Item 2. PROPERTIES

20K characters. Original on sec.gov · Markdown

Item 2. PROPERTIES

Building Materials Business

As of December 31, 2022, the Company processed or shipped aggregates from 344 quarries, mines and distribution terminals in 28 states, Canada and The Bahamas. No individual quarry or mine is material to the Company’s business or financial condition. The Company’s aggregates reserves, on average, represent approximately 75 years at the 2022 annual production level. However, certain locations may be subject to more limited reserves and may not be able to expand. As of December 31, 2022, the Company operated 78 aggregates distribution terminals. In total, aggregates locations (quarries, mines and distribution terminals) include 154 located on land owned by the Company free of major encumbrances, 63 on land owned in part and leased in part, 114 on leased land, and 13 on facilities neither owned nor leased where raw materials are removed under an agreement. In addition, as of December 31, 2022, the Company processed and shipped ready mixed concrete and asphalt products from 132 properties in five states, of which 98 are located on land owned by the Company free of major encumbrances, 3 are on land owned in part and leased in part, 28 are on leased land and 3 are at facilities neither owned nor leased.

An overview of the Company’s quarrying and mining operations is included in “Business—Building Materials Business” and “Business—Environmental and Governmental Regulations,” included in Item 1, “Business” of this Form 10-K, which is incorporated herein by reference. The following map presents the locations of these quarries and underground mines, including the limestone reserves adjacent to the California cement plant that is classified as held for sale:

img129715836_1.jpg

Mineral reserves and mineral resources for the Company’s aggregates and cement businesses have been prepared in accordance with the disclosure requirements of subpart 1300 of U.S. Securities and Exchange Commission Regulation S-K. Mineral resources represent concentrations or occurrences of material of economic interest in or on the Earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. A measured mineral resource is that part of the mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling in sufficient detail to support detailed extraction planning and final evaluation of the economic viability of the deposit to be quarried or mined. An indicated mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of

Form 10-K ♦ Page 27img129715836_0.jpg

Part I ♦ Item 2 – Properties

adequate geological evidence and sampling in sufficient detail to support mine planning and evaluation of the economic viability of the deposit of the material to be quarried or mined. Inferred mineral resources are that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The Company has no inferred resources as of December 31, 2022.

A mineral reserve is an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. A probable mineral reserve is the economically mineable part of an indicated and, in some cases, a measured mineral resource. A proven mineral reserve is the economically mineable part of a measured mineral resource and can only result from the conversion of a measured mineral resource. The Company estimates proven and probable mineral reserves based on the results of drilling and testing completed by or under the supervision of qualified persons.

The Company uses various exploratory drilling methods, depending on the type of deposit, to estimate mineral reserves that are economically mineable. The extent of drilling varies depending on the complexity of the mineral deposit and whether the location is a potential new site (greensite), an existing location or a potential acquisition. More extensive drilling is performed for potential greensites and acquisitions, and, in rare cases, the Company may rely on existing geological data or results of prior drilling by reputable third parties. Subsequent to drilling, selected drill samples are tested by an accredited laboratory for soundness, abrasion resistance and other physical properties relevant to the aggregates industry. If the mineral reserves meet the Company’s standards and are economically mineable, they are either leased or purchased. Once in operation, routine quality control testing is performed to ensure the quality grade of aggregates continues to meet specifications.

In determining the amount of reserves, evaluations are completed by or under the supervision of qualified Company personnel using industry best practices and internal controls defined by the Company. Reserve estimates represent net tons after consideration of applicable losses incurred during mining and plant processing. The Company’s policy is to exclude from reserve estimates the portions of a mineral deposit that are not available due to property boundaries, set-backs and plant configurations, as deemed appropriate when estimating reserves. The Company uses the same methods of analysis to evaluate and estimate the amount of its mineral reserves used in the cement manufacturing process for its cement operations as it does for its aggregates operations. For additional information on the Company’s assessment of reserves, see “Management’s Discussion and Analysis of Financial Condition and Results of Operations – Other Financial Information - Critical Accounting Policies and Estimates - Property, Plant and Equipment” included under Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” of this Form 10-K. While the mineral reserve and resource classification categories (proven and probable) identify relative confidence of reserve estimates, there is inherent risk associated with such estimates. The Company bases estimates on the information known at the time of determination and regularly reevaluates reserves whenever new information indicates a material change in reserves at one of the Company’s sites.

In general, quarry and mining facilities must comply with air quality, water quality, noise regulations, zoning and special-use permitting requirements, applicable mining regulations, and federal health and safety requirements. As new quarry and mining sites are located and acquired, the Company works closely with local authorities during the zoning and permitting processes to design new quarries and mines in such a way as to minimize disturbances. The Company frequently acquires large tracts of land so that quarry, mine and production facilities can be situated substantial distances from surrounding property owners.

Set forth in the tables below are the Company’s estimates as of December 31, 2022 of proven and probable mineral reserves of aggregates (crushed stone and sand and gravel) and measured, indicated and inferred mineral resources of aggregates (exclusive of proven and probable reserves), shown on a geographic division basis. The East Division includes Alabama, Florida, Georgia, Maryland, North Carolina, Pennsylvania, South Carolina, Tennessee, Virginia, Canada and The Bahamas. The Central Division includes Indiana, Iowa, Kansas, Kentucky, Minnesota, Missouri, Nebraska, Ohio and West Virginia. The Southwest Division includes Arkansas, Louisiana, Oklahoma and Texas. The West Division includes Arizona, California, Colorado, Utah, Washington and Wyoming. The reserve estimates shown were determined to be economically mineable using a reasonable and justifiable price for salable product as of December 31, 2021 with respect to each division for each product category of aggregates resources. The Company’s estimate of resources and reserves of aggregates shown in the tables below includes resources and reserves that would be devoted for use in the Company’s cement product line and Magnesia Specialties business.

Form 10-K ♦ Page 28img129715836_0.jpg

Part I ♦ Item 2 – Properties

Summary Mineral Resources At End of Fiscal Year Ended December 31, 2022****1,2
Measured Mineral ResourcesIndicated Mineral ResourcesMeasured + Indicated Mineral ResourcesInferred Mineral Resources
Tons (in thousands)Grades/QualitiesTons (in thousands)Grades/QualitiesTons (in thousands)Grades/QualitiesTons (in thousands)Grades/Qualities
Crushed Stone
East Division144,299Crushed Stone30,584Crushed Stone174,883Crushed Stone—Crushed Stone
Central Division—Crushed Stone22,730Crushed Stone22,730Crushed Stone—Crushed Stone
Southwest Division—Crushed Stone—Crushed Stone—Crushed Stone—Crushed Stone
West Division61,320Crushed Stone152,137Crushed Stone213,457Crushed Stone—Crushed Stone
Total crushed stone205,619205,451411,070—
Sand and Gravel
East Division—Sand & Gravel—Sand & Gravel—Sand & Gravel—Sand & Gravel
Central Division1,102Sand & Gravel35,390Sand & Gravel36,492Sand & Gravel—Sand & Gravel
Southwest Division—Sand & Gravel—Sand & Gravel—Sand & Gravel—Sand & Gravel
West Division59,839Sand & Gravel143,191Sand & Gravel203,030Sand & Gravel—Sand & Gravel
Total sand and gravel60,941178,581239,522—
Summary Mineral Reserves****At End of Fiscal Year Ended December 31, 2022 1,2
Proven Mineral ReservesProbable Mineral ReservesTotal Mineral Reserves
Tons (in thousands)Grades/QualitiesTons (in thousands)Grades/QualitiesTons (in thousands)Grades/Qualities
Crushed Stone
East Division4,608,483Crushed Stone3,643,381Crushed Stone8,251,864Crushed Stone
Central Division1,472,296Crushed Stone1,418,537Crushed Stone2,890,833Crushed Stone
Southwest Division2,253,444Crushed Stone1,711,836Crushed Stone3,965,280Crushed Stone
West Division351,196Crushed Stone600,000Crushed Stone951,196Crushed Stone
Total crushed stone8,685,4197,373,75416,059,173
Sand and Gravel
East Division63,500Sand and Gravel110,046Sand and Gravel173,546Sand and Gravel
Central Division226,350Sand and Gravel69,562Sand and Gravel295,912Sand and Gravel
Southwest Division55,196Sand and Gravel80,557Sand and Gravel135,753Sand and Gravel
West Division170,288Sand and Gravel41,436Sand and Gravel211,724Sand and Gravel
Total sand and gravel515,334301,601816,935

The tons presented were determined to be economically mineable using the 2021 average selling price per ton for that product category in that geographic division. There is a range of selling prices for each product category and each geography that depend on the type of product, whether it is washed or not, and its end use. The average selling price per ton used for crushed stone for the East Division, Central Division, Southwest Division and West Division was $15.65, $14.08, $10.46 and $11.53, respectively. The average selling price per ton used for sand and gravel for the East Division, Central Division, Southwest Division and West Division was $10.66, $10.73, $13.28 and $13.52, respectively. These prices exclude any portion of revenues allocated to freight, including internal freight to ship products from a producing quarry to a distribution terminal and third-party freight to deliver product to a customer.

For the purposes of this table, the Company calculates its mineral reserves based on land that has been zoned for quarrying and land for which the Company has determined zoning is not required. The Company's reserves presented in the Central Division include dolomitic limestone reserves used in the Magnesia Specialties business. The Company's reserves presented in the Southwest Division and the West Division include limestone reserves used in the business of the cement product line.

The following presents the Company’s total annual production for the last three years, shown on a product line-by-product line basis.

**Total Annual Production (tons in millions)**For year ended December 31
202220212020
Aggregates214.5199.6191.2
Cement limestone6.65.45.1
Magnesia Specialties limestone2.93.02.8
Total224.0208.0199.1

Cement

As of December 31, 2022, the Company processed or shipped cement from 14 properties in two states, of which 7 are located on land owned by the Company free of major encumbrances, 1 is located on land owned in part and leased in part and 6 are

Form 10-K ♦ Page 29img129715836_0.jpg

Part I ♦ Item 2 – Properties

on leased land. The Company’s cement operations have production facilities located at three sites: Midlothian, Texas, south of Dallas/Fort Worth; Hunter, Texas, north of San Antonio; and Tehachapi, California. Tehachapi was acquired on October 1, 2021 in connection with the Lehigh Hanson West Region acquisition and is classified as held for sale as of December 31, 2022. The following table summarizes certain information about the Company’s cement manufacturing facilities at December 31, 2022:

PlantRated Annual Productive Capacity-Tons of Clinker (in millions)Manufacturing ProcessService DateInternally Estimated Reserves—Years
Midlothian, TX2.4Dry200160
Hunter, TX2.1Dry2013, 1981140
Tehachapi, CA0.9Dry2018, 1990, 190830
Total5.4

Reserves identified with the facilities shown above are contained on approximately 3,000 acres of land owned by the Company. As of December 31, 2022, the Company estimated its total proven and probable limestone reserves on such land to be approximately 717 million tons, which are included in the Summary Mineral Reserves table.

The Company’s cement manufacturing facilities include kilns, crushers, pre-heaters/calciners, coolers, finish mills and other equipment used to process limestone and other raw materials into cement, as well as equipment used to extract and transport the limestone from the adjacent quarries. These cement manufacturing facilities are served by rail and truck.

As of December 31, 2022, the Company also operated, directly or through third parties, 11 cement distribution terminals, of which six are classified as assets held for sale.

Magnesia Specialties Business

The Magnesia Specialties business currently operates major manufacturing facilities in Manistee, Michigan, and Woodville, Ohio. Both of these facilities are owned.

Other Properties

The Company’s principal corporate office, which it leases, is located in Raleigh, North Carolina. The Company owns and leases various administrative offices for its five operating business segments.

Condition and Utilization

The Company’s principal properties, which are of varying ages and construction types, are believed to be generally in good condition, are generally well maintained, and are generally suitable and adequate for the purposes for which they are used.

During 2022, the principal properties of the aggregates operations were believed to be utilized at average productive capacities of approximately 75% and were capable of supporting a higher level of market demand. The Company adjusts its production schedules to meet volume demand for its products.

During 2022, the Texas cement kilns operated on average at 77% utilization. The Portland Cement Association (PCA) has projected that Texas cement consumption will increase 2.0% in 2023 over 2022. The cement business’ leadership, in collaboration with the aggregates and ready mixed concrete teams, has developed strategic plans regarding inter-plant efficiencies, as well as tactical plans addressing plant utilization and efficiency.

The Company’s Magnesia Specialties business expects future organic earnings growth to result from increased pricing, product mix optimization, capacity expansion projects and/or cost reductions. In the current operating environment, where steel utilization is between 72% and 77%, any unplanned change in costs or customers introduces volatility to the earnings of the Magnesia Specialties segment. The dolomitic lime business of the Magnesia Specialties segment operated at 77% utilization in 2022.