The first mortgage indentures for the Ohio Companies, Penn, MP, PE and WP constitute direct first liens on substantially all of the respective physical property, subject only to excepted encumbrances, as defined in the first mortgage indentures. See Note 11, "Capitalization," of the Notes to Consolidated Financial Statements for information concerning financing encumbrances affecting certain of the Utilities’ properties.

FirstEnergy controls the following generation sources as of December 31, 2019, shown in the table below. Except for the OVEC participation referenced in the footnotes to the table, the Corp/Other units are owned by AE Supply and the Regulated Distribution segment generating units are owned by either JCP&L or MP.

Plant (Location)UnitTotalCorp/OtherRegulated Distribution
Net Demonstrated Capacity (MW)
Super-critical Coal-fired:
Harrison (Haywood, WV)1-31,984—1,984
Pleasants (Willow Island, WV)1-21,300(1)1,300—
Fort Martin (Maidsville, WV)1-21,098—1,098
4,3821,3003,082
Sub-critical and Other Coal-fired:
OVEC (Cheshire, OH) (Madison, IN)1-1178(2)6711
Pumped-storage Hydro:
Bath County (Warm Springs, VA)1-6487(3)—487
Yard’s Creek (Blairstown Twp., NJ)1-3210(4)—210
697—697
Total5,1571,3673,790
(1)On August 26, 2018, FirstEnergy, the FES Key Creditor Groups, the FES Debtors and the UCC entered into a FES Bankruptcy settlement agreement which included the transfer of the Pleasants Power Station and related assets to FES or its designee for the benefit of FES' creditors. Prior to the transfer, which was completed on January 30, 2020, and beginning January 1, 2019, FES acquired the economic interests in Pleasants and AE Supply operated Pleasants until the transfer.
(2)Represents AE Supply's 3.01% and MP's 0.49% entitlement based on their participation in OVEC.
(3)Represents AGC's 16.25% undivided interest in Bath County. The station is operated by VEPCO.
(4)Represents JCP&L’s 50% ownership interest.

The above generating plants and load centers are connected by a transmission system with various voltage ratings ranging from 23 kV to 500 kV. FirstEnergy's overhead and underground transmission lines aggregate 24,486 circuit miles.

The Utilities’ electric distribution systems include 269,691 miles of overhead pole line and underground conduit carrying primary, secondary and street lighting circuits.

FirstEnergy owns substations with a total installed transformer capacity of 156,115,196 kV-amperes.

All of FirstEnergy's transmission, distribution and generation assets operate in PJM.

FirstEnergy’s distribution and transmission systems as of December 31, 2019, consist of the following:

Distribution Lines**(1)**Transmission Lines**(1)**Substation Transformer Capacity**(2)**
kV Amperes
OE67,3403797,228,811
Penn13,609—915,584
CEI33,037—9,296,048
TE19,039732,941,606
JCP&L23,6802,59821,375,598
ME18,983—4,804,655
PN27,670—6,828,636
ATSI(3)—7,88937,985,722
WP24,7374,33114,266,148
MP22,3222,61213,314,783
PE19,2742,08610,514,104
TrAIL—26213,643,600
MAIT—4,25612,999,901
Total269,69124,486156,115,196
(1)Circuit Miles
(2)Top rating of in-service power transformers only. Excludes grounding banks, station power transformers, and generator and customer-owned transformers.
(3)Represents transmission line assets of 69 kV and greater located in the service territories of the Ohio Companies and Penn.