NiSource 10-Q 2026-09-30

NI · CIK 1111711 · Form 10-Q · Period ended September 30, 2026 · Filed October 28, 2026

Revenue rose 4.7% to $1.30 billion. Operating margin was 26.2%, against 24.0% a year earlier. Net income was $130 million.

8 sections, 351K characters. Original on sec.gov · ·

Risk FactorsBusiness

Key numbers
MeasureQuarter ended Sep 30, 2026Quarter ended Sep 30, 2025Change
Revenue$1.30B$1.24B+4.7%
Operating income$340M$298M+14.4%
Net income$130M$94.7M+36.7%
Diluted EPS$0.27$0.20+35.0%
Cash and equivalents$57.5Mn/an/a
Operating margin*26.2%24.0%+2.2 pts

From the XBRL facts tagged to this filing; both columns are as reported in this filing. * Computed by filings.tools: free cash flow is operating cash flow less capital spending; operating margin is operating income over revenue.

The 66 tables in this filing as one CSV, figures in aligned columns. For subscribers: paste your API key. One API call. Plans from $19 a month, see pricing.

Cover and table of contents

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

FORM 10-Q

☑ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)

OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended September 30, 2026

or

☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d)

OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from to

Commission file number 001-16189

NiSource Inc.

(Exact name of registrant as specified in its charter)

DE35-2108964
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
801 East 86th Avenue
Merrillville,IN46410
(Address of principal executive offices)(Zip Code)

(614) 460-6000

(Registrant’s telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Act:

Title of Each ClassTrading Symbol(s)Name of Each Exchange on Which Registered
Common Stock, par value $0.01 per shareNINYSE

Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes þ No ¨

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files.)

Yes þ No ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of "large accelerated filer," "accelerated filer," "smaller reporting company," and "emerging growth company" in Rule 12b-2 of the Exchange Act.

Large accelerated filer þ Accelerated filer ¨ Emerging growth company ☐ Non-accelerated filer ¨ Smaller reporting company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes ☐ No ☑

Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date: Common Stock, $0.01 Par Value: 479,668,642 shares outstanding at October 21, 2026.

NISOURCE INC.

FORM 10-Q QUARTERLY REPORT

FOR THE QUARTER ENDED SEPTEMBER 30, 2026

Table of Contents

Page
Defined Terms3
PART IFINANCIAL INFORMATION
Item 1.Financial Statements - unaudited
Condensed Statements of Consolidated Income (unaudited)9
Condensed Statements of Consolidated Comprehensive Income (unaudited)10
Condensed Consolidated Balance Sheets (unaudited)11
Condensed Statements of Consolidated Cash Flows (unaudited)13
Condensed Statements of Consolidated Equity (unaudited)14
Notes to Condensed Consolidated Financial Statements (unaudited)17
Item 2.Management’s Discussion and Analysis of Financial Condition and Results of Operations43
Item 3.Quantitative and Qualitative Disclosures About Market Risk67
Item 4.Controls and Procedures67
PART IIOTHER INFORMATION
Item 1.Legal Proceedings68
Item 1A.Risk Factors68
Item 2.Unregistered Sales of Equity Securities and Use of Proceeds73
Item 3.Defaults Upon Senior Securities73
Item 4.Mine Safety Disclosures73
Item 5.Other Information73
Item 6.Exhibits74
Signature75
DEFINED TERMS
The following is a list of frequently used abbreviations or acronyms that are found in this report:
NiSource Subsidiaries and Affiliates (not exhaustive)
Columbia of KentuckyColumbia Gas of Kentucky, Inc.
Columbia of MarylandColumbia Gas of Maryland, Inc.
Columbia of OhioColumbia Gas of Ohio, Inc.
Columbia of PennsylvaniaColumbia Gas of Pennsylvania, Inc.
Columbia of VirginiaColumbia Gas of Virginia, Inc.
GenCoNiSource Generation Company LLC, formerly known as NIPSCO Generation LLC
Generation Holdings IGeneration Holdings I LLC
Generation Holdings IIGeneration Holdings II LLC
NIPSCONorthern Indiana Public Service Company LLC
NIPSCO Holdings INIPSCO Holdings I LLC
NIPSCO Holdings IINIPSCO Holdings II LLC
NiSource ("we," "us" or "our")NiSource Inc.
RosewaterRosewater Wind Generation LLC and its wholly owned subsidiary, Rosewater Wind Farm LLC
Indiana Crossroads SolarIndiana Crossroads Solar Generation LLC and its wholly owned subsidiary, Meadow Lake Solar Park LLC
Indiana Crossroads WindIndiana Crossroads Wind Generation LLC and its wholly owned subsidiary, Indiana Crossroads Wind Farm LLC
Dunn's Bridge IDunn's Bridge I Solar Generation LLC and its wholly owned subsidiary, Dunns Bridge Solar Center, LLC
Abbreviations and Other
ADSAmazon Data Services, Inc.
ADS ContractNIPSCO agreement to provide electricity to ADS' data centers
ADS EPC ContractsGenCo's EPC Contracts relating to the Contract Assets
AGPAtlas Storage 1 LLC, an indirect subsidiary of AGP Capital Holdings Pte. Ltd.
AFUDCAllowance for funds used during construction
AlphabetAlphabet Inc.
Alphabet ContractNIPSCO agreement to provide electricity to Alphabet's data centers
AOCIAccumulated other comprehensive income (loss)
ASCAccounting standards codification
ASUAccounting standards update
ATMAt-the-market
BESSBattery energy storage system
BIP Orion Holdco L.P.BIP Orion Holdco L.P., a Delaware limited partnership and also an affiliate of Blackstone
BIP Orion Holdco II L.P.BIP Orion Holdco II L.P., a Delaware limited partnership and also an affiliate of Blackstone
BlackstoneBlackstone Infrastructure Partners L.P.
Blackstone InvestorBIP Orion Holdco L.P. and BIP Orion Holdco II L.P. (GenCo Minority Interest Transaction)
BTABuild-transfer agreement
CCGTCombined cycle gas turbine
DEFINED TERMS
CCRsCoal combustion residuals
CEOChief executive officer
CEPOhio capital expenditure program
CERCLAComprehensive Environmental Response Compensation and Liability Act (also known as Superfund)
CODMChief operating decision maker
Columbia OperationsReportable segment comprised of the results of NiSource Gas Distribution Group, Inc., including all of its Columbia Gas distribution companies and related subsidiaries
Contract AssetsGeneration assets and related transmission infrastructure to be developed in connection with the ADS Contract
CTCombustion gas turbine
Current Data Center ContractsThe ADS Contract, Alphabet Contract and Microsoft Contract
DSMDemand side management
Dunn's Bridge IIDunn's Bridge II Solar Generation LLC
EPAUnited States Environmental Protection Agency
EPCEngineering, procurement, and construction
EPSEarnings per share
ESAEnergy storage agreement
FACFuel adjustment clause
FASBFinancial Accounting Standards Board
FERCFederal Energy Regulatory Commission
FMCAIndiana federally mandated cost adjustment mechanism
F-Frames EPC ContractGenCo’s EPC Contract relating to the two 239 MW F-frame CTs we plan to construct as part of our Pool Resource Assets
GAAPGenerally Accepted Accounting Principles
GCAGas cost adjustment
GCTGeneration cost tracker
GenCo Minority Interest TransactionA transaction between Generation Holdings I, Generation Holdings II (sole owner of GenCo) and Blackstone Investor entered into in October 2025, that offered equity interests in Generation Holdings II in exchange for capital contributions by the parties.
Generation Holdings II LLC AgreementAmended and Restated Limited Liability Company Agreement of Generation Holdings II
GHGGreenhouse gases
GWhGigawatt hours
IRPOhio infrastructure replacement program
IURCIndiana Utility Regulatory Commission
JVJoint venture
MGPManufactured gas plant
MicrosoftMicrosoft Corporation
Microsoft ContractNIPSCO Agreement to provide capacity and electric service to Microsoft's data center facility
MISOMidcontinent Independent System Operator
MMDthMillion dekatherms
MWMegawatts
MWACMegawatt alternating current
MWhMegawatt hours
DEFINED TERMS
Net Zero GoalA goal, announced in November 2022, of net zero GHG emissions by 2040 covering both Scope 1 and Scope 2 GHG emissions
NIPSCO ElectricThe electric generation, transmission and distribution activities of the NIPSCO Operations reportable segment
NIPSCO GasThe gas distribution activities of the NIPSCO Operations reportable segment
NIPSCO Holdings II LLC AgreementThird Amended and Restated Limited Liability Company Agreement of NIPSCO Holdings II
NIPSCO Industrial GroupA group of NIPSCO industrial customers who regularly participate in matters before the IURC
NIPSCO OperationsReportable segment comprised of the results of NIPSCO Holdings I, NIPSCO Holdings II, and NIPSCO and all related subsidiaries
NYMEXNew York Mercantile Exchange
OPEBOther postemployment benefits
OUCCOffice of Utility Consumer Counselor
PHMSAPipeline and Hazardous Materials Safety Administration
Pool Resource AssetsPortfolio of electric generation assets and related assets owned or contracted for by NIPSCO and/or its affiliates (primarily including GenCo) and designed to serve the needs of data center customers.
PPAPower purchase agreement
QuantaQuanta Power Solutions, LLC
ROEReturn on equity
SAVESteps to advance Virginia's energy plan
Scope 1 GHG EmissionsDirect emissions from sources owned or controlled by us (e.g., emissions from our combustion of fuel, vehicles, and process emissions and fugitive emissions)
Scope 2 GHG EmissionsIndirect emissions from sources owned or controlled by us
SECSecurities and Exchange Commission
SMRPKentucky safety modification and replacement program
SMSSafety management system
TDSICIndiana transmission, distribution and storage system improvement charge
TempletonTempleton Wind Energy Center LLC
VIEVariable interest entity
2018 Plan2018 integrated resource plan
2021 Plan2021 integrated resource plan
2024 Plan2024 integrated resource plan
2026 Plan2026 integrated resource plan

Note regarding forward-looking statements

This Quarterly Report on Form 10-Q contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended (the "Securities Act"), and Section 21E of the Securities Exchange Act of 1934, as amended (the "Exchange Act"). These forward-looking statements include, but are not limited to, statements concerning our plans, strategies, objectives, expected performance, planned expenditures, recovery of expenditures through rates, stated on either a consolidated or segment basis, and any and all underlying assumptions and other statements that are not statements of historical fact. Expressions of future goals and expectations and similar expressions reflecting something other than historical fact, including "may," "will," "should," "could," "would," "aims," "seeks," "expects," "plans," "anticipates," "intends," "believes," "estimates," "predicts," "potential," "targets," "forecast," and "continue," are intended to identify forward-looking statements. All forward-looking statements are based on assumptions that management believes to be reasonable; however, there can be no assurance that actual results will not differ materially. Investors and prospective investors should understand that many factors

impact whether any forward-looking statement contained herein will, or can be, realized. Any one of those factors could cause actual results to differ materially from those projected.

Factors that could cause actual results to differ materially from those projected in any forward-looking statement discussed in this Quarterly Report on Form 10-Q include, among other things:

  • our ability to execute our business plan or growth strategy, including utility infrastructure investments, or business opportunities;

  • our ability to manage data center growth in our service territories;

  • potential incidents and other operating risks associated with our business;

  • our ability to work successfully with our JV partners;

  • our ability to construct, develop and place into service generation and transmission assets we develop to support our current and any future data center contracts on time or at all and consistent with initial cost estimates, as well as the performance of such assets once constructed and placed into service;

  • our ability to obtain the significant additional financing required to construct the generation and transmission assets we develop to support our current and any future data center contracts on favorable terms, if at all;

  • our ability to recover our investments and realize our expected return under our Current Data Center Contracts and any future data center contracts that we enter into;

  • our ability to maintain our investment grade credit ratings as we finance and pursue our data center strategy, including our performance under our Current Data Center Contracts and any future data center contracts that we enter into;

  • performance by our customers under our Current Data Center Contracts and any future data center contracts;

  • any default by a current or future data center customer or any decision by a current or future data center customer, if applicable, to reduce committed capacity under, or to terminate, such contracts;

  • potential changes in the MISO accreditation treatment of capacity resources;

  • our ability to adapt to, and manage costs related to, advances in technology, including alternative energy sources and changes in related laws and regulations;

  • our increased dependency on technology;

  • impacts related to our aging infrastructure;

  • our ability to obtain sufficient insurance coverage and whether such coverage will protect us against significant losses;

  • the success of our electric generation strategy;

  • construction risks and supply risks;

  • fluctuations in demand from residential and commercial customers;

  • fluctuations in the price of energy commodities and related transportation costs or an inability to obtain an adequate, reliable and cost-effective fuel supply to meet customer demand;

  • our ability to attract, retain or re-skill a qualified workforce and maintain good labor relations;

  • our ability to manage new initiatives and organizational changes;

  • the performance and quality of third-party suppliers and service providers;

  • our ability to manage the financial and operational risks related to achieving our carbon emission reduction goals, including our Net Zero Goal (as defined above), including any future associated impact from business opportunities such as data center development as those opportunities evolve;

  • regulation and the impact of regulatory rate reviews;

  • our ability to obtain expected financial or regulatory outcomes;

  • any damage to our reputation;

  • the impacts of natural disasters, acts of terrorism, acts of war or other catastrophic events;

  • the physical impacts of climate change and the transition to a lower carbon future;

  • potential cybersecurity attacks or security breaches;

  • increased requirements and costs related to cybersecurity;

  • our debt obligations;

  • any changes to our credit ratings or the credit ratings of certain of our subsidiaries;

  • adverse economic and capital market conditions, including increases in inflation or interest rates, recession, or changes in investor sentiment;

  • the actions of activist stockholders;

  • economic conditions in certain industries;

  • the ability of customers and suppliers to fulfill their payment and contractual obligations;

  • the ability of our subsidiaries to generate cash;

  • pension funding obligations;

  • potential impairments of goodwill;

  • the outcome of legal and regulatory proceedings, investigations, incidents, claims and litigation;

  • compliance with changes in, or new interpretations of applicable laws, regulations and tariffs;

  • the cost of compliance with environmental laws and regulations and the costs of associated liabilities;

  • changes in tax laws or the interpretation thereof; and

  • other matters set forth in Part I, Item 2, “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and Part II, Item 1A, “Risk Factors,” of this report, and Part I, Item 1, “Business,” Part I, Item 1A, "Risk Factors," and Part II, Item 7, "Management’s Discussion and Analysis of Financial Condition and Results of Operations," of our Annual Report on Form 10-K for the fiscal year ended December 31, 2025, some of which risks are beyond our control.

In addition, the relative contributions to profitability by each business segment, and the assumptions underlying the forward-looking statements relating thereto, may change over time.

All forward-looking statements are expressly qualified in their entirety by the foregoing cautionary statements. We undertake no obligation to, and expressly disclaim any such obligation to, update or revise any forward-looking statement to reflect changed assumptions, the occurrence of anticipated or unanticipated events or changes to expected results over time or otherwise, except as required by law.

IndexPage
Condensed Statements of Consolidated Income (unaudited)9
Condensed Statements of Consolidated Comprehensive Income (unaudited)10
Condensed Consolidated Balance Sheets (unaudited)11
Condensed Statements of Consolidated Cash Flows (unaudited)13
Condensed Statements of Consolidated Equity (unaudited)14
Notes to Condensed Consolidated Financial Statements (unaudited)17
1. Basis of Accounting Presentation17
2. Recent Accounting Pronouncements17
3. Revenue Recognition17
4. Noncontrolling Interests21
5. Earnings Per Share23
6. Equity24
7. Short-Term Borrowings24
8. Long-Term Debt25
9. Regulatory Matters25
10. Risk Management Activities28
11. Fair Value30
12. Income Taxes33
13. Pension and Other Postemployment Benefits33
14. Other Commitments and Contingencies35
15. Accumulated Other Comprehensive Loss37
16. Business Segment Information38
17. Other, Net41
18. Supplemental Disclosures of Cash Flow Information42

Table of Contents

PART I

Item 1. FINANCIAL STATEMENTS

NiSource Inc.

Condensed Statements of Consolidated Income (unaudited)

Three Months Ended September 30,Nine Months Ended September 30,
(in millions, except per share amounts)2026202520262025
Operating Revenues
Customer revenues$1,299.1$1,240.2$4,910.9$4,636.2
Other revenues50.332.9144.0103.1
Total Operating Revenues1,349.41,273.15,054.94,739.3
Operating Expenses
Cost of energy207.3193.61,070.11,102.9
Operation and maintenance428.5401.11,392.61,225.1
Depreciation and amortization337.8306.9988.3852.2
Loss on impairment of assets———0.7
Loss (gain) on sale of assets, net1.0(0.6)1.00.2
Other taxes34.574.6215.3238.4
Total Operating Expenses1,009.1975.63,667.33,419.5
Operating Income340.3297.51,387.61,319.8
Other Income (Deductions)
Interest expense, net(210.5)(179.8)(601.3)(451.7)
Other, net22.39.954.916.2
Total Other Deductions, Net(188.2)(169.9)(546.4)(435.5)
Income before Income Taxes152.1127.6841.2884.3
Income Taxes13.120.6109.1150.1
Net Income139.0107.0732.1734.2
Net income attributable to noncontrolling interest9.512.350.062.5
Net Income Attributable to NiSource129.594.7682.1671.7
Preferred dividends redemption premium——3.6—
Net Income Available to Common Shareholders$129.5$94.7$685.7$671.7
Earnings Per Share
Basic Earnings Per Share$0.27$0.20$1.43$1.42
Diluted Earnings Per Share$0.27$0.20$1.42$1.42
Basic Average Common Shares Outstanding479.8472.1479.5471.1
Diluted Average Common Shares481.1473.7481.1472.8

The accompanying Notes to Condensed Consolidated Financial Statements (unaudited) are an integral part of these statements.

Table of Contents

ITEM 1. FINANCIAL STATEMENTS (continued)

NiSource Inc.

Condensed Statements of Consolidated Comprehensive Income (unaudited)

Three Months Ended September 30,Nine Months Ended September 30,
(in millions, net of taxes)2026202520262025
Net Income$139.0$107.0$732.1$734.2
Other comprehensive (loss) income:
Net unrealized (loss) gain on available-for-sale debt securities(1)(4.3)1.3(4.8)3.1
Reclassification adjustment for cash flow hedges(2)(0.1)(0.1)(0.3)(0.3)
Unrecognized pension and OPEB benefit (costs)(3)0.314.0(2.3)14.6
Total other comprehensive (loss) income(4.1)15.2(7.4)17.4
Comprehensive Income$134.9$122.2$724.7$751.6

(1)Net unrealized (loss) gain on available-for-sale debt securities, net of $1.2 million tax benefit and $0.3 million tax expense in the third quarter of 2026 and 2025, respectively, and net of $1.5 million tax benefit and $0.8 million tax expense for the nine months ended 2026 and 2025, respectively.

(2)Reclassification adjustment for cash flow hedges, net of zero tax benefit and $0.1 million tax benefit in the third quarter of 2026 and 2025, respectively, and net of $0.1 million tax benefit and $0.2 million tax benefit for the nine months ended 2026 and 2025, respectively.

(3)Unrecognized pension and OPEB benefit (costs), net of $0.1 million tax expense and $4.6 million tax expense in the third quarter of 2026 and 2025, respectively, and net of $1.5 million tax expense and $4.8 million tax expense for the nine months ended 2026 and 2025, respectively.

The accompanying Notes to Condensed Consolidated Financial Statements (unaudited) are an integral part of these statements.

Table of Contents

ITEM 1. FINANCIAL STATEMENTS (continued)

NiSource Inc.

Condensed Consolidated Balance Sheets (unaudited)

(in millions)September 30, 2026December 31, 2025
ASSETS
Property, Plant and Equipment
Plant$41,563.1$3

Showing the first 8K of 175K characters. Open the full section

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

NiSource Inc.

IndexPage
Executive Summary44
Summary of Consolidated Financial Results47
Results and Discussion of Segment Operations53
Columbia Operations54
NIPSCO Operations49
Liquidity and Capital Resources57
Regulatory, Environmental and Safety Matters62
Market Risk Disclosures65
Other Information66

Table of Contents

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (continued)

NiSource Inc.

EXECUTIVE SUMMARY

This Management's Discussion and Analysis of Financial Condition and Results of Operations ("Management’s Discussion") includes management’s analysis of past financial results and certain potential factors that may affect future results, potential future risks and approaches that may be used to manage those risks. See "Note regarding forward-looking statements" at the beginning of this report for a list of factors that may cause results to differ materially.

Management's Discussion is designed to provide an understanding of our operations and financial performance and should be read in conjunction with our Condensed Consolidated Financial Statements (unaudited) included in this report and our Annual Report on Form 10-K for the fiscal year ended December 31, 2025.

We are an energy holding company under the Public Utility Holding Company Act of 2005 whose primary subsidiaries are fully regulated natural gas and electric utility companies serving customers in six states. We generate substantially all of our operating income through these rate-regulated businesses, which are summarized for financial reporting purposes into two primary reportable segments: Columbia Operations and NIPSCO Operations. Refer to Note 16, "Business Segment Information," in the Notes to the Condensed Consolidated Financial Statements (unaudited) for further discussion of our business segments.

Our vision is to be a premier, innovative and trusted energy partner. We exist to deliver safe, reliable and competitive energy that drives value to our customers. In order to achieve this goal, we seek to develop strategies that benefit all stakeholders as we (i) support long-term infrastructure investment and safety programs to better serve our customers, (ii) align our tariff structures and regulatory programs with our cost structure, and (iii) create value and enable growth in an evolving energy ecosystem. These strategies focus on improving safety and reliability, enhancing customer experience, pursuing regulatory and legislative initiatives to increase accessibility for customers currently not on our gas and electric service, ensuring customer value and reducing emissions while generating sustainable returns. The safety of our customers, communities and employees remains our focus. Serving as a guiding practice for our SMS, NiSource is certified in conformance to the American Petroleum Institute Recommended Practice 1173, which is the foundation to our journey towards operational excellence.

Data Center Contracts and Strategy: NIPSCO recently entered into a data center contract with a new customer, Microsoft. Set forth below is a discussion of this new contract and other recent developments relating to our data center contracts and strategy. This discussion is supplemental to, and should be read in conjunction with, Part II Item 1A, "Risk Factors" of this report, as well as our Annual Report on Form 10-K for the fiscal year ended December 31, 2025, in particular Part II, Item 7, "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Executive Summary—ADS Contract and Data Center Strategy" and our Quarterly Reports on Form 10-Q for the quarters ended March 31, 2026 and June 30, 2026, in particular Part I, Item 2, "Management's Discussion and Analysis of Financial Condition and Results of Operations—Executive Summary—Data Center Contracts and Strategy" in each such report.

Microsoft Contract

In October 2026, NIPSCO entered into an agreement with Microsoft, which will be submitted to the IURC for approval, under which NIPSCO will provide capacity and electricity services to Microsoft’s data center facility to be located in NIPSCO’s service territory pursuant to a capacity commitment beginning in 2028 and increases to 788 MW commencing in 2031 (the “Microsoft Contract”). The initial term of the Microsoft Contract ends 20 years after the initial energization of Microsoft’s data center. Microsoft will make an initial capacity payment in 2026, and commencing in the second quarter of 2027 through the end of the initial term, Microsoft will pay monthly capacity charges that are based on negotiated rates and actual consumption (subject to specified minimum amounts throughout the initial term), together with certain pass-through charges and an existing system charge which will be used to pass savings back to existing electric customers. These charges are structured to provide us with a return of and on our invested capital over the twenty-year initial term. The Microsoft Contract contains provisions for adjustment of the capacity charge designed to provide us with an unlevered internal rate of return on our invested capital over the initial term within a defined range, which we expect over the life of the Microsoft Contract to result in an overall realized return greater than that of NIPSCO’s current electric operations, driven by execution and financing. Our realized overall return may be impacted by factors such as construction costs, operating performance, financing costs and other variables. Either party may terminate the Microsoft Contract upon certain defaults or failure to obtain necessary related approvals from the IURC and FERC. If the Microsoft Contract is terminated (other than as a result of default by NIPSCO), the customer is required to make

Table of Contents

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (continued)

NiSource Inc.

certain termination payments that we believe will be sufficient to reimburse us for our investment costs, and NIPSCO has certain obligations to mitigate.

The customer’s electricity supply under the Microsoft Contract will be provided through Pool Resource Assets. See “Data Center Strategy & Pool Resource Assets” below for additional information on our Pool Resource Assets model. NIPSCO will construct transmission infrastructure to connect Microsoft facilities to the grid. In addition, NIPSCO will enter into a PPA with GenCo in connection with the Microsoft Contract, which will be submitted to the IURC for approval.

Construction Update

GenCo continues to advance development of its new CCGT facility to support the ADS Contract. During the period, key project milestones included receipt of major permits, issuance of Full Notice to Proceed to our EPC contractor, continued engineering and procurement activit

Showing the first 8K of 106K characters. Open the full section

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Quantitative and qualitative disclosures about market risk are reported in Item 2, "Management's Discussion and Analysis of Financial Condition and Results of Operations - Market Risk Disclosures."

Item 4. CONTROLS AND PROCEDURES

Evaluation of Disclosure Controls and Procedures

Our chief executive officer and our chief financial officer are responsible for evaluating the effectiveness of our disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)). Our disclosure controls and procedures are designed to provide reasonable assurance that the information required to be disclosed by us in reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our chief executive officer and chief financial officer, as appropriate, to allow timely decisions regarding required disclosure and is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC. Based upon that evaluation, our chief executive officer and chief financial officer concluded that, as of the end of the period covered by this report, our disclosure controls and procedures were effective at a reasonable assurance level.

Changes in Internal Controls

There have been no changes in our internal control over financial reporting during the most recently completed quarter covered by this report that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Table of Contents

NiSource Inc.

PART II

ITEM 1. LEGAL PROCEEDINGS

For a description of our legal proceedings, see Note 14, "Other Commitments and Contingencies - B. Legal Proceedings," in the Notes to the Condensed Consolidated Financial Statements (unaudited).

ITEM 1A. RISK FACTORS

Please refer to the risk factors set forth in Part I, Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2025 (the “2025 Form 10-K”). Other than as set forth below, there have been no material changes to such risk factors. In connection with the additional data center contracts we have entered into since the fiscal year ended December 31, 2025 and developments in the data center industry generally since that time, we are providing updated risk factors relating to our data center operations and strategy risks, as set forth below. The following risk factors update and supersede the risk factors set forth under the heading “Data Center Operations and Strategy Risks” in Part I, Item 1A of our 2025 Form 10-K. For the avoidance of doubt, to the extent risk factors set forth in our 2025 Form 10-K contain cross-references to risk factors contained in the discussion of risks under the heading"Data Center Operations and Strategy Risks," such cross-references should be deemed to refer to the corresponding risk factors set forth below.

DATA CENTER OPERATIONS AND STRATEGY RISKS

Data center growth in our service territories, including a focus on northern Indiana, while providing growth opportunities that enhance our business strategy, provides significant financial, operational, and regulatory risks that must be effectively managed.

As we continue to evaluate new business opportunities presented by the data center development in our territories, including a focus on northern Indiana, we face a variety of challenges including accurately predicting future power needs of data centers due to rapidly changing technology and market dynamics, managing the potential power demand, generation sources, and transmission capabilities to meet potential load growth from any data center customer, financing the capital investment needed to build and maintain the necessary infrastructure to support data center development, obtaining permitting and siting approval for necessary infrastructure, managing the possible environmental impact of the potential increased power demand, and evaluating and complying with evolving regulations related to data center development.

Although the state legal and regulatory environment in Indiana is currently supportive of data center development, federal, state, and local governments are increasingly considering or adopting moratoria, permitting restrictions, reporting obligations, environmental and water-use standards, tax-incentive limitations, and other similar requirements applicable to data centers and other large electric loads. For example, in July and August 2026, the governors of New York and Texas implemented temporary moratoria restricting data center development in those states, and the governor of Pennsylvania issued an executive order placing significant constraints on data center development in that state. In addition, although at present NIPSCO’s service territory has not been significantly affected, a number of counties and municipalities in Indiana have passed or proposed moratoria or ordinances relating to data center development. If similar measures are adopted at a state level in Indiana or by counties or municipalities in NIPSCO’s service territory, or other jurisdictions in which we operate or may seek to develop generation or transmission assets, this could delay, condition, limit, or prevent the development of data center projects or related utility infrastructure, increase the cost of serving data center customers, or affect our ability to recover costs and earn expected returns. Even where such measures do not directly affect us or our service territories, they could reduce or redirect data center development activity (if such measures make our service territories less attractive for data center customers as compared to other jurisdictions), increase public and regulatory scrutiny of large-load service arrangements, and adversely affect the timing, scope, profitability, or viability of data center-related opportunities.

In addition, throughout the U.S., the data center industry has recently experienced numerous delayed, withdrawn or canceled projects as a result of permitting, financing, litigation, community opposition, water, air-quality, and other infrastructure constraints. These developments have affected data center projects announced by major hyperscaler companies, and they may make it more difficult for us to predict whether announced or anticipated data center load will materialize, when such load will commence, and whether customers will require the full amount of capacity initially expected.

Our Current Data Center Contracts require us to invest significant capital to develop generation sources and transmission capabilities before we receive the full return of on the capital invested, and it is likely that any future data center contracts we enter into similarly will require significant investment before receiving returns. Although our Current Data Center Contracts provide cost recovery mechanisms and termination payments, if our data center customers delay, reduce, cancel, or relocate their projects after we have incurred development, financing, procurement, construction, or other costs, we may be unable to

Table of Contents

ITEM 1A. RISK FACTORS

NiSource Inc.

fully recover those costs, redeploy related assets, or earn our expected return, which could adversely affect our results of operations, cash flows, financial condition, credit metrics, and reputation.

For the reasons described above, among others, we face challenges in predicting the demand of potential data center customers in our service territories. It is possible that we may overestimate such demand, causing us to invest in generation and transmission assets in excess of those needed to serve data center customers. If we are not able to utilize such assets to serve other customers, this could negatively affect our reputation, cash flows, financial position and/or results of operations. We also may underestimate the potential demand of data center customers, in which case we may not be able to develop necessary generation and transmission assets within a timeframe that is acceptable to potential customers, resulting in the loss of potentially profitable opportunities. We must effectively manage these financial, operational and regulatory risks.

Our construction of the generation and transmission assets we develop to support our current and any future data center contracts involves significant risks. In addition, we are reliant on third parties to construct certain capacity resources related to our capacity agreements (such as ESAs, tolling agreements or similar agreements) that we expect to rely on for capacity to serve our data center customers. Construction delays, cost overruns or performance issues with any such assets could reduce our returns under our Current Data Center Contracts or other future data center contracts and could require us to obtain additional financing.

In connection with our Current Data Center Contracts and any future data center contracts, we expect to construct significant generation and transmission assets. Our ability to construct such assets in a timely manner and within budget is contingent upon many variables and subject to substantial risks. See Part I, Item 1A, "Risk Factors—Operational Risks—Our capital projects and programs subject us to construction and supply risks, and are subject to regulatory oversight, including requirements for permits, approvals and certificates from various governmental agencies” of our Annual Report on Form 10-K for the fiscal year ended December 31, 2025 for additional information. In addition to the factors discussed therein, the construction of generation, transmission, interconnection, and related infrastructure required to serve data center customers depends on the timely availability of specialized equipment and materials, including natural gas turbines, transformers, substation equipment, transmission equipment, batteries, battery components, critical minerals, steel, copper, and other grid equipment. Market-wide demand from data centers, utilities, industrial electrification, renewable generation, and other infrastructure projects has contributed to extended lead times, cost increases, and limited production slots for key equipment. Tariffs, trade remedies, forced-labor enforcement, critical-mineral restrictions, geopolitical developments, and dependence on foreign supply chains may further increase costs, delay procurement, or limit availability of battery energy storage components, batteries, processed minerals, and other materials required for our projects. Moreover, any federal, state, or local legal or regulatory developments directly affecting us or our service territory could adversely affect our ability to construct the generation and transmission assets required to serve our customers in a timely manner and within budget.

Our return under our Current Data Center Contracts will be, and our return under any future data center contracts is expected to be, affected by our ability to construct, develop and place into service these assets on time or at all and consistent with initial cost estimates, as well as the performance of these assets once constructed and placed into service. Under certain of our Current Data Center Contracts, if the applicable generation and transmission assets our subsidiaries have undertaken to construct are delivered into service late or do not achieve certain other performance-related milestones, our counterparties would be entitled to liquidated damages, which would be offset against NIPSCO’s billings to its customers and reduce the rate of return earned under the applicable Data Center Contract. In addition, our actual costs to construct such generation and transmission assets may exceed the budgets contemplated by the applicable Data Center Contract, which could result from delays in construction or from other factors. For example, the target cost and project scope and schedule under our F-Frames EPC Contract are subject to change, and the target cost and schedule may exceed the amount and time initially planned for construction of the F-Frames CTs. Cost overruns in connection with any of the generation and transmission assets we develop to support our current and any future data center customers will need to be funded initially by us, either through our cash flows from operating activities or additional debt or equity financing. Although our ADS EPC Contracts and F-Frames EPC Contract provide certain protections against cost overruns under those contracts, and our Current Data Center Contracts provide certain protections against any excess costs not recoverable through the applicable EPC contracts, any recoveries from our EPC contractors and/or our data center customers would occur over an extended period of time (and may be subject to contractual dispute resolution frameworks). The need for us to fund these expenses in the first instance may reduce our ability to use our operating cash flows for other purposes or may require us to obtain additional debt or equity financing, which may not be available on favorable terms or at all. These costs, if incurred, could negatively impact our return under our Current Data Center Contracts or adversely affect our future results and financial condition. In addition, we expect that construction delays, performance shortfalls or cost overruns in connection with construction of generation and transmission assets supporting any future data center contracts could similarly have a negative effect on our return under such contracts and our financial condition.

In addition, certain of the capacity agreements we have entered into with third parties to provide capacity for our data center customers will be served by capacity resources to be constructed by the counterparties to these agreements. We will be reliant

Table of Contents

ITEM 1A. RISK FACTORS

NiSource Inc.

on these third parties to construct these capacity resources effectively and on time, which may be subject to uncertainty. For example, AGP, which has agreed to develop and operate a 600 MWAC / 2,400 MWh stand-alone battery energy storage system under a tolling agreement, is a special purpose entity that will be required to provide certain credit support and will be required to obtain project financing to complete the project. It is expected that AGP’s assets relating to the project will be subject to security interests in favor of AGP’s financing counterparties. In order to perform under the tolling agreement, AGP also must obtain a satisfactory interconnection agreement and execute an EPC agreement. Although our capacity agreements generally entitle us to certain compensation if our counterparties fail to perform, our ability to recover compensation from our counterparties will depend on their financial strength and the existence of any competing claims on our counterparties’ assets (among other factors) and could take significant time to enforce (especially if disputes arise). A default by one of our counterparties under our capacity agreements could require us to obtain replacement capacity, which may take the form of market capacity purchases and/or bilateral capacity agreements, either of which may not may not be available on favorable terms, and may impair our performance under our Current Data Center Contracts, any of which could negatively impact our return under our Current Data Center Contracts or adversely affect our future results and financial condition.

We will be required to obtain significant additional financing in order to construct the generation or transmission assets we develop to support current and any future data center contracts. Such financing may not be available on favorable terms, if at all.

In order to finance the construction of the generation and transmission assets we develop to support our current and any future data center contracts, we expect to incur significant additional long-term debt and issue additional equity in NiSource, in addition to the financing we otherwise would seek to support investments in our existing businesses and refinance existing indebtedness. The NIPSCO Holdings II LLC Agreement and Generation Holdings II LLC Agreement will allow for additional capital contributions from affiliates of Blackstone to NIPSCO Holdings II and Generation Holdings II in connection with such Blackstone affiliates’ minority interest investments in those entities. In addition, we may consider other funding sources, structures, or partnerships such as JVs or off-balance sheet arrangements such as BTAs, as market conditions and strategic considerations evolve, or as may be necessary to support maintenance of our investment grade credit ratings. The amount of additional long-term debt or NiSource equity needed to support construction of the generation and transmission assets we develop to support our current and any future data center contracts could increase, potentially significantly, from our current expectations if we experience construction delays or cost overruns.

External factors such as inflation, monetary policy or other market conditions could impact our cost of borrowing and could make it more difficult to obtain the financing that is required to construct the generation and transmission assets we develop to support our current and any future data center contracts on favorable terms, or at all. The issuance of additional debt could negatively impact our credit ratings and overall cost of capital, which could in turn adversely affect our future results and liquidity. In addition, an economic downturn or uncertainty, market turmoil, changes in interest rates, changes in tax policy, challenges faced by financial institutions, or any negative investor sentiment toward us or the utilities industry or the cloud-computing, artificial intelligence and data center industry generally could adversely affect our ability to raise the necessary capital. For example, major cloud computing and artificial intelligence companies have announced raising hundreds of billions of dollars in debt and equity financing in 2026 and are expected to raise significant additional financing in connection with their planned capital expenditures in the coming years, which have been reported to exceed a trillion dollars. If investors’ perceived risk of investing in cloud computing and/or artificial intelligence infrastructure increases, or if investors seek to limit their exposure to these industries for any other reasons, investors may be less willing to invest in our debt and equity securities to the extent our operations are perceived as being related to the cloud computing and/or artificial intelligence industries. Reduced access to capital markets, increased borrowing costs, and/or lower equity valuation levels could jeopardize our ability to complete construction of the generation and transmission assets we develop to support our current and any future data center contracts on-time and within budget, and could reduce future earnings per share and cash flows. In addition, any rise in interest rates may lead to higher borrowing costs, which may adversely impact reported earnings, cost of capital and capital holdings.

Pursuit of our partnerships with our data center customers creates significant opportunity costs and reduces our strategic and financial flexibility in the near term.

We expect to incur significant indebtedness to fund our construction of the generation and transmission assets we develop to support our current and any future data center contracts. Doing so will reduce our ability to incur further indebtedness to pursue other strategic opportunities, such as partnerships with other large data center customers or strategic mergers and acquisitions, while at the same time maintaining our investment grade credit ratings, which may require us to rely to a greater degree on equity financing in connection with future data center contracts and also may increase our reliance on equity financing for future investments in our existing traditionally regulated utility business, each of which could lead to substantial dilution of our existing shareholders. In addition, our credit rating agencies consider the percentage of our business comprised of traditionally regulated utility operations in their analysis of our credit quality and determination of our downgrade thresholds.

Table of Contents

Item 1A. RISK FACTORS

NiSource Inc.

In addition to these factors relating to our financing and credit ratings, our partnerships with our data center customers are expected to employ a significant amount of our existing excess transmission infrastructure, which will limit our ability to use these assets for other opportunities, including additional data center opportunities. Furthermore, effectively overseeing the construction and financing of the generation and transmission assets we develop to support our current and any future data center contracts has required and will continue to require significant time and attention of our management, which could detract from their oversight of our existing business and ability to pursue other strategic opportunities.

The return structure and risk profile of our Current Data Center Contracts and any future data center contracts will differ from those of NIPSCO’s traditionally regulated utility operations.

NIPSCO’s and GenCo’s operations under our Current Data Center Contracts will be, and under future data center contracts are expected to be, regulated by the IURC in a different way from the regulatory mechanisms applicable to NIPSCO’s historical operations, which affects the manner in which we recover our investment costs and earn a return on our investment. NIPSCO’s electric utility rates historically have been determined and approved in regulatory proceedings with the IURC based on an analysis of NIPSCO’s costs to provide utility service and a return on, and recovery of, NIPSCO’s investment in the utility business. Through the IURC rate-making process, retail rates may be adjusted over time, and NIPSCO may request additional revenue, in order to cover ongoing costs and investment and earn an adequate return.

In contrast, the terms of our Data Center Contracts were, and the terms of any future contracts with other data center customers are expected to be, determined through commercial negotiations. In the case of our Current Data Center Contracts, these terms include the charges that we receive from our data center customers, which are designed to allow us to recover the costs that we incur to construct and operate the generation and transmission assets we develop to support our current and any future data center contracts and otherwise to secure the capacity needed to serve these customers (including through capacity agreements such as PPAs, ESAs and tolling agreements) and earn a return, and provisions that may result in adjustments to those charges such as, among other factors, those relating to certain liquidated damages that we may owe certain of our data center customers in the event of construction delays or capacity shortfalls and the parties’ responsibility to share or pay for cost overruns, among other provisions. Although the terms of any future data center contracts we enter into may differ in certain respects from the terms of our Current Data Center Contracts, the terms of any future data center contracts (including the charges we receive from customers and any potential adjustments to such charges) will inform our ability to recover our investments and earn a return. These terms of our Current Data Center Contracts do not, and the terms of any future data center contract are not expected to, guarantee a specific overall rate of return, and the overall return we earn under our Current Data Center Contracts or any future data center contracts may ultimately be lower than that of NIPSCO’s traditional utility operations. The IURC has not and will not determine the commercial terms of our Current Data Center Contracts or any future data center contracts; however, the IURC is expected to maintain oversight under our Current Data Center Contracts and any future data center contracts to ensure NIPSCO provides reliable service to our data center customers and any future data center customers at just and reasonable rates. In order to recover our investment costs and earn our return under our Current Data Center Contracts and any future data center contracts, our subsidiaries must efficiently perform their own obligations and must look to our existing and any future data center customers (or, if applicable, any parent guarantor) to perform their obligations, rather than the IURC making use of its traditional rate-making process. In addition, under our Current Data Center Contracts, NIPSCO has direct contractual obligations to its data center customers to, among other things, construct certain generation and transmission assets to support our current data center customers and deliver committed electric capacity in fixed amounts by certain dates. We expect our subsidiaries to have comparable contractual obligations to customers in connection with any future data center contracts. If disputes arise with data center customers regarding provisions of a data center contract or payments to be made or actions to be taken thereunder, we may be significantly disadvantaged as a result of, among other factors, the significance of such contracts to us and the greater resources (financial and otherwise) available to the relevant customer. Any dispute or litigation with a data center customer could create significant demands on the attention of management and result in significant costs to us.

In addition, the IURC, through its review and approval of our Current Data Center Contracts and any future data center contracts, and the related PPAs between NIPSCO and GenCo, will have ultimate authority over the implementation of these agreements. In this context, we will need to continuously assess the applicability of ASC Topic 980 over the life of our Current Data Center Contracts and future data center contracts. It is possible that significant construction overruns, capacity shortfalls or other events that could result in NIPSCO or GenCo owing liquidated damages under our Current Data Center Contracts or any future data center contract could either preclude ongoing application of ASC Topic 980 or result in an immediate disallowance and impairment of the applicable generation and transmission assets we have developed to support the applicable data center contracts. In addition, early termination of a Data Center Contract or any future data center contract, as applicable, could result in such impairment and discontinuation of application of ASC Topic 980 with respect to the assets being constructed to serve the applicable data center contract, unless such assets can be used to support new or existing customers. If we incur significant costs that we are not able to recover from our current or any future data center customers (for example, greater than expected purchases of market capacity or operations and maintenance costs significantly exceeding those contemplated by an applicable

Table of Contents

ITEM 1A. RISK FACTORS

NiSource Inc.

current or future data center contract), this also could discontinue the application of ASC Topic 980 to the applicable data center contract and related generation and transmission assets.

Our partnerships with our data center customers expose us to significant customer and industry concentration risk.

Our three existing data center customers will be significant customers of our electric utility operations. For example, at full ramp (expected in 2032), we expect to employ approximately 4,920MW of capacity (representing the generation resources we plan to construct, combined with contracted capacity) to serve our existing data center customers. By comparison, as of December 31, 2025, we owned generating resources representing approximately 3,967 MW of capacity and had PPAs providing for approximately 1,200 MW of capacity.

Although we anticipate expanding our base of data center customers, we expect the total number of data center customers we serve to remain relatively small by comparison to our current customer base. The concentration of business with a small number of customers in a single industry based on emerging technologies, including artificial intelligence and machine learning, presents several risks for us. Our data center customers’ technologies and their related business applications have developed rapidly in recent years and continue to develop. In addition, our customers’ data center and cloud computing businesses may themselves serve concentrated customers, such as “frontier” artificial intelligence companies, which may have developing and uncertain business models. We cannot predict the rate at which or the extent to which these emerging technologies will be broadly adopted or successful as business models. It is possible our customers will reduce their investment in these new technologies or abandon them entirely. Many factors, including those outside our and our customers’ control, could contribute to such a decision, including, for example: (i) any decrease or lessening of current cloud-computing or artificial intelligence demand trends, (ii) reports of significant financial or business difficulties at a “frontier” artificial intelligence company, (iii) adverse legal or regulatory developments (in Northern Indiana or elsewhere) with respect to data centers, cloud-computing or artificial intelligence, which could result, for example, from concerns with respect to the safety of artificial intelligence (which have led to recent statements and proposals from U.S. federal lawmakers calling for federal oversight and pauses in development of artificial intelligence models), environmental concerns (such as those relating to the sourcing of natural gas to power data centers or supplying water from local resources to cool data centers), or other factors, and which could negatively impact the demand for data centers, and (iv) any business downturns or weakening financial condition that our data center customers may experience (whether or not resulting from the foregoing factors). In addition, even if our data center customers do not decide to reduce or abandon their investments in data center technologies, it is possible they may seek to reduce or end their relationship with us. This could occur if, among other potential causes: (i) we experience construction delays, cost overruns or capacity shortfalls in connection with our construction of the generation and transmission assets we plan to construct to serve our data center customers, (ii) our data center customers encounter similar problems connection with constructing their data centers that we will serve, (iii) technological or other advances relating to the design and operation of data centers reduce the amount of electricity needed to power data centers (which reduction could be significant) or (iv) competing energy technologies that we are not able to offer become a preferred source of energy for powering data centers.

If, for any reason, one or more of our customers decide to reduce their investments in data centers generally or to reduce or end their relationship with us, it is possible such customer(s) could default under its contract with us. Our Current Data Center Contracts contain protections in the event of a customer default, including required termination payments designed to reimburse us for our costs related to the applicable data center contract and provide a return. However, it is possible disputes may arise in connection with termination payments. For example, a data center customer may dispute the existence of a customer default or the amount of a termination payment, or may assert that we are in default, among other tactics. If this were to occur, we may be significantly disadvantaged as a result of, among other factors, the significance of the applicable data center contract to us and the greater resources (financial and otherwise) available to the relevant customer.

In addition, ADS has the right to terminate the ADS Contract for convenience following certain notice periods and has a one-time option (exercisable no later than March 31, 2029) to reduce committed capacity under the ADS Contract by 1,200 MW commencing January 31, 2032. If ADS elects to terminate the ADS Contract during its initial term or reduce the committed capacity under the ADS Contract, we may not receive the full earnings we expect to receive over the life of the ADS Contract. Although the ADS Contract provides for reimbursement for our investment in the Contract Assets and related expenses in the event of a reduction in the committed capacity or early termination, the amount of any reimbursement is capped under the ADS Contract, with the amount of the caps being based on cost estimates determined as of signing. Furthermore, our ability to collect any reimbursable amounts will depend upon the willingness and ability of ADS or its parent guarantor to satisfy their payment obligations under the ADS Contract and related guarantee. Accordingly, we may not be able to recover our full investment, which may adversely affect our future results and financial condition.

Any future data center contracts our subsidiaries enter into may contain termination and/or capacity reduction provisions (which we expect would be accompanied by related reimbursement provisions), which would expose us to risks comparable to those described above.

Table of Contents

ITEM 1A. RISK FACTORS

NiSource Inc.

If any of our data center customers defaults under, terminates or reduces capacity under its data center contract, we may not be able to replace such customer’s demand or otherwise fully utilize the assets constructed in connection with the such contract. We also may not receive the same level of return with respect to any alternative use of the assets we have constructed or contracted for to serve such customers. Any of such could adversely affect our future results, financial conditions and results of operations (the significance of which effect will be affected by the relative size of such contract and the costs we have incurred to develop resources supporting such contract).

In addition, as a result of our Current Data Center Contracts, and any further agreements we may sign with data center companies, our stock price may experience increased volatility as a result of factors outside our control. For example, our stock price may be negatively affected as a result of any actual or perceived slowdown in the adoption of artificial intelligence technology, the regulation or proposed regulation of such technology, or actual or perceived changes in the strategic or financial position of our data center customers, or “frontier” artificial intelligence companies more generally. The trading prices for shares of stock in a number of U.S. public companies operating or serving data centers have recently experienced significant volatility.

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

None.

ITEM 3. DEFAULTS UPON SENIOR SECURITIES

None.

ITEM 4. MINE SAFETY DISCLOSURES

Not applicable.

Item 5. OTHER INFORMATION

Director and Officer Trading Arrangements

During the quarter ended September 30, 2026, none of our directors or executive officers adopted or terminated a Rule 10b5-1 trading plan or adopted or terminated a non-Rule 10b5-1 trading arrangement (as defined in Item 408(c) of Regulation S-K).

Table of Contents

Item 6. EXHIBITS

NiSource Inc.

(4.1)Fourth Supplemental Indenture, dated as of August 18, 2026, between NiSource Inc. and The Bank of New York Mellon, as trustee (incorporated by reference to Exhibit 4.1 to the NiSource Inc. Form 8-K filed on August 18, 2026).
(4.2)Form of 6.250% Fixed-to-Fixed Reset Junior Subordinated Notes due 2057 (incorporated by reference to Exhibit 4.2 to the NiSource Inc. Form 8-K filed on August 18, 2026).
(31.1)Certification of Chief Executive Officer pursuant to Rule 13a-14(a)/15d-14(a), as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.*
(31.2)Certification of Chief Financial Officer pursuant to Rule 13a-14(a)/15d-14(a), as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.*
(32.1)Certification of Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).*
(32.2)Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 (furnished herewith).*
(101.INS)Inline XBRL Instance Document - the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
(101.SCH)Inline XBRL Schema Document
(101.CAL)Inline XBRL Calculation Linkbase Document
(101.LAB)Inline XBRL Labels Linkbase Document
(101.PRE)Inline XBRL Presentation Linkbase Document
(101.DEF)Inline XBRL Definition Linkbase Document
(104)Cover page Interactive Data File (formatted as inline XBRL, and contained in Exhibit 101.)
*Exhibit filed herewith.
**Schedules and similar attachments to this Exhibit have been omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company agrees to furnish supplementally a copy of any omitted schedule or exhibit to the U.S. Securities and Exchange Commission (the “SEC”) upon request

Table of Contents

SIGNATURE

NiSource Inc.

Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

NiSource Inc.
(Registrant)
Date:October 28, 2026By:/s/ Gunnar J. Gode
Gunnar J. Gode
Senior Vice President, Chief Accounting and Tax Officer (Principal Accounting Officer)