Alliant Energy - As a holding company, Alliant Energy doesn’t directly own any significant properties other than the stock of its subsidiaries. The principal properties of those subsidiaries are as follows:
IPL and WPL
Electric - At December 31, 2016, IPL’s and WPL’s EGUs by primary fuel type were as follows:
| | | | | | | | | | | | |
|---|
| | | | | | | | | | | | |
| IPL | | Expected | | | | Primary | | Nameplate | | | Generating | |
| | Retirement or | | In-service | | Dispatch | | Capacity | | | Capacity | |
| Name of EGU and Location | | Fuel Switch (a) | | Dates | | Type (b) | | in MW | | | in MW (c) | |
| Emery Generating Station (Units 1-3); Mason City, IA | | N/A | | 2004 | | IN | | 603 | | | 527 | |
| M.L. Kapp Generating Station (Unit 2); Clinton, IA | | N/A | | 1967 | | IN | | 218 | | | 92 | |
| Sutherland Generating Station (Units 1,3); Marshalltown, IA | | Retire by 6/30/17 (d) | | 1955-1961 | | IN | | 119 | | | 99 | |
| Fox Lake Generating Station (Units 1,3); Sherburn, MN | | Retire by 12/31/17 | | 1950-1962 | | IN | | 93 | | | 83 | |
| Burlington Combustion Turbines (Units 1-4); Burlington, IA | | Retire by 12/31/17 | | 1994-1996 | | PK | | 79 | | | 51 | |
| Dubuque Generating Station (Units 3-4); Dubuque, IA | | Retire by 6/30/17 (d) | | 1952-1959 | | IN | | 66 | | | 59 | |
| Grinnell Combustion Turbines (Units 1-2); Grinnell, IA | | Retire by 12/31/17 | | 1990-1991 | | PK | | 48 | | | 36 | |
| Red Cedar Combustion Turbine (Unit 1); Cedar Rapids, IA | | Retire by 12/31/18 | | 1996 | | PK | | 23 | | | 11 | |
| Total Gas | | | | | | | | 1,249 | | | 958 | |
| | | | | | | | | | | | |
| Ottumwa Generating Station (Unit 1); Ottumwa, IA (e) | | N/A | | 1981 | | BL | | 348 | | | 326 | |
| Lansing Generating Station (Unit 4); Lansing, IA | | N/A | | 1977 | | BL | | 275 | | | 235 | |
| Prairie Creek Generating Station (Units 1,3,4); Cedar Rapids, IA | | Units 1 and 3 - fuel switch or retire by 12/31/25; Unit 4 - fuel switch by 12/31/17 (d) | | 1958-1997 | | BL | | 213 | | | 147 | |
| Burlington Generating Station (Unit 1); Burlington, IA | | Fuel switch by 12/31/21 (d) | | 1968 | | BL | | 212 | | | 203 | |
| George Neal Generating Station (Unit 4); Sioux City, IA (f) | | N/A | | 1979 | | BL | | 179 | | | 160 | |
| George Neal Generating Station (Unit 3); Sioux City, IA (g) | | N/A | | 1975 | | BL | | 164 | | | 131 | |
| Louisa Generating Station (Unit 1); Louisa, IA (h) | | N/A | | 1983 | | BL | | 32 | | | 29 | |
| Total Coal | | | | | | | | 1,423 | | | 1,231 | |
| | | | | | | | | | | | |
| Marshalltown Combustion Turbines (Units 1-3); Marshalltown, IA | | Fuel switch by 12/31/17 | | 1978 | | PK | | 189 | | | 139 | |
| Lime Creek Combustion Turbines (Units 1-2); Mason City, IA | | N/A | | 1991 | | PK | | 90 | | | 69 | |
| Centerville Combustion Turbines (Units 1-2); Centerville, IA | | Retire by 12/31/17 | | 1990 | | PK | | 54 | | | 47 | |
| Diesel Stations (5 Units); Iowa (i) | | Retire by 12/31/17 | | 1963-1966 | | PK | | 10 | | | — | |
| Total Oil | | | | | | | | 343 | | | 255 | |
| | | | | | | | | | | | |
| Whispering Willow - East (121 Units); Franklin Co., IA | | N/A | | 2009 | | IN | | 200 | | | 33 | |
| Total Wind | | | | | | | | 200 | | | 33 | |
| | | | | | | | | | | | |
| Total capacity | | | | | | | | 3,215 | | | 2,477 | |
| | | | | | | | | | | | |
|---|
| | | | | | | | | | | | |
| WPL | | | | | | Primary | | Nameplate | | | Generating | |
| | | | In-service | | Dispatch | | Capacity | | | Capacity | |
| Name of EGU and Location | | Expected Retirement (a) | | Dates | | Type (b) | | in MW | | | in MW (c) | |
| Riverside Energy Center (Units 1-3); Beloit, WI | | N/A | | 2004 | | IN | | 675 | | | 539 | |
| Neenah Energy Facility (Units 1-2); Neenah, WI | | N/A | | 2000 | | PK | | 371 | | | 283 | |
| South Fond du Lac Combustion Turbines (2 Units); Fond du Lac, WI (j) | | N/A | | 1994 | | PK | | 191 | | | 146 | |
| Rock River Combustion Turbines (Units 3-6); Beloit, WI | | Retire by 12/31/20 | | 1967-1972 | | PK | | 169 | | | 122 | |
| Sheepskin Combustion Turbine (Unit 1); Edgerton, WI | | Retire by 12/31/20 | | 1971 | | PK | | 42 | | | 35 | |
| Total Gas | | | | | | | | 1,448 | | | 1,125 | |
| | | | | | | | | | | | |
| Columbia Energy Center (Units 1-2); Portage, WI (k) | | N/A | | 1975-1978 | | BL | | 514 | | | 495 | |
| Edgewater Generating Station (Unit 5); Sheboygan, WI | | N/A | | 1985 | | BL | | 414 | | | 399 | |
| Edgewater Generating Station (Unit 4); Sheboygan, WI (l) | | Retire by 12/31/18 (d) | | 1969 | | BL | | 239 | | | 191 | |
| Total Coal | | | | | | | | 1,167 | | | 1,085 | |
| | | | | | | | | | | | |
| Bent Tree (122 Units); Freeborn Co., MN | | N/A | | 2010-2011 | | IN | | 201 | | | 32 | |
| Cedar Ridge (41 Units); Fond du Lac Co., WI | | N/A | | 2008 | | IN | | 68 | | | 9 | |
| Total Wind | | | | | | | | 269 | | | 41 | |
| | | | | | | | | | | | |
| Prairie du Sac Hydro Plant (8 Units); Prairie due Sac, WI | | N/A | | 1914-1940 | | IN | | 32 | | | 12 | |
| Kilbourn Hydro Plant (4 Units); Wisconsin Dells, WI | | N/A | | 1926-1939 | | IN | | 10 | | | 6 | |
| Total Hydro | | | | | | | | 42 | | | 18 | |
| | | | | | | | | | | | |
| Total capacity | | | | | | | | 2,926 | | | 2,269 | |
| |
|---|
| (a) | Expected dates for the retirement and fuel switching of these EGUs are subject to change depending on operational, regulatory, market and other factors. The potential retirement of other EGUs within the generation fleet continues to be evaluated. IPL and WPL are working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of certain of these actions. Final MISO studies could indicate that the retirement of an individual EGU may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable such retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors. |
| |
|---|
| (b) | Base load EGUs (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate EGUs (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peak load EGUs (PK) are generally low efficiency, quick response units that run primarily when there is high demand. |
| |
|---|
| (c) | Based on the accredited generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2016 through May 2017. |
| |
|---|
| (d) | Actions and plans for retirement or fuel switch meet requirements specified in IPL’s and WPL’s respective Consent Decree, which are discussed in Note 16(e). |
| |
|---|
| (e) | Represents IPL’s 48% ownership interest in this 726 MW (nameplate capacity) / 680 MW (generating capacity) EGU, which is operated by IPL. |
| |
|---|
| (f) | Represents IPL’s 25.695% ownership interest in this 696 MW (nameplate capacity) / 622 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (g) | Represents IPL’s 28% ownership interest in this 584 MW (nameplate capacity) / 466 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (h) | Represents IPL’s 4% ownership interest in this 812 MW (nameplate capacity) / 725 MW (generating capacity) EGU, which is operated by MidAmerican Energy Company. |
| |
|---|
| (i) | These EGUs did not receive any accredited generating capacity for the planning period from June 2016 through May 2017. |
| |
|---|
| (j) | Represents Units 2 and 3, which WPL owns. WPL also operates, but does not own, South Fond du Lac Combustion Turbines Units 1 and 4. |
| |
|---|
| (k) | Represents WPL’s 46.2% ownership interest in this 1,112 MW (nameplate capacity) / 1,072 MW (generating capacity) EGU, which is operated by WPL. |
| |
|---|
| (l) | Represents WPL’s 68.2% ownership interest in this 351 MW (nameplate capacity) / 280 MW (generating capacity) EGU, which is operated by WPL. |
At December 31, 2016, IPL owned approximately 17,485 miles of overhead electric distribution line and 2,977 miles of underground electric distribution cable, as well as 564 substation distribution transformers, substantially all of which are located in Iowa. At December 31, 2016, WPL owned approximately 16,222 miles of overhead electric distribution line and 5,481 miles of underground electric distribution cable, as well as 302 substation distribution transformers, substantially all of which are located in Wisconsin.
Gas - IPL’s and WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related transmission and distribution equipment. At December 31, 2016, IPL’s gas distribution facilities included approximately 5,116 miles of gas mains located in Iowa and WPL’s included approximately 4,430 miles of gas mains located in Wisconsin.
Other - IPL’s and WPL’s other property consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment. IPL’s other property also includes steam service assets. Refer to Note 10(b) for information regarding WPL’s lease of Sheboygan Falls from AEF’s Non-regulated Generation business.
AEF - AEF’s principal properties included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2016 were as follows:
Non-regulated Generation - Includes Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL, and the 99 MW (60 Units) Franklin County wind farm in Franklin County, Iowa that was placed in service in 2012. Sheboygan Falls and Franklin County wind farm were accredited with 281 MW and 17 MW, respectively, of generating capacity for MISO’s resource adequacy process for the planning period from June 2016 through May 2017.
Transportation - Includes a short-line railway in Iowa with 114 miles of railroad track, 10 active locomotives and 12 rail-cars; and a barge terminal on the Mississippi River.
Corporate Services - Corporate Services’ property included in “Property, plant and equipment, net” on Alliant Energy’s balance sheet at December 31, 2016 consisted primarily of a customer billing and information system for IPL and WPL and other computer software, and the corporate headquarters building located in Madison, Wisconsin.