(Mark One)
☒ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the Fiscal Year Ended December 31, 2019
☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from _________ to ___________
Commission File NumberExact Name of Registrant as Specified In Its CharterState or Other Jurisdiction of Incorporation or OrganizationIRS Employer Identification Number
1-12609PG&E CORPORATIONCalifornia94-3234914
1-2348PACIFIC GAS AND ELECTRIC COMPANYCalifornia94-0742640
pcg-20191231_g1.jpgpcg-20191231_g2.jpg
77 Beale Street77 Beale Street
P.O. Box 770000P.O. Box 770000
San Francisco,California94117San Francisco,California94117
(Address of principal executive offices) (Zip Code)(Address of principal executive offices) (Zip Code)
415973-1000415973-1000
(Registrant’s telephone number, including area code)(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
Title of each classTrading Symbol(s)Name of each exchange on which registered
Common stock, no par valuePCGThe New York Stock Exchange
First preferred stock, cumulative, par value $25 per share, 5% series A redeemablePCG-PENYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% redeemablePCG-PDNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.80% redeemablePCG-PGNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.50% redeemablePCG-PHNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 4.36% series A redeemablePCG-PINYSE American LLC
First preferred stock, cumulative, par value $25 per share, 6% nonredeemablePCG-PANYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5.50% nonredeemablePCG-PBNYSE American LLC
First preferred stock, cumulative, par value $25 per share, 5% nonredeemablePCG-PCNYSE American LLC

Securities registered pursuant to Section 12(g) of the Act: none

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act:
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act:
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
PG&E Corporation:☒Yes☐No
Pacific Gas and Electric Company:☒Yes☐No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company (as defined in Rule 12b-2 of the Exchange Act). (Check one):
PG&E CorporationPacific Gas and Electric Company
☒Large accelerated filer☐Large accelerated filer
☐Non-accelerated filer☒Non-accelerated filer
☐Smaller reporting company☐Smaller reporting company
☐Accelerated filer☐Accelerated filer
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
PG&E Corporation:☐
Pacific Gas and Electric Company:☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Indicate by check mark whether the registrant has filed all documents and reports required to be filed by Section 12, 13 or 15(d) of the Securities Exchange Act of 1934 subsequent to the distribution of securities under a plan confirmed by a court.
PG&E Corporation:☐Yes☒No
Pacific Gas and Electric Company:☐Yes☒No
Aggregate market value of voting and non-voting common equity held by non-affiliates of the registrants as of June 30, 2019, the last business day of the most recently completed second fiscal quarter:
PG&E Corporation common stock$12,130 million
Pacific Gas and Electric Company common stockWholly owned by PG&E Corporation
Common Stock outstanding as of February 13, 2020:
PG&E Corporation:529,254,082shares
Pacific Gas and Electric Company:264,374,809shares (wholly owned by PG&E Corporation)

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the documents listed below have been incorporated by reference into the indicated parts of this report, as specified in the responses to the item numbers involved:

Designated portions of the Joint Proxy Statement relating to the 2020 Annual Meetings of ShareholdersPart III (Items 10, 11, 12, 13 and 14)

Contents

UNITS OF MEASUREMENT
GLOSSARY
FORWARD-LOOKING STATEMENTS
PART 1
ITEM 1. BUSINESS
Regulatory Environment
Ratemaking Mechanisms
Electric Utility Operations
Natural Gas Utility Operations
Competition
Environmental Regulation
ITEM 1A. RISK FACTORS
ITEM 1B. UNRESOLVED STAFF COMMENTS
ITEM 2. PROPERTIES
ITEM 3. LEGAL PROCEEDINGS
ITEM 4. MINE SAFETY DISCLOSURES
EXECUTIVE OFFICERS OF THE REGISTRANTS
PART II
ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED SHAREHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES
ITEM 6. SELECTED FINANCIAL DATA
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
OVERVIEW
RESULTS OF OPERATIONS
LIQUIDITY AND FINANCIAL RESOURCES
CONTRACTUAL COMMITMENTS
ENFORCEMENT AND LITIGATION MATTERS
REGULATORY MATTERS
LEGISLATIVE AND REGULATORY INITIATIVES
ENVIRONMENTAL MATTERS
RISK MANAGEMENT ACTIVITIES
CRITICAL ACCOUNTING POLICIES
NEW ACCOUNTING PRONOUNCEMENTS
ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
PG&E Corporation
CONSOLIDATED STATEMENTS OF INCOME
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONSOLIDATED BALANCE SHEETS
CONSOLIDATED STATEMENTS OF CASH FLOWS
CONSOLIDATED STATEMENTS OF EQUITY
Pacific Gas and Electric Company
CONSOLIDATED STATEMENTS OF INCOME
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
CONSOLIDATED BALANCE SHEETS
CONSOLIDATED STATEMENTS OF CASH FLOWS
CONSOLIDATED STATEMENTS OF SHAREHOLDERS’ EQUITY
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
NOTE 1: ORGANIZATION AND BASIS OF PRESENTATION
NOTE 2: BANKRUPTCY FILING
NOTE 3: SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
NOTE 4: REGULATORY ASSETS, LIABILITIES, AND BALANCING ACCOUNTS
NOTE 5: DEBT
NOTE 6: COMMON STOCK AND SHARE-BASED COMPENSATION
NOTE 7: PREFERRED STOCK
NOTE 8: EARNINGS PER SHARE
NOTE 9: INCOME TAXES
NOTE 10: DERIVATIVES
NOTE 11: FAIR VALUE MEASUREMENTS
NOTE 12: EMPLOYEE BENEFIT PLANS
NOTE 13: RELATED PARTY AGREEMENTS AND TRANSACTIONS
NOTE 14: WILDFIRE-RELATED CONTINGENCIES
NOTE 15: OTHER CONTINGENCIES AND COMMITMENTS
QUARTERLY CONSOLIDATED FINANCIAL DATA (UNAUDITED)
MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
ITEM 9A. CONTROLS AND PROCEDURES
ITEM 9B. OTHER INFORMATION
PART III
ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
ITEM 11. EXECUTIVE COMPENSATION
ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
PART IV
ITEM 15. EXHIBITS AND FINANCIAL STATEMENT SCHEDULES
EXHIBIT INDEX
ITEM 16. FORM 10-K SUMMARY
SIGNATURES

UNITS OF MEASUREMENT

1 Kilowatt (kW)=One thousand watts
1 Kilowatt-Hour (kWh)=One kilowatt continuously for one hour
1 Megawatt (MW)=One thousand kilowatts
1 Megawatt-Hour (MWh)=One megawatt continuously for one hour
1 Gigawatt (GW)=One million kilowatts
1 Gigawatt-Hour (GWh)=One gigawatt continuously for one hour
1 Kilovolt (kV)=One thousand volts
1 MVA=One megavolt ampere
1 Mcf=One thousand cubic feet
1 MMcf=One million cubic feet
1 Bcf=One billion cubic feet
1 MDth=One thousand decatherms

GLOSSARY

The following terms and abbreviations appearing in the text of this report have the meanings indicated below.

2019 Form 10-KPG&E Corporation’s and Pacific Gas and Electric Company’s combined Annual Report on Form 10-K for the year ended December 31, 2019
2019 Wildfire Mitigation Planthe wildfire mitigation plan for 2019 submitted by the Utility to the CPUC pursuant to SB 901, previously also referred to as the “2019 Wildfire Safety Plan”
ABAssembly Bill
ALJadministrative law judge
ARAMaverage rate assumption method
AROasset retirement obligation
ASUaccounting standard update issued by the FASB (see below)
Backstop Partya third-party investor party to a Backstop Commitment Letter
Bankruptcy Codethe United States Bankruptcy Code
Bankruptcy Courtthe U.S. Bankruptcy Court for the Northern District of California
BPPbundled procurement plan
CAISOCalifornia Independent System Operator
Cal FireCalifornia Department of Forestry and Fire Protection
CARBCalifornia Air Resources Board
CCACommunity Choice Aggregator
CCPACalifornia Consumer Privacy Act of 2018
CECCalifornia Energy Resources Conservation and Development Commission
CEMACatastrophic Event Memorandum Account
Chapter 11chapter 11 of title 11 of the U.S. Code
Chapter 11 Casesthe voluntary cases commenced by each of PG&E Corporation and the Utility under Chapter 11 on January 29, 2019
CHTCustomer Harm Threshold
CPUCCalifornia Public Utilities Commission
CRRscongestion revenue rights
CUECoalition of California Utility Employees
CWSPCommunity Wildfire Safety Program
DADirect Access
DERdistributed energy resources
Diablo CanyonDiablo Canyon nuclear power plant
DIP Credit AgreementSenior Secured Superpriority Debtor in Possession Credit, Guaranty and Security Agreement, dated as of February 1, 2019, among the Utility, as borrower, PG&E Corporation, as guarantor, JPMorgan Chase Bank, N.A., as administrative agent, and Citibank, N.A., as collateral agent
DOEU.S. Department of Energy
DRPDistribution Resource Plan
DTSCDepartment of Toxic Substances Control
EIMEnergy Imbalance Market
Effective Datethe effective date of the Proposed Plan
EPAU.S. Environmental Protection Agency
EPSearnings per common share
EVelectric vehicle
EVMenhanced vegetation management
FASBFinancial Accounting Standards Board
FEMAFederal Emergency Management Agency
FERCFederal Energy Regulatory Commission
FHPMAFire Hazard Prevention Memorandum Account
Fire Victim TrustA trust to be established pursuant to the Proposed Plan for the benefit of holders of the fire victim claims, as defined in Note 14 of the Notes to the Consolidated Financial Statements in Item 8
FRMMAFire Risk Mitigation Memorandum Account
GAAPU.S. Generally Accepted Accounting Principles
GHGgreenhouse gas
GRCgeneral rate case
GT&Sgas transmission and storage
HSMhazardous substance memorandum account
IOUsinvestor-owned utility(ies)
LCCLand Conservation Commitment
LIBORLondon Interbank Offered Rate
LSTCliabilities subject to compromise
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations set forth in Part II, Item 7, of this Form 10-K
MGP(s)manufactured gas plants
the Monitorthird-party monitor retained as part of its compliance with the sentencing terms of the Utility’s January 27, 2017 federal criminal conviction
NAVnet asset value
NDCTPNuclear Decommissioning Cost Triennial Proceedings
NDTDiablo Canyon Nuclear Decommissioning Trust
NEILNuclear Electric Insurance Limited
NEMnet energy metering
Noteholder RSARestructuring Support Agreement dated as of January 22, 2020 with certain holders of indebtedness of the Utility, among others
NRCNuclear Regulatory Commission
OESState of California Office of Emergency Services
OIIorder instituting investigation
OIRorder instituting rulemaking
OSAOffice of the Safety Advocate, a division of the CPUC
PAOPublic Advocates Office of the California Public Utilities Commission (formerly known as Office of Ratepayer Advocates or ORA)
PCIAPower Charge Indifference Adjustment
PDproposed decision
Petition DateJanuary 29, 2019
PFMpetition for modification
Proposed PlanPlan of Reorganization, as defined in Note 2 of the Notes to the Consolidated Financial Statements in Item 8
PSAplan support agreement
PSPSPublic Safety Power Shutoff
RAMPRisk Assessment Mitigation Phase
ROEreturn on equity
ROU assetright-of-use asset
RPSrenewable portfolio standard
RSArestructuring support agreement
SBSenate Bill
SECU.S. Securities and Exchange Commission
SEDSafety and Enforcement Division of the CPUC
Subrogation RSARestructuring Support Agreement dated September 22, 2019 with certain holders of insurance subrogation claims, as amended
Tax ActTax Cuts and Jobs Act of 2017
TCCOfficial Committee of Tort Claimants
TCC RSARestructuring Support Agreement dated December 6, 2019 with the TCC and attorneys and other advisors and agents for certain holders of Fire Victim Claims (as defined therein), as amended
TEtransportation electrification
TOtransmission owner
TURNThe Utility Reform Network
UCCOfficial Committee of Unsecured Creditors
USAOUnited States Attorney’s Office for the Northern District of California
UtilityPacific Gas and Electric Company
VIE(s)variable interest entity(ies)
VMvegetation management
WEMAWildfire Expense Memorandum Account
Wildfire Assistance Fundprogram designed to assist those displaced by the 2018 Camp fire and 2017 Northern California wildfires with the costs of temporary housing and other urgent needs
Wildfire Fundstatewide fund established by AB 1054 that will be available for eligible electric utility companies to pay eligible claims for liabilities arising from wildfires occurring after July 12, 2019 that are caused by the applicable electric utility company’s equipment
Wildfires OIIOrder Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire
WMPwildfire mitigation plan
WMPMAWildfire Mitigation Plan Memorandum Account

FORWARD-LOOKING STATEMENTS

This report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management’s judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the date of this report. These forward-looking statements relate to, among other matters, estimated losses, including penalties and fines, associated with various investigations and proceedings; forecasts of capital expenditures; estimates and assumptions used in critical accounting policies, including those relating to liabilities subject to compromise, insurance receivable, regulatory assets and liabilities, environmental remediation, litigation, third-party claims, and other liabilities; and the level of future equity or debt issuances. These statements are also identified by words such as “assume,” “expect,” “intend,” “forecast,” “plan,” “project,” “believe,” “estimate,” “predict,” “anticipate,” “may,” “should,” “would,” “could,” “potential” and similar expressions. PG&E Corporation and the Utility are not able to predict all the factors that may affect future results. Some of the factors that could cause future results to differ materially from those expressed or implied by the forward-looking statements, or from historical results, include, but are not limited to:

  • the risks and uncertainties associated with the Chapter 11 Cases, including, but not limited to, the ability to develop, consummate, and implement a plan of reorganization with respect to PG&E Corporation and the Utility that satisfies all applicable legal requirements; the ability to obtain applicable Bankruptcy Court, creditor or state or federal regulatory approvals; the effect of any alternative proposals, views or objections related to the plan of reorganization; potential complexities that may arise in connection with concurrent proceedings involving the Bankruptcy Court, the CPUC, and the FERC; increased costs related to the Chapter 11 Cases; the ability to obtain sufficient financing sources for ongoing and future operations and investment; the ability to satisfy the conditions precedent to financing under the Backstop Commitment Letters and the Debt Commitment Letters and the risk that such agreements may be terminated; the risk that the Noteholder RSA, the Subrogation RSA, the TCC RSA or the PSAs could be terminated; disruptions to PG&E Corporation’s and the Utility’s business and operations and the potential impact on regulatory compliance;

  • whether, PG&E Corporation and the Utility will be able to emerge from Chapter 11 by June 30, 2020 with a plan of reorganization that is deemed to meet the requirements of AB 1054, and whether PG&E Corporation and the Utility will need to undertake significant changes in ownership, management and governance in connection therewith;

  • if the Proposed Plan is determined not to meet the requirements of AB 1054 or the Utility does not otherwise participate in the Wildfire Fund under AB 1054, it could result in a significant delay in emergence from bankruptcy, as PG&E Corporation and the Utility may be required to make material modifications or amendments to their Proposed Plan, to develop and consummate a new consensual plan of reorganization or engage in a contested proceeding;

  • restrictions on PG&E Corporation’s and the Utility’s ability to pursue strategic and operational initiatives for the duration of the Chapter 11 Cases;

  • PG&E Corporation’s and the Utility’s historical financial information not being indicative of future financial performance as a result of the Chapter 11 Cases and the potential financial and other restructuring currently contemplated by the Proposed Plan;

  • the possibility that PG&E Corporation and the Utility will not be able to meet the conditions precedent to funding under the Backstop Commitment Letters and the Debt Commitment Letters, or that events or circumstances will occur that give rise to termination rights of the Backstop Parties or Commitment Parties under the Backstop Commitment Letters or Debt Commitment Letters, respectively, which could make raising funds to pay claims and exit Chapter 11 difficult or uneconomic;

  • the ability of PG&E Corporation and the Utility to access capital markets and other sources of debt and equity financing in a timely manner and on acceptable terms in order to exit Chapter 11 and to raise financing for operations and investment after emergence;

  • the impact of AB 1054 on potential losses in connection with future wildfires, including the CPUC’s implementation of the procedures for recovering such losses;

  • whether, in light of the CPUC’s July 8, 2019 final decision in the CHT OIR that excludes companies in Chapter 11 from accessing the CHT, the Utility will be able to obtain substantial recovery of costs related to the 2017 Northern California wildfires;

  • the impact of the 2018 Camp fire and the 2017 Northern California wildfires, including whether the Utility will be able to timely recover costs incurred in connection with the wildfires through rates; the timing and outcome of the remaining wildfire investigations and the extent to which the Utility will have liability associated with these fires; the timing and amount of insurance recoveries; and potential liabilities in connection with fines or penalties that could be imposed on the Utility if the CPUC or any other law enforcement agency were to bring an enforcement action, including a criminal proceeding, and determined that the Utility failed to comply with applicable laws and regulations (which actions could also adversely impact a timely emergence from Chapter 11);

  • the ability of PG&E Corporation and the Utility to finance costs, expenses and other possible losses with respect to claims related to the 2018 Camp fire and the 2017 Northern California wildfires, through securitization mechanisms or otherwise, which potential financings are not addressed by AB 1054 as it only applies to wildfires occurring after July 12, 2019;

  • the timing and outcome of any proceeding to recover 2015 Butte fire-related costs in excess of insurance through rates;

  • the risks and uncertainties associated with the 2019 Kincade fire;

  • the timing and outcome of future regulatory and legislative developments in connection with SB 901, including future wildfire reforms, inverse condemnation reform, and other wildfire mitigation measures or other reforms targeted at the Utility or its industry;

  • the outcome of the Utility’s CWSP that the Utility has developed in coordination with first responders, civic and community leaders, and customers, to help reduce wildfire threats and improve safety as a result of climate-driven wildfires and extreme weather, including the Utility’s ability to comply with the targets and metrics set forth in the 2020-2022 Wildfire Mitigation Plan; and the cost of the program and the timing and outcome of any proceeding to recover such cost through rates;

  • whether the Utility will be able to obtain full recovery of its significantly increased insurance premiums, and the timing of any such recovery;

  • whether the Utility can obtain wildfire insurance at a reasonable cost in the future, or at all, and whether insurance coverage is adequate for future losses or claims;

  • increased employee attrition as a result of the filing of the Chapter 11 Cases and the challenging political and operating environment facing the company;

  • the impact of the Utility’s implementation of its PSPS program, including the timing and outcome of the PSPS OII and order to show cause, and whether any fines or penalties or civil liability for damages will be imposed on the Utility as a result; the costs in connection with PSPS events, and the effects on PG&E Corporation’s and the Utility’s reputations caused by implementation of the PSPS program;

  • the timing and outcomes of the 2020 GRC, FERC TO18, TO19, and TO20 rate cases, 2018 and 2019 CEMA applications, WEMA application, future applications for FHPMA, FRMMA, and WMPMA, future cost of capital proceedings, and other ratemaking and regulatory proceedings;

  • the outcome of the probation and the monitorship imposed by the federal court after the Utility’s conviction in the federal criminal trial in 2017, the timing and outcomes of the debarment proceeding, potential reliability penalties or sanctions from the North American Electric Reliability Corporation, the SED’s unresolved enforcement matters relating to the Utility’s compliance with natural gas-related laws and regulations, and other investigations that have been or may be commenced relating to the Utility’s compliance with natural gas- and electric- related laws and regulations, and the ultimate amount of fines, penalties, and remedial costs that the Utility may incur in connection with the outcomes including the costs of complying with any additional conditions of probation imposed in connection with the Utility’s federal criminal proceeding, such as expenses associated with any material expansion of the Utility’s vegetation management program following the entry on January 16, 2020 of an order to show cause by the United States District Court for the Northern District of California, as well as the impact of additional conditions of probation on PG&E Corporation’s and the Utility’s ability to make distributions to shareholders;

  • the effects on PG&E Corporation’s and the Utility’s reputations caused by matters such as the CPUC’s investigations and enforcement proceedings;

  • the outcome of the Safety Culture OII proceeding, and future legislative or regulatory actions that may be taken, such as requiring the Utility to separate its electric and natural gas businesses, or restructure into separate entities, or undertake some other corporate restructuring, or transfer ownership of the Utility’s assets to municipalities or other public entities, or implement corporate governance changes;

  • whether the Utility can control its operating costs within the authorized levels of spending, and timely recover its costs through rates; whether the Utility can continue implementing a streamlined organizational structure and achieve project savings, the extent to which the Utility incurs unrecoverable costs that are higher than the forecasts of such costs; and changes in cost forecasts or the scope and timing of planned work resulting from changes in customer demand for electricity and natural gas or other reasons;

  • whether the Utility and its third-party vendors and contractors are able to protect the Utility’s operational networks and information technology systems from cyber- and physical attacks, or other internal or external hazards;

  • the timing and outcome in the Court of Appeals of the appeal of FERC’s order denying rehearing on September 19, 2019 of the complaint filed by the CPUC and certain other parties that the Utility provide an open and transparent planning process for its capital transmission projects that do not go through the CAISO’s Transmission Planning Process to allow for greater participation and input from interested parties; and the timing and outcome of FERC’s Order on Remand on July 18, 2019 granting the Utility a 50 basis point ROE incentive adder for continued participation in the CAISO;

  • the outcome of current and future self-reports, investigations, or other enforcement proceedings that could be commenced or notices of violation that could be issued relating to the Utility’s compliance with laws, rules, regulations, or orders applicable to its operations, including the construction, expansion, or replacement of its electric and gas facilities, electric grid reliability, inspection and maintenance practices, customer billing and privacy, physical and cybersecurity, environmental laws and regulations; and the outcome of existing and future SED notices of violations;

  • the impact of environmental remediation laws, regulations, and orders; the ultimate amount of costs incurred to discharge the Utility’s known and unknown remediation obligations; and the extent to which the Utility is able to recover environmental costs in rates or from other sources;

  • the impact of SB 100, which was signed into law on September 10, 2018, that increases the percentage from 50% to 60% of California’s electricity portfolio that must come from renewables by 2030; and establishes state policy that 100% of all retail electricity sales must come from renewable portfolio standard-eligible or carbon-free resources by 2045;

  • how the CPUC and the CARB implement state environmental laws relating to GHG, renewable energy targets, energy efficiency standards, DERs, EVs, and similar matters, including whether the Utility is able to continue recovering associated compliance costs, such as the cost of emission allowances and offsets under cap-and-trade regulations; and whether the Utility is able to timely recover its associated investment costs;

  • the impact of the California governor’s executive order issued on January 26, 2018, to implement a new target of five million zero-emission vehicles on the road in California by 2030;

  • the ultimate amount of unrecoverable environmental costs the Utility incurs associated with the Utility’s natural gas compressor station site located near Hinkley, California and the Utility’s fossil fuel-fired generation sites;

  • the impact of new legislation or NRC regulations, recommendations, policies, decisions, or orders relating to the nuclear industry, including operations, seismic design, security, safety, relicensing, the storage of spent nuclear fuel, decommissioning, cooling water intake, or other issues; the impact of potential actions, such as legislation, taken by state agencies that may affect the Utility’s ability to continue operating Diablo Canyon until its planned retirement;

  • the impact of wildfires, droughts, floods, or other weather-related conditions or events, climate change, natural disasters, acts of terrorism, war, vandalism (including cyber-attacks), downed power lines, and other events, that can cause unplanned outages, reduce generating output, disrupt the Utility’s service to customers, or damage or disrupt the facilities, operations, or information technology and systems owned by the Utility, its customers, or third parties on which the Utility relies, and the reparation and other costs that the Utility may incur in connection with such conditions or events; the impact of the adequacy of the Utility’s emergency preparedness; whether the Utility incurs liability to third parties for property damage or personal injury caused by such events; whether the Utility is subject to civil, criminal, or regulatory penalties in connection with such events; and whether the Utility’s insurance coverage is available for these types of claims and sufficient to cover the Utility’s liability;

  • whether the Utility’s climate change adaptation strategies are successful;

  • the breakdown or failure of equipment that can cause damages, including fires, and unplanned outages; and whether the Utility will be subject to investigations, penalties, and other costs in connection with such events;

  • the impact that reductions in Utility customer demand for electricity and natural gas, driven by customer departures to CCAs and DA providers, have on the Utility’s ability to make and recover its investments through rates and earn its authorized return on equity, and whether the Utility is successful in addressing the impact of growing distributed and renewable generation resources, and changing customer demand for its natural gas and electric services;

  • the supply and price of electricity, natural gas, and nuclear fuel; the extent to which the Utility can manage and respond to the volatility of energy commodity prices; the ability of the Utility and its counterparties to post or return collateral in connection with price risk management activities; and whether the Utility is able to recover timely its electric generation and energy commodity costs through rates, including its renewable energy procurement costs;

  • the amount and timing of charges reflecting probable liabilities for third-party claims; the extent to which costs incurred in connection with third-party claims or litigation can be recovered through insurance, rates, or from other third parties; and whether the Utility can continue to obtain adequate insurance coverage for future losses or claims, especially following a major event that causes widespread third-party losses;

  • the impact of the regulation of utilities and their holding companies, including how the CPUC interprets and enforces the financial and other conditions imposed on PG&E Corporation when it became the Utility’s holding company, and whether the uncertainty in connection with the 2018 Camp fire and the 2017 Northern California wildfires, the ultimate outcomes of the CPUC’s pending investigations, and other enforcement matters will impact the Utility’s ability to make distributions to PG&E Corporation;

  • the outcome of federal or state tax audits and the impact of any changes in federal or state tax laws, policies, regulations, or their interpretation;

  • changes in the regulatory and economic environment, including potential changes affecting renewable energy sources and associated tax credits, as a result of the current federal administration; and

  • the impact of changes in GAAP, standards, rules, or policies, including those related to regulatory accounting, and the impact of changes in their interpretation or application.

For more information about the significant risks that could affect the outcome of the forward-looking statements and PG&E Corporation’s and the Utility’s future financial condition, results of operations, liquidity, and cash flows, see Item 1A. Risk Factors below and a detailed discussion of these matters contained in Item 7. MD&A. PG&E Corporation and the Utility do not undertake any obligation to update forward-looking statements, whether in response to new information, future events, or otherwise.

PART I

Next: Item 1. BUSINESS