Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
283K characters. Original on sec.gov ·
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
This MDA includes information relating to Alliant Energy, IPL and WPL, as well as Resources and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Consolidated Financial Statements and Combined Notes to Consolidated Financial Statements included in this report. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.
CONTENTS OF MDA
Alliant Energy’s, IPL’s and WPL’s MDA consists of the following information:
| • | Executive Summary |
| • | Strategic Overview |
| • | Rate Matters |
| • | Environmental Matters |
| • | Legislative Matters |
| • | Alliant Energy’s Results of Operations |
| • | IPL’s Results of Operations |
| • | WPL’s Results of Operations |
| • | Liquidity and Capital Resources |
| • | Other Matters |
| • | Market Risk Sensitive Instruments and Positions |
| • | Critical Accounting Policies and Estimates |
| • | Other Future Considerations |
EXECUTIVE SUMMARY
Description of Business
General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. At December 31, 2013, WPL, through its ownership interest in WPL Transco, held an approximate 16% interest in ATC, a transmission-only utility operating in the Midwest. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses as of December 31, 2013 is shown below.
| Alliant Energy | |||||
| Utility and Corporate Services | Non-regulated and Parent | ||||
| - Electric and gas services in IA (IPL) | - Transportation (Resources) | ||||
| - Electric and gas services in WI (WPL) | - Non-regulated Generation (Resources) | ||||
| - 16% interest in ATC (WPL) | - Parent Company | ||||
| - Electric and gas services in MN (IPL) (a) | |||||
| - Corporate Services |
| (a) | In September 2013, IPL signed definitive agreements to sell its Minnesota electric and natural gas distribution assets. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for further discussion of these proposed sales. |
Utility and Corporate Services - IPL and WPL own a portfolio of EGUs located in Iowa, Wisconsin and Minnesota with a diversified fuel mix including coal, natural gas and renewable resources. The output from these EGUs, supplemented with purchased power, is used to provide electric service to approximately 1 million electric customers in the upper Midwest. The utility business also procures natural gas from various suppliers to provide service to approximately 418,000 retail gas customers in the upper Midwest. Alliant Energy’s utility business is its primary source of earnings and cash flows. The earnings and cash flows from the utility and Corporate Services business are sensitive to various external factors including, but not limited to, the amount and timing of rates approved by regulatory authorities, the impact of weather and economic conditions on electric and gas sales volumes and other factors listed in “Risk Factors” in Item 1A and “Forward-looking Statements.”
Non-regulated Business and Parent - Resources manages various businesses including Non-regulated Generation (EGU management), Transportation (short-line railway and barge transportation services) and several other modest investments. Parent includes the operations of Alliant Energy (parent holding company).
Financial Results - Details regarding Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for 2013 and 2012 were as follows (dollars in millions, except per share amount):
| 2013 | 2012 | ||||||||||||||
| Net Income | EPS | Net Income | EPS | ||||||||||||
| Continuing operations: | |||||||||||||||
| Utilities and Corporate Services | $356.5 | $3.22 | $304.8 | $2.75 | |||||||||||
| Non-regulated and parent | 7.7 | 0.07 | 20.1 | 0.18 | |||||||||||
| Income from continuing operations | 364.2 | 3.29 | 324.9 | 2.93 | |||||||||||
| Loss from discontinued operations | (5.9 | ) | (0.06 | ) | (5.1 | ) | (0.04 | ) | |||||||
| Net income | $358.3 | $3.23 | $319.8 | $2.89 |
The table above includes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP financial measures. Alliant Energy believes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the
measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utilities and Corporate Services EPS from continuing operations to determine performance-based compensation.
Utilities and Corporate Services - Higher EPS from continuing operations in 2013 compared to 2012 was primarily due to:
| • | $0.32 per share of purchased electric capacity expense related to the Riverside PPA recorded in 2012; |
| • | $0.14 per share related to the impact of state income tax charges in 2012 due to changes in state apportionment projections caused by Alliant Energy’s announced sale of the RMT business; |
| • | $0.13 per share from the revenue requirement adjustment related to certain IPL tax benefits in 2013; |
| • | an estimated $0.13 per share of higher weather-normalized retail electric and gas sales in 2013 compared to 2012; |
| • | $0.11 per share of lower energy conservation cost recovery amortizations at WPL in 2013 compared to 2012; |
| • | $0.06 per share of lower income tax expense at IPL in 2013 compared to 2012 due to Iowa rate-making practices; and |
| • | an estimated $0.05 per share of net increases in revenues from higher electric and gas sales in 2013 compared to 2012 due to weather conditions. |
These items were partially offset by:
| • | $0.17 per share of higher depreciation expense in 2013 compared to 2012, primarily due to WPL’s acquisition of Riverside in December 2012; |
| • | $0.09 per share of higher generation operation and maintenances expenses in 2013 compared to 2012; |
| • | $0.08 per share of higher electric transmission service expenses, net of recoveries, in 2013 compared to 2012; |
| • | $0.06 per share of higher performance-based compensation expense in 2013 compared to 2012; |
| • | $0.06 per share of charges related to preferred stock redemptions at IPL and WPL in 2013; and |
| • | $0.05 per share of higher distribution system operation and maintenance expenses in 2013 compared to 2012. |
Non-regulated and parent - Lower EPS from continuing operations in 2013 compared to 2012 was primarily due to $0.04 per share of losses incurred at the Franklin County wind project in 2013.
Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting their respective earnings during 2013, 2012 and 2011.
Strategic Overview Highlights
Alliant Energy’s, IPL’s and WPL’s strategic plan focuses on their core business of delivering regulated electric and natural gas service in Iowa and Wisconsin. The strategic plan is built upon three key elements: competitive costs, safe and reliable service, and balanced generation. Key strategic plan developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Strategic Overview” for a more detailed discussion of strategic plan developments.
| • | January 2013 - The IUB issued an order allowing IPL to proceed with a PPA for the purchase of capacity and energy generated by DAEC for a term of February 22, 2014 through December 31, 2025. |
| • | February 2013 - The IUB approved IPL’s most recent EPB, which includes emission controls projects for Ottumwa Unit 1 and Lansing Unit 4. |
| • | April 2013 - WPL announced that its current environmental compliance plans include installing an SCR at Columbia Unit 2 to reduce NOx emissions. The SCR is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR or some alternative to this rule that may be implemented. WPL currently expects to file a CA application with the PSCW in the second quarter of 2014 for the SCR at Columbia Unit 2. |
| • | June 2013 - WPL received an order from the PSCW approving WPL’s CA application to install a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions. WPL currently expects to begin construction of the project in 2014 and place it in service in 2016. |
| • | July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff, which determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. IPL and WPL currently anticipate that ITC will pursue an option separate from ITC’s revised Attachment “FF” tariff to self-fund the transmission network upgrades associated with Marshalltown and Bent Tree, respectively. As a result, ITC would incur the capital expenditures to construct the transmission network upgrades and include a direct charge for such transmission network upgrade costs as part of its electric transmission service costs billed to IPL and WPL as the owners of Marshalltown and Bent Tree, respectively. |
| • | September 2013 - IPL signed separate definitive agreements to sell its Minnesota electric and natural gas distribution assets. Proceeds from the sales are expected to be approximately $128 million in aggregate, subject to customary closing adjustments. The proceeds are expected to reduce Alliant Energy’s and IPL’s future financing requirements. Pending all |
necessary federal and state regulatory approvals, including the MPUC, FERC and the IUB, the transactions are expected to be concluded in the second half of 2014. The electric distribution asset sales agreement includes a wholesale power supply agreement, which is subject to FERC approval. The agreement contains a five-year termination notice, which may not be given until the fifth anniversary of the effective date of the agreement, resulting in a minimum term of 10 years. This wholesale power supply agreement includes standardized pricing mechanisms that are detailed in IPL’s current tariffs accepted by FERC through wholesale rate case proceedings.
| • | November 2013 - Alliant Energy announced WPL currently expects to begin incurring capital expenditures in 2016 for a potential generation investment to address its future customer energy and capacity needs. Options under consideration include conversion of an existing natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete a feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014. |
| • | November 2013 - The IUB issued an order approving a siting certificate and establishing rate-making principles for Marshalltown. The rate-making principles include a cost cap of $920 million (including costs to construct Marshalltown, a pipeline to supply natural gas to Marshalltown and transmission network upgrades to transmit electricity from Marshalltown, as well as AFUDC), an 11% return on common equity for the 35-year depreciable life and a 10.3% return on common equity for the calculation of AFUDC. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent. The IUB’s approval is contingent upon the receipt of various state and federal permitting approvals. Pending all remaining regulatory approvals, IPL currently expects to begin construction of Marshalltown in 2014 and place it in service in 2017. |
| • | November 2013 - WPL received approval from MISO to retire Nelson Dewey Units 1 and 2. MISO has also approved WPL’s retirement of Edgewater Unit 3. Both approvals are contingent on completion of necessary transmission network upgrades. |
| • | December 2013 - IPL received an order from the IUB approving IPL’s EEP for 2014 through 2018. The EEP includes IPL spending approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018, and is expected to conserve electric and natural gas usage equal to that of more than 100,000 homes. |
| • | January 2014 - WPL received an order from the PSCW approving a request for generation performance and reliability improvements at Columbia Units 1 and 2. WPL expects to begin construction in the first half of 2015 and place the projects in service by the end of 2017. |
Rate Matters Highlights
Alliant Energy’s utility subsidiaries, IPL and WPL, are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates. Key regulatory developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Rate Matters” for a more detailed discussion of regulatory developments.
| • | January 2013 - The IUB authorized IPL to recover the Iowa retail portion of the costs of its DAEC PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The IUB encouraged IPL to continue discussions with parties to the DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding regarding rate impacts beginning in 2014. IPL is preparing to file an Iowa retail electric base rate case without interim rates in late March 2014 in case such discussions do not result in a resolution of the issues. Based on the terms of the January 2013 order, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014. IPL currently anticipates a decision from the IUB on this matter by the end of 2014, either through an approved rate case or an approved settlement. |
| • | February 2013 - IPL received an order from the IUB approving the 2013 electric tax benefit rider tariff and a $24 million revenue requirement adjustment recognized during 2013. |
| • | November 2013 - Alliant Energy announced WPL currently expects to make a retail rate filing in late March 2014 based on a forward-looking test period that may include calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the 2015 and 2016 test period. Any rate changes granted are expected to be effective in early 2015. |
| • | December 2013 - IPL received an order from the IUB approving the 2014 electric tax benefit rider tariff and a $15 million revenue requirement adjustment to be recognized during 2014. |
| • | December 2013 - IPL received an order from the MPUC approving full cost recovery of the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs of approximately $30 million, effective January 1, 2013. |
| • | December 2013 - WPL received an order from the PSCW authorizing an annual retail electric rate increase of $19 million, or approximately 2%, effective January 1, 2014, to reflect anticipated increases in retail electric fuel-related costs in 2014 compared to the fuel-related cost estimates used to determine rates for 2013. WPL’s 2014 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. |
| • | January 2014 - IPL received an order from the IUB approving IPL’s transmission cost rider rates effective February 1, 2014. |
Environmental Matters Highlights
Alliant Energy, IPL and WPL are subject to regulation of environmental matters by various federal, state and local authorities. Key environmental developments that may impact Alliant Energy, IPL and WPL include the following. Refer to “Environmental Matters” for a more detailed discussion of environmental developments.
| • | April 2013 - WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve certain alleged air permitting violations, while admitting no liability. The Consent Decree was approved by the Court in June 2013 thereby resolving the related claims and requiring the installation of certain emission controls systems. |
| • | June 2013 - The EPA issued proposed effluent limitation guidelines, which would require changes to discharge limits for wastewater from steam generating facilities. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines. |
| • | June 2013 - President Obama announced plans to address climate change and issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In January 2014, the EPA published revised proposed NSPS for GHG emissions for new fossil-fueled EGUs. A date for finalizing these standards has not yet been established. The EPA is expected to issue proposed and final NSPS for GHG emissions for existing EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016. |
| • | June 2013 - The U.S. Supreme Court issued an order granting an EPA petition for review of a D.C. Circuit Court decision to vacate and remand CSAPR for further EPA review. The U.S. Supreme Court ruling on the CSAPR vacatur is expected in 2014, and during the interim, CAIR remains effective. |
Legislative Matters Highlights
Alliant Energy, IPL and WPL monitor various legislative developments, including those relating to energy, tax, financial and other matters. Key legislative developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Legislative Matters” for a more detailed discussion of legislative developments.
| • | January 2013 - The ATR Act was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013. |
Liquidity and Capital Resources Highlights
Based on their current liquidity positions and capital structures, Alliant Energy, IPL and WPL believe they will be able to secure the additional capital required to implement their strategic plan and to meet their long-term contractual obligations. Key financing developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Liquidity and Capital Resources” for a more detailed discussion of financing developments.
| • | March 2013 - IPL issued 8,000,000 shares of 5.1% cumulative preferred stock and received proceeds of $200 million. The proceeds were used by IPL to redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock for $150 million, reduce commercial paper classified as long-term debt by $40 million and for other general corporate purposes. |
| • | March 2013 - WPL redeemed all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock for $61 million. |
| • | August 2013 - WPL received approval from the PSCW to issue up to $400 million of long-term debt securities through 2014. |
| • | October 2013 - IPL issued $250 million of 4.7% senior debentures due 2043. The proceeds from the issuance were used by IPL to reduce cash proceeds received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt by $65 million and for general working capital purposes. |
| • | November 2013 - Alliant Energy announced an increase in its targeted 2014 annual common stock dividend to $2.04 per share, which is equivalent to a quarterly rate of $0.51 per share, beginning with the February 2014 dividend payment. |
| • | November 2013 - IPL received authority from FERC to issue through December 31, 2015 up to $750 million of long-term debt securities in aggregate, up to $750 million of short-term debt securities at any time and up to $300 million of preferred stock in aggregate. |
| • | November 2013 - Alliant Energy, IPL and WPL announced their future financing plans, which include issuing up to $600 million, $300 million and $300 million, respectively, of additional long-term debt in 2014. Alliant Energy currently |
expects to issue approximately $150 million of common stock through 2016. Alliant Energy currently does not plan to issue any material amount of common stock in 2014.
| • | December 2013 - At December 31, 2013, Alliant Energy and its subsidiaries had $721 million of available capacity under their revolving credit facilities, $121 million of available capacity at IPL under its sales of accounts receivable program and $10 million of cash and cash equivalents. |
| • | January 2014 - Moody’s Investors Service raised Alliant Energy’s and WPL’s credit ratings. |
Other Matters Highlights
Other key developments that could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations include the following. Refer to “Other Matters” for a more detailed discussion of potential impacts to future financial condition and results of operations.
| • | April 2013 - IPL and MidAmerican filed a joint Notice of Appeal, and the IUB and the Iowa Association of Electric Cooperatives filed Notices of Appeal, with the Iowa Supreme Court related to a ruling by the Polk County, Iowa District Court in March 2013. This ruling found Eagle Point is not a public utility and could sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. The District Court decision is currently stayed. Alliant Energy and IPL are unable to determine how this District Court ruling may impact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity by IPL’s customers. |
| • | July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff to conform to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing with the proposed tariff revisions, which became effective as of the date of the July 2013 order. Also in August 2013, ITC filed a request for rehearing and/or clarification, and IPL filed a request for clarification. In February 2014, FERC issued an order that denied ITC’s request for rehearing, responded to the requests for clarification, accepted MISO’s tariff revisions and substantially affirmed its July 2013 order. The tariff revisions ordered by FERC are expected to reduce the amount of transmission network upgrade costs billed by ITC to IPL compared to what would have been billed under ITC’s prior Attachment “FF” tariff. Alliant Energy and IPL currently expect to pass on the Iowa retail portion of any changes in electric transmission service costs billed by ITC to IPL from the revision in ITC’s Attachment “FF” tariff to IPL’s retail electric customers in Iowa through the transmission cost recovery rider. |
| • | September 2013 - ITC finalized its Attachment “O” rate it proposes to charge its customers in 2014 for electric transmission services. The increase in ITC’s Attachment “O” rate, as well as MISO transmission charges for shared transmission projects, are expected to contribute to increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2014 will be higher than the comparable expenses charged in 2013 by approximately $30 million, $20 million and $10 million, respectively. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the transmission cost recovery rider. A significant portion of the increase in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case. |
| • | November 2013 - A group of MISO industrial customer organizations filed a complaint with FERC requesting to: (1) reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 9.15%; (2) institute a regulatory capital structure not to exceed 50% of common equity; and (3) eliminate certain return on equity adders. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. ITC’s and ATC’s current authorized regulatory capital structure for common equity is 60% and 50%, respectively. Any change to ITC’s and ATC’s return on equity and regulatory capital structure for common equity would impact the calculation of their respective Attachment “O” rates, resulting in changes to electric transmission service costs billed by ITC and ATC to their customers. Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. In addition, any change to ATC’s return on equity and regulatory capital structure for common equity could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the future. |
STRATEGIC OVERVIEW
Strategic Plan - Alliant Energy’s, IPL’s and WPL’s strategic plan focuses on their core business of delivering regulated electric and natural gas service in their Iowa and Wisconsin service territories. The strategic plan is built upon three key elements: competitive costs, safe and reliable service, and balanced generation.
Competitive Costs - Providing competitive and predictable energy costs for customers is a key element of the strategic plan. Alliant Energy, IPL and WPL are aware that the majority of their costs become part of rates charged to their customers and any rate increase has an impact on their customers. Given that potential public policy changes and resulting increases in future energy costs are possible, Alliant Energy, IPL and WPL are focused on controlling their costs with the intent of providing competitive rates to their customers. Alliant Energy and IPL also have electric and gas tax benefit riders, which utilize tax benefits from income tax strategies to provide credits on Iowa retail customers’ bills to help offset impacts of rate increases. Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” and “Rate Matters” for further discussion of the tax benefit riders. Energy efficiency is also an important part of the strategic plan and is an option that provides customers with the opportunity to save on their energy bills. Alliant Energy’s, IPL’s and WPL’s approach to energy efficiency is based on regulations in Iowa and Wisconsin. The objective in each of these states is to meet prescribed goals in the most cost-effective manner. Refer to “Energy Efficiency Programs” below for further discussion of energy efficiency programs used by Alliant Energy, IPL and WPL.
Safe and Reliable Service - The strategic plan is intended to focus resources on providing safe and reliable electricity and natural gas service. Investments are expected to be targeted in system improvements, replacing aging infrastructure and distribution grid efficiency to maintain strong reliability. Alliant Energy, IPL and WPL monitor system performance and take the necessary steps to continually improve the safety and reliability of their service for their customers. Providing exceptional customer service, including emergency and outage response, is part of Alliant Energy’s, IPL’s and WPL’s mission and commitment to the customers they serve.
Balanced Generation - One of the key components of Alliant Energy’s, IPL’s and WPL’s strategic plan is focused on a balanced and flexible portfolio of energy resources that will meet their utility customers’ short- and long-term energy needs. Alliant Energy, IPL and WPL believe a diversified fuel mix for their EGUs is important to meeting the needs of their customers, shareowners and the environment while preparing for a potentially carbon-constrained environment in the future. The current strategic plan includes the following diversified portfolio of energy resources:
| • | Natural gas - purchasing, constructing and/or converting to natural gas-fired EGUs; |
| • | Coal - implementing emission controls and performance and reliability improvements at their newer, larger and more efficient coal-fired EGUs, and fuel switching at, and retirement of, certain older, smaller and less efficient coal-fired EGUs; |
| • | PPAs - purchasing electricity to meet a portion of customer demand for electricity, including a nuclear generation PPA related to DAEC for a term of February 22, 2014 through December 31, 2025; and |
| • | Renewable - evaluating potential future development of existing wind sites. |
Installing emission controls at the more efficient coal-fired EGUs and increasing levels of energy produced by Alliant Energy’s, IPL’s and WPL’s wind projects and other renewable energy resources results in significant environmental benefits.
Additional details of changes to Alliant Energy’s, IPL’s and WPL’s generation portfolio, as well as discussion of investments in emission controls and performance and reliability upgrades, are included in “Generation Plans” and “Environmental Compliance Plans” below.
Non-regulated Operations - The strategic plan for Alliant Energy’s non-regulated operations involves maintaining a modest portfolio of businesses that are accretive to earnings but not significant users of capital.
Generation Plans - Alliant Energy, IPL and WPL review and update, as deemed necessary and in accordance with regulatory requirements, their generation plans. Alliant Energy, IPL and WPL are currently evaluating the types of capacity and energy additions they will pursue to meet their customers’ long-term energy needs and are monitoring several related external factors that could influence those evaluations. Some of these external factors include regulatory policies and decisions, changes in long-term projections of customer demand, availability and cost effectiveness of different generation technologies, forward market prices for fossil fuels, market conditions for obtaining financing, developments related to federal and state RPS, environmental requirements, such as any future requirements relating to GHG emissions or renewable energy sources, and federal and state tax incentives.
Natural Gas-Fired Generation -
IPL’s Construction of Marshalltown - In November 2013, the IUB issued an order approving a siting certificate and establishing rate-making principles for IPL’s construction of an approximate 600 MW natural gas-fired combined-cycle EGU in Marshalltown, Iowa, referred to as Marshalltown. In November 2013, IPL accepted the IUB’s rate-making principles, which include the following:
| • | A cost cap of $920 million, including costs to construct Marshalltown, a pipeline to supply natural gas to Marshalltown and transmission network upgrades to transmit electricity from Marshalltown as well as AFUDC. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent. |
| • | An 11% return on common equity for the 35-year depreciable life of Marshalltown and a 10.3% return on common equity for the calculation of AFUDC related to the construction of Marshalltown. |
| • | The application of double leverage is deferred until IPL’s next retail electric base rate case or other proceeding. |
The IUB’s approval is contingent upon the receipt of various state and federal permitting approvals necessary to construct and operate the EGU. In December 2013, the IUB approved the construction of a pipeline for the transportation of natural gas to Marshalltown. Pending all remaining regulatory approvals, IPL currently expects to begin construction of Marshalltown in 2014 and place it in service in 2017. Refer to “Transmission Network Upgrades” below for discussion of transmission network upgrade costs associated with Marshalltown.
WPL’s Potential Generation Investment - In 2013, WPL initiated a feasibility study of resource options to address its future customer energy and capacity needs as part of its long-term resource planning. Based on its long-term resource plans that include the retirements of Edgewater Unit 3 and Nelson Dewey Units 1 and 2 by the end of 2015, and the retirement or fuel switching to natural gas of Edgewater Unit 4 by the end of 2018, WPL is currently planning for a new generation investment to address its customer energy and capacity needs in 2019 and beyond. WPL currently expects to begin incurring capital expenditures in 2016 for the potential generation investment. Options under consideration include conversion of an existing natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete the feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014. Refer to “Liquidity and Capital Resources” for details regarding estimated capital expenditures associated with this potential generation investment.
Coal-Fired Generation -
Emission Controls Projects - Alliant Energy’s, IPL’s and WPL’s strategic plan includes new emission controls at IPL’s and WPL’s newer, larger and more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment. Refer to “Environmental Compliance Plans” below for details regarding these emission controls projects including the capital expenditures in 2014 through 2017 currently anticipated for these projects.
Generation Improvement Projects - Alliant Energy’s, IPL’s and WPL’s strategic plan includes investments in performance and reliability improvements at their newer, larger and more efficient coal-fired EGUs including IPL’s Lansing Unit 4 and Ottumwa Unit 1, and WPL’s Edgewater Unit 5, and Columbia Units 1 and 2. Refer to “Liquidity and Capital Resources” for details regarding estimated capital expenditures in 2014 through 2017 for these generation performance and reliability improvement projects.
Columbia Units 1 and 2 - In January 2014, WPL received an order from the PSCW approving a request for generation performance and reliability improvements at Columbia Units 1 and 2. WPL’s portion of the capital expenditures for the projects, excluding AFUDC, is currently estimated to be between $55 million and $65 million. WPL expects to begin construction in the first half of 2015 and place the projects in service by the end of 2017.
Plant Retirements or Fuel Switching - Alliant Energy’s, IPL’s and WPL’s current strategic plan includes the retirement of, and fuel switching at, several older, smaller and less efficient EGUs. The following table provides a list of the EGUs retired in 2013 as well as EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
| EGU (In-Service Year) | Nameplate Rated Capacity (a) | Actual / Expected Action (b) | ||
| IPL: | ||||
| Lansing Unit 3 (1957) | 38 MW | Retired in 2013 | ||
| M.L. Kapp Unit 2 (1967) | 218 MW | Fuel switch in 2015 (c) | ||
| Dubuque Unit 3 (1952) | 29 MW | Retire by December 31, 2016 (d) | ||
| Dubuque Unit 4 (1959) | 37 MW | Retire by December 31, 2016 (d) | ||
| Fox Lake Unit 1 (1950) | 11 MW | Retire by December 31, 2017 | ||
| Fox Lake Unit 3 (1962) | 82 MW | Retire by December 31, 2017 (d) (e) | ||
| Sutherland Unit 1 (1955) | 37 MW | Retire by December 31, 2017 (e) | ||
| Sutherland Unit 3 (1961) | 82 MW | Retire by December 31, 2017 (e) | ||
| Other units | Approximately 200 MW | Retire by December 31, 2017 (e) | ||
| WPL: | ||||
| Edgewater Unit 3 (1951) | 60 MW | Retire by December 31, 2015 (f) | ||
| Nelson Dewey Unit 1 (1959) | 100 MW | Retire by December 31, 2015 (f) | ||
| Nelson Dewey Unit 2 (1962) | 100 MW | Retire by December 31, 2015 (f) | ||
| Edgewater Unit 4 (1969) | 225 MW (g) | Fuel switch or retire by December 31, 2018 |
| (a) | Nameplate rated capacity represents the nominal amount of electricity an EGU is designed to produce. Each EGU is also assessed a generating capacity amount from MISO through its annual resource adequacy process. The generating capacity amount assessed by MISO is subject to change each year and is based upon the current performance capability of the EGU and is based on historical forced outages. |
| (b) | As of December 31, 2013, the aggregate net book value of EGUs that may be retired in the future was $64 million for IPL and $97 million for WPL. |
| (c) | M.L. Kapp Unit 2 is expected to switch from coal to natural gas as its primary fuel type in 2015. |
| (d) | Final MISO studies could indicate that the retirement of Dubuque Units 3 and 4 and Fox Lake Unit 3 may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirements. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors. |
| (e) | The retirements of Fox Lake Unit 3, Sutherland Units 1 and 3, and other units are contingent on the construction of Marshalltown as well as various operational, market and other factors. |
| (f) | In 2013, WPL received approval from MISO to retire Edgewater Unit 3, and Nelson Dewey Units 1 and 2, contingent on completion of transmission network upgrades necessary for system reliability. |
| (g) | Reflects WPL’s 68.2% ownership interest in Edgewater Unit 4. |
Alliant Energy, IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of these actions. The expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. Alliant Energy, IPL and WPL also continue to evaluate the potential retirement of other EGUs within their generation fleet.
Nuclear Generation -
IPL’s DAEC PPA - In January 2013, the IUB issued an order allowing IPL to proceed with a PPA that was negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of capacity and energy generated by DAEC located near Palo, Iowa. The IUB also authorized IPL to recover the Iowa retail portion of the cost of the DAEC PPA from Iowa retail electric customers through the energy adjustment clause. The terms of the PPA provide IPL the right to NER’s entire output quantities (70% of the total plant output) in exchange for payment from IPL to NER based on the amount of MWhs received by IPL. IPL will purchase 431 MWs of capacity and the resulting energy from DAEC for a term from February 22, 2014 through December 31, 2025. Among the terms and conditions of the PPA are guarantees by NER to provide minimum amounts of capacity and energy. The PPA also contains provisions for the replacement of energy from alternative sources under certain conditions as well as provisions that convey to IPL the potential environmental attributes associated with its portion of the output from DAEC. Refer to “Rate Matters” for further discussion of the IUB’s January 2013 order approving the DAEC PPA.
Wind Generation -
Resources’ Franklin County Wind Project - The Franklin County wind project began generating electricity in 2012. Resources is currently selling the electricity output from the wind project into the MISO market as a merchant generator, and is evaluating different options to sell the electricity output from this wind project. Such options include entering into a PPA with an independent third party, entering into a PPA with either IPL or WPL and/or continuing to sell the output into the MISO market as a merchant generator.
Undeveloped Wind Sites - IPL has approximately 200 MW of wind site capacity remaining in Franklin County, Iowa. WPL has approximately 200 MW of wind site capacity remaining in Freeborn County, Minnesota. Future development of the balance of these wind sites will depend on numerous factors such as changes in customer demand, RPS, environmental requirements, electricity and fossil fuel prices, wind project costs, technology advancements and transmission capabilities.
Refer to Note 3 of the “Combined Notes to Consolidated Financial Statements” for further discussion of the Franklin County wind project and undeveloped wind sites.
Transmission Network Upgrades - In July 2013, FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. As a result of the July 2013 FERC order, IPL and WPL initially expected to incur capital expenditures for transmission network upgrades for Marshalltown and Bent Tree, respectively, that would have previously been reimbursed by ITC under the previous Attachment “FF” tariff. However, IPL and WPL currently anticipate that ITC will pursue an option under the terms of MISO’s Attachment “X” tariff to self-fund the transmission network upgrades associated with Marshalltown and Bent Tree. As a result, ITC would incur the capital expenditures to construct the transmission network upgrades and include a direct charge for such transmission network upgrade costs as part of its electric transmission service costs billed to IPL and WPL as the owners of Marshalltown and Bent Tree, respectively. Refer to “Other Future Considerations” for further discussion of ITC’s Attachment “FF” tariff.
Marshalltown - ITC is expected to construct the majority of the required transmission network upgrades for Marshalltown, which IPL currently expects to be completed in 2016. IPL currently expects any regulatory filings necessary for approval of the transmission network upgrades will be made after the execution of the interconnection agreement for Marshalltown, which is expected in the second quarter of 2014. IPL anticipates the required transmission network upgrades for Marshalltown will result in additional electric transmission service costs billed by ITC to IPL if ITC pursues the option to self-fund. IPL currently expects to pass on the Iowa retail portion of any changes in the electric transmission service costs to IPL’s retail electric customers in Iowa through the transmission cost recovery rider. IPL does not currently believe that the cost cap included in the IUB’s order approving construction of Marshalltown would be affected if ITC were to ultimately self-fund the transmission network upgrades for Marshalltown.
Bent Tree - Phase I Wind Project - ITC is expected to construct the majority of the transmission network upgrades for the Bent Tree - Phase I wind project, which WPL currently expects to be completed in 2016. WPL currently expects any regulatory filings necessary for approval of the transmission network upgrades will be made after the execution of a revised interconnection agreement for Bent Tree, which is expected in the second quarter of 2014. WPL anticipates the transmission network upgrades for Bent Tree will result in additional electric transmission service costs billed by ITC to WPL if ITC pursues the option to self-fund. WPL currently expects to seek recovery of any changes in the electric transmission service costs from WPL’s electric customers in future rates.
Utility Business Divestitures -
IPL’s Minnesota Electric and Natural Gas Distribution Assets - Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the proposed sales of IPL’s Minnesota electric and natural gas distribution assets. Alliant Energy and IPL currently do not expect the sales of these assets to have a significant impact on their earnings for 2014.
Environmental Compliance Plans - Alliant Energy, IPL and WPL have developed environmental compliance plans to help ensure cost effective compliance with current and proposed environmental laws and regulations. Alliant Energy, IPL and WPL expect these environmental laws and regulations will require significant reductions of future emissions of NOx, SO2, PM, mercury and other HAPs at their EGUs. Alliant Energy, IPL and WPL review and update, as deemed necessary and in accordance with regulatory requirements, their environmental compliance plans to address various external factors. Some of these external factors include regulatory decisions regarding proposed emission controls projects, developments related to environmental regulations, outcomes of legal proceedings, settlements reached with environmental agencies and citizens groups, availability and cost effectiveness of different emission reduction technologies, market prices for electricity and fossil fuels, market prices for emission allowances, market conditions for obtaining financings, and federal and state tax incentives. Refer to “Environmental Matters” for details of certain current and proposed environmental regulations, including regulations for which these plans are expected to support compliance obligations. The following table provides current estimates of capital expenditures planned for 2014 through 2017 as well as the total (past and future) project costs for certain emission controls projects included in Alliant Energy’s, IPL’s and WPL’s current environmental compliance plans (in millions):
| Actual/ | ||||||||||||||||||||||
| Expected | Total | |||||||||||||||||||||
| Generating Unit | In-service Date | Technology (a) | 2014 | 2015 | 2016 | 2017 | Project Cost | |||||||||||||||
| IPL: | ||||||||||||||||||||||
| George Neal Units 3 & 4 (b) | 2013/2014 | Scrubber & Baghouse | $20 | $— | $— | $— | $120-$140 | |||||||||||||||
| Ottumwa Unit 1 | 2014 | Scrubber & Baghouse | 30 | — | — | — | 150-170 | |||||||||||||||
| Lansing Unit 4 | 2015 | Scrubber | 20 | 15 | — | — | 50-60 | |||||||||||||||
| WPL: | ||||||||||||||||||||||
| Columbia Units 1 & 2 | 2014 | Scrubber & Baghouse | 30 | — | — | — | 275-285 | |||||||||||||||
| Edgewater Unit 5 | 2016 | Scrubber & Baghouse | 85 | 115 | 85 | 5 | 280-320 | |||||||||||||||
| Columbia Unit 2 | 2018 | SCR | — | 15 | 35 | 35 | 100-120 |
| (a) | Scrubber is a post-combustion process that injects lime or lime slurry into the stream of gases leaving the EGU boiler to remove SO2 and other acid gases (including hydrochloric acid) and capture them in a solid or liquid waste by-product. A scrubber typically removes more than 90% of the SO2 emissions. |
Baghouse, including carbon injection, is a post-combustion process that injects carbon particles into the stream of gases leaving the EGU boiler to facilitate the capture of mercury in filters or bags. This process can remove more than 85% of mercury emissions.
SCR is a post-combustion process that injects ammonia or urea into the stream of gases leaving the EGU boiler to convert NOx emissions into nitrogen and water. The use of a catalyst enhances the effectiveness of the conversion, enabling NOx emissions reductions of up to 90%.
| (b) | George Neal Units 3 and 4 are operated by MidAmerican. IPL owns a 28% interest in George Neal Unit 3 and a 25.695% interest in George Neal Unit 4. |
These capital expenditure estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of emission controls technologies and environmental requirements.
IPL’s Emission Controls Projects - Under Iowa law, IPL is required to file an EPB biennially. Filing of annual periodic reports regarding the implementation of IPL’s compliance plan and related budget identified in an EPB is also currently required under a settlement agreement between IPL and the OCA. An EPB provides a utility’s compliance plan and related budget to meet applicable state environmental requirements and federal air quality standards. IUB approval of an EPB demonstrates that the IUB believes the EPB is reasonably expected to achieve cost-effective compliance with applicable state environmental requirements and federal air quality standards. In February 2013, the IUB approved IPL’s most recent EPB, which includes the emission controls projects for Ottumwa Unit 1 and Lansing Unit 4 listed in the above table. MidAmerican’s most recent EPB has also been approved by the IUB, which includes the emission controls projects for George Neal Units 3 and 4 listed in the above table.
George Neal Units 3 and 4, and Ottumwa Unit 1 - Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the scrubber and baghouse projects at George Neal Units 3 and 4, and Ottumwa Unit 1.
Lansing Unit 4 - IPL is constructing a scrubber at Lansing Unit 4 to reduce SO2 emissions at the EGU. The scrubber at Lansing Unit 4 is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR or some alternative to this rule that may be implemented.
Other - IPL is currently constructing lower-cost emission controls projects at Burlington Unit 1 and Prairie Creek Units 3 and 4 to support compliance obligations for current and anticipated air quality regulatory requirements, including the MATS Rule. Alliant Energy and IPL currently anticipate the projects will be completed in 2014, at which time these generating facilities will be in compliance with the MATS Rule.
WPL’s Emission Controls Projects - WPL must file a CA and receive authorization from the PSCW to proceed with any individual emission controls project with an estimated project cost of $10 million or more.
Columbia Units 1 and 2, and Edgewater Unit 5 - Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the scrubber and baghouse projects at Columbia Units 1 and 2, and Edgewater Unit 5.
Columbia Unit 2 - WPL currently expects to file a CA application with the PSCW in the second quarter of 2014 to install an SCR at Columbia Unit 2 to reduce NOx emissions at the EGU. The SCR is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR or some alternative to this rule that may be implemented.
Refer to Note 16(e) of the “Combined Notes to Consolidated Financial Statements” for discussion of a Consent Decree approved by the Court in June 2013, which includes a requirement for WPL to install emission controls systems noted above at certain of its EGUs.
Energy Efficiency Programs - Alliant Energy, IPL and WPL have several energy efficiency programs and initiatives that help customers reduce their energy usage and related costs through the use of new energy efficient equipment, products and practices. The following are Alliant Energy’s, IPL’s and WPL’s current key energy efficiency programs:
IPL EEP - In December 2013, IPL received an order from the IUB approving IPL’s EEP for 2014 through 2018. The EEP includes IPL spending approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018, and is expected to conserve electric and natural gas usage equal to that of more than 100,000 homes. In accordance with Iowa law, IPL is required to file an EEP every five years. An EEP provides a utility’s plan and related budget to achieve specified levels of energy savings. IUB approval demonstrates that the IUB believes that IPL’s EEP is reasonably expected to achieve cost effective delivery of the energy efficiency programs. To the extent approved by the IUB, costs associated with executing the EEP are recovered from ratepayers through an additional tariff called an EECR factor. The EECR factors are revised annually and include a reconciliation to eliminate any over- or under-recovery of energy efficiency expenses from prior periods. There are no carrying costs associated with the cost recovery factors. The annual EECR factors are based on IPL’s approved budget as filed with its EEP, along with any over- or under-collection from prior periods, and therefore are not expected to have a material impact on Alliant Energy’s and IPL’s financial condition or results of operations.
Focus on Energy Program - In 2013 and 2012, WPL contributed 1.2% of annual utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program.
Shared Savings Programs - IPL and WPL have historically offered energy efficiency programs to certain customers in Minnesota and Wisconsin referred to as Shared Savings programs. These programs have provided low-cost financing to help customers identify, purchase and install energy efficiency improvement projects. The customers repay IPL and WPL with monthly payments over a term up to five years. Refer to Note 5(c) of the “Combined Notes to Consolidated Financial Statements” for additional details of Shared Savings programs.
RATE MATTERS
Overview - Alliant Energy has two utility subsidiaries, IPL and WPL. IPL and WPL are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates and certain natural gas facilities, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates and standards of service. Such regulatory oversight also covers IPL’s and WPL’s plans for construction and financing of new EGUs and related activities.
Recent Retail Base Rate Filings - Details of IPL’s and WPL’s recent retail base rate cases impacting their historical and future results of operations are as follows (dollars in millions; Electric (E); Gas (G)):
| Retail Base Rate Cases | Utility Type | Filing Date | Interim Increase Implemented (a)(b) | Interim Effective Date | Final Increase / (Decrease) Granted (b) | Final Effective Date | |||||||||
| WPL: | |||||||||||||||
| Wisconsin 2013/2014 Test Period | E/G | May-12 | N/A | N/A | E-$0;G-($13) | Jan-13 | |||||||||
| IPL: | |||||||||||||||
| Iowa 2011 Test Year | G | May-12 | $9 | Jun-12 | 11 | Jan-13 | |||||||||
| Minnesota 2009 Test Year | E | May-10 | 14 | Jul-10 | 8 | Feb-12 (c) | |||||||||
| Iowa 2009 Test Year | E | Mar-10 | 119 | Mar-10 | 114 | Apr-11 |
| (a) | In Iowa, IPL’s interim rates can be implemented 10 days after the filing date, without regulatory review and are subject to refund, pending determination of final rates. In Minnesota, IPL’s interim rates can be implemented 60 days after the filing date, with regulatory review and are subject to refund, pending determination of final rates. The amount of the interim rates is replaced by the amount of final rates once the final rates are effective. |
| (b) | Base rate changes reflect both returns on additions to infrastructure and recovery of changes in costs incurred or expected to be incurred. Given that a portion of the rate changes will offset changes in costs, revenues from rate changes should not be expected to result in an equal change in net income for either IPL or WPL. |
| (c) | Refer to “IPL’s Minnesota Retail Electric Rate Case (2009 Test Year)” below for details of the final recovery amount of IPL’s Whispering Willow - East wind project costs. |
WPL’s Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In July 2012, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The retail base rate filing request was based on a forward-looking test period that included 2013 and 2014. The filing requested approval for WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The filing also requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2014. Recovery of the costs for the acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 were included in the request. The recovery of the costs for these capital projects are offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. WPL’s retail base rate filing included continuation of a 10.4% return on common equity and the following related provisions: (1) WPL may request a change in retail base rates during the test period if its annual regulatory return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual regulatory return on common equity exceeds 10.65% during the test period. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%. In addition, the filing requested WPL maintain its ability to request deferrals based on current practices. As of December 31, 2013, Alliant Energy and WPL did not record any material deferred amounts for these provisions.
Refer to “WPL’s Retail Fuel-related Rate Filings” below for information on WPL’s retail fuel-related filings for 2013 and 2014. Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for details of impacts to “Regulatory assets” on Alliant Energy’s and WPL’s Consolidated Balance Sheets from the PSCW’s July 2012 order.
IPL’s Iowa Retail Gas Rate Case (2011 Test Year) - In May 2012, IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers based on a 2011 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of capital investments since IPL’s last Iowa retail gas rate case filed in 2005. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012.
In November 2012, the IUB approved a settlement agreement between IPL, the OCA and the Iowa Consumers Coalition related to IPL’s request resulting in a final increase in annual rates for IPL’s Iowa retail gas customers of $11 million, or approximately 4%, effective January 10, 2013, a 9.6% return on common equity after the application of double leverage and the adoption of IPL’s proposed gas tax benefit rider discussed below.
Gas Tax Benefit Rider - IPL’s May 2012 retail gas rate case filing with the IUB included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL proposed to reduce customer bills utilizing a gas tax benefit rider over a three-year period by approximately $36 million in aggregate. In November 2012, IPL received an order from the IUB authorizing the gas tax benefit rider. The
IUB’s order authorized up to $12 million of regulatory liabilities from tax benefits to be credited to IPL’s retail gas customers’ bills in Iowa annually from January 2013 through December 2015 through the gas tax benefit rider. In December 2012, IPL filed a report with the IUB that identified approximately $48 million of total tax benefits allocated for use with the gas tax benefit rider. Any remaining benefit, including any portion not utilized of the agreed upon amount from January 2013 through December 2015, will be credited to Iowa’s retail gas customers’ bills in 2016. IPL utilized $11 million of regulatory liabilities to credit Iowa retail gas customers’ bills in 2013. Refer to “IPL’s Iowa Retail Electric Rate Case (2009 Test Year)” below and Note 2 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of the tax benefit riders.
IPL’s Minnesota Retail Electric Rate Case (2009 Test Year) - In 2010, IPL filed a request with the MPUC to increase annual rates for its Minnesota retail electric customers based on a 2009 historical test year as adjusted for certain known and measurable items at the time of the filing. The key drivers for the filing included recovery of investments in IPL’s Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail rate increase of $14 million, on an annual basis, effective July 6, 2010.
In November 2011, IPL received an order from the MPUC authorizing a final annual retail electric rate increase equivalent to $11 million. The final annual retail electric rate increase of $11 million includes $8 million of higher base rates, $2 million from the temporary renewable energy rider and $1 million from the utilization of regulatory liabilities to offset higher electric transmission service costs. Because the final rate increase level was below the interim retail rate increase level implemented in July 2010, IPL refunded $4 million, including interest, to its Minnesota retail electric customers in 2012.
The MPUC’s order approved IPL’s Minnesota renewable energy rider request on a temporary basis but deferred judgment on the prudence of the Whispering Willow - East wind project costs. The initial recovery amount of the project costs were allowed through the temporary renewable energy rider at a levelized cost of $51 per MWh. In December 2013, IPL received an order from the MPUC approving full cost recovery of the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs of approximately $30 million, effective January 1, 2013. IPL will continue to recover all costs, including production tax credits, through the renewable energy rider until all costs are moved into base rates, subject to approval by the MPUC in a future rate proceeding.
Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for discussion of changes to regulatory assets and regulatory liabilities in 2011 based on the MPUC’s November 2011 order. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of adjustments made by Alliant Energy and IPL in 2011 and 2013 to the carrying value of IPL’s Whispering Willow - East wind project, based on amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.
IPL’s Iowa Retail Electric Rate Case (2009 Test Year) - In 2010, IPL filed a request with the IUB to increase annual rates for its Iowa retail electric customers based on a 2009 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of investments in the Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail electric rate increase of $119 million, or approximately 10%, on an annual basis, effective March 20, 2010. In February 2011, IPL received an order from the IUB authorizing a final annual retail electric rate increase of $114 million, or approximately 10%. Because the final rate increase level was below the interim rate increase level of $119 million implemented on March 20, 2010, IPL refunded $5 million, including interest, to its Iowa retail electric customers in 2011. Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for details of changes to regulatory assets and regulatory liabilities based on a separate January 2011 IUB order.
Transmission Cost Rider - In January 2011, the IUB approved IPL’s proposal to implement a transmission cost rider for recovery of electric transmission service expenses incurred to provide electric service to IPL’s retail customers in Iowa. The IUB stipulated that the rider would be implemented on a pilot basis conditional upon IPL’s agreement to not file a retail electric base rate case for three years from the date of the order and meet additional reporting requirements. In January 2011, IPL accepted the transmission cost rider with the IUB’s conditions. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, at which time the rider will continue in its current form, continue in a modified form or be terminated. Effective February 2011, electric transmission service expenses were removed from base rates and billed to IPL’s Iowa retail electric customers through the transmission cost rider. This cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa retail electric customers for changes in electric transmission service expenses. The cumulative effects of the under-/over-collection of these costs will be recorded in
regulatory assets or regulatory liabilities on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers.
In November 2013, IPL filed its latest request with the IUB to update the rates IPL uses to bill its Iowa retail electric customers in 2014 under the transmission cost rider. In January 2014, IPL received an order from the IUB approving IPL’s rates for 2014 as requested, which became effective February 1, 2014. Refer to “Other Future Considerations - Electric Transmission Service Charges” for discussion of estimated increases in transmission service charges expected by IPL for 2014.
Electric Tax Benefit Rider - In 2009, IPL filed a request with the IUB to create a regulatory liability account for potential tax benefits resulting from changes in tax accounting methodologies and tax elections available under the Internal Revenue Code. These potential tax benefits are related to the tax treatment of repairs expenditures, allocation of insurance proceeds from floods in 2008 and allocation of mixed service costs. In December 2012, IPL filed a report with the IUB requesting approval of the final amount of the regulatory liability account based on the tax benefits generated from these changes in tax accounting methodologies and tax elections that were sustained under IRS audit. The December 2012 report filed by IPL identified approximately $500 million of such tax benefits, which includes $452 million allocated for use with the electric tax benefit rider and $48 million allocated for use with the gas tax benefit rider discussed previously. In February 2013, the IUB authorized IPL to reduce the billing credits on customers’ bills by $24 million in 2013 to recognize the revenue requirement impact of the changes in tax accounting methods. This resulted in a revenue requirement adjustment increasing Alliant Energy’s and IPL’s electric revenues by $24 million in 2013.
The electric tax benefit rider, which was approved by the IUB and implemented in early 2011, utilizes amounts from the regulatory liability account to credit bills of Iowa retail customers to help offset the impact of rate increases on such customers. These credits on customers’ electric bills reduce electric revenues each quarter based on customers’ KWh usage. In 2013, 2012 and 2011, the electric tax benefit rider utilized $79 million, $83 million and $61 million of the regulatory liability account to credit IPL’s customers’ bills, respectively. In December 2013, the IUB issued an order approving IPL’s 2014 electric tax benefit rider tariff, which proposes to utilize $85 million of the regulatory liability account in 2014 to credit IPL’s retail electric customers’ bills. In December 2013, the IUB also authorized IPL to reduce the $85 million of billing credits on customers’ bills by $15 million in 2014 to recognize the revenue requirement impact of the changes in tax accounting methods.
The remaining $144 million of the regulatory liability account balance allocated for use with the electric tax benefit rider is currently expected to be utilized subsequent to 2014 and will be dependent on future decisions by the IUB. Refer to Notes 2 and 11 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of the impacts of the electric tax benefit rider on Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities, income tax expense and effective income tax rates.
WPL’s Retail Fuel-related Rate Filings -
2014 Test Year - In December 2013, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $19 million, or approximately 2%, effective January 1, 2014, to reflect anticipated increases in retail electric fuel-related costs in 2014 compared to the fuel-related cost estimates used to determine rates for 2013. WPL’s 2014 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. Deferral of under-collections are reduced to the extent WPL’s actual return on common equity exceeds the most recently authorized return on common equity.
2013 Test Year - In December 2012, WPL received an order from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, effective January 1, 2013 to reflect anticipated decreases in retail electric fuel-related costs in 2013 compared to the fuel-related cost estimates used to determine rates for 2012. WPL’s 2013 fuel-related costs were subject to deferral if they fell outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. Retail fuel-related costs incurred by WPL for 2013 did not fall outside of the fuel monitoring range.
2012 Test Year - In December 2011, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $4 million, effective January 1, 2012 to reflect anticipated increases in fuel-related costs in 2012 compared to fuel-related cost estimates used to determine rates for 2011. WPL’s 2012 fuel-related costs were subject to deferral if they fell outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. Retail fuel-related costs incurred by WPL in 2012 were lower than retail fuel-related costs used to determine rates for such period resulting in an over-collection of fuel-related costs for 2012 of approximately $17 million (including $11 million outside the approved range
for 2012 recorded in “Regulatory liabilities” on Alliant Energy’s and WPL’s Consolidated Balance Sheets as of December 31, 2012). In 2013, WPL refunded $12 million, including interest, to its retail electric customers for these over-collections.
Planned Utility Rate Cases in 2014 -
IPL’s Iowa Retail Electric Rate Case (2013 Test Year) - In January 2013, the IUB issued an order allowing IPL to proceed with its DAEC PPA for a term of February 22, 2014 through December 31, 2025 and authorized IPL to recover the Iowa retail portion of the costs of such PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The January 2013 order encouraged IPL to continue discussions with parties to the DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding regarding rate impacts beginning in 2014. IPL is preparing to file an Iowa retail electric base rate case without interim rates in late March 2014 in case such discussions do not result in a resolution of the issues. The key drivers to determining the final rates in such a rate case are expected to be the reduction in purchased electric capacity expenses in 2014 with the expiration of the existing DAEC PPA and significant additions to IPL’s rate base since its 2009 test year retail electric rate case for emission controls added to generating facilities to comply with environmental regulations, generation performance improvement projects and other capital expenditures to ensure reliable electric service. IPL currently believes the impact of the reduction in purchased electric capacity expenses on the determination of final rates will be largely offset by the significant rate base additions since IPL’s last retail electric rate case. However, IPL is currently unable to predict the final rates to be determined by the IUB from such a rate case. Final rates may also be dependent on other matters expected to be addressed in such rate case, including extension of the current temporary transmission rider, utilization of remaining regulatory liabilities related to the electric tax benefit rider and future revenue requirement adjustments related to certain tax benefits from tax accounting method changes. Based on the terms of the IUB’s January 2013 order discussed above, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014. IPL currently anticipates a decision from the IUB on this matter by the end of 2014, either through an approved rate case or an approved settlement.
WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) - WPL currently expects to make a retail rate filing in late March 2014 based on a forward-looking test period that may include calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the 2015 and 2016 test period. The key non-fuel drivers for the anticipated filing include recovery of the scrubber and baghouse projects at Columbia Units 1 and 2 and partial recovery of the scrubber and baghouse projects at Edgewater Unit 5. The recovery of costs associated with these capital projects is expected to be partially offset by lower energy conservation cost recovery amortizations. Any rate changes granted are expected to be effective in early 2015.
Rate Case Details - Details of the currently effective rate orders in IPL’s and WPL’s key jurisdictions were as follows (Common Equity (CE); Preferred Equity (PE); Long-term Debt (LD); Short-term Debt (SD)):
| Authorized Return | Average | ||||||||||||||||||
| Test | on Common | Regulatory Capital Structure | After-tax | Rate Base | |||||||||||||||
| Jurisdictions | Period | Equity (a) | CE | PE | LD | SD | WACC | (in millions) | |||||||||||
| IPL: | |||||||||||||||||||
| Iowa retail (IUB): | |||||||||||||||||||
| Electric: | |||||||||||||||||||
| - Emery (b) | 2009 | 11.58 | % | 48.2% | 6.5% | 45.3% | N/A | 8.85% | $281 | ||||||||||
| - Whispering Willow - East (b) | 2009 | 11.09 | % | 48.2% | 6.5% | 45.3% | N/A | 8.61% | 266 | ||||||||||
| - Other (b) | 2009 | 9.53 | % | 48.2% | 6.5% | 45.3% | N/A | 7.86% | 1,843 | ||||||||||
| Gas (c) | 2011 | 9.56 | % | 48.8% | 5.0% | 46.2% | N/A | 7.76% | 255 | ||||||||||
| Minnesota retail (MPUC): | |||||||||||||||||||
| Electric | 2009 | 10.35 | % | 47.7% | 6.3% | 43.9% | 2.1% | 8.11% | 126 (d) | ||||||||||
| Gas | 1994 | 10.75 | % | 41.0% | 7.4% | 44.0% | 7.6% | 8.82% | 7 | ||||||||||
| Wholesale electric (FERC) (e) | 2013 | 10.97 | % | 48.9% | 5.4% | 45.7% | N/A | 8.32% | 30 | ||||||||||
| WPL: | |||||||||||||||||||
| Wisconsin retail (PSCW): | |||||||||||||||||||
| Electric | 2014 | 10.40 | % | 49.4% | 1.9% | 44.2% | 4.5% | 7.77% | 2,240 (f) | ||||||||||
| Gas | 2014 | 10.40 | % | 49.4% | 1.9% | 44.2% | 4.5% | 7.77% | 199 (f) | ||||||||||
| Wholesale electric (FERC) (g) | 2013 | 10.90 | % | 55.0% | N/A | 45.0% | N/A | 8.49% | 273 (h) |
| (a) | Authorized returns on common equity may not be indicative of actual returns earned or projections of future returns. |
| (b) | Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to the IUB’s January 2011 order discussed above. Prior to the application of double leverage, authorized returns on common equity were: Emery-12.23%, Whispering Willow-East-11.7% and Other-10.0%, and after-tax WACC were: Emery-9.16%, Whispering Willow-East-8.91% and Other-8.09%. |
| (c) | Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to the unanimous settlement agreement approved in the IUB’s November 2012 order. Prior to the application of double leverage, authorized return on common equity was 10.0% and after-tax WACC was 8.0%. |
| (d) | Average rate base amounts do not include Whispering Willow - East capital costs, which are currently being recovered through a temporary renewable energy rider approved by the MPUC. Refer to “IPL’s Minnesota Retail Electric Rate Case (2009 Test Year)” above for details of the final recovery amount of the Whispering Willow - East capital costs. |
| (e) | IPL’s wholesale formula rates reflect annual changes in CE, PE, LD, WACC and rate base. |
| (f) | Average rate base amounts do not include CWIP or a cash working capital allowance. The PSCW provides a return on selected CWIP and a cash working capital allowance by adjusting the percentage return on rate base. |
| (g) | WPL’s wholesale formula rates reflect annual changes in WACC and rate base. |
| (h) | WPL’s wholesale average rate base reflects production-related rate base calculated as the simple average of the beginning of year and end of year balances in accordance with WPL’s approved formula rates. |
ENVIRONMENTAL MATTERS
Overview - Alliant Energy, IPL and WPL are subject to regulation of environmental matters by federal, state and local authorities as a result of their current and past operations. Alliant Energy, IPL and WPL monitor these environmental matters and address them by installing controls that reduce emissions and by implementing operational modifications or other measures to address compliance obligations. These programs are subject to continuing review and are periodically revised due to various factors, including but not limited to changes in environmental regulations, litigation of environmental requirements, construction plans and compliance costs. There is currently significant regulatory uncertainty with respect to a number of environmental rules and regulations discussed below. Given the dynamic nature of environmental regulations and other related regulatory requirements, Alliant Energy, IPL and WPL have established an integrated planning process that is used for environmental compliance for their operations. Alliant Energy, IPL and WPL anticipate future expenditures for environmental compliance will be material, including significant capital investments. Alliant Energy, IPL and WPL anticipate that prudent expenditures incurred by IPL and WPL to comply with environmental requirements would likely be recovered in rates from IPL’s and WPL’s customers. Refer to “Strategic Overview - Environmental Compliance Plans” for details of environmental compliance plans, including discussion of specific projects and the associated estimated capital expenditures. The following are major environmental matters that could potentially have a significant impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.
Air Quality - The CAA and its amendments mandate preservation of air quality through existing regulations and periodic reviews to ensure adequacy of the CAA provisions based on scientific data. As part of the basic framework under the CAA, the EPA is required to establish NAAQS rules, which serve to protect public health and welfare. These rules address six “criteria” pollutants, four of which (NOx, SO2, PM and ozone) are particularly relevant to Alliant Energy’s, IPL’s and WPL’s electric utility operations. Ozone is not directly emitted from Alliant Energy’s, IPL’s and WPL’s EGUs; however, NOx emissions may contribute to its formation in the atmosphere. PM2.5 may also be formed in the atmosphere from SO2 and NOx emissions.
SIPs document the collection of regulations that individual state agencies will apply to maintain NAAQS rules and related CAA requirements. The EPA must approve each SIP and if a SIP is not acceptable to the EPA or if a state chooses not to issue separate state rules, then the EPA can assume enforcement of the CAA in that state by issuing a federal implementation plan. Routinely monitored locations that do not comply with NAAQS rules may be classified by the EPA as non-attainment and require further actions to reduce emissions. Additional emissions standards may also be applied under the CAA regulatory framework beyond NAAQS rules. The specific federal and state air quality regulations that may affect Alliant Energy’s, IPL’s and WPL’s operations are listed in the table below. Refer to the sections below the following tables for detailed discussion of the following air quality regulations.
| Emissions | Alliant Energy’s Primary Facilities | Actual/Anticipated | ||||
| Environmental Regulation | Regulated | Potentially Affected | Compliance Deadline | |||
| CAIR | SO2, NOx | Fossil-fueled EGUs over 25 MW capacity in IA and WI | Phase I - 2009/2010; Phase II - January 2015 | |||
| CAVR | SO2, NOx, PM | Fossil-fueled EGUs built between 1962 and 1977 in IA and WI | TBD | |||
| MATS Rule | Mercury and other HAPs | Coal-fueled EGUs over 25 MW capacity in IA and WI | April 2015 (a) | |||
| Wisconsin State Mercury Rule | Mercury | WPL’s coal-fueled EGUs over 25 MW capacity | Phase I - 2010; Phase II - April 2016 | |||
| Industrial Boiler and Process Heater MACT Rule | Mercury and other HAPs | IPL’s Prairie Creek boilers 1, 2 and 5 | January 2016 (a) | |||
| Ozone NAAQS Rule | NOx | Fossil-fueled EGUs in non-attainment areas | December 2015 | |||
| Fine Particulate NAAQS Rule | SO2, NOx, PM | Fossil-fueled EGUs in non-attainment areas | 2020 | |||
| NO2 NAAQS Rule | NO2 | Fossil-fueled EGUs in non-attainment areas | TBD | |||
| SO2 NAAQS Rule | SO2 | Fossil-fueled EGUs in non-attainment areas | 2018 | |||
| GHG NSPS | CO2 | Fossil-fueled EGUs | New units upon startup and existing units TBD |
| (a) | An additional year for compliance can be requested, which may be granted on a case-by-case basis by state permitting authorities. |
The following table lists the fossil-fueled generating facilities by primary fuel type that IPL and WPL currently own or operate with greater than 25 MW of nameplate capacity. All of IPL’s generating facilities listed below are located in Iowa except for Fox Lake Unit 3, which is located in Minnesota. All of WPL’s generating facilities listed below are located in Wisconsin. Refer to “Strategic Overview” for discussion of various generating facilities that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
| IPL | WPL | |||||||
| Coal | Natural Gas | Oil | Coal | Natural Gas | ||||
| Ottumwa 1 | Emery 1-3 | Marshalltown 1-3 | Columbia 1-2 | Riverside 1-3 | ||||
| Lansing 4 | Fox Lake 3 | Lime Creek 1-2 | Edgewater 3-5 | Sheboygan Falls 1-2 | ||||
| M.L. Kapp 2 (a) | Sutherland 1,3 (b) | Centerville 1-2 | Nelson Dewey 1-2 | Neenah 1-2 | ||||
| Burlington 1 | Dubuque 3-4 | South Fond du Lac 1-4 | ||||||
| George Neal 3-4 | Rock River 3,5-6 | |||||||
| Prairie Creek 3-4 | Sheepskin 1 | |||||||
| Louisa 1 |
| (a) | M.L. Kapp Unit 2 is expected to switch from coal to natural gas as its primary fuel type in 2015. |
| (b) | In 2012, IPL switched Sutherland Units 1 and 3 to using natural gas as their primary fuel type; however, Sutherland Units 1 and 3 are still permitted to burn coal and are subject to all of the coal-burning EGU air regulations. |
As discussed in greater detail below, a number of these air regulations are subject to legal challenges, reconsideration and/or other uncertainties that affect Alliant Energy’s, IPL’s and WPL’s ability to predict with certainty what impact such regulations may have on their financial condition and results of operations.
CAIR/CSAPR - CAIR includes a regional cap-and-trade system covering the eastern U.S., where compliance with SO2 and NOx emissions limits may be achieved by either adding emission controls and/or purchasing emission allowances. In 2011, the EPA issued CSAPR as a replacement rule for CAIR. CSAPR also included requirements to reduce SO2 and NOx emissions. In June 2013, the U.S. Supreme Court issued an order granting an EPA petition for review of a D.C. Circuit Court decision to vacate and remand CSAPR for further EPA review. The U.S. Supreme Court ruling on the CSAPR vacatur is expected in 2014, and during the interim, CAIR remains effective. Given that these rules remain subject to potential further reconsideration by the EPA in response to legal challenges, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact on their financial condition or results of operations. Alliant Energy, IPL and WPL currently believe that CAIR will be replaced in the future, either by a modified CSAPR or another rule that addresses the interstate transport of air pollutants, and expect that capital investments and/or modifications to their EGUs to meet the final compliance requirements will be significant.
CAVR - CAVR requires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas across the U.S. with a national goal of no impairment by 2064. These implementation plans require BART emission controls at certain IPL and WPL fossil-fueled EGUs that were built between 1962 and 1977 and other additional measures needed for reducing state contributions to regional haze. IPL’s facilities that may be impacted include Burlington Unit 1, George Neal Units 3 and 4, Prairie Creek Unit 4, M.L. Kapp Unit 2 and Lansing Unit 4. WPL’s facilities that may be impacted include Edgewater Unit 4, Nelson Dewey Unit 2, and Columbia Units 1 and 2.
In 2012, the EPA published a final rule (BART-CSAPR Rule) that allowed BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. In 2012, the EPA approved Wisconsin’s CAVR plan, which relied on the EPA’s BART-CSAPR rule. In 2012, the EPA issued a federal plan specifying that Iowa’s compliance with CSAPR would be sufficient to meet CAVR requirements.
As a result of the Court decision to vacate CSAPR, it is unknown whether the EPA will allow BART to be fulfilled by CAIR, a modified CSAPR or another rule pending the ongoing legal review of these regulations and the EPA’s responses to resolve the court orders on these rules. In addition, groups have legally challenged the EPA’s reliance on CSAPR to satisfy CAVR BART requirements. Alliant Energy, IPL and WPL are unable to predict with certainty the impact that CAVR might have on the operations of their existing EGUs until the legal challenges to CAIR and CSAPR are resolved.
MATS Rule - In 2011, the EPA issued the final MATS Rule, which requires compliance with emission limits for mercury and other HAPs. In 2012, the EPA issued a proposed reconsideration to the MATS Rule, including revisions to the startup and shutdown provisions for existing EGUs. In March 2013, the EPA announced that the final reconsideration rule for startup and shutdown provisions under the MATS Rule was delayed, but did not provide a revised schedule for issuance. Compliance with the MATS Rule is required by April 2015; however, an entity can request an additional year for compliance for units that are needed to assure power reliability, units needed while building replacement generation or repowering to gas, or units that need additional time to install air emission controls technology. In February 2014, the Wisconsin DNR approved an extension to the MATS compliance deadline for WPL’s Edgewater Unit 3 and Nelson Dewey Units 1 and 2 to April 2016. The MATS Rule is subject to legal challenge that is pending in the D.C. Circuit Court and a ruling in the case is not expected until mid-2014 or later. Given that this rule remains subject to legal challenge in the D.C. Circuit Court and possible revision due to the proposed reconsideration, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the MATS Rule on their financial condition and results of operations, but expect that capital investments and/or modifications to their EGUs could be significant to comply with the rule.
Wisconsin State Mercury Rule - The second phase of the Wisconsin State Mercury Rule requires large coal-fueled EGUs with greater than 150 MW of capacity to either achieve a mercury emissions reduction standard or limit the annual concentration of mercury emissions beginning in January 2015. Small coal-fueled EGUs between 25 MW and 150 MW of capacity must install Best Available Control Technology by January 2015 to reduce mercury emissions. As an alternative, the Wisconsin State Mercury Rule allows large and small EGUs to achieve compliance through averaging of covered emissions. WPL expects to utilize large and small EGU averaging to comply with this rule. In accordance with Wisconsin Statutes, EGUs complying with the MATS Rule by April 2015 would no longer be subject to the Wisconsin State Mercury Rule. The Wisconsin NRB proposed changes to the Wisconsin State Mercury Rule that would extend the second phase compliance date to April 2016, thereby accommodating the MATS Rule compliance deadline. A decision regarding Wisconsin NRB proposed changes to the Wisconsin State Mercury Rule is expected in 2014. Alliant Energy and WPL continue to evaluate the impact of the Wisconsin State Mercury Rule and the MATS Rule discussed above on their financial condition and results of operations to determine if further mercury emission reductions would be required.
Industrial Boiler and Process Heater MACT Rule - In 2012, the EPA issued a final reconsidered Industrial Boiler and Process Heater MACT Rule with a compliance deadline of early 2016 for major sources; however, an entity can request an additional year for compliance, which may be granted on a case-by-case basis by state permitting authorities. The rule is expected to apply to IPL’s Prairie Creek boilers 1, 2 and 5, and fossil-fueled auxiliary boilers and process heaters operated at other IPL and WPL fossil-fueled generating facilities. The rule requires compliance with HAPs emission limitations and work practice standards. The final rule remains subject to legal challenges in the D.C. Circuit Court. Given that this rule remains subject to legal challenges in the D.C. Circuit Court, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the Industrial Boiler and Process Heater MACT rule on their financial condition and results of operations, but expect that capital investments and/or modifications to their generating facilities to meet compliance requirements of the rule could be significant.
Ozone NAAQS Rule - The 2008 ozone NAAQS rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the EPA. There are five non-attainment classifications: marginal, moderate,
serious, severe and extreme. In 2012, the EPA issued a final rule that classified Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve the 2008 eight-hour ozone NAAQS by December 2015. WPL operates Edgewater and Sheboygan Falls in Sheboygan County, Wisconsin. The final rule does not list any non-attainment areas in Iowa or Minnesota that impact IPL. In May 2013, the EPA issued a proposed rule to assist state agencies in developing SIPs. The SIPs will explain what actions and emission reductions may be required for compliance to achieve attainment. The Edgewater Unit 5 SCR system completed in 2012 is expected to assist with possible compliance obligations under the ozone NAAQS SIP for Wisconsin. In addition, the EPA is expected to issue a proposed rulemaking in 2014 in response to legal challenges for missing its five-year statutory deadline to re-evaluate the level of the 2008 ozone NAAQS, which could make the standard more stringent. Given the Wisconsin DNR has not yet issued an eight-hour ozone non-attainment SIP, and the 2008 standard may be revised, Alliant Energy and WPL are currently unable to predict with certainty the impact of the ozone NAAQS on their financial condition and results of operations.
Fine Particulate (PM2.5) NAAQS Rule - In 2012, the EPA issued a final rule that strengthened the annual PM2.5 NAAQS. The EPA is expected to designate non-attainment areas for the revised annual PM2.5 NAAQS by December 2014 with an effective date in early 2015. States with areas designated as non-attainment will be required to submit PM2.5 NAAQS SIPs within three years of the effective date of area designations by the EPA. The SIPs will explain what actions are needed in the non-attainment areas to achieve compliance with annual PM2.5 NAAQS. Compliance with the final rule is required five years after the effective date of the area designations by the EPA, which is expected to be 2020 for non-attainment areas designated by EPA in December 2014. Given that the PM2.5 NAAQS rule remains subject to legal challenges in the D.C. Circuit Court, the EPA has not yet designated non-attainment areas and the PM2.5 NAAQS SIPs have not been issued, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the final PM2.5 NAAQS rule on their financial condition and results of operations.
NO2 NAAQS Rule - In 2010, the EPA issued a final rule that establishes a new one-hour NAAQS for NO2. In 2012, the EPA issued a final rule that does not propose to designate any non-attainment areas in Iowa, Wisconsin or Minnesota. The EPA is expected to re-evaluate these designations in 2016 based on expanded monitoring data. Given that the EPA has not yet re-evaluated designations, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of any potential NO2 NAAQS changes on their financial condition and results of operations.
SO2 NAAQS Rule - In 2010, the EPA issued a final rule that establishes a new one-hour NAAQS for SO2. In July 2013, the EPA finalized non-attainment designations for certain areas in the U.S. currently exceeding the SO2 standard based on ambient monitoring data, including parts of Iowa and Wisconsin; however, IPL and WPL do not operate any EGUs in these areas. Compliance with the SO2 NAAQS rule is currently expected to be required by 2018 for non-attainment areas finalized in 2013. Non-attainment designations for the remainder of the U.S. have been delayed to allow for modeling and collection of additional monitoring data. Given that this rule remains subject to legal challenges in the D.C. Circuit Court and the EPA has not yet issued final non-attainment designations for any areas where IPL or WPL operate EGUs, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of any potential SO2 NAAQS changes on their financial condition and results of operations.
GHG Emissions - Climate change continues to be assessed by policymakers including consideration of the appropriate actions to mitigate global warming. There is continued debate regarding the public policy response that the U.S. should adopt, involving both domestic actions and international efforts. As discussed in greater detail below, the EPA currently regulates GHG emissions under the Tailoring Rule for PSD construction permits and Title V operation permits, and President Obama has issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. Additional proposals may be considered in the future, which could reduce GHG emissions through additional renewable energy standards and/or energy efficiency requirements.
In 2009, the EPA issued a finding that GHG emissions contribute to climate change, and therefore, threaten public health and welfare. This enabled the EPA to issue rules to report and regulate GHG emissions under the authority of the CAA. The EPA Mandatory GHG Reporting rule requires sources above certain threshold levels to monitor and report emissions. The primary GHG emitted from Alliant Energy’s, IPL’s and WPL’s utility operations is CO2 from the combustion of fossil fuels at their larger EGUs. Emissions of GHG are reported at the facility level in CO2e and include those facilities that emit 25,000 metric tons or more of CO2e annually. Annual emissions reported to the EPA for electric utility and natural gas distribution operations, in terms of total mass of CO2e, were as follows (in millions of metric tons):
| Alliant Energy | IPL | WPL | |||||||||
| 2012 | 2011 | 2012 | 2011 | 2012 | 2011 | ||||||
| CO2e emissions (a) | 25.2 | 26.7 | 10.8 | 12.1 | 14.4 | 14.6 |
| (a) | CO2e emissions reported to the EPA represent all emissions from the facilities operated by IPL and WPL and do not reflect their share of co-owned facilities operated by other companies. |
In 2010, the EPA issued the GHG Tailoring Rule, which establishes a GHG emission threshold for major sources under the PSD construction permit and Title V operation permit. Legal challenges to the EPA’s permit authority to regulate GHG emissions under the GHG Tailoring Rule are pending review in the Supreme Court. There is no required deadline for the Supreme Court to issue a decision in this case.
In June 2013, President Obama announced plans to address climate change and issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In January 2014, the EPA published revised proposed NSPS for GHG emissions for new fossil-fueled EGUs, which would establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown is expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. Also, WPL’s potential generation investment could be impacted by these standards. A date for finalizing these standards has not yet been established.
The EPA is expected to issue proposed and final NSPS for GHG emissions for existing EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016. Accordingly, the implications of the EPA’s NSPS for GHG emissions from new and existing EGUs remains highly uncertain. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of these standards, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.
WPL Consent Decree - Refer to Note 16(e) of the “Combined Notes to Consolidated Financial Statements” for discussion of a Consent Decree approved by the Court in June 2013 and WPL’s obligations thereunder. The Consent Decree resolves an NOV issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Columbia, Edgewater and Nelson Dewey.
Other Air Quality Matters - IPL, the EPA, the State of Iowa and the Sierra Club are in discussions regarding CAA issues associated with IPL’s Iowa operations. Alliant Energy and IPL believe that they are in compliance with the CAA. IPL is pursuing these discussions because IPL believes there is an opportunity to reach an agreement among the parties that avoids potential litigation and the long-term planning and operational uncertainty associated with such litigation. Alliant Energy and IPL believe that any agreement could contain terms similar to those seen in other EPA CAA settlements, including, among others, the installation of emission controls, the retirement or fuel switching of EGUs, compliance with specified emission rates and emission caps, beneficial environmental mitigation projects and penalties, such as those addressed by the WPL Consent Decree. Alliant Energy and IPL are currently unable to predict with certainty the outcome of these discussions and the impact on their financial condition or results of operations.
Water Quality -
Section 316(b) of Federal Clean Water Act - The Federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure that these structures reflect the best technology available for minimizing adverse environmental impacts to fish and other aquatic life. In 2011, the EPA issued a revised proposed rule related to Section 316(b) of the Federal Clean Water Act. This rule applies to existing and new cooling water intake structures at certain steam generating and manufacturing facilities. IPL and WPL have identified nine (Ottumwa 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, George Neal Units 3-4 and Louisa Unit 1) and three (Columbia Units 1-2, Nelson Dewey Units 1-2 and Edgewater Units 3-5) generating facilities, respectively, which may be impacted by the revised Section 316(b) Rule. A final rule is currently expected to be issued by the EPA in the first half of 2014, and compliance is currently expected to be required within eight years of the effective date of the final rule. Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the EPA’s Section 316(b) rule on their financial condition and results of operations.
Hydroelectric Fish Passage Device - In 2002, FERC issued an order requiring WPL to install a fish passage device at its Prairie du Sac hydro plant. WPL has been working with the FWS and the Wisconsin DNR on the final design for the fish passage device. In 2012, FERC approved an updated deadline to install an agency-approved fish passage device at the facility by July 1, 2015. In January 2013, the FWS initiated an environmental study of the fish passage device under the National Environmental Policy Act, which could result in changes to the design of the fish passage device. The FWS has indicated that this environmental study will be completed in 2014, during which time WPL is expected to request an extension of the project deadline from FERC. Alliant Energy and WPL currently believe the required capital investments and/or modifications to install the currently designed fish passage device at the facility could be approximately $15 million.
Effluent Limitation Guidelines - In June 2013, the EPA issued proposed effluent limitation guidelines, which would require changes to discharge limits for wastewater from steam generating facilities. IPL and WPL have identified eleven (Emery Units 1-3, Ottumwa Unit 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, Sutherland Units 1 and 3, George Neal Units 3-4 and Louisa Unit 1) and four (Riverside Units 1-3, Columbia Units 1-2, Nelson Dewey Units 1-2 and Edgewater Units 3-5) existing steam generating facilities, respectively, that are expected to be impacted by these guidelines. In addition, Marshalltown is expected to be impacted by these guidelines. Also, WPL’s potential generation investment could be impacted by these guidelines. Based on information in the proposed guidelines, IPL is currently unable to determine if Prairie Creek Unit 1 may be impacted by these guidelines. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines. Given that the EPA has not yet issued final guidelines, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these guidelines on their financial condition and results of operations, but believe the expenditures to comply with these guidelines could be significant.
Land and Solid Waste -
Coal Combustion Residuals - In 2010, the EPA issued a proposed rule considering two potential regulatory options for management of CCRs: (1) regulate as a special waste under the federal hazardous waste regulations when the CCR is destined for disposal, but continue to allow beneficial use applications of CCRs as a non-hazardous material; or (2) regulate as a non-hazardous waste for all applications subject to new national standards. These proposed regulations include additional requirements with significant impact for CCR management, beneficial use applications and disposal. IPL and WPL have nine and four current or former coal-fired EGUs, respectively, with one or more existing coal ash surface impoundments at each location. In addition, IPL and WPL each have two active CCR company-owned landfills. All of these CCR disposal units would be subject to the proposed rule currently anticipated to be finalized in 2014. The schedule for compliance with this rule has not yet been established. Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these information collection requests, site inspections, or potential regulations for the management of CCRs, but expect that capital investments, operating expenditures and/or modifications to comply with CCR rules could be significant.
MGP Sites - Refer to Note 16(e) of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s MGP sites.
Other - Refer to Note 16(e) of the “Combined Notes to Consolidated Financial Statements,” Item 1 Business, “Strategic Overview” and “Liquidity and Capital Resources - Cash Flows - Investing Activities - Construction and Acquisition Expenditures” for further discussion of environmental matters, including discussion of specific projects and the associated estimated capital expenditures.
LEGISLATIVE MATTERS
Overview - Alliant Energy, IPL and WPL monitor various legislative developments, including those relating to energy, tax, financial and other matters. Key legislative developments impacting Alliant Energy, IPL and WPL include the following:
ATR Act - In January 2013, the ATR Act was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013. Based on capital projects placed into service in 2013 and projected to be placed into service 2014, Alliant Energy currently estimates its total bonus depreciation deductions to be claimed on its U.S. federal income tax returns for calendar years 2013 and 2014 will be approximately $130 million ($70 million for IPL and $45 million for WPL) and $250 million ($100 million for IPL and $150 million for WPL), respectively.
ALLIANT ENERGY’S RESULTS OF OPERATIONS
Overview - “Executive Summary” provides an overview of Alliant Energy’s 2013 and 2012 earnings and the various components of Alliant Energy’s business. Additional details of Alliant Energy’s 2013, 2012 and 2011 earnings are discussed below.
Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for Alliant Energy were as follows:
| Revenues and Costs (dollars in millions) | MWhs Sold (MWhs in thousands) | |||||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||||
| Residential | $1,009.1 | $975.9 | 3% | $985.8 | (1%) | 7,824 | 7,679 | 2% | 7,740 | (1%) | ||||||||||||||||||
| Commercial | 649.4 | 611.4 | 6% | 612.1 | —% | 6,432 | 6,352 | 1% | 6,253 | 2% | ||||||||||||||||||
| Industrial | 765.4 | 741.8 | 3% | 748.9 | (1%) | 11,471 | 11,555 | (1%) | 11,504 | —% | ||||||||||||||||||
| Retail subtotal | 2,423.9 | 2,329.1 | 4% | 2,346.8 | (1%) | 25,727 | 25,586 | 1% | 25,497 | —% | ||||||||||||||||||
| Sales for resale: | ||||||||||||||||||||||||||||
| Wholesale | 195.4 | 187.6 | 4% | 189.8 | (1%) | 3,564 | 3,317 | 7% | 3,372 | (2%) | ||||||||||||||||||
| Bulk power and other | 17.7 | 23.8 | (26%) | 52.2 | (54%) | 763 | 1,303 | (41%) | 1,757 | (26%) | ||||||||||||||||||
| Other | 52.0 | 48.8 | 7% | 47.0 | 4% | 152 | 151 | 1% | 151 | —% | ||||||||||||||||||
| Total revenues/sales | 2,689.0 | 2,589.3 | 4% | 2,635.8 | (2%) | 30,206 | 30,357 | —% | 30,777 | (1%) | ||||||||||||||||||
| Electric production fuel expense | 431.0 | 367.2 | 17% | 428.3 | (14%) | |||||||||||||||||||||||
| Energy purchases expense | 294.0 | 345.1 | (15%) | 336.2 | 3% | |||||||||||||||||||||||
| Purchased electric capacity expense | 216.8 | 271.5 | (20%) | 257.2 | 6% | |||||||||||||||||||||||
| Margins (c) | $1,747.2 | $1,605.5 | 9% | $1,614.1 | (1%) |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
| (c) | Includes $79 million, $83 million and $61 million of credits on Iowa retail electric customers’ bills for 2013, 2012 and 2011, respectively, resulting from IPL’s electric tax benefit rider. IPL’s electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for 2013, 2012 and 2011. |
2013 vs. 2012 Summary - Electric margins increased $142 million, or 9%, primarily due to $60 million of higher revenues at IPL related to increases in recovery of transmission costs related to the transmission rider, $59 million of purchased electric capacity expenses at WPL during 2012 related to the Riverside PPA, $24 million of revenues at IPL in 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, $4 million of increased revenues due to lower credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2013 compared to 2012 and an increase in weather-normalized retail sales volumes at WPL. These items were partially offset by an estimated $11 million decrease in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories and $4 million of lower energy conservation revenues at IPL. The higher transmission rider revenues at IPL were offset by higher electric transmission service expenses at IPL. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.
2012 vs. 2011 Summary - Electric margins decreased $9 million, or 1%, primarily due to $22 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2012 compared to 2011. Other decreases to electric margins included $8 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA, $6 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $5 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 at WPL and lower weather-normalized sales volumes at WPL. These items were partially offset by $16 million of higher revenues at IPL related to increases in recovery of transmission costs related to the transmission rider implemented in 2011, a $10 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL, an estimated $7 million increase in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories,
$2 million of SO2 emission allowance charges at IPL in 2011 and an increase in weather-normalized sales volumes at IPL. The higher transmission rider revenues at IPL were offset by higher electric transmission service expenses at IPL.
Forecast - In December 2013, the IUB authorized IPL to reduce the billing credits on customers’ bills by $15 million in 2014 to recognize the revenue requirement impact of the changes in tax accounting methods in Alliant Energy’s and IPL’s electric revenues. Refer to “Rate Matters” for additional discussion.
Weather Conditions - Alliant Energy’s electric sales demand is seasonal to some extent with the annual peak normally occurring in the summer months due to air conditioning usage by its residential, commercial and wholesale customers. CDD data is used to measure the variability of temperatures during summer months and is correlated with electric sales demand. HDD data is used to measure the variability of temperatures during winter months and is correlated with both electric and gas sales demand. Refer to “Utility Gas Margins - Weather Conditions” for details regarding HDD in Alliant Energy’s service territories. CDD in Alliant Energy’s service territories were as follows:
| Actual | |||||||||||
| CDD (a): | 2013 | 2012 | 2011 | Normal (a) | |||||||
| Cedar Rapids, Iowa (IPL) | 884 | 1,052 | 887 | 740 | |||||||
| Madison, Wisconsin (WPL) | 709 | 1,070 | 814 | 625 |
| (a) | CDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical CDD. |
Estimated increases to electric margins from the impacts of weather were as follows (in millions):
| 2013 | 2012 | 2011 | |||||||||
| IPL | $16 | $15 | $16 | ||||||||
| WPL | 9 | 21 | 13 | ||||||||
| Total Alliant Energy | $25 | $36 | $29 |
Electric Production Fuel and Energy Purchases (Fuel-related) Cost Recoveries - Alliant Energy burns coal and other fossil fuels to produce electricity at its EGUs. The cost of fossil fuels used during each period is included in electric production fuel expense. Alliant Energy also purchases electricity to meet the demand of its customers and charges these costs to energy purchases expense. The impact on electric margins of changes in electricity volumes generated from Alliant Energy’s generating facilities was largely offset by the impact of the changes in energy volumes purchased and changes in bulk power sales volumes discussed below.
2013 vs. 2012 Summary - Alliant Energy’s electric production fuel expense increased $64 million, or 17%, and energy purchases expense decreased $51 million, or 15%, in 2013. Higher MISO dispatch of WPL’s generation facilities during 2013 compared to 2012 resulted in an increase in electric production fuel expense and a decrease in energy purchases expense for Alliant Energy and WPL. These changes were partially due to the Riverside PPA being terminated in conjunction with WPL’s acquisition of Riverside in December 2012. Partially offsetting the decrease in energy purchases expense for Alliant Energy was an increase in energy purchases expense at IPL primarily due to higher prices for electricity purchased from wholesale energy markets (primarily MISO) in 2013.
2012 vs. 2011 Summary - Alliant Energy’s electric production fuel expense decreased $61 million, or 14%, and energy purchases expense increased $9 million, or 3%, in 2012. The decrease in electric production fuel expense was largely due to lower MISO dispatch of Alliant Energy’s EGUs. Alliant Energy’s EGUs were dispatched at a lower level during 2012 because electricity could be purchased in the MISO market at prices that were lower than the cost to generate electricity at certain of Alliant Energy’s EGUs. The increase in energy purchases expense was largely due to increased electricity purchases in the MISO market.
Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues, and therefore, did not have a significant impact on IPL’s electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on its electric margins.
WPL’s retail fuel-related costs incurred in 2013 and 2012 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $4 million and $6 million in 2013 and 2012, respectively. WPL’s retail fuel-related costs incurred in 2011 were higher than the forecasted fuel-related costs used to set retail rates during such period. WPL estimates the higher than forecasted retail fuel-related costs decreased electric margins by approximately $4 million in 2011.
Refer to “Other Matters - Market Risk Sensitive Instruments and Positions” for discussion of risks associated with increased electric production fuel and energy purchases expenses on WPL’s electric margins. Refer to “Rate Matters” and Note 1(g) of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery mechanisms for electric production fuel and energy purchases expenses.
Purchased Electric Capacity Expenses - Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity. The Riverside PPA terminated in conjunction with WPL’s acquisition of Riverside in December 2012. Details of purchased electric capacity expense included in the utility electric margins table above were as follows (in millions):
| 2013 | 2012 | 2011 | |||||||||
| DAEC PPA (IPL) | $154 | $152 | $146 | ||||||||
| Kewaunee PPA (WPL) | 61 | 59 | 51 | ||||||||
| Riverside PPA (WPL) | — | 59 | 59 | ||||||||
| Other | 2 | 2 | 1 | ||||||||
| $217 | $272 | $257 |
Forecast - Purchased electric capacity expenses are expected to decrease significantly in 2014 compared to 2013 due to the expiration of the existing DAEC PPA in February 2014 and the expiration of the Kewaunee PPA in December 2013. Purchased electric capacity expenses from the existing DAEC PPA are estimated to be $25 million in 2014. The new DAEC PPA effective February 2014 does not contain minimum payments for electric generating capacity.
Sales Trends - Retail sales volumes increased 1% in 2013 and were relatively flat in 2012. The 2013 increase was due to increases in weather-normalized retail sales volumes primarily at WPL related to economic recovery and modest customer growth experienced in WPL’s service territory. These increases were partially offset by the unseasonably warm weather conditions during the third quarter of 2012 and a decrease in industrial sales volumes at IPL in 2013 due to lower co-generation customer requirements.
Wholesale sales volumes increased 7% and decreased 2% in 2013 and 2012, respectively, primarily due to the impact of changes in sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market.
Bulk power and other revenue changes were largely due to changes in sales in the wholesale energy markets operated by MISO and PJM. These changes are impacted by several factors including the availability of Alliant Energy’s EGUs and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were largely offset by changes in fuel-related costs, and therefore, did not have a significant impact on electric margins.
Forecast - IPL currently expects a 1%-2% increase in weather-normalized retail electric sales in 2014 compared to 2013. WPL currently expects weather-normalized retail electric sales to be relatively flat in 2014 compared to 2013.
Refer to “Rate Matters” for discussion of potential future retail electric base rate case filings by IPL and WPL in 2014. Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s revenue requirement adjustment, which became effective in January 2013, and WPL retail rate cases, including a retail electric base rate freeze at WPL through the end of 2014 and WPL’s retail fuel-related rate increase effective January 1, 2014. Refer to “Other Future Considerations” for discussion of litigation related to a renewable power developer seeking to distribute energy in IPL’s service territory, which may impact IPL’s future electric sales.
Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and Dth sales for Alliant Energy were as follows:
| Revenues and Costs (dollars in millions) | Dths Sold (Dths in thousands) | |||||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||||
| Residential | $262.5 | $224.3 | 17% | $269.7 | (17%) | 29,916 | 23,071 | 30% | 26,891 | (14%) | ||||||||||||||||||
| Commercial | 150.3 | 124.3 | 21% | 155.1 | (20%) | 21,892 | 17,115 | 28% | 19,271 | (11%) | ||||||||||||||||||
| Industrial | 21.1 | 16.7 | 26% | 24.5 | (32%) | 3,803 | 3,068 | 24% | 3,848 | (20%) | ||||||||||||||||||
| Retail subtotal | 433.9 | 365.3 | 19% | 449.3 | (19%) | 55,611 | 43,254 | 29% | 50,010 | (14%) | ||||||||||||||||||
| Transportation/other | 30.9 | 31.0 | —% | 27.4 | 13% | 60,261 | 57,532 | 5% | 52,210 | 10% | ||||||||||||||||||
| Total revenues/sales | 464.8 | 396.3 | 17% | 476.7 | (17%) | 115,872 | 100,786 | 15% | 102,220 | (1%) | ||||||||||||||||||
| Cost of gas sold | 276.7 | 217.2 | 27% | 295.2 | (26%) | |||||||||||||||||||||||
| Margins (c) | $188.1 | $179.1 | 5% | $181.5 | (1%) |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
| (c) | Includes $11 million of credits on Iowa retail gas customers’ bills for 2013 resulting from IPL’s gas tax benefit rider. IPL’s gas tax benefit rider resulted in reductions in gas revenues that were offset by reductions in income tax expense for 2013. |
2013 vs. 2012 Summary - Gas margins increased $9 million, or 5%, primarily due to an estimated $19 million increase in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $6 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013, $5 million of higher energy conservation revenues at IPL and an increase in weather-normalized retail sales volumes primarily at WPL. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates and higher gas volumes required by agricultural customers to dry grain in 2013. These items were partially offset by $15 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013 and $11 million of decreased revenues during 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider at IPL. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.
2012 vs. 2011 Summary - Gas margins decreased $2 million, or 1%, in 2012 largely due to an estimated $13 million decrease in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. This item was partially offset by an increase in weather-normalized sales volumes at WPL and $5 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective in June 2012 at IPL. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates.
Natural Gas Cost Recoveries - In 2013 and 2012, Alliant Energy’s cost of gas sold increased $60 million, or 27%, and decreased $78 million, or 26%, respectively. The 2013 increase was primarily due to higher retail gas volumes caused by weather discussed below and higher gas volumes required by agricultural customers to dry grain in 2013. The 2012 decrease was primarily due to a decrease in natural gas prices and lower retail gas volumes caused by weather discussed below. Due to Alliant Energy’s rate recovery mechanisms for natural gas costs, these changes in cost of gas sold resulted in comparable changes in gas revenues, and therefore, did not have a significant impact on gas margins. Refer to Note 1(g) of the “Combined Notes to Consolidated Financial Statements” for additional information relating to natural gas cost recoveries.
Weather Conditions - Alliant Energy’s gas sales demand follows a seasonal pattern with an annual base load of gas and a large heating peak occurring during the winter season. HDD data is used to measure the variability of temperatures during winter months and is correlated with gas sales demand. HDD in Alliant Energy’s service territories were as follows:
| Actual | |||||||||||
| HDD (a): | 2013 | 2012 | 2011 | Normal (a) | |||||||
| Cedar Rapids, Iowa (IPL) | 7,232 | 5,901 | 6,745 | 6,794 | |||||||
| Madison, Wisconsin (WPL) | 7,627 | 5,964 | 6,992 | 7,089 |
| (a) | HDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD. |
Estimated increases (decreases) to gas margins from the impacts of weather were as follows (in millions):
| 2013 | 2012 | 2011 | |||||||||
| IPL | $3 | ($6 | ) | $— | |||||||
| WPL | 3 | (7 | ) | — | |||||||
| Total Alliant Energy | $6 | ($13 | ) | $— |
Refer to “Rate Matters” for discussion of IPL’s gas tax benefit rider and retail rate cases, including an interim retail gas base rate increase effective June 2012 and final retail gas base rate increase effective January 2013 for IPL’s Iowa customers, a retail gas base rate decrease for WPL’s customers effective January 2013 and a potential future retail gas base rate case filing by WPL in 2014.
Utility Other Revenues -
2013 vs. 2012 Summary - Other revenues for the utilities increased $15 million in 2013 primarily due to $7 million of higher coal sales at WPL and $6 million of capacity revenues recognized by WPL during 2013. WPL recognized capacity revenues in 2013 related to a PPA with a third party for the sale of a portion of Riverside’s capacity assumed by WPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in utility other revenues were largely offset by related changes in utility other operation and maintenance expenses.
Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $77 million in 2013 primarily due to $41 million of higher electric transmission service costs from ITC and MISO billed to IPL during 2013 compared to 2012 primarily due to an increase in transmission service rates, $22 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider at IPL and $11 million of higher electric transmission service costs from ATC and MISO billed to WPL during 2013 compared to 2012 primarily due to increases in transmission service rates. IPL is currently recovering the Iowa retail portion of its increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.
2012 vs. 2011 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $18 million in 2012 primarily due to changes in transmission costs at IPL related to transmission services from ITC. The increase was primarily due to $10 million of higher electric transmission service costs billed by ITC to IPL during 2012 compared to 2011 due to a modest increase in transmission service rates, and the impact of IPL utilizing regulatory liabilities to credit a portion of the electric transmission service costs billed to IPL by ITC during 2011.
Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for IPL and WPL.
Refer to “Rate Matters” for additional discussion of the transmission rider approved by the IUB in January 2011. Refer to Notes 1(g) and 2 of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery of electric transmission service expenses.
Utility Other Operation and Maintenance Expenses - Alliant Energy’s other operation and maintenance expenses for the utilities increased $31 million and decreased $40 million for 2013 and 2012, respectively, due to the following reasons (amounts represent variances between periods in millions):
| 2013 vs. 2012 Summary: | Alliant Energy | IPL | WPL | ||||||||
| Higher generation expenses (a) | $16 | $3 | $13 | ||||||||
| Higher performance-based compensation expenses (b) | 11 | 6 | 5 | ||||||||
| Higher distribution system expenses (c) | 10 | 6 | 4 | ||||||||
| Higher expenses related to coal sales at WPL (d) | 7 | — | 7 | ||||||||
| Higher bad debt expense at IPL (e) | 6 | 6 | — | ||||||||
| Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012 (f) | 5 | — | 5 | ||||||||
| Higher cost of capital charges from Corporate Services (g) | 5 | 3 | 2 | ||||||||
| Contract amortization expenses at WPL in 2013 (h) | 5 | — | 5 | ||||||||
| Lower energy conservation cost recovery amortizations at WPL (i) | (20 | ) | — | (20 | ) | ||||||
| Regulatory-related credit from IPL’s Minnesota decision regarding Whispering Willow - East recorded in 2013 (j) | (7 | ) | (7 | ) | — | ||||||
| Contract cancellation charge at IPL in 2012 (k) | (3 | ) | (3 | ) | — | ||||||
| Other | (4 | ) | (2 | ) | (3 | ) | |||||
| $31 | $12 | $18 |
| 2012 vs. 2011 Summary: | Alliant Energy | IPL | WPL | ||||||||
| Regulatory-related (charges) and credits from IPL’s Minnesota electric rate case order recorded in 2011 (f) | ($11 | ) | ($11 | ) | $— | ||||||
| Lower generation expenses at IPL (a) | (10 | ) | (10 | ) | — | ||||||
| Additional benefits costs for Cash Balance Plan amendment in 2011 (l) | (10 | ) | (6 | ) | (4 | ) | |||||
| Regulatory asset impairments in 2011 (m) | (9 | ) | (2 | ) | (7 | ) | |||||
| Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012 (f) | (5 | ) | — | (5 | ) | ||||||
| Wind site impairment charge at WPL in 2011 (n) | (5 | ) | — | (5 | ) | ||||||
| SO2 emission allowance charge allocated to IPL’s steam business in 2011 (o) | (2 | ) | (2 | ) | — | ||||||
| Cost of capital charges from Corporate Services in 2012 (g) | 9 | 5 | 4 | ||||||||
| Contract cancellation charge at IPL in 2012 (k) | 3 | 3 | — | ||||||||
| Other | — | (2 | ) | 2 | |||||||
| ($40 | ) | ($25 | ) | ($15 | ) |
| (a) | Resulting from the timing of maintenance projects at IPL’s and WPL’s EGUs and additional operation and maintenance expenses related to Riverside, which was acquired in December 2012. |
| (b) | Performance-based compensation expenses are largely based on the achievement of specific operational and financial performance measures compared to targets established within the performance-based compensation plans. |
| (c) | Primarily due to increased maintenance of the electric and gas distribution systems at IPL and WPL. |
| (d) | Changes in expenses related to coal sales at WPL were largely offset by changes in coal sales revenue at WPL. |
| (e) | Higher bad debt expense at IPL was largely due to increases in past due accounts receivable during 2013. |
| (f) | Refer to Notes 2 and 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of regulatory-related charges and credits recognized by Alliant Energy, IPL and WPL in 2011 and 2012. |
| (g) | Cost of capital charges by Corporate Services to IPL and WPL in accordance with a new service agreement implemented during 2012. The 2013 increase was primarily due to increased property additions at Corporate Services in 2013. |
| (h) | Resulting from the amortization of capacity rights related to a PPA with a third party for the sale of a portion of Riverside’s capacity WPL assumed with the acquisition of Riverside. The PPA expires in May 2014. These amortization expenses were largely offset by capacity revenues included in utility other revenues. |
| (i) | The July 2012 PSCW order for WPL’s 2013/2014 test period electric and gas base rate case authorized lower energy conservation cost recovery amortizations for 2013. Regulatory amortizations at WPL related to energy conservation costs were $22 million, $42 million and $42 million for 2013, 2012 and 2011, respectively. |
| (j) | Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of a regulatory-related credit recorded by IPL in 2013 due to decisions by the MPUC regarding recovery of costs for IPL’s Whispering Willow - East wind project. |
| (k) | Due to the cancellation of a services agreement at one of IPL’s EGUs in 2012. |
| (l) | Refer to Notes 12(a) and 16(c) of the “Combined Notes to Consolidated Financial Statements” for details of the additional benefit costs incurred by Alliant Energy, IPL and WPL in 2011 resulting from an amendment to the Cash Balance Plan and details of the Cash Balance Plan lawsuit. |
| (m) | Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for details of regulatory asset impairments incurred by Alliant Energy, IPL and WPL in 2011. |
| (n) | Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of the wind site impairment charge recorded by Alliant Energy and WPL in 2011. |
| (o) | Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for details of the SO2 emission allowance charges recorded by Alliant Energy and IPL in 2011. |
Forecast - Alliant Energy currently expects its other operation and maintenance expenses to increase in 2014 compared to 2013 primarily due to increases in regulatory amortizations at WPL related to energy conservation costs approved by the PSCW in a July 2012 order. Regulatory amortizations at WPL related to energy conservation costs are expected to be $42 million for 2014 compared to $22 million for 2013. This item is expected to be partially offset by decreases in retirement plan costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.
Depreciation and Amortization Expenses -
2013 vs. 2012 Summary - Depreciation and amortization expenses increased $39 million in 2013 primarily due to depreciation expense at WPL related to Riverside, WPL’s SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012, new depreciation rates implemented by WPL effective January 2013, and depreciation expense at the Franklin County wind project, which was placed in service in the fourth quarter of 2012.
2012 vs. 2011 Summary - Depreciation and amortization expenses increased $11 million in 2012 primarily due to higher depreciation rates at IPL effective January 1, 2012 resulting from IPL’s most recent depreciation study, and property additions at IPL and WPL. These items were partially offset by the impact of regulatory-related charges and credits to depreciation expense in 2012 compared to 2011 at WPL.
Forecast - Alliant Energy currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including various emission controls projects at IPL and WPL placed in service in 2013 and expected to be placed in service in 2014.
Interest Expense -
2013 vs. 2012 Summary - Alliant Energy’s interest expense increased $16 million in 2013 primarily due to $6 million of capitalized interest recognized in 2012 for the Franklin County wind project, $5 million of higher interest expense recorded in 2013 compared to 2012 for WPL’s 2.25% debentures issued in November 2012 to fund a portion of the purchase price of Riverside and $3 million of interest expense recorded in 2013 for IPL’s 4.7% senior debentures issued in October 2013.
2012 vs. 2011 Summary - Alliant Energy’s interest expense decreased $2 million in 2012 primarily due to $3 million of higher capitalized interest recognized in 2012 compared to 2011 for the Franklin County wind project.
Forecast - Alliant Energy currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2013 and 2014 to fund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of Alliant Energy’s financing forecast.
Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of debt.
AFUDC - Alliant Energy’s AFUDC increased $9 million and $10 million for 2013 and 2012, respectively, primarily due to changes in AFUDC recognized for IPL’s and WPL’s emission controls projects. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of AFUDC recognized in 2013, 2012 and 2011.
Forecast - Alliant Energy currently expects AFUDC to increase in 2014 compared to 2013 primarily due to increased CWIP balances related to the construction of Marshalltown and emission controls projects at IPL’s Ottumwa Unit 1.
Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of Alliant Energy’s effective income tax rates for continuing operations, including discussion of IPL’s tax benefit riders, production tax credits, the effect of rate-making on property-related differences, state apportionment changes and Wisconsin tax legislation enacted in 2011.
Forecast - Alliant Energy currently expects its effective income tax rate to increase in 2014 compared to 2013 due to anticipated lower tax benefits for the effect of rate-making on property-related differences. Refer to “Rate Matters” for discussion of the authorization IPL received from the IUB in December 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider for 2014.
Loss from Discontinued Operations, Net of Tax - RMT’s net loss in 2011 was largely driven by losses associated with certain large solar projects. Schedule delays, abandonment of work by the original subcontractor and the need to hire additional subcontractors to complete the solar projects in a timely manner resulted in significant additional costs for RMT in 2011. Refer to Note 19 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of Alliant Energy’s discontinued operations.
Preferred Dividend Requirements of Subsidiaries -
2013 vs. 2012 Summary - Preferred dividend requirements of subsidiaries increased $2 million in 2013 primarily due to IPL and WPL recording charges of $5 million and $1 million in 2013, respectively, related to the redemption of preferred stock. Refer to Note 8 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of IPL’s and WPL’s preferred stock transactions.
2012 vs. 2011 Summary - Preferred dividend requirements of subsidiaries decreased $2 million in 2012 primarily due to a $2 million charge related to IPL’s redemption of its 7.10% cumulative preferred stock in 2011.
IPL’S RESULTS OF OPERATIONS
Overview - Earnings available for common stock increased $36 million and $13 million in 2013 and 2012, respectively. The 2013 increase was primarily due to higher electric revenues from the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, which became effective in January 2013, higher AFUDC in 2013 for IPL’s emission controls projects, a lower effective income tax rate and higher gas revenues from increased sales and a rate increase implemented in January 2013. These items were partially offset by higher other operation and maintenance expenses. The 2012 increase was primarily due to regulatory-related charges and credits from the Minnesota 2009 test year base rate case recorded in 2011, a lower effective income tax rate and lower generation operation and maintenance expenses. These items were partially offset by higher depreciation and amortization expenses due to higher depreciation rates effective January 1, 2012, decreases in electric and gas margins from lower sales caused by weather conditions in 2012 and higher purchased electric capacity expenses related to the DAEC PPA.
Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for IPL were as follows:
| Revenues and Costs (dollars in millions) | MWhs Sold (MWhs in thousands) | |||||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||||
| Residential | $574.3 | $529.9 | 8% | $543.2 | (2%) | 4,272 | 4,141 | 3% | 4,223 | (2%) | ||||||||||||||||||
| Commercial | 409.6 | 365.3 | 12% | 366.0 | —% | 4,118 | 4,045 | 2% | 3,953 | 2% | ||||||||||||||||||
| Industrial | 442.9 | 408.0 | 9% | 415.4 | (2%) | 6,973 | 7,116 | (2%) | 7,080 | 1% | ||||||||||||||||||
| Retail subtotal | 1,426.8 | 1,303.2 | 9% | 1,324.6 | (2%) | 15,363 | 15,302 | —% | 15,256 | —% | ||||||||||||||||||
| Sales for resale: | ||||||||||||||||||||||||||||
| Wholesale | 30.0 | 27.8 | 8% | 29.6 | (6%) | 419 | 418 | —% | 417 | —% | ||||||||||||||||||
| Bulk power and other | 2.0 | 9.5 | (79%) | 24.6 | (61%) | 98 | 377 | (74%) | 729 | (48%) | ||||||||||||||||||
| Other | 33.0 | 30.6 | 8% | 29.5 | 4% | 80 | 81 | (1%) | 84 | (4%) | ||||||||||||||||||
| Total revenues/sales | 1,491.8 | 1,371.1 | 9% | 1,408.3 | (3%) | 15,960 | 16,178 | (1%) | 16,486 | (2%) | ||||||||||||||||||
| Electric production fuel expense | 193.9 | 193.8 | —% | 230.9 | (16%) | |||||||||||||||||||||||
| Energy purchases expense | 188.2 | 150.7 | 25% | 152.2 | (1%) | |||||||||||||||||||||||
| Purchased electric capacity expense | 155.2 | 153.7 | 1% | 147.7 | 4% | |||||||||||||||||||||||
| Margins (c) | $954.5 | $872.9 | 9% | $877.5 | (1%) |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
| (c) | Includes $79 million, $83 million and $61 million of credits on Iowa retail electric customers’ bills for 2013, 2012 and 2011, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for 2013, 2012 and 2011. |
2013 vs. 2012 Summary - Electric margins increased $82 million, or 9%, primarily due to $60 million of higher revenues related to increases in recovery of transmission costs related to the transmission rider, $24 million of revenues during 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes and $4 million of increased revenues due to lower credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2013 compared to 2012. These items were partially offset by $4 million of lower energy conservation revenues. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses included in other operation and maintenance expenses. The higher transmission rider revenues were offset by higher electric transmission service expenses.
2012 vs. 2011 Summary - Electric margins decreased $5 million, or 1%, primarily due to $22 million of decreased revenues during 2012 due to additional credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider. Other decreases to electric margins included $6 million of higher purchased electric capacity expenses related to the DAEC PPA. These items were partially offset by $16 million of higher revenues from increases in recovery of transmission costs related to the transmission rider implemented in 2011, $2 million of SO2 emission allowance charges in 2011 and an increase in weather-normalized retail sales volumes. The higher transmission rider revenues were offset by higher electric transmission service expenses.
Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of IPL’s CDD and HDD data, estimated impacts of weather, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses, sales trends and items impacting IPL’s electric margin forecast. Refer to “Rate Matters” for discussion of IPL’s retail electric rate increases from its Iowa and Minnesota test year base rate cases, IPL’s electric tax benefit rider and a potential future IPL retail electric base rate case filing in 2014. Refer to “Other Future Considerations” for discussion of expected increased recoveries under the transmission rider related to expected increases in electric transmission service expenses.
Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and Dth sales for IPL were as follows:
| Revenues and Costs (dollars in millions) | Dths Sold (Dths in thousands) | |||||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||||
| Residential | $152.8 | $126.4 | 21% | $155.2 | (19%) | 16,975 | 12,955 | 31% | 15,660 | (17%) | ||||||||||||||||||
| Commercial | 85.7 | 69.7 | 23% | 87.8 | (21%) | 12,051 | 9,403 | 28% | 10,677 | (12%) | ||||||||||||||||||
| Industrial | 16.1 | 12.8 | 26% | 19.0 | (33%) | 2,931 | 2,435 | 20% | 3,023 | (19%) | ||||||||||||||||||
| Retail subtotal | 254.6 | 208.9 | 22% | 262.0 | (20%) | 31,957 | 24,793 | 29% | 29,360 | (16%) | ||||||||||||||||||
| Transportation/other | 19.3 | 17.8 | 8% | 14.3 | 24% | 32,019 | 30,992 | 3% | 27,720 | 12% | ||||||||||||||||||
| Total revenues/sales | 273.9 | 226.7 | 21% | 276.3 | (18%) | 63,976 | 55,785 | 15% | 57,080 | (2%) | ||||||||||||||||||
| Cost of gas sold | 160.3 | 124.9 | 28% | 175.6 | (29%) | |||||||||||||||||||||||
| Margins (c) | $113.6 | $101.8 | 12% | $100.7 | 1% |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
| (c) | Includes $11 million of credits on Iowa retail gas customers’ bills for 2013 resulting from the gas tax benefit rider. The gas tax benefit rider resulted in reductions in gas revenues that were offset by reductions in income tax expense for 2013. |
2013 vs. 2012 Summary - Gas margins increased $12 million, or 12%, largely due to an estimated $9 million increase in gas margins from changes in sales caused by weather conditions in IPL’s service territory, $6 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013 and $5 million of higher energy conservation revenues. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses in other operation and maintenance expenses. These items were partially offset by $11 million of decreased revenues during 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider.
2012 vs. 2011 Summary - Gas margins increased $1 million, or 1%, in 2012 largely due to $5 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective June 2012. This item was offset by an estimated $6 million decrease in gas margins from changes in sales caused by weather conditions in IPL’s service territory.
Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for details of IPL’s HDD data, estimated impacts of weather and discussion of the impacts on IPL’s gas margins of recoveries of natural gas costs. Refer to “Rate Matters” for discussion of an interim retail gas base rate increase effective June 2012 and final retail gas base rate increase effective January 2013 for IPL’s Iowa customers and IPL’s gas tax benefit rider.
Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Electric transmission service expense increased $66 million in 2013 primarily due to $41 million of higher electric transmission service costs from ITC and MISO billed to IPL in 2013 compared to 2012 primarily due to an increase in transmission service rates and $22 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.
2012 vs. 2011 Summary - Electric transmission service expense increased $16 million in 2012 primarily due to changes in transmission costs related to transmission services from ITC. The increase was primarily due to $10 million of higher electric transmission service costs billed by ITC to IPL during 2012 compared to 2011 due to a modest increase in transmission service rates, and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during 2011.
Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for IPL.
Refer to “Rate Matters” for additional discussion of the transmission rider approved by the IUB in January 2011. Refer to Notes 1(g) and 2 of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery of electric transmission service expenses.
Other Operation and Maintenance Expenses - Other operation and maintenance expenses increased $12 million and decreased $25 million in 2013 and 2012, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for details of the changes in IPL’s other operation and maintenance expenses.
Forecast - IPL currently expects its other operation and maintenance expenses to decrease in 2014 compared to 2013 due to decreases in retirement plan costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.
Depreciation and Amortization Expenses -
2012 vs. 2011 Summary - Depreciation and amortization expenses increased $10 million in 2012 primarily due to higher depreciation rates effective in January 2012 resulting from IPL’s most recent depreciation study, and property additions.
Forecast - IPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including various emission controls projects placed in service in 2013 and expected to be placed in service in 2014.
Interest Expense -
2013 vs. 2012 Summary - Interest expense increased $3 million in 2013 primarily due to $3 million of interest expense recorded in 2013 for IPL’s 4.7% senior debentures issued in October 2013.
Forecast - IPL currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2013 and 2014 to fund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of IPL’s financing forecast.
Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of IPL’s debt.
AFUDC - AFUDC increased $13 million and $3 million in 2013 and 2012, respectively, primarily due to changes in AFUDC recognized for emission controls projects. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of AFUDC recognized in 2013, 2012 and 2011.
Forecast - IPL currently expects AFUDC to increase in 2014 compared to 2013 primarily due to increased CWIP balances related to its construction of Marshalltown and emission controls projects at Ottumwa Unit 1.
Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of IPL’s effective income tax rates, including discussion of the tax benefit riders, production tax credits, effect of rate-making on property-related differences and state apportionment changes.
Forecast - IPL currently expects its effective income tax rate to increase in 2014 compared to 2013 due to anticipated lower tax benefits for the effect of rate-making on property-related differences. Refer to “Rate Matters” for discussion of the authorization IPL received from the IUB in December 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider for 2014.
Preferred Dividend Requirements -
2013 vs. 2012 Summary - Preferred dividend requirements increased $4 million in 2013 primarily due to IPL recording charges of $5 million related to the redemption of preferred stock in 2013. Refer to Note 8 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of IPL’s preferred stock transactions.
2012 vs. 2011 Summary - Preferred dividend requirements decreased $2 million in 2012 primarily due to a $2 million charge related to IPL’s redemption of its 7.10% cumulative preferred stock in 2011.
WPL’S RESULTS OF OPERATIONS
Overview - WPL’s earnings available for common stock increased $14 million and $2 million in 2013 and 2012, respectively. The 2013 increase was primarily due to purchased electric capacity expense related to the Riverside PPA in 2012, lower energy conservation cost recovery amortizations and a lower effective tax rate. These items were partially offset by higher depreciation expense largely due to the purchase of Riverside in December 2012, lower gas revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013, higher electric transmission service costs from ATC and MISO and higher other operation and maintenance expenses. The 2012 increase was primarily due to various asset impairment charges in 2011, higher retail fuel-related cost recoveries and higher AFUDC recognized in 2012 for WPL’s emission controls projects. These items were partially offset by higher purchased electric capacity expenses related to the Kewaunee PPA and a state apportionment charge in 2012.
Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for WPL were as follows:
| Revenues and Costs (dollars in millions) | MWhs Sold (MWhs in thousands) | |||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||
| Residential | $434.8 | $446.0 | (3%) | $442.6 | 1% | 3,552 | 3,538 | —% | 3,517 | 1% | ||||||||||||||||
| Commercial | 239.8 | 246.1 | (3%) | 246.1 | —% | 2,314 | 2,307 | —% | 2,300 | —% | ||||||||||||||||
| Industrial | 322.5 | 333.8 | (3%) | 333.5 | —% | 4,498 | 4,439 | 1% | 4,424 | —% | ||||||||||||||||
| Retail subtotal | 997.1 | 1,025.9 | (3%) | 1,022.2 | —% | 10,364 | 10,284 | 1% | 10,241 | —% | ||||||||||||||||
| Sales for resale: | ||||||||||||||||||||||||||
| Wholesale | 165.4 | 159.8 | 4% | 160.2 | —% | 3,145 | 2,899 | 8% | 2,955 | (2%) | ||||||||||||||||
| Bulk power and other | 15.7 | 14.3 | 10% | 27.6 | (48%) | 665 | 926 | (28%) | 1,028 | (10%) | ||||||||||||||||
| Other | 19.0 | 18.2 | 4% | 17.5 | 4% | 72 | 70 | 3% | 67 | 4% | ||||||||||||||||
| Total revenues/sales | 1,197.2 | 1,218.2 | (2%) | 1,227.5 | (1%) | 14,246 | 14,179 | —% | 14,291 | (1%) | ||||||||||||||||
| Electric production fuel expense | 237.1 | 173.4 | 37% | 197.4 | (12%) | |||||||||||||||||||||
| Energy purchases expense | 105.8 | 194.4 | (46%) | 184.0 | 6% | |||||||||||||||||||||
| Purchased electric capacity expense | 61.6 | 117.8 | (48%) | 109.5 | 8% | |||||||||||||||||||||
| Margins | $792.7 | $732.6 | 8% | $736.6 | (1%) |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
2013 vs. 2012 Summary - Electric margins increased $60 million, or 8%, primarily due to $59 million of purchased electric capacity expenses related to the Riverside PPA in 2012 and an increase in weather-normalized retail sales volumes. These items were partially offset by an estimated $12 million decrease in electric margins from changes in sales caused by weather conditions in WPL’s service territory.
2012 vs. 2011 Summary - Electric margins decreased $4 million, or 1%, primarily due to $8 million of higher purchased electric capacity expenses related to the Kewaunee PPA in 2012 compared to 2011, $5 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 and a decrease in weather-normalized sales volumes. These items were partially offset by a $10 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses and an estimated $8 million increase in electric margins from changes in sales caused by weather conditions in WPL’s service territory.
Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of WPL’s CDD and HDD data, estimated impacts of weather, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses, sales trends and items impacting WPL’s electric margin forecast. Refer to “Rate Matters” for discussion of retail rate cases, including a retail electric base rate freeze through December 31, 2014 and a potential future retail electric base rate case filing in 2014.
Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and Dth sales for WPL were as follows:
| Revenues and Costs (dollars in millions) | Dths Sold (Dths in thousands) | |||||||||||||||||||||||||||
| 2013 | 2012 | (a) | 2011 | (b) | 2013 | 2012 | (a) | 2011 | (b) | |||||||||||||||||||
| Residential | $109.7 | $97.9 | 12% | $114.5 | (14%) | 12,941 | 10,116 | 28% | 11,231 | (10%) | ||||||||||||||||||
| Commercial | 64.6 | 54.6 | 18% | 67.3 | (19%) | 9,841 | 7,712 | 28% | 8,594 | (10%) | ||||||||||||||||||
| Industrial | 5.0 | 3.9 | 28% | 5.5 | (29%) | 872 | 633 | 38% | 825 | (23%) | ||||||||||||||||||
| Retail subtotal | 179.3 | 156.4 | 15% | 187.3 | (16%) | 23,654 | 18,461 | 28% | 20,650 | (11%) | ||||||||||||||||||
| Transportation/other | 11.6 | 13.2 | (12%) | 13.1 | 1% | 28,242 | 26,540 | 6% | 24,490 | 8% | ||||||||||||||||||
| Total revenues/sales | 190.9 | 169.6 | 13% | 200.4 | (15%) | 51,896 | 45,001 | 15% | 45,140 | —% | ||||||||||||||||||
| Cost of gas sold | 116.4 | 92.3 | 26% | 119.6 | (23%) | |||||||||||||||||||||||
| Margins | $74.5 | $77.3 | (4%) | $80.8 | (4%) |
| (a) | Reflects the % change from 2012 to 2013. (b) Reflects the % change from 2011 to 2012. |
2013 vs. 2012 Summary - Gas margins decreased $3 million, or 4%, largely due to $15 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013. This item was partially offset by an estimated $10 million increase in gas margins from changes in sales caused by weather conditions in WPL’s service territory and an increase in weather-normalized retail sales volumes. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates and higher gas volumes required by agricultural customers to dry grain in 2013.
2012 vs. 2011 Summary - Gas margins decreased $4 million, or 4%, in 2012 largely due to an estimated $7 million decrease in gas margins from changes in sales caused by weather conditions in WPL’s service territory. This item was partially offset by an increase in weather normalized sales volumes. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates.
Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for WPL’s HDD data, estimated weather impacts and discussion of the impacts on WPL’s gas margins of recoveries of natural gas costs. Refer to “Rate Matters” for discussion of retail rate cases, including a retail gas base rate decrease effective January 2013 and a potential future retail gas base rate case filing in 2014.
Other Revenues -
2013 vs. 2012 Summary - Other revenues increased $14 million in 2013 primarily due to $7 million of higher coal sales and $6 million of capacity revenues recognized during 2013. WPL recognized capacity revenues in 2013 related to a PPA with a third party for the sale of a portion of Riverside’s capacity assumed by WPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in other revenues were largely offset by related changes in other operation and maintenance expenses.
Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Electric transmission service expense increased $11 million in 2013 primarily due to $11 million of higher electric transmission service costs from ATC and MISO billed to WPL in 2013 compared to 2012 primarily due to increases in transmission service rates.
Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for WPL.
Other Operation and Maintenance Expenses - Other operation and maintenance expenses increased $18 million and decreased $15 million in 2013 and 2012, respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for details of the changes in WPL’s other operation and maintenance expenses.
Forecast - WPL currently expects its other operation and maintenance expenses to increase in 2014 compared to 2013 due to increases in regulatory amortizations related to energy conservation costs approved by the PSCW in a July 2012 order. This item is expected to be partially offset by decreases in retirement plan costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.
Depreciation and Amortization Expenses -
2013 vs. 2012 Summary - Depreciation and amortization expenses increased $31 million in 2013 primarily due to depreciation expense related to Riverside, the SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012, and new depreciation rates implemented by WPL effective in January 2013.
Forecast - WPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including an emission controls project expected to be placed in service in 2014.
Interest Expense -
2013 vs. 2012 Summary - Interest expense increased $5 million in 2013 primarily due to $5 million of higher interest expense recorded in 2013 compared to 2012 for WPL’s 2.25% debentures issued in November 2012 to fund a portion of the purchase price of Riverside.
Forecast - WPL currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2014 to fund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of WPL’s financing forecast.
Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of WPL’s debt.
AFUDC - AFUDC decreased $4 million and increased $7 million in 2013 and 2012, respectively, primarily due to changes in AFUDC recognized for emission controls projects. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of AFUDC recognized in 2013, 2012 and 2011.
Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of WPL’s effective income tax rates, including discussion of production tax credits and state apportionment changes.
LIQUIDITY AND CAPITAL RESOURCES
Overview - Alliant Energy, IPL and WPL expect to maintain adequate liquidity to operate their businesses and implement their strategic plan as a result of available capacity under their revolving credit facilities, IPL’s sales of accounts receivable program and operating cash flows generated by their utility business, supplemented by periodic issuances of long-term debt and equity securities.
Liquidity Position - At December 31, 2013, Alliant Energy had $10 million of cash and cash equivalents, $721 million ($205 million at the parent company, $300 million at IPL and $216 million at WPL) of available capacity under their revolving credit facilities and $121 million of available capacity at IPL under its sales of accounts receivable program. Refer to “Cash Flows - Financing Activities - Short-term Debt” below and Note 9(a) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the credit facilities. Refer to Note 5(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on IPL’s sales of accounts receivable program.
Capital Structure - Alliant Energy, IPL and WPL plan to maintain debt-to-total capitalization ratios that are consistent with their investment-grade credit ratings. Alliant Energy, IPL and WPL currently expect to maintain capital structures in which debt would not exceed 45% to 55% of total capital and preferred stock would not exceed 5% to 10% of total capital. These targets may be adjusted depending on subsequent developments and their impact on Alliant Energy’s, IPL’s and WPL’s respective weighted average cost of capital and investment-grade credit ratings. Capital structures at December 31, 2013 were as follows (dollars in millions):
| Alliant Energy (Consolidated) | IPL | WPL | ||||||||||||||||||
| Common equity | $3,281.4 | 46 | % | $1,679.7 | 49 | % | $1,642.4 | 52 | % | |||||||||||
| Preferred stock | 200.0 | 3 | % | 200.0 | 6 | % | — | — | % | |||||||||||
| Noncontrolling interest | 1.8 | — | % | — | — | % | — | — | % | |||||||||||
| Long-term debt (incl. current maturities) | 3,336.3 | 47 | % | 1,558.4 | 45 | % | 1,332.1 | 42 | % | |||||||||||
| Short-term debt | 279.4 | 4 | % | — | — | % | 183.7 | 6 | % | |||||||||||
| $7,098.9 | 100 | % | $3,438.1 | 100 | % | $3,158.2 | 100 | % |
Alliant Energy, IPL and WPL intend to manage their capital structures and liquidity positions in such a way that facilitates their ability to raise the necessary funds reliably and on reasonable terms and conditions, while maintaining financial capital structures consistent with those approved by regulators and necessary to maintain appropriate credit quality. In addition to capital structures, other important financial considerations used to determine the characteristics of future financings include potential proceeds from asset sales, financial coverage ratios, flexibility in capital spending plans, regulatory orders and rate-making considerations, the levels of debt imputed by rating agencies, market conditions and the impact of tax initiatives. The
most significant debt imputations relate to the sales of accounts receivable program, the DAEC PPA, and pension and other postretirement benefits obligations. The PSCW factors certain imputed debt adjustments in establishing a regulatory capital structure as part of WPL’s retail rate cases. The IUB and MPUC do not make any explicit adjustments for imputed debt in establishing capital ratios used in determining customer rates, although such adjustments are considered by IPL in recommending an appropriate capital structure.
Credit and Capital Markets - Alliant Energy, IPL and WPL are aware of the potential implications that credit and capital market disruptions might have on their ability to raise the external funding required for their respective operations and capital expenditure plans. Alliant Energy’s, IPL’s and WPL’s strategic initiatives include a desire to maintain sufficient liquidity resources to reasonably withstand such a disruption. Alliant Energy, IPL and WPL maintain revolving credit facilities to provide backstop liquidity to their commercial paper programs, ensure a committed source of liquidity in the event the commercial paper market becomes disrupted and efficiently manage their long-term financings. In addition, Alliant Energy and IPL maintain a sales of accounts receivable program at IPL as an alternative financing source.
Primary Sources and Uses of Cash - Alliant Energy’s, IPL’s and WPL’s most significant source of cash is from electric and gas sales to their utility customers. Cash from these sales reimburses IPL and WPL for prudently-incurred expenses to provide service to their utility customers and provides IPL and WPL a return of and a return on the assets used to provide such services. Utility operating cash flows are expected to cover the majority of IPL’s and WPL’s capital expenditures required to maintain their current infrastructure and to pay dividends to Alliant Energy’s shareowners. Capital needed to retire debt and fund capital expenditures related to large strategic projects is expected to be met primarily through external financings.
Cash Flows - Selected information from the Consolidated Statements of Cash Flows was as follows (in millions):
| Alliant Energy | IPL | WPL | |||||||||||||||||||||||||||
| 2013 | 2012 | 2011 | 2013 | 2012 | 2011 | 2013 | 2012 | 2011 | |||||||||||||||||||||
| Cash and cash equivalents, January 1 | $21.2 | $11.4 | $159.3 | $4.5 | $2.1 | $5.7 | $0.7 | $2.7 | $0.1 | ||||||||||||||||||||
| Cash flows from (used for): | |||||||||||||||||||||||||||||
| Operating activities | 731.0 | 841.1 | 702.7 | 232.6 | 291.0 | 366.9 | 423.3 | 427.4 | 428.8 | ||||||||||||||||||||
| Investing activities | (754.7 | ) | (1,155.5 | ) | (652.1 | ) | (423.3 | ) | (331.2 | ) | (200.6 | ) | (335.9 | ) | (710.2 | ) | (305.4 | ) | |||||||||||
| Financing activities | 12.3 | 324.2 | (198.5 | ) | 190.6 | 42.6 | (169.9 | ) | (87.6 | ) | 280.8 | (120.8 | ) | ||||||||||||||||
| Net increase (decrease) | (11.4 | ) | 9.8 | (147.9 | ) | (0.1 | ) | 2.4 | (3.6 | ) | (0.2 | ) | (2.0 | ) | 2.6 | ||||||||||||||
| Cash and cash equivalents, December 31 | $9.8 | $21.2 | $11.4 | $4.4 | $4.5 | $2.1 | $0.5 | $0.7 | $2.7 |
Operating Activities -
2013 vs. 2012 - Alliant Energy’s cash flows from operating activities decreased $110 million primarily due to $91 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during 2013 and 2012, $63 million of cash flows from operations at RMT in 2012 due to changes in working capital requirements associated with renewable energy projects, lower cash flows from changes in prepaid gas and inventory levels of gas stored underground at IPL and WPL, and refunds paid by WPL to its retail electric customers during 2013 for over-collected fuel-related costs during 2012. These items were partially offset by $59 million of purchased electric capacity payments by WPL in 2012 related to the Riverside PPA, and the timing of electric fuel-related, natural gas and transmission cost recoveries at IPL.
IPL’s cash flows from operating activities decreased $58 million primarily due to $91 million of lower cash flows from changes in the level of accounts receivable sold in 2013 compared to 2012 and lower cash flows from changes in prepaid gas and inventory levels of gas stored underground. These items were partially offset by the timing of electric fuel-related, natural gas and transmission cost recoveries.
WPL’s cash flows from operating activities decreased $4 million primarily due to $26 million of lower cash flows caused by income tax payments in 2013 and income tax refunds in 2012, refunds paid by WPL to its retail electric customers during 2013 for over-collected fuel-related costs during 2012, and lower cash flows from changes in prepaid gas and inventory levels of gas stored underground. These items were largely offset by $59 million of purchased electric capacity payments in 2012 related to the Riverside PPA.
2012 vs. 2011 - Alliant Energy’s cash flows from operating activities increased $138 million primarily due to $166 million of higher cash flows from operations at RMT due to changes in working capital requirements associated with renewable energy projects in 2012 and 2011 and $117 million of pension plan contributions in 2011. These items were partially offset by $85 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during 2012 and 2011, $22 million of higher credits on retail electric customers’ bills in Iowa during 2012 compared to 2011 resulting from IPL’s electric tax benefit rider and changes in working capital during 2012 and 2011.
IPL’s cash flows from operating activities decreased $76 million primarily due to $85 million of lower cash flows from changes in the level of accounts receivable sold during 2012 and 2011, $22 million of higher credits on retail electric customers’ bills in Iowa during 2012 compared to 2011 resulting from the electric tax benefit rider and changes in working capital during 2012 and 2011. These items were partially offset by $58 million of pension plan contributions in 2011 and $22 million of lower income tax payments during 2012 compared to 2011.
WPL’s cash flows from operating activities decreased $1 million primarily due to $48 million of lower income tax refunds during 2012 compared to 2011. This item was largely offset by $47 million of pension plan contributions in 2011.
IPL’s Sales of Accounts Receivable Program - Alliant Energy and IPL utilize the sales of accounts receivable program to finance a portion of their cash needs. Changes in IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by ($101) million, ($10) million and $75 million in 2013, 2012 and 2011, respectively. The decrease in 2013 was primarily due to IPL using a portion of the proceeds from its issuance of $250 million of long-term debt in 2013 to reduce cash proceeds from its sales of accounts receivable program. The higher level of proceeds from the receivables sold in 2011 was primarily used by IPL to help fund working capital and construction expenditures, and to reduce short-term debt. The purchase commitment from the third party to which it sells its receivables expires in March 2014. IPL is currently pursuing the extension of the purchase commitment. Refer to Note 5(a) of the “Combined Notes to Consolidated Financial Statements” for additional details of IPL’s sales of accounts receivable program.
RMT’s Working Capital Requirements - Cash flows from operations at RMT decreased significantly in 2013 compared to 2012 and increased significantly in 2012 compared to 2011 largely due to amounts collected in 2012 for customers’ large renewable energy projects completed in late 2011 and early 2012. In January 2013, Alliant Energy sold RMT.
Electric Fuel-related, Natural Gas and Transmission Cost Recoveries - IPL has cost recovery mechanisms applicable for its retail electric and gas customers to provide for subsequent adjustments to its electric and gas rates for changes in electric fuel-related and natural gas costs. IPL also has a cost recovery mechanism applicable for its Iowa retail electric customers to provide for subsequent adjustments to its electric rates for changes in electric transmission service expenses. Changes in the timing of IPL’s electric fuel-related, natural gas and transmission cost recoveries resulted in $47 million of higher cash flows from operations for Alliant Energy and IPL in 2013 compared to 2012.
Income Tax Payments and Refunds - Income tax payments (refunds) for 2011 through 2013 were as follows (in millions):
| 2013 | 2012 | 2011 | |||||||||
| IPL | $— | $3 | $25 | ||||||||
| WPL | 23 | (3 | ) | (51 | ) | ||||||
| Other subsidiaries | (33 | ) | (20 | ) | 15 | ||||||
| Alliant Energy | ($10 | ) | ($20 | ) | ($11 | ) |
Alliant Energy’s income tax refunds in 2013, 2012 and 2011 were primarily due to federal and state claims filed related to net operating losses carried back to prior years. Alliant Energy, IPL and WPL currently do not expect to make any significant federal income tax payments in 2014 and 2015 based on their current federal net operating loss and credit carryforward positions and future amounts of bonus depreciation expected to be claimed on Alliant Energy’s U.S. federal income tax returns for calendar years 2013 and 2014. While no significant federal income tax payments in 2014 and 2015 are expected to occur, some tax payments and refunds may occur between consolidated group members (including IPL and WPL) under the tax sharing agreement between Alliant Energy and its subsidiaries. Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for discussion of the carryforward positions.
Pension Plan Contributions - Contributions to qualified and non-qualified defined benefit pension plans for 2011 through 2013 were as follows (in millions):
| 2013 | 2012 | 2011 | |||||||||
| IPL (a) | $1 | $— | $58 | ||||||||
| WPL (a) | — | — | 47 | ||||||||
| Other subsidiaries | 2 | 16 | 12 | ||||||||
| Alliant Energy | $3 | $16 | $117 |
| (a) | Pension plan contributions for IPL and WPL include contributions to their respective qualified pension plans as well as an assigned portion of the contributions to pension plans sponsored by Corporate Services. |
Alliant Energy, IPL and WPL currently do not expect to make any significant pension plan contributions in 2014 through 2016 based on the funded status and assumed return on assets for each plan as of the December 31, 2013 measurement date. Refer to Note 12(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the current funded levels of pension plans and contributions expected in 2014.
IPL’s Tax Benefit Riders - IPL currently expects $85 million and $12 million of billing credits in 2014 for its Iowa retail electric and gas customers, respectively. Refer to “Rate Matters,” “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations,” and Notes 2 and 11 of the “Combined Notes to Consolidated Financial Statements” for further discussion of IPL’s tax benefit riders.
Whiting Petroleum Tax Sharing Agreement - In 2014, Alliant Energy currently expects to receive approximately $25 million from Whiting Petroleum related to its tax sharing agreement, which is discussed in Note 5(b) of the “Combined Notes to Consolidated Financial Statements.”
Investing Activities -
2013 vs. 2012 - Alliant Energy’s cash flows used for investing activities decreased $401 million primarily due to $294 million of lower utility construction and acquisition expenditures, a $62 million cash grant Alliant Energy received during 2013 related to the Franklin County wind project, and expenditures in 2012 for the Franklin County wind project and Corporate Services’ purchase of its corporate headquarters building. The lower utility construction and acquisition expenditures were largely due to expenditures for WPL’s purchase of Riverside in 2012 and for emission controls projects at WPL’s Edgewater Unit 5 in 2012, partially offset by higher expenditures in 2013 for the emission controls projects at WPL’s Columbia Units 1 and 2, and IPL’s George Neal Units 3 and 4 and Lansing Unit 4 . Refer to Note 5(d) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the Franklin County wind project cash grant.
IPL’s cash flows used for investing activities increased $92 million due to $93 million of higher construction expenditures. The higher construction expenditures were largely due to higher expenditures in 2013 for emission controls projects at George Neal Units 3 and 4 and Lansing Unit 4.
WPL’s cash flows used for investing activities decreased $374 million primarily due to $387 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from expenditures in 2012 for the purchase of Riverside and emission controls projects at Edgewater Unit 5. These items were partially offset by higher expenditures in 2013 for emission controls projects at Columbia Units 1 and 2.
2012 vs. 2011 - Alliant Energy’s cash flows used for investing activities increased $503 million primarily due to $485 million of higher construction and acquisition expenditures and $12 million of net proceeds from the sales of IEA and RMT’s environmental business unit in 2011. The higher construction and acquisition expenditures resulted from expenditures during 2012 for WPL’s purchase of Riverside, the Franklin County wind project, Corporate Services’ purchase of its corporate headquarters building, and emission controls projects at WPL’s Columbia Units 1 and 2, IPL’s Ottumwa Unit 1 and IPL’s George Neal Units 3 and 4. These items were partially offset by progress payments by IPL during 2011 for wind turbine generators that were sold to Resources in 2011, and expenditures during 2011 for WPL’s Bent Tree - Phase I wind project and WPL’s acquisition of the remaining 25% interest in Edgewater Unit 5.
IPL’s cash flows used for investing activities increased $131 million primarily due to $115 million of proceeds from the sale of wind project assets to Resources in 2011, and $14 million of higher construction expenditures. The higher construction expenditures resulted from expenditures during 2012 for the emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4, partially offset by progress payments during 2011 for wind turbine generators that were sold to Resources in 2011.
WPL’s cash flows used for investing activities increased $405 million primarily due to $404 million of higher construction and acquisition expenditures. The higher construction and acquisition expenditures resulted from expenditures during 2012 for the purchase of Riverside and emission controls projects at Columbia Units 1 and 2. These items were partially offset by expenditures during 2011 for the Bent Tree - Phase I wind project and the acquisition of the remaining 25% interest in Edgewater Unit 5.
Construction and Acquisition Expenditures - Capital expenditures and financing plans are reviewed, approved and updated as part of Alliant Energy’s, IPL’s and WPL’s financial planning processes. Significant capital projects and investments are subject to a cross-functional review prior to approval. Changes in Alliant Energy’s, IPL’s and WPL’s anticipated construction and acquisition expenditures may result from a number of reasons including economic conditions, regulatory requirements, changing legislation, ability to obtain adequate and timely rate relief, improvements in technology, changing market conditions and new opportunities. Alliant Energy, IPL and WPL have not yet entered into contractual commitments relating to the majority of their anticipated future capital expenditures. As a result, they have some discretion with regard to the level and timing of capital expenditures eventually incurred, and closely monitor and frequently update such estimates. Alliant Energy, IPL and WPL currently anticipate construction and acquisition expenditures for 2014 through 2017 as follows (in millions):
| Alliant Energy | IPL | WPL | ||||||||||||||||||||||||||||||||||||
| 2014 | 2015 | 2016 | 2017 | 2014 | 2015 | 2016 | 2017 | 2014 | 2015 | 2016 | 2017 | |||||||||||||||||||||||||||
| Utility business (a): | ||||||||||||||||||||||||||||||||||||||
| Marshalltown | $185 | $280 | $190 | $20 | $185 | $280 | $190 | $20 | $— | $— | $— | $— | ||||||||||||||||||||||||||
| WPL generation investment (b) | — | — | 45 | 245 | — | — | — | — | — | — | 45 | 245 | ||||||||||||||||||||||||||
| Generation performance improvements | 70 | 25 | 45 | 35 | 55 | 5 | 20 | 25 | 15 | 20 | 25 | 10 | ||||||||||||||||||||||||||
| Environmental compliance | 185 | 145 | 140 | 65 | 95 | 30 | — | 15 | 90 | 115 | 140 | 50 | ||||||||||||||||||||||||||
| Electric and gas distribution systems | 315 | 320 | 315 | 295 | 185 | 190 | 185 | 185 | 130 | 130 | 130 | 110 | ||||||||||||||||||||||||||
| Other | 125 | 140 | 120 | 95 | 55 | 75 | 55 | 50 | 70 | 65 | 65 | 45 | ||||||||||||||||||||||||||
| Total utility business | 880 | 910 | 855 | 755 | $575 | $580 | $450 | $295 | $305 | $330 | $405 | $460 | ||||||||||||||||||||||||||
| Corporate Services (c) | 55 | 35 | 20 | 20 | ||||||||||||||||||||||||||||||||||
| Other non-utility (c) | 10 | 5 | 5 | 5 | ||||||||||||||||||||||||||||||||||
| $945 | $950 | $880 | $780 |
| (a) | Cost estimates represent IPL’s or WPL’s estimated portion of total escalated construction expenditures and exclude AFUDC, if applicable. Refer to “Strategic Overview” for further discussion of key projects impacting construction and acquisition plans related to the utility business. |
| (b) | Initial cost estimates are based on WPL potentially constructing a 300 MW natural gas-fired combined-cycle EGU. These initial cost estimates are preliminary and will be updated in the future after the resource option is selected. Refer to “Strategic Overview” for further details on WPL’s potential generation investment, including WPL’s feasibility study of resource options. |
| (c) | Cost estimates represent total escalated construction and acquisition expenditures and exclude capitalized interest. |
Financing Activities -
2013 vs. 2012 - Alliant Energy’s cash flows from financing activities decreased $312 million primarily due to the impacts of $385 million of long-term debt issued in 2012 discussed below, payments of $211 million to redeem IPL’s and WPL’s cumulative preferred stock in 2013 and net changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL. These items were partially offset by $250 million of proceeds from the issuance of 4.7% senior debentures by IPL in 2013 and $200 million of proceeds from IPL’s issuance of 5.1% cumulative preferred stock in 2013.
IPL’s cash flows from financing activities increased $148 million primarily due to $250 million of proceeds from the issuance of 4.7% senior debentures in 2013 and $200 million of proceeds from the issuance of 5.1% cumulative preferred stock in 2013. These items were partially offset by payments of $150 million to redeem 8.375% cumulative preferred stock in 2013 and changes in the amount of commercial paper outstanding.
WPL’s cash flows used for financing activities increased $368 million primarily due to the impacts of $250 million of long-term debt issued in 2012 discussed below, $90 million of capital contributions from its parent company, Alliant Energy, in 2012 and payments of $61 million to redeem 4.4% through 6.5% cumulative preferred stock in 2013. These items were partially offset by changes in the amount of commercial paper outstanding.
2012 vs. 2011 - Alliant Energy’s cash flows from financing activities increased $523 million primarily due to the impacts of $385 million of long-term debt issued in 2012 discussed below, changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL, and $40 million of payments to redeem IPL’s 7.10% cumulative preferred stock in April 2011.
IPL’s cash flows from financing activities increased $213 million primarily due to $101 million of repayments of capital to its parent company, Alliant Energy, during 2011, changes in the amount of commercial paper outstanding, $56 million of higher capital contributions from its parent company during 2012 compared to 2011, and $40 million of payments to redeem IPL’s 7.10% cumulative preferred stock in April 2011. These items were partially offset by $50 million of higher common stock dividends paid to its parent company during 2012 compared to 2011.
WPL’s cash flows from financing activities increased $402 million primarily due to the impacts of $250 million of long-term debt issued in 2012 discussed below, changes in the amount of commercial paper outstanding and $65 million of higher capital contributions from its parent company, Alliant Energy, during 2012 compared to 2011.
FERC and Public Utility Holding Company Act Financing Authorizations - Under PUHCA, FERC has authority over the issuance of utility securities, except to the extent that a public utility’s primary state regulatory commission has retained jurisdiction over such matters. FERC currently has authority over the issuance of securities by IPL and Corporate Services. FERC does not have authority over the issuance of securities by Alliant Energy, WPL or Resources.
In November 2013, IPL received authorization from FERC through December 31, 2015 for the following (in millions):
| Initial Authorization and Current Remaining Authority | |||
| Long-term debt securities issuances in aggregate | $750 | ||
| Short-term debt securities outstanding at any time (including borrowings from its parent) | 750 | ||
| Preferred stock issuances in aggregate | 300 |
In 2012, Corporate Services received authorization from FERC for $150 million of long-term debt securities issuances in aggregate (with $75 million of remaining authority as of December 31, 2013) and to maintain up to $200 million of short-term debt securities outstanding at any time through March 30, 2014. As of December 31, 2013, Corporate Services has authority under the 2012 order issued by FERC to receive an unspecified amount of capital contributions and advances from its parent or other affiliates through March 30, 2014. In January 2013, FERC accepted Corporate Services’ filing canceling its market-based rate authority tariff. As a result, Corporate Services will no longer be considered a public utility under the Federal Power Act and will no longer be required to seek authority from FERC for future securities issuances beyond the March 30, 2014 authorization period.
State Regulatory Financing Authorizations - In 2011, WPL received authorization from the PSCW to have up to $400 million of short-term borrowings and/or letters of credit outstanding at any time through the earlier of the expiration date of WPL’s credit facility agreement (including extensions) or December 2019. As of December 31, 2013, WPL also has remaining authority to issue up to $400 million of long-term debt securities in aggregate in 2014 pursuant to an August 2013 PSCW order.
In 2010, the MPUC issued an order that determined IPL does not need to obtain authorization to issue securities as long as IPL is not organized under the laws of the state of Minnesota and the securities issued do not encumber any of its property in the state of Minnesota. IPL currently does not have, and does not plan to issue, securities that encumber its property, thus IPL is not currently required to obtain approval from the MPUC for unsecured securities issuances. However, if in the future IPL were to subject its utility property in Minnesota to an encumbrance for the purpose of securing the payment of any indebtedness, IPL would be required to obtain an order from the MPUC approving such securities issuances.
Shelf Registrations - Alliant Energy, IPL and WPL have current shelf registration statements on file with the SEC for availability to issue securities through December 2014 as follows:
| Alliant Energy | IPL | WPL | |||
| Aggregate amount available as of December 31, 2013 | Unspecified | $350 million | $550 million | ||
| Securities available to be issued | Common stock, debt and other securities | Preferred stock and debt securities | Preferred stock and debt securities |
Common Stock Dividends - Payment of common stock dividends is subject to dividend declaration by Alliant Energy’s Board of Directors. Alliant Energy’s general long-term goal is to maintain a dividend payout ratio that is competitive with the industry average. Based on that, Alliant Energy’s goal is to maintain a dividend payout ratio of approximately 60% to 70% of consolidated earnings from continuing operations. Alliant Energy’s dividend payout ratio was 57% of its consolidated earnings from continuing operations in 2013. Refer to “Financing Forecast” below for discussion of expected common stock dividends in 2014. Refer to Note 7 of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s dividend payment restrictions based on the terms of applicable regulatory limitations and IPL’s outstanding preferred stock.
Common Stock Issuances and Capital Contributions - Alliant Energy issued a modest amount of additional common stock in 2011 through 2013 under its equity-based compensation plans for employees. Refer to “Financing Forecast” below for discussion of expected issuances of common stock through 2016. Refer to Note 7 of the “Combined Notes to Consolidated Financial Statements” for discussion of capital contributions from Alliant Energy to each of IPL, WPL, Corporate Services and Resources; payments of common stock dividends by IPL and WPL to their parent company; and repayments of capital by IPL and Resources to their parent company.
Preferred Stock Issuance and Redemptions - Refer to Note 8 of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s preferred stock redemptions and IPL’s issuance of preferred stock in 2013.
Short-term Debt - Alliant Energy and its subsidiaries maintain committed revolving credit facilities to provide short-term borrowing flexibility and backstop liquidity for commercial paper outstanding. At December 31, 2013, Alliant Energy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL). There are currently 13 lenders that participate in the three credit facilities, with aggregate respective commitments ranging from $10 million to $135 million. In 2013, each of the credit facilities was extended one year through December 2017, and each has a one-year extension renewal provision remaining, subject to lender approval. Each of the credit facilities has a provision to expand the facility size up to $100 million, subject to lender approval for Alliant Energy and IPL, and subject to lender and regulatory approvals for WPL. During 2013, the Alliant Energy parent company, IPL and WPL issued commercial paper to meet short-term financing requirements and did not borrow directly under their respective credit facilities.
Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a financial covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).
The credit agreements contain provisions that prohibit placing liens on any of Alliant Energy’s, IPL’s or WPL’s property or their respective subsidiaries with certain exceptions. Exceptions include among others, liens to secure obligations of up to 5% of the consolidated assets of the applicable borrower (valued at carrying value), liens imposed by government entities, materialmens’ and similar liens, judgment liens, and liens to secure non-recourse debt not to exceed $100 million outstanding at any one time, and purchase money liens.
The credit agreements contain provisions that require, during their term, any proceeds from asset sales, with certain exclusions, in excess of 20% of Alliant Energy’s, IPL’s and WPL’s respective consolidated assets be used to reduce commitments under their respective facilities. Exclusions include, among others, certain sale and lease-back transactions and sales of non-regulated assets and accounts receivable.
The credit agreements contain customary events of default. In addition, Alliant Energy’s credit agreement contains a cross-default provision that would be triggered if Alliant Energy or any domestic, majority-owned subsidiary of Alliant Energy
defaults on debt (other than non-recourse debt) totaling $50 million or more. A cross-default provision would be triggered for Alliant Energy under the IPL or WPL credit agreements if IPL or WPL, as applicable, or a majority-owned subsidiary accounting for 20% or more of IPL’s or WPL’s, as applicable, consolidated assets (valued at carrying value) defaults on debt totaling $50 million or more. A default by a minority-owned subsidiary and, in the case of the Alliant Energy credit agreement, a default by a foreign subsidiary, would not trigger a cross-default. A default by Alliant Energy, Corporate Services or Resources and its subsidiaries would not trigger a cross-default under either the IPL or WPL credit agreements, nor would a default by either of IPL or WPL constitute a cross-default event for the other. If an event of default under any of the credit agreements occurs and is continuing, then the lenders may declare any outstanding obligations under the credit agreements immediately due and payable. In addition, if any order for relief is entered under bankruptcy laws with respect to Alliant Energy, IPL or WPL, then any outstanding obligations under the respective credit agreements would be immediately due and payable. In addition, IPL’s sales of accounts receivable program agreement contains a cross-default provision that is triggered if IPL or Alliant Energy incurs an event of default on debt totaling $50 million or more. If an event of default under IPL’s sales of accounts receivable program agreement occurs, then the counterparty could terminate such agreement. Refer to Note 5(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on amounts outstanding under IPL’s sales of accounts receivable program.
A material adverse change representation is not required for borrowings under the credit agreements.
At December 31, 2013, Alliant Energy, IPL and WPL were in compliance with all material covenants and other provisions of the credit agreements.
Refer to Note 9(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on the credit facilities, commercial paper outstanding and debt-to-capital ratios.
Long-term Debt - In 2013 and 2012, there were no significant retirements of long-term debt. In 2013 and 2012, significant issuances of long-term debt were as follows (dollars in millions):
| Company | Principal Amount | Type | Interest Rate | Maturity Date | Use of Proceeds | |||||||
| 2013: | ||||||||||||
| IPL | $250 | Senior debentures | 4.7% | Oct-2043 | Reduce cash proceeds received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general working capital purposes | |||||||
| 2012: | ||||||||||||
| WPL | 250 | Debentures | 2.25% | Nov-2022 | Fund a portion of the purchase price of Riverside | |||||||
| Corporate Services | 75 | Senior notes | 3.45% | Sep-2022 | Repay short-term debt primarily incurred for the purchase of the corporate headquarters building and for general working capital purposes | |||||||
| Franklin County Holdings, LLC | 60 | Variable-rate term loan credit agreement | 1.04% at December 31, 2013 | Dec-2014 | Fund a portion of the costs of the Franklin County wind project |
Refer to Note 9(b) of the “Combined Notes to Consolidated Financial Statements” for further discussion of long-term debt.
Financing Forecast - Alliant Energy, IPL and WPL currently anticipate the following financing activities to occur in the future. The financing activities of Alliant Energy and IPL are contingent on the completion of the sale of IPL’s Minnesota electric and natural gas distribution assets in 2014.
| • | Long-term Debt - Alliant Energy, IPL and WPL currently expect to issue up to $600 million, $300 million and $300 million, respectively, of additional long-term debt in 2014. In addition, Alliant Energy currently anticipates refinancing $250 million of senior notes at the parent company and a $60 million term loan credit agreement at Franklin County Holdings LLC in the second half of 2014. |
| • | Common Stock Issuances - Alliant Energy currently expects to issue approximately $150 million of common stock through 2016. Alliant Energy currently does not plan to issue any material amount of common stock in 2014. |
| • | Common Stock Dividends - In November 2013, Alliant Energy announced an increase in its targeted 2014 annual common stock dividend to $2.04 per share, which is equivalent to a quarterly rate of $0.51 per share, beginning with the February 2014 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from its Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors. |
Creditworthiness -
Ratings Triggers - The long-term debt of Alliant Energy and its subsidiaries is not subject to any repayment requirements as a result of explicit credit rating downgrades or so-called “ratings triggers.” However, Alliant Energy and its subsidiaries are parties to various agreements that contain provisions dependent on credit ratings. In the event of a significant downgrade, Alliant Energy or its subsidiaries may need to provide credit support, such as letters of credit or cash collateral equal to the amount of the exposure, or may need to unwind the contract or pay the underlying obligation. In the event of a significant downgrade, management believes Alliant Energy, IPL and WPL have sufficient liquidity to cover counterparty credit support or collateral requirements under these various agreements. In addition, a downgrade in the credit ratings of Alliant Energy, IPL or WPL could also result in them paying higher interest rates in future financings, reduce their pool of potential lenders, increase their borrowing costs under existing credit facilities or limit their access to the commercial paper market. Alliant Energy, IPL and WPL are committed to taking the necessary steps required to maintain investment-grade credit ratings. Current credit ratings and outlooks are as follows:
| Standard & Poor’s Ratings Services | Moody’s Investors Service | |||
| Alliant Energy: | Corporate/issuer | A- | A3 | |
| Commercial paper | A-2 | P-2 | ||
| Senior unsecured long-term debt | BBB+ | A3 | ||
| Outlook | Stable | Stable | ||
| IPL: | Corporate/issuer | A- | A3 | |
| Commercial paper | A-2 | P-2 | ||
| Senior unsecured long-term debt | A- | A3 | ||
| Preferred stock | BBB | Baa2 | ||
| Outlook | Stable | Stable | ||
| WPL: | Corporate/issuer | A | A1 | |
| Commercial paper | A-1 | P-1 | ||
| Senior unsecured long-term debt | A | A1 | ||
| Outlook | Stable | Stable | ||
| Resources: | Corporate/issuer | A- | Not rated |
Credit ratings are not recommendations to buy or sell securities and are subject to change, and each rating should be evaluated independently of any other rating. Each of Alliant Energy, IPL or WPL assumes no obligation to update their respective credit ratings. Refer to Note 15 of the “Combined Notes to Consolidated Financial Statements” for additional information on ratings triggers for commodity contracts accounted for as derivatives.
Off-Balance Sheet Arrangements -
Special Purpose Entities - IPL maintains a Receivables Agreement whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third party through wholly-owned and consolidated special purpose entities. In 2013, 2012 and 2011, IPL evaluated the third party that purchases IPL’s receivable assets under the Agreement and believes that the third party is a VIE. However, IPL does not have a variable interest in the third party. Refer to “Cash Flows - Operating Activities - IPL’s Sales of Accounts Receivable Program” and Note 5(a) of the “Combined Notes to Consolidated Financial Statements” for information regarding IPL’s sales of accounts receivable program.
Guarantees and Indemnifications - Alliant Energy has guarantees and indemnifications outstanding at December 31, 2013 related to its prior divestiture activities. Refer to Note 16(d) of the “Combined Notes to Consolidated Financial Statements” for additional information.
Certain Financial Commitments -
Contractual Obligations - Consolidated long-term contractual obligations as of December 31, 2013 were as follows (in millions):
| Alliant Energy | 2014 | 2015 | 2016 | 2017 | 2018 | Thereafter | Total | ||||||||||||||||||||
| Operating expense purchase obligations (Note 16(b)): | |||||||||||||||||||||||||||
| Purchased power and fuel commitments (a) | $487 | $338 | $265 | $222 | $195 | $1,031 | $2,538 | ||||||||||||||||||||
| SO2 emission allowances | — | 12 | 14 | 8 | — | — | 34 | ||||||||||||||||||||
| Other (b) | 8 | 3 | — | — | — | — | 11 | ||||||||||||||||||||
| Long-term debt maturities (Note 9(b)) | 359 | 183 | 3 | 4 | 355 | 2,444 | 3,348 | ||||||||||||||||||||
| Interest - long-term debt obligations | 173 | 158 | 154 | 154 | 153 | 1,847 | 2,639 | ||||||||||||||||||||
| Capital purchase obligations (Note 16(a)) | 86 | — | — | — | — | — | 86 | ||||||||||||||||||||
| Operating leases (Note 10(a)) | 10 | 9 | 3 | 3 | 2 | 22 | 49 | ||||||||||||||||||||
| Capital leases | 1 | 1 | — | — | — | — | 2 | ||||||||||||||||||||
| $1,124 | $704 | $439 | $391 | $705 | $5,344 | $8,707 |
| IPL | 2014 | 2015 | 2016 | 2017 | 2018 | Thereafter | Total | ||||||||||||||||||||
| Operating expense purchase obligations (Note 16(b)): | |||||||||||||||||||||||||||
| Purchased power and fuel commitments (a) | $312 | $188 | $170 | $152 | $135 | $1,031 | $1,988 | ||||||||||||||||||||
| SO2 emission allowances | — | 12 | 14 | 8 | — | — | 34 | ||||||||||||||||||||
| Other (b) | 5 | 1 | — | — | — | — | 6 | ||||||||||||||||||||
| Long-term debt maturities (Note 9(b)) | 38 | 150 | — | — | 350 | 1,025 | 1,563 | ||||||||||||||||||||
| Interest - long-term debt obligations | 86 | 81 | 79 | 79 | 79 | 940 | 1,344 | ||||||||||||||||||||
| Capital purchase obligations (Note 16(a)) | 35 | — | — | — | — | — | 35 | ||||||||||||||||||||
| Operating leases (Note 10(a)) | 4 | 3 | 2 | 2 | 1 | 15 | 27 | ||||||||||||||||||||
| Capital leases | — | 1 | — | — | — | — | 1 | ||||||||||||||||||||
| $480 | $436 | $265 | $241 | $565 | $3,011 | $4,998 |
| WPL | 2014 | 2015 | 2016 | 2017 | 2018 | Thereafter | Total | ||||||||||||||||||||
| Operating expense purchase obligations (Note 16(b)): | |||||||||||||||||||||||||||
| Purchased power and fuel commitments (a) | $175 | $150 | $95 | $70 | $60 | $— | $550 | ||||||||||||||||||||
| Other (b) | 2 | — | — | — | — | — | 2 | ||||||||||||||||||||
| Long-term debt maturities (Note 9(b)) | 9 | 31 | — | — | — | 1,299 | 1,339 | ||||||||||||||||||||
| Interest - long-term debt obligations | 71 | 71 | 69 | 69 | 69 | 890 | 1,239 | ||||||||||||||||||||
| Capital purchase obligations (Note 16(a)) | 51 | — | — | — | — | — | 51 | ||||||||||||||||||||
| Operating leases (Note 10(a)) | 6 | 5 | 1 | 1 | — | — | 13 | ||||||||||||||||||||
| Capital lease - Sheboygan Falls (Note 10(b)) | 15 | 15 | 15 | 15 | 15 | 98 | 173 | ||||||||||||||||||||
| Capital leases - other | 1 | — | — | — | — | — | 1 | ||||||||||||||||||||
| $330 | $272 | $180 | $155 | $144 | $2,287 | $3,368 |
| (a) | Purchased power and fuel commitments represent normal business contracts used to ensure adequate purchased power, coal and natural gas supplies, and to minimize exposure to market price fluctuations. Alliant Energy, through its subsidiary Corporate Services, entered into system-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments were assigned to IPL and WPL based on information available as of December 31, 2013 regarding expected future usage, which is subject to change. |
| (b) | Other operating expense purchase obligations represent individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 2013. |
At December 31, 2013, Alliant Energy, IPL and WPL had no uncertain tax positions recorded as liabilities. Refer to Note 12(a) of the “Combined Notes to Consolidated Financial Statements” for anticipated pension and other postretirement benefits funding amounts, which are not included in the above tables. Refer to “Cash Flows - Investing Activities - Construction and Acquisition Expenditures” for additional information on construction and acquisition programs. In addition, at December 31, 2013, there were various other long-term liabilities and deferred credits included on the Consolidated Balance Sheets that, due to the nature of the liabilities, the timing of payments cannot be estimated and are therefore excluded from the above tables.
OTHER MATTERS
Market Risk Sensitive Instruments and Positions - Alliant Energy’s, IPL’s and WPL’s primary market risk exposures are associated with commodity prices, investment prices and interest rates. Alliant Energy, IPL and WPL have risk management policies to monitor and assist in mitigating these market risks and use derivative instruments to manage some of the exposures. Refer to Notes 1(h) and 15 of the “Combined Notes to Consolidated Financial Statements” for further discussion of derivative instruments.
Commodity Price - Alliant Energy, IPL and WPL are exposed to the impact of market fluctuations in the price and transportation costs of commodities they procure and market. Alliant Energy, IPL and WPL employ established policies and procedures to mitigate their risks associated with these market fluctuations, including the use of various commodity derivatives and contracts of various durations for the forward sale and purchase of these commodities. Alliant Energy’s, IPL’s and WPL’s exposure to commodity price risks in their utility businesses is also significantly mitigated by current rate-making structures in place for recovery of their fuel-related costs as well as their cost of natural gas purchased for resale. IPL’s electric and gas tariffs and WPL’s wholesale electric and gas tariffs provide for subsequent monthly adjustments to their tariff rates for material changes in prudently incurred commodity costs. IPL’s and WPL’s rate mechanisms, combined with commodity derivatives, significantly reduce commodity risk associated with their electric and gas margins.
WPL’s retail electric margins have the most exposure to the impact of changes in commodity prices for Alliant Energy and WPL due largely to the current retail recovery mechanism in place in Wisconsin for fuel-related costs. The cost recovery mechanism applicable for WPL’s retail electric customers is based on forecasts of fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each retail electric rate proceeding or in a separate fuel cost plan approval proceeding. Under this cost recovery mechanism, if WPL’s actual fuel-related costs fall outside this fuel monitoring range during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel-related costs from retail electric customers that are outside the approved ranges. Deferral of under-collection of fuel-related costs are reduced to the extent WPL’s return on common equity during the fuel cost plan year exceeds the most recently authorized return on common equity. Retail fuel-related costs incurred by WPL for 2013 did not fall outside of the fuel monitoring range.
In December 2013, the PSCW approved annual forecasted fuel-related costs per MWh of $25.11 based on $345 million of variable fuel-related costs for WPL’s 2014 test period. These 2014 fuel-related costs will be monitored using an annual bandwidth of plus or minus 2%. Based on the cost recovery mechanism in Wisconsin, the annual forecasted fuel-related costs approved by the PSCW in December 2013 and an annual bandwidth of plus or minus 2%, Alliant Energy and WPL currently estimate the commodity risk exposure to their electric margins in 2014 is approximately $5 million. However, if WPL’s return on common equity in 2014 exceeds the most recently authorized return on common equity, the commodity risk exposure to WPL’s electric margins in 2014 could increase.
Refer to “Rate Matters” and Note 1(g) of the “Combined Notes to Consolidated Financial Statements” for additional details of utility cost recovery mechanisms that significantly reduce Alliant Energy’s, IPL’s and WPL’s commodity risk.
Investment Price - Alliant Energy, IPL and WPL are exposed to investment price risk as a result of their investments in securities, largely related to securities held by their pension and other postretirement benefits plans. Refer to Note 12(a) of the “Combined Notes to Consolidated Financial Statements” for details of the securities held by their pension and other postretirement benefits plans. Refer to “Critical Accounting Policies and Estimates - Pensions and Other Postretirement Benefits” for the impact on Alliant Energy’s, IPL’s and WPL’s retirement plan costs of changes in the rate of returns earned by their plan assets.
Interest Rate - Alliant Energy and WPL are exposed to risk resulting from changes in interest rates as a result of their issuance of variable-rate borrowings. In addition, Alliant Energy and IPL are exposed to risk resulting from changes in interest rates as a result of cash proceeds outstanding under IPL’s sales of accounts receivable program. Assuming the impact
of a hypothetical 100 basis point increase in interest rates on variable-rate borrowings, commercial paper and cash proceeds outstanding under IPL’s sales of accounts receivable program at December 31, 2013, Alliant Energy’s, IPL’s and WPL’s annual pre-tax expense would increase by approximately $4 million, $0 and $2 million, respectively.
Refer to Note 5(a) and Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional information on cash proceeds outstanding under IPL’s sales of accounts receivable program, and short-and long-term variable-rate borrowings, respectively. Refer to “Critical Accounting Policies and Estimates - Pensions and Other Postretirement Benefits” for the impacts of changes in discount rates on retirement plan obligations and costs.
Critical Accounting Policies and Estimates - The preparation of consolidated financial statements in conformity with GAAP requires that management apply accounting policies and make estimates that affect results of operations and the amounts of assets and liabilities reported in the financial statements. Based on historical experience and various other factors, Alliant Energy, IPL and WPL believe the following accounting policies and estimates are critical to their business and the understanding of their financial results as they require critical assumptions and judgments by management. The results of these assumptions and judgments form the basis for making estimates regarding the results of operations and the amounts of assets and liabilities that are not readily apparent from other sources. Actual financial results may differ materially from these estimates. Alliant Energy’s, IPL’s and WPL’s management has discussed these critical accounting policies and estimates with the Audit Committee. Refer to Note 1 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of accounting policies and the estimates used in the preparation of the consolidated financial statements.
Contingencies - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding the future outcome of contingent events and record loss contingency amounts for any contingent events that are both probable and reasonably estimated based upon current available information. The amounts recorded may differ from the actual income or expense that occurs when the uncertainty is resolved. The estimates that Alliant Energy, IPL and WPL make in accounting for contingencies, and the gains and losses that they record upon the ultimate resolution of these uncertainties, could have a significant effect on the results of operations and the amount of assets and liabilities in their financial statements. Note 16 of the “Combined Notes to Consolidated Financial Statements” provides discussion of contingencies assessed at December 31, 2013 including various pending legal proceedings, guarantees and indemnifications that may have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.
Regulatory Assets and Regulatory Liabilities - Alliant Energy’s utility subsidiaries (IPL and WPL) are regulated by various federal and state regulatory agencies. As a result, they are subject to accounting guidance for regulated operations, which recognizes that the actions of a regulator can provide reasonable assurance of the existence of an asset or liability. Regulatory assets or regulatory liabilities arise as a result of a difference between GAAP and the accounting principles imposed by the regulatory agencies in the rate-making process. Regulatory assets generally represent incurred costs that have been deferred as they are probable of recovery in future customer rates. Regulatory liabilities generally represent obligations to make refunds to customers and amounts collected in rates for which the related costs have not yet been incurred. Alliant Energy, IPL and WPL recognize regulatory assets and regulatory liabilities in accordance with the rulings of applicable federal and state regulators, and future regulatory rulings may impact the carrying value and accounting treatment of their regulatory assets and regulatory liabilities.
Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding whether their regulatory assets are probable of future recovery and their regulatory liabilities are probable future obligations by considering factors such as regulatory environment changes, rate orders issued by the applicable regulatory agencies and historical decisions by such regulatory agencies regarding similar regulatory assets and regulatory liabilities. The decisions made by regulatory authorities have an impact on the recovery of costs, the rate of return on invested capital and the timing and amount of assets to be recovered by rates. A change in these decisions may result in a material impact on Alliant Energy’s, IPL’s and WPL’s results of operations and the amount of assets and liabilities in their financial statements. Note 2 of the “Combined Notes to Consolidated Financial Statements” provides details of the nature and amounts of Alliant Energy’s, IPL’s and WPL’s regulatory assets and regulatory liabilities assessed at December 31, 2013 as well as material changes to their regulatory assets and regulatory liabilities during 2013.
Long-Lived Assets - Alliant Energy, IPL and WPL complete periodic assessments regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within their non-regulated operations that are proposed to be sold or are generating operating losses, and certain long-lived assets within their regulated operations that may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.
Non-regulated Operations - Factors considered in determining if an impairment review is necessary for long-lived assets within non-regulated operations include a significant underperformance of the assets relative to historical or projected future operating results, a significant change in the use of the acquired assets or business strategy related to such assets, and significant negative industry, regulatory or economic trends. When an impairment review is deemed necessary, a comparison is made between the expected undiscounted future cash flows and the carrying amount of the asset. If the carrying amount of the asset exceeds the expected undiscounted future cash flows, an impairment loss is recognized equal to the amount by which the carrying amount of the asset exceeds the fair value of the asset. The fair value is determined by the use of quoted market prices, appraisals, or the use of valuation techniques such as expected discounted future cash flows. Alliant Energy’s and IPL’s long-lived assets within their non-regulated operations assessed in 2013 included a wind site currently expected to be used to develop a future wind project. In addition, Alliant Energy’s long-lived assets within its non-regulated operations assessed in 2013 also included the Franklin County wind project.
Franklin County Wind Project - Alliant Energy completed construction of its 99 MW Franklin County wind project and placed it into service in 2012. In 2012, Alliant Energy performed an impairment test of the carrying value of the Franklin County wind project given a significant change in the use of the asset as a result of it being placed into service, continued downturn in forward electricity prices in 2012 and no long-term off-take arrangement. The test concluded the undiscounted cash flows expected from the Franklin County wind project during its estimated useful life exceeded its carrying value as of December 31, 2012, resulting in no impairment. In 2013, Alliant Energy evaluated if there were any significant changes in the undiscounted cash flows used in the 2012 impairment test, which may indicate a significant decrease in the market value of the Franklin County wind project. No significant changes in the undiscounted cash flows were identified, and as a result, an impairment test was not required in 2013. Future changes in the estimated cash flows could result in the undiscounted cash flows being less than the carrying amount and a future material impairment could be required. Primary factors that could have an effect on the future expected cash flows for the project include the price of electricity generated from the project during its useful life, the volume of electricity generated, the expected life of the project, probability of selling the wind project, and changes in anticipated operation and maintenance expenses. An impairment of the Franklin County wind project could be triggered in the future if long-term electricity prices stay at current levels or decline, or if the expected output or life of the project is significantly reduced. As of December 31, 2013, the carrying value of the Franklin County wind project was $142 million and was recorded in “Non-regulated Generation property, plant and equipment” on Alliant Energy’s Consolidated Balance Sheet. Note 3 of the “Combined Notes to Consolidated Financial Statements” provides additional discussion of the Franklin County wind project.
Undeveloped Wind Site - As of December 31, 2013, Alliant Energy and IPL have an undeveloped wind site with capitalized costs of $13 million related to IPL’s approximate 200 MW of wind site capacity in Franklin County, Iowa. Alliant Energy and IPL assessed the recoverability of this undeveloped wind site given the long-term period projected until the site is utilized and concluded no impairment test was required in 2013. Changes in the future use of this undeveloped wind site could result in a future material impairment. The future utilization of this undeveloped wind site is dependent on the future demand of wind energy in the region where the wind site is located. Such future wind energy demand is dependent on various factors including future government incentives for wind projects, energy policy and legislation including federal and state renewable energy standards and regulation of carbon emissions, electricity and fossil fuel prices, transmission constraints in the region where the wind site is located and further technological advancements for wind generation. Alliant Energy and IPL currently believe, based on a combination of the various factors, further wind development in the region where the wind site is located will occur. Alliant Energy and IPL could realize an impairment related to this wind site if one or more of these factors are no longer expected to occur, or actions by regulatory agencies with jurisdiction over IPL indicate the costs of the undeveloped wind site would not be approved to be recovered from customers.
Regulated Operations - Long-lived assets within regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL is disallowed recovery of any portion of the carrying value of its regulated property, plant and equipment that has been recently completed or is probable of being retired early, an impairment charge is recognized equal to the amount of the carrying value that was disallowed recovery. If IPL or WPL is disallowed a full or partial return on the carrying value of its regulated property, plant and equipment that has been recently completed or is probable of being retired early, an impairment charge is recognized equal to the difference between the carrying amount of the asset and the present value of the future revenues expected from its regulated property, plant and equipment. Alliant Energy’s, IPL’s and WPL’s long-lived assets within their regulated operations that were assessed for impairment in 2013 included transmission network upgrade costs related to WPL’s Bent Tree - Phase I wind project, the Minnesota retail electric portion of IPL’s Whispering Willow - East wind project, and IPL’s and WPL’s generating units subject to early retirement.
WPL’s Bent Tree - Phase I Wind Project - Certain costs incurred by WPL in 2011 and 2012 related to transmission network upgrades at its Bent Tree - Phase I wind project have been subject to periodic recoverability assessments. In July 2013, FERC issued an order requiring changes to ITC’s Attachment “FF” tariff, which results in owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. As a result, Alliant Energy and WPL do not expect reimbursement of these transmission network upgrade costs from ITC and could record an impairment of these costs in the future if WPL is not allowed to recover these costs from its electric customers. As of December 31, 2013, Alliant Energy and WPL recorded $14 million in “Deferred charges and other” on their Consolidated Balance Sheets related to the transmission network upgrades constructed by ITC. Refer to “Other Future Considerations - Electric Transmission Service Charges” for further discussion of transmission network upgrade costs.
IPL’s Whispering Willow - East Wind Project - Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of adjustments made by Alliant Energy and IPL in 2011 and 2013 to the carrying value of IPL’s Whispering Willow - East wind project, based on amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.
Generating Units Subject to Early Retirement - Due to current and proposed environmental regulations, Alliant Energy, IPL and WPL are evaluating future plans for their electric generation fleet and have announced the early retirement of certain older and less-efficient EGUs. When it becomes probable that an EGU will be retired before the end of its useful life, Alliant Energy, IPL and WPL must assess whether the EGU meets the criteria to be considered probable of abandonment. EGUs that are considered probable of abandonment generally have material remaining net book values and are expected to cease operations in the near term significantly before the end of their original estimated useful lives. If an EGU meets the criteria to be considered probable of abandonment, Alliant Energy, IPL and WPL must assess the probability of full recovery of the remaining carrying value of such EGU. If it is probable that regulators will not allow full recovery of and a full return on the remaining carrying amount of the abandoned EGU, an impairment charge is recognized equal to the difference between the remaining carrying value and the present value of the future revenues expected from the abandoned EGU. Alliant Energy, IPL and WPL evaluated their EGUs that are subject to early retirement and determined that Edgewater Unit 3 and Nelson Dewey Units 1 and 2 met the criteria to be considered probable of abandonment as of December 31, 2013. Alliant Energy and WPL concluded that no impairment was required as of December 31, 2013 for Edgewater Unit 3 and Nelson Dewey Units 1 and 2 given that WPL is recovering the remaining net book value of these EGUs over a 10-year period beginning January 1, 2013 pursuant to a PSCW order issued in May 2012. Refer to Note 3(a) of “Combined Notes to Consolidated Financial Statements” for additional details of the EGUs anticipated to be retired in the future. Refer to “Strategic Overview” for discussion of EGUs that may be retired by Alliant Energy, IPL and WPL in the future, along with the aggregate net book value of these EGUs.
Unbilled Revenues - Unbilled revenues are primarily associated with Alliant Energy’s, IPL’s and WPL’s utility operations. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout the month. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weather impacts, line losses and the most recent customer rates. Such process involves the use of various judgments and assumptions and significant changes in these judgments and assumptions could have a material impact on Alliant Energy’s, IPL’s and WPL’s results of operations. As of December 31, 2013, unbilled revenues related to Alliant Energy’s utility operations were $178 million ($86 million at IPL and $92 million at WPL). Note 5(a) of the “Combined Notes to Consolidated Financial Statements” provides discussion of IPL’s unbilled revenues as of December 31, 2013 sold to a third party related to its sales of accounts receivable program.
Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL sponsor various defined benefit pension and other postretirement benefits plans that provide benefits to a significant portion of their employees. Alliant Energy, IPL and WPL make assumptions and judgments periodically to estimate the obligations and costs related to their retirement plans. There are many judgments and assumptions involved in determining an entity’s pension and other postretirement liabilities and costs each period including employee demographics (including age, life expectancies and compensation levels), discount rates, assumed rates of return and funding. Changes made to plan provisions may also impact current and future benefits costs. Judgments and assumptions are supported by historical data and reasonable projections and are reviewed at least annually. The following table shows the impacts of changing certain key actuarial assumptions discussed above (in millions):
| Defined Benefit Pension Plans | Other Postretirement Benefits Plans | |||||||||||||||
| Change in Actuarial Assumption | Impact on Projected Benefit Obligation at December 31, 2013 | Impact on 2014 Net Periodic Benefit Costs | Impact on Projected Benefit Obligation at December 31, 2013 | Impact on 2014 Net Periodic Benefit Costs | ||||||||||||
| Alliant Energy | ||||||||||||||||
| 1% change in discount rate | $137 | $9 | $19 | $2 | ||||||||||||
| 1% change in expected rate of return | N/A | 10 | N/A | 1 | ||||||||||||
| IPL | ||||||||||||||||
| 1% change in discount rate | 64 | 4 | 8 | 1 | ||||||||||||
| 1% change in expected rate of return | N/A | 5 | N/A | 1 | ||||||||||||
| WPL | ||||||||||||||||
| 1% change in discount rate | 59 | 5 | 8 | 1 | ||||||||||||
| 1% change in expected rate of return | N/A | 4 | N/A | — |
Note 12(a) of the “Combined Notes to Consolidated Financial Statements” provides additional details of pension and other postretirement benefits plans. Note 16(c) of the “Combined Notes to Consolidated Financial Statements” provides recent developments of the class-action lawsuit filed against the Cash Balance Plan in 2008.
Income Taxes - Alliant Energy, IPL and WPL are subject to income taxes in various jurisdictions. Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their income tax assets, liabilities, benefits and expenses. Judgments and assumptions are supported by historical data and reasonable projections. Significant changes in these judgments and assumptions could have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations. Alliant Energy’s and IPL’s critical assumptions and judgments for 2013 include projections of qualifying repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences. Alliant Energy’s, IPL’s and WPL’s critical assumptions and judgments include projections of future taxable income used to determine their ability to utilize net operating losses and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned.
Effect of Rate-making on Property-related Differences - Alliant Energy’s and IPL’s effective income tax rates are normally impacted by certain property-related differences at IPL for which deferred tax is not recorded in the income statement pursuant to Iowa rate-making principles. Changes in methods or assumptions regarding the amount of IPL’s qualifying repairs expenditures, allocation of mixed service costs, and retirement or removal of depreciable property could result in a material impact on Alliant Energy’s and IPL’s financial condition and results of operations. Refer to Note 1(c) of the “Combined Notes to Consolidated Financial Statements” for further discussion of regulatory accounting for taxes. Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of how the effect of rate-making on property-related differences impacted Alliant Energy’s and IPL’s effective income tax rates for 2013, 2012 and 2011. Refer to “Other Future Considerations” for further discussion of potential tax accounting method changes.
Carryforward Utilization - Alliant Energy, IPL and WPL have generated significant federal tax credit carryforwards and federal and state net operating loss carryforwards. Based on projections of current and future taxable income, Alliant Energy, IPL and WPL plan to utilize substantially all of these carryforwards prior to their expiration. Changes in assumptions regarding Alliant Energy’s, IPL’s and WPL’s current and future taxable income could require valuation allowances in the future resulting in a material impact on their financial condition and results of operations. Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for further discussion of federal tax credit carryforwards, and federal and state net operating loss carryforwards.
Other Future Considerations - In addition to items discussed earlier in MDA, the “Combined Notes to Consolidated Financial Statements” in Item 8 and “Risk Factors” in Item 1A, the following items could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations:
Electric Transmission Service Charges - IPL and WPL currently receive substantially all their transmission services from ITC and ATC, respectively. The annual transmission service rates that ITC or ATC charges their customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O,” which is administered by MISO. Because Attachment “O” is a FERC-approved formula rate, ITC and ATC can implement new rates each calendar year without filing a request with FERC. However, new rates are subject to challenge by either FERC or customers. If the rates proposed by ITC or ATC are determined by FERC to be unjust or unreasonable or another mechanism is determined by FERC to be just and reasonable, ITC’s or ATC’s rates would change accordingly. Due to the formula rates
used by ITC and ATC to charge their customers and possible future changes to these rates as discussed below, there is uncertainty regarding the long-term trends of IPL’s and WPL’s future electric transmission service expenses.
2014 Electric Transmission Service Expenses -
2014 Rates Charged by ITC to IPL - In September 2013, ITC filed with MISO the Attachment “O” rate it proposes to charge its customers in 2014 for electric transmission services. The proposed rate was based on ITC’s net revenue requirement for 2014 as well as a true-up adjustment credit related to amounts that ITC over-recovered from its customers in 2012 and a true-up adjustment credit related to a FERC audit of ITC. The 2014 Attachment “O” rate filed with MISO is approximately 13% higher than the rate ITC charged its customers in 2013.
2014 Rates Charged by ATC to WPL - WPL does not expect any material changes in the 2014 Attachment “O” rate billed by ATC compared to the rate billed in 2013.
MISO Transmission Charges Billed to IPL and WPL - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects including MVPs. MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, to provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable reliability standards. The costs of these projects are primarily allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region.
The increase in ITC’s Attachment “O” rate and MISO transmission charges for shared transmission projects are expected to contribute to increases in future electric transmission service charges for IPL and WPL. IPL’s expected increase for 2014 is partially offset by the impact of electric transmission service expenses IPL over-collected from its Iowa retail electric customers in 2013 under its transmission cost recovery rider, which will reduce electric transmission service expenses billed to Iowa customers in 2014. As a result, Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2014 will be higher than the comparable expenses charged in 2013 by approximately $30 million, $20 million and $10 million, respectively. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the transmission cost recovery rider. A significant portion of the increase in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case.
ITC’s Attachment “FF” Tariff - In 2012, IPL filed a complaint with FERC regarding ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. In the complaint, IPL alleged that its customers have made material incremental payments under ITC’s Attachment “FF” tariff without obtaining equal benefits, as compared to costs that would have been charged under MISO’s Attachment “FF” tariff applicable in the majority of the MISO pricing zones. In July 2013, FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff to conform to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing with these tariff revisions, which became effective as of the date of the July 2013 order. Also in August 2013, ITC filed a request for rehearing and/or clarification, and IPL filed a request for clarification. In February 2014, FERC issued an order that denied ITC’s request for rehearing, responded to the requests for clarification, accepted MISO’s tariff revisions and substantially affirmed its July 2013 order. The revised Attachment “FF” tariff is expected to reduce the amount of transmission network upgrade costs billed by ITC to IPL compared to what would have been billed under ITC’s prior Attachment “FF” tariff. Alliant Energy and IPL currently expect to pass on the Iowa retail portion of any changes in electric transmission service costs billed by ITC to IPL from the revision in ITC’s Attachment “FF” tariff to IPL’s retail electric customers in Iowa through the transmission cost recovery rider. Refer to “Strategic Overview” for further discussion of the July 2013 FERC order and IPL’s and WPL’s anticipation that ITC will self-fund the transmission network upgrades associated with Marshalltown and Bent Tree, respectively.
FERC Order 1000 - In 2011, FERC issued Order 1000, which reforms its electric transmission planning and cost allocation requirements for public utility transmission providers. One substantial change from the order is the requirement for projects with regional cost allocation to have the federal right of first refusal removed. Incumbent public utility transmission providers no longer have a federal right of first refusal to build, own and operate large-scale transmission projects located within their service territory that have regional cost sharing. To comply with this requirement, MISO is creating a
competitive bidding process for projects subject to the right of first refusal removal, which could lead to a potential decrease in the expected costs of impacted future transmission projects. Alliant Energy, IPL and WPL are currently unable to determine what impacts, if any, this order may have on their future electric transmission service charges.
MISO Transmission Owner Return on Equity Complaint - In November 2013, a group of MISO industrial customer organizations filed a complaint with FERC requesting to: (1) reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 9.15%; (2) institute a regulatory capital structure not to exceed 50% of common equity; and (3) eliminate certain return on equity adders. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. ITC’s and ATC’s current authorized regulatory capital structure for common equity is 60% and 50%, respectively. Any change to ITC’s and ATC’s return on equity and regulatory capital structure for common equity would impact the calculation of their respective Attachment “O” rates, resulting in changes to electric transmission service costs billed by ITC and ATC to their customers. Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. In addition, any change to ATC’s return on equity and regulatory capital structure for common equity could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the future. Alliant Energy, IPL and WPL are currently unable to determine the timing and nature of any FERC actions related to this complaint and resulting changes to their financial condition and results of operations.
MISO Attachment “O” Protocols - In 2012, IPL filed comments in a FERC inquiry related to MISO’s Attachment “O” protocols. In May 2013, FERC issued an order that determined the MISO Attachment “O” protocols to be insufficient. FERC ordered MISO and the impacted transmission owners, including ITC and ATC, to make certain changes to their protocols. In September 2013, MISO transmission owners, including ITC and ATC, submitted proposed revisions to their Attachment “O” rate protocols to FERC for approval. Alliant Energy, IPL and WPL are currently unable to determine the timing of final FERC approval and what impacts the changes in protocols will have on their future electric transmission service charges.
Sales Trends - In January 2012, Eagle Point filed a Petition for Declaratory Order requesting that the IUB declare Eagle Point is not a public utility subject to the service territory laws in Iowa. Specifically, Eagle Point sought to sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. IPL, MidAmerican, the Iowa Association of Electric Cooperatives, a coalition of solar power advocates, and the OCA actively participated in the related IUB proceeding. In April 2012, the IUB issued an order finding that Eagle Point’s proposed arrangement would make it a public utility operating in IPL’s exclusive service territory in violation of Iowa’s service territory laws. In May 2012, Eagle Point requested review of the IUB’s April 2012 order from the Polk County, Iowa District Court. In March 2013, the District Court issued a ruling that vacated the IUB’s decision, and found Eagle Point did not constitute a public utility and could enter into its proposed direct sales arrangement with the City of Dubuque. In April 2013, IPL and MidAmerican filed a joint Notice of Appeal with the Iowa Supreme Court. The IUB and the Iowa Association of Electric Cooperatives also filed Notices of Appeal with the Iowa Supreme Court, and Eagle Point submitted a Notice of Cross-Appeal. In January 2014, the Iowa Supreme Court heard oral arguments in the case. The District Court decision is currently stayed. Alliant Energy and IPL are currently unable to determine how this District Court ruling, if upheld by the Iowa Supreme Court, may impact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity by IPL’s customers.
Potential Tax Accounting Method Changes - Alliant Energy, IPL and WPL are currently assessing potential tax accounting method changes as a result of certain final and proposed regulations issued by the U.S. Department of the Treasury and procedures issued by the IRS. In May 2013, the IRS issued a revenue procedure identifying the units of property that can be utilized for determining repairs on electric generation assets. In September 2013, the U.S. Department of the Treasury issued both final and proposed tangible property regulations clarifying the tax treatment of costs incurred to acquire, maintain or improve tangible property and to retire and remove depreciable property. In January 2014, the IRS issued guidance containing the procedures to comply with the tangible property regulations. In addition, Alliant Energy, IPL and WPL currently anticipate the IRS will publish additional guidance clarifying regulations related to the tax treatment of repairs expenditures for gas distribution property. The outcomes of the assessment of the January 2014 guidance and additional guidance could result in Alliant Energy, IPL and WPL filing additional tax accounting method changes with the IRS. If approved by the IRS, these tax accounting method changes could materially impact Alliant Energy’s and IPL’s future income tax benefits and expenses due to Iowa rate-making principles, which do not recognize deferred income tax benefits and expenses for certain property-related differences at IPL.
Retirement Plan Costs - Alliant Energy’s, IPL’s and WPL’s net periodic benefit costs related to their defined benefit pension and other postretirement benefits plans are currently expected to be lower in 2014 compared to 2013 by approximately $18 million, $9 million and $8 million, respectively. These amounts do not include the impact of $9 million of additional benefit costs related to the Cash Balance Plan in 2013. The decrease in net periodic benefit costs is primarily due to the use of higher discount rates as of December 31, 2013 and higher than expected returns on plan assets resulting in increases in retirement plan assets during 2013. Approximately 30% to 40% of net periodic benefit costs are allocated to capital projects each year. As a result, the decrease in net periodic benefit costs is not expected to result in a comparable decrease in other operation and maintenance expenses. Refer to Note 12(a) of the “Combined Notes to Consolidated Financial Statements” for additional details of Alliant Energy’s, IPL’s and WPL’s defined benefit pension and other postretirement benefits plans.
Performance-based Compensation Plans - Alliant Energy’s total compensation package includes a performance-based compensation program, which provides substantially all of Alliant Energy’s non-bargaining employees an opportunity to receive annual cash payments based on the achievement of specific short-term annual operational and financial performance measures. In 2013, Alliant Energy, IPL and WPL incurred $41 million, $23 million and $17 million, respectively, of performance-based compensation expense. The current operational performance measures for 2014 relate to diversity, safety, customer satisfaction, service reliability and the availability of certain EGUs. The current financial performance measures for 2014 relate to earnings per share from continuing operations and cash flows from operations generated by IPL, WPL and Corporate Services, as adjusted pursuant to the terms of the OIP. In addition, the total compensation program for certain key employees includes long-term awards issued under equity-based compensation plans. Refer to Note 12(b) of the “Combined Notes to Consolidated Financial Statements” for details of the equity-based compensation plans. Alliant Energy, IPL and WPL are currently unable to determine what impacts these performance-based compensation plans will have on their future financial condition or results of operations.
System Support Resource - In 2013, MISO designated another utility’s EGU located in a local resource zone for which ATC provides transmission services as an SSR. In January 2014, MISO filed an SSR agreement with the owner of the designated EGU, which established an annual revenue requirement of approximately $52 million, effective February 1, 2014. The revenue requirement has been requested to be allocated among ATC’s customers located in the local resource zone, including WPL. If approved by FERC, WPL’s estimated share of this annual revenue requirement is expected to be approximately $10 million. Although MISO’s tariff only allows SSR agreements with a term of one year, WPL currently expects that the SSR agreement and revenue requirement for this EGU could be extended for several years until transmission facilities are constructed to eliminate the need for this EGU. WPL currently expects to defer any SSR costs incurred through December 31, 2015 pursuant to an April 2013 PSCW order.
Previous: Item 6. SELECTED FINANCIAL DATA · Next: Item 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK