miles of underground 230 kV onshore export circuits, a new Harpers switching station, 14 miles of three new overhead 230 kV transmission circuits between a new Harpers switching station and the Fentress substation, rebuild eight miles of two existing 230 kV overhead lines and an expansion of the Fentress substation | |
| Virginia LNG Storage Facility | A proposed LNG storage facility in Brunswick and Greensville Counties, Virginia | |
| Virginia Power | The legal entity, Virginia Electric and Power Company, one or more of its consolidated subsidiaries or operating segment, or the entirety of Virginia Electric and Power Company and its consolidated subsidiaries | |
| VOC | Volatile organic compounds | |
| VPFS | Virginia Power Fuel Securitization, LLC | |
| VPP | Virtual power plant | |
| Warren County | A 1,349 MW combined-cycle, natural gas-fired power station in Warren County, Virginia | |
| Westinghouse | Westinghouse Electric Company LLC | |
| Wexpro | The legal entity, Wexpro Company, one or more of its consolidated subsidiaries, or the entirety of Wexpro Company and its consolidated subsidiaries (a subsidiary of Enbridge effective May 2024) | |
| Wyoming Commission | Wyoming Public Service Commission |
Part I